WO2020194697A1 - Dispositif d'alimentation électrique auxiliaire de bâtiment de gare - Google Patents

Dispositif d'alimentation électrique auxiliaire de bâtiment de gare Download PDF

Info

Publication number
WO2020194697A1
WO2020194697A1 PCT/JP2019/013750 JP2019013750W WO2020194697A1 WO 2020194697 A1 WO2020194697 A1 WO 2020194697A1 JP 2019013750 W JP2019013750 W JP 2019013750W WO 2020194697 A1 WO2020194697 A1 WO 2020194697A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
load
station building
threshold value
unit
Prior art date
Application number
PCT/JP2019/013750
Other languages
English (en)
Japanese (ja)
Inventor
俊明 竹岡
田中 毅
修司 石倉
松本 真一
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2019/013750 priority Critical patent/WO2020194697A1/fr
Priority to DE112019007098.3T priority patent/DE112019007098T5/de
Priority to JP2021508626A priority patent/JP6991391B2/ja
Publication of WO2020194697A1 publication Critical patent/WO2020194697A1/fr

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M3/00Feeding power to supply lines in contact with collector on vehicles; Arrangements for consuming regenerative power
    • B60M3/06Arrangements for consuming regenerative power

Definitions

  • the present invention relates to a station building auxiliary power supply device that supplies electric power to various loads in the station building.
  • the power required to operate the load in the station building may temporarily increase rapidly.
  • a plurality of platform doors and the like have been newly installed as a load in the station building.
  • the power consumption of platform doors temporarily increases rapidly because multiple motors operate at the same time during operation.
  • the electric power required for the operation of the load in the station building is, for example, to convert the high-voltage AC power supplied from the AC system into low-pressure AC power and supply the electric power to each load in the station building. If the capacity of the transformer is exceeded, it will be temporarily impossible to supply sufficient power to the load inside the station building. Therefore, it is necessary to make up for the temporary shortage of power.
  • Patent Document 1 in order to utilize the surplus regenerative power generated when the regenerative power exceeds the power running power, the surplus regenerative power is in a state where the power for operating the load in the station building is temporarily insufficient. Without it, there is a risk that the shortage of power cannot be supplemented.
  • the present invention has been made to solve the above-mentioned problems, and provides a station building auxiliary power supply device capable of supplementing the supply of electric power to a load in a station building regardless of the presence or absence of surplus regenerative electric power.
  • the purpose is to do.
  • the station building auxiliary power supply device converts the first electric power supplied from the overhead wire into the second electric power that can be used by the load provided in the station building. It includes a unit and an operation start determination unit that determines whether or not to operate the first power conversion unit based on the load state information indicating the operation state of the load.
  • the first electric power supplied from the overhead wire is converted into the second electric power that can be used by the load provided in the station building based on the load state information indicating the operating state of the load. Since it is determined whether or not to operate the first power conversion unit to be converted, it is possible to supplement the supply of power to the load in the station building regardless of the presence or absence of surplus regenerative power.
  • the station building auxiliary power supply device 2 provided in the station building 1 includes a control device 3, an inverter (first power conversion unit) 4, a voltage sensor 5, and the like.
  • the station building auxiliary power supply device 2 converts the first electric power (for example, DC1500V) supplied from the overhead line 6 and uses the second electric power used by various loads 7 (7-1 to 7-n) in the station building 1. Is configured to be able to generate.
  • the inverter 4 of the station building auxiliary power supply device 2 does not always perform the conversion operation of converting the first electric power into the second electric power, but converts the regenerated electric power generated by each electric vehicle 8 in the railway system into an electric vehicle.
  • the load 7 is also supplied with the electric power (for example, AC210V) obtained by converting the electric power (for example, AC6600V) generated from the AC system 200 generated in the substation 100 by the transformer 9 and is also supplied from the transformer 9. Use the supplied power.
  • the load 7 is, for example, various electric facilities such as a lighting device, an air conditioner, a display device, an elevator, an escalator, and a platform door.
  • the overhead wire 6 is connected to the substation 100, and supplies electric power of, for example, DC 1500V to the electric car 8 or the like.
  • a power detection unit 10 for detecting load power indicating the total power consumed when various loads 7 operate is provided in the station building 1, a power detection unit 10 for detecting load power indicating the total power consumed when various loads 7 operate is provided. In the present embodiment, the power detection unit 10 detects, for example, the sum of the power consumed by all the loads 7 provided in the station building 1 as the load power in the power meter.
  • the control device 3 of the station building auxiliary power supply device 2 is based on the overhead line voltage whether or not it is necessary to receive the regenerative power generated by the electric vehicle 8 in operation via the overhead line 6 and convert it into the power supplied to the load 7. If it is determined that it is necessary, the inverter 4 is controlled to perform the conversion operation.
  • the inverter 4 is configured to include a switching element, and by turning on / off each switching element according to an instruction from the control device 3, a second power supplied from the overhead wire 6 is supplied to the load 7. Convert to power.
  • the voltage sensor 5 measures the overhead wire voltage.
  • FIG. 2 is a diagram showing an example of the configuration of the control device 3 of the station building auxiliary power supply device 2 according to the first embodiment of the present invention.
  • the control device 3 includes an interface unit 31, an operation start determination unit 32, a storage unit 33, a voltage command value calculation unit 34, and a PWM signal generation unit 35.
  • the interface unit 31 periodically (for example, every 20 ms) acquires the overhead wire voltage measurement value (hereinafter referred to as “overhead wire voltage”) output from the voltage sensor 5, and obtains the overhead wire voltage to A / D (Analog to). Digital) Convert. Further, the interface unit 31 acquires load state information indicating the operating state of the load 7. In the present embodiment, the interface unit 31 indicates the load power, which is the total power consumed when the various loads 7 output from the power detection unit 10, for example, are operated as the load state information. Information is acquired periodically (for example, every 20 ms), and the power value is A / D (Analog to Digital) converted.
  • the operation start determination unit 32 Based on the load state information acquired by the interface unit 31, the operation start determination unit 32 converts the DC power, which is the first power supplied from the overhead wire 6, into the AC power, which is the second power that can be used by the load 7. In order to perform conversion, it is determined whether or not to cause the inverter 4 to perform a conversion operation. Further, the operation start determination unit 32 determines whether or not to cause the inverter 4 to perform the conversion operation based on the overhead wire voltage acquired by the interface unit 31. When, for example, the operation start determination unit 32 decides to cause the inverter 4 to perform the conversion operation, the operation start determination unit 32 generates a signal indicating that the inverter 4 performs the conversion operation and outputs the signal to the voltage command value calculation unit 34.
  • the storage unit 33 stores, for example, a first threshold value and a second threshold value used by the operation start determination unit 32 for determining whether or not the inverter 4 is to perform a power conversion operation.
  • the first threshold value is used for comparison with the load power indicated by the load power information output from the power detection unit 10.
  • the first threshold value is set in advance based on, for example, the capacity of the transformer 9 for converting high-voltage AC power supplied from the AC system into low-voltage AC power and supplying power to various loads 7. ing.
  • the first threshold value is set to a value at least equal to or less than the capacity of the transformer 9.
  • the second threshold value is used for comparison with the overhead line voltage output from the voltage sensor 5.
  • the second threshold is that when the other electric vehicle 8 as a load for consuming the regenerative power returned from the electric vehicle 8 to the overhead wire 6 is small or absent, the surplus regenerative power becomes various in the station building 1.
  • This is a reference threshold for determining whether or not to cause the inverter 4 to perform a conversion operation in order to supply the load 7.
  • the voltage command value calculation unit 34 calculates a voltage command value according to the signal, for example, when a signal indicating that the inverter 4 is to perform the conversion operation is input from the operation start determination unit 32.
  • the voltage command value calculation unit 34 outputs the calculated voltage command value to the PWM signal generation unit 35.
  • the PWM signal generation unit 35 generates a PWM (Pulse Width Modulation) signal for controlling the inverter 4 based on the voltage command value input from the voltage command value calculation unit 34.
  • FIG. 3 is a flowchart showing an example of processing by the operation start determination unit 32 of the station building auxiliary power supply device 2 according to the first embodiment of the present invention.
  • FIG. 3 is a flowchart showing an example of processing by the operation start determination unit 32 of the station building auxiliary power supply device 2 according to the first embodiment of the present invention.
  • an example of the processing flow by the operation start determination unit 32 of the station building auxiliary power supply device 2 according to the first embodiment of the present invention will be described with reference to the flowchart of FIG.
  • step S101 the operation start determination unit 32 calculates the total of the overhead line voltage converted from the interface unit 31 into a digital signal and the electric power consumed when the various loads 7 operate. Acquires the information of the indicated load power.
