WO2020053702A1 - Active battery management method - Google Patents
Active battery management method Download PDFInfo
- Publication number
- WO2020053702A1 WO2020053702A1 PCT/IB2019/057409 IB2019057409W WO2020053702A1 WO 2020053702 A1 WO2020053702 A1 WO 2020053702A1 IB 2019057409 W IB2019057409 W IB 2019057409W WO 2020053702 A1 WO2020053702 A1 WO 2020053702A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- battery
- discharging
- charging
- signal injections
- signals
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/367—Software therefor, e.g. for battery testing using modelling or look-up tables
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/382—Arrangements for monitoring battery or accumulator variables, e.g. SoC
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/392—Determining battery ageing or deterioration, e.g. state of health
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/44—Methods for charging or discharging
- H01M10/443—Methods for charging or discharging in response to temperature
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
- H01M10/486—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for measuring temperature
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/02—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries for charging batteries from AC mains by converters
- H02J7/04—Regulation of charging current or voltage
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/40—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries characterised by the exchange of charge or discharge related data
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/80—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries including monitoring or indicating arrangements
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/80—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries including monitoring or indicating arrangements
- H02J7/82—Control of state of charge [SOC]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/80—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries including monitoring or indicating arrangements
- H02J7/84—Control of state of health [SOH]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J7/90—Regulation of charging or discharging current or voltage
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/396—Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
- H01M2010/4271—Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M2220/00—Batteries for particular applications
- H01M2220/20—Batteries in motive systems, e.g. vehicle, ship, plane
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Definitions
- Battery management is of critical importance to a number of commercial applications ranging from consumer electronics to automotive electrification and grid- level energy storage. Battery management is also a key component of the value proposition of any battery system whose utility depends on delivering a minimum amount of energy reliably and safely over an extended period of time, from a couple of years for consumer electronics to a decade for grid installations.
- a first method for active battery management includes injecting randomized controlled signals in charging or discharging of a battery and ensuring the signal injections occur within normal operational ranges and constraints. The method also includes monitoring performance of the battery in response to the controlled signals, computing confidence intervals about the causal relationships between the battery performance and the controlled signals, and selecting optimal signals for the charging or discharging of the battery based on the computed confidence intervals.
- a second method for active battery management includes providing signal injections for charging or discharging of a battery and receiving response signals corresponding with the signal injections. The method also includes measuring a utility of the response signals, accessing data relating to charging or discharging of the battery, and modifying the data based upon the utility of the response signals.
- FIG. l is a diagram illustrating a system for implementing an active battery management method
- FIG. 2 is a flow chart of a search space method for the system
- FIG. 3 is a flow chart of a signal injection method for the system
- FIG. 4 is a flow chart of a continuous learning method for the system
- FIG. 5 is a flow chart of a memory management method for the system
- FIGS. 6A-6D illustrate the search space of all possible charge profiles for the Examples
- FIGS. 7A-7C illustrate that the algorithm in the Examples identified distinct effect sizes for old cells versus new cells.
- FIGS. 8A-8C illustrate voltage versus capacity for a charge profile assigned by the algorithm in the Examples.
- This battery management by implementing random experiments on the charge and discharge variables and inferring their causal effects on utility metrics such as energy capacity, power, fade rate, charge time, internal resistance, state of health, cell imbalance, temperature, cell swelling, electricity cost, and more. Linear combinations of any of the above utility metrics may also be defined to give the figure of merit which balances competing requirements.
- This battery management can be used in, for example, electric or hybrid vehicles, electric bicycles, consumer electronic devices, grid storage systems and other vehicles and devices using batteries.
- FIG. l is a diagram illustrating a system for implementing an active battery management method.
- the system includes a processor 10 electrically coupled with a power source 12, a load 20, and a data storage 22.
- Power source 12 provides power for charging one or more batteries 14, 16, and 18, and the batteries provide power to load 20.
