WO2020044627A1 - 構造物の点検システム - Google Patents

構造物の点検システム Download PDF

Info

Publication number
WO2020044627A1
WO2020044627A1 PCT/JP2019/009810 JP2019009810W WO2020044627A1 WO 2020044627 A1 WO2020044627 A1 WO 2020044627A1 JP 2019009810 W JP2019009810 W JP 2019009810W WO 2020044627 A1 WO2020044627 A1 WO 2020044627A1
Authority
WO
WIPO (PCT)
Prior art keywords
unit
signal
sensor
tunnel
gateway
Prior art date
Application number
PCT/JP2019/009810
Other languages
English (en)
French (fr)
Inventor
毅 関谷
隆文 植村
徹平 荒木
秀輔 吉本
野田 祐樹
貴康 櫻井
浩 濱田
智之 塚田
直明 河村
堤 知明
瀬下 雄一
周治 井出
慎也 尾藤
崇 金村
理寛 ▲高▼安
Original Assignee
国立大学法人大阪大学
国立大学法人東京大学
東電設計株式会社
ダイキン工業株式会社
双葉電子工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国立大学法人大阪大学, 国立大学法人東京大学, 東電設計株式会社, ダイキン工業株式会社, 双葉電子工業株式会社 filed Critical 国立大学法人大阪大学
Publication of WO2020044627A1 publication Critical patent/WO2020044627A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N17/00Investigating resistance of materials to the weather, to corrosion, or to light
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; Lime; Mortar; Gypsum; Bricks; Ceramics; Glass
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B25/00Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
    • G08B25/01Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium
    • G08B25/04Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium using a single signalling line, e.g. in a closed loop
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C15/00Arrangements characterised by the use of multiplexing for the transmission of a plurality of signals over a common path
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link

