WO2020149760A1 - Système et procédés (variantes) de construction et de complétion de puits multiples - Google Patents

Système et procédés (variantes) de construction et de complétion de puits multiples Download PDF

Info

Publication number
WO2020149760A1
WO2020149760A1 PCT/RU2019/000021 RU2019000021W WO2020149760A1 WO 2020149760 A1 WO2020149760 A1 WO 2020149760A1 RU 2019000021 W RU2019000021 W RU 2019000021W WO 2020149760 A1 WO2020149760 A1 WO 2020149760A1
Authority
WO
WIPO (PCT)
Prior art keywords
anchor
whipstock
orientation
liner
tool
Prior art date
Application number
PCT/RU2019/000021
Other languages
English (en)
Russian (ru)
Inventor
Александр Сергеевич КАШЛЕВ
Динар Ильгизович НИЗАМОВ
Андрей Геннадьевич ФЕДОТОВ
Original Assignee
Общество С Ограниченной Ответственностью "Адл Заканчивание"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество С Ограниченной Ответственностью "Адл Заканчивание" filed Critical Общество С Ограниченной Ответственностью "Адл Заканчивание"
Priority to PCT/RU2019/000021 priority Critical patent/WO2020149760A1/fr
Priority to RU2019133397A priority patent/RU2753417C2/ru
Publication of WO2020149760A1 publication Critical patent/WO2020149760A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling

