WO2020232983A1 - Algorithme graphique pour afficher des données de processus de compactage - Google Patents
Algorithme graphique pour afficher des données de processus de compactage Download PDFInfo
- Publication number
- WO2020232983A1 WO2020232983A1 PCT/CN2019/115797 CN2019115797W WO2020232983A1 WO 2020232983 A1 WO2020232983 A1 WO 2020232983A1 CN 2019115797 W CN2019115797 W CN 2019115797W WO 2020232983 A1 WO2020232983 A1 WO 2020232983A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- construction
- compaction
- data
- compaction process
- displaying
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/903—Querying
- G06F16/9038—Presentation of query results
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T13/00—Animation
- G06T13/80—2D [Two Dimensional] animation, e.g. using sprites
Definitions
- the invention relates to the field of Beidou digital construction, in particular to a graphic algorithm for displaying compaction process data.
- the owner, construction unit, and supervisor cannot know the construction progress and construction quality in the first time, and generally can only know one piece of construction result data, without knowing the process information.
- the present invention provides a graphic algorithm for displaying compaction process data.
- the present invention uses data processing and canvas drawing to obtain construction process animation, so that the owner, construction unit and supervisor can accurately grasp and monitor the construction quality in time , Engineering measurement and construction progress information, and through in-depth understanding of construction quality.
- the present invention provides a graphic algorithm for displaying compaction process data, including the following steps:
- Step (1) Provide a central controller, Beidou positioning module, and compaction sensor;
- Step (2) Collect the data of the compaction process through the compaction sensor
- Step (3) Filter the data of machine stop and shutdown during the compaction process, leaving normal construction data
- Step (4) Display construction machinery and its current construction location, current speed information, and display construction progress information over time by using the canvas.
- the output terminals of the Beidou positioning module and the compaction sensor are respectively connected to the data input terminal of the central controller, and an output terminal of the central controller communicates with the background through a communication module. Server connection.
- the graphic algorithm described above further includes a power supply module, and the input end of the power supply module is connected to the power supply device of the vibrating roller compactor.
- the construction result information is displayed from different quality index dimensions, including the number of compaction passes, compaction speed, and rolling temperature.
- the present invention provides a graphic algorithm for displaying compaction process data and has the following beneficial effects: the present invention obtains construction process animation through data processing and canvas drawing, and the owner, construction unit and supervisor can timely and accurately grasp and monitor the construction quality and engineering measurement. And construction progress information, and through in-depth understanding of the construction quality; the present invention realizes the animation drawing of the compaction process; the data drawn by the animation comes from the filtering process of the actual compaction data; different projects will have adapted machinery and The size of the entire engineering road design drawing; and through the operation of the interface, you can select which machine is the center of the field of view, the field of view follows a certain car, and can perform playback pause, acceleration, deceleration, and fast rewinding; the entire animation can be in the mouse Pan and zoom under the operation.
- Fig. 1 is a flow chart of a graphic algorithm for displaying compaction process data of the present invention.
- a graphic algorithm for displaying compaction process data includes the following steps:
- Step (1) Provide a central controller, Beidou positioning module, and compaction sensor;
- Step (2) Collect the data of the compaction process through the compaction sensor
- Step (3) Filter the data of machine stop and shutdown during the compaction process, leaving normal construction data
- Step (4) Display construction machinery and its current construction location, current speed information, and display construction progress information over time by using canvas; display construction result information from different quality index dimensions, including compaction passes, pressure Actual speed, rolling temperature.
- the traditional technology uses the construction progress per second per square meter to calculate the construction quality.
- This technology uses canvas technology to reproduce the on-site construction process, and more intuitively shows the construction quality and obtains the construction through animation. Quality process.
- the compaction data filtering process is used to filter the data of the machine stopped and shut down during the compaction process, leaving the normal construction data, and the construction site simulation is very accurate.
- the output terminals of the Beidou positioning module and the compaction sensor are respectively connected to the data input terminal of the central controller, and one output terminal of the central controller is connected to the background server through a communication module.
- a power supply module is further included, and the input end of the power supply module is connected with the power supply device of the vibrating roller compactor.
- the product is presented to the user in the mode of a website.
- Technical support personnel assist in the configuration of related projects, bids, and machinery information; use canvas to display construction machinery and its current construction location, current speed and other information, and display construction progress and other information over time.
- Display construction result information from different quality indicator dimensions (such as number of compaction passes, compaction speed, rolling temperature, etc.).
