WO2018152956A1 - 一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法 - Google Patents

一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法 Download PDF

Info

Publication number
WO2018152956A1
WO2018152956A1 PCT/CN2017/081968 CN2017081968W WO2018152956A1 WO 2018152956 A1 WO2018152956 A1 WO 2018152956A1 CN 2017081968 W CN2017081968 W CN 2017081968W WO 2018152956 A1 WO2018152956 A1 WO 2018152956A1
Authority
WO
WIPO (PCT)
Prior art keywords
wedge
steel pipe
circular steel
strength
shaped connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2017/081968
Other languages
English (en)
French (fr)
Inventor
张春巍
牟犇
孙丽
朱立猛
王玲玲
王昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Publication of WO2018152956A1 publication Critical patent/WO2018152956A1/zh
Priority to US16/416,192 priority Critical patent/US10851537B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • E04B1/215Connections specially adapted therefor comprising metallic plates or parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/07Reinforcing elements of material other than metal, e.g. of glass, of plastics, or not exclusively made of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2448Connections between open section profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2457Beam to beam connections
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B2001/2466Details of the elongated load-supporting parts
    • E04B2001/2478Profile filled with concrete
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/04Clamping or clipping connections
    • F16B7/0406Clamping or clipping connections for rods or tubes being coaxial
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L39/00Joints or fittings for double-walled or multi-channel pipes or pipe assemblies
    • F16L39/005Joints or fittings for double-walled or multi-channel pipes or pipe assemblies for concentric pipes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T403/00Joints and connections
    • Y10T403/57Distinct end coupler
    • Y10T403/5733Plural opposed sockets

