WO2019090640A1 - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
WO2019090640A1
WO2019090640A1 PCT/CN2017/110274 CN2017110274W WO2019090640A1 WO 2019090640 A1 WO2019090640 A1 WO 2019090640A1 CN 2017110274 W CN2017110274 W CN 2017110274W WO 2019090640 A1 WO2019090640 A1 WO 2019090640A1
Authority
WO
WIPO (PCT)
Prior art keywords
bracket
base
scaffold
support
building construction
Prior art date
Application number
PCT/CN2017/110274
Other languages
French (fr)
Chinese (zh)
Inventor
张丽红
Original Assignee
张丽红
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张丽红 filed Critical 张丽红
Priority to PCT/CN2017/110274 priority Critical patent/WO2019090640A1/en
Publication of WO2019090640A1 publication Critical patent/WO2019090640A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets

Definitions

  • the utility model relates to the technical field of construction machinery, in particular to a scaffold for building construction.
  • Scaffolding refers to the various supports that are built on the construction site for workers to operate and solve vertical and horizontal transportation.
  • the general terminology of the construction industry refers to the place on the construction site used for exterior walls, interior decoration or high level construction that cannot be directly constructed.
  • scaffolding materials usually include: bamboo, wood, steel pipe or synthetic materials.
  • the purpose of the utility model is to provide a scaffold for building construction, which can realize soft connection with the wall surface during the construction process, reduce the pressure on the wall surface during the construction process, and can prevent the scaffolding from slipping when used on the icy road surface. shift.
  • a scaffold for building construction comprising a first bracket, a second bracket and a base, wherein the first bracket and the second bracket are fixedly connected by a connecting rod and a supporting rod,
  • One side of the second bracket is provided with a circular hole
  • the second bracket is a hollow structure
  • the second bracket is internally provided with an elastic steel cord
  • one end of the elastic steel cord is fixedly connected with the bottom of the second bracket
  • the other end of the elastic steel cord is A hook is fixedly connected through the circular hole
  • the carrier rod is disposed above the connecting rod
  • the two ends of the connecting rod are respectively welded with a pedal
  • the carrying rod is provided with a card slot
  • the upper surface of the base is provided with two a threaded hole
  • the base is screwed to the bottom end of the first bracket and the second bracket respectively through a threaded hole
  • the base is a cavity structure
  • the inner wall of the base is provided with a heating tube
  • a battery is disposed on one side
  • the heating tube is electrically connected to the battery and the temperature sensor.
  • the saw teeth are provided in plurality, and the saw teeth are distributed in a row at the bottom of the base.
  • one side of the first bracket is provided with a bolt, and the first bracket is connected with a support rod by bolts.
  • the pedal surface is provided with a non-slip groove.
  • the utility model is fixedly connected with an elastic steel wire rope through the bottom end of the second bracket, and the other end of the elastic steel wire rope is connected with a hook, so that the scaffold is softly connected with the wall through the hook, thereby reducing the pressure on the wall surface during the construction process, and simultaneously passing the hook Connection and disassembly are more convenient.
