WO2020232983A1 - Graphics algorithm for displaying compaction process data - Google Patents

Graphics algorithm for displaying compaction process data Download PDF

Info

Publication number
WO2020232983A1
WO2020232983A1 PCT/CN2019/115797 CN2019115797W WO2020232983A1 WO 2020232983 A1 WO2020232983 A1 WO 2020232983A1 CN 2019115797 W CN2019115797 W CN 2019115797W WO 2020232983 A1 WO2020232983 A1 WO 2020232983A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction
compaction
data
compaction process
displaying
Prior art date
Application number
PCT/CN2019/115797
Other languages
French (fr)
Chinese (zh)
Inventor
胡俊
张远卓
孙文明
吴涛
郑西楠
Original Assignee
南京天辰礼达电子科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 南京天辰礼达电子科技有限公司 filed Critical 南京天辰礼达电子科技有限公司
Publication of WO2020232983A1 publication Critical patent/WO2020232983A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • G06F16/9038Presentation of query results
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T13/00Animation
    • G06T13/802D [Two Dimensional] animation, e.g. using sprites

Definitions

  • the invention relates to the field of Beidou digital construction, in particular to a graphic algorithm for displaying compaction process data.
  • the owner, construction unit, and supervisor cannot know the construction progress and construction quality in the first time, and generally can only know one piece of construction result data, without knowing the process information.
  • the present invention provides a graphic algorithm for displaying compaction process data.
  • the present invention uses data processing and canvas drawing to obtain construction process animation, so that the owner, construction unit and supervisor can accurately grasp and monitor the construction quality in time , Engineering measurement and construction progress information, and through in-depth understanding of construction quality.
  • the present invention provides a graphic algorithm for displaying compaction process data, including the following steps:
  • Step (1) Provide a central controller, Beidou positioning module, and compaction sensor;
  • Step (2) Collect the data of the compaction process through the compaction sensor
  • Step (3) Filter the data of machine stop and shutdown during the compaction process, leaving normal construction data
  • Step (4) Display construction machinery and its current construction location, current speed information, and display construction progress information over time by using the canvas.
  • the output terminals of the Beidou positioning module and the compaction sensor are respectively connected to the data input terminal of the central controller, and an output terminal of the central controller communicates with the background through a communication module. Server connection.
  • the graphic algorithm described above further includes a power supply module, and the input end of the power supply module is connected to the power supply device of the vibrating roller compactor.
  • the construction result information is displayed from different quality index dimensions, including the number of compaction passes, compaction speed, and rolling temperature.
  • the present invention provides a graphic algorithm for displaying compaction process data and has the following beneficial effects: the present invention obtains construction process animation through data processing and canvas drawing, and the owner, construction unit and supervisor can timely and accurately grasp and monitor the construction quality and engineering measurement. And construction progress information, and through in-depth understanding of the construction quality; the present invention realizes the animation drawing of the compaction process; the data drawn by the animation comes from the filtering process of the actual compaction data; different projects will have adapted machinery and The size of the entire engineering road design drawing; and through the operation of the interface, you can select which machine is the center of the field of view, the field of view follows a certain car, and can perform playback pause, acceleration, deceleration, and fast rewinding; the entire animation can be in the mouse Pan and zoom under the operation.
  • Fig. 1 is a flow chart of a graphic algorithm for displaying compaction process data of the present invention.
  • a graphic algorithm for displaying compaction process data includes the following steps:
  • Step (1) Provide a central controller, Beidou positioning module, and compaction sensor;
  • Step (2) Collect the data of the compaction process through the compaction sensor
  • Step (3) Filter the data of machine stop and shutdown during the compaction process, leaving normal construction data
  • Step (4) Display construction machinery and its current construction location, current speed information, and display construction progress information over time by using canvas; display construction result information from different quality index dimensions, including compaction passes, pressure Actual speed, rolling temperature.
  • the traditional technology uses the construction progress per second per square meter to calculate the construction quality.
  • This technology uses canvas technology to reproduce the on-site construction process, and more intuitively shows the construction quality and obtains the construction through animation. Quality process.
  • the compaction data filtering process is used to filter the data of the machine stopped and shut down during the compaction process, leaving the normal construction data, and the construction site simulation is very accurate.
  • the output terminals of the Beidou positioning module and the compaction sensor are respectively connected to the data input terminal of the central controller, and one output terminal of the central controller is connected to the background server through a communication module.
  • a power supply module is further included, and the input end of the power supply module is connected with the power supply device of the vibrating roller compactor.
  • the product is presented to the user in the mode of a website.
  • Technical support personnel assist in the configuration of related projects, bids, and machinery information; use canvas to display construction machinery and its current construction location, current speed and other information, and display construction progress and other information over time.
  • Display construction result information from different quality indicator dimensions (such as number of compaction passes, compaction speed, rolling temperature, etc.).
  • Customers can also switch the project, bid section, date, etc. to view the required construction information.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Databases & Information Systems (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Computational Linguistics (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Machines (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Provided is a graphics algorithm for displaying compaction process data, comprising the following steps: step (1), providing a central controller, a BeiDou positioning module and a compaction sensor; step (2), acquiring, by means of the compaction sensor, data generated in a compaction process; step (3), performing filtering on data associated with pause, shutdown and startup of a machine in the compaction process, and retaining normal construction data; and step (4), using a canvas to display a construction machine and a current construction position and current speed information thereof, and to display construction progress information over time. The present invention employs data processing and canvas drawing techniques to create an animation of a construction process, such that a proprietor, a construction unit and a supervisor can timely and accurately monitor information about construction quality, engineering measurement and construction progress so as to ascertain the construction quality.

