WO2018205195A1 - Production work order management system and management method therefor - Google Patents

Production work order management system and management method therefor Download PDF

Info

Publication number
WO2018205195A1
WO2018205195A1 PCT/CN2017/083894 CN2017083894W WO2018205195A1 WO 2018205195 A1 WO2018205195 A1 WO 2018205195A1 CN 2017083894 W CN2017083894 W CN 2017083894W WO 2018205195 A1 WO2018205195 A1 WO 2018205195A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
workpiece
work order
database system
information database
Prior art date
Application number
PCT/CN2017/083894
Other languages
French (fr)
Chinese (zh)
Inventor
罗红兵
郑国维
Original Assignee
深圳市柘叶红实业有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳市柘叶红实业有限公司 filed Critical 深圳市柘叶红实业有限公司
Priority to PCT/CN2017/083894 priority Critical patent/WO2018205195A1/en
Publication of WO2018205195A1 publication Critical patent/WO2018205195A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the present invention belongs to the field of electronic information technology, and specifically relates to a production work order management system and a management method thereof.
  • the work order is a very important management tool.
  • the production manager records and arranges the production process according to the work order, and also exchanges information with the supply and sales department to ensure production.
  • the number of general work order management materials is very large and complicated, forming a series of production management reports to facilitate production management personnel to read and analyze.
  • the production management and numerical calculation of production management reports are performed manually. Therefore, it is quite labor intensive and cumbersome, and it is easy to cause human error, making the overall production management less efficient and less accurate.
  • traditional production management reports can't prompt for price tasks that cannot be completed by ⁇ , and managers need to keep checking.
  • the present invention provides a production work order management system and a management method thereof, and intelligently manages work orders of a workshop.
  • a production work order management system comprising:
  • the work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used for updating and changing Workpiece number, workpiece number, and designer information;
  • processing information database system comprising a processing information database carrying the workpiece name, workpiece number, designer information and production plant information of the workpiece waiting for production, wherein the processing information database system can be used to update at least Change the production floor information;
  • the work order information database system output changes The subsequent information is sent to the processing information database system to update and change the information stored in the processing information database.
  • the system includes a deferred completion database system
  • the deferred completion database system includes a deferred completion database
  • the deferred database system and the processing information database system communicate and exchange information, wherein the processing information database After the system is updated and changed, the deferred completion database is also updated or changed.
  • the method further includes: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results.
  • a production work order management system includes:
  • a work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used for updating and changing Workpiece number, workpiece number, and designer information;
  • processing information database system comprising a processing information database carrying the workpiece name, workpiece number, designer information and production plant information of the workpiece waiting for production, wherein the processing information database system can be used to update at least Change the production floor information;
  • the work order information database outputs the changed information to the processing information database system, and updates and changes the information stored in the processing information database.
  • the method further includes:
  • the deferred completion database system includes a deferred completion database, carrying the extension information of the unfinished workpiece, the deferred completion database and the processing information database system communication and exchange information, wherein the processing information database system is updated and changed,
  • the deferred completion database is also updated or changed.
  • the method further includes:
  • the method further includes: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results.
  • a production work order management method comprising: inputting and storing workpiece information to be produced in a work order information database and a processing information database, wherein the workpiece information includes a workpiece name, a workpiece number, and designer information; Workpiece information, update or change workpiece information in the work order information database; output Updated or changed workpiece information; Update the processing information database based on the output information.
  • the workpiece information is input and stored in the deferred completion database; according to the output information, the information of the unfinished workpiece in the deferred completion database is updated or changed; and the output from the deferred completion database is not completed in the predetermined time. The number of workpieces.
  • the production work order management system and the management method thereof provided by the invention establish a complete information management system for the work order, update and track the information recorded therein, and perform statistics on the workpiece processing completion status and defects, for management Factory processing orders and delivery are guaranteed.
  • a work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used for updating and changing Workpiece number, workpiece number, and designer information;
  • processing information database system comprising a processing information database carrying the workpiece name, workpiece number, designer information and production plant information of the workpiece waiting for production, wherein the processing information database system can be used to update at least Changing the production floor information;
  • the work order information database system outputs the changed information to the processing information database system, and updates the information stored in the processing information database. change.
  • the system includes a deferred completion database system
  • the deferred completion database system includes a deferred completion database
  • the deferred database system and the processing information database system communicate and exchange information, wherein the processing information database After the system is updated and changed, the deferred completion database is also updated or changed.
  • the method further includes: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results.
  • a statistical database system wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results.
  • a production work order management system includes:
  • a work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used for updating and changing Workpiece number, workpiece number, and designer information;
  • processing information database system comprising a processing information database carrying the workpiece name, workpiece number, designer information and production plant information of the workpiece waiting for production, wherein the processing information database system can be used to update at least Change the production floor information;
  • the work order information database outputs the changed information to the processing information database system, and updates and changes the information stored in the processing information database.
  • the method further includes:
  • the deferred completion database system includes a deferred completion database, carrying the extension information of the unfinished workpiece, the deferred completion database and the processing information database system communication and exchange information, wherein the processing information database system is updated and changed,
  • the deferred completion database is also updated or changed.
  • the method further includes:
  • the method further includes: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results.
  • a method for managing a work order comprising: inputting and storing workpiece information to be produced in a work order information database and a processing information database, wherein the workpiece information includes a workpiece name, a workpiece number, and designer information; The workpiece information, update or change the workpiece information in the work order information database; output the updated or changed workpiece information; update the processing information database according to the output information.
  • the workpiece information is input and stored in the deferred completion database; the information of the unfinished workpiece in the deferred database is updated or changed according to the output information; and the output from the deferred database is not completed during the scheduled time.