  • the utility model is provided with serrations through the bottom end of the base, and a heating pipe is arranged in the base, and the temperature sensor is used to sense the ground temperature to control the heating pipe to work, and the deicing effect is ensured, thereby ensuring that the scaffold can also be safe on the icy road surface. use.
  • the utility model has the advantages of welding the pedal at both ends of the connecting rod, and the anti-slip groove is provided on the upper surface of the pedal, thereby preventing the person from slipping during the climbing process.
  • Figure 1 is a schematic view of the structure of the present invention
  • Figure 2 is a schematic view of the interior of the second bracket of the structure of the present invention.
  • Figure 3 is a schematic view of the structure base of the present invention.
  • 1 first bracket
  • 2 second bracket
  • 3 base
  • 4 connecting rod
  • 5 pedal
  • 6 bearing rod
  • 7 card slot
  • 9 elastic wire rope
  • 10- Hook 11-threaded hole
  • 12-heating tube 13-saw tooth
  • 14-temperature sensor 15-battery, 16-support bar.
  • a scaffold for building construction comprising a first bracket 1, a second bracket 2 and a base 3, wherein the first bracket 1 and the second bracket 2 are connected
  • the rod 4 is fixedly connected to the supporting rod 6
  • the second bracket 2 is provided with a circular hole 8 on one side thereof
  • the second bracket 2 is a hollow structure
  • the second bracket 2 is internally provided with an elastic steel wire rope 9 , the elastic steel wire rope
  • the end of the connecting rod 4 is fixedly connected to the bottom of the second bracket 2, and the other end of the elastic steel cord 9 is fixedly connected with the hook 10 through the circular hole 8.
  • the bearing rod 6 is disposed above the connecting rod 4, and the two ends of the connecting rod 4 are respectively A pedal 5 is welded to the carrier rod 6.
  • the upper surface of the base 3 is provided with two threaded holes 11 through which the base 3 passes through the threaded holes 11 and the first bracket 1 and the second bracket 2, respectively.
  • the base 3 is a threaded structure, the base 3 is a cavity structure, the inner wall of the base 3 is provided with a heating tube 12, a battery 15 is disposed on one side of the inner wall of the base 3, and the bottom of the base 3 is provided with serrations 13, the sawtooth 13 is internally provided with a temperature sensor 14.
  • the heating tube 12 is electrically connected to the battery 15 and the temperature sensor 14.
  • the saw teeth 13 are provided in plurality.
  • the saw teeth 13 are arranged in a row in the bottom of the base 3.
  • the first bracket 1 is provided with bolts on one side.
  • the first bracket 1 is connected with a support rod 16 by bolts, and the surface of the pedal 5 is provided with a non-slip groove.
  • a scaffold for building construction comprising a first bracket 1, a second bracket 2 and a base 3.
  • the inner bottom end of the second bracket 2 is fixedly connected with an elastic steel cord 9 and the other end of the elastic steel cord 9 is connected with a hook 10 through the hook 10 realizes the soft connection between the scaffold and the wall, reduces the pressure on the wall during the construction process
  • the bottom of the base 3 is provided with serrations 13
  • the heating pipe 12 is arranged in the base 3, and the temperature is sensed by the temperature sensor 14 to control the heating pipe 12 work, play the deicing effect, ensure that the scaffolding can be safely used on the icy road surface
  • the two ends of the connecting rod 4 are welded with the pedal 5, and the upper surface of the pedal 5 is provided with a non-slip groove, thereby avoiding the person climbing during the process. slip.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