Description

一种展示压实过程数据的图形算法A graphic algorithm for displaying compaction process data 技术领域Technical field
本发明涉及北斗数字化施工领域,具体涉及到一种展示压实过程数据的图形算法。The invention relates to the field of Beidou digital construction, in particular to a graphic algorithm for displaying compaction process data.
背景技术Background technique
近年来,基础设计建设发展迅速,国内施工领域对施工质量、精度要求越来越高,同时提倡数字化施工和信息化施工。In recent years, basic design and construction have developed rapidly, and the domestic construction field has increasingly higher requirements for construction quality and accuracy. At the same time, digital construction and information construction are advocated.
目前,业主,施工单位和监理无法第一时间知道施工进度和施工质量,一般只能知道一个施工结果数据,对于过程信息无从知晓。At present, the owner, construction unit, and supervisor cannot know the construction progress and construction quality in the first time, and generally can only know one piece of construction result data, without knowing the process information.
发明内容Summary of the invention
为了解决上述不足的缺陷,本发明提供了一种展示压实过程数据的图形算法,本发明通过数据处理和canvas绘图得到的施工过程动画,业主、施工单位和监理能及时准确地掌握监控施工质量,工程计量和施工进度信息等信息,并通过深入了解施工质量情况。In order to solve the above shortcomings, the present invention provides a graphic algorithm for displaying compaction process data. The present invention uses data processing and canvas drawing to obtain construction process animation, so that the owner, construction unit and supervisor can accurately grasp and monitor the construction quality in time , Engineering measurement and construction progress information, and through in-depth understanding of construction quality.
本发明提供了一种展示压实过程数据的图形算法,包括以下步骤:The present invention provides a graphic algorithm for displaying compaction process data, including the following steps:
步骤(1):提供一中央控制器、北斗定位模块、压实传感器;Step (1): Provide a central controller, Beidou positioning module, and compaction sensor;
步骤(2):通过压实传感器采集压实过程的数据;Step (2): Collect the data of the compaction process through the compaction sensor;
步骤(3):将压实过程中机械停下和关机开机的数据进行过滤,留下正常施工数据;Step (3): Filter the data of machine stop and shutdown during the compaction process, leaving normal construction data;
步骤(4):通过使用canvas画布展示施工机械及其当前施工位置、当前速度信息,以及随着时间显示施工进度信息。Step (4): Display construction machinery and its current construction location, current speed information, and display construction progress information over time by using the canvas.
上述的图形算法,其中,所述北斗定位模块和所述压实传感器的输出端分别与所述中央控制器的数据输入端连接,所述中央控制器的一个输出端通 过通讯模块与所述后台服务器连接。In the above-mentioned graphics algorithm, the output terminals of the Beidou positioning module and the compaction sensor are respectively connected to the data input terminal of the central controller, and an output terminal of the central controller communicates with the background through a communication module. Server connection.
上述的图形算法,其中,还包括电源模块,所述电源模块的输入端与振动碾压机的供电设备连接。The graphic algorithm described above further includes a power supply module, and the input end of the power supply module is connected to the power supply device of the vibrating roller compactor.
上述的图形算法,其中,从不同的质量指标维度展示施工结果信息,其中包括压实遍数、压实速度、碾压温度。In the above-mentioned graphic algorithm, the construction result information is displayed from different quality index dimensions, including the number of compaction passes, compaction speed, and rolling temperature.
本发明提供了一种展示压实过程数据的图形算法具有以下有益效果:本发明通过数据处理和canvas绘图得到的施工过程动画,业主、施工单位和监理能及时准确地掌握监控施工质量,工程计量和施工进度信息等信息,并通过深入了解施工质量情况;本发明实现了压实过程动画绘制;动画绘制的数据来源于对实际压实数据的过滤处理;不同的工程会有适配的机械和整个工程道路设计图大小;以及通过界面的操作可以选择以哪一辆机械为视野中心,视野跟随某一辆车,可以进行播放暂停,加速减速和快放回退等功能;整个动画可以在鼠标的操作下平移缩放。The present invention provides a graphic algorithm for displaying compaction process data and has the following beneficial effects: the present invention obtains construction process animation through data processing and canvas drawing, and the owner, construction unit and supervisor can timely and accurately grasp and monitor the construction quality and engineering measurement. And construction progress information, and through in-depth understanding of the construction quality; the present invention realizes the animation drawing of the compaction process; the data drawn by the animation comes from the filtering process of the actual compaction data; different projects will have adapted machinery and The size of the entire engineering road design drawing; and through the operation of the interface, you can select which machine is the center of the field of view, the field of view follows a certain car, and can perform playback pause, acceleration, deceleration, and fast rewinding; the entire animation can be in the mouse Pan and zoom under the operation.
附图说明Description of the drawings
通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明及其特征、外形和优点将会变得更明显。在全部附图中相同的标记指示相同的部分。并未刻意按照比例绘制附图,重点在于示出本发明的主旨。By reading the detailed description of the non-limiting embodiments with reference to the following drawings, the present invention and its features, appearance and advantages will become more apparent. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale deliberately, and the focus is on showing the gist of the present invention.
图1为本发明一种展示压实过程数据的图形算法的流程示意图。Fig. 1 is a flow chart of a graphic algorithm for displaying compaction process data of the present invention.
具体实施方式Detailed ways
