WO2020145617A1 - Équipement de fixation pour appareil de collecte de sable par balayage permettant d'empêcher l'érosion côtière - Google Patents

Équipement de fixation pour appareil de collecte de sable par balayage permettant d'empêcher l'érosion côtière Download PDF

Info

Publication number
WO2020145617A1
WO2020145617A1 PCT/KR2020/000252 KR2020000252W WO2020145617A1 WO 2020145617 A1 WO2020145617 A1 WO 2020145617A1 KR 2020000252 W KR2020000252 W KR 2020000252W WO 2020145617 A1 WO2020145617 A1 WO 2020145617A1
Authority
WO
WIPO (PCT)
Prior art keywords
sand collecting
collecting device
support block
fixing
lost sand
Prior art date
Application number
PCT/KR2020/000252
Other languages
English (en)
Korean (ko)
Inventor
이광수
Original Assignee
주식회사 한오션
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한오션 filed Critical 주식회사 한오션
Priority claimed from KR1020200001782A external-priority patent/KR102447163B1/ko
Publication of WO2020145617A1 publication Critical patent/WO2020145617A1/fr

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor

Definitions

  • the present invention relates to a fixing device for stably fixing the lost sand collecting device for preventing coastal erosion on the sea floor.
  • the sand on the coast is created by the accumulation of sand supplied from rivers and coastal dunes in the land, and in nature, the sand supplied in this form is deposited on the coast and the phenomenon of sand being lost to the sea by blue balances. So it will keep the sandy beach.
  • the forced crushing method includes a submerged method of suppressing blue waves by installing an underwater structure on the seabed away from the coast to the sea, and a shoreline method of blocking the effects of blue waves on the land side by installing structures close to the shore or inside the coastline.
  • the submerged method is a method that blocks only high blue using a structure that is constructed under the surface of the structure, that is, submerged ( ⁇ ), and the low blue and high blue using an lancing agent that protrudes a certain height above the water surface. All are separated by blocking.
  • the latent agent and the antagonist are mostly made of a concrete structure in order to satisfy these conditions because they require a degree of stiffness not to be swept by the currents or waves. Due to the nature of these underwater structures, it not only hinders the operation of the ship, but also has an adverse effect on the activation of marine leisure sports.
  • the artificial way of injecting sand artificially takes a lot of cost for sand collection and transportation, and there is a burden to continuously supply sand because it is not a fundamental measure to prevent the loss of sand.
  • a sand collecting device 10 capable of effectively suppressing coastal erosion has been devised by collecting sand swept away by sea currents.
  • the conventional lost sand collecting device 10 is a structure in which a plurality of plates are superimposed in parallel with each other and partially adjacent to each other at regular intervals in the longitudinal direction, and are extended laterally to form a plurality of filling spaces. It consists of a filling part, and a resistive film part provided on the top of the filling part.
  • the conventional lost sand collecting device 10 is simply installed in a manner that is seated on the sea floor, it is continuously affected by the flow of sea water, and has a problem that its installation position changes little by little.
  • the seabed surface on which the lost sand collecting device 10 is settled is made of sand, it may occur that the sand of the seabed surface is moved by the current, so that it may deviate significantly from the initially set installation position over time.
  • moving from the installed location it is not possible to act as intended, and there is a concern that it will be pushed to the beach and turned into waste.
  • the present invention is to solve the problems of the prior art as described above, and an object of the present invention is to provide a fixing device stably fixed so that the position of the lost sand collecting device installed on the sea bottom does not change.
  • Fixing device of the coastal erosion prevention loss sand collecting device a plurality of plates are arranged in parallel with each other and the adjacent plates are partially joined to each other, and the filling portion is extended laterally to form a plurality of filling spaces.
  • a lost sand collecting device made of a resistive film provided on the top of the filling portion, arranged to support the lost sand collecting device thereunder, a plurality of binding to each other by a connecting wire It comprises a support block of the dog, a fixed frame seated on the upper end of the filling portion of the lost sand collecting device and engaged with the connection wire, and an anchor mechanism engaged with the support block to be pushed to the bottom surface.
  • the support block is in the form of a disc and has a round bottom and a flat top surface to receive downward lift by the horizontal flow of seawater.
  • the support block is formed in a vertical through hole formed in the center.
  • a locking bar is provided in the vertical through hole of the supporting block, and the connecting wires are wound around the locking bar of each supporting block so that each supporting block is bound to each other.
  • the fixed frame is formed of a grid in which a plurality of vertical bars and a plurality of horizontal bars are combined.
  • the connecting wire and the fixed frame that bind the support block are bound to each other by a plurality of binding bands.
  • the anchor mechanism consists of a post equipped with a hook at the top end, a conical member configured at the bottom of the post, and a plurality of bendable engaging pieces provided on an outer surface of the conical member.
  • the downward lift force caused by the support block and the resistance phenomenon caused by the anchor mechanism are combined, and the installation position of the lost sand collecting device is fixed stably even under special conditions such as the seabed. It has the advantage of being.
