WO2020122324A1 - Water treatment facility cover - Google Patents

Water treatment facility cover Download PDF

Info

Publication number
WO2020122324A1
WO2020122324A1 PCT/KR2019/003154 KR2019003154W WO2020122324A1 WO 2020122324 A1 WO2020122324 A1 WO 2020122324A1 KR 2019003154 W KR2019003154 W KR 2019003154W WO 2020122324 A1 WO2020122324 A1 WO 2020122324A1
Authority
WO
WIPO (PCT)
Prior art keywords
water treatment
treatment facility
cover
pipe
wall
Prior art date
Application number
PCT/KR2019/003154
Other languages
French (fr)
Korean (ko)
Inventor
이승태
Original Assignee
이승태
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이승태 filed Critical 이승태
Publication of WO2020122324A1 publication Critical patent/WO2020122324A1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/12Activated sludge processes
    • C02F3/1236Particular type of activated sludge installations
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/12Activated sludge processes
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/14Maintenance of water treatment installations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Definitions

  • Disclosure relates to a water treatment facility for purifying sewage.
  • a water treatment facility includes a plurality of compartments (flow control tank, reaction tank, aeration tank, sedimentation tank, etc.), and is installed in a building to function to purify sewage discharged from the facility.
  • compartments flow control tank, reaction tank, aeration tank, sedimentation tank, etc.
  • Korean Registered Patent Publication No. 10-0335997 discloses an example of a water treatment facility.
  • a water treatment facility cover is a water treatment facility cover that is coupled to a water treatment facility body having at least two compartments, has an area corresponding to the water treatment facility body, and is coupled to an upper portion of the water treatment facility body, and the water treatment facility A body in which a management hole is formed at a position corresponding to each upper compartment of the main body; An edge wall formed on an edge of the lower surface of the body; And, at least one boundary wall formed on a lower surface of the body and dividing the inner space of the border wall into a number corresponding to a compartment of the water treatment facility body, including one end of the boundary wall and one side of the boundary wall Between the end and the inside of the border wall facing each other, it is characterized in that a space is formed to be fitted with a pipe.
  • the water treatment facility cover according to the embodiment is formed on the side of the body, a pipe hole connected to any one of the plurality of management holes; Pipe fixing protrusions formed on the lower surface of the body; may further include.
  • the water treatment facility cover according to the embodiment is configured so that the pipe can be easily installed therein. Accordingly, when constructing a water treatment facility, if the cover of the water treatment facility according to the embodiment is applied, there is no need to make a groove or hole for pipe installation in the body of the water treatment facility, and thus the construction period of the water treatment facility can be significantly shortened.
  • FIG. 1 is a perspective view of a water treatment facility cover 100 according to an embodiment.
  • FIG. 2 is a use state diagram of the water treatment facility cover 100 according to the embodiment.
  • FIG 3 is a perspective view of a water treatment facility cover 100 ′ according to another embodiment and a water treatment facility cover 100 ′′ according to another embodiment.
  • FIG. 1 is a perspective view of a water treatment facility cover 100 according to an embodiment
  • FIG. 2 is a water treatment facility cover 100 showing a state in which the water treatment facility cover 100 according to the embodiment is coupled to the water treatment facility body TB. It is also in use.
  • the water treatment facility cover 100 has at least two or more compartments, and is coupled to an open water treatment facility body TB.
  • the water treatment facility main body TB illustrated in the drawings is only an example for explaining the water treatment facility cover 100 according to the embodiment.