A scaffold for building construction, comprising a first support (1), a second support (2), and a base (3). The first support (1) and the second support (2) are fixedly connected by a connecting rod (4) and a bearing rod (6). A circular hole (8) is provided on one side of the second support (2); an elastic wire rope (9) is provided inside the second support (2); one end of the elastic wire rope (9) is fixedly connected to the bottom of the second support (2), and the other end of the elastic wire rope (9) passes through the circular hole (8) to fixedly connected to a hook (10). The bearing rod (6) is provided above the connecting rod (4). Footboards (5) are respectively welded to either end of the connecting rod (4). The bearing rod (6) is provided with recesses (7). Two threaded holes (11) are provided on the upper surface of the base (3); the base (3) is threadedly connected to the bottom ends of the first support (1) and the second support (2) respectively by the threaded holes (11); the base (3) is a hollow cavity structure; a heating pipe (12) is provided on the inner wall of the base (3). The scaffold can be softly connected to a wall during a construction process; therefore, the pressure on the wall during the construction process is reduced, and the scaffold can be prevented from slipping when used on an icy road surface.

Description

一种建筑施工用脚手架Scaffolding for building construction 技术领域Technical field
本实用新型涉及建筑机械技术领域,具体为一种建筑施工用脚手架。The utility model relates to the technical field of construction machinery, in particular to a scaffold for building construction.
背景技术Background technique
脚手架指施工现场为工人操作并解决垂直和水平运输而搭设的各种支架。建筑界的通用术语,指建筑工地上用在外墙、内部装修或层高较高无法直接施工的地方。主要为了施工人员上下作业或外围安全网围护及高空安装构件等,说白了就是搭架子,脚手架制作材料通常有:竹、木、钢管或合成材料等。有些工程也用脚手架当模板使用,此外在广告业、市政、交通路桥、矿山等部门也广泛被使用。Scaffolding refers to the various supports that are built on the construction site for workers to operate and solve vertical and horizontal transportation. The general terminology of the construction industry refers to the place on the construction site used for exterior walls, interior decoration or high level construction that cannot be directly constructed. Mainly for the construction workers to work up and down or peripheral safety net enclosures and high-altitude installation components, etc., it is said that the shelves are used, scaffolding materials usually include: bamboo, wood, steel pipe or synthetic materials. Some projects are also used as scaffolding as templates, and are also widely used in advertising, municipal, transportation, roads, and mining.
在现实施工过程中,脚手架与墙体多采用硬性拉结,这种施工方法会对墙体造成较大的负荷,而且拆卸困难,影响施工效率。同时在冬季结冰路面使用时,脚手架容易产生滑移,存在安全隐患。In the actual construction process, the scaffolding and the wall are mostly hard-drawn, and this construction method will cause a large load on the wall, and the disassembly is difficult, which affects the construction efficiency. At the same time, when used on icy roads in winter, scaffolding is prone to slippage, posing a safety hazard.
实用新型内容Utility model content
本实用新型的目的在于提供一种建筑施工用脚手架可以在施工过程中与墙面实现软连接,降低施工过程中对墙面的压力,同时在结冰路面上使用时可以很好的防止脚手架滑移。The purpose of the utility model is to provide a scaffold for building construction, which can realize soft connection with the wall surface during the construction process, reduce the pressure on the wall surface during the construction process, and can prevent the scaffolding from slipping when used on the icy road surface. shift.