Definitions

  • the completion system is intended for the construction and completion of multilateral wells and refers to the construction of wells intended for oil production, and in particular to the construction and completion of multiple side branches from the main wellbore to enable oil production from multiple subterranean zones.
  • the completion system is intended for the construction and completion of multilateral wells and refers to the construction of wells intended for oil production, and in particular to the construction and completion of multiple side branches from the main wellbore to enable oil production from multiple subterranean zones.
  • stem junctions (as well as articulations or branches).
  • TAML classification abbreviated from the English “Technical Advancement of Multilaterals", gradation of multilateral wells according to the level of technical excellence
  • wellbore connections are divided according to their characteristics into levels from 1 to 6, the first of which corresponds to the lowest degree of complexity design and functionality, and the sixth level is the highest.
  • a method of construction of a multilateral well and a diverting device for its implementation is known from the prior art (RU 2514048, C1, E21 B 7/08, E21 B 29/06, publ: 27.04.2014).
  • the method includes installing a fixing unit with a whipstock with one deflecting surface in the main borehole built to the target depth.
  • the fixing unit is made in the form of a hydromechanical anchor with a seat, and the anchor is fixed below the cutting interval.
  • the casing Before drilling the side bore, the casing is opened by milling the "window", and after the construction of the side bore, the whipstock is removed from the well, disconnecting it from the fixing unit, an additional whipstock of greater length is lowered until it interacts with the seat of the hydromechanical anchor, which fixes it from rotation, and before drilling an additional sidetrack, the casing is opened by milling an additional "window” followed by extraction an additional whipstock after the construction of the second sidetrack.
  • the device for implementing the method includes a whipstock run on the pipe string, equipped with one deflecting surface, connected from the bottom with shear elements through a sub with a fixing unit made in the form of a hydromechanical anchor, equipped with a longitudinally corrugated pipe, plugged from the bottom by a shoe, and a hydraulic centralizer located at the bottom of the sub ...
  • the centralizer is made in the form of a body with a longitudinal channel communicated with a longitudinally corrugated pipe and a pipe string.
  • a hollow piston is installed inside the body, made with the possibility of axial movement under excess fluid pressure and equipped with conical surfaces that act upon the movement of the piston on the pushers, located evenly along the perimeter and height of the body with the possibility of limited radial movement outward until it interacts with the walls of the casing, while the body from above it is equipped with a groove for the counter projections of the sub-wedge-off-take and additional wedge-whipstock to prevent rotation and set them in a given direction.
  • the equipment assembly is configured to be installed in the wellbore and comprises an outer wall surface configured to deflect the cutting tool to form a side borehole, and also deflect at least part of the component for completing the wellbore towards the side borehole, and at least part of a component for completing a wellbore is a joint used for completing a lateral wellbore and containing a shutoff and a sidetrack, a subsystem for temporary plugging of the space between the specified surface and a channel into which the shutoff can be inserted, and a sleeve attached to the temporary plugging subsystem and made with the ability to be displaced by the overlap, and the specified sleeve is made to prevent at least part of the debris from entering the seal, while the specified surface is configured to dock with the overlap and
  • the wellbore completion method includes moving the whipstock wedge and anchor retainer into the parent wellbore, while the anchor retainer is attached to the whipstock wedge by means of a detachable connection.
  • the parent wellbore is lined at least partially with a casing that includes a latch connection, securing the anchor retainer within the parent wellbore by mating the anchor retainer latch profile to the latch connection; deflection of the drill bit by a wedge - a diverter for drilling a side borehole extending from the parent borehole; moving the lateral completion equipment into the lateral wellbore with a tool for running the casing-liner, while the lateral completion equipment contains a finishing tool; separating the whipstock wedge from the anchor retainer by a detachable connection using the whipstock wedge extraction tool and thereby opening the detachable section, the whipstock extraction tool being functionally connected to the distal end of the tool for running the liner casing; removing the whipstock from the parent wellbore by means of the whipstock extraction tool; and moving the completion deflector into the interior of the parent wellbore, the completion deflector being functionally secured to the work string, and attaching the completion deflector to the anchor retainer via a detachable connection.
  • a method for constructing a multilateral well characterized by the fact that the main wellbore is drilled from the surface of the earth to the formation, a sidetrack is drilled from the previously drilled main borehole, upon completion of its drilling, a casing string equipped in the upper part with a node for the formation of a multilateral “joint” not lower than the third level of complexity according to the TAML classification is lowered into the side bore.
  • the casing string is lowered into the side bore, made from the lower section and at least one upper section, and is lowered in sections, while the lower section is equipped with a receiving adapter-disconnector for connection with the subsequent section, and the upper section has a length determined based on the actual depth running the previous section and the actual interval of the "window" milled in the string is made of the same or larger diameter and includes at least one casing pipe equipped in the lower part with a node for connection with the previous section located in the well, and the upper one is equipped in the upper part either a receiving adapter-disconnector for connection with a subsequent section, or a node for the formation of a multilateral joint not lower than the third level of complexity according to the TAML classification.
  • EFFECT improving the quality of construction of multilateral wells, minimizing the risks of getting rejects in the construction of multilateral wells caused by a liner failure.
  • the task to be solved by the claimed technical solution is to create a method for involving additional volumes of reservoir products in the development, by drilling an additional wellbore from an uncased section of the main wellbore, as well as creating a method and system that allows to reduce the number of trips, to increase the orientation accuracy and increase the speed of orientation.
  • the technical result of the claimed group of the invention is a reduction in hoisting operations, a reduction in orientation time when increasing drainage area of the productive formation due to drilling in a given direction and subsequent casing of an additional one (2, 3, etc.) sidetracks.