- processor 10 injects signals to power source 12 using profiles and parameters 24 and possibly external data 26 in order to evaluate the performance of batteries 14, 16, and 18, for example how the batteries perform for charging and discharging of them.
- Performance metrics can include, for example, delivered power, energy capacity, and fade rate.
- Processor 10 stores as results 28 the response to the signal injections, and those responses can be used to optimize performance of the batteries.
- the processing for the battery management can occur locally with dedicated firmware on the battery charging system, on standalone PC, or be cloud based and occur remotely from the batteries.
- Profiles and parameters 24 includes possible charging and discharging rates, charging and discharging profiles, and profile endpoints.
- the charging and discharging profiles include the shape of such profiles and possibly time at a particular state of charge or voltage.
- the charging endpoints include the percentage of charge in the batteries at which to start and stop charging charging the batteries, and the discharging endpoints include the percentage of charge in the batteries at which to start and stop discharging the batteries.
- the profiles and parameters can be stored in look-up tables, for example.
- External data 26 can include, for example, environmental conditions or factors such as temperature, humidity, airflow around the batteries, time of day or year, and time since turning on the device or vehicle using the batteries. Also, active cooling or heating of the batteries can be used as other control variables with parameters of temperature set points, rates, and gradients in time and space.
- external data can also include the following with respect to such devices: usage of applications, user settings, a scheduled event or alarm, a power consumption pattern, a time of day, or the location of the device.
- external data can include time of day or time next scheduled use, typical driving patterns for the vehicle, electricity cost versus time (i.e., for example to avoid peak pricing), predicted weather conditions, planned travel route, or traffic conditions.
- the batteries can include a single physical battery or multiple physical batteries that collectively provide power. In the case of multiple physical batteries, the batteries may have the same or different construction or electrochemistry.
- the process of injecting signals for charging and discharging of the batteries seeks to optimize charging and discharging profiles for a particular battery or a pack of batteries.
- the pack of batteries can be considered as a single battery where the pack collectively operates together, or the pack of batteries can be considered multiple physical batteries driven one-by-one.
- Examples of types of batteries include lithium ion, reflow, lead acid, and others.
- FIGS. 2-5 are flow charts of methods for active battery management to optimize charging and discharging profiles and parameters. These methods can be implemented in, for example, software modules for execution by processor 10.
- FIG. 2 is a flow chart of a search space method.
- the search space method includes the following steps: receive control information (including costs) 30; construct multidimensional space of all possible control states 32; constrain space of potential control spaces 34; determine normal/baseline sampling distribution 36; determine highest utility sampling distribution 38; and automated control selection within constrained space 40.
- FIG. 3 is a flow chart of a signal injection method.
- the signal injection method includes the following steps: receive set of potential signal injections 42; compute spatial and temporal reaches of signal injections 44; coordinate signal injections in space and time 46; implement signal injections 48; collect response data 50; and associate response data with signal injections 52.
- the signal injections are changes in charging and discharging profiles and parameters for battery management.
- the responses to signal injection are typically battery performance resulting from or related to the changes in profiles and parameters from the signal injections.
- the algorithm can perturb values in a look-up table representing charging and discharging profiles and parameters, and then monitor and store the corresponding battery performance response.
- the temporal and spatial reaches of signal injections relate to, respectively, when and where to measure the response signals to those signal injections that are used for computing causal relationships.
- the cost of signal injection typically relates to how the signal injection affects battery performance, for example signal injection can result in lower battery performance, and is controlled by the specified experimental range.
- the queue for signal injection involves the order and priority of signal injections and relies on blocking and randomization to guarantee high internal validity at all times, even when optimizing utility.
- the utility of responses to signal injection involves the effectiveness of the signal injections or other measures of utility.
- FIG. 4 is a flow chart of a continuous learning method.