  • step S102 the operation start determination unit 32 determines whether or not the load power acquired in step S101 is equal to or greater than the first threshold value stored in the storage unit 33.
  • step S102 determines in step S102 that the load power is equal to or greater than the first threshold value (Yes)
  • the operation start determination unit 32 decides to cause the inverter 4 to perform the conversion operation in step S103.
  • step S104 the operation start determination unit 32 includes, for example, information indicating that the inverter 4 is to perform the conversion operation, and insufficient power information indicating the difference between the load power and the first threshold value. Generate a signal.
  • step S105 the operation start determination unit 32 outputs the generated first signal to the voltage command value calculation unit 34.
  • step S102 determines in step S102 that the load power is not equal to or higher than the first threshold value (No)
  • the overhead wire voltage acquired in step S101 is stored in the storage unit 33 in step S106. It is determined whether or not it is equal to or higher than the second threshold value.
  • step S106 determines in step S106 that the overhead line voltage is equal to or higher than the second threshold value (Yes)
  • the operation start determination unit 32 decides to cause the inverter 4 to perform the conversion operation in step S107.
  • step S108 the operation start determination unit 32 includes, for example, information indicating that the inverter 4 is to perform the conversion operation and surplus regenerative power generation information indicating that surplus regenerative power is being generated. Generate a signal of.
  • step S109 the operation start determination unit 32 outputs the generated second signal to the voltage command value calculation unit 34.
  • step S106 when the operation start determination unit 32 determines that the overhead line voltage is not equal to or higher than the second threshold value (No), in step S110, the operation start determination unit 32 determines whether or not the inverter 4 is performing the conversion operation. .. In step 110, if the operation start determination unit 32 determines that the inverter 4 is performing the conversion operation (Yes), the operation start determination unit 32 determines in step S111 to stop the conversion operation of the inverter 4. In step S112, the operation start determination unit 32 stops the generation and output of the first signal and the second signal when the inverter 4 is performing the change operation.
  • step S110 If it is determined in step S110 that the inverter 4 is not performing the conversion operation (No), the operation start determination unit 32 decides not to cause the inverter 4 to perform the conversion operation in step S113. In the operation start determination unit 32, for example, every time the overhead line voltage and the load power are acquired, the processes after step S102 are repeated.
  • FIG. 4 is a flowchart showing an example of processing by the voltage command value calculation unit 34 of the station building auxiliary power supply device 2 according to the first embodiment of the present invention.
  • FIG. 4 an example of the processing flow by the voltage command value calculation unit 34 of the station building auxiliary power supply device 2 according to the first embodiment of the present invention will be described with reference to the flowchart of FIG.
  • step S201 the voltage command value calculation unit 34 determines whether or not the first signal has been input from the operation start determination unit 32.
  • the voltage command value calculation unit 34 determines in step S201 that the first signal is input (Yes)
  • step S202 the load power included in the first signal and the first threshold value are determined.
  • the voltage command value is calculated based on the insufficient power information indicating the difference between. That is, the voltage command value is calculated in consideration of how much power is insufficient with respect to the first threshold value on the load 7 side in the station building 1.
  • step S203 the voltage command value calculation unit 34 outputs the voltage command value calculated in step S202 to the PWM signal generation unit 35.
  • step S201 when the voltage command value calculation unit 34 determines that the first signal has not been input (No), whether or not the second signal has been input from the operation start determination unit 32 in S204. Is determined.
  • step S204 when the voltage command value calculation unit 34 determines that the second signal is input (Yes), in S205, the surplus regeneration is performed based on the surplus regenerative power generation information included in the second signal. Recognizing that electric power is being generated, for example, the voltage command value is calculated based on the set electric power value absorbed by the station building auxiliary power supply device 2 when surplus regenerative electric power is generated. Then, in step S203, the voltage command value calculation unit 34 outputs the voltage command value calculated in step S205 to the PWM signal generation unit 35. Further, in step S204, when the voltage command value calculation unit 34 determines that the second signal is not input (No), the process after step S201 is repeated.
  • FIG. 5 is a flowchart showing an example of processing by the PWM signal generation unit 35 of the station building auxiliary power supply device 2 according to the first embodiment of the present invention.
  • FIG. 5 an example of the processing flow by the PWM signal generation unit 35 of the station building auxiliary power supply device 2 according to the first embodiment of the present invention will be described with reference to the flowchart of FIG.
  • step S301 the PWM signal generation unit 35 inputs the voltage command value from the voltage command value calculation unit 34.
  • step S302 the PWM signal generation unit 35 generates a PWM signal that controls the conversion operation of the inverter 4 based on the voltage command value input in step S301.
  • step S303 the PWM signal generation unit 35 outputs the PWM signal generated in step S302 to the inverter 4.
  • the inverter 4 performs a conversion operation based on the PWM signal input from the PWM signal generation unit 35.
  • the load power which is the sum of the powers consumed by all the loads 7 provided in the station building 1, when the operation start determination unit 32 processes. It is also possible to use the load power which is the sum of the powers consumed by the specific plurality of set loads 7 or the load power consumed by one specific load 7 which is set in advance. ..
  • a load 7 other than the load 7 of the lighting device and the air conditioner that is operating almost all the time is set in advance as a specific load 7, and in the operation start determination unit 32, the lighting device, the air conditioner, etc.
  • the load power which is the sum of the power consumed by the specific load 7 other than the load 7, may be compared with a preset threshold value.
  • the threshold value for comparison with the load power which is the sum of the powers consumed by the specific plurality of loads 7, or the load power consumed by one specific load 7, is the type of the specific load 7, etc. It may be set as appropriate according to the above, and is not particularly limited.
  • the load power which is the sum of the electric power consumed by the specific plurality of loads 7 and the load power consumed by one specific load 7 are the sum of the electric power consumed by all the loads 7. It is expected to be lower than the load power. Therefore, the threshold value for comparing with the load power, which is the sum of the powers consumed by a specific plurality of loads 7, and the threshold value for comparing with the load power consumed by one specific load 7, are all. It is preferable that the values are set lower than the first threshold value for comparison with the load power, which is the total power consumed by the load 7.
  • the load power which is the total power consumed when various loads 7 output from the power detection unit 10 operate as load state information. Shows an example of acquiring load power information indicating.
  • the control device 3 may acquire information from various loads 7 as load state information, including load power information indicating the electric power. In that case, the operation start determination unit 32 of the control device 3 integrates and processes each load power indicated by each load power information included in the load state information acquired from various loads 7, and sets the first threshold value. Compare.
  • the station building auxiliary power supply device 2 stores, for example, load power information indicating load power required when various loads 7 operate in advance in the storage unit 33, and starts information for operating the load 7. May be acquired from various loads 7 as load state information.
  • the operation start determination unit 32 of the control device 3 extracts the load power information of each load 7 corresponding to the various acquired start information from the storage unit 33, and each load indicated by each load power information. The power is integrated and compared with the first threshold.
  • the operation start determination unit 32 is insufficient to show a difference from the first threshold value when it is determined that the load power is equal to or higher than the first threshold value.
  • a first signal including power information is generated and output to the voltage command value calculation unit 34.
  • the voltage command value calculation unit 34 gives a voltage command based on the insufficient power information inserted from the first threshold value included in the first signal. The value is being calculated.
  • the operation start determination unit 32 does not necessarily include the insufficient power information indicating the difference from the first threshold value in the first signal, and only the information indicating that the inverter 4 performs the conversion operation is the first. It may be included in the signal of. In that case, the voltage command value calculation unit 34 may calculate the voltage command value based on, for example, the set power value absorbed by the station building auxiliary power supply device 2 set in advance.
  • the first electric power supplied from the overhead wire 6 is converted into the second electric power that can be used by the load 7 provided in the station building 1. Since it is provided with an inverter 4 which is a power conversion unit of the above, and an operation start determination unit 32 which determines whether or not to cause the inverter 4 to perform a conversion operation based on the load state information indicating the operation state of the load 7. ,
  • the power supply to the load 7 in the station building can be supplemented regardless of the presence or absence of surplus regenerative power.
  • the load state information includes the load power information indicating the load power consumed by the load 7, and the operation start determination unit 32 is indicated by the load power information.