  • the technical result of the claimed group of inventions is achieved due to the fact that the main wellbore is drilled, the section for the liner is worked through, the running tool is lowered with an orientation tool, a liner and a suspension anchor, a liner with a suspension anchor is installed in an open wellbore at a given depth, and the actual the position of the orientation profile of the anchor-suspension in the well, the anchor is activated, the tool is released and the running tool is lifted to the surface, the instrument data is read and the actual position of the anchor in the well is determined, after which the assembly of cutters and a hollow whipstock is lowered with a preset at the wellhead orientation, join the hollow whipstock in the anchor and fix the whipstock in the anchor, while the top of the anchor is made in the form of a figured orientation profile, and the whipstock is made with an orientation key, the cutters are freed from the deflector wedge and the lateral branch is drilled wellbore along the whipstock, after which the liner is run, made with the possibility of
  • an autonomous orientator device is used to orient the top of the shank suspension.
  • a hydraulic or hydro-mechanical device for determining the orientation of the whipstock is used to orient the top of the liner suspension.
  • the points of measurement of the orientation tool and the orientation profile are set so that their orientation relative to the apsidal plane is the same.
  • a ram system or a corrugated pipe system is used as anchoring elements.
  • the technical result of the claimed group of inventions is also achieved due to the second variant of the method, in which the main wellbore is drilled, the section for the liner is worked through, the running tool with the orientation tool, the liner and the suspension anchor is lowered, the top of which is made in the form of a hollow whipstock with an anchor up to a given depth, while the transport column is made with a hydromechanical device that allows you to set in a given orientation the working surface of the whipstock, and the top of the shank is made with the possibility of rotation relative to the entire liner, while the whipstock is set in a predetermined orientation and the whipstock is fixed in the open hole, the sidetrack branch is cut off with a mill or chisel.
  • the points of measurement of the orientation tool and the orientation profile are set so that their orientation relative to the apsidal plane is the same.
  • a ram system or a corrugated pipe system is used as anchoring elements.
  • the technical result of the claimed group of inventions is also achieved due to a system for construction and completion of a well containing a liner, an anchor-suspension for an open hole with an orientation profile, a running tool connected to an anchor with a suspension, a device for determining the orientation of the whipstock, a hollow whipstock, when the anchor suspension consists of an orientation profile, made in the form of a funnel with a groove, and an anchor element, and the whipstock is made with a deflecting surface in the upper part, while an orientation key is made in the upper part of the whipstock to interact with the groove of the orientation profile, and the bottom of the whipstock is made in the form of a ratchet grip, while the anchor-hanger running tool is made with the possibility of lowering the hanger-hanger and the liner into the well, activating the liner hanger-anchor in the open wellbore, and freeing the transport string from the running liner, the running tool inserted into the component the armature and is fixed in it by shear elements in
  • the device for determining the orientation of the whipstock is made in the form of an autonomous device that allows determining the position of the anchor orientation profile relative to the apsidal plane of the wellbore.
  • the device for determining the orientation of the whipstock is made in the form of a hydraulic or hydromechanical device.
  • the anchor element is made in the form of a corrugated pipe with longitudinal rays, with the possibility of changing the shape by creating excessive internal pressure.
  • the anchor suspension is connected to the triggering tool using shear elements or using a hydromechanical system for fixing the triggering tool.
  • Fig. 1 an anchor-suspension for an open hole with an orientation profile
  • Figure 2 is the profile of the anchor element
  • Figure 4 is an anchor trigger
  • Fig. 5 is a hollow whipstock
  • Fig. 6 is a sectional view of a hollow whipstock
  • Fig. 7 is a completion system
  • Fig. 8 is a whipstock assembly with an arrangement of cutters. the following positions are indicated in the figures:
  • the main components of the system are a whipstock assembly (16) with the possibility of producing fluid from the underlying wellbore, (15) an anchor-suspension for an open hole, with the possibility of producing fluid from the underlying wellbore.
  • Well completion method is the following sequence of actions: After drilling a section of the main borehole, a liner is run and installed in an open wellbore, and the liner is fixed in an open wellbore with an anchor element.
  • the design features of the liner hanger make it possible to determine / set the liner hanger in a given orientation relative to the apsidal plane of the well.
  • an autonomous orientator device is used, which is run as part of the liner hanger running tool and, as a consequence, after installing the liner hanger in the open hole, allows to determine the actual orientation of the liner hanger.
  • the whipstock (16) is lowered and docked with the orientation profile of the liner hanger.
  • orientation occurs due to a hydraulic or hydromechanical device for determining the orientation of the hollow whipstock assembly (16). Accordingly, after orienting the whipstock assembly (16) in the borehole to a predetermined orientation, the anchor element is activated to fix the whipstock in the open hole.
  • the window cut-out system (wedge-cutter and the arrangement of cutters) / the assembly may be launched for drilling.
  • the liner After drilling the sidetrack, the liner is run with the possibility of producing fluid in the interval of the hollow whipstock assembly (16), thereby ensuring production from the interval below the location of the hollow whipstock assembly (16).
  • An anchor-suspension for an open hole is a device for fixing the overlying equipment in an open hole from axial movement, as well as from turning in the apsidal plane of the wellbore. If necessary, the suspension anchor (15) can have a packer in its structure, which makes it possible to separate the interval above and below with respect to the anchor.
  • the top of the anchor can be a figured orientation profile (1), designed to create fixed depth rapper and orientation in the apsidal plane of the well, for assemblies intended for subsequent docking with the orientation profile, in the case of a whipstock assembly.
  • the figured orientation profile (1) due to its geometry and design, makes it possible to fix subsequent assemblies exclusively in one position, due to the presence of a profile for an orientation key and, accordingly, a corresponding orientation key on the assembly of the hollow whipstock assembly (16).
  • the assembly of the hollow whipstock assembly (16) has a reciprocal orientation key, which, when docked with the hollow deflector wedge assembly (16), can only be fixed in the position when the orientation key has completely entered the groove of the orientational figured orientation profile (1) ...
  • the hollow whipstock assembly (16) consists of two components: the top of the whipstock (deflecting surface) (11), the bottom of the whipstock (12) with an orientation key.
  • the assembly of the hollow whipstock assembly (16), for the case of application with an orientation profile, has the ability to set and then fix the bottom of the whipstock (12) relative to the deflecting surface (11) in any orientation.
  • the hollow whipstock is designed to create the possibility of deflecting the assembly for sidetracking at a given depth and in a given orientation in the apsidal plane.
  • the suspension anchor (3) in the form of a hollow whipstock (11) is an anchor element, the top of which is represented by a hollow whipstock (11).
  • the main components of the multilateral well construction and completion system are:
  • Anchor suspension for an open hole consists of an orientation profile (1) and an anchor element (2).
  • the orientational profile of the anchor is rigidly connected to the anchor element, without the possibility of rotation or axial displacement relative to each other.