  • the water treatment facility cover 100 according to the embodiment may be applied to various types of water treatment facility bodies (eg, a starting type, a tank lorry form, etc.), including the water treatment facility body TB shown in the drawings.
  • the water treatment facility body TB is not limited to a specific material.
  • the water treatment facility cover 100 includes a body 110 and a border wall 120 and a border wall 130.
  • the body 110 has an area corresponding to the water treatment facility body TB, and is coupled to the water treatment facility body TB.
  • the body 110 may be in the form of a plate.
  • a management hole 112 is formed at predetermined points of the body 110 corresponding to each compartment above the water treatment facility body TB.
  • the management hole 112 may have a size and shape corresponding to a commercially available manhole cover, and may be configured to be closed with a manhole cover.
  • the edge wall 120 is formed on the lower edge of the body 110.
  • the border wall 120 is configured to be higher than the diameter of the pipe P1 to be installed in the water treatment facility.
  • the thickness of the border wall 120 may be configured to correspond to the wall thickness of the water treatment facility body TB, and a space of a predetermined size is formed inside the border wall 120.
  • the boundary wall 130 is formed on the lower surface of the body 110, and divides the inner space of the border wall 120 into a number corresponding to the compartment of the water treatment facility body TB.
  • the boundary wall 130 of the body 110 may be configured to be located in a position corresponding to the upper boundary wall of the water treatment facility body (TB), the boundary wall ( 130) may be configured to a thickness corresponding to the thickness of the boundary wall of the water treatment facility body (TB).
  • a pipe (P1) for transferring fluid from one compartment of the water treatment facility body TB to another compartment A space into which a can be fitted is formed.
  • a space in which can be fitted may be formed.
  • a guide wall for stably supporting the pipe P1 at the end of the boundary wall 130 may be further formed, and referring to FIG. 3 (b), the pipe to the boundary wall 130 A groove or the like into which the P1 can be fitted may be formed.
  • a pipe hole 114 connected to any one of the plurality of management holes 112 may be formed on a side surface of the body 110.
  • the pipe hole 114 may be one or more for each management hole 112.
  • a pipe P2 or a hose made of a thin or flexible material, such as an air injection pipe, may be installed in the pipe hole 114.
  • the pipe P2 installed in the pipe hole 114 is not damaged due to friction with an external object.
  • the water treatment facility cover 100 according to the embodiment provided with the pipe hole 114 is divided into a pipe P1 having its own rigidity and a pipe P2 of a thin or flexible material. That is, the pipe having a self-fixing force (rigidity) is quickly installed between the boundary wall 130 and the edge wall 120, and the thin or flexible material pipe P2 is stable in the pipe hole 114. It is installed as an insert.
  • a self-fixing force rigidity
  • a pipe fixing protrusion 116 for fixing the pipe P1 may be further formed on a lower surface of the body 110 corresponding to the management hole 112.
  • the pipe fixing protrusion 116 functions to fix the end of the pipe P1.
  • equipment such as pipes and filter media in the vertical direction are installed inside the body TB of the water treatment facility.
  • the water treatment facility cover 100 having pipes P1 and P2 therein is coupled to the top of the water treatment facility body TB.
  • the water treatment facility cover 100 may be applied to a general water treatment facility body TB.
  • the pipes P1 and P2 are configured to be easily installed therein, and when the water treatment facility cover 100 according to the embodiment is applied during construction of the water treatment facility, the pipe is installed in the main body TB of the water treatment facility. Since there is no need to make a groove or hole, a construction period of a water treatment facility can be significantly shortened compared to the prior art.

