WO2018117248A1 - 通信システム - Google Patents

通信システム Download PDF

Info

Publication number
WO2018117248A1
WO2018117248A1 PCT/JP2017/046054 JP2017046054W WO2018117248A1 WO 2018117248 A1 WO2018117248 A1 WO 2018117248A1 JP 2017046054 W JP2017046054 W JP 2017046054W WO 2018117248 A1 WO2018117248 A1 WO 2018117248A1
Authority
WO
WIPO (PCT)
Prior art keywords
pucch
cell
information
pucch resource
transmission
Prior art date
Application number
PCT/JP2017/046054
Other languages
English (en)
French (fr)
Inventor
望月 満
忠宏 下田
福井 範行
草野 正明
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to US16/340,228 priority Critical patent/US20200045725A1/en
Priority to CN201780078073.4A priority patent/CN110115090B/zh
Priority to EP17885215.8A priority patent/EP3562243A4/en
Priority to EP23197280.3A priority patent/EP4274346A3/en
Priority to JP2018558085A priority patent/JP7320948B2/ja
Publication of WO2018117248A1 publication Critical patent/WO2018117248A1/ja
Priority to US17/649,974 priority patent/US20220159704A1/en
Priority to JP2022163761A priority patent/JP7507825B2/ja
Priority to US18/542,885 priority patent/US20240121793A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/046Wireless resource allocation based on the type of the allocated resource the resource being in the space domain, e.g. beams
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/24Cell structures
    • H04W16/28Cell structures using beam steering
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W84/00Network topologies
    • H04W84/02Hierarchically pre-organised networks, e.g. paging networks, cellular networks, WLAN [Wireless Local Area Network] or WLL [Wireless Local Loop]
    • H04W84/04Large scale networks; Deep hierarchical networks
    • H04W84/042Public Land Mobile systems, e.g. cellular systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Definitions