  • Figure 1 Figure showing a conventional lost sand collecting device
  • Figure 2 is a view showing by separating the components of the fixed equipment for collecting lost sand according to the present invention
  • Figure 3 A diagram showing a state in which the components of the fixed device for collecting lost sand according to the present invention are combined.
  • Figure 4 In the present invention, a view showing the connection structure of the connection wire and the anchor mechanism for the support block
  • Figure 6a, 6b a view showing the resistance phenomenon of the support block and the anchor mechanism in the present invention
  • the fixing device is for fixing the position where the lost sand collecting device 5 is installed on the seabed.
  • a plurality of plates 12 are disposed in parallel with each other. It is a structure in which the adjacent plates 12 are partially joined to each other and is formed of a filling part 10 extending laterally to form a plurality of filling spaces, and a resistive film part 14 provided on an upper end of the filling part 10. (See Figure 1)
  • the fixing device is arranged to support the lost sand collecting device 5, as shown in Figures 2 and 3, and a plurality of support blocks 20 that are bound to each other by a connecting wire 22 ,
  • a fixed frame 30 that is seated on the upper end of the filling portion 10 of the lost sand collecting device 5 and engaged with the connecting wire 22, and an anchor fastened to the bottom surface by being engaged with the supporting block 20 It consists of a mechanism (40).
  • the support block 20 is in the form of a disc, and the bottom surface 201 is rounded and the top surface 202 is formed in a flat shape to receive downward lift by the horizontal flow of seawater, and a vertical through hole 20a is formed in the center thereof. .
  • the support blocks 20 are spaced apart at regular intervals so that an even support state is formed with respect to the lost sand collecting device 5.
  • a locking bar 24 is provided in the vertical through hole 20a of the support block 20, and each of the connecting wires 22 is wound around the locking bar 24.
  • the support blocks 20 are bound to each other.
  • the fixed frame 30 is made of a grid shape in which a plurality of vertical bars 301 and a plurality of horizontal bars 302 are combined, and the connection wire 22 and the fixed frame binding the support block 20 30 is bound to each other by a plurality of binding bands (26).
  • the anchor mechanism 40 includes a post 42 equipped with a hook at the top end, a conical member 44 formed at a lower end of the post 42, and a plurality of curves provided on an outer surface of the conical member 44. It consists of a possible catch piece (46).
  • the anchor mechanism 40 has a structure in which the hook portion at the top of the post 42 is caught by the locking rod 24 through the vertical through hole 20a of the support block 20, and the conical member 44 is pushed to the bottom surface. It is installed, and depending on the condition, it may be installed so that the hook portion is hooked to the connecting wire 22 that binds each of the supporting blocks 20.
  • the support block 20 is basically installed in a way that is embedded in the sand of the sea floor, and the lost sand collecting device 5 is placed on the sea floor.
  • the fixed frame 30 is installed in a form that covers the filling portion 10 of the lost sand collecting device 5, and the resistive film portion 14 of the lost sand collecting device 5 is vertical to the fixed frame 30.
  • the bar 301 and the horizontal bar 302 are protruded upward through the grid gap.
  • the anchor mechanism 40 passes through the vertical through hole 20a of the support block 20 from the top to the bottom, and the hook portion is caught in the locking bar 24, and the conical member 44 is in a state of being embedded in the bottom surface.
  • the fixing frame 30 for pressing the lost sand collecting device 5 is bound to the connecting wire 22 by a binding band 26, the Connection wire 22 is connected to the support block 20, the structure of the anchor mechanism 40 is applied to the support block 20, the fixing action of the support block 20 and the anchor mechanism 40 is combined to connect the wire
  • the movement of the fixed frame 30 is suppressed by being applied to the fixed frame 30 through 22, and as a result, the position of the lost sand collecting device 5 is stably maintained by the fixed frame 30.
  • the supporting block 20 is fixed by the downward lift phenomenon according to its shape characteristics
  • the anchor mechanism 40 is fixed by the resistance phenomenon by the locking piece 46.
  • the description of each fixing action is as follows.
  • the downward lift action is due to the shape characteristics of the support block 20 whose bottom surface 201 has a round shape and the upper surface 202 has a flat shape, according to which the support block 20 of the support block 20 is shown.
  • the direction of the support block 20 is directed downward. Lifting force, that is, downward lifting force is applied, and accordingly, the phenomenon that the supporting block 20 is pressed down occurs.
  • the resistance phenomenon of the anchor mechanism 40 is caused when the anchor mechanism 40 exerts an upward force acting upward and the engaging piece 46 interferes with the surrounding sand and unfolds.
  • the support block 20 is basically buried in the sand of the sea floor, the support block 20 is not significantly affected by the flow of seawater. Can be seen (see Figure 6a).
  • the sand in the bottom of the sea surface is a mixture of sea water and sand unlike the soil on the land, even when the support block 20 is buried in the sea bottom, the flow of sea water is also accelerated by typhoons or strong tidal currents. When the bottom surface is affected by this, the flow of seawater and sand is generated, and the downward lift force pressing the support block 20 downwards acts.
  • the lost sand collecting device 5 is firmly fixed despite changes in the conditions of the seabed.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