Abstract

A water treatment facility cover, according to an embodiment, is a water treatment facility cover coupled to a water treatment facility body having at least two compartments, the cover comprising: a body having an area corresponding to the water treatment facility body, coupled to an upper portion of the water treatment facility body, and having management holes formed at positions corresponding to the upper portion of each compartment of the water treatment facility body; an edge wall formed on edges of the bottom surface of the body; and a boundary wall, formed on the bottom surface of the body, for partitioning an inner space of the edge wall into a number corresponding to the number of compartments of the water treatment facility body.

Description

수처리시설 덮개Water treatment facility cover
본 개시(Disclosure)는 오수를 정화처리하는 수처리시설와 관련된다.Disclosure relates to a water treatment facility for purifying sewage.
일반적으로 수처리시설는 복수 개의 격실(유량조절조, 반응조, 폭기조, 침전조 등)을 포함하고, 건물 등에 설치되어, 시설에서 배출되는 오수를 정화처리하는 기능을 한다.In general, a water treatment facility includes a plurality of compartments (flow control tank, reaction tank, aeration tank, sedimentation tank, etc.), and is installed in a building to function to purify sewage discharged from the facility.
한국 등록특허공보 제10-0335997호에는 수처리시설의 일례가 게재되어 있다. Korean Registered Patent Publication No. 10-0335997 discloses an example of a water treatment facility.
한편, 전술한 공보를 참조하면, 수처리시설 시공시, 복수 개의 격실을 구비한 수처리시설 본체의 내부에는, 어느 하나의 격실에서 다른 하나의 격실로 이어지는 파이프(반송파이프 등)가 설치되는데, 상기 파이프를 설치하기 위해서는, 격실을 구획하는 경계벽에 홈이나 홀을 만드는 번거로운 작업이 선행되어야 한다.On the other hand, referring to the above-mentioned publication, when constructing a water treatment facility, a pipe (conveying pipe, etc.) from one compartment to the other is installed inside the body of the water treatment facility having a plurality of compartments. In order to install the, the cumbersome work of making a groove or a hole in the boundary wall partitioning the compartment must be preceded.
수처리시설 시공시, 수처리시설 본체에 파이프 설치를 위한 홈이나 홀을 만들 필요가 없도록 하여, 수처리시설 시공기간을 현격히 단축시킬 수 있는, 새로운 형태의 수처리시설 덮개를 제공하는 것이다.It is to provide a new type of water treatment facility cover that can significantly shorten the construction period of the water treatment facility by eliminating the need to make grooves or holes for pipe installation in the body of the water treatment facility.
실시예에 따른 수처리시설 덮개는, 적어도 2개 이상의 격실이 구비된 수처리시설 본체에 결합되는 수처리시설 덮개로서, 수처리시설 본체에 대응하는 면적을 갖고 상기 수처리시설 본체의 상부에 결합되며, 상기 수처리시설 본체의 각 격실 상방에 해당하는 위치에 관리홀이 형성된 몸체; 상기 몸체의 하면 가장자리에 형성된 테두리벽; 및, 상기 몸체의 하면에 형성되어 상기 테두리벽의 내측 공간을 상기 수처리시설 본체의 격실에 대응되는 개수로 구획하는, 적어도 하나 이상의 경계벽;을 포함하되, 상기 경계벽의 일측 단부와, 상기 경계벽의 일측 단부와 마주하는 상기 테두리벽의 내측 사이에는, 파이프가 끼워질 수 있는 공간이 형성되는 것을 특징으로 한다.A water treatment facility cover according to an embodiment is a water treatment facility cover that is coupled to a water treatment facility body having at least two compartments, has an area corresponding to the water treatment facility body, and is coupled to an upper portion of the water treatment facility body, and the water treatment facility A body in which a management hole is formed at a position corresponding to each upper compartment of the main body; An edge wall formed on an edge of the lower surface of the body; And, at least one boundary wall formed on a lower surface of the body and dividing the inner space of the border wall into a number corresponding to a compartment of the water treatment facility body, including one end of the boundary wall and one side of the boundary wall Between the end and the inside of the border wall facing each other, it is characterized in that a space is formed to be fitted with a pipe.