Definitions

  • the present disclosure relates to a structure inspection system.
  • Japanese Patent Application Laid-Open No. 2018-22687 discloses an invention related to a structure operation support system.
  • This structure operation support system includes a sheet-like system including a carbon wiring and a sensor (detection unit), and a detection signal output from the sensor is transmitted to a server or a monitoring terminal device via a communication network. It has become so.
  • a structure inspection system includes a detection unit capable of detecting a state of a structure, and a detection signal provided in the structure and output from the detection unit based on a measurement value of the detection unit. And a first integrated unit capable of outputting a first signal based on the detection signal, and a first integrated unit provided on the structure, capable of inputting the first signal and based on the first signal.
  • a second integration unit capable of outputting two signals, wherein a plurality of the first integration units are connected to one second integration unit, and the second integration unit A plurality of the second signals are arranged in the longitudinal direction or in the transverse direction of the structure, so that the second signal can be input / output to / from each other.
  • the state of the structure can be measured by the plurality of detection units, and a detection signal is output from the detection unit based on the measurement value of the detection unit. Is output.
  • the detection signal is input to a first integration unit provided in the structure, and the first signal is output from the first integration unit.
  • the structure is provided with the second accumulation unit, and one second accumulation unit is connected to a plurality of first accumulation units.
  • the first signal is input to the second accumulation unit from the plurality of first accumulation units, and the measurement values obtained by the plurality of detection units can be aggregated in the second accumulation unit.
  • the plurality of second integration units are arranged in the longitudinal direction of the structure or in the short direction of the structure, and are capable of inputting and outputting the second signal to and from each other. For this reason, the measurement values of the plurality of detection units can be shared between the plurality of second accumulation units.
  • a structure inspection system is the structure inspection system according to the first aspect, wherein the state of the structure is estimated based on the parameters obtained from accumulated data and the measured values.
  • a possible state estimator is configured to include the second accumulator.
  • the state estimation unit includes the second accumulation unit.
  • the state estimating unit is capable of estimating the state of the structure based on parameters and measurement values obtained from the stored data. For this reason, the state estimation unit can estimate the state of the structure by aggregating the measurement values at a plurality of locations over a wide range of the structure.
  • the structure inspection system is the structure inspection system according to the second aspect, wherein a notification unit is electrically connected to each of the second accumulation units, and the state estimation is performed.
  • the unit is capable of specifying the detection unit at a location where it is estimated that an abnormality has occurred in the structure, and when it is estimated that an abnormality has occurred in the structure, the detection unit performs the detection.
  • the notification unit electrically connected to the second integration unit to which the first signal based on the detection signal from the unit is input is operable.
  • the notification unit is electrically connected to each of the plurality of second accumulation units.
  • the state estimating unit estimates that an abnormality has occurred in the structure
  • the state estimating unit specifies the detecting unit at a location where it is estimated that an abnormality has occurred in the structure.
  • a notification unit electrically connected to the second accumulation unit to which the first signal based on the detection signal from the detection unit at the location where the abnormality is estimated to have occurred in the structure is provided. Actuated by For this reason, when an abnormality occurs in a structure, it is possible to notify the location where the abnormality occurs in the structure.
  • the notification unit is estimated by the state estimation unit to have an abnormality in the structure.
  • the light emitting unit emits light when supplied with power from the second integrated unit.
  • the state estimating unit estimates that an abnormality has occurred in the structure, a point in the structure where the abnormality is estimated to have occurred.
  • the light emitting unit emits light to notify the abnormality of the structure. For this reason, the observer can quickly recognize the location of the abnormality in the structure at the site.
  • the structure inspection system according to the present disclosure has an excellent effect that the detection signal output from the detection unit can be used on site.
  • FIG. 3 is a development view showing a state where the structure inspection system according to the present embodiment is installed in a tunnel, and schematically showing an arrangement of sensors and the like when an inner peripheral surface of the tunnel is developed in a plane.
  • FIG. 3 is a development view showing a state where the structure inspection system according to the present embodiment is installed in a tunnel, and schematically showing an arrangement of sensors and the like when an inner peripheral surface of the tunnel is developed in a plane.
  • It is a flow chart which shows an example of processing performed in an edge node in a structure inspection system concerning this embodiment.
  • It is a flow chart which shows an example of processing performed by a gateway in a structure inspection system concerning this embodiment.
  • FIGS. 1 to 10 An example of an embodiment of a structure inspection system and a structure inspection method using the same according to the present disclosure will be described with reference to FIGS. 1 to 10.
  • the “inspection system 10” as a structure inspection system includes a plurality of seat units arranged along an inner peripheral surface 12A of a “tunnel 12” as a structure. 14, and a “gateway 16” as a plurality of second accumulation units disposed between adjacent sheet units 14.
  • the sheet unit 14 is configured to include the edge nodes 18 and 20, the wiring sheet 22, and the insulating sheet 24.
  • the edge nodes 18 and 20 function as loads in the seat unit 14.
  • the wiring sheet 22 is a conductor having carbon as a main material and a flexible material, specifically, graphene, graphite, a single-layer or multi-layer carbon nanotube, and the like. A linear shape or a plate shape is exemplified.
  • the wiring sheet 22 is electrically connected to the edge nodes 18 and 20, and functions as a signal line and a power supply line of the edge nodes 18 and 20.
  • the wiring sheet 22 may be made of metal such as copper depending on the environment in which the sheet unit 14 is arranged. Further, the wiring sheet 22 is electrically connected to an existing power supply line (not shown) for supplying electric power to lighting and the like (not shown) arranged in the tunnel 12.
  • the insulating sheet 24 is made of a material having electrical insulation and flexibility, specifically, an insulating organic polymer such as a polyvinyl chloride resin. It has a rectangular plate shape in plan view along the direction.
  • the wiring sheet 22 is buried inside the insulating sheet 24 except for a portion necessary for connection with the outside of the wiring sheet 22.
  • the seat units 14 are arranged at intervals of about 10 [m] in the longitudinal direction of the tunnel 12.
  • a plurality of edge nodes 18 and edge nodes 20 are provided on the sheet unit 14 so as to extend in the longitudinal direction of the sheet unit 14.
  • a second feature is that a plurality of gateways 16 are arranged in the tunnel 12, and the gateways 16 can communicate with each other.
  • a third feature is that a "light emitting unit 74" as a notification unit is connected to the gateway 16.
  • the edge node 18 includes a “distortion sensor 26” as a detection unit, a “control unit 28” as a first integration unit, and a signal processing unit 30.
  • the strain sensor 26 includes a strain gauge (not shown) attached to the inner peripheral surface 12A of the tunnel 12 and controls the magnitude of the strain generated in the tunnel 12 where the strain gauge is attached. Accordingly, the “detection signal V1 (voltage)” can be output to the control unit 28.
  • control unit 28 is configured by attaching a CPU (Central Processing Unit) to a board (not shown), and is electrically connected to the signal processing unit 30 via the wiring sheet 22.
  • the control unit 28 includes a case 32 made of a resin having electrical insulation and weather resistance, and the above-described CPU and the like are housed inside the case 32. .
  • the control part 28 is attached to the surface of the insulating sheet 24.
  • the control unit 28 can evaluate the soundness of the strain sensor 26.
  • the control unit 28 includes a ROM (Read Only Memory) and a RAM (Random Access Memory) (not shown).
  • the ROM stores the upper limit value and the lower limit value of the output value of the strain sensor 26, and the control unit 28 stores the detection signal V1 input from the strain sensor 26 as the upper limit value and the lower limit value stored in the ROM. Otherwise, the detection signal V1 is stored in the RAM as an error.
  • the detection signal V1 falls between the upper limit value and the lower limit value stored in the ROM, the detection signal V1 is stored in the RAM as a measurement value of the strain sensor 26. .
  • the signal processing unit 30 is configured to be able to remove noise of an input signal, and includes a low-pass filter configured by attaching a capacitor, a resistor, and the like (not shown) to a substrate (not shown).
  • the signal processing unit 30 includes a case (not shown) that covers the electronic devices that constitute the signal processing unit 30, similarly to the control unit 28, and is attached to the surface of the insulating sheet 24.