为实现上述目的,本实用新型提供如下技术方案:一种建筑施工用脚手架,包括第一支架,第二支架和底座,所述第一支架与第二支架通过连接杆和承载杆固定连接,所述第二支架一侧设有圆孔,所述第二支架为空心结构,所述第二支架内部设有弹性钢丝绳,所述弹性钢丝绳一端与第二支架底部固定连接,所述弹性钢丝绳另一端穿过圆孔固定连接有挂钩,所述承载杆设在连接杆上方,所述连接杆的两端分别焊接有踏板,所述承载杆上设有卡槽,所述底座上表面设有两个螺纹孔,所述底座通过螺纹孔分别与第一支架和第二支架底端螺纹连接,所述底座为空腔结构,所述底座内壁设有加热管,所 述底座内壁一侧设有蓄电池,所述底座底部设有锯齿,所述锯齿内部设有温度传感器。In order to achieve the above object, the present invention provides the following technical solution: a scaffold for building construction, comprising a first bracket, a second bracket and a base, wherein the first bracket and the second bracket are fixedly connected by a connecting rod and a supporting rod, One side of the second bracket is provided with a circular hole, the second bracket is a hollow structure, and the second bracket is internally provided with an elastic steel cord, one end of the elastic steel cord is fixedly connected with the bottom of the second bracket, and the other end of the elastic steel cord is A hook is fixedly connected through the circular hole, the carrier rod is disposed above the connecting rod, the two ends of the connecting rod are respectively welded with a pedal, the carrying rod is provided with a card slot, and the upper surface of the base is provided with two a threaded hole, wherein the base is screwed to the bottom end of the first bracket and the second bracket respectively through a threaded hole, the base is a cavity structure, and the inner wall of the base is provided with a heating tube A battery is disposed on one side of the inner wall of the base, and a bottom is provided on the bottom of the base, and a temperature sensor is disposed inside the saw tooth.
优选的,所述加热管与蓄电池、温度感应器电性连接。Preferably, the heating tube is electrically connected to the battery and the temperature sensor.
优选的,所述锯齿设有多个,所述锯齿成排分布在底座底部。Preferably, the saw teeth are provided in plurality, and the saw teeth are distributed in a row at the bottom of the base.
优选的,所述第一支架一侧设有螺栓,所述第一支架通过螺栓连接有支撑杆。Preferably, one side of the first bracket is provided with a bolt, and the first bracket is connected with a support rod by bolts.
优选的,所述踏板表面设有防滑槽。Preferably, the pedal surface is provided with a non-slip groove.
与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the utility model are as follows:
1、本实用新型通过第二支架内部底端固定连接有弹性钢丝绳,弹性钢丝绳另一端连接有挂钩,实现脚手架通过挂钩与墙体软连接,降低了施工过程中对墙面的压力,同时通过挂钩连接拆卸更加方便。1. The utility model is fixedly connected with an elastic steel wire rope through the bottom end of the second bracket, and the other end of the elastic steel wire rope is connected with a hook, so that the scaffold is softly connected with the wall through the hook, thereby reducing the pressure on the wall surface during the construction process, and simultaneously passing the hook Connection and disassembly are more convenient.
2、本实用新型通过底座底端设置有锯齿,且底座内设置有加热管,通过温度传感器感应地面温度来控制加热管进行工作,起到除冰效果,确保了脚手架在结冰路面也能安全使用。2. The utility model is provided with serrations through the bottom end of the base, and a heating pipe is arranged in the base, and the temperature sensor is used to sense the ground temperature to control the heating pipe to work, and the deicing effect is ensured, thereby ensuring that the scaffold can also be safe on the icy road surface. use.
3、本实用新型通过在连接杆的两端焊接踏板,且踏板上表面设有防滑槽,避免了人在攀爬过程中滑倒。3. The utility model has the advantages of welding the pedal at both ends of the connecting rod, and the anti-slip groove is provided on the upper surface of the pedal, thereby preventing the person from slipping during the climbing process.
附图说明DRAWINGS
图1为本实用新型结构示意图;Figure 1 is a schematic view of the structure of the present invention;
图2为本实用新型结构第二支架内部示意图;Figure 2 is a schematic view of the interior of the second bracket of the structure of the present invention;
图3为本实用新型结构底座示意图。Figure 3 is a schematic view of the structure base of the present invention.
图中:1—第一支架,2—第二支架,3—底座,4—连接杆,5—踏板,6—承载杆,7—卡槽,8—圆孔,9—弹性钢丝绳,10—挂钩,11—螺纹孔,12—加热管,13—锯齿,14—温度传感器,15—蓄电池,16—支撑杆。In the figure: 1—first bracket, 2—second bracket, 3—base, 4—connecting rod, 5—pedal, 6—bearing rod, 7—card slot, 8-round hole, 9—elastic wire rope, 10- Hook, 11-threaded hole, 12-heating tube, 13-saw tooth, 14-temperature sensor, 15-battery, 16-support bar.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术 方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technology in the embodiment of the present invention will be combined with the drawings in the embodiments of the present invention. The present invention is described in a clear and complete manner, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative efforts are within the scope of the present invention.