또한, 실시예에 따른 수처리시설 덮개는, 상기 몸체의 측면에 형성되어, 복수 개의 상기 관리홀 중 어느 하나와 연결되는 파이프홀; 상기 몸체의 하면에 형성되는 파이프고정돌기;를 더 포함할 수 있다.In addition, the water treatment facility cover according to the embodiment is formed on the side of the body, a pipe hole connected to any one of the plurality of management holes; Pipe fixing protrusions formed on the lower surface of the body; may further include.
실시예에 따른 수처리시설 덮개는, 내부에 파이프가 용이하게 설치될 수 있도록 구성된다. 그에 따라, 수처리시설 시공시, 실시예에 따른 수처리시설 덮개를 적용하면, 수처리시설 본체에 파이프 설치를 위한 홈이나 홀을 만들 필요가 없으므로, 수처리시설 시공기간을 현격히 단축시킬 수 있다.The water treatment facility cover according to the embodiment is configured so that the pipe can be easily installed therein. Accordingly, when constructing a water treatment facility, if the cover of the water treatment facility according to the embodiment is applied, there is no need to make a groove or hole for pipe installation in the body of the water treatment facility, and thus the construction period of the water treatment facility can be significantly shortened.
도 1은 실시예에 따른 수처리시설 덮개(100)의 사시도이다.1 is a perspective view of a water treatment facility cover 100 according to an embodiment.
도 2는 실시예에 따른 수처리시설 덮개(100)의 사용 상태도이다.2 is a use state diagram of the water treatment facility cover 100 according to the embodiment.
도 3은 다른 실시예에 따른 수처리시설 덮개(100')와 또 다른 실시예에 따른 수처리시설 덮개(100'')의 사시도이다.3 is a perspective view of a water treatment facility cover 100 ′ according to another embodiment and a water treatment facility cover 100 ″ according to another embodiment.
* 부호의 설명* Explanation of codes
100, 100', 100'' : 수처리시설 덮개100, 100', 100'': Water treatment facility cover
110 : 몸체110: body
112 : 관리홀112: management hall
114 : 파이프홀114: pipe hole
116 : 파이프고정돌기116: pipe fixing protrusion
120 : 테두리벽120: border wall
130 : 경계벽130: boundary wall
---
TB : 수처리시설 본체TB: Water treatment facility body
P1, P2 : 파이프P1, P2: Pipe
이하, 첨부된 도면을 참조하여, 실시예에 따른 수처리시설 덮개(100)를 구체적으로 설명한다.Hereinafter, the water treatment facility cover 100 according to the embodiment will be described in detail with reference to the accompanying drawings.
도 1은 실시예에 따른 수처리시설 덮개(100)의 사시도이고, 도 2는 수처리시설 본체(TB)에 실시예에 따른 수처리시설 덮개(100)가 결합된 모습을 도시하는 수처리시설 덮개(100)의 사용 상태도이다.1 is a perspective view of a water treatment facility cover 100 according to an embodiment, and FIG. 2 is a water treatment facility cover 100 showing a state in which the water treatment facility cover 100 according to the embodiment is coupled to the water treatment facility body TB. It is also in use.
도 1 내지 도 2를 참조하면, 실시예 따른 수처리시설 덮개(100)는, 적어도 2개 이상의 격실을 구비하고, 상부가 개방된 수처리시설 본체(TB)에 결합된다.1 to 2, the water treatment facility cover 100 according to the embodiment has at least two or more compartments, and is coupled to an open water treatment facility body TB.
도면에 도시된 수처리시설 본체(TB)는, 실시예 따른 수처리시설 덮개(100)를 설명하기 위한, 일례에 불과하다. 실시예에 따른 수처리시설 덮개(100)는 도면에 도시된 수처리시설 본체(TB)를 포함하여, 다양한 형태의 수처리시설 본체(예 : 원기동 형태, 탱크로리 형태 등)에 적용될 수 있다. 또한, 수처리시설 본체(TB)는 특정 재질로 제한되지 않는다.The water treatment facility main body TB illustrated in the drawings is only an example for explaining the water treatment facility cover 100 according to the embodiment. The water treatment facility cover 100 according to the embodiment may be applied to various types of water treatment facility bodies (eg, a starting type, a tank lorry form, etc.), including the water treatment facility body TB shown in the drawings. In addition, the water treatment facility body TB is not limited to a specific material.
실시예에 따른 수처리시설 덮개(100)는, 몸체(110) 및, 테두리벽(120), 경계벽(130)을 포함한다.The water treatment facility cover 100 according to the embodiment includes a body 110 and a border wall 120 and a border wall 130.