- the continuous learning method includes the following steps: receive set of potential signal injections 54; receive current belief states 56; compute learning values for signal injections 58; receive costs for signal injections 60; select and coordinate signal injections 62; implement signal injections 64; collect response data 66; and update belief states 68.
- the belief states are a set of different models of battery performance in response to charging and discharging. These belief states may have attached uncertainty values reflecting the likelihood that they are accurate given the current set of trials and knowledge that may tend to confirm or falsify these different models, and the information that can further confirm or falsify the models may be included in this data or derived from the basic characteristics of the particular model and the physics of the underlying system.
- the learning value is a measure of the value that knowledge generated as a result of the signal injection may provide to subsequent decision-making by a system, such as determining that a particular charging or discharging profile is more likely to be optimal.
- the learning value may be computed through, for example, predicting the raw number of belief states that may be falsified according to the predictions of a Partially Observable Markov Decision Process (POMDP) or other statistical model, predicted impacts of the signal injection on the uncertainty levels in the belief states in such models, or experimental power analyses computing the reduction in uncertainty and narrowing of confidence intervals based on increasing to the current sample size.
- POMDP Partially Observable Markov Decision Process
- FIG. 5 is a flow chart of a memory management method.
- the memory management method includes the following steps: receive set of historical clusters 70; receive set of historical signal injections 72; and compute temporal stability of signal injections for current clusters 74. If the signal injections from step 74 are stable 76, then the memory management method executes the following steps: receive set of historical external factor states 78; compute stability of signal injections versus external factors states 80; select two states to split cluster across 82 only if there is enough variance across the two states and enough data within each state (after splitting) to be able to drive decisions in each state (i.e., compute confidence intervals); and update set of historical clusters 84.
- a cluster is a group of experimental units that are statistically equivalent with respect to the measure causal effects. Within a cluster, effects are measured free of bias and/or confounding effects from external factors, which guarantees that we are measuring causation and not just correlations/associations. Distribution of measured effects within each cluster are approximately normally distributed.
- Table 1 provides an algorithm of an embodiment for automatically generating and applying causal knowledge for active battery management. This algorithm can be implemented in software or firmware for execution by processor 10.
- Power characterizes the amount of energy per unit time. Maximizing power is a balancing act of minimizing charge time while minimizing the loss in energy capacity with each cycle. In electric vehicle applications, increased power enables faster acceleration and greater performance. In grid applications such as peak shaving where a typical charge/discharge cycle is 24 hours, increased power translates to longer life-time and/or smaller installations.
- the 4 independent variables consisted of the two coordinates (cutoff voltage: V, and constant current: I) of the two control points of the cubic Bezier function. Each independent variable was discretized into 8 levels, resulting in a total of 4096 possible combinations. Once fully charged, the cells were discharged under a fixed discharge profile (constant current at 250 mA to 3 V).
- the Figure Of Merit was defined as delivered power calculated as the discharge energy divided by cycle time (i.e., charge time + discharge time). Prior to any significant aging of the cells, both discharge energy and discharge time were nearly constant across cells (or cycles) and the FOM was driven primarily by charge time. Additional dependent variables were recorded with each cycle including charge energy and charge time. External variables were also recorded with each cycle to explore their possible effect of the dependent variables and find clustering opportunities.
- the external variables included cell identification (ID), old versus new cell, discharge energy and discharge time.
- FIGS. 6A-6D show the search space of all possible charge profiles for the described experiment.
- the optimum charge profile is shown as the dashed line with its end points and control handle points shown as the dot-dashed line.
- the chosen FOM total delivered power
- the power values associated with the optimum charge profile are shown as the dark gray circles.
- the FOM and the exploit frequency are also plotted as a function of time.
- FIG. 6A shows the search space of all possible charge profiles.
- FIG. 6B shows the FOM versus discharge energy.
- FIG. 6C shows the FOM versus time.
- FIG. 6D shows the exploit frequency.
