WO2019038829A1 - Information processing device, mounting system and information processing method - Google Patents
Information processing device, mounting system and information processing method Download PDFInfo
- Publication number
- WO2019038829A1 WO2019038829A1 PCT/JP2017/029935 JP2017029935W WO2019038829A1 WO 2019038829 A1 WO2019038829 A1 WO 2019038829A1 JP 2017029935 W JP2017029935 W JP 2017029935W WO 2019038829 A1 WO2019038829 A1 WO 2019038829A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- information
- mounting
- planned
- consumption plan
- information processing
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
Definitions
- the invention disclosed in the present specification relates to an information processing apparatus, a mounting system, and an information processing method.
- the present disclosure has been made in view of such a problem, and provides an information processing apparatus, a mounting system, and an information processing method that are less likely to cause an error in the handling of the containing member and can further simplify processing. As the main purpose.
- the present disclosure takes the following measures in order to achieve the above-mentioned main objects.
- the information processing apparatus disclosed in the present specification is An information processing apparatus used in a mounting system including a mounting apparatus for collecting components mounted in a housing member and mounting the components on a substrate, Consumption plan information on an order of use of the accommodating member containing the part, including one or more scheduled work order identification information, is generated between the time of ordering of the part and the time of arrival of the part, and the consumption plan for the accommodating member is generated Control unit that performs processing of correlating information, Is provided.
- processing for associating consumption planning information with the containing member is performed between the time of ordering parts and the time of arrival of parts.
- the order of use of the work order to be used can be understood from the contents of the consumption plan information, and errors in handling the housing member are unlikely to occur.
- the consumption plan is generated from the time of ordering parts to the time of arrival of parts, it is only necessary to allocate parts (accommodating members) as it is when ordering the necessary parts for the production plan. For this reason, in this apparatus, an extra step of allocating parts later can be omitted, and the processing can be further simplified.
- “work order” refers to the production content of the ordered substrate.
- “work order identification information” may be any one that can identify a work order, and includes, for example, a number or a symbol associated with the work order, a work order name, and the like.
- FIG. 1 is a schematic explanatory view showing an example of a mounting system 10;
- FIG. 10 is a conceptual diagram showing an example of production plan information 54 stored in a storage unit 53.
- FIG. 6 is a flowchart illustrating an example of a reel management processing routine. Explanatory drawing which shows an example of the consumption plan display screen 60.
- FIG. 6 is a flowchart illustrating an example of a mounting preparation processing routine.
- FIG. 1 is a schematic explanatory view showing an example of the mounting system 10.
- FIG. 2 is a conceptual diagram showing an example of the production plan information 54 stored in the storage unit 53.
- FIG. 3 is an explanatory diagram showing an example of the consumption plan information 55 stored in the storage unit 53.
- the mounting system 10 is configured as a production line of a substrate including a plurality of mounting lines 11A to 11C that execute a process of mounting components on the substrate.
- the mounting lines 11A to 11C are collectively referred to as the mounting line 11.
- the mounting system 10 includes a mounting device 15 connected to a network 12 such as a LAN, and a management computer (PC) 50 connected to the network 12 to manage information.
- the mounting system 10 includes a printing device 13, a printing inspection device 14, a mounting device 15, a mounting inspection device 16, a reflow device and a reflow inspection device (not shown), a substrate transfer device, and the like. These devices are located in the production area. In addition to the production area, this factory also has a preparation area 19 and the like.
- a reel storage device 40 or the like for storing the parts and storing the reels 36 mounted on the mounting device 15 is disposed, and the stock parts are stored.
- a tape containing components is wound.
- the reel storage device 40 is configured as an automatic warehouse that automatically stores the reels 36 and automatically dispenses the reels 36.
- the reel storage device 40 includes an operation panel 41 for performing various inputs and displays, a gate 42 serving as an inlet and an outlet for the reel 36, and the like, in addition to a storage portion for storing the reels 36.
- the reels 36 may store the tape containing the components to be used soon, or the tape not to be used may store the tape wound from the reel 36. .
- the operator M takes out the reel 36 from the reel storage device 40 before starting production of a substrate, etc., attaches the taken-out reel 36 to the feeder 35, and carries out an operation of mounting the reel 36 on a predetermined mounting device 15.
- the reel identifier 37 is given to the new reel 36 at the time of ordering.
- the worker M attaches a reel identifier 37 to the reel 36 in the preparation area 19.
- the reel identifier 37 may be a barcode or a two-dimensional code.
- Information of the reel identifier 37 of the attached reel 36 may be stored in the feeder 35.
- the worker M holds the portable terminal 18 capable of reading the reel identifier 37.
- the portable terminal 18 can exchange information with the mounting apparatus 15, the management PC 50, and the like via the network 12, acquires information on the mounting line 11 and the reel 36, and displays the information.
- the mounting apparatus 15 includes a mounting control unit 20, a transport unit 23, a supply unit 24, a mounting unit 25, a communication unit 29, and an operation panel 30.
- the mounting control unit 20 is configured as a microprocessor centering on the CPU 21 and includes a storage unit 22 that stores various data.
- the mounting control unit 20 exchanges information with the transport unit 23, the supply unit 24, the mounting unit 25, and the communication unit 29 to control them.
- the transport unit 23 is a unit that transports and fixes the substrate.
- the supply unit 24 is a unit for supplying components to the mounting unit 25.
- the supply unit 24 has, for example, a slot for mounting a feeder 35 to which a reel 36 (housing member) on which a tape holding components is wound is attached.
- the supply unit 24 also has a tray unit or the like that accommodates a tray on which components are arranged.
- the mounting unit 25 is a mounting unit for collecting components from the supply unit 24 and arranging the components on a substrate fixed to the transport unit 23.
- the mounting unit 25 includes a head moving unit 26, a mounting head 27, and a suction nozzle 28.
- the head moving unit 26 includes a slider that is guided by the guide rail and moves in the X and Y directions, and a motor that drives the slider.
- the mounting head 27 is removably mounted on the slider, and moves in the X and Y directions by the head moving unit 26.
- One or more suction nozzles 28 are removably mounted on the lower surface of the mounting head 27. The suction nozzle 28 picks up components using negative pressure.
- the components may be collected using a mechanical chuck or the like that holds the components mechanically.
- the communication unit 29 outputs and acquires information to another device via the network 12.
- the operation panel 30 has a display unit as a display for displaying a screen, and an operation unit that receives an input from the worker M.
- the management PC 50 is a computer that manages information related to the mounting process.
- the management PC 50 includes a management control unit 51, a communication unit 56, a display unit 57, an input unit 58, and the like.
- the management control unit 51 is configured as a microprocessor centering on the CPU 52, and includes a storage unit 53 that stores various data.
- the management control unit 51 exchanges information with the communication unit 56, the display unit 57, and the input unit 58, and controls these.
- the communication unit 56 outputs and acquires information to another device via the network 12.
- the management PC 50 exchanges information with each device of the mounting line 11 connected to the network 12 via the communication unit 56.
- the display unit 57 is a liquid crystal display that displays a screen.
- the input unit 58 is, for example, a device such as a mouse or a keyboard for inputting an instruction of the operator.
- the storage unit 53 stores production plan information 54, consumption plan information 55 and the like.
- the production plan information 54 is information including a production plan of a substrate produced on the mounting lines 11A to 11C or the like within a predetermined period (for example, three days or one week).
- the production plan information 54 is created within several days before the predetermined period for producing the substrate, taking into consideration the securing of parts, etc., based on orders for substrate production from customers, requests for trial manufacture in the company, parts inventory information, etc. Be done.
- the production plan information 54 shows information as to which reel 36 (feeder 35) is attached to which slot of which device, and from when to how many parts are consumed within a specific period, as shown in FIG. It may be included.
- the reel 36 to be attached is represented by a rectangular frame and is described next to the slot number to be attached.
- the number of parts scheduled to be used for the reel 36 in that period is shown in the frame.
- the hatched and hatched reels 36 will be described in detail in the later-described reel management processing routine. It corresponds to 1, 2.
- the production plan information 54 is set in consideration of the number of parts of the reel 36 existing as stock so that if there is an inventory part in the reel storage device 40, it is used with priority.
- “the number of parts existing as stock” may be a virtual number of parts in consideration of, for example, a planned use in the current storage or another device, the number of orders already placed, etc. in addition to the number of parts actually existing.
- Worker M orders a new reel 36 and secures it until the board production, when there are no stock parts, when stock parts run out during the period, when the stock reel 36 is used in another device, etc. .
- the consumption plan information 55 includes one or more work order identification information to be used, and is information relating to the use order of the receiving members containing the parts.
- This work order refers to the production content of the ordered substrate, and is information including a production job that defines which component is to be disposed at which position of the substrate, and the number of production substrates of how many substrates are to be produced. is there.
- the work order identification information may be any one that can identify the work order, and may be, for example, one or more of a number or a symbol associated with the work order, a work order name, and the like.
- the work order name will be described as an example.
- the work order name may be set to a name such as “smartphone substrate 1”, “SUV in-vehicle substrate A”, or the like that allows understanding of the content of the order.
- the consumption plan information 55 is information in which at least a reel identifier and a use order of the work order (consumption plan) are associated. Thus, in the mounting system 10, a consumption plan is set for each reel 36.
- the consumption plan information 55 includes the planned production job, the number of manufactured boards, the planned use date and time, the number of planned parts, the planned factory, the planned use line, the planned mounting device and the use.
- the consumption plan information 55 is generated between the time of ordering of the part accommodated on the corresponding reel 36 and the time of arrival of the part. That is, the consumption plan information 55 is set before the start of use of the reels 36.
- the reels 36 that can not use parts within a predetermined period of production are stored in the reel storage device 40 as stock.
- FIG. 4 is a flowchart showing an example of a reel management processing routine executed by the CPU 52 of the management control unit 51.
- This routine is stored in the storage unit 53 and executed at predetermined intervals after the management PC 50 is activated.
- the CPU 52 first determines whether to create the consumption plan information 55 (S100). This determination is, for example, positively determined between the time of ordering parts and the time of arrival of parts.
- the creation timing of the consumption plan information 55 may be at the time of ordering of parts, at the time of arrival of parts, or may be on any date of the period between them.
- the timing of creating the consumption plan information 55 may be, for example, a date and time predetermined to create the consumption plan information 55 periodically, or it may be determined whether or not an order for parts is required. It may be any date and time within a predetermined period after 54 is created.
- the CPU 52 acquires the production plan information 54 (S110), and extracts the information of the work order using the reel 36 newly ordered (S120). Next, the CPU 52 generates consumption plan information 55 in which the work order arranged in the extracted use order is associated with the reel identifier 37 of the corresponding reel 36 (S130), and stores the generated consumption plan information 55 It stores to 53 (S140). For example, the reel identifier of FIG. It is assumed that one reel 36 is to be used in each device within the shaded period in FIG.