  • the present invention relates to a communication system that performs wireless communication between a communication terminal device such as a mobile terminal device and a base station device.
  • LTE Long Term Evolution
  • network the core network and radio access network
  • SAE System Architecture Evolution
  • OFDM Orthogonal Frequency Division Multiplexing
  • SC-FDMA Single Carrier Frequency Division Multiple Access
  • W-CDMA Wideband Code Division Multiple Access
  • Non-Patent Document 1 (Chapter 5), 3GPP determination items related to the frame configuration in the LTE system will be described with reference to FIG.
  • FIG. 1 is an explanatory diagram showing a configuration of a radio frame used in an LTE communication system.
  • one radio frame (Radio frame) is 10 ms.
  • the radio frame is divided into ten equally sized subframes.
  • the subframe is divided into two equally sized slots.
  • a downlink synchronization signal (Downlink Synchronization Signal) is included in the first and sixth subframes for each radio frame.
  • the synchronization signal includes a first synchronization signal (Primary Synchronization Signal: P-SS) and a second synchronization signal (Secondary Synchronization Signal: S-SS).
  • Non-Patent Document 1 (Chapter 5) describes the decision items regarding the channel configuration in the LTE system in 3GPP. It is assumed that the same channel configuration as that of the non-CSG cell is used in a CSG (Closed Subscriber Group) cell.
  • a physical broadcast channel (Physical Broadcast Channel: PBCH) is a communication terminal device such as a base station device (hereinafter simply referred to as “base station”) to a mobile terminal device (hereinafter also simply referred to as “mobile terminal”). It is a channel for downlink transmission to (hereinafter sometimes simply referred to as “communication terminal”).
  • a BCH transport block (transport block) is mapped to four subframes in a 40 ms interval. There is no obvious signaling of 40ms timing.
  • the physical control format indicator channel (Physical Control Format Indicator Channel: PCFICH) is a channel for downlink transmission from the base station to the communication terminal.
  • the PCFICH notifies the communication terminal of the number of OFDM (Orthogonal Frequency Division Multiplexing) symbols used for PDCCHs.
  • PCFICH is transmitted for each subframe.
  • the physical downlink control channel (Physical Downlink Control Channel: PDCCH) is a channel for downlink transmission from the base station to the communication terminal.
  • the PDCCH includes resource allocation (allocation) information of a downlink shared channel (DL-SCH), which is one of transport channels described later, and a paging channel (Paging channel: PCH, one of transport channels described later). ) Resource allocation (allocation) information and HARQ (Hybrid Automatic Repeat reQuest) information related to DL-SCH.
  • the PDCCH carries an uplink scheduling grant (Uplink Scheduling Grant).
  • the PDCCH carries Ack (Acknowledgement) / Nack (Negative Acknowledgment) which is a response signal for uplink transmission.
  • the PDCCH is also called an L1 / L2 control signal.
  • a physical downlink shared channel is a channel for downlink transmission from a base station to a communication terminal.
  • a downlink shared channel (DL-SCH) that is a transport channel and PCH that is a transport channel are mapped.
  • the physical multicast channel (Physical Multicast Channel: PMCH) is a channel for downlink transmission from the base station to the communication terminal.
  • a multicast channel (Multicast Channel: MCH) that is a transport channel is mapped to the PMCH.
  • a physical uplink control channel (Physical Uplink Control Channel: PUCCH) is a channel for uplink transmission from a communication terminal to a base station.
  • the PUCCH carries Ack / Nack which is a response signal (response signal) for downlink transmission.
  • the PUCCH carries a CQI (Channel Quality Indicator) report.
  • CQI is quality information indicating the quality of received data or channel quality.
  • the PUCCH carries a scheduling request (SR).
  • SR scheduling request
  • the physical uplink shared channel (Physical Uplink Shared Channel: PUSCH) is a channel for uplink transmission from the communication terminal to the base station.
  • An uplink shared channel (Uplink Shared Channel: UL-SCH), which is one of the transport channels, is mapped to the PUSCH.
  • a physical HARQ indicator channel (Physical Hybrid ARQ Indicator Channel: PHICH) is a channel for downlink transmission from the base station to the communication terminal. PHICH carries Ack / Nack which is a response signal for uplink transmission.
  • a physical random access channel (Physical Random Access Channel: PRACH) is a channel for uplink transmission from a communication terminal to a base station. The PRACH carries a random access preamble.
  • the downlink reference signal (Reference Signal: RS) is a symbol known as an LTE communication system.
  • the following five types of downlink reference signals are defined.
  • Cell specific reference signal Cell-specific Reference Signal: CRS
  • MBSFN reference signal MBSFN Reference Signal
  • UE specific reference signal UE-specific Reference Signal: Signal demodulation reference signal (Demodulation Reference Signal: DM-RS)
  • Position determination reference signal Position determination reference signal
  • PRS Position determination reference signal
  • CSI-RS Channel State Information Reference Signal
  • RSRP reference signal received power
  • Non-Patent Document 1 (Chapter 5) will be described.
  • a broadcast channel (Broadcast Channel: BCH) is broadcast to the entire coverage of the base station (cell).
  • the BCH is mapped to the physical broadcast channel (PBCH).
  • PBCH physical broadcast channel
  • HARQ Hybrid ARQ
  • DL-SCH downlink shared channel
  • the DL-SCH can be broadcast to the entire coverage of the base station (cell).
  • DL-SCH supports dynamic or semi-static resource allocation. Quasi-static resource allocation is also referred to as persistent scheduling.
  • the DL-SCH supports discontinuous reception (DRX) of the communication terminal in order to reduce the power consumption of the communication terminal.
  • the DL-SCH is mapped to the physical downlink shared channel (PDSCH).
  • the paging channel supports DRX of the communication terminal in order to enable low power consumption of the communication terminal.
  • the PCH is required to be broadcast to the entire coverage of the base station (cell).
  • the PCH is mapped to a physical resource such as a physical downlink shared channel (PDSCH) that can be dynamically used for traffic.
  • PDSCH physical downlink shared channel
  • a multicast channel (Multicast Channel: MCH) is used for broadcasting to the entire coverage of a base station (cell).
  • the MCH supports SFN combining of MBMS (Multimedia Broadcast Multicast Service) services (MTCH and MCCH) in multi-cell transmission.
  • MTCH and MCCH Multimedia Broadcast Multicast Service
  • the MCH supports quasi-static resource allocation.
  • MCH is mapped to PMCH.
  • HARQ Hybrid ARQ
  • PUSCH physical uplink shared channel
  • Random Access Channel is limited to control information. RACH is at risk of collision.
  • the RACH is mapped to a physical random access channel (PRACH).
  • PRACH physical random access channel
  • HARQ is a technique for improving the communication quality of a transmission path by a combination of an automatic repeat request (Automatic Repeat reQuest: ARQ) and error correction (Forward Error Correction).
  • ARQ Automatic Repeat reQuest
  • error correction Forward Error Correction
  • HARQ has an advantage that error correction functions effectively by retransmission even for a transmission path whose communication quality changes. In particular, further quality improvement can be obtained by combining the initial transmission reception result and the retransmission reception result upon retransmission.
  • BCCH Broadcast Control Channel
  • BCH Broadcast Control Channel
  • DL-SCH downlink shared channel
  • the paging control channel (Paging Control Channel: PCCH) is a downlink channel for transmitting changes in paging information (Paging Information) and system information (System Information).
  • PCCH is used when the network does not know the cell location of the communication terminal.
  • the PCCH that is a logical channel is mapped to a paging channel (PCH) that is a transport channel.
  • PCH paging channel
  • the common control channel (Common Control Channel: CCCH) is a channel for transmission control information between the communication terminal and the base station. CCCH is used when the communication terminal does not have an RRC connection with the network.
  • CCCH is mapped to a downlink shared channel (DL-SCH) that is a transport channel.
  • DL-SCH downlink shared channel
  • UL-SCH uplink shared channel
  • the multicast control channel (Multicast Control Channel: MCCH) is a downlink channel for one-to-many transmission. MCCH is used for transmission of MBMS control information for one or several MTCHs from a network to a communication terminal. MCCH is used only for communication terminals receiving MBMS.
  • the MCCH is mapped to a multicast channel (MCH) that is a transport channel.
  • the dedicated control channel (Dedicated Control Channel: DCCH) is a channel for transmitting individual control information between the communication terminal and the network on a one-to-one basis.
  • the DCCH is used when the communication terminal is an RRC connection.
  • the DCCH is mapped to the uplink shared channel (UL-SCH) in the uplink, and is mapped to the downlink shared channel (DL-SCH) in the downlink.
  • the dedicated traffic channel (Dedicated Traffic Channel: DTCH) is a channel for one-to-one communication to individual communication terminals for transmitting user information.
  • DTCH exists for both uplink and downlink.
  • the DTCH is mapped to the uplink shared channel (UL-SCH) in the uplink, and is mapped to the downlink shared channel (DL-SCH) in the downlink.
  • UL-SCH uplink shared channel
  • DL-SCH downlink shared channel
  • a multicast traffic channel is a downlink channel for transmitting traffic data from a network to a communication terminal.
  • MTCH is a channel used only for communication terminals receiving MBMS.
  • the MTCH is mapped to a multicast channel (MCH).
  • CGI is a Cell Global Identifier.
  • ECGI is an E-UTRAN cell global identifier (E-UTRAN Cell Global Identifier).
  • LTE Long Term Evolution Advanced
  • UMTS Universal Mobile Telecommunication System
  • a CSG (Closed Subscriber Group) cell is a cell in which an operator identifies an available subscriber (hereinafter, may be referred to as a “specific subscriber cell”).
  • the identified subscribers are allowed to access one or more cells of the PLMN (Public Land Mobile Mobile Network).
  • PLMN Public Land Mobile Mobile Network
  • One or more cells to which the identified subscribers are allowed access are called “CSG cells (CSG cell (s))”.
  • CSG cell (s) Public Land Mobile Mobile Network
  • PLMN Public Land Mobile Mobile Network
  • the CSG cell is a part of the PLMN that broadcasts a unique CSG identity (CSG identity: CSG ID) and broadcasts “TRUE” by CSG indication (CSG Indication). Members of the subscriber group who have been registered in advance and permitted access the CSG cell using the CSG ID that is the access permission information.
  • CSG identity CSG ID
  • CSG Indication CSG indication
  • the CSG ID is reported by the CSG cell or cell. There are multiple CSG IDs in an LTE communication system.
  • the CSG ID is used by a communication terminal (UE) to facilitate access of CSG-related members.
  • the location tracking of communication terminals is performed in units of one or more cells.
  • the position tracking is performed to track the position of the communication terminal and call the communication terminal even in the standby state, in other words, to enable the communication terminal to receive a call.
  • This area for tracking the location of the communication terminal is called a tracking area.
  • Non-Patent Document 2 discloses three different modes of access to HeNB and HNB. Specifically, an open access mode (Open access mode), a closed access mode (Closed access mode), and a hybrid access mode (Hybrid access mode) are disclosed.
  • Open access mode Open access mode
  • closed access mode closed access mode
  • Hybrid access mode Hybrid access mode
  • LTE-A Long Term Evolution Advanced
  • Release 10 the Long Term Evolution Advanced (LTE-A) standard is being developed as Release 10 (see Non-Patent Document 3 and Non-Patent Document 4).
  • LTE-A is based on the LTE wireless communication system, and is configured by adding several new technologies.
  • CA Carrier aggregation
  • the UE When CA is configured, the UE has a network (NW) and only one RRC connection (RRC connection). In the RRC connection, one serving cell provides NAS mobility information and security input. This cell is referred to as a primary cell (PCell).
  • a carrier corresponding to PCell is a downlink primary component carrier (Downlink Primary Component Carrier: DL PCC).
  • the carrier corresponding to the PCell in the uplink is an uplink primary component carrier (Uplink Primary Component Carrier: UL PCC).
  • a secondary cell (Secondary Cell: SCell) is configured to form a serving cell set together with the PCell.
  • the carrier corresponding to the SCell in the downlink is a downlink secondary component carrier (Downlink Secondary Component Carrier: DL SCC).
  • the carrier corresponding to the SCell in the uplink is an uplink secondary component carrier (Uplink Secondary Component Carrier: UL SCC).
  • a set of serving cells composed of one PCell and one or more SCells is configured for one UE.
  • Non-Patent Document 1 describes CoMP being studied for LTE-A by 3GPP.
  • a small eNB (hereinafter sometimes referred to as a “small base station apparatus”) that constitutes a small cell.
  • a technology for increasing frequency utilization efficiency and increasing communication capacity by installing a large number of small eNBs and configuring a large number of small cells has been studied.
  • DC dual connectivity
  • Non-Patent Document 1 describes DC.
  • eNBs that perform dual connectivity (DC)
  • master eNB abbreviation: MeNB
  • secondary eNB abbreviation: SeNB
  • the amount of mobile network traffic is increasing and the communication speed is increasing.
  • the communication speed is expected to be further increased.
  • 5G fifth-generation wireless access system aimed at starting service after 2020 for mobile communication that is becoming more sophisticated is being studied.
  • 5G requirements are compiled by an organization called METIS (see Non-Patent Document 5).
  • the system capacity is 1000 times
  • the data transmission speed is 100 times
  • the data processing delay is 1/10 (1/10)
  • the simultaneous connection number of communication terminals is 100 times that of the LTE system.
  • Non-Patent Documents 6 to 10 The technology for the 5G radio section is called “New Radio (abbreviation: NR) Access Technology”, and several new technologies are being studied (see Non-Patent Documents 11 to 13).
  • NR New Radio
  • frame structure for NR using self-contained subframe, multi-beam forming (MBF) by analog beam forming or hybrid beam forming, beam sweeping in MBF, and maximum code block size at the time of coding, etc. Is being considered.
  • NR is considering multi-beam forming.
  • multi-beam forming when the number of beams that can be formed at a time in a cell is small, beam sweeping is performed using one or a plurality of beams at different timings in order to cover the required coverage. Therefore, each beam which a cell constitutes cannot be transmitted / received at all timings.
  • the UE since scheduling is normally performed dynamically, the UE needs to receive a downlink control channel in each subframe.
  • the beam cannot be transmitted / received at all timings as described above, so it is useless for the UE to continue receiving the downlink control channel in every subframe. Become. Therefore, useless power consumption increases.
  • it is useless for the UE to transmit the uplink control channel at a beam timing that cannot be transmitted / received, which increases power consumption and makes it impossible to perform uplink communication.
  • multi-beam forming a plurality of beams are formed in one cell, and coverage is configured for each beam. Therefore, the beam coverage is narrower than the cell coverage. If the beam coverage is not properly formed, there is a problem that communication is likely to be cut off due to movement of the UE between the beams or a coverage hole is generated.
  • An object of the present invention is to provide a communication system that can suppress an increase in power consumption of a communication terminal device, a deterioration in communication quality, and a decrease in use efficiency of radio resources.
  • the communication system of the present invention is a communication system including a base station device and at least one communication terminal device capable of wireless communication with the base station device, wherein the base station device Information on reception timing is notified, and the communication terminal apparatus performs reception based on information on the next reception timing notified from the base station apparatus.
  • a communication system is configured by including a base station device and at least one communication terminal device capable of wireless communication with the base station device.
  • the base station apparatus notifies the communication terminal apparatus of information regarding the next reception timing.
  • the notification terminal apparatus performs reception based on information on the next reception timing notified from the base station apparatus.
  • the communication terminal apparatus can receive information transmitted from the base station apparatus at the notified reception timing, so that power consumption required for reception can be saved.
  • retransmission when retransmission is necessary, retransmission can be performed quickly, so that a delay in communication between the base station apparatus and the communication terminal apparatus can be suppressed. Therefore, it is possible to suppress an increase in power consumption of the communication terminal device, a deterioration in communication quality, and a decrease in use efficiency of radio resources.
  • FIG. 2 is an explanatory diagram showing a configuration of a radio frame used in an LTE communication system.
  • 1 is a block diagram showing an overall configuration of an LTE communication system 200 discussed in 3GPP.
  • FIG. It is a block diagram which shows the structure of the mobile terminal 202 shown in FIG. 2 which is a communication terminal which concerns on this invention.
  • It is a block diagram which shows the structure of the base station 203 shown in FIG. 2 which is a base station which concerns on this invention.
  • 3 is a flowchart illustrating an outline from a cell search to a standby operation performed by a communication terminal (UE) in an LTE communication system.
  • UE communication terminal
  • FIG. FIG. 2 is a block diagram showing an overall configuration of an LTE communication system 200 discussed in 3GPP.
  • the radio access network is referred to as E-UTRAN (Evolved Universal Terrestrial Radio Access Network) 201.
  • a mobile terminal device hereinafter referred to as “user equipment (UE)”
  • UE user equipment
  • base station E-UTRAN NodeB: eNB
  • signals are transmitted and received by wireless communication.
  • the “communication terminal device” includes not only a mobile terminal device such as a movable mobile phone terminal device but also a non-moving device such as a sensor.
  • the “communication terminal device” may be simply referred to as “communication terminal”.
  • Control protocols for the mobile terminal 202 such as RRC (Radio Resource Control) and user planes such as PDCP (Packet Data Convergence Protocol), RLC (Radio Link Control), MAC (Medium Access Control), PHY (Physical Layer)
  • RRC Radio Resource Control
  • PDCP Packet Data Convergence Protocol
  • RLC Radio Link Control
  • MAC Medium Access Control
  • PHY Physical Layer
  • a control protocol RRC (Radio Resource Control) between the mobile terminal 202 and the base station 203 performs broadcast, paging, RRC connection management (RRC connection management), and the like. As states of the base station 203 and the mobile terminal 202 in RRC, there are RRC_IDLE and RRC_CONNECTED.
  • RRC_IDLE PLMN (Public Land Mobile Mobile Network) selection, system information (System Information: SI) notification, paging, cell re-selection, mobility, and the like are performed.
  • RRC_CONNECTED the mobile terminal has an RRC connection and can send and receive data to and from the network.
  • handover Handover: HO
  • measurement of neighbor cells neighborhbor cells
  • the base station 203 is classified into an eNB 207 and a Home-eNB 206.
  • the communication system 200 includes an eNB group 203-1 including a plurality of eNBs 207 and a Home-eNB group 203-2 including a plurality of Home-eNBs 206.
  • a system composed of EPC (Evolved Packet Core) as a core network and E-UTRAN 201 as a radio access network is referred to as EPS (Evolved Packet System).
  • EPS Evolved Packet System
  • the EPC that is the core network and the E-UTRAN 201 that is the radio access network may be collectively referred to as “network”.
  • the eNB 207 includes a mobility management entity (Mobility Management Entity: MME), an S-GW (Serving Management Gateway), or an MME / S-GW unit including the MME and S-GW (hereinafter, also referred to as “MME unit”) 204.
  • MME mobility management entity
  • S-GW Serving Management Gateway
  • MME / S-GW unit including the MME and S-GW
  • the control information is communicated between the eNB 207 and the MME unit 204 through the S1 interface.
  • a plurality of MME units 204 may be connected to one eNB 207.
  • the eNBs 207 are connected by the X2 interface, and control information is communicated between the eNBs 207.
  • the Home-eNB 206 is connected to the MME unit 204 via the S1 interface, and control information is communicated between the Home-eNB 206 and the MME unit 204.
  • a plurality of Home-eNBs 206 are connected to one MME unit 204.
  • the Home-eNB 206 is connected to the MME unit 204 via a HeNBGW (Home-eNB GateWay) 205.
  • the Home-eNB 206 and the HeNBGW 205 are connected via the S1 interface, and the HeNBGW 205 and the MME unit 204 are connected via the S1 interface.
  • One or more Home-eNBs 206 are connected to one HeNBGW 205, and information is communicated through the S1 interface.
  • the HeNBGW 205 is connected to one or a plurality of MME units 204, and information is communicated through the S1 interface.
  • the MME unit 204 and the HeNBGW 205 are higher-level devices, specifically higher-level nodes, and control the connection between the eNB 207 and Home-eNB 206, which are base stations, and the mobile terminal (UE) 202.
  • the MME unit 204 constitutes an EPC that is a core network.
  • the base station 203 and the HeNBGW 205 constitute an E-UTRAN 201.
  • the X2 interface between Home-eNB 206 is supported. That is, the Home-eNB 206 is connected by the X2 interface, and control information is communicated between the Home-eNB 206. From the MME unit 204, the HeNBGW 205 appears as a Home-eNB 206. From the Home-eNB 206, the HeNBGW 205 appears as the MME unit 204.
  • the interface between the Home-eNB 206 and the MME unit 204 is an S1 interface. The same.
  • the base station 203 may configure one cell or a plurality of cells. Each cell has a predetermined range as a coverage that is a range in which communication with the mobile terminal 202 is possible, and performs wireless communication with the mobile terminal 202 within the coverage. When one base station 203 forms a plurality of cells, each cell is configured to be able to communicate with the mobile terminal 202.
  • FIG. 3 is a block diagram showing a configuration of the mobile terminal 202 shown in FIG. 2, which is a communication terminal according to the present invention.
  • the transmission process of the mobile terminal 202 shown in FIG. 3 will be described.
  • control data from the protocol processing unit 301 and user data from the application unit 302 are stored in the transmission data buffer unit 303.
  • the data stored in the transmission data buffer unit 303 is transferred to the encoder unit 304 and subjected to encoding processing such as error correction.
  • the data encoded by the encoder unit 304 is modulated by the modulation unit 305.
  • the modulated data is converted into a baseband signal, and then output to the frequency conversion unit 306, where it is converted into a radio transmission frequency.
  • a transmission signal is transmitted from the antenna 307 to the base station 203.
  • the reception process of the mobile terminal 202 is executed as follows.
  • a radio signal from the base station 203 is received by the antenna 307.
  • the received signal is converted from a radio reception frequency to a baseband signal by the frequency converter 306, and demodulated by the demodulator 308.
  • the demodulated data is transferred to the decoder unit 309 and subjected to decoding processing such as error correction.
  • control data is passed to the protocol processing unit 301, and user data is passed to the application unit 302.
  • a series of processing of the mobile terminal 202 is controlled by the control unit 310. Therefore, although not shown in FIG. 3, the control unit 310 is connected to the units 301 to 309.
  • FIG. 4 is a block diagram showing a configuration of the base station 203 shown in FIG. 2, which is a base station according to the present invention.
  • the transmission process of the base station 203 shown in FIG. 4 will be described.
  • the EPC communication unit 401 transmits and receives data between the base station 203 and the EPC (such as the MME unit 204) and the HeNBGW 205.
  • the other base station communication unit 402 transmits / receives data to / from other base stations.
  • the EPC communication unit 401 and the other base station communication unit 402 exchange information with the protocol processing unit 403, respectively. Control data from the protocol processing unit 403 and user data and control data from the EPC communication unit 401 and the other base station communication unit 402 are stored in the transmission data buffer unit 404.
  • the data stored in the transmission data buffer unit 404 is passed to the encoder unit 405 and subjected to encoding processing such as error correction. There may exist data directly output from the transmission data buffer unit 404 to the modulation unit 406 without performing the encoding process.
  • the encoded data is subjected to modulation processing by the modulation unit 406.
  • the modulated data is converted into a baseband signal and then output to the frequency conversion unit 407 where it is converted into a radio transmission frequency. Thereafter, a transmission signal is transmitted from the antenna 408 to one or a plurality of mobile terminals 202.
  • the reception processing of the base station 203 is executed as follows. Radio signals from one or more mobile terminals 202 are received by the antenna 408. The received signal is converted from a radio reception frequency to a baseband signal by the frequency conversion unit 407, and demodulated by the demodulation unit 409. The demodulated data is transferred to the decoder unit 410 and subjected to decoding processing such as error correction. Of the decoded data, control data is passed to the protocol processing unit 403 or EPC communication unit 401 and other base station communication unit 402, and user data is passed to the EPC communication unit 401 and other base station communication unit 402. A series of processing of the base station 203 is controlled by the control unit 411. Therefore, although not shown in FIG. 4, the control unit 411 is connected to the units 401 to 410.
  • FIG. 5 is a block diagram showing the configuration of the MME according to the present invention.
  • FIG. 5 shows the configuration of the MME 204a included in the MME unit 204 shown in FIG.
  • the PDN GW communication unit 501 transmits and receives data between the MME 204a and the PDN GW.
  • the base station communication unit 502 performs data transmission / reception between the MME 204a and the base station 203 using the S1 interface.
  • the data received from the PDN GW is user data
  • the user data is passed from the PDN GW communication unit 501 to the base station communication unit 502 via the user plane communication unit 503 and to one or more base stations 203.
  • Sent When the data received from the base station 203 is user data, the user data is passed from the base station communication unit 502 to the PDN GW communication unit 501 via the user plane communication unit 503 and transmitted to the PDN GW.
  • control data is passed from the PDN GW communication unit 501 to the control plane control unit 505.
  • control data is transferred from the base station communication unit 502 to the control plane control unit 505.
  • the HeNBGW communication unit 504 is provided when the HeNBGW 205 exists, and performs data transmission / reception through an interface (IF) between the MME 204a and the HeNBGW 205 depending on the information type.
  • the control data received from the HeNBGW communication unit 504 is passed from the HeNBGW communication unit 504 to the control plane control unit 505.
  • the processing result in the control plane control unit 505 is transmitted to the PDN GW via the PDN GW communication unit 501.
  • the result processed by the control plane control unit 505 is transmitted to one or more base stations 203 via the S1 interface via the base station communication unit 502, and to one or more HeNBGWs 205 via the HeNBGW communication unit 504. Sent.
  • the control plane control unit 505 includes a NAS security unit 505-1, an SAE bearer control unit 505-2, an idle state mobility management unit 505-3, and the like, and performs overall processing for the control plane.
  • the NAS security unit 505-1 performs security of a NAS (Non-Access Stratum) message.
  • the SAE bearer control unit 505-2 performs management of SAE (System Architecture) Evolution bearers and the like.
  • the idle state mobility management unit 505-3 performs mobility management in a standby state (idle state; also referred to as LTE-IDLE state or simply idle), generation and control of a paging signal in the standby state,
  • the tracking area of one or a plurality of mobile terminals 202 is added, deleted, updated, searched, and tracking area list is managed.
  • the MME 204a distributes the paging signal to one or a plurality of base stations 203. Further, the MME 204a performs mobility control (Mobility control) in a standby state (Idle State). The MME 204a manages a tracking area list when the mobile terminal is in a standby state and in an active state (Active State). The MME 204a starts a paging protocol by transmitting a paging message to a cell belonging to a tracking area (tracking area: TrackingTrackArea) where the UE is registered. Management of the CSG of the Home-eNB 206 connected to the MME 204a, management of the CSG ID, and management of the white list may be performed by the idle state mobility management unit 505-3.
  • FIG. 6 is a flowchart illustrating an outline from a cell search to a standby operation performed by a communication terminal (UE) in an LTE communication system.
  • the communication terminal uses the first synchronization signal (P-SS) and the second synchronization signal (S-SS) transmitted from the neighboring base stations in step ST601, and performs slot timing, frame Synchronize timing.
  • P-SS first synchronization signal
  • S-SS second synchronization signal
  • the P-SS and S-SS are collectively referred to as a synchronization signal (SS).
  • SS synchronization signal
  • a synchronization code corresponding to one-to-one is assigned to the PCI assigned to each cell.
  • 504 patterns are under consideration. Synchronization is performed using the 504 PCIs, and the PCI of the synchronized cell is detected (specified).
  • a cell-specific reference signal that is a reference signal (reference signal: RS) transmitted from the base station to each cell is detected for the synchronized cell.
  • Measure the received power of RS Reference Signal Received Power: RSRP.
  • RS Reference Signal Received Power
  • RS Reference Signal
  • a code corresponding to PCI one to one is used. By correlating with that code, it can be separated from other cells.
  • deriving the RS code of the cell from the PCI specified in step ST601 it is possible to detect the RS and measure the received power of the RS.
  • a cell having the best RS reception quality for example, a cell having the highest RS reception power, that is, the best cell is selected from one or more cells detected in step ST602.
  • step ST604 the PBCH of the best cell is received and the BCCH that is broadcast information is obtained.
  • MIB Master Information Block
  • the MIB information includes, for example, DL (downlink) system bandwidth (also called transmission bandwidth setting (transmission bandwidth configuration: dl-bandwidth)), the number of transmission antennas, SFN (System frame number), and the like.
  • SIB1 includes information related to access to the cell, information related to cell selection, and scheduling information of other SIBs (SIBk; an integer of k ⁇ 2).
  • SIB1 includes a tracking area code (TrackingTrackArea Code: TAC).
  • the communication terminal compares the TAC of SIB1 received in step ST605 with the TAC portion of the tracking area identifier (Tracking Area Identity: TAI) in the tracking area list already held by the communication terminal.
  • the tracking area list is also referred to as a TAI list (TAI list).
  • TAI is identification information for identifying a tracking area, and is composed of MCC (Mobile Country Code), MNC (Mobile Network Code), and TAC (Tracking Area Code).
  • MCC Mobile Country Code
  • MNC Mobile Network Code
  • TAC Track Area Code
  • MCC Mobile Country Code
  • MNC Mobile Network Code
  • TAC Track Area Code
  • step ST606 If, as a result of the comparison in step ST606, the TAC received in step ST605 is the same as the TAC included in the tracking area list, the communication terminal enters a standby operation in the cell. In comparison, if the TAC received in step ST605 is not included in the tracking area list, the communication terminal passes through the cell to a core network (Core Network, EPC) including MME and the like, and TAU (Tracking Area Update). Request tracking area change to do
  • EPC Core Network, EPC
  • MME Mobile Management Entity
  • TAU Track Area Update
  • a device that constitutes a core network performs tracking based on the identification number (UE-ID, etc.) of the communication terminal sent from the communication terminal together with the TAU request signal. Update the area list.
  • the core network side device transmits the updated tracking area list to the communication terminal.
  • the communication terminal rewrites (updates) the TAC list held by the communication terminal based on the received tracking area list. Thereafter, the communication terminal enters a standby operation in the cell.
  • a cell configured by an eNB has a relatively wide range of coverage.
  • a cell is configured to cover a certain area with a relatively wide range of coverage of a plurality of cells configured by a plurality of eNBs.
  • the cell configured by the eNB has a coverage that is narrower than the coverage of the cell configured by the conventional eNB. Therefore, in the same way as in the past, in order to cover a certain area, a larger number of eNBs having a smaller cell size are required as compared with the conventional eNB.
  • a cell having a relatively large coverage such as a cell configured by a conventional eNB
  • a macro cell an eNB that configures the macro cell
  • a cell having a relatively small coverage such as a small cell
  • an eNB configuring the small cell is referred to as a “small eNB”.
  • the macro eNB may be a “wide area base station” described in Non-Patent Document 7, for example.
  • the small eNB may be, for example, a low power node, a local area node, a hot spot, or the like.
  • the small eNB is a pico eNB that constitutes a pico cell, a femto eNB that constitutes a femto cell, a HeNB, an RRH (Remote Radio Unit), an RRU (Remote Radio Unit), an RRE (Remote Radio Equipment), or an RN (Relay Node). There may be.
  • the small eNB may be a “local area base station (Local (Base Station)” or “Home base station (Home Base Station)” described in Non-Patent Document 7.
  • FIG. 7 is a diagram illustrating a concept of a cell configuration when a macro eNB and a small eNB coexist.
  • a macro cell configured by a macro eNB has a relatively wide range of coverage 701.
  • a small cell configured by a small eNB has a coverage 702 having a smaller range than a coverage 701 of a macro eNB (macro cell).
  • the coverage of a cell configured by a certain eNB may be included in the coverage of a cell configured by another eNB.
  • the small cell coverage 702 configured by the small eNB is included in the macro cell coverage 701 configured by the macro eNB. May be.
  • a plurality of, for example, two small cell coverages 702 may be included in one macro cell coverage 701.
  • a mobile terminal (UE) 703 is included in, for example, a small cell coverage 702 and performs communication via the small cell.
  • the macro cell coverage 701 configured by the macro eNB and the small cell coverage 702 configured by the small eNB overlap in a complicated manner. Cases arise.
  • a plurality of small cell coverages 702 configured by a plurality of small eNBs are configured in one macro cell coverage 701 configured by one macro eNB. Sometimes it happens.
  • a base station in this specification, a 5G base station is referred to as gNB
  • gNB comprises the antenna 408 shown in FIG. 4 with a multi-element antenna.
  • the gNB forms a beam in a predetermined direction by using a plurality of antennas that are part or all of the multi-element antenna.
  • Non-Patent Document 12 When the number of beams that can be formed at one time with gNB is small and the coverage required as a cell cannot be covered, a method that covers a wide range of coverage by performing beam sweeping at different timings using one or more beams is proposed. (See Non-Patent Document 12).
  • FIG. 8 is a diagram for explaining beam sweeping.
  • a downlink beam sweeping block (DL sweeping block) 801 and an uplink beam sweeping block (UL sweeping block) 803 are provided.
  • a DL / UL data subframe 805 in which downlink data and uplink data are transmitted is between the downlink beam sweeping block 801 and the uplink beam sweeping block 803.
  • Each block 801, 803 includes a plurality of resources 802, 804, 806 as indicated by reference numeral “811”. Each resource is transmitted using a beam indicated by reference numeral “812”.
  • the downlink beam sweeping block 801 is repeatedly transmitted at a predetermined downlink sweeping block period T sbp .
  • the downlink beam sweeping block 801 forms and transmits a beam for a predetermined narrow range coverage during the first predetermined period, and transmits a beam for the next predetermined narrow range coverage during the next predetermined period. Form and send. By repeating this, the entire coverage as a cell is covered.
  • the resource indicated by the reference symbol “802” is used for transmission of the synchronization signal, PBCH, and beam reference signal.
  • Uplink beam sweeping block 803 forms and receives a beam for a predetermined narrow range coverage during the first predetermined period and receives a beam for the next predetermined narrow range coverage during the next predetermined period. Form and receive. By repeating this, the entire coverage as a cell is covered. For example, the resource indicated by reference numeral “804” is used for RACH transmission.
  • a series of beam sweeping while covering the entire coverage of a cell is called a beam sweeping block.
  • the transmission / reception period of each beam of the beam sweeping block may be referred to as a “beam unit”.
  • Beam sweeping blocks are provided periodically.
  • a common control signal and a channel are transmitted in each beam.
  • Examples of the common control signal and channel include a synchronization signal (SS), a PBCH, and a reference signal (RS) that are common control signals necessary for initial access.
  • SS synchronization signal
  • PBCH PBCH
  • RS reference signal
  • uplink beam sweeping block 803 RACH resources and the like are allocated to each beam.
  • the UE 813 performs reception during the entire period of downlink beam sweeping block 801. By doing so, the UE 813 can receive the beam transmitted to the position regardless of the position of the coverage as the cell. Therefore, the UE 813 can receive a common control signal necessary for initial access, for example.
  • the UE 813 performs transmission in the uplink beam sweeping block 803. In this way, the gNB can receive the uplink transmission of the UE 813.
  • the UE 813 transmits / receives uplink / downlink data to / from the gNB in the DL / UL data subframe 805 using the beam.
  • the UE uses the beam sweeping to find a beam that can be transmitted / received by the UE and uses it for communication with the gNB.
  • the UE uses a beam different from the beam, the UE does not need to receive a downlink signal.
  • the UE does not know at what timing the gNB transmits and receives data for the UE. Therefore, the UE needs to receive a downlink control signal transmitted from the gNB in each subframe in order to determine whether to perform transmission / reception of uplink / downlink user data with the gNB. Thus, when the UE receives the downlink control signal from the gNB in each subframe, the power consumption of the UE, the frequency and time resources used for reception are wasted.
  • 3GPP R1-1609135 (hereinafter referred to as “reference document 1”), it is proposed to receive a downlink control signal with a period longer than a scheduling unit.
  • 3GPP R1-1610240 (hereinafter referred to as “reference document 2”), it is proposed that the timing at which the gNB transmits a downlink control signal is assigned to each beam.
  • the UE even when the downlink control signal is not transmitted from the gNB in the cycle, the UE needs to periodically perform the downlink control signal reception operation. There arises a problem that power consumption is wasted. Further, in the above-described method, even when retransmission due to HARQ occurs, it is necessary to wait for the retransmission until the next cycle, which causes a problem that a delay increases in communication between the gNB and the UE. In the above-described method, no consideration is given to the method for setting the period.
  • the gNB notifies the UE of the next timing (hereinafter referred to as “PDCCH reception timing”) at which the UE needs to perform a PDCCH reception operation.
  • the PDCCH reception timing may be a timing at which the gNB may transmit downlink control information to the UE, or may be a timing at which uplink / downlink data transmission / reception may be scheduled for the UE. However, it may be the timing when the gNB directs the beam to the UE.
  • the gNB may notify the UE of scheduling information for uplink / downlink data transmission / reception.
  • the gNB may perform transmission / reception of uplink / downlink data with the UE.
  • the UE performs a PDCCH reception operation from the gNB.
  • the UE may receive downlink control information for the own UE from the gNB.
  • the UE may perform transmission / reception of uplink / downlink data with the gNB.
  • the gNB may notify the PDCCH reception timing using a downlink control signal.
  • the downlink control signal may be notified using L1 / L2 signaling. By using L1 / L2 signaling, the PDCCH reception timing can be notified quickly.
  • the gNB may notify the PDCCH reception timing using a MAC control signal. Since retransmission control by HARQ is performed by using the MAC control signal, it is possible to notify the PDCCH reception timing with high reliability.
  • the UE may perform the PDCCH reception operation every subframe until the notification of the PDCCH reception timing is received.
  • the gNB may notify the PDCCH reception timing after the RRC connection establishment of the UE, may be notified during the RRC connection establishment process, or may be notified during the random access process. When the notification is made during the random access process, information on PDCCH reception timing may be included in the random access response.
  • Information indicating a subframe number may be notified as the PDCCH reception timing.
  • the information indicating the subframe number may be a subframe number, for example, or may be a remainder obtained by dividing the subframe number by a predetermined divisor.
  • the predetermined divisor may be determined by a standard, may be notified from the gNB to the UE, or may be individually notified by RRC dedicated signaling.
  • the time from the current subframe may be notified as the PDCCH reception timing.
  • the time from the current subframe may be a subframe unit or another unit.
  • the gNB may determine some options in advance as the PDCCH reception timing, and notify the UE of the selected value from the gNB to the UE.
  • the options may be determined by a standard, or may be notified from the gNB to the UE in advance.
  • the options may be reported to UEs being served by gNB, or may be notified individually.
  • RRC dedicated signaling may be used for the above-described individual notification. In this way, by individually notifying the options, the gNB can notify the UE of the PDCCH reception timing in the form of an identifier of a value selected from the options, so that the PDCCH reception can be performed with a small number of bits. It becomes possible to notify the timing.
  • GNB may set multiple PDCCH reception timings in the UE. By doing so, even if the PDCCH transmission from the gNB to the UE is impossible at a certain PDCCH reception timing, the UE only needs to perform the PDCCH reception operation at the next PDCCH reception timing. UE received power up to the PDCCH reception timing can be saved.
  • information on a plurality of PDCCH reception timings may be included in one downlink control information, or a plurality of downlink control information may be multiplexed and notified.
  • a plurality of downlink control information each including a plurality of PDCCH reception timings may be used.
  • An upper limit may be provided for the number of PDCCH reception timings in one downlink control information.
  • the upper limit may be determined by a standard. By doing so, it is possible to notify the UE of multiple PDCCH reception timings from the gNB while keeping the size of one downlink control information below a certain level. Therefore, the reception process of the downlink control information in the UE is simplified.
  • the gNB and the UE may enable both the PDCCH reception timing previously notified to the UE and the PDCCH reception timing notified to the UE later. By doing so, the number of PDCCH reception timings to be notified to the UE later can be reduced.
  • the PDCCH reception timing notified to the UE first may be invalidated, and the PDCCH reception timing notified to the UE later may be validated.
  • control of the PDCCH reception operation in the UE can be simplified, and power consumption due to the PDCCH reception operation in the UE can be reduced.
  • whether to enable the PDCCH reception timing previously notified to the UE may be determined by the standard, may be notified from the gNB to the UE in advance, or the PDCCH reception timing to be notified to the UE later
  • the notification may include information on whether or not to enable the previously notified PDCCH reception timing.
  • the PDCCH reception timing can be flexibly controlled by including the information in the notification of the PDCCH reception timing to be notified to the UE later.
  • FIG. 9 is a diagram illustrating an example of notification of timing when it is necessary to receive the next PDCCH from the gNB to the UE, and transmission / reception of uplink / downlink data in the UE.
  • the next transmission / reception timing of the UE is notified by downlink control information transmitted from the gNB to the UE.
  • portions denoted by reference numerals 902, 906, and 910 represent downlink control signals that the UE receives from the gNB.
  • Portions indicated by reference numerals 903, 907, and 911 represent user data transmitted and received by the UE.
  • Thick solid-line arrows 904, 908, and 912 represent subframe information indicated by the next PDCCH reception timing.
  • Downlink control information 902, 906, 910 may or may not include scheduling information for transmission / reception of user data 904, 908, 912 in the subframe.
  • FIG. 9 shows a case where the downlink control signals 902, 906, 910 include scheduling information for transmission / reception of user data 904, 908, 912 in the subframe.
  • the UE receives the downlink control signal 902 in the subframe 901.
  • the UE acquires scheduling information for transmission / reception of user data 903 of the subframe 901 and information 904 related to the next PDCCH reception timing from the downlink control signal 902.
  • the UE transmits and receives user data 903 to and from the gNB. For transmission / reception of the user data 903, scheduling information included in the downlink control signal 902 is used.
  • information 904 regarding the next PDCCH reception timing indicates that the next PDCCH reception timing of the UE is a subframe 905.
  • the UE receives the downlink control signal 906 in the subframe 905.
  • the UE acquires information related to the user data 907 in the subframe 905 and information 908 related to the next PDCCH reception timing from the received downlink control signal 906.
  • the UE transmits / receives user data 907 to / from the gNB. For transmission / reception of user data 907, scheduling information included in the downlink control signal 906 is used.
  • information 908 regarding the next PDCCH reception timing indicates that the next PDCCH reception timing of the UE is a subframe 909. Since the subsequent flow is the same as described above, description thereof is omitted.
  • GNB may include other downlink control information in the PDCCH including downlink control information indicating the next PDCCH reception timing.
  • the other downlink control information may be, for example, information related to uplink / downlink data scheduling, a CQI transmission request, or a power control instruction to the UE.
  • the gNB may not include other downlink control information in the PDCCH including the downlink control information indicating the next PDCCH reception timing by the UE.
  • the UE PDCCH reception timing can be received from gNB. Therefore, the UE does not need to perform useless PDCCH reception operation.
  • GNB may notify the next PDCCH reception timing to a plurality of UEs transmitting and receiving with the same beam.
  • the plurality of UEs may be all UEs that perform transmission / reception using the beam, or may not be all UEs.
  • L1 / L2 signaling may be used for the timing notification.
  • the notification of the timing may be performed for each of a plurality of UEs, or may be performed simultaneously for all UEs using the beam.
  • an identifier representing the beam may be used.
  • the identifier may be used for encoding processing of downlink control information.
  • the identifier may be used for the modulation process of the downlink control information.
  • the identifier may be used for both the encoding process and the modulation process.
  • the GNB may multiplex and transmit downlink control signals for a plurality of UEs.
  • the multiplexing may use the timing for notification to each of a plurality of UEs.
  • the multiplexing may be frequency multiplexing, time multiplexing, or a combination of frequency multiplexing and time multiplexing.
  • the multiplexing method may be determined by the standard, may be notified in advance from the gNB to the subordinate UEs, or may be notified to each UE.
  • the gNB may notify each UE of the same timing or different timings. By notifying the same value to a plurality of UEs, the gNB can flexibly perform scheduling of the plurality of UEs. For example, even when there is no transmission / reception of user data to a predetermined UE in the beam at the timing, transmission / reception of user data at the timing can be assigned to another UE in the beam. Therefore, the frequency resource at the timing can be efficiently used.
  • the gNB may multiplex downlink control signals for other UEs with uplink / downlink signals transmitted and received with the UE.
  • the uplink / downlink signal may include a downlink control signal for the UE.
  • the multiplexing may be frequency multiplexing, time multiplexing, or a combination of frequency multiplexing and time multiplexing.
  • the multiplexing method may be determined by the standard, may be notified in advance from the gNB to the subordinate UEs, or may be notified to each UE. In this way, for example, the gNB notifies the next PDCCH reception timing of another UE in addition to the transmission / reception of uplink / downlink data with the UE and the notification of the next PDCCH reception timing of the UE. Therefore, frequency resources and time resources can be used efficiently.
  • the gNB may not transmit the PDCCH for the UE at the next PDCCH reception timing of the UE. It is not necessary to perform uplink / downlink transmission / reception with the UE. Thereby, gNB can suppress the power consumption when there is no transmission / reception data with UE.
  • the following 11 (1) to (11) are disclosed as specific examples of information necessary for gNB to determine the UE's next PDCCH reception timing.
  • Channel status For example, CQI / CSI.
  • Target Quality of Service Target Quality of Service
  • Information on UEs in the beam For example, the number of UEs in the beam.
  • the gNB sets a long period until the timing for the UE, and when the CQI / CSI is good, the period until the timing is set. May be frequently assigned to UEs having good CQI / CSI. Thereby, the throughput of the entire system can be increased.
  • the period up to the timing may be set short. As a result, the time from the initial HARQ transmission to the retransmission in the UE can be shortened, so that the delay due to the HARQ retransmission can be reduced.
  • the gNB quickly sets the timing for the UE so that the scheduling by the gNB quickly follows the change of the communication channel. be able to.
  • gNB may use a buffer retention amount for downlink communication or a buffer retention amount for uplink communication.
  • a buffer status report (Buffer Status Report: BSR) notified from the UE to the gNB may be used, or another value may be used.
  • the gNB and the UE frequently communicate with each other by setting a short period until the timing for the gNB. Buffer overflow at the UE can be prevented.
  • the buffer retention amount in (3) may be a relative value with the buffer retention amount of data for other UEs in downlink communication, for example, and may be the buffer retention amount of other UEs in uplink communication. It may be a relative value.
  • a period up to the timing can be set short for a UE having a large buffer retention amount, so that a buffer overflow of a UE having a large buffer retention amount can be prevented.
  • the UE by setting a short period until the timing for a UE that communicates using a service of Ultra-Reliability-and-Low-Latency-Communication (URLLC), the UE The delay in can be reduced.
  • URLLC Ultra-Reliability-and-Low-Latency-Communication
  • the period up to the timing may be set short. .
  • the communication speed in the UE can be increased to ensure the predetermined communication speed.
  • the gNB sets the time period until the timing to the subordinate UE by shortening the period.
  • the gNB can be transmitted to the UE without retaining the user data.
  • the master eNB is an LTE base station, it may be replaced with a 5G base station, that is, a base station serving as a master in DC, for example, a master gNB.
  • the gNB may have a DC configuration.
  • the gNB may be a master base station.
  • the upper network apparatus may be an upper network apparatus in LTE or an upper network apparatus in 5G.
  • the secondary eNB may be replaced with a 5G base station, that is, a base station that is secondary in DC, for example, a secondary gNB.
  • (9) and (10) above are combined.
  • user data transmitted from the higher-level network device to the own gNB A value obtained by subtracting the throughput of user data transmitted from the gNB to the secondary eNB from the throughput may be used to set a short period until the timing when the reduced value is increasing. By doing so, the timing can be set using the amount of data stored in the gNB, and user data can be transmitted to the UE while suppressing the stay in the gNB.
  • the gNB may notify the UE of the PDCCH reception timing in a predetermined period. There may be a plurality of PDCCH reception timings. The gNB may determine transmission / reception timing in the period. UE transmits / receives with gNB at the said timing. By doing so, the gNB does not need to notify the UE of the PDCCH reception timing every time, and even when the gNB cannot communicate with the UE at a certain PDCCH reception timing, the gNB and the UE Communication can be performed at the next PDCCH reception timing.
  • the gNB may notify the UE of the predetermined period.
  • the predetermined period for example, the number of times of data transmission / reception with the UE until expiration may be used, or the number of subframes until expiration may be used, or the subframe number at expiration may be used.
  • the gNB may notify the UE separately of the predetermined period and the PDCCH reception timing. Alternatively, a predetermined period and PDCCH reception timing may be notified at the same time. The predetermined period and the PDCCH reception timing may be notified using the same downlink control information, or may be notified using different downlink control information. The UE may update a predetermined period using the notification, or may update the PDCCH reception timing.
  • the gNB may directly notify the UE of a value indicated as a predetermined period, or may determine some options in advance and notify the UE of the selected value from the gNB.
  • the options may be determined by a standard, or may be notified from the gNB to the UE in advance.
  • the notification of the options may be notified to UEs being served by gNB, or may be notified individually.
  • the above-described individual notification may use RRC dedicated signaling. By doing so, the gNB can notify the UE of the period in the form of an identifier having a value selected from the options, and thus can notify the period with a small number of bits.
  • the gNB may notify the UE of the PDCCH reception timing in the form of a bitmap. For example, when the number of subframes up to a predetermined period is 10 and the PDCCH reception timing is designated as 1 subframe, 3 subframes, 6 subframes, or 8 subframes, the bit corresponding to the timing is set. “1”, other bits may be “0”, and “1010010100” may be used as a bitmap to be notified to the UE. In this way, it is possible to notify the PDCCH reception timing with a small number of bits. In the above, “1” and “0” may be reversed.
  • the period and the PDCCH reception timing may be changeable from the gNB to the UE.
  • the gNB may change the period and PDCCH reception timing semi-statically or dynamically.
  • the gNB may notify the UE of the period and the PDCCH reception timing at every PDCCH reception timing for the UE, or may notify only when the PDCCH reception timing is changed within the period. And you may notify when updating the said period. It is desirable for the gNB to update the period and PDCCH reception timing for the UE before the period expires. By doing so, it is possible to prevent waste of power due to the UE performing the PDCCH reception operation every subframe. Alternatively, the gNB may notify the UE of the period and PDCCH reception timing immediately after the period expires.
  • the gNB may notify the UE of the period and PDCCH reception timing semi-statically or dynamically.
  • RRC dedicated signaling may be used as the semi-static notification.
  • a MAC control signal may be used, or L1 / L2 signaling may be used.
  • the same method may be used for the notification of the period and the notification of the timing, or different methods may be used. Moreover, you may use it combining the above-mentioned method.
  • the gNB notifies the UE of the period using RRC dedicated signaling, and notifies the PDCCH reception timing using L1 / L2 signaling, thereby dynamically changing the timing within the period. Can be performed with a small amount of signaling.
  • the above (1) to (11) disclosed as specific examples of the information necessary to determine the transmission / reception timing may be used.
  • FIG. 10 is a diagram illustrating an example of notification of PDCCH reception timing in a predetermined period and transmission / reception of uplink / downlink data in the UE from the gNB to the UE.
  • the period and the timing are notified by downlink control information transmitted from the gNB to the UE.
  • portions denoted by reference numerals 1001 and 1007 represent downlink control signals received by the UE from the gNB, which have a predetermined period for the UE and notification of PDCCH reception timing.
  • the parts indicated by reference numerals 1003, 1005, and 1009 represent downlink control signals that the UE receives from the gNB.
  • Portions indicated by reference numerals 1002, 1004, 1006, 1008, and 1010 represent user data transmitted and received by the UE with gNB.
  • a thick solid arrow represents information on the PDCCH reception timing of the UE.
  • the predetermined period T0 is represented by a thick dotted line
  • information on the predetermined period T0 in the downlink control signal is represented by a thick dashed line.
  • a thin solid arrow represents scheduling information for transmission / reception of user data in the subframe.
  • Downlink control signals 1001, 1003, 1005, 1007, 1009 may or may not include scheduling information for transmission / reception of user data 1002, 1004, 1006, 1008, 1010 in the subframe.
  • FIG. 10 shows a case where downlink control signals 1001, 1003, 1005, 1007, 1009 include scheduling information for transmission / reception of user data 1002, 1004, 1006, 1008, 1010 in the subframe.
  • the UE receives downlink control signals 1001, 1003, 1005, 1007, 1009.
  • the downlink control signals 1001 and 1007 store information related to a predetermined period and information related to PDCCH reception timing within a predetermined period, in addition to scheduling information for transmitting and receiving user data of the subframe.
  • the UE acquires PDCCH reception information and receives downlink control signals 1003, 1005, and 1009 after the downlink control signals 1001 and 1007 in which the acquired information is stored.
  • the UE transmits and receives user data 1002, 1004, 1006, 1008, and 1010 using scheduling information acquired from the downlink control signals 1001, 1003, 1005, 1007, and 1009.
  • the gNB may also notify the UE of the PDCCH reception timing in the downlink control signals 1003, 1005, and 1009. You may notify also the predetermined period. By doing so, since the redundancy in the notification of the PDCCH reception timing for the UE increases, the reliability of the notification of the PDCCH reception timing can be improved.
  • the gNB does not have to notify the UE of the PDCCH reception timing in the downlink control signals 1003, 1005, and 1009. By doing so, the number of bits of the downlink control signal can be saved.
  • the gNB contrary to the above, the timing at which the UE does not need to perform the PDCCH reception operation from the gNB (hereinafter referred to as “PDCCH reception unnecessary”). (Referred to as “timing”).
  • the PDCCH reception unnecessary timing may be notified together with a predetermined period.
  • the UE may perform a PDCCH reception operation from the gNB in a subframe that does not correspond to the PDCCH reception unnecessary timing.
  • the PDCCH reception unnecessary timing may be notified using a subframe number, as the notification of the PDCCH reception timing in a predetermined period, or may be notified as the number of subframes counted from the present time, or a bitmap You may notify as a form.
  • the gNB may specify a subframe that has already been scheduled for another UE as a PDCCH reception unnecessary timing. In this way, the gNB can flexibly perform scheduling for the UE in the subframe range other than the PDCCH reception unnecessary timing.
  • the gNB may set a PDCCH reception period in the UE.
  • the PDCCH reception period may be notified in units of subframes or may be notified in other units.
  • the present embodiment differs from Reference 1 in that a method for setting the PDCCH reception period is disclosed.
  • the gNB may also set the effective period of the PDCCH reception cycle in the UE.
  • the effective period may be set in the same manner as the predetermined period.
  • the gNB may notify the UE of the offset of the PDCCH reception timing together with the PDCCH reception cycle.
  • the offset may be notified as a subframe number, may be notified as a remainder by the period of the subframe number, or may be notified as a time until the next PDCCH reception timing in the UE.
  • the time may be notified in subframe units or in other units.
  • the gNB may notify the UE of the timing at which the PDCCH reception period and the offset become effective together with the PDCCH reception period and the offset.
  • the timing when it becomes valid may be notified by a subframe number, or may be notified as the time from when the notification is made until it becomes valid.
  • the gNB may separately notify the UE of the PDCCH reception period, the offset, and the effective timing, or may simultaneously notify a plurality of items.
  • the gNB may directly notify the UE of the value indicated as the PDCCH reception period, or may determine some options in advance and notify the UE of the selected value from the gNB.
  • the options may be determined by a standard, or may be notified from the gNB to the UE in advance.
  • the notification of the options may be notified to UEs being served by gNB, or may be notified individually.
  • the above-described individual notification may use RRC dedicated signaling. In this way, by individually notifying the options, the gNB can notify the UE of the PDCCH reception period in the form of an identifier of the value selected from the options, so that the PDCCH reception period is notified with a small number of bits. It becomes possible to do. The same may be applied to the offset and the effective timing.
  • the gNB may notify the UE of the PDCCH reception period, the offset, and the valid timing semi-statically or dynamically.
  • RRC dedicated signaling may be used as the semi-static notification.
  • a MAC control signal may be used, or L1 / L2 signaling may be used.
  • the same method may be used for the notification of the PDCCH reception period, the offset, and the effective timing, or different methods may be used. Moreover, you may use it combining the above-mentioned method.
  • the gNB may notify the UE of PDCCH reception timing in a predetermined cycle.
  • a bitmap may be used.
  • a predetermined cycle may be the number of bits.
  • “1” may be associated with the PDCCH reception timing
  • “0” may be associated with other subframes.
  • the bit position may be associated with a remainder by a predetermined period of the subframe number. For example, if the predetermined period is 4 subframes and the UE's PDCCH reception timing is a remainder of 0, 1, and 3 according to the predetermined period of the subframe number, gNB notifies UE of “1101” as the bitmap. May be. By doing in this way, allocation of the PDCCH reception timing from gNB to UE can be performed flexibly.
  • GNB may distribute PDCCH reception timing at different ratios to different UEs.
  • the PDCCH reception timing of UE # 1 is a subframe in which the remainder obtained by dividing the subframe number by 3 is 0 or 1
  • the PDCCH reception timing of UE # 2 is the remainder obtained by dividing the subframe number by 6.
  • the gNB is assigned to each of UE # 1, UE # 2, and UE # 3.
  • the bitmaps to be notified may be “110”, “000010”, and “000001”, respectively. By doing so, it is possible to flexibly assign PDCCH reception timings to different UEs.
  • the information (1) to (1) disclosed as specific examples of information necessary for determining the above-mentioned PDCCH reception timing as information necessary for determining the predetermined period, the offset, and the effective timing of gNB. 11) may be used.
  • the UE may perform a PDCCH reception operation transmitted from the gNB every subframe.
  • the trigger for the UE to perform the PDCCH reception operation every subframe may be, for example, when the UE's PDCCH reception timing has passed or does not exist, or when the above-described predetermined period has expired, or from the gNB
  • the downlink control signal may not be normally received, or the downlink user data from the gNB may not be normally received. In this way, when the UE performs the PDCCH reception operation every subframe, the UE can receive the downlink control signal for the own UE from the gNB, and can restore or continue the communication with the gNB. .
  • the gNB may perform retransmission of downlink user data for the UE using the next PDCCH reception timing after transmitting the initial transmission data. Alternatively, the gNB may retransmit to the UE in the subframe next to the timing at which the initial transmission data is transmitted regardless of the next PDCCH reception timing.
  • the UE may receive the retransmission at the next PDCCH reception timing after the initial transmission, or may receive the retransmission at the next subframe after the initial transmission. Or UE may receive retransmission data from gNB using every sub-frame execution of PDCCH reception. Since the gNB performs retransmission in the next subframe after the initial transmission, the delay due to Nack can be reduced in the communication between the gNB and the UE. Also, for example, when the UE has not successfully received RRC signaling or MAC control information used for notification of the next PDCCH reception timing, the UE can acquire the PDCCH reception timing in the next subframe. .
  • the gNB may notify the UE in advance of information indicating whether or not the gNB uses the next subframe of the initial transmission for retransmission, or may be determined by the standard.
  • the gNB may perform the notification by notification to UEs being served thereby, or may perform the notification by transmitting RRC dedicated signaling to the UE.
  • the UE may determine whether to receive a retransmission in the next subframe after the initial transmission using the notification.
  • the gNB may determine whether to use the next subframe of the initial transmission for retransmission to the UE using information on the beam in which the UE is located.
  • the beam information may be, for example, the number of UEs located in the beam. For example, when there are many UEs in the beam, the next subframe after the initial transmission may not be used for retransmission to the UE. By doing so, for example, it is possible to prevent congestion of data to be transmitted / received to / from another UE due to retransmission to the UE.
  • the service information used by the UE may be determined. For example, when the UE uses a URLLC service, the next subframe after the initial transmission may be used for retransmission to the UE. By doing so, the requirements of the service used by the UE can be satisfied, for example, low delay in URLLC.
  • the subframe may be a subframe after a designated subframe. By doing so, communication to other UEs can be continued even when retransmission from the gNB to the UE occurs.
  • the value of the designated subframe may be determined according to the standard, may be notified from the gNB to UEs being served thereby, or may be notified to each UE by RRC signaling.
  • the gNB may determine the value of the subframe using information on the beam used by the UE or information on the service used by the UE.
  • the gNB may perform transmission / reception with another UE at the next PDCCH reception timing in the UE.
  • the transmission / reception with the other UE may be, for example, retransmission of the other UE or communication with high priority.
  • the priority may be determined according to a standard using the type of service used by the UE, or may be determined by the gNB.
  • the gNB may not transmit L1 / L2 signaling to the UE at the PDCCH reception timing, that is, to the UE interrupted by the other UE at the PDCCH reception timing.
  • the UE may return to the operation of continuously receiving the PDCCH in every subframe, or may perform the operation of receiving the PDCCH from the gNB at the PDCCH reception timing next to the PDCCH reception timing.
  • the gNB may further notify the UE of the next PDCCH reception timing.
  • the notification may be performed using L1 / L2 signaling.
  • the L1 / L2 signaling for the UE and the L1 / L2 signaling for the other UE may be multiplexed and transmitted.
  • the multiplexing may be time multiplexing using different symbols, spatial multiplexing using a plurality of beams, or a combination of both.
  • L1 / L2 signaling for the UE may be first, or L1 / L2 signaling for the other UE may be first.
  • Which of the L1 / L2 signaling the gNB is to have first may be determined in advance by the standard.
  • the UE and the other UE may each receive L1 / L2 signaling for the own UE from the gNB based on the standard.
  • the gNB may notify the UE of the next PDCCH reception timing using a beam sweeping block.
  • the gNB may notify the identifier representing the UE and the timing together.
  • the UE may acquire the next PDCCH reception timing by receiving the beam sweeping block.
  • the UE may receive the beam sweeping block when triggered by another UE at the PDCCH reception timing, or may always perform the reception.
  • the UE may stop receiving PDCCH continuously in every subframe, triggered by acquisition of PDCCH reception timing from the beam sweeping block. By doing so, the UE does not need to continuously receive the PDCCH in every subframe after the beam sweeping block, so that the power consumption of the UE can be reduced.
  • the gNB may notify the PDCCH reception timing by the beam sweeping block to a UE different from the UE.
  • the notification to the another UE is preferably performed by a beam sweeping block earlier than the next PDCCH reception timing in the another UE.
  • said another UE can perform transmission / reception with gNB at a timing earlier than the PDCCH reception timing in the own UE.
  • the gNB may send a notification instructing the UE to switch the downlink control channel reception method.
  • the UE may switch the reception method of downlink control information using the notification.
  • the notification may include an identifier representing the reception method.
  • the notification may be notified semi-statically from the gNB to the UE using RRC dedicated signaling, dynamically using a MAC control signal, or using L1 / L2 signaling. May be notified dynamically.
  • the method shown in this embodiment may be used for uplink data communication.
  • the content notified from the gNB to the UE may be the same as in the case of downlink data communication.
  • notification of an uplink grant to the UE may be performed together.
  • the gNB may notify the UE of Ack / Nack using the next PDCCH reception timing when the UE receives the initial transmission data.
  • the Ack / Nack notification from the gNB to the UE and the grant notification may be performed simultaneously or separately.
  • the UE may transmit uplink data to the gNB in the same subframe as the subframe that received the grant, or may transmit in another subframe.
  • the gNB may notify the UE of Ack / Nack in the subframe next to the subframe in which the UE transmitted the initial transmission data.
  • the UE may receive Ack / Nack from gNB in the next subframe.
  • a subframe subsequent to the predetermined number of subframes may be used instead of the next subframe.
  • the predetermined number of subframes may be determined by a standard, may be notified from the gNB to the UE being served by the gNB, or may be notified from the gNB to the UE by RRC dedicated signaling.
  • the gNB may notify the UE of a grant in a subframe after a predetermined number of subframes from the subframe in which the gNB has transmitted Ack / Nack to the UE, regardless of the next PDCCH reception timing.
  • the predetermined number of subframes may be 0, 1 or 2 or more.
  • the grant may be notified in the same subframe as the subframe that transmitted Ack / Nack.
  • the predetermined number of subframes may be determined by the standard, may be notified from the gNB to the UE being served by the gNB, or may be notified from the gNB to the UE by RRC dedicated signaling.
  • the UE may transmit retransmission data to the gNB in a subframe that is a predetermined number of subframes after the subframe in which the gNB transmits a grant to the UE, regardless of the next PDCCH reception timing.
  • the predetermined number of subframes may be 0, 1 or 2 or more.
  • retransmission data is transmitted from the UE in the same subframe as the subframe in which the UE has received the grant.
  • the predetermined number of subframes may be determined by the standard, may be notified from the gNB to the UE being served by the gNB, or may be notified from the gNB to the UE by RRC dedicated signaling.
  • the predetermined number of subframes is preferably the same as the number of subframes between the grant and the initial transmission data in the initial transmission.
  • the gNB may include Ack / Nack information in the uplink grant to the UE. That is, the gNB may include Ack / Nack for the previous reception of the uplink signal from the UE in the notification of the grant used for reception of the next uplink signal to the UE. The UE may perform initial transmission or retransmission of the next user data using the Ack / Nack.
  • the gNB does not need to notify the UE of Ack.
  • the UE may consider that the uplink data has been correctly received by the gNB by not receiving Ack / Nack related to the uplink data for a predetermined time.
  • the predetermined time may be determined by a standard, gNB may notify a UE being served by gNB, or may be notified to each UE by RRC dedicated signaling.
  • the gNB may determine the predetermined time using a service used by the UE. For example, a UE that uses URLLC may be set to have a shorter time than a UE that uses eMBB.
  • the above-described method of including Ack / Nack in the upstream grant and the method of not notifying the UE of Ack may be used in combination.
  • the UE does not need to receive a grant from the gNB even when it finishes transmitting continuous uplink user data, and confirms that the last uplink user data has been normally received by the gNB. I can know.
  • gNB since gNB does not need to notify UE of Ack with respect to the last uplink user data, it saves communication resources.
  • FIG. 11 is a diagram showing a transmission / reception channel in the case of performing Ack / Nack notification and retransmission in the subframe next to the uplink initial transmission in uplink communication.
  • the part indicated by reference numeral 1101 indicates downlink control information including a grant notified from the gNB to the UE.
  • the portions denoted by reference numerals 1102 and 1104 indicate uplink user data from the UE.
  • a part denoted by reference numeral 1103 indicates downlink control information including Nack and grant notified from the gNB to the UE.
  • the part denoted by reference numeral 1105 indicates downlink control information including notification of Ack from the gNB to the UE.
  • FIG. 11 shows that the uplink user data for the grant is transmitted in the same subframe as the grant, the Ack / Nack for the uplink user data is transmitted in the next subframe, and the Nack and the retransmission grant are the same subframe. In this case, retransmission is performed in the same subframe as that of Nack.
  • Subframe # 2 shown in FIG. 11 is assigned as the PDCCH reception timing of the UE.
  • the gNB notifies the UE of downlink control information including the grant 1101.
  • the UE transmits uplink user data 1102 to gNB in subframe # 2, which is the same subframe as downlink control information 1101 including the grant.
  • the gNB when the gNB cannot correctly receive the uplink user data 1102, it assigns subframe # 3 to the UE, and notifies the UE of downlink control information 1103 including a Nack and a retransmission grant. To do.
  • the UE receives downlink control information 1103 including Nack and a retransmission grant, and acquires Ack / Nack from the received downlink control information.
  • the UE transmits uplink user data 1104 in subframe # 3.
  • gNB In subframe # 4 shown in FIG. 11, gNB notifies the UE of downlink control information 1105 including Ack. In subframe # 4, the UE receives downlink control information 1105 including Ack, and acquires Ack / Nack from the received downlink control information.
  • the gNB may allocate a subframe for notifying the UE of Ack to another UE or may allocate to the UE.
  • the gNB may multiplex and transmit Ack / Nack for the UE and a downlink control signal to the other UE.
  • the multiplexing may be time multiplexing using different symbols, or frequency multiplexing within the same symbol. Alternatively, time multiplexing and frequency multiplexing may be combined.
  • notification of Ack / Nack for the UE may be first, or L1 / L2 signaling for the other UE may be first. It may be determined in advance by the standard as to which signal the gNB has first. The UE and the other UE may each receive a signal directed to the own UE from the gNB based on the standard.
  • the gNB may use the same operation as downlink transmission as the operation for the UE at the PDCCH reception timing, that is, the UE interrupted by the other UE at the PDCCH reception timing. That is, the gNB does not need to transmit L1 / L2 signaling to the UE, may notify the next PDCCH reception timing, or notifies the next PDCCH reception timing using a beam sweeping block. May be.
  • the UE may continuously receive in each subframe, may receive the next PDCCH reception timing, or may receive a beam sweeping block.
  • the UE when the UE belongs to another beam, TRP (Transmission Reception Point) or cell until the next PDCCH reception timing, the UE gives a radio link failure (Radio Failure: RLF). It may be detected.
  • the UE may receive a beam sweeping block. In receiving the beam sweeping block, the UE may perform a random access process to the gNB using the received beam.
  • the gNB may use the same PDCCH reception timing or different PDCCH reception timings for the source beam and the destination beam.
  • the gNB may use the same PDCCH reception timing or different PDCCH reception timings in the source TRP and the destination TRP.
  • the destination TRP may request the source TRP to notify the PDCCH reception timing used in the source TRP.
  • the request may be made simultaneously to TRPs in the gNB.
  • the source TRP may notify the destination TRP of the PDCCH reception timing.
  • the gNB may use the same PDCCH reception timing or different PDCCH reception timings in the source cell and the destination cell.
  • the destination cell may request the source cell to notify the PDCCH reception timing used in the source cell.
  • the request may be made using an inter-cell interface.
  • the source cell may notify the destination cell of the PDCCH reception timing.
  • the method shown in this embodiment makes it possible to save power consumption and radio resources required for the UE to receive downlink control signals in communication with multi-beam gNBs. In addition, it is possible to suppress delay in communication with gNB by quickly performing retransmission after Nack.
  • the base station apparatus notifies the communication terminal apparatus (UE) of information related to the next PDCCH reception timing.
  • the notification terminal apparatus performs reception based on information on the next PDCCH reception timing notified from the base station apparatus.
  • the communication terminal apparatus can receive information transmitted from the base station apparatus at the notified PDCCH reception timing, thereby saving power consumption and radio resources required for reception.
  • retransmission can be performed quickly, so that a delay in communication between the base station apparatus and the communication terminal apparatus can be suppressed. Therefore, it is possible to suppress an increase in power consumption of the communication terminal device, a deterioration in communication quality, and a decrease in use efficiency of radio resources.
  • the base station apparatus (gNB) and the communication terminal apparatus (UE) perform transmission / reception by switching the directivity of the beam emitted from the antenna.
  • the base station apparatus when the base station apparatus notifies the communication terminal apparatus of information related to the next reception timing, the communication terminal apparatus has a beam directed in a direction different from the own apparatus. It is possible to prevent reception. Therefore, it is possible to suppress an increase in power consumption of the communication terminal device, a deterioration in communication quality, and a decrease in use efficiency of radio resources.
  • the method described in this embodiment may be applied to a communication system that can switch beams in symbol units. Moreover, you may apply to the communication system which can communicate using a several beam simultaneously. Moreover, you may apply to the communication system which combined the above. By switching beams in symbol units, UEs belonging to different beams can be notified of PDCCH reception timing within the same subframe, and gNB scheduling flexibility can be improved. The same effect can be obtained by communicating using a plurality of beams at the same time.
  • the method described in this embodiment may be applied to a single beam gNB, that is, a gNB that does not perform beam sweeping.
  • a single beam gNB that is, a gNB that does not perform beam sweeping.
  • PUCCH is a physical control channel to which uplink control information (UCI) is mapped.
  • the PUCCH resource is set for each UE.
  • the PUCCH resource for SR (Scheduling Request) and the SR configuration such as the SR cycle are set for each UE (3GPP TS 36.211 V14.0.0 (hereinafter referred to as “reference 3”), and 3GPP TS 36.213 V14.0.0 (referred to as “Reference 4” hereinafter)).
  • RRC signaling is used for these settings (see 3GPP TS 36.331 V14.0.0 (hereinafter referred to as “reference 5”)).
  • NR is considering MBF (Multi Beam Forming) that requires beam sweeping.
  • MBF Multi Beam Forming
  • beam switching is required to cover the full coverage. Since one subframe is used for transmission / reception of only one beam, transmission / reception of another beam becomes impossible. Therefore, in the conventional LTE setting method in which the PUCCH resources of a plurality of UEs are configured in one subframe, there is a problem that the PUCCHs of UEs existing in beams that do not form coverage in the subframe cannot be transmitted / received.
  • the UE existing in each beam cannot recognize the transmission timing and resources of the PUCCH in the beam with which the UE is communicating.
  • the reception timing and resources of the PUCCH in the cell and the transmission timing and resources of the PUCCH of the UE cannot be matched, there arises a problem that transmission / reception of the PUCCH becomes impossible .
  • Resources are allocated for PUCCH per beam.
  • Subframes and symbols are allocated as PUCCH resources for each beam. Symbols may be assigned using symbol numbers. The symbol number set in the subframe may be used. Or you may determine the maximum symbol number of the resource for PUCCH allocated to a sub-frame. The symbol number may be renumbered by the maximum number of symbols. Thereby, the amount of information representing the symbol number, for example, the number of bits can be reduced.
  • a PUCCH resource for each UE is allocated from the PUCCH resource of the beam where the UE exists. That is, the PUCCH resource for each UE is allocated and multiplexed on the PUCCH resource of each beam.
  • the PUCCH resource for each UCI for each UE may be allocated from the PUCCH resource of the beam where the UE exists. That is, PUCCH resources for each UCI for each UE may be allocated and multiplexed on the PUCCH resources for each beam. Within a subframe, a beam for transmitting / receiving a symbol of a PUCCH resource may be different from a beam for transmitting / receiving a symbol different from the symbol.
  • a subframe for assigning a PUCCH for each beam is set with a period and an offset, and a symbol for assigning a PUCCH is set with a symbol number.
  • FIG. 12 is a diagram for explaining an example of a method for setting the PUCCH resource for each beam by the period, the offset, and the symbol number.
  • the case where the number of beam sweeps is four is shown.
  • the number of beam switching required to cover a predetermined coverage is defined as the number of beam sweeps.
  • the PUCCH with beam number 0 is a reference subframe number, for example, a subframe with an offset of 0 from the subframe with subframe number 0, a period of 5 subframes, and an intraframe subframe symbol number 10 (symbol # 10).
  • the reference subframe number may be set in advance.
  • the reference subframe number may be determined in advance according to a standard, for example.
  • a resource 1202 is set with a period of 10 subframes, an offset of 1 subframe, and a subframe symbol number of 11.
  • the PUCCH with beam number 1 is assigned to the resource 1202 with the subframe having the offset 1 from the subframe with the reference subframe number, the period of 10 subframes, and the symbol number 11 within the subframe (symbol # 11).
  • a resource 1203 is set with a period of 1 subframe, an offset of 0 subframe, and a subframe symbol number of 12.
  • the PUCCH with beam number 2 is assigned to the resource 1203 with the subframe having an offset of 0 from the subframe with the reference subframe number, the period of 1 subframe, and the symbol number in subframe 12 (symbol # 12).
  • a resource 1204 is set with a period of 2 subframes, an offset of 0 subframes, and a subframe symbol number of 13.
  • the PUCCH with the beam number 3 is assigned to the resource 1204 with the subframe having the offset 0 from the subframe with the reference subframe number, the period of 2 subframes, and the symbol number 13 in the subframe (symbol # 13).
  • PUCCH resources for each beam are periodically allocated. If the subframe number is in units of radio frames, and if the radio frame number is in units of system frames, the periodic settings should be renumbered using not only the subframe number but also the radio frame number and system frame number. Also good.
  • the symbol to which the PUCCH for each beam is assigned may be set from the end of the subframe.
  • the number of gaps (Gap) can be minimized by assigning a symbol preceding a symbol to which a PUCCH is assigned to the DL.
  • the number of symbols to which PUCCH is assigned for each beam is set to one, a plurality of symbols may be used. By using a plurality, it is possible to increase the reception power of the PUCCH of the cell and improve the reception quality of the PUCCH. In addition, the number of PUCCHs multiplexed in the beam can be increased.
  • beam switching may be performed for a plurality of beams.
  • spatial multiplexing can be performed between the plurality of beams. Therefore, the same resource may be allocated to the PUCCH for each of a plurality of beams that can communicate at the same timing.
  • the number of beam sweeps PUCCH is set in k subframes.
  • k is a natural number.
  • FIG. 13 is a diagram illustrating an example of a method for setting the number of beam sweep PUCCHs in k subframes.
  • the case where the number of beam sweeps is four is shown.
  • k number of beam sweeps.
  • the PUCCH of each beam is assigned to the last symbol 1302, 1304, 1306, 1308 of consecutive subframes, and repeatedly assigned with the number of subframes equal to the number of beam sweeps.
  • the symbol allocated to the PUCCH resource is one symbol in one subframe.
  • the symbol number assigned to the PUCCH resource may be fixed.
  • Symbols 1301, 1303, 1305, and 1307 are assigned arbitrary signals of arbitrary beams or non-transmission intervals. It may be DL or UL.
  • a downlink signal with beam number 0 is assigned to symbol 1301
  • a downlink signal with beam number 1 is assigned to symbol 1303
  • a downlink signal with beam number 2 is assigned to symbol 1305, and a downlink signal with beam number 3 is assigned to symbol 1307. It is done.
  • the beam number 3 is swept from the beam number 0 beam.
  • the PUCCH with beam number 0 is assigned to subframe number n and symbol number 13 (1302).
  • the PUCCH with beam number 1 is assigned to subframe number n + 1 and symbol number 13 (1304).
  • the PUCCH of beam number 2 is assigned to subframe number n + 2 and symbol number 13 (1306).
  • the PUCCH with beam number 3 is assigned to subframe number n + 3 and symbol number 13 (1308).
  • n is an integer of 0 or more.
  • the PUCCH of each beam is assigned to the last symbol 1302, 1304, 1306, 1308 for each subframe, and is repeatedly assigned with the number of subframes equal to the number of beam sweeps.
  • the subframe number is a radio frame unit
  • the radio frame number is a system frame unit
  • renumbering is performed using not only the subframe number but also the radio frame number and the system frame number so that they are repeatedly assigned. May be.
  • FIG. 14 is a diagram for explaining another example of a method for setting the number of beam sweep PUCCHs in k subframes.
  • the case where the number of beam sweeps is four is shown.
  • k 1.
  • All beam PUCCHs are assigned to one subframe and repeatedly assigned in one subframe (1402 to 1405, 1407 to 1410, 1412 to 1415, 1417 to 1420). In other words, every subframe is repeatedly allocated.
  • Symbols assigned to the PUCCH resources of each beam are one symbol within one subframe.
  • the symbol number assigned to the PUCCH resource may be fixed.
  • symbols of the number of beam sweeps are allocated from the end in one subframe.
  • Symbols 1401, 1406, 1411, and 1416 are assigned arbitrary signals of arbitrary beams or non-transmission intervals. It may be DL or UL. For example, a downlink signal with beam number 0 is assigned to symbol 1401, a downlink signal with beam number 1 is assigned to symbol 1406, a downlink signal with beam number 2 is assigned to symbol 1411, and a downlink signal with beam number 3 is assigned to symbol 1416. It is done.
  • the beam number 3 is swept from the beam number 0 beam.
  • the PUCCH with beam number 0 is assigned to subframe number n and symbol number 10 (1402, 1407, 1412, 1417).
  • the PUCCH with beam number 1 is assigned to subframe number n and symbol number 11 (1403, 1408, 1413, 1418).
  • the PUCCH of beam number 2 is assigned to subframe number n and symbol number 12 (1404, 1409, 1414, 1419).
  • the PUCCH with beam number 3 is assigned to subframe number n and symbol number 13 (1405, 1410, 1415, 1420).
  • n is an integer of 0 or more.
  • the SR cycle can be set in units of subframes. Specifically, if the subframe is 1 ms, the SR cycle can be set to 1 ms. As a result, the time from when transmission data is generated in the UE to when the SR is transmitted can be shortened, so that the delay time until the start of data transmission can be shortened.
  • Symbol 1501, 1503, 1505, 1507 is assigned an arbitrary signal of an arbitrary beam or a non-transmission section. It may be DL or UL.
  • a downlink signal with beam number 0 is assigned to symbol 1501
  • a downlink signal with beam number 1 is assigned to symbol 1503
  • a downlink signal with beam number 2 is assigned to symbol 1505, and
  • a downlink signal with beam number 3 is assigned to symbol 1507. It is done.
  • the beam number 3 is swept from the beam number 0 beam.
  • the PUCCH with beam number 0 is assigned to subframe number n and symbol number 13 (1502).
  • the PUCCH with beam number 1 is assigned to subframe number n + 1 and symbol number 13 (1504).
  • the PUCCH of beam number 2 is assigned to subframe number n + 2 and symbol number 12 (1506).
  • the PUCCH of beam number 3 is assigned to subframe number n + 2 and symbol number 13 (1507).
  • PUCCH is not assigned to subframe number n + 3.
  • n is an integer of 0 or more.
  • PUCCH of all beams is allocated in k subframes.
  • the frequency of assigning PUCCH resources can be changed. Therefore, it is possible to flexibly set the resource amount to allocate the PUCCH according to the cell load and the type of service performed by the UE.
  • the number of symbols to which the PUCCH of one beam is assigned is 1 in k subframes to be repeated, but the number is not limited to 1 and may be plural. Further, the number may be different for each beam. By making the number of symbols to which the PUCCH of one beam is assigned in k subframes repeated in this way different for each beam, it is possible to flexibly set PUCCH resources.
  • k subframes are repeatedly allocated continuously.
  • the k subframes may be allocated not discretely but discretely or periodically.
  • the k subframes to which the PUCCH is allocated may be periodically repeated at m subframe intervals.
  • the k subframes to which the PUCCH is assigned may be periodically repeated every m + 1 subframes.
  • m is an integer of 0 or more.
  • the cell may increase or decrease PUCCH resources according to the number of UEs present in the beam.
  • the PUCCH resource on the time axis may be increased or decreased according to the request delay time of the UE existing in the beam.
  • the frequency at which PUCCH resources are assigned is reduced and assigned to other data and control information. Increase the amount of resources available.
  • the frequency with which the PUCCH resource is allocated is increased, and the delay time until the start of transmission is reduced.
  • a beam to be communicated may be determined in each subframe among j subframes to be repeated.
  • j is a natural number.
  • the cell performs PUCCH resource setting for each beam.
  • the following seven (1) to (7) are disclosed as examples of determination indices.
  • the PUCCH resource is allocated with high frequency
  • the PUCCH resource is allocated with low frequency
  • PUCCH resources are allocated with high frequency
  • PUCCH resources are allocated with low frequency
  • a PUCCH resource is allocated at a high frequency
  • the PUCCH resource is allocated at a low frequency. Assign. It is good to match with the service in which uplink data is generated most frequently among UEs existing in the beam.
  • a PUCCH resource is allocated at a high frequency
  • a PUCCH resource is allocated at a low frequency.
  • it may be adjusted to the highest required QoS.
  • a PUCCH resource is allocated with a low frequency
  • a PUCCH resource is allocated with a high frequency. It is good to match the UE with the lowest required delay time among the UEs present in the beam.
  • a PUCCH resource is allocated with high frequency
  • a PUCCH resource is allocated with low frequency. It is good to match the UE having the highest required throughput among the UEs present in the beam.
  • the cell notifies the UE of information related to the PUCCH resource.
  • the following 13 (1) to (13) are disclosed as examples of information related to PUCCH resources.
  • the beam ID (1) indicates which beam PUCCH is set to.
  • the period (2) indicates a period for assigning PUCCH. It may be set in units of radio frames, subframes, symbols, or the like.
  • the offset (3) indicates an offset for assigning a PUCCH. It may be set in units of radio frames, subframes, symbols, or the like.
  • the symbol number in (4) indicates to which symbol the PUCCH is assigned.
  • the subframe number in (5) indicates to which subframe the PUCCH is assigned.
  • K in (6) indicates the number of subframes to which PUCCH resources for each beam are allocated.
  • M in (7) indicates how many subframes the PUCCH allocation for each beam is repeated.
  • the UCI type (8) indicates which UCI PUCCH is allocated.
  • the frequency resource (9) indicates to which frequency resource the PUCCH is allocated.
  • the CS of (10) indicates the CS of the ZC sequence used for PUCCH.
  • the sequence number (11) indicates the sequence number of the sequence used for PUCCH.
  • the orthogonal code (12) indicates the orthogonal code when the orthogonal code is used for the PUCCH.
  • Information relating to the PUCCH RS may be included as information relating to the PUCCH resource.
  • Information on the PUCCH resource is notified via a beam that the UE can communicate with.
  • a beam with which the UE can communicate is referred to as a “serving beam”.
  • Information on PUCCH resources may not always be fixed.
  • the cell may be set up semi-statically or dynamically and notified to the UE.
  • the UE By notifying such information, the UE acquires information on the PUCCH resource. Thereby, it becomes possible to recognize the setting of the PUCCH resource of the own UE.
  • the cell may notify the UE of information related to the PUCCH resource using a single beam that covers the entire coverage of the cell.
  • Information regarding PUCCH resources for each beam and information regarding PUCCH resources for each UE may be provided. Each may be provided in combination with information on PUCCH.
  • the cell may separately notify the UE regarding the information on the PUCCH resource for each beam and the information regarding the PUCCH resource for each UE.
  • the UE can recognize the setting of the PUCCH resource of the own UE by acquiring these pieces of information.
  • a case where a subframe to which a PUCCH for each beam is assigned is set with a period and an offset, and a symbol to which a PUCCH is assigned is set with a symbol number is shown.
  • information on PUCCH resources for each beam is (1) beam ID, (2) period, (3) offset, (4) symbol number, (10) CS, and (11) route sequence number.
  • the cell notifies the UE of information related to the PUCCH resource for each beam. You may notify the information regarding the PUCCH resource for every beam of all the beams which a cell comprises. By doing in this way, it becomes possible for UE to recognize which PUCCH resource is set to which symbol of which sub-frame for every beam. It is also possible to recognize the CS and route sequence used for PUCCH.
  • information on PUCCH resources for each UE is (2) period, (3) offset, (8) UCI type, and (9) frequency resource.
  • the cell notifies the UE of information related to the PUCCH resource for each UE. In this way, the UE can recognize which frequency resource of which symbol of which subframe is to set the PUCCH resource according to the UCI type of the own UE.
  • the cell sets a PUCCH resource for each UE from among PUCCH resources set for each beam of the beam in which the UE exists for the UE.
  • the cell notifies the UE of information regarding the set PUCCH resource for each UE.
  • a part or all of the information on the PUCCH resource may be the same for each beam and for each UE.
  • the cell may notify the UE of information related to the PUCCH resource having the same setting in one time.
  • the same setting may be omitted from the information regarding the PUCCH resource for each beam. What is necessary is just to notify only as the information regarding the PUCCH resource for every UE.
  • the cell sets a PUCCH resource for each beam for each cell.
  • the cell notifies the UE of information on PUCCH resources for each beam set for each cell as cell information.
  • the cell notifies information related to the PUCCH resource for each beam to UEs being served by the cell.
  • the information on the PUCCH resource for each beam includes information on the PUCCH resource for each beam of the beam with which the UE is communicating.
  • the cell may notify the UE of information related to PUCCH resources for each beam of all the beams in the cell. Or you may notify the information regarding the PUCCH resource for every beam of several beams instead of all the beams in a cell. For example, you may notify the information regarding the PUCCH resource of the beam which UE is communicating, and the information regarding the PUCCH resource of the several beam which has the periphery coverage. This eliminates the need for notifying information about the PUCCH resource for each beam at the movement destination when the UE moves.
  • the cell may notify the UE of information regarding the PUCCH resource for each beam of only the beam with which the UE is communicating. This makes it possible to reduce the amount of information for one signaling.
  • a cell may notify the information regarding the PUCCH resource for every beam of the 1 or several beam which the cell determined. For example, you may notify the information regarding the PUCCH resource for every beam of the beam which changed the setting. Thereby, it is not necessary to notify the information about the PUCCH resource for every beam of every beam every time the setting is changed.
  • the cell may notify only the information whose setting has been changed among the information regarding the PUCCH resource for each beam. As a result, the amount of information to be notified can be further reduced.
  • the cell notifies the UE of information on the PUCCH resource for each beam through the serving beam.
  • the beam ID may be omitted for the information related to the PUCCH resource of the serving beam.
  • the beam ID may be included in the information regarding the PUCCH resource.
  • the cell may notify the information on the PUCCH resource using a single beam that covers the entire coverage of the cell.
  • information on the PUCCH resource can be notified to the entire coverage of the cell, so that the signaling load can be reduced.
  • the cell may be notified by including information on the PUCCH resource in the system information.
  • the cell may broadcast information on the PUCCH resource.
  • a cell may notify the information regarding the said PUCCH resource by UE separate signaling.
  • the cell notifies the UE of information related to the PUCCH resource as UE-specific information.
  • the cell may notify some or all of the information on the PUCCH resource for each beam. For example, when the cell changes the setting of a part of the information related to the UE-specific PUCCH resource, the cell may notify only the part of the information to the UE. Thereby, the amount of information to be notified can be reduced.
  • the cell notifies information on the PUCCH resource via a serving beam.
  • the beam ID may be omitted.
  • the cell may notify the information on the PUCCH resource by UE dedicated signaling. By doing in this way, it becomes possible for UE to acquire the information regarding the PUCCH resource for every UE via the beam which is performing communication.
  • the cell may notify the information on the PUCCH resource using a single beam that covers the entire coverage of the cell.
  • information on the PUCCH resource can be notified to the entire coverage of the cell, so that the signaling load can be reduced.
  • the cell may notify the UE of information related to the PUCCH resource for each UCI for each UE.
  • the above notification method may be applied.
  • the cell can set the PUCCH resource for each UCI, and the UE can transmit the PUCCH for each UCI using the setting of the PUCCH resource set for each UCI.
  • the PUCCH of a plurality of UEs in one symbol that is a PUCCH resource for each beam it may be set to perform frequency division multiplexing or code division multiplexing between the plurality of UEs.
  • FIG. 16 is a diagram illustrating an example of a PUCCH setting and SR transmission / reception sequence.
  • FIG. 16 illustrates a case where the cell separately notifies the UE regarding information about PUCCH resources for each beam and information regarding PUCCH resources for each UE.
  • step ST2501 the cell sets a PUCCH resource configuration for each beam of all the beams in the cell.
  • the cell notifies the UE of information regarding the PUCCH resource for each beam including information regarding the PUCCH resource for each beam of the beam with which the UE communicates. Notification may be made via a beam communicating with the UE. For the notification of the information, RRC dedicated signaling is used.
  • Step ST2503 the UE that has received information on the PUCCH resource for each beam in Step ST2502 stores the PUCCH resource configuration corresponding to the serving beam that is a beam with which the UE communicates.
  • UE may memorize
  • step ST2504 the cell sets a PUCCH resource configuration for each UE.
  • step ST2505 the cell notifies the UE of information related to the PUCCH resource for each UE.
  • RRC dedicated signaling is used for the notification of the information.
  • Step ST2506 the UE that has received the PUCCH resource for each UE in Step ST2505 sets the PUCCH resource configuration for each UE on the PUCCH resource for each beam. Specifically, in Step ST2506, the UE sets the PUCCH resource configuration of the own UE using information regarding the PUCCH resource for each beam and information regarding the PUCCH resource for each UE.
  • step ST2505 the cell that has notified the information on the PUCCH resource for each UE in step ST2505 starts reception with the PUCCH resource configuration for each UE set for the UE in step ST2507.
  • step ST2508 the UE determines whether uplink data has been generated. If it is determined in step ST2508 that no uplink data has been generated, the process returns to step ST2508 to repeat the determination of whether uplink data has been generated. If it is determined in step ST2508 that uplink data is generated, the mobile terminal makes a transition to step ST2509.
  • step ST2509 the UE transmits SR to the cell via the serving beam using the set PUCCH resource for SR for each UE.
  • step ST2509 the cell that has started reception using the PUCCH resource for each UE set for the UE in step ST2507 receives the SR transmitted from the UE.
  • step ST2510 the cell starts uplink scheduling for the UE according to the received SR.
  • step ST2511 the cell transmits uplink grant, specifically uplink scheduling information including the uplink grant, to the UE.
  • Step ST2512 the UE that has received the uplink grant in Step ST2511 transmits a BSR (Buffer Status Report) to the cell using the uplink grant. At this time, uplink data may be transmitted.
  • BSR Buffer Status Report
  • the cell that has received the BSR in step ST2512 performs uplink scheduling for the UE according to the BSR.
  • step ST2513 the cell transmits an uplink grant to the UE.
  • the UE that has received the uplink grant in Step ST2513 transmits uplink data to the cell using the uplink grant.
  • Step ST2514 the cell receives uplink data transmitted from the UE.
  • uplink communication is started between the UE and the cell.
  • the UE transmits the BSR to the cell, but may transmit uplink data together with the BSR. Alternatively, only uplink data may be transmitted. Thereby, in the case of a small amount of data, uplink data transmission can be completed only by the transmission, and the delay time can be shortened.
  • the cell notifies the UE of information on the PUCCH resource for each beam, it may be statically determined in advance by a standard or the like. Or you may use the function which outputs the information regarding the PUCCH resources for every beam, such as a sub-frame number and a symbol number, using beam ID as an input parameter. By doing in this way, it becomes possible to reduce the signaling load between a cell and UE.
  • the PUCCH can be transmitted / received by the beam with which the UE is communicating, and uplink communication from the UE to the cell can be performed. It becomes possible.
  • a beam for transmitting / receiving a symbol of a PUCCH resource may be different from a beam for transmitting / receiving a symbol different from the symbol.
  • the UE Since the beam is different between the downlink and the uplink, the UE does not continuously receive the downlink signal and transmit the uplink signal. Therefore, reception and transmission do not overlap at the UE, and a gap is unnecessary.
  • the cell may set the gap configuration and notify the UE.
  • the gap setting may also be included in the information regarding the PUCCH resource.
  • the cell may notify the UE together with information on other PUCCH resources.
  • the gap configuration so that the cell can notify the UE, for example, different beams are used for symbols used for downlink and symbols used for uplink in one subframe. In such a case, it is possible to set so that no gap is provided between the downlink and the uplink.
  • Embodiment 2 Modification 1 In the present embodiment, another method for solving the problem described in the second embodiment is disclosed.
  • Embodiment 2 discloses that a PUCCH resource is determined in advance for each beam and a PUCCH resource for each UE is set in the PUCCH resource for each beam.
  • the required PUCCH setting cycle differs depending on the service communicated for each UE, resources that are not used among the PUCCH resources set for each beam are also generated. Therefore, there arises a problem that the use efficiency of radio resources is lowered.
  • a PUCCH resource is set for each UE without setting a PUCCH resource for each beam.
  • the PUCCH resource may be set dynamically. By dynamically setting the PUCCH resource for each UE, it becomes possible to set the PUCCH resource in a timely manner according to the connection state of the UE. In addition, it is possible to suppress reduction in resource usage efficiency due to generation of unused resources among PUCCH resources set for each beam in the method disclosed in the second embodiment.
  • the cell notifies the UE of information related to the PUCCH resource set for each UE and sets the PUCCH resource. What is disclosed in Embodiment 2 may be applied to the information example regarding the PUCCH resource. A setting example in this modification will be disclosed. A subframe for allocating PUCCH for each UE is set with a period and an offset, and a symbol for allocating PUCCH is set with a symbol number.
  • the subframe period may be one or more predetermined values.
  • An index indicating a combination of the subframe period and the offset may be provided and set by the index.
  • Symbols may be assigned using symbol numbers.
  • the symbol allocation may be performed using a symbol number set in the subframe. For example, the subframe period is set to 10, the offset is set to 4, and the symbol number is set to 13.
  • the PUCCH is assigned to the symbol whose subframe symbol number is 13 every 10 subframes from the fifth subframe.
  • the maximum number of symbols for PUCCH resources allocated to a subframe may be determined and the symbol number may be renumbered with the maximum number of symbols. Thereby, the amount of information representing the symbol number, for example, the number of bits can be reduced.
  • the cell sets the PUCCH frequency resource, CS, and sequence number for the UE.
  • the UE configures the PUCCH with symbols of the timing for assigning the PUCCH described above in accordance with these pieces of information.
  • the cell When a PUCCH resource is set for each UE for UEs having different serving beams, the cell is set so that the setting timings of the PUCCH resources for those UEs are not the same. When allocating symbols to PUCCH resources, it may be set not to be the same symbol in the same subframe.
  • the cell notifies the information via the serving beam.
  • the beam ID may be omitted.
  • the cell may notify the information by UE dedicated signaling. By doing in this way, it becomes possible for UE to acquire the information regarding the PUCCH resource for every UE via the beam which is performing communication.
  • RRC signaling may be used as UE individual signaling.
  • Information on PUCCH resources for each UE may be included in the RRC message.
  • L1 / L2 control signaling may be used as UE dedicated signaling.
  • Information on PUCCH resources for each UE may be included in downlink L1 / L2 control information (may be downlink control information).
  • MAC signaling may be used as UE individual signaling.
  • Information on PUCCH resources for each UE may be included in the MAC control information.
  • FIG. 17 is a diagram illustrating an example of a PUCCH setting for each UE and an SR transmission / reception sequence. Since the sequence shown in FIG. 17 includes the same steps as the sequence shown in FIG. 16, the same steps are denoted by the same step numbers and common description is omitted. FIG. 17 illustrates a case where the cell notifies the UE of information related to the PUCCH resource set for each UE.
  • step ST2601 the cell sets a PUCCH resource configuration for each UE for the UE.
  • a cell sets up to the symbol number which allocates PUCCH with respect to UE.
  • the cell is set so that the PUCCH resource timing is not the same for UEs having different serving beams.
  • the cell notifies the UE of information on the PUCCH resource for each UE.
  • the symbol number (symbol #) to which the PUCCH is allocated is included in the information related to the PUCCH resource. Notification may be made via a beam communicating with the UE. For the notification of the information, RRC dedicated signaling is used.
  • Step ST2602 which received the information regarding the PUCCH resource for every UE in Step ST2602 sets the PUCCH resource configuration in Step ST2603.
  • step ST2602 the cell that has notified the UE of information related to the PUCCH resource starts reception with the PUCCH resource configuration set for the UE in step ST2604.
  • Step ST2605 the UE determines whether uplink data has been generated. If no uplink data is generated in step ST2605, the process returns to step ST2605 to repeat the determination of whether uplink data has been generated. If uplink data is generated in step ST2605, the base station moves to step ST2606.
  • Step ST2606 the UE transmits the SR to the cell via the serving beam using the set SR PUCCH resource.
  • step ST2606 the cell that has started reception using the PUCCH resource set for the UE in step ST2604 receives the SR transmitted from the UE.
  • the cell that has received the SR from the UE in this way performs processing for starting uplink communication. Thereby, uplink communication is started between the UE and the cell.
  • the PUCCH resource can be set during the beam sweeping operation in MBF.
  • the PUCCH can be transmitted / received by the beam with which the UE is communicating, and uplink communication from the UE to the cell can be performed. It becomes possible.
  • the cell may notify the information using a single beam that covers the entire coverage of the cell. Good. As a result, the information on the PUCCH resource can be notified to the entire coverage of the cell, so that the signaling load can be reduced.
  • the cell may notify the UE of information related to the PUCCH resource for each UCI for each UE.
  • the above notification method may be applied.
  • the cell can set the PUCCH resource for each UCI, and the UE can transmit the PUCCH for each UCI using the setting of the PUCCH resource set for each UCI.
  • Information related to the start, correction, and stop of PUCCH resource settings is set for each UE.
  • the cell notifies the UE of information related to the PUCCH resource for each UE in advance.
  • the cell sets the PUCCH resource by notifying the UE of information related to the start, correction, and stop of the PUCCH resource setting.
  • the UE actually performs transmission of PUCCH, transmission after modification, and stop by receiving the setting.
  • the following eight (1) to (8) are shown as examples of information related to the start, correction, and stop of PUCCH resource settings.
  • (1) is information indicating the start, and when the information is set, the UE enables PUCCH transmission using a preset PUCCH resource.
  • (2) is information indicating a stop, and when the information is set, the UE stops the PUCCH transmission on the preset PUCCH resource.
  • (3) is information indicating modification, and when the information is set, the UE enables PUCCH transmission using the resource in which the PUCCH resource is modified and set.
  • the PUCCH resource information to be corrected may be notified together.
  • (4) is information indicating a setting period, and when the information is set, the UE enables PUCCH transmission on the PUCCH resource for the setting period from the start of setting.
  • the setting may be stopped when the setting period expires.
  • (5) is information indicating a stop period, and when the information is set, the UE stops PUCCH transmission on the PUCCH resource from the stop of setting when the information is set.
  • the setting may be started when the stop period expires.
  • (6) is information indicating an offset, and when the information is set, the UE performs setting start by offsetting the offset value from the timing of setting start.
  • (7) is a symbol number to which a PUCCH is assigned, and when the information is set, the UE sets a PUCCH resource to the symbol number.
  • the symbol number is included in the PUCCH resource set in advance for the UE, it follows the newly set symbol number.
  • FIG. 18 is a diagram for explaining an example of a method for setting information related to start, correction, and stop of PUCCH resource setting for each UE.
  • the horizontal axis represents a subframe
  • the vertical axis represents a symbol number in the subframe.
  • FIG. 18 shows a case where the maximum number of symbols to which PUCCH is assigned is set to 4 in one subframe. In this case, the symbol numbers in the subframe are renumbered from 0 to 3.
  • symbol number 10 corresponds to symbol number 0
  • symbol number 11 corresponds to symbol number 1
  • symbol number 12 corresponds to symbol number 2
  • symbol number 13 corresponds to symbol number 3.
  • the maximum number of symbols to which PUCCH of one subframe is allocated and the correspondence relationship between the symbol number in the subframe and the symbol number after renumbering may be notified from the cell to the UE in advance.
  • you may include in the information regarding the PUCCH resource for every UE notified beforehand. The UE can recognize the symbol number to which the PUCCH is allocated using the information.
  • arrows indicate information to be notified from the cell to the UE.
  • the cell notifies UE1, UE2, UE3, and UE4 in advance of information related to PUCCH resources for each UE.
  • the cell 2 determines to start the setting of the PUCCH resource, the cell notifies the UE 2 of information indicating the start of the PUCCH setting (Str_UE # 2 (symbol # 3)) together with the symbol number to which the PUCCH is allocated.
  • the symbol number is 3.
  • a PUCCH resource is set for UE2.
  • the cell When the cell determines the start of setting the PUCCH resource, the cell notifies the UE 3 of the information indicating the start of PUCCH setting (Str_UE # 3 (symbol # 2)) together with the symbol number to which the PUCCH is allocated.
  • the symbol number is 2.
  • a PUCCH resource is set for UE3.
  • the cell When the cell determines the start of setting the PUCCH resource, the cell notifies UE1 of the information indicating the start of PUCCH setting (Str_UE # 1 (symbol # 3)) together with the symbol number to which the PUCCH is allocated.
  • the symbol number is 3.
  • a PUCCH resource is set for UE1.
  • the cell determines the setting correction of the PUCCH resource and notifies the UE.
  • the cell notifies UE2 of information indicating the PUCCH resource configuration modification (Mod_UE # 2 (symbol # 2)) together with the symbol number assigned after the modification.
  • the symbol number is 2. This corrects the PUCCH resource setting for UE2.
  • the cell determines the setting correction of the PUCCH resource and notifies the UE.
  • the cell notifies UE3 of information indicating the PUCCH resource configuration modification (Mod_UE # 3 (symbol # 1)) together with the symbol number assigned after the modification.
  • the symbol number is 1. This corrects the PUCCH resource setting for UE3.
  • the cell determines the setting start of the PUCCH resource to the UE 4, the cell notifies the UE 4 of the information indicating the start of the PUCCH setting (Str_UE # 4 (symbol # 2)) together with the symbol number to which the PUCCH is allocated.
  • the symbol number is 2.
  • a PUCCH resource is set for UE4.
  • the cell When the cell decides to stop the setting of the PUCCH resource for the UE2, the cell notifies the UE2 of information (Stp_UE # 2) indicating the PUCCH setting stop. Thereby, the PUCCH resource set for UE2 is released.
  • the cell Since the cell has released the PUCCH resource set for UE2, the cell determines that there is no collision of the PUCCH resource set for UE3, determines the PUCCH resource setting correction, and notifies UE3.
  • the cell notifies UE3 of the information (Mod_UE # 3 (symbol # 2)) indicating the PUCCH resource setting correction together with the symbol number assigned after the correction.
  • the symbol number is 2. This corrects the PUCCH resource setting for UE3.
  • the cell When the cell decides to stop the setting of the PUCCH resource for the UE1, the cell notifies the UE1 of information indicating the PUCCH setting stop (Stp_UE # 1). Thereby, the PUCCH resource set for UE1 is released.
  • the cell Since the cell has released the PUCCH resource set for UE1, the cell determines that there is no collision of the PUCCH resource set for UE4, determines the PUCCH resource setting correction, and notifies UE4.
  • the cell notifies UE4 of information (Mod_UE # 4 (symbol # 3)) indicating the PUCCH resource setting correction together with the symbol number assigned after the correction.
  • the symbol number is 3. This corrects the PUCCH resource setting for UE4.
  • the cell Since the cell has corrected the PUCCH resource set for UE1, the cell determines that there is no collision of the PUCCH resource set for UE4, determines the PUCCH resource setting correction, and notifies UE3.
  • the cell notifies UE3 of the information (Mod_UE # 3 (symbol # 3)) indicating the PUCCH resource setting correction together with the symbol number assigned after the correction.
  • the symbol number is 3. This corrects the PUCCH resource setting for UE3.
  • the cell can allocate different resources to the PUCCH of the UE for each UE communicating with different beams. Therefore, in a cell that requires beam sweep, it is possible to switch the beam for each UE communicating with a different beam and receive the PUCCH of the UE.
  • the cell notifies the UE of information related to the start, correction, and stop of PUCCH resource settings.
  • the cell notifies the information via the serving beam.
  • the beam ID may be omitted.
  • the cell may notify the information by UE dedicated signaling. By doing in this way, it becomes possible for UE to acquire the information regarding the start of PUCCH resource setting for every UE, correction, and a stop via the beam which is communicating.
  • RRC signaling may be used as UE individual signaling.
  • Information regarding the start, correction, and stop of PUCCH resource settings may be included in the RRC message.
  • L1 / L2 control signaling may be used as UE dedicated signaling.
  • Information regarding the start, correction, and stop of PUCCH resource settings may be included in the downlink L1 / L2 control information.
  • MAC signaling may be used as UE individual signaling. Information regarding the start, correction, and stop of PUCCH resource settings may be included in the MAC control information.
  • MAC signaling as UE dedicated signaling, HARQ is applied, so that the UE can receive with a low reception error rate and can receive a setting relatively early.
  • An example of a notification method of information on PUCCH resources and information on start, correction, and stop of PUCCH resource settings is disclosed.
  • Information on PUCCH resources is notified by RRC signaling, and information on PUCCH resource setting start, modification, and stop is notified by RRC signaling. Since RRC signaling is used, a large amount of information can be notified, and notification with a low reception error rate can be achieved.
  • Information on PUCCH resource is notified by RRC signaling, and information on setting start, modification, and stop of PUCCH resource is notified by L1 / L2 control signaling. Since the information on the start, correction, and stop of the setting of the PUCCH resource is notified by the L1 / L2 control signaling, the start, correction, and stop of the setting in the UE can be executed at an early stage. By making it possible to execute setting start, correction, and stop dynamically at an early stage, it is possible to improve the use efficiency of radio resources.
  • Information on PUCCH resource is notified by RRC signaling, and information on setting start, modification, and stop of PUCCH resource is notified by MAC signaling. Since the information regarding the start, correction, and stop of the setting of the PUCCH resource is notified by MAC signaling, it is possible to notify at a low error rate.
  • the setting start, correction, and stop in the UE can be executed relatively early. It is possible to improve the use efficiency of radio resources by making it possible to execute setting start, correction, and stop dynamically at a relatively early stage.
  • the cell has disclosed that the information on the PUCCH resource and the information on the start, correction, and stop of the PUCCH resource configuration are notified via the serving beam
  • the cell has the information on the PUCCH resource, and You may notify using the single beam which covers the whole coverage of a cell at least one of the information regarding the start of PUCCH resource setting, correction, and a stop.
  • the information on the PUCCH resource and the information on the start, correction, and stop of the PUCCH resource configuration can be notified to the entire coverage of the cell, so that the signaling load can be reduced.
  • the cell may notify the UE of information related to the PUCCH resource for each UCI for each UE.
  • the above notification method may be applied.
  • the cell can set the PUCCH resource for each UCI, and the UE can transmit the PUCCH for each UCI using the setting of the PUCCH resource set for each UCI.
  • Priority may be set for symbol numbers assigned to PUCCH. Priorities may be provided for setting symbol numbers for PUCCH resources. The highest priority is given to the last symbol in one subframe, and the priority to the preceding symbol is made lower in order. For example, when one subframe is composed of 14 symbols of symbol number 0 to symbol number 13, the priority of symbol number 13 is the highest, and then the symbol number 12, symbol number 11, and the symbol number are sequentially decreased. According to the lower priority.
  • Assign to PUCCH from symbols with high priority For example, at the start of setting the first PUCCH resource, the highest symbol is assigned.
  • the PUCCH resource setting set for the next priority symbol may be corrected to the released higher symbol.
  • the PUCCH resources may be assigned from the tail symbol in ascending order of the set period length. For example, at the start of setting the first PUCCH resource, the highest symbol is assigned. If the period for setting the next PUCCH resource is shorter than the period for setting the first PUCCH resource, the first PUCCH resource setting is modified to the next priority symbol, and the next PUCCH resource setting is the highest priority symbol. Set to.
  • PUCCH resources are dynamically set for each UE.
  • PUCCH resource setting start, correction, and stop. Become.
  • a PUCCH of a beam different from a beam for transmitting and receiving other symbols in one subframe may be configured.
  • downlink resources do not always exist in subframes in which PUCCH is set. Therefore, the cell may not be able to notify the UE of the information in the PUCCH resource setting subframe for each UE.
  • the cell notifies the UE at a timing before the PUCCH resource setting subframe for each UE.
  • the cell may perform transmission / reception with a beam in which the UE to be configured exists at a timing before the PUCCH resource configuration subframe for each UE, and complete signaling of the information in the transmission / reception.
  • the UE Since the UE has already been notified of the PUCCH resource setting subframe, when the UE is notified at a timing before the PUCCH resource setting subframe for each UE from the cell, the notified information in the PUCCH resource setting subframe after the notification. Should be applied.
  • the cell may also notify the timing to apply the configuration. You may notify as an offset. For example, after the notification, the number of PUCCH resource setting subframes to which the setting is applied may be notified. This makes it possible to set the time flexibly.
  • FIG. 19 is a diagram illustrating an example of a PUCCH setting and an SR transmission / reception sequence for each UE. Since the sequence shown in FIG. 19 includes the same steps as the sequence shown in FIG. 16, the same steps are denoted by the same step numbers and common description is omitted. FIG. 19 illustrates a case where the cell separately notifies the UE regarding information on PUCCH resources for each UE and information regarding PUCCH resource setting start, correction, and stop for each UE.
  • step ST2801 the cell sets a PUCCH resource configuration for each UE for the UE.
  • the cell notifies the UE of information related to the PUCCH resource for each UE.
  • the cell may notify information on PUCCH resources for each UE via a beam communicating with the UE.
  • RRC dedicated signaling is used for the notification of the information.
  • Step ST2803 the UE that has received information on the PUCCH resource for each UE in Step ST2802 stores the PUCCH resource configuration.
  • Step ST2804 the cell determines the start of PUCCH resource setting for the UE.
  • the cell determines the start of PUCCH resource configuration for the UE and also determines the symbols to be allocated to the UE.
  • the cell is set so that the PUCCH resource timing is not the same for UEs having different serving beams.