- FIGS. 7A-7C show that, over time, the algorithm identified distinct effect sizes for old cells versus new cells. Once clustering is initiated, the algorithm exploits charge profiles that are optimum for each distinct cluster, which may or may not be the same across clusters.
- FIGS. 7 A and 7B illustrate the Example of method for maximizing delivered power, where E-Cap refers to energy capacity.
- FIG. 7C illustrates the Example of method for maximizing delivered power under environmental conditions. Method for measuring cell internal resistance
- FIG. 8A shows voltage versus capacity for a charge profile assigned by the algorithm (solid line) versus reference C/20 charge profile (dashed line) illustrating the overpotential Dn.
- FIG. 8B shows SOC and overpotential versus current.
- FIG. 8C shows internal resistance versus SOC.
- Knowledge of in situ internal resistance over time can be used to improve the performance and safety of the battery management system by eliminating charge profiles in the search space that could lead to significant over- and under-voltage, heating and degradation of the cells.
- Internal resistance maps can be built from subgroups within the data, and examples of possible subgroups include but are not limited to: cell age, number of cycles, temperature exposure, cumulative discharged energy, average discharge current, average charge current, maximum charge current, average voltage, manufacturing batch. Changes in internal resistance can also be used to detect anomalous conditions such as onset of a short circuit in a battery pack. Method for balancing cells in a pack
- SOH state of health
- internal resistance across cells While cell aging tends to be fairly uniform at the beginning of battery life (within manufacturing tolerances), it becomes increasingly more heterogeneous and unpredictable with each additional charge/discharge cycle. This is an important consideration when repackaging used cells into packs for new applications as a way to extent their life time in less demanding applications.
- One example is reusing EV batteries for grid-level energy storage.
- the development of smart battery management systems that are capable of balancing cell ageing is critical to ensure safe, reliable and durable operations and make the application economically viable. Accurate determination of the internal resistance of each cell as well as clustering across homogeneous cell groups is an effective mechanism to quantitatively implement cell balancing in practice.
- hybrid vehicles can use systems that combine different types of cells with different performance and ageing characteristics.
- the power grid can use systems that combine high power and high energy storage. This translates to greater variance in the data, resulting in greater difficulty to apply standard data analytics techniques for battery management.
- the algorithm disclosed herein can address this type of problem by automatically identifying the minimum set of homogeneous clusters that can be used for reliable causal inference over time.
- the algorithm disclosed herein can also be used to implement experiments on batteries across different vehicles.
- Li-ion polymer battery wound pouch cells Rechargeable Li-ion polymer battery wound pouch cells, 5.0x30x35 mm, nominal capacity 500mAh; graphite anode and LiCoCh cathode (E-Group, Mt. Laurel, New Jersey).
- Maccor 96 channel, Series 4000 Maccor (Tulsa, Oklahoma).
- the cubic Bezier curve can be defined as an affine combination of two quadratic Bezier curves:
- the curve may intersect itself or contain a cusp.