- the CPU 52 controls the reel 36 to be slot # 1 of the mounting apparatus A1 of the production line A, slot # 5 of the mounting apparatus B1 of the production line B, slot # 1 of the mounting apparatus A1 of the production line A, and production line C.
- the information to the effect that it will be used in each period in order of slot # 7 of the mounting apparatus C1 is extracted from the production plan information 54.
- the consumption plan information 55 of 1 is generated.
- the period in which the two reels 36 are used is indicated by hatching. Thus, a consumption plan is set for each new reel 36.
- the CPU 52 determines whether an inquiry of the consumption plan information 55 has been received (S150). For the inquiry about the consumption plan information 55, for example, after the feeder 35 is attached to the supply unit 24, the mounting control unit 20 may inquire about the one corresponding to the attached reel identifier 37, or the feeder 35 may be mounted When attaching to the 15 supply units 24, the worker M may inquire from the portable terminal 18 for confirmation. When the query of the consumption plan information 55 has not been received, this routine is ended as it is. On the other hand, when the inquiry is received, the CPU 52 outputs the consumption plan information 55 of the corresponding reel identifier 37 to the inquiry source device (S160), and ends this routine.
- FIG. 5 is an explanatory view showing an example of the consumption plan display screen 60.
- the CPU 52 transmits the consumption plan display screen 60 to the portable terminal 18.
- the consumption plan display screen 60 is displayed on the display unit of the portable terminal 18, the worker M can confirm which device the reel 36 is used for what period.
- FIG. 6 is a flowchart showing an example of the mounting preparation processing routine executed by the CPU 21 of the mounting device 15.
- This routine is executed by the CPU 21 when production of a substrate is newly started.
- the CPU 21 first acquires a work order of the mounting device 15 (S200).
- the work order may be obtained from the management PC 50 via the network 12 or may be obtained by reading out data stored in advance in the storage unit 22.
- the CPU 21 acquires consumption plan information 55 of the mounted reel 36 based on the reel identifier 37 of the reel 36 (S210).
- the CPU 21 may acquire the consumption plan information 55 from the management PC 50, or may read and acquire one stored in advance in the storage unit 22 or acquires one stored in the storage unit of the feeder 35. It is good also as things.
- the CPU 21 collates the work order with the information included in the consumption plan information 55, and determines whether or not the reels 36 conform (S220).
- the CPU 21 displays on the operation panel 30 that the reels can be used, and permits the use of the reels 36 (S230).
- the CPU 21 displays on the operation panel 30 that the reels 36 can not be used, and prohibits the reels 36 from being used (S240).
- the CPU 21 determines whether or not there is an undetermined reel 36 (S250), and when there is an undetermined reel 36, the processing after S210 is repeatedly executed. On the other hand, when there is no undecided reel 36, the CPU 21 ends this routine as it is.
- the management control unit 51 of the present embodiment corresponds to the control unit of the present disclosure
- the reel 36 corresponds to the housing member
- the management PC 50 corresponds to the information processing apparatus
- the mounting apparatus 15 corresponds to the mounting apparatus
- the mounting system 10 Is equivalent to the mounting system.
- the management PC 50 by describing the operation of the management PC 50, an example of the information processing method of the present disclosure is also clarified.
- the management PC 50 described above generates consumption plan information 55 regarding the order of use of the reel 36 containing the part, including one or more scheduled work order identification information, from the time of ordering this part to the time of arrival of this part, Process for correlating the consumption plan information with 36.
- the management PC 50 since the consumption plan has been prepared for each reel 36, the contents of the consumption plan information 55 make it possible to know the order of use of the work order to be used, and errors in the handling of the reel 36 hardly occur. For example, if the consumption plan is not set even after the start of use of the reel 36, and if parts remain on the reel 36 after the end of use in the mounting apparatus 15, the carrying destination and storage location of the reel 36 are unknown.
- the management control unit 51 When the management control unit 51 receives an inquiry about the reel 36 from a device (for example, the mounting device 15 or the portable terminal 18) in the mounting system 10, the management control unit 51 uses the consumption plan information 55 associated with the reel 36 as the inquiry source. Output to the device of In the management PC 50, the generated consumption plan information 55 can be used by devices in the mounting system 10. Furthermore, the management control unit 51, besides the scheduled work order identification information, the scheduled production job, the number of manufactured substrates, the scheduled date and time, the scheduled number of parts to be used, the scheduled factory, the scheduled use line, the scheduled mounting device and scheduled use Consumption planning information including one or more pieces of information in a slot is generated. The management PC 50 can use any of the above information included in the consumption plan information 55.
- the management control unit 51 acquires production plan information 54 regarding the execution order of the planned work order, and generates consumption plan information 55 based on the execution order of the planned work order in the production plan information 54.
- the management PC 50 can generate the consumption plan information 55 by collective processing in which the production plan and the order of parts are linked. Further, since the management control unit 51 generates the consumption plan information 55 in consideration of the number of parts of the reels 36 existing as inventory, it is possible to generate the consumption plan information 55 by further reducing inventory parts.
- the mounting system 10 includes the mounting apparatus 15 for collecting the components contained in the reels 36 and mounting the components on the substrate, and the management PC 50 described above.
- the mounting apparatus 15 determines the suitability of the reels 36 based on the consumption plan information 55 associated with the reels 36 when the reels 36 containing components are mounted, and the reels 36 are applicable. Sometimes this use is permitted, while this use is prohibited when the reel 36 is not applicable.
- a production plan can be executed in accordance with the consumption plan.
- the mounting system 10 by allocating the consumption plan of the reel 36 between the time of order placement and the time of arrival of parts, it is possible to perform batch processing in which the production plan and the order are linked, thus simplifying processing. it can. Furthermore, in this mounting system 10, since it is only necessary to assign the reels 36 necessary for the production plan as it is from the order placement to the arrival time, there is no need for an extra step of assignment later, the production plan and order placement The relationship with is clear. Furthermore, it is not necessary to take into account the difference between the order backlog (not delivered) and the unallocated production plan, and the relationship between the production plan and the order becomes clear. Furthermore, in the mounting system 10, since it is only necessary to order the production plan, it is possible to further suppress excess inventory.
- the consumption plan information 55 includes the planned production job, the number of manufactured boards, the planned date and time, the number of planned parts, the planned factory, the planned use line, the planned mounting device and the planned slot. Although one or more pieces of information are included, one or more of them may be omitted. For example, if there is only one factory, the use planned factory can be omitted, and if there is only one production line, the use planned line can be omitted. Also, since the planned production job, the number of boards to be manufactured, the planned date and time of use, the number of planned parts to be used, the planned mounting device and the planned slot, etc. can be identified from the planned work order identification information by the production plan information 54 etc. , One or more of these may be omitted.
- the management PC 50 when the management PC 50 receives the inquiry from the device in the mounting system 10, the management PC 50 outputs the corresponding consumption plan information 55 to the device, but it is not particularly limited thereto.
- the consumption plan information 55 may be stored in each device in the mounting system 10, and the consumption plan information 55 may be used in each device.
- the generated consumption plan information 55 can be used by devices in the mounting system 10.
- the devices in the mounting system 10 are the mounting device 15 and the portable terminal 18, not only this but the devices in the mounting system 10 may be used.
- the consumption plan information 55 is described as being generated from the time of ordering of parts to the time of arrival of parts, but it is also possible to reset consumption plan information 55 when there is a change in production plan, for example. Good.
- the management control unit 51 generates the consumption plan information 55 including the planned use date and time, and then changes the planned use date and time of the planned work order according to the change of the production plan regarding the execution order of the planned work order.
- the information 55 may be regenerated.
- consumption plan information is normally generated between the time of ordering parts and the time of parts arrival, and when the production plan is changed, the consumption plan information is regenerated, so simplification of processing can be achieved as much as possible. it can.
- the management PC 50 has the function of the information processing apparatus of the present disclosure in the above-described embodiment, the present invention is not particularly limited to this, and the mounting apparatus 15 may have the function of the information processing apparatus of the present disclosure. , And may be included in the portable terminal 18.
- the mounting system 10 including the mounting apparatus 15 and the management PC 50 has been described. However, only the mounting apparatus 15 may be used, or only the management PC 50 may be used.
- the control unit outputs the consumption plan information associated with the containing member to the apparatus when receiving an inquiry about the containing member from the apparatus in the mounting system. It is also possible to In this apparatus, the generated consumption plan information can be used by the apparatus in the mounting system.
- the “apparatus in the mounting system” may be, in addition to the mounting apparatus, a computer or a portable terminal in the network of the mounting system.
- control unit is, besides the scheduled work order identification information, the planned production job, the number of manufactured substrates, the planned date and time, the planned number of parts, the planned factory, the planned use line, and the planned use.
- Consumption plan information including one or more pieces of information of the mounting apparatus and the planned use slot may be generated. This apparatus can use any of the above information contained in the consumption plan information.
- the control unit acquires production plan information on an execution order of a planned work order, and generates the consumption plan information based on the execution order of the planned work order in the production plan information. It is good also as things.
- consumption plan information can be generated by collective processing in which a production plan and an order for parts are linked.
- control unit may generate the consumption plan information in consideration of the number of parts of the storage member existing as stock.
- the inventory parts can be further reduced to generate the consumption plan information.
- the control unit generates the consumption plan information including the planned use date and time, and uses the planned use date and time of the planned work order according to the change of the production plan regarding the execution order of the planned work order.
- the changed consumption plan information may be regenerated.
- consumption plan information is normally generated between the time of ordering parts and the time of parts arrival, and when the production plan is changed, the consumption plan information is regenerated, so simplification of processing can be achieved as much as possible. it can.
- a mounting system includes a mounting device configured to extract components mounted in a housing member and mount the components on a substrate, and any of the information processing devices described above.
- a mounting device configured to extract components mounted in a housing member and mount the components on a substrate, and any of the information processing devices described above.
- this mounting system as in the case of the information processing apparatus described above, errors in the handling of the containing member are less likely to occur, and processing can be further simplified.
- the mounting apparatus determines the suitability of the housing member based on the consumption plan information associated with the housing member when the housing member housing the component is mounted.
- the use of the containing member may be permitted when the containing member is applicable, while the use of the containing member may be prohibited when the containing member is not applicable.
- "when the accommodation member is attached” is intended to include "under the situation where the accommodation member is attached".
- the information processing method of the present disclosure is It is an information processing method used in a mounting system including a mounting device for collecting components mounted in a housing member and mounting the components on a substrate, and executed by a computer, Consumption plan information on an order of use of the accommodating member containing the part, including one or more scheduled work order identification information, is generated between the time of ordering of the part and the time of arrival of the part, and the consumption plan for the accommodating member is generated Performing a process of correlating information, Is included.
- processing for associating consumption planning information with the housing member is performed between the time of ordering of the parts and the time of arrival of the parts.
- the processing can be simplified.
- various aspects of the above-described information processing apparatus may be adopted, and further, steps may be added to realize each function of the above-described information processing apparatus.
- the information processing apparatus, the mounting system, and the information processing method of the present disclosure can be used in the technical field of an apparatus that performs processing such as collecting and arranging parts.