Definitions

  • the invention relates to the technical field of structural engineering, in particular to a assembled circular steel tube casing fiber concrete column connecting node and a mounting method thereof.
  • the ordinary circular steel tube concrete or steel reinforced concrete structure designed by high-strength steel will cause cracking when combined with high-strength steel pipe or section steel when large deformation occurs, and then the steel pipe or section steel will locally buckle and cause structural damage.
  • the circular steel pipe casing fiber concrete column designed by high-strength steel has a large contact area between the inner and outer circular steel pipes and the inner fiber-filled concrete, which is tightly combined and has better integrity, and is between the inner and outer steel pipes and the inner-filled fiber concrete.
  • the interaction (the ultimate strain of the fiber-filled concrete is increased, and the local buckling of the inner and outer round steel pipes is limited), so that the deformation resistance and bearing capacity of the circular steel tube casing fiber concrete column designed by high-strength steel are obviously improved.
  • the main object of the present invention is to provide a fabricated circular steel tube casing fiber concrete column connecting node to solve the structural stability and reliability of the prior art circular steel tube casing fiber concrete column connection node due to welding quality problems. Not a problem.
  • a fabricated circular steel tube casing fiber concrete column connecting node including an outer wrapped high-strength circular steel tube and an inner sleeve high-strength circle
  • the steel pipe and the circular casing are converted into the dividing plate
  • the inner high-strength circular steel pipe is located in the outer high-strength circular steel pipe and is concentric with the outer high-strength circular steel pipe, and both ends of the outer high-strength circular steel pipe and the inner high-strength circular steel pipe are respectively
  • the utility model is provided with a wedge-shaped connecting tooth, the wedge-shaped connecting tooth is non-continuously distributed along the circumference,
  • the circular sleeve conversion dividing plate comprises a circular plate, the central plate is provided with a central through hole at the center, and the vertical plate is arranged on the lower two sides of the circular plate.
  • the distribution of the vertical partitions corresponds to the distribution of the wedge-shaped connecting teeth
  • the vertical partition comprises two inner and outer joints, each set includes at least one vertical partition, and the vertical partition is provided with a wedge-shaped chute matching the wedge-shaped connecting teeth.
  • the inner vertical partition is matched with the inner sleeve high-strength circular steel tube
  • the outer vertical partition is matched with the outer high-strength circular steel tube
  • the steel tube sleeve and the circular sleeve conversion partition plate pass the wedge-shaped connecting tooth and the wedge shape.
  • the chutes cooperate to achieve a fixed connection.
  • wedge-shaped connecting teeth are disposed on the inner side and the outer side of the steel pipe;
  • each set of vertical partitions comprises two blocks, and opposite sides of the two vertical partitions are provided with wedge-shaped chutes with wedge-shaped connecting teeth matching;
  • the circular casing conversion partition plate is further provided with a crescent-shaped through hole for pouring concrete
  • wedge-shaped connecting teeth are evenly distributed in two or three groups
  • an outer reinforcing high-strength circular steel pipe is welded with an outer reinforcing ring on the outer side, and the outer reinforcing ring is connected to the steel beam by welding or bolting.
  • the installation method of the above-mentioned assembled circular steel tube casing reinforced concrete connection node comprises the following steps:
  • the first step outsourcing high-strength round steel pipe and inner set of high-strength circular steel pipe welded with wedge-shaped connecting teeth at both ends;
  • Step 2 Place the wedge-shaped connecting teeth on the inner high-strength circular steel pipe in the vacancy between the two vertical partitions, align the wedge-shaped connecting teeth with the wedge-shaped chute, and then rotate the inner sleeve high-strength circular steel pipe , the wedge connecting teeth are caught in the wedge chute;
  • the third step placing the wedge-shaped connecting teeth on the outer high-strength circular steel pipe in the vacancy between the two vertical partitions, aligning the wedge-shaped connecting teeth with the wedge-shaped chute, and then rotating the inner high-strength circular steel pipe. Inserting the wedge connecting teeth into the wedge chute;
  • the fourth step pouring the fiber concrete through the central through hole and the crescent-shaped through hole in the outer high-strength circular steel pipe and the inner high-strength circular steel pipe;
  • the fifth step welding the outer ring to the outer side of the outer high-strength circular steel pipe;
  • Step 6 Attach the steel beam to the reinforced outer ring.
  • the node form of the present invention avoids field welding between high-strength circular steel tubes and improves the reliability of the nodes;
  • the cross-section of the upper and lower steel pipe columns of the joint can be adjusted by adjusting the spacing of the vertical baffles on the circular casing to change the spacing between the columns on the partition plate, not only for the connection between the columns of the same section, but also for the connection of the variable-section columns.
  • Figure 1 is a schematic view of the structure of the present invention
  • FIG. 2 is a schematic structural view showing the end portion of a circular steel pipe casing fiber concrete column according to the present invention
  • Figure 3 is a partial enlarged view of A in Figure 1;
  • Figure 4 is a plan view showing the planar structure of the circular casing conversion partition plate of the present invention.
  • Figure 5 is a perspective view showing the three-dimensional structure of the circular casing conversion partition plate of the present invention.
  • Figure 6 is a schematic view showing the distribution of vertical partitions according to Embodiment 1 of the present invention.
  • Figure 7 is a schematic view showing the distribution of vertical partitions according to Embodiment 2 of the present invention.
  • FIG. 1 an outer wrapped high-strength circular steel pipe; 2. an inner sleeve high-strength circular steel pipe; 3. a wedge-shaped connecting tooth; 4, a circular casing conversion partition plate; 5, a circular plate; 6, vertical partition; 7, wedge-shaped chute; 8, central through hole; 9, crescent-shaped through hole; 10, outer reinforcement ring; 11, steel beam.
  • the assembled circular steel pipe casing fiber concrete column connecting node of the invention comprises an outer wrapped high-strength circular steel pipe 1, an inner sleeve high-strength circular steel pipe 2 and a circular casing conversion partition plate 4, and an inner sleeve.
  • the high-strength circular steel pipe is located in the outer high-strength circular steel pipe and is concentric with the outer high-strength circular steel pipe.
  • the upper and lower steel pipe casing fiber concrete columns are connected by a circular casing conversion partition plate, and the outer high-strength circular steel pipe is welded on the outer side.
  • the outer reinforcing ring 10 is connected to the steel beam 11 by welding or bolting.
  • both ends of the outer high-strength circular steel pipe and the inner high-strength circular steel pipe are provided with wedge-shaped connecting teeth 3, and the wedge-shaped connecting teeth are welded at the end of the steel pipe, and the wedge-shaped connecting teeth are non-continuously distributed along the circumference, as shown in Fig. 6.
  • there are three sets of wedge-shaped connecting teeth on each side wall of the steel pipe the center angle of each set of wedge-shaped connecting teeth is 60 degrees, and the interval angle between each set of wedge-shaped connecting teeth is 60 degrees;
  • the circular casing conversion partition plate comprises a circular plate 5, and the circular plate is provided with a central through hole 8 and a crescent-shaped through hole 9, and the vertical plate 6 is disposed on both sides of the circular plate.
  • the vertical partition comprises two inner and outer partitions, each set includes at least one vertical partition, and the vertical partition is provided with a wedge-shaped sliding groove 7 matched with the wedge-shaped connecting teeth, and the inner vertical partition and the inner sleeve are high-strength circular
  • the steel pipe is matched, and the outer vertical partition plate is matched with the outer high-strength circular steel pipe.
  • the steel pipe casing and the circular casing conversion partition plate are fixedly connected by the wedge-shaped connecting teeth and the wedge-shaped sliding groove, as shown in FIG. .
  • the wedge-shaped connecting teeth on the inner high-strength circular steel pipe are placed in the gap between the two vertical partitions, so that the wedge-shaped connecting teeth are aligned with the wedge-shaped chute, and then the inner sleeve high-strength circular steel pipe is rotated.
  • the wedge-shaped connecting teeth are clamped into the wedge-shaped chute, and the outer-mounted high-strength circular steel pipe is installed in the same manner as the inner high-strength circular steel pipe, so the distribution of the vertical partition plate corresponds to the distribution of the wedge-shaped connecting teeth.
  • each vertical baffle is disposed on one side of the inner side or the outer side of the steel pipe. If the wedge-shaped connecting teeth are disposed on both inner and outer sides of the steel pipe, each set of vertical baffles needs to be provided inside and outside.
  • a wedge chute that mates with the wedge-shaped connecting teeth is disposed on the opposite faces of the two vertical partitions. The wedge-shaped chute and the double-sided wedge-shaped connecting teeth ensure the bearing capacity and reliability at the joint, and are suitable for structures with high bearing capacity.
  • the invention not only applies to the connection between the columns of the same section, but also to the connection of the variable section columns. If the upper and lower steel tube casings of the circular casing conversion conversion plate are completely identical, the vertical direction of the upper and lower sides The partitions have the same distribution. If the sections of the upper and lower steel tube casings are different, the diameter of the vertical partitions can be changed accordingly.
  • the installation method of the above-mentioned assembled circular steel tube casing reinforced concrete connection node comprises the following steps:
  • the first step outsourcing high-strength round steel pipe and inner set of high-strength circular steel pipe welded with wedge-shaped connecting teeth at both ends;
  • Step 2 Place the wedge-shaped connecting teeth on the inner high-strength circular steel pipe in the vacancy between the two vertical partitions, align the wedge-shaped connecting teeth with the wedge-shaped chute, and then rotate the inner sleeve high-strength circular steel pipe , the wedge connecting teeth are caught in the wedge chute;
  • the third step placing the wedge-shaped connecting teeth on the outer high-strength circular steel pipe in the vacancy between the two vertical partitions, aligning the wedge-shaped connecting teeth with the wedge-shaped chute, and then rotating the inner high-strength circular steel pipe. Inserting the wedge connecting teeth into the wedge chute;
  • the fourth step pouring the fiber concrete through the central through hole and the crescent-shaped through hole in the outer high-strength circular steel pipe and the inner high-strength circular steel pipe;
  • the fifth step welding the outer ring to the outer side of the outer high-strength circular steel pipe;
  • Step 6 Attach the steel beam to the reinforced outer ring.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