  • the load power exceeds the preset first threshold value, it is determined that the first power conversion unit performs the conversion operation. Therefore, when the load power exceeds the first threshold value, the surplus Regardless of the presence or absence of regenerated electric power, the electric power supply to the load 7 in the station building 1 can be supplemented.
  • the load power information is information indicating the total load power consumed by the plurality of loads 7 provided in the station building 1, and thus the plurality of loads.
  • the power supply to the load 7 in the station building 1 can be supplemented regardless of the presence or absence of surplus regenerated power.
  • the station building auxiliary power supply device 2 when the load power indicated by the load power information exceeds the first threshold value, the load power indicated by the load power information and the first threshold value A control signal generation that generates a control signal for causing a voltage command value calculation unit 34 that calculates a voltage command value based on the difference and an inverter 4 that is a first power conversion unit to perform a conversion operation based on the voltage command value. Since the PWM signal generation unit 35, which is a unit, is provided, it is possible to efficiently supply the insufficient power on the load 7 side in the station building 1.
  • the first threshold value is the load 7 in the station building 1 by converting the high-voltage AC power supplied from the AC system into the low-voltage AC power. Since the capacity of the transformer 9 for supplying power is set to be less than or equal to the capacity of the transformer 9, the load 7 in the station building 1 is reached before the power on the load 7 side in the station building 1 is insufficient to interfere with the operation of the load 7. It can supply power.
  • the operation start determination unit 32 sets the voltage of the overhead wire 6 in advance. It is determined whether or not the set second threshold value is exceeded, and if the voltage of the overhead wire 6 exceeds the second threshold value, it is determined that the first power conversion unit performs the conversion operation. Therefore, the surplus regenerated power can be effectively supplied to the load 7 in the station building 1.
  • FIG. 6 is a diagram showing an example of the configuration of a railway system including the station building auxiliary power supply device 2a according to the second embodiment of the present invention.
  • the same components as those of the station building auxiliary power supply device 2 according to the first embodiment of the present invention are designated by the same reference numerals, and detailed description thereof will be omitted.
  • load state information is input from a specific load 7 set in advance.
  • the specific load 7 for example, a plurality of platform doors provided on the platform in the station building 1 are set. Since the motors provided for each of the plurality of platform doors operate at the same time during operation, the power consumption temporarily increases sharply. Therefore, since the power fluctuation is larger than that of the load 7 in the other station building 1, it is conceivable that the power on the load 7 side in the station building 1 may be temporarily insufficient.
  • the specific load 7 is not limited to the platform door, and for example, the electrical equipment newly installed in the station building 1 may be set as the specific load 7. Further, the specific load 7 is not limited to one type of load 7, and a plurality of types of load 7 may be set as the specific load 7. Further, as the load state information, for example, activation information indicating that a specific load 7 operates is used.
  • FIG. 7 is a diagram showing an example of the configuration of the control device 3a of the station building auxiliary power supply device 2a according to the second embodiment of the present invention.
  • the control device 3a includes an interface unit 31a, an operation start determination unit 32a, a storage unit 33a, a voltage command value calculation unit 34a, and a PWM signal generation unit 35a.
  • the interface unit 31a periodically (for example, every 20 ms) acquires the overhead wire voltage measurement value (hereinafter, referred to as “overhead wire voltage”) output from the voltage sensor 5, and obtains the overhead wire voltage to A / D (Analog to). Digital) Convert.
  • overhead wire voltage the overhead wire voltage measurement value
  • a / D Analog to.
  • the operation start determination unit 32a uses the DC power, which is the first power supplied from the overhead wire 6, as the second power that can be used by the load 7, based on the load state information acquired from the specific load 7. It is determined whether or not the inverter 4 is to perform the conversion operation in order to convert to. Further, the operation start determination unit 32a determines whether or not to cause the inverter 4 to perform the conversion operation based on the voltage acquired by the interface unit 31a. When, for example, the operation start determination unit 32a decides to cause the inverter 4 to perform the conversion operation, the operation start determination unit 32a generates a signal indicating that the inverter 4 performs the conversion operation and outputs the signal to the voltage command value calculation unit 34a.
  • the storage unit 33a is used, for example, for load power information indicating the load power required when the specific load 7 operates, and for determining whether or not the operation start determination unit 32a causes the inverter 4 to perform a power conversion operation.
  • the overhead line voltage threshold is a load that consumes the regenerative power returned from the electric train 8 to the overhead line 6 in the same manner as the second threshold stored in the storage unit 33a of the station building auxiliary power supply device 2 according to the first embodiment.
  • the voltage command value calculation unit 34a calculates a voltage command value according to the signal, for example, when a signal indicating that the inverter 4 is to perform the conversion operation is input from the operation start determination unit 32a.
  • the voltage command value calculation unit 34a outputs the calculated voltage command value to the PWM signal generation unit 35a.
  • the PWM signal generation unit 35a generates a PWM (Pulse Width Modulation) signal for controlling the inverter 4 based on the voltage command value input from the voltage command value calculation unit 34a.
  • FIG. 8 is a flowchart showing an example of processing by the operation start determination unit 32a of the station building auxiliary power supply device 2a according to the second embodiment of the present invention.
  • FIG. 8 an example of the processing flow by the operation start determination unit 32a of the station building auxiliary power supply device 2a according to the second embodiment of the present invention will be described with reference to the flowchart of FIG.
  • step S401 the operation start determination unit 32a determines whether or not the start information has been acquired as the load state information from the specific load 7. If it is determined in step S401 that the operation start determination unit 32a has acquired the start information from the specific load 7 (Yes), the operation start determination unit 32a decides to cause the inverter 4 to perform the conversion operation in step S402.
  • step S403 the operation start determination unit 32a generates a third signal.
  • the operation start determination unit 32a acquires the load power information of the specific load 7 stored in the storage unit 33a, for example, based on the start information of the specific load 7 which is the load state information acquired in step S401. Then, the operation start determination unit 32a generates a third signal including information indicating that the inverter 4 is to perform the conversion operation and load power information of the specific load 7 acquired from the storage unit 33a.
  • step S404 the operation start determination unit 32a outputs the generated third signal to the voltage command value calculation unit 34a.
  • step S405 the operation start determination unit 32a acquires the overhead wire voltage converted into the digital signal from the interface unit 31a. To do.
  • step S406 the operation start determination unit 32a determines whether or not the overhead wire voltage acquired in step S405 is equal to or higher than the overhead wire voltage threshold value stored in the storage unit 33a.
  • step S406 determines in step S406 that the overhead wire voltage is equal to or higher than the overhead wire voltage threshold value (Yes)
  • the operation start determination unit 32a determines in step S407 to cause the inverter 4 to perform a conversion operation.
  • step S408 the operation start determination unit 32a includes, for example, information indicating that the inverter 4 is to perform the conversion operation and surplus regenerative power generation information indicating that surplus regenerative power is being generated. Generate a signal of.
  • step S409 the operation start determination unit 32a outputs the generated fourth signal to the voltage command value calculation unit 34a.
  • step S410 determines whether or not the inverter 4 is performing the conversion operation. In step 410, if the operation start determination unit 32a determines that the inverter 4 is performing the conversion operation (Yes), the operation start determination unit 32a determines in step S411 to stop the conversion operation of the inverter 4. In step S412, the operation start determination unit 32a stops the generation and output of the third signal and the fourth signal when the inverter 4 is performing the change operation.
  • step S410 when the operation start determination unit 32a determines that the inverter 4 is not performing the conversion operation (No), the operation start determination unit 32a determines in step S413 not to cause the inverter 4 to perform the conversion operation.
  • the operation start determination unit 32a periodically repeats the process from step S401.
  • FIG. 9 is a flowchart showing an example of processing by the voltage command value calculation unit 34a of the station building auxiliary power supply device 2a according to the second embodiment of the present invention.
  • FIG. 9 an example of the processing flow by the voltage command value calculation unit 34a of the station building auxiliary power supply device 2a according to the second embodiment of the present invention will be described with reference to the flowchart of FIG.
  • step S501 the voltage command value calculation unit 34a determines whether or not a third signal has been input from the operation start determination unit 32a.
  • the voltage command value calculation unit 34a determines in step S501 that the third signal is input (Yes), for example, in step S502, the load power information of the specific load 7 included in the third signal.
  • the voltage command value is calculated based on. That is, the voltage command value calculation unit 34a calculates the voltage command value in consideration of the load power required when the specific load 7 operates.