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Supply And Installment Of Electrical Components (AREA)
- General Factory Administration (AREA)
Abstract
An information processing device of the present disclosure is used in a mounting system which includes a mounting device that extracts a component accommodated in an accommodation member and mounts the component onto a board. This information processing device is provided with a control unit which includes one or more pieces of work order identification information scheduled to be used, and performs a process of generating, between an ordering time of the component and a receipt time of the component, consumption schedule information related to a use sequence of accommodation members in which components are accommodated, and mapping the accommodation members to the consumption schedule information.
Description
本明細書で開示する発明は、情報処理装置、実装システム及び情報処理方法に関する。
The invention disclosed in the present specification relates to an information processing apparatus, a mounting system, and an information processing method.
従来、実装システムとしては、例えば、リール部品に添付されたICタグにリール部品の情報を書き込んでおき、携帯型リーダライタ装置でリール部品の情報を読み取ってサーバに送信し、サーバは登録された情報とリール部品の情報とを照合し、情報が一致した場合にリールの情報を表示し作業者へ指示するものが提案されている(例えば、特許文献1参照)。この装置では、作業者に対してリール部品の保管位置、スロット装填位置、返却場所を正確且つ迅速に指示できるとしている。
Conventionally, as a mounting system, for example, information on reel parts is written on an IC tag attached to a reel part, information on reel parts is read by a portable reader / writer device and transmitted to a server, and the server is registered. It has been proposed to collate the information with the information on the reel parts, and when the information matches, display the information on the reel and instruct the operator (for example, see Patent Document 1). In this device, it is possible to accurately and quickly indicate to the operator the storage position, the slot loading position and the return position of the reel parts.
ところで、特許文献1に記載の装置では、リール部品を実装装置のスロットに装填する際にICタグにリール部品の情報を書き込むものと推察される。このように、リール部品の使用時にリール部品の情報を書き込もうとすると、そのリール部品のそれまでの利用状況やその後の利用状況などを加味する必要があり、処理が煩雑であった。
By the way, in the device described in Patent Document 1, when loading a reel component into a slot of a mounting device, it is presumed that information on the reel component is written to an IC tag. As described above, when trying to write information on reel parts when using the reel parts, it is necessary to take into consideration the usage situation of the reel parts until then and the usage situation thereafter, and the processing is complicated.
本開示は、このような課題に鑑みなされたものであり、収容部材の取り扱いに誤りが生じにくく、処理の簡略化をより図ることができる情報処理装置、実装システム及び情報処理方法を提供することを主目的とする。
The present disclosure has been made in view of such a problem, and provides an information processing apparatus, a mounting system, and an information processing method that are less likely to cause an error in the handling of the containing member and can further simplify processing. As the main purpose.
本開示は、上述の主目的を達成するために以下の手段を採った。
The present disclosure takes the following measures in order to achieve the above-mentioned main objects.
本明細書で開示する情報処理装置は、
収容部材に収容された部品を採取して基板に実装する実装装置を含む実装システムに用いられる情報処理装置であって、
1以上の使用予定ワークオーダー識別情報を含み、部品を収容した収容部材の使用順序に関する消費計画情報を該部品の発注時から該部品の入荷時の間において生成し、該収容部材に対して該消費計画情報を対応付ける処理を行う制御部、
を備えたものである。 The information processing apparatus disclosed in the present specification is
An information processing apparatus used in a mounting system including a mounting apparatus for collecting components mounted in a housing member and mounting the components on a substrate,
Consumption plan information on an order of use of the accommodating member containing the part, including one or more scheduled work order identification information, is generated between the time of ordering of the part and the time of arrival of the part, and the consumption plan for the accommodating member is generated Control unit that performs processing of correlating information,
Is provided.
収容部材に収容された部品を採取して基板に実装する実装装置を含む実装システムに用いられる情報処理装置であって、
1以上の使用予定ワークオーダー識別情報を含み、部品を収容した収容部材の使用順序に関する消費計画情報を該部品の発注時から該部品の入荷時の間において生成し、該収容部材に対して該消費計画情報を対応付ける処理を行う制御部、
を備えたものである。 The information processing apparatus disclosed in the present specification is
An information processing apparatus used in a mounting system including a mounting apparatus for collecting components mounted in a housing member and mounting the components on a substrate,
Consumption plan information on an order of use of the accommodating member containing the part, including one or more scheduled work order identification information, is generated between the time of ordering of the part and the time of arrival of the part, and the consumption plan for the accommodating member is generated Control unit that performs processing of correlating information,
Is provided.
この情報処理装置では、収容部材に対して消費計画情報を対応付ける処理を、部品の発注時から部品の入荷時の間において行う。この装置では、収容部材ごとに消費計画を作成済みであるため、消費計画情報の内容から使用予定ワークオーダーの使用順がわかり、その収容部材の取り扱いに誤りが生じにくい。また、消費計画が部品の発注時から部品の入荷時の間において生成されるから、生産計画に対して必要な部品を発注するときにそのまま部品(収容部材)の割り付けを行うだけで済む。このため、この装置では、あとで部品の割り付けを行う余分な工程を省略することができ、処理の簡略化をより図ることができる。ここで、「ワークオーダー」は、発注された基板の生産内容をいう。また、「ワークオーダー識別情報」は、ワークオーダーを識別可能なものであればよく、例えば、ワークオーダーに対応付けられた番号や記号、ワークオーダー名などを含む。
In this information processing apparatus, processing for associating consumption planning information with the containing member is performed between the time of ordering parts and the time of arrival of parts. In this apparatus, since the consumption plan has been prepared for each housing member, the order of use of the work order to be used can be understood from the contents of the consumption plan information, and errors in handling the housing member are unlikely to occur. Further, since the consumption plan is generated from the time of ordering parts to the time of arrival of parts, it is only necessary to allocate parts (accommodating members) as it is when ordering the necessary parts for the production plan. For this reason, in this apparatus, an extra step of allocating parts later can be omitted, and the processing can be further simplified. Here, "work order" refers to the production content of the ordered substrate. Further, “work order identification information” may be any one that can identify a work order, and includes, for example, a number or a symbol associated with the work order, a work order name, and the like.
本実施形態を図面を参照しながら以下に説明する。図1は、実装システム10の一例を示す概略説明図である。図2は、記憶部53に記憶された生産計画情報54の一例を示す概念図である。図3は、記憶部53に記憶された消費計画情報55の一例を表す説明図である。実装システム10は、部品を基板に実装する処理を実行する複数の実装ライン11A~11Cを含む基板の生産ラインとして構成されている。なお、ここでは、実装ライン11A~11Cを実装ライン11と総称する。この実装システム10は、例えばLANなどのネットワーク12に接続された実装装置15と、ネットワーク12に接続され情報を管理する管理コンピュータ(PC)50とを備えている。この実装システム10は、印刷装置13と、印刷検査装置14と、実装装置15と、実装検査装置16と、図示しないリフロー装置及びリフロー検査装置、基板搬送装置などが含まれている。これらの装置は、生産エリアに配置されている。また、この工場には、生産エリアのほか、準備エリア19などがある。
The present embodiment will be described below with reference to the drawings. FIG. 1 is a schematic explanatory view showing an example of the mounting system 10. FIG. 2 is a conceptual diagram showing an example of the production plan information 54 stored in the storage unit 53. As shown in FIG. FIG. 3 is an explanatory diagram showing an example of the consumption plan information 55 stored in the storage unit 53. As shown in FIG. The mounting system 10 is configured as a production line of a substrate including a plurality of mounting lines 11A to 11C that execute a process of mounting components on the substrate. Here, the mounting lines 11A to 11C are collectively referred to as the mounting line 11. The mounting system 10 includes a mounting device 15 connected to a network 12 such as a LAN, and a management computer (PC) 50 connected to the network 12 to manage information. The mounting system 10 includes a printing device 13, a printing inspection device 14, a mounting device 15, a mounting inspection device 16, a reflow device and a reflow inspection device (not shown), a substrate transfer device, and the like. These devices are located in the production area. In addition to the production area, this factory also has a preparation area 19 and the like.
準備エリア19には、部品を収容し実装装置15に装着されるリール36を保管するリール収納装置40などが配置されており、在庫部品が保管されている。リール36には、部品を収容したテープが巻き付けられている。リール収納装置40は、自動でリール36を収容したり、自動でリール36を払い出す自動倉庫として構成されている。このリール収納装置40は、各リール36を収容する収容部のほか、各種入力や表示を行う操作パネル41、リール36の取入口及び取出口であるゲート42などを備えている。リール収納装置40において、近日中に使用される部品を収容したテープではリール36のまま保管してもよいし、使用予定のないテープではリール36からテープを巻き取った状態で保管してもよい。作業者Mは、基板の生産開始前などにリール収納装置40からリール36を取り出し、取り出したリール36をフィーダ35に取り付け、予め定められた実装装置15に装着する作業を行う。新たなリール36には、発注時にリール識別子37が付与される。作業者Mは、新たなリール36が入庫すると、例えば、準備エリア19にてリール識別子37をリール36に貼付する。リール識別子37は、バーコードや二次元コードとしてもよい。フィーダ35には、取り付けられたリール36のリール識別子37の情報が記憶されているものとしてもよい。また、実装ライン11や準備エリア19で作業を行う際には、作業者Mは、リール識別子37を読み取り可能な携帯端末18を所持する。携帯端末18は、ネットワーク12を介して実装装置15や管理PC50などと情報をやりとり可能であり、実装ライン11やリール36に関する情報を取得して表示する。
In the preparation area 19, a reel storage device 40 or the like for storing the parts and storing the reels 36 mounted on the mounting device 15 is disposed, and the stock parts are stored. On the reel 36, a tape containing components is wound. The reel storage device 40 is configured as an automatic warehouse that automatically stores the reels 36 and automatically dispenses the reels 36. The reel storage device 40 includes an operation panel 41 for performing various inputs and displays, a gate 42 serving as an inlet and an outlet for the reel 36, and the like, in addition to a storage portion for storing the reels 36. In the reel storage device 40, the reels 36 may store the tape containing the components to be used soon, or the tape not to be used may store the tape wound from the reel 36. . The operator M takes out the reel 36 from the reel storage device 40 before starting production of a substrate, etc., attaches the taken-out reel 36 to the feeder 35, and carries out an operation of mounting the reel 36 on a predetermined mounting device 15. The reel identifier 37 is given to the new reel 36 at the time of ordering. When a new reel 36 is received, the worker M, for example, attaches a reel identifier 37 to the reel 36 in the preparation area 19. The reel identifier 37 may be a barcode or a two-dimensional code. Information of the reel identifier 37 of the attached reel 36 may be stored in the feeder 35. Further, when working in the mounting line 11 and the preparation area 19, the worker M holds the portable terminal 18 capable of reading the reel identifier 37. The portable terminal 18 can exchange information with the mounting apparatus 15, the management PC 50, and the like via the network 12, acquires information on the mounting line 11 and the reel 36, and displays the information.