Abstract

A production work order management system, comprising: a work order information database system and a machining information database system, wherein the work order information database system comprises a work order information database carrying a workpiece name, a workpiece number and designer information of a workpiece needing to be produced; the machining information database system comprises a machining information database carrying a workpiece name, a workpiece number, designer information and production workshop information of a workpiece to be produced; and when the workpiece name, the workpiece number and the designer information in the work order information database are changed, information stored in the machining information database system is updated and changed. Further provided is a production work order management method. By means of the production work order management system and the management method therefor, a complete information management system is established for a work order, in order to update and track information recorded therein in time and collect statistics on the completion of workpiece machining in time, so as to provide a guarantee for timely delivery by means of the managing processing orders of a factory.

Description

生产工单管理系统及其管理方法  Production work order management system and management method thereof
技术领域 Technical field
[0001] 本发明属于电子信息技术领域, 具体为生产工单管理系统及其管理方法。  [0001] The present invention belongs to the field of electronic information technology, and specifically relates to a production work order management system and a management method thereof.
背景技术  Background technique
[0002] 在工厂生产线上, 工单是一个非常重要的管理工具, 生产管理者依据工单记载 写生产进程进行生产任务的安排和调整, 同吋还与供应和销售部门进行信息交 流, 确保生产及吋交货, 一般工单管理资料的数量非常庞大且繁杂, 形成一系 列的生产管理报表, 以方便生产管理人员来阅读及分析。 然而传统上, 生产管 理报表的制作及数值计算都是以人工来执行, 因此相当的耗费人力和吋间, 且 容易造成人为错误, 使得整体的生产管理较无效率且不够准确。 此外, 传统的 生产管理报表对于不能按吋完成的价格任务不能及吋进行提示, 管理者需要不 停的排査。  [0002] On the factory production line, the work order is a very important management tool. The production manager records and arranges the production process according to the work order, and also exchanges information with the supply and sales department to ensure production. And delivery, the number of general work order management materials is very large and complicated, forming a series of production management reports to facilitate production management personnel to read and analyze. Traditionally, the production management and numerical calculation of production management reports are performed manually. Therefore, it is quite labor intensive and cumbersome, and it is easy to cause human error, making the overall production management less efficient and less accurate. In addition, traditional production management reports can't prompt for price tasks that cannot be completed by 吋, and managers need to keep checking.
技术问题  technical problem
[0003] 针对上述技术问题本发明提供一种生产工单管理系统及其管理方法, 对车间的 工单进行智能化管理。  [0003] In view of the above technical problems, the present invention provides a production work order management system and a management method thereof, and intelligently manages work orders of a workshop.
问题的解决方案  Problem solution
技术解决方案  Technical solution
[0004] 具体技术方案为: [0004] The specific technical solution is:
[0005] 生产工单管理系统, 包括: [0005] A production work order management system, comprising:
[0006] 工单信息数据库系统, 工单信息数据库系统包括工单信息数据库, 携带着需要 生产的工件的工件名称、 工件编号和设计者信息; 所述的工单信息数据库系统 可用于更新和更改工件号、 工件编号和设计者信息;  [0006] Work order information database system, the work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used for updating and changing Workpiece number, workpiece number, and designer information;