Landscapes
- Engineering & Computer Science (AREA)
- General Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Secondary Cells (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Medical Informatics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021537523A JP7361122B2 (ja) | 2018-09-11 | 2019-09-03 | アクティブバッテリ管理方法 |
| US17/272,824 US20210190868A1 (en) | 2018-09-11 | 2019-09-03 | Active battery management method |
| CN201980058914.4A CN112703412A (zh) | 2018-09-11 | 2019-09-03 | 主动式蓄电池管理方法 |
| EP19860886.1A EP3850385A4 (en) | 2018-09-11 | 2019-09-03 | Active battery management method |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201862729598P | 2018-09-11 | 2018-09-11 | |
| US62/729,598 | 2018-09-11 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2020053702A1 true WO2020053702A1 (en) | 2020-03-19 |
Family
ID=69777670
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/IB2019/057409 Ceased WO2020053702A1 (en) | 2018-09-11 | 2019-09-03 | Active battery management method |
| PCT/US2019/050281 Ceased WO2020055778A1 (en) | 2018-09-11 | 2019-09-10 | Active battery management method for economic optimization |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2019/050281 Ceased WO2020055778A1 (en) | 2018-09-11 | 2019-09-10 | Active battery management method for economic optimization |
Country Status (5)
| Country | Link |
|---|---|
| US (3) | US20210190868A1 (enExample) |
| EP (2) | EP3850385A4 (enExample) |
| JP (2) | JP7361122B2 (enExample) |
| CN (3) | CN112703412A (enExample) |
| WO (2) | WO2020053702A1 (enExample) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12092694B2 (en) | 2018-09-11 | 2024-09-17 | 3M Innovative Properties Company | Active battery management method for economic optimization |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6896793B2 (ja) * | 2019-05-27 | 2021-06-30 | 本田技研工業株式会社 | 情報処理装置 |
| DE102019216015A1 (de) * | 2019-10-17 | 2021-04-22 | Robert Bosch Gmbh | Verfahren zum Anpassen einer Anodenüberspannung einer Lithium-Ionen-Batterie, Verfahren zum Verbessern eines Kapazitätsalterungszustands der Lithium-Ionen-Batterie |
| DE102020212236A1 (de) * | 2020-09-29 | 2022-03-31 | Robert Bosch Gesellschaft mit beschränkter Haftung | Verfahren und Vorrichtung zum Betreiben eines Systems zum Bereitstellen von Alterungszuständen von elektrischen Energiespeichern für eine Vielzahl von Geräten mithilfe von maschinellen Lernverfahren |
| CN115556610A (zh) * | 2021-07-01 | 2023-01-03 | 沃尔沃汽车公司 | 车对车充电系统和方法 |
| US11443569B1 (en) * | 2021-10-30 | 2022-09-13 | Beta Air, Llc | Systems and methods for battery management for a vehicle |
| US12179608B2 (en) | 2021-12-03 | 2024-12-31 | Sustainable Energy Technologies, Inc. | Monitoring and managing temperature of power packs |
| WO2023102265A1 (en) * | 2021-12-03 | 2023-06-08 | Sustainable Energy Technologies, Inc. | System and method for energy management of a power pack for an electric vehicle including photovoltaic charging |
| US12194886B2 (en) | 2021-12-06 | 2025-01-14 | Sustainable Energy Technologies, Inc. | System and method for analyzing temperature changes in supercapacitor battery storage for electric vehicle |
| US12296721B2 (en) | 2021-12-10 | 2025-05-13 | Sustainable Energy Technologies, Inc. | Method and systems to trickle charge electric vehicle's supercapacitors using solar energy |