一种装配式圆形钢管套管纤维混凝土柱连接节点,其包括外包高强圆形钢管(1)、内套高强圆形钢管(2)和圆形套管转换分隔板(4),外包高强圆形钢管(1)和内套高强圆形钢管(2)的两端均设置有楔形连接齿(3),楔形连接齿(3)沿圆周非连续均布,圆形套管转换分隔板(4)包括圆板(5),圆板(5)中心位置设置有中心通孔(8),圆板(5)上下两面均设置有竖向隔板(6),竖向隔板(6)上设置有与楔形连接齿(3)匹配的楔形滑槽(7),钢管套管与圆形套管转换分隔板(4)通过楔形连接齿(3)与楔形滑槽(7)相配合实现固定连接。避免了高强圆形钢管之间的现场焊接,提高了节点的可靠性,整个节点的钢材部位,全部工厂制作,现场装配,现场浇筑混凝土,最大限度地降低了现场施工对质量的影响。

Description

一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法 技术领域
本发明涉及结构工程技术领域,具体而言,涉及一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法。
背景技术
由于我国的钢材产量过剩,国家大力支持装配式钢结构建筑,高强钢开始广泛应用于建筑结构中,它有利于我国建筑工业化的发展,提高生产效率节约能源,发展绿色环保建筑,并且有利于提高和保证建筑工程质量。装配式钢结构建筑有利于绿色施工,因为装配式施工更能符合绿色施工的节地、节能、节材、节水和环境保护等要求,降低对环境的负面影响,遵循可持续发展的原则。
使用高强钢设计的普通圆形钢管混凝土或型钢混凝土结构,在产生较大变形时,与高强钢管或型钢结合的混凝土会产生开裂现象,随后钢管或型钢发生局部屈曲并导致结构破坏。然而采用高强钢设计的圆形钢管套管纤维混凝土柱,内外圆形钢管与内填纤维混凝土接触面积大,结合紧密,具有更好的整体性,并且由于内外钢管与内填纤维混凝土之间的相互作用(内填纤维混凝土的极限应变增大,内外圆钢管的局部屈曲受限制),使得采用高强钢设计的圆形钢管套管纤维混凝土柱的抗变形能力和承载力明显提高。
但是,对于普通圆形钢管混凝土或型钢混凝土结构,由于需要满足结构整体性的要求,因此在构件的连接处需要较复杂的工艺,以保证构件连接节点的可靠度,这就给装配式钢结构的施工带来了一定的不便。通常情况下,高强度钢材对焊接质量的要求以及焊接的技术难度要远远高于普通钢材。在实际工程中,钢管之间的焊接往往在施工现场完成。这就造成焊缝的焊接质量受现场的施工环境和作业人员技术水平的影响,不能完全保证焊接的质量,对结构的稳定性和可靠度有不利的影响,并且由于施工中存在现场焊接环节,延长了施工时间的同时也提高了工程造价。
发明内容
本发明的主要目的在于提供一种装配式圆形钢管套管纤维混凝土柱连接节点,以解决现有技术中圆形钢管套管纤维混凝土柱连接节点由于焊接质量问题带来的结构稳定性和可靠度不高的问题。
为了实现上述目的,本发明采用以下的技术方案:
一种装配式圆形钢管套管纤维混凝土柱连接节点,包括外包高强圆形钢管、内套高强圆 形钢管和圆形套管转换分隔板,内套高强圆形钢管位于外包高强圆形钢管内且与外包高强圆形钢管同心,外包高强圆形钢管和内套高强圆形钢管的两端均设置有楔形连接齿,楔形连接齿沿圆周非连续均布,圆形套管转换分隔板包括圆板,圆板中心位置设置有中心通孔,圆板上下两面均设置有竖向隔板,竖向隔板的分布与楔形连接齿的分布相对应,竖向隔板包括内外两组,每组包括至少一块竖向隔板,竖向隔板上设置有与楔形连接齿匹配的楔形滑槽,内组竖向隔板与内套高强圆形钢管相配合,外组竖向隔板与外包高强圆形钢管相配合,钢管套管与圆形套管转换分隔板通过楔形连接齿与楔形滑槽相配合实现固定连接。
进一步的,楔形连接齿设置于钢管内侧和外侧;
进一步的,每组竖向隔板包括两块,两块竖向隔板的相对面上设置有楔形连接齿匹配的楔形滑槽;
进一步的,圆形套管转换分隔板上还设置有月牙形通孔,用于浇筑混凝土;
进一步的,楔形连接齿沿圆周均布两组或三组;
进一步的,外包高强圆形钢管外侧焊接有外加强环,外加强环通过焊接或螺栓连接的方式与钢梁连接。
上述装配式圆形钢管套管钢筋混凝土连接节点的安装方法,包括以下步骤:
第一步:外包高强圆形钢管和内套高强圆形钢管两端焊接好楔形连接齿;
第二步:将内套高强圆形钢管上的楔形连接齿放置于两块竖向隔板之间的空缺处,使楔形连接齿与楔形滑槽对准,然后将内套高强圆形钢管旋转,使楔形连接齿卡入楔形滑槽中;