在下文的描述中,给出了大量具体的细节以便提供对本发明更为彻底的理解。然而,对于本领域技术人员而言显而易见的是,本发明可以无需一个或多个这些细节而得以实施。在其他的例子中,为了避免与本发明发生混淆,对于本领域公知的一些技术特征未进行描述。In the following description, a lot of specific details are given in order to provide a more thorough understanding of the present invention. However, it is obvious to those skilled in the art that the present invention can be implemented without one or more of these details. In other examples, in order to avoid confusion with the present invention, some technical features known in the art are not described.
为了彻底理解本发明,将在下列的描述中提出详细的步骤以及详细的结构,以便阐释本发明的技术方案。本发明的较佳实施例详细描述如下,然而除了这些详细描述外,本发明还可以具有其他实施方式。In order to thoroughly understand the present invention, detailed steps and detailed structures will be presented in the following description to explain the technical solution of the present invention. The preferred embodiments of the present invention are described in detail as follows. However, in addition to these detailed descriptions, the present invention may also have other embodiments.
参照图1所示,一种展示压实过程数据的图形算法,包括以下步骤:Referring to Figure 1, a graphic algorithm for displaying compaction process data includes the following steps:
步骤(1):提供一中央控制器、北斗定位模块、压实传感器;Step (1): Provide a central controller, Beidou positioning module, and compaction sensor;
步骤(2):通过压实传感器采集压实过程的数据;Step (2): Collect the data of the compaction process through the compaction sensor;
步骤(3):将压实过程中机械停下和关机开机的数据进行过滤,留下正常施工数据;Step (3): Filter the data of machine stop and shutdown during the compaction process, leaving normal construction data;
步骤(4):通过使用canvas画布展示施工机械及其当前施工位置、当前速度信息,以及随着时间显示施工进度信息;从不同的质量指标维度展示施工结果信息,其中包括压实遍数、压实速度、碾压温度。在本发明中,传统的技术以每秒每平米的施工进度进行统计得出施工质量情况,本技术采用canvas画布技术可重现现场施工过程,通过动画更直观的显示出施工质量以及得到该施工质量的过程。采用压实数据过滤处理,将压实过程中机械停下和关机开机的数据进行过滤,留下正常施工数据,对施工现场模拟得非常精准。Step (4): Display construction machinery and its current construction location, current speed information, and display construction progress information over time by using canvas; display construction result information from different quality index dimensions, including compaction passes, pressure Actual speed, rolling temperature. In the present invention, the traditional technology uses the construction progress per second per square meter to calculate the construction quality. This technology uses canvas technology to reproduce the on-site construction process, and more intuitively shows the construction quality and obtains the construction through animation. Quality process. The compaction data filtering process is used to filter the data of the machine stopped and shut down during the compaction process, leaving the normal construction data, and the construction site simulation is very accurate.
在本发明中,北斗定位模块和所述压实传感器的输出端分别与所述中央控制器的数据输入端连接,所述中央控制器的一个输出端通过通讯模块与所述后台服务器连接。In the present invention, the output terminals of the Beidou positioning module and the compaction sensor are respectively connected to the data input terminal of the central controller, and one output terminal of the central controller is connected to the background server through a communication module.
在本发明中,还包括电源模块,所述电源模块的输入端与振动碾压机的供电设备连接。In the present invention, a power supply module is further included, and the input end of the power supply module is connected with the power supply device of the vibrating roller compactor.
在本发明中,产品以网站的模式呈现给用户。技术支持人员协助配置相关的工程,标段,机械信息;使用canvas画布展示了施工机械及其当前施工位置、当前速度等信息,随着时间显示施工进度等信息。从不同的质量指标维度(如压实遍数、压实速度、碾压温度等)展示施工结果信息。客户也可切换工程,标段,日期等查看所需的施工信息。In the present invention, the product is presented to the user in the mode of a website. Technical support personnel assist in the configuration of related projects, bids, and machinery information; use canvas to display construction machinery and its current construction location, current speed and other information, and display construction progress and other information over time. Display construction result information from different quality indicator dimensions (such as number of compaction passes, compaction speed, rolling temperature, etc.). Customers can also switch the project, bid section, date, etc. to view the required construction information.
以上对本发明的较佳实施例进行了描述。需要理解的是,本发明并不局限于上述特定实施方式,其中未尽详细描述的设备和结构应该理解为用本领域中的普通方式予以实施;任何熟悉本领域的技术人员,在不脱离本发明技术方案范围情况下,都可利用上述揭示的方法和技术内容对本发明技术方案做出许多可能的变动和修饰,或修改为等同变化的等效实施例,这并不影响本发明的实质内容。因此,凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本发明技术方案保护的范围内。The preferred embodiments of the present invention have been described above. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the equipment and structures not described in detail should be understood as being implemented in ordinary ways in the art; any person skilled in the art will not depart from this In the case of the scope of the technical solution of the invention, the method and technical content disclosed above can be used to make many possible changes and modifications to the technical solution of the invention, or be modified into equivalent embodiments with equivalent changes. This does not affect the essence of the invention. . Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the technical solutions of the present invention still fall within the protection scope of the technical solutions of the present invention.