  • step ST2805 the cell notifies the UE of PUCCH resource setting start information. Also, the symbol number information to be allocated as a PUCCH resource is notified. The cell includes these pieces of information in downlink L1 / L2 control information and notifies the UE by downlink L1 / L2 control signaling.
  • the UE that has received the PUCCH resource setting start information in Step ST2805 uses the information on the PUCCH resource for each UE stored in Step ST2803 and the symbol number received in Step ST2805 in Step ST2813, and the UE's PUCCH resource configuration Set.
  • the cell that has notified the UE of the PUCCH resource setting start information and the symbol number information in Step ST2805 starts reception with the PUCCH resource configuration set for the UE in Step ST2806.
  • the UE When the transmission of the uplink signal occurs, the UE transmits an SR with this PUCCH resource setting. However, in the example of FIG. 19, it is assumed that no uplink data is generated in the UE in this state.
  • step ST2807 the cell determines the PUCCH resource setting correction and the symbols to be allocated after the correction to the UE. At this time, the cell is set so that the PUCCH resource timing is not the same for UEs having different serving beams. Moreover, you may set according to the priority of the symbol number allocated to the above-mentioned PUCCH.
  • Step ST2808 the cell notifies the UE of PUCCH resource setting correction information. Moreover, the symbol number information allocated after correction is notified as a PUCCH resource.
  • the cell includes these pieces of information in downlink L1 / L2 control information and notifies the UE by downlink L1 / L2 control signaling. By notifying with L1 / L2 control signaling, it is possible to reduce the set time as much as possible.
  • Step ST2809 the UE that has received the PUCCH resource setting correction information and the symbol number in Step ST2808 corrects the PUCCH resource setting of the own UE.
  • step ST2810 the cell that has notified the UE of the PUCCH resource setting modification information and the symbol number information starts reception with the modified PUCCH resource configuration in step ST2808.
  • step ST2811 the UE determines whether uplink data has been generated. If no uplink data is generated in step ST2811, the process returns to step ST2811, and the determination of whether uplink data has occurred is repeated. If uplink data is generated in step ST2811, the process proceeds to step ST2812.
  • Step ST2812 the UE transmits the SR to the cell through the serving beam with the modified SR PUCCH resource configuration.
  • step ST2812 the cell that has started reception with the PUCCH resource modified for the UE in step ST2810 receives the SR transmitted from the UE.
  • the cell that has received the SR from the UE in this way performs processing for starting uplink communication. Thereby, uplink communication is started between the UE and the cell.
  • Embodiment 2 Modification 2 In the first modification of the second embodiment, it is disclosed that the use efficiency of radio resources is improved by setting the PUCCH resource for each UE for the UE.
  • PUCCH resources are set periodically, communication must always be performed using the beam in which the PUCCH resources are set at the timing.
  • there is communication that requires low delay with another beam there is a problem that communication cannot be performed with the beam in which the PUCCH resource is set.
  • the cell sets a PUCCH resource for the UE in the same subframe as the subframe constituting the DL resource of the beam with which the UE communicates.
  • the UE transmits the PUCCH in the same subframe in which the downlink signal of the serving beam is transmitted.
  • a self-contained subframe in which a DL resource and a UL resource are configured in the same subframe is proposed. In this modification, this self-contained subframe may be used.
  • the cell notifies the UE whether or not PUCCH transmission is possible in the same subframe in the same subframe as that constituting the DL resource of the beam with which the UE communicates.
  • the cell notifies the UE of whether or not PUCCH transmission is possible by downlink L1 / L2 control signaling using a serving beam in accordance with the timing at which PUCCH transmission is required.
  • PUCCH transmission availability information may be provided.
  • the cell may include PUCCH transmission availability information in downlink control information and notify the UE by downlink L1 / L2 control signaling.
  • the UE receives PUCCH transmission availability information, and enables PUCCH transmission in the subframe that has received the PUCCH transmission availability information when PUCCH transmission is possible.
  • the UE disables PUCCH transmission in the subframe in which the PUCCH transmission availability information is received.
  • the UE receives the PUCCH transmission enable / disable information and fails to receive the PUCCH transmission enable / disable information, the UE may make PUCCH transmission impossible in the subframe.
  • the PUCCH transmission enable information Only the PUCCH transmission enable information may be provided and the PUCCH transmission rejection information may be omitted. Only when receiving the PUCCH transmission enable information, the UE enables PUCCH transmission in the subframe in which the PUCCH transmission enable information is received.
  • the cell transmits PUCCH transmission availability information within the previously set PUCCH resource to instruct the UE whether or not PUCCH transmission is possible.
  • the PUCCH resource to be set in advance may include a timing for setting the PUCCH resource. It is preferable to include at least timing in subframe units. You may notify and set the information regarding the PUCCH resource disclosed in Embodiment 2 or Modification 1 of Embodiment 2.
  • the UE When the UE receives information indicating that PUCCH transmission is possible, the UE enables transmission of PUCCH. Conversely, when PUCCH transmission rejection (impossible) information is received, PUCCH transmission is disabled.
  • PUCCH resource settings are notified in advance, some or all of the PUCCH resource settings may be notified together with PUCCH transmission availability information. You may notify the resource setting of the time unit smaller than a sub-frame with PUCCH transmission availability information. For example, the symbol number information assigned to the PUCCH is notified together with the PUCCH transmission availability information. This makes it possible to dynamically and flexibly assign symbols.
  • PUCCH transmission may be indicated by notification of part or all of the PUCCH resource settings. As a result, it becomes possible to omit information indicating that PUCCH transmission is possible. Information to be notified together with PUCCH transmission availability information may be limited to a small number. By setting most of the PUCCH resources in advance, it is possible to shorten the processing time from reception of PUCCH transmission enabled information to transmission of PUCCH. The UE can transmit the PUCCH in the same subframe in which the information indicating that the PUCCH transmission is possible is received.
  • the cell may not transmit / receive a beam communicated by the UE in a subframe in which a PUCCH resource is set for the UE.
  • the UE cannot receive the downlink L1 / L2 control signaling from the serving beam, and thus cannot receive the PUCCH transmission availability information. Therefore, the operation of the UE becomes unclear, and the UE may perform PUCCH transmission.
  • Disclose other setting method for UE Disclose other setting method for UE.
  • the cell notifies the UE of PUCCH resource settings other than timing in advance, and follows the PUCCH resource settings except for timing.
  • the notification of information on the PUCCH resource disclosed in the second embodiment or the first modification of the second embodiment may be applied.
  • the cell instructs the UE whether or not PUCCH transmission is possible at an arbitrary timing.
  • the cell notifies the UE of PUCCH transmission availability information. You may notify the resource setting of the time unit smaller than a sub-frame with PUCCH transmission availability information. For example, the symbol number is notified.
  • the UE When receiving information indicating that PUCCH transmission is possible, the UE enables transmission of PUCCH. On the other hand, when information indicating that PUCCH transmission is rejected is received, PUCCH transmission is disabled.
  • PUCCH resource settings other than timing are notified in advance
  • part or all of PUCCH resource settings other than timing may be notified together with PUCCH transmission availability information.
  • PUCCH frequency resource information may be notified together with PUCCH transmission availability information.
  • the PUCCH transmission may be indicated by the notification of the symbol number or the notification of part or all of the PUCCH resource setting. As a result, it becomes possible to omit information indicating that PUCCH transmission is possible.
  • the information notified together with the PUCCH transmission availability information may be limited to a small number.
  • By setting most of the PUCCH resources in advance it is possible to shorten the processing time from reception of PUCCH transmission enabled information to transmission of PUCCH.
  • the UE can perform PUCCH transmission in the same subframe as the subframe in which the information indicating that PUCCH transmission is possible is received.
  • the UE can determine whether or not PUCCH can be transmitted according to the PUCCH transmission availability information included in the L1 / L2 control signaling transmitted using the serving beam.
  • the cell can use the PUCCH resource elsewhere by disabling PUCCH transmission with the PUCCH resource set for the UE. For example, it can be used for resources for downlink communication.
  • the cell can dynamically determine the other usage of the PUCCH resource.
  • SR it is possible to dynamically set a PUCCH resource based on cell determination by associating a downlink control signal with PUCCH transmission.
  • the cell can dynamically change the beam to be transmitted and received. There is no need to transmit / receive at the PUCCH resource timing set in advance for each beam. It is possible to flexibly cope with changes in radio wave propagation environment, cell load fluctuations, or required communication services.
  • the UE When the UE receives information indicating that PUCCH transmission is possible, the UE performs PUCCH transmission when there is UCI to be transmitted on the PUCCH. When there is no UCI to be transmitted on the PUCCH, PUCCH transmission is not performed. For example, when there is an SR to be transmitted, the UE performs SR PUCCH transmission. When receiving information indicating that PUCCH transmission is not possible, the UE does not perform PUCCH transmission regardless of the presence or absence of UCI transmitted on the PUCCH. For example, even if there is an SR to be transmitted, SR PUCCH transmission is not performed.
  • the UCI that has not been transmitted when the UE cannot transmit PUCC is transmitted until the UE receives the next PUCCH transmission enable information. This makes it possible to transmit UCI reliably.
  • the UE may discard the UCI that has not been transmitted.
  • the UE may discard the UCI that has not been transmitted when the next same type of UCI occurs. This makes it possible to reduce the buffer required for the UE.
  • FIG. 20 is a diagram for explaining an example of a method for setting the PUCCH resource in the same subframe as the DL resource of the serving beam of the UE.
  • a symbol assigned to the PUCCH resource is one symbol in one subframe.
  • the symbol number 13 is assigned.
  • the symbol number assigned to the PUCCH resource may be fixed.
  • a symbol assigned to downlink L1 / L2 control signaling is one symbol in one subframe.
  • the symbol number 0 is assigned to the symbol.
  • the symbol number assigned to the downlink L1 / L2 control signaling may be fixed.
  • the cell transmits / receives the beam 2002 with the subframe number 0 and the beam number 2.
  • the cell includes the PUCCH resource transmission availability information for each UE in the UCI and notifies the UE communicating with the beam number 2 using the downlink L1 / L2 control signaling 2001 of the beam number 2.
  • the cell may notify the UE by including the symbol number information in the UCI together with the PUCCH resource transmission availability information.
  • the UE that performs transmission / reception using the beam 2002 with the beam number 2 receives the L1 / L2 control signaling 2001 with the subframe number 0 and receives the PUCCH resource transmission availability information and the symbol number.
  • the UE that has received the PUCCH resource transmission permission sets the PUCCH resource from the information on the PUCCH resource set in advance and the symbol number, and enables transmission.
  • a UE having UCI to transmit transmits PUCCH using the PUCCH resource.
  • PUCCH 2003 of beam # 2 is transmitted.
  • the UE that has received the PUCCH resource transmission disabled status cannot transmit the PUCCH.
  • the UE does not transmit PUCCH even if there is UCI to transmit.
  • the cell transmits and receives the beam 2002 with the beam number 3 in the next subframe number 1.
  • the cell includes the PUCCH resource transmission availability information for each UE in the UCI and notifies the UE that communicates with the beam number 3 using the downlink L1 / L2 control signaling 2004 of the beam number 3.
  • the cell may notify the UE by including the symbol number information in the UCI together with the PUCCH resource transmission availability information.
  • the UE that performs transmission / reception with the beam 2002 with the beam number 3 receives the L1 / L2 control signaling 2004 with the subframe number 1 and receives the PUCCH resource transmission availability information and the symbol number.
  • the UE that has received the PUCCH resource transmission permission sets the PUCCH resource from the information on the PUCCH resource set in advance and the symbol number, and enables transmission.
  • a UE having UCI to transmit transmits PUCCH using the PUCCH resource.
  • PUCCH 2005 of beam # 3 is transmitted.
  • the UE that has received the PUCCH resource transmission disabled status cannot transmit the PUCCH.
  • the UE does not transmit PUCCH even if there is UCI to transmit.
  • the cell transmits / receives the beam 2002 with the beam number 1 in the next subframe number 2.
  • the cell includes the PUCCH resource transmission availability information for each UE in the UCI and notifies the UE communicating with the beam number 1 using the downlink L1 / L2 control signaling 2006 for the beam number 1.
  • the cell may notify the UE by including the symbol number information in the UCI together with the PUCCH resource transmission availability information.
  • the UE that performs transmission / reception with the beam 2002 with the beam number 1 receives the L1 / L2 control signaling 2006 with the subframe number 2 and receives the PUCCH resource transmission availability information and the symbol number.
  • the UE that has received the PUCCH resource transmission permission sets the PUCCH resource from the information on the PUCCH resource set in advance and the symbol number, and enables transmission.
  • a UE having UCI to transmit transmits PUCCH using the PUCCH resource.
  • PUCCH 2007 of beam # 1 is transmitted.
  • the UE that has received the PUCCH resource transmission disabled status cannot transmit the PUCCH.
  • the UE does not transmit PUCCH even if there is UCI to transmit.
  • the cell transmits / receives the beam 2002 with the beam number 0 in the next subframe number 3.
  • the cell notifies the UE that communicates with the beam number 0 by using the downlink L1 / L2 control signaling 2008 with the beam number 0, including the PUCCH resource transmission availability information for each UE in the UCI.
  • the cell may notify the UE by including the symbol number information in the UCI together with the PUCCH resource transmission availability information.
  • the UE that performs transmission / reception with the beam 2002 with the beam number 0 receives the L1 / L2 control signaling 2008 with the subframe number 3 and receives the PUCCH resource transmission availability information and the symbol number.
  • the UE that has received the PUCCH resource transmission permission sets the PUCCH resource from the information on the PUCCH resource set in advance and the symbol number, and enables transmission.
  • a UE having UCI to transmit transmits PUCCH using the PUCCH resource.
  • PUCCH 2009 of beam # 0 is transmitted.
  • the UE that has received the PUCCH resource transmission disabled status cannot transmit the PUCCH.
  • the UE does not transmit PUCCH even if there is UCI to transmit.
  • PUCCH transmission / reception can be performed in accordance with the timing of the beam transmitted / received by the cell.
  • the UE can determine whether or not PUCCH can be transmitted according to the PUCCH transmission availability information included in the L1 / L2 control signaling transmitted using the serving beam.
  • By associating the downlink control signal with the transmission of PUCCH it becomes possible to dynamically set the PUCCH resource based on cell determination.
  • FIG. 21 is a diagram illustrating an example of a PUCCH resource setting and SR transmission / reception sequence in the same subframe as a DL resource. Since the sequence shown in FIG. 21 includes the same steps as the sequence shown in FIG. 16, the same steps are denoted by the same step numbers, and common description is omitted.
  • step ST3001 the cell sets a PUCCH resource configuration other than timing for the UE.
  • the cell notifies the UE of information related to PUCCH resources other than timing.
  • Information on the PUCCH resource may be notified via a beam communicating with the UE.
  • RRC dedicated signaling is used for notification of information on the PUCCH resource.
  • Step ST3003 the UE that has received information related to the PUCCH resource other than the timing in Step ST3002 stores the PUCCH resource configuration.
  • step ST3004 the UE determines whether uplink data has been generated. If no uplink data is generated in step ST3004, the process returns to step ST3004 to repeat the determination of whether uplink data has been generated. If uplink data is generated in step ST3004, the base station moves to step ST3005.
  • step ST3005 the UE waits for SR transmission and stores uplink data in a buffer.
  • Step ST3006 the cell determines transmission / reception to / from the beam with which the UE communicates in an arbitrary subframe. Also, the cell determines that PUCCH transmission is possible for the UE in the subframe.
  • the cell notifies the UE of information indicating that PUCCH transmission is possible in the subframe.
  • the symbol number information is notified together with information indicating that PUCCH transmission is possible.
  • the cell includes these pieces of information in downlink L1 / L2 control information and notifies the UE by downlink L1 / L2 control signaling.
  • step ST3008 the UE that has received the information indicating that PUCCH transmission is possible in step ST3007 is the same as the received subframe using the information on the PUCCH resource for each UE stored in step ST3003 and the symbol number received in step ST3007.
  • the PUCCH resource configuration of the own UE is set.
  • Step ST3009 the UE transmits the standby SR to the cell via the serving beam with the SR PUCCH resource configuration set in Step ST3008.
  • the cell that has notified the UE of PUCCH transmission enabled information and symbol number information in Step ST3007 starts reception with the PUCCH resource configuration set for the UE in the same subframe in Step ST3010.
  • step ST3009 the cell that has started reception with the PUCCH resource configuration set for the UE in step ST3010 receives the SR transmitted from the UE.
  • the cell that has received the SR from the UE in this way performs processing for starting uplink communication. Thereby, uplink communication is started between the UE and the cell.
  • the PUCCH resource can be set during the beam sweeping operation in MBF.
  • the PUCCH can be transmitted / received by the beam with which the UE is communicating, and uplink communication from the UE to the cell can be performed. It becomes possible.
  • PUCCH transmission / reception can be performed in accordance with the timing of the beam transmitted / received by the cell.
  • the UE can determine whether or not PUCCH can be transmitted according to the PUCCH transmission availability information included in the L1 / L2 control signaling transmitted using the serving beam. By doing in this way, it becomes unnecessary to control the beam which transmits / receives PUCCH according to the PUCCH resource set with respect to UE. Therefore, it is possible to facilitate control for PUCCH resource setting to the UE and PUCCH transmission / reception.
  • the cell notifies the UE of whether or not PUCCH can be transmitted in the same subframe as the subframe constituting the DL resource of the beam with which the UE communicates.
  • the cell may notify the PUCCH transmission availability in the subframe after the offset from the subframe that has notified the PUCCH transmission availability, not the PUCCH transmission availability in the same subframe.
  • Offset information indicating an offset value may be provided from a subframe that has notified whether or not PUCCH transmission is possible.
  • the cell notifies the UE of the offset information together with the PUCCH transmission availability information.
  • the UE transmits the PUCCH in a subframe after the offset value from the subframe that has received the information indicating that PUCCH transmission is possible.
  • the UE does not transmit PUCCH in a subframe that is an offset value after the subframe.
  • the cell may be applied when the UE is aware of the next transmission / reception timing of the beam with which the UE is communicating. Or a cell is good to apply, when scheduling the next transmission-and-reception timing of the beam which UE is communicating. Alternatively, the cell may be applied when determining the next transmission / reception timing of the beam with which the UE is communicating when notifying the UE of the PUCCH transmission enable information.
  • the UE does not have to set the PUCCH in the same subframe as the subframe that has received the information indicating that PUCCH transmission is possible and does not transmit the PUCCCH. Therefore, even when processing related to PUCCH transmission such as demodulation, decoding, coding and modulation at the UE requires time, it is possible to transmit the PUCCH from the UE.
  • the UE may notify the cell in advance of the time or capability required for processing related to demodulation, decoding, coding, modulation, and the like. You may notify as UE capability information.
  • the cell may determine the offset value by using time or capability required for processing related to demodulation, decoding, coding, modulation, and the like notified from the UE.
  • the cell when the UE can perform the PUCCH transmission from the reception of PUCCH transmission availability to the PUCCH transmission within the same subframe, the cell notifies the UE with an offset of 0.
  • the offset information may be omitted.
  • the cell when the UE requires two subframes from reception of PUCCH transmission availability to transmission of PUCCH, the cell notifies the UE with an offset of 2. At this time, the cell may consider the communication status of other beams, and may set the offset after 2 and notify the UE.
  • one subframe is assigned to one beam. Instead of assigning all one subframe to only one beam, it may be assigned to a plurality of beams. For example, only a symbol to which a downlink L1 / L2 control signal of one subframe is mapped and a symbol in which a PUCCH resource is configured may be allocated to the same beam, and another symbol may be allocated to another beam. By doing so, the cell can further flexibly operate the beam, and the use efficiency of radio resources as the cell can be improved.
  • downlink L1 / L2 control signals of one beam but also downlink L1 / L2 control signals of a plurality of beams may be assigned to one subframe. You may allocate for every symbol. Also, not only PUCCH resources for one beam but also PUCCH resources for a plurality of beams may be allocated to one subframe. It may be assigned for each symbol.
  • the cell can receive PUCCH transmissions from UEs communicating with each beam in a plurality of beams in one subframe.
  • the symbols to which the L1 / L2 control signal may be mapped within one subframe may be limited.
  • a maximum value may be provided.
  • the UE may receive the possible symbols and determine whether there is an L1 / L2 control signal for the serving beam.
  • the maximum value may be notified in advance from the cell to the UE. You may alert
  • the communication opportunities in each beam increase, so that it is possible to shorten the SR transmission standby time in the UE. Therefore, it is possible to shorten the delay time from the generation of uplink data from the UE to the start of uplink communication.
  • the UE When L1 / L2 control signals of a plurality of beams are allocated to a plurality of symbols in one subframe, the UE receives a plurality of symbols instead of the first symbol.
  • the UE can receive the L1 / L2 control signal transmitted by the serving beam by receiving the number of symbols. However, if the number of symbols is fixed in advance, when a beam that does not require the L1 / L2 control signal is generated, the symbol is wasted.
  • the cell may notify information on the number of symbols used for each subframe and the L1 / L2 control signal.
  • the information may be information common to cells.
  • the information may be notified by being included in downlink L1 / L2 control information. It may be L1 / L2 control information specific to the UE. Or it is good also as L1 / L2 control information common to a cell. By using L1 / L2 control information common to cells, the amount of information can be reduced.
  • a physical channel for mapping information on the number of symbols used for the L1 / L2 control signal may be individually provided and notified to each subframe UE.
  • the physical channel may be mapped to the first symbol of the subframe.
  • the cell discloses that the information on the number of symbols used for the L1 / L2 control signal is notified every subframe, it may be periodically notified. It may be applied to a case where L1 / L2 control signals of a plurality of beams are periodically assigned to a plurality of symbols in one subframe.
  • the cell may notify the UE of the period information and the offset information that is the starting point in advance. You may alert
  • NR when all the beams in a cell cannot be configured at the same timing in the MBF, it is considered to perform beam sweeping continuously for all the beams in order to transmit and receive the control channel common to the cells.
  • a portion where all the beams are continuously subjected to beam sweeping is also referred to as a beam sweeping block.
  • the timing of the beam sweeping block may be excluded as the PUCCH resource timing.
  • the cell may not set the PUCCH resource. The PUCCH cannot be transmitted.
  • the UE does not set the PUCCH resource when the beam sweeping block timing and the PUCCH resource timing overlap.
  • PUCCH may not be transmitted. This may be determined in advance by a standard or the like.
  • the UE can recognize the beam sweeping block timing.
  • the beam sweeping block is a self-contained subframe.
  • uplink transmission is enabled.
  • the uplink transmission symbol may be assigned to the PUCCH.
  • the beam at the timing overlapping with the PUCCH transmission may be a beam other than the beam that requires the PUCCH transmission, instead of the beam that requires the PUCCH transmission.
  • an uplink transmission symbol of a beam that requires transmission of PUCCH in the beam sweeping block may be allocated to PUCCH. This may be determined in advance by a standard or the like.
  • a part of the symbols of the uplink beam sweeping block may be allocated to the PUCCH.
  • a beam at a timing overlapping with PUCCH transmission may be a beam other than a beam that requires PUCCH transmission, and may be another beam.
  • a part of symbols of the beam that needs to transmit the PUCCH in the uplink beam sweeping block may be allocated to the PUCCH. This may be determined in advance by a standard or the like.
  • Embodiment 3 In the second modification from the second embodiment to the second modification of the second embodiment, a method of allocating the PUCCH of each beam to a different resource is disclosed as a PUCCH transmission / reception method in MBF that requires beam sweeping. In the present embodiment, another method is disclosed as a PUCCH transmission / reception method in MBF that requires beam sweeping.
  • the cell prioritizes reception of PUCCH between beams.
  • the cell prioritizes PUCCH reception between the beams, and receives the PUCCH on the target beam according to the priority.
  • the cell may prioritize between UEs.
  • the cell may prioritize between beams with which the UE communicates using the priority of the UE. For example, priorities between beams are set according to the highest priority among UEs that communicate using the same beam.
  • Communication service type For example, a higher priority is set for services that require urgency.
  • Request delay time For example, a higher priority is set for a UE that requires a low delay time.
  • UE capability For example, the priority of a UE having a high UE capability is set high.
  • SR cycle For example, the priority of UE with a long SR cycle is set high.
  • Number of UEs per beam For example, the priority of a beam with a large number of UEs is set high.
  • Communication quality For example, the priority of a beam with good communication quality is set high.
  • the cell may prioritize the reception of the beam PUCCH in accordance with the above-described indicators.
  • the cell may prioritize at least one of beam transmission and reception in advance according to the above-described index.
  • the cell may prioritize reception of the PUCCH of the UE in advance according to the above-described index, and may prioritize the beams according to the priority of the UE.
  • the cell receives the PUCCH with the target beam according to the set priority. For example, when the priority of a beam with good communication quality is set high, a beam with good communication quality is set as a PUCCH reception target beam. For example, a beam in which a high priority UE exists is set as a PUCCH reception target beam.
  • the cell determines which beam is given priority for transmission / reception according to the set priority. Not only when colliding with the transmission timing of PUCCH of UE of another beam, but also when colliding with scheduling timing of transmission / reception with another beam may be used.
  • the cell receives PUCCH with a beam with which a UE with higher priority communicates, and does not receive PUCCH with a beam with which a UE with lower priority communicates.
  • a UE having a high priority at the timing transmits PUCCH to the cell.
  • a UE having a low priority at the timing transmits PUCCH to the cell, but the cell does not receive the PUCCH.
  • a UE with a low priority will transmit a PUCCH, but since the UE communicates with a beam different from the beam with which the UE communicates, the received signals do not collide in the cell, It doesn't matter.
  • the UE having a low priority order does not receive the PUCCH in the cell, and therefore transmits each time at the timing set for transmitting the PUCCH. However, this becomes useless transmission, which causes the problem that the power consumption of the UE increases and the uplink interference power increases.
  • Priority is set to the lowest priority of UE receiving BSR.
  • the cell sets the priority of the UE receiving the BSR to the lowest priority.
  • the cell finishes transmission of the uplink scheduling (uplink grant) for the BSR, the cell returns the priority of the UE.
  • a cell notifies PUCCH transmission availability information to a UE with low priority using a beam with which the UE communicates in a subframe with PUCCH resources.
  • the downlink L1 / L2 control signal of the beam with which the UE communicates is mapped to a subframe with a PUCCH resource, and information indicating whether or not PUCCH transmission is possible is included in the downlink L1 / L2 control information of the beam. It is good also as only PUCCH transmission impossibility information.
  • the resources for downlink L1 / L2 control signals may be in symbol units. One symbol may be used.
  • the UE receives a downlink L1 / L2 control signal of a beam with which the UE communicates in a subframe with a PUCCH resource, and determines whether or not PUCCH transmission is possible.
  • the UE does not transmit the PUCCH when receiving the transmission impossibility of the PUCCH.
  • the method disclosed in the second modification of the second embodiment may be applied.
  • FIGS. 22 and 23 are diagrams illustrating an example of an SR transmission / reception sequence when priority is given to PUCCH reception between beams. 22 and FIG. 23 are connected at the position of the boundary line BL1. The sequence shown in FIGS. 22 and 23 includes the same steps as the sequence shown in FIG. 19, so the same steps are denoted by the same step numbers and the common description is omitted.
  • FIG. 22 and FIG. 23 there are UEs with high priority (hereinafter may be referred to as “UE1”) and UEs with low priority (hereinafter may be referred to as “UE2”). It shows a case where a beam with which a UE having a higher communication is different from a beam with which a UE with a lower priority is communicating.
  • UE1 UEs with high priority
  • UE2 UEs with low priority
  • step ST2801 the cell sets a PUCCH resource configuration for each UE for UE1.
  • Step ST2801 the cell also sets the PUCCH resource configuration for each UE for UE2.
  • the cell notifies UE1 of information related to the PUCCH resource for each UE.
  • Information on the PUCCH resource may be notified via a beam communicating with UE1.
  • RRC dedicated signaling is used for notification of information on the PUCCH resource.
  • the cell notifies UE2 of information related to the PUCCH resource for each UE.
  • Information on the PUCCH resource may be notified via a beam communicating with UE2.
  • RRC dedicated signaling is used for notification of information on the PUCCH resource.
  • UE1 which received the information regarding the PUCCH resource for every UE in step ST3101 sets the PUCCH resource configuration in step ST3103.
  • Step ST3102 which received the information regarding the PUCCH resource for every UE in Step ST3102 sets the PUCCH resource configuration in Step ST3104.
  • step ST3105 UE1 determines whether or not uplink data has occurred. If no uplink data is generated in step ST3105, the process returns to step ST3105 to repeat the determination of whether uplink data has been generated. If uplink data is generated in step ST3105, the base station moves to step ST3106.
  • step ST3106 UE1 transmits SR to the cell via the serving beam with the configured SR PUCCH resource configuration.
  • step ST3107 the cell recognizes that a collision has occurred at the PUCCH resource timing between UE1 and UE2.
  • step ST3108 the cell determines reception of the PUCCH with a beam that communicates with the UE having a higher priority, here UE1, at the PUCCH resource timing. In other words, at the PUCCH resource timing, the cell determines not to receive the PUCCH with a beam that communicates with a UE having a low priority, here UE2.
  • Step ST3106 the cell receives the SR transmitted from the UE1 using the PUCCH resource set for the UE1.
  • the cell that has received the SR from UE1 starts uplink scheduling for the UE that transmitted the SR, that is, for UE1, in step ST2510A.
  • step ST2511A the cell transmits uplink scheduling information including uplink grant, specifically, uplink grant, to UE1.
  • UE1 which received the uplink grant in step ST2511A transmits a BSR (Buffer Status Report) to the cell using the uplink grant in step ST2512A. At this time, uplink data may be transmitted.
  • BSR Buffer Status Report
  • the cell that has received the BSR in step ST2512A performs uplink scheduling for the UE 1 according to the BSR.
  • step ST2513A the cell transmits an uplink grant to UE1.
  • UE1 which received the uplink grant by step ST2513A transmits uplink data to a cell using this uplink grant in step ST2514A.
  • Step ST2514A the cell receives the uplink data transmitted from UE1.
  • the cell performs processing for starting uplink communication for UE1 in steps ST2511A to ST2514A. Thereby, uplink communication is started between UE1 and a cell.
  • step ST3109 UE2 determines whether or not uplink data has occurred. If no uplink data is generated in step ST3109, the process returns to step ST3109 to repeat the determination of whether uplink data has been generated. If uplink data is generated in step ST3109, the base station moves to step ST3110.
  • step ST3110 UE2 transmits SR to the cell via the serving beam with the configured SR PUCCH resource configuration.
  • step ST3108 the cell decides reception of PUCCH with a beam communicating with UE1 at the PUCCH resource timing, and receives the SR transmitted from UE1 with the PUCCH resource set for UE1 in step ST3108. To do.
  • Step ST3110 the cell cannot receive the SR transmitted from the UE2 with the beam communicating with the UE2.
  • step ST3111 the cell determines whether or not it is receiving the BSR of UE1, which is a UE having a high priority. If it is determined in step ST3111 that no BSR is being received, the process returns to step ST3111 to determine again whether a BSR is being received. If a BSR is being received in step ST3111, the base station moves to step ST3112.
  • the cell is performing processing for scheduling resources for transmitting uplink data to UE1, and therefore determines that UE1 does not need to transmit SR. And in step ST3112, a cell sets the priority of UE1 to the lowest.
  • step ST3113 the cell recognizes that a collision has occurred again at the PUCCH resource timing between UE1 and UE2.
  • Step ST3114 the cell determines reception of the PUCCH with a beam communicating with the UE having a higher priority, here UE2, at the PUCCH resource timing. In other words, the cell determines not to receive the PUCCH with a beam communicating with the UE having a low priority, here UE1, at the PUCCH resource timing.
  • step ST3110 again uses the PUCCH resource timing in step ST3115 to set the SR to the cell via the serving beam in the configured PUCCH resource configuration for SR. Send to.
  • step ST3115 the cell receives the SR transmitted from UE2 using the PUCCH resource set for UE2.
  • the cell that has received the SR from UE2 starts uplink scheduling for the UE that transmitted the SR, that is, for UE2, in step ST2510A.
  • step ST2511B the cell transmits uplink grant to UE2, specifically uplink scheduling information including the uplink grant.
  • UE2 which received the uplink grant in step ST2511B transmits a BSR to the cell using the uplink grant in step ST2512B. At this time, uplink data may be transmitted.
  • the cell that has received the BSR in step ST2512B performs uplink scheduling for the UE 2 according to the BSR.
  • step ST2513B the cell transmits an uplink grant to UE2.
  • UE2 which received the uplink grant by step ST2513B transmits uplink data to a cell using this uplink grant in step ST2514B.
  • Step ST2514B the cell receives uplink data transmitted from UE2.
  • the cell performs processing for starting uplink communication for UE2 in steps ST2511B to ST2514B. As a result, uplink communication is started between the UE 2 and the cell.
  • the cell can receive the PUCCHs of those UEs.
  • Embodiment 4 FIG. In Embodiment 2 to Embodiment 3, it has been disclosed that a symbol is assigned as the minimum unit of resources to which PUCCH is assigned. As the number of beam sweeps increases, the number of symbols required for PUCCH resources increases. Therefore, when trying to configure PUCCH resources of a large number of beams in one subframe, there is a problem that the data resources are reduced and the communication speed is reduced. Alternatively, if PUCCH resources of a small number of beams are configured in one subframe, PUCCH resources are required over a plurality of subframes, and the generation interval of PUCCH resources for each beam increases. Therefore, there arises a problem that the delay time becomes large.
  • a plurality of symbols are formed within one symbol period, and PUCCH resources of a plurality of beams are time-division multiplexed.
  • the number of symbols configured in one symbol period may be 2 times n (n is a natural number). By doing so, the symbol period to which the PUCCH resource is allocated can be shortened, and the PUCCH resource of a large number of beams can be configured.
  • the shortened symbol may be referred to as a shortened symbol in the following description.
  • Reference 7 discloses that 4 symbols are configured within one symbol period, and the UE performs transmission by irradiating a beam with each symbol using the 4 symbols. It is disclosed that the cell receives transmissions from one UE with the 4 symbols.
  • each shortened symbol is allocated as a PUCCH resource for each UE.
  • the cell can receive PUCCH from a plurality of UEs communicating with different beams by receiving a plurality of shortened symbols configured within one symbol period.
  • the subcarrier interval is widened.
  • time division multiplexing is required.
  • transmission / reception can be performed only with a beam in a specific direction at a certain timing, it is possible to use frequency resources of the entire band at the timing. Therefore, even if the subcarrier interval is widened and the required frequency resource is increased, it is effective to shorten the one symbol interval and assign it to the PUCCHs of a plurality of beams.
  • symbols of 2n times are configured in one symbol period, but not only one symbol but also a plurality of symbols may be used.
  • a plurality of symbols may be configured to be 2 n times as many symbols within one symbol period.
  • the value of n may be the same or different for each symbol.
  • the cell notifies the UE of information related to the shortened symbol. Further, the cell may notify the UE of information related to the PUCCH resource. The cell may notify the UE by combining information on the shortened symbol and information on the PUCCH resource.
  • the cell may notify the UE of information on the shortened symbol together with information on the corresponding PUCCH resource or in information on the corresponding PUCCH resource.
  • PUCCH resources may be set for normal symbols that are not shortened symbols. In this case, information regarding PUCCH resources may be provided separately for normal symbols and for shortened symbols.
  • Embodiments 2 to 3 may be applied as appropriate.
  • the method disclosed in each embodiment or modification may be applied to a method for notifying information on shortened symbols or information on corresponding PUCC resources.
  • the UE since the UE transmits the PUCCH with a shortened symbol, the transmission time of the PUCCH can be shortened. Therefore, it is possible to reduce the power consumption of the UE and reduce the uplink interference power.
  • the cell may use a normal symbol and a shortened symbol.
  • a cell may be determined as a normal symbol or a shortened symbol depending on the number of beam sweeps. If the number of beam sweeps is large, a shortened symbol may be configured. In this way, when the number of beam sweeps is small, it is not necessary to use shortened symbols. Therefore, setting and processing in the cell and the UE can be facilitated.
  • a cell may determine whether to use a normal symbol or a shortened symbol depending on the number of UEs communicating with each beam.
  • a beam having a small number of UEs for communication configures a shortened symbol and assigns the shortened symbol.
  • a beam having a large number of communicating UEs is assigned a normal symbol.
  • the subcarrier interval is increased.
  • the number of UEs that can be multiplexed into one symbol is reduced compared to normal symbols. Therefore, it is effective to assign a normal symbol to a beam having a large number of UEs for communication.
  • the use efficiency of radio resources can be improved according to the beam configuration and the load for each beam by properly using the normal symbol and the shortened symbol.
  • Embodiment 4 Modification 1 In the fourth embodiment, a solution to the problem that the number of symbols required for the PUCCH resource increases due to an increase in the number of beam sweeps and the like has been disclosed.
  • This modification discloses another method for solving such a problem.
  • One symbol period is divided into a predetermined number.
  • a period divided into a predetermined number may be referred to as a divided period.
  • the UE multiplies the PUCCH data timing in one symbol by n and repeats the PUCCH data n times in one symbol. In this way, the UE transmits PUCCH.
  • the cell shortens the beam switching interval. The cell receives by switching the beam in a divided period in which one symbol period is 1 / n.
  • the UE transmits the PUCCH only for one symbol period using the beam communicated by the UE, but the cell receives the PUCCH using the beam only for the divided period.
  • the PUCCH transmitted from the UE with a plurality of beams is received for each beam during the divided period. By doing in this way, the cell can receive PUCCH transmitted by a plurality of beams in one symbol period in divided periods.
  • IFDMA Interleaved Frequency Domain Multiple Access
  • Reference Document 7 discloses a case where one UE repeats data and switches the beam with each data and transmits with one symbol.
  • the cell receives with the same beam in one symbol period.
  • one UE repeats data n times with one symbol, but does not switch the beam.
  • the cell receives and switches the beam in a divided period in which one symbol period is 1 / n.
  • the cell receives one of the data that has been repeated n times.
  • CP Cyclic Prefix
  • the UE transmits PUCCH data by repeating n times in one symbol period with symbols set in the PUCCH resource.
  • UEs of different beams each transmit data for PUCCH by repeating n times in one symbol period with symbols set in the PUCCH resource.
  • PUCCH data may be transmitted with the same symbol from UEs of different beams.
  • the cell receives by switching the beam in a divided period with 1 symbol period being 1 / n.
  • the cell receives one PUCCH data out of n repetitions transmitted from the UE of each beam. By doing so, it is possible to allocate more beams of PUCCH resources to one symbol. Further, DFT (Discrete Fourier Transform) -s (Spread) -OFDM can be used. Therefore, it is possible to reduce the uplink PAPR (Peak-to-Average Power Ratio) of the UE and reduce the power consumption of the UE.
  • DFT Discrete Fourier Transform
  • Spread Discrete Fourier Transform
  • PAPR Peak-to-Average Power Ratio
  • information related to the PUCCH resource disclosed in the second embodiment information related to the divided period is provided.
  • the cell notifies the UE of information related to the division period. Further, the cell may notify the UE of information related to the PUCCH resource. The cell may notify the UE by combining information on the division period and information on the PUCCH resource.
  • the cell may notify the UE of information on the division period together with information on the corresponding PUCCH resource or in information on the corresponding PUCCH resource.
  • PUCCH resources may be set for normal symbols that are not divided. In this case, information regarding PUCCH resources may be separately provided for normal symbols and for divided symbols.
  • Embodiments 2 to 3 may be applied as appropriate.
  • the method disclosed in each embodiment or modification may be applied to a method for notifying information on divided periods or information on corresponding PUCC resources.
  • the cell may use a normal symbol and a divided symbol.
  • the method disclosed in Embodiment 4 may be applied. This makes it possible to improve the use efficiency of radio resources according to the beam configuration and the load for each beam.
  • Embodiment 5 The cell that has received the SR transmits an uplink grant as a response signal to the SR.
  • 3GPP there is no discussion regarding the transmission timing of the uplink grant for the SR in MBF that requires beam sweeping.
  • the timing of each beam is limited. Therefore, it is necessary to match the uplink grant transmission timing for the SR between the cell and the UE.
  • the transmission / reception timing of the response signal to the SR is disclosed.
  • the timing at which the cell receiving the SR transmits the uplink grant to the UE is asynchronous.
  • the cell transmits an uplink grant for the SR to the UE at an arbitrary timing using the serving beam of the UE that transmitted the SR.
  • the UE receives the subframe L1 / L2 control signal after transmitting the SR.
  • the UE Even if the cell performs transmission / reception with another beam from the reception of SR to the transmission timing of the uplink grant, the UE receives the subframe L1 / L2 control signal. When the cell is performing transmission / reception with another beam, the UE cannot receive the L1 / L2 control signal, and therefore can determine that there is no uplink grant. By doing so, the UE can receive the uplink grant transmitted at an arbitrary timing.
  • the cell determines the timing for transmitting the uplink grant for the SR using the beam that has received the SR.
  • the determination index example of PUCCH resource allocation disclosed in Embodiment 2 may be applied.
  • the cell can determine the uplink grant transmission timing in accordance with the situation as described above. Even if asynchronous, the UE can receive an uplink grant for the transmitted SR and can start uplink communication.
  • the UE When the timing of transmitting the uplink grant for the SR is made asynchronous, the UE must receive the subframe L1 / L2 control signal after transmitting the SR.
  • the MBF that requires beam sweeping, there is a timing at which transmission / reception is performed with another beam, and thus there is a problem that it is useless for the UE to receive each subframe.
  • N indicates SR transmission timing.
  • L represents one value of 0 or more.
  • N and L may be expressed in schedule units. For example, it is a subframe unit, a slot unit, or a minislot unit.
  • the UE does not have to receive the subframe L1 / L2 control signal every time. Therefore, it is not necessary to perform a useless reception operation, and it is possible to suppress a reduction in power consumption of the UE.
  • L is a single value.
  • L may be a plurality of values. For example, as L1, L2, L3,...,
  • the cell sets a plurality of timings for the SR for the UE.
  • the maximum value of the number of L may be determined.
  • N may be the starting point for the period of K.
  • an offset value may be provided and the offset after N may be set as a starting point.
  • N Starting from N, it is set to the (L + 1) th subframe from the first subframe in the period of N + 0 to N + (K ⁇ 1) subframes.
  • the transmission timing of the uplink grant for the SR is set in the (N + 1) th and (N + 3) th subframes.
  • the cell can select the uplink grant transmission timing for the SR.
  • the cell does not need to transmit the uplink grant at all the set timings.
  • Other beams may be transmitted and received.
  • the cell can determine the uplink grant transmission timing for the SR according to the situation of each beam.
  • the UE receives the L1 / L2 control signal at a plurality of set timings.
  • the L value may be set separately for even and odd numbers.
  • L is an even number (may include 0)
  • uplink grant transmission timing for SR occurs in even-numbered subframes starting from N.
  • L is an odd number
  • uplink grant transmission timing for SR occurs in an odd-numbered subframe starting from N.
  • the cell selects the set N + L timing and transmits an uplink grant for the SR.
  • the cell does not need to transmit an uplink grant at all N + L timings.
  • Other beams may be transmitted and received.
  • the cell can determine the uplink grant transmission timing for the SR according to the situation of each beam.
  • UE receives L1 / L2 control signal at N + L timing according to L set to even or odd. By doing so, it is possible to reduce the power consumption of the UE by half compared to the case of asynchronous transmission, and it is possible to set transmission timing more suitable for the cell situation. Therefore, it is possible to improve the usage efficiency of radio resources as a cell.
  • L is set with an even number and an odd number, it may be set with a remainder of A as well.
  • A be an integer of 1 or greater.
  • transmission timing occurs at N + (A ⁇ (n ⁇ 1) + L).
  • the cell selects from the set timing and transmits an uplink grant for the SR.
  • the cell does not need to transmit the uplink grant at all the set timings.
  • Other beams may be transmitted and received.
  • the cell can determine the uplink grant transmission timing for the SR according to the situation of each beam.
  • the UE receives the L1 / L2 control signal at the set timing according to the set L. By doing so, it is possible to reduce the power consumption of the UE by half compared to the case of asynchronous transmission, and it is possible to set transmission timing more suitable for the cell situation. Therefore, it is possible to improve the usage efficiency of radio resources as a cell.
  • the setting is made at a timing starting from N, it may be set by a subframe number given as a cell. This is effective when the subframe number indicates which beam is used for transmission / reception.
  • the period during which the uplink grant for the SR is not transmitted may be set as L.
  • the cell transmits an uplink grant for the SR at an arbitrary timing after N + L.
  • the UE receives the L1 / L2 control signal at a timing after N + L.
  • the processing time by the cell is set as n, and L> n is set.
  • the cell does not transmit the uplink grant to the SR at the timing from N to N + L.
  • the cell transmits an uplink grant to the SR at an arbitrary timing after N + L.
  • the UE does not receive the L1 / L2 control signal at the timing from N to N + L.
  • the UE receives the L1 / L2 control signal at a timing after N + L.
  • the cell does not transmit an uplink grant to the SR in subframes from N to N + L.
  • the cell transmits an uplink grant for the SR in an arbitrary subframe after N + L.
  • the UE does not receive the L1 / L2 control signal in subframes from N to N + L.
  • the UE receives the L1 / L2 control signal in every subframe after N + L.
  • the UE does not have to receive L1 / L2 control signals of several subframes after transmitting the SR.
  • a reception period after N + L may be set. Let the reception period be W.
  • the cell transmits an uplink grant for the SR at an arbitrary timing in a period of W after N + L.
  • the UE receives the L1 / L2 control signal at the timing in the period W after N + L.
  • the UE does not have to receive the L1 / L2 control signal of several subframes after transmitting the SR, and furthermore, only during the period of W after N + L, It is only necessary to receive the L1 / L2 control signal. Therefore, the power consumption of the UE can be further reduced.
  • the timing at which downlink scheduling is performed for the UE is determined in advance, it shall be followed.
  • the L1 / L2 control signal is received at the timing when the downlink scheduling after the SR transmission is performed.
  • the method disclosed in Embodiment 1 may be applied as a method for setting the timing at which downlink scheduling is performed in advance for the UE.
  • SR response information a setting method and a notification method of information (hereinafter, also referred to as “SR response information”) set by the cell for the UE are disclosed.
  • the method of notifying the UE from the cell may be the same as the method of notifying the information on the PUCCH resource for each beam disclosed in the second embodiment.
  • the information for each cell may be notified by being included in the system information, or may be notified individually for each UE by being included in the RRC message.
  • the method of notifying the UE from the cell may be the same as the method of notifying information on the PUCCH resource for each UE disclosed in the second embodiment.
  • the information for each UE may be included in the RRC message and notified individually for each UE.
  • A is fixed as a system, and L is set for each UE.
  • K is set for each cell, and L is set for each beam. In this way, the cell can notify the UE of the timing at which the uplink grant for the SR occurs.
  • the cell and the UE derive the timing for transmitting the uplink grant for the SR using the UE identifier of the UE that transmitted the SR. For example, when the timing for transmitting the uplink grant for the SR is N + L, L is derived using the identifier of the UE that transmitted the SR. For example, when the UE identifier is an odd number, L is an odd number. If the UE identifier is even, L is an even number.
  • beam identifier may be used.
  • the cell and the UE derive the timing for transmitting the uplink grant for the SR using the identifier of the beam with which the UE that transmitted the SR is communicating. For example, when the timing for transmitting the uplink grant for the SR is N + L, L is derived using the identifier of the beam with which the UE that transmitted the SR is communicating. For example, when the beam identifier is an odd number, L is an odd number. If the beam identifier is even, L is even.
  • the cell does not have to set information regarding the SR response for the UE. Therefore, the signaling load can be reduced.
  • FIG. 24 is a diagram illustrating an example of an uplink grant transmission / reception timing setting sequence for the SR. Since the sequence shown in FIG. 24 includes the same steps as the sequence shown in FIG. 19, the same steps are denoted by the same step numbers, and common description is omitted.
  • step ST2801 the cell sets a PUCCH resource configuration for each UE for the UE.
  • step ST3201 the cell sets the SR response timing for the UE to the UE.
  • the cell notifies the UE of information related to the SR response together with information related to the PUCCH resource.
  • Information regarding the PUCCH resource and information regarding the SR response may be notified via a beam communicating with the UE.
  • RRC dedicated signaling is used for notification of information on the PUCCH resource and information on the SR response.
  • step ST3202 After performing the process of step ST3202, the cell performs the processes of step ST2804, step ST2805, and step ST2806.
  • step ST3202 which received the information regarding PUCCH resource and the information regarding SR response in step ST3202 performs the process of step ST2803. Then, UE performs the process of step ST2813.
  • Step ST2811 the UE determines whether or not uplink data has been generated. If uplink data has been generated, the UE moves to Step ST2812.
  • Step ST2812A the UE transmits the SR with the set SR PUCCH resource configuration to the cell via the serving beam.
  • step ST3203 the cell that has received the SR from the UE in step ST2812A performs uplink scheduling at the SR response timing set for the UE.
  • Step ST3204 the UE that has transmitted the SR in Step ST2812 derives the SR response timing using the information regarding the SR response, and performs reception at the SR response timing.
  • step ST2511 the cell notifies the UE of an uplink grant at the SR response timing set for the UE.
  • step ST2511 the UE acquires an uplink grant from the cell at the set SR response timing.
  • the UE that has received the uplink grant for the SR from the cell performs processing for starting uplink communication with the cell from step ST2512 to step ST2514. Thereby, uplink communication is started between the UE and the cell.
  • the cell can notify the UE of information related to the SR response, and the cell and the UE can recognize the uplink grant transmission timing for the SR. Is possible.
  • Embodiment 6 When the transmission of the SR fails, the cell does not transmit the uplink grant for the SR to the UE. Alternatively, even if the cell transmits an uplink grant to the UE, the radio wave propagation environment is bad and the UE may not be able to receive. In these cases, the UE cannot transmit the uplink grant because the SR transmission is unsuccessful, or the cell cannot communicate using the serving beam because the cell is communicating using another beam, and transmits the uplink grant for the SR. I can't tell if it's not.
  • the UE since the UE receives the uplink grant for the SR at the SR response timing, the UE continues to receive the L1 / L2 control signal.
  • 3GPP there is no discussion about non-delivery of SR in MBF that requires beam sweeping.
  • a timer is set to set a period for waiting for the upstream grant from the SR transmission.
  • the timer may be referred to as an “SR response waiting timer”.
  • the UE activates an SR response waiting timer by sending an SR, and resets the SR response waiting timer when receiving an uplink grant before the SR response waiting timer expires.
  • the UE cannot receive the uplink grant during the SR response waiting timer and the SR response waiting timer expires, the UE retransmits the SR.
  • the value of the SR response waiting timer may be determined in advance by a standard or the like, or may be set by a cell and notified to the UE.
  • the information notification method related to the SR response disclosed in the fifth embodiment may be applied.
  • the SR response waiting timer may be a time unit or a scheduling unit. Examples of scheduling units include subframes, slots, minislots, and the like.
  • the UE By doing so, it becomes possible for the UE to transmit an uplink grant for the SR within the SR response waiting timer period when the cell transmits the SR. As a result, when the SR response waiting timer expires, the UE can transmit the SR again because the transmission of the SR is not reached. Therefore, the UE cannot determine whether the cell is communicating with another beam and does not continue to receive the L1 / L2 control signal at the SR response timing.
  • the SR response timing may be set for each beam or UE. Therefore, the SR response timing may be different for each beam or UE. In this case, if the value of the SR response waiting timer is set as the period from the transmission of SR, a different value must be set for each beam or UE, resulting in a problem that the setting becomes complicated.
  • the SR response waiting timer is set by the number of times the uplink grant transmission timing occurs for the SR. For example, set X times.
  • the UE activates the SR response waiting timer by transmitting the SR, and resets the SR response waiting timer when the uplink grant is received within the X times of the transmission timing of the uplink grant for the SR.
  • the UE retransmits the SR when the uplink grant is not received within X times of the occurrence timing of the uplink grant transmission timing for the SR.
  • the SR response waiting timer is set by the number of repetitions of K. Also good. For example, set X times.
  • the UE activates the SR response waiting timer by SR transmission, and resets the SR response waiting timer when the uplink grant is received within the number of repetitions of K within X times.
  • the UE retransmits the SR when the uplink grant is not received within the number of repetitions of K within X times.
  • the SR is continuously retransmitted. For example, when uplink synchronization is lost due to a beam with which the UE communicates, the cell cannot receive SR transmission from the UE. If such a state continues, no matter how many times the UE retransmits the SR, the cell cannot receive the SR transmission from the UE, and the uplink grant for the SR is not transmitted. Therefore, the UE repeats retransmission of SR.
  • the maximum number of times for SR retransmission For example, set Y times. If the SR retransmission exceeds Y times, the UE stops the SR retransmission. By doing so, it is possible to avoid that the UE continues to retransmit the SR due to movement of the UE, deterioration of the radio wave propagation environment, and the like. Therefore, the power consumption of the UE can be reduced.
  • SR retransmission exceeds Y times, it may be started from RA processing.
  • Uplink synchronization is performed by RA processing.
  • the RA processing may use a beam sweeping block. By doing in this way, it becomes possible for UE to acquire uplink synchronization with the beam which UE communicates again.
  • the PUCCH resource setting, SR response setting, and SR non-delivery setting set for the UE may be reset. By resetting, the resources that have been set can be released to others, and the use efficiency of radio resources can be improved.
  • Embodiment 7 FIG.
  • the beam coverage in MBF is narrower than the cell coverage.
  • a cell may perform communication using another beam after the UE transmits an SR until an uplink grant for the SR is received. In this case, the period from the transmission of SR to the reception timing of the SR response signal is longer than when beam sweeping is unnecessary.
  • a cell constitutes one or more TRPs
  • a TRP constitutes one or more beams.
  • the movement between beams is mainly described, but the present invention can also be applied to the movement between TRPs.
  • a DU may constitute one or a plurality of beams. It is also applicable to movement between DUs in such a case. It may be applied to the movement between beams formed by the DU.
  • Embodiment 5 discloses a method for setting the timing at which the UE receives the SR response signal in the beam that has transmitted the SR. However, if movement between beams occurs after the UE transmits the SR, the UE moves from the beam that transmitted the SR, so the method of the fifth embodiment is simply applied. I can't. In such a case, it becomes a problem how to transmit and receive the SR response signal between the cell and the UE.
  • the UE When the movement between the beams occurs after the transmission of the SR, the UE receives the uplink grant for the transmitted SR with the beam of the movement destination. After receiving the SR from the UE, the cell transmits an uplink grant for the received SR to the UE using a beam to which the UE moves. By doing so, it is possible to transmit and receive the SR response signal with a beam having a good communication quality for the UE. Therefore, it is possible to reduce the reception error rate of the SR response signal in the UE.
  • the setting of the uplink grant transmission timing in the destination beam becomes a problem because the beam is different.
  • the setting of the movement source beam hereinafter sometimes referred to as “source beam (S-beam)”
  • the movement destination beam hereinafter also referred to as “target beam (T-beam)”.
  • the UE may follow the setting even after moving between the beams.
  • the SR transmission timing may be used as a starting point.
  • the uplink grant transmission timing for the SR may be set to be the same for a plurality of beams in the cell.
  • the transmission timing of the uplink grant for the SR may be based on the transmission timing of the SR.
  • the UE receives a plurality of beam physical control channels.
  • a beam group may be provided by such a plurality of beams.
  • the UE may set a beam movement destination as a beam group due to a rapid deterioration of the radio wave propagation state of the beam in communication.
  • the transmission timing of the uplink grant for the SR may be set to be the same in the beam group described above.
  • the UE can receive the SR response signal in the target beam after moving between the beams. Further, since the UE does not change the reception timing of the SR response signal even after the movement between the beams, it is possible to simplify the process of the movement between the beams.
  • the transmission timing of the SR response signal starts from the transmission timing of the SR
  • the SR starts from the timing of movement between the beams of the UE or the inter-beam movement instruction from the cell to the UE.
  • the timing of the response signal may be determined.
  • the SR transmission timing with the source beam can be made unnecessary with the target beam.
  • the timing of the inter-beam movement instruction is used as a starting point, there is no need to notify new information. Therefore, it is possible to simplify the processing required between the UE and the beam.
  • the cell sets the uplink grant transmission timing for the SR of all the beams or a plurality of beams in the cell in advance for the UE.
  • the cell sets the uplink grant transmission timing for the target beam or the SR for each UE of a plurality of beams in advance for the UE.
  • the multiple beam may be the beam group described above.
  • a group of a plurality of beams that may become target beams may be used.
  • the UE receives using the uplink grant transmission timing for the SR of the target beam after moving between the beams.
  • the cell transmits using the uplink grant transmission timing for the SR of the target beam after the UE moves between the beams.
  • the UE can receive the SR response signal in the target beam after moving between the beams.
  • the UE uses the transmission timing of the uplink grant for the SR of the target beam after receiving the movement instruction between the beams from the cell. May be received.
  • the cell may transmit using the uplink grant transmission timing for the SR of the target beam after transmitting a movement instruction between beams to the UE.
  • the SR transmission timing from the source beam may be used as the starting point.
  • the cell and the UE can specify the transmission timing of the uplink grant for the SR.
  • the UE can receive the SR response signal transmitted by the cell at the transmission timing.
  • the reception timing of the SR response signal with the target beam may end.
  • the cell transmits an uplink grant at the transmission timing of the SR response signal of the target beam, the UE cannot receive the uplink grant for the SR.
  • the UE when the UE moves between the beams, it follows the transmission timing of the uplink grant for the SR with the source beam.
  • the UE that has transmitted the SR receives the movement instruction before receiving the uplink grant for the SR, the UE starts with the transmission timing of the uplink grant set by the source beam from the SR transmission timing of the source beam as a starting point. Receive.
  • the cell When the cell instructs the UE that has transmitted the SR to move between beams before transmitting the uplink grant for the SR, the cell transmits the transmission timing of the uplink grant for the SR to the UE as the SR transmission timing for the source beam. Is transmitted at the uplink grant transmission timing set by the source beam. By doing so, even when the UE moves between beams, the timing of the SR response signal can be set to the transmission timing of the uplink grant for the SR with the source beam. The signal reception timing does not end, and the UE can receive the SR response signal with the target beam.
  • the transmission from the SR transmission to the uplink grant transmission timing for the SR follows the longer one.
  • the cell sets reception timings of SR response signals of all beams or a plurality of beams in the cell in advance for the UE.
  • the plurality of beams may be the beam group described above.
  • the UE When the UE that has transmitted the SR receives the movement instruction before receiving the uplink grant for the SR, the UE transmits the period from the transmission of the SR in the source beam to the reception timing of the uplink grant for the SR, and the target beam. The period from the transmission of the SR to the reception timing of the uplink grant for the SR is compared, and the reception timing of the uplink grant for the longer SR is selected and set, and reception is performed at the timing.
  • the cell transmits a movement instruction between beams before transmitting the uplink grant for the SR to the UE that transmitted the SR
  • the cell transmits the period from the transmission of the SR in the source beam to the transmission timing of the uplink grant for the SR
  • the target The period from the transmission of the SR by the beam to the transmission timing of the uplink grant for the SR is compared, and the transmission timing of the uplink grant for the longer SR is selected and set, and transmission is performed at the timing.
  • the SR response signal timing can be set to the uplink grant transmission timing for the longer SR, so the SR response signal before the UE moves between beams.
  • the UE can receive the SR response signal with the target beam.
  • the UE resets the timing of the SR response signal in the source beam when it moves between beams or receives an inter-beam movement instruction from the cell.
  • the UE receives at the timing of the SR response signal of the target beam, starting from a subframe of movement between beams or reception of an instruction to move between beams from a cell (N).
  • the cell transmits at the timing of the SR response signal in the target beam, starting from a subframe of UE movement between beams or transmission of an inter-beam movement instruction as a starting point (N).
  • the timing of the SR response signal can be set based on the fact that the UE has moved between the beams, the reception timing of the SR response signal at the target beam ends before the UE moves between the beams. In other words, the UE can receive the SR response signal using the target beam.
  • a cell sets the timing of the SR response signal in a target beam with the movement instruction
  • the cell sets the timing of the SR response signal in the target beam, transmits an inter-beam movement instruction to the UE, and notifies the timing of the SR response signal.
  • the cell resets the timing of the SR response signal in the source beam by transmission of the inter-beam movement instruction to the UE, and transmits at the timing of the SR response signal in the target beam.
  • the UE receives the inter-beam movement instruction from the cell and receives the timing of the SR response signal in the target beam. Upon reception of the inter-beam movement instruction from the cell, the UE resets the timing of the SR response signal in the source beam and receives it at the timing of the SR response signal in the target beam.
  • the cell may newly set the timing of the SR response signal after the UE moves to the target beam.
  • the SR transmission timing with the source beam can be made unnecessary with the target beam. Therefore, it is possible to simplify the processing required between the beams.
  • the UE resets the reception timing of the SR response signal in the source beam upon reception of the inter-beam movement instruction from the cell. After receiving the inter-beam movement instruction from the cell, the UE continuously receives the SR response signal with the target beam. For example, when the transmission timing of the SR response signal is in units of subframes, the UE receives the SR response signal with the target beam every subframe.
  • the cell may newly set the timing of the SR response signal to the UE after the UE moves to the target beam.
  • the cell does not notify the UE of the inter-beam movement instruction of the UE or does not notify the transmission timing of the SR response signal in the target beam in advance before the inter-beam movement. Get better. Therefore, the amount of information necessary for signaling can be reduced.
  • the UE receives the SR response signal reception timing in the source beam even after receiving the inter-beam movement instruction from the cell. After receiving the inter-beam movement instruction from the cell, the UE sets the transmission timing setting of the SR response signal in the source beam as the transmission timing setting of the SR response signal in the target beam.
  • the cell notifies the target beam of the timing setting of the SR response signal in the source beam after determining the movement of the beam to the UE and before reaching the transmission timing of the SR response signal in the next source beam. To do. This is effective when the source beam and the target beam are configured by different nodes.
  • the node constituting the source beam reaches the node constituting the target beam before the SR response signal is transmitted at the next source beam.
  • the timing setting of the SR response signal in the source beam is notified. This is effective when the source beam and the target beam are configured by different nodes and each node sets the timing of the SR response signal.
  • the cell may newly set the timing of the SR response signal to the UE after the UE moves to the target beam.
  • the SR response signal timing may be determined based on the SR transmission timing.
  • the cell sets the reception timing of the SR response signal for each UE with respect to the UE.
  • the UE receives the set SR response signal reception timing for each UE even after moving between beams or after receiving an inter-beam movement instruction from a cell.
  • the UE receives at the timing of the SR response signal for each UE, starting from the transmission timing of the SR before the movement between the beams or before receiving the inter-beam movement instruction from the cell.
  • the cell transmits at the transmission timing of the SR response signal set for each UE even after the UE moves between beams or transmits an inter-beam movement instruction.
  • the cell transmits at the timing of the SR response signal for each UE, starting from the reception timing of SR before the UE moves between the beams or before transmitting the inter-beam movement instruction.
  • the timing of the SR response signal is determined based on the timing of movement between the beams of the UE or the inter-beam movement instruction from the cell to the UE. Also good.
  • the UE receives at the timing of the SR response signal for each UE, starting from the reception timing of the movement between beams or the inter-beam movement instruction from the cell (N).
  • the cell transmits at the timing of the SR response signal for each UE starting from the transmission timing of the movement of the UE between the beams or the inter-beam movement instruction as a starting point (N).
  • the SR transmission timing with the source beam can be made unnecessary with the target beam. Therefore, it is possible to simplify the processing required between the beams.
  • a method in which the uplink grant transmission timing for the SR is set for each beam or for each UE for each beam may be applied.
  • the setting of the uplink grant transmission timing for the SR for each UE is effective when the timing used for the beam communicated by the UE is taken into consideration.
  • FIG. 25 and FIG. 26 are diagrams illustrating an example of a sequence for setting an uplink grant transmission / reception timing for an SR when movement between beams occurs after the transmission of the SR. 25 and FIG. 26 are connected at the position of the boundary line BL2.
  • the sequence shown in FIGS. 25 and 26 includes the same steps as the sequence shown in FIG. 24. Therefore, the same steps are denoted by the same step numbers and common description is omitted.
  • step ST2801 the cell sets a PUCCH resource configuration for each UE for the UE.
  • step ST3201 the cell sets the SR response timing for the UE to the UE.
  • the cell notifies the UE of information related to the SR response together with information related to the PUCCH resource.
  • Information regarding the PUCCH resource and information regarding the SR response may be notified via a beam communicating with the UE.
  • RRC dedicated signaling is used for notification of information on the PUCCH resource and information on the SR response.
  • the beam communicating with the UE is a source beam.
  • step ST3202 After performing the process of step ST3202, the cell performs the processes of step ST2804, step ST2805, and step ST2806.
  • step ST3202 which received the information regarding PUCCH resource and the information regarding SR response in step ST3202 performs the process of step ST2803. Then, UE performs the process of step ST2813.
  • Step ST2811 the UE determines whether or not uplink data has been generated. If uplink data has been generated, the UE moves to Step ST2812.
  • Step ST2812A the UE transmits the SR with the set SR PUCCH resource configuration to the cell via the serving beam.
  • the serving beam is a source beam.
  • step ST2812A which transmitted SR by step ST2812A starts reception with the SR response timing derived
  • step ST2812A the cell receives the SR from the UE.
  • the cell that has received the SR from the UE performs processing for performing uplink scheduling at the SR response timing set in step ST3201.
  • Step ST3301 the cell transmits downlink CSI-RS to the UE via the source beam.
  • Step ST3302 the UE that has received the downlink CSI-RS in Step ST3301 reports the CSI-RS measurement result to the cell via the source beam. Specifically, the UE reports the CSI-RS measurement result to the cell as CSI.
  • the cell may transmit CSI-RS with a plurality of beams.
  • the UE may notify the cell of CSI-RS measurement results of a plurality of beams.
  • the UE may derive a beam having better reception quality than the serving beam from the CSI-RS measurement result and notify the identifier of the beam. As a result, the amount of information can be reduced.
  • step ST3302 the cell that has acquired the CSI report from the UE determines to move the UE to the target beam in step ST3303.
  • Step ST3304 the cell determines whether or not it is possible to transmit an SR response to the UE at the SR response timing set by the source beam.
  • step ST3304 If it is determined in step ST3304 that the cell can transmit an SR response at the SR response timing, the mobile terminal makes a transition to step ST3305.
  • the cell notifies the UE of an instruction to move to the target beam.
  • the beam identifier of the target beam may be included as an instruction to move to the target beam.
  • L1 / L2 control signaling may be used for notification of the movement instruction.
  • MAC signaling may be used. By using the MAC signaling, the cell can notify the UE of the beam movement instruction with a lower delay than the notification by the RRC signaling. A change instruction to the SR response timing is not notified together with the movement instruction.
  • step ST3304 If it is determined in step ST3304 that the cell cannot transmit the SR response at the SR response timing, the cell moves to step ST3306.
  • step ST3306 the cell changes the setting to the SR response timing with the target beam for the UE.
  • Step ST3307 the cell notifies the UE of an instruction to move to the target beam and an instruction to change the SR response timing whose setting has been changed.
  • Information regarding the SR response in the target beam may be included as the SR response timing setting change instruction.
  • Step ST3308 the UE determines whether an instruction to change setting of SR response timing is received together with the movement instruction received from the cell.
  • Step ST3308 if the UE has not received the SR response timing setting change instruction, the UE moves to Step ST3309.
  • Step ST3309 the UE continues reception at the SR response timing in the source beam.
  • Step ST3308 when the UE receives an SR response timing setting change instruction, the UE moves to Step ST3310.
  • Step ST3310 the UE derives the SR response timing using the received information regarding the SR response, changes the setting to the SR response timing, and performs reception.
  • step ST3311 the cell performs uplink scheduling with the target beam at the SR response timing set for the UE.
  • step ST3312 the cell notifies the UE of the uplink grant through the target beam at the SR response timing set for the UE.
  • Step ST3312 the UE acquires an uplink grant from the cell via the target beam at the set SR response timing.
  • Step ST3313 the UE transmits a BSR (Buffer Status Report) to the cell via the target beam using the acquired uplink grant.
  • BSR Buffer Status Report
  • the cell that has received the BSR in Step ST3313 performs uplink scheduling for the UE according to the BSR.
  • Step ST3314 the cell notifies the UE of the uplink grant through the target beam.
  • the UE that has received the uplink grant for the SR from the cell transmits uplink data to the cell in step ST3315. Thereby, uplink communication is started between the UE and the cell via the target beam.
  • FIG. 27 and FIG. 28 are diagrams showing another example of the sequence for setting the transmission / reception timing of the uplink grant for the SR when the movement between the beams occurs after the transmission of the SR.
  • FIG. 27 and FIG. 28 are connected at the position of the boundary line BL3.
  • the sequence shown in FIGS. 27 and 28 includes the same steps as the sequence shown in FIG. 25. Therefore, the same steps are denoted by the same step numbers and common description is omitted.
  • step ST2801 the cell sets a PUCCH resource configuration for each UE for the UE.
  • step ST3201 the cell sets the SR response timing for the UE to the UE.
  • the cell notifies the UE of information related to the SR response together with information related to the PUCCH resource.
  • Information regarding the PUCCH resource and information regarding the SR response may be notified via a beam communicating with the UE.
  • RRC dedicated signaling is used for notification of information on the PUCCH resource and information on the SR response.
  • the beam communicating with the UE is a source beam.
  • step ST3202 After performing the process of step ST3202, the cell performs the processes of step ST2804, step ST2805, and step ST2806.
  • step ST3202 which received the information regarding PUCCH resource and the information regarding SR response in step ST3202 performs the process of step ST2803. Then, UE performs the process of step ST2813.
  • step ST2811 the UE determines whether or not uplink data has been generated. If uplink data has been generated, the UE moves to step ST2812A.
  • Step ST2812A the UE transmits the SR with the set SR PUCCH resource configuration to the cell via the serving beam.
  • the serving beam is a source beam.
  • step ST2812A which transmitted SR by step ST2812A starts reception with the SR response timing derived
  • step ST2812A the cell receives the SR from the UE.
  • the cell that has received the SR from the UE performs processing for performing uplink scheduling at the SR response timing set in step ST3201.
  • Step ST3301 the cell transmits downlink CSI-RS to the UE via the source beam.
  • Step ST3302 the UE that has received the downlink CSI-RS in Step ST3301 reports the CSI-RS measurement result to the cell via the source beam. Specifically, the UE reports the CSI-RS measurement result to the cell as CSI.
  • the cell may transmit CSI-RS with a plurality of beams.
  • the UE may notify the cell of CSI-RS measurement results of a plurality of beams.
  • the UE may derive a beam with better reception quality than the serving beam from the CSI-RS measurement result and notify the identifier of the beam. As a result, the amount of information can be reduced.
  • step ST3302 the cell that has acquired the CSI report from the UE determines to move the UE to the target beam in step ST3303.
  • step ST3305 the cell notifies the UE of an instruction to move to the target beam.
  • Step ST3403 the UE that has received the movement instruction in Step ST3305 resets the SR response timing in the source beam and sets reception in every subframe.
  • step ST3401 the cell that has transmitted the movement instruction to the UE in step ST3305 resets the SR response timing in the source beam set for the UE, and dynamically sets the SR response timing.
  • step ST3402 the cell performs uplink scheduling for the UE at an arbitrary timing.
  • step ST3312 the cell transmits an uplink grant to the UE.
  • the uplink grant is transmitted through the target beam.
  • Step ST3403 the UE set to receive in each subframe by receiving the movement instruction subsequently receives each subframe in the target beam.
  • the UE can receive the uplink grant transmitted from the cell in Step ST3312.
  • the UE that has received the uplink grant for the SR from the cell performs processing for starting uplink communication with the cell via the target beam in steps ST3313 to ST3315. Thereby, uplink communication is started between the UE and the cell.
  • the cell can perform uplink scheduling for the SR from the UE and transmit an uplink grant with a target beam at an arbitrary timing. Further, even when the uplink grant is transmitted at an arbitrary timing, the UE can receive the uplink grant. The cell can perform uplink scheduling for the SR at an appropriate timing according to the load status of each beam and the radio wave propagation status.
  • a source beam transmission / reception point hereinafter also referred to as “S-TRP”
  • a target beam transmission / reception point hereinafter also referred to as “T-TRP”
  • the radio wave propagation time from the UE to the S-TRP is different from the radio wave propagation time from the UE to the T-TRP.
  • TimingTAAdvance: TA timing advance
  • a similar problem occurs with respect to SR retransmission from the UE using the target beam. Even if the UE repeats the retransmission of the SR with the target beam many times, the cell cannot receive the retransmission of the SR and cannot transmit the uplink grant to the UE. This causes a problem that the UE cannot start uplink transmission.
  • the cell instructs the UE to start the RA processing for each UE in the target beam together with the movement instruction.
  • the UE-specific RA process uses a UE-specific configuration for the RA preamble. Therefore, it is possible to reliably perform the RA process without causing a collision.
  • the UE-specific RA preamble configuration includes radio resources and a sequence of signals used for the preamble.
  • the cell notifies the UE of information related to the RA preamble in the target beam.
  • the cell may notify the UE of the information included in signaling of a movement instruction in the source beam. When this information is notified, UE-specific RA processing may be activated.
  • the UE When the UE receives information on the RA preamble in the target beam together with the movement instruction, the UE performs the RA processing for each UE in the target beam.
  • the UE can acquire the timing advance in the target beam from the cell by this RA processing.
  • the UE that has acquired the timing advance in the target beam performs uplink transmission using the timing advance.
  • the cell can receive uplink transmission from the UE in the target beam.
  • the SR is retransmitted using the timing advance. In this way, the cell can receive the retransmission of the SR from the UE in the target beam.
  • the cell may activate the UE-specific RA process for the UE. For example, when the positions of S-TRP and T-TRP are different, the UE-specific RA process is activated for the UE. When the positions of the S-TRP and the T-TRP are the same, or when the source beam and the target beam are configured by the same TRP, the UE-specific RA processing is not activated for the UE.
  • the radio wave propagation time from the UE is almost equal. Therefore, it is not necessary to reset the timing advance in the target beam, and it is preferable to continue using the timing advance in the source beam.
  • TAG Tuiming Advance Group
  • the TAG has been set for each cell.
  • NR it is considered that one or a plurality of TRPs are configured in a cell and the TRP configures one or a plurality of beams.
  • the timing advance is different as described above.
  • the cell may determine whether or not the target beam is in the same TAG as the source beam, and may activate UE-specific RA processing for the UE. If the target beam is in the same TAG as the source beam, the cell does not initiate UE specific RA processing for the UE. If the target beam is in a different TAG than the source beam, the cell initiates UE-specific RA processing for the UE. By doing in this way, the effect similar to this Embodiment can be acquired.
  • the cell activates the RA process for the UE, it may be determined that the UE activates the RA process.
  • the cell notifies the UE of TAG setting information for each beam or TRP in advance.
  • RRC signaling may be used as the TAG setting information notification method.
  • MAC signaling may be used.
  • the UE that has received the movement instruction between the beams from the cell determines whether the target beam is in the same TAG as the source beam using the TAG setting information from the identifier of the target beam included in the movement instruction. If the target beam is in the same TAG as the source beam, the UE does not initiate UE-specific RA processing. If the target beam is in a different TAG than the source beam, the UE initiates RA processing. Information on the RA preamble in the target beam may be notified from the cell to the UE together with the movement instruction.
  • the UE may perform RA processing that is not UE-specific.
  • the cell does not have to notify the UE of information related to the RA preamble in the target beam together with the movement instruction.
  • the UE may use information regarding the RA preamble set for each cell or beam for the RA processing.
  • the information may be determined in advance by a standard or the like, or may be notified in advance from the cell to the UE.
  • RRC signaling may be used as a method for reporting information related to the RA preamble. By doing in this way, it becomes possible for UE to start RA process.
  • the UE that has activated the RA process with the target beam retransmits the SR with the target beam using the timing advance acquired by the RA process.
  • a UE that does not activate RA processing with the target beam continues to use timing advance with the source beam and retransmits SR with the target beam.
  • Such a method makes it possible to perform further SR retransmission using the target beam even if SR transmission using the source beam and one or more SR retransmissions are not achieved.
  • the maximum number of retransmissions of SR may be reset by an instruction to move between beams.
  • the first SR retransmission with the target beam may be used as the initial SR retransmission or the initial SR transmission, and the SR retransmission may be performed again up to the maximum number of SR retransmissions. By doing so, it is possible to sufficiently provide an SR retransmission opportunity with the target beam. Therefore, SR transmission failure can be reduced.
  • the maximum number of SR retransmissions may be reset only for the UE that has activated RA processing with the target beam.
  • the first SR retransmission with the target beam may be used as the initial SR retransmission or the initial SR transmission, and the SR retransmission may be performed again up to the maximum number of SR retransmissions.
  • the SR process may be reset.
  • the UE may start the SR process after starting the RA process. It is good to start from the setting of the PUCCH resource in the target beam. At this time, information on the same PUCCH resource as that of the source beam may be omitted. By doing so, it is possible to start SR processing with target beams having different TAs.
  • Embodiment 8 FIG. In NR, analog beam forming and hybrid beam forming are being studied. A plurality of beams are formed in one cell, and coverage is configured for each beam. Therefore, the beam coverage is narrower than the cell coverage.
  • the beam coverage is not properly formed, there is a problem that communication is likely to be disconnected due to movement of the UE between the beams.
  • the reception power is reduced depending on the point, and there is a problem that a coverage hole is generated.
  • LTE supports MDT (Minimization of Drive Test) as a coverage evaluation function by UE (3GPP TS 37.320 V13.1.0 (hereinafter referred to as “Reference 8”), 3GPP TS 36.331 V14. 0.0 (referred to as “Reference 5” hereinafter) and Non-Patent Document 1).
  • Reference 8 3GPP TS 37.320 V13.1.0
  • Reference 5 3GPP TS 36.331 V14. 0.0
  • Non-Patent Document 1 Non-Patent Document 1
  • Conventional MDT is a function that allows a UE to measure, record, and report how much received power can be obtained from a cell at a geographical point in order to evaluate how the cell forms coverage.
  • a cell is used to form coverage of a cell by obtaining a report of received power from one or more cells at a measurement point from the UE. As a result, it is possible to form a coverage that reduces a zone where communication is disconnected due to, for example, a handover failure.
  • a TRP identifier may be introduced.
  • a combination of the TRP identifier and the beam identifier may be introduced. In the following description, such a method may be referred to as MDT for each beam.
  • the UE puts the beam identifier at the time of measurement in the log where the measurement results are recorded. You may put the identifier of the beam at the time of a measurement in the measurement result for every cell in conventional MDT.
  • An RS (reference signal) (hereinafter also referred to as “BRS”) transmitted for each beam is associated with a beam identifier.
  • the beam identifier may be a beam number, for example.
  • the UE receives the BRS transmitted for each beam and obtains the beam identifier.
  • the UE records the cell identifier, information on the measurement point, and the measurement result of the received power at the measurement point in a log.
  • the identifier of the beam receiving at the measurement point is added to this log.
  • the received power of BRS may be measured as the received power at the measurement point.
  • Recording of the cell identifier, information on the measurement point, and the measurement result of the received power or reception quality at the measurement point in the log is performed by conventional MDT.
  • the UE adds the identifier of the beam received at the measurement point to the log to be recorded, and reports it to the cell. In this way, the cell can recognize which beam the UE can receive from the measurement point, and can determine how the beam coverage is formed.
  • the UE measures the received power for each beam and records the measurement results in a log.
  • the UE notifies the cell of the log.
  • the UE records the measurement result in a log in association with the measured beam identifier.
  • the beam identifier may be derived by receiving a beam-specific BRS, as described above.
  • the UE records an identifier for each beam, information on the measurement point, and a measurement result of reception power (or reception quality) for each beam at the measurement point in a log.
  • the number of beams to be measured may be one or more. Further, the beam to be measured is not limited to the serving beam. Beams to be measured may include other beams in the same TRP, other beams in the same cell, beams in other TRPs, beams in other cells.
  • the beam measured by the UE may be determined by the cell and notified from the cell to the UE. Or it is good also as a beam which UE can measure.
  • a maximum value may be set for the number of beams that the UE records in the log.
  • a maximum value for each cell may be provided. Or you may provide the maximum value for every TRP. Alternatively, a maximum value for each frequency may be provided. As a result, when the number of measurable beams becomes large, the number of beams to be recorded in the log can be limited, so that an increase in the recording capacity of the UE can be suppressed.
  • These maximum numbers may be determined in advance by the standard, or may be notified from the cell to the UE. The maximum number may be notified using RRC dedicated signaling.
  • Synchronization signal (SS).
  • CSI-RS Channel Status Information-RS
  • the SS of (1) can be used regardless of the RRC connection state of the UE.
  • the UE can measure the SS in both the RRC_Idle state and the RRC_Connected state. It may be performed as a RRM (Radio Resource Management) measurement.
  • RRM Radio Resource Management
  • SS transmits a signal common to all beams in a cell by each beam.
  • the UE may store the SS measurement result for each beam in association with the identifier of the beam for which the SS has been measured in a log.
  • the BRS (2) can be used regardless of the RRC connection state of the UE.
  • the UE can measure the BRS in either the RRC_Idle state or the RRC_Connected state. It may be performed as an RRM measurement. Alternatively, it may be performed as an RLC measurement or a PHY measurement. In NR, it is considered that a BSR is transmitted for each beam.
  • the UE may store the BSR measurement result for each beam in the log in association with the identifier of the beam for which the BSR is measured.
  • the DMRS (3) can be used by the UE in an RRC connection state.
  • DMRS can be measured in the RRC_Connected state. It may be performed as an RLC measurement. Alternatively, it may be performed as a PHY measurement.
  • DMRS is transmitted for demodulation together with downlink data or downlink control signal of UE.
  • the UE may store the DMRS measurement result and the identifier of the beam that has measured the DMRS in a log in association with each other.
  • the CSI-RS (4) can be used by the UE in an RRC connection state.
  • CSI-RS can be measured in the RRC_Connected state. It may be performed as an RLC measurement. Alternatively, it may be performed as a PHY measurement. In NR, it is considered that a CSI-RS for each beam or antenna is transmitted for channel state evaluation of the beam.
  • the UE may store the CSI-RS measurement result and the identifier of the beam from which the CSI-RS is measured in a log.
  • the UE may measure the reception power of the single beam and record the measurement result in a log. Even in this case, the above-described method can be applied as appropriate.
  • the reception power of the RS transmitted as a single beam may be measured. Further, the above (1) to (4) may be combined.
  • a multi-beam is configured in the UE, but a single beam may be configured in the measurement of the UE.
  • the UE measures the received power for each beam formed by the cell with a single beam and records the result in a log. It is possible to eliminate the influence of the beam formed by the UE from the measurement result of the received power for each beam formed by the cell.
  • the measurement result with multiple beams may be converted into the measurement result with single beam using a predetermined conversion method.
  • Multi-beam measurement may be performed by the UE performing beam sweeping.
  • a predetermined conversion method may be statically determined by a standard or the like. As a result, an increase in signaling required for notification of the conversion method can be avoided, and conversion is facilitated.
  • the UE may be notified semi-statically or dynamically. For example, it is effective when the number of multi-beams and the correspondence with single beams are changed quasi-statically or dynamically.
  • a plurality of conversion methods may be determined in advance, an indication indicating each method may be provided, and the cell may notify the UE of the indication. . Thereby, the amount of information to be signaled can be reduced.
  • RRM measurement was performed by RRM measurement.
  • the beam measurement is not an RRM measurement but an RLC measurement or a PHY measurement.
  • RLC measurement or PHY measurement may be used for measurement of received power for each beam. This eliminates the need for RRM processing for beam measurement.
  • Disclose the method of measuring the received power for each beam and recording to the log.
  • a threshold is set for the measurement result of received power. For example, when it is larger than the threshold value, the measurement result is recorded in a log, and when it is less than the threshold value, the measurement result is not recorded in the log.
  • the cell may notify the UE of preset conditions.
  • the notification may be included in a message notifying the MDT setting.
  • the received power may be measured periodically and the measurement result recorded in a log.
  • the cell may notify the UE of a preset period.
  • the notification may be included in a message notifying the MDT setting.
  • the cycle may be a measurement cycle for MDT.
  • the cycle may be set according to the DRX operation period (active period). By adjusting to the active period, it is not necessary to perform a receiving operation for measuring the received power during the inactive period during DRX. Therefore, it is possible to reduce the power consumption of the UE.
  • the cell When in the RRC_Idle state, the cell may notify the UE of a report request for the MDT result.
  • the UE that has received the request notifies the log.
  • RRC signaling may be used for these notifications.
  • the existing UE information procedure may be used in LTE for the MDT result report request and the MDT result report.
  • a UE information request (UE Information Request) is used for the MDT result report request
  • a UE information response (UE Information Response) is used for the MDT result report. Accordingly, when the method disclosed in the present embodiment is applied to LTE, it is not necessary to separately provide signaling, which is effective.
  • the cell sets the UE to perform a measurement report. You may set the measurement report of a MDT result.
  • the UE that has received the measurement report setting notifies the cell of the measurement report including a log according to the setting.
  • the cell configures the UE to perform CSI reporting. You may set the CSI report of a MDT result. The UE that has received the setting of the CSI report notifies the cell including the log in the CSI report according to the setting. This is effective when logging CSI-RS measurement results.
  • a new message may be provided and notified.
  • the cell sets the log report with a message requesting the UE to report the log.
  • the UE that has received the setting of the log report request notifies the cell of the log report message including the log according to the setting.
  • RRC signaling may be used for notification of these new messages.
  • the cell can recognize how much beam is received from which beam at the measurement point of the UE. It is possible to determine with high accuracy how the beam coverage is formed. As a result, it is possible to form a coverage that reduces a zone where communication is disconnected due to, for example, a handover failure.
  • CN can request MDT from eNB.
  • the CN may request the MDT for each beam or the MDT for each TRP from the gNB.
  • CN notifies gNB of a message requesting MDT for each beam or TRP. Notification may be performed using an interface set between CN and gNB in 5G.
  • a conventional MDT request message may be used.
  • the conventional MDT request message is “Trace Start”, and S1 signaling is used.
  • S1 signaling is used.
  • notification is made using an interface set between CN and gNB in 5G. Good.
  • the CN notifies the eNB including the MDT configuration in the “Trace Start” message.
  • the eNB that has received the MDT configuration with the “Trace Start” message instructs the cell to cause the UE to execute MDT.
  • the setting information of the MDT area is “CHOICE Area Scope of MDT”. Conventionally, only the setting in the cell or the tracking area can be performed.
  • a TRP setting may be added. For example, it is possible to set information indicating whether to perform MDT for each beam or information indicating whether to perform MDT for each TRP. Further, the beam identifier or TRP identifier set by MDT may be settable.
  • the CN can cause the gNB to execute MDT for each beam or MDT for each TRP.
  • a signal for measuring the received power for each beam, and predetermined conditions and thresholds may be set.
  • the setting information such as the measurement signal is “CHOICE MDT Mode”. It is preferable to newly add the above-mentioned signal, predetermined conditions and threshold values.
  • a signal for measuring the received power for each beam it is possible to set information indicating which signal to use, information indicating a predetermined condition for recording the measurement result of received power in a log, or information indicating a threshold And
  • CN can set what kind of signal is measured in MDT for each beam or MDT for each TRP, and logs are acquired under what conditions for gNB. It becomes.
  • Embodiment 9 FIG.
  • a data block before channel coding that is, a transport block
  • code blocks having a predetermined size or less determined in advance by the standard and coding is performed for each code block.
  • NR it is expected that the size of the transport block increases due to the widening of the use frequency, and as a result, the number of code blocks increases.
  • CRC bits are provided for each code block and for the entire transport block.
  • the receiving side feeds back the code block number that could not be decoded correctly, and the transmitting side performs HARQ retransmission of only the fed back code block. It has been proposed to perform HARQ retransmission efficiently. Further, it has been proposed that the number of bits of the feedback is set to each UE semi-statically using control signaling from gNB or dynamically using control signaling according to the transport block size.
  • bundling that is, grouping
  • 3GPP R1-1161207 3GPP R1-1161207
  • the receiving side feeds back a bundling number including a code block that cannot be correctly decoded.
  • gNB determines the predetermined number.
  • FIG. 29 is a diagram for explaining a code block reception error due to a URLLC interrupt.
  • one transport block is transmitted in one subframe.
  • the transport block is divided into code blocks (hereinafter sometimes referred to as “CB”) # 1 to # 19, and mapped in order from the first symbol in one subframe.
  • CB code blocks
  • the CB mapped to each symbol differs depending on the symbol. For example, as shown in FIG. 29, if a URLLC interrupt occurs in the fourth symbol, all of the original CB # 9 and CB # 10 cannot be transmitted, and only a part of CB # 11 transmits. I can't. At this time, a total of three CBs, CB # 9 to CB # 11, cause reception errors. On the other hand, since a total of four CBs of CB # 11 to CB # 14 are mapped to the fifth symbol, if a URLLC interrupt is input to the fifth symbol, the four CBs will result in a reception error. .
  • the grouping of the code blocks in the transport block may be performed by determining the maximum number of code blocks per one code block group (hereinafter sometimes referred to as “Code Block Group: CBG”).
  • CBG Code Block Group
  • the number of CBGs may be determined using the maximum number of code blocks per CBG. For example, the value obtained by dividing the number of code blocks by the maximum number of code blocks per CBG and rounding up the fractional part may be used as the number of CBGs.
  • the HARQ feedback in the present embodiment is different from the ARQ in RLC in that the code blocks in which a reception error has occurred are grouped and fed back to the transmission side.
  • the allocation of the number of code blocks to each CBG may be grouped into, for example, a CBG having the maximum number of code blocks and a CBG having a remaining number of code blocks.
  • a CBG having the remaining number of code blocks may include a leading code block or a trailing code block.
  • the number of code blocks is 50 and the maximum number of code blocks per CBG is 8, the number of CBGs is 7.
  • the number of code blocks assigned to each CBG is 8 code blocks for 6 CBGs and 2 code blocks for the remaining 1 CBG.
  • the number of code blocks in each CBG may be equalized.
  • the CBG having the maximum number of code blocks may be arranged at the beginning or at the end.
  • one CBG has 8 code blocks and the remaining 6 CBGs have 7 code blocks. By doing so, it is possible to suppress a deviation between CBGs in the number of wasted code block retransmissions.
  • the number of CBGs may be determined.
  • the maximum number of code blocks per CBG may be determined using the number of CBGs. For example, the value obtained by dividing the number of code blocks by the number of CBGs and rounding up the decimal part may be used as the maximum number of code blocks per CBG. In this way, the number of bits required for feedback of one CBG can be made constant.
  • code blocks may be allocated in the same manner as in the grouping of code blocks in which the maximum number of code blocks per CBG is determined.
  • the CBG having the maximum number of code blocks and the CBG having the remaining number of code blocks may be grouped.
  • a CBG having the remaining number of code blocks may include a leading code block or a trailing code block.
  • the maximum number of code blocks per CBG is 7.
  • the number of code blocks assigned to each CBG is 7 code blocks for 7 CBGs and 1 code block for the remaining 1 CBG.
  • the number of code blocks in each CBG may be equalized.
  • 7 code blocks are allocated to 2 CBGs, and 6 code blocks are allocated to the remaining 6 CBGs.
  • a default value of the number of CBGs or the maximum number of code blocks per CBG may be provided.
  • a default setting may be provided for the CBG arrangement.
  • the default value for the number of CBGs may be 1.
  • the maximum number of code blocks per CBG the number of code blocks in the transport block may be the same.
  • the CBG having the maximum number of code blocks may be arranged at the head, or the CBG having the smallest number of code blocks may be arranged at the head.
  • the method of grouping CBGs may be determined by standards. For example, it may be a fixed value. As an example of the fixed value, for example, the number of CBGs may be fixed at 16. As another example determined by the standard, the maximum code block number that can be transmitted or received by the UE may be used. The maximum transport block size that can be transmitted or received by the UE may be used, or the UE category may be used.
  • a propagation environment may be used.
  • CQI / CSI may be used as the propagation environment.
  • the maximum number of code blocks per CBG may be reduced. By doing so, it is possible to reduce overhead due to retransmission of a code block that has been correctly received in the CBG with respect to feedback of a CBG that has caused a reception error.
  • a reception error rate may be used. For example, when the reception error rate is high, by increasing the maximum number of code blocks per CBG, it is possible to perform feedback to the transmission side of a CBG that has caused a reception error with a small number of bits.
  • the gNB may determine the CBG grouping method. Information necessary for the gNB to perform grouping of CBGs may be the same as that determined by the standard.
  • gNB may be determined using the number of bits that can be used for HARQ feedback to the UE.
  • the number of bits may be the same as the number of CBGs, and Ack / Nack information may be fed back for each CBG.
  • the number of bits is 4, and 1 is associated with a CBG having a reception error and 0 is associated with a CBG without a reception error, if there is a reception error in a code block belonging to CBG # 3, the gNB transmits to the UE.
  • the bit string to be fed back may be “0010”.
  • a combination of CBGs having a reception error may be associated with a value indicated by the bit string.
  • CBG # 1 when there is no reception error, a value of 0, CBG # 1 only, CBG # 2 only, CBG # 3 only, and CBG # 4 only receive a value of 1, 2, 3, and 4, respectively.
  • # 2 when receiving a reception error, 5 when CBG # 1 and # 3 are receiving errors, and 6 when CBG # 1, # 2, and # 3 are receiving errors. 11, CBG # 1, # 2, # 4 may be associated with value 12, and CBG # 1, # 2, and # 4 may be associated with value 12, and all four CBGs may be associated with reception error.
  • the UE may obtain a code block belonging to the CBG that has become unreceivable using the number of bits of HARQ feedback and the value of the bit string. Accordingly, in uplink communication, it is not necessary to notify the UE of information necessary for grouping CBGs from the gNB, so that the amount of signaling can be reduced. Furthermore, even if the number of CBGs including code blocks that cause reception errors increases, the number of bits fed back to the UE can be kept constant without increasing.
  • the method of grouping CBGs may be determined using the number of bits that the UE can use for HARQ feedback for gNB. For example, as described above, the number of bits that the UE can use for HARQ feedback may be determined. As a result, the same effects as described above can be obtained in downlink communication.
  • the following five (1) to (5) are disclosed as specific examples of means for notifying the UE of the GBG grouping method from the gNB.
  • Control signaling for each UE For example, RRC dedicated signaling.
  • each UE is notified semi-statically, and therefore, setting suitable for the individual UE situation can be performed with less signaling.
  • the maximum number of code blocks per CBG may be used as the content notified from the gNB to the UE.
  • the CBG number may be used.
  • an identifier representing a method for allocating code blocks to CBGs may be notified.
  • the identifier is, for example, grouped into a CBG having the maximum number of code blocks and a CBG having a surplus number of code blocks, whether the number of code blocks per CBG is allocated equally, and each of the two It may represent whether the CBG having the maximum number of code blocks is arranged at the head or at the tail.
  • Ack may be 1 bit and Nack may be a plurality of bits.
  • the plurality of bits may be used to indicate information on the CBG that has caused the reception error. This makes it possible to put other information using the surplus bits during Ack transmission.
  • PUCCH For transmission of HARQ feedback from the UE to the gNB for downlink communication, for example, PUCCH may be used.
  • PUCCH for example, HARQ feedback may be transmitted using physical resources in the frequency direction.
  • MAC control information may be used for transmitting the feedback. By using the MAC control information, multi-level modulation can be performed, so that transmission can be performed with few physical resources.
  • the gNB may notify the UE of a grant for sending the feedback.
  • the feedback may be transmitted using a newly provided channel.
  • HARQ feedback may be performed in the same manner as transmission of uplink user data.
  • L1 / L2 signaling may be used for transmission of HARQ feedback from the UE to the gNB for uplink communication.
  • a configuration of EPDCCH Enhanced Physical Downlink Control Channel
  • NG CBG information may be placed somewhere in the same subframe, or MAC control information may be used.
  • MAC control information By using the MAC control information, multi-level modulation becomes possible, so that more bits of information can be fed back.
  • HARQ feedback may be performed in the same manner as transmission of downlink user data.
  • PHICH may be used for transmission of HARQ feedback from the gNB to the UE.
  • the gNB may include feedback information for uplink communication in the uplink grant to the UE.
  • the gNB may not notify the UE of Ack feedback.
  • the UE may consider that the uplink data has been received correctly by the gNB by not receiving HARQ feedback regarding the uplink data at a predetermined time. Or you may use combining the method of including feedback information in an uplink grant, and the method of not notifying UE of feedback of Ack.
  • the UE does not need to receive a grant from the gNB and can know that the last uplink user data has been normally received by the gNB. Further, since the gNB does not need to notify the UE of HARQ feedback information for the last uplink user data, it saves communication resources.
  • a plurality of methods may be used in combination for the above-described HARQ feedback for downlink communication and uplink communication.
  • the UE for HARQ feedback for downlink communication, notifies the gNB of the presence or absence of a reception error using the PUCCH, and notifies the CBG number to which the code block including the reception error belongs using the MAC control information. Good. By doing in this way, the reliability in HARQ feedback can be improved.
  • CBG information including a code block in which a reception error has occurred.
  • the information may include, for example, a CBG number or a CBG number.
  • it may be transmitted as a bitmap indicating CBG receivability / error.
  • the bitmap for example, when the number of CBGs is 4, and 1 is associated with a CBG in which there is a reception error and 0 is associated with a CBG in which there is no reception error, there is a reception error in a code block belonging to CBG # 3 ,
  • the bit string fed back from the gNB to the UE may be “0010”.
  • code blocks belonging to a plurality of CBGs there may be code blocks belonging to a plurality of CBGs.
  • code blocks mapped to each symbol may be grouped into one CBG.
  • the receiving side feeds back the CBG information corresponding to the symbol to the transmitting side,
  • the transmitting side can retransmit the code block mapped to the symbol.
  • code blocks mapped to a plurality of symbols may be grouped into one CBG. As a result, the number of bits required for HARQ feedback can be reduced.
  • each code block and each CBG may be determined in advance by the standard.
  • the correspondence relationship may be notified from the gNB to the UE.
  • the correspondence information for example, the numbers at the beginning and the end of code blocks belonging to each CBG may be used.
  • the notification may be performed semi-statically using RRC dedicated signaling.
  • the reception side may notify the transmission side of a reception error of a code block belonging to a plurality of CBGs as a CBG including a code block that has received a reception error among the plurality of CBGs.
  • the reception side may notify the transmission side as a CBG having a preceding number among the plurality of CBGs, or may be notified as a CBG having a subsequent number.
  • the number of CBGs to be fed back can be reduced by notifying them as CBGs including other code blocks that have received errors.
  • the reception side may notify the transmission side of the symbol number including the code block that has caused the reception error. In this way, it is not necessary to notify the UE of the correspondence between each code block and each CBG in advance from the gNB, and the amount of signaling can be reduced.
  • a plurality of symbols may be combined into one group, and an identifier representing the group may be fed back from the reception side to the transmission side.
  • FIG. 30 is a diagram illustrating a correspondence relationship between code blocks and CBGs when there are code blocks belonging to a plurality of CBGs.
  • FIG. 30 illustrates a case where code blocks mapped to one symbol are grouped into one CBG in downlink communication.
  • symbol # 2 that is, code block #h (CB #h), code block # (h + 1) (CB # (h + 1)) and code block # (k-1) (CB # ( Since k-1)) is a reception error
  • the UE performs HARQ feedback to gNB that CBG # 2 is a reception error.
  • the gNB retransmits the code block #k (CB # k) from the code block #h (CB # h) to the UE using the HARQ feedback.
  • code block chunks information on consecutive code blocks (hereinafter sometimes referred to as “code block chunks”) including code blocks that have received errors may be notified.
  • the code block block may include a code block whose reception result is OK.
  • the receiving side obtains the code block block from the reception result of each code block.
  • the receiving side includes the information of the code block block in HARQ feedback information and notifies the transmitting side.
  • the transmitting side retransmits the code blocks belonging to the code block block to the receiving side.
  • code block block information information indicating the first code block or information indicating the last code block may be used. Alternatively, information indicating the number of code blocks may be used. Alternatively, two or more of these may be used in combination.
  • the information indicating the head code block may be, for example, the head code block number, or a value obtained by dividing the code block number by a predetermined constant.
  • the value may be a value obtained by rounding down fractions.
  • the constant may be determined by a standard, or may be notified in advance from the gNB to the UE by RRC dedicated signaling.
  • the reception side may determine the constant and notify the transmission side.
  • the receiving side may perform the notification dynamically.
  • MAC control information may be used, or L1 / L2 signaling may be used. In this way, the reception side can send HARQ feedback to the transmission side with a small number of bits in accordance with the state of occurrence of reception errors.
  • the constant may be dynamically notified from the gNB to the UE.
  • the number of bits of HARQ feedback can be reduced by using a value obtained by dividing the leading code block number by a constant.
  • the information indicating the last code block may be handled in the same manner as the information indicating the first code block.
  • the information indicating the number of code blocks may be handled in the same manner as the information indicating the head code block.
  • the number of code blocks may be rounded to a predetermined integer power value, and the power exponent value may be used.
  • the power value is preferably equal to or greater than the number of code blocks.
  • the integer may be determined by a standard, or may be notified in advance from the gNB to the UE by RRC dedicated signaling.
  • the reception side may determine the integer and notify the transmission side.
  • the receiving side may perform the notification dynamically. For example, it may be notified by MAC control information or may be notified by L1 / L2 signaling. In this way, the reception side can send HARQ feedback to the transmission side with a small number of bits in accordance with the state of occurrence of reception errors.
  • the integer may be dynamically notified from the gNB to the UE.
  • FIG. 31 is a diagram showing the relationship between consecutive code blocks including reception errors and code block blocks.
  • code block # 2 (CB # 2)
  • code block # 4 (CB # 4)
  • code block # 6 (CB # 6) are reception errors.
  • the reception side regards code block # 3 (CB # 3) whose reception result is OK as a reception error, so that code block # 2 (CB # 2) to code block # 6 (CB # 6). ) As a reception error.
  • the receiving side may notify the identifier of the code block # 2 (CB # 2) and the code block # 6 (CB # 6) to the transmitting side, or the code block # 2 (CB # 2).
  • Information indicating the identifier and the number of reception errors may be notified.
  • the number of reception errors notified from the reception side to the transmission side is five.
  • the sending side acquires the information of the code block that caused the reception error from the notification.
  • the transmitting side retransmits code block # 2 (CB # 2) to code block # 6 (CB # 6) to the receiving side.
  • the code blocks in which the receiving error has occurred are generated continuously or slightly apart.
  • the code block in which the receiving error has occurred is the boundary of the CBG. Even if it straddles, HARQ feedback information notified from the receiving side to the transmitting side can be kept small.
  • CBG may be used instead of the code block.
  • the first CBG number including the reception error and the number of CBGs may be used. In this way, HARQ feedback information notified from the reception side to the transmission side can be further reduced.
  • a predetermined pattern may be used for feedback from the reception side to the transmission side.
  • the predetermined pattern may be, for example, a code error of the first quarter and the last quarter code block among all the code blocks in the transport block.
  • the predetermined pattern may be a code block from the first quarter to the last quarter, resulting in a reception error, or, for example, the first eighth and the last eighth. 1 may be a reception error.
  • the predetermined pattern may not be symmetrical.
  • the first five may cause a reception error, or the first three and the fifth and seventh from the beginning may cause a reception error. Good.
  • the predetermined pattern may correspond to the symbol number when the mapped code block causes a reception error for each symbol of the physical channel.
  • the list of predetermined patterns may be determined by the standard, or may be previously notified from the gNB to the UE.
  • the predetermined pattern list may include Ack, that is, a pattern in which there is no code block that causes a reception error.
  • the list of predetermined patterns may include a pattern in which there is no code block that causes a reception error.
  • the gNB and UE may use the pattern for notification that all code blocks have been received correctly.
  • the receiving side uses the reception result of each code block to determine a pattern to be fed back to the transmitting side. It is desirable that the pattern includes all code blocks that have received errors in a list of predetermined patterns.
  • the receiving side notifies the transmitting side of an identifier indicating the pattern.
  • the transmission side retransmits the code block corresponding to the reception error in the pattern indicated by the identifier to the reception side.
  • FIG. 32 is a diagram for explaining a code block pattern including a reception error.
  • FIG. 32 shows a case where the received data includes reception errors 3302, 3304, and 3305.
  • portions excluding reception errors 3302, 3304, and 3305 for example, portions indicated by reference numerals 3301, 3303, and 3306 are portions that can be received without causing a reception error.
  • the reception side when the reception side detects reception errors 3302, 3304, and 3305 as shown in the reception data, it feeds back an identifier indicating the pattern # 4 to the transmission side.
  • the transmission side retransmits code block # 1 (CB # 1) to code block # 5 (CB # 5) to the reception side according to pattern # 4.
  • the receiving side By notifying the transmitting side of code block block information, the receiving side suppresses HARQ feedback information notified from the receiving side to the transmitting side even if code blocks that have received errors are dispersed in the transport block. be able to.
  • the gNB may switch the HARQ feedback level.
  • the HARQ level may include, for example, feedback for each code block, may include feedback for each CBG, or may include feedback for the entire transport block.
  • a plurality of levels may be provided for feedback for each CBG.
  • a feedback level by a CBG with a small number of code blocks per CBG and a feedback level by a CBG with a large number of code blocks per CBG may be provided.
  • the number of code blocks included in a CBG used in a certain level may be an integer multiple of the number of code blocks included in a CBG used in another level, or may not be an integer multiple.
  • a plurality of CBGs may or may not include the same code block.
  • the gNB notifies the UE of the feedback level.
  • the notification content may be feedback level content, for example, the number of code blocks per CBG, or the level identifier. In using the identifier, a list of feedback levels may be determined by the standard, or the gNB may notify the UE in advance. For example, RRC signaling may be used as the notification.
  • the following five (1) to (5) are disclosed as methods for the gNB to notify the HARQ feedback level.
  • Control signaling for each UE For example, RRC dedicated signaling for each UE.
  • a series of CBG numbers may be assigned to a plurality of levels of HARQ feedback. For example, after assigning a CBG number composed of a predetermined maximum number of code blocks to all code blocks in the transport block, a CBG number composed of a maximum number of code blocks larger than the predetermined maximum number of code blocks May be assigned.
  • the receiving side may decide which level to use the assigned CBG number according to the distribution of code blocks that have received errors.
  • the receiving side may feed back the CBG number determined by the receiving side as described above to the transmitting side.
  • CBG # 1 is assigned to code blocks # 1 to # 3
  • CBG # 2 is assigned to code blocks # 4 to # 6, and so on.
  • CBG # 6 is assigned to code blocks # 15 to # 18
  • CBG # 7 is assigned to code blocks # 19 and # 20, and a CBG having a maximum number of code blocks of 5 is used.
  • CBG # 7 may be assigned to code blocks # 1 to # 5
  • CBG # 8 may be assigned to code blocks # 6 to # 10
  • CBG # 10 may be assigned to code blocks # 16 to # 20 in the same manner.
  • the receiving side may feed back to the transmitting side that CBG # 7 has a reception error.
  • the receiving side may feed back the information of the code block whose reception result is OK to the transmitting side. You may feed back the information of CBG comprised only by the code block whose reception result was OK.
  • the reception side may include an identifier indicating whether the reception result is OK or a reception error in the feedback.
  • the receiving side may decide whether to perform feedback of the reception result OK or the reception error by using the information of the number of code blocks or the number of CBGs in which the reception error has occurred, or the reception result OK or the reception error. It may be determined using the number of bits required for feedback.
  • the following five (1) to (5) are disclosed as information used by gNB to determine the HARQ feedback level.
  • Propagation environment For example, CQI / CSI.
  • Uplink communication load For example, UE buffer accumulation.
  • UE category and UE usage service For example, UE category and UE usage service.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