  • step S503 the voltage command value calculation unit 34a outputs the voltage command value calculated in step S502 to the PWM signal generation unit 35a.
  • step S501 determines in step S501 that the third signal has not been input (No), whether or not the fourth signal has been input from the operation start determination unit 32a in S504. Is determined.
  • step S504 when the voltage command value calculation unit 34a determines that the fourth signal is input (Yes), in S505, the surplus regeneration is performed based on the surplus regenerative power generation information included in the fourth signal. Recognizing that electric power is being generated, for example, the voltage command value is calculated based on the set electric power value absorbed by the station building auxiliary power supply device 2a when the surplus regenerative electric power is generated. Then, in step S503, the voltage command value calculation unit 34a outputs the voltage command value calculated in step S505 to the PWM signal generation unit 35a.
  • step S504 when the voltage command value calculation unit 34a determines that the fourth signal is not input (No), the process after step S501 is repeated.
  • the processing by the PWM signal generation unit 35a of the station building auxiliary power supply device 2a according to the second embodiment is the same as the processing by the PWM signal generation unit 35 of the station building auxiliary power supply device 2 according to the first embodiment shown in FIG. Therefore, detailed description will be omitted.
  • the station building auxiliary power supply device 2a shows an example in which start-up information is input from a specific load 7 as load state information.
  • the load state information is not limited to this.
  • the specific load 7 is a platform door
  • the electric vehicle 8 that enters and stops in the station building 1 provided with the platform door.
  • the position information may be acquired as the load status information.
  • the operation start determination unit 32a generates a third signal when, for example, it detects that the electric vehicle 8 has reached a predetermined specific position based on the position information of the electric vehicle 8. To do.
  • the specific position is set in front of the stop position of the electric vehicle.
  • the platform door starts opening and closing after the electric car 8 stops at the stop position in the station building 1.
  • the station building auxiliary power supply device 2a performs a conversion operation on the inverter 4, so that the electric vehicle 8 stops. Since power can be supplied to the load 7 side in the station building 1 before the opening / closing operation of the home door is performed, it is surely prevented that the power shortage on the load 7 side in the station building 1 is temporarily performed. be able to.
  • the method by which the station building auxiliary power supply device 2a acquires the position information of the electric vehicle 8 is not particularly limited, but for example, the position of the electric vehicle 8 generated by the on-board control device provided in the electric vehicle 8.
  • the information may be directly received by the station building auxiliary power supply device 2a by wireless communication.
  • the station building auxiliary power supply device 2a may receive the position information of the electric vehicle 8 by wire or wirelessly after being transmitted from the on-board control device to the ground control device by wireless communication.
  • the station building auxiliary power supply device 2a may receive not the position information of the electric vehicle 8 but the information indicating that the electric vehicle 8 has reached a specific position.
  • the station building auxiliary power supply device 2a sets, for example, the position of the ground element provided in front of the stop position of the electric vehicle 8 to a specific position, and when the electric vehicle 8 reaches the ground element, the electric vehicle from the ground element.
  • Information indicating that 8 has reached a specific position may be acquired.
  • the operation start determination unit 32a does not need to detect that the electric vehicle 8 has reached a predetermined specific position based on the position information of the electric vehicle 8, and the electric vehicle 8 is specific.
  • a third signal may be generated when the information indicating that the position has been reached is acquired.
  • the specific load 7 may be, for example, an elevator or an escalator.
  • the specific load 7 is an elevator, for example, activation information indicating that the operation is started when the operation button is pressed by the user may be used as the load state information.
  • the specific load 7 is an escalator, for example, start information indicating that the motion sensor detects the user and starts the operation from the case where the escalator is in the standby state may be used as the load state information.
  • the station building auxiliary power supply device 2a according to the second embodiment can be combined with the station building auxiliary power supply device 2 according to the first embodiment.
  • the station building auxiliary power supply device 2a also acquires the load power indicating the total power consumed by the various loads 7 from the power detection unit 10 as in the station building auxiliary power supply device 2 according to the first embodiment. Is also good.
  • the operation start determination unit 32a of the station building auxiliary power supply device 2a for example, in addition to the determination as to whether or not the start information is acquired as the load state information of the specific load 7 in step S401 shown in FIG.
  • the determination of whether or not the load power in step S102 shown in the above is equal to or greater than the first threshold value is also included.
  • the operation start determination unit 32a converts the start information of the specific load 7 into the inverter 4 as shown in steps S402 to S404 of FIG. It is decided to carry out the operation, and a third signal is generated and output.
  • the operation start determination unit 32a has acquired the start information of the specific load 7, and when the load power is equal to or higher than the first threshold value, the load power detected by the voltage detection unit 10 is a specific load. When the load power of 7 is also included, the first signal may be generated and output. Further, the operation start determination unit 32a specifies, for example, the load power detected by the voltage detection unit 10 when the start information of the specific load 7 is acquired and the load power is equal to or higher than the first threshold value. When the load power of the load 7 is not included, a signal including the load power information of the specific load 7 acquired from the storage unit 33a and the insufficient power information indicating the difference between the load power and the first threshold value is output. It may be generated. In that case, the voltage command value calculation unit 34a calculates the voltage command value based on the load power information of the specific load 7 and the insufficient power information indicating the difference between the load power and the first threshold value.
  • the operation start determination unit 32a is the first power conversion unit when the load state information of the specific load 7 set in advance is input. Since it is determined that the inverter 4 is to perform the conversion operation, the power can be supplied to the load 7 side of the station building 1 regardless of the presence or absence of the surplus regenerated power, and the specific load 7 in the station building 1 can be supplied. It is possible to prevent the power shortage due to the operation of.
  • the station building auxiliary electric device 2a since the specific load 7 is the platform door provided in the station building 1, the power consumption temporarily increases rapidly when the platform door operates. Even in this case, the power can be supplied to the load 7 side of the station building 1 regardless of the presence or absence of the surplus regenerated power, and it is possible to prevent the power shortage due to the operation of the platform door.
  • the load state information is the position information of the electric vehicle 8 that enters and stops in the station building 1 provided with the platform door, and operates. Since the start determination unit 32a determines that the inverter 4, which is the first power conversion unit, performs the conversion operation based on the position information, it is before the electric vehicle 8 is stopped and the platform door is opened and closed. The inverter 4 can be made to perform the conversion operation. As a result, in the station building auxiliary electric power device 2a, power can be supplied to the load 7 side in the station building 1 before the platform door is opened and closed, so that the station building is temporarily opened and closed as the platform door is opened and closed. It is possible to surely prevent the power shortage on the load 7 side in 1.
  • the operation start determination unit includes a storage unit 33a for storing load power information indicating the load power required when the specific load 7 operates.
  • the voltage command value calculation unit 34a that calculates the voltage command value based on the load power information, and the voltage command value. Since the PWM signal generation unit 35a, which is a control signal generation unit that generates a control signal for causing the inverter 4 to perform the conversion operation, is provided, the load in the station building 1 is accompanied by the operation of the specific load 7. It is possible to efficiently supply the amount of electric power that may be insufficient on the 7 side.
  • the operation start determination unit 32a is preset with the voltage of the overhead wire 6 when the load state information of the specific load 7 is not input. It is determined whether or not the overhead line voltage threshold is exceeded, and if the voltage of the overhead line 6 exceeds the overhead line voltage threshold, it is determined that the inverter 4 which is the first power conversion unit performs the conversion operation. , Surplus regenerative power can also be effectively supplied to the load 7 in the station building 1.
  • FIG. 10 is a diagram showing an example of the configuration of a railway system including the station building auxiliary power supply device 2b according to the third embodiment of the present invention.
  • the same components as those of the station building auxiliary power supply devices 2 and 2a according to the first or second embodiment of the present invention are designated by the same reference numerals, and detailed description thereof will be omitted.
  • the storage of surplus regenerative power supplied from the overhead wire 6 is stored.
  • a converter (second power conversion unit) 12 provided between the unit 11 and the overhead wire 6 and the power storage unit 11 to convert excess regenerative power and supply the power to the power storage unit 11 and the charge amount of the power storage unit 11 are charged. It further includes a charge amount detecting unit 13 for detecting.