请参阅图1-3,本实用新型提供一种技术方案:一种建筑施工用脚手架,包括第一支架1,第二支架2和底座3,所述第一支架1与第二支架2通过连接杆4和承载杆6固定连接,所述第二支架2一侧设有圆孔8,所述第二支架2为空心结构,所述第二支架2内部设有弹性钢丝绳9,所述弹性钢丝绳9一端与第二支架2底部固定连接,所述弹性钢丝绳9另一端穿过圆孔8固定连接有挂钩10,所述承载杆6设在连接杆4上方,所述连接杆4的两端分别焊接有踏板5,所述承载杆6上设有卡槽7,所述底座3上表面设有两个螺纹孔11,所述底座3通过螺纹孔11分别与第一支架1和第二支架2底端螺纹连接,所述底座3为空腔结构,所述底座3内壁设有加热管12,所述底座3内壁一侧设有蓄电池15,所述底座3底部设有锯齿13,所述锯齿13内部设有温度传感器14。Referring to FIG. 1-3, the present invention provides a technical solution: a scaffold for building construction, comprising a first bracket 1, a second bracket 2 and a base 3, wherein the first bracket 1 and the second bracket 2 are connected The rod 4 is fixedly connected to the supporting rod 6 , and the second bracket 2 is provided with a circular hole 8 on one side thereof, the second bracket 2 is a hollow structure, and the second bracket 2 is internally provided with an elastic steel wire rope 9 , the elastic steel wire rope The end of the connecting rod 4 is fixedly connected to the bottom of the second bracket 2, and the other end of the elastic steel cord 9 is fixedly connected with the hook 10 through the circular hole 8. The bearing rod 6 is disposed above the connecting rod 4, and the two ends of the connecting rod 4 are respectively A pedal 5 is welded to the carrier rod 6. The upper surface of the base 3 is provided with two threaded holes 11 through which the base 3 passes through the threaded holes 11 and the first bracket 1 and the second bracket 2, respectively. The base 3 is a threaded structure, the base 3 is a cavity structure, the inner wall of the base 3 is provided with a heating tube 12, a battery 15 is disposed on one side of the inner wall of the base 3, and the bottom of the base 3 is provided with serrations 13, the sawtooth 13 is internally provided with a temperature sensor 14.
所述加热管12与蓄电池15、温度感应器14电性连接,所述锯齿13设有多个,所述锯齿13成排分布在底座3底部,所述第一支架1一侧设有螺栓,所述第一支架1通过螺栓连接有支撑杆16,所述踏板5表面设有防滑槽。The heating tube 12 is electrically connected to the battery 15 and the temperature sensor 14. The saw teeth 13 are provided in plurality. The saw teeth 13 are arranged in a row in the bottom of the base 3. The first bracket 1 is provided with bolts on one side. The first bracket 1 is connected with a support rod 16 by bolts, and the surface of the pedal 5 is provided with a non-slip groove.
工作原理:一种建筑施工用脚手架,包括第一支架1,第二支架2和底座3,第二支架2内部底端固定连接有弹性钢丝绳9,弹性钢丝绳9另一端连接有挂钩10,通过挂钩10实现脚手架与墙体软连接,降低了施工过程中对墙面的压力,底座3底端设置有锯齿13,且底座3内设置有加热管12,通过温度传感器14感应地面温度来控制加热管12进行工作,起到除冰效果,确保了脚手架在结冰路面也能安全使用,连接杆4的两端焊接踏板5,且踏板5上表面设有防滑槽,避免了人在攀爬过程中滑倒。 Working principle: a scaffold for building construction, comprising a first bracket 1, a second bracket 2 and a base 3. The inner bottom end of the second bracket 2 is fixedly connected with an elastic steel cord 9 and the other end of the elastic steel cord 9 is connected with a hook 10 through the hook 10 realizes the soft connection between the scaffold and the wall, reduces the pressure on the wall during the construction process, the bottom of the base 3 is provided with serrations 13, and the heating pipe 12 is arranged in the base 3, and the temperature is sensed by the temperature sensor 14 to control the heating pipe 12 work, play the deicing effect, ensure that the scaffolding can be safely used on the icy road surface, the two ends of the connecting rod 4 are welded with the pedal 5, and the upper surface of the pedal 5 is provided with a non-slip groove, thereby avoiding the person climbing during the process. slip.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。 While the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art The scope of the invention is defined by the appended claims and their equivalents.