몸체(110)는 수처리시설 본체(TB)에 대응하는 면적을 갖고, 수처리시설 본체(TB)에 결합된다. 몸체(110)는 플레이트 형태일 수 있다. 몸체(110)가 수처리시설 본체(TB)에 결합되었을 때, 수처리시설 본체(TB)의 각 격실 상방에 해당하는 몸체(110)의 소정 지점들에는 관리홀(112)이 형성된다. 하나의 예로서, 관리홀(112)은 시중에 판매되는 맨홀 뚜껑에 대응되는 크기와 형태일 수 있고, 맨홀 뚜껑으로 폐쇄할 수 있도록 구성될 수 있다.The body 110 has an area corresponding to the water treatment facility body TB, and is coupled to the water treatment facility body TB. The body 110 may be in the form of a plate. When the body 110 is coupled to the water treatment facility body TB, a management hole 112 is formed at predetermined points of the body 110 corresponding to each compartment above the water treatment facility body TB. As one example, the management hole 112 may have a size and shape corresponding to a commercially available manhole cover, and may be configured to be closed with a manhole cover.
테두리벽(120)은 몸체(110)의 하면 가장자리에 형성된다. 테두리벽(120)은 수처리시설에 설치될 파이프(P1) 지름에 비하여, 높도록 구성된다. 테두리벽(120)의 두께는, 수처리시설 본체(TB)의 벽 두께에 대응되도록 구성될 수 있고, 테두리벽(120)의 내측에는 소정 크기의 공간이 형성된다.The edge wall 120 is formed on the lower edge of the body 110. The border wall 120 is configured to be higher than the diameter of the pipe P1 to be installed in the water treatment facility. The thickness of the border wall 120 may be configured to correspond to the wall thickness of the water treatment facility body TB, and a space of a predetermined size is formed inside the border wall 120.
경계벽(130)은 몸체(110)의 하면에 형성되며, 테두리벽(120)의 내측 공간을 수처리시설 본체(TB)의 격실에 대응되는 개수로 구획한다. 한편, 몸체(110)가 수처리시설 본체(TB)에 결합되었을 때, 몸체(110)의 경계벽(130)은 수처리시설 본체(TB)의 경계벽 상방에 해당하는 곳에 위치되도록 구성될 수 있고, 경계벽(130)은 수처리시설 본체(TB)의 경계벽의 두께에 대응되는 두께로 구성될 수 있다. The boundary wall 130 is formed on the lower surface of the body 110, and divides the inner space of the border wall 120 into a number corresponding to the compartment of the water treatment facility body TB. On the other hand, when the body 110 is coupled to the water treatment facility body (TB), the boundary wall 130 of the body 110 may be configured to be located in a position corresponding to the upper boundary wall of the water treatment facility body (TB), the boundary wall ( 130) may be configured to a thickness corresponding to the thickness of the boundary wall of the water treatment facility body (TB).
경계벽(130)의 일측 단부와 경계벽(130)의 일측 단부와 마주하는 테두리벽(120)의 내측 사이에는, 수처리시설 본체(TB)의 어느 한 격실에서 다른 격실로 유체를 이송시키는 파이프(P1)가 끼워질 수 있는 공간이 형성된다.Between the one end of the boundary wall 130 and the inside of the edge wall 120 facing one end of the boundary wall 130, a pipe (P1) for transferring fluid from one compartment of the water treatment facility body TB to another compartment A space into which a can be fitted is formed.
경계벽(130)의 타측 단부와 경계벽(130)의 타측 단부와 마주하는 테두리벽(120)의 내측 사이에도, 수처리시설 본체(TB)의 어느 한 격실에서 다른 격실로 유체를 이송시키는 파이프(P1)가 끼워질 수 있는 공간이 형성될 수 있다.A pipe P1 for transferring fluid from one compartment of the water treatment facility body TB to another compartment between the other end of the boundary wall 130 and the inside of the edge wall 120 facing the other end of the boundary wall 130. A space in which can be fitted may be formed.
한편, 도 3 (a)를 참조하면,경계벽(130) 단부에는 파이프(P1)를 안정적으로 지지하는 가이드벽이 더 형성될 수 있고, 도 3 (b)를 참조하면, 경계벽(130)에 파이프(P1)가 끼워질 수 있는 홈 등이 형성될 수도 있다.On the other hand, referring to FIG. 3 (a), a guide wall for stably supporting the pipe P1 at the end of the boundary wall 130 may be further formed, and referring to FIG. 3 (b), the pipe to the boundary wall 130 A groove or the like into which the P1 can be fitted may be formed.
계속해서, 몸체(110)의 측면에는 복수 개의 관리홀(112) 중 어느 하나와 연결되는 파이프홀(114)이 형성될 수 있다. 파이프홀(114)은 각 관리홀(112)당 1개 이상일 수 있다. 파이프홀(114)에는 공기주입파이프 등과 같이, 얇거나 플렉시블(Flexible)한 재질의 파이프(P2) 또는 호스가 설치될 수 있다. 파이프홀(114)에 설치된 파이프(P2)는 외부 물체와의 마찰 등의 이유로 손상될 우려가 없다. 또한, 파이프홀(114)에 파이프(P2)를 설치할 경우, 별도의 고정구를 사용할 필요가 없다.Subsequently, a pipe hole 114 connected to any one of the plurality of management holes 112 may be formed on a side surface of the body 110. The pipe hole 114 may be one or more for each management hole 112. A pipe P2 or a hose made of a thin or flexible material, such as an air injection pipe, may be installed in the pipe hole 114. The pipe P2 installed in the pipe hole 114 is not damaged due to friction with an external object. In addition, when installing the pipe (P2) in the pipe hole 114, there is no need to use a separate fixture.