  • FIG. 11 is a diagram showing an example of the configuration of the control device 3b of the station building auxiliary power supply device 2b according to the third embodiment of the present invention.
  • the control device 3b includes an interface unit 31b, an operation start determination unit 32b, a storage unit 33b, a voltage command value calculation unit 34b, and a PWM signal generation unit 35b.
  • the interface unit 31b periodically (for example, every 20 ms) acquires the overhead wire voltage measurement value (hereinafter referred to as “overhead wire voltage”) output from the voltage sensor 5, and obtains the overhead wire voltage to A / D (Analog to). Digital) Convert. Further, the interface unit 31b acquires load state information indicating the operating state of the load 7. In the present embodiment, the interface unit 31b indicates the load power, which is the total power consumed when various loads 7 output from the power detection unit 10, for example, are operated as the load state information. Information is acquired periodically (for example, every 20 ms), and the power value is A / D (Analog to Digital) converted. Further, the interface unit 31b acquires charge amount information indicating the charge amount charged in the power storage unit 11 from the charge amount detection unit 13.
  • the operation start determination unit 32b can use the DC power, which is the first power supplied from the overhead wire 6, on the load 7 based on the load state information and the charge amount information acquired by the interface unit 31b, for example. It is determined whether or not the inverter 4 is to perform a conversion operation in order to convert it into AC power, which is electric power, or to convert the charging power stored in the power storage unit 11 into AC power that can be used by the load 7. .. Further, the operation start determination unit 32b determines whether or not to cause the inverter 4 or the converter 12 to perform the conversion operation based on the overhead line voltage and the charge amount information acquired by the interface unit 31b.
  • the operation start determination unit 32b determines, for example, that the inverter 4 or the converter 12 performs the conversion operation
  • the operation start determination unit 32b When the operation start determination unit 32b determines, for example, that the inverter 4 or the converter 12 performs the conversion operation, the operation start determination unit 32b generates a signal indicating that the inverter 4 or the converter 12 performs the conversion operation and calculates the voltage command value. Output to unit 34b.
  • the storage unit 33b stores, for example, a first threshold value, a second threshold value, and a charge amount threshold value used by the operation start determination unit 32b to determine whether or not the inverter 4 or the converter 12 performs a conversion operation. ..
  • the first threshold value is used for comparison with the load power indicated by the load power information output from the power detection unit 10.
  • the charge amount threshold value is set in advance according to the capacity of the power storage unit 11, and is used for comparison with the charge amount of the power storage unit 11 output from the charge amount detection unit 13.
  • the voltage command value calculation unit 34b calculates a voltage command value according to the signal, for example, when a signal indicating that the inverter 4 or the converter 12 is to perform the conversion operation is input from the operation start determination unit 32b.
  • the voltage command value calculation unit 34b outputs the calculated voltage command value to the PWM signal generation unit 35b.
  • the PWM signal generation unit 35b generates a PWM (Pulse Width Modulation) signal that controls the inverter 4 or the converter 12 based on the voltage command value input from the voltage command value calculation unit 34b, for example.
  • FIGS. 12 and 13 are flowcharts showing an example of processing by the operation start determination unit 32b of the station building auxiliary power supply device 2b according to the third embodiment of the present invention.
  • an example of the processing flow by the operation start determination unit 32b of the station building auxiliary power supply device 2b according to the third embodiment of the present invention will be described with reference to the flowcharts of FIGS. 12 and 13.
  • step S601 the operation start determination unit 32b is a load indicating the total of the overhead wire voltage converted from the interface unit 31a into a digital signal and the electric power consumed when various loads 7 operate.
  • the electric power information and the charge amount information indicating the charge amount charged in the power storage unit 11 are acquired.
  • step S602 the operation start determination unit 32b determines whether or not the load power acquired in step S601 is equal to or greater than the first threshold value stored in the storage unit 33b.
  • step S602 determines in step S602 that the load power is equal to or greater than the first threshold value (Yes)
  • the charge amount is equal to or greater than the charge threshold value stored in the storage unit 33b in step S603.
  • step 603 when the operation start determination unit 32b determines that the charge amount is equal to or greater than the charge threshold value (Yes), in S604, the inverter so as to supply power from the power storage unit 11 to the load 7 side in the station building 1. It is decided to have 4 perform the conversion operation.
  • step S605 the operation start determination unit 32b includes, for example, information indicating that the inverter 4 is to perform the conversion operation, information indicating that power is supplied from the power storage unit 11, load power, and a first threshold value. Generates a fifth signal that includes underpower information indicating the difference between.
  • step S606 the operation start determination unit 32b outputs the generated fifth signal to the voltage command value calculation unit 34b.
  • step 603 when the operation start determination unit 32b determines that the charge amount is not equal to or higher than the charge threshold value (No), the inverter 4 so as to supply electric power from the overhead line 6 to the load 7 side in the station building 1 in S607. Decides to perform the conversion operation. Then, in step S608, the operation start determination unit 32b includes, for example, information indicating that the inverter 4 is to perform the conversion operation, information indicating that power is supplied from the overhead wire 6, load power, and a first threshold value. A sixth signal containing the underpower information indicating the difference between the two is generated. In step S609, the operation start determination unit 32b outputs the generated sixth signal to the voltage command value calculation unit 34b.
  • step S610 the overhead line voltage is equal to or higher than the second threshold value stored in the storage unit 33b. It is determined whether or not it is.
  • step S610 If the operation start determination unit 32b determines in step S610 that the overhead wire voltage is equal to or higher than the second threshold value (Yes), the operation start determination unit 32b charges the power storage unit 11 using the surplus regenerative power from the overhead wire 6 in step S611. At the same time, it is decided that the inverter 4 and the converter 12 perform a conversion operation so as to supply electric power to the load 7 side in the station building 1. Then, in step S612, the operation start determination unit 32b generates, for example, information indicating that the inverter 4 performs the conversion operation, information indicating that the converter 12 performs the conversion operation, and surplus regenerative power. A seventh signal including surplus regenerative power generation information indicating that the power is generated is generated.
  • step S613 the operation start determination unit 32b outputs the generated seventh signal to the voltage command value calculation unit 34b.
  • step S611 when the charge amount of the power storage unit 11 is fully charged, the inverter 4 so as to supply power to the load 7 side in the station building 1 without charging the power storage unit 11. Decides to perform the conversion operation.
  • step S610 When the operation start determination unit 32b determines in step S610 that the overhead line voltage is not equal to or higher than the second threshold value (No), the charge amount of the power storage unit 11 is stored in the storage unit 33b in step S614 shown in FIG. It is determined whether or not it is equal to or higher than the charging threshold value.
  • FIG. 13 shows the details of the process A after the operation start determination unit 32b determines that the overhead line voltage is not equal to or higher than the second threshold value (No) in the process of step S610 of FIG.
  • step S614 when the operation start determination unit 32b determines that the charge amount of the power storage unit 11 is equal to or greater than the charge threshold value (Yes), the power storage unit 11 supplies power to the load 7 side in the station building 1 in S615. It is decided that the inverter 4 performs the conversion operation so as to perform the conversion operation. Then, in step S616, the operation start determination unit 32b generates an eighth signal including, for example, information indicating that the inverter 4 is to perform the conversion operation and information indicating that power is supplied from the power storage unit 11. To do. In step S617, the operation start determination unit 32b outputs the generated eighth signal to the voltage command value calculation unit 34b.
  • step S614 determines in step S614 that the charge amount of the power storage unit 11 is not equal to or greater than the charge threshold value (No), whether or not the inverter 4 or the converter 12 is performing the conversion operation in S618. Is determined. If the operation start determination unit 32b determines in step S618 that at least one of the inverter 4 and the converter 12 is performing the conversion operation (Yes), the operation start determination unit 32b performs the conversion operation of the inverter 4 and the converter 12 in step S619. Decide to stop. In step S620, the operation start determination unit 32b stops the generation and output of the fifth to eighth signals when at least one of the inverter 4 and the converter 12 is performing the conversion operation.
  • step S618 when it is determined that neither the inverter 4 nor the converter 12 is performing the conversion operation (No), the operation start determination unit 32b decides not to cause the inverter 4 and the converter 12 to perform the conversion operation.
  • the operation start determination unit 32b for example, every time the overhead line voltage and the load power are acquired, the processes after step S602 are repeated. Further, the charge amount information may be acquired from the charge amount detection unit 13 between steps S602 and S603 shown in FIG. 12 and between steps S610 and step S614 shown in FIG. Further, although the same charge threshold value is used in the determination in step S603 and step S614, the determination may be performed using different charge threshold values.