通信端末装置の消費電力の増大、通信品質の劣化、および無線リソースの使用効率の減少を抑えることができる通信システムを提供する。基地局装置(gNB)は、通信端末装置(UE)に、次の受信タイミングに関する情報を通知する。例えば、UEは、サブフレーム(901)における下り制御信号(902)を受信する。UEは、下り制御信号(902)から、サブフレーム(901)のユーザデータ(903)に関する情報および次の受信タイミングに関する情報(904)を取得する。UEは、gNBとの間で、ユーザデータ(903)を送受信する。次の受信タイミングに関する情報(904)には、UEの次の受信タイミングが、サブフレーム(905)であることが示されている。UEは、サブフレーム(905)において、下り制御信号(906)を受信する。

Description

通信システム
 本発明は、移動端末装置などの通信端末装置と基地局装置との間で無線通信を行う通信システムに関する。
 移動体通信システムの規格化団体である3GPP(3rd Generation Partnership Project)において、無線区間についてはロングタームエボリューション(Long Term Evolution:LTE)と称し、コアネットワークおよび無線アクセスネットワーク(以下、まとめて、ネットワークとも称する)を含めたシステム全体構成については、システムアーキテクチャエボリューション(System Architecture Evolution:SAE)と称される通信方式が検討されている(例えば、非特許文献1~5)。この通信方式は3.9G(3.9 Generation)システムとも呼ばれる。
 LTEのアクセス方式としては、下り方向はOFDM(Orthogonal Frequency Division Multiplexing)、上り方向はSC-FDMA(Single Carrier Frequency Division Multiple Access)が用いられる。また、LTEは、W-CDMA(Wideband Code Division Multiple Access)とは異なり、回線交換を含まず、パケット通信方式のみになる。
 非特許文献1(5章)に記載される、3GPPでの、LTEシステムにおけるフレーム構成に関する決定事項について、図1を用いて説明する。図1は、LTE方式の通信システムで使用される無線フレームの構成を示す説明図である。図1において、1つの無線フレーム(Radio frame)は10msである。無線フレームは10個の等しい大きさのサブフレーム(Subframe)に分割される。サブフレームは、2個の等しい大きさのスロット(slot)に分割される。無線フレーム毎に1番目および6番目のサブフレームに下り同期信号(Downlink Synchronization Signal)が含まれる。同期信号には、第一同期信号(Primary Synchronization Signal:P-SS)と、第二同期信号(Secondary Synchronization Signal:S-SS)とがある。
 3GPPでの、LTEシステムにおけるチャネル構成に関する決定事項が、非特許文献1(5章)に記載されている。CSG(Closed Subscriber Group)セルにおいてもnon-CSGセルと同じチャネル構成が用いられると想定されている。
 物理報知チャネル(Physical Broadcast Channel:PBCH)は、基地局装置(以下、単に「基地局」という場合がある)から移動端末装置(以下、単に「移動端末」という場合がある)などの通信端末装置(以下、単に「通信端末」という場合がある)への下り送信用のチャネルである。BCHトランスポートブロック(transport block)は、40ms間隔中の4個のサブフレームにマッピングされる。40msタイミングの明白なシグナリングはない。
 物理制御フォーマットインジケータチャネル(Physical Control Format Indicator Channel:PCFICH)は、基地局から通信端末への下り送信用のチャネルである。PCFICHは、PDCCHsのために用いるOFDM(Orthogonal Frequency Division Multiplexing)シンボルの数を、基地局から通信端末へ通知する。PCFICHは、サブフレーム毎に送信される。
 物理下り制御チャネル(Physical Downlink Control Channel:PDCCH)は、基地局から通信端末への下り送信用のチャネルである。PDCCHは、後述のトランスポートチャネルの1つである下り共有チャネル(Downlink Shared Channel:DL-SCH)のリソース割り当て(allocation)情報、後述のトランスポートチャネルの1つであるページングチャネル(Paging Channel:PCH)のリソース割り当て(allocation)情報、DL-SCHに関するHARQ(Hybrid Automatic Repeat reQuest)情報を通知する。PDCCHは、上りスケジューリンググラント(Uplink Scheduling Grant)を運ぶ。PDCCHは、上り送信に対する応答信号であるAck(Acknowledgement)/Nack(Negative Acknowledgement)を運ぶ。PDCCHは、L1/L2制御信号とも呼ばれる。
 物理下り共有チャネル(Physical Downlink Shared Channel:PDSCH)は、基地局から通信端末への下り送信用のチャネルである。PDSCHには、トランスポートチャネルである下り共有チャネル(DL-SCH)、およびトランスポートチャネルであるPCHがマッピングされている。
 物理マルチキャストチャネル(Physical Multicast Channel:PMCH)は、基地局から通信端末への下り送信用のチャネルである。PMCHには、トランスポートチャネルであるマルチキャストチャネル(Multicast Channel:MCH)がマッピングされている。
 物理上り制御チャネル(Physical Uplink Control Channel:PUCCH)は、通信端末から基地局への上り送信用のチャネルである。PUCCHは、下り送信に対する応答信号(response signal)であるAck/Nackを運ぶ。PUCCHは、CQI(Channel Quality Indicator)レポートを運ぶ。CQIとは、受信したデータの品質、もしくは通信路品質を示す品質情報である。またPUCCHは、スケジューリングリクエスト(Scheduling Request:SR)を運ぶ。
 物理上り共有チャネル(Physical Uplink Shared Channel:PUSCH)は、通信端末から基地局への上り送信用のチャネルである。PUSCHには、トランスポートチャネルの1つである上り共有チャネル(Uplink Shared Channel:UL-SCH)がマッピングされている。
 物理HARQインジケータチャネル(Physical Hybrid ARQ Indicator Channel:PHICH)は、基地局から通信端末への下り送信用のチャネルである。PHICHは、上り送信に対する応答信号であるAck/Nackを運ぶ。物理ランダムアクセスチャネル(Physical Random Access Channel:PRACH)は、通信端末から基地局への上り送信用のチャネルである。PRACHは、ランダムアクセスプリアンブル(random access preamble)を運ぶ。
 下り参照信号(リファレンスシグナル(Reference Signal):RS)は、LTE方式の通信システムとして既知のシンボルである。以下の5種類の下りリファレンスシグナルが定義されている。セル固有参照信号(Cell-specific Reference Signal:CRS)、MBSFN参照信号(MBSFN Reference Signal)、UE固有参照信号(UE-specific Reference Signal)であるデータ復調用参照信号(Demodulation Reference Signal:DM-RS)、位置決定参照信号(Positioning Reference Signal:PRS)、チャネル状態情報参照信号(Channel State Information Reference Signal:CSI-RS)。通信端末の物理レイヤの測定として、リファレンスシグナルの受信電力(Reference Signal Received Power:RSRP)測定がある。
 非特許文献1(5章)に記載されるトランスポートチャネル(Transport channel)について、説明する。下りトランスポートチャネルのうち、報知チャネル(Broadcast Channel:BCH)は、その基地局(セル)のカバレッジ全体に報知される。BCHは、物理報知チャネル(PBCH)にマッピングされる。
 下り共有チャネル(Downlink Shared Channel:DL-SCH)には、HARQ(Hybrid ARQ)による再送制御が適用される。DL-SCHは、基地局(セル)のカバレッジ全体への報知が可能である。DL-SCHは、ダイナミックあるいは準静的(Semi-static)なリソース割り当てをサポートする。準静的なリソース割り当ては、パーシステントスケジューリング(Persistent Scheduling)ともいわれる。DL-SCHは、通信端末の低消費電力化のために通信端末の間欠受信(Discontinuous reception:DRX)をサポートする。DL-SCHは、物理下り共有チャネル(PDSCH)へマッピングされる。
 ページングチャネル(Paging Channel:PCH)は、通信端末の低消費電力を可能とするために通信端末のDRXをサポートする。PCHは、基地局(セル)のカバレッジ全体への報知が要求される。PCHは、動的にトラフィックに利用できる物理下り共有チャネル(PDSCH)のような物理リソースへマッピングされる。
 マルチキャストチャネル(Multicast Channel:MCH)は、基地局(セル)のカバレッジ全体への報知に使用される。MCHは、マルチセル送信におけるMBMS(Multimedia Broadcast Multicast Service)サービス(MTCHとMCCH)のSFN合成をサポートする。MCHは、準静的なリソース割り当てをサポートする。MCHは、PMCHへマッピングされる。
 上りトランスポートチャネルのうち、上り共有チャネル(Uplink Shared Channel:UL-SCH)には、HARQ(Hybrid ARQ)による再送制御が適用される。UL-SCHは、ダイナミックあるいは準静的(Semi-static)なリソース割り当てをサポートする。UL-SCHは、物理上り共有チャネル(PUSCH)へマッピングされる。
 ランダムアクセスチャネル(Random Access Channel:RACH)は、制御情報に限られている。RACHは、衝突のリスクがある。RACHは、物理ランダムアクセスチャネル(PRACH)へマッピングされる。
 HARQについて説明する。HARQとは、自動再送要求(Automatic Repeat reQuest:ARQ)と誤り訂正(Forward Error Correction)との組合せによって、伝送路の通信品質を向上させる技術である。HARQには、通信品質が変化する伝送路に対しても、再送によって誤り訂正が有効に機能するという利点がある。特に、再送にあたって初送の受信結果と再送の受信結果との合成をすることで、更なる品質向上を得ることも可能である。
 再送の方法の一例を説明する。受信側にて、受信データが正しくデコードできなかった場合、換言すればCRC(Cyclic Redundancy Check)エラーが発生した場合(CRC=NG)、受信側から送信側へ「Nack」を送信する。「Nack」を受信した送信側は、データを再送する。受信側にて、受信データが正しくデコードできた場合、換言すればCRCエラーが発生しない場合(CRC=OK)、受信側から送信側へ「Ack」を送信する。「Ack」を受信した送信側は次のデータを送信する。
 非特許文献1(6章)に記載される論理チャネル(ロジカルチャネル:Logical channel)について、説明する。報知制御チャネル(Broadcast Control Channel:BCCH)は、報知システム制御情報のための下りチャネルである。論理チャネルであるBCCHは、トランスポートチャネルである報知チャネル(BCH)、あるいは下り共有チャネル(DL-SCH)へマッピングされる。
 ページング制御チャネル(Paging Control Channel:PCCH)は、ページング情報(Paging Information)およびシステム情報(System Information)の変更を送信するための下りチャネルである。PCCHは、通信端末のセルロケーションをネットワークが知らない場合に用いられる。論理チャネルであるPCCHは、トランスポートチャネルであるページングチャネル(PCH)へマッピングされる。
 共有制御チャネル(Common Control Channel:CCCH)は、通信端末と基地局との間の送信制御情報のためのチャネルである。CCCHは、通信端末がネットワークとの間でRRC接続(connection)を有していない場合に用いられる。下り方向では、CCCHは、トランスポートチャネルである下り共有チャネル(DL-SCH)へマッピングされる。上り方向では、CCCHは、トランスポートチャネルである上り共有チャネル(UL-SCH)へマッピングされる。
 マルチキャスト制御チャネル(Multicast Control Channel:MCCH)は、1対多の送信のための下りチャネルである。MCCHは、ネットワークから通信端末への1つあるいはいくつかのMTCH用のMBMS制御情報の送信のために用いられる。MCCHは、MBMS受信中の通信端末のみに用いられる。MCCHは、トランスポートチャネルであるマルチキャストチャネル(MCH)へマッピングされる。
 個別制御チャネル(Dedicated Control Channel:DCCH)は、1対1にて、通信端末とネットワークとの間の個別制御情報を送信するチャネルである。DCCHは、通信端末がRRC接続(connection)である場合に用いられる。DCCHは、上りでは上り共有チャネル(UL-SCH)へマッピングされ、下りでは下り共有チャネル(DL-SCH)にマッピングされる。
 個別トラフィックチャネル(Dedicated Traffic Channel:DTCH)は、ユーザ情報の送信のための個別通信端末への1対1通信のチャネルである。DTCHは、上りおよび下りともに存在する。DTCHは、上りでは上り共有チャネル(UL-SCH)へマッピングされ、下りでは下り共有チャネル(DL-SCH)へマッピングされる。
 マルチキャストトラフィックチャネル(Multicast Traffic channel:MTCH)は、ネットワークから通信端末へのトラフィックデータ送信のための下りチャネルである。MTCHは、MBMS受信中の通信端末のみに用いられるチャネルである。MTCHは、マルチキャストチャネル(MCH)へマッピングされる。
 CGIとは、セルグローバル識別子(Cell Global Identifier)のことである。ECGIとは、E-UTRANセルグローバル識別子(E-UTRAN Cell Global Identifier)のことである。LTE、後述のLTE-A(Long Term Evolution Advanced)およびUMTS(Universal Mobile Telecommunication System)において、CSG(Closed Subscriber Group)セルが導入される。
 CSG(Closed Subscriber Group)セルとは、利用可能な加入者をオペレータが特定しているセル(以下「特定加入者用セル」という場合がある)である。特定された加入者は、PLMN(Public Land Mobile Network)の1つ以上のセルにアクセスすることが許可される。特定された加入者がアクセスを許可されている1つ以上のセルを「CSGセル(CSG cell(s))」と呼ぶ。ただし、PLMNにはアクセス制限がある。
 CSGセルは、固有のCSGアイデンティティ(CSG identity:CSG ID)を報知し、CSGインジケーション(CSG Indication)にて「TRUE」を報知するPLMNの一部である。予め利用登録し、許可された加入者グループのメンバーは、アクセス許可情報であるところのCSG IDを用いてCSGセルにアクセスする。
 CSG IDは、CSGセルまたはセルによって報知される。LTE方式の通信システムにCSG IDは複数存在する。そして、CSG IDは、CSG関連のメンバーのアクセスを容易にするために、通信端末(UE)によって使用される。
 通信端末の位置追跡は、1つ以上のセルからなる区域を単位に行われる。位置追跡は、待受け状態であっても通信端末の位置を追跡し、通信端末を呼び出す、換言すれば通信端末が着呼することを可能にするために行われる。この通信端末の位置追跡のための区域をトラッキングエリアと呼ぶ。
 3GPPにおいて、Home-NodeB(Home-NB;HNB)、Home-eNodeB(Home-eNB;HeNB)と称される基地局が検討されている。UTRANにおけるHNB、およびE-UTRANにおけるHeNBは、例えば家庭、法人、商業用のアクセスサービス向けの基地局である。非特許文献2には、HeNBおよびHNBへのアクセスの3つの異なるモードが開示されている。具体的には、オープンアクセスモード(Open access mode)と、クローズドアクセスモード(Closed access mode)と、ハイブリッドアクセスモード(Hybrid access mode)とが開示されている。
 また3GPPでは、リリース10として、ロングタームエボリューションアドヴァンスド(Long Term Evolution Advanced:LTE-A)の規格策定が進められている(非特許文献3、非特許文献4参照)。LTE-Aは、LTEの無線区間通信方式を基本とし、それにいくつかの新技術を加えて構成される。
 LTE-Aシステムでは、100MHzまでのより広い周波数帯域幅(transmission bandwidths)をサポートするために、二つ以上のコンポーネントキャリア(Component Carrier:CC)を集約する(「アグリゲーション(aggregation)する」とも称する)、キャリアアグリゲーション(Carrier Aggregation:CA)が検討されている。CAについては、非特許文献1に記載されている。
 CAが構成される場合、UEはネットワーク(Network:NW)と唯一つのRRC接続(RRC connection)を有する。RRC接続において、一つのサービングセルがNASモビリティ情報とセキュリティ入力を与える。このセルをプライマリセル(Primary Cell:PCell)と呼ぶ。下りリンクで、PCellに対応するキャリアは、下りプライマリコンポーネントキャリア(Downlink Primary Component Carrier:DL PCC)である。上りリンクで、PCellに対応するキャリアは、上りプライマリコンポーネントキャリア(Uplink Primary Component Carrier:UL PCC)である。
 UEの能力(ケーパビリティ(capability))に応じて、セカンダリセル(Secondary Cell:SCell)が、PCellとともに、サービングセルの組を形成するために構成される。下りリンクで、SCellに対応するキャリアは、下りセカンダリコンポーネントキャリア(Downlink Secondary Component Carrier:DL SCC)である。上りリンクで、SCellに対応するキャリアは、上りセカンダリコンポーネントキャリア(Uplink Secondary Component Carrier:UL SCC)である。
 一つのPCellと一つ以上のSCellとからなるサービングセルの組が、一つのUEに対して構成される。
 また、LTE-Aでの新技術としては、より広い帯域をサポートする技術(Wider bandwidth extension)、および多地点協調送受信(Coordinated Multiple Point transmission and reception:CoMP)技術などがある。3GPPでLTE-Aのために検討されているCoMPについては、非特許文献1に記載されている。
 また、3GPPにおいて、将来の膨大なトラフィックに対応するために、スモールセルを構成するスモールeNB(以下「小規模基地局装置」という場合がある)を用いることが検討されている。例えば、多数のスモールeNBを設置して、多数のスモールセルを構成することによって、周波数利用効率を高めて、通信容量の増大を図る技術などが検討されている。具体的には、UEが2つのeNBと接続して通信を行うデュアルコネクティビティ(Dual Connectivity;略称:DC)などがある。DCについては、非特許文献1に記載されている。
 デュアルコネクティビティ(DC)を行うeNBのうち、一方を「マスターeNB(略称:MeNB)」といい、他方を「セカンダリeNB(略称:SeNB)」という場合がある。
 モバイルネットワークのトラフィック量は、増加傾向にあり、通信速度も高速化が進んでいる。LTEおよびLTE-Aが本格的に運用を開始されると、更に通信速度が高速化されることが見込まれる。
 さらに、高度化する移動体通信に対して、2020年以降にサービスを開始することを目標とした第5世代(以下「5G」という場合がある)無線アクセスシステムが検討されている。例えば、欧州では、METISという団体で5Gの要求事項がまとめられている(非特許文献5参照)。
 5G無線アクセスシステムでは、LTEシステムに対して、システム容量は1000倍、データの伝送速度は100倍、データの処理遅延は10分の1(1/10)、通信端末の同時接続数は100倍として、更なる低消費電力化、および装置の低コスト化を実現することが要件として挙げられている。
 このような要求を満たすために、3GPPでは、リリース14として、5Gの規格検討が進められている(非特許文献6~10参照)。5Gの無線区間の技術は、「New Radio(略称:NR) Access Technology」と称され、いくつかの新たな技術が検討されている(非特許文献11~13参照)。例えば、自己完結型(self-contained)サブフレームを用いたNR用フレーム構成、アナログビームフォーミングまたはハイブリッドビームフォーミングによるマルチビームフォーミング(MBF)、MBFにおけるビームスイーピング、ならびにコーディングの際の最大コードブロックサイズなどが検討されている。
3GPP TS 36.300 V14.0.0 3GPP S1-083461 3GPP TR 36.814 V9.0.0 3GPP TR 36.912 V13.0.0 "Scenarios, requirements and KPIs for 5G mobile and wireless system"、[online]、平成25(2013)年4月30日、ICT-317669-METIS/D1.1、[平成28年12月13日検索]、インターネット<https://www.metis2020.com/documents/deliverables/> 3GPP TR 23.799 V1.1.0 3GPP TR 38.801 V0.4.0 3GPP TR 38.802 V0.3.0 3GPP TR 38.804 V0.3.0 3GPP TR 38.912 V0.0.2 3GPP R1-166104 3GPP R1-165364 3GPP R1-1609068
 NRでは、マルチビームフォーミングが検討されている。マルチビームフォーミングでは、セルで一時に形成できるビーム数が少ない場合、必要なカバレッジをカバーするために、1つまたは複数のビームを用いて、タイミングをずらして、ビームスイーピングが行われる。したがって、セルが構成する各ビームは、全てのタイミングで送受信できるわけではない。
 LTEでは、通常、ダイナミックにスケジューリングが行われるので、UEは、毎サブフレームで下り制御チャネルを受信する必要がある。しかし、マルチビームフォーミングにおいてビームスイーピングが行われるような場合、前述のように全てのタイミングでビームを送受信できるわけではないので、UEが毎サブフレームで下り制御チャネルの受信を継続するのは無駄となる。したがって、無駄な消費電力が増大してしまう。また、UEが、送受信できないビームのタイミングで上り制御チャネルを送信するのは無駄であり、消費電力が増大するとともに、上り通信が不可能となってしまう。
 また、マルチビームフォーミングでは、一つのセルにおいて複数のビームが形成され、ビーム毎にカバレッジが構成される。したがって、ビームのカバレッジは、セルのカバレッジよりも狭範囲となる。ビームのカバレッジが適切に形成されていないと、UEのビーム間の移動で通信の切断が生じやすくなったり、カバレッジホールが発生したりするという問題が生じる。
 また、NRにおいては、使用周波数の広帯域化によって、トランスポートブロックのサイズが大きくなり、コードブロック数が増加することが見込まれる。LTEのようなAck/Nackフィードバック方法では、正常に受信されたコードブロックも含めてトランスポートブロック全体を再送するので、コードブロック数が増加すると、無線リソースの使用効率が大きく減少する。
 したがって、NRにおいては、正しくデコードできなかったコードブロックをHARQによって再送することが検討されている。しかし、コードブロック数が多いので、複数のコードブロックが受信エラーとなった場合に、フィードバックに要するビット数が増大するという問題が生じる。これによって、UEの消費電力の増大および無線リソースの使用効率の減少が引き起こされる。
 本発明の目的は、通信端末装置の消費電力の増大、通信品質の劣化、および無線リソースの使用効率の減少を抑えることができる通信システムを提供することである。
 本発明の通信システムは、基地局装置と、前記基地局装置と無線通信可能な少なくとも1つの通信端末装置とを備える通信システムであって、前記基地局装置は、前記通信端末装置に、次の受信タイミングに関する情報を通知し、前記通信端末装置は、前記基地局装置から通知された次の受信タイミングに関する情報に基づいて受信を行うことを特徴とする。
 本発明の通信システムによれば、基地局装置と、基地局装置と無線通信可能な少なくとも1つの通信端末装置とを備えて、通信システムが構成される。基地局装置は、通信端末装置に、次の受信タイミングに関する情報を通知する。通知端末装置は、基地局装置から通知された次の受信タイミングに関する情報に基づいて受信を行う。これによって、通信端末装置は、通知された受信タイミングで、基地局装置から送信される情報を受信することができるので、受信に要する消費電力を節約することができる。また、再送が必要な場合には、迅速に再送を行うことができるので、基地局装置と通信端末装置との通信の遅延を抑制することができる。したがって、通信端末装置の消費電力の増大、通信品質の劣化、および無線リソースの使用効率の減少を抑えることができる。
 本発明の目的、特徴、局面、および利点は、以下の詳細な説明と添付図面とによって、より明白となる。
LTE方式の通信システムで使用される無線フレームの構成を示す説明図である。 3GPPにおいて議論されているLTE方式の通信システム200の全体的な構成を示すブロック図である。 本発明に係る通信端末である図2に示す移動端末202の構成を示すブロック図である。 本発明に係る基地局である図2に示す基地局203の構成を示すブロック図である。 本発明に係るMMEの構成を示すブロック図である。 LTE方式の通信システムにおいて通信端末(UE)が行うセルサーチから待ち受け動作までの概略を示すフローチャートである。 マクロeNBとスモールeNBとが混在する場合のセルの構成の概念を示す図である。 ビームスイーピングを説明するための図である。 gNBからUEへの、次のPDCCHを受信する必要のあるタイミングの通知、および該UEにおける上り/下りデータの送受信の一例を示す図である。 gNBからUEへの、予め定める期間におけるPDCCH受信タイミングの通知および該UEにおける上り/下りデータの送受信の一例を示す図である。 上り通信において、Ack/Nackの通知および再送を上り初送の次のサブフレームで行う場合の送受信チャネルを示す図である。 ビーム毎のPUCCHリソースを、周期、オフセット、シンボル番号で設定する方法の一例を説明する図である。 ビームスイープ数のPUCCHをkサブフレーム内に設定する方法の一例を説明する図である。 ビームスイープ数のPUCCHをkサブフレーム内に設定する方法の他の例を説明する図である。 ビームスイープ数のPUCCHをkサブフレーム内に設定する方法の他の例を説明する図である。 PUCCHの設定およびSRの送受信のシーケンスの一例を示す図である。 UE毎のPUCCHの設定およびSRの送受信のシーケンスの一例を示す図である。 UE毎にPUCCHリソース設定の開始、修正、停止に関する情報を設定する方法の一例を説明する図である。 UE毎のPUCCHの設定およびSRの送受信のシーケンスの一例を示す図である。 UEのサービングビームのDLリソースと同一のサブフレームでPUCCHリソースを設定する方法の一例を説明する図である。 DLリソースと同一サブフレームでのPUCCHリソースの設定およびSRの送受信のシーケンスの一例を示す図である。 ビーム間でPUCCH受信に優先順位を設けた場合のSRの送受信のシーケンスの一例を示す図である。 ビーム間でPUCCH受信に優先順位を設けた場合のSRの送受信のシーケンスの一例を示す図である。 SRに対する上りグラントの送受信タイミング設定のシーケンスの一例を示す図である。 SRの送信後にビーム間の移動が発生した場合のSRに対する上りグラントの送受信タイミング設定のシーケンスの一例を示す図である。 SRの送信後にビーム間の移動が発生した場合のSRに対する上りグラントの送受信タイミング設定のシーケンスの一例を示す図である。 SRの送信後にビーム間の移動が発生した場合のSRに対する上りグラントの送受信タイミング設定のシーケンスの他の例を示す図である。 SRの送信後にビーム間の移動が発生した場合のSRに対する上りグラントの送受信タイミング設定のシーケンスの他の例を示す図である。 URLLCの割り込みによるコードブロックの受信エラーを説明する図である。 複数のCBGに属するコードブロックが存在する場合のコードブロックとCBGとの対応関係を示す図である。 受信誤りを含む連続したコードブロックとコードブロック塊との関係を示す図である。 受信エラーを含むコードブロックのパターンを説明するための図である。 CBG毎のパリティチェック3401~3404の付与を説明するための図である。
 実施の形態1.
 図2は、3GPPにおいて議論されているLTE方式の通信システム200の全体的な構成を示すブロック図である。図2について説明する。無線アクセスネットワークは、E-UTRAN(Evolved Universal Terrestrial Radio Access Network)201と称される。通信端末装置である移動端末装置(以下「移動端末(User Equipment:UE)」という)202は、基地局装置(以下「基地局(E-UTRAN NodeB:eNB)」という)203と無線通信可能であり、無線通信で信号の送受信を行う。
 ここで、「通信端末装置」とは、移動可能な携帯電話端末装置などの移動端末装置だけでなく、センサなどの移動しないデバイスも含んでいる。以下の説明では、「通信端末装置」を、単に「通信端末」という場合がある。
 移動端末202に対する制御プロトコル、例えばRRC(Radio Resource Control)と、ユーザプレイン、例えばPDCP(Packet Data Convergence Protocol)、RLC(Radio Link Control)、MAC(Medium Access Control)、PHY(Physical layer)とが基地局203で終端するならば、E-UTRANは1つあるいは複数の基地局203によって構成される。
 移動端末202と基地局203との間の制御プロトコルRRC(Radio Resource Control)は、報知(Broadcast)、ページング(paging)、RRC接続マネージメント(RRC connection management)などを行う。RRCにおける基地局203と移動端末202との状態として、RRC_IDLEと、RRC_CONNECTEDとがある。
 RRC_IDLEでは、PLMN(Public Land Mobile Network)選択、システム情報(System Information:SI)の報知、ページング(paging)、セル再選択(cell re-selection)、モビリティなどが行われる。RRC_CONNECTEDでは、移動端末はRRC接続(connection)を有し、ネットワークとのデータの送受信を行うことができる。またRRC_CONNECTEDでは、ハンドオーバ(Handover:HO)、隣接セル(Neighbour cell)の測定(メジャメント(measurement))などが行われる。
 基地局203は、eNB207と、Home-eNB206とに分類される。通信システム200は、複数のeNB207を含むeNB群203-1と、複数のHome-eNB206を含むHome-eNB群203-2とを備える。またコアネットワークであるEPC(Evolved Packet Core)と、無線アクセスネットワークであるE-UTRAN201とで構成されるシステムは、EPS(Evolved Packet System)と称される。コアネットワークであるEPCと、無線アクセスネットワークであるE-UTRAN201とを合わせて、「ネットワーク」という場合がある。
 eNB207は、移動管理エンティティ(Mobility Management Entity:MME)、あるいはS-GW(Serving Gateway)、あるいはMMEおよびS-GWを含むMME/S-GW部(以下「MME部」という場合がある)204とS1インタフェースにより接続され、eNB207とMME部204との間で制御情報が通信される。一つのeNB207に対して、複数のMME部204が接続されてもよい。eNB207間は、X2インタフェースにより接続され、eNB207間で制御情報が通信される。
 Home-eNB206は、MME部204とS1インタフェースにより接続され、Home-eNB206とMME部204との間で制御情報が通信される。一つのMME部204に対して、複数のHome-eNB206が接続される。あるいは、Home-eNB206は、HeNBGW(Home-eNB GateWay)205を介してMME部204と接続される。Home-eNB206とHeNBGW205とは、S1インタフェースにより接続され、HeNBGW205とMME部204とはS1インタフェースを介して接続される。
 一つまたは複数のHome-eNB206が一つのHeNBGW205と接続され、S1インタフェースを通して情報が通信される。HeNBGW205は、一つまたは複数のMME部204と接続され、S1インタフェースを通して情報が通信される。
 MME部204およびHeNBGW205は、上位装置、具体的には上位ノードであり、基地局であるeNB207およびHome-eNB206と、移動端末(UE)202との接続を制御する。MME部204は、コアネットワークであるEPCを構成する。基地局203およびHeNBGW205は、E-UTRAN201を構成する。
 さらに3GPPでは、以下のような構成が検討されている。Home-eNB206間のX2インタフェースはサポートされる。すなわち、Home-eNB206間は、X2インタフェースにより接続され、Home-eNB206間で制御情報が通信される。MME部204からは、HeNBGW205はHome-eNB206として見える。Home-eNB206からは、HeNBGW205はMME部204として見える。
 Home-eNB206が、HeNBGW205を介してMME部204に接続される場合および直接MME部204に接続される場合のいずれの場合も、Home-eNB206とMME部204との間のインタフェースは、S1インタフェースで同じである。
 基地局203は、1つのセルを構成してもよいし、複数のセルを構成してもよい。各セルは、移動端末202と通信可能な範囲であるカバレッジとして予め定める範囲を有し、カバレッジ内で移動端末202と無線通信を行う。1つの基地局203が複数のセルを構成する場合、1つ1つのセルが、移動端末202と通信可能に構成される。
 図3は、本発明に係る通信端末である図2に示す移動端末202の構成を示すブロック図である。図3に示す移動端末202の送信処理を説明する。まず、プロトコル処理部301からの制御データ、およびアプリケーション部302からのユーザデータが、送信データバッファ部303へ保存される。送信データバッファ部303に保存されたデータは、エンコーダー部304へ渡され、誤り訂正などのエンコード処理が施される。エンコード処理を施さずに、送信データバッファ部303から変調部305へ直接出力されるデータが存在してもよい。エンコーダー部304でエンコード処理されたデータは、変調部305にて変調処理が行われる。変調されたデータは、ベースバンド信号に変換された後、周波数変換部306へ出力され、無線送信周波数に変換される。その後、アンテナ307から基地局203に送信信号が送信される。
 また、移動端末202の受信処理は、以下のように実行される。基地局203からの無線信号がアンテナ307により受信される。受信信号は、周波数変換部306にて無線受信周波数からベースバンド信号に変換され、復調部308において復調処理が行われる。復調後のデータは、デコーダー部309へ渡され、誤り訂正などのデコード処理が行われる。デコードされたデータのうち、制御データはプロトコル処理部301へ渡され、ユーザデータはアプリケーション部302へ渡される。移動端末202の一連の処理は、制御部310によって制御される。よって制御部310は、図3では省略しているが、各部301~309と接続している。
 図4は、本発明に係る基地局である図2に示す基地局203の構成を示すブロック図である。図4に示す基地局203の送信処理を説明する。EPC通信部401は、基地局203とEPC(MME部204など)、HeNBGW205などとの間のデータの送受信を行う。他基地局通信部402は、他の基地局との間のデータの送受信を行う。EPC通信部401および他基地局通信部402は、それぞれプロトコル処理部403と情報の受け渡しを行う。プロトコル処理部403からの制御データ、ならびにEPC通信部401および他基地局通信部402からのユーザデータおよび制御データは、送信データバッファ部404へ保存される。
 送信データバッファ部404に保存されたデータは、エンコーダー部405へ渡され、誤り訂正などのエンコード処理が施される。エンコード処理を施さずに、送信データバッファ部404から変調部406へ直接出力されるデータが存在してもよい。エンコードされたデータは、変調部406にて変調処理が行われる。変調されたデータは、ベースバンド信号に変換された後、周波数変換部407へ出力され、無線送信周波数に変換される。その後、アンテナ408より一つもしくは複数の移動端末202に対して送信信号が送信される。
 また、基地局203の受信処理は以下のように実行される。一つもしくは複数の移動端末202からの無線信号が、アンテナ408により受信される。受信信号は、周波数変換部407にて無線受信周波数からベースバンド信号に変換され、復調部409で復調処理が行われる。復調されたデータは、デコーダー部410へ渡され、誤り訂正などのデコード処理が行われる。デコードされたデータのうち、制御データはプロトコル処理部403あるいはEPC通信部401、他基地局通信部402へ渡され、ユーザデータはEPC通信部401および他基地局通信部402へ渡される。基地局203の一連の処理は、制御部411によって制御される。よって制御部411は、図4では省略しているが、各部401~410と接続している。
 図5は、本発明に係るMMEの構成を示すブロック図である。図5では、前述の図2に示すMME部204に含まれるMME204aの構成を示す。PDN GW通信部501は、MME204aとPDN GWとの間のデータの送受信を行う。基地局通信部502は、MME204aと基地局203との間のS1インタフェースによるデータの送受信を行う。PDN GWから受信したデータがユーザデータであった場合、ユーザデータは、PDN GW通信部501から、ユーザプレイン通信部503経由で基地局通信部502に渡され、1つあるいは複数の基地局203へ送信される。基地局203から受信したデータがユーザデータであった場合、ユーザデータは、基地局通信部502から、ユーザプレイン通信部503経由でPDN GW通信部501に渡され、PDN GWへ送信される。
 PDN GWから受信したデータが制御データであった場合、制御データは、PDN GW通信部501から制御プレイン制御部505へ渡される。基地局203から受信したデータが制御データであった場合、制御データは、基地局通信部502から制御プレイン制御部505へ渡される。
 HeNBGW通信部504は、HeNBGW205が存在する場合に設けられ、情報種別によって、MME204aとHeNBGW205との間のインタフェース(IF)によるデータの送受信を行う。HeNBGW通信部504から受信した制御データは、HeNBGW通信部504から制御プレイン制御部505へ渡される。制御プレイン制御部505での処理の結果は、PDN GW通信部501経由でPDN GWへ送信される。また、制御プレイン制御部505で処理された結果は、基地局通信部502経由でS1インタフェースにより1つあるいは複数の基地局203へ送信され、またHeNBGW通信部504経由で1つあるいは複数のHeNBGW205へ送信される。
 制御プレイン制御部505には、NASセキュリティ部505-1、SAEベアラコントロール部505-2、アイドルステート(Idle State)モビリティ管理部505-3などが含まれ、制御プレインに対する処理全般を行う。NASセキュリティ部505-1は、NAS(Non-Access Stratum)メッセージのセキュリティなどを行う。SAEベアラコントロール部505-2は、SAE(System Architecture Evolution)のベアラの管理などを行う。アイドルステートモビリティ管理部505-3は、待受け状態(アイドルステート(Idle State);LTE-IDLE状態、または、単にアイドルとも称される)のモビリティ管理、待受け状態時のページング信号の生成および制御、傘下の1つあるいは複数の移動端末202のトラッキングエリアの追加、削除、更新、検索、トラッキングエリアリスト管理などを行う。
 MME204aは、1つまたは複数の基地局203に対して、ページング信号の分配を行う。また、MME204aは、待受け状態(Idle State)のモビリティ制御(Mobility control)を行う。MME204aは、移動端末が待ち受け状態のとき、および、アクティブ状態(Active State)のときに、トラッキングエリア(Tracking Area)リストの管理を行う。MME204aは、UEが登録されている(registered)追跡領域(トラッキングエリア:Tracking Area)に属するセルへ、ページングメッセージを送信することで、ページングプロトコルに着手する。MME204aに接続されるHome-eNB206のCSGの管理、CSG IDの管理、およびホワイトリストの管理は、アイドルステートモビリティ管理部505-3で行われてもよい。
 次に通信システムにおけるセルサーチ方法の一例を示す。図6は、LTE方式の通信システムにおいて通信端末(UE)が行うセルサーチから待ち受け動作までの概略を示すフローチャートである。通信端末は、セルサーチを開始すると、ステップST601で、周辺の基地局から送信される第一同期信号(P-SS)、および第二同期信号(S-SS)を用いて、スロットタイミング、フレームタイミングの同期をとる。
 P-SSとS-SSとを合わせて、同期信号(Synchronization Signal:SS)という。同期信号(SS)には、セル毎に割り当てられたPCIに1対1に対応するシンクロナイゼーションコードが割り当てられている。PCIの数は504通りが検討されている。この504通りのPCIを用いて同期をとるとともに、同期がとれたセルのPCIを検出(特定)する。
 次に同期がとれたセルに対して、ステップST602で、基地局からセル毎に送信される参照信号(リファレンスシグナル:RS)であるセル固有参照信号(Cell-specific Reference Signal:CRS)を検出し、RSの受信電力(Reference Signal Received Power:RSRP)の測定を行う。参照信号(RS)には、PCIと1対1に対応したコードが用いられている。そのコードで相関をとることによって他セルと分離できる。ステップST601で特定したPCIから、該セルのRS用のコードを導出することによって、RSを検出し、RSの受信電力を測定することが可能となる。
 次にステップST603で、ステップST602までで検出された一つ以上のセルの中から、RSの受信品質が最もよいセル、例えば、RSの受信電力が最も高いセル、つまりベストセルを選択する。
 次にステップST604で、ベストセルのPBCHを受信して、報知情報であるBCCHを得る。PBCH上のBCCHには、セル構成情報が含まれるMIB(Master Information Block)がマッピングされる。したがって、PBCHを受信してBCCHを得ることで、MIBが得られる。MIBの情報としては、例えば、DL(ダウンリンク)システム帯域幅(送信帯域幅設定(transmission bandwidth configuration:dl-bandwidth)とも呼ばれる)、送信アンテナ数、SFN(System Frame Number)などがある。
 次にステップST605で、MIBのセル構成情報をもとに該セルのDL-SCHを受信して、報知情報BCCHの中のSIB(System Information Block)1を得る。SIB1には、該セルへのアクセスに関する情報、セルセレクションに関する情報、他のSIB(SIBk;k≧2の整数)のスケジューリング情報が含まれる。また、SIB1には、トラッキングエリアコード(Tracking Area Code:TAC)が含まれる。
 次にステップST606で、通信端末は、ステップST605で受信したSIB1のTACと、通信端末が既に保有しているトラッキングエリアリスト内のトラッキングエリア識別子(Tracking Area Identity:TAI)のTAC部分とを比較する。トラッキングエリアリストは、TAIリスト(TAI list)とも称される。TAIはトラッキングエリアを識別するための識別情報であり、MCC(Mobile Country Code)と、MNC(Mobile Network Code)と、TAC(Tracking Area Code)とによって構成される。MCCは国コードである。MNCはネットワークコードである。TACはトラッキングエリアのコード番号である。
 通信端末は、ステップST606で比較した結果、ステップST605で受信したTACがトラッキングエリアリスト内に含まれるTACと同じならば、該セルで待ち受け動作に入る。比較して、ステップST605で受信したTACがトラッキングエリアリスト内に含まれなければ、通信端末は、該セルを通して、MMEなどが含まれるコアネットワーク(Core Network,EPC)へ、TAU(Tracking Area Update)を行うためにトラッキングエリアの変更を要求する。
 コアネットワークを構成する装置(以下「コアネットワーク側装置」という場合がある)は、TAU要求信号とともに通信端末から送られてくる該通信端末の識別番号(UE-IDなど)をもとに、トラッキングエリアリストの更新を行う。コアネットワーク側装置は、通信端末に更新後のトラッキングエリアリストを送信する。通信端末は、受信したトラッキングエリアリストに基づいて、通信端末が保有するTACリストを書き換える(更新する)。その後、通信端末は、該セルで待ち受け動作に入る。
 スマートフォンおよびタブレット型端末装置の普及によって、セルラー系無線通信によるトラフィックが爆発的に増大しており、世界中で無線リソースの不足が懸念されている。これに対応して周波数利用効率を高めるために、小セル化し、空間分離を進めることが検討されている。
 従来のセルの構成では、eNBによって構成されるセルは、比較的広い範囲のカバレッジを有する。従来は、複数のeNBによって構成される複数のセルの比較的広い範囲のカバレッジによって、あるエリアを覆うように、セルが構成されている。
 小セル化された場合、eNBによって構成されるセルは、従来のeNBによって構成されるセルのカバレッジに比べて範囲が狭いカバレッジを有する。したがって、従来と同様に、あるエリアを覆うためには、従来のeNBに比べて、多数の小セル化されたeNBが必要となる。
 以下の説明では、従来のeNBによって構成されるセルのように、カバレッジが比較的大きいセルを「マクロセル」といい、マクロセルを構成するeNBを「マクロeNB」という。また、小セル化されたセルのように、カバレッジが比較的小さいセルを「スモールセル」といい、スモールセルを構成するeNBを「スモールeNB」という。
 マクロeNBは、例えば、非特許文献7に記載される「ワイドエリア基地局(Wide Area Base Station)」であってもよい。
 スモールeNBは、例えば、ローパワーノード、ローカルエリアノード、ホットスポットなどであってもよい。また、スモールeNBは、ピコセルを構成するピコeNB、フェムトセルを構成するフェムトeNB、HeNB、RRH(Remote Radio Head)、RRU(Remote Radio Unit)、RRE(Remote Radio Equipment)またはRN(Relay Node)であってもよい。また、スモールeNBは、非特許文献7に記載される「ローカルエリア基地局(Local Area Base Station)」または「ホーム基地局(Home Base Station)」であってもよい。
 図7は、マクロeNBとスモールeNBとが混在する場合のセルの構成の概念を示す図である。マクロeNBによって構成されるマクロセルは、比較的広い範囲のカバレッジ701を有する。スモールeNBによって構成されるスモールセルは、マクロeNB(マクロセル)のカバレッジ701に比べて範囲が小さいカバレッジ702を有する。
 複数のeNBが混在する場合、あるeNBによって構成されるセルのカバレッジが、他のeNBによって構成されるセルのカバレッジ内に含まれる場合がある。図7に示すセルの構成では、参照符号「704」または「705」で示されるように、スモールeNBによって構成されるスモールセルのカバレッジ702が、マクロeNBによって構成されるマクロセルのカバレッジ701内に含まれる場合がある。
 また、参照符号「705」で示されるように、複数、例えば2つのスモールセルのカバレッジ702が、1つのマクロセルのカバレッジ701内に含まれる場合もある。移動端末(UE)703は、例えばスモールセルのカバレッジ702内に含まれ、スモールセルを介して通信を行う。
 また図7に示すセルの構成では、参照符号「706」で示されるように、マクロeNBによって構成されるマクロセルのカバレッジ701と、スモールeNBによって構成されるスモールセルのカバレッジ702とが複雑に重複する場合が生じる。
 また、参照符号「707」で示されるように、マクロeNBによって構成されるマクロセルのカバレッジ701と、スモールeNBによって構成されるスモールセルのカバレッジ702とが重複しない場合も生じる。
 さらには、参照符号「708」で示されるように、多数のスモールeNBによって構成される多数のスモールセルのカバレッジ702が、1つのマクロeNBによって構成される1つのマクロセルのカバレッジ701内に構成される場合も生じる。
 5Gでは、電波到達範囲すなわちカバレッジを広くするために、基地局(本明細書では、5Gの基地局をgNBと称する)が複数のアンテナを用いて狭範囲なビームを形成するビームフォーミングを利用して通信を行うことが提案されている。例えば、gNBは、図4に示すアンテナ408を、多素子アンテナによって構成する。gNBは、多素子アンテナの一部または全部の複数のアンテナを用いて、予め定める方向にビームを形成する。狭範囲なビーム形成を行うことによって、電波到達範囲を広くすることが可能となる。gNBで一時に形成できるビーム数が少なく、セルとして必要となるカバレッジをカバーできない場合、1つまたは複数のビームを用いて、タイミングをずらしてビームスイーピングを行い、広範囲のカバレッジをカバーする方法が提案されている(非特許文献12参照)。
 図8は、ビームスイーピングを説明するための図である。ビームスイーピングを行うために、下りビームスイーピングブロック(DL sweeping block)801と、上りビームスイーピングブロック(UL sweeping block)803とが設けられる。下りビームスイーピングブロック801と、上りビームスイーピングブロック803との間が、下りデータおよび上りデータが送信されるDL/ULデータサブフレーム805となる。
 各ブロック801,803は、参照符号「811」で示されるように、複数のリソース802,804,806を含んで構成される。各リソースは、参照符号「812」で示されるビームを用いて送信される。
 下りビームスイーピングブロック801は、予め定める下りスイーピングブロック周期Tsbpで、繰返し送信される。下りビームスイーピングブロック801では、最初の予め定める期間に、予め定める狭範囲のカバレッジに対してビームを形成して送信し、次の予め定める期間に、次の予め定める狭範囲のカバレッジに対してビームを形成して送信する。これを繰り返し行うことによって、セルとしての全カバレッジをカバーする。例えば、参照符号「802」で示されるリソースは、同期信号、PBCHおよびビーム参照信号の送信に用いられる。
 上りビームスイーピングブロック803では、最初の予め定める期間に、予め定める狭範囲のカバレッジに対してビームを形成して受信し、次の予め定める期間に、次の予め定める狭範囲のカバレッジに対してビームを形成して受信する。これを繰り返し行うことによって、セルとしての全カバレッジをカバーする。例えば、参照符号「804」で示されるリソースは、RACHの送信に用いられる。
 セルの全カバレッジをカバーする間の一連のビームスイーピングを、ビームスイーピングブロックと称する。以下の説明では、ビームスイーピングブロックの各ビームの送受信期間を「ビームユニット」と称することもある。
 ビームスイーピングブロックは、周期的に設けられる。下りビームスイーピングブロック801では、共通制御信号およびチャネルが各ビームで送信される。共通制御信号およびチャネルとして、例えば、初期アクセスに必要となる共通制御信号である、同期信号(SS)、PBCH、および参照信号(RS)などがある。上りビームスイーピングブロック803では、RACHリソースなどが、各ビームに割当てられる。
 UE813は、下りビームスイーピングブロック801の全期間で受信を行う。このようにすることによって、UE813は、セルとしてのカバレッジのどこに位置していても、該位置に送信されたビームを受信することが可能となる。したがって、UE813は、例えば、初期アクセスに必要となる共通制御信号を受信することが可能となる。UE813は、上りビームスイーピングブロック803において送信を行う。このようにすることによって、gNBは、該UE813の上り送信を受信することが可能となる。UE813は、該ビームを用いて、DL/ULデータサブフレーム805において上りデータ/下りデータをgNBとの間で送受信する。
 以上のようにして、UEは、ビームスイーピングを用いて、自UEが送受信可能なビームを見つけ、gNBとの通信に用いる。gNBが該ビームとは別のビームを用いているときは、該UEは下り信号を受信する必要はない。
 ところが、gNBが該UE向けのデータの送受信をどのタイミングで行うかを該UEは知らない。したがって、該UEは、gNBとの上り/下りのユーザデータの送受信を行うかどうかを判断するために、gNBから送信される下り制御信号を毎サブフレームで受信する必要がある。このように該UEがgNBからの下り制御信号を毎サブフレームで受信することによって、該UEの消費電力ならびに、受信に使用される周波数および時間リソースが無駄となる。
 3GPP R1-1609135(以下「参考文献1」という)において、スケジューリング単位よりも長い周期で下り制御信号を受信することが提案されている。また、3GPP R1-1610240(以下「参考文献2」という)において、gNBが下り制御信号を送信するタイミングを、ビーム毎に割り当てることが提案されている。
 ところが、前述の方法では、該周期で下り制御信号がgNBから送信されないときにおいても、UEは周期的に下り制御信号の受信動作を行う必要があるので、該UEの下り制御信号の受信動作による消費電力が無駄になるという問題が生じる。また、前述の方法では、HARQによる再送が発生した場合においても、前記再送を次の周期まで待つ必要があるので、gNBとUEとの間の通信において遅延が増加するという問題が生じる。また、前述の方法では、周期の設定方法について何ら考慮されていない。
 本実施の形態では、以上のような問題を解決する方法を開示する。
 gNBは、UEに対して、次に該UEがPDCCHの受信動作を行う必要のあるタイミング(以下「PDCCH受信タイミング」と称する)を通知する。PDCCH受信タイミングは、gNBが該UEに下り制御情報を送信する可能性のあるタイミングであってもよいし、該UEに上り/下りデータの送受信をスケジューリングする可能性のあるタイミングであってもよいし、gNBが該UEにビームを向けるタイミングであってもよい。PDCCH受信タイミングにおいて、gNBは、該UEに上り/下りデータの送受信のスケジューリング情報を通知してもよい。gNBは、該UEと上り/下りデータの送受信を行ってもよい。PDCCH受信タイミングにおいて、UEは、gNBからのPDCCHの受信動作を行う。UEは、gNBからの自UE向け下り制御情報を受信してもよい。UEは、gNBと上り/下りデータの送受信を行ってもよい。
 gNBは、PDCCH受信タイミングを、下り制御信号を用いて通知するとよい。前記下り制御信号は、L1/L2シグナリングを用いて通知するとよい。L1/L2シグナリングを用いることによって、PDCCH受信タイミングを迅速に通知することが可能となる。
 あるいは、gNBは、PDCCH受信タイミングを、MAC制御信号を用いて通知してもよい。MAC制御信号を用いることによって、HARQによる再送制御が行われるので、高い信頼性でPDCCH受信タイミングを通知することができる。
 UEは、PDCCH受信タイミングの通知を受信するまでは、PDCCHの受信動作を毎サブフレーム行うとよい。gNBは、PDCCH受信タイミングを該UEのRRC接続確立後に通知してもよいし、RRC接続確立処理中に通知してもよいし、ランダムアクセス処理中に通知してもよい。前記ランダムアクセス処理中に通知する場合には、ランダムアクセス応答にPDCCH受信タイミングの情報を含めて通知してもよい。
 PDCCH受信タイミングとして、サブフレーム番号を示す情報を通知してもよい。前記サブフレーム番号を示す情報は、例えば、サブフレーム番号であってもよいし、あるいは、サブフレーム番号を予め定める除数で割った剰余であってもよい。前記予め定める除数は、規格で定めてもよいし、gNBからUEに報知してもよいし、RRC個別シグナリングで個別に通知してもよい。
 あるいは、PDCCH受信タイミングとして、現在のサブフレームからの時間を通知してもよい。前記現在のサブフレームからの時間は、サブフレーム単位でもよいし、別の単位でもよい。
 gNBは、PDCCH受信タイミングとして、いくつかの選択肢を予め定め、gNBからUEに、選択した値の識別子を通知してもよい。前記選択肢は、規格で定めてもよいし、予めgNBからUEに通知してもよい。前記選択肢は、gNBの傘下のUEに対して報知してもよいし、個別に通知してもよい。前述の個別の通知には、RRC個別シグナリングを用いるとよい。このように前記選択肢を個別に通知することによって、gNBは、UEに対して、PDCCH受信タイミングを、前記選択肢から選択した値の識別子の形で通知することができるので、少ないビット数でPDCCH受信タイミングを通知することが可能になる。
 gNBは、UEに、PDCCH受信タイミングを複数設定してもよい。このようにすることによって、あるPDCCH受信タイミングにおいてgNBからUEへのPDCCHの送信が不可能であった場合においても、UEは、次のPDCCH受信タイミングにおいてPDCCHの受信動作をすればよいので、次のPDCCH受信タイミングまでのUEの受信電力を節約することができる。
 gNBからUEに対してPDCCH受信タイミングを複数設定するにあたり、1つの下り制御情報に複数のPDCCH受信タイミングの情報を含めてもよいし、複数の下り制御情報を多重して通知してもよい。
 あるいは、それぞれが複数のPDCCH受信タイミングを含む下り制御情報を複数用いてもよい。1つの下り制御情報におけるPDCCH受信タイミングの数に上限を設けてもよい。前記上限は規格で定めてもよい。このようにすることによって、1つの下り制御情報のサイズを一定以下に抑えつつ、複数のPDCCH受信タイミングをgNBからUEに通知することが可能となる。したがって、UEにおける下り制御情報の受信処理が簡単になる。
 複数のPDCCH受信タイミングの設定において、gNBおよびUEは、先にUEに通知したPDCCH受信タイミングと、後からUEに通知したPDCCH受信タイミングとの両方を有効にしてもよい。このようにすることによって、後からUEに通知するPDCCH受信タイミングの数を少なくすることができる。
 あるいは、先にUEに通知したPDCCH受信タイミングを無効として、後からUEに通知したPDCCH受信タイミングを有効にしてもよい。このようにすることによって、UEにおけるPDCCHの受信動作の制御を簡単にすることができるとともに、UEにおけるPDCCHの受信動作による消費電力を少なくすることができる。
 前述において、先にUEに通知したPDCCH受信タイミングを有効にするかどうかを、規格で定めてもよいし、予めgNBからUEに通知してもよいし、後からUEに通知するPDCCH受信タイミングの通知に、先に通知したPDCCH受信タイミングを有効とするかどうかの情報を含めてもよい。例えば、前記情報を後からUEに通知するPDCCH受信タイミングの通知に含めることによって、PDCCH受信タイミングの制御を柔軟に行うことが可能となる。
 図9は、gNBからUEへの、次のPDCCHを受信する必要のあるタイミングの通知、および該UEにおける上り/下りデータの送受信の一例を示す図である。図9では、gNBからUEに送信する下り制御情報によって、該UEの次の送受信タイミングが通知されている。図9において、参照符号902,906,910で示す部分は、該UEがgNBから受信する下り制御信号を表している。参照符号903,907,911で示す部分は、該UEが送受信するユーザデータを表している。太い実線の矢印904,908,912は、次のPDCCH受信タイミングが示すサブフレームの情報を表している。下り制御情報902,906,910は、該サブフレームにおけるユーザデータ904,908,912の送受信のためのスケジューリング情報を含んでもよいし、含まなくてもよい。図9においては、下り制御信号902,906,910が該サブフレームにおけるユーザデータ904,908,912の送受信のためのスケジューリング情報を含む場合について示している。
 図9において、UEは、サブフレーム901における下り制御信号902を受信する。UEは、前記下り制御信号902から、サブフレーム901のユーザデータ903の送受信のためのスケジューリング情報および次のPDCCH受信タイミングに関する情報904を取得する。UEは、gNBとの間で、ユーザデータ903を送受信する。ユーザデータ903の送受信には、下り制御信号902に含まれるスケジューリング情報を用いる。
 図9において、次のPDCCH受信タイミングに関する情報904には、UEの次のPDCCH受信タイミングが、サブフレーム905であることが示されている。UEは、サブフレーム905において、下り制御信号906を受信する。UEは、受信した下り制御信号906から、サブフレーム905のユーザデータ907に関する情報および次のPDCCH受信タイミングに関する情報908を取得する。UEは、gNBとの間で、ユーザデータ907を送受信する。ユーザデータ907の送受信には、下り制御信号906に含まれるスケジューリング情報を用いる。
 図9において、次のPDCCH受信タイミングに関する情報908には、UEの次のPDCCH受信タイミングが、サブフレーム909であることが示されている。以降の流れは、前述と同じであるので、説明を省略する。
 gNBは、次のPDCCH受信タイミングを示す下り制御情報を含むPDCCHに、他の下り制御情報を含めてもよい。前記他の下り制御情報は、例えば、上り/下りデータのスケジューリングに関する情報であってもよいし、CQI送信要求であってもよいし、UEへの電力制御指示であってもよい。
 あるいは、gNBは、UEが次にPDCCH受信タイミングを示す下り制御情報を含むPDCCHに、他の下り制御情報を含めなくてもよい。このようにすることによって、例えば、gNBが前記タイミングにおいて送受信すべき上り/下りデータの送受信がなく、かつ、gNBからUEに送信すべき下り制御情報が他にない場合においても、UEは、次のPDCCH受信タイミングをgNBから受信することができる。したがって、UEは、無駄なPDCCHの受信動作を行わないでよくなる。
 gNBは、同じビームで送受信をしている複数のUEに対して、次のPDCCH受信タイミングを通知してもよい。前記複数のUEは、該ビームを用いて送受信を行う全てのUEであってもよいし、全てのUEでなくともよい。前記タイミングの通知には、L1/L2シグナリングを用いるとよい。前記タイミングの通知は、複数のUEのそれぞれに対して行ってもよいし、該ビームを用いる全てのUEに対して一斉に行ってもよい。
 前記タイミングを、該ビームを用いる全てのUEに対して一斉に通知するにあたり、前記ビームを表す識別子を用いてもよい。例えば、下り制御情報の符号化処理に前記識別子を用いてもよい。あるいは、前記下り制御情報の変調処理に前記識別子を用いてもよい。符号化処理と変調処理との両方に前記識別子を用いてもよい。
 gNBは、複数のUEに対する下り制御信号を多重して送信してもよい。前記多重は、前記タイミングを複数のUEのそれぞれに対する通知に用いてもよい。前記多重は、周波数多重であってもよいし、時間多重であってもよいし、周波数多重と時間多重とを組合せてもよい。前記多重の方法は、規格で定めてもよいし、予めgNBから配下のUEに報知してもよいし、各UEに通知してもよい。
 前記タイミングを複数のUEのそれぞれに対して通知するにあたり、gNBは、各UEに同じタイミングを通知してもよいし、異なるタイミングを通知してもよい。複数のUEに同じ値を通知することによって、gNBは、前記複数のUEのスケジューリングを柔軟に行うことができる。例えば、前記タイミングにおいて、該ビーム内の予め定めるUEに対するユーザデータの送受信がない場合においても、該ビーム内の他のUEに対して、前記タイミングにおけるユーザデータの送受信を割り当てることができる。したがって、前記タイミングにおける周波数リソースを効率的に使用することができる。
 gNBは、UEと送受信する上り/下り信号に、他のUEに対する下り制御信号を多重してもよい。前記上り/下り信号は、該UEに対する下り制御信号を含んでもよい。前記多重は、周波数多重であってもよいし、時間多重であってもよいし、周波数多重と時間多重とを組合せてもよい。前記多重の方法は、規格で定めてもよいし、予めgNBから配下のUEに報知してもよいし、各UEに通知してもよい。このようにすることによって、例えば、gNBは、該UEとの上り/下りデータの送受信と、該UEの次のPDCCH受信タイミングの通知に加え、他のUEの次のPDCCH受信タイミングを通知することができるので、周波数リソースおよび時間リソースを効率的に使用することができる。
 gNBは、UEの次のPDCCH受信タイミングにおいて、該UEに対するPDCCHを送信しなくてもよい。該UEとの上り/下り送受信を行わなくてもよい。これによって、gNBは、UEとの送受信データがない場合における消費電力を抑えることができる。
 UEの次のPDCCH受信タイミングをgNBが判断するために必要な情報の具体例として、以下の(1)~(11)の11個を開示する。
 (1)チャネル状況。例えば、CQI/CSI。
 (2)チャネル状況の変動。例えば、CQI/CSIの変動。
 (3)バッファ滞留量。
 (4)バッファ滞留量の変動。
 (5)目標サービス品質(target Quality of Service:target QoS)。
 (6)目標サービス品質と実際のサービス品質の差分。
 (7)ビーム内にいるUEの情報。例えば、ビーム内にいるUE数。
 (8)マスターeNBから自gNBに送信されるユーザデータのスループット。
 (9)上位ネットワーク装置から自gNBに送信されるユーザデータのスループット。
 (10)自gNBからセカンダリeNBに送信するユーザデータのスループット。
 (11)前記(1)~(10)の組合せ。
 前記(1)において、例えば、gNBは、UEから通知されるCQI/CSIが悪いときに、該UEに対する前記タイミングまでの期間を長く設定し、CQI/CSIが良いときに、前記タイミングまでの期間を短く設定することによって、CQI/CSIが良いUEに対して頻繁に送受信タイミングを割り当ててもよい。これによって、システム全体としてのスループットを高めることができる。あるいは、例えば、CQI/CSIが悪いときに前記タイミングまでの期間を短く設定してもよい。これによって、該UEにおけるHARQの初送から再送までの時間を短くできるので、HARQ再送による遅延を小さくすることができる。
 前記(2)において、例えば、UEから通知されるCQI/CSIの変動が大きいときに、gNBが該UEに対する前記タイミングを短く設定することによって、gNBによるスケジューリングを通信チャネルの変動に迅速に追従させることができる。
 前記(3)において、gNBは、下り通信用のバッファ滞留量を用いてもよいし、上り通信用のバッファ滞留量を用いてもよい。上り通信用のバッファ滞留量は、UEからgNBに通知するバッファ状態報告(Buffer Status Report:BSR)を用いてもよいし、他の値を用いてもよい。
 前記(3)において、例えば、UEにおけるバッファ滞留量が大きいときに、gNBが該UEに対する前記タイミングまでの期間を短く設定することによって、gNBと該UEとの通信が頻繁に行われるので、該UEにおけるバッファ溢れを防ぐことができる。
 また、前記(3)におけるバッファ滞留量は、例えば、下り通信においては、他のUE向けデータのバッファ滞留量との相対値でもよいし、上り通信においては、他のUEのバッファ滞留量との相対値でもよい。前述の相対値を用いることによって、バッファ滞留量が多いUEに対して、前記タイミングまでの期間を短く設定することができるので、バッファ滞留量が多いUEのバッファ溢れを防ぐことができる。
 前記(4)において、例えば、UEのバッファ滞留量が増加しているときに、該UEに対する前記タイミングまでの期間を短く設定することによって、gNBによるスケジューリングのバッファ滞留量増加への追従を迅速に行うことができる。
 前記(5)において、例えば、超高信頼性・低遅延(Ultra Reliability and Low Latency Communication:URLLC)のサービスを用いて通信するUEに対し、前記タイミングまでの期間を短く設定することによって、該UEにおける遅延を小さくすることができる。
 前記(6)において、例えば、モバイルブロードバンド(enhanced Mobile BroadBand:eMBB)のサービスを用いて通信するUEに対し、予め定める通信速度を確保できないときに、前記タイミングまでの期間を短く設定してもよい。これによって、該UEにおける通信速度を上げて前記予め定める通信速度を確保することができる。
 前記(7)において、例えば、あるビームに多くのUEが在圏している場合、前記UEのそれぞれに対して前記タイミングまでの期間を短く設定することによって、各UEのスループットを確保することができる。
 前記(8)において、例えば、DCにおいて該gNBがマスターeNBから受信するユーザデータが増加しているときに、該gNBは配下のUEに対して前記タイミングまでの期間を短く設定することによって、該gNBは、前記ユーザデータを滞留させることなく、UEに送信することができる。ここで、前記マスターeNBは、LTEの基地局であるが、5Gの基地局に置き換えたもの、すなわち、DCにおいてマスターとなる基地局、例えば、マスターgNBであってもよい。
 前記(9)において、例えば、該gNBが上位ネットワーク装置から受信するユーザデータが増加しているときに、前記タイミングまでの期間を短く設定することによって、前記ユーザデータを滞留させることなく、UEに送信することができる。ここで、該gNBは、DCの構成をとっていてもよい。前記DCの構成において、該gNBは、マスターとなる基地局であってもよい。また、前記上位ネットワーク装置は、LTEにおける上位ネットワーク装置であってもよいし、5Gにおける上位ネットワーク装置であってもよい。
 前記(10)において、例えば、DCにおいて該gNBがマスターとなる基地局である場合、該gNBからセカンダリeNBに送信するユーザデータのスループットが減少しているときに、前記タイミングまでの期間を短く設定してもよい。これによって、該gNBからUEへのユーザデータ送信において、該gNBにおける滞留を抑制することができる。ここで、セカンダリeNBは、5Gの基地局に置き換えたもの、すなわち、DCにおいてセカンダリとなる基地局、例えば、セカンダリgNBであってもよい。
 前記(11)において、例えば、前記(3)と前記(7)とを組合せ、あるビームを用いているUEのバッファ滞留量を合算し、また、合算したバッファ滞留量が多いビームを用いているUEに前記タイミングまでの期間を短く設定することによって、前記ビームを用いているUEとの通信におけるバッファ溢れを防ぐことができる。
 また、例えば、前記(11)において、前記(9)と前記(10)とを組合せ、例えば、該gNBがマスター基地局となるDC構成において、上位ネットワーク装置から自gNBに送信されるユーザデータのスループットから、該gNBからセカンダリeNBに送信されるユーザデータのスループットを減じた値を用い、前記減じた値が増加しているときに、前記タイミングまでの期間を短く設定してもよい。このようにすることによって、該gNBに蓄積されるデータ量を用いて前記タイミングを設定できるようになるので、該gNBにおける滞留を抑制しつつ、UEにユーザデータを送信することができる。
 gNBからUEへの次のPDCCH受信タイミングの通知について、gNBは、予め定める期間におけるPDCCH受信タイミングを該UEに通知してもよい。PDCCH受信タイミングは複数であってもよい。gNBは、前記期間における送受信タイミングを決定するとよい。UEは、前記タイミングでgNBとの送受信を行う。このようにすることによって、gNBは、UEに毎回PDCCH受信タイミングを通知する必要がなくなり、また、gNBが、あるPDCCH受信タイミングで該UEと通信ができない場合においても、gNBと該UEとは、次のPDCCH受信タイミングにおいて通信を行うことが可能となる。
 前述において、gNBは、UEに、前記予め定める期間を通知するとよい。予め定める期間として、例えば、満了までの該UEとのデータの送受信回数を用いてもよいし、満了までのサブフレーム数を用いてもよいし、満了時のサブフレーム番号を用いてもよい。
 gNBは、UEに、予め定める期間とPDCCH受信タイミングとを別々に通知してもよい。あるいは、予め定める期間とPDCCH受信タイミングとを同時に通知してもよい。予め定める期間とPDCCH受信タイミングとを同じ下り制御情報を用いて通知してもよいし、異なる下り制御情報を用いて通知してもよい。UEは、前記通知を用いて、予め定める期間を更新してもよいし、PDCCH受信タイミングを更新してもよい。
 gNBは、予め定める期間として示す値を直接UEに通知してもよいし、いくつかの選択肢を予め定め、gNBからUEに、選択した値の識別子を通知してもよい。前記選択肢は、規格で定めてもよいし、予めgNBからUEに通知してもよい。前記選択肢の通知は、gNBの傘下のUEに対して報知してもよいし、個別に通知してもよい。前述の個別の通知は、RRC個別シグナリングを用いるとよい。このようにすることによって、gNBは、UEに対し、前記期間を、前記選択肢から選択した値の識別子の形で通知できるので、少ないビット数で前記期間を通知することが可能になる。
 gNBは、UEに、PDCCH受信タイミングをビットマップの形式で通知してもよい。例えば、予め定める期間までのサブフレーム数を10として、PDCCH受信タイミングとして、1サブフレーム後、3サブフレーム後、6サブフレーム後、8サブフレーム後を指定する場合、前記タイミングに対応するビットを「1」とし、それ以外のビットを「0」とし、UEに通知するビットマップとして、「1010010100」としてもよい。このようにすることによって、PDCCH受信タイミングを少ないビット数で通知することが可能となる。前記において、「1」と「0」を逆としてもよい。
 前記期間およびPDCCH受信タイミングは、gNBからUEに対して変更可能としてもよい。gNBは、前記期間およびPDCCH受信タイミングを、準静的に変更してもよいし、動的に変更してもよい。gNBは、UEに対して、前記期間およびPDCCH受信タイミングを、該UEに対するPDCCH受信タイミングのたびに通知してもよいし、前記期間内においてPDCCH受信タイミングの変更を行うときのみ通知してもよいし、前記期間を更新するときに通知してもよい。gNBは、UEに対して、前記期間が満了する前に前記期間およびPDCCH受信タイミングを更新することが望ましい。このようにすることによって、UEがPDCCHの受信動作を毎サブフレーム行うことによる電力の浪費を防ぐことができる。あるいは、gNBは、UEに対して、前記期間が満了した後すぐに前記期間およびPDCCH受信タイミングを通知してもよい。
 gNBは、UEに対して、前記期間およびPDCCH受信タイミングを準静的に通知してもよいし、動的に通知してもよい。前記準静的な通知として、例えば、RRC個別シグナリングを用いてもよい。また、前記動的な通知として、例えば、MAC制御信号を用いてもよいし、L1/L2シグナリングを用いてもよい。前記期間の通知と前記タイミングの通知とには、同じ方法を用いてもよいし、異なる方法を用いてもよい。また、前述の方法を組合せて用いてもよい。例えば、gNBがUEに対して、前記期間をRRC個別シグナリングを用いて通知し、また、PDCCH受信タイミングをL1/L2シグナリングを用いて通知することによって、前記期間内における前記タイミングの動的な変更を、少ないシグナリング量で行うことができる。
 gNBが前記期間およびPDCCH受信タイミングを判断するために必要な情報として、前述の送受信タイミングを判断するために必要な情報の具体例として開示した前記(1)~(11)を用いてもよい。
 図10は、gNBからUEへの、予め定める期間におけるPDCCH受信タイミングの通知および該UEにおける上り/下りデータの送受信の一例を示す図である。図10では、gNBからUEに送信する下り制御情報によって、前記期間および前記タイミングが通知されている。また、図10において、参照符号1001,1007で示す部分は、UEがgNBから受信する下り制御信号のうち、該UE向けの予め定める期間およびPDCCH受信タイミングの通知があるものを表している。
 参照符号1003,1005,1009で示す部分は、該UEがgNBから受信する下り制御信号を表している。参照符号1002,1004,1006,1008,1010で示す部分は、該UEがgNBと送受信するユーザデータを表している。太い実線の矢印は、該UEのPDCCH受信タイミングの情報を表している。また、予め定める期間T0を太い点線で表しており、下り制御信号における予め定める期間T0の情報を、太い一点鎖線で表している。細い実線の矢印は、該サブフレームにおけるユーザデータの送受信のためのスケジューリング情報を表している。下り制御信号1001,1003,1005,1007,1009は、該サブフレームにおけるユーザデータ1002,1004,1006,1008,1010の送受信のためのスケジューリング情報を含んでもよいし、含まなくてもよい。図10においては、下り制御信号1001,1003,1005,1007,1009が、該サブフレームにおけるユーザデータ1002,1004,1006,1008,1010の送受信のためのスケジューリング情報を含む場合について示している。
 図10において、UEは、下り制御信号1001,1003,1005,1007,1009を受信する。このうち、下り制御信号1001,1007には、該サブフレームのユーザデータの送受信のためのスケジューリング情報に加え、予め定める期間に関する情報および予め定める期間内のPDCCH受信タイミングに関する情報が格納されている。UEは、PDCCH受信情報を取得し、取得した前記情報が格納されていた下り制御信号1001,1007よりも後の下り制御信号1003,1005,1009の受信を行う。UEは、下り制御信号1001,1003,1005,1007,1009から取得したスケジューリング情報を用いてユーザデータ1002,1004,1006,1008,1010の送受信を行う。
 図10において、gNBは、下り制御信号1003,1005,1009においても、PDCCH受信タイミングをUEに通知してもよい。予め定める期間を併せて通知してもよい。このようにすることによって、前記UE向けのPDCCH受信タイミングの通知における冗長性が増すので、PDCCH受信タイミングの通知の信頼性を向上させることができる。
 図10において、gNBは、下り制御信号1003,1005,1009において、PDCCH受信タイミングをUEに通知しなくてもよい。このようにすることによって、下り制御信号のビット数を節約することができる。
 前述の、gNBからUEへのPDCCH受信タイミングの通知の他の例として、gNBは、前述とは逆に、UEに、gNBからのPDCCHの受信動作を行わなくてよいタイミング(以下「PDCCH受信不要タイミング」と称する)を通知してもよい。PDCCH受信不要タイミングは、予め定める期間と併せて通知してもよい。UEは、PDCCH受信不要タイミングに該当しないサブフレームにおいて、gNBからのPDCCHの受信動作を行うこととしてもよい。
 PDCCH受信不要タイミングは、予め定める期間におけるPDCCH受信タイミングの通知と同様に、サブフレーム番号を用いて通知してもよいし、現在から数えたサブフレーム数として通知してもよいし、あるいはビットマップの形式として通知してもよい。
 gNBは、PDCCH受信不要タイミングとして、既に他のUEへのスケジューリングが決まっているサブフレームを指定してもよい。このようにすることによって、gNBは、PDCCH受信不要タイミング以外におけるサブフレームの範囲中で、UEに対して柔軟にスケジューリングを行うことができる。
 gNBからUEへのPDCCH受信タイミングの通知の他の例として、gNBは、UEに、PDCCH受信周期を設定してもよい。PDCCH受信周期は、サブフレーム単位で通知してもよいし、他の単位で通知してもよい。PDCCH受信周期の設定方法を開示する点で、本実施の形態は参考文献1と異なる。
 前述の、PDCCH受信周期の設定において、gNBは、UEに、PDCCH受信周期の有効期間を併せて設定してもよい。有効期間の設定は、前述の予め定める期間と同様に行うとよい。