実装装置15は、図1に示すように、実装制御部20と、搬送部23と、供給部24と、実装部25と、通信部29と、操作パネル30とを備えている。実装制御部20は、CPU21を中心とするマイクロプロセッサとして構成されており、各種データを記憶する記憶部22などを備えている。この実装制御部20は、搬送部23や供給部24、実装部25、通信部29と情報のやりとりを行い、これらを制御する。搬送部23は、基板を搬送固定するユニットである。供給部24は、実装部25へ部品を供給するユニットである。この供給部24は、例えば、部品が保持されたテープを巻いたリール36(収容部材)を取り付けたフィーダ35を装着するスロットなどを有する。また、供給部24は、部品が配列載置されたトレイを収容したトレイユニットなども有する。実装部25は、部品を供給部24から採取し、搬送部23に固定された基板へ配置する実装ユニットである。この実装部25は、ヘッド移動部26と、実装ヘッド27と、吸着ノズル28とを備えている。ヘッド移動部26は、ガイドレールに導かれてXY方向へ移動するスライダと、スライダを駆動するモータとを備えている。実装ヘッド27は、スライダに取り外し可能に装着されており、ヘッド移動部26によりXY方向へ移動する。実装ヘッド27の下面には、1以上の吸着ノズル28が取り外し可能に装着されている。吸着ノズル28は、負圧を利用して部品を採取するものである。なお、部品の採取は、吸着ノズル28のほか、部品を機械的に保持するメカニカルチャックなどにより行ってもよい。通信部29は、ネットワーク12を介して他の装置に対し情報の出力及び取得を行うものである。操作パネル30は、画面を表示するディスプレイとしての表示部と、作業者Mからの入力を受け付ける操作部とを有している。
As shown in FIG. 1, the mounting apparatus 15 includes a mounting control unit 20, a transport unit 23, a supply unit 24, a mounting unit 25, a communication unit 29, and an operation panel 30. The mounting control unit 20 is configured as a microprocessor centering on the CPU 21 and includes a storage unit 22 that stores various data. The mounting control unit 20 exchanges information with the transport unit 23, the supply unit 24, the mounting unit 25, and the communication unit 29 to control them. The transport unit 23 is a unit that transports and fixes the substrate. The supply unit 24 is a unit for supplying components to the mounting unit 25. The supply unit 24 has, for example, a slot for mounting a feeder 35 to which a reel 36 (housing member) on which a tape holding components is wound is attached. The supply unit 24 also has a tray unit or the like that accommodates a tray on which components are arranged. The mounting unit 25 is a mounting unit for collecting components from the supply unit 24 and arranging the components on a substrate fixed to the transport unit 23. The mounting unit 25 includes a head moving unit 26, a mounting head 27, and a suction nozzle 28. The head moving unit 26 includes a slider that is guided by the guide rail and moves in the X and Y directions, and a motor that drives the slider. The mounting head 27 is removably mounted on the slider, and moves in the X and Y directions by the head moving unit 26. One or more suction nozzles 28 are removably mounted on the lower surface of the mounting head 27. The suction nozzle 28 picks up components using negative pressure. In addition to the suction nozzle 28, the components may be collected using a mechanical chuck or the like that holds the components mechanically. The communication unit 29 outputs and acquires information to another device via the network 12. The operation panel 30 has a display unit as a display for displaying a screen, and an operation unit that receives an input from the worker M.
管理PC50は、実装処理に関連する情報を管理するコンピュータである。管理PC50は、管理制御部51、通信部56、表示部57、入力部58などを備える。管理制御部51は、CPU52を中心とするマイクロプロセッサとして構成されており、各種データを記憶する記憶部53などを備えている。この管理制御部51は、通信部56や表示部57、入力部58と情報のやりとりを行い、これらを制御する。通信部56は、ネットワーク12を介して他の装置に対し情報の出力及び取得を行うものである。管理PC50は、通信部56を介してネットワーク12に接続されている実装ライン11の各装置と情報のやりとりを行う。表示部57は、画面を表示する液晶ディスプレイである。入力部58は、例えば、マウスやキーボードなど、作業者の指示を入力するデバイスである。
The management PC 50 is a computer that manages information related to the mounting process. The management PC 50 includes a management control unit 51, a communication unit 56, a display unit 57, an input unit 58, and the like. The management control unit 51 is configured as a microprocessor centering on the CPU 52, and includes a storage unit 53 that stores various data. The management control unit 51 exchanges information with the communication unit 56, the display unit 57, and the input unit 58, and controls these. The communication unit 56 outputs and acquires information to another device via the network 12. The management PC 50 exchanges information with each device of the mounting line 11 connected to the network 12 via the communication unit 56. The display unit 57 is a liquid crystal display that displays a screen. The input unit 58 is, for example, a device such as a mouse or a keyboard for inputting an instruction of the operator.
記憶部53には、図2、3に示すように、生産計画情報54や消費計画情報55などが記憶されている。生産計画情報54は、所定期間内(例えば、3日や一週間など)に実装ライン11A~11Cなどで生産される基板の生産計画を含む情報である。この生産計画情報54は、顧客からの基板製造の発注や、社内での試作依頼、部品の在庫情報などに基づき、部品の確保などを考慮し、基板を生産する所定期間の数日前までに作成される。生産計画情報54は、図2に示すように、どの装置のどのスロットに、どのリール36(フィーダ35)がいつからいつまで装着され、特定の期間内に何個の部品が消費されるかの情報を含むものとしてもよい。図2では、装着されるリール36を矩形の枠で表し、装着されるスロット番号の横に記載した。枠内にはその期間におけるそのリール36の使用予定部品個数を示した。網掛け及び斜線のリール36については、後述のリール管理処理ルーチンにて詳しく説明するが、それぞれ図3のリールNo.1,2に該当する。この生産計画情報54は、リール収納装置40に在庫部品があればそれを優先して使用するよう、在庫として存在するリール36の部品数が加味されて設定されている。なお、「在庫として存在する部品数」は、現実に存在する部品数のほか、現在庫や他の装置での使用予定、既発注数などを考慮した仮想的な部品数としてもよい。在庫部品がない場合や、在庫部品が期間中になくなる場合、在庫のリール36が他の装置で使用される場合などに、作業者Mは新たなリール36を発注して基板生産までに確保する。
As shown in FIGS. 2 and 3, the storage unit 53 stores production plan information 54, consumption plan information 55 and the like. The production plan information 54 is information including a production plan of a substrate produced on the mounting lines 11A to 11C or the like within a predetermined period (for example, three days or one week). The production plan information 54 is created within several days before the predetermined period for producing the substrate, taking into consideration the securing of parts, etc., based on orders for substrate production from customers, requests for trial manufacture in the company, parts inventory information, etc. Be done. As shown in FIG. 2, the production plan information 54 shows information as to which reel 36 (feeder 35) is attached to which slot of which device, and from when to how many parts are consumed within a specific period, as shown in FIG. It may be included. In FIG. 2, the reel 36 to be attached is represented by a rectangular frame and is described next to the slot number to be attached. The number of parts scheduled to be used for the reel 36 in that period is shown in the frame. The hatched and hatched reels 36 will be described in detail in the later-described reel management processing routine. It corresponds to 1, 2. The production plan information 54 is set in consideration of the number of parts of the reel 36 existing as stock so that if there is an inventory part in the reel storage device 40, it is used with priority. Note that “the number of parts existing as stock” may be a virtual number of parts in consideration of, for example, a planned use in the current storage or another device, the number of orders already placed, etc. in addition to the number of parts actually existing. Worker M orders a new reel 36 and secures it until the board production, when there are no stock parts, when stock parts run out during the period, when the stock reel 36 is used in another device, etc. .
消費計画情報55は、1以上の使用予定ワークオーダー識別情報を含み、部品を収容した収容部材の使用順序に関する情報である。このワークオーダーは、発注された基板の生産内容をいい、どの部品を基板のどの位置に配置するかを定めた生産ジョブと、その基板を何枚製造するかの製造基板枚数とを含む情報である。ワークオーダー識別情報は、ワークオーダーを識別可能なものであればよく、例えば、ワークオーダーに対応付けられた番号や記号、ワークオーダー名などのうち1以上としてもよい。ここでは、ワークオーダー名を一例として説明する。ワークオーダー名は、例えば、「スマートフォン用基板1」や、「SUV車載基板A」など、発注内容が理解できる名称に設定されるものとしてもよい。なお、同一基板が枚数違いで異なる期間に発注されることがあるので、ワークオーダーに用いられる生産ジョブは繰り返し利用される場合がある。消費計画情報55は、少なくともリール識別子とワークオーダーの使用順序(消費計画)とが対応付けられた情報である。このように、この実装システム10では、リール36ごとに消費計画が設定されている。また、この消費計画情報55には、使用予定ワークオーダー名のほか、使用予定生産ジョブ、製造基板枚数、使用予定日時、使用予定部品個数、使用予定ファクトリ、使用予定ライン、使用予定実装装置及び使用予定スロットのうち1以上の情報を含むものとしてもよい。この消費計画情報55は、該当するリール36に収容された部品の発注時からこの部品の入荷時の間において生成される。即ち、消費計画情報55は、リール36の使用開始前に設定される。詳しくは後述するが、生産の所定期間内に部品を使用しきれなかったリール36は、在庫としてリール収納装置40に保管される。
The consumption plan information 55 includes one or more work order identification information to be used, and is information relating to the use order of the receiving members containing the parts. This work order refers to the production content of the ordered substrate, and is information including a production job that defines which component is to be disposed at which position of the substrate, and the number of production substrates of how many substrates are to be produced. is there. The work order identification information may be any one that can identify the work order, and may be, for example, one or more of a number or a symbol associated with the work order, a work order name, and the like. Here, the work order name will be described as an example. The work order name may be set to a name such as “smartphone substrate 1”, “SUV in-vehicle substrate A”, or the like that allows understanding of the content of the order. In addition, since the same substrate may be ordered in different periods due to the difference in the number of sheets, the production job used for the work order may be repeatedly used. The consumption plan information 55 is information in which at least a reel identifier and a use order of the work order (consumption plan) are associated. Thus, in the mounting system 10, a consumption plan is set for each reel 36. In addition to the planned work order name, the consumption plan information 55 includes the planned production job, the number of manufactured boards, the planned use date and time, the number of planned parts, the planned factory, the planned use line, the planned mounting device and the use. One or more pieces of information in the scheduled slot may be included. The consumption plan information 55 is generated between the time of ordering of the part accommodated on the corresponding reel 36 and the time of arrival of the part. That is, the consumption plan information 55 is set before the start of use of the reels 36. Although details will be described later, the reels 36 that can not use parts within a predetermined period of production are stored in the reel storage device 40 as stock.