  • the orientation profile (1) is shaped like a funnel with a groove for an orientation key.
  • the presence of a shaped funnel is due to the fact that the assembly of the hollow whipstock assembly (Fig. 5.) has a matching orientation key, which, when docked with the whipstock, can only be locked in a position when the orientation key has completely entered the groove of the orientation funnel (1) ...
  • the anchor element (2) is a corrugated pipe (FIG. 2) with longitudinal beams.
  • the anchor element is activated by creating an excess internal pressure, then assuming a circular shape in its cross section.
  • an excess internal pressure is created, the corrugated pipe, under the influence of pressure, begins to take its original shape, opening the longitudinal rays and increasing in size.
  • the number of beams can be selected based on the geometric dimensions of the anchor element in the transport position.
  • the anchor hanger is lowered into the well on the running tool.
  • the anchor suspension is connected to the trigger by means of shear elements of the hydromechanical system for fixing the trigger to the anchor.
  • the lower part of the hanger is provided with threads similar to those of the shank.
  • the running tool (Fig. 4.) of the anchor suspension is a unit that allows the following operations to be performed: lowering the suspension anchor and the liner into the well, activate the liner suspension anchor in the open wellbore, and release the transport string from the running liner.
  • the trigger tool (Fig. 4) consists of an upper sub (4) and sealing assemblies (6), a seat (8) for a locating ball, an orientation device (9). All elements of the trigger are connected by threaded connections.
  • the trigger (Fig. 4) is inserted into the anchor assembly and fixed therein with shear bolts (5) in the axial and radial directions.
  • the seal assemblies (6) the trigger element creates a hermetically sealed cavity inside the anchor assembly, thus, when the discharge pressure increases, the force generated by the pressure through the hole (7) acted on the anchor element - activating it.
  • the setting ball is dropped into the transport pipe string.
  • the seat (8) which is inside the trigger (Fig. 4.)
  • the seat (8) is sheared off by increasing the pressure inside the trigger (Fig. 4).
  • the pins holding the seat are sheared off, the seat (8) is shifted to the lower part of the trigger.
  • openings (7) in the trigger are opened, allowing pressure to be injected into the anchor element, thereby activating the anchor element in the open wellbore.
  • the bolts (5) are sheared, which fix the tool relative to the anchor assembly (Fig. 1).
  • the pins are cut off by turning the transport string to the right and then tightening the transport string of pipes. After the pins have been cut off, the trigger tool (Fig. 4) is lifted to the surface.
  • the downhole orientation tool (9) is designed to determine the actual position of the orientation profile of the anchor-suspension (Fig. 1) in the well, after activation of the anchor unit.
  • An autonomous device (9) that allows you to determine the position of the orientation profile (1) of the anchor relative to the apsidal plane of the wellbore.
  • the measurement point of the orientation tool (9) and the orientation profile (1) is set, so that their orientation relative to the apsidal plane is the same.
  • the device As a source of energy, the device has rechargeable batteries in its structure.
  • the device has 2 modes: mode - active, mode - sleep.
  • mode - active During the descent into the well, the tool is in the sleep mode and is motionlessly attached to the trigger.
  • the point of measurement of the orientation device (9) and the orientation profile (1) is set, so that their orientation relative to the apsidal plane is the same.
  • the anchor element is activated at a given depth
  • the device (9) switches to the active mode.
  • the transition to the "Active" mode occurs due to the creation of a magnetic field around the device (9).
  • the magnetic field is generated by permanent magnets installed in the body of the saddle (8) under the locating ball.
  • the seat is shifted by pressure along the inner diameter of the trigger until the tool (9) touches the lower part of the trigger.
  • the magnetic field from the permanent magnets covers the device and the device switches to the "active" mode, recording the actual position of the groove of the anchor's orientation profile.
  • the device is removed and information is read from it on the actual position of the orientation profile (1) of the armature assembly (Fig. 1).
  • the whipstock (Fig. 5) is a node for sidetracking in an open wellbore with a bore internal diameter and subsequent production of fluid through the internal passageway (18) of the whipstock.
  • the hollow whipstock consists of 2 main elements: the top of the whipstock (deflecting surface) (11), the bottom of the whipstock (12).
  • the bottom (12) of the whipstock is represented by a ratchet grip (13) (Fig. B), for its subsequent fixation in the anchor - the shank suspension (Fig. 1).
  • the bottom (12) of the whipstock is also intended to orient the arrangement of the whipstock in the orientation profile (1) of the suspension armature (Fig. 1).
  • the upper part (11) is designed to deflect the cutter or directional drilling assembly.
  • the whipstock is run into the well together with the cutter assemblies (18) to cut off the branch in the open wellbore.
  • the bottom (12) of the whipstock relative to the top (11) is set in such a way that after joining the whipstock assembly into the anchor (Fig.
  • the deflecting surface (11) of the whipstock is directed to the target for shearing branching degrees relative to the apsidal plane of the wellbore.
  • the whipstock wedge (Fig. B) is mechanically joined into the orientation profile (1) of the anchor, and can only be fixed in one position (when the orientation key has entered the orientation profile (1) of the anchor).
  • the cutter assembly is released by tension and unloading of the transport pipe string.
  • the milling cutter with a whipstock is connected by a transport shear bolt, which breaks when a load on it is greater than the shearing force.
  • the key feature of the whipstock from similar wedge designs is the inner cavity of the maximum possible size for the possibility of producing fluid without removing the whipstock from the well, as well as for the possibility of drilling the wellbore along the diverter without significant wear the geometry of the deflecting surface (11) of the whipstock. Drilling along this whipstock is carried out primarily due to the fact that the wall thickness on the deflecting surface (11) makes it possible to create sufficient support for the arrangement of the cutter and the arrangement for drilling the sidetrack, while maintaining the maximum possible inner diameter of the whipstock ...
  • the liner (14) with an anchor-suspension (15) is lowered. After the liner is allowed to the specified depth, the anchor-suspension (15) is activated in the open hole, and the tool is released.
  • the instrument contains an autonomous orientation device that records the final position of the orientation profile relative to the apsidal plane.
  • the whipstock (16) is lowered, with the orientation already displayed at the wellhead.
  • the whipstock fits into the orientation funnel only in one position.
  • TRN Na1 Running a liner with an anchor-hanger. Activation of the anchor-suspension of the anchor with orientation profile. After lifting the tool - determination of the profile orientation according to the data of the stand-alone device.
  • OPONd2 Lowering a hollow whipstock with an orientation-fixing profile. Docking with the anchor profile. Cutting off a sidetrack branch, drilling a well.
  • CnONs3 Running a sidetrack liner, activating the liner hanger in the production casing.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Piles And Underground Anchors (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