  • the detection signal V1 stored in the RAM of the control unit 28 when the detection signal V1 stored in the RAM of the control unit 28 is an error, the detection signal V1 is transmitted to the gateway 16 as an error signal, and the detection signal V1 Is not an error, the detection signal is input to the signal processing unit 30 and is output to the gateway 16 as a correction signal (correction data) in a state where noise is removed.
  • a signal output from the edge node 18 to the gateway 16 is referred to as a “first signal 34” regardless of whether the signal is an error signal or a correction signal.
  • the edge node 20 includes a “strain sensor 36”, a “salt sensor 38”, and a “potential sensor 40” as detection units, a “control unit 42” as a first integration unit, and a signal processing unit 44.
  • the control unit 42 has the same configuration as the control unit 28
  • the distortion sensor 36 has the same configuration as the distortion sensor 26
  • the signal processing unit 44 has the same configuration as the signal processing unit 30.
  • the strain sensor 36 can output a “detection signal V2 (voltage)” to the control unit 42.
  • the strain sensors 26 and 36 are arranged at predetermined intervals along the longitudinal direction of the seat unit 14 (the circumferential direction of the tunnel 12).
  • the salt sensor 38 is configured to measure the salt concentration of water on the inner peripheral surface 12A of the tunnel 12 and output a “detection signal V3 (voltage)” to the control unit 42 according to the salt concentration.
  • a moisture sensor (not shown) is connected to the salt sensor 38.
  • the salt sensor 38 is activated by a detection signal output when the moisture sensor detects moisture on the inner peripheral surface 12A of the tunnel 12. It has become.
  • the potential sensor 40 is capable of measuring a potential difference between a not-shown reference electrode provided on concrete forming the tunnel 12 and a reinforcing bar 46 (see FIG. 2) of the tunnel 12, and detects a “detection signal” according to the potential difference.
  • V4 voltage
  • the control unit 42 can evaluate the soundness of the strain sensor 36, the salt sensor 38, and the potential sensor 40.
  • the ROM of the control unit 42 stores the upper limit value and the lower limit value of the output value of each sensor that outputs a detection signal to the control unit 42. Then, in the control unit 42, when the detection signals input from the strain sensor 36, the salt sensor 38, and the potential sensor 40 do not fall between the upper limit value and the lower limit value corresponding to each stored in the ROM.
  • the detection signal is stored in the RAM as an error.
  • the detection signal is stored in the RAM as the measurement value of each sensor. Has become.
  • the detection signal stored in the RAM of the control unit 42 when the detection signal stored in the RAM of the control unit 42 is an error, the detection signal is transmitted to the gateway 16 as an error signal, and the detection signal is If no error is detected, the detection signal is input to the signal processing unit 44 and is input to the gateway 16 as a correction signal (correction data) in a state where noise is removed.
  • a signal input from the edge node 20 to the gateway 16 is referred to as a “first signal 48” regardless of whether the signal is an error signal or a correction signal.
  • the gateway 16 includes a control unit 50, a communication unit 52, a storage unit 54, and a case 56 (see FIG. 8) in which these are housed and made of a resin having electrical insulation and weather resistance.
  • control unit 50 is configured by attaching a CPU or the like to a board (not shown), and controls the control unit 28 of the edge node 18 and the edge node via the wiring sheet 22 and the cable 58 (see FIG. 8). 20 are electrically connected to the control unit 42.
  • the control unit 50 can receive the first signals 34 and 48.
  • the cable 58 is also used as a power supply line to the gateway 50.
  • the communication unit 52 is electrically connected to the control unit 50 via a wiring unit (not shown) or the like, so that signals can be input and output between the communication unit 52 and the control unit 50.
  • the communication unit 52 includes, for example, an antenna (not shown) and the like, and can communicate with the external server 60 via a network such as a wireless LAN.
  • the storage unit 54 includes a RAM and a ROM (not shown), and is electrically connected to the control unit 50 and the communication unit 52 via a wiring unit (not shown).
  • the measurement value including the error of each sensor and the identification signal of the sensor that outputs the error are temporarily stored. Is stored.
  • the measurement value of each sensor stored in the storage unit 54 is transmitted to the external server 60 via the communication unit 52 and stored in the external server 60. It has become.
  • a vibration sensor 62 is electrically connected to the control unit 50 of the gateway 16.
  • the vibration sensor 62 includes, for example, an accelerometer and the like, and is capable of outputting a “detection signal V5 (voltage)” to the control unit 50 according to the vibration generated in the tunnel 12. I have.
  • the measurement value of the vibration sensor 62 is output to the storage unit 54 via the control unit 50, and is temporarily stored in the RAM of the storage unit 54.
  • One of the gateways 16 configured as described above is arranged for one seat unit 14 and is arranged at a predetermined interval in the longitudinal direction of the tunnel 12.
  • the control unit 50 of the gateway 16 outputs an instruction signal for instructing measurement by each sensor to the edge nodes 18 and 20.
  • the edge nodes 18 and 20 receive the instruction signal based on the instruction signal. The measurement by each sensor is started.
  • the measurement by the vibration sensor 62 connected to the gateway 16 is performed at the same timing as when an instruction signal is output from the gateway 16 to the edge nodes 18 and 20. Further, the measurement of each sensor of the edge nodes 18 and 20 and the vibration sensor 62 is performed intermittently. For example, even if the measurement is performed about once a day, it is set. Alternatively, the measurement may be set to be performed every few minutes.
  • the adjacent gateways 16 among these gateways 16 are electrically connected by a cable 58. Accordingly, these gateways 16 can share the measured values by inputting and outputting the measured values of the respective sensors stored in the RAM of the storage unit 54 as the “second signal 64”. ing.
  • control unit 50 of the gateway 16 analyzes a relative relationship between a predetermined number of measured values stored in the storage unit 54.
  • the control unit 50 determines that the tunnel 12 has an abnormality such as damage due to the case where the measured value of the same sensor is increasing or the magnitude of the measured value of the same sensor measured at the same timing. In this case, a warning signal is transmitted from the gateway 16 to the external server 60.
  • a location where it is estimated that an abnormality has occurred in the tunnel 12 based on the magnitude relationship between the sensors of the same type measured at the same timing, for example, the strain sensors 26 and 36. Can be specified. For example, when the measured value of the strain sensors 26 arranged in series is increased as approaching a specific strain sensor 26, the control unit 50 of the gateway 16 detects an abnormality at a location where the strain sensor 26 is provided. A configuration in which it is determined that an error has occurred may be adopted. This can also be considered that the control unit 50 can specify the strain sensors 26 and 36 disposed at the location where it is estimated that an abnormality has occurred in the tunnel 12.
  • the light emitting unit 74 is configured to include an LED (Light Emitting Diode) 76, is arranged for all the gateways 16, and is electrically connected to the gateway 16 by a cable 78.
  • the light emitting section 74 emits light (lights up) when power is supplied from the gateway 16 via the cable 78.
  • the strain sensors 26 and 36 disposed at the locations where the abnormality is estimated to have occurred in the tunnel 12 are provided.
  • Power is supplied from the gateway 16 which is electrically connected via the control units 28 and 42.
  • the light emitting unit 74 arranged near the place where it is estimated that the abnormality has occurred in the tunnel 12 emits light. It is supposed to.
  • the external server 60 when an alarm signal is input from the gateway 16, a warning is displayed on the monitor 68 of the monitoring computer 66 connected to the external server 60 via a network such as a wireless LAN. (See FIG. 1).
  • a network such as a wireless LAN.
  • the external server 60 also has a database, and the database stores prediction models corresponding to measurement values of various sensors provided in the edge nodes 18 and 20 and the gateway 16. As this prediction model, the relationship between measured values such as strain, salinity and potential of each part in a predetermined structure made of reinforced concrete and the age of the structure, and the reinforced concrete to be measured by the sensor A state prediction model that can predict the deterioration state of the reinforced concrete structure by comparing each state amount of the structure with the state amount of the structure. Further, this database also stores basic information such as the basic structure of the tunnel 12 and the composition of the material constituting the tunnel 12, and some of the predetermined parameters used in the state prediction model are included in the basic information. It is decided based on.
  • the external server 60 can estimate whether the state of the tunnel 12 is abnormal or normal by comparing the measurement value of each sensor with the prediction model. In other words, in the present embodiment, the deterioration state of the tunnel 12 can be determined in the external server 60.
  • a complex of the gateway 16, the edge nodes 18, 20 and the external server 60 will be referred to as a "state estimating unit 70".
  • the external server 60 compares the measurement value of each sensor with the prediction model, and determines whether there is an abnormality in the tunnel 12 based on the degree of deviation between the measurement value and the value of the prediction model. It is supposed to be. Then, when an abnormality is confirmed in the tunnel 12, as shown in FIG. 1, an abnormality signal 72 is output from the external server 60 to the monitoring computer 66, and a warning is displayed on the monitor 68. I have. On the other hand, as a result of comparing the measured values of the sensors with the prediction model in the external server 60, if no abnormality is confirmed in the tunnel 12, the monitor 68 displays that there is no abnormality.