次に、こうして構成された本実施形態の実装システム10の動作、特に、管理PC50でリール36の情報を管理する処理について説明する。図4は、管理制御部51のCPU52により実行されるリール管理処理ルーチンの一例を表すフローチャートである。このルーチンは、記憶部53に記憶され、管理PC50の起動後に所定間隔で実行される。
このルーチンを開始すると、CPU52は、まず、消費計画情報55を作成するか否かを判定する(S100)。この判定は、例えば、部品の発注時から部品の入荷時の間において肯定的に判定されるものとする。消費計画情報55の作成タイミングは、部品の発注時としてもよいし、部品の入荷時としてもよいし、これらの間の期間のいずれかの日時としてもよい。また、この消費計画情報55の作成タイミングは、例えば、定期的に消費計画情報55を作成するよう予め定められた日時としてもよいし、部品の発注の要否が判断可能である、生産計画情報54が作成されたあとの所定期間内のいずれかの日時としてもよい。 Next, the operation of the mountingsystem 10 of the embodiment configured in this way, in particular, the process of managing the information of the reel 36 by the management PC 50 will be described. FIG. 4 is a flowchart showing an example of a reel management processing routine executed by the CPU 52 of the management control unit 51. This routine is stored in the storage unit 53 and executed at predetermined intervals after the management PC 50 is activated.
When this routine is started, theCPU 52 first determines whether to create the consumption plan information 55 (S100). This determination is, for example, positively determined between the time of ordering parts and the time of arrival of parts. The creation timing of the consumption plan information 55 may be at the time of ordering of parts, at the time of arrival of parts, or may be on any date of the period between them. Also, the timing of creating the consumption plan information 55 may be, for example, a date and time predetermined to create the consumption plan information 55 periodically, or it may be determined whether or not an order for parts is required. It may be any date and time within a predetermined period after 54 is created.
このルーチンを開始すると、CPU52は、まず、消費計画情報55を作成するか否かを判定する(S100)。この判定は、例えば、部品の発注時から部品の入荷時の間において肯定的に判定されるものとする。消費計画情報55の作成タイミングは、部品の発注時としてもよいし、部品の入荷時としてもよいし、これらの間の期間のいずれかの日時としてもよい。また、この消費計画情報55の作成タイミングは、例えば、定期的に消費計画情報55を作成するよう予め定められた日時としてもよいし、部品の発注の要否が判断可能である、生産計画情報54が作成されたあとの所定期間内のいずれかの日時としてもよい。 Next, the operation of the mounting
When this routine is started, the
消費計画情報55を作成するものと判定された際には、CPU52は、生産計画情報54を取得し(S110)、新たに発注したリール36を使用するワークオーダーの情報を抽出する(S120)。次に、CPU52は、抽出した使用順序に配列したワークオーダーと、該当するリール36のリール識別子37とを対応付けた消費計画情報55を生成すし(S130)、生成した消費計画情報55を記憶部53へ記憶する(S140)。例えば、図3のリール識別子=No.1のリール36は、図2の網掛けで示した期間内に、それぞれの装置で使用される予定であるものとする。この場合、CPU52は、このリール36が、生産ラインAの実装装置A1のスロット#1、生産ラインBの実装装置B1のスロット#5、生産ラインAの実装装置A1のスロット#1、生産ラインCの実装装置C1のスロット#7の順にそれぞれの期間内で使用される旨の情報を生産計画情報54から抽出する。そして、CPU52は、図3に示すリール識別子=No.1の消費計画情報55を生成するのである。なお、図2では、図3のリール識別子=No.2のリール36が使用される期間については斜線で示した。このように、それぞれの新たなリール36に対して、消費計画が設定される。
When it is determined that the consumption plan information 55 is to be created, the CPU 52 acquires the production plan information 54 (S110), and extracts the information of the work order using the reel 36 newly ordered (S120). Next, the CPU 52 generates consumption plan information 55 in which the work order arranged in the extracted use order is associated with the reel identifier 37 of the corresponding reel 36 (S130), and stores the generated consumption plan information 55 It stores to 53 (S140). For example, the reel identifier of FIG. It is assumed that one reel 36 is to be used in each device within the shaded period in FIG. In this case, the CPU 52 controls the reel 36 to be slot # 1 of the mounting apparatus A1 of the production line A, slot # 5 of the mounting apparatus B1 of the production line B, slot # 1 of the mounting apparatus A1 of the production line A, and production line C. The information to the effect that it will be used in each period in order of slot # 7 of the mounting apparatus C1 is extracted from the production plan information 54. Then, the CPU 52 sets the reel identifier = No. The consumption plan information 55 of 1 is generated. In FIG. 2, the reel identifier of FIG. The period in which the two reels 36 are used is indicated by hatching. Thus, a consumption plan is set for each new reel 36.
S140のあと、または、S100で消費計画情報55を作成しないと判定されたあと、CPU52は、消費計画情報55の問合せを受領したか否かを判定する(S150)。消費計画情報55の問合せは、例えば、フィーダ35が供給部24に装着されたあと、装着されたリール識別子37に対応するものを実装制御部20が問い合わせるものとしてもよいし、フィーダ35を実装装置15の供給部24に装着する際、確認するために作業者Mが携帯端末18から問い合わせるものとしてもよい。消費計画情報55の問合せを受領していないときには、そのままこのルーチンを終了する。一方、問合せを受領したときには、CPU52は、該当するリール識別子37の消費計画情報55を問合せ元の装置へ出力し(S160)、このルーチンを終了する。図5は、消費計画表示画面60の一例を示す説明図である。例えば、作業者Mが携帯端末18からリール識別子37と共に消費計画情報55の問い合わせを出力した場合、CPU52は、消費計画表示画面60を携帯端末18へ送信する。携帯端末18の表示部に消費計画表示画面60が表示されると、そのリール36がどの装置でどような期間に用いられるかを作業者Mは確認することができる。
After S140, or after it is determined that the consumption plan information 55 is not created in S100, the CPU 52 determines whether an inquiry of the consumption plan information 55 has been received (S150). For the inquiry about the consumption plan information 55, for example, after the feeder 35 is attached to the supply unit 24, the mounting control unit 20 may inquire about the one corresponding to the attached reel identifier 37, or the feeder 35 may be mounted When attaching to the 15 supply units 24, the worker M may inquire from the portable terminal 18 for confirmation. When the query of the consumption plan information 55 has not been received, this routine is ended as it is. On the other hand, when the inquiry is received, the CPU 52 outputs the consumption plan information 55 of the corresponding reel identifier 37 to the inquiry source device (S160), and ends this routine. FIG. 5 is an explanatory view showing an example of the consumption plan display screen 60. As shown in FIG. For example, when the worker M outputs an inquiry about the consumption plan information 55 together with the reel identifier 37 from the portable terminal 18, the CPU 52 transmits the consumption plan display screen 60 to the portable terminal 18. When the consumption plan display screen 60 is displayed on the display unit of the portable terminal 18, the worker M can confirm which device the reel 36 is used for what period.
次に、リール36が取り付けられたフィーダ35を実装装置15へ装着する際の処理について説明する。図6は、実装装置15のCPU21が実行する実装準備処理ルーチンの一例を表すフローチャートである。このルーチンは、新たに基板の生産が開始される際にCPU21により実行される。このルーチンが開始されると、CPU21は、まず、この実装装置15のワークオーダーを取得する(S200)。ワークオーダーの取得は、管理PC50からネットワーク12を介して取得してもよいし、予め記憶部22に記憶されたものを読み出して取得するものとしてもよい。次に、CPU21は、装着されるリール36の消費計画情報55をリール36のリール識別子37に基づいて取得する(S210)。CPU21は、消費計画情報55を管理PC50から取得してもよいし、予め記憶部22に記憶したものを読み出して取得するものとしてもよいし、フィーダ35の記憶部に記憶されたものを取得するものとしてもよい。次に、CPU21は、ワークオーダーと消費計画情報55に含まれる情報とを照合し、リール36が適合するか否かを判定する(S220)。リール36が適合するときには、CPU21は、使用可能である旨、操作パネル30に表示し、このリール36を使用許可する(S230)。一方、リール36が適合しないときには、CPU21は、使用不可である旨、操作パネル30に表示し、このリール36を使用禁止とする(S240)。そして、S230、S240のあと、CPU21は、未判定のリール36があるか否かを判定し(S250)、未判定のリール36があるときには、S210以降の処理を繰り返し実行する。一方、未判定のリール36がないときには、CPU21は、そのままこのルーチンを終了する。
Next, a process of mounting the feeder 35 to which the reel 36 is attached to the mounting apparatus 15 will be described. FIG. 6 is a flowchart showing an example of the mounting preparation processing routine executed by the CPU 21 of the mounting device 15. This routine is executed by the CPU 21 when production of a substrate is newly started. When this routine is started, the CPU 21 first acquires a work order of the mounting device 15 (S200). The work order may be obtained from the management PC 50 via the network 12 or may be obtained by reading out data stored in advance in the storage unit 22. Next, the CPU 21 acquires consumption plan information 55 of the mounted reel 36 based on the reel identifier 37 of the reel 36 (S210). The CPU 21 may acquire the consumption plan information 55 from the management PC 50, or may read and acquire one stored in advance in the storage unit 22 or acquires one stored in the storage unit of the feeder 35. It is good also as things. Next, the CPU 21 collates the work order with the information included in the consumption plan information 55, and determines whether or not the reels 36 conform (S220). When the reels 36 fit, the CPU 21 displays on the operation panel 30 that the reels can be used, and permits the use of the reels 36 (S230). On the other hand, when the reels 36 do not fit, the CPU 21 displays on the operation panel 30 that the reels 36 can not be used, and prohibits the reels 36 from being used (S240). Then, after S230 and S240, the CPU 21 determines whether or not there is an undetermined reel 36 (S250), and when there is an undetermined reel 36, the processing after S210 is repeatedly executed. On the other hand, when there is no undecided reel 36, the CPU 21 ends this routine as it is.
ここで、本実施形態の構成要素と本発明の構成要素との対応関係を明らかにする。本実施形態の管理制御部51が本開示の制御部に相当し、リール36が収容部材に相当し、管理PC50が情報処理装置に相当し、実装装置15が実装装置に相当し、実装システム10が実装システムに相当する。なお、本実施形態では、管理PC50の動作を説明することにより本開示の情報処理方法の一例も明らかにしている。
Here, the correspondence between the components of the present embodiment and the components of the present invention will be clarified. The management control unit 51 of the present embodiment corresponds to the control unit of the present disclosure, the reel 36 corresponds to the housing member, the management PC 50 corresponds to the information processing apparatus, the mounting apparatus 15 corresponds to the mounting apparatus, and the mounting system 10 Is equivalent to the mounting system. In the present embodiment, by describing the operation of the management PC 50, an example of the information processing method of the present disclosure is also clarified.