| CN114660478B (zh) | 2022-05-12 | 2022-09-02 | 中创新航科技股份有限公司 | 电池装置、其检测方法、电池单元的筛选方法及装置 |
| KR102769183B1 (ko) * | 2022-06-13 | 2025-02-14 | 연세대학교 산학협력단 | 이차전지 수명 분석방법 및 장치 |
| WO2024187166A1 (en) * | 2023-03-08 | 2024-09-12 | Lifetime Energy Inc. | System and method of determining economic decisions based on lifetime performance of a battery by a real-time battery management system |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6526361B1 (en) * | 1997-06-19 | 2003-02-25 | Snap-On Equipment Limited | Battery testing and classification |
| JP2009183105A (ja) * | 2008-01-31 | 2009-08-13 | Panasonic Corp | 充電制御回路、電池パック、及び充電システム |
| KR101288652B1 (ko) * | 2009-10-09 | 2013-07-22 | 주식회사 엘지화학 | 사용자 패턴별 충전 설정시스템 및 충전방법 |
| KR20140025310A (ko) * | 2010-10-22 | 2014-03-04 | 누클레우스 사이언티픽, 인크. | 배터리를 급속 충전하는 장치 및 방법 |
| KR20140094362A (ko) * | 2013-01-22 | 2014-07-30 | 한국전자통신연구원 | 전기차 에너지 관리 장치 및 방법 |
Family Cites Families (34)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3379298B2 (ja) * | 1995-08-30 | 2003-02-24 | 新神戸電機株式会社 | シール鉛蓄電池の寿命判定装置 |
| US6374251B1 (en) * | 1998-03-17 | 2002-04-16 | Microsoft Corporation | Scalable system for clustering of large databases |
| JPH11289676A (ja) * | 1998-04-01 | 1999-10-19 | Toyo System Kk | 二次電池充放電装置用の電源装置 |
| KR100317598B1 (ko) | 1999-03-13 | 2001-12-22 | 박찬구 | 라플라스 변환 임피던스 측정방법 및 측정장치 |
| AU2001273306A1 (en) * | 2000-07-05 | 2002-01-14 | Camo, Inc. | Method and system for the dynamic analysis of data |
| US6653817B2 (en) * | 2001-06-26 | 2003-11-25 | General Motors Corporation | State-of-charge detection device for a battery |
| US6555991B1 (en) | 2002-02-05 | 2003-04-29 | Andrew Michael Zettel | Battery operating condition dependent method and apparatus for controlling energy transfer between an energy bus and a system of batteries |
| US7590642B2 (en) * | 2002-05-10 | 2009-09-15 | Oracle International Corp. | Enhanced K-means clustering |
| CN1862279B (zh) * | 2005-05-11 | 2010-04-28 | 苏州润源电气技术有限公司 | 电池组老化率估算、故障检测方法和电池组管理监测装置 |
| CN1975444A (zh) * | 2005-11-28 | 2007-06-06 | 孙斌 | 蓄电池内阻及劣化状态在线监测方法及系统 |
| DE102006005334B4 (de) * | 2006-02-07 | 2022-12-22 | Bayerische Motoren Werke Aktiengesellschaft | Verfahren zur Überwachung und/oder Steuerung oder Regelung der Spannung wenigstens einer Zellgruppe in einem Zellenverbund eines Energiespeichers sowie Zellgruppenlogik und Zentral-Logik zur Durchführung des Verfahrens |
| JP5098912B2 (ja) * | 2008-07-11 | 2012-12-12 | ソニー株式会社 | バッテリパックおよび充電制御システム |
| US8564246B2 (en) | 2010-03-30 | 2013-10-22 | Grrreen, Inc. | Battery charging system and method |
| CN102545280A (zh) * | 2010-12-16 | 2012-07-04 | 鸿富锦精密工业(深圳)有限公司 | 充电电路 |
| US8838510B2 (en) * | 2011-09-16 | 2014-09-16 | International Business Machines Corporation | Choosing pattern recognition algorithms and data features using a genetic algorithm |
| RU2635101C2 (ru) * | 2012-04-12 | 2017-11-09 | Ист Пенн Мэньюфэкчуринг Ко. | Управление емкостью аккумуляторной батареи |
| US8963494B2 (en) * | 2012-05-18 | 2015-02-24 | Tesla Motors, Inc. | Charge rate optimization |
| US20140097787A1 (en) | 2012-10-09 | 2014-04-10 | Yi-Ming Lin | Active battery management system for a battery pack |
| US9476946B2 (en) | 2013-05-08 | 2016-10-25 | GM Global Technology Operations LLC | SOC determination by evaluation of effects invoked by dimensional changes of battery cells |