  • the state of the tunnel 12 can be measured by the strain sensors 26 and 36, the salt sensor 38, the potential sensor 40, and the vibration sensor 62.
  • a detection signal is output based on the value measured by the sensor.
  • the detection signal is input to the control units 28 and 42 provided in the tunnel 12, and the control units 28 and 42 output first signals 34 and 48, respectively.
  • the gateway 16 is provided in the tunnel 12, and a plurality of controllers 28 and 42 are connected to one gateway 16. For this reason, the first signals 34 and 48 are input to the gateway 16 from the plurality of control units 28 and 42, and the gateway 16 can aggregate the measurement values obtained by the plurality of sensors.
  • the gateways 16 are arranged in a plurality in the longitudinal direction of the tunnel 12, and are capable of inputting and outputting the second signal 64 with each other. For this reason, the measurement values of a plurality of sensors can be shared by a plurality of gateways 16.
  • the state estimation unit 70 includes the gateway 16. This state estimating unit is capable of estimating the state of the tunnel 12 based on parameters and measurement values obtained from the stored data. For this reason, the state estimating unit 70 can estimate the state of the tunnel 12 by aggregating the measured values at a plurality of locations in a wide range of the tunnel 12.
  • the light emitting unit 74 is electrically connected to each of the plurality of gateways 16.
  • the state estimating unit 70 estimates that an abnormality has occurred in the tunnel 12
  • the state estimating unit 70 specifies a sensor at a location where it is estimated that an abnormality has occurred in the tunnel 12.
  • the light emitting unit 74 electrically connected to the gateway 16 to which the first signal 48 based on the detection signal from the sensor at the location where the abnormality is estimated to have occurred in the tunnel 12 is input to the state estimation unit 70 Actuated by For this reason, when an abnormality occurs in the tunnel 12, it is possible to notify the location where the abnormality occurs in the tunnel 12.
  • the state estimating unit 70 estimates that an abnormality has occurred in the tunnel 12
  • the light emitting unit 74 emits light at a location where it is estimated that an abnormality has occurred in the tunnel 12. Then, the abnormality of the tunnel 12 is notified. For this reason, the observer can quickly recognize the location where the abnormality has occurred in the tunnel 12 at the site.
  • step S100 an instruction signal from the gateway 16 is output to the edge nodes 18 and 20.
  • step S102 measurements are performed by the strain sensors 26 and 36, the salt sensor 38, and the potential sensor 40 based on the instruction signal from the gateway 16.
  • step S104 the soundness of each sensor is evaluated by the control units 28 and 42 from the measured values of each sensor, and the control units 28 and 42 perform the measurement signal of each sensor and the upper and lower limit values of each sensor. Are compared.
  • step S106 the control units 28 and 42 determine whether an error (a value that does not fall between the upper limit value and the lower limit value of each sensor) is included in the measurement value of each sensor. If it is determined that an error is included in the measurement value of each sensor, the process proceeds to step S108, where the corresponding measurement value is transmitted to the gateway 16 as an error signal (abnormal value), and other measurement is performed. The value is transmitted to the signal processing units 30 and 44, and proceeds to step S110. On the other hand, when it is determined that no error is included in the measurement values of each sensor, all the measurement values of each sensor are transmitted to the signal processing units 30 and 44, and the process proceeds to step S110.
  • an error a value that does not fall between the upper limit value and the lower limit value of each sensor
  • step S110 the noise of the measurement value of each sensor is removed by the signal processing units 30 and 44.
  • step S112 the measured values of the sensors from which noise has been removed are transmitted from the edge nodes 18 and 20 to the gateway 16, and the control flow ends.
  • step S200 an instruction signal for instructing the edge nodes 18 and 20 to perform measurement is output from the gateway 16.
  • step S202 it is determined whether or not there is an error in the measurement values of the sensors input from the edge nodes 18 and 20. If it is determined that there is an error in the measured values of the sensors, the process proceeds to step S204, where the identification signal of the sensor that has output the error is stored in the storage unit 54 of the gateway 16, and the process proceeds to step S206. move on. On the other hand, when it is determined that there is no error in the measurement values of the sensors input from the edge nodes 18 and 20, the process proceeds to step S206.
  • step S206 the control unit 50 of the gateway 16 analyzes the relative relationship between the measurement values of the sensors transmitted from the edge nodes 18 and 20.
  • step S208 a simple diagnosis of the tunnel 12 is performed based on the analysis result in step S206.
  • this simple diagnosis the tendency of the increase and decrease of the measurement value of the same sensor and the magnitude relation of the measurement values of the same type of sensor measured at the same timing are compared.
  • step S210 it is determined from the result of step S208 whether an abnormality has occurred in the tunnel 12. If it is determined that an abnormality has occurred in the tunnel 12, the process proceeds to step S212, where an alarm signal is transmitted from the gateway 16 to the external server 60, and it is estimated that an abnormality has occurred in the tunnel 12.
  • the light emitting unit 74 disposed near the point where the light emission is performed is turned on, and the process proceeds to step S214. On the other hand, if it is determined that no abnormality has occurred in the tunnel 12, the process proceeds to step S214.
  • step S214 the measurement value of each sensor is transmitted from the gateway 16 to the external server 60, and the control flow ends.
  • step S300 it is determined whether an alarm signal has been input from the gateway 16. If it is determined that an alarm signal has been input from the gateway 16, the process proceeds to step S302, a warning is displayed on the monitor 68, and the process proceeds to step S304. On the other hand, when it is determined that the alarm signal has not been input from the gateway 16, the process proceeds to step S304.
  • step S304 the measured values of each sensor transmitted from the gateway 16 are stored in the external server 60.
  • step S306 it is determined whether or not the measurement value of each sensor transmitted from the gateway 16 includes an error. If it is determined that an error is included in the measurement value of each sensor transmitted from the gateway 16, the process proceeds to step S ⁇ b> 308, and the monitor 68 displays the type and location of the sensor that has output the error. Then, the process proceeds to step S310. On the other hand, if it is determined that no error is included in the measurement values of each sensor transmitted from the gateway 16, the process proceeds to step S310.
  • step S310 the basic information of the tunnel 12 is called from the database.
  • step S312 a prediction model corresponding to the measurement value of each sensor is called from the database based on the basic information of the tunnel 12.
  • step S314 the measured value of each sensor is compared with the prediction model.
  • step S316 it is determined from the result of step S312 whether the tunnel 12 has an abnormality. If it is determined that there is an abnormality in the tunnel 12, the process proceeds to step S318, where the external server 60 outputs an abnormality signal 72 to the monitoring computer 66, and a warning is displayed on the monitor 68. Ends. On the other hand, if it is determined that there is no abnormality in the tunnel 12, the process proceeds to step S320, where no abnormality is displayed on the monitor 68, and the control flow ends.
  • the detection signal output from the sensor can be used on site.
  • the inspection system 10 can be arranged on the “bridge 80” as a structure.
  • the seat unit 14 is arranged along the longitudinal direction of the main girder 82 (the longitudinal direction of the bridge 80) for each of the plurality of main girders 82 of the bridge 80, and
  • One gateway 16 is arranged for each of the 82.
  • Each of the gateways 16 is provided with a light emitting unit 74.
  • the communication unit 52 is shared by the plurality of gateways 16 arranged in the short direction of the bridge 80 (the direction orthogonal to the long direction of the main girder 82), and the second signal 64 Input / output is performed between the gateways 16 via the two communication units 52.
  • the abnormality of the bridge 80 can be detected by the state estimation unit 70 as in the case of the tunnel 12.
  • the configuration is such that data from the edge nodes 18 and 20 is aggregated in the gateway 16, but this is not a limitation.
  • the detection signal of each sensor may be directly output to the gateway 16 according to the function of the CPU or the like of the control unit 50 of the gateway 16.
  • the gateways 16 are connected to each other by the cable 58.
  • the configuration is not limited to this, and the gateways 16 may perform wireless communication using the communication unit 52.
  • an antenna or the like may be provided in the edge nodes 18 and 20 to perform wireless communication between the edge nodes 18 and 20 and the gateway 16.
  • the strain sensor, the salt content sensor, the potential sensor, and the vibration sensor are provided, but a sensor other than these may be arranged on the structure. Further, the type of each sensor is not limited to those described above, and various types of sensors can be adopted.
  • the inspection system 10 detects the abnormality of the tunnel 12 and the bridge 80.
  • the inspection system 10 may use other structures. Can be detected.
  • the light emitting unit 74 is used as the notification unit, but an alarm or the like may be used as the notification unit.