 gNBは、UEに対して、PDCCH受信周期と併せてPDCCH受信タイミングのオフセットを通知するとよい。前記オフセットは、サブフレーム番号として通知してもよいし、前記サブフレーム番号の前記周期による剰余として通知してもよいし、該UEにおける次のPDCCH受信タイミングまでの時間として通知してもよい。前記時間は、サブフレーム単位で通知してもよいし、他の単位で通知してもよい。
 gNBは、UEに対して、PDCCH受信周期および前記オフセットと併せて、PDCCH受信周期および前記オフセットが有効になるタイミングを通知するとよい。有効になるタイミングは、サブフレーム番号で通知してもよいし、通知時から有効になるまでの時間として通知してもよい。
 gNBは、UEに対して、PDCCH受信周期、前記オフセットおよび前記有効になるタイミングをそれぞれ別々に通知してもよいし、複数のものを同時に通知してもよい。
 gNBは、PDCCH受信周期として示す値を直接UEに通知してもよいし、いくつかの選択肢を予め定め、gNBからUEに、選択した値の識別子を通知してもよい。前記選択肢は、規格で定めてもよいし、予めgNBからUEに通知してもよい。前記選択肢の通知は、gNBの傘下のUEに対して報知してもよいし、個別に通知してもよい。前述の個別の通知は、RRC個別シグナリングを用いるとよい。このように前記選択肢を個別に通知することによって、gNBは、UEに対して、PDCCH受信周期を、前記選択肢から選択した値の識別子の形で通知できるので、少ないビット数でPDCCH受信周期を通知することが可能になる。前記オフセットおよび前記有効になるタイミングについても同様としてもよい。
 gNBは、UEに対して、PDCCH受信周期、前記オフセットおよび前記有効になるタイミングを準静的に通知してもよいし、動的に通知してもよい。前記準静的な通知として、例えば、RRC個別シグナリングを用いてもよい。また、前記動的な通知として、例えば、MAC制御信号を用いてもよいし、L1/L2シグナリングを用いてもよい。PDCCH受信周期、前記オフセットおよび前記有効になるタイミングの通知には、同じ方法を用いてもよいし、異なる方法を用いてもよい。また、前述の方法を組合せて用いてもよい。
 gNBは、UEに、予め定める周期におけるPDCCH受信タイミングを通知してもよい。前記通知において、例えばビットマップを用いてもよい。前記ビットマップにおいて、予め定める周期をビット数としてもよい。また、PDCCH受信タイミングに「1」を対応付け、それ以外のサブフレームに「0」を対応付けてもよい。また、ビットの位置を、サブフレーム番号の予め定める周期による剰余に対応付けてもよい。例えば、予め定める周期を4サブフレームとし、UEのPDCCH受信タイミングを、サブフレーム番号の予め定める周期による剰余が0、1、3とした場合、gNBはUEに前記ビットマップとして「1101」を通知してもよい。このようにすることによって、gNBからUEへのPDCCH受信タイミングの割り当てを柔軟に行うことができる。
 gNBは、異なるUEに対して、異なる割合でPDCCH受信タイミングを配分してもよい。
 例えば、UE#1のPDCCH受信タイミングを、サブフレーム番号を3で割った余りが0あるいは1となるサブフレームとし、UE#2のPDCCH受信タイミングを、サブフレーム番号を6で割った余りが4となるサブフレームとし、UE#3のPDCCH受信タイミングを、サブフレーム番号を6で割った余りが5となるサブフレームとしたとき、gNBがUE#1、UE#2、UE#3のそれぞれに対して通知するビットマップを、それぞれ、「110」、「000010」、「000001」としてもよい。このようにすることによって、異なるUEへのPDCCH受信タイミングの割り当てを柔軟に行うことができる。
 gNBが前記予め定める周期、前記オフセット、前記有効になるタイミングを判断するために必要な情報として、前述のPDCCH受信タイミングを判断するために必要な情報の具体例として開示した前記(1)~(11)を用いてもよい。
 UEは、gNBから送信されるPDCCHの受信動作を毎サブフレーム行うとしてもよい。UEがPDCCHの受信動作を毎サブフレーム行う契機としては、例えば、UEのPDCCH受信タイミングが過ぎた、あるいは存在しない場合でもよいし、前述の、予め定める期間が満了した場合でもよいし、gNBからの下り制御信号を正常に受信できなかった場合でもよいし、gNBからの下りユーザデータを正常に受信できなかった場合でもよい。このようにして、UEがPDCCHの受信動作を毎サブフレーム行うことによって、UEは、gNBから自UE向けの下り制御信号を受信することができ、gNBとの通信を復旧あるいは継続させることができる。
 gNBは、UE向けの下りユーザデータの再送を、初送データを送信した次のPDCCH受信タイミングを用いて行ってもよい。あるいは、次のPDCCH受信タイミングによらず、初送データを送信したタイミングの次のサブフレームで、gNBはUEに再送を行ってもよい。UEは、前記再送を、初送の次のPDCCH受信タイミングで受信してもよいし、初送の次のサブフレームで受信してもよい。あるいは、UEは、PDCCH受信の毎サブフレーム実行を用いてgNBから再送データを受信してもよい。gNBが再送を初送の次のサブフレームで行うことによって、gNBおよびUE間の通信において、Nackによる遅延を少なくすることができる。また、例えば、UEが次のPDCCH受信タイミングの通知に用いられるRRCシグナリングあるいはMAC制御情報を正常に受信できなかった場合に、UEは、次のサブフレームにおいて、PDCCH受信タイミングを取得することができる。
 gNBが再送に初送の次のサブフレームを用いるか否かを表す情報を、gNBは、UEに予め通知するか、あるいは、規格で定めるとよい。gNBは、傘下のUEに対する報知によって前記通知を行ってもよいし、UEにRRC個別シグナリングを送信することによって前記通知を行ってもよい。UEは、前記通知を用いて、再送を初送の次のサブフレームで受信するかどうかを判断してもよい。
 gNBは、UEへの再送に初送の次のサブフレームを用いるか否かを、該UEが在圏するビームの情報を用いて決めてもよい。前記ビームの情報は、例えば、該ビームに在圏するUEの数であってもよい。例えば、該ビームに在圏するUEが多い場合は、該UEへの再送に初送の次のサブフレームを用いないとしてもよい。このようにすることによって、例えば、該UEへの再送によって他のUEと送受信すべきデータが輻輳することを防ぐことができる。
 他の例として、UEが用いるサービスの情報を用いて決めてもよい。例えば、該UEがURLLCのサービスを用いる場合に、該UEへの再送に初送の次のサブフレームを用いるとしてもよい。このようにすることによって、例えば、URLLCにおける低遅延といったように、該UEが用いるサービスの要件を満たすことができる。
 前述において、UEへの再送を初送の次のサブフレームとする代わりに、指定のサブフレームだけ後のサブフレームとしてもよい。このようにすることによって、gNBから該UEへの再送が発生する場合においても、他のUEへの通信を継続させることができる。
 前記指定のサブフレームの値について、規格で決定してもよいし、gNBから傘下のUEに対して報知してもよいし、各UEに対してRRCシグナリングで通知してもよい。gNBは、前記サブフレームの値を、UEが用いるビームの情報を用いて決めてもよいし、UEが用いるサービスの情報を用いて決めてもよい。
 gNBは、UEにおける次のPDCCH受信タイミングにおいて、他のUEとの送受信を行ってもよい。前記他のUEとの送受信とは、例えば、前記他のUEの再送であってもよいし、優先度が高い通信であってもよい。前記優先度は、例えば、UEが用いるサービスの種別を用いて、規格によって決めてもよいし、gNBが決定してもよい。
 前述において、gNBは、PDCCH受信タイミングにおいて、該UE、すなわち、PDCCH受信タイミングにおいて前記他のUEに割り込まれたUEに、L1/L2シグナリングを送信しなくてもよい。該UEは、PDCCHを毎サブフレームで連続して受信する動作に戻ってもよいし、PDCCH受信タイミングの次のPDCCH受信タイミングでgNBからのPDCCHを受信する動作を行ってもよい。
 前述において、gNBは、該UEに、さらに次のPDCCH受信タイミングを通知してもよい。前記通知は、L1/L2シグナリングを用いて行ってもよい。該UE向けのL1/L2シグナリングと、前記他のUE向けのL1/L2シグナリングとを多重して送信してもよい。前記多重は、例えば、異なるシンボルを用いた時間多重でもよいし、複数のビームを用いた空間多重でもよいし、両者を組合せて用いてもよい。前記時間多重において、該UE向けのL1/L2シグナリングが先でもよいし、前記他のUE向けのL1/L2シグナリングが先でもよい。gNBがどちらのL1/L2シグナリングを先とするかについては、予め規格で定めるとよい。該UEおよび前記他のUEは、前記規格に基づいて、それぞれ自UE向けのL1/L2シグナリングをgNBから受信するとよい。
 前述において、gNBは、該UEに、ビームスイーピングブロックを用いて次のPDCCH受信タイミングを通知してもよい。gNBは、前記ビームスイーピングブロックを用いた通知において、該UEを表す識別子と、前記タイミングとを併せて通知するとよい。UEは、ビームスイーピングブロックの受信によって、次のPDCCH受信タイミングを取得してもよい。UEは、前記ビームスイーピングブロックの受信を、PDCCH受信タイミングにおいて他のUEに割り込まれたことを契機として行ってもよいし、常に行ってもよい。UEは、ビームスイーピングブロックからのPDCCH受信タイミングの取得を契機として、毎サブフレームで連続してPDCCHを受信することを止めてもよい。このようにすることによって、UEは、ビームスイーピングブロック以降の毎サブフレームで連続してPDCCHを受信する必要がなくなるので、UEの消費電力を削減することができる。
 gNBは、ビームスイーピングブロックによるPDCCH受信タイミングの通知を、該UEとは別のUEに対して行ってもよい。前記別のUEへの通知は、前記別のUEにおける次のPDCCH受信タイミングよりも早いビームスイーピングブロックで行うことが望ましい。このようにすることによって、前記別のUEは、自UEにおけるPDCCH受信タイミングよりも早いタイミングで、gNBとの送受信を行うことができる。
 本実施の形態に示した、UEにおける下り制御情報の指定タイミングにおける受信、周期的な受信、あるいは毎サブフレーム受信を、切り替え可能な構成としてもよい。gNBは、UEに対して、下り制御チャネル受信方法の切り替えを指示する通知を送ってもよい。UEは、前記通知を用いて、下り制御情報の受信方法を切り替えてもよい。前記通知は、前記受信方法を表す識別子を含むとよい。前記通知について、gNBからUEに対して、RRC個別シグナリングを用いて準静的に通知してもよいし、MAC制御信号を用いて動的に通知してもよいし、L1/L2シグナリングを用いて動的に通知してもよい。
 本実施の形態において示す方法を、上りデータの通信に用いてもよい。その際に、gNBからUEに通知する内容は、下りデータの通信の場合と同じでよい。上りデータの通信においては、前記UEへの上りグラントの通知を併せて行うとよい。
 gNBは、UEが初送データを受信した次のPDCCH受信タイミングを用いて、UEにAck/Nackを通知してもよい。gNBからUEへのAck/Nack通知とグラントの通知とを、同時に行ってもよいし、別々に行ってもよい。UEは、前記Ack/Nack通知およびグラントを用いて、前記グラントを受信したサブフレームと同じサブフレームでgNBに上りデータを送信してもよいし、別のサブフレームで送信してもよい。
 UEにおける次のPDCCH受信タイミングによらず、UEが初送データを送信したサブフレームの次のサブフレームにおいて、gNBは、UEにAck/Nackを通知してもよい。UEは、前記次のサブフレームにおいて、gNBからのAck/Nackを受信してもよい。前述において、次のサブフレームの代わりに、予め定めるサブフレーム数だけ後のサブフレームでもよい。前記予め定めるサブフレーム数は、規格で定めてもよいし、gNBから傘下のUEに報知してもよいし、gNBからUEに、RRC個別シグナリングで通知してもよい。
 前述において、前記次のPDCCH受信タイミングによらず、gNBがUEにAck/Nackを送信したサブフレームから予め定めるサブフレーム数だけ後のサブフレームで、gNBは、UEにグラントを通知してもよい。前述において、予め定めるサブフレーム数は、0でもよいし、1でもよいし、2以上の値でもよい。予め定めるサブフレーム数が0の場合は、Ack/Nackを送信したサブフレームと同じサブフレームでグラントが通知されるとしてもよい。前記予め定めるサブフレーム数は、規格で定めてもよいし、gNBから傘下のUEに報知してもよいし、gNBからUEにRRC個別シグナリングで通知してもよい。
 前述において、前記次のPDCCH受信タイミングによらず、gNBがUEにグラントを送信したサブフレームから予め定めるサブフレーム数だけ後のサブフレームで、UEは、gNBに再送データを送信してもよい。前述において、予め定めるサブフレーム数は、0でもよいし、1でもよいし、2以上の値でもよい。予め定めるサブフレーム数が0の場合は、UEがグラントを受信したサブフレームと同じサブフレームで再送データがUEから送信される。前記予め定めるサブフレーム数は、規格で定めてもよいし、gNBから傘下のUEに報知してもよいし、gNBからUEにRRC個別シグナリングで通知してもよい。前記予め定めるサブフレーム数は、初送におけるグラントから初送データの間のサブフレーム数と同じであることが望ましい。
 前述において、gNBは、Ack/Nack情報をUEへの上りグラントの中に含めてもよい。すなわち、gNBは、次の上り信号の受信に用いるグラントのUEへの通知において、前回の前記UEからの上り信号の受信に対するAck/Nackを含めてもよい。UEは、前記Ack/Nackを用いて、次のユーザデータの初送あるいは再送を行うとよい。
 前述において、gNBは、AckをUEに通知しなくてもよい。UEは、予め定める時間の間、上りデータに関するAck/Nackを受信しなかったことを用いて、該上りデータがgNBに正しく受信されたとみなしてもよい。前記予め定める時間は、規格で定めてもよいし、gNBの傘下のUEに対してgNBが報知してもよいし、各UEに対してRRC個別シグナリングで通知してもよい。また、gNBは、前記予め定める時間を、UEが使用するサービスを用いて決めてもよい。例えば、URLLCを用いるUEには、eMBBを用いるUEよりも短い時間を設定してもよい。
 前述の、Ack/Nackを上りグラントの中に含める方法と、AckをUEに通知しない方法とを組合せて用いてもよい。このようにすることによって、UEは、連続する上りユーザデータを送信し終えたときにおいても、gNBからのグラントを受信する必要がなく、最後の上りユーザデータがgNBによって正常に受信されたことを知ることができる。また、gNBは、最後の上りユーザデータに対するAckを、UEに通知しなくてもよいので、通信リソースの節約になる。
 図11は、上り通信において、Ack/Nackの通知および再送を上り初送の次のサブフレームで行う場合の送受信チャネルを示す図である。図11において、参照符号1101で示す部分は、gNBから該UEに通知するグラントを含む下り制御情報を示している。また、参照符号1102,1104で示す部分は、該UEからの上りユーザデータを示している。また、参照符号1103で示す部分は、gNBから該UEに通知するNackおよびグラントを含む下り制御情報を示している。また、参照符号1105で示す部分は、gNBから該UEへのAckの通知を含む下り制御情報を示している。
 図11は、グラントに対する上りユーザデータが前記グラントと同じサブフレームで送信され、かつ、上りユーザデータに対するAck/Nackが次のサブフレームで送信され、かつ、Nackと再送用のグラントが同じサブフレームで送信され、かつ、Nackと同じサブフレームで再送が行われる場合について示している。
 図11に示すサブフレーム#2は、該UEのPDCCH受信タイミングとして割り当てられている。前記サブフレーム#2において、gNBは、該UEに対してグラント1101を含む下り制御情報を通知する。該UEは、前記グラントを含む下り制御情報1101と同じサブフレームであるサブフレーム#2において、gNBに上りユーザデータ1102を送信する。
 図11において、gNBは、前記上りユーザデータ1102を正しく受信できなかった場合、サブフレーム#3を該UEに割り当て、該UEに対して、Nackおよび再送用のグラントを含む下り制御情報1103を通知する。該UEは、サブフレーム#3において、Nackおよび再送用のグラントを含む下り制御情報1103を受信し、受信した下り制御情報からAck/Nackを取得する。該UEは、gNBからのNackの通知を受けて、サブフレーム#3において、上りユーザデータ1104を送信する。
 図11に示すサブフレーム#4において、gNBは、Ackを含む下り制御情報1105を該UEに通知する。該UEは、サブフレーム#4において、Ackを含む下り制御情報1105を受信し、受信した下り制御情報からAck/Nackを取得する。
 本実施の形態における上り通信において、gNBは、UEにAckを通知するサブフレームを他のUEに割り当ててもよいし、該UEに割り当ててもよい。
 前述の、他のUEへの割り当てにおいては、gNBは、該UE向けのAck/Nackと他のUEへの下り制御信号とを多重して送信してもよい。前記多重は、異なるシンボルを用いた時間多重としてもよいし、同じシンボル内での周波数多重としてもよい。あるいは、時間多重と周波数多重とを組合せてもよい。時間多重においては、該UE向けのAck/Nackの通知が先でもよいし、前記他のUE向けのL1/L2シグナリングが先でもよい。gNBがどちらの信号を先とするかについては、予め規格で定めるとよい。該UEおよび前記他のUEは、前記規格に基づいて、それぞれ自UE向けの信号をgNBから受信するとよい。
 前述において、gNBは、PDCCH受信タイミングにおいて、該UE、すなわち、PDCCH受信タイミングにおいて前記他のUEに割り込まれたUEに対する動作として、下り送信と同じ動作を用いてもよい。すなわち、gNBは、該UEに、L1/L2シグナリングを送信しなくてもよいし、さらに次のPDCCH受信タイミングを通知してもよいし、ビームスイーピングブロックを用いて次のPDCCH受信タイミングを通知してもよい。該UEは、毎サブフレームで連続して受信を行ってもよいし、さらに次のPDCCH受信タイミングを受信してもよいし、ビームスイーピングブロックを受信してもよい。
 本実施の形態において、UEが、次のPDCCH受信タイミングまでの間に別のビーム、TRP(Transmission Reception Point)、あるいはセルに帰属するにあたり、UEは、無線リンク障害(Radio Link Failure:RLF)を検出してもよい。あるいは、UEは、ビームスイーピングブロックを受信してもよい。UEは、前記ビームスイーピングブロックの受信において、受信したビームを用いてgNBへのランダムアクセス処理を行ってもよい。
 前述において、gNBは、移動元ビームと移動先ビームとで、同じPDCCH受信タイミングを用いてもよいし、異なるPDCCH受信タイミングを用いてもよい。
 前述において、gNBは、移動元TRPと移動先TRPとで、同じPDCCH受信タイミングを用いてもよいし、異なるPDCCH受信タイミングを用いてもよい。移動先TRPは、移動元TRPに、移動元TRPで用いていたPDCCH受信タイミングの通知を要求してもよい。前記要求は、gNB内のTRPに対して一斉に行ってもよい。移動元TRPは、移動先TRPに、PDCCH受信タイミングを通知してもよい。
 前述において、gNBは、移動元セルと移動先セルとで、同じPDCCH受信タイミングを用いてもよいし、異なるPDCCH受信タイミングを用いてもよい。移動先セルは、移動元セルに、移動元セルで用いていたPDCCH受信タイミングの通知を要求してもよい。前記要求は、セル間インタフェースを用いて行ってもよい。移動元セルは、移動先セルに、PDCCH受信タイミングを通知してもよい。
 本実施の形態に示す方法によって、マルチビームのgNBとの通信において、UEが下り制御信号の受信に要する消費電力および無線リソースを節約することができる。また、Nack後の再送を迅速に行うことによって、gNBとの通信の遅延を抑制することができる。
 すなわち、本実施の形態によれば、基地局装置(gNB)によって通信端末装置(UE)に、次のPDCCH受信タイミングに関する情報が通知される。通知端末装置は、基地局装置から通知された次のPDCCH受信タイミングに関する情報に基づいて受信を行う。これによって、通信端末装置は、通知されたPDCCH受信タイミングで、基地局装置から送信される情報を受信することができるので、受信に要する消費電力および無線リソースを節約することができる。また、再送が必要な場合には、迅速に再送を行うことができるので、基地局装置と通信端末装置との通信の遅延を抑制することができる。したがって、通信端末装置の消費電力の増大、通信品質の劣化、および無線リソースの使用効率の減少を抑えることができる。
 特に本実施の形態では、基地局装置(gNB)と通信端末装置(UE)とは、アンテナから放出されるビームの指向性を切替えて送受信を行う。この場合に、前述のように基地局装置によって通信端末装置に、次の受信タイミングに関する情報を通知することによって、通信端末装置は、自装置とは別の方向にビームが向けられているときには、受信を行わないようにすることができる。したがって、通信端末装置の消費電力の増大、通信品質の劣化、および無線リソースの使用効率の減少を抑えることができる。
 本実施の形態において記載した方法を、シンボル単位でビームを切り替えることのできる通信システムに適用してもよい。また、同時に複数のビームを用いて通信できる通信システムに適用してもよい。また、前記を組合せた通信システムに適用してもよい。シンボル単位でビームを切り替えることによって、異なるビームに属するUEに対して、PDCCH受信タイミングを同じサブフレーム内で通知することができるようになり、gNBのスケジューリングの柔軟性を向上させることができる。同時に複数のビームを用いて通信することによっても、同じ効果が得られる。
 本実施の形態において記載した方法を、シングルビームのgNB、すなわち、ビームスイーピングを行わないgNBに適用してもよい。本実施の形態のシングルビームのgNBに適用することによって、他のgNBへの干渉を低減することができる。
 実施の形態2.
 LTEでは、上り制御情報(Uplink Control Information:UCI)がマッピングされる物理制御チャネルとしてPUCCHがある。PUCCHのリソースは、UE毎に設定される。例えば、SR(Scheduling Request)用のPUCCHのリソースおよびSR周期などのSR構成は、UE毎に設定される(3GPP TS 36.211 V14.0.0(以下「参考文献3」という)、および3GPP TS 36.213 V14.0.0(以下「参考文献4」という)参照)。これらの設定には、RRCシグナリングが用いられる(3GPP TS 36.331 V14.0.0(以下「参考文献5」という)参照)。
 NRでは、ビームスイーピングを必要とするMBF(Multi Beam Forming)が検討されている。ビームスイーピングを必要とするMBFでは、全カバレッジをカバーするために、ビーム切換が必要となる。一つのサブフレームは、一つのビームに対してのみの送受信に用いられることになるので、他のビームの送受信は不可能となる。したがって、一つのサブフレームに複数のUEのPUCCHリソースを構成する従来のLTEの設定方法では、該サブフレームでカバレッジを形成されないビームに存在するUEのPUCCHは送受信できないという問題がある。
 3GPPでは、このような問題を解決するために、MBFの運用において、ビーム毎に異なるシンボルのPUCCHリソースを設けることが提案されている(3GPP R1-1609740(以下「参考文献6」という)参照)。しかし、PUCCHリソースをシンボル毎に設定することは開示されているが、その設定方法については何ら開示されていない。例えば、どのシンボルをどのビームのPUCCH用に割当てるか、どのようにUE毎に割当てるかなどについては全く開示されていない。
 したがって、各ビームに存在するUEは、自UEが通信を行っているビームにおけるPUCCHの送信タイミングおよびリソースを認識できないことになる。UEが通信を行っているビームにおいて、セルでのPUCCHの受信タイミングおよびリソースと、UEのPUCCHの送信タイミングおよびリソースとを合わせることができない場合、PUCCHの送受信が不可能になるという問題が発生する。
 本実施の形態では、このような問題を解決する方法を開示する。
 PUCCHのためのリソースの割当方法について開示する。ビーム毎のPUCCHのために、リソースを割当てる。ビーム毎のPUCCHリソースとして、サブフレームおよびシンボルを割当てる。シンボルの割当ては、シンボル番号で行うとよい。サブフレーム内で設定されるシンボル番号で行うとよい。あるいは、サブフレームに割当てられるPUCCH用リソースの最大シンボル数を決めてもよい。シンボル番号は、最大シンボル数でリナンバリングしてもよい。これによって、シンボル番号を表す情報量、例えばビット数を削減することができる。
 UEが存在するビームのPUCCHリソースから、UE毎のPUCCHリソースを割当てる。すなわち、各ビームのPUCCHリソース上で、UE毎のPUCCHリソースを割当てて、多重する。
 UEが存在するビームのPUCCHリソースから、UE毎のUCI毎のPUCCHリソースを割当ててもよい。すなわち、各ビームのPUCCHリソース上で、UE毎のUCI毎のPUCCHリソースを割当てて多重してもよい。サブフレーム内で、PUCCHリソースのシンボルを送受信するビームと、該シンボルと異なるシンボルを送受信するビームとを異ならせてもよい。
 ビーム毎のPUCCHリソースの設定方法について開示する。ビーム毎のPUCCHを割当てるサブフレームを周期およびオフセットで設定し、PUCCHを割当てるシンボルをシンボル番号で設定する。
 図12は、ビーム毎のPUCCHリソースを、周期、オフセット、シンボル番号で設定する方法の一例を説明する図である。ここでは、ビームスイープ数が4個の場合について示す。予め定めるカバレッジをカバーするために必要となるビーム切換数をビームスイープ数とする。
 ビーム番号0のPUCCHリソースとして、周期を5サブフレームとし、オフセットを0サブフレームとし、サブフレーム内シンボル番号を10としたリソース1201を設定する。これによって、ビーム番号0のPUCCHは、基準サブフレーム番号、例えばサブフレーム番号0のサブフレームからオフセットが0のサブフレームで、周期が5サブフレームで、サブフレーム内シンボル番号が10(シンボル#10)のリソース1201に割当てられる。基準サブフレーム番号は、予め設定されるとよい。基準サブフレーム番号は、例えば、規格などで予め決めておくとよい。
 同様に、ビーム番号1のPUCCHリソースとして、周期を10サブフレームとし、オフセットを1サブフレームとし、サブフレーム内シンボル番号を11としたリソース1202を設定する。これによって、ビーム番号1のPUCCHは、基準サブフレーム番号のサブフレームからオフセット1のサブフレームで、周期が10サブフレームで、サブフレーム内シンボル番号が11(シンボル#11)のリソース1202に割当てられる。
 同様に、ビーム番号2のPUCCHリソースとして、周期を1サブフレームとし、オフセットを0サブフレームとし、サブフレーム内シンボル番号を12としたリソース1203を設定する。これによって、ビーム番号2のPUCCHは、基準サブフレーム番号のサブフレームからオフセット0のサブフレームで、周期が1サブフレームで、サブフレーム内シンボル番号が12(シンボル#12)のリソース1203に割当てられる。
 同様に、ビーム番号3のPUCCHリソースとして、周期を2サブフレームとし、オフセットを0サブフレームとし、サブフレーム内シンボル番号を13としたリソース1204を設定する。これによって、ビーム番号3のPUCCHは、基準サブフレーム番号のサブフレームからオフセット0のサブフレームで、周期が2サブフレームで、サブフレーム内シンボル番号が13(シンボル#13)のリソース1204に割当てられる。
 このように、各ビームのPUCCHリソースが周期的に割当てられる。サブフレーム番号が無線フレーム単位である場合、および無線フレーム番号がシステムフレーム単位である場合は、周期的な設定をサブフレーム番号だけでなく、無線フレーム番号およびシステムフレーム番号を用いてリナンバリングしてもよい。
 ビーム毎のPUCCHを割当てるシンボルは、サブフレーム内の最後尾から設定してもよい。DLリソースを設けるような場合、PUCCHを割当てるシンボルの前のシンボルをDLに割当てることによって、ギャップ(Gap)の数を最小にすることができる。
 ビーム毎のPUCCHを割当てるシンボル数を1つにしたが、複数であってもよい。複数にすることによって、セルのPUCCHの受信電力を増大させることができ、PUCCHの受信品質を向上させることが可能となる。また、ビーム内で多重されるPUCCHの数を増大させることが可能となる。
 ビーム切換が1ビーム毎に行われる場合について示しているが、ビーム切換が複数のビーム毎に行われる場合であってもよい。同じタイミングで複数のビームで通信可能な場合、該複数のビーム間は空間多重が可能である。したがって、同じタイミングで通信可能な複数のビーム毎のPUCCHには同じリソースを割当てるとよい。
 ビーム毎のPUCCHリソースの他の設定方法について開示する。ビームスイープ数のPUCCHをkサブフレーム内に設定する。ここで、kは自然数である。
 図13は、ビームスイープ数のPUCCHをkサブフレーム内に設定する方法の一例を説明する図である。ここでは、ビームスイープ数が4個の場合について示す。一例として、k=ビームスイープ数とする。各ビームのPUCCHを、連続するサブフレームの最後のシンボル1302,1304,1306,1308に割当て、ビームスイープ数のサブフレーム数で繰り返し割当てる。ここでは、PUCCHリソースに割当てるシンボルは、1サブフレーム内1シンボルとしている。PUCCHリソースに割当てるシンボル番号は、固定としてもよい。
 シンボル1301,1303,1305,1307には、任意のビームの任意の信号あるいは無送信区間が割当てられる。DLでもよいしULでもよい。例えば、シンボル1301にはビーム番号0の下り信号が、シンボル1303にはビーム番号1の下り信号が、シンボル1305にはビーム番号2の下り信号が、シンボル1307にはビーム番号3の下り信号が割当てられる。
 ビーム番号0のビームからビーム番号3のビームがスイープされる。ビーム番号0のPUCCHは、サブフレーム番号n、シンボル番号13(1302)に割当てられる。ビーム番号1のPUCCHは、サブフレーム番号n+1、シンボル番号13(1304)に割当てられる。ビーム番号2のPUCCHは、サブフレーム番号n+2、シンボル番号13(1306)に割当てられる。ビーム番号3のPUCCHは、サブフレーム番号n+3、シンボル番号13(1308)に割当てられる。nは0以上の整数である。
 このように、各ビームのPUCCHがサブフレーム毎に最後のシンボル1302,1304,1306,1308に割当てられ、ビームスイープ数のサブフレーム数で繰り返し割当てられる。サブフレーム番号が無線フレーム単位である場合、および無線フレーム番号がシステムフレーム単位である場合は、繰り返し割当てられるように、サブフレーム番号だけでなく、無線フレーム番号およびシステムフレーム番号を用いてリナンバリングされてもよい。
 このようにすることによって、ビームスイープ数のサブフレームで全ビームのPUCCHを割当てることができる。したがって、ビームスイープ数のサブフレームにおいて、少なくとも一度は、各ビームのPUCCHの送受信を行うことが可能となる。
 図14は、ビームスイープ数のPUCCHをkサブフレーム内に設定する方法の他の例を説明する図である。ここでは、ビームスイープ数が4個の場合について示す。一例として、k=1とする。全ビームのPUCCHを一つのサブフレームに割当て、1サブフレームで繰り返し割当てる(1402~1405,1407~1410,1412~1415,1417~1420)。言い換えると、毎サブフレーム繰り返し割当てる。各ビームのPUCCHリソースに割当てられるシンボルは、1サブフレーム内1シンボルとしている。PUCCHリソースに割当てるシンボル番号は、固定としてもよい。ここでは、1サブフレーム内の最後からビームスイープ数のシンボルを割当てることとなる。
 シンボル1401,1406,1411,1416には、任意のビームの任意の信号あるいは無送信区間が割当てられる。DLでもよいしULでもよい。例えば、シンボル1401にはビーム番号0の下り信号が、シンボル1406にはビーム番号1の下り信号が、シンボル1411にはビーム番号2の下り信号が、シンボル1416にはビーム番号3の下り信号が割当てられる。
 ビーム番号0のビームからビーム番号3のビームがスイープされる。ビーム番号0のPUCCHは、サブフレーム番号n、シンボル番号10(1402,1407,1412,1417)に割当てられる。ビーム番号1のPUCCHは、サブフレーム番号n、シンボル番号11(1403,1408,1413,1418)に割当てられる。ビーム番号2のPUCCHは、サブフレーム番号n、シンボル番号12(1404,1409,1414,1419)に割当てられる。ビーム番号3のPUCCHは、サブフレーム番号n、シンボル番号13(1405,1410,1415,1420)に割当てられる。nは0以上の整数である。
 このように、全ビームのPUCCHリソースが同一サブフレームの異なるシンボルに割当てられる。このようにすることによって、毎サブフレーム、全ビームのPUCCHリソースを構成することが可能となる。例えば、PUCCHで送信するSRについては、SR周期をサブフレーム単位に設定することが可能となる。具体的には、サブフレームを1msとすると、SR周期を1msに設定することができる。これによって、UEに送信データが発生してからSRを送信するまでの時間を短縮することができるので、データの送信開始までの遅延時間を短縮することができる。
 図15は、ビームスイープ数のPUCCHをkサブフレーム内に設定する方法の他の例を説明する図である。k個のサブフレーム毎に、ビームスイープ数分のPUCCHリソースを、k個のサブフレーム内のサブフレームとシンボルとに個別に割当てる。このk個のサブフレームの割当てパターンが繰り返される。ここでは、ビームスイープ数が4個の場合について示す。一例として、k=4とする。
 シンボル1501,1503,1505,1507には、任意のビームの任意の信号あるいは無送信区間が割当てられる。DLでもよいしULでもよい。例えば、シンボル1501にはビーム番号0の下り信号が、シンボル1503にはビーム番号1の下り信号が、シンボル1505にはビーム番号2の下り信号が、シンボル1507にはビーム番号3の下り信号が割当てられる。
 ビーム番号0のビームからビーム番号3のビームがスイープされる。ビーム番号0のPUCCHは、サブフレーム番号n、シンボル番号13(1502)に割当てられる。ビーム番号1のPUCCHは、サブフレーム番号n+1、シンボル番号13(1504)に割当てられる。ビーム番号2のPUCCHは、サブフレーム番号n+2、シンボル番号12(1506)に割当てられる。ビーム番号3のPUCCHは、サブフレーム番号n+2、シンボル番号13(1507)に割当てられる。サブフレーム番号n+3には、PUCCHは割当てられない。nは0以上の整数である。
 このようにすることによって、k個のサブフレーム内に、全ビームのPUCCHが割当てられる。kを増減させることによって、PUCCHリソースを割当てる頻度を変更することができる。したがって、セルの負荷およびUEが行うサービスの種類によって、柔軟にPUCCHを割当てるリソース量を設定することができる。
 前述の例では、繰り返されるkサブフレーム内で、一つのビームのPUCCHが割り当てられるシンボル数を1としたが、1に限らず複数であってもよい。また、その数はビーム毎に異なってもよい。このように繰り返されるkサブフレーム内で一つのビームのPUCCHが割り当てられるシンボル数を、ビーム毎に異なるようにすることによって、PUCCHのリソースの柔軟な設定が可能となる。
 前述の例では、kサブフレームを連続して繰り返し割当てることを開示した。他の方法として、kサブフレームを連続ではなく、離散的に割当てるようにしてもよいし、周期的に割当てるようにしてもよい。例えば、PUCCHが割り当てられるkサブフレームを、mサブフレーム間隔で周期的に繰り返してもよい。言い換えると、PUCCHが割り当てられるkサブフレームを、m+1サブフレーム毎に周期的に繰り返してもよい。mは0以上の整数である。
 このようにすることによって、PUCCHリソースを設定するサブフレーム間に、PUCCHリソースを設定しないサブフレームを設けることが可能となる。例えば、DLのみのサブフレームを設定することも可能となる。これによって、PUCCHのリソースのさらに柔軟な設定が可能となる。また、DLおよびULの通信遅延量の柔軟な設定、ならびに通信量の柔軟な設定を行うことが可能となる。
 セルは、ビーム内に存在するUE数に応じて、PUCCHのリソースを増減させてもよい。例えば、ビーム内に存在するUEの要求遅延時間に応じて、時間軸上のPUCCHリソースを増減させてもよい。
 例えば、ビームスイープ数のPUCCHをkサブフレーム内に設定して繰り返し割当てる方法において、kおよびmを大きく設定することによって、PUCCHリソースが割り当てられる頻度を少なくして、他のデータおよび制御情報に割当てられるリソース量を増大させる。逆に、kおよびmを小さく設定することによって、PUCCHリソースが割り当てられる頻度を多くして、送信開始までの遅延時間を低減させる。
 繰り返されるj個のサブフレーム内の各サブフレームで通信が行われるビームを決めておいてもよい。ここで、jは自然数である。このような場合のPUCCHの設定方法として、前述に開示した方法を適用してもよい。上りリンクのサブフレームに適用するとよい。k=jと設定するとよい。通信が行われるビームに設定されたサブフレームの中で、そのビームに対するPUCCHリソースを設定するのに、前述に開示した方法を適用するとよい。
 PUCCHリソース割当ての判断方法について開示する。セルは、ビーム毎のPUCCHリソースの設定を行う。判断指標例として、以下の(1)~(7)の7つを開示する。
 (1)各ビームの負荷。
 例えば、各ビームの負荷が高負荷の場合は、高頻度でPUCCHリソースを割当て、各ビームの負荷が低負荷の場合は、低頻度でPUCCHリソースを割当てる。
 (2)各ビームの存在するUE数。
 例えば、各ビームの存在するUE数が多い場合は、高頻度でPUCCHリソースを割当て、各ビームの存在するUE数が少ない場合は、低頻度でPUCCHリソースを割当てる。
 (3)各ビームに存在するUEの使用サービス。
 例えば、高頻度に上りデータが発生するサービスのUEが存在する場合は、高頻度でPUCCHリソースを割当て、低頻度で上りデータが発生するサービスのUEが存在する場合は、低頻度でPUCCHリソースを割当てる。ビームに存在するUEのうち、最も高頻度に上りデータが発生するサービスに合わせるとよい。
 (4)各ビームの傘下のUEのサービスの要求QoS。
 例えば、高いQoSが要求されるサービスのUEが存在する場合は、高頻度でPUCCHリソースを割当て、低いQoSが要求されるサービスのUEが存在する場合は、低頻度でPUCCHリソースを割当てる。ビームに存在するUEのうち、最も高い要求QoSに合わせるとよい。
 (5)各ビームに存在するUEの要求遅延時間。
 例えば、高遅延時間が要求されるサービスのUEが存在する場合は、低頻度でPUCCHリソースを割当て、低遅延時間が要求されるサービスのUEが存在する場合は、高頻度でPUCCHリソースを割当てる。ビームに存在するUEのうち、要求遅延時間が最も低いものに合わせるとよい。
 (6)各ビームに存在するUEの要求スループット。
 例えば、高スループットが要求されるサービスのUEが存在する場合は、高頻度でPUCCHリソースを割当て、低スループットが要求されるサービスのUEが存在する場合は、低頻度でPUCCHリソースを割当てる。ビームに存在するUEのうち、要求スループットが最も高いものに合わせるとよい。
 (7)前記(1)~(6)の組合せ。
 UEに対するPUCCHリソースの設定方法について開示する。
 セルは、UEに対して、PUCCHリソースに関する情報を通知する。PUCCHリソースに関する情報例として、以下の(1)~(13)の13個を開示する。
 (1)ビームID。
 前記(1)のビームIDは、どのビームのPUCCHの設定であるかを示す。
 (2)周期。
 前記(2)の周期は、PUCCHを割当てる周期を示す。無線フレーム単位、サブフレーム単位、シンボル単位などで設定するとよい。
 (3)オフセット。
 前記(3)のオフセットは、PUCCHを割当てるオフセットを示す。無線フレーム単位、サブフレーム単位、シンボル単位などで設定するとよい。
 (4)シンボル番号。
 前記(4)のシンボル番号は、PUCCHをどのシンボルに割当てるかを示す。
 (5)サブフレーム番号。
 前記(5)のサブフレーム番号は、PUCCHをどのサブフレームに割当てるかを示す。
 (6)k。
 前記(6)のkは、ビーム毎のPUCCHのリソースを何サブフレーム毎に割当てるかを示す。
 (7)m。
 前記(7)のmは、ビーム毎のPUCCHの割当てが何サブフレーム毎に繰り返されるかを示す。
 (8)UCI種類。
 前記(8)のUCI種類は、どのUCIのPUCCHを割当てるかを示す。
 (9)周波数リソース。
 前記(9)の周波数リソースは、PUCCHをどの周波数リソースに割当てるかを示す。
 (10)サイクリックシフト(Cyclic Shift:CS)。
 前記(10)のCSは、PUCCHに用いるZCシーケンスのCSを示す。
 (11)シーケンス番号。
 前記(11)のシーケンス番号は、PUCCHに用いるシーケンスのシーケンス番号を示す。
 (12)直交符号。
 前記(12)の直交符号は、PUCCHに直交符号を用いる場合、該直交符号を示す。
 (13)前記(1)~(12)の組合せ。
 PUCCHリソースに関する情報として、PUCCH用RSに関する情報を含めてもよい。PUCCHリソースに関する情報を、該UEが通信可能なビームを介して通知する。以降、UEが通信可能なビームを「サービングビーム」と称する。PUCCHリソースに関する情報は、常に固定でなくてもよい。セルは、準静的または動的に設定して、UEに通知してもよい。
 これらの情報の通知を行うことによって、UEは、PUCCHリソースに関する情報を取得する。これによって、自UEのPUCCHリソースの設定を認識することが可能となる。
 セルは、UEに対して、PUCCHリソースに関する情報を、セルのカバレッジ全体をカバーするシングルビームを用いて通知してもよい。
 ビーム毎のPUCCHリソースに関する情報と、UE毎のPUCCHリソースに関する情報とを設けてもよい。各々、PUCCHに関する情報を組合せて設けてもよい。セルは、UEに対して、ビーム毎のPUCCHリソースに関する情報と、UE毎のPUCCHリソースに関する情報とを別々に通知してもよい。UEは、これらの情報を取得することによって、自UEのPUCCHリソースの設定を認識することが可能となる。
 例えば、ビーム毎のPUCCHリソースの設定方法において、ビーム毎のPUCCHを割当てるサブフレームを周期およびオフセットで設定し、PUCCHを割当てるシンボルをシンボル番号で設定する場合について示す。
 例えば、ビーム毎のPUCCHリソースに関する情報を、(1)ビームID、(2)周期、(3)オフセット、(4)シンボル番号、(10)CS、(11)ルートシーケンス番号とする。セルは、UEに対して、ビーム毎のPUCCHリソースに関する情報を通知する。セルが構成する全ビームのビーム毎のPUCCHリソースに関する情報を通知してもよい。このようにすることによって、UEは、ビーム毎に、どのサブフレームのどのシンボルにPUCCHリソースが設定されるかを認識することが可能となる。また、PUCCHに用いるCSおよびルートシーケンスを認識することが可能となる。
 例えば、UE毎のPUCCHリソースに関する情報を、(2)周期、(3)オフセット、(8)UCI種類、(9)周波数リソースとする。セルは、UEに対して、UE毎のPUCCHリソースに関する情報を通知する。このようにすることによって、UEは、自UEのUCI種類に応じて、どのサブフレームのどのシンボルのどの周波数リソースにPUCCHリソースを設定するかを認識することが可能となる。
 セルは、UEに対して、該UEが存在するビームのビーム毎に設定するPUCCHリソースの中から、UE毎のPUCCHリソースを設定する。セルは、UEに対して、設定したUE毎のPUCCHリソースに関する情報を通知する。
 PUCCHリソースに関する情報の一部または全部について、ビーム毎とUE毎とで同じにしてもよい。このような場合、セルは、UEに対して、同じ設定のPUCCHリソースに関する情報の通知を1回で行ってもよい。ビーム毎のPUCCHリソースに関する情報から同じ設定を省略してもよい。UE毎のPUCCHリソースに関する情報としてのみ通知すればよい。
 ビーム毎のPUCCHリソースに関する情報の通知方法について開示する。
 セルは、セル毎に、ビーム毎のPUCCHリソースを設定する。セルは、セル毎に設定したビーム毎のPUCCHリソースに関する情報を、セルの情報として、UEに通知する。セルは、ビーム毎のPUCCHリソースに関する情報を、セルの傘下のUEに対して通知する。ビーム毎のPUCCHリソースに関する情報には、UEが通信を行っているビームのビーム毎のPUCCHリソースに関する情報が含まれる。
 セルは、UEに対して、セル内における全ビームのビーム毎のPUCCHリソースに関する情報を通知してもよい。あるいは、セル内における全ビームではなく、複数のビームのビーム毎のPUCCHリソースに関する情報を通知してもよい。例えば、UEが通信を行っているビームのPUCCHリソースに関する情報と、その周辺のカバレッジを有する複数のビームのPUCCHリソースに関する情報とを通知してもよい。これによって、UEのビーム移動時に、移動先のビーム毎のPUCCHリソースに関する情報を通知しなくて済む。
 あるいは、セルは、UEに対して、UEが通信を行っているビームのみのビーム毎のPUCCHリソースに関する情報を通知してもよい。これによって、1回のシグナリングの情報量を少なくすることが可能となる。あるいは、セルは、セルが決定した一つまたは複数のビームのビーム毎のPUCCHリソースに関する情報を通知してもよい。例えば、設定を変更したビームのビーム毎のPUCCHリソースに関する情報を通知してもよい。これによって、設定変更のたびに全ビームのビーム毎のPUCCHリソースに関する情報を通知しなくて済む。また、セルは、ビーム毎のPUCCHリソースに関する情報のうち、設定を変更した情報のみを通知してもよい。これによって、さらに通知する情報量を低減することができる。
 セルは、UEに対して、前記ビーム毎のPUCCHリソースに関する情報を、サービングビームを介して通知する。サービングビームを介して通知する場合、サービングビームのPUCCHリソースに関する情報に関しては、ビームIDを省略してもよい。サービングビームと異なるビームのPUCCHリソースに関する情報を通知する場合は、ビームIDを、前記PUCCHリソースに関する情報に含めるとよい。このようにすることによって、UEは、通信を行っているビームを介して、ビーム毎のPUCCHリソースに関する情報を得ることが可能となる。
 他の方法として、セルは、前記PUCCHリソースに関する情報を、セルのカバレッジ全体をカバーするシングルビームを用いて通知してもよい。これによって、セルのカバレッジ全体に前記PUCCHリソースに関する情報を通知することができるので、シグナリング負荷を低減させることが可能となる。
 セルは、前記PUCCHリソースに関する情報をシステム情報に含めて通知してもよい。セルは、前記PUCCHリソースに関する情報を報知してもよい。あるいは、セルは、前記PUCCHリソースに関する情報をUE個別シグナリングで通知してもよい。UE個別シグナリングで通知することによって、セルが報知する情報量を増大させることがなくなる。したがって、報知に必要となる無線リソースの増大を抑制することができる。また、UE個別シグナリングで通知することによって、ビーム毎のリソースを用いて通知することが可能となる。これによって、前記PUCCHリソースに関する情報を、ビーム毎に柔軟に通知することが可能となる。
 UE毎のPUCCHリソースに関する情報の通知方法について開示する。
 セルは、PUCCHリソースに関する情報を、UE個別の情報としてUEに通知する。セルは、ビーム毎のPUCCHリソースに関する情報のうちの一部あるいは全部を通知してもよい。例えば、セルは、UE個別のPUCCHリソースに関する情報のうちの一部の設定を変更した場合、UEに対して、該一部の情報のみを通知してもよい。これによって、通知する情報量を低減することができる。
 セルは、前記PUCCHリソースに関する情報を、サービングビームを介して通知する。サービングビームを介して通知する場合、ビームIDを省略してもよい。セルは、前記PUCCHリソースに関する情報をUE個別シグナリングで通知するとよい。このようにすることによって、UEは、通信を行っているビームを介して、UE毎のPUCCHリソースに関する情報を得ることが可能となる。
 他の方法として、セルは、前記PUCCHリソースに関する情報を、セルのカバレッジ全体をカバーするシングルビームを用いて通知してもよい。これによって、セルのカバレッジ全体に前記PUCCHリソースに関する情報を通知することができるので、シグナリング負荷を低減させることが可能となる。
 また、セルは、UEに対して、UE毎に、UCI毎のPUCCHリソースに関する情報を通知してもよい。前述の通知方法を適用するとよい。セルは、UCI毎のPUCCHリソースの設定が可能となり、UEは、UCI毎に設定されたPUCCHリソースの設定を用いて、UCI毎のPUCCHを送信することが可能となる。
 ビーム毎のPUCCHリソースである一つのシンボルに複数のUEのPUCCHを設定する方法として、複数のUE間で周波数分割多重あるいは符号分割多重を行うように設定するとよい。
 図16は、PUCCHの設定およびSRの送受信のシーケンスの一例を示す図である。図16では、セルが、UEに対して、ビーム毎のPUCCHリソースに関する情報と、UE毎のPUCCHリソースに関する情報とを別々に通知する場合について示している。
 ステップST2501において、セルは、セル内における全ビームのビーム毎のPUCCHリソース構成を設定する。
 ステップST2502において、セルは、UEに対して、UEが通信するビームのビーム毎のPUCCHリソースに関する情報を含む、ビーム毎のPUCCHリソースに関する情報を通知する。UEと通信するビームを介して通知するとよい。該情報の通知には、RRC個別シグナリングを用いる。
 ステップST2502でビーム毎のPUCCHリソースに関する情報を受信したUEは、ステップST2503において、UEが通信するビームであるサービングビームに対応するPUCCHリソース構成を記憶する。ここで、UEは、通知されビーム全てについて、ビーム毎のPUCCHリソースに関する情報を記憶してもよい。
 ステップST2504において、セルは、UE毎のPUCCHリソース構成を設定する。
 ステップST2505において、セルは、UEに対して、UE毎のPUCCHリソースに関する情報を通知する。該情報の通知には、RRC個別シグナリングを用いる。
 ステップST2505でUE毎のPUCCHリソースを受信したUEは、ステップST2506において、ビーム毎のPUCCHリソース上でUE毎のPUCCHリソース構成を設定する。具体的には、UEは、ステップST2506において、ビーム毎のPUCCHリソースに関する情報と、UE毎のPUCCHリソースに関する情報とを用いて、自UEのPUCCHリソース構成を設定する。
 ステップST2505でUE毎のPUCCHリソースに関する情報を通知したセルは、ステップST2507において、UEに対して設定したUE毎のPUCCHリソース構成で受信を開始する。
 ステップST2508において、UEは、上りデータが発生したか否かを判断する。ステップST2508において上りデータが発生していないと判断された場合は、ステップST2508に戻り、上りデータが発生したか否かの判断を繰り返す。ステップST2508において上りデータが発生していると判断された場合は、ステップST2509に移行する。
 ステップST2509において、UEは、設定されたUE毎のSR用PUCCHリソースでSRを、サービングビームを介してセルに対して送信する。
 ステップST2507でUEに対して設定したUE毎のPUCCHリソースで受信を開始したセルは、ステップST2509において、UEから送信されたSRを受信する。
 ステップST2510において、セルは、受信したSRに従って、UEに対して上りスケジューリングを開始する。
 ステップST2511において、セルは、UEに対して上りグラント、具体的には上りグラントを含む上りスケジューリング情報を送信する。
 ステップST2511で上りグラントを受信したUEは、ステップST2512において、該上りグラントを用いて、BSR(Buffer Status Report)をセルに送信する。このときに、上りデータを送信してもよい。
 ステップST2512でBSRを受信したセルは、BSRに従って、UEに対して上りスケジューリングを行う。
 ステップST2513において、セルは、UEに対して上りグラントを送信する。ステップST2513で上りグラントを受信したUEは、ステップST2514において、該上りグラントを用いて、上りデータをセルに送信する。ステップST2514において、セルは、UEから送信された上りデータを受信する。
 このようにして、UEとセルとの間で上り通信が開始される。
 ステップST2512において、UEは、セルに対してBSRを送信したが、BSRとともに上りデータを送信してもよい。あるいは、上りデータのみを送信してもよい。これによって、少量のデータの場合、該送信のみで上りデータ送信を完了させることができ、遅延時間の短縮を図ることができる。
 ビーム毎のPUCCHリソースに関する情報を、セルがUEに対して通知することを開示したが、静的に規格などで予め決めておいてもよい。あるいは、ビームIDをインプットパラメータとして用いて、サブフレーム番号およびシンボル番号などのビーム毎のPUCCHリソースに関する情報をアウトプットする関数を用いてもよい。このようにすることによって、セルとUEとの間のシグナリング負荷を低減させることが可能となる。
 本実施の形態で開示した方法を用いることによって、MBFにおけるビームスイーピング運用時のPUCCHリソースの設定が可能となる。
 セルがUEに対して、本実施の形態で開示した方法でPUCCHリソースの設定を行うことによって、UEが通信を行っているビームでのPUCCHの送受信が可能となり、UEからセルへの上り通信が可能となる。
 サブフレーム内で、PUCCHリソースのシンボルを送受信するビームと、該シンボルと異なるシンボルを送受信するビームとを異ならせてもよいことを開示した。1サブフレーム内の他のシンボルを送受信するビームとは異なるビームのPUCCHが構成されるような場合、たとえ、他のシンボルが下り通信に用いられたとしても、ギャップを設けなくてもよい。
 下りリンクと上りリンクとでビームが異なるので、UEは、下り信号の受信と上り信号の送信とを連続して行うことは無い。したがって、UEで受信と送信とが重なることはなく、ギャップは不要となる。
 セルは、ギャップ構成を設定してUEに通知してもよい。ギャップ設定についても、PUCCHリソースに関する情報に含めてもよい。セルは、他のPUCCHリソースに関する情報とともに、UEに対して通知してもよい。
 セルがギャップ構成を設定して、UEに対して通知できるようにしておくことによって、例えば、1サブフレーム内の下りリンクに用いられるシンボルと上りリンクに用いられるシンボルとで異なるビームが用いられるような場合に、下りリンクから上りリンクの間にギャップを設けないように設定することが可能となる。
 このようにすることによって、従来必要であったギャップを、下り通信あるいは上り通信に使用することが可能となる。したがって、無線リソースの使用効率を向上させることが可能となる。
 ビームをシンボル毎に切換える場合、送受信機においてビーム切換えに時間を要し、その期間は正常に送受信できない場合がある。したがって、ビーム切換え期間の設定が必要となる。ビーム切換え期間は、静的に規格などで決めておくとよい。セルとUEとで送受信できない期間を認識することが可能となる。ビーム切換期間をCP長内と決めてもよい。1シンボルで送るデータに影響を及ぼさずにビーム切換を行うことができる。
 実施の形態2 変形例1.
 本実施の形態では、実施の形態2で述べた問題を解決する他の方法を開示する。実施の形態2では、PUCCHリソースをビーム毎に予め決めておき、ビーム毎のPUCCHリソースの中で、UE毎のPUCCHリソースを設定することを開示した。しかし、UE毎に通信するサービスによって、必要となるPUCCHの設定周期が異なるので、ビーム毎に設定したPUCCHリソースの中で使用しないリソースも発生する。したがって、無線リソースの使用効率が低下してしまうという問題が生じる。
 本変形例では、このような問題を解決する方法を開示する。
 PUCCHリソースをUE毎に設定する。ビーム毎のPUCCHリソースを設定せず、UE毎にPUCCHリソースを設定する。PUCCHリソースを動的に設定してもよい。UE毎に、動的にPUCCHリソースを設定することによって、UEの接続状態に応じて、適時にPUCCHリソースを設定することが可能となる。また、実施の形態2で開示した方法におけるビーム毎に設定したPUCCHリソースの中で使用しないリソースが発生することによるリソースの使用効率の低減を抑制できる。
 UEに対するPUCCHリソースの設定方法について開示する。
 セルは、UEに対して、UE毎に設定するPUCCHリソースに関する情報を通知して、PUCCHリソースを設定する。PUCCHリソースに関する情報例は、実施の形態2で開示したものを適用すればよい。本変形例における設定例を開示する。UE毎のPUCCHを割当てるサブフレームを周期およびオフセットで設定し、PUCCHを割当てるシンボルをシンボル番号で設定する。
 サブフレーム周期を1つまたは複数の予め定める値としてもよい。サブフレーム周期とオフセットとの組合せを示すインデックスを設け、インデックスで設定してもよい。シンボルの割当ては、シンボル番号で行うとよい。あるいは、シンボルの割当ては、サブフレーム内で設定されるシンボル番号で行うとよい。例えば、サブフレーム周期を10、オフセットを4、シンボル番号を13と設定する。この場合、5番目のサブフレームから10サブフレーム毎のサブフレームのシンボル番号が13のシンボルにPUCCHを割当てる。
 サブフレームに割当てられるPUCCH用リソースの最大シンボル数を決めて、シンボル番号を最大シンボル数でリナンバリングして設定してもよい。これによって、シンボル番号を表す情報量、例えばビット数を削減することができる。
 また、セルは、UEに対して、PUCCHの周波数リソース、CS、シーケンス番号を設定する。UEは、これらの情報に従って、前述のPUCCHを割当てるタイミングのシンボルでPUCCHを構成する。
 セルは、サービングビームが異なるUEに対して、UE毎にPUCCHリソースを設定するときに、それらのUEに対するPUCCHリソースの設定タイミングが同一にならないように設定する。PUCCHリソースにシンボルを割当てる場合、同一サブフレームの同一シンボルにならないように設定するとよい。
 セルは、該情報を、サービングビームを介して通知する。サービングビームを介して通知する場合、ビームIDを省略してもよい。セルは、該情報をUE個別シグナリングで通知するとよい。このようにすることによって、UEは、通信を行っているビームを介して、UE毎のPUCCHリソースに関する情報を得ることが可能となる。
 UE個別シグナリングとして、RRCシグナリングを用いてもよい。UE毎のPUCCHリソースに関する情報を、RRCメッセージに含めるとよい。あるいは、UE個別シグナリングとして、L1/L2制御シグナリングを用いてもよい。UE毎のPUCCHリソースに関する情報を、下りL1/L2制御情報(下り制御情報であってもよい)に含めるとよい。UE個別シグナリングとしてL1/L2制御シグナリングを用いることによって、UEは、比較的早期に設定を受信することが可能となるので、設定遅延時間の低減が可能となる。
 あるいは、UE個別シグナリングとして、MACシグナリングを用いてもよい。UE毎のPUCCHリソースに関する情報を、MAC制御情報に含めるとよい。UE個別シグナリングとして、MACシグナリングを用いることによって、HARQが適用されるので、UEは、低い受信誤り率で受信することが可能となるとともに、比較的早期に設定を受信することが可能となる。
 図17は、UE毎のPUCCHの設定およびSRの送受信のシーケンスの一例を示す図である。図17に示すシーケンスは、図16に示すシーケンスと同一のステップを含んでいるので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。図17では、セルが、UEに対して、UE毎に設定するPUCCHリソースに関する情報を通知する場合について示している。
 ステップST2601において、セルは、UEに対して、UE毎のPUCCHリソース構成を設定する。セルは、UEに対して、PUCCHを割当てるシンボル番号まで設定する。このとき、セルは、サービングビームが異なるUEに対して、PUCCHリソースタイミングが同一にならないように設定する。
 ステップST2602において、セルは、UEに対して、UE毎のPUCCHリソースに関する情報を通知する。PUCCHリソースに関する情報に、PUCCHを割当てるシンボル番号(シンボル#)を含ませる。UEと通信するビームを介して通知するとよい。該情報の通知には、RRC個別シグナリングを用いる。
 ステップST2602でUE毎のPUCCHリソースに関する情報を受信したUEは、ステップST2603において、PUCCHリソース構成を設定する。
 ステップST2602でUEに対してPUCCHリソースに関する情報を通知したセルは、ステップST2604において、UEに対して設定したPUCCHリソース構成で受信を開始する。
 ステップST2605において、UEは、上りデータが発生したか否かを判断する。ステップST2605で上りデータが発生していない場合は、ステップST2605に戻り、上りデータが発生したか否かの判断を繰り返す。ステップST2605で上りデータが発生している場合は、ステップST2606に移行する。
 ステップST2606において、UEは、設定されたSR用PUCCHリソースで、SRを、サービングビームを介してセルに対して送信する。
 ステップST2604でUEに対して設定したPUCCHリソースで受信を開始したセルは、ステップST2606において、UEから送信されたSRを受信する。
 このようにしてUEからSRを受信したセルは、上り通信開始のための処理を行う。これによって、UEとセルとの間で上り通信が開始される。
 本変形例で開示した方法を用いることによって、MBFにおけるビームスイーピング運用時のPUCCHリソースの設定が可能となる。セルがUEに対して、本実施の形態で開示した方法でPUCCHリソースの設定を行うことによって、UEが通信を行っているビームでのPUCCHの送受信が可能となり、UEからセルへの上り通信が可能となる。
 また、UE毎に、動的にPUCCHリソースを設定することによって、UEの接続状態に応じて、PUCCHリソースを設定することが可能となる。また、実施の形態2で開示した方法におけるビーム毎に設定したPUCCHリソースの中で使用しないリソースが発生することによるリソースの使用効率の低減を抑制することができる。
 セルは、PUCCHリソースに関する情報を、サービングビームを介して通知することを開示したが、他の方法として、セルは、該情報を、セルのカバレッジ全体をカバーするシングルビームを用いて通知してもよい。これによって、セルのカバレッジ全体に前記PUCCHリソースに関する情報を通知できるので、シグナリング負荷を低減させることが可能となる。
 また、セルはUEに対して、UE毎に、UCI毎のPUCCHリソースに関する情報を通知してもよい。前述の通知方法を適用するとよい。セルは、UCI毎のPUCCHリソースの設定が可能となり、UEは、UCI毎に設定されたPUCCHリソースの設定を用いて、UCI毎のPUCCHを送信することが可能となる。
 本変形例における他の設定例を開示する。UE毎にPUCCHリソースの設定の開始、修正、停止に関する情報を設定する。セルは、UEに対して、予めUE毎のPUCCHリソースに関する情報を通知する。セルは、UEに対して、PUCCHリソース設定の開始、修正、停止に関する情報を通知することによって、該PUCCHリソースを設定する。UEは、該設定の受信によって、実際にPUCCHの送信、修正後送信、停止を実行する。
 PUCCHリソース設定の開始、修正、停止に関する情報例として、以下の(1)~(8)の8つを示す。
 (1)開始を示す情報。
 (2)停止を示す情報。
 (3)修正を示す情報。
 (4)設定期間を示す情報。
 (5)停止期間を示す情報。
 (6)オフセットを示す情報。
 (7)シンボル番号。
 (8)前記(1)~(7)の組合せ。
 前記(1)は、開始を示す情報であり、UEは、該情報が設定された場合に、予め設定されたPUCCHリソースでのPUCCH送信を可能とする。
 前記(2)は、停止を示す情報であり、UEは、該情報が設定された場合に、予め設定されたPUCCHリソースでのPUCCH送信を停止する。
 前記(3)は、修正を示す情報であり、UEは、該情報が設定された場合に、PUCCHリソースを修正設定したリソースでPUCCH送信を可能とする。修正するPUCCHリソース情報を併せて通知するとよい。
 前記(4)は、設定期間を示す情報であり、UEは、該情報が設定された場合に、設定開始から該設定期間、PUCCHリソースでのPUCCH送信を可能とする。該設定期間の満了で設定停止とするとよい。
 前記(5)は、停止期間を示す情報であり、UEは、該情報が設定された場合に、設定停止から該停止期間、PUCCHリソースでのPUCCH送信を停止する。該停止期間の満了で設定開始とするとよい。
 前記(6)は、オフセットを示す情報であり、UEは、該情報が設定された場合に、設定開始などのタイミングから該オフセット値だけオフセットして設定開始などを行う。
 前記(7)は、PUCCHを割当てるシンボル番号であり、UEは、該情報が設定された場合に、該シンボル番号にPUCCHリソースを設定する。UEに対して予め設定するPUCCHリソースにシンボル番号が含まれている場合は、新たに設定されたシンボル番号に従う。
 図18は、UE毎にPUCCHリソース設定の開始、修正、停止に関する情報を設定する方法の一例を説明する図である。ここでは、ビームスイープ数が4個の場合について示す。図18において、横軸はサブフレームを示し、縦軸はサブフレーム内のシンボル番号を示している。図18では、PUCCHが割当てられるシンボル数を1サブフレームに最大4つと設定した場合について示す。この場合、サブフレーム内のシンボル番号を0から3でリナンバリングする。
 ここでは、シンボル番号10がシンボル番号0に対応し、シンボル番号11がシンボル番号1に対応し、シンボル番号12がシンボル番号2に対応し、シンボル番号13がシンボル番号3に対応する。1サブフレームのPUCCHを割当てる最大シンボル数、サブフレーム内のシンボル番号とリナンバリング後のシンボル番号との対応関係を、予めセルからUEに対して通知しておくとよい。また、予め通知するUE毎のPUCCHリソースに関する情報に含めてもよい。UEは、該情報を用いて、PUCCHを割当てるシンボル番号を認識することができる。
 図18において、矢符はセルからUEへ通知する情報を示している。セルは、予めUE1、UE2、UE3、UE4に対して、UE毎のPUCCHリソースに関する情報を通知しておく。セルは、UE2に対して、PUCCHリソースの設定開始を決定した場合、UE2に対して、PUCCHを割当てるシンボル番号とともに、PUCCH設定開始を示す情報(Str_UE#2(シンボル#3))を通知する。ここでは、シンボル番号を3とする。これによって、UE2に対して、PUCCHリソースが設定される。
 セルは、UE3に対して、PUCCHリソースの設定開始を決定した場合、UE3に対して、PUCCHを割当てるシンボル番号とともに、PUCCH設定開始を示す情報(Str_UE#3(シンボル#2))を通知する。ここでは、シンボル番号を2とする。これによって、UE3に対して、PUCCHリソースが設定される。
 セルは、UE1に対して、PUCCHリソースの設定開始を決定した場合、UE1に対して、PUCCHを割当てるシンボル番号とともに、PUCCH設定開始を示す情報(Str_UE#1(シンボル#3))を通知する。ここでは、シンボル番号を3とする。これによって、UE1に対して、PUCCHリソースが設定される。
 セルは、UE2に対して設定したPUCCHリソースと、UE1に対して設定したPUCCHリソースとが衝突すると判断した場合、PUCCHリソースの設定修正を決定し、UEに通知する。ここでは、セルは、UE2に対して、修正後に割当てるシンボル番号とともに、PUCCHリソース設定修正を示す情報(Mod_UE#2(シンボル#2))を通知する。ここでは、シンボル番号を2とする。これによって、UE2に対して、PUCCHリソース設定が修正される。
 セルは、UE3に対して設定したPUCCHリソースと、UE2に対して設定したPUCCHリソースとが衝突すると判断した場合、PUCCHリソースの設定修正を決定し、UEに通知する。ここでは、セルは、UE3に対して、修正後に割当てるシンボル番号とともに、PUCCHリソース設定修正を示す情報(Mod_UE#3(シンボル#1))を通知する。ここでは、シンボル番号を1とする。これによって、UE3に対して、PUCCHリソース設定が修正される。
 セルは、UE4に対してPUCCHリソースの設定開始を決定した場合、UE4に対して、PUCCHを割当てるシンボル番号とともに、PUCCH設定開始を示す情報(Str_UE#4(シンボル#2))を通知する。ここでは、シンボル番号を2とする。これによって、UE4に対して、PUCCHリソースが設定される。
 セルは、UE2に対してPUCCHリソースの設定停止を決定した場合、UE2に対して、PUCCH設定停止を示す情報(Stp_UE#2)を通知する。これによって、UE2に対して設定されたPUCCHリソースは解放される。
 セルは、UE2に対して設定したPUCCHリソースを解放したので、UE3に対して設定したPUCCHリソースの衝突は生じないと判断し、PUCCHリソースの設定修正を決定し、UE3に通知する。ここでは、セルは、UE3に対して、修正後に割当てるシンボル番号とともに、PUCCHリソース設定修正を示す情報(Mod_UE#3(シンボル#2))を通知する。ここでは、シンボル番号を2とする。これによって、UE3に対して、PUCCHリソース設定が修正される。
 セルは、UE1に対してPUCCHリソースの設定停止を決定した場合、UE1に対して、PUCCH設定停止を示す情報(Stp_UE#1)を通知する。これによって、UE1に対して設定されたPUCCHリソースは解放される。
 セルは、UE1に対して設定したPUCCHリソースを解放したので、UE4に対して設定したPUCCHリソースの衝突は生じないと判断し、PUCCHリソースの設定修正を決定し、UE4に通知する。ここでは、セルは、UE4に対して、修正後に割当てるシンボル番号とともに、PUCCHリソース設定修正を示す情報(Mod_UE#4(シンボル#3))を通知する。ここでは、シンボル番号を3とする。これによって、UE4に対して、PUCCHリソース設定が修正される。
 セルは、UE1に対して設定したPUCCHリソースを修正したので、UE4に対して設定したPUCCHリソースの衝突は生じないと判断し、PUCCHリソースの設定修正を決定し、UE3に通知する。ここでは、セルは、UE3に対して、修正後に割当てるシンボル番号とともに、PUCCHリソース設定修正を示す情報(Mod_UE#3(シンボル#3))を通知する。ここでは、シンボル番号を3とする。これによって、UE3に対して、PUCCHリソース設定が修正される。
 このようにすることによって、セルは、異なるビームで通信を行うUE毎に、異なるリソースを、該UEのPUCCHに割当てることが可能となる。したがって、ビームスイープが必要なセルにおいて、異なるビームで通信を行うUE毎にビームを切り替えて、該UEのPUCCHを受信することが可能となる。
 また、このようにすることによって、動的に、異なるビームで通信を行うUE毎に、異なるリソースを、該UEのPUCCHに割当てることが可能となる。PUCCHリソースを設定不要のときは、PUCCHリソースの設定停止として、他のビームのUEに対して解放できる。実施の形態2で開示した方法のように、ビーム毎のPUCCHリソースを予め設定しておく必要が無くなる。したがって、無線リソースの使用効率が低下することを抑制することが可能となる。
 PUCCHリソース設定の開始、修正、停止に関する情報の通知方法について開示する。セルは、UEに対して、PUCCHリソース設定の開始、修正、停止に関する情報を通知する。セルは、該情報を、サービングビームを介して通知する。サービングビームを介して通知する場合、ビームIDを省略してもよい。セルは、該情報をUE個別シグナリングで通知するとよい。このようにすることによって、UEは、通信を行っているビームを介して、UE毎のPUCCHリソース設定の開始、修正、停止に関する情報を得ることが可能となる。
 UE個別シグナリングとして、RRCシグナリングを用いてもよい。PUCCHリソース設定の開始、修正、停止に関する情報を、RRCメッセージに含めるとよい。あるいは、UE個別シグナリングとして、L1/L2制御シグナリングを用いてもよい。PUCCHリソース設定の開始、修正、停止に関する情報を、下りL1/L2制御情報に含めるとよい。UE個別シグナリングとしてL1/L2制御シグナリングを用いることによって、UEは、比較的早期に設定を受信することが可能となるので、設定遅延時間の低減が可能となる。
 あるいは、UE個別シグナリングとして、MACシグナリングを用いてもよい。PUCCHリソース設定の開始、修正、停止に関する情報を、MAC制御情報に含めるとよい。UE個別シグナリングとして、MACシグナリングを用いることによって、HARQが適用されるので、UEは、低い受信誤り率で受信することが可能となるとともに、比較的早期に設定を受信することが可能となる。
 PUCCHリソースに関する情報と、PUCCHリソース設定の開始、修正、停止に関する情報との通知方法の一例を開示する。PUCCHリソースに関する情報をRRCシグナリングで通知し、PUCCHリソースの設定開始、修正、停止に関する情報をRRCシグナリングで通知する。RRCシグナリングを用いるので、多くの情報を通知できるとともに、低い受信誤り率で通知することが可能となる。
 通知方法の他の例を開示する。
 PUCCHリソースに関する情報をRRCシグナリングで通知し、PUCCHリソースの設定開始、修正、停止に関する情報をL1/L2制御シグナリングで通知する。PUCCHリソースの設定開始、修正、停止に関する情報をL1/L2制御シグナリングで通知するので、UEにおける該設定開始、修正、停止を早期に実行することが可能となる。動的に設定開始、修正、停止を早期に実行可能とすることによって、無線リソースの使用効率を向上させることが可能となる。
 通知方法のさらに他の例を開示する。
 PUCCHリソースに関する情報をRRCシグナリングで通知し、PUCCHリソースの設定開始、修正、停止に関する情報をMACシグナリングで通知する。PUCCHリソースの設定開始、修正、停止に関する情報をMACシグナリングで通知するので、低誤り率で通知することが可能となる。また、UEにおける該設定開始、修正、停止を比較的早期に実行することが可能となる。動的に設定開始、修正、停止を比較的早期に確実に実行可能とすることによって、無線リソースの使用効率を向上させることが可能となる。
 セルは、PUCCHリソースに関する情報、およびPUCCHリソース設定の開始、修正、停止に関する情報を、サービングビームを介して通知することを開示したが、他の方法として、セルは、前記PUCCHリソースに関する情報、およびPUCCHリソース設定の開始、修正、停止に関する情報の少なくとも一方を、セルのカバレッジ全体をカバーするシングルビームを用いて通知してもよい。これによって、セルのカバレッジ全体に、前記PUCCHリソースに関する情報、およびPUCCHリソース設定の開始、修正、停止に関する情報の少なくとも一方を通知することができるので、シグナリング負荷を低減させることが可能となる。
 また、セルはUEに対して、UE毎に、UCI毎のPUCCHリソースに関する情報を通知してもよい。前述の通知方法を適用するとよい。セルは、UCI毎のPUCCHリソースの設定が可能となり、UEは、UCI毎に設定されたPUCCHリソースの設定を用いて、UCI毎のPUCCHを送信することが可能となる。
 PUCCHに割当てるシンボル番号に優先順位を設けてもよい。PUCCHリソースのためのシンボル番号の設定に優先順位を設けてもよい。1サブフレーム内の最後尾のシンボルの優先順位を最も高くして、それから順に、前方のシンボルに対する優先順位を低くする。例えば、1サブフレームが、シンボル番号0~シンボル番号13の14シンボルで構成される場合、シンボル番号13の優先順位が最も高く、それから順に、シンボル番号12、シンボル番号11、とシンボル番号が小さくなるに従って優先順位が低くなる。
 優先順位の高いシンボルからPUCCHに割当てる。例えば、最初のPUCCHリソースの設定開始では、最も高いシンボルに割当てる。より高いシンボルへのPUCCHリソースの設定が停止によって解放された場合、次の優先順位のシンボルに設定していたPUCCHリソース設定を、解放された、より高いシンボルに修正するとよい。
 このようにすることによって、優先順位に従って、柔軟に設定を修正することが可能となる。また、後尾のシンボルをPUCCHリソースとして、優先して使用することによって、PUCCHリソースより前方のシンボルをまとめて他のDL用およびUL用の少なくとも一方に用いることが可能となる。また、ギャップ数も少なくすることが可能となる。
 また、PUCCHリソースの設定周期の長さが短い順に、後尾のシンボルから割当ててもよい。例えば、最初のPUCCHリソースの設定開始では、最も高いシンボルに割当てる。次のPUCCHリソースの設定の周期が、最初のPUCCHリソース設定の周期より短い場合は、最初のPUCCHリソース設定を次の優先順位のシンボルに修正し、次のPUCCHリソース設定を最も高い優先順位のシンボルに設定する。
 このようにすることによって、さらに、PUCCHリソースより前方のシンボル数がまとまって発生する回数を大きくすることができる。
 本変形例では、UE毎に、動的にPUCCHリソースを設定することを開示したが、セルからUEへのPUCCHリソースに関する情報、およびPUCCHリソース設定開始、修正、停止に関する情報の通知タイミングが問題となる。
 1サブフレーム内の他のシンボルを送受信するビームとは異なるビームのPUCCHを構成してもよいことを開示した。この場合、予め定めるビームにおいて、PUCCHが設定されるサブフレームで常に下りリソースが存在するとは限らない。したがって、セルは、UEに対して、UE毎のPUCCHリソース設定サブフレームで、該情報を通知することはできない場合が生じる。
 このような問題を解決する方法を開示する。
 セルは、UEに対して、UE毎のPUCCHリソース設定サブフレーム以前のタイミングで通知する。セルは、UE毎のPUCCHリソース設定サブフレーム以前のタイミングで、設定するUEが存在するビームでの送受信を行い、該送受信において、該情報のシグナリングを完了させるとよい。
 UEは、PUCCHリソース設定サブフレームは既に通知されているので、セルからUE毎のPUCCHリソース設定サブフレーム以前のタイミングで通知された場合、該通知以降のPUCCHリソース設定サブフレームで該通知された情報を適用すればよい。
 セルは、UEに対して、UE毎のPUCCHリソース設定サブフレーム以前のタイミングで通知する場合、設定を適用させるタイミングを併せて通知してもよい。オフセットとして通知してもよい。例えば、通知以降、何回目のPUCCHリソース設定サブフレームから該設定を適用させるかを通知してもよい。このようにすることによって、時間的に柔軟に設定することが可能となる。
 図19は、UE毎のPUCCHの設定およびSRの送受信のシーケンスの一例を示す図である。図19に示すシーケンスは、図16に示すシーケンスと同一のステップを含んでいるので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。図19では、セルが、UEに対して、UE毎のPUCCHリソースに関する情報と、UE毎のPUCCHリソース設定開始、修正、停止に関する情報とを別々に通知する場合について示している。
 ステップST2801において、セルは、UEに対して、UE毎のPUCCHリソース構成を設定する。
 ステップST2802において、セルは、UEに対して、UE毎のPUCCHリソースに関する情報を通知する。セルは、UEと通信するビームを介して、UE毎のPUCCHリソースに関する情報を通知するとよい。該情報の通知には、RRC個別シグナリングを用いる。
 ステップST2802でUE毎のPUCCHリソースに関する情報を受信したUEは、ステップST2803において、該PUCCHリソース構成を記憶する。
 ステップST2804において、セルは、UEに対して、PUCCHリソース設定開始を決定する。本実施の形態では、セルは、UEに対してPUCCHリソース設定開始を決定するとともに、UEに対して割当てるシンボルを決定する。このとき、セルは、サービングビームが異なるUEに対して、PUCCHリソースタイミングが同一にならないように設定する。
 ステップST2805において、セルは、UEに対して、PUCCHリソース設定開始情報を通知する。また、PUCCHリソースとして割当てるシンボル番号情報を通知する。セルは、これらの情報を下りL1/L2制御情報に含めて、下りL1/L2制御シグナリングで、UEに対して通知する。
 ステップST2805でPUCCHリソース設定開始情報を受信したUEは、ステップST2813において、ステップST2803で記憶したUE毎のPUCCHリソースに関する情報と、ステップST2805で受信したシンボル番号とを用いて、自UEのPUCCHリソース構成を設定する。
 ステップST2805でUEに対してPUCCHリソース設定開始情報とシンボル番号情報とを通知したセルは、ステップST2806において、UEに対して設定したPUCCHリソース構成で受信を開始する。
 UEは、上り信号の送信が発生した場合、このPUCCHリソース設定でSRを送信することになる。しかし、図19の例では、この状態ではUEに上りデータが発生しなかったとする。
 ステップST2807において、セルは、UEに対して、PUCCHリソース設定修正と修正後に割当てるシンボルとを決定する。このとき、セルは、サービングビームが異なるUEに対して、PUCCHリソースタイミングが同一にならないように設定する。また、前述のPUCCHに割当てるシンボル番号の優先順位に従って設定してもよい。
 ステップST2808において、セルは、UEに対して、PUCCHリソース設定修正情報を通知する。また、PUCCHリソースとして修正後に割当てるシンボル番号情報を通知する。セルは、これらの情報を下りL1/L2制御情報に含めて、下りL1/L2制御シグナリングで、UEに対して通知する。L1/L2制御シグナリングで通知することによって、可能な限り設定時間の削減を図ることができる。
 ステップST2808でPUCCHリソース設定修正情報とシンボル番号とを受信したUEは、ステップST2809において、自UEのPUCCHリソース設定を修正する。