第三步:将外包高强圆形钢管上的楔形连接齿放置于两块竖向隔板之间的空缺处,使楔形连接齿与楔形滑槽对准,然后将内套高强圆形钢管旋转,使楔形连接齿卡入楔形滑槽中;
第四步:在外包高强圆形钢管和内套高强圆形钢管内部通过中心通孔和月牙形通孔浇灌纤维混凝土;
第五步:将加强外环焊接在外包高强圆形钢管外侧;
第六步:将钢梁连接在加强外环上。
本发明具有以下有益效果:
(1)本发明的这种节点形式避免了高强圆形钢管之间的现场焊接,提高了节点的可靠性;
(2)整个节点的钢材部位,全部工厂制作,现场装配,现场浇筑混凝土,最大限度地降低了现场施工对质量的影响;
(3)节点上下钢管柱截面改变可以通过调整圆形套管转换分隔板上竖向隔板的间距来调整,不仅适用于同截面柱之间的连接,还适用于变截面柱的连接。
附图说明
图1是本发明结构示意图;
图2是本发明的圆形钢管套管纤维混凝土柱端部结构示意图;
图3是图1中A处局部放大图;
图4是本发明的圆形套管转换分隔板平面结构示意图;
图5是本发明的圆形套管转换分隔板立体结构示意图;
图6是本发明实施例1竖向隔板分布示意图;
图7是本发明实施例2竖向隔板分布示意图;
其中,上述附图包括以下附图标记:1、外包高强圆形钢管;2、内套高强圆形钢管;3、楔形连接齿;4、圆形套管转换分隔板;5、圆板;6、竖向隔板;7、楔形滑槽;8、中心通孔;9、月牙形通孔;10、外加强环;11、钢梁。
具体实施方式
下面结合附图对本发明作进一步说明。
实施例1
如图1所示,本发明的装配式圆形钢管套管纤维混凝土柱连接节点,包括外包高强圆形钢管1、内套高强圆形钢管2和圆形套管转换分隔板4,内套高强圆形钢管位于外包高强圆形钢管内且与外包高强圆形钢管同心,上下两个钢管套管纤维混凝土柱之间通过圆形套管转换分隔板连接,外包高强圆形钢管外侧焊接有外加强环10,外加强环通过焊接或螺栓连接的方式与钢梁11连接。
如图2所示外包高强圆形钢管和内套高强圆形钢管的两端均设置有楔形连接齿3,楔形连接齿焊接在钢管端部,楔形连接齿沿圆周非连续均布,如图6所示,每个钢管侧壁上的楔形连接齿有三组,每组楔形连接齿的圆心角为60度,每组楔形连接齿之间间隔角度为60度;
如图4和图5所示,圆形套管转换分隔板包括圆板5,圆板上设置有中心通孔8和月牙形通孔9,圆板上下两面均设置有竖向隔板6,竖向隔板包括内外两组,每组包括至少一块竖向隔板,竖向隔板上设置有与楔形连接齿匹配的楔形滑槽7,内组竖向隔板与内套高强圆形钢管相配合,外组竖向隔板与外包高强圆形钢管相配合,钢管套管与圆形套管转换分隔板通过楔形连接齿与楔形滑槽相配合实现固定连接,如图3所示。
安装时,先将内套高强圆形钢管上的楔形连接齿放置于两块竖向隔板之间的空缺处,使楔形连接齿与楔形滑槽对准,然后将内套高强圆形钢管旋转,使楔形连接齿卡入楔形滑槽,外包高强圆形钢管的安装方式与内套高强圆形钢管相同,因此竖向隔板的分布要与楔形连接齿的分布相对应。
如果楔形连接齿设置在钢管内侧或外侧中的一侧,则每组竖向隔板只需一块,如果楔形连接齿设置在钢管内外两侧,每组竖向隔板则需要设置内外两块,与楔形连接齿匹配的楔形滑槽设置于两块竖向隔板的相对面上。楔形滑槽和双侧楔形连接齿连接保证了节点处的承载力和可靠度,适用于对承载力要求较高的结构。
本发明不仅适用于同截面柱之间的连接,还适用于变截面柱的连接,如果圆形套管转换分隔板连接的上下两个钢管套管混凝土柱完全相同,则上下两面的竖向隔板分布相同,如果上下两个钢管套管混凝土柱截面不同,则相应改变竖向隔板的直径即可。
上述装配式圆形钢管套管钢筋混凝土连接节点的安装方法,包括以下步骤:
第一步:外包高强圆形钢管和内套高强圆形钢管两端焊接好楔形连接齿;
第二步:将内套高强圆形钢管上的楔形连接齿放置于两块竖向隔板之间的空缺处,使楔形连接齿与楔形滑槽对准,然后将内套高强圆形钢管旋转,使楔形连接齿卡入楔形滑槽中;
第三步:将外包高强圆形钢管上的楔形连接齿放置于两块竖向隔板之间的空缺处,使楔形连接齿与楔形滑槽对准,然后将内套高强圆形钢管旋转,使楔形连接齿卡入楔形滑槽中;
第四步:在外包高强圆形钢管和内套高强圆形钢管内部通过中心通孔和月牙形通孔浇灌纤维混凝土;
第五步:将加强外环焊接在外包高强圆形钢管外侧;
第六步:将钢梁连接在加强外环上。
实施例2
本实施例与实施例1的区别在于,每个钢管侧壁上的楔形连接齿有两组,每组楔形连接齿的圆心角为90度,每组楔形连接齿之间间隔角度为90度,如图7所示。其余与实施例1相同。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (7)