Landscapes

  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Pathology (AREA)
  • Immunology (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Medicinal Chemistry (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Food Science & Technology (AREA)
  • Environmental Sciences (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Alarm Systems (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

トンネル(12)にゲートウェイ(16)が設けられており、一つのゲートウェイ(16)には、複数の制御部(28、42)が接続されている。このため、ゲートウェイ(16)には、複数の制御部(28、42)から第1信号(34、48)が入力され、ゲートウェイ(16)に複数のセンサによる計測値を集約することができる。

Description

構造物の点検システム
 本開示は、構造物の点検システムに関する。
 特開2018-22687号公報には、構造物運用支援システムに関する発明が記載されている。この構造物運用支援システムは、炭素配線とセンサ(検知部)とを備えたシート状システムを備えており、センサから出力された検知信号が通信ネットワークを介してサーバや監視用端末装置に送信されるようになっている。
 しかしながら、特開2018-22687号公報に記載の先行技術では、センサから出力された検知信号によるデータは、サーバに蓄積されるか監視用端末装置のモニタに表示されるのみであり、センサから出力された信号を現場で利用することができない。
 本開示は上記事実を考慮し、検知部から出力された検知信号を現場で利用することができる構造物の点検システムを提供することが目的である。
 第1の態様に係る構造物の点検システムは、構造物の状態を検知可能な検知部と、前記構造物に設けられ、前記検知部による計測値に基づいて当該検知部から出力された検知信号が入力されると共に、当該検知信号に基づいて第1信号を出力可能な第1集積部と、前記構造物に設けられ、前記第1信号を入力可能とされると共に当該第1信号に基づく第2信号を出力可能な第2集積部と、を備え、一つの前記第2集積部には、複数の前記第1集積部が接続されていると共に、当該第2集積部は、前記構造物の長手方向又は当該構造物の短手方向に複数配置されて、互いに前記第2信号を入出力可能とされている。
 第1の態様に係る構造物の点検システムによれば、複数の検知部によって構造物の状態を測定可能とされており、当該検知部からは、当該検知部による計測値に基づいて、検知信号が出力される。また、検知信号は、構造物に設けられた第1集積部に入力されると共に、当該第1集積部からは第1信号が出力される。
 ここで、本態様では、構造物に第2集積部が設けられており、一つの第2集積部には、複数の第1集積部が接続されている。このため、第2集積部には、複数の第1集積部から第1信号が入力され、当該第2集積部に複数の検知部による計測値を集約することができる。
 また、第2集積部は、構造物の長手方向又は構造物の短手方向に複数配置されていると共に、互いに第2信号を入出力可能とされている。このため、複数の検知部による計測値を複数の第2集積部間で共有することができる。
 第2の態様に係る構造物の点検システムは、第1の態様に係る構造物の点検システムにおいて、蓄積されたデータから求められたパラメータと前記計測値とに基づいて前記構造物の状態を推定可能な状態推定部が、前記第2集積部を含んで構成されている。
 第2の態様に係る構造物の点検システムによれば、第2集積部を含んで状態推定部が構成されている。この状態推定部は、蓄積されたデータから求められたパラメータと計測値とに基づいて構造物の状態を推定可能とされている。このため、状態推定部では、構造物の広範囲において複数箇所の計測値を集約し、当該構造物の状態を推定することができる。
 第3の態様に係る構造物の点検システムは、第2の態様に係る構造物の点検システムにおいて、前記第2集積部のそれぞれには、報知部が電気的に接続されており、前記状態推定部は、前記構造物において異常が発生していると推定された箇所の前記検知部を特定可能とされていると共に、当該構造物に異常が発生していると推定された場合に、当該検知部からの前記検知信号に基づく前記第1信号が入力される前記第2集積部に電気的に接続された前記報知部を作動可能とされている。
 第3の態様に係る構造物の点検システムによれば、複数の第2集積部のそれぞれに報知部が電気的に接続されている。一方、状態推定部は、構造物に異常が発生していると推定したときに、当該構造物において異常が発生していると推定された箇所の検知部を特定する。そして、構造物において異常が発生していると推定された箇所の検知部からの検知信号に基づく第1信号が入力される第2集積部に電気的に接続された報知部が、状態推定部によって作動される。このため、構造物に異常が発生した場合に、当該構造物において異常が発生している箇所を報知することができる。
 第4の態様に係る構造物の点検システムは、第3の態様に係る構造物の点検システムにおいて、前記報知部は、前記状態推定部で前記構造物に異常が発生していると推定された場合に、前記第2集積部から電力を供給されて発光する発光部とされている。
 第4の態様に係る構造物の点検システムによれば、状態推定部で構造物に異常が発生していると推定された場合に、当該構造物における異常が発生していると推定された箇所において、発光部が発光して当該構造物の異常が報知される。このため、観測者は、現場において、構造物における異常発生箇所を速やかに認識することができる。
 以上説明したように、本開示に係る構造物の点検システムは、検知部から出力された検知信号を現場で利用することができるという優れた効果を有する。
本実施形態に係る構造物の点検システムの概略構成を示す模式図である。 本実施形態に係る構造物の点検システムがトンネルに設置された状態を示しており、トンネルの内周面を平面状に展開したときの各センサ等の配置を模式的に示す展開図である。 本実施形態に係る構造物の点検システムの概略構成を示すブロック図である。 本実施形態に係る構造物の点検システムにおいて、エッジ・ノードで行われる処理の一例を示すフローチャートである。 本実施形態に係る構造物の点検システムにおいて、ゲートウェイで行われる処理の一例を示すフローチャートである。 本実施形態に係る構造物の点検システムにおいて、サーバで行われる処理の一例を示すフローチャートである。 本実施形態に係る構造物の点検システムの一部を構成する配線シートの構成を模式的に示す部分断面図である。 本実施形態に係る構造物の点検システムがトンネルに設置された状態を示す模式図である。 本実施形態の変形例に係る構造物の点検システムが橋に設置された状態を示す模式図である。 本実施形態の変形例に係る構造物の点検システムが橋に設置された状態を示しており、橋を下方側から見たときの各センサ等の配置を模式的に示す平面図である。
 以下、図1~図10を用いて、本開示に係る構造物の点検システム及びこれを用いた構造物の点検方法の実施形態の一例について説明する。
 図8に示されるように、本実施形態に係る構造物の点検システムとしての「点検システム10」は、構造物としての「トンネル12」の内周面12Aに沿って配置された複数のシートユニット14と、隣接するシートユニット14間にそれぞれ配置された複数の第2集積部として「ゲートウェイ16」とを備えている。
 図7にも示されるように、シートユニット14は、エッジ・ノード18、20、配線シート22及び絶縁シート24を含んで構成されている。なお、エッジ・ノード18、20は、シートユニット14において、負荷として機能している。
 配線シート22は、炭素を主な材料とする導体でかつ可撓性を有する材質、具体的には、グラフェン、グラファイト及び単層又は多層のカーボンナノチューブ等で構成されており、その形状としては、線状又は板状が挙げられる。この配線シート22は、エッジ・ノード18、20と電気的に接続されており、エッジ・ノード18、20の信号線や電力供給線として機能している。なお、配線シート22は、シートユニット14が配置される環境等に応じて、銅等の金属製とされていてもよい。また、配線シート22は、トンネル12内に配置された図示しない照明等に電力を供給する図示しない既設の電力供給線と電気的に接続されている。
 一方、絶縁シート24は、電気絶縁性及び可撓性を有する材質、具体的には、ポリ塩化ビニル樹脂等の絶縁性有機高分子体で構成されており、その形状としては、トンネル12の周方向に沿う平面視で矩形の板状とされている。そして、絶縁シート24の内側には、配線シート22が、当該配線シート22の外部との接続に必要な箇所を除いて、埋め込まれた状態となっている。
 なお、本実施形態では、一例として、シートユニット14がトンネル12の長手方向に10[m]程度の間隔をあけて配置されている。
 ここで、本実施形態では、図1及び図2に示されるように、シートユニット14に当該シートユニット14の長手方向に連なって複数のエッジ・ノード18及びエッジ・ノード20が設けられている点に第1の特徴がある。また、本実施形態では、トンネル12に複数のゲートウェイ16が配置されており、当該ゲートウェイ16同士が通信可能とされている点に第2の特徴がある。さらに、ゲートウェイ16に報知部としての「発光部74」が接続されている点に第3の特徴がある。以下、本実施形態の要部を構成するエッジ・ノード18、20、ゲートウェイ16及び発光部74の構成について詳細に説明することとする。
 図3に示されるように、エッジ・ノード18は、検知部としての「歪センサ26」と、第1集積部としての「制御部28」と、信号処理部30とを備えている。
 歪センサ26は、トンネル12の内周面12Aに貼り付けられた図示しない歪ゲージを含んで構成されていると共に、トンネル12における当該歪ゲージが貼り付けられた箇所に発生した歪の大きさに応じて「検知信号V1(電圧)」を制御部28に出力可能とされている。
 制御部28は、一例として、図示しない基板にCPU(Central Processing Unit)等が取り付けられて構成されていると共に、配線シート22を介して信号処理部30に電気的に接続されている。この制御部28は、図7に示されるように、電気絶縁性及び耐候性を有する樹脂で構成されたケース32を備えており、ケース32の内側には、上述したCPU等が収納されている。そして、制御部28は、絶縁シート24の表面に取り付けられている。