 ステップST2808でUEに対してPUCCHリソース設定修正情報とシンボル番号情報とを通知したセルは、ステップST2810において、UEに対して修正したPUCCHリソース構成で受信を開始する。
 ステップST2811において、UEは、上りデータが発生したか否かを判断する。ステップST2811で上りデータが発生していない場合は、ステップST2811に戻り、上りデータが発生したか否かの判断を繰り返す。ステップST2811で上りデータが発生している場合は、ステップST2812に移行する。
 ステップST2812において、UEは、修正されたSR用PUCCHリソース構成で、SRを、サービングビームを介してセルに対して送信する。
 ステップST2810でUEに対して修正したPUCCHリソースで受信を開始したセルは、ステップST2812において、UEから送信されたSRを受信する。
 このようにしてUEからSRを受信したセルは、上り通信開始のための処理を行う。これによって、UEとセルとの間で上り通信が開始される。
 このような方法を用いることによって、先に示した例と同様の効果を得ることが可能となる。
 また、予めUEに対してPUCCHリソースを設定しておき、適宜PUCCHリソース設定開始、修正、停止を通知することによって、UEの接続状態に応じて、より早期にPUCCHリソースを設定することが可能となる。これによって、さらにリソースの使用効率の低減を抑制することができる。
 実施の形態2 変形例2.
 実施の形態2の変形例1では、UEに対してUE毎のPUCCHリソースの設定を行うことによって、無線リソースの使用効率を向上させることを開示した。しかし、周期的にPUCCHリソースを設定すると、該タイミングでは、常にPUCCHリソースが設定されたビームで通信を行わなくてはならない。他のビームで低遅延を要する通信があるような場合は、PUCCHリソースが設定されたビームで通信を行うことはできないという問題が生じる。
 本変形例では、このような問題を解決する方法を開示する。
 セルは、UEに対して、UEが通信するビームのDLリソースを構成するサブフレームと同一のサブフレームにPUCCHリソースを設定する。UEは、サービングビームの下り信号の送信が行われるサブフレームと同一のサブフレームでPUCCHを送信する。NRでは、同一のサブフレーム内でDLリソースとULリソースとが構成される自己完結型サブフレーム(self-contained subframe)が提案されている。本変形例では、この自己完結型サブフレームを用いてもよい。
 セルは、UEに対して、UEが通信するビームのDLリソースを構成するサブフレームと同一のサブフレームで、同じサブフレームでのPUCCH送信可否を通知する。セルは、UEに対して、PUCCH送信が必要なタイミングに応じて、サービングビームで下りL1/L2制御シグナリングによってPUCCH送信可否を通知する。PUCCH送信可否情報を設けるとよい。セルは、PUCCH送信可否情報を下り制御情報に含めて、下りL1/L2制御シグナリングでUEに対して通知するとよい。
 UEは、PUCCH送信可否情報を受信し、PUCCH送信が可の場合に、PUCCH送信可否情報を受信したサブフレームでPUCCH送信を可能とする。UEは、PUCCH送信可否情報を受信し、PUCCH送信が不可の場合に、PUCCH送信可否情報を受信したサブフレームでPUCCH送信を不可能とする。UEは、PUCCH送信可否情報を受信し、PUCCH送信可情報を受信できなかった場合に、該サブフレームでPUCCH送信を不可能としてもよい。
 PUCCH送信可情報のみ設けて、PUCCH送信否情報は省略してもよい。UEは、PUCCH送信可情報を受信した場合にのみ、PUCCH送信可情報を受信したサブフレームでPUCCH送信を可能とする。
 UEに対する設定方法について開示する。
 セルは、UEに対して、予め設定したPUCCHリソース内で、PUCCH送信可否情報を送信して、PUCCH送信可否を指示する。予め設定するPUCCHリソースには、PUCCHリソースを設定するタイミングを含ませるとよい。少なくともサブフレーム単位のタイミングを含ませるとよい。実施の形態2あるいは実施の形態2の変形例1で開示したPUCCHリソースに関する情報を通知して設定してもよい。
 UEは、PUCCH送信可の情報を受信した場合に、PUCCHを送信可能とする。逆に、PUCCH送信否(不可)情報を受信した場合に、PUCCHを送信不可とする。
 予めPUCCHリソース設定を通知しておくことを開示したが、PUCCHリソース設定のうちの一部あるいは全部を、PUCCH送信可否情報とともに通知してもよい。サブフレームより小さい時間単位のリソース設定をPUCCH送信可否情報とともに通知してもよい。例えば、PUCCHに割当てるシンボル番号情報をPUCCH送信可否情報とともに通知する。これによって、動的に柔軟にシンボルを割当てることが可能となる。
 あるいは、PUCCHリソース設定の一部あるいは全部の通知によって、PUCCH送信可を示すとしてもよい。これによって、PUCCH送信可の情報を省略することが可能となる。PUCCH送信可否情報とともに通知する情報を少数に限定してもよい。予め大部分のPUCCHリソースを設定しておくことによって、PUCCH送信可の情報を受信してからPUCCHの送信までの処理時間を短時間にすることができる。UEが、PUCCH送信可の情報を受信したのと同一のサブフレームでPUCCHの送信が可能となる。
 セルは、UEに対してPUCCHリソースを設定したサブフレームで、UEが通信するビームを送受信しなくてもよい。しかし、この場合、UEは、サービングビームからの下りL1/L2制御シグナリングを受信できなくなるので、PUCCH送信可否情報を受信できなくなる。したがって、UEの動作が不明確となり、UEは、PUCCH送信を行ってしまうおそれがある。
 このような場合に、前述に開示したように、UEは、PUCCH送信可否情報を受信してPUCCH送信可情報を受信できなかった場合に、該サブフレームでPUCCH送信を不可能としておくことによって、UEが無駄なPUCCH送信を行うことを回避することが可能となる。これによって、UEの低消費電力化、および上り干渉電力の削減を図ることができる。
 UEに対する他の設定方法について開示する。
 セルは、UEに対して、予め、タイミング以外のPUCCHリソース設定を通知しておき、タイミング以外は、該PUCCHリソース設定に従う。予め設定するタイミング以外のPUCCHリソースの設定には、実施の形態2あるいは実施の形態2の変形例1で開示したPUCCHリソースに関する情報の通知を適用してもよい。
 セルは、UEに対して、任意のタイミングでPUCCH送信可否を指示する。セルは、UEに対して、PUCCH送信可否情報を通知する。PUCCH送信可否情報とともに、サブフレームより小さい時間単位のリソース設定を通知してもよい。例えば、シンボル番号を通知する。UEは、PUCCH送信可の情報を受信した場合に、PUCCHを送信可とする。逆に、PUCCH送信否の情報を受信した場合に、PUCCHを送信不可とする。
 タイミング以外のPUCCHリソース設定を予め通知しておくことを開示したが、タイミング以外のPUCCHリソース設定のうちの一部あるいは全部を、PUCCH送信可否情報とともに通知してもよい。例えば、PUCCHの周波数リソース情報を、PUCCH送信可否情報とともに通知してもよい。これによって、動的に柔軟に周波数リソースを割当てることが可能となる。
 シンボル番号の通知、またはPUCCHリソース設定の一部もしくは全部の通知によって、PUCCH送信可を示すとしてもよい。これによって、PUCCH送信可の情報を省略することが可能となる。
 PUCCH送信可否情報とともに通知する情報を少数に限定してもよい。予め大部分のPUCCHリソースを設定しておくことによって、PUCCH送信可の情報を受信してからPUCCHの送信までの処理時間を短時間にすることができる。これによって、UEが、PUCCH送信可の情報を受信したサブフレームと同一のサブフレームで、PUCCH送信が可能となる。
 このようにすることによって、UEは、サービングビームで送信されるL1/L2制御シグナリングに含まれるPUCCH送信可否情報に応じて、PUCCHの送信可否を判断することが可能となる。セルは、UEに対して設定したPUCCHリソースでPUCCH送信を不可とすることによって、該PUCCHリソースを他に使用できる。例えば、下り通信用リソースに使用できる。セルは、該PUCCHリソースの他への使用をダイナミックに決定できる。
 特に、SRについては、PUCCH送信に下り制御信号を関連させることによって、セルの判断で動的にPUCCHリソースを設定することが可能となる。ビームスイープが必要なMBFの場合に、セルは、動的に送受信するビームを変更することが可能となる。予め各ビームに設定されたPUCCHリソースタイミングで送受信する必要がなくなる。時々刻々とした電波伝搬環境変動、セルの負荷変動、または要求される通信サービスなどに柔軟に対応することが可能となる。
 UEは、PUCCH送信可の情報を受信した場合、PUCCHで送信するUCIがある場合、PUCCH送信を行う。PUCCHで送信するUCIが無い場合、PUCCH送信を行わない。例えば、UEは、送信すべきSRがある場合、SR用PUCCH送信を行う。UEは、PUCCH送信不可の情報を受信した場合、PUCCHで送信するUCIの有無にかかわらず、PUCCH送信を行わない。例えば、送信すべきSRがあったとしても、SR用PUCCH送信を行わない。
 UEがPUCC送信不可の場合に送信しなかったUCIは、UEが、次のPUCCH送信可情報を受信するまで待ってから送信する。これによって、確実にUCIを送信することが可能となる。他の方法として、UEは、送信しながったUCIを破棄するとしてもよい。あるいは、UEは、送信しなかったUCIを、次の同じ種類のUCIが発生した場合に破棄するとしてもよい。これによって、UEに必要となるバッファを少なくすることが可能となる。
 図20は、UEのサービングビームのDLリソースと同一のサブフレームでPUCCHリソースを設定する方法の一例を説明する図である。ここでは、ビームスイープ数が4個の場合について示す。PUCCHリソースに割当てるシンボルは、1サブフレーム内1シンボルとしている。ここでは、シンボル番号が13のシンボルに割当てる。PUCCHリソースに割当てるシンボル番号は、固定としてもよい。下りL1/L2制御シグナリングに割当てるシンボルは、1サブフレーム内1シンボルとしている。ここでは、シンボル番号が0のシンボルに割当てる。下りL1/L2制御シグナリングに割当てるシンボル番号は、固定としてもよい。
 セルは、サブフレーム番号0でビーム番号2のビーム2002の送受信を行う。セルは、ビーム番号2で通信を行うUEに対して、UE毎のPUCCHリソース送信可否情報をUCIに含めて、ビーム番号2の下りL1/L2制御シグナリング2001で通知する。セルは、UEに、PUCCHリソース送信可否情報とともに、シンボル番号情報をUCIに含めて通知してもよい。
 ビーム番号2のビーム2002で送受信を行うUEは、サブフレーム番号0のL1/L2制御シグナリング2001を受信して、PUCCHリソース送信可否情報とシンボル番号とを受信する。PUCCHリソース送信可を受信したUEは、予め設定されたPUCCHリソースに関する情報とシンボル番号とから、PUCCHリソースを設定し、送信可能とする。送信するUCIがあるUEは、該PUCCHリソースでPUCCHを送信する。ここでは、ビーム#2のPUCCH2003を送信する。
 PUCCHリソース送信不可を受信したUEは、PUCCHの送信を不可能とする。UEは、たとえ送信するUCIがあったとしても、PUCCHを送信しない。
 セルは、次のサブフレーム番号1でビーム番号3のビーム2002の送受信を行う。セルは、ビーム番号3で通信を行うUEに対して、UE毎のPUCCHリソース送信可否情報をUCIに含めて、ビーム番号3の下りL1/L2制御シグナリング2004で通知する。セルは、UEに、PUCCHリソース送信可否情報とともに、シンボル番号情報をUCIに含めて通知してもよい。
 ビーム番号3のビーム2002で送受信を行うUEは、サブフレーム番号1のL1/L2制御シグナリング2004を受信して、PUCCHリソース送信可否情報とシンボル番号とを受信する。PUCCHリソース送信可を受信したUEは、予め設定されたPUCCHリソースに関する情報とシンボル番号とから、PUCCHリソースを設定し、送信可能とする。送信するUCIがあるUEは、該PUCCHリソースでPUCCHを送信する。ここでは、ビーム#3のPUCCH2005を送信する。
 PUCCHリソース送信不可を受信したUEは、PUCCHの送信を不可能とする。UEは、たとえ送信するUCIがあったとしても、PUCCHを送信しない。
 セルは、次のサブフレーム番号2でビーム番号1のビーム2002の送受信を行う。セルは、ビーム番号1で通信を行うUEに対して、UE毎のPUCCHリソース送信可否情報をUCIに含めて、ビーム番号1の下りL1/L2制御シグナリング2006で通知する。セルは、UEに、PUCCHリソース送信可否情報とともに、シンボル番号情報をUCIに含めて通知してもよい。
 ビーム番号1のビーム2002で送受信を行うUEは、サブフレーム番号2のL1/L2制御シグナリング2006を受信して、PUCCHリソース送信可否情報とシンボル番号とを受信する。PUCCHリソース送信可を受信したUEは、予め設定されたPUCCHリソースに関する情報とシンボル番号とから、PUCCHリソースを設定し、送信可能とする。送信するUCIがあるUEは、該PUCCHリソースでPUCCHを送信する。ここでは、ビーム#1のPUCCH2007を送信する。
 PUCCHリソース送信不可を受信したUEは、PUCCHの送信を不可能とする。UEは、たとえ送信するUCIがあったとしても、PUCCHを送信しない。
 セルは、次のサブフレーム番号3でビーム番号0のビーム2002の送受信を行う。セルは、ビーム番号0で通信を行うUEに対して、UE毎のPUCCHリソース送信可否情報をUCIに含めて、ビーム番号0の下りL1/L2制御シグナリング2008で通知する。セルは、UEに、PUCCHリソース送信可否情報とともに、シンボル番号情報をUCIに含めて通知してもよい。
 ビーム番号0のビーム2002で送受信を行うUEは、サブフレーム番号3のL1/L2制御シグナリング2008を受信して、PUCCHリソース送信可否情報とシンボル番号とを受信する。PUCCHリソース送信可を受信したUEは、予め設定されたPUCCHリソースに関する情報とシンボル番号とから、PUCCHリソースを設定し、送信可能とする。送信するUCIがあるUEは、該PUCCHリソースでPUCCHを送信する。ここでは、ビーム#0のPUCCH2009を送信する。
 PUCCHリソース送信不可を受信したUEは、PUCCHの送信を不可能とする。UEは、たとえ送信するUCIがあったとしても、PUCCHを送信しない。
 このようにすることによって、セルが送受信を行うビームのタイミングに合わせてPUCCHの送受信が可能となる。UEは、サービングビームで送信されるL1/L2制御シグナリングに含まれるPUCCH送信可否情報に応じて、PUCCHの送信可否を判断することが可能となる。PUCCHの送信に下り制御信号を関連させることによって、セルの判断で動的にPUCCHリソースを設定することが可能となる。
 図21は、DLリソースと同一サブフレームでのPUCCHリソースの設定およびSRの送受信のシーケンスの一例を示す図である。図21に示すシーケンスは、図16に示すシーケンスと同一のステップを含んでいるので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。
 ステップST3001において、セルは、UEに対して、タイミング以外のPUCCHリソース構成を設定する。
 ステップST3002において、セルは、UEに対して、タイミング以外のPUCCHリソースに関する情報を通知する。前記PUCCHリソースに関する情報は、UEと通信するビームを介して通知するとよい。前記PUCCHリソースに関する情報の通知には、RRC個別シグナリングを用いる。
 ステップST3002でタイミング以外のPUCCHリソースに関する情報を受信したUEは、ステップST3003において、該PUCCHリソース構成を記憶する。
 ステップST3004において、UEは、上りデータが発生したか否かを判断する。ステップST3004において上りデータが発生していない場合は、ステップST3004に戻り、上りデータが発生したか否かの判断を繰り返す。ステップST3004において上りデータが発生している場合は、ステップST3005に移行する。
 ステップST3005において、UEは、SR送信を待機し、上りデータをバッファに記憶する。
 ステップST3006において、セルは、任意のサブフレームにおいて、UEが通信を行うビームへの送受信を決定する。また、セルは、該サブフレームにおいて、UEに対して、PUCCHの送信が可能であることを決定する。
 ステップST3007において、セルは、該サブフレームにおいて、UEに対して、PUCCH送信可の情報を通知する。ここでは、PUCCH送信可の情報とともに、シンボル番号情報を通知する。セルは、これらの情報を下りL1/L2制御情報に含めて、下りL1/L2制御シグナリングで、UEに対して通知する。
 ステップST3007でPUCCH送信可の情報を受信したUEは、ステップST3008において、ステップST3003で記憶したUE毎のPUCCHリソースに関する情報と、ステップST3007で受信したシンボル番号とを用いて、受信したサブフレームと同一のサブフレームに、自UEのPUCCHリソース構成を設定する。
 ステップST3009において、UEは、待機していたSRを、ステップST3008で設定したSR用PUCCHリソース構成で、サービングビームを介してセルに対して送信する。
 ステップST3007でUEに対してPUCCH送信可の情報とシンボル番号情報とを通知したセルは、ステップST3010において、同一のサブフレームでUEに対して設定したPUCCHリソース構成で受信を開始する。
 ステップST3010でUEに対して設定したPUCCHリソース構成で受信を開始したセルは、ステップST3009において、UEから送信されたSRを受信する。
 このようにしてUEからSRを受信したセルは、上り通信開始のための処理を行う。これによって、UEとセルとの間で上り通信が開始される。
 本変形例で開示した方法を用いることによって、MBFにおけるビームスイーピング運用時のPUCCHリソースの設定が可能となる。セルがUEに対して、本実施の形態で開示した方法でPUCCHリソースの設定を行うことによって、UEが通信を行っているビームでのPUCCHの送受信が可能となり、UEからセルへの上り通信が可能となる。
 また、セルが送受信を行うビームのタイミングに合わせてPUCCHの送受信が可能となる。UEは、サービングビームで送信されるL1/L2制御シグナリングに含まれるPUCCH送信可否情報に応じて、PUCCHの送信可否を判断することが可能となる。このようにすることによって、PUCCHを送受信するビームを、UEに対して設定したPUCCHリソースに合わせて制御することが不要となる。したがって、UEへのPUCCHリソース設定およびPUCCH送受信のための制御を容易にすることが可能となる。
 前述に開示した方法では、セルは、UEに対して、UEが通信するビームのDLリソースを構成するサブフレームと同一サブフレームでのPUCCHの送信可否を通知した。セルは、同一サブフレームでのPUCCHの送信可否ではなく、PUCCHの送信可否を通知したサブフレームからオフセット後のサブフレームでのPUCCHの送信可否を通知してもよい。
 PUCCHの送信可否を通知したサブフレームからオフセット値を示すオフセット情報を設けてもよい。セルは、UEに対して、PUCCH送信可否情報とともに、該オフセット情報を通知する。UEは、PUCCH送信可の情報を受信したサブフレームからオフセット値だけ後のサブフレームでPUCCHを送信する。UEは、PUCCH送信不可の情報を受信した場合、サブフレームからオフセット値だけ後のサブフレームでPUCCHを送信しない。
 セルは、UEが通信しているビームの次の送受信タイミングを認識している場合に適用するとよい。あるいは、セルは、UEが通信しているビームの次の送受信タイミングをスケジューリングしているような場合に適用するとよい。あるいは、セルは、UEに対して、PUCCH送信可の情報を通知するときに、UEが通信しているビームの次の送受信タイミングを決定した場合に適用するとよい。
 このようにすることによって、UEは、PUCCH送信可の情報を受信したサブフレームと同一のサブフレームでPUCCHを設定し、PUCCCHを送信しなくてもよい。したがって、UEでの復調、デコーディング、コーディングおよび変調などのPUCCHの送信に関する処理に時間を要する場合も、UEからのPUCCHを送信することが可能となる。
 UEは、セルに対して、予め、復調、デコーディング、コーディングおよび変調などに関する処理に要する時間あるいは能力を通知しておいてもよい。UEケーパビリティ情報として通知してもよい。セルは、UEから通知された復調、デコーディング、コーディングおよび変調などに関する処理に要する時間あるいは能力を用いて、オフセット値を決定してもよい。
 例えば、UEが、PUCCH送信可否の受信からPUCCHの送信までを同一のサブフレーム内で可能な場合、セルは、オフセットを0としてUEに通知する。オフセットが0の場合は、オフセット情報を省略してもよい。また、例えば、UEが、PUCCH送信可否の受信からPUCCHの送信まで2サブフレームを要する場合は、セルは、オフセットを2としてUEに通知する。このとき、セルは、他のビームの通信状況を考慮してもよく、オフセットが2以降を設定してUEに通知してもよい。
 前述に開示した方法では、一つのサブフレームを一つのビームに割当てた。一つのサブフレーム全部を一つのビームだけに割当てるのではなく、複数のビームに割当ててもよい。例えば、一つのサブフレームの下りL1/L2制御信号がマッピングされるシンボルとPUCCHリソースが構成されるシンボルのみ同一のビームに割当てて、他のシンボルを他のビームに割当ててもよい。このようにすることによって、セルは、さらにビームの運用を柔軟に行うことが可能となり、セルとしての無線リソースの使用効率を向上させることができる。
 例えば、一つのサブフレームに一つのビームの下りL1/L2制御信号だけでなく、複数のビームの下りL1/L2制御信号が割当てられてもよい。シンボル毎に割当てらえてもよい。また、一つのサブフレームに一つのビームのPUCCHリソースだけでなく、複数のビームのPUCCHリソースが割り当てられてもよい。シンボル毎に割当てられてもよい。セルは、一つのサブフレームで複数のビームにおいて、各ビームと通信するUEからのPUCCH送信を受信することが可能となる。
 1サブフレーム内でL1/L2制御信号がマッピングされる可能性のあるシンボルを限定してもよい。最大値を設けてもよい。UEは、該可能性のあるシンボルを受信して、サービングビーム向けのL1/L2制御信号があるかどうか判断するとよい。最大値は、セルからUEに対して、予め通知してもよい。セル毎の情報として報知してもよいし、UE個別シグナリングで通知してもよい。あるいは、静的に規格などで決めておいてもよい。UEは、該最大値のシンボルだけを受信して、自UE宛の下りL1/L2制御情報を受信できなかった場合、該サブフレームを受信しなくてよい。
 このような方法を用いることによって、各ビームでの通信機会が増大するので、UEでのSR送信待機時間を短縮することが可能となる。したがって、UEからの上りデータの発生から上り通信の開始までの遅延時間の短縮を図ることができる。
 1サブフレーム内の複数のシンボルに複数のビームのL1/L2制御信号が割当てられる場合、UEは、先頭の1シンボルではなく、複数のシンボルを受信する。予めL1/L2制御信号が割当てられるシンボル数が固定されている場合は、UEは、該シンボル数を受信して、サービングビームで送信されるL1/L2制御信号を受信することが可能となる。しかし、予めシンボル数を固定にすると、L1/L2制御信号が不要なビームが発生した場合、該シンボルは無駄になる。
 このような問題を解決する方法を開示する。
 セルは、毎サブフレーム、L1/L2制御信号に用いられるシンボル数の情報を通知するとよい。該情報をセル共通の情報とするとよい。該情報を下りL1/L2制御情報に含めて通知してもよい。UE個別のL1/L2制御情報とするとよい。あるいは、セル共通のL1/L2制御情報としてもよい。セル共通のL1/L2制御情報とすることによって、情報量を削減することができる。
 前記L1/L2制御信号に用いられるシンボル数の情報をマッピングする物理チャネルを個別に設けて、毎サブフレームUEに対して通知してもよい。該物理チャネルをサブフレームの先頭のシンボルにマッピングしてもよい。
 セルは、前記L1/L2制御信号に用いられるシンボル数の情報を毎サブフレーム通知することを開示したが、周期的に通知してもよい。周期的に1サブフレーム内の複数のシンボルに複数のビームのL1/L2制御信号が割当てるような場合に適用するとよい。セルは、該周期情報および始点となるオフセット情報を予めUEに通知しておくとよい。セル毎の情報として報知してもよいし、UE個別シグナリングで通知してもよい。あるいは、静的に規格などで決めておいてもよい。
 このようにすることによって、MBFにおけるビームスイーピング運用時のL1/L2制御シグナリングを柔軟に設定することが可能となる。また、本変形例を用いることによって、MBFにおけるビームスイーピング運用時のPUCCHリソースの設定が可能となる。
 NRでは、MBFにおいてセル内の全てのビームを同一のタイミングで構成できないような場合、セル共通の制御チャネルを送受信するために、全てのビームを連続してビームスイーピングを行うことが検討されている(非特許文献12参照)。このように全てのビームを連続してビームスイーピングを行う部分を、ビームスイーピングブロックとも称する。
 PUCCHリソースタイミングが、このようなビームスイーピングブロックのタイミングと重なる場合、PUCCHにシンボルを割当てられなくなる。このような場合、PUCCHリソースタイミングとして、ビームスイーピングブロックのタイミングを除くとよい。セルは、ビームスイーピングブロックタイミングと、UEに対して設定したPUCCHリソースタイミングとが重なる場合、PUCCHリソースを設定しないとしてもよい。PUCCHを送信不可能とする。
 あるいは、UEは、ビームスイーピングブロックタイミングと、PUCCHリソースタイミングとが重なる場合、PUCCHリソースを設定しない。PUCCHを送信不可能としてもよい。このことを、予め規格などで決めておいてもよい。セルがUEに対して、ビームスイーピングブロック周期などを通知することによって、UEは、ビームスイーピングブロックタイミングを認識することができる。
 このようにすることによって、ビームスイーピングブロックで無駄なPUCCHの送信を防ぐことができる。したがって、UEの低消費電力化を図ることができる。
 PUCCHリソースタイミングが、このようなビームスイーピングブロックのタイミングと重なる場合の他の方法を開示する。
 ビームスイーピングブロックを自己完結型サブフレームとする。下りビームスイーピングブロックの各ビームの送信において、上り送信を可能にする。該上り送信用シンボルをPUCCHに割当てるとよい。
 ビームスイーピングブロックにおいて、PUCCH送信と重なるタイミングでのビームが、PUCCHの送信を必要とするビームではなく、他のビームとなる場合がある。このような場合は、該ビームスイーピングブロック内の、PUCCHの送信を必要とするビームの上り送信用シンボルを、PUCCHに割当てるようにしてもよい。このことを、予め規格などで決めておいてもよい。
 このようにすることによって、たとえ、PUCCHリソースタイミングが、ビームスイーピングブロックタイミングと重なるとしても、該タイミングあるいはビームスイーピングブロックのタイミングでPUCCHを送信することが可能となる。
 PUCCHリソースタイミングが、上りのビームスイーピングブロックのタイミングと重なる場合は、上りビームスイーピングブロックの一部のシンボルをPUCCHに割当てるとよい。
 上りビームスイーピングブロックにおいて、PUCCHの送信と重なるタイミングでのビームが、PUCCHの送信を必要とするビームではなく、他のビームとなる場合がある。このような場合は、該上りビームスイーピングブロック内の、PUCCHの送信を必要とするビームの一部のシンボルを、PUCCHに割当てるようにしてもよい。このことを、予め規格などで決めておいてもよい。
 このようにすることによって、たとえ、PUCCHリソースタイミングが、上りビームスイーピングブロックタイミングと重なるとしても、該タイミングあるいは上りビームスイーピングブロックのタイミングでPUCCHを送信することが可能となる。
 周波数分割複信(Frequency Division Duplex:FDD)の場合、PUCCHリソースタイミングと、下りビームスイーピングブロックタイミングとが重なったときは、周波数が異なるので問題ないが、PUCCHリソースタイミングと、上りビームスイーピングブロックタイミングとが重なったときは、問題が生じる。このようなときも、前述の上りビームスイーピングブロックについて開示した方法を適用するとよい。これによって、同様の効果を得ることができる。
 実施の形態3.
 実施の形態2から実施の形態2の変形例2では、ビームスイーピングを必要とするMBFでのPUCCHの送受信方法として、各ビームのPUCCHを異なるリソースに割当てる方法を開示した。本実施の形態では、ビームスイーピングを必要とするMBFでのPUCCHの送受信方法として、他の方法を開示する。
 セルは、ビーム間でPUCCHの受信の優先順位をつける。セルは、ビーム間でPUCCHの受信の優先順位をつけ、優先順位に従って対象ビームでPUCCHを受信する。
 セルは、UE間で優先順位をつけてもよい。セルは、UEの優先順位を用いて、UEが通信を行うビーム間で優先順位をつけてもよい。例えば、同一ビームで通信を行うUEのうち、最も高い優先順位に応じて、ビーム間の優先順位をつける。
 優先順位付けの指標例として、以下の(1)~(9)の9つを開示する。
 (1)通信のサービス種類。例えば、緊急性を要するサービスの優先順位を高く設定する。
 (2)要求QoS。例えば、高スループットを要するQoSの優先順位を高く設定する。
 (3)要求遅延時間。例えば、低遅延時間を要するUEの優先順位を高く設定する。
 (4)ビーム毎の負荷。例えば、負荷の高いビームの優先順位を高く設定する。
 (5)UE能力(UEケーパビリティ)。例えば、UE能力の高いUEの優先順位を高く設定する。
 (6)SR周期。例えば、SR周期の長いUEの優先順位を高く設定する。
 (7)ビーム毎のUE数。例えば、UE数の多いビームの優先順位を高く設定する。
 (8)通信品質。例えば、通信品質の良いビームの優先順位を高く設定する。
 (9)前記(1)~(8)の組合せ。
 セルは、予め前述のような指標に従って、ビームのPUCCHの受信に優先順位をつけるとよい。セルは、予め前述の指標に従って、ビームの送信および受信の少なくとも一方に優先順位をつけてもよい。セルは、予め前述のような指標に従って、UEのPUCCHの受信に優先順位をつけ、UEの優先順位に応じて、ビーム間の優先順位をつけてもよい。
 セルは、設定した優先順位に従って、対象ビームでPUCCHを受信する。例えば、通信品質の良いビームの優先順位を高く設定した場合、通信品質の良いビームをPUCCHの受信対象ビームとする。例えば、高い優先順位のUEが存在するビームをPUCCHの受信対象ビームとする。
 あるビームのUEのPUCCHの送信タイミングが、他のビームのUEのPUCCHの送信タイミングと衝突した場合、セルは、設定した優先順位に従って、どのビームで送受信を優先して行うかを決定する。他のビームのUEのPUCCHの送信タイミングと衝突した場合だけでなく、他のビームでの送受信のスケジューリングタイミングと衝突した場合としてもよい。
 UEの優先順位を用いて、UEが通信を行うビーム間で優先順位をつける場合の例について開示する。該タイミングが衝突した場合、該タイミングで、セルは、優先順位の高いUEが通信を行うビームでPUCCHの受信を行い、優先順位の低いUEが通信を行うビームでPUCCHの受信を行わない。該タイミングで優先順位の高いUEは、セルに対して、PUCCHの送信を行う。該タイミングで優先順位の低いUEは、セルに対して、PUCCHを送信するが、セルは、該PUCCHを受信しない。
 衝突タイミングで、優先順位の低いUEがPUCCHを送信することになるが、該UEが通信を行うビームとは異なるビームで通信を行うことになるので、セルにおいて受信信号が衝突することはなく、問題にはならない。
 このように、たとえPUCCHの送信タイミングが衝突しても、優先順位を設けて、優先順位に応じたビームでPUCCHの送受信を行うことによって、ビームとは関係なく、PUCCH用リソースの設定を実行することができる。したがって、UEに対する処理の追加などによって、処理が複雑化することを回避することが可能となる。
 前述に開示した方法では、優先順位の低いUEは、PUCCHがセルに受信されなくなるので、PUCCHの送信のために設定されたタイミングで毎回送信することになる。しかし、これは無駄な送信となり、UEの消費電力が増大し、上り干渉電力が増大するという問題を引き起こす。
 このような問題を解決する方法を開示する。
 BSRを受信中のUEの優先順位を最下位にする。セルは、BSRを受信中のUEの優先順位を最下位に設定する。セルは、BSRに対する上りスケジューリング(上りグラント)の送信を終了すると、UEの優先順位を元に戻す。このような方法を用いることによって、優先順位の低いUEが通信を行うビームでPUCCHの送受信が可能となる。したがって、優先順位の低いUEが無駄なPUCCHを繰り返し送信してしまうことを回避することが可能となる。
 他の方法を開示する。セルは、優先順位の低いUEに対して、PUCCHリソースのあるサブフレームで該UEが通信を行うビームを用いてPUCCH送信可否情報を通知する。PUCCHリソースのあるサブフレームに該UEが通信を行うビームの下りL1/L2制御信号をマッピングし、該ビームの下りL1/L2制御情報にPUCCH送信可否を示す情報を含ませる。PUCCH送信不可情報のみとしてもよい。
 下りL1/L2制御信号用のリソースは、シンボル単位としてもよい。1シンボルとしてもよい。UEは、PUCCHリソースのあるサブフレームで、自UEが通信を行うビームの下りL1/L2制御信号を受信して、PUCCH送信可否を判断する。UEは、PUCCHの送信不可を受信した場合、PUCCHの送信を行わない。このPUCCH送信可否情報の送信に関しては、実施の形態2の変形例2で開示した方法を適用するとよい。
 このようにすることによって、優先順位の低いUEが、衝突したタイミングでPUCCHの送信を行わないようにすることができる。したがって、優先順位の低いUEが無駄なPUCCHを繰り返し送信してしまうことを回避することが可能となる。
 図22および図23は、ビーム間でPUCCH受信に優先順位を設けた場合のSRの送受信のシーケンスの一例を示す図である。図22と図23とは、境界線BL1の位置で、つながっている。図22および図23に示すシーケンスは、図19に示すシーケンスと同一のステップを含んでいるので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。図22および図23では、優先順位が高いUE(以下「UE1」と称する場合がある)と、優先順位が低いUE(以下「UE2」と称する場合がある)とが存在しており、優先順位の高いUEが通信を行うビームと優先順位の低いUEが通信を行うビームとが異なる場合について示している。
 ステップST2801において、セルは、UE1に対して、UE毎のPUCCHリソース構成を設定する。また、ステップST2801において、セルは、UE2に対しても、UE毎のPUCCHリソース構成を設定する。
 ステップST3101において、セルは、UE1に対して、UE毎のPUCCHリソースに関する情報を通知する。前記PUCCHリソースに関する情報は、UE1と通信するビームを介して通知するとよい。前記PUCCHリソースに関する情報の通知には、RRC個別シグナリングを用いる。
 ステップST3102において、セルは、UE2に対して、UE毎のPUCCHリソースに関する情報を通知する。前記PUCCHリソースに関する情報は、UE2と通信するビームを介して通知するとよい。前記PUCCHリソースに関する情報の通知には、RRC個別シグナリングを用いる。
 ステップST3101でUE毎のPUCCHリソースに関する情報を受信したUE1は、ステップST3103において、該PUCCHリソース構成を設定する。
 ステップST3102でUE毎のPUCCHリソースに関する情報を受信したUE2は、ステップST3104において、該PUCCHリソース構成を設定する。
 ステップST3105において、UE1は、上りデータが発生したか否かを判断する。ステップST3105において上りデータが発生していない場合は、ステップST3105に戻り、上りデータが発生したか否かの判断を繰り返す。ステップST3105において上りデータが発生している場合は、ステップST3106に移行する。
 ステップST3106において、UE1は、設定されたSR用PUCCHリソース構成でSRを、サービングビームを介してセルに対して送信する。
 ステップST3107において、セルは、UE1とUE2とのPUCCHリソースタイミングで衝突が発生していることを認識する。
 ステップST3108において、セルは、前記PUCCHリソースタイミングで、優先順位の高いUE、ここではUE1と通信を行うビームでPUCCHの受信を決定する。言い換えると、セルは、前記PUCCHリソースタイミングで、優先順位の低いUE、ここではUE2と通信を行うビームでPUCCHの受信を行わないことを決定する。
 ステップST3106において、セルは、UE1に対して設定したPUCCHリソースでUE1から送信されたSRを受信する。
 このようにしてUE1からSRを受信したセルは、ステップST2510Aにおいて、SRを送信したUEに対して、すなわちUE1に対して、上りスケジューリングを開始する。
 ステップST2511Aにおいて、セルは、UE1に対して上りグラント、具体的には上りグラントを含む上りスケジューリング情報を送信する。
 ステップST2511Aで上りグラントを受信したUE1は、ステップST2512Aにおいて、該上りグラントを用いて、BSR(Buffer Status Report)をセルに送信する。このときに、上りデータを送信してもよい。
 ステップST2512AでBSRを受信したセルは、BSRに従って、UE1に対して上りスケジューリングを行う。
 ステップST2513Aにおいて、セルは、UE1に対して上りグラントを送信する。ステップST2513Aで上りグラントを受信したUE1は、ステップST2514Aにおいて、該上りグラントを用いて、上りデータをセルに送信する。ステップST2514Aにおいて、セルは、UE1から送信された上りデータを受信する。
 以上のようにして、セルは、ステップST2511AからステップST2514Aにおいて、UE1に対して上り通信開始のための処理を行う。これによって、UE1とセルとの間で上り通信が開始される。
 ステップST3109において、UE2は、上りデータが発生したか否かを判断する。ステップST3109において上りデータが発生していない場合は、ステップST3109に戻り、上りデータが発生したか否かの判断を繰り返す。ステップST3109において上りデータが発生している場合は、ステップST3110に移行する。
 ステップST3110において、UE2は、設定されたSR用PUCCHリソース構成でSRを、サービングビームを介してセルに対して送信する。
 しかし、ステップST3108において、セルは、前記PUCCHリソースタイミングで、UE1と通信を行うビームでPUCCHの受信を決定し、ステップST3108において、UE1に対して設定したPUCCHリソースでUE1から送信されたSRを受信する。
 したがって、セルは、ステップST3110において、UE2と通信を行うビームでUE2から送信されたSRを受信できない。
 ステップST3111において、セルは、優先順位の高いUEであるUE1のBSRを受信中か否かを判断する。ステップST3111においてBSRを受信中でない場合は、ステップST3111に戻り、再度BSRを受信中か否かの判断を行う。ステップST3111においてBSRを受信中である場合は、ステップST3112に移行する。
 ステップST3111においてBSRを受信中である場合、セルは、UE1に対して上りデータを送信するためのリソースをスケジューリングする処理を行っているので、UE1がSRを送信する必要は無いと判断する。そして、ステップST3112において、セルは、UE1の優先順位を最下位に設定する。
 ステップST3113において、セルは、UE1とUE2とのPUCCHリソースタイミングで衝突が再度発生していることを認識する。
 ステップST3114において、セルは、前記PUCCHリソースタイミングで、優先順位の高いUE、ここではUE2と通信を行うビームでPUCCHの受信を決定する。言い換えると、セルは、前記PUCCHリソースタイミングで、優先順位の低いUE、ここではUE1と通信を行うビームでPUCCHの受信を行わないことを決定する。
 ステップST3110においてSRを送信したにもかかわらず、上りグラントを受信できなかったUE2は、再度PUCCHリソースタイミングで、ステップST3115において、設定されたSR用PUCCHリソース構成でSRを、サービングビームを介してセルに対して送信する。
 ステップST3115において、セルは、UE2に対して設定したPUCCHリソースで、UE2から送信されたSRを受信する。
 このようにしてUE2からSRを受信したセルは、ステップST2510Aにおいて、SRを送信したUEに対して、すなわちUE2に対して、上りスケジューリングを開始する。
 ステップST2511Bにおいて、セルは、UE2に対して上りグラント、具体的には上りグラントを含む上りスケジューリング情報を送信する。
 ステップST2511Bで上りグラントを受信したUE2は、ステップST2512Bにおいて、該上りグラントを用いて、BSRをセルに送信する。このときに、上りデータを送信してもよい。
 ステップST2512BでBSRを受信したセルは、BSRに従って、UE2に対して上りスケジューリングを行う。
 ステップST2513Bにおいて、セルは、UE2に対して上りグラントを送信する。ステップST2513Bで上りグラントを受信したUE2は、ステップST2514Bにおいて、該上りグラントを用いて、上りデータをセルに送信する。ステップST2514Bにおいて、セルは、UE2から送信された上りデータを受信する。
 以上のようにして、セルは、ステップST2511BからステップST2514Bにおいて、UE2に対して上り通信開始のための処理を行う。これによって、UE2とセルとの間で上り通信が開始される。
 このようにすることによって、たとえ、通信しているビームが異なる複数のUEのPUCCHリソースタイミングが衝突したとしても、セルは、それらのUEのPUCCHを受信することが可能となる。
 これによって、ビームとは関係なく、従来のPUCCHの設定方法を適用できる。したがって、UEに対する処理の追加などによって、処理が複雑化することを回避することが可能となる。また、上りグラントを送信したUEに対する優先順位を最下位に再設定することによって、低い優先順位のUEに対しても該ビームでPUCCHを受信することが可能となる。したがって、低い優先順位のUEが無駄なPUCCHの送信を繰り返すことによる消費電力の増大、および上り干渉電力の増大を回避することが可能となる。
 実施の形態4.
 実施の形態2から実施の形態3では、PUCCHを割当てるリソースの最小単位としてシンボルを割当てることを開示した。ビームスイープ数が多くなると、PUCCHリソースのために必要となるシンボル数が増大する。したがって、一つのサブフレーム内で多数のビームのPUCCHリソースを構成しようとすると、データ用のリソースが少なくなり、通信速度を低下させてしまうという問題が発生する。あるいは、一つのサブフレーム内では、少数のビームのPUCCHリソースを構成すると、複数のサブフレームにわたってPUCCHリソースが必要となり、ビーム毎のPUCCHリソースの発生間隔が増大する。したがって、遅延時間が大きくなってしまうという問題が発生する。
 本実施の形態では、このような問題を解決するための方法を開示する。
 1シンボル期間内に複数のシンボルを構成し、複数のビームのPUCCHリソースを時間分割多重する。1シンボル期間内に構成する複数のシンボル数を2のn(nは自然数)乗倍とするとよい。このようにすることによって、PUCCHリソースを割当てるシンボル期間を短くすることができ、多数のビームのPUCCHリソースを構成することが可能となる。短くしたシンボルのことを、以下の説明において、短縮シンボルと称する場合がある。
 1シンボル期間内に複数のシンボルを構成する方法として、3GPPで提案されているサブキャリア間隔増大(Larger subcarrier spacing)方法(3GPP R1-166566(以下「参考文献7」という)参照)を用いるとよい。参考文献7では、1シンボル期間内で4シンボルが構成され、UEは、該4シンボルを用いて、各シンボルでビームを振って送信を行うことが開示されている。セルは、該4シンボルで一つのUEからの送信を受信することが開示されている。
 本実施の形態では、各短縮シンボルをUE毎のPUCCHのリソースとして割当てる。セルは、1シンボル期間内で構成された複数の短縮シンボルを受信することによって、異なるビームで通信する複数のUEからのPUCCHを受信することが可能となる。
 1シンボル期間を短くするので、サブキャリア間隔は広がることになる。しかし、ビームスイープが必要なMBFにおいては、同一タイミングで複数のビームで送受信できないので、時間分割多重が必要となる。逆に、あるタイミングでは、特定の方向のビームでしか送受信を行うことができないので、該タイミングでは全帯域の周波数リソースを使用することが可能となる。したがって、サブキャリア間隔が広がり、必要となる周波数リソースが増大したとしても、1シンボル間隔を短くして、複数のビームのPUCCHに割当てることが有効となる。
 前述の方法では、1シンボル期間内で2のn乗倍のシンボルが構成されることを開示したが、1シンボルのみでなくてもよく、複数のシンボルであってもよい。複数のシンボルが、1シンボル期間内で、各々、2のn乗倍のシンボルが構成されるようにしてもよい。nの値は、各シンボルで同じでもよいし、異なっていてもよい。
 このようにすることによって、短縮シンボルに、さらに多くのビームのPUCCHリソースを割当てることが可能となる。
 PUCCHのためのリソースの設定方法について開示する。実施の形態2で開示したPUCCHリソースに関する情報の他に、短縮シンボルに関する情報を設ける。
 短縮シンボルに関する情報の具体例として、以下の(1)~(6)の6つを開示する。
 (1)短縮シンボルにするシンボル番号。
 (2)1シンボル内に構成する短縮シンボル数。
 (3)短縮シンボルのシンボル長。
 (4)短縮シンボルのサブキャリア間隔。
 (5)短縮シンボルでのシンボル番号。
 (6)前記(1)~(5)の組合せ。
 セルは、UEに対して、短縮シンボルに関する情報を通知する。また、セルは、UEに対して、PUCCHリソースに関する情報を通知してもよい。セルは、UEに対して、短縮シンボルに関する情報と、PUCCHリソースに関する情報とを組合せて通知してもよい。
 セルは、UEに対して、短縮シンボルに関する情報を、対応するPUCCHリソースに関する情報とともに、あるいは、対応するPUCCHリソースに関する情報に含めて通知してもよい。
 また、短縮シンボルの他に、短縮シンボルではない通常のシンボルにPUCCHリソースを設定してもよい。この場合、通常のシンボル用と、短縮シンボル用とで、PUCCHリソースに関する情報を別に設けてもよい。
 PUCCHのためのリソースの割当方法については、実施の形態2から実施の形態3の方法を適宜適用するとよい。また、短縮シンボルに関する情報あるいは対応するPUCCリソースに関する情報の通知方法は、各実施の形態あるいは変形例で開示した方法を適用すればよい。
 このようにすることによって、より多くのビームスイープ数が必要となるセルあるいはTRPにおいても、一つのサブフレーム内でより多くのビームのPUCCHリソースを構成することが可能となる。したがって、データ用のリソースの低減による通信速度の低下、およびビーム毎のPUCCHリソースの発生間隔の増大による遅延時間の増大を抑制することが可能となる。
 また、UEは、短縮シンボルでPUCCHを送信することになるので、PUCCHの送信時間を短縮することが可能となる。したがって、UEの低消費電力化、および上り干渉電力の低減を図ることが可能となる。
 セルは、通常のシンボルと短縮シンボルとを使い分けてもよい。例えば、セルは、ビームスイープ数によって、通常のシンボルとするか、短縮シンボルとするかを決定してもよい。ビームスイープ数が多い場合、短縮シンボルを構成するとよい。このようにすることによって、ビームスイープ数が少ない場合は、短縮シンボルを用いずに済む。したがって、セルおよびUEでの設定および処理を容易にすることができる。
 他の例として、セルは、各ビームと通信するUE数によって、通常のシンボルとするか、短縮シンボルとするかを決定してもよい。通信するUE数が少ないビームは、短縮シンボルを構成して短縮シンボルを割当てる。通信するUE数が多いビームは、通常のシンボルを割当てる。短縮シンボルにすると、サブキャリア間隔が増大する。これによって、1シンボルに多重できるUE数が通常シンボルに比べて減少する。したがって、通信するUE数が多いビームは、通常のシンボルを割当てることが有効である。
 このように、通常のシンボルと短縮シンボルとを使い分けることによって、ビーム構成およびビーム毎の負荷などに応じて、無線リソースの使用効率を向上させることが可能となる。
 実施の形態4 変形例1.
 実施の形態4では、ビームスイープ数の増大などによって、PUCCHリソースのために必要となるシンボル数が増大する問題に対する解決方法を開示した。
 本変形例では、このような問題を解決するための他の方法を開示する。
 1シンボル期間を予め定める数に分割する。以下の説明において、予め定める数に分割した期間を、分割期間と称する場合がある。予め定める数をnとする。UEは、1シンボル内のPUCCHデータタイミングをn倍して、1シンボル内でPUCCHデータをn回リピティションする。このようにして、UEは、PUCCHを送信する。セルは、ビーム切換間隔を短くする。セルは、1シンボル期間を1/nにした分割期間でビームを切換えて受信する。
 UEは、UEが通信するビームで、1シンボル期間だけPUCCHを送信することになるが、セルは、分割期間だけ該ビームでPUCCHを受信することになる。複数のビームでUEから送信されるPUCCHを、各ビームで分割期間だけ受信することになる。このようにすることによって、セルは、1シンボル期間で、複数のビームで送信されるPUCCHを分割期間で受信することが可能となる。
 1シンボル内のPUCCHデータタイミングをn倍して、1シンボル内でPUCCHデータをn回リピティションする方法として、3GPPで提案されているIFDMA(Interleaved Frequency Domain Multiple Access)ベース方法(参考文献7参照)を用いるとよい。参考文献7では、1シンボル内でデータタイミングが4倍され、1シンボル内でデータが4回リピティションされることが開示されている。
 参考文献7では、1シンボルで、一つのUEがデータをリピティションして各データでビームを切換えて送信する場合について開示している。セルは、1シンボル期間で同じビームで受信する。本変形例では、1シンボルで、一つのUEがデータをn回リピティションするが、ビームを切換えることは無い。セルが1シンボル期間を1/nにした分割期間でビームを切換えて受信する。セルは、n回リピティションされているうちの一つのデータを受信する。
 データタイミングをn倍に高速にするために、n個おきに離散的にサブキャリアを使用する。見かけ上n倍のサブキャリアを用いてデータを送るようにすることによって、データタイミングをn倍に高速にできる。1シンボル期間内でデータタイミングをn倍にしたので、同一データのn回のリピティションとなる。CP(Cyclic Prefix)は、1シンボルの先頭に付加されるとよい。あるいは、1シンボルの最後尾でもよい。あるいは、1シンボルの先頭と最後尾とに付加されてもよい。セルおよびUEが共通に認識していればよい。
 UEは、PUCCHリソースに設定されたシンボルで、1シンボル期間でn回繰返してPUCCH用のデータを送信する。異なるビームのUEは、各々、PUCCHリソースに設定されたシンボルで、1シンボル期間でn回繰返してPUCCH用のデータを送信する。このときに、異なるビームのUEから、同一シンボルでPUCCH用のデータが送信されてもよい。
 セルは、1シンボル期間を1/nにした分割期間でビームを切換えて受信する。セルは、各ビームのUEから送信される、n回リピティションされているうちの一つのPUCCH用データを受信する。このようにすることによって、1つのシンボルに、さらに多くのビームのPUCCHリソースを割当てることが可能となる。また、DFT(Discrete Fourier Transform)-s(Spread)-OFDMを用いることができる。したがって、UEの上りPAPR(Peak-to-Average Power Ratio)の低減、およびUEの低消費電力化を図ることができる。
 PUCCHのためのリソースの設定方法について開示する。実施の形態2で開示したPUCCHリソースに関する情報の他に、分割期間に関する情報を設ける。
 分割期間に関する情報の具体例として、以下の(1)~(7)の7つを開示する。
 (1)1シンボル内の分割数。
 (2)周波数範囲を何倍にするか。
 (3)周波数リソース。
 (4)データ繰り返し数。
 (5)CP挿入方法。
 (6)CP挿入位置。
 (7)前記(1)~(6)の組合せ。
 セルは、UEに対して、分割期間に関する情報を通知する。また、セルは、UEに対して、PUCCHリソースに関する情報を通知してもよい。セルは、UEに対して、分割期間に関する情報と、PUCCHリソースに関する情報とを組合せて通知してもよい。
 セルは、UEに対して、分割期間に関する情報を、対応するPUCCHリソースに関する情報とともに、あるいは、対応するPUCCHリソースに関する情報に含めて通知してもよい。
 また、分割期間の他に、分割ではない通常のシンボルにPUCCHリソースを設定してもよい。この場合、通常のシンボル用と、分割シンボル用とで、PUCCHリソースに関する情報を別に設けてもよい。
 PUCCHのためのリソースの割当方法については、実施の形態2から実施の形態3の方法を適宜適用するとよい。また、分割期間に関する情報あるいは対応するPUCCリソースに関する情報の通知方法は、各実施の形態あるいは変形例で開示した方法を適用すればよい。
 このようにすることによって、より多くのビームスイープ数が必要となるセルあるいはTRPにおいても、一つのサブフレーム内でより多くのビームのPUCCHリソースを構成することが可能となる。したがって、データ用のリソースの低減による通信速度の低下、およびビーム毎のPUCCHリソースの発生間隔の増大による遅延時間の増大を抑制することが可能となる。
 セルは、通常のシンボルと分割シンボルとを使い分けてもよい。実施の形態4で開示した方法を適用するとよい。これによって、ビーム構成およびビーム毎の負荷などに応じて、無線リソースの使用効率を向上させることが可能となる。
 実施の形態5.
 SRを受信したセルは、SRに対する応答信号として上りグラントを送信する。3GPPでは、ビームスイーピングを必要とするMBFにおける、SRに対する上りグラントの送信タイミングに関しては何ら議論されていない。ビームスイーピングを行う必要がある場合、各ビームのタイミングは限られる。したがって、セルとUEとで、SRに対する上りグラントの送信タイミングの認識を合わせておく必要が生じる。
 本実施の形態では、SRに対する応答信号の送受信タイミングについて開示する。
 UEからSRを送信した後、SRを受信したセルが、上りグラントをUEに対して送信するタイミングを非同期とする。セルは、SRを送信したUEのサービングビームで、該SRに対する上りグラントをUEに対して任意のタイミングで送信する。UEは、SRを送信した後、毎サブフレームL1/L2制御信号を受信する。
 たとえ、セルがSRの受信から上りグラントの送信タイミングまで他のビームで送受信を行っているとしても、UEは、毎サブフレームL1/L2制御信号を受信する。セルが他のビームで送受信を行っている場合、UEは、L1/L2制御信号を受信できないので、上りグラントが無いと判断できる。このようにすることによって、任意のタイミングで送信される上りグラントをUEは受信することが可能となる。
 セルは、SRを受信したビームで該SRに対する上りグラントを送信するタイミングを決定する。決定するために用いる指標例として、実施の形態2で開示したPUCCHリソース割当ての判断指標例を適用するとよい。
 このように、SRに対する上りグラントの送信タイミングを非同期にすることによって、前述の判断指標のような状況に応じて、セルは、上りグラントの送信タイミングを決定できる。また、たとえ非同期であったとしても、UEは、送信したSRに対する上りグラントを受信することが可能となり、上り通信を開始できる。
 SRに対する上りグラントの送受信タイミングの他の方法について開示する。
 SRに対する上りグラントを送信するタイミングを非同期にした場合、UEは、SRを送信した後、毎サブフレームL1/L2制御信号を受信しなければならない。しかし、ビームスイーピングを必要とするMBFでは、他のビームで送受信を行っているタイミングがあるので、UEが毎サブフレーム受信するのは無駄になるという問題が生じる。
 このような問題を解決する方法を開示する。
 SRに対する上りグラントの送信タイミングをN+Lとする。Nは、SR送信タイミングを示す。Lは、0以上の一つの値を示す。N,Lは、スケジュール単位で表すとよい。例えば、サブフレーム単位、スロット単位、あるいはミニスロット単位などである。
 このようにすることによって、UEが毎サブフレームL1/L2制御信号を受信しなくて済む。したがって、無駄な受信動作を行わなくて済むので、UEの消費電力の低減を抑制することが可能となる。
 他の方法について開示する。
 前述に開示した方法では、Lを一つの値とした。Lを複数の値としてもよい。例えば、L1、L2、L3、・・・として、セルは、UEに対してSRに対する複数のタイミングを設定する。Lの数の最大値を決めておいてもよい。
 Lの値を設定する範囲(期間)を決めておいてもよい。例えば、Lの値を設定する範囲(期間)をKとする。例えば、サブフレーム単位の場合、Kサブフレーム期間内でLの値を設定する。Kサブフレーム過ぎた場合、さらにKの期間の設定が繰り返し行われるとしてもよい。例えば、K=6、L=1,3と設定する。
 Kの期間の起点として、Nを起点としてもよい。あるいはオフセット値を設けて、Nからオフセット後を起点として設定してもよい。
 前述の例では、Nを起点とする場合、Nを起点に6サブフレーム毎に、L=1,3の設定が繰り返される。
 Nを起点に、N+0~N+(K-1)サブフレームの期間において、最初のサブフレームからL+1番目のサブフレームに設定される。
 ここでは、N+1、N+3番目のサブフレームでSRに対する上りグラントの送信タイミングが設定される。K=6を過ぎた場合、さらにKの期間の設定が繰り返し行われるとしてもよい。
 このように複数の値を設定することによって、セルがSRに対する上りグラントの送信タイミングを選択することが可能となる。セルは、設定した複数のタイミングの全てで上りグラントを送信する必要はない。他のビームの送受信を行ってもよい。セルは、ビーム毎の状況に応じて、SRに対する上りグラントの送信タイミングを決定することが可能となる。
 UEは、設定された複数のタイミングでL1/L2制御信号を受信する。
 このようにすることによって、非同期の場合に比べて、UEの低消費電力化を図ることができるとともに、セルの状況にさらに適した送信タイミングとすることが可能となる。したがって、セルとしての無線リソースの使用効率を向上させることが可能となる。
 他の方法について開示する。
 Lの値の設定として、偶数と奇数とに分けて設定してもよい。Lを偶数(0を含めてもよい)とした場合、Nを起点に偶数番目のサブフレームでSRに対する上りグラントの送信タイミングが発生する。Lを奇数とした場合、Nを起点に奇数番目のサブフレームでSRに対する上りグラントの送信タイミングが発生する。
 セルは、設定したN+Lのタイミングから選択して、SRに対する上りグラントを送信する。セルは、N+Lのタイミング全てで上りグラントを送信する必要はない。他のビームの送受信を行ってもよい。セルは、ビーム毎の状況に応じて、SRに対する上りグラントの送信タイミングを決定することが可能となる。
 UEは、偶数または奇数に設定されたLに応じて、N+LのタイミングでL1/L2制御信号を受信する。このようにすることによって、非同期の場合に比べて、UEの消費電力を半分に低減することが可能になるとともに、セルの状況にさらに適した送信タイミングとすることが可能となる。したがって、セルとしての無線リソースの使用効率を向上させることが可能となる。
 Lを偶数と奇数とで設定することを開示したが、同様に、Aの剰余で設定してもよい。Aを1以上の整数とする。Lを、0、1、2、・・・、あるいは(A-1)で設定する。例えば、A=6のとき、Lを、0、1、2、3、4、あるいは5として設定する。
 この場合、N+(A×(n-1)+L)で送信タイミングが発生することになる。
 セルは、設定したタイミングから選択して、SRに対する上りグラントを送信する。セルは、設定したタイミング全てで上りグラントを送信する必要はない。他のビームの送受信を行ってもよい。セルは、ビーム毎の状況に応じて、SRに対する上りグラントの送信タイミングを決定することが可能となる。
 UEは、設定されたLに応じて、設定されたタイミングでL1/L2制御信号を受信する。このようにすることによって、非同期の場合に比べて、UEの消費電力を半分に低減することが可能になるとともに、セルの状況にさらに適した送信タイミングとすることが可能となる。したがって、セルとしての無線リソースの使用効率を向上させることが可能となる。
 Nを起点にしたタイミングで設定することを開示したが、セルとして与えられているサブフレーム番号で設定してもよい。どのビームで送受信を行うかがサブフレーム番号で与えられるような場合に有効である。
 他の方法について開示する。
 SRに対する上りグラントを送信しない期間をLとして設定してもよい。セルは、N+Lより後の任意のタイミングで、SRに対する上りグラントを送信する。UEは、N+Lより後のタイミングで、L1/L2制御信号を受信する。
 例えば、セルによる処理時間をnとして、L>nとして設定する。この場合、セルは、NからN+Lまでのタイミングで、SRに対する上りグラントの送信を行わない。セルは、N+Lより後の任意のタイミングで、SRに対する上りグラントの送信を行う。UEは、NからN+Lまでのタイミングで、L1/L2制御信号の受信を行わない。UEは、N+Lより後のタイミングで、L1/L2制御信号を受信する。
 サブフレーム単位の場合、セルは、NからN+Lまでのサブフレームで、SRに対する上りグラントの送信を行わない。セルは、N+Lより後の任意のサブフレームで、SRに対する上りグラントの送信を行う。UEは、NからN+Lまでのサブフレームで、L1/L2制御信号の受信を行わない。UEは、N+Lより後の毎サブフレームで、L1/L2制御信号を受信する。
 このようにすることによって、UEは、SRを送信した後、いくつかのサブフレームのL1/L2制御信号の受信を行わなくて済むようになる。
 さらに、N+Lより後の受信期間を設定してもよい。該受信期間をWとする。セルは、N+Lより後のWの期間で、任意のタイミングでSRに対する上りグラントを送信する。UEは、N+Lより後のWの期間で、タイミングでL1/L2制御信号を受信する。
 このようにすることによって、UEは、SRを送信した後、いくつかのサブフレームのL1/L2制御信号の受信を行わなくて済むようになるとともに、さらに、N+Lより後のWの期間だけ、L1/L2制御信号を受信すればよくなる。したがって、さらにUEの低消費電力化を図ることができる。
 このようにすることによって、UEの低消費電力化を図りつつ、セルは、セルの状況に適した送信タイミングとすることが可能となる。したがって、セルとしての無線リソースの使用効率を向上させることが可能となる。
 他の方法について開示する。
 予めUEに対して下りスケジューリングが行われるタイミングが決められている場合は、それに従うこととする。SRの送信以降の該下りスケジューリングが行われるタイミングで、L1/L2制御信号を受信する。予めUEに対して、下りスケジューリングが行われるタイミングを設定する方法は、実施の形態1で開示した方法を適用するとよい。
 このようにすることによって、SRに対する上りグラントだけでなく、通常のスケジューリングと統一した方法を用いることが可能となる。したがって、セルおよびUEでの処理を容易にすることができる。
 前述に開示した方法において、セルがUEに対して設定する情報(以下「SR応答に関する情報」と称する場合がある)の設定方法および通知方法について開示する。
 システムとして固定としてもよい。予め静的に規格などで決めておくとよい。
 他の方法として、セル毎およびビーム毎の少なくとも一方に設定してもよい。セルからUEに対して通知する方法は、実施の形態2で開示したビーム毎のPUCCHリソースに関する情報を通知する方法と同様にしてもよい。例えば、セル毎の情報として、システム情報に含めて報知してもよいし、あるいは、RRCメッセージに含めてUE個別に通知してもよい。
 他の方法として、UE毎に設定してもよい。セルからUEに対して通知する方法は、実施の形態2で開示したUE毎のPUCCHリソースに関する情報を通知する方法と同様にしてもよい。例えば、UE毎の情報として、RRCメッセージに含めてUE個別に通知してもよい。
 これらの設定方法および通知方法を組合せて行ってもよい。SR応答に関する情報毎にこれらの方法を使い分けてもよい。例えば、剰余を用いる場合、Aはシステムとして固定とし、LはUE毎に設定するなどである。あるいは、Kはセル毎に設定し、Lはビーム毎に設定するなどである。このようにすることによって、セルはUEに対して、SRに対する上りグラントが発生するタイミングを通知することが可能となる。
 他の方法について開示する。
 セルおよびUEは、SRを送信したUEのUE識別子を用いて、SRに対する上りグラントを送信するタイミングを導出する。例えば、SRに対する上りグラントを送信するタイミングをN+Lとする場合、SRを送信したUEの識別子を用いてLを導出する。例えば、該UEの識別子が奇数である場合、Lは奇数とする。該UEの識別子が偶数である場合、Lは偶数とする。
 UEの識別子ではなく、ビームの識別子を用いてもよい。セルおよびUEは、SRを送信したUEが通信しているビームの識別子を用いて、SRに対する上りグラントを送信するタイミングを導出する。例えば、SRに対する上りグラントを送信するタイミングをN+Lとする場合、SRを送信したUEが通信を行っているビームの識別子を用いてLを導出する。例えば、該ビームの識別子が奇数である場合、Lは奇数とする。該ビームの識別子が偶数である場合、Lは偶数とする。
 このようにすることによって、セルがUEに対してSR応答に関する情報を設定しなくてもよい。したがって、シグナリングの負荷の削減を図ることができる。
 図24は、SRに対する上りグラントの送受信タイミング設定のシーケンスの一例を示す図である。図24に示すシーケンスは、図19に示すシーケンスと同一のステップを含んでいるので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。
 ステップST2801において、セルは、UEに対して、UE毎のPUCCHリソース構成を設定する。
 ステップST3201において、セルは、UEに対して、UEに対するSR応答タイミングを設定する。
 ステップST3202において、セルは、UEに対して、PUCCHリソースに関する情報とともに、SR応答に関する情報を通知する。PUCCHリソースに関する情報およびSR応答に関する情報は、UEと通信するビームを介して通知するとよい。前記PUCCHリソースに関する情報およびSR応答に関する情報の通知には、RRC個別シグナリングを用いる。
 セルは、ステップST3202の処理を行った後は、ステップST2804、ステップST2805およびステップST2806の処理を行う。
 ステップST3202でPUCCHリソースに関する情報およびSR応答に関する情報を受信したUEは、ステップST2803の処理を行う。その後、UEは、ステップST2813の処理を行う。
 ステップST2811において、UEは、上りデータが発生したか否かを判断し、上りデータが発生している場合は、ステップST2812に移行する。
 ステップST2812Aにおいて、UEは、設定されたSR用PUCCHリソース構成でSRを、サービングビームを介してセルに対して送信する。
 ステップST2812AでUEからのSRを受信したセルは、ステップST3203において、UEに対して設定したSR応答タイミングで上りスケジューリングを行う。
 ステップST2812でSRを送信したUEは、ステップST3204において、SR応答に関する情報を用いて、SR応答タイミングを導出し、SR応答タイミングで受信を行う。
 ステップST2511において、セルは、UEに対して設定したSR応答タイミングで上りグラントを通知する。
 ステップST2511において、UEは、設定されたSR応答タイミングで、セルから上りグラントを取得する。
 このようにしてセルからSRに対する上りグラントを受信したUEは、ステップST2512からステップST2514において、セルとの間で上り通信開始のための処理を行う。これによって、UEとセルとの間で上り通信が開始される。
 本実施の形態で開示した方法を用いることによって、セルは、UEに対して、SR応答に関する情報を通知することが可能となり、セルとUEとでSRに対する上りグラントの送信タイミングの認識を合わせることが可能となる。
 実施の形態6.
 SRの送信が不達となった場合、セルは、UEに対して、SRに対する上りグラントを送信しない。あるいは、セルがUEに対して上りグラントを送信したとしても、電波伝搬環境が悪く、UEが受信できない場合がある。これらの場合、UEは、SRの送信が不達のために上りグラントが送信されないのか、あるいはセルが他のビームで通信を行っているためにサービングビームで通信できず、SRに対する上りグラントを送信していないのかの判断がつかない。
 したがって、UEは、SR応答タイミングでSRに対する上りグラントを受信するので、L1/L2制御信号を受信し続けることになる。3GPPでは、ビームスイーピングを必要とするMBFにおける、SRの送信不達については、何ら議論されていない。
 本実施の形態では、このような問題を解決する方法を開示する。
 SRの送信から上りグラントを待つ期間を設定するタイマを設ける。以下の説明において、前記タイマを「SR応答待機タイマ」と称する場合がある。UEは、SRの送信でSR応答待機タイマを起動し、SR応答待機タイマが満了する前に上りグラントを受信した場合、SR応答待機タイマをリセットする。UEは、SR応答待機タイマの期間中に上りグラントを受信できず、SR応答待機タイマが満了した場合、SRの再送を行う。
 SR応答待機タイマの値は、予め規格などで決めておいてもよいし、セルが設定してUEに対して通知してもよい。実施の形態5で開示したSR応答に関する情報の通知方法を適用してもよい。SR応答待機タイマとして、時間単位であってもよいし、スケジューリング単位であってもよい。スケジューリング単位の例としては、例えば、サブフレーム、スロット、ミニスロットなどがある。
 このようにすることによって、UEは、セルがSRを送信した場合に、SR応答待機タイマ期間内でSRに対する上りグラントを送信すると仮定することが可能となる。これによって、UEは、SR応答待機タイマが満了した場合、SRの送信が不達として、再度SRを送信することが可能となる。したがって、UEは、セルが他のビームで通信を行っているかどうかの判断がつかず、SR応答タイミングでL1/L2制御信号を受信し続けることが無くなる。
 SR応答タイミングは、ビーム毎あるいはUE毎に設定される場合がある。したがって、SR応答タイミングは、ビーム毎あるいはUE毎に異なる場合がある。この場合、SR応答待機タイマの値をSRの送信からの期間として設定すると、ビーム毎あるいはUE毎に異なった値を設定しなければならず、設定が複雑になるという問題が生じる。
 このような問題を解決する方法を開示する。
 SR応答待機タイマを、SRに対する上りグラントの送信タイミングの発生回数で設定する。例えばX回と設定する。UEは、SRの送信でSR応答待機タイマを起動し、SRに対する上りグラントの送信タイミングの発生回数がX回以内に上りグラントを受信した場合、SR応答待機タイマをリセットする。UEは、SRに対する上りグラントの送信タイミングの発生回数がX回以内に上りグラントを受信しなかった場合、SRの再送を行う。
 実施の形態5で開示した、SRに対する上りグランントの送信発生タイミングの設定において、Lの値を設定する範囲(K)を決めるような場合、SR応答待機タイマを、Kの繰返し回数で設定してもよい。例えばX回と設定する。UEは、SR送信でSR応答待機タイマを起動し、Kの繰返し回数がX回以内に上りグラントを受信した場合、SR応答待機タイマをリセットする。UEは、Kの繰返し回数がX回以内に上りグラントを受信しなかった場合、SRの再送を行う。
 このようにすることによって、上りグラントの発生回数に応じて、SR応答待機タイマを設定することが可能となる。したがって、ビーム毎、UE毎に、上りグラントの発生回数に応じて、均等な機会で設定するときに、異なるタイマ値で設定しなくて済む。これによって、セルからUEに対するSR応答待機タイマの設定および通知の処理を容易にすることが可能となる。
 前述の方法の場合、UEが、セルからSRに対する上りグラントを受信できなかった場合、SRの再送を続けて行うことになる。例えば、UEが通信を行うビームで上り同期がはずれた場合、セルは、UEからのSRの送信を受信できなくなる。このような状態が続くと、UEが何度SRを再送したとしても、セルは、UEからのSRの送信を受信することができず、SRに対する上りグラントは送信されないことになる。したがって、UEは、SRの再送を繰り返すことになる。
 このような問題を解決する方法を開示する。
 SRの再送に最大回数を設けるとよい。例えばY回と設定する。SRの再送がY回を超えた場合、UEはSRの再送を停止する。このようにすることによって、UEの移動、および電波伝搬環境の悪化などによって、UEがSRを再送し続けることを回避することができる。したがって、UEの低消費電力化を図ることができる。
 SRの再送がY回を超えた場合、RA処理から開始するとしてもよい。RA処理によって上り同期が行われる。RA処理は、ビームスイーピングブロックを用いてもよい。このようにすることによって、UEは、再度UEが通信を行うビームで上り同期を得ることが可能となる。
 SRの再送がY回を超えた場合、UEに対して設定されているPUCCHリソース設定、SR応答設定、SR不達設定をリセットしてもよい。リセットすることによって、設定されていたリソースを他に開放できるので、無線リソースの使用効率を向上させることができる。
 実施の形態7.
 MBFでのビームカバレッジは、セルのカバレッジより狭域になる。また、MBFにおいてビームスイーピングが必要な場合、UEがSRを送信してからSRに対する上りグラントを受信するまでの間に、セルは、他のビームでの通信を行う場合がある。この場合、SRの送信からSR応答信号の受信タイミングまでの期間は、ビームスイーピングが不要な場合に比べて長くなる。
 したがって、UEがSRを送信してからSR応答信号を受信するまでに、ビームカバレッジを跨いだ移動が発生する場合がある。いわゆるビーム間の移動(モビリティ)が行われる場合がある。セルは、一つまたは複数のTRPを構成し、TRPは、一つまたは複数のビームを構成する。ここでは、主として、ビーム間の移動について記載するが、TRP間の移動にも適用可能である。
 TRPが構成するビーム間の移動に適用するとよい。また、DU(Distributed Unit)が一つまたは複数のビームを構成する場合がある。このような場合のDU間の移動にも適用可能である。DUが構成するビーム間の移動に適用するとよい。
 実施の形態5では、UEがSRの送信を行ったビームにおいてSR応答信号を受信するタイミングの設定方法について開示した。しかし、UEがSRの送信を行った後に、ビーム間の移動が発生した場合は、SRの送信を行ったビームからUEが移動しているので、実施の形態5の方法を単純に適用することはできない。そのような場合に、セルとUEとの間でSR応答信号をどのように送受信するかが問題となる。
 本実施の形態では、このような問題を解決する方法を開示する。
 SRの送信後、UEにビーム間の移動が発生した場合、UEがSRの送信を行ったビームでそのままSRに対する上りグラントを待っていても、該ビームでのUEの通信品質は悪化するので、上りグラントを受信できなくなる場合が発生する。ここでは、このような問題を解決する方法を開示する。
 UEは、SRの送信後にビーム間の移動が発生した場合、送信したSRに対する上りグラントを、移動先のビームで受信する。セルは、UEからのSRを受信した後、受信したSRに対する上りグラントを、UEの移動先のビームでUEに対して送信する。このようにすることによって、UEにとって通信品質の良いビームで、SR応答信号の送受信を行うことができる。したがって、UEにおけるSR応答信号の受信誤り率を低減させることが可能となる。
 SRに対する上りグラントの送信タイミングについて開示する。
 移動元のビームで送信されたSRに対する上りグラントを移動先のビームで送信する場合、ビームが異なるので、移動先ビームでの上りグラントの送信タイミングの設定が問題となる。例えば、移動元ビーム(以下「ソースビーム(S-beam)」と称する場合がある)の設定をそのまま用いるのか、移動先ビーム(以下「ターゲットビーム(T-beam)」と称する場合がある)で新たに設定するのか、新たに設定する場合の設定方法はどうするのか、などの問題が生じる。
 ここでは、このような問題を解決する方法を開示する。
 SRに対する上りグラントの送信タイミングが、システムで固定、あるいはセル毎にセル内の全ビームで同一に設定されている場合、UEは、ビーム間の移動後も該設定に従うとよい。SRの送信タイミングを起点にするとよい。また、SRに対する上りグラントの送信タイミングが、セル内の複数のビームで同一に設定されてもよい。SRに対する上りグラントの送信タイミングは、SRの送信タイミングを起点にするとよい。
 電波伝搬状況の急激な悪化に対抗するために、UEが複数のビームの物理制御チャネルを受信することが提案されている。そのような複数のビームでビームグループを設けてもよい。UEは、通信しているビームの電波伝搬状況の急激な悪化によるビームの移動先をビームグループとしてもよい。例えば、前述のビームグループで、SRに対する上りグラントの送信タイミングを同一に設定してもよい。
 このようにすることによって、UEは、ビーム間移動後のターゲットビームでのSR応答信号を受信することが可能となる。また、UEは、ビーム間の移動後もSR応答信号の受信タイミングを変更することが無くなるので、ビーム間移動の処理を簡易にすることが可能となる。
 SR応答信号の送信タイミングが、SRの送信タイミングを起点にすることを開示したが、他の方法として、UEのビーム間の移動あるいはセルからUEへのビーム間移動指示のタイミングを起点に、SR応答信号のタイミングを決定してもよい。
 このようにすることによって、ソースビームでのSR送信タイミングをターゲットビームで不要とすることができる。また、ビーム間移動指示のタイミングを起点にするので、新たな情報を通知する必要もない。したがって、UEおよびビーム間で要する処理を簡易にすることが可能となる。
 SRに対する上りグラントの送信タイミングが、ビーム毎に、あるいは、ビーム毎にUE毎に設定されている場合の方法について開示する。ビーム毎に設定されている場合、セルは、UEに対して、予め、セル内の全ビームあるいは複数のビームのSRに対する上りグラントの送信タイミングを設定する。ビーム毎にUE毎に設定されている場合、セルは、UEに対して、予め、ターゲットビームあるいは複数のビームのUE毎のSRに対する上りグラントの送信タイミングを設定する。
 複数のビームとしては、前述のビームグループとしてもよい。ターゲットビームとなる可能性のある複数のビームのグループとしてもよい。
 UEは、ビーム間の移動後に、ターゲットビームのSRに対する上りグラントの送信タイミングを用いて受信する。セルは、UEがビーム間を移動した後、ターゲットビームのSRに対する上りグラントの送信タイミングを用いて送信する。
 このようにすることによって、UEは、ビーム間移動後のターゲットビームでのSR応答信号を受信することが可能となる。
 UEのビーム間の移動において、セルからUEに対して移動指示が通知される場合は、UEは、セルからビーム間の移動指示を受信した後、ターゲットビームのSRに対する上りグラントの送信タイミングを用いて受信するとしてもよい。また、セルは、UEにビーム間の移動指示を送信した後、ターゲットビームのSRに対する上りグラントの送信タイミングを用いて送信するとしてもよい。
 ここで、SRに対する上りグラントの送信タイミングが、SRの送信タイミングを起点にする場合、ソースビームでのSRの送信タイミングを起点とするとよい。このようにすることによって、セルおよびUEは、SRに対する上りグラントの送信タイミングを特定することが可能となる。UEは、該送信タイミングで受信することによって、セルが該送信タイミングで送信したSR応答信号を受信することが可能となる。
 ソースビームでのSRの送信タイミングからSR応答信号の受信タイミングまでの期間よりも、ターゲットビームでのSRの送信タイミングからSR応答信号の受信タイミングまでの期間が長い場合、UEのビーム間の移動前に、ターゲットビームでのSR応答信号の受信タイミングが終わっていることがある。このような場合、セルは、ターゲットビームのSR応答信号の送信タイミングで上りグラントを送信してしまった場合、UEは、SRに対する上りグラントを受信できなくなる。
 このような問題を解決する方法を開示する。
 SRに対する上りグラントの送信タイミングについて、UEのビーム間の移動時は、ソースビームでのSRに対する上りグラントの送信タイミングに従う。SRを送信したUEが、SRに対する上りグラントを受信する前に移動指示を受信した場合、UEは、ソースビームでのSRの送信タイミングを起点に、ソースビームで設定された上りグラントの送信タイミングで受信する。
 セルは、SRを送信したUEに対して、SRに対する上りグラントを送信する前にビーム間の移動を指示した場合、該UEに対するSRに対する上りグラントの送信タイミングを、ソースビームでのSRの送信タイミングを起点に、ソースビームで設定された上りグラントの送信タイミングで送信する。このようにすることによって、UEがビーム間を移動した場合でも、SR応答信号のタイミングをソースビームでのSRに対する上りグラントの送信タイミングに設定できるので、UEのビーム間の移動前に、SR応答信号の受信タイミングが終わってしまうようなことはなく、UEは、ターゲットビームでSR応答信号を受信することが可能となる。
 他の方法を開示する。
 SRに対する上りグラントの送信タイミングについて、UEのビーム間の移動時は、SRの送信からSRに対する上りグラントの送信タイミングまでが長い方に従う。セルは、UEに対して、予め、セル内の全ビームあるいは複数のビームのSR応答信号の受信タイミングを設定する。複数のビームとしては、前述のビームグループとしてもよい。