Claims (4)

  1. 一种展示压实过程数据的图形算法,其特征在于,包括以下步骤:A graphic algorithm for displaying compaction process data is characterized by including the following steps:
    步骤(1):提供一中央控制器、北斗定位模块、压实传感器;Step (1): Provide a central controller, Beidou positioning module, and compaction sensor;
    步骤(2):通过压实传感器采集压实过程的数据;Step (2): Collect the data of the compaction process through the compaction sensor;
    步骤(3):将压实过程中机械停下和关机开机的数据进行过滤,留下正常施工数据;Step (3): Filter the data of machine stop and shutdown during the compaction process, leaving normal construction data;
    步骤(4):通过使用canvas画布展示施工机械及其当前施工位置、当前速度信息,以及随着时间显示施工进度信息。Step (4): Display construction machinery and its current construction location, current speed information, and display construction progress information over time by using the canvas.
  2. 如权利要求1所述的一种展示压实过程数据的图形算法,其特征在于,所述北斗定位模块和所述压实传感器的输出端分别与所述中央控制器的数据输入端连接,所述中央控制器的一个输出端通过通讯模块与所述后台服务器连接。The graphic algorithm for displaying compaction process data according to claim 1, wherein the output terminals of the Beidou positioning module and the compaction sensor are respectively connected to the data input terminals of the central controller, and An output terminal of the central controller is connected with the background server through a communication module.
  3. 如权利要求2所述的一种展示压实过程数据的图形算法,其特征在于,还包括电源模块,所述电源模块的输入端与振动碾压机的供电设备连接。The graphic algorithm for displaying compaction process data according to claim 2, further comprising a power module, the input end of the power module is connected to the power supply device of the vibrating roller compactor.
  4. 如权利要求3所述的一种展示压实过程数据的图形算法,其特征在于,从不同的质量指标维度展示施工结果信息,其中包括压实遍数、压实速度、碾压温度。A graphic algorithm for displaying compaction process data according to claim 3, characterized in that the construction result information is displayed from different quality index dimensions, including compaction passes, compaction speed, and rolling temperature.
PCT/CN2019/115797 2019-05-20 2019-11-05 Graphics algorithm for displaying compaction process data WO2020232983A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910417146.9A CN110111405A (en) 2019-05-20 2019-05-20 A kind of pattern algorithm showing compacting process data
CN201910417146.9 2019-05-20