  • FIG. 14 is a flowchart showing an example of processing by the voltage command value calculation unit 34b of the station building auxiliary power supply device 2b according to the third embodiment of the present invention.
  • FIG. 14 an example of the processing flow by the voltage command value calculation unit 34b of the station building auxiliary power supply device 2b according to the third embodiment of the present invention will be described with reference to the flowchart of FIG.
  • step S701 the voltage command value calculation unit 34b determines whether or not a fifth signal has been input from the operation start determination unit 32b.
  • the voltage command value calculation unit 34b determines in step S701 that the fifth signal is input (Yes), for example, in step S702, the voltage command value calculation unit 34b calculates the voltage command value based on the fifth signal.
  • the voltage command value based on the fifth signal is for executing the conversion operation of the inverter 4 so as to supply power from the power storage unit 11 to the load 7 side in the station building 1, and is the load power and the first. It is calculated based on the insufficient power information indicating the difference from the threshold value.
  • step S703 the voltage command value calculation unit 34b outputs the voltage command value calculated in step S702 to the PWM signal generation unit 35b.
  • step S701 determines whether or not the fifth signal has been input (No)
  • step S704 determines whether or not the voltage command value calculation unit 34b has input the sixth signal (Yes)
  • step S704 determines whether or not the voltage command value calculation unit 34b has input the sixth signal (Yes)
  • the voltage command value calculation unit 34b calculates the voltage command value based on the sixth signal in S705.
  • the voltage command value based on the sixth signal is for performing the conversion operation of the inverter 4 so as to supply power from the overhead wire 6 to the load 7 side in the station building 1, and is the load power and the first threshold value. It is calculated based on the insufficient power information indicating the difference from.
  • step S703 the voltage command value calculation unit 34b outputs the voltage command value calculated in step S705 to the PWM signal generation unit 35b.
  • step S704 determines whether or not the seventh signal has been input from the operation start determination unit 32b in S706. judge. If it is determined in step S706 that the seventh signal has been input (Yes), the voltage command value calculation unit 34b calculates the voltage command value based on the seventh signal in S707.
  • the voltage command value based on the seventh signal is for charging the power storage unit 11 with the surplus regenerative power and performing the conversion operation of the inverter 4 and the converter 12 so as to supply the power to the load 7 side in the station building 1. This is calculated based on, for example, a preset power value absorbed by the station building auxiliary power supply device 2b when surplus regenerative power is generated.
  • step S703 the voltage command value calculation unit 34b outputs the voltage command value calculated in step S707 to the PWM signal generation unit 35b.
  • step S708 If the voltage command value calculation unit 34b determines in step S706 that the seventh signal has not been input (No), in step S708, whether or not the eighth signal has been input from the operation start determination unit 32b is determined. judge. If it is determined in step S708 that the eighth signal has been input (Yes), the voltage command value calculation unit 34b calculates the voltage command value based on the eighth signal in S709.
  • the voltage command value based on the eighth signal is for causing the conversion operation of the inverter 4 to supply electric power from the power storage unit 11 to the load 7 side in the station building 1, and is set in advance, for example. It is calculated based on the set power value.
  • step S703 the voltage command value calculation unit 34b outputs the voltage command value calculated in step S709 to the PWM signal generation unit 35b. Further, in step S708, when the voltage command value calculation unit 34 determines that the eighth signal is not input (No), the process after step S701 is repeated.
  • FIG. 15 is a flowchart showing an example of processing by the PWM signal generation unit 35b of the station building auxiliary power supply device 2b according to the third embodiment of the present invention.
  • FIG. 15 an example of the processing flow by the PWM signal generation unit 35b of the station building auxiliary power supply device 2b according to the third embodiment of the present invention will be described with reference to the flowchart of FIG.
  • step S801 the PWM signal generation unit 35b receives the voltage command value from the voltage command value calculation unit 34b.
  • step S802 the PWM signal generation unit 35b generates a PWM signal that controls the conversion operation of the inverter 4 or the converter 12 based on the voltage command value input in step S801.
  • step S303 the PWM signal generation unit 35b outputs the PWM signal generated in step S302 to the inverter 4 or the converter 12.
  • the inverter 4 and the converter perform a conversion operation based on the PWM signal input from the PWM signal generation unit 35b.
  • the power storage unit 11 for storing the surplus regenerative power supplied from the overhead wire 6 is provided between the overhead wire 6 and the power storage unit 11, and the surplus
  • the configuration including a converter (second power conversion unit) 12 that converts regenerative power into electric power and supplies it to the power storage unit 11 and a charge amount detection unit 13 that detects the charge amount of the power storage unit 11 is in the second embodiment. It is also applicable to the station building auxiliary power supply device 2a. In that case, the storage unit 33a of the station building auxiliary power supply device 2a according to the second embodiment stores a charge amount threshold value for use by the operation start determination unit 31a for comparison with the charge amount output from the charge amount detection unit 13. I will do it.
  • the operation start determination unit 31a may, for example, determine between step S401 and step S402 shown in FIG. 8 whether or not the amount of stored electricity is equal to or greater than the charge amount threshold value. Then, when the operation start determination unit 31a acquires the load state information from the specific load 7 and the charge amount is equal to or more than the charge amount threshold value, the power storage unit 11 supplies electric power to the load 7 side in the station building 1. It is decided to carry out the conversion operation of the inverter 4 so as to supply the power. The operation start determination unit 31a supplies power from the overhead line 6 to the load 7 side in the station building 1 when the load state information is acquired from the specific load 7 and the charge amount is less than the charge amount threshold value. Decides to have the inverter perform the conversion operation.
  • the station building auxiliary power supply device 2b when the charge amount of the power storage unit 11 is equal to or more than the charge amount threshold value, even if the surplus regenerative power is not generated, the power on the overhead line 6 side is not used and the inside of the station building 1 is used.
  • the power supply to the load 7 can be supplemented.
  • the power storage unit 11 for storing the surplus regenerated electric power supplied from the overhead wire 6 is provided between the overhead wire 6 and the power storage unit 11, and the overhead wire 6 is provided.
  • the converter 12 which is the second power conversion unit that converts the surplus regenerated power into power and supplies it to the power storage unit 11 and the charge that detects the charge amount of the power storage unit 11.
  • the operation start determination unit 31b includes the amount detection unit 13, and when the load power indicated by the load power information exceeds the first threshold value, the charge amount detected by the charge amount detection unit 13 is preset.
  • the inverter 4 It is determined whether or not the charge amount is equal to or higher than the charge amount threshold, and if the charge amount is equal to or higher than the charge amount threshold, it is determined to cause the inverter 4 to perform a conversion operation so as to supply power from the power storage unit 11 to the load 7, and charge the battery. If the amount is less than the charge amount threshold, it is determined that the inverter 4 performs the conversion operation so as to supply power from the overhead wire 6 to the load 7, so that the load in the station building 1 is irrespective of the presence or absence of surplus regenerated power.
  • the power supply to 7 can be supplemented.
  • the power storage unit 11 when the charge amount of the power storage unit 11 is equal to or more than the charge amount threshold value, the power is supplied to the load 7 in the station building 1 without using the power on the overhead line 6 side even when the surplus regenerative power is not generated. Can be supplemented.
  • control devices 3 to 3b of the station building auxiliary power supply devices 2 to 2b according to the first to third embodiments of the present invention include, for example, a processor and a memory, and the operation of each part can be realized by software.
  • FIG. 16 is a diagram showing an example of a hardware configuration that realizes the control devices 3 to 3b of the station building auxiliary power supply devices 2 to 2b according to the first to third embodiments of the present invention.
  • the control devices 3 to 3b of the station building auxiliary power supply devices 2 to 2b according to the first to third embodiments of the present invention include the processor 91 and the memory 92, and the processor 91 and the memory 92 include the processor 91 and the memory 92. It is connected by the system bus 93.
  • the processor 91 performs calculation and control by software using the input data
  • the memory 92 stores the input data or data and programs necessary for the processor 91 to perform calculation and control.
  • a plurality of processors 91 and a plurality of memories 92 may be provided.
  • station building auxiliary power supply devices 2 to 2b according to the first to third embodiments of the present invention, an example in which the electric power from the DC overhead line 6 is supplied to the load 7 side in the station building 1 is shown, but the DC overhead line 6 is used.
  • the present invention is not limited to this, and the present invention is also applicable to AC overhead wires.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Inverter Devices (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