L'invention concerne un système de complétion destiné à la construction et la complétion de puits multiples. Le procédé consiste à forer un trou de forage. On aménage la section sous l'emmanchement. On fait descendre un outil de descente avec un instrument d'orientation, l'emmanchement et une ancre suspendue. On installe l'emmanchement avec l'ancre suspendue dans le trou de forage ouvert. On détermine la position physique du profil d'orientation de l'ancre suspendue dans le puits. On active d'ancre, on libère l'outil et on fait remonter l'outil de descente vers la surface. On effectue une lecture des données de l'instrument et on détermine la position physique de l'ancre dans le puits. On fait descendre un ensemble de fraises et une cale de déviation creuse ayant une orientation déterminée au niveau de l'embouchure. La cale de déviation creuse est disposée sur l'ancre et fixée sur celle-ci. On libère les fraises de la cale de déviation et on effectue un forage d'un puits de forage latéral ramifié en fonction de la cale de déviation. On fait descendre l'emmanchement de manière à extraire un fluide dans l'intervalle de positionnement de la cale de déviation.
PCT/RU2019/000021 2019-01-16 2019-01-16 Système et procédés (variantes) de construction et de complétion de puits multiples WO2020149760A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/RU2019/000021 WO2020149760A1 (fr) 2019-01-16 2019-01-16 Système et procédés (variantes) de construction et de complétion de puits multiples
RU2019133397A RU2753417C2 (ru) 2019-01-16 2019-01-16 Система и способ строительства и заканчивания многозабойных скважин