파이프홀(114)이 구비된 실시예에 따른 수처리시설 덮개(100)는, 자체 강성을 지닌 파이프(P1)와, 얇거나 플렉시블(Flexible)한 재질의 파이프(P2) 설치 방법이 구분된다. 즉, 자체 고정력(강성)을 지닌 파이프는, 경계벽(130)과 테두리벽(120) 사이에 신속히 설치되고, 얇거나 플렉시블(Flexible)한 재질의 파이프(P2)는, 파이프홀(114)에 안정적으로 삽입 설치된다.The water treatment facility cover 100 according to the embodiment provided with the pipe hole 114 is divided into a pipe P1 having its own rigidity and a pipe P2 of a thin or flexible material. That is, the pipe having a self-fixing force (rigidity) is quickly installed between the boundary wall 130 and the edge wall 120, and the thin or flexible material pipe P2 is stable in the pipe hole 114. It is installed as an insert.
또한, 관리홀(112) 인근에 해당하는 몸체(110)의 하면에는, 파이프(P1)를 고정하는 파이프고정돌기(116)가 더 형성될 수 있다. 파이프고정돌기(116)는 파이프(P1)의 단부를 고정하는 기능을 한다.In addition, a pipe fixing protrusion 116 for fixing the pipe P1 may be further formed on a lower surface of the body 110 corresponding to the management hole 112. The pipe fixing protrusion 116 functions to fix the end of the pipe P1.
실시예에 따른 수처리시설 덮개(100)를 적용한 수처리시설 시공법에 대하여 설명한다. A method of constructing a water treatment facility to which the cover 100 of a water treatment facility according to an embodiment is applied will be described.
먼저, 수처리시설 본체(TB)의 내부에 수직 방향의 파이프 및 여과재 등의 기자재를 설치된다.First, equipment such as pipes and filter media in the vertical direction are installed inside the body TB of the water treatment facility.
계속해서, 내부에 파이프(P1, P2)가 구비된 수처리시설 덮개(100)가 수처리시설 본체(TB)의 상부에 결합된다.Subsequently, the water treatment facility cover 100 having pipes P1 and P2 therein is coupled to the top of the water treatment facility body TB.
이어서, 관리홀(112)을 활용한 작업을 통해, 수처리시설 본체(TB)에 설치된 파이프의 단부와, 수처리시설 덮개(100)에 설치된 파이프(P1, P2)의 단부가 연결되고, 맨홀 뚜껑에 의해, 관리홀(112)을 폐쇄되면, 수처리시설 설치가 완료된다.Subsequently, through the operation using the management hole 112, the ends of the pipes installed in the water treatment facility main body TB and the ends of the pipes P1 and P2 installed in the water treatment facility cover 100 are connected to the manhole cover. Thereby, when the management hall 112 is closed, the water treatment facility installation is completed.
앞서 설명한 실시예에 따른 수처리시설 덮개(100)는, 일반적인 수처리시설 본체(TB)에 적용될 수 있다. The water treatment facility cover 100 according to the above-described embodiment may be applied to a general water treatment facility body TB.
또한, 내부에 파이프(P1, P2)가 용이하게 설치될 수 있도록 구성되어 있어서, 수처리시설 시공시, 실시예에 따른 수처리시설 덮개(100)를 적용하면, 수처리시설 본체(TB)에 파이프 설치를 위한 홈이나 홀을 만들 필요가 없으므로, 종래에 비하여, 수처리시설 시공기간을 현격히 단축시킬 수 있다.In addition, since the pipes P1 and P2 are configured to be easily installed therein, and when the water treatment facility cover 100 according to the embodiment is applied during construction of the water treatment facility, the pipe is installed in the main body TB of the water treatment facility. Since there is no need to make a groove or hole, a construction period of a water treatment facility can be significantly shortened compared to the prior art.
본 개시는 당해 기술분야에서 통상의 지식을 가진 자에 의하여, 기술적 사상을 벗어나지 않는 범위 내에서 다양하게 변형(응용)될 수 있을 것이다.The present disclosure may be variously modified (applied) by those skilled in the art without departing from the technical spirit.
따라서, 본 개시의 청구범위는 '발명의 설명' 및 '도면' 전반에 내포된 기술적 사상을 바탕으로 폭넓게 해석되어야 한다.Therefore, the claims of the present disclosure should be interpreted broadly based on the technical ideas contained throughout the description of the invention and the drawings.