Claims (5)

  1. 一种建筑施工用脚手架,包括第一支架(1),第二支架(2)和底座(3),所述第一支架(1)与第二支架(2)通过连接杆(4)和承载杆(6)固定连接,所述第二支架(2)一侧设有圆孔(8),所述第二支架(2)为空心结构,所述第二支架(2)内部设有弹性钢丝绳(9),所述弹性钢丝绳(9)一端与第二支架(2)底部固定连接,所述弹性钢丝绳(9)另一端穿过圆孔(8)固定连接有挂钩(10),所述承载杆(6)设在连接杆(4)上方,所述连接杆(4)的两端分别焊接有踏板(5),所述承载杆(6)上设有卡槽(7),所述底座(3)上表面设有两个螺纹孔(11),所述底座(3)通过螺纹孔(11)分别与第一支架(1)和第二支架(2)底端螺纹连接,所述底座(3)为空腔结构,所述底座(3)内壁设有加热管(12),所述底座(3)内壁一侧设有蓄电池(15),所述底座(3)底部设有锯齿(13),所述锯齿(13)内部设有温度传感器(14)。A scaffold for building construction, comprising a first bracket (1), a second bracket (2) and a base (3), the first bracket (1) and the second bracket (2) passing through a connecting rod (4) and carrying The rod (6) is fixedly connected, the second bracket (2) is provided with a circular hole (8) on one side, the second bracket (2) is a hollow structure, and the second bracket (2) is provided with an elastic steel wire rope (9) one end of the elastic steel wire rope (9) is fixedly connected to the bottom of the second bracket (2), and the other end of the elastic steel wire rope (9) is fixedly connected with a hook (10) through the circular hole (8), the bearing The rod (6) is disposed above the connecting rod (4), and the two ends of the connecting rod (4) are respectively welded with a pedal (5), and the carrying rod (6) is provided with a card slot (7), the base (3) The upper surface is provided with two threaded holes (11), and the base (3) is screwed to the bottom ends of the first bracket (1) and the second bracket (2) respectively through the threaded holes (11), the base (3) is a cavity structure, the inner wall of the base (3) is provided with a heating tube (12), a battery (15) is arranged on one side of the inner wall of the base (3), and a sawtooth is provided at the bottom of the base (3) ( 13), the sawtooth (13) is internally provided with a temperature sensor (14).
  2. 根据权利要求1所述的一种建筑施工用脚手架,其特征在于:所述加热管(12)与蓄电池(15)、温度感应器(14)电性连接。A scaffold for building construction according to claim 1, characterized in that the heating pipe (12) is electrically connected to the battery (15) and the temperature sensor (14).
  3. 根据权利要求1所述的一种建筑施工用脚手架,其特征在于:所述锯齿(13)设有多个,所述锯齿(13)成排分布在底座(3)底部。A scaffold for building construction according to claim 1, characterized in that the saw teeth (13) are provided in plurality, and the serrations (13) are arranged in a row at the bottom of the base (3).
  4. 根据权利要求1所述的一种建筑施工用脚手架,其特征在于:所述第一支架(1)一侧设有螺栓,所述第一支架(1)通过螺栓连接有支撑杆(16)。A scaffold for building construction according to claim 1, characterized in that the first bracket (1) is provided with a bolt on one side, and the first bracket (1) is connected with a support rod (16) by bolts.
  5. 根据权利要求1所述的一种建筑施工用脚手架,其特征在于:所述踏板(5)表面设有防滑槽。 A scaffold for building construction according to claim 1, characterized in that the surface of the pedal (5) is provided with a non-slip groove.
PCT/CN2017/110274 2017-11-09 2017-11-09 Scaffold for building construction WO2019090640A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/110274 WO2019090640A1 (en) 2017-11-09 2017-11-09 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/110274 WO2019090640A1 (en) 2017-11-09 2017-11-09 Scaffold for building construction

Publications (1)

Publication Number Publication Date
WO2019090640A1 true WO2019090640A1 (en) 2019-05-16