 また、制御部28は、歪センサ26の健全性を評価可能とされている。詳しくは、制御部28は、図示しないROM(Read Only Memory)及びRAM(Random Access Memory)を備えている。そして、ROMには歪センサ26の出力値の上限値及び下限値が記憶されており、制御部28では、歪センサ26から入力された検知信号V1がROMに記憶された上限値と下限値との間に収まっていない場合には、検知信号V1がエラーとしてRAMに記憶されるようになっている。なお、検知信号V1が上記ROMに記憶された上限値と下限値との間に収まっている場合には、検知信号V1は、歪センサ26の計測値としてRAMに記憶されるようになっている。
 信号処理部30は、一例として、入力された信号のノイズを除去可能な構成とされており、図示しない基板に同じく図示しないコンデンサや抵抗器等が取り付けられて構成されたローパスフィルタを備えている。なお、信号処理部30は、制御部28と同様に信号処理部30を構成する電子機器を覆う図示しないケースを備えていると共に、絶縁シート24の表面に取り付けられている。
 そして、上記のように構成されたエッジ・ノード18では、制御部28のRAMに記憶された検知信号V1がエラーである場合に、検知信号V1がエラー信号としてゲートウェイ16に送信され、検知信号V1がエラーでない場合には、当該検知信号が信号処理部30に入力されてノイズが除去された状態で、ゲートウェイ16に補正信号(補正データ)として出力されるようになっている。なお、以下では、エッジ・ノード18からゲートウェイ16に出力される信号を、エラー信号であるか補正信号であるかに関わらず、「第1信号34」と称することとする。
 一方、エッジ・ノード20は、検知部としての「歪センサ36」、「塩分センサ38」及び「電位センサ40」と、第1集積部としての「制御部42」と、信号処理部44とを備えている。これらのうち、制御部42は制御部28と、歪センサ36は歪センサ26と、信号処理部44は信号処理部30と、それぞれ基本的に同様の構成とされている。なお、歪センサ36は、「検知信号V2(電圧)」を制御部42に出力可能とされている。また、歪センサ26、36は、シートユニット14の長手方向(トンネル12の周方向)に沿って所定の間隔をあけて配置されている。
 塩分センサ38は、トンネル12の内周面12Aの水分の塩分濃度を測定して、当該塩分濃度に応じて「検知信号V3(電圧)」を制御部42に出力可能とされている。なお、塩分センサ38には、図示しない水分センサが接続されており、塩分センサ38は、当該水分センサがトンネル12の内周面12Aの水分を検出したときに出力される検知信号によって起動されるようになっている。
 電位センサ40は、トンネル12を構成するコンクリートに設けられた図示しない照合電極とトンネル12の鉄筋46(図2参照)との電位差を測定可能とされていると共に、当該電位差に応じて「検知信号V4(電圧)」を制御部42に出力可能とされている。
 なお、制御部42も制御部28と同様に、歪センサ36、塩分センサ38及び電位センサ40の健全性を評価可能とされている。詳しくは、制御部42のROMには、制御部42に検知信号を出力する各センサの出力値の上限値及び下限値が記憶されている。そして、制御部42では、歪センサ36、塩分センサ38及び電位センサ40から入力された検知信号が、ROMに記憶されたそれぞれに対応する上限値と下限値との間に収まっていない場合には、当該検知信号がエラーとしてRAMに記憶されるようになっている。なお、これらの検知信号が制御部42のROMに記憶された上限値と下限値との間に収まっている場合には、当該検知信号は、各センサの計測値としてRAMに記憶されるようになっている。
 そして、上記のように構成されたエッジ・ノード20では、制御部42のRAMに記憶された検知信号がエラーである場合に、当該検知信号がエラー信号としてゲートウェイ16に送信され、当該検知信号がエラーでない場合には、当該検知信号が信号処理部44に入力されてノイズが除去された状態で、ゲートウェイ16に補正信号(補正データ)として入力されるようになっている。なお、以下では、エッジ・ノード20からゲートウェイ16に入力される信号を、エラー信号であるか補正信号であるかに関わらず、「第1信号48」と称することとする。
 次に、ゲートウェイ16の構成について説明する。ゲートウェイ16は、制御部50、通信部52、記憶部54及びこれらが収納されると共に電気絶縁性及び耐候性を有する樹脂で構成されたケース56(図8参照)を備えている。
 制御部50は、一例として、図示しない基板にCPU等が取り付けられて構成されていると共に、配線シート22及びケーブル58(図8参照)を介してエッジ・ノード18の制御部28及びエッジ・ノード20の制御部42に電気的に接続されている。そして、制御部50には、第1信号34、48が入力可能とされている。なお、ケーブル58は、ゲートウェイ50への電力供給線としても用いられている。
 通信部52は、図示しない配線部等を介して制御部50と電気的に接続されており、通信部52と制御部50との間で信号の入出力等が可能とされている。また、通信部52は、一例として、図示しないアンテナ等を備えており、無線LAN等のネットワークを介して外部サーバ60との通信が可能とされている。
 記憶部54は、図示しないRAM及びROMを備えていると共に、図示しない配線部等を介して制御部50及び通信部52と電気的に接続されている。そして、記憶部54のRAMには、制御部28、42からの第1信号34、48が入力されることで、各センサのエラーを含む計測値及びエラーを出力したセンサの識別信号が一時的に記憶されるようになっている。なお、記憶部54に記憶された各センサの計測値は、制御部50から制御信号が入力されると、通信部52を介して外部サーバ60に送信されて、当該外部サーバ60に記憶されるようになっている。
 また、ゲートウェイ16の制御部50には、振動センサ62が電気的に接続されている。この振動センサ62は、一例として、加速度計等を含んで構成されており、トンネル12に発生する振動に応じて「検知信号V5(電圧)」を制御部50に出力することが可能とされている。そして、振動センサ62の計測値は、制御部50を介して記憶部54に出力されて、記憶部54のRAMに一時的に記憶されるようになっている。
 上記のように構成されたゲートウェイ16は、一つのシートユニット14に対して一つ配置されていると共に、トンネル12の長手方向に所定の間隔をあけて配置されている。また、ゲートウェイ16の制御部50からは、エッジ・ノード18、20に各センサによる計測を指示する指示信号が出力されるようになっており、エッジ・ノード18、20は、当該指示信号に基づき各センサによる計測を開始するようになっている。
 なお、ゲートウェイ16に接続された振動センサ62による測定は、ゲートウェイ16からエッジ・ノード18、20への指示信号が出力されるのと同様のタイミングで行われるようになっている。また、エッジ・ノード18、20の各センサ及び振動センサ62の測定は、間欠的に行われるようになっており、例えば、当該計測が一日に一回程度行われるように設定されていてもよいし、当該計測が数分毎に行われるように設定されていてもよい。
 そして、図1及び図2に示されるように、これらのゲートウェイ16のうち隣接するゲートウェイ16同士はケーブル58で電気的に接続されている。これにより、これらのゲートウェイ16は、互いに記憶部54のRAMに記憶されている各センサの計測値を「第2信号64」として入出力することで、当該計測値を共有することが可能となっている。
 また、本実施形態では、トンネル12の簡易診断を行うことが可能となっている。具体的には、ゲートウェイ16の制御部50では、記憶部54に記憶された所定数の計測値の相対関係が解析されるようになっている。
 そして、同じセンサの計測値が増加傾向にある場合や、同様のタイミングで測定された同種のセンサの計測値の大小関係からトンネル12に損傷等の異常が発生していると制御部50で判定された場合には、ゲートウェイ16から外部サーバ60に警報信号が送信されるようになっている。
 さらに、ゲートウェイ16の制御部50では、同様のタイミングで測定された同種のセンサ、一例として、歪センサ26、36の計測値の大小関係からトンネル12において異常が発生していると推定される箇所を特定することが可能となっている。例えば、ゲートウェイ16の制御部50は、連なって配置された歪センサ26において、特定の歪センサ26に近付くに従って計測値が大きくなっている場合、当該歪センサ26が設けられている箇所で異常が発生していると判定するような構成としてもよい。これは、制御部50によって、トンネル12において異常が発生していると推定される箇所に配置された歪センサ26、36を特定可能とされていると捉えることもできる。
 一方、発光部74は、LED(Light Emitting Diode)76を含んで構成されていると共に、全てのゲートウェイ16に対して配置されており、ケーブル78でゲートウェイ16と電気的に接続されている。そして、発光部74は、ゲートウェイ16からケーブル78を介して電力を供給されることで発光(点灯)するようになっている。
 詳しくは、ゲートウェイ16の制御部50でトンネル12において異常が発生していると推定された場合、トンネル12において異常が発生していると推定された箇所に配置された歪センサ26、36に、制御部28、42を介して電気的に接続されたゲートウェイ16から電力が供給されるようになっている。その結果、ゲートウェイ16の制御部50でトンネル12において異常が発生していると推定された場合、トンネル12において異常が発生していると推定された箇所の近傍に配置された発光部74が発光するようになっている。
 一方、外部サーバ60では、ゲートウェイ16からの警報信号が入力されると、無線LAN等のネットワークを介して外部サーバ60に接続された監視コンピュータ66のモニタ68に警告が表示されるようになっている(図1参照)。また、ゲートウェイ16から送信された各センサの計測値にエラーが含まれていた場合には、モニタ68にエラーが出力されたセンサの種類と配置箇所が表示されるようになっている。
 また、外部サーバ60は、データベースを備えており、当該データベースには、エッジ・ノード18、20及びゲートウェイ16に設けられている各種センサの計測値に対応する予測モデルが格納されている。この予測モデルとしては、鉄筋コンクリート製の所定の構造物における各部分の歪、塩分濃度及び電位度等の実測値と当該構造物の経過年数との関係と、上記センサで測定された測定対象の鉄筋コンクリート構造物の各状態量とを照合し、当該鉄筋コンクリート構造物構造物の劣化状態を予測可能な状態予測モデルが挙げられる。さらに、このデータベースには、トンネル12の基本構造やトンネル12を構成する材料の組成等の基本情報も格納されており、上記状態予測モデルに用いられる所定のパラメータの一部が、当該基本情報に基づいて決定されるようになっている。
 そして、本実施形態では、外部サーバ60において、各センサの計測値と予測モデルとが比較されることで、トンネル12の状態が異常であるか正常であるかを推定可能とされている。換言すれば、本実施形態では、外部サーバ60において、トンネル12の劣化状態を判定可能とされている。なお、以下では、ゲートウェイ16、エッジ・ノード18、20及び外部サーバ60の複合体を「状態推定部70」と称することとする。