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/RU2019/000021 WO2020149760A1 (fr) 2019-01-16 2019-01-16 Système et procédés (variantes) de construction et de complétion de puits multiples

Publications (1)

Publication Number Publication Date
WO2020149760A1 true WO2020149760A1 (fr) 2020-07-23

Family

ID=71614541

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/RU2019/000021 WO2020149760A1 (fr) 2019-01-16 2019-01-16 Système et procédés (variantes) de construction et de complétion de puits multiples

Country Status (2)

Country Link
RU (1) RU2753417C2 (fr)
WO (1) WO2020149760A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117127919A (zh) * 2023-10-26 2023-11-28 石家庄锦鸿能源科技有限公司 一种煤矿钻探施工的搬运系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2484231C1 (ru) * 2011-11-23 2013-06-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Клиновой отклонитель для забуривания боковых стволов из скважины
RU158893U1 (ru) * 2015-09-30 2016-01-20 Открытое акционерное общество "Сургутнефтегаз" Конструкция герметичного соединения для секционного спуска хвостовика с оборудованием многостадийного гидроразрыва пласта
WO2018052452A1 (fr) * 2016-09-19 2018-03-22 Halliburton Energy Services, Inc. Dispositif d'achèvement de rentrée extensible

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1631167A1 (ru) * 1989-03-10 1991-02-28 Всесоюзный Научно-Исследовательский Институт Буровой Техники Гидравлический сигнализатор положени отклонител
US6923274B2 (en) * 2003-01-02 2005-08-02 Weatherford/Lamb, Inc. Retrievable pre-milled window with deflector
CN106170601B (zh) * 2014-06-04 2019-01-18 哈利伯顿能源服务公司 用于多边井筒的造斜器和偏转器组件

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2484231C1 (ru) * 2011-11-23 2013-06-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Клиновой отклонитель для забуривания боковых стволов из скважины
RU158893U1 (ru) * 2015-09-30 2016-01-20 Открытое акционерное общество "Сургутнефтегаз" Конструкция герметичного соединения для секционного спуска хвостовика с оборудованием многостадийного гидроразрыва пласта
WO2018052452A1 (fr) * 2016-09-19 2018-03-22 Halliburton Energy Services, Inc. Dispositif d'achèvement de rentrée extensible

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
September 2018 (2018-09-01), XP055725719, Retrieved from the Internet <URL:https://temir-energy.kz/wp-content/uploads/2018/09/ADL_Full_Package_rev3.pdf> *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117127919A (zh) * 2023-10-26 2023-11-28 石家庄锦鸿能源科技有限公司 一种煤矿钻探施工的搬运系统
CN117127919B (zh) * 2023-10-26 2023-12-22 石家庄锦鸿能源科技有限公司 一种煤矿钻探施工的搬运系统

Also Published As

Publication number Publication date
RU2753417C2 (ru) 2021-08-16
RU2019133397A (ru) 2021-04-22
RU2019133397A3 (fr) 2021-04-22

Similar Documents

Publication Publication Date Title
US6752211B2 (en) Method and apparatus for multilateral junction
US7575050B2 (en) Method and apparatus for a downhole excavation in a wellbore
EP2622165B1 (fr) Système combiné de sifflet déviateur et de déflecteur de conditionnement
NO322081B1 (no) Foringsbossing for bruk naer en krysning mellom en hovedbronnstromningsleder og en lateral bronnboring
US9617791B2 (en) Sidetracking system and related methods
NO20180450A1 (en) One-trip multilateral tool
US7077206B2 (en) Method and apparatus involving an integrated or otherwise combined exit guide and section mill for sidetracking or directional drilling from existing wellbores
US20140360723A1 (en) Protective sheath through a casing window
RU2753417C2 (ru) Система и способ строительства и заканчивания многозабойных скважин
EP1248894A1 (fr) Procede et dispositif de forage devie a guide sortie combine a la fraise de section
EP2715057B1 (fr) Joint à fenêtre pour construction de puits de forage latéral et son procédé d&#39;ouverture
US10989006B2 (en) Creation of a window opening/exit utilizing a single trip process
RU2657583C1 (ru) Направляющее устройство бурового инструмента для селективного входа в боковой ствол

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19910324

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19910324

Country of ref document: EP

Kind code of ref document: A1