Family

ID=66438160

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/110274 WO2019090640A1 (en) 2017-11-09 2017-11-09 Scaffold for building construction

Country Status (1)

Country Link
WO (1) WO2019090640A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882651A (en) * 2021-10-19 2022-01-04 山东滕建建设集团有限公司 Hanging flower basket fixing device for construction of building outer wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3925518A1 (en) * 1989-08-02 1991-02-07 Baumann Verwertungs Gmbh Walkway attached to outside wall of building - can be positioned at any required height using bracket structure
US20060163001A1 (en) * 2005-01-24 2006-07-27 Pozell Charles A Wall hanging scaffold
CN104131688A (en) * 2014-08-21 2014-11-05 长沙远大住宅工业集团有限公司 Externally-mounted work platform for fabricated building and method for operating externally-mounted work platform for fabricated building
CN205025078U (en) * 2015-08-11 2016-02-10 中建二局第一建筑工程有限公司 Be applied to drawknot system that outside support body and major structure are connected
US20160083968A1 (en) * 2014-09-19 2016-03-24 John Brough Safety platform scaffold apparatus
CN205153504U (en) * 2015-11-09 2016-04-13 天津一建建筑工程有限公司 Detachable cantilever frame body base

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3925518A1 (en) * 1989-08-02 1991-02-07 Baumann Verwertungs Gmbh Walkway attached to outside wall of building - can be positioned at any required height using bracket structure
US20060163001A1 (en) * 2005-01-24 2006-07-27 Pozell Charles A Wall hanging scaffold
CN104131688A (en) * 2014-08-21 2014-11-05 长沙远大住宅工业集团有限公司 Externally-mounted work platform for fabricated building and method for operating externally-mounted work platform for fabricated building
US20160083968A1 (en) * 2014-09-19 2016-03-24 John Brough Safety platform scaffold apparatus
CN205025078U (en) * 2015-08-11 2016-02-10 中建二局第一建筑工程有限公司 Be applied to drawknot system that outside support body and major structure are connected
CN205153504U (en) * 2015-11-09 2016-04-13 天津一建建筑工程有限公司 Detachable cantilever frame body base

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882651A (en) * 2021-10-19 2022-01-04 山东滕建建设集团有限公司 Hanging flower basket fixing device for construction of building outer wall

Similar Documents

Publication Publication Date Title
WO2019090640A1 (en) Scaffold for building construction
CN202498720U (en) Traction machine for plastic pipes
CN204476233U (en) Construction safety hanging ladder
CN103615120A (en) Combined-type shaping building peripheral horizontal safety net
CN104372923B (en) Scaffolding
CN206418751U (en) One kind can freely lift flexible assembled hoistway operation platform
CN209339555U (en) A kind of construction scaffold
CN216042484U (en) Building platform for outdoor building and indoor decoration
CN204174915U (en) Scaffold
CN205590175U (en) Standard festival with half space
CN203977844U (en) A kind of for the fixing steel pipe iron wire fastener of building trade
CN203983855U (en) A kind of steel tower flex holder
CN203373983U (en) Discharging platform capable of rising and falling along with climbing frame
CN204673525U (en) A kind of device tightening furred ceiling muscle expansion bolt
CN206376731U (en) A kind of underground construction extension ladder
CN104373037A (en) Novel steel pipe tower assistant ladder
CN214958412U (en) Stepped combined cable bridge
CN204370688U (en) Beam column of steel structure
CN204089035U (en) A kind of transmission line pole tower ascent aid
CN205204554U (en) Narrow shaft rescue lifting mechanism
CN219710915U (en) Construction scaffold
CN203594211U (en) Scaffold
CN207063525U (en) A kind of stair template structure
CN204139946U (en) With warning function multifunctional building folding ladder
CN208122742U (en) A kind of indoor security ladder in construction site

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17931184

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 25/08/2020)

122 Ep: pct application non-entry in european phase

Ref document number: 17931184

Country of ref document: EP

Kind code of ref document: A1