Publications (1)

Publication Number Publication Date
WO2020232983A1 true WO2020232983A1 (en) 2020-11-26

Family

ID=67490995

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/115797 WO2020232983A1 (en) 2019-05-20 2019-11-05 Graphics algorithm for displaying compaction process data

Country Status (2)

Country Link
CN (1) CN110111405A (en)
WO (1) WO2020232983A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110111405A (en) * 2019-05-20 2019-08-09 南京天辰礼达电子科技有限公司 A kind of pattern algorithm showing compacting process data
CN112837277A (en) * 2021-01-22 2021-05-25 安徽省交通控股集团有限公司 Rendering method, storage medium and electronic device of rolling pass process based on geographic data
CN113073518A (en) * 2021-04-02 2021-07-06 重庆酷滴科技有限公司 Intelligent monitoring system for high-speed pavement construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109493006A (en) * 2018-11-15 2019-03-19 中铁第六勘察设计院集团有限公司 The method that project process comparison is shown based on BIM platform
CN109636332A (en) * 2018-12-06 2019-04-16 南京天辰礼达电子科技有限公司 A kind of subgrade compaction digitlization construction system
CN110111405A (en) * 2019-05-20 2019-08-09 南京天辰礼达电子科技有限公司 A kind of pattern algorithm showing compacting process data

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008008730B4 (en) * 2008-02-11 2010-07-22 Bookrix Gmbh & Co. Kg Apparatus and method for animating a graphic digital document
CN208815376U (en) * 2018-09-04 2019-05-03 中国水利水电第七工程局有限公司 A kind of Asphalt Pavement Compaction Degree Index detector
CN109688206A (en) * 2018-12-11 2019-04-26 南京天辰礼达电子科技有限公司 A kind of pavement compaction digitlization construction system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109493006A (en) * 2018-11-15 2019-03-19 中铁第六勘察设计院集团有限公司 The method that project process comparison is shown based on BIM platform
CN109636332A (en) * 2018-12-06 2019-04-16 南京天辰礼达电子科技有限公司 A kind of subgrade compaction digitlization construction system
CN110111405A (en) * 2019-05-20 2019-08-09 南京天辰礼达电子科技有限公司 A kind of pattern algorithm showing compacting process data

Also Published As

Publication number Publication date
CN110111405A (en) 2019-08-09

Similar Documents

Publication Publication Date Title
WO2020232983A1 (en) Graphics algorithm for displaying compaction process data
CN204044127U (en) Simple air mass monitoring system
DK178624B1 (en) Fremgangsmåde og indretning til overvågning af en drift af et systemaktiv
CN106681701A (en) Task display method and device
CN107246959A (en) The diagnostic system and method for a kind of equipment fault based on wireless senser
CN103310377A (en) Methods and apparatus for monitoring operation of a system asset
CN107870856B (en) Video playing starting time testing method and device and electronic terminal
TW201413443A (en) System and method for displaying test status and marking abnormalities
CN107576503A (en) Aero-engine high accuracy assembly quality detector device people's system
CN115314637A (en) Processing system and processing method for construction site panoramic image and electronic equipment
CN103946887A (en) Gaze position estimation system, control method for gaze position estimation system, gaze position estimation device, control method for gaze position estimation device, program, and information storage medium
EP3098570A1 (en) Non-linear qualitative visualization
CN111476467A (en) Color aluminum production equipment monitoring and management system
JP7186833B2 (en) Information processing device, information processing method, and computer program
WO2020114179A1 (en) Digital construction system for subgrade compaction
WO2020119333A1 (en) Digitalized construction system for pavement compaction
JP4813071B2 (en) Macro image display system and macro image display method
CN211063632U (en) Boiler system real-time monitoring system applying 3D technology
CN114529677A (en) Scene temperature cloud chart generation method and device, storage medium and electronic equipment
CN113706072A (en) Method for realizing fine management of production materials by using 5G technology
JP2014055798A5 (en) Power management system and method
JP2007164800A (en) Data display apparatus
JP2020080163A (en) Information processor, information processing method, and computer program
TWI692249B (en) Monitoring terminal and monitoring method
CN104268677A (en) Energy consumption benchmarking computerization handheld terminal system and benchmarking computerization method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19929363

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19929363

Country of ref document: EP

Kind code of ref document: A1