  1. 一种装配式圆形钢管套管纤维混凝土柱连接节点,其特征在于:包括外包高强圆形钢管(1)、内套高强圆形钢管(2)和圆形套管转换分隔板(4),内套高强圆形钢管(2)位于外包高强圆形钢管(1)内且与外包高强圆形钢管(1)同心,外包高强圆形钢管(1)和内套高强圆形钢管(2)的两端均设置有楔形连接齿(3),楔形连接齿(3)沿圆周非连续均布,圆形套管转换分隔板(4)包括圆板(5),圆板(5)中心位置设置有中心通孔(8),圆板(5)上下两面均设置有竖向隔板(6),竖向隔板(6)的分布与楔形连接齿(3)的分布相对应,竖向隔板(6)包括内外两组,每组包括至少一块竖向隔板(6),竖向隔板(6)上设置有与楔形连接齿(3)匹配的楔形滑槽(7),内组竖向隔板(6)与内套高强圆形钢管(2)相配合,外组竖向隔板(6)与外包高强圆形钢管(1)相配合,钢管套管与圆形套管转换分隔板(4)通过楔形连接齿(3)与楔形滑槽(7)相配合实现固定连接。
  2. 根据权利要求1所述的装配式圆形钢管套管钢筋混凝土连接节点,其特征在于:楔形连接齿(3)设置于钢管内侧和外侧。
  3. 根据权利要求1所述的装配式圆形钢管套管钢筋混凝土连接节点,其特征在于:每组竖向隔板(6)包括两块,两块竖向隔板(6)的相对面上设置有与楔形连接齿(3)匹配的楔形滑槽(7)。
  4. 根据权利要求1所述的装配式圆形钢管套管钢筋混凝土连接节点,其特征在于:圆形套管转换分隔板(4)上还设置有月牙形通孔(9),用于浇筑混凝土。
  5. 根据权利要求1所述的装配式圆形钢管套管钢筋混凝土连接节点,其特征在于:楔形连接齿(3)沿圆周均布两组或三组。
  6. 根据权利要求1所述的装配式圆形钢管套管钢筋混凝土连接节点,其特征在于:外包高强圆形钢管(1)外侧焊接有外加强环(10),外加强环(10)通过焊接或螺栓连接的方式与钢梁(11)连接。
  7. 一种权利要求1-6任一权利要求所述的装配式圆形钢管套管钢筋混凝土连接节点的安装方法,其特征在于:包括以下步骤:
    第一步:外包高强圆形钢管(1)和内套高强圆形钢管(2)两端焊接好楔形连接齿(3);
    第二步:将内套高强圆形钢管(2)上的楔形连接齿(3)放置于两块竖向隔板(6)之间的空缺处,使楔形连接齿(3)与楔形滑槽(7)对准,然后将内套高强圆形钢管(2)旋转,使楔形连接齿(3)卡入楔形滑槽(7)中;
    第三步:将外包高强圆形钢管(1)上的楔形连接齿(3)放置于两块竖向隔板(6)之间的空缺处,使楔形连接齿(3)与楔形滑槽(7)对准,然后将内套高强圆形钢管(2)旋转,使楔形连接齿(3)卡入楔形滑槽(7)中;
    第四步:在外包高强圆形钢管(1)和内套高强圆形钢管(2)内部通过中心通孔(8)和月牙形通孔(9)浇灌纤维混凝土;
    第五步:将外加强环(10)焊接在外包高强圆形钢管(1)外侧;
    第六步:将钢梁(11)连接在外加强环(10)上。
PCT/CN2017/081968 2017-02-23 2017-04-26 一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法 Ceased WO2018152956A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/416,192 US10851537B2 (en) 2017-02-23 2019-05-18 Assemblable structural column joint connection using fiber-reinforced concrete filled round double steel tubes and mounting method thereof