 具体的には、外部サーバ60では、各センサの計測値と予測モデルとが比較されて、当該計測値と予測モデルの値との乖離度に基づいてトンネル12に異常があるか否かが判定されるようになっている。そして、トンネル12に異常が確認された場合には、図1に示されるように、外部サーバ60から監視コンピュータ66に異常信号72が出力されて、モニタ68に警告が表示されるようになっている。一方、外部サーバ60で各センサの計測値と予測モデルとを比較した結果、トンネル12に異常が確認されない場合には、モニタ68には、異常無しと表示されるようになっている。
 (本実施形態の作用及び効果)
 次に、本実施形態の作用並びに効果を説明する。
 本実施形態では、図1に示されるように、歪センサ26、36、塩分センサ38、電位センサ40及び振動センサ62によってトンネル12の状態を測定可能とされており、これらのセンサからは、当該センサによる計測値に基づいて、検知信号が出力される。また、検知信号は、トンネル12に設けられた制御部28、42に入力されると共に、制御部28、42からは第1信号34、48が出力される。
 ここで、本実施形態では、トンネル12にゲートウェイ16が設けられており、一つのゲートウェイ16には、複数の制御部28、42が接続されている。このため、ゲートウェイ16には、複数の制御部28、42から第1信号34、48が入力され、ゲートウェイ16に複数のセンサによる計測値を集約することができる。
 また、ゲートウェイ16は、トンネル12の長手方向に複数配置されていると共に、互いに第2信号64を入出力可能とされている。このため、複数のセンサによる計測値を複数のゲートウェイ16で共有することができる。
 また、本実施形態では、ゲートウェイ16を含んで状態推定部70が構成されている。この状態推定部は、蓄積されたデータから求められたパラメータと計測値とに基づいてトンネル12の状態を推定可能とされている。このため、状態推定部70では、トンネル12の広範囲において複数箇所の計測値を集約し、トンネル12の状態を推定することができる。
 また、本実施形態では、複数のゲートウェイ16のそれぞれに発光部74が電気的に接続されている。一方、状態推定部70は、トンネル12に異常が発生していると推定したときに、トンネル12において異常が発生していると推定された箇所のセンサを特定する。そして、トンネル12において異常が発生していると推定された箇所のセンサからの検知信号に基づく第1信号48が入力されるゲートウェイ16に電気的に接続された発光部74が、状態推定部70によって作動される。このため、トンネル12に異常が発生した場合に、トンネル12において異常が発生している箇所を報知することができる。
 加えて、本実施形態では、状態推定部70でトンネル12に異常が発生していると推定された場合に、トンネル12における異常が発生していると推定された箇所において、発光部74が発光してトンネル12の異常が報知される。このため、観測者は、現場において、トンネル12における異常発生箇所を速やかに認識することができる。
 次に、図4~図6に示されるフローチャートを用いて、本実施形態に係る点検システム10による構造物(トンネル12)の点検方法の手順の一例を示す。なお、トンネル12の点検方法は、図4~図6に示されるフローチャートに限らず他の手順により行われてもよい。
 最初に、図4を用いてエッジ・ノード18、20の制御フローを示すこととする。このフローが開始されると、まず、ステップS100では、ゲートウェイ16からの指示信号がエッジ・ノード18、20に出力される。
 次に、ステップS102では、ゲートウェイ16からの指示信号に基づき、歪センサ26、36、塩分センサ38、電位センサ40による計測が行われる。
 次に、ステップS104では、各センサの計測値から制御部28、42で各センサの健全性評価が行われ、制御部28、42において各センサの計測信号と各センサの上限値及び下限値とが比較される。
 次に、ステップS106では、制御部28、42で各センサの計測値にエラー(各センサの上限値と下限値との間に収まっていない値)が含まれているか否かが判定される。そして、各センサの計測値にエラーが含まれていると判定された場合には、ステップS108に進み、該当する計測値がエラー信号(異常値)としてゲートウェイ16に送信されると共に、その他の計測値は、信号処理部30、44に送信されて、ステップS110に進む。一方、各センサの計測値にエラーが含まれていないと判定された場合には、各センサの全ての計測値が信号処理部30、44に送信されて、ステップS110に進む。
 次に、ステップS110では、信号処理部30、44で各センサの計測値のノイズが除去される。
 次に、ステップS112では、ノイズが除去された各センサの計測値がエッジ・ノード18、20からゲートウェイ16に送信されて、上記制御フローが終了する。
 次に、図5を用いてゲートウェイ16の制御フローを示すこととする。このフローが開始されると、まず、ステップS200では、ゲートウェイ16からエッジ・ノード18、20に計測を指示する指示信号が出力される。
 次に、ステップS202では、エッジ・ノード18、20から入力された各センサの計測値にエラーがあるか否かが判定される。そして、各センサの計測値の中にエラーがあると判定された場合には、ステップS204に進み、ゲートウェイ16の記憶部54にエラーが出力されたセンサの識別信号が記憶されて、ステップS206に進む。一方、エッジ・ノード18、20から入力された各センサの計測値にエラーがないと判定された場合には、ステップS206に進む。
 次に、ステップS206では、エッジ・ノード18、20から送信された各センサによる計測値の相対関係が、ゲートウェイ16の制御部50で解析される。
 次に、ステップS208では、ステップS206での解析結果に基づき、トンネル12の簡易診断が行われる。この簡易診断では、同じセンサの計測値の増減の傾向や同様のタイミングで測定された同種のセンサの計測値の大小関係が比較される。
 次に、ステップS210では、ステップS208の結果からトンネル12に異常が発生しているか否かが判定される。そして、トンネル12に異常が発生していると判定された場合には、ステップS212に進み、ゲートウェイ16から外部サーバ60に警報信号が送信されると共に、トンネル12において異常が発生していると推定された箇所の近傍に配置された発光部74が点灯されて、ステップS214に進む。一方、トンネル12に異常が発生していないと判定された場合には、ステップS214に進む。
 次に、ステップS214では、ゲートウェイ16から各センサの計測値が外部サーバ60に送信されて、上記制御フローが終了する。
 次に、図6を用いて外部サーバ60の制御フローを示すこととする。このフローが開始されると、まず、ステップS300では、ゲートウェイ16から警報信号が入力されているか否かが判定される。そして、ゲートウェイ16から警報信号が入力されていると判定された場合には、ステップS302に進み、モニタ68に警告が表示されて、ステップS304に進む。一方、ゲートウェイ16から警報信号が入力されていないと判定された場合には、ステップS304に進む。
 次に、ステップS304では、ゲートウェイ16から送信された各センサの計測値が外部サーバ60に記憶される。
 次に、ステップS306では、ゲートウェイ16から送信された各センサの計測値にエラーが含まれているか否かが判定される。そして、ゲートウェイ16から送信された各センサの計測値にエラーが含まれていると判定された場合には、ステップS308に進み、モニタ68にエラーが出力されたセンサの種類と配置箇所が表示されて、ステップS310に進む。一方、ゲートウェイ16から送信された各センサの計測値にエラーが含まれていないと判定された場合には、ステップS310に進む。
 次に、ステップS310では、トンネル12の基本情報がデータベースから呼び出される。
 次に、ステップS312では、トンネル12の基本情報に基づき、データベースから各センサの計測値に対応する予測モデルが呼び出される。
 次に、ステップS314では、各センサの計測値と予測モデルとが比較される。
 次に、ステップS316では、ステップS312の結果からトンネル12に異常があるか否かが判定される。そして、トンネル12に異常があると判定された場合には、ステップS318に進み、外部サーバ60から監視コンピュータ66に異常信号72が出力されることでモニタ68に警告が表示されて、上記制御フローが終了する。一方、トンネル12に異常がないと判定された場合には、ステップS320に進み、モニタ68に異常無しが表示されて、上記制御フローが終了する。
 以上、説明したように、本実施形態に係る点検システム10によれば、センサから出力された検知信号を現場で利用することができる。
 <上記実施形態の変形例>
 また、本実施形態では、図9及び図10に示されるように、構造物としての「橋80」に対して点検システム10を配置することも可能である。具体的には、本変形例では、橋80の複数の主桁82のそれぞれに対し、主桁82の長手方向(橋80の長手方向)に沿ってシートユニット14を配置されると共に、主桁82のそれぞれに一つずつゲートウェイ16が配置されている。そして、ゲートウェイ16には、それぞれ発光部74が設けられている。
 また、本変形例では、橋80の短手方向(主桁82の長手方向と直交する方向)に配置された複数のゲートウェイ16において、通信部52が共有されており、第2信号64が一つの通信部52を介して当該ゲートウェイ16間で入出力されるようになっている。
 このような構成によれば、状態推定部70によって、トンネル12の場合と同様に橋80の異常を検知することができる。
 <上記実施形態の補足説明>
 (1) 上述した実施形態では、エッジ・ノード18、20からのデータをゲートウェイ16に集約する構成としていたが、これに限らない。例えば、ゲートウェイ16の制御部50のCPU等の機能等に応じて、各センサの検知信号が直接ゲートウェイ16に出力される構成としてもよい。
 (2) また、上述した実施形態では、ゲートウェイ16同士がケーブル58で接続されていたが、これに限らず、ゲートウェイ16同士で通信部52を用いた無線通信を行う構成としてもよい。また、エッジ・ノード18、20にアンテナ等を設けて、エッジ・ノード18、20とゲートウェイ16との間で無線通信を行う構成としてもよい。
 (3) さらに、上述した実施形態では、歪センサ、塩分センサ、電位センサ及び振動センサを備えていたが、これら以外のセンサを構造物に配置する構成としてもよい。また、各センサの方式も上述したものに限らず、種々の方式のセンサを採用可能である。
 (4) 加えて、上述した実施形態では、点検システム10によってトンネル12及び橋80の異常を検知していたが、鉄筋コンクリート製の構造物であれば、点検システム10によってこれら以外の種類の構造物の異常を検知することも可能である。
 (5) さらに加えて、上述した実施形態では、報知部として発光部74が用いられているたが、アラーム等を報知部として用いてもよい。