- Customers can also switch the project, bid section, date, etc. to view the required construction information.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Entrepreneurship & Innovation (AREA)
- Databases & Information Systems (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Computational Linguistics (AREA)
- Economics (AREA)
- General Engineering & Computer Science (AREA)
- Road Paving Machines (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
L'invention concerne un algorithme graphique destiné à afficher des données de processus de compactage, comprenant les étapes suivantes : étape (1), fourniture d'un contrôleur central, d'un module de positionnement BeiDou et d'un capteur de compactage ; étape (2), acquisition, au moyen du capteur de compactage, de données générées lors d'un processus de compactage ; étape (3), réalisation d'un filtrage sur des données associées à la pause, l'arrêt et le démarrage d'un engin lors du processus de compactage, et conservation de données de construction normales ; et étape (4), utilisation d'une toile pour afficher un engin de chantier et une position de construction actuelle et des informations de vitesse actuelle de celui-ci, et pour afficher des informations de progression de construction au fil du temps. La présente invention utilise des techniques de traitement de données et de dessin de toile pour créer une animation d'un processus de construction, de telle sorte qu'un propriétaire, une unité de construction et un superviseur peuvent surveiller de manière opportune et précise des informations concernant la qualité de construction, la mesure d'ingénierie et la progression de construction de façon à déterminer la qualité de construction.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910417146.9A CN110111405A (zh) | 2019-05-20 | 2019-05-20 | 一种展示压实过程数据的图形算法 |
CN201910417146.9 | 2019-05-20 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2020232983A1 true WO2020232983A1 (fr) | 2020-11-26 |
Family
ID=67490995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2019/115797 WO2020232983A1 (fr) | 2019-05-20 | 2019-11-05 | Algorithme graphique pour afficher des données de processus de compactage |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN110111405A (fr) |
WO (1) | WO2020232983A1 (fr) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110111405A (zh) * | 2019-05-20 | 2019-08-09 | 南京天辰礼达电子科技有限公司 | 一种展示压实过程数据的图形算法 |
CN112837277A (zh) * | 2021-01-22 | 2021-05-25 | 安徽省交通控股集团有限公司 | 基于地理数据的碾压遍数工艺的渲染方法、存储介质和电子装置 |
CN113073518A (zh) * | 2021-04-02 | 2021-07-06 | 重庆酷滴科技有限公司 | 高速路面施工智能监控系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109493006A (zh) * | 2018-11-15 | 2019-03-19 | 中铁第六勘察设计院集团有限公司 | 基于bim平台对项目进度对比展示的方法 |
CN109636332A (zh) * | 2018-12-06 | 2019-04-16 | 南京天辰礼达电子科技有限公司 | 一种路基压实数字化施工系统 |
CN110111405A (zh) * | 2019-05-20 | 2019-08-09 | 南京天辰礼达电子科技有限公司 | 一种展示压实过程数据的图形算法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102008008730B4 (de) * | 2008-02-11 | 2010-07-22 | Bookrix Gmbh & Co. Kg | Vorrichtung und Verfahren zur Animation eines grafischen digitalen Dokumentes |
CN208815376U (zh) * | 2018-09-04 | 2019-05-03 | 中国水利水电第七工程局有限公司 | 一种沥青路面压实度检测仪 |
CN109688206A (zh) * | 2018-12-11 | 2019-04-26 | 南京天辰礼达电子科技有限公司 | 一种路面压实数字化施工系统 |
-
2019
- 2019-05-20 CN CN201910417146.9A patent/CN110111405A/zh active Pending
- 2019-11-05 WO PCT/CN2019/115797 patent/WO2020232983A1/fr active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109493006A (zh) * | 2018-11-15 | 2019-03-19 | 中铁第六勘察设计院集团有限公司 | 基于bim平台对项目进度对比展示的方法 |
CN109636332A (zh) * | 2018-12-06 | 2019-04-16 | 南京天辰礼达电子科技有限公司 | 一种路基压实数字化施工系统 |
CN110111405A (zh) * | 2019-05-20 | 2019-08-09 | 南京天辰礼达电子科技有限公司 | 一种展示压实过程数据的图形算法 |
Also Published As
Publication number | Publication date |
---|---|
CN110111405A (zh) | 2019-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020232983A1 (fr) | Algorithme graphique pour afficher des données de processus de compactage | |
DK178624B1 (en) | Fremgangsmåde og indretning til overvågning af en drift af et systemaktiv | |
CN109638959B (zh) | 基于ar和深度学习的电力设备遥信功能调试方法及系统 | |
US20140260673A1 (en) | Remote flow rate measuring | |
CN106681701A (zh) | 一种任务的显示方法和装置 | |
CN107246959A (zh) | 一种基于无线传感器的设备故障的诊断系统及方法 | |
CN103310377A (zh) | 用于监测系统资产的运行的方法和设备 | |
CN107870856B (zh) | 视频播放启动时长测试方法、装置及电子终端 | |
CA2894853A1 (fr) | Systeme et procede d'essai | |
TW201811266A (zh) | 電子裝置與其提供膚質檢測資訊的方法 | |
TW201413443A (zh) | 測試狀態呈現及異常索引系統及方法 | |
US10877636B2 (en) | Non-linear qualitative visualization | |
CN103946887A (zh) | 注视位置估计系统、注视位置估计系统的控制方法、注视位置估计装置、注视位置估计装置的控制方法、程序以及信息存储介质 | |
JP7186833B2 (ja) | 情報処理装置、情報処理方法及びコンピュータプログラム | |
CN107478205A (zh) | 航空发动机高精度装配质量检测机器人系统 | |
WO2020114179A1 (fr) | Système numérique de construction de compactage de fondation | |
WO2020119333A1 (fr) | Système de construction numérisée pour compactage de chaussée | |
JP4813071B2 (ja) | マクロ画像表示システム及びマクロ画像表示方法 | |
CN102314387A (zh) | 触摸屏精确度的测量方法 | |
JP6514401B1 (ja) | 情報処理装置、学習装置、情報処理システム、情報処理方法及びコンピュータプログラム | |
CN106770308A (zh) | 一种流水线质检系统 | |
JP2014055798A5 (ja) | 電力管理システムおよび方法 | |
CN211063632U (zh) | 一种应用3d技术的锅炉系统实时监控系统 | |
CN115861535A (zh) | 环境监控信息展示方法、装置、电子设备及存储介质 | |
CN212933894U (zh) | 一种可远程操控的不可压缩流体恒定流动量定律实验系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19929363 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 19929363 Country of ref document: EP Kind code of ref document: A1 |