以上説明した管理PC50では、1以上の使用予定ワークオーダー識別情報を含み、部品を収容したリール36の使用順序に関する消費計画情報55をこの部品の発注時からこの部品の入荷時の間において生成し、リール36に対してこの消費計画情報を対応付ける処理を行う。この管理PC50では、リール36ごとに消費計画を作成済みであるため、消費計画情報55の内容から使用予定ワークオーダーの使用順がわかり、そのリール36の取り扱いに誤りが生じにくい。例えば、リール36の使用開始後においても消費計画が設定されていない場合には、実装装置15での使用終了後に部品がリール36に残っている場合、このリール36の運び先や保管場所が不明であり、テープは巻き取った方がよいのか、リールのまま保管すればよいのか、次に使用される先はあるのか、などが不明であった。特に、使用後のリール36がリール収納装置40へ持ち込まれた際に、どのように取り扱えばよいかを判断することは、非常に困難であった。この管理PC50では、リール36の消費計画が部品の発注時から部品の入荷時の間において生成されるから、生産計画に対して必要な部品を発注するときにそのまま部品(リール36)の割り付けを行うだけで済む。このため、この管理PC50では、あとで部品の割り付けを行う余分な工程を省略することができ、処理の簡略化をより図ることができる。
The management PC 50 described above generates consumption plan information 55 regarding the order of use of the reel 36 containing the part, including one or more scheduled work order identification information, from the time of ordering this part to the time of arrival of this part, Process for correlating the consumption plan information with 36. In the management PC 50, since the consumption plan has been prepared for each reel 36, the contents of the consumption plan information 55 make it possible to know the order of use of the work order to be used, and errors in the handling of the reel 36 hardly occur. For example, if the consumption plan is not set even after the start of use of the reel 36, and if parts remain on the reel 36 after the end of use in the mounting apparatus 15, the carrying destination and storage location of the reel 36 are unknown. It was unclear as to whether the tape should be taken up, should it be stored as a reel, or have a place to be used next. In particular, when the used reel 36 was brought into the reel storage device 40, it was very difficult to determine how to handle it. In this management PC 50, since the consumption plan of the reel 36 is generated from the time of ordering of parts to the time of arrival of parts, it is only necessary to allocate the parts (reels 36) as it is when ordering the necessary parts to the production plan. That's it. For this reason, in the management PC 50, an extra step of allocating parts later can be omitted, and the processing can be further simplified.
また、管理制御部51は、実装システム10内の装置(例えば実装装置15や携帯端末18など)からリール36の問合せを受領したときには、リール36に対応付けられた消費計画情報55をこの問合せ元の装置へ出力する。この管理PC50では、生成された消費計画情報55を実装システム10内の装置で利用することができる。更に、管理制御部51は、使用予定ワークオーダー識別情報のほか、使用予定生産ジョブ、製造基板枚数、使用予定日時、使用予定部品個数、使用予定ファクトリ、使用予定ライン、使用予定実装装置及び使用予定スロットのうち1以上の情報を含む消費計画情報を生成する。この管理PC50では、消費計画情報55に含まれる上記情報のいずれかを利用することができる。更にまた、管理制御部51は、使用予定ワークオーダーの実行順に関する生産計画情報54を取得し、この生産計画情報54における使用予定ワークオーダーの実行順に基づいて消費計画情報55を生成する。この管理PC50では、生産計画と部品の発注とをリンクした一括処理により消費計画情報55を生成することができる。そしてまた、管理制御部51は、在庫として存在するリール36の部品数を加味して消費計画情報55を生成するため、在庫部品をより低減して消費計画情報55を生成することができる。
When the management control unit 51 receives an inquiry about the reel 36 from a device (for example, the mounting device 15 or the portable terminal 18) in the mounting system 10, the management control unit 51 uses the consumption plan information 55 associated with the reel 36 as the inquiry source. Output to the device of In the management PC 50, the generated consumption plan information 55 can be used by devices in the mounting system 10. Furthermore, the management control unit 51, besides the scheduled work order identification information, the scheduled production job, the number of manufactured substrates, the scheduled date and time, the scheduled number of parts to be used, the scheduled factory, the scheduled use line, the scheduled mounting device and scheduled use Consumption planning information including one or more pieces of information in a slot is generated. The management PC 50 can use any of the above information included in the consumption plan information 55. Furthermore, the management control unit 51 acquires production plan information 54 regarding the execution order of the planned work order, and generates consumption plan information 55 based on the execution order of the planned work order in the production plan information 54. The management PC 50 can generate the consumption plan information 55 by collective processing in which the production plan and the order of parts are linked. Further, since the management control unit 51 generates the consumption plan information 55 in consideration of the number of parts of the reels 36 existing as inventory, it is possible to generate the consumption plan information 55 by further reducing inventory parts.
また、実装システム10は、リール36に収容された部品を採取して基板に実装する実装装置15と、上述した管理PC50とを備えている。この実装システム10では、上述した管理PC50と同様に、リール36の取り扱いに誤りが生じにくく、処理の簡略化をより図ることができる。また、実装装置15は、部品を収容されたリール36が装着されるときにこのリール36に対応付けられた消費計画情報55に基づいてリール36の適否を判定し、リール36が適用可能であるときにはこの使用を許可する一方、リール36が適用可能でないときにはこの使用を禁止する。この実装システム10では、消費計画に沿った生産計画を実行することができる。
Further, the mounting system 10 includes the mounting apparatus 15 for collecting the components contained in the reels 36 and mounting the components on the substrate, and the management PC 50 described above. In this mounting system 10, as in the case of the management PC 50 described above, errors in handling the reel 36 are unlikely to occur, and processing can be further simplified. The mounting apparatus 15 determines the suitability of the reels 36 based on the consumption plan information 55 associated with the reels 36 when the reels 36 containing components are mounted, and the reels 36 are applicable. Sometimes this use is permitted, while this use is prohibited when the reel 36 is not applicable. In the mounting system 10, a production plan can be executed in accordance with the consumption plan.
また、実装システム10では、発注から部品の入荷時の間においてリール36の消費計画を割付することにより、生産計画と発注とをリンクした一括処理とすることができるため、処理の簡素化を図ることができる。更に、この実装システム10では、生産計画に対して必要なリール36を発注から入荷時の間に、そのまま割付を行なうだけで済むため、後で割付を行う余分な工程を要さず、生産計画と発注との関連が明確になる。更にまた、発注残(未納品)分と未割付け生産計画との大小の考慮などをする必要がなく、生産計画分と発注分との関係が明確になる。そしてまた、実装システム10では、生産計画分のみを発注すればよいため、余分な在庫をより抑制することができる。
In addition, in the mounting system 10, by allocating the consumption plan of the reel 36 between the time of order placement and the time of arrival of parts, it is possible to perform batch processing in which the production plan and the order are linked, thus simplifying processing. it can. Furthermore, in this mounting system 10, since it is only necessary to assign the reels 36 necessary for the production plan as it is from the order placement to the arrival time, there is no need for an extra step of assignment later, the production plan and order placement The relationship with is clear. Furthermore, it is not necessary to take into account the difference between the order backlog (not delivered) and the unallocated production plan, and the relationship between the production plan and the order becomes clear. Furthermore, in the mounting system 10, since it is only necessary to order the production plan, it is possible to further suppress excess inventory.
なお、本明細書で開示する情報処理装置及び実装システムは上述した実施形態に何ら限定されることはなく、本開示の技術的範囲に属する限り種々の態様で実施し得ることはいうまでもない。
Note that the information processing apparatus and mounting system disclosed in the present specification are not limited to the above-described embodiment at all, and it goes without saying that they can be implemented in various modes as long as they belong to the technical scope of the present disclosure. .
例えば、上述した実施形態では、消費計画情報55には、使用予定生産ジョブ、製造基板枚数、使用予定日時、使用予定部品個数、使用予定ファクトリ、使用予定ライン、使用予定実装装置及び使用予定スロットのうち1以上の情報を含むものとしたが、このうち1以上を省略してもよい。例えば、ファクトリが1つしかない場合は、使用予定ファクトリを省略できるし、生産ラインが1つしかない場合も使用予定ラインを省略できる。また、使用予定生産ジョブ、製造基板枚数、使用予定日時、使用予定部品個数、使用予定実装装置及び使用予定スロットなどは、使用予定ワークオーダー識別情報から生産計画情報54などにより特定することができるため、これのいずれか1以上を省略してもよい。
For example, in the embodiment described above, the consumption plan information 55 includes the planned production job, the number of manufactured boards, the planned date and time, the number of planned parts, the planned factory, the planned use line, the planned mounting device and the planned slot. Although one or more pieces of information are included, one or more of them may be omitted. For example, if there is only one factory, the use planned factory can be omitted, and if there is only one production line, the use planned line can be omitted. Also, since the planned production job, the number of boards to be manufactured, the planned date and time of use, the number of planned parts to be used, the planned mounting device and the planned slot, etc. can be identified from the planned work order identification information by the production plan information 54 etc. , One or more of these may be omitted.
上述した実施形態では、管理PC50は、実装システム10内の装置から問合せを受領したときには、該当する消費計画情報55をその装置へ出力するものとしたが、特にこれに限定されない。例えば、問合せに関わらず、消費計画情報55を実装システム10内の各装置へ記憶させておき、各装置で消費計画情報55を利用するものとしてもよい。この実装システム10においても、生成された消費計画情報55を実装システム10内の装置で利用することができる。なお、上述した実施形態では。実装システム10内の装置は、実装装置15や携帯端末18としたが、これのみならず、実装システム10内の装置であればよい。
In the embodiment described above, when the management PC 50 receives the inquiry from the device in the mounting system 10, the management PC 50 outputs the corresponding consumption plan information 55 to the device, but it is not particularly limited thereto. For example, regardless of the inquiry, the consumption plan information 55 may be stored in each device in the mounting system 10, and the consumption plan information 55 may be used in each device. Also in this mounting system 10, the generated consumption plan information 55 can be used by devices in the mounting system 10. In the embodiment described above. Although the devices in the mounting system 10 are the mounting device 15 and the portable terminal 18, not only this but the devices in the mounting system 10 may be used.
上述した実施形態では、部品の発注時から部品の入荷時の間において消費計画情報55を生成するものとして説明したが、例えば、生産計画に変更があるときに消費計画情報55を再設定するものとしてもよい。この場合、管理制御部51は、使用予定日時を含む消費計画情報55を生成したのち、使用予定ワークオーダーの実行順に関する生産計画の変更に伴い使用予定ワークオーダーの使用予定日時を変更した消費計画情報55を再生成するものとしてもよい。この装置では、通常では部品の発注時から部品の入荷時の間において消費計画情報を生成し、生産計画が変更された際には消費計画情報を再生成するため、処理の簡略化をできるだけ図ることができる。
In the embodiment described above, the consumption plan information 55 is described as being generated from the time of ordering of parts to the time of arrival of parts, but it is also possible to reset consumption plan information 55 when there is a change in production plan, for example. Good. In this case, the management control unit 51 generates the consumption plan information 55 including the planned use date and time, and then changes the planned use date and time of the planned work order according to the change of the production plan regarding the execution order of the planned work order. The information 55 may be regenerated. In this apparatus, consumption plan information is normally generated between the time of ordering parts and the time of parts arrival, and when the production plan is changed, the consumption plan information is regenerated, so simplification of processing can be achieved as much as possible. it can.