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710100604.7 2017-02-23
CN201710100604.7A CN106836489B (zh) 2017-02-23 2017-02-23 一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US16/416,192 Continuation US10851537B2 (en) 2017-02-23 2019-05-18 Assemblable structural column joint connection using fiber-reinforced concrete filled round double steel tubes and mounting method thereof

Publications (1)

Publication Number Publication Date
WO2018152956A1 true WO2018152956A1 (zh) 2018-08-30

Family

ID=59133482

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/081968 Ceased WO2018152956A1 (zh) 2017-02-23 2017-04-26 一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法

Country Status (3)

Country Link
US (1) US10851537B2 (zh)
CN (1) CN106836489B (zh)
WO (1) WO2018152956A1 (zh)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268419B (zh) * 2017-07-24 2022-02-11 中交二航局南方工程有限公司 铰装置运输设备
KR101848699B1 (ko) * 2017-09-22 2018-04-16 (주)피에스테크 용접 없이 기둥과 보의 접합이 가능한 접합부 코어 및 이를 이용한 기둥과 보의 접합 방법
CN107842107A (zh) * 2017-11-29 2018-03-27 长安大学 一种局部采用纤维增强混凝土的型钢混凝土柱‑钢梁节点
CN107916726B (zh) * 2017-12-21 2018-12-04 青岛理工大学 装配式自恢复圆形钢管混凝土组合节点
CN108560753B (zh) * 2018-04-20 2019-11-01 青岛理工大学 带有颗粒阻尼仓耗能的装配式智能节点及安装方法
CN108412045A (zh) * 2018-05-15 2018-08-17 钟利芬 一种高层建筑核心筒梁柱结构
CN108999342B (zh) * 2018-09-11 2023-06-20 深圳大学 预制模块化装配式框架结构柱-柱连接节点及制作方法
CN110424632B (zh) * 2019-08-13 2024-04-09 北京矿冶科技集团有限公司 装配式预制泡沫铝芯圆钢管混凝土柱及其装配结构
CN111733986B (zh) * 2020-07-13 2021-04-20 青岛理工大学 内置frp筋连接装置的双钢管混凝土梁柱节点及安装方法
CN112443098A (zh) * 2020-11-23 2021-03-05 浙江亚厦装饰股份有限公司 一种装配式墙面用活动管
CN112443100A (zh) * 2020-11-23 2021-03-05 浙江亚厦装饰股份有限公司 一种装配式墙面用按压头
CN112360062A (zh) * 2020-11-27 2021-02-12 任现妹 一种装配式建筑的立柱模块
CN112922232A (zh) * 2021-01-27 2021-06-08 海南大学 一种混凝土预制柱的梁柱节点及其施工方法
CN113062450A (zh) * 2021-03-11 2021-07-02 中国十七冶集团有限公司 装配式钢结构钢管与混凝土柱的旋转连接节点及安装方法
JP7850408B2 (ja) * 2022-06-20 2026-04-23 Jfeシビル株式会社 二重鋼管コンクリート柱