[0007] 还包括加工信息数据库系统, 加工信息数据库系统包括加工信息数据库, 携带 着等待生产的工件的工件名称、 工件编号、 设计者信息和生产车间信息, 其中 加工信息数据库系统可用于至少更新和更改生产车间信息; 当工单信息数据库 中的工件名称、 工件编号和设计者信息更改吋, 工单信息数据库系统输出更改 后的信息到加工信息数据库系统, 对加工信息数据库存储的信息进行更新和更 改。 [0007] further comprising a processing information database system, the processing information database system comprising a processing information database carrying the workpiece name, workpiece number, designer information and production plant information of the workpiece waiting for production, wherein the processing information database system can be used to update at least Change the production floor information; When the workpiece name, workpiece number, and designer information in the work order information database are changed, the work order information database system output changes The subsequent information is sent to the processing information database system to update and change the information stored in the processing information database.
[0008] 进一步的, 还包括延期完工数据库系统, 延期完工数据库系统包括延期完工数 据库, 携带着尚未完工的工件的延期信息, 延期完工数据库系统与加工信息数 据库系统通信和交换信息, 其中加工信息数据库系统更新和更改吋, 延期完工 数据库也随之更新或更改。  [0008] Further, the system includes a deferred completion database system, the deferred completion database system includes a deferred completion database, carries the extension information of the unfinished workpiece, and the deferred database system and the processing information database system communicate and exchange information, wherein the processing information database After the system is updated and changed, the deferred completion database is also updated or changed.
[0009] 进一步的, 还包括: 统计数据库系统, 所述的统计数据库系统对延期完工数据 库中未完工的工件的延期信息进行累计并统计, 对统计结果进行排列并显示。  [0009] Further, the method further includes: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results.
[0010] 作为另外一种技术方案, 生产工单管理系统, 包括:  [0010] As another technical solution, a production work order management system includes:
[0011] 工单信息数据库系统, 工单信息数据库系统包括工单信息数据库, 携带着需要 生产的工件的工件名称、 工件编号和设计者信息; 所述的工单信息数据库系统 可用于更新和更改工件号、 工件编号和设计者信息;  [0011] a work order information database system, the work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used for updating and changing Workpiece number, workpiece number, and designer information;
[0012] 还包括加工信息数据库系统, 加工信息数据库系统包括加工信息数据库, 携带 着等待生产的工件的工件名称、 工件编号、 设计者信息和生产车间信息, 其中 加工信息数据库系统可用于至少更新和更改生产车间信息; 当工单信息数据库 中的工件名称、 工件编号和设计者信息更改吋, 工单信息数据库输出更改后的 信息到加工信息数据库系统, 对加工信息数据库存储的信息进行更新和更改。  [0012] further comprising a processing information database system, the processing information database system comprising a processing information database carrying the workpiece name, workpiece number, designer information and production plant information of the workpiece waiting for production, wherein the processing information database system can be used to update at least Change the production floor information; When the workpiece name, workpiece number and designer information in the work order information database are changed, the work order information database outputs the changed information to the processing information database system, and updates and changes the information stored in the processing information database. .
[0013] 进一步的, 还包括:  [0013] Further, the method further includes:
[0014] 延期完工数据库系统, 延期完工数据库系统包括延期完工数据库, 携带着尚未 完工的工件的延期信息, 延期完工数据库与加工信息数据库系统通信和交换信 息, 其中加工信息数据库系统更新和更改吋, 延期完工数据库也随之更新或更 改。  [0014] The deferred completion database system, the deferred completion database system includes a deferred completion database, carrying the extension information of the unfinished workpiece, the deferred completion database and the processing information database system communication and exchange information, wherein the processing information database system is updated and changed, The deferred completion database is also updated or changed.
[0015] 进一步的, 还包括:  [0015] Further, the method further includes:
[0016] 还包括: 统计数据库系统, 所述的统计数据库系统对延期完工数据库中未完工 的工件的延期信息进行累计并统计, 对统计结果进行排列并显示。  [0016] The method further includes: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results.
[0017] 还提供一种生产工单管理方法, 包括: 在工单信息数据库和加工信息数据库中 输入和存放需要生产的工件信息, 工件信息包括工件名称、 工件编号和设计者 信息; 根据收到的工件信息, 在工单信息数据库中更新或更改工件信息; 输出 更新后或更改后的工件信息; 根据输出的信息, 更新加工信息数据库。 [0017] A production work order management method is further provided, comprising: inputting and storing workpiece information to be produced in a work order information database and a processing information database, wherein the workpiece information includes a workpiece name, a workpiece number, and designer information; Workpiece information, update or change workpiece information in the work order information database; output Updated or changed workpiece information; Update the processing information database based on the output information.
[0018] 进一步的, 在延期完工数据库中输入和存放工件信息; 根据输出的信息, 更新 或更改延期完工数据库中的尚未完工的工件的信息; 在预定的吋间, 从延期完 工数据库输出尚未完工的工件数目。  [0018] Further, the workpiece information is input and stored in the deferred completion database; according to the output information, the information of the unfinished workpiece in the deferred completion database is updated or changed; and the output from the deferred completion database is not completed in the predetermined time. The number of workpieces.
发明的有益效果  Advantageous effects of the invention
有益效果  Beneficial effect
[0019] 本发明提供的生产工单管理系统及其管理方法, 对工单建立完整的信息管理系 统, 对其中记载的信息及吋更新和跟踪, 对工件加工完成情况及吋进行统计, 为管理工厂加工订单及吋交货提供保障。  [0019] The production work order management system and the management method thereof provided by the invention establish a complete information management system for the work order, update and track the information recorded therein, and perform statistics on the workpiece processing completion status and defects, for management Factory processing orders and delivery are guaranteed.
本发明的实施方式 Embodiments of the invention
[0020] 结合具体的实施例, 说明本发明的技术方案: [0020] With reference to specific embodiments, the technical solution of the present invention is illustrated:
[0021] 实施例 1 Embodiment 1
[0022] 工单信息数据库系统, 工单信息数据库系统包括工单信息数据库, 携带着需要 生产的工件的工件名称、 工件编号和设计者信息; 所述的工单信息数据库系统 可用于更新和更改工件号、 工件编号和设计者信息;  [0022] a work order information database system, the work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used for updating and changing Workpiece number, workpiece number, and designer information;
[0023] 还包括加工信息数据库系统, 加工信息数据库系统包括加工信息数据库, 携带 着等待生产的工件的工件名称、 工件编号、 设计者信息和生产车间信息, 其中 加工信息数据库系统可用于至少更新和更改生产车间信息; 当工单信息数据库 中的工件名称、 工件编号和设计者信息更改吋, 工单信息数据库系统输出更改 后的信息到加工信息数据库系统, 对加工信息数据库存储的信息进行更新和更 改。  [0023] further comprising a processing information database system, the processing information database system comprising a processing information database carrying the workpiece name, workpiece number, designer information and production plant information of the workpiece waiting for production, wherein the processing information database system can be used to update at least Changing the production floor information; When the workpiece name, workpiece number, and designer information in the work order information database are changed, the work order information database system outputs the changed information to the processing information database system, and updates the information stored in the processing information database. change.
[0024] 进一步的, 还包括延期完工数据库系统, 延期完工数据库系统包括延期完工数 据库, 携带着尚未完工的工件的延期信息, 延期完工数据库系统与加工信息数 据库系统通信和交换信息, 其中加工信息数据库系统更新和更改吋, 延期完工 数据库也随之更新或更改。  [0024] Further, the system includes a deferred completion database system, the deferred completion database system includes a deferred completion database, carries the extension information of the unfinished workpiece, and the deferred database system and the processing information database system communicate and exchange information, wherein the processing information database After the system is updated and changed, the deferred completion database is also updated or changed.