L'invention concerne un dispositif d'alimentation électrique auxiliaire de bâtiment de gare (2) qui comprend : un premier convertisseur d'alimentation électrique (4) qui convertit une première énergie électrique fournie par un câblage aérien (6) en une seconde énergie électrique qui peut être utilisée par des charges (7) installées à l'intérieur d'un bâtiment de gare (1) ; et une unité de détermination de début de fonctionnement (32) qui détermine, sur la base d'informations d'état de charge indiquant l'état de fonctionnement de la charge (7), s'il faut ou non que le premier convertisseur d'alimentation électrique (4) effectue une opération de conversion.
PCT/JP2019/013750 2019-03-28 2019-03-28 Dispositif d'alimentation électrique auxiliaire de bâtiment de gare WO2020194697A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/JP2019/013750 WO2020194697A1 (fr) 2019-03-28 2019-03-28 Dispositif d'alimentation électrique auxiliaire de bâtiment de gare
DE112019007098.3T DE112019007098T5 (de) 2019-03-28 2019-03-28 Bahnhofsgebäude-hilfsstromversorgungseinheit
JP2021508626A JP6991391B2 (ja) 2019-03-28 2019-03-28 駅舎補助電源装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/013750 WO2020194697A1 (fr) 2019-03-28 2019-03-28 Dispositif d'alimentation électrique auxiliaire de bâtiment de gare