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62160338A (ja) * 1986-01-10 1987-07-16 清水建設株式会社 充填鋼管構造
JPH04258447A (ja) * 1991-02-14 1992-09-14 Nippon Concrete Ind Co Ltd 鋼管コンクリート柱の製造法
JPH10331263A (ja) * 1997-06-04 1998-12-15 Takenaka Komuten Co Ltd 鋼管コンクリート部材の継手構造
KR20090105512A (ko) * 2008-04-03 2009-10-07 최진욱 철판거푸집과 보의 연결구조
KR20130074281A (ko) * 2011-12-26 2013-07-04 재단법인 포항산업과학연구원 목재 충전 강관
CN103321301A (zh) * 2013-07-02 2013-09-25 宁波建工股份有限公司 一种预制钢筋混凝土柱的连接接头及其施工方法
CN104100010A (zh) * 2014-08-08 2014-10-15 陈辉国 一种抢修用自适应钢管混凝土连接接头
CN205024965U (zh) * 2015-09-01 2016-02-10 滨州学院 一种空心橡胶混凝土柱
CN205777098U (zh) * 2016-05-29 2016-12-07 湖南大学 一种可拆卸装配式圆钢管混凝土柱

Family Cites Families (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2936184A (en) * 1956-04-20 1960-05-10 Epstein Saul Round vent pipe coupling construction
CH498605A (de) * 1968-11-04 1970-11-15 Ed Mueller Hermann Tragsäule
DE2421640B1 (de) * 1974-05-04 1975-09-25 Dyckerhoff & Widmann Ag, 8000 Muenchen Bauwerk, insbesondere aus Stahl, Stahl- oder Spannbeton
NL169766C (nl) * 1974-12-13 1982-08-16 Ronald Gronert Montagebouwsysteem.
US4419026A (en) * 1980-08-28 1983-12-06 Alfonso Leto Internal locking device for telescopic elements and method of making the same
US4518277A (en) * 1982-06-11 1985-05-21 The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration Self-locking mechanical center joint
CA1259808A (en) * 1985-03-05 1989-09-26 Takanori Sato Concrete filled steel tube column and method of constructing same
FR2656391B1 (fr) * 1989-12-27 1992-04-03 Aerospatiale Systeme pour l'assemblage coaxial de deux pieces de revolution.
US20030175075A1 (en) * 2002-03-15 2003-09-18 Garrison Arthur L. Dovetail with locking teeth
US6802171B2 (en) * 2002-10-18 2004-10-12 Mckinnon Duane Framing member with fastener attachments having square threads
US7673432B2 (en) * 2004-03-11 2010-03-09 The Hong Kong Polytechnic University Double-skin tubular structural members
EP1767729A1 (de) * 2005-09-23 2007-03-28 Sika Technology AG Turmkonstruktion
US7637076B2 (en) * 2006-03-10 2009-12-29 Vaughn Willaim B Moment-resistant building column insert system and method
US7717183B2 (en) * 2006-04-21 2010-05-18 Halliburton Energy Services, Inc. Top-down hydrostatic actuating module for downhole tools
US20080250752A1 (en) * 2007-04-12 2008-10-16 Hapco Aluminum Pole Products Embeddable breakaway utility pole
US20090263189A9 (en) * 2007-04-13 2009-10-22 Kari Koivunen Joint for reinforced concrete pile sections
US8047804B2 (en) * 2007-12-27 2011-11-01 General Electric Company Wind tower and method of assembling the same
ITBO20080360A1 (it) * 2008-06-09 2009-12-10 Cogefrin S P A Pilastro per edilizia e metodo di messa in opera di una struttura edile comprendente lo stesso.
US8490337B2 (en) * 2009-06-09 2013-07-23 Thomas Nott Word, III Structural flange connection system and method
KR101227715B1 (ko) * 2010-10-28 2013-01-29 한봉길 철골/철근 콘크리트 구조를 갖는 고층 건축구조물 시공구조
US8881485B2 (en) * 2011-05-23 2014-11-11 Iowa State University Research Foundation, Inc. Wind turbine tower system
US8808104B2 (en) * 2011-07-15 2014-08-19 Roland Foster Modular golfing system
KR101409418B1 (ko) * 2011-12-28 2014-06-19 재단법인 포항산업과학연구원 강관 소켓 및 이를 이용한 강관 말뚝과 강관 기둥의 연결 방법
US9153853B2 (en) * 2012-08-24 2015-10-06 Wake Skykeeper, Llc Monopole tower reinforcement configuration and related methods
US8726610B2 (en) * 2012-08-29 2014-05-20 General Electric Company Crack-resistant member, a method of preventing crack propagation, and a method of assembling a tower
US8915039B1 (en) * 2013-06-05 2014-12-23 Vasile C. OROS Solid-wood rigid block assemblies
US9822544B2 (en) * 2015-08-26 2017-11-21 Infinigy Solutions, LLC Monopole tower reinforcement system
CN105735471A (zh) * 2016-02-17 2016-07-06 浙江远大钢构实业有限公司 一种钢结构箱型柱连接结构
CN105587040B (zh) * 2016-03-11 2017-09-22 中国建筑第八工程局有限公司 一种后盖瓦式钢管柱错位对接机构及组焊方法
US20170292275A1 (en) * 2016-04-06 2017-10-12 Kumar Arch Tech Pvt. Ltd. Friction fit column assembly with interlocking joint system and methods of use
CN105888080B (zh) * 2016-04-11 2018-01-19 青岛理工大学 装配式钢管套管钢筋混凝土组合节点及安装方法
CN106088334B (zh) * 2016-08-09 2018-05-22 青岛理工大学 一种装配式巨型钢管柱异型组合节点及安装方法
US10640987B2 (en) * 2017-01-13 2020-05-05 Fry Reglet Corporation Column cover reveal
EP3366853B1 (en) * 2017-02-24 2020-04-22 New World China Land Limited Prefabricated structural system and assembling method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62160338A (ja) * 1986-01-10 1987-07-16 清水建設株式会社 充填鋼管構造
JPH04258447A (ja) * 1991-02-14 1992-09-14 Nippon Concrete Ind Co Ltd 鋼管コンクリート柱の製造法
JPH10331263A (ja) * 1997-06-04 1998-12-15 Takenaka Komuten Co Ltd 鋼管コンクリート部材の継手構造
KR20090105512A (ko) * 2008-04-03 2009-10-07 최진욱 철판거푸집과 보의 연결구조
KR20130074281A (ko) * 2011-12-26 2013-07-04 재단법인 포항산업과학연구원 목재 충전 강관
CN103321301A (zh) * 2013-07-02 2013-09-25 宁波建工股份有限公司 一种预制钢筋混凝土柱的连接接头及其施工方法
CN104100010A (zh) * 2014-08-08 2014-10-15 陈辉国 一种抢修用自适应钢管混凝土连接接头
CN205024965U (zh) * 2015-09-01 2016-02-10 滨州学院 一种空心橡胶混凝土柱
CN205777098U (zh) * 2016-05-29 2016-12-07 湖南大学 一种可拆卸装配式圆钢管混凝土柱