Claims (4)

  1. 적어도 2개 이상의 격실이 구비된 수처리시설 본체에 결합되는 수처리시설 덮개로서,A water treatment facility cover coupled to a water treatment facility body having at least two compartments,
    수처리시설 본체에 대응하는 면적을 갖고 상기 수처리시설 본체의 상부에 결합되며, 상기 수처리시설 본체의 각 격실 상방에 해당하는 위치에 관리홀이 형성된 몸체;A body having an area corresponding to the main body of the water treatment facility, coupled to an upper portion of the main body of the water treatment facility, and having a management hole formed at a position corresponding to each compartment above the main body of the water treatment facility;
    상기 몸체의 하면 가장자리에 형성된 테두리벽; 및,An edge wall formed on an edge of the lower surface of the body; And,
    상기 몸체의 하면에 형성되어 상기 테두리벽의 내측 공간을 상기 수처리시설 본체의 격실에 대응되는 개수로 구획하는, 적어도 하나 이상의 경계벽;을 포함하되,It includes at least one or more boundary walls formed on the lower surface of the body to divide the inner space of the border wall into a number corresponding to the compartment of the water treatment facility body.
    상기 경계벽의 일측 단부와, 상기 경계벽의 일측 단부와 마주하는 상기 테두리벽의 내측 사이에는, 파이프가 끼워질 수 있는 공간이 형성되는 것을 특징으로 하는, 수처리시설 덮개.Between the one end of the boundary wall and the inside of the border wall facing one end of the boundary wall, characterized in that a space in which a pipe can be fitted, water treatment facility cover.
  2. 제1항에 있어서,According to claim 1,
    상기 몸체의 측면에 형성되어, 복수 개의 상기 관리홀 중 어느 하나와 연결되는 파이프홀;을 더 포함하는, 수처리시설 덮개.A pipe hole formed on the side of the body and connected to any one of the plurality of management holes; further comprising a water treatment facility cover.
  3. 제1항에 있어서,According to claim 1,
    상기 몸체의 하면에 형성되는 파이프고정돌기;를 더 포함하는, 수처리시설 덮개.A pipe fixing protrusion formed on the lower surface of the body; further comprising, a water treatment facility cover.
  4. 적어도 2개 이상의 격실이 구비된 수처리시설 본체에 결합되는 수처리시설 덮개로서,A water treatment facility cover coupled to a water treatment facility body having at least two compartments,
    수처리시설 본체에 대응하는 면적을 갖고 상기 수처리시설 본체의 상부에 결합되며, 상기 수처리시설 본체의 각 격실 상방에 해당하는 위치에 관리홀이 형성된 몸체;A body having an area corresponding to the main body of the water treatment facility, coupled to an upper portion of the main body of the water treatment facility, and having a management hole formed at a position corresponding to each compartment above the main body of the water treatment facility;
    상기 몸체의 하면 가장자리에 형성된 테두리벽; 및,An edge wall formed on an edge of the lower surface of the body; And,
    상기 몸체의 하면에 형성되어 상기 테두리벽의 내측 공간을 상기 수처리시설 본체의 격실에 대응되는 개수로 구획하는, 적어도 하나 이상의 경계벽;을 포함하되,It includes at least one or more boundary walls formed on the lower surface of the body to divide the inner space of the border wall into a number corresponding to the compartment of the water treatment facility body.
    상기 경계벽에는 파이프가 끼워질 수 있는 홈이 형성되는 것을 특징으로 하고,The boundary wall is characterized in that a groove through which a pipe can be fitted is formed,
    상기 몸체의 측면에 형성되어, 복수 개의 상기 관리홀 중 어느 하나와 연결되는 파이프홀;을 더 포함하는 수처리시설 덮개.A water treatment facility cover further comprising a pipe hole formed on a side of the body and connected to any one of the plurality of management holes.
PCT/KR2019/003154 2018-12-12 2019-03-19 Water treatment facility cover WO2020122324A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2018-0159791 2018-12-12
KR1020180159791A KR20200072055A (en) 2018-12-12 2018-12-12 Cover for water treatment facility