Claims (4)

  1.  構造物の状態を検知可能な検知部と、
     前記構造物に設けられ、前記検知部による計測値に基づいて当該検知部から出力された検知信号が入力されると共に、当該検知信号に基づいて第1信号を出力可能な第1集積部と、
     前記構造物に設けられ、前記第1信号を入力可能とされると共に当該第1信号に基づく第2信号を出力可能な第2集積部と、を備え、
     一つの前記第2集積部には、複数の前記第1集積部が接続されていると共に、当該第2集積部は、前記構造物の長手方向又は当該構造物の短手方向に複数配置されて、互いに前記第2信号を入出力可能とされている、
     構造物の点検システム。
  2.  蓄積されたデータから求められたパラメータと前記計測値とに基づいて前記構造物の状態を推定可能な状態推定部が、前記第2集積部を含んで構成されている、
     請求項1に記載の構造物の点検システム。
  3.  前記第2集積部のそれぞれには、報知部が電気的に接続されており、
     前記状態推定部は、前記構造物において異常が発生していると推定された箇所の前記検知部を特定可能とされていると共に、当該構造物に異常が発生していると推定された場合に、当該検知部からの前記検知信号に基づく前記第1信号が入力される前記第2集積部に電気的に接続された前記報知部を作動可能とされている、
     請求項2に記載の構造物の点検システム。
  4.  前記報知部は、前記状態推定部で前記構造物に異常が発生していると推定された場合に、前記第2集積部から電力を供給されて発光する発光部とされている、
     請求項3に記載の構造物の点検システム。
PCT/JP2019/009810 2018-08-27 2019-03-11 構造物の点検システム WO2020044627A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018-158754 2018-08-27
JP2018158754A JP7190128B2 (ja) 2018-08-27 2018-08-27 構造物の点検システム

Publications (1)

Publication Number Publication Date
WO2020044627A1 true WO2020044627A1 (ja) 2020-03-05

Family

ID=69643197

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/009810 WO2020044627A1 (ja) 2018-08-27 2019-03-11 構造物の点検システム

Country Status (2)

Country Link
JP (1) JP7190128B2 (ja)
WO (1) WO2020044627A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0572080A (ja) * 1991-09-13 1993-03-23 Showa Electric Wire & Cable Co Ltd バスダクトの温度監視装置
JP2003315317A (ja) * 2002-04-18 2003-11-06 Taiheiyo Cement Corp コンクリート構造物の監視システム
JP2004502161A (ja) * 2000-06-29 2004-01-22 ユニヴァーシティ カレッジ ロンドン 構造疲労および使用を監視するための方法および装置
CN101408487A (zh) * 2008-10-28 2009-04-15 常州赛杰电子信息有限公司 基于无线传感器网络的桥梁结构安全状态应急监测及预警方法与系统
JP2010211440A (ja) * 2009-03-10 2010-09-24 Railway Technical Res Inst 異常予測装置、異常予測システム、異常予測方法、及びプログラム
JP2018022687A (ja) * 2016-07-25 2018-02-08 国立大学法人大阪大学 配線シート、シート状システム、及び構造物運用支援システム

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0572080A (ja) * 1991-09-13 1993-03-23 Showa Electric Wire & Cable Co Ltd バスダクトの温度監視装置
JP2004502161A (ja) * 2000-06-29 2004-01-22 ユニヴァーシティ カレッジ ロンドン 構造疲労および使用を監視するための方法および装置
JP2003315317A (ja) * 2002-04-18 2003-11-06 Taiheiyo Cement Corp コンクリート構造物の監視システム
CN101408487A (zh) * 2008-10-28 2009-04-15 常州赛杰电子信息有限公司 基于无线传感器网络的桥梁结构安全状态应急监测及预警方法与系统
JP2010211440A (ja) * 2009-03-10 2010-09-24 Railway Technical Res Inst 異常予測装置、異常予測システム、異常予測方法、及びプログラム
JP2018022687A (ja) * 2016-07-25 2018-02-08 国立大学法人大阪大学 配線シート、シート状システム、及び構造物運用支援システム

Also Published As

Publication number Publication date
JP7190128B2 (ja) 2022-12-15
JP2020034307A (ja) 2020-03-05

Similar Documents

Publication Publication Date Title
US20160142160A1 (en) Method of managing sensor network
KR101306506B1 (ko) 침수 검출 회로 및 이를 이용한 침수 검출 장치
EP2063243A1 (en) Smart coating for damage detected information, inspecting device and damage inspecting method using said coating
RU2451912C2 (ru) Устройство измерения множества сил, силоизмерительный модуль и способы мониторинга состояния устройства измерения множества сил
RU2307881C1 (ru) Способ автоматического контроля технологического состояния алюминиевого электролизера
CN102365663A (zh) 磨损传感器
EP3273221B1 (en) System and method for detecting corrosion
CN107278016B (zh) 印刷基板的恶化检测装置
CN104820180A (zh) 具有印刷基板的劣化检测功能的电子装置
WO2020044626A1 (ja) 構造物の点検システム及び構造物の点検方法
JP2007132684A (ja) 絶縁抵抗測定装置
US20100141281A1 (en) Water detector
US10324055B2 (en) Process variable transmitter with terminal block moisture sensor
WO2020044627A1 (ja) 構造物の点検システム
RU2009116443A (ru) Способ тестирования электронного блока
JP6182052B2 (ja) ガスセンサ使用寿命予測方法およびガス検知装置
EP2751881A1 (en) Electrical connector
WO2020195536A1 (ja) 構造物の異常判別方法及び異常判別システム
JP5372398B2 (ja) 多成分ガス検知装置
CN110487711A (zh) 用于实时监测设备腐蚀的方法和系统
CN116071900A (zh) 桥梁监测预警方法、装置、可读存储介质及电子设备
KR102053373B1 (ko) 초절전 무선 센서 네트워크를 이용한 단계별 실시간 현장 무선 재난경보시스템
JP6968252B1 (ja) IoTシステム、ノード端末、及びプログラム
JP2006308422A (ja) 車載用半導体センサ
KR101045479B1 (ko) 다인자 계측시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19853637

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19853637

Country of ref document: EP

Kind code of ref document: A1