上述した実施形態では、本開示の情報処理装置の機能を管理PC50が有するものとしたが、特にこれに限定されず、本開示の情報処理装置の機能を実装装置15が有するものとしてもよいし、携帯端末18が有するものとしてもよい。上述した実施形態では、実装装置15と管理PC50とを備えた実装システム10として説明したが、実装装置15のみとしてもよいし、管理PC50のみとしてもよい。
Although the management PC 50 has the function of the information processing apparatus of the present disclosure in the above-described embodiment, the present invention is not particularly limited to this, and the mounting apparatus 15 may have the function of the information processing apparatus of the present disclosure. , And may be included in the portable terminal 18. In the embodiment described above, the mounting system 10 including the mounting apparatus 15 and the management PC 50 has been described. However, only the mounting apparatus 15 may be used, or only the management PC 50 may be used.
ここで、本開示の情報処理装置において、前記制御部は、前記実装システム内の装置から前記収容部材の問合せを受領したときには、前記収容部材に対応付けられた前記消費計画情報を該装置へ出力するものとしてもよい。この装置では、生成された消費計画情報を実装システム内の装置で利用することができる。なお、「実装システム内の装置」としては、実装装置のほか、実装システムのネットワーク内にあるコンピュータや携帯端末などが挙げられる。
Here, in the information processing apparatus of the present disclosure, the control unit outputs the consumption plan information associated with the containing member to the apparatus when receiving an inquiry about the containing member from the apparatus in the mounting system. It is also possible to In this apparatus, the generated consumption plan information can be used by the apparatus in the mounting system. The “apparatus in the mounting system” may be, in addition to the mounting apparatus, a computer or a portable terminal in the network of the mounting system.
本開示の情報処理装置において、前記制御部は、使用予定ワークオーダー識別情報のほか、使用予定生産ジョブ、製造基板枚数、使用予定日時、使用予定部品個数、使用予定ファクトリ、使用予定ライン、使用予定実装装置及び使用予定スロットのうち1以上の情報を含む消費計画情報を生成するものとしてもよい。この装置では、消費計画情報に含まれる上記情報のいずれかを利用することができる。
In the information processing apparatus according to the present disclosure, the control unit is, besides the scheduled work order identification information, the planned production job, the number of manufactured substrates, the planned date and time, the planned number of parts, the planned factory, the planned use line, and the planned use. Consumption plan information including one or more pieces of information of the mounting apparatus and the planned use slot may be generated. This apparatus can use any of the above information contained in the consumption plan information.
本開示の情報処理装置において、前記制御部は、使用予定ワークオーダーの実行順に関する生産計画情報を取得し、該生産計画情報における前記使用予定ワークオーダーの実行順に基づいて前記消費計画情報を生成するものとしてもよい。この装置では、生産計画と部品の発注とをリンクした一括処理により消費計画情報を生成することができる。
In the information processing apparatus of the present disclosure, the control unit acquires production plan information on an execution order of a planned work order, and generates the consumption plan information based on the execution order of the planned work order in the production plan information. It is good also as things. In this apparatus, consumption plan information can be generated by collective processing in which a production plan and an order for parts are linked.
本開示の情報処理装置において、前記制御部は、在庫として存在する前記収容部材の部品数を加味して前記消費計画情報を生成するものとしてもよい。この装置では、在庫の部品数を加味するため、在庫部品をより低減して消費計画情報を生成することができる。
In the information processing apparatus of the present disclosure, the control unit may generate the consumption plan information in consideration of the number of parts of the storage member existing as stock. In this apparatus, since the number of parts in the inventory is taken into consideration, the inventory parts can be further reduced to generate the consumption plan information.
本開示の情報処理装置において、前記制御部は、使用予定日時を含む前記消費計画情報を生成し、使用予定ワークオーダーの実行順に関する生産計画の変更に伴い前記使用予定ワークオーダーの使用予定日時を変更した前記消費計画情報を再生成するものとしてもよい。この装置では、通常では部品の発注時から部品の入荷時の間において消費計画情報を生成し、生産計画が変更された際には消費計画情報を再生成するため、処理の簡略化をできるだけ図ることができる。
In the information processing apparatus of the present disclosure, the control unit generates the consumption plan information including the planned use date and time, and uses the planned use date and time of the planned work order according to the change of the production plan regarding the execution order of the planned work order. The changed consumption plan information may be regenerated. In this apparatus, consumption plan information is normally generated between the time of ordering parts and the time of parts arrival, and when the production plan is changed, the consumption plan information is regenerated, so simplification of processing can be achieved as much as possible. it can.
本開示の実装システムは、収容部材に収容された部品を採取して基板に実装する実装装置と、上述したいずれかの情報処理装置と、を備えたものである。この実装システムでは、上述した情報処理装置と同様に、収容部材の取り扱いに誤りが生じにくく、処理の簡略化をより図ることができる。
A mounting system according to an embodiment of the present disclosure includes a mounting device configured to extract components mounted in a housing member and mount the components on a substrate, and any of the information processing devices described above. In this mounting system, as in the case of the information processing apparatus described above, errors in the handling of the containing member are less likely to occur, and processing can be further simplified.
本開示の実装システムにおいて、前記実装装置は、前記部品を収容された収容部材が装着されるときに該収容部材に対応付けられた前記消費計画情報に基づいて該収容部材の適否を判定し、該収容部材が適用可能であるときには該収容部材の使用を許可する一方、該収容部材が適用可能でないときには該収容部材の使用を禁止するものとしてもよい。この実装システムでは、消費計画に沿った生産計画を実行することができる。ここで、「収容部材が装着されるときに」とは、「収容部材が装着される状況下において」を含む趣旨である。
In the mounting system of the present disclosure, the mounting apparatus determines the suitability of the housing member based on the consumption plan information associated with the housing member when the housing member housing the component is mounted. The use of the containing member may be permitted when the containing member is applicable, while the use of the containing member may be prohibited when the containing member is not applicable. In this mounting system, it is possible to execute a production plan in accordance with the consumption plan. Here, "when the accommodation member is attached" is intended to include "under the situation where the accommodation member is attached".
本開示の情報処理方法は、
収容部材に収容された部品を採取して基板に実装する実装装置を含む実装システムに用いられコンピュータにより実行される情報処理方法であって、
1以上の使用予定ワークオーダー識別情報を含み、部品を収容した収容部材の使用順序に関する消費計画情報を該部品の発注時から該部品の入荷時の間において生成し、該収容部材に対して該消費計画情報を対応付ける処理を行うステップ、
を含むものである。 The information processing method of the present disclosure is
It is an information processing method used in a mounting system including a mounting device for collecting components mounted in a housing member and mounting the components on a substrate, and executed by a computer,
Consumption plan information on an order of use of the accommodating member containing the part, including one or more scheduled work order identification information, is generated between the time of ordering of the part and the time of arrival of the part, and the consumption plan for the accommodating member is generated Performing a process of correlating information,
Is included.
収容部材に収容された部品を採取して基板に実装する実装装置を含む実装システムに用いられコンピュータにより実行される情報処理方法であって、
1以上の使用予定ワークオーダー識別情報を含み、部品を収容した収容部材の使用順序に関する消費計画情報を該部品の発注時から該部品の入荷時の間において生成し、該収容部材に対して該消費計画情報を対応付ける処理を行うステップ、
を含むものである。 The information processing method of the present disclosure is
It is an information processing method used in a mounting system including a mounting device for collecting components mounted in a housing member and mounting the components on a substrate, and executed by a computer,
Consumption plan information on an order of use of the accommodating member containing the part, including one or more scheduled work order identification information, is generated between the time of ordering of the part and the time of arrival of the part, and the consumption plan for the accommodating member is generated Performing a process of correlating information,
Is included.
この情報処理方法では、上述した情報処理装置と同様に、収容部材に対して消費計画情報を対応付ける処理を、部品の発注時から部品の入荷時の間において行うため、収容部材の取り扱いに誤りが生じにくく、処理の簡略化をより図ることができる。なお、この情報処理方法において、上述した情報処理装置の種々の態様を採用してもよいし、また、上述した情報処理装置の各機能を実現するようなステップを追加してもよい。
In this information processing method, as in the above-described information processing apparatus, processing for associating consumption planning information with the housing member is performed between the time of ordering of the parts and the time of arrival of the parts. The processing can be simplified. In the information processing method, various aspects of the above-described information processing apparatus may be adopted, and further, steps may be added to realize each function of the above-described information processing apparatus.
本開示の情報処理装置や実装システム、情報処理方法は、部品を採取、配置などの処理を行う装置の技術分野に利用可能である。
The information processing apparatus, the mounting system, and the information processing method of the present disclosure can be used in the technical field of an apparatus that performs processing such as collecting and arranging parts.
10 実装システム、11 実装ライン、12 ネットワーク、13 印刷装置、14 印刷検査装置、15 実装装置、16 実装検査装置、18 携帯端末、19 準備エリア、20 実装制御部、21 CPU、22 記憶部、23 搬送部、24 供給部、25 実装部、26 ヘッド移動部、27 実装ヘッド、28 吸着ノズル、29 通信部、30 操作パネル、35 フィーダ、36 リール、37 リール識別子、40 リール収納装置、41 操作パネル、42 ゲート、50 管理PC、51 管理制御部、52 CPU、53 記憶部、54 生産計画情報、55 消費計画情報、56 通信部、57 表示部、58 入力部、60 消費計画表示画面、M 作業者。
DESCRIPTION OF SYMBOLS 10 mounting system, 11 mounting line, 12 network, 13 printing apparatus, 14 printing inspection apparatus, 15 mounting apparatus, 16 mounting inspection apparatus, 18 portable terminal, 19 preparation area, 20 mounting control unit, 21 CPU, 22 storage unit, 23 Conveying unit, 24 supplying unit, 25 mounting unit, 26 head moving unit, 27 mounting head, 28 suction nozzle, 29 communication unit, 30 operation panel, 35 feeder, 36 reel, 37 reel identifier, 40 reel storage device, 41 operation panel 42 gate 50 management PC 51 management control unit 52 CPU 53 storage unit 54 production plan information 55 consumption plan information 56 communication unit 57 display unit 58 input unit 60 consumption plan display screen M work Person.
Claims (9)
- 収容部材に収容された部品を採取して基板に実装する実装装置を含む実装システムに用いられる情報処理装置であって、
1以上の使用予定ワークオーダー識別情報を含み、部品を収容した収容部材の使用順序に関する消費計画情報を該部品の発注時から該部品の入荷時の間において生成し、該収容部材に対して該消費計画情報を対応付ける処理を行う制御部、
を備えた情報処理装置。 An information processing apparatus used in a mounting system including a mounting apparatus for collecting components mounted in a housing member and mounting the components on a substrate,
Consumption plan information on an order of use of the accommodating member containing the part, including one or more scheduled work order identification information, is generated between the time of ordering of the part and the time of arrival of the part, and the consumption plan for the accommodating member is generated Control unit that performs processing of correlating information,
An information processing apparatus provided with - 前記制御部は、前記実装システム内の装置から前記収容部材の問合せを受領したときには、前記収容部材に対応付けられた前記消費計画情報を該装置へ出力する、請求項1に記載の情報処理装置。 The information processing apparatus according to claim 1, wherein the control unit outputs the consumption plan information associated with the containing member to the device when receiving an inquiry about the containing member from the device in the mounting system. .