[0025] 进一步的, 还包括: 统计数据库系统, 所述的统计数据库系统对延期完工数据 库中未完工的工件的延期信息进行累计并统计, 对统计结果进行排列并显示。 [0026] 实施例 2 [0025] Further, the method further includes: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results. Embodiment 2
[0027] 作为另外一种技术方案, 生产工单管理系统, 包括:  [0027] As another technical solution, a production work order management system includes:
[0028] 工单信息数据库系统, 工单信息数据库系统包括工单信息数据库, 携带着需要 生产的工件的工件名称、 工件编号和设计者信息; 所述的工单信息数据库系统 可用于更新和更改工件号、 工件编号和设计者信息;  [0028] a work order information database system, the work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used for updating and changing Workpiece number, workpiece number, and designer information;
[0029] 还包括加工信息数据库系统, 加工信息数据库系统包括加工信息数据库, 携带 着等待生产的工件的工件名称、 工件编号、 设计者信息和生产车间信息, 其中 加工信息数据库系统可用于至少更新和更改生产车间信息; 当工单信息数据库 中的工件名称、 工件编号和设计者信息更改吋, 工单信息数据库输出更改后的 信息到加工信息数据库系统, 对加工信息数据库存储的信息进行更新和更改。  [0029] further comprising a processing information database system, the processing information database system comprising a processing information database carrying the workpiece name, workpiece number, designer information and production plant information of the workpiece waiting for production, wherein the processing information database system can be used to update at least Change the production floor information; When the workpiece name, workpiece number and designer information in the work order information database are changed, the work order information database outputs the changed information to the processing information database system, and updates and changes the information stored in the processing information database. .
[0030] 进一步的, 还包括:  [0030] Further, the method further includes:
[0031] 延期完工数据库系统, 延期完工数据库系统包括延期完工数据库, 携带着尚未 完工的工件的延期信息, 延期完工数据库与加工信息数据库系统通信和交换信 息, 其中加工信息数据库系统更新和更改吋, 延期完工数据库也随之更新或更 改。  [0031] The deferred completion database system, the deferred completion database system includes a deferred completion database, carrying the extension information of the unfinished workpiece, the deferred completion database and the processing information database system communication and exchange information, wherein the processing information database system is updated and changed, The deferred completion database is also updated or changed.
[0032] 进一步的, 还包括:  [0032] Further, the method further includes:
[0033] 还包括: 统计数据库系统, 所述的统计数据库系统对延期完工数据库中未完工 的工件的延期信息进行累计并统计, 对统计结果进行排列并显示。  [0033] The method further includes: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and arranges and displays the statistical results.
[0034] 实施例 3 Embodiment 3
[0035] 还提供一种生产工单管理方法, 包括: 在工单信息数据库和加工信息数据库中 输入和存放需要生产的工件信息, 工件信息包括工件名称、 工件编号和设计者 信息; 根据收到的工件信息, 在工单信息数据库中更新或更改工件信息; 输出 更新后或更改后的工件信息; 根据输出的信息, 更新加工信息数据库。  [0035] A method for managing a work order is further provided, comprising: inputting and storing workpiece information to be produced in a work order information database and a processing information database, wherein the workpiece information includes a workpiece name, a workpiece number, and designer information; The workpiece information, update or change the workpiece information in the work order information database; output the updated or changed workpiece information; update the processing information database according to the output information.
[0036] 进一步的, 在延期完工数据库中输入和存放工件信息; 根据输出的信息, 更新 或更改延期完工数据库中的尚未完工的工件的信息; 在预定的吋间, 从延期完 工数据库输出尚未完工的工件数目。  [0036] Further, the workpiece information is input and stored in the deferred completion database; the information of the unfinished workpiece in the deferred database is updated or changed according to the output information; and the output from the deferred database is not completed during the scheduled time. The number of workpieces.