| US9770997B2 (en) * | 2013-06-11 | 2017-09-26 | Ford Global Technologies, Llc | Detection of imbalance across multiple battery cells measured by the same voltage sensor |
| BR112016022665A2 (pt) * | 2014-03-31 | 2017-08-15 | Ingrain Inc | Determinação de volume elementar representativo por meio de estatística baseada em agrupamento |
| US20150372279A1 (en) | 2014-06-24 | 2015-12-24 | Turboroto Inc. | Active battery stack system and method |
| EP3852036A1 (en) * | 2015-01-16 | 2021-07-21 | 3M Innovative Properties Co. | Systems and methods for selecting grid actions to improve grid outcomes |
| CN105005005B (zh) | 2015-08-10 | 2017-10-13 | 东南大学 | 一种蓄电池组劣化单体电池检测方法 |
| US20170045902A1 (en) | 2015-08-14 | 2017-02-16 | Nec Laboratories America, Inc. | Control strategies for grid scale storage operation in frequency regulation markets considering battery health factors |
| US10298042B2 (en) * | 2016-02-05 | 2019-05-21 | Nec Corporation | Resilient battery charging strategies to reduce battery degradation and self-discharging |
| JP6841278B2 (ja) | 2016-04-22 | 2021-03-10 | 株式会社村田製作所 | 充放電制御装置、充放電制御方法、電池パック、電子機器、電動車両、電動工具および電力貯蔵システム |
| CN107528337A (zh) | 2016-11-21 | 2017-12-29 | 六安市科宇专利技术开发服务有限公司 | 一种带储能系统的电动汽车充电站 |
| US10193369B2 (en) | 2017-01-05 | 2019-01-29 | Gbatteries Energy Canada Inc. | Active battery management system |
| CN107453408B (zh) | 2017-07-18 | 2020-05-08 | 广东双新电气科技有限公司 | 一种考虑不确定性的微电网能量优化调度方法 |
| WO2019017991A1 (en) * | 2017-07-21 | 2019-01-24 | Quantumscape Corporation | PREDICTIVE MODEL FOR ESTIMATING BATTERY CONDITIONS |
| US10992156B2 (en) * | 2017-10-17 | 2021-04-27 | The Board Of Trustees Of The Leland Stanford Junior University | Autonomous screening and optimization of battery formation and cycling procedures |
| US20210190868A1 (en) | 2018-09-11 | 2021-06-24 | 3M Innovative Properties Company | Active battery management method |
| EP3938974A4 (en) | 2019-03-15 | 2023-01-04 | 3M Innovative Properties Company | OPERATION OF A SUPPLY CHAIN USING CAUSED MODELS |
-
2019
- 2019-09-03 US US17/272,824 patent/US20210190868A1/en active Pending
- 2019-09-03 JP JP2021537523A patent/JP7361122B2/ja active Active
- 2019-09-03 EP EP19860886.1A patent/EP3850385A4/en active Pending
- 2019-09-03 WO PCT/IB2019/057409 patent/WO2020053702A1/en not_active Ceased
- 2019-09-03 CN CN201980058914.4A patent/CN112703412A/zh not_active Withdrawn
- 2019-09-10 JP JP2021538167A patent/JP7731286B2/ja active Active
- 2019-09-10 CN CN201980058878.1A patent/CN112673509B/zh active Active
- 2019-09-10 EP EP19860879.6A patent/EP3850700A4/en not_active Withdrawn
- 2019-09-10 WO PCT/US2019/050281 patent/WO2020055778A1/en not_active Ceased
- 2019-09-10 CN CN202510122862.XA patent/CN119944132A/zh active Pending
- 2019-09-10 US US17/274,307 patent/US12092694B2/en active Active
-
2024
- 2024-09-04 US US18/824,176 patent/US20240426921A1/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6526361B1 (en) * | 1997-06-19 | 2003-02-25 | Snap-On Equipment Limited | Battery testing and classification |
| JP2009183105A (ja) * | 2008-01-31 | 2009-08-13 | Panasonic Corp | 充電制御回路、電池パック、及び充電システム |
| KR101288652B1 (ko) * | 2009-10-09 | 2013-07-22 | 주식회사 엘지화학 | 사용자 패턴별 충전 설정시스템 및 충전방법 |