- 前記制御部は、使用予定ワークオーダー識別情報のほか、使用予定生産ジョブ、製造基板枚数、使用予定日時、使用予定部品個数、使用予定ファクトリ、使用予定ライン、使用予定実装装置及び使用予定スロットのうち1以上の情報を含む消費計画情報を生成する、請求項1又は2に記載の情報処理装置。 The control unit is configured to use a planned production job, the number of manufactured boards, a planned use date, a planned number of parts, a planned factory, a planned use line, a planned mounting device and a planned slot, as well as planned work order identification information. The information processing apparatus according to claim 1, wherein consumption plan information including one or more pieces of information is generated.
- 前記制御部は、使用予定ワークオーダーの実行順に関する生産計画情報を取得し、該生産計画情報における前記使用予定ワークオーダーの実行順に基づいて前記消費計画情報を生成する、請求項1~3のいずれか1項に記載の情報処理装置。 The control unit acquires production plan information on an execution order of a scheduled work order, and generates the consumption plan information based on the execution order of the scheduled work order in the production plan information. An information processing apparatus according to any one of the preceding items.
- 前記制御部は、在庫として存在する前記収容部材の部品数を加味して前記消費計画情報を生成する、請求項1~4のいずれか1項に記載の情報処理装置。 The information processing apparatus according to any one of claims 1 to 4, wherein the control unit generates the consumption plan information in consideration of the number of parts of the housing member existing as stock.
- 前記制御部は、使用予定日時を含む前記消費計画情報を生成し、使用予定ワークオーダーの実行順に関する生産計画の変更に伴い前記使用予定ワークオーダーの使用予定日時を変更した前記消費計画情報を再生成する、請求項1~5のいずれか1項に記載の情報処理装置。 The control unit generates the consumption plan information including the planned use date and time, and reproduces the consumption plan information in which the planned use date and time of the planned work order is changed according to the change of the production plan regarding the execution order of the planned work order. The information processing apparatus according to any one of claims 1 to 5, wherein
- 収容部材に収容された部品を採取して基板に実装する実装装置と、
請求項1~6のいずれか1項に記載の情報処理装置と、
を備えた実装システム。 A mounting device for collecting parts mounted in the housing member and mounting the parts on the substrate;
An information processing apparatus according to any one of claims 1 to 6.
Implementation system with. - 前記実装装置は、前記部品を収容された収容部材が装着されるときに該収容部材に対応付けられた前記消費計画情報に基づいて該収容部材の適否を判定し、該収容部材が適用可能であるときには該収容部材の使用を許可する一方、該収容部材が適用可能でないときには該収容部材の使用を禁止する、請求項7に記載の実装システム。 The mounting apparatus determines the suitability of the housing member based on the consumption plan information associated with the housing member when the housing member housing the component is mounted, and the housing member is applicable. 8. The mounting system according to claim 7, wherein the use of the containing member is permitted when the containing member is permitted while the use of the containing member is prohibited when the containing member is not applicable.
- 収容部材に収容された部品を採取して基板に実装する実装装置を含む実装システムに用いられコンピュータにより実行される情報処理方法であって、
1以上の使用予定ワークオーダー識別情報を含み、部品を収容した収容部材の使用順序に関する消費計画情報を該部品の発注時から該部品の入荷時の間において生成し、該収容部材に対して該消費計画情報を対応付ける処理を行うステップ、
を含む情報処理方法。 It is an information processing method used in a mounting system including a mounting device for collecting components mounted in a housing member and mounting the components on a substrate, and executed by a computer,
Consumption plan information on an order of use of the accommodating member containing the part, including one or more scheduled work order identification information, is generated between the time of ordering of the part and the time of arrival of the part, and the consumption plan for the accommodating member is generated Performing a process of correlating information,
Information processing method including:
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019537457A JP6766269B2 (en) | 2017-08-22 | 2017-08-22 | Information processing equipment, mounting system and information processing method |
PCT/JP2017/029935 WO2019038829A1 (en) | 2017-08-22 | 2017-08-22 | Information processing device, mounting system and information processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2017/029935 WO2019038829A1 (en) | 2017-08-22 | 2017-08-22 | Information processing device, mounting system and information processing method |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019038829A1 true WO2019038829A1 (en) | 2019-02-28 |
Family
ID=65439430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2017/029935 WO2019038829A1 (en) | 2017-08-22 | 2017-08-22 | Information processing device, mounting system and information processing method |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP6766269B2 (en) |
WO (1) | WO2019038829A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020194710A1 (en) * | 2019-03-28 | 2020-10-01 | 株式会社Fuji | Management apparatus and mounting system |
JPWO2022137379A1 (en) * | 2020-12-23 | 2022-06-30 | ||
CN114868466A (en) * | 2020-01-14 | 2022-08-05 | 株式会社富士 | Setup change adjusting system of component supply unit |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5553376A (en) * | 1995-02-15 | 1996-09-10 | Motorola, Inc. | Method of and apparatus for changing a production setup |
JPH1168380A (en) * | 1997-08-22 | 1999-03-09 | Pfu Ltd | Reel member allocation system |
JP2002123311A (en) * | 2000-10-13 | 2002-04-26 | Ffc:Kk | Device and method for material management and storage medium with computer program implementing the same managing method recorded thereon |
JP2005175017A (en) * | 2003-12-08 | 2005-06-30 | Matsushita Electric Ind Co Ltd | Reel cassette management method in printed wiring board packaging process |
JP2008078235A (en) * | 2006-09-19 | 2008-04-03 | Matsushita Electric Ind Co Ltd | Method and device for managing part information |
JP2013008729A (en) * | 2011-06-22 | 2013-01-10 | Fuji Mach Mfg Co Ltd | Electronic component mounting device |
JP2013243243A (en) * | 2012-05-21 | 2013-12-05 | Panasonic Corp | Electronic component mounting system and facility unit management method in electronic component mounting system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08222892A (en) * | 1995-02-14 | 1996-08-30 | Fujitsu Ltd | Parts management system |
-
2017
- 2017-08-22 WO PCT/JP2017/029935 patent/WO2019038829A1/en active Application Filing
- 2017-08-22 JP JP2019537457A patent/JP6766269B2/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5553376A (en) * | 1995-02-15 | 1996-09-10 | Motorola, Inc. | Method of and apparatus for changing a production setup |
JPH1168380A (en) * | 1997-08-22 | 1999-03-09 | Pfu Ltd | Reel member allocation system |
JP2002123311A (en) * | 2000-10-13 | 2002-04-26 | Ffc:Kk | Device and method for material management and storage medium with computer program implementing the same managing method recorded thereon |
JP2005175017A (en) * | 2003-12-08 | 2005-06-30 | Matsushita Electric Ind Co Ltd | Reel cassette management method in printed wiring board packaging process |
JP2008078235A (en) * | 2006-09-19 | 2008-04-03 | Matsushita Electric Ind Co Ltd | Method and device for managing part information |
JP2013008729A (en) * | 2011-06-22 | 2013-01-10 | Fuji Mach Mfg Co Ltd | Electronic component mounting device |
JP2013243243A (en) * | 2012-05-21 | 2013-12-05 | Panasonic Corp | Electronic component mounting system and facility unit management method in electronic component mounting system |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020194710A1 (en) * | 2019-03-28 | 2020-10-01 | 株式会社Fuji | Management apparatus and mounting system |
JPWO2020194710A1 (en) * | 2019-03-28 | 2020-10-01 | ||
CN113597827A (en) * | 2019-03-28 | 2021-11-02 | 株式会社富士 | Management device and installation system |
EP3952627A4 (en) * | 2019-03-28 | 2022-04-06 | Fuji Corporation | Management apparatus and mounting system |
CN113597827B (en) * | 2019-03-28 | 2022-12-09 | 株式会社富士 | Management device and installation system |
JP7249403B2 (en) | 2019-03-28 | 2023-03-30 | 株式会社Fuji | Management device and mounting system |
US12120826B2 (en) | 2019-03-28 | 2024-10-15 | Fuji Corporation | Management apparatus and mounting system |
CN114868466A (en) * | 2020-01-14 | 2022-08-05 | 株式会社富士 | Setup change adjusting system of component supply unit |
CN114868466B (en) * | 2020-01-14 | 2024-02-06 | 株式会社富士 | Yield-changing adjusting system of component supply unit |
JPWO2022137379A1 (en) * | 2020-12-23 | 2022-06-30 | ||
WO2022137379A1 (en) * | 2020-12-23 | 2022-06-30 | 株式会社Fuji | Substrate production system |
JP7412601B2 (en) | 2020-12-23 | 2024-01-12 | 株式会社Fuji | Board production system |
Also Published As
Publication number | Publication date |
---|---|
JP6766269B2 (en) | 2020-10-07 |
JPWO2019038829A1 (en) | 2019-12-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5945690B2 (en) | Electronic component mounting system and facility unit management method in electronic component mounting system | |
US9807920B2 (en) | Electronic component mounting system | |
JP5909645B2 (en) | Electronic component mounting system and facility unit management method in electronic component mounting system | |
JP6204486B2 (en) | Component mounting line management device | |
WO2019038829A1 (en) | Information processing device, mounting system and information processing method | |
JP6314319B2 (en) | Electronic component mounting system | |
JP4796462B2 (en) | Component assembly assignment method, component assembly assignment device, and mounter for mounting machine | |
CN109315088B (en) | Splicing unit | |
JP7105390B2 (en) | Information processing system, mounting system and information processing method | |
JP5903660B2 (en) | Electronic component mounting system and component management method in electronic component mounting system | |
JP7041727B2 (en) | Information processing equipment, mounting system and information processing method | |
WO2004103052A1 (en) | Electronic part mounting system | |
EP3927130B1 (en) | Article management apparatus and article management method | |
JP2022036107A (en) | Storage searching method | |
JP7249403B2 (en) | Management device and mounting system | |
CN113454549B (en) | Component management system | |
WO2022085107A1 (en) | Production system | |
JP4684741B2 (en) | Parts management system and parts management apparatus | |
WO2022249332A1 (en) | Component storage support device, component storage support method, component storage support program, and recording medium | |
WO2022259677A1 (en) | Property management assistance system, property management system, and property management assistance method | |
JP2004039881A (en) | Smd mounting system corresponding to multivender | |
JP2023118458A (en) | Supply shelf, production system, and supply method | |
JP2000076343A (en) | Maintenance component management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17922603 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2019537457 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 17922603 Country of ref document: EP Kind code of ref document: A1 |