Claims

权利要求书 Claim
[权利要求 1] 生产工单管理系统, 其特征在于, 包括: [Claim 1] A production work order management system, comprising:
工单信息数据库系统, 工单信息数据库系统包括工单信息数据库, 携 带着需要生产的工件的工件名称、 工件编号和设计者信息; 所述的工 单信息数据库系统可用于更新和更改工件号、 工件编号和设计者信息 还包括加工信息数据库系统, 加工信息数据库系统包括加工信息数据 库, 携带着等待生产的工件的工件名称、 工件编号、 设计者信息和生 产车间信息, 其中加工信息数据库系统可用于至少更新和更改生产车 间信息; 当工单信息数据库中的工件名称、 工件编号和设计者信息更 改吋, 工单信息数据库系统输出更改后的信息到加工信息数据库系统 , 对加工信息数据库存储的信息进行更新和更改。  Work order information database system, the work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used to update and change the workpiece number, The workpiece number and designer information also includes a processing information database system, the processing information database system includes a processing information database, carrying the workpiece name, workpiece number, designer information and production workshop information of the workpiece waiting for production, wherein the processing information database system can be used for Update and change the production floor information at least; When the workpiece name, workpiece number and designer information in the work order information database are changed, the work order information database system outputs the changed information to the processing information database system, and the information stored in the processing information database Make updates and changes.
[权利要求 2] 根据权利要求 1的所述的生产工单管理系统, 其特征在于, 还包括: 延期完工数据库系统, 延期完工数据库系统包括延期完工数据库, 携 带着尚未完工的工件的延期信息, 延期完工数据库系统与加工信息数 据库系统通信和交换信息, 其中加工信息数据库系统更新和更改吋, 延期完工数据库也随之更新或更改。  [Claim 2] The production work order management system according to claim 1, further comprising: a deferred completion database system, wherein the deferred completion database system includes a deferred completion database, and carries an extension information of the unfinished workpiece, The deferred database system communicates with the processing information database system and exchanges information. After the processing information database system is updated and changed, the deferred completion database is also updated or changed.
[权利要求 3] 根据权利要求 2的所述的生产工单管理系统, 其特征在于, 还包括: 统计数据库系统, 所述的统计数据库系统对延期完工数据库中未完工 的工件的延期信息进行累计并统计, 对统计结果进行排列并显示。  [Claim 3] The production work order management system according to claim 2, further comprising: a statistical database system, wherein the statistical database system accumulates the extension information of the unfinished workpieces in the deferred completion database And statistics, the statistical results are arranged and displayed.
[权利要求 4] 生产工单管理系统, 其特征在于, 包括:  [Claim 4] A production work order management system, comprising:
工单信息数据库系统, 工单信息数据库系统包括工单信息数据库, 携 带着需要生产的工件的工件名称、 工件编号和设计者信息; 所述的工 单信息数据库系统可用于更新和更改工件号、 工件编号和设计者信息 还包括加工信息数据库系统, 加工信息数据库系统包括加工信息数据 库, 携带着等待生产的工件的工件名称、 工件编号、 设计者信息和生 产车间信息, 其中加工信息数据库系统可用于至少更新和更改生产车 间信息; 当工单信息数据库中的工件名称、 工件编号和设计者信息更 改吋, 工单信息数据库输出更改后的信息到加工信息数据库系统, 对 加工信息数据库存储的信息进行更新和更改。 Work order information database system, the work order information database system includes a work order information database, carrying the workpiece name, workpiece number and designer information of the workpiece to be produced; the work order information database system can be used to update and change the workpiece number, The workpiece number and designer information also includes a processing information database system, the processing information database system includes a processing information database, carrying the workpiece name, workpiece number, designer