La présente invention concerne un équipement de fixation pour un appareil de collecte de sable par balayage pour empêcher l'érosion côtière. Ledit équipement comprend: une pluralité de blocs de support qui sont disposés de façon à supporter un appareil de collecte de sable par balayage à partir du fond de celui-ci, et sont reliés l'un à l'autre par un fil de liaison; un cadre de fixation qui est placé sur l'extrémité supérieure d'une partie de remplissage de l'appareil de collecte de sable par balayage, et est relié au fil de liaison; et un mécanisme d'ancrage qui est fixé à chacun des blocs de support et est intégré dans un fond marin. Les blocs de support sont chacun formés de manière à avoir une surface inférieure ronde et une surface supérieure plate. Une tige de saisie est disposée dans un trou traversant vertical de chacun des blocs de support, et le fil de liaison est enroulé autour des tiges de saisie respectives des blocs de support. Le cadre de fixation et le fil de liaison liant les blocs de support sont liés l'un à l'autre par une pluralité de bandes de liaison. Le mécanisme d'ancrage comprend : un montant ayant une partie de crochet disposée sur son extrémité avant supérieure; un élément de cône configuré sur l'extrémité inférieure du montant; et une pluralité de pièces de butée pouvant être incurvées disposées sur la surface extérieure de l'élément de cône. Selon la présente invention, un phénomène de portance négative au moyen des blocs de support et un phénomène de résistance au moyen des mécanismes d'ancrage sont combinés, et ainsi la position d'installation de l'appareil de collecte de sable par balayage peut être fixée de manière stable.
PCT/KR2020/000252 2019-01-07 2020-01-07 Équipement de fixation pour appareil de collecte de sable par balayage permettant d'empêcher l'érosion côtière WO2020145617A1 (fr)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR20190001554 2019-01-07
KR10-2019-0001554 2019-01-07
KR1020200001782A KR102447163B1 (ko) 2019-01-07 2020-01-07 해안침식방지용 유실모래 포집장치의 고정설비
KR10-2020-0001782 2020-01-07

Publications (1)

Publication Number Publication Date
WO2020145617A1 true WO2020145617A1 (fr) 2020-07-16