Publications (1)

Publication Number Publication Date
WO2020122324A1 true WO2020122324A1 (en) 2020-06-18

Family

ID=71076523

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2019/003154 WO2020122324A1 (en) 2018-12-12 2019-03-19 Water treatment facility cover

Country Status (2)

Country Link
KR (3) KR20200072055A (en)
WO (1) WO2020122324A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003019408A (en) * 2001-07-09 2003-01-21 Aqua Garden Hightech:Kk Closed type filtration equipment for water tank and amphibious pump
KR200321399Y1 (en) * 2003-04-21 2003-07-28 (주) 동서엔지니어링 Apparatus for treating wastewater using a permeable block
KR200332793Y1 (en) * 2003-08-19 2003-11-07 원유곤 Concrete module reactor produced in a factory for the use of wastewater treatment facilities
KR20090047577A (en) * 2007-11-08 2009-05-13 박진서 Integrated head filter housing assembly for water purifier and water purifier using the same
KR101682065B1 (en) * 2016-04-21 2016-12-02 김재록 Prefabricated wastewater treatment equipment using bio-filters

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003019408A (en) * 2001-07-09 2003-01-21 Aqua Garden Hightech:Kk Closed type filtration equipment for water tank and amphibious pump
KR200321399Y1 (en) * 2003-04-21 2003-07-28 (주) 동서엔지니어링 Apparatus for treating wastewater using a permeable block
KR200332793Y1 (en) * 2003-08-19 2003-11-07 원유곤 Concrete module reactor produced in a factory for the use of wastewater treatment facilities
KR20090047577A (en) * 2007-11-08 2009-05-13 박진서 Integrated head filter housing assembly for water purifier and water purifier using the same
KR101682065B1 (en) * 2016-04-21 2016-12-02 김재록 Prefabricated wastewater treatment equipment using bio-filters

Also Published As

Publication number Publication date
KR20210095110A (en) 2021-07-30
KR20200072055A (en) 2020-06-22
KR20210001804U (en) 2021-08-06
KR200497461Y1 (en) 2023-11-17

Similar Documents

Publication Publication Date Title
AU2005330523B2 (en) Cable duct
WO2017065406A1 (en) One-touch type rebar coupler
CN102239616B (en) Spillover fitting
WO2020122324A1 (en) Water treatment facility cover
WO2014030808A1 (en) Foul-water storage and discharge device
WO2018101733A1 (en) Pile guide structure for ground excavation, and pile installation construction method using same
AU2016320250B2 (en) Line leadthrough with integrated smoke stopper
NL8303750A (en) DEVICE FOR END-CLOSING OF CABLE CHANNELS.
WO2019009614A1 (en) Water leak-preventing non-powered humidifying module for air purifier
WO2018155866A1 (en) Installation structure of non-buoyant collector well having leakage prevention function
WO2017026589A1 (en) Outer-wall heat-insulating finishing material
WO2016114482A1 (en) Block connector for septic tank and water treatment facility, and prefabricated block using same
WO2013141511A1 (en) Structure for preventing air leakage and air cleaner having the same
WO2015111776A1 (en) Movable apparatus for collecting floating matters
WO2014104527A1 (en) Three-row chain flight-type sludge collector
WO2017164694A2 (en) Drain trap
WO2014021625A1 (en) Greenhouse comprising concrete piles
KR200420493Y1 (en) A concrete sewage disposal tank
CN208057163U (en) Tunnel drainage system
CN204079581U (en) A kind of injection circulation reactor for sewage disposal
CN207468449U (en) A kind of outlet air purifier of three lattice one septic tank
JPS61175424A (en) Clean room
WO2018088880A1 (en) Watertight member for pipe connecting device
CN217848914U (en) Cable trough for coal mine
CN209583748U (en) A kind of uniform aeration device for immersion type membrane separator

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19895950

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19895950

Country of ref document: EP

Kind code of ref document: A1