| KR20140025310A (ko) * | 2010-10-22 | 2014-03-04 | 누클레우스 사이언티픽, 인크. | 배터리를 급속 충전하는 장치 및 방법 |
| KR20140094362A (ko) * | 2013-01-22 | 2014-07-30 | 한국전자통신연구원 | 전기차 에너지 관리 장치 및 방법 |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12092694B2 (en) | 2018-09-11 | 2024-09-17 | 3M Innovative Properties Company | Active battery management method for economic optimization |
Also Published As
| Publication number | Publication date |
|---|---|
| US20240426921A1 (en) | 2024-12-26 |
| JP7361122B2 (ja) | 2023-10-13 |
| WO2020055778A1 (en) | 2020-03-19 |
| JP7731286B2 (ja) | 2025-08-29 |
| JP2022500995A (ja) | 2022-01-04 |
| US20210336471A1 (en) | 2021-10-28 |
| CN112673509B (zh) | 2025-02-18 |
| US12092694B2 (en) | 2024-09-17 |
| CN112703412A (zh) | 2021-04-23 |
| EP3850700A1 (en) | 2021-07-21 |
| US20210190868A1 (en) | 2021-06-24 |
| EP3850385A1 (en) | 2021-07-21 |
| EP3850385A4 (en) | 2022-06-29 |
| EP3850700A4 (en) | 2022-07-27 |
| JP2022500994A (ja) | 2022-01-04 |
| CN119944132A (zh) | 2025-05-06 |
| CN112673509A (zh) | 2021-04-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20210190868A1 (en) | Active battery management method | |
| US20240385256A1 (en) | Methods and systems for predicting and controlling future battery performance | |
| US11598818B2 (en) | Determination of the aging of an electric storage system | |
| US9846886B2 (en) | Strategic modeling for economic optimization of grid-tied energy assets | |
| US10656211B2 (en) | Method of predicting time for charging battery of eco-friendly vehicle | |
| US12241942B2 (en) | Method for estimating aging state of battery and apparatus for performing method therefor | |
| CN107329094A (zh) | 动力电池健康状态估算方法及装置 | |
| CN115616432A (zh) | 运行用于提供老化状态预测置信区间的系统的方法和装置 | |
| CN115219932A (zh) | 用于评价设备电池组的相对老化状态的方法和装置 | |
| CN117388737A (zh) | 电池健康状态的评估方法、装置、设备及存储介质 | |
| CN114325442A (zh) | 用于鲁棒地预测机器中的蓄能器的老化特性的方法和设备 | |
| US20230324463A1 (en) | Method and Apparatus for Operating a System for Detecting an Anomaly of an Electrical Energy Store for a Device by Means of Machine Learning Methods | |
| Namdari et al. | An entropy-based approach for modeling lithium-ion battery capacity fade | |
| Maheshwari et al. | Electric Vehicle Battery Health Monitoring System | |
| CN118944238B (zh) | 一种新能源储能锂电池控制系统及控制方法 | |
| EP4545989A1 (en) | Method and system for calculating battery state of charge | |
| Sahoo et al. | Soc and soh prediction of pevs using different machine learning techniques | |
| Donadee et al. | Estimating the rate of battery degradation under a stationary Markov operating policy | |
| US20240086588A1 (en) | Systems and Methods for Managing Energy Storage Devices | |
| US20230268753A1 (en) | Intelligent battery charging based on history | |
| Avanthika et al. | SOC Prediction of Lithium Ion Battery Based on Machine Learning Algorithm | |
| CN121602586A (zh) | 锂离子电池充电控制方法、装置、设备、介质和产品 | |
| Namdari | Methodologies for Modeling Lithium-ion Battery Capacity Degradation Based on Entropy Measures | |
| Pop et al. | Battery aging process | |
| CN117572267A (zh) | 一种充电模拟方法及电池监控系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19860886 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2021537523 Country of ref document: JP Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2019860886 Country of ref document: EP Effective date: 20210412 |