 SRを送信したUEが、SRに対する上りグラントを受信する前に移動指示を受信した場合、UEは、ソースビームでのSRの送信からSRに対する上りグラントの受信タイミングまでの期間と、ターゲットビームでのSRの送信からSRに対する上りグラントの受信タイミングまでの期間とを比較して、長い方のSRに対する上りグラントの受信タイミングを選択して設定し、該タイミングで受信する。
 セルは、SRを送信したUEに、SRに対する上りグラントを送信する前にビーム間の移動指示を送信した場合、ソースビームでのSRの送信からSRに対する上りグラントの送信タイミングまでの期間と、ターゲットビームでのSRの送信からSRに対する上りグラントの送信タイミングまでの期間とを比較して、長い方のSRに対する上りグラントの送信タイミングを選択して設定し、該タイミングで送信する。
 このようにすることによって、UEがビーム間を移動した場合でも、SR応答信号のタイミングを長い方のSRに対する上りグラントの送信タイミングに設定できるので、UEのビーム間の移動前に、SR応答信号の受信タイミングが終わってしまうようなことはなく、UEは、ターゲットビームでSR応答信号を受信することが可能となる。
 他の方法を開示する。
 UEは、ビーム間の移動、あるいはセルからのビーム間移動指示の受信で、ソースビームでのSR応答信号のタイミングをリセットする。
 UEは、ビーム間の移動、あるいはセルからのビーム間移動指示の受信のサブフレームを起点(N)として、ターゲットビームのSR応答信号のタイミングで受信する。セルは、UEのビーム間移動、あるいはビーム間移動指示の送信のサブフレームを起点(N)として、ターゲットビームでのSR応答信号のタイミングで送信する。
 このようにすることによって、UEがビーム間移動したことを起点にSR応答信号のタイミングを設定できるので、UEのビーム間の移動前に、ターゲットビームでのSR応答信号の受信タイミングが終わるようなことはなく、UEは、ターゲットビームでSR応答信号を受信することが可能となる。
 SRに対する上りグラントの送信タイミングが、ビーム毎に、あるいは、ビーム毎にUE毎に設定されている場合の他の方法について開示する。セルは、UEへの移動指示とともに、ターゲットビームでのSR応答信号のタイミングを設定する。セルは、ターゲットビームでのSR応答信号のタイミングを設定し、UEに、ビーム間移動指示を送信するとともに、該SR応答信号のタイミングを通知する。セルは、UEへのビーム間移動指示の送信で、ソースビームでのSR応答信号のタイミングをリセットし、ターゲットビームでのSR応答信号のタイミングで送信する。
 UEは、セルからビーム間移動指示を受信するとともに、ターゲットビームでのSR応答信号のタイミングを受信する。UEは、セルからのビーム間移動指示の受信で、ソースビームでのSR応答信号のタイミングをリセットし、ターゲットビームでのSR応答信号のタイミングで受信する。
 セルは、UEがターゲットビームに移動した後、新たにSR応答信号のタイミングを設定してもよい。
 このようにすることによって、ソースビームでのSR送信タイミングをターゲットビームで不要とすることができる。したがって、ビーム間で要する処理を簡易にすることが可能となる。
 SRに対する上りグラントの送信タイミングが、ビーム毎に、あるいは、ビーム毎にUE毎に設定されている場合の他の方法について開示する。UEに対するビーム間移動指示の送信以降、ターゲットビームでのSR応答信号の送信タイミングをダイナミックにする。セルは、UEに対して、ビーム間移動指示を送信するとともに、ターゲットビームでのSR応答送信のタイミングをダイナミックにする。
 UEは、セルからのビーム間移動指示の受信で、ソースビームでのSR応答信号の受信タイミングをリセットする。UEは、セルからのビーム間移動指示を受信した後、ターゲットビームでSR応答信号を連続受信する。例えば、SR応答信号の送信タイミングがサブフレーム単位の場合、UEは、ターゲットビームでのSR応答信号を毎サブフレーム受信する。セルは、UEに対して、UEがターゲットビームに移動した後、新たにSR応答信号のタイミングを設定してもよい。
 このようにすることによって、セルはUEに対して、UEのビーム間移動指示を通知するとき、あるいは、ビーム間移動前に予め、ターゲットビームでのSR応答信号の送信タイミングを通知しなくてもよくなる。したがって、シグナリングに必要な情報量を低減することが可能となる。
 SRに対する上りグラントの送信タイミングが、ビーム毎に、あるいは、ビーム毎にUE毎に設定されている場合の他の方法について開示する。セルからのUEへの移動指示後も、ソースビームのSR応答信号のタイミングが維持される。セルは、UEに対して、ビーム間移動指示を送信した後も、ソースビームのSR応答信号の送信タイミングで送信する。セルは、UEに対して、ビーム間移動指示を送信した後、ソースビームでのSR応答信号の送信タイミング設定を、ターゲットビームでのSR応答信号の送信タイミング設定とする。
 UEは、セルからのビーム間移動指示を受信した後も、ソースビームでのSR応答信号の受信タイミングで受信する。UEは、セルからのビーム間移動指示を受信した後、ソースビームでのSR応答信号の送信タイミング設定を、ターゲットビームでのSR応答信号の送信タイミング設定とする。
 セルは、UEに対してビームの移動を決定してから、次のソースビームでのSR応答信号の送信タイミングになる前までに、ソースビームでのSR応答信号のタイミング設定を、ターゲットビームに通知する。これは、ソースビームとターゲットビームとが異なるノードによって構成されている場合に有効である。
 あるいは、ソースビームがUEに対してビームの移動を通知してから、次のソースビームでのSR応答信号の送信タイミングになる前までに、ソースビームを構成するノードがターゲットビームを構成するノードに対して、ソースビームでのSR応答信号のタイミング設定を通知する。これは、ソースビームとターゲットビームとが異なるノードによって構成されており、各ノードがSR応答信号のタイミングを設定する場合に有効である。
 前述のノードとして、例えば、TRP、DUなどがある。セルは、UEに対して、UEがターゲットビームに移動した後、新たにSR応答信号のタイミングを設定してもよい。
 SRに対する上りグラント送信タイミングが、セル内でUE毎に設定されている場合の方法について開示する。UEがビーム間を移動した後も、移動前に設定されたUE毎のSR応答信号のタイミング設定に従う。SRの送信タイミングを起点にSR応答信号のタイミングを決定するとよい。セルは、UEに対して、UE毎にSR応答信号の受信タイミングを設定する。
 UEは、ビーム間を移動した後、あるいはセルからビーム間移動指示を受信した後も、設定されたUE毎のSR応答信号の受信タイミングで受信する。UEは、ビーム間の移動前、あるいはセルからビーム間移動指示を受信する前のSRの送信タイミングを起点(N)として、UE毎のSR応答信号のタイミングで受信する。
 このようにすることによって、ビーム間移動処理とSR応答信号送信タイミング設定処理とを分離することが可能となる。したがって、実運用時の誤動作を低減させることが可能となる。
 セルは、UEがビーム間を移動した後、あるいはビーム間移動指示を送信した後も、UE毎に設定したSR応答信号の送信タイミングで送信する。セルは、UEのビーム間の移動前、あるいはビーム間移動指示を送信する前のSRの受信タイミングを起点(N)として、UE毎のSR応答信号のタイミングで送信する。
 このようにすることによって、ビーム間移動においてUE毎に設定されたSR応答信号タイミングを変更しなくて済む。したがって、ビーム間移動処理を簡易にすることが可能となる。
 SRの送信タイミングを起点にすることを開示したが、他の方法として、UEのビーム間の移動あるいはセルからUEへのビーム間移動指示のタイミングを起点に、SR応答信号のタイミングを決定してもよい。UEは、ビーム間の移動、あるいはセルからのビーム間移動指示の受信タイミングを起点(N)として、UE毎のSR応答信号のタイミングで受信する。セルは、UEのビーム間の移動、あるいはビーム間移動指示の送信タイミングを起点(N)として、UE毎のSR応答信号のタイミングで送信する。
 このようにすることによって、ソースビームでのSR送信タイミングをターゲットビームで不要とすることができる。したがって、ビーム間で要する処理を簡易にすることが可能となる。
 SRに対する上りグラントの送信タイミングが、UE毎に設定されている場合の他の方法について開示する。SRに対する上りグラントの送信タイミングが、ビーム毎に、あるいは、ビーム毎にUE毎に設定されている場合の方法を適用してもよい。UE毎のSRに対する上りグラントの送信タイミングの設定が、UEが通信するビームに使用するタイミングを考慮している場合に有効となる。
 図25および図26は、SRの送信後にビーム間の移動が発生した場合のSRに対する上りグラントの送受信タイミング設定のシーケンスの一例を示す図である。図25と図26とは、境界線BL2の位置で、つながっている。図25および図26に示すシーケンスは、図24に示すシーケンスと同一のステップを含んでいるので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。
 ステップST2801において、セルは、UEに対して、UE毎のPUCCHリソース構成を設定する。
 ステップST3201において、セルは、UEに対して、UEに対するSR応答タイミングを設定する。
 ステップST3202において、セルは、UEに対して、PUCCHリソースに関する情報とともに、SR応答に関する情報を通知する。PUCCHリソースに関する情報およびSR応答に関する情報は、UEと通信するビームを介して通知するとよい。前記PUCCHリソースに関する情報およびSR応答に関する情報の通知には、RRC個別シグナリングを用いる。ここで、UEと通信するビームは、ソースビームである。
 セルは、ステップST3202の処理を行った後は、ステップST2804、ステップST2805およびステップST2806の処理を行う。
 ステップST3202でPUCCHリソースに関する情報およびSR応答に関する情報を受信したUEは、ステップST2803の処理を行う。その後、UEは、ステップST2813の処理を行う。
 ステップST2811において、UEは、上りデータが発生したか否かを判断し、上りデータが発生している場合は、ステップST2812に移行する。
 ステップST2812Aにおいて、UEは、設定されたSR用PUCCHリソース構成でSRを、サービングビームを介してセルに対して送信する。ここで、サービングビームは、ソースビームである。
 ステップST2812AでSRを送信したUEは、ステップST3202で通知されたSR応答に関する情報から導出したSR応答タイミングで受信を開始する。
 ステップST2812Aにおいて、セルは、UEからのSRを受信する。UEからのSRを受信したセルは、ステップST3201で設定したSR応答タイミングで上りスケジューリングを行うための処理を行う。
 この間に、ステップST3301において、セルは、下りCSI-RSを、ソースビームを介してUEに対して送信する。
 ステップST3301で下りCSI-RSを受信したUEは、ステップST3302において、CSI-RSの測定結果を、ソースビームを介してセルに対して報告する。具体的には、UEは、CSI-RSの測定結果をCSIとしてセルに報告する。
 ここで、セルは、複数のビームでCSI-RSを送信してもよい。UEは、複数のビームのCSI-RSの測定結果をセルに通知してもよい。あるいは、UEは、CSI-RSの測定結果から、サービングビームよりも受信品質の良いビームを導出し、該ビームの識別子を通知してもよい。これによって、情報量を削減することができる。
 ステップST3302において、UEからCSI報告を取得したセルは、ステップST3303において、UEをターゲットビームに移動させることを決定する。
 ステップST3304において、セルは、UEに対して、ソースビームで設定したSR応答タイミングでSR応答を送信することが可能か否かを判断する。
 ステップST3304において、セルがSR応答タイミングでSR応答を送信可能と判断した場合は、ステップST3305に移行する。
 ステップST3305において、セルは、UEに対して、ターゲットビームへの移動指示を通知する。ターゲットビームへの移動指示として、ターゲットビームのビーム識別子を含ませてもよい。移動指示の通知には、L1/L2制御シグナリングを用いてもよい。あるいは、MACシグナリングを用いてもよい。MACシグナリングを用いることによって、RRCシグナリングで通知するよりも、セルは、UEに対して、より低遅延でビームの移動指示を通知することができる。該移動指示とともに、SR応答タイミングへの変更指示は通知しない。
 ステップST3304において、セルがSR応答タイミングでSR応答を送信不可能と判断した場合は、ステップST3306に移行する。
 ステップST3306において、セルは、UEに対して、ターゲットビームでのSR応答タイミングに設定を変更する。
 ステップST3307において、セルは、UEに対して、ターゲットビームへの移動指示と、設定変更したSR応答タイミングへの変更指示を通知する。SR応答タイミングの設定変更指示として、ターゲットビームでのSR応答に関する情報を含ませてもよい。
 ステップST3308において、UEは、セルから受信した移動指示とともに、SR応答タイミングの設定変更指示を受信したか否かを判断する。
 ステップST3308において、UEがSR応答タイミングの設定変更指示を受信していない場合は、ステップST3309に移行する。
 ステップST3309において、UEは、ソースビームでのSR応答タイミングで受信を継続する。
 ステップST3308において、UEがSR応答タイミングの設定変更指示を受信した場合は、ステップST3310に移行する。
 ステップST3310において、UEは、受信したSR応答に関する情報を用いてSR応答タイミングを導出し、該SR応答タイミングに設定を変更して受信を行う。
 ステップST3311において、セルは、UEに対して設定したSR応答タイミングで、ターゲットビームでの上りスケジューリングを行う。
 ステップST3312において、セルは、UEに対して設定したSR応答タイミングで、ターゲットビームを介して上りグラントをUEに通知する。
 ステップST3312において、UEは、設定されたSR応答タイミングで、セルからターゲットビームを介して上りグラントを取得する。
 ステップST3313において、UEは、取得した上りグラントを用いて、BSR(Buffer Status Report)を、ターゲットビームを介してセルに送信する。
 ステップST3313でBSRを受信したセルは、BSRに従って、UEに対して上りスケジューリングを行う。
 ステップST3314において、セルは、ターゲットビームを介してUEに、上りグラントを通知する。
 このようにしてセルからのSRに対する上りグラントを受信したUEは、ステップST3315において、上りデータをセルに送信する。これによって、UEとセルとの間でターゲットビームを介して上り通信が開始される。
 このようにすることによって、UEがSRの送信後にビーム間移動が生じた場合に、たとえターゲットビームにおいてSR応答タイミングが変更されたとしても、UEがターゲットビームにおいてSR応答信号を受信することが可能となる。
 図27および図28は、SRの送信後にビーム間の移動が発生した場合のSRに対する上りグラントの送受信タイミング設定のシーケンスの他の例を示す図である。図27と図28とは、境界線BL3の位置で、つながっている。図27および図28に示すシーケンスは、図25に示すシーケンスと同一のステップを含んでいるので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。
 ステップST2801において、セルは、UEに対して、UE毎のPUCCHリソース構成を設定する。
 ステップST3201において、セルは、UEに対して、UEに対するSR応答タイミングを設定する。
 ステップST3202において、セルは、UEに対して、PUCCHリソースに関する情報とともに、SR応答に関する情報を通知する。PUCCHリソースに関する情報およびSR応答に関する情報は、UEと通信するビームを介して通知するとよい。前記PUCCHリソースに関する情報およびSR応答に関する情報の通知には、RRC個別シグナリングを用いる。ここで、UEと通信するビームは、ソースビームである。
 セルは、ステップST3202の処理を行った後は、ステップST2804、ステップST2805およびステップST2806の処理を行う。
 ステップST3202でPUCCHリソースに関する情報およびSR応答に関する情報を受信したUEは、ステップST2803の処理を行う。その後、UEは、ステップST2813の処理を行う。
 ステップST2811において、UEは、上りデータが発生したか否かを判断し、上りデータが発生している場合は、ステップST2812Aに移行する。
 ステップST2812Aにおいて、UEは、設定されたSR用PUCCHリソース構成でSRを、サービングビームを介してセルに対して送信する。ここで、サービングビームは、ソースビームである。
 ステップST2812AでSRを送信したUEは、ステップST3202で通知されたSR応答に関する情報から導出したSR応答タイミングで受信を開始する。
 ステップST2812Aにおいて、セルは、UEからのSRを受信する。UEからのSRを受信したセルは、ステップST3201で設定したSR応答タイミングで上りスケジューリングを行うための処理を行う。
 この間に、ステップST3301において、セルは、下りCSI-RSを、ソースビームを介してUEに対して送信する。
 ステップST3301で下りCSI-RSを受信したUEは、ステップST3302において、CSI-RSの測定結果を、ソースビームを介してセルに対して報告する。具体的には、UEは、CSI-RSの測定結果をCSIとしてセルに報告する。
 ここで、セルは、複数のビームでCSI-RSを送信してもよい。UEは、複数のビームのCSI-RSの測定結果をセルに通知してもよい。あるいは、UEは、CSI-RSの測定結果から、サービングビームよりも受信品質の良いビームを導出し、該ビームの識別子を通知してもよい。これによって、情報量を削減することができる。
 ステップST3302において、UEからCSI報告を取得したセルは、ステップST3303において、UEをターゲットビームに移動させることを決定する。
 ステップST3305において、セルは、UEに対して、ターゲットビームへの移動指示を通知する。
 ステップST3305で移動指示を受信したUEは、ステップST3403において、ソースビームでのSR応答タイミングをリセットして、毎サブフレームでの受信に設定する。
 ステップST3305でUEに移動指示を送信したセルは、ステップST3401において、UEに対して設定したソースビームでのSR応答タイミングをリセットし、SR応答タイミングをダイナミックに設定する。
 ステップST3402において、セルは、UEに対して、任意のタイミングで上りスケジューリングを行う。
 ステップST3312において、セルは、UEに対して、上りグラントを送信する。上りグラントの送信は、ターゲットビームを介して行う。
 ステップST3403において、移動指示の受信によって毎サブフレームでの受信に設定したUEは、以降、ターゲットビームにおいて毎サブフレーム受信する。
 これによって、UEは、ステップST3312においてセルから送信された上りグラントを受信することが可能となる。
 このようにしてセルからSRに対する上りグラントを受信したUEは、ステップST3313からステップST3315によって、セルとの間でターゲットビームを介して上り通信開始のための処理を行う。これによって、UEとセルとの間で上り通信が開始される。
 このようにすることによって、UEがSRの送信後にビーム間移動が生じた場合に、たとえターゲットビームにおいてSR応答タイミングが変更されたとしても、UEがターゲットビームにおいてSR応答信号を受信することが可能となる。
 セルは、任意のタイミングで、ターゲットビームで、UEからのSRに対する上りスケジューリングを行い、上りグラントを送信することができる。また、UEも任意のタイミングで上りグラントが送信されたとしても、該上りグラントを受信することが可能となる。セルは、各ビームの負荷状況および電波伝搬状況などに応じて、適宜適切なタイミングで、SRに対する上りスケジューリングを行うことが可能となる。
 ターゲットビームでSRの送信が不達になった場合についても問題となる。例えば、ソースビームの設定をそのまま用いるのか、ターゲットビームで新たに設定するのか、新たに設定する場合の設定方法はどうするのか、などの問題が生じる。
 SRの送信が不達になった場合についても、前述に開示した、ターゲットビームでのSRに対する上りグラントの送信タイミング設定および設定方法を適用するとよい。これによって、SRの送信が不達の場合でも、ターゲットビームでセルおよびUEの協調動作が可能となる。
 ターゲットビームでのUEからのSRの再送についてさらなる問題が生じる。例えば、ターゲットビームでUEが上り送信を行う場合、ソースビームの送受信ポイント(以下「S-TRP」という場合がある)と、ターゲットビームの送受信ポイント(以下「T-TRP」という場合がある)とが異なるような場合、UEからS-TRPまでの電波伝搬時間と、UEからT-TRPまでの電波伝搬時間とが異なる。
 このような場合、ソースビームでのタイミングアドバンス(Timing Advance:TA)を用いて、ターゲットビームで上り送信を行っても、セルは、T-TRPで該上り送信を受信することができないという問題が生じる。
 ターゲットビームでのUEからのSRの再送についても同様の問題が生じる。UEがターゲットビームでSRの再送を何度繰り返しても、セルは、該SRの再送を受信できず、UEに対して上りグラントを送信できなくなる。これによって、UEは、上り送信を開始できなくなってしまうという問題が生じる。
 このような問題を解決する方法を開示する。
 セルは、UEに対して、移動指示とともに、ターゲットビームにおいて、UE個別のRA処理の起動を指示する。UE個別のRA処理は、RA用のプリアンブルにUE個別の構成を用いる。したがって、衝突をすることなく、確実にRA処理を行うことが可能となる。
 UE個別のRA用プリアンブル構成として、無線リソースおよびプリアンブルに用いる信号のシーケンスなどがある。セルは、UEに対して、ターゲットビームでのRA用プリアンブルに関する情報を通知する。セルは、UEに対して、該情報を、ソースビームでの移動指示のシグナリングに含めて通知してもよい。該情報が通知されると、UE個別のRA処理が起動されるようにしてもよい。
 UEは、移動指示とともに、前記ターゲットビームでのRA用プリアンブルに関する情報を受信した場合、ターゲットビームにおいてUE個別のRA処理を行う。UEは、このRA処理によって、ターゲットビームでのタイミングアドバンスをセルから取得することが可能となる。ターゲットビームでのタイミングアドバンスを取得したUEは、該タイミングアドバンスを用いて上り送信を行う。
 このようにすることによって、セルは、ターゲットビームにおけるUEからの上り送信を受信することが可能となる。SRの再送においても同様に、該タイミングアドバンスを用いてSRの再送を行う。このようにすることによって、セルは、ターゲットビームにおけるUEからのSRの再送を受信することが可能となる。
 セルは、UEに対する、ソースビームでのタイミングアドバンスとターゲットビームでのタイミングアドバンスとが異なると判断した場合に、UEに対して、UE個別のRA処理を起動してもよい。例えば、S-TRPとT-TRPとの位置が異なるような場合に、UEに対して、UE個別のRA処理を起動する。S-TRPとT-TRPとの位置が同じ、あるいは、ソースビームとターゲットビームとが同一のTRPによって構成されている場合、UEに対して、UE個別のRA処理を起動しない。
 S-TRPとT-TRPとの位置が同じ、あるいは、ソースビームとターゲットビームとが同一のTRPによって構成されている場合は、UEからの電波伝搬時間は、ほぼ等しくなる。したがって、ターゲットビームでのタイミングアドバンスを設定し直す必要が無く、ソースビームでのタイミングアドバンスを引き続き使用するとよい。
 このようにすることによって、UEがビーム間の移動のときに、常にRA処理を起動する必要が無くなる。したがって、UEおよびセルにおける処理を容易にするとともに、低消費電力化を図ることができる。
 他の方法を開示する。ビーム毎あるいはTRP毎のTAG(Timing Advance Group)を設定する。従来、TAGは、セル毎に設定されていた。NRでは、セル内に一つまたは複数のTRPが構成され、TRPが一つまたは複数のビームを構成することが検討されている。ビームを構成するTRPの位置が異なるような場合、前述のように、タイミングアドバンスが異なってくる。ビーム毎あるいはTRP毎のTAGを設定することによって、ビームを構成するTRPの位置の違いによるTAGを設定することが可能となる。
 セルは、ターゲットビームがソースビームと同じTAG内か否かを判断して、UEに対してUE個別のRA処理を起動してもよい。ターゲットビームがソースビームと同じTAG内である場合、セルは、UEに対してUE個別のRA処理を起動しない。ターゲットビームがソースビームと異なるTAG内である場合、セルは、UEに対してUE個別のRA処理を起動する。このようにすることによって、本実施の形態と同様の効果を得ることができる。
 セルがUEに対してRA処理を起動することを判断したが、UEがRA処理を起動することを判断してもよい。セルは、予め、ビーム毎あるいはTRP毎のTAG設定情報をUEに対して通知する。TAG設定情報の通知方法として、RRCシグナリングを用いるとよい。あるいは、MACシグナリングを用いてもよい。
 セルからビーム間の移動指示を受信したUEは、該移動指示に含まれるターゲットビームの識別子から、前記TAG設定情報を用いて、ターゲットビームがソースビームと同じTAG内か否かを判断する。ターゲットビームがソースビームと同じTAG内である場合、UEは、UE個別のRA処理を起動しない。ターゲットビームがソースビームと異なるTAG内である場合、UEは、RA処理を起動する。ターゲットビームでのRA用プリアンブルに関する情報は、移動指示とともにセルからUEに対して通知されるとよい。
 UEは、UE個別ではないRA処理を行うとよい。セルは、ターゲットビームでのRA用プリアンブルに関する情報を、移動指示とともにUEに対して通知しなくて済む。UEは、RA処理に、セル毎あるいはビーム毎に設定されたRA用プリアンブルに関する情報を用いるとよい。該情報は、予め規格などで決められていてもよいし、セルからUEに対して予め通知してもよい。RA用プリアンブルに関する情報の通知方法として、RRCシグナリングを用いるとよい。このようにすることによって、UEがRA処理を起動することが可能となる。
 このような方法で、ターゲットビームでRA処理を起動したUEは、RA処理で取得したタイミングアドバンスを用いて、ターゲットビームでSRの再送を行う。ターゲットビームでRA処理を起動しないUEは、ソースビームでのタイミングアドバンスを引き続き使用して、ターゲットビームでSRの再送を行う。
 このようにすることによって、ソースビームでのSRの送信が不達の場合でも、ターゲットビームでSRを再送することが可能となる。また、ターゲットビームでSRを再送する場合に、RA処理から行うことによって、TAが異なることに起因してSRの送信の不達が続くような状況を早期に回避することができる。したがって、早期に上り送信を開始することが可能となる。
 このような方法は、ソースビームでSRの送信および一回以上のSRの再送が不達であった場合でも、ターゲットビームでさらなるSRの再送を行うことが可能となる。
 ビーム間の移動指示によって、SRの再送最大回数をリセットしてもよい。ターゲットビームでの最初のSRの再送を、初回SRの再送あるいはSRの初送として、再度、SRの再送最大回数までSRの再送を可能としてもよい。このようにすることによって、ターゲットビームでのSRの再送機会を十分に与えることができる。したがって、SRの送信不達を低減することができる。
 また、ターゲットビームでRA処理を起動したUEに対してのみ、SRの再送最大回数をリセットしてもよい。ターゲットビームでの最初のSRの再送を、初回SRの再送あるいはSRの初送として、再度、SRの再送最大回数までSRの再送を可能としてもよい。このようにすることによって、TAが変更されたUEに対してのみSRの再送機会を十分に与えることができる。したがって、SRの送信不達を低減することができる。また、TAが変更されないUEに対しては、無駄に最大回数になるまでの期間を長くせず、早期に再度RA処理から行うことが可能となる。
 UEがRA処理を起動した場合、SR処理をリセットするとしてもよい。UEは、RA処理を起動した後、SR処理を起動するとよい。ターゲットビームにおけるPUCCHリソースの設定から起動するとよい。このとき、ソースビームと同じPUCCHリソースに関する情報は省略してもよい。このようにすることによって、TAの異なるターゲットビームでSR処理を開始することが可能となる。
 実施の形態8.
 NRでは、アナログビームフォーミングおよびハイブリッドビームフォーミングが検討されている。一つのセルにおいて複数のビームが形成され、ビーム毎にカバレッジが構成される。したがって、ビームのカバレッジは、セルのカバレッジよりも狭範囲となる。
 ビームのカバレッジが適切に形成されていないと、UEのビーム間の移動で通信の切断が生じやすくなるという問題が生じる。また、新たに障害物が形成されたような場合、地点によっては受信電力の低下が生じ、カバレッジホールが発生するという問題が生じる。
 LTEでは、UEによるカバレッジの評価機能として、MDT(Minimization of Drive Test)がサポートされている(3GPP TS 37.320 V13.1.0(以下「参考文献8」という)、3GPP TS 36.331 V14.0.0(以下「参考文献5」という)、および非特許文献1参照)。
 従来のMDTは、セルがカバレッジをどのように形成しているかを評価するために、地理的ポイントでセルからどの程度の受信電力が得られるかを、UEに測定、記録、報告させる機能である。セルは、UEからの測定地点における一つまたは複数のセルからの受信電力の報告を取得することによって、セルのカバレッジの形成に利用する。これによって、例えばハンドオーバ失敗などによる通信の切断が生じる地帯を低減するようなカバレッジを形成することができる。
 しかし、このように従来のMDTは、セルのカバレッジの形成を目的にしているので、NRで検討されているビーム毎のカバレッジの適切な形成には適用できないという問題がある。
 本実施の形態では、このような問題を解決する方法を開示する。
 MDTにビームの識別子を導入する。また、TRPの識別子がある場合、TRPの識別子を導入してもよい。TRPの識別子とビームの識別子とを組合せて導入してもよい。このような方法を、以下の説明では、ビーム毎のMDTと称する場合がある。
 MDTへのビーム識別子の導入の具体例を開示する。
 UEが測定結果を記録するログに、測定時点のビームの識別子を入れる。従来のMDTにおけるセル毎の測定結果に、測定時点のビームの識別子を入れてもよい。ビーム毎に送信されるRS(reference signal)(以下「BRS」と称する場合がある)とビームの識別子とを関連付けておく。ビームの識別子として、例えばビーム番号などとしてもよい。
 UEは、ビーム毎に送信されるBRSを受信してビームの識別子を得る。UEは、セルの識別子と、測定地点に関する情報と、測定地点での受信電力の測定結果とをログに記録する。このログに、測定地点で受信を行っているビームの識別子を加える。
 測定地点での受信電力として、BRSの受信電力を測定してもよい。
 セルの識別子と、測定地点に関する情報と、測定地点での受信電力または受信品質の測定結果のログへの記録は、従来のMDTで行われる。これに、測定地点で受信を行っているビームの識別子を加えることによって、測定地点で、どのビームから受信しているかが判ることになる。UEは、記録するログに、測定地点で受信を行っているビームの識別子を加えて、セルに報告する。このようにすることによって、セルは、UEが測定地点でどのビームから受信できているかを認識することができ、ビームのカバレッジがどのように形成されているかを判断することが可能となる。
 また、従来のMDTにビームの識別子を加えるだけでよいので、変更が容易である。
 他の方法を開示する。
 UEは、ビーム毎に受信電力を測定し、測定結果をログに記録する。UEは、該ログをセルに通知する。UEは、測定したビームの識別子に対応付けて測定結果をログに記録する。ビームの識別子は、前述と同様に、ビーム個別のBRSを受信することによって導出するとよい。UEは、ビーム毎の識別子と、測定地点に関する情報と、測定地点でのビーム毎の受信電力(または受信品質であってもよい)の測定結果とをログに記録する。
 測定するビームは、一つであってもよいし、複数であってもよい。また、測定するビームは、サービングビームに限らなくてもよい。測定するビームは、同じTRP内の他のビーム、同じセル内の他のビーム、他のTRP内のビーム、他のセル内のビームを含んでもよい。UEが測定するビームは、セルが決定して、セルからUEに通知してもよい。あるいは、UEが測定できるビームとしてもよい。
 UEがログに記録するビーム数に最大値を設けてもよい。セル毎の最大値を設けてもよい。あるいは、TRP毎の最大値を設けてもよい。あるいは、周波数毎の最大値を設けてもよい。これによって、測定可能なビーム数が多大になった場合に、ログに記録するビームを限定できるので、UEの記録容量が増大することを抑制することができる。これらの最大数は、予め規格で決められていてもよいし、あるいは、セルからUEに対して通知してもよい。前記最大数は、RRC個別シグナリングを用いて通知するとよい。
 ビーム毎の受信電力を測定する信号の具体例として、以下の(1)~(5)の5つを開示する。
 (1)同期信号(Synchronization Signal:SS)。
 (2)BRS。
 (3)DMRS(Demodulation RS)。
 (4)CSI-RS(Channel Status Information - RS)。
 (5)前記(1)~(4)の組合せ。
 前記(1)のSSは、UEのRRC接続状態によらずに用いることができる。UEは、RRC_Idle状態でも、RRC_Connected状態でもSSを測定できる。RRM(Radio Resource Management)メジャメントとして行われてもよい。NRでは、SSはセル内の全ビーム共通の信号が各ビームで送信されることが検討されている。UEは、ビーム毎のSSの測定結果と、SSを測定したビームの識別子とを関連付けてログに記憶するとよい。
 前記(2)のBRSは、UEのRRC接続状態によらずに用いることができる。UEは、RRC_Idle状態でも、RRC_Connected状態でもBRSを測定できる。RRMメジャメントとして行われてもよい。あるいは、RLCメジャメント、あるいは、PHYメジャメントとして行われてもよい。NRでは、ビーム毎にBSRが送信されることが検討されている。UEは、ビーム毎のBSRの測定結果と、BSRを測定したビームの識別子とを関連付けてログに記憶するとよい。
 前記(3)のDMRSは、UEがRRC接続状態で用いることができる。RRC_Connected状態でDMRSを測定できる。RLCメジャメントとして行われてもよい。あるいは、PHYメジャメントとして行われてもよい。NRでは、UEの下りデータあるいは下り制御信号とともに、復調用にDMRSが送信されることが検討されている。UEは、DMRSの測定結果と、DMRSを測定したビームの識別子とを関連付けてログに記憶するとよい。
 前記(4)のCSI-RSは、UEがRRC接続状態で用いることができる。RRC_Connected状態でCSI-RSを測定できる。RLCメジャメントとして行われてもよい。あるいは、PHYメジャメントとして行われてもよい。NRでは、ビームのチャネル状態評価用にビーム毎あるいはアンテナ毎のCSI-RSが送信されることが検討されている。UEは、CSI-RSの測定結果と、CSI-RSを測定したビームの識別子とを関連付けてログに記憶するとよい。
 セルあるいはTRPが複数のビームで構成する全カバレッジとほぼ同等のカバレッジをシングルビームで構成している場合がある。シングルビームについても、UEは、シングルビームでの受信電力を測定し、測定結果をログに記録してもよい。この場合でも、前述の方法を適宜適用できる。ビーム毎の受信電力を測定する信号としては、前述の(1)から(4)に加えて、シングルビームとして送信されるRSの受信電力を測定してもよい。また、前述の(1)から(4)を組合せてもよい。
 NRでは、UEにおいてもマルチビームを構成することが検討されているが、UEの測定においては、シングルビームを構成するとしてもよい。UEは、シングルビームで、セルが構成するビーム毎の受信電力を測定し結果をログに記録する。セルが構成するビーム毎の受信電力の測定結果から、UEが構成するビームの影響を排除することが可能となる。
 UEがシングルビームを構成できない場合、マルチビームでの測定結果をシングルビームでの測定結果に、予め定める変換方法を用いて変換するとよい。マルチビームでの測定は、UEがビームスイーピングを行って実行してもよい。予め定める変換方法は、静的に規格などで決めておいてもよい。これによって、変換方法の通知に要するシグナリングの増大を回避することができ、変換が容易になる。あるいは、準静的にもしくは動的にUEに通知してもよい。例えば、マルチビームのビーム数およびシングルビームとの対応関係が準静的あるいは動的に変更されるような場合に有効である。
 準静的あるいは動的にUEに通知するような場合、複数の変換方法を予め決めておき、各方法を示すインジケーションを設け、セルは、該インジケーションをUEに通知するようにしてもよい。これによって、シグナリングする情報量を低減することができる。
 従来のMDTは、RRMメジャメントで行われていた。しかし、NRにおいて、ビームのメジャメントは、RRMメジャメントではなく、RLCメジャメントあるいはPHYメジャメントとすることが検討されている。ビームのメジャメントが、RLCメジャメントあるいはPHYメジャメントで行われるような場合、ビーム毎の受信電力の測定には、RLCメジャメントあるいはPHYメジャメントを用いるようにしてもよい。これによって、ビームのメジャメントにRRM処理を不要とすることができる。
 ビーム毎の受信電力の測定およびログへの記録方法を開示する。
 受信電力の測定結果に予め定める条件を設定するとよい。予め定める条件に合致した場合に、測定結果をログに記録する。予め定める条件に合致しない場合は、測定結果をログに記録しない。
 例えば、受信電力の測定結果に閾値を設定する。例えば、閾値より大きい場合は、測定結果をログに記録し、閾値以下の場合は、測定結果をログに記録しないとするとよい。
 セルは、予め設定した条件をUEに通知するとよい。例えば、MDT設定を通知するメッセージに含めて通知してもよい。
 他の方法として、周期的に受信電力を測定し、測定結果をログに記録してもよい。セルは、予め設定した周期をUEに通知するとよい。例えば、MDT設定を通知するメッセージに含めて通知してもよい。該周期としては、MDT用の測定周期としてもよい。
 該周期をDRXの動作期間(アクティブ期間)に合わせて設定してもよい。アクティブ期間にあわせることによって、DRX中のインアクティブ期間中に受信電力の測定のために受信動作を行わなくて済む。したがって、UEの低消費電力化を図ることが可能となる。
 UEからセルへログを通知する方法について開示する。
 RRC_Idle状態のときは、セルからUEに対して、MDT結果の報告要求を通知するとよい。該要求を受信したUEは、ログを通知する。これらの通知には、RRCシグナリングを用いるとよい。
 MDT結果の報告要求およびMDT結果報告に、LTEで既存のUE情報プロシージャ(UE information procedure)を用いてもよい。MDT結果の報告要求に、UE情報要求(UE Information Request)を用いて、MDT結果報告にUE情報応答(UE Information Response)を用いる。これによって、LTEにおいて本実施の形態で開示した方法が適用された場合に、別途シグナリングを設ける必要がなくなるので、有効である。
 RRC_Connected状態のときは、メジャメント報告に含めて通知するとよい。セルは、UEに対して、メジャメント報告を行うように設定する。MDT結果のメジャメント報告を設定してもよい。メジャメント報告の設定を受信したUEは、該設定に従って、メジャメント報告にログを含めてセルに通知する。
 あるいは、CSI報告として通知してもよい。セルは、UEに対して、CSI報告を行うように設定する。MDT結果のCSI報告を設定してもよい。CSI報告の設定を受信したUEは、該設定に従って、CSI報告にログを含めてセルに通知する。CSI-RSの測定結果をログしているような場合に有効である。
 あるいは、新たなメッセージを設けて通知してもよい。セルは、UEに対して、ログの報告を要求するメッセージでログの報告を設定する。ログの報告要求の設定を受信したUEは、該設定に従って、ログを報告するメッセージにログを含めてセルに通知する。これらの新たなメッセージの通知には、RRCシグナリングを用いるとよい。
 このようにすることによって、セルは、UEの測定地点で、どのビームからどの程度受信できているかを認識することができる。ビームのカバレッジが、どのように形成されているかを、より精度良く判断することが可能となる。これによって、例えばハンドオーバ失敗などによる通信の切断が生じる地帯を低減するようなカバレッジを形成することができる。
 従来、LTEにおいては、CNはeNBに対してMDTを要求可能であった。MDTを、NRで検討されているビーム毎のカバレッジに対応させるために、CNは、gNBに対して、ビーム毎のMDTあるいはTRP毎のMDTを要求してもよい。CNがgNBに対してビーム毎あるいはTRP毎のMDTを要求するメッセージを通知する。5GでのCNとgNBとの間で設定されるインタフェースを用いて通知するよい。
 従来のMDT要求メッセージを用いてもよい。従来のMDT要求メッセージは、「Trace Start」であり、S1シグナリングが用いられるが、gNBに対して通知可能とするために、5GでのCNとgNBとの間で設定されるインタフェースを用いて通知するとよい。
 CNは、「Trace Start」メッセージにMDT構成を含めてeNBに通知する。「Trace Start」メッセージでMDTの構成を受信したeNBは、セルに対して、UEにMDTを実行させるように指示する。
 「Trace Start」メッセージでMDT構成の中の情報として、MDTエリアの設定情報がある。MDTエリアの設定情報は、「CHOICE Area Scope of MDT」である。この中で、従来は、セルあるいはトラッキングエリアでの設定しかできない。
 「CHOICE Area Scope of MDT」に、新たに、ビームの設定を加えるとよい。TRPの設定を加えてもよい。例えば、ビーム毎のMDTを行うか否かを示す情報、あるいは、TRP毎のMDTを行うか否かを示す情報を設定可能とする。さらに、MDTで設定するビームの識別子あるいはTRPの識別子を設定可能としてもよい。
 このようにすることによって、CNは、gNBに対して、ビーム毎のMDTあるいはTRP毎のMDTを実行させることができる。
 また、ビーム毎の受信電力を測定する信号、ならびに予め定める条件および閾値などの設定を行ってもよい。「Trace Start」メッセージでMDT構成の中の情報として、測定信号などの設定情報がある。測定信号などの設定情報は、「CHOICE MDT Mode」である。これに新たに、前述の信号、予め定める条件および閾値の設定を加えるとよい。例えば、ビーム毎の受信電力を測定する信号として、どの信号にするかを示す情報、受信電力の測定結果をログに記録するための予め定める条件を示す情報、あるいは閾値を示す情報などを設定可能とする。
 このようにすることによって、CNは、gNBに対して、ビーム毎のMDTあるいはTRP毎のMDTにおいて、どのような信号を測定し、どのような条件でログを取得させるかを設定することが可能となる。
 実施の形態9.
 LTEのチャネルコーディングにおいて、チャネルコーディング前のデータブロック、すなわち、トランスポートブロックを、予め規格で定められた一定サイズ以下のコードブロックに分割し、コードブロック毎にコーディングを行っている。NRにおいては、使用周波数の広帯域化によって、トランスポートブロックのサイズが大きくなり、結果として、コードブロック数が増加することが見込まれる。
 LTEにおけるチャネルコーディングにおいて、コードブロック毎およびトランスポートブロック全体に対し、CRCビットが設けられる。LTEのAck/Nackフィードバックにおいては、受信側は、受信したトランスポートブロック中、1つでもCRCエラーとなるコードブロックが存在した場合、送信側に対してNackを送信する。送信側は、前記トランスポートブロック全体を受信側に再送する。したがって、CRC=OKとなったコードブロックも同時に再送されることによって、通信の無駄が生じる。
 NRにおいては、3GPP R1-1609744(以下「参考文献9」という)において、受信側は正しくデコードできなかったコードブロックの番号をフィードバックし、送信側はフィードバックされたコードブロックのみをHARQ再送することによって、HARQ再送を効率的に行うことが提唱されている。また、前記フィードバックのビット数について、gNBから制御シグナリングを用いて準静的に、あるいはトランスポートブロックサイズに応じて制御シグナリングを用いて動的に各UEに設定することが提唱されている。
 また、NRにおいては、3GPP R1-1612072(以下「参考文献10」という)において、受信側から送信側へのフィードバックのビット数を節約するために、コードブロックを予め定める数ごとにバンドリングすなわちグループ分けし、受信側は正しくデコードできなかったコードブロックを含むバンドリングの番号をフィードバックすることが提唱されている。また、前記予め定める数は、gNBが決定することが提唱されている。
 ところが、コードブロックのバンドリングの番号のフィードバックにおいて、バンドリングあたりのコードブロック数を決めるための詳細は開示されていない。
 また、特定シンボルが受信エラーとなった場合において、フィードバック対象となるコードブロックあるいはコードブロックのバンドリングが複数になるので、フィードバック数が増大するという問題が生じる。特定シンボルが受信エラーとなる例として、URLLCの割り込みが挙げられる。
 図29は、URLLCの割り込みによるコードブロックの受信エラーを説明する図である。図29において、1つのトランスポートブロックが、1サブフレームで送信されている。前記トランスポートブロックは、コードブロック(以下「CB」という場合がある)#1~#19に分割され、1サブフレームの中において先頭のシンボルから順にマッピングされている。
 図29に示すように、各シンボルにマッピングされるCBは、シンボルによって異なる。例えば、図29に示すように、4番目のシンボルにURLLCの割り込みが入ったとすると、元のCB#9およびCB#10は全部送信することができず、CB#11は一部しか送信することができない。このとき、CB#9~CB#11の計3つのCBが受信エラーとなる。一方、5番目のシンボルには、CB#11~CB#14の計4つのCBがマッピングされているので、5番目のシンボルにURLLCの割り込みが入った場合、前記4つのCBが受信エラーとなる。従来の方法によると、1バンドリングあたりのCB数は一定であるので、URLLCによる割り込みによって生じるCBの受信エラーのフィードバックに、複数のバンドリングの番号をフィードバックする必要がある。したがって、フィードバックに要するビット数が多くなるという問題がある。
 本実施の形態では、このような問題を解決する方法を開示する。
 トランスポートブロック中のコードブロックのグループ分けを、1つのコードブロックグループ(以下、Code Block Group:CBGと称する場合がある)あたりの最大コードブロック数を決めて行ってもよい。CBG数を、1つのCBGあたりの最大コードブロック数を用いて決めるとよい。例えば、コードブロック数を、1つのCBGあたりの最大コードブロック数で除算し、小数部を切り上げた値をCBG数としてもよい。
 このようにすることによって、CBGの受信側から送信側へのフィードバックにおいて、正しく受信できた(受信結果がOKとなった)コードブロックを再び送信することによる無駄なコードブロック再送の数を一定以下に抑えることができる。
 本実施の形態におけるHARQフィードバックは、受信エラーとなったコードブロックをグループ分けして送信側にフィードバックする点で、RLCにおけるARQと異なる。
 各CBGへのコードブロック数の割り振りについて、例えば、最大コードブロック数を持つCBGと、余りのコードブロック数を持つCBGとにグループ分けしてもよい。余りのコードブロック数を持つCBGは、先頭のコードブロックを含むものであってもよいし、末尾のコードブロックを含むものであってもよい。余りのコードブロック数を持つCBGを、先頭のコードブロックを含むものとすることによって、トランスポートブロックの先頭に配置されるMACヘッダを含むCBGに割り当てるコードブロック数が少なくなり、前記CBGを少ない再送回数で受信可能とすることができる。これによって、受信側は、MACヘッダを早期に取得することができる。
 具体例として、コードブロック数を50、1つのCBGあたりの最大コードブロック数を8とすると、CBG数は7となる。各CBGへのコードブロック数の割り当ては、6つのCBGに8コードブロック、残り1つのCBGに2コードブロックとなる。
 前記割り振りの他の例として、各CBGにおけるコードブロック数が均等となるように行ってもよい。最大コードブロック数を持つCBGを、先頭に配置してもよいし、末尾に配置してもよい。前述の具体例において、コードブロック数が均等となるように割り振りを行うと、1つのCBGに8コードブロック、残り6つのCBGに7コードブロックとなる。このようにすることによって、無駄なコードブロック再送の数のCBG間の偏りを抑えることができる。
 コードブロックのグループ分けの他の方法として、CBG数を決めて行ってもよい。1つのCBGあたりの最大コードブロック数を、前記CBG数を用いて決めるとよい。例えば、コードブロック数を、CBG数で除算し、小数部を切り上げた値を1つのCBGあたりの最大コードブロック数としてもよい。このようにすることによって、1つのCBGのフィードバックに要するビット数を一定とすることが可能となる。
 前述の、CBG数を決めたコードブロックのグループ分けにおいて、前述の、1つのCBGあたりの最大コードブロック数を決めたコードブロックのグループ分けと同様に、コードブロックの割り振りを行ってもよい。例えば、最大コードブロック数を持つCBGと、余りのコードブロック数を持つCBGとにグループ分けしてもよい。余りのコードブロック数を持つCBGは、先頭のコードブロックを含むものであってもよいし、末尾のコードブロックを含むものであってもよい。余りのコードブロック数を持つCBGを、先頭のコードブロックを含むものとすることによって、受信側は、MACヘッダを早期に取得することができる。
 具体例として、コードブロック数を50、CBG数を8とすると、1つのCBGあたりの最大コードブロック数は7となる。各CBGへのコードブロック数の割り当ては、7つのCBGに7コードブロック、残り1つのCBGに1コードブロックとなる。
 前記割り振りの他の例として、各CBGにおけるコードブロック数が均等となるように行ってもよい。前述の具体例において、コードブロック数が均等となるように割り振りを行うと、2つのCBGに7コードブロック、残り6つのCBGに6コードブロックとなる。このようにすることによって、無駄なコードブロック再送の数のCBG間の偏りを抑えることができる。
 コードグループのグループ分けにおいて、CBG数あるいは1つのCBGあたりの最大コードブロック数のデフォルト値を設けてもよい。また、CBGの配置についても、デフォルトとなる設定を設けてもよい。例えば、CBG数のデフォルト値として、1としてもよい。あるいは、1つのCBGあたりの最大コードブロック数の例として、トランスポートブロック内のコードブロック数と同一としてもよい。あるいは、CBGの配置のデフォルト設定の例として、最大コードブロック数を持つCBGを先頭に配置してもよいし、コードブロック数が一番少ないCBGを先頭に配置してもよい。
 CBGのグループ分けの方法について、規格で決定してもよい。例えば、固定値としてもよい。固定値の例として、例えば、CBG数を16と固定してもよい。規格で決める他の例として、UEが送信あるいは受信可能な最大コードブロック数を用いて決めてもよい。UEが送信あるいは受信可能な最大トランスポートブロックサイズを用いてもよいし、UEカテゴリーを用いてもよい。
 規格で決める他の例として、伝搬環境を用いてもよい。伝搬環境として、CQI/CSIを用いてもよい。例えば、CQI/CSIが良いときに、1つのCBGあたりの最大コードブロック数を少なくしてもよい。このようにすることによって、受信エラーとなったCBGのフィードバックについて、前記CBGのうち正しく受信できたコードブロックの再送によるオーバーヘッドを少なくすることができる。
 規格で決める他の例として、受信誤り率を用いてもよい。例えば、受信誤り率が高いときに、1つのCBGあたりの最大コードブロック数を多くすることによって、受信エラーとなったCBGの送信側へのフィードバックを少ないビット数で行うことができる。
 CBGのグループ分けの方法について、gNBが決定してもよい。gNBがCBGのグループ分けを行うために必要な情報としては、規格で決定する場合と同様としてもよい。
 あるいは、gNBがUEに対してHARQフィードバックに用いることができるビット数を用いて決めてもよい。
 HARQフィードバックのビット数を用いる例として、例えば、前記ビット数をCBG数と同一とし、各CBGについてAck/Nackの情報をフィードバックしてもよい。例えば、前記ビット数を4とし、受信エラーが存在するCBGに1を、受信エラーが存在しないCBGに0を対応付けるとき、CBG#3に属するコードブロックに受信エラーが存在する場合、gNBからUEにフィードバックするビット列を「0010」としてもよい。他の例として、前記ビット列が示す値に、受信エラーが存在するCBGの組合せを対応付けしてもよい。例えば、受信エラーなしに値0を、CBG#1のみ、CBG#2のみ、CBG#3のみ、CBG#4のみが受信エラーとなる場合にそれぞれ値1、2、3、4を、CBG#1および#2が受信エラーとなる場合に値5を、CBG#1および#3が受信エラーとなる場合に値6を、また、CBG#1、#2、#3が受信エラーとなる場合に値11、CBG#1、#2、#4が受信エラーとなる場合に値12、CBGが4つとも受信エラーとなる場合に値15を対応付けてもよい。
 UEは、HARQフィードバックのビット数および前記ビット列の値を用いて、受信不可能となったCBGに属するコードブロックを求めるとよい。これによって、上り通信において、CBGのグループ分けに必要な情報をgNBからUEに通知する必要がなくなるので、シグナリング量の削減が可能となる。さらに、受信エラーとなるコードブロックが含まれるCBGの数が増えても、UEにフィードバックするビット数を増やさずに一定とすることができる。
 CBGのグループ分けの方法について、UEがgNBに対してHARQフィードバックに用いることができるビット数を用いて決定してもよい。例えば、前述と同様に、UEがHARQフィードバックに用いることができるビット数を用いて決めてもよい。これによって、下り通信において、前述と同様の効果を得ることができる。
 CBGのグループ分けの方法を、gNBからUEに通知するための手段の具体例として、以下の(1)~(5)の5つを開示する。
 (1)傘下のUEに対する報知。
 (2)UE毎の制御シグナリング。例えば、RRC個別シグナリング。
 (3)MAC制御情報。
 (4)L1/L2シグナリング。
 (5)前記(1)~(4)の組合せ。
 前記(1)を用いることによって、複数のUEに同時にCBGのグループ分けの方法を通知することができるので、シグナリング量の削減が可能となる。
 前記(2)を用いることによって、各UEに対して準静的に通知を行うので、UE個別の状況に適した設定を少ないシグナリングで行うことができる。
 前記(3)を用いることによって、例えば、伝搬環境の短期的変動に応じて、HARQ再送制御によって高い信頼性でUEに通知することができる。
 前記(4)を用いることによって、gNBからUEに送信するユーザデータがないときにおいても、動的に通知を行うことが可能となる。
 CBGのグループ分けの方法としてgNBからUEに通知する内容として、1つのCBGあたりの最大コードブロック数を用いてもよい。あるいは、CBG数を用いてもよい。前述の、1つのCBGあたりの最大コードブロック数あるいはCBG数と併せて、CBGへのコードブロックの割り振り方法を表す識別子を通知するとよい。前記識別子は、例えば、最大コードブロック数を持つCBGと、余りのコードブロック数を持つCBGとにグループ分けするのか、各CBGあたりのコードブロック数を均等に割り当てるのか、また、前記2つのそれぞれについて、最大コードブロック数を持つCBGを先頭に配置するか、あるいは末尾に配置するか、を表すものであってもよい。
 HARQフィードバックに用いるビット数について、Ackを1ビット、Nackを複数ビットとしてもよい。前記複数ビットを用いて、前記受信エラーとなったCBGの情報を示してもよい。これによって、Ack送信時に余ったビットを用いて他の情報を載せることが可能となる。
 下り通信に対するUEからgNBへのHARQフィードバックの送信について、例えば、PUCCHを用いてもよい。PUCCHについて、例えば、周波数方向の物理リソースを用いてHARQフィードバックを送信してもよい。あるいは、前記フィードバックの送信にMAC制御情報を用いてもよい。MAC制御情報を用いることによって、多値変調が可能となるので、少ない物理リソースで送信が可能となる。
 MAC制御情報を用いるにあたり、gNBからUEに対して、前記フィードバックを送るためのグラントを通知してもよい。あるいは、前記フィードバックの送信について、新たに設けたチャネルを用いて送信してもよい。前記MAC制御情報の送信について、上りユーザデータの送信と同じように、HARQフィードバックを行うとよい。
 上り通信に対するUEからgNBへのHARQフィードバックの送信について、例えば、L1/L2シグナリングを用いてもよい。あるいは、EPDCCH(Enhanced Physical Downlink Control Channel)の構成を用いてもよいし、同じサブフレームのどこかに、NGとなったCBGの情報を載せてもよいし、MAC制御情報を用いてもよい。MAC制御情報を用いることによって、多値変調が可能となるので、より多いビットの情報をフィードバックできる。前記MAC制御情報の送信について、下りユーザデータの送信と同じように、HARQフィードバックを行うとよい。あるいは、gNBからUEへのHARQフィードバックの送信について、PHICHを用いてもよい。
 実施の形態1と同様、gNBは、上り通信に対するフィードバック情報をUEへの上りグラントの中に含めてもよい。あるいは、gNBは、AckのフィードバックをUEに通知しなくてもよい。UEは、予め定める時間において上りデータに関するHARQフィードバックを受信しないことを用いて、該上りデータがgNBに正しく受信されたとみなしてもよい。あるいは、フィードバック情報を上りグラントの中に含める方法と、AckのフィードバックをUEに通知しない方法とを組合せて用いてもよい。これによって、UEは、上りユーザデータを送信し終えたときにおいても、gNBからのグラントを受信する必要がなく、最後の上りユーザデータがgNBにおいて正常に受信されたことを知ることができる。また、gNBは、最後の上りユーザデータに対するHARQフィードバック情報をUEに通知しなくてもよいので、通信リソースの節約になる。
 前述の、下り通信、上り通信それぞれに対するHARQフィードバックについて、複数の方法を組合せて用いてもよい。例えば、下り通信に対するHARQフィードバックについて、UEはgNBに対して、PUCCHを用いて受信エラーの有無を通知し、MAC制御情報を用いて、受信エラーを含むコードブロックの属するCBG番号を通知してもよい。このようにすることによって、HARQフィードバックにおける信頼性を高めることができる。
 本実施の形態におけるHARQフィードバックの内容として、受信エラーとなったコードブロックを含むCBGの情報を送信するとよい。前記情報としては、例えば、CBG番号を含んでもよいし、CBG数を含んでもよい。あるいは、例えば、CBGの受信可能/エラーを示すビットマップとして送信してもよい。前記ビットマップとしては、例えば、CBG数を4とし、受信エラーが存在するCBGに1を、受信エラーが存在しないCBGに0を対応付けるとき、CBG#3に属するコードブロックに受信エラーが存在する場合、gNBからUEにフィードバックするビット列を「0010」としてもよい。
 本実施の形態におけるCBGのグループ分けについて、複数のCBGに属するコードブロックが存在してもよい。例えば、各シンボルにマッピングされるコードブロックを1つのCBGにグループ分けしてもよい。これによって、例えば、優先度が高い通信、例えば、URLLCのサービスが求められる通信によって、あるシンボルが割り込まれた場合、受信側は送信側に該シンボルに対応するCBGの情報をフィードバックすることによって、送信側は該シンボルにマッピングされたコードブロックを再送することが可能となる。
 前述において、複数のシンボルにマッピングされるコードブロックを1つのCBGにグループ分けしてもよい。これによって、HARQフィードバックに要するビット数を小さく抑えることができる。
 前述におけるグループ分けについて、各コードブロックと各CBGとの対応関係を、予め規格で定めてもよい。あるいは、gNBからUEに前記対応関係を通知してもよい。前記対応関係の情報としては、例えば、各CBGに属するコードブロックの先頭および末尾の番号を用いてもよい。前記通知は、RRC個別シグナリングを用いて準静的に行ってもよい。
 前述において、受信側は、送信側に、複数のCBGに属するコードブロックの受信エラーを、前記複数のCBGのうち他に受信エラーとなったコードブロックを含むCBGとして通知するとよい。あるいは、受信側は、送信側に、前記複数のCBGのうち先の番号のCBGとして通知してもよいし、後ろの番号のCBGとして通知してもよい。前述において、他に受信エラーとなったコードブロックを含むCBGとして通知することによって、フィードバックするCBGの数を減らすことができる。
 あるいは、受信側は、受信エラーとなったコードブロックを含むシンボル番号を送信側に通知してもよい。このようにすることによって、各コードブロックと各CBGの対応関係を予めgNBからUEに通知する必要がなくなり、シグナリング量を削減することができる。複数のシンボルを1つのグループにまとめて、前記グループを表す識別子を受信側から送信側にフィードバックしてもよい。
 図30は、複数のCBGに属するコードブロックが存在する場合のコードブロックとCBGとの対応関係を示す図である。図30は、下り通信において、1つのシンボルにマッピングされるコードブロックを1つのCBGにグループ分けした場合を示している。
 図30において、シンボル#2、すなわちCBG#2に属するコードブロック#h(CB#h)、コードブロック#(h+1)(CB#(h+1))およびコードブロック#(k-1)(CB#(k-1))が受信エラーとなっているので、UEは、gNBに、CBG#2が受信エラーである旨のHARQフィードバックを行う。gNBは、前記HARQフィードバックを用いて、コードブロック#h(CB#h)からコードブロック#k(CB#k)をUEに再送する。
 本実施の形態において、CBGのグループ分けをする代わりに、受信エラーとなったコードブロックを含む、連続したコードブロック(以下「コードブロック塊」と称する場合がある)の情報を通知してもよい。前記コードブロック塊には、受信結果がOKであったコードブロックが含まれていてもよい。
 前述において、受信側は、各コードブロックの受信結果から、前記コードブロック塊を求める。受信側は、前記コードブロック塊の情報をHARQフィードバック情報に含めて送信側に通知する。送信側は、前記コードブロック塊に属するコードブロックを受信側に再送する。
 前記コードブロック塊の情報として、先頭のコードブロックを示す情報を用いてもよいし、末尾となるコードブロックを示す情報を用いてもよい。あるいは、コードブロック数を示す情報を用いてもよい。あるいは、これらの2つ以上を組合せて用いてもよい。
 前述において、先頭となるコードブロックを示す情報は、例えば、先頭となるコードブロック番号でもよいし、前記コードブロック番号を、予め決めた定数で除した値を用いてもよい。前記値は、小数以下を切り捨てたものであってもよい。前記定数は、規格で定めてもよいし、予めgNBからUEにRRC個別シグナリングで通知してもよい。あるいは、前記定数を受信側が決定し、送信側に通知してもよい。受信側は、前記通知を動的に行ってもよい。例えば、MAC制御情報を用いてもよいし、L1/L2シグナリングを用いてもよい。このようにすることによって、受信側は、受信エラーの発生状況に応じて、少ないビット数で送信側にHARQフィードバックを送ることが可能となる。前記定数をgNBからUEに動的に通知してもよい。
 先頭となるコードブロック番号を定数で除した値を用いることによって、HARQフィードバックのビット数を小さくすることができる。前述における、末尾となるコードブロックを示す情報についても、前記先頭となるコードブロックを示す情報と同様に扱ってもよい。
 前述において、コードブロック数を示す情報についても、前記先頭となるコードブロックを示す情報と同様に扱ってもよい。あるいは、コードブロック数を、予め定める整数のべき乗の値に丸め込み、前記べき乗の指数の値を用いてもよい。前記べき乗の値は、前記コードブロック数以上であることが望ましい。前記整数について、規格で定めてもよいし、予めgNBからUEにRRC個別シグナリングで通知してもよい。あるいは、前記整数を受信側が決定し、送信側に通知してもよい。受信側は、前記通知を動的に行ってもよい。例えば、MAC制御情報で通知してもよいし、L1/L2シグナリングで通知してもよい。このようにすることによって、受信側は、受信エラーの発生状況に応じて、少ないビット数で送信側にHARQフィードバックを送ることが可能となる。前記整数をgNBからUEに動的に通知してもよい。
 図31は、受信誤りを含む連続したコードブロックとコードブロック塊との関係を示す図である。図31において、コードブロック#2(CB#2)、コードブロック#4(CB#4)~コードブロック#6(CB#6)が受信エラーとなっている。
 図31において、受信側は、受信結果がOKであったコードブロック#3(CB#3)も受信エラーとみなすことによって、コードブロック#2(CB#2)~コードブロック#6(CB#6)を受信エラーとして送信側に通知する。前記通知において、受信側はコードブロック#2(CB#2)およびコードブロック#6(CB#6)の識別子を送信側に通知してもよいし、あるいは、コードブロック#2(CB#2)の識別子および受信エラーの個数を示す情報を通知してもよい。図31においては、受信側から送信側に通知される受信エラーの個数は5である。
 送信側は、前記通知から、受信エラーとなったコードブロックの情報を取得する。送信側は、コードブロック#2(CB#2)~コードブロック#6(CB#6)を受信側に再送する。
 受信側が送信側にコードブロック塊の情報を通知することによって、受信エラーとなったコードブロックが連続、あるいは少し離れて発生している場合について、特に、受信エラーとなったコードブロックがCBGの境界を跨いでいても、受信側から送信側に通知するHARQフィードバックの情報を小さく抑えることができる。
 本実施の形態におけるコードブロック塊の情報の通知において、コードブロックの代わりにCBGを用いてもよい。例えば、受信側から送信側へのHARQフィードバックにおいて、受信エラーを含む先頭のCBG番号とCBG数とを用いてもよい。このようにすることによって、受信側から送信側に通知するHARQフィードバックの情報をさらに小さく抑えることができる。
 本実施の形態において、受信側から送信側へのフィードバックに、予め定めるパターンを用いてもよい。予め定めるパターンは、例えば、トランスポートブロック中の全コードブロックのうち、先頭の4分の1および末尾の4分の1のコードブロックが受信エラーとなるものでもよい。また、予め定めるパターンは、先頭の4分の1から末尾の4分の1までのコードブロックが受信エラーとなるものでもよいし、あるいは、例えば、先頭の8分の1および末尾の8分の1が受信エラーとなるものでもよい。
 また、予め定めるパターンは、対称形でなくてもよい。例えば、トランスポートブロック中の全コードブロックのうち、先頭の5個が受信エラーとなるものでもよいし、あるいは、先頭の3個ならびに先頭から5個目および7個目が受信エラーとなるものでもよい。
 あるいは、予め定めるパターンは、物理チャネルの各シンボルについて、マッピングされたコードブロックが受信エラーとなる場合のシンボル番号に対応するものであってもよい。
 予め定めるパターンの一覧について、規格で定めてもよいし、予めgNBからUEに対して通知してもよい。また、前記予め定めるパターンの一覧は、Ack、すなわち、受信エラーとなるコードブロックが存在しないパターンを含んでもよい。
 予め定めるパターンの一覧には、受信エラーとなるコードブロックが存在しないパターンが含まれていてもよい。gNBおよびUEは、前記パターンを、全てのコードブロックを正しく受信したことの通知に用いてもよい。
 受信側は、各コードブロックの受信結果を用いて、送信側にフィードバックするパターンを決定する。前記パターンは、予め定めるパターンの一覧のうち、受信エラーとなったコードブロックを全て含むものであることが望ましい。受信側は、前記パターンを示す識別子を送信側に通知する。送信側は、前記識別子にて示されたパターンにおいて受信エラーに該当するコードブロックを、受信側に再送する。
 図32は、受信エラーを含むコードブロックのパターンを説明するための図である。図32では、受信データが受信エラー3302,3304,3305を含む場合を示す。図32において、受信エラー3302,3304,3305を除く部分、例えば参照符号3301,3303,3306で示す部分は、受信エラーとならずに受信できた部分である。
 図32において、受信側は、受信データに示すように受信エラー3302,3304,3305を検出した場合、送信側にパターン#4を示す識別子をフィードバックする。送信側は、パターン#4に従い、コードブロック#1(CB#1)~コードブロック#5(CB#5)を受信側に再送する。
 受信側が送信側にコードブロック塊の情報を通知することによって、受信エラーとなったコードブロックがトランスポートブロック内に分散していても、受信側から送信側に通知するHARQフィードバックの情報を小さく抑えることができる。
 本実施の形態において、gNBは、HARQフィードバックのレベルを切り替えてもよい。HARQレベルとしては、例えば、コードブロック毎のフィードバックを含んでもよいし、CBG毎のフィードバックを含んでもよいし、トランスポートブロック全体のフィードバックを含んでもよい。前述において、CBG毎のフィードバックについても、複数のレベルを設けてもよい。例えば、CBGあたりのコードブロック数が少ないCBGによるフィードバックのレベルと、CBGあたりのコードブロック数が多いCBGによるフィードバックのレベルとを設けてもよい。各レベルにおけるコードブロック数について、あるレベルにおいて用いるCBGに含まれるコードブロック数は、他のレベルにおいて用いるCBGに含まれるコードブロック数の整数倍であってもよいし、整数倍でなくてもよい。また、あるレベルにおいて、複数のCBGが同じコードブロックを含んでもよいし、含まなくてもよい。
 gNBは、前記フィードバックのレベルをUEに通知する。前記通知内容としては、フィードバックのレベルの内容、例えば、CBGあたりのコードブロック数でもよいし、前記レベルの識別子でもよい。前記識別子を用いるにあたり、フィードバックのレベルの一覧を、規格で定めてもよいし、予めgNBからUEに通知してもよい。前記通知としては例えばRRCシグナリングを用いてもよい。
 gNBがHARQフィードバックのレベルの通知を行う方法として、以下の(1)~(5)の5つを開示する。
 (1)傘下のUEへの報知。
 (2)UE毎の制御シグナリング。例えば、UE毎のRRC個別シグナリング。
 (3)MAC制御情報。
 (4)L1/L2シグナリング。
 (5)前記(1)~(4)の組合せ。
 前記(1)を用いることによって、複数のUEに対して一斉に通知を行うことができるので、シグナリングの削減が可能となる。
 前記(2)を用いることによって、個別のUEに準静的な設定が可能となる。例えば、該gNBの配下に、URLLCのサービスを用いるUEが接続されたときに、eMBBのサービスを使用しているUEに対して、HARQフィードバックレベルをトランスポートブロック全体のフィードバックのレベルから、シンボル毎のフィードバックのレベルに切り替えることが可能となる。これによって、前記URLLCのサービスを用いるUEが、前記eMBBのサービスを使用しているUEが使用するシンボルに割り込んだ場合において、UEはgNBに対し前記シンボル番号のフィードバックが可能となり、eMBBのサービスを使用するUEにとっての伝送効率が向上する。
 前記(3)を用いることによって、伝搬環境などの動的な変化に対応したレベルの切り替えを、高い信頼性で行うことができる。また、MAC制御情報を用いることによって、多値変調が可能であるので、前記通知に用いるビット数を少なく抑えることができる。
 前記(4)を用いることによって、ユーザデータが存在しない場合においても、伝搬環境などの動的な変化に対応した迅速なレベルの切り替えが可能となる。
 本実施の形態におけるCBGのグループ分けについて、HARQフィードバックの複数のレベルに対して一連のCBG番号を割り当ててもよい。例えば、トランスポートブロック内のコードブロック全体に、予め定めた最大コードブロック数で構成されるCBG番号を割り当てた後、前記予め定めた最大コードブロック数より大きい最大コードブロック数で構成されるCBG番号を割り当ててもよい。
 受信側は、受信エラーとなったコードブロックの分布に応じて、どのレベルに対して割り当てたCBG番号を用いるかを決めてもよい。受信側は、送信側に、前述において受信側が決めたCBG番号をフィードバックしてもよい。
 例えば、コードブロック数が20であるトランスポートブロックについて、gNBおよびUEは、最大コードブロック数が3であるCBGを用いて、CBG#1をコードブロック#1~#3、CBG#2をコードブロック#4~#6、以下同様にして、CBG#6をコードブロック#15~#18、CBG#7をコードブロック#19、#20に割り当て、最大コードブロック数が5であるCBGを用いて、CBG#7をコードブロック#1~#5、CBG#8をコードブロック#6~#10、以下同様にして、CBG#10をコードブロック#16~#20に割り当ててもよい。
 前述の例において、受信側においてコードブロック#3,#4が受信エラーとなった場合において、受信側は、送信側に、CBG#7が受信エラーとなったことをフィードバックすればよい。
 このようにすることによって、gNBからUEへのHARQフィードバックのレベルの通知が不要となるので、gNBからUEへのシグナリング量を削減することが可能となる。
 本実施の形態におけるHARQフィードバックについて、受信側は、送信側に、受信結果がOKであったコードブロックの情報をフィードバックしてもよい。受信結果がOKであったコードブロックのみで構成されるCBGの情報をフィードバックしてもよい。受信側は、前記フィードバックに、受信結果OKおよび受信エラーのどちらのフィードバックであるかを示す識別子を含めてもよい。
 受信側は、自身が受信結果OKおよび受信エラーのどちらのフィードバックを行うかを、受信エラーとなったコードブロック数、あるいはCBG数の情報を用いて決めてもよいし、受信結果OKまたは受信エラーのフィードバックに要するビット数を用いて決めてもよい。
 このようにすることによって、受信側は、トランスポートの受信結果に応じて、少ないビット数で送信側にフィードバックを行うことが可能となる。
 gNBがHARQフィードバックのレベルの判断に用いる情報として、以下の(1)~(5)の5つを開示する。
 (1)伝搬環境。例えば、CQI/CSI。
 (2)下り通信の負荷。例えば、gNBのバッファ蓄積量。
 (3)上り通信の負荷。例えば、UEのバッファ蓄積量。
 (4)UEについての情報。例えば、UEカテゴリーやUEの使用サービス。
 (5)前記(1)~(4)の組合せ。
 前記(1)において、例えば、CQI/CSIが良いときに、1つのCBGあたりの最大コードブロック数を多くするようにレベルを切り替えてもよい。このようにすることによって、Ackを通知するためのフィードバックのビット数を少なくすることができる。
 前記(2)において、例えば、gNBのバッファ蓄積量が多いときに、1つのCBGあたりの最大コードブロック数を少なくすることによって、下り通信において、受信エラーとなったCBGのフィードバックについて、受信結果がOKであったコードブロックの再送のオーバーヘッドを少なくすることができる。これによって、下り通信における伝送効率を高めることができる。
 前記(3)において、UEからgNBに通知するバッファ状態報告(Buffer Status Report:BSR)を用いてもよいし、他の値を用いてもよい。
 前記(3)において、例えば、UEのバッファ蓄積量が多いときに、1つのCBGあたりの最大コードブロック数を少なくすることによって、上り通信において、受信エラーとなったCBGのフィードバックについて、受信結果がOKであったコードブロックの再送のオーバーヘッドを少なくすることができる。これによって、上り通信における伝送効率を高めることができる。
 前記(4)において、例えば、eMBBを用いるUEに対して、1つのCBGあたりの最大コードブロック数を少なくすることによって、受信エラーとなったCBGのフィードバックについて、受信結果がOKであったコードブロックの再送のオーバーヘッドを少なくすることができる。これによって、eMBBを用いるUEの伝送効率を高めることができる。
 本実施の形態において、受信側は、予め定めた閾値を用いて、すべてのコードブロックを受信エラーとみなしてもよい。受信側は、すべてのコードブロックが受信エラーである旨の通知を送信側に行ってもよい。送信側は、すべてのコードブロックを再送してもよい。前述において、送信側は、既に受信可能となっているコードブロックは再送から除外してもよい。前述において、既に受信可能となっているコードブロックは、受信側からのフィードバックによって得られたものであってもよい。
 前述において、予め定めた閾値は、規格で決定してもよいし、gNBからUEに通知してもよい。
 前記閾値は、受信エラーとなるコードブロック数を用いて決められてもよいし、受信エラーとなるコードブロックを含むCBG数を用いて決められてもよいし、受信側からのHARQフィードバックに使用可能なビット数を用いて決められてもよい。例えば、前記ビット数が2のとき、受信エラーとなるコードブロックがトランスポートブロックの中央を跨いで存在していた場合に、受信側は、すべてのコードブロックを受信エラーとして送信側に通知してもよい。このようにすることによって、受信エラーを送信側にフィードバックするビット数を少なくすることができる。
 本実施の形態において、CBG、コードブロック塊、あるいはコードブロックのパターンの最大再送回数は、HARQ最大再送回数と同じとしてもよい。すなわち、本実施の形態における前記再送は、HARQ再送とみなしてもよい。これによって、gNBおよびUEの実装を簡易にすることができる。
 本実施の形態において、受信側は、受信結果がOKであったコードブロックを破棄して受信し直してもよい。前述において、送信側は、受信側における受信結果がOKであったコードブロックの送信をやり直してもよい。前記送信のやり直しは、HARQ最大再送回数を超過したときに行ってもよい。
 本実施の形態において、受信側は、上位レイヤ、例えばRLCレイヤのデータユニット、例えばRLC PDUが完成した時点で、受信データを前記上位レイヤに送信してもよい。前記受信データは、トランスポートブロックのうち、一部のコードブロックが正しく受信できたデータでもよい。これによって、前記データの送受信にかかる遅延を抑制することができる。
 前述において、受信側は、MACヘッダのサイズおよび上位レイヤのデータユニットのサイズを予め送信側から取得していてもよい。あるいは、規格によって決められてもよい。
 本実施の形態において、送信側は、CBG毎にパリティチェックビットを付加してもよい。前記パリティチェックビットは、例えば、CRCでもよい。前記CBG毎のパリティチェックビットとトランスポートブロック全体のパリティチェックビットとが共存していてもよい。
 前述において、gNBは、CBG毎のパリティチェックの使用の有無をUEに通知してもよい。前記通知は、RRC個別シグナリングを用いて準静的に通知してもよいし、L1/L2シグナリングを用いて動的に通知してもよい。あるいは、規格で決定してもよい。
 図33は、CBG毎のパリティチェック3401~3404の付与を説明するための図である。図33において、送信側は、CBG#1に含まれるコードブロック#1~コードブロック#kに基づいてパリティビットを計算し、コードブロック#1(CB#1)にパリティチェック3401を付与する。CBG#2以降についても、同様にして、コードブロック#k+1(CB#(k+1))、…コードブロック#2k+1(CB#(2k+1))、…コードブロック#(N-1)k+1(CB#((N-1)k+1))に、それぞれパリティチェック3402、3403、3404が付与される。
 前述の方法を用いることによって、トランスポートブロック全体におけるパリティチェックの信頼性を高めることができる。
 本実施の形態によって、受信側は、受信エラーとなったコードブロックの情報のフィードバックを少ないビット数で行うことができるので、通信を効率的に行うことができる。
 前述の各実施の形態およびその変形例は、本発明の例示に過ぎず、本発明の範囲内において、各実施の形態およびその変形例を自由に組合せることができる。また各実施の形態およびその変形例の任意の構成要素を適宜変更または省略することができる。
 例えば、前述の各実施の形態およびその変形例において、サブフレームは、第5世代基地局通信システムにおける通信の時間単位の一例である。スケジューリング単位であってもよい。前述の各実施の形態およびその変形例において、サブフレーム単位として記載している処理を、TTI単位、スロット単位、サブスロット単位、ミニスロット単位として行ってもよい。
 本発明は詳細に説明されたが、上記した説明は、すべての局面において、例示であって、本発明がそれに限定されるものではない。例示されていない無数の変形例が、本発明の範囲から外れることなく想定され得るものと解される。
 701 マクロセルのカバレッジ、702 スモールセルのカバレッジ、703,813 移動端末(UE)、801 下りビームスイーピングブロック、802,804,806,811 リソース、803 上りビームスイーピングブロック、805 DL/ULデータサブフレーム、812 ビーム、901,905,909 サブフレーム、902,906,910 下り制御信号、903,907,911 ユーザデータ、904,908,912 次の受信タイミングに関する情報。