Also Published As

Publication number Publication date
US10851537B2 (en) 2020-12-01
CN106836489A (zh) 2017-06-13
US20190271144A1 (en) 2019-09-05
CN106836489B (zh) 2018-11-02

Similar Documents

Publication Publication Date Title
WO2018152956A1 (zh) 一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法
CN108532759B (zh) 环板拼接式中空夹层钢管混凝土组合节点及安装方法
CN102733487B (zh) 方钢管内套筒t型螺栓长圆孔拼接节点及其施工方法
CN103590488B (zh) 螺栓装配双层铝合金网壳结构
CN207919899U (zh) 一种钢管混凝土柱法兰套筒连接机构
CN108532777B (zh) 完全装配式圆形钢骨架混凝土连接节点及安装方法
CN105863076A (zh) 低层建筑全装配式连接结构
CN108118783A (zh) 一种钢管混凝土柱与钢梁的连接节点
CN104100007A (zh) 双耳板式方管柱与h型钢架可变梁高装配节点及施工方法
CN108167125B (zh) 连接构件、混凝土塔筒分片及模具、塔筒及其制作方法
CN203559492U (zh) 装配式空间结构cp型节点
CN107299683A (zh) 复式钢管混凝土柱装配式对接节点及连接方法
CN205502577U (zh) 一种用于管道井中预埋套管一次成型施工的套管组件
CN104847015A (zh) 一种单层三角形空间网格结构装配式节点
CN105544865A (zh) 一种预应力装配式组合异形柱
CN213391448U (zh) 一种分片预制混凝土塔筒管片快速调平拼接装置
CN209874076U (zh) 一种装配式复合钢管混凝土柱-钢梁连接结构
CN104790525A (zh) 预应力螺栓装配式双层铝合金网壳结构
CN107795034A (zh) 双钢板‑混凝土剪力墙边柱内衬管式连接节点结构
CN104775520A (zh) 单层网壳装配式节点
CN204551756U (zh) 一种型钢柱与大跨钢结构树形钢支撑相连接的固定支座
CN116122418A (zh) 卡槽式螺栓连接的新型装配式钢混组合消能减震节点及其安装方法
CN110725405A (zh) 一种带拉筋钢管混凝土柱h型钢梁刚接节点构造及施工方法
CN103104033A (zh) 钢管拼接无凸出转换式连接节点
CN204401628U (zh) 大跨度钢支撑多向连接件

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17897872

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17897872

Country of ref document: EP

Kind code of ref document: A1