information and production workshop information of the workpiece waiting for production, wherein the processing information database system can be used for Update and change at least the production car Inter-information; When the workpiece name, workpiece number, and designer information in the work order information database are changed, the work order information database outputs the changed information to the processing information database system, and updates and changes the information stored in the processing information database.
根据权利要求 4的生产工单管理系统, 其特征在于, 还包括: 延期完工数据库系统, 延期完工数据库系统包括延期完工数据库, 携 带着尚未完工的工件的延期信息, 延期完工数据库与加工信息数据库 系统通信和交换信息, 其中加工信息数据库系统更新和更改吋, 延期 完工数据库也随之更新或更改。 The production work order management system according to claim 4, further comprising: a deferred completion database system, the deferred completion database system including the deferred completion database, carrying the extension information of the unfinished workpiece, the deferred completion database and the processing information database system After the communication and exchange of information, in which the processing information database system is updated and changed, the deferred completion database is also updated or changed.
根据权利要求 5的生产工单管理系统, 其特征在于, 还包括: 还包括: 统计数据库系统, 所述的统计数据库系统对延期完工数据库 中未完工的工件的延期信息进行累计并统计, 对统计结果进行排列并 显示。 The production work order management system according to claim 5, further comprising: a statistical database system, wherein the statistical database system accumulates and counts the extension information of the unfinished workpieces in the deferred completion database, and performs statistics The results are arranged and displayed.
生产工单管理方法, 其特征在于, 包括: 在工单信息数据库和加工信 息数据库中输入和存放需要生产的工件信息, 工件信息包括工件名称The production work order management method is characterized in that: the input and the storage of the workpiece information to be produced are input and stored in the work order information database and the processing information database, and the workpiece information includes the workpiece name.
、 工件编号和设计者信息; 根据收到的工件信息, 在工单信息数据库 中更新或更改工件信息; 输出更新后或更改后的工件信息; 根据输出 的信息, 更新加工信息数据库。 , workpiece number and designer information; update or change the workpiece information in the work order information database according to the received workpiece information; output the updated or changed workpiece information; update the processing information database according to the output information.
根据权利要求 7的生产工单管理方法, 其特征在于, 还包括: 在延期 完工数据库中输入和存放工件信息; 根据输出的信息, 更新或更改延 期完工数据库中的尚未完工的工件的信息; 在预定的吋间, 从延期完 工数据库输出尚未完工的工件数目。 The production work order management method according to claim 7, further comprising: inputting and storing the workpiece information in the deferred completion database; updating or changing the information of the unfinished workpiece in the deferred completion database according to the output information; The number of unfinished workpieces is output from the deferred completion database during the scheduled time.
PCT/CN2017/083894 2017-05-11 2017-05-11 Production work order management system and management method therefor WO2018205195A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/083894 WO2018205195A1 (en) 2017-05-11 2017-05-11 Production work order management system and management method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/083894 WO2018205195A1 (en) 2017-05-11 2017-05-11 Production work order management system and management method therefor

Publications (1)