Family

ID=71520408

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2020/000252 WO2020145617A1 (fr) 2019-01-07 2020-01-07 Équipement de fixation pour appareil de collecte de sable par balayage permettant d'empêcher l'érosion côtière

Country Status (1)

Country Link
WO (1) WO2020145617A1 (fr)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331126A (ja) * 1997-06-02 1998-12-15 Ohbayashi Corp 漂砂制御用ブロック体及び該ブロック体の設置方法
KR101513681B1 (ko) * 2013-11-27 2015-04-23 한국건설기술연구원 사면보강틀 고정용 앵커기구
KR101782157B1 (ko) * 2017-03-10 2017-09-27 (주) 대현이엔씨 친환경 스톤네트 구조물 및 그 시공방법
KR20170113018A (ko) * 2016-04-01 2017-10-12 주식회사 한오션 해안침식 방지용 파압 및 해빈류 완화 시스템
KR20170112806A (ko) * 2016-04-01 2017-10-12 주식회사 한오션 해안침식 방지용 유실모래 포집장치

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331126A (ja) * 1997-06-02 1998-12-15 Ohbayashi Corp 漂砂制御用ブロック体及び該ブロック体の設置方法
KR101513681B1 (ko) * 2013-11-27 2015-04-23 한국건설기술연구원 사면보강틀 고정용 앵커기구
KR20170113018A (ko) * 2016-04-01 2017-10-12 주식회사 한오션 해안침식 방지용 파압 및 해빈류 완화 시스템
KR20170112806A (ko) * 2016-04-01 2017-10-12 주식회사 한오션 해안침식 방지용 유실모래 포집장치
KR101782157B1 (ko) * 2017-03-10 2017-09-27 (주) 대현이엔씨 친환경 스톤네트 구조물 및 그 시공방법

Similar Documents

Publication Publication Date Title
US5071286A (en) Floating boom for confining waterborne contaminates
CN109196167B (zh) 防止海岸侵蚀用流失沙捕集装置
US20040115003A1 (en) Floating river debris skimmer
US5944443A (en) Adjustable porous groynes and method for shoreline reclamation
ES2294133T3 (es) Estructuras porosas ajustables y metodo para la recuperacion de costas y masas de terreno.
US6722817B2 (en) Adjustable porous structures and method for shoreline and land mass reclamation
KR101958907B1 (ko) 해안침식 방지용 파압 및 해빈류 완화 시스템
WO2020145617A1 (fr) Équipement de fixation pour appareil de collecte de sable par balayage permettant d'empêcher l'érosion côtière
DE2729201A1 (de) Vorrichtung zum ablagern und zum schutz von sedimentmaterial am boden von gewaessern
KR20200085672A (ko) 해안침식방지용 유실모래 포집장치의 고정설비
WO2017155182A1 (fr) Corps de bloc de maîtrise de dérive du sable
US6190088B1 (en) Device for forming a sand body and method for the application thereof
EP0537261B1 (fr) Structures incorporant des pneus de vehicules usages
WO2003021046A2 (fr) Epi poreux et flexible et procede de mise en valeur du rivage
WO2020149641A1 (fr) Appareil de suppression d'érosion côtière
US20050169709A1 (en) Coastal land reclamation and erosion prevention system
WO2017171267A1 (fr) Système de régulation de la pression des vagues et du courant de littoral pour prévenir l'érosion côtière
KR100572385B1 (ko) 단선식 오일펜스 전개장치 및 이를 이용한 유출유 회수방법
WO2020141679A1 (fr) Équipement d'induction de tourbillon sous-marin
KR200442717Y1 (ko) 오일 또는 오탁 방지막 지지용 앵커
JP3077022B2 (ja) 消波構造物
JP3010274B2 (ja) 移動式防波堤の構造及びその設置方法
US20240286717A1 (en) Multipurpose selective fish capture system
GB2143269A (en) Bridges for traversing waterways
JP2881725B2 (ja) 消波敷設体とそれを使用した消波構造物

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20738135

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20738135

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 17.11.2021)

122 Ep: pct application non-entry in european phase

Ref document number: 20738135

Country of ref document: EP

Kind code of ref document: A1