Publications (1)

Publication Number Publication Date
WO2020194697A1 true WO2020194697A1 (fr) 2020-10-01

Family

ID=72611266

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/013750 WO2020194697A1 (fr) 2019-03-28 2019-03-28 Dispositif d'alimentation électrique auxiliaire de bâtiment de gare

Country Status (3)

Country Link
JP (1) JP6991391B2 (fr)
DE (1) DE112019007098T5 (fr)
WO (1) WO2020194697A1 (fr)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006062427A (ja) * 2004-08-25 2006-03-09 Hitachi Ltd 電力変換装置、電力変換システムおよびその制御方法
WO2014033862A1 (fr) * 2012-08-29 2014-03-06 三菱電機株式会社 Dispositif d'alimentation d'un bâtiment de gare et son procédé de commande
WO2014038020A1 (fr) * 2012-09-05 2014-03-13 三菱電機株式会社 Dispositif d'alimentation en courant de bâtiment de gare
WO2015079544A1 (fr) * 2013-11-28 2015-06-04 三菱電機株式会社 Dispositif d'alimentation électrique de bâtiment de gare
WO2017033328A1 (fr) * 2015-08-27 2017-03-02 三菱電機株式会社 Dispositif d'alimentation électrique auxiliaire pour bâtiments de gare

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006062427A (ja) * 2004-08-25 2006-03-09 Hitachi Ltd 電力変換装置、電力変換システムおよびその制御方法
WO2014033862A1 (fr) * 2012-08-29 2014-03-06 三菱電機株式会社 Dispositif d'alimentation d'un bâtiment de gare et son procédé de commande
WO2014038020A1 (fr) * 2012-09-05 2014-03-13 三菱電機株式会社 Dispositif d'alimentation en courant de bâtiment de gare
WO2015079544A1 (fr) * 2013-11-28 2015-06-04 三菱電機株式会社 Dispositif d'alimentation électrique de bâtiment de gare
WO2017033328A1 (fr) * 2015-08-27 2017-03-02 三菱電機株式会社 Dispositif d'alimentation électrique auxiliaire pour bâtiments de gare

Also Published As

Publication number Publication date
JPWO2020194697A1 (fr) 2020-10-01
DE112019007098T5 (de) 2021-12-09
JP6991391B2 (ja) 2022-01-12

Similar Documents

Publication Publication Date Title
EP2326586B1 (fr) Gestion de puissance provenant de multiples sources dans un système de puissance d ascenseur
CN106809040B (zh) 用于对高压电池组件充电的方法和设备
US9421867B2 (en) Electric vehicle
CN103874649B (zh) 电梯的再生蓄电控制装置
US10981471B2 (en) Fuel cell system, vehicle including fuel cell system, and control method of fuel cell system
JP6004833B2 (ja) 駅舎電源装置
US11338689B2 (en) System and method for controlling vehicle including solar cell
US9013125B2 (en) Electric power converter of electric rolling stock
US20140167701A1 (en) Power Converter and its Control Method
EP2965940B1 (fr) Dispositif de conversion principal pour véhicule électrique
US9083194B2 (en) Battery charging system and train
WO2010059139A1 (fr) Gestion de la puissance dans les ascenseurs en cas de conditions de puissance de qualité médiocre
US20200391614A1 (en) Emergency electric power supply system, emergency electric power supply method, and storage medium
EP3075596B1 (fr) Dispositif d'alimentation électrique de bâtiment de gare
KR101332586B1 (ko) 엘리베이터 도어 제어기 시스템
JP7241490B2 (ja) エレベータ駆動装置用の自動救助及び充電システム
CN113054288A (zh) 车辆及其电池加热方法和系统
JP6991391B2 (ja) 駅舎補助電源装置
JPH08308025A (ja) 電気自動車電源制御装置
US10372101B2 (en) Station auxiliary power source apparatus
US10155640B2 (en) Elevator system using rescue storage device for increased power
US20170305279A1 (en) Charging apparatus
WO2014010025A1 (fr) Système de charge et procédé de charge
EP3640175B1 (fr) Gestion de puissance décentralisée dans un système d'ascenseur
JP2011050196A (ja) 制御方法及び制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19921713

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021508626

Country of ref document: JP

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 19921713

Country of ref document: EP

Kind code of ref document: A1