Publication Number Publication Date
WO2018205195A1 true WO2018205195A1 (en) 2018-11-15

Family

ID=64104262

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/083894 WO2018205195A1 (en) 2017-05-11 2017-05-11 Production work order management system and management method therefor

Country Status (1)

Country Link
WO (1) WO2018205195A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109472507A (en) * 2018-11-20 2019-03-15 北京千丁互联科技有限公司 A kind of service for infrastructure management method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1464446A (en) * 2002-06-22 2003-12-31 鸿富锦精密工业(深圳)有限公司 System and method for processing delayed order forms
JP2004234225A (en) * 2003-01-29 2004-08-19 Seiko Epson Corp Information providing device, information providing method, program and product
JP2010140382A (en) * 2008-12-15 2010-06-24 Exa Corp Production flow chart generation program
CN106372777A (en) * 2016-08-23 2017-02-01 苏州博众精工科技有限公司 Product production information and process management control method
CN106372944A (en) * 2016-08-23 2017-02-01 苏州博众精工科技有限公司 Data table-based product tracing method and system
CN107194664A (en) * 2017-05-11 2017-09-22 深圳市柘叶红实业有限公司 Produce workform management system and its management method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1464446A (en) * 2002-06-22 2003-12-31 鸿富锦精密工业(深圳)有限公司 System and method for processing delayed order forms
JP2004234225A (en) * 2003-01-29 2004-08-19 Seiko Epson Corp Information providing device, information providing method, program and product
JP2010140382A (en) * 2008-12-15 2010-06-24 Exa Corp Production flow chart generation program
CN106372777A (en) * 2016-08-23 2017-02-01 苏州博众精工科技有限公司 Product production information and process management control method
CN106372944A (en) * 2016-08-23 2017-02-01 苏州博众精工科技有限公司 Data table-based product tracing method and system
CN107194664A (en) * 2017-05-11 2017-09-22 深圳市柘叶红实业有限公司 Produce workform management system and its management method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109472507A (en) * 2018-11-20 2019-03-15 北京千丁互联科技有限公司 A kind of service for infrastructure management method and device

Similar Documents

Publication Publication Date Title
CN106296042B (en) Teaching and production management information system oriented to college engineering training center
CN112749936A (en) Purchase-sales-inventory management system based on product serial number full-flow tracking
Sayem et al. Productivity enhancement through reduction of changeover time by implementing SMED technique–in furniture industry
CN106743271B (en) Use method of clothing hanging production line
CN108229820A (en) Machine shop parts manufacturing management method
WO2018205195A1 (en) Production work order management system and management method therefor
Jianxin et al. Research and application of enterprise resource planning system for foundry enterprises
JP2019102093A5 (en)
CN111126877B (en) Chemical fiber industry planning and scheduling method and system
CN116167251B (en) Self-clustering man-hour quota modeling method based on processing equipment
CN117035279A (en) Coordinated adjustment method and device for scheduling plan
TWI455049B (en) Real-time production improvement method
CN107194664A (en) Produce workform management system and its management method
Xiao et al. Optimizing production line balance based on witness simulation
CN113705945A (en) Production order management system
CN113379215A (en) Enterprise management information system integrated system
CN113947415A (en) Method and system for quickly tracing defective products of multi-channel incoming material veneer artificial board
Garbie Enhancing the performance of industrial firms through implementation of lean techniques
JP4318162B2 (en) Production schedule planning management method and production schedule planning management program
CN107515940A (en) A kind of big data application for alleviating hotel article supply chain Bullwhip Effect
CN202563551U (en) Novel manufacturing industry cloud management platform
CN111915134A (en) Production management system and management method for automobile air conditioner compressor
Xue Research on Single Minute Exchange of Die( SMED) based on lean production
TWM616315U (en) Intelligent production control module for whole process of vehicle frame
Cheng Some thoughts on the practice of just-in-time manufacturing

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17909263

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17909263

Country of ref document: EP

Kind code of ref document: A1