Claims (2)

  1.  基地局装置と、前記基地局装置と無線通信可能な少なくとも1つの通信端末装置とを備える通信システムであって、
     前記基地局装置は、前記通信端末装置に、次の受信タイミングに関する情報を通知し、
     前記通信端末装置は、前記基地局装置から通知された次の受信タイミングに関する情報に基づいて受信を行うことを特徴とする通信システム。
  2.  前記基地局装置と前記通信端末装置とは、アンテナから放出されるビームの指向性を切替えて送受信を行うことを特徴とする請求項1に記載の通信システム。
PCT/JP2017/046054 2016-12-22 2017-12-22 通信システム WO2018117248A1 (ja)

Priority Applications (8)

Application Number Priority Date Filing Date Title
US16/340,228 US20200045725A1 (en) 2016-12-22 2017-12-22 Communication system
CN201780078073.4A CN110115090B (zh) 2016-12-22 2017-12-22 通信系统
EP17885215.8A EP3562243A4 (en) 2016-12-22 2017-12-22 COMMUNICATION SYSTEM
EP23197280.3A EP4274346A3 (en) 2016-12-22 2017-12-22 Communication system
JP2018558085A JP7320948B2 (ja) 2016-12-22 2017-12-22 通信システム、基地局装置および通信端末装置
US17/649,974 US20220159704A1 (en) 2016-12-22 2022-02-04 Communication system, base station and communication terminal
JP2022163761A JP7507825B2 (ja) 2016-12-22 2022-10-12 通信システム、基地局装置および通信端末装置
US18/542,885 US20240121793A1 (en) 2016-12-22 2023-12-18 Communication system, base station and communication terminal

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016249443 2016-12-22
JP2016-249443 2016-12-22

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US16/340,228 A-371-Of-International US20200045725A1 (en) 2016-12-22 2017-12-22 Communication system
US17/649,974 Division US20220159704A1 (en) 2016-12-22 2022-02-04 Communication system, base station and communication terminal

Publications (1)

Publication Number Publication Date
WO2018117248A1 true WO2018117248A1 (ja) 2018-06-28

Family

ID=62626757

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/046054 WO2018117248A1 (ja) 2016-12-22 2017-12-22 通信システム

Country Status (5)

Country Link
US (3) US20200045725A1 (ja)
EP (2) EP3562243A4 (ja)
JP (2) JP7320948B2 (ja)
CN (1) CN110115090B (ja)
WO (1) WO2018117248A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111586740A (zh) * 2019-02-15 2020-08-25 华为技术有限公司 最小化路测技术配置方法和基站
EP3834459A4 (en) * 2018-08-21 2021-11-10 Guangdong Oppo Mobile Telecommunications Corp., Ltd. BEAM MEASUREMENT PROCESS, NETWORK DEVICE, AND USER EQUIPMENT
JP2022521712A (ja) * 2019-02-15 2022-04-12 華為技術有限公司 送信方法および通信装置
US11627613B2 (en) 2019-12-13 2023-04-11 Apple Inc. Mechanism for low latency communication using historical beam information
WO2023073939A1 (ja) * 2021-10-29 2023-05-04 株式会社Nttドコモ 端末、無線通信方法及び基地局

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018126357A1 (en) * 2017-01-04 2018-07-12 Qualcomm Incorporated Techniques for indicating or using information about a subsequent physical downlink control channel transmission
US10721756B2 (en) * 2017-02-13 2020-07-21 Qualcomm Incorporated Repetition-based uplink for low latency communications in a new radio wireless communication system
TWI778336B (zh) * 2017-03-08 2022-09-21 南韓商Lg電子股份有限公司 在無線通訊系統中用於傳送和接收無線訊號的方法、設備、媒體、裝置、及基地臺
RU2739925C1 (ru) * 2017-06-06 2020-12-29 Гуандун Оппо Мобайл Телекоммьюникейшнс Корп., Лтд. Способ передачи данных путем преобразования и относящийся к нему продукт
JP7409086B2 (ja) * 2017-08-10 2024-01-09 ソニーグループ株式会社 通信装置、通信制御方法及びコンピュータプログラム
CN109861775B (zh) * 2017-11-30 2021-04-09 上海华为技术有限公司 一种传播路径搜索方法以及装置
US11088750B2 (en) * 2018-02-16 2021-08-10 Qualcomm Incorporated Feedback of beam switch time capability
CN110446232B (zh) * 2018-05-04 2021-10-29 中国移动通信有限公司研究院 测量上报配置方法、测量上报方法、小区切换方法及设备
CA3045809A1 (en) * 2018-05-10 2019-11-10 Comcast Cable Communications, Llc Prioritization in beam failure recovery procedures
US11224088B2 (en) * 2018-07-02 2022-01-11 Qualcomm Incorporated Beam sweeping during an on-period of a DRX cycle
WO2020027572A1 (ko) * 2018-07-31 2020-02-06 엘지전자 주식회사 무선통신시스템에서 사이드 링크 단말이 동기 신호를 전송하는 방법 및 장치
CN113261377B (zh) * 2019-01-10 2024-09-24 索尼集团公司 通信设备,通信方法和通信程序
US10848965B1 (en) * 2019-07-12 2020-11-24 Qualcomm Incorporated Compromised-message exploit protection
US11503611B2 (en) * 2019-10-29 2022-11-15 Hon Lin Technology Co., Ltd. Method and apparatus for allocation of resources in a wireless communication system
US10917843B1 (en) * 2020-09-02 2021-02-09 Lockheed Martin Corporation Cell selection and reselection algorithm for LTE over satellite
EP4009564B1 (en) * 2020-12-03 2023-12-06 Hon Lin Technology Co., Ltd. Method for allocating wireless resources based on sensitivity to inter-cell interference and apparatus thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006030582A1 (ja) * 2004-09-17 2006-03-23 Nec Corporation 通信制御方法、移動通信システム、基地局及び回線制御局

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101468490B1 (ko) 2007-05-02 2014-12-10 삼성전자주식회사 무선 통신 시스템에서 제어 채널들의 집합을 한정하여 송수신하는 방법 및 장치
JP2010232920A (ja) 2009-03-26 2010-10-14 Kyocera Corp 無線端末及び通信制御方法
JPWO2010122808A1 (ja) * 2009-04-24 2012-10-25 パナソニック株式会社 基地局装置及び端末装置
US8787234B2 (en) 2009-06-23 2014-07-22 Qualcomm Incorporated Multicasting within a wireless communications system
WO2013017154A1 (en) * 2011-07-29 2013-02-07 Fujitsu Limited Control channel for wireless communication
EP2987255B1 (en) * 2013-04-14 2019-07-03 LG Electronics Inc. Method and apparatus for controlling monitoring timing in wireless communication system
US11252582B2 (en) * 2013-09-27 2022-02-15 Nokia Technologies Oy Method for determining start time of a physical downlink control channel
JP6255281B2 (ja) * 2014-02-27 2017-12-27 パナソニック株式会社 無線通信装置及び指向性制御方法
US10187136B2 (en) * 2014-04-28 2019-01-22 Sharp Kabushiki Kaisha Terminal device, base station device, and communication method
US9474013B2 (en) * 2014-06-16 2016-10-18 Qualcomm Incorporated Method and apparatus for connection point discovery and association in a directional wireless network
US10070478B2 (en) 2015-01-22 2018-09-04 Intel IP Corporation Devices and methods for EPDCCH monitoring in wireless communication systems
AR103887A1 (es) 2015-03-09 2017-06-14 ERICSSON TELEFON AB L M (publ) Canal pucch breve en canal spucch de enlace ascendente
US10531474B2 (en) * 2015-05-04 2020-01-07 Lg Electronics Inc. Method for transmitting uplink data in wireless communication system and device for same
CN106559101B (zh) * 2015-09-25 2019-12-10 电信科学技术研究院 一种频域扩频、解扩频方法及装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006030582A1 (ja) * 2004-09-17 2006-03-23 Nec Corporation 通信制御方法、移動通信システム、基地局及び回線制御局

Non-Patent Citations (14)

* Cited by examiner, † Cited by third party
Title
"Scenarios, requirements and KPIs for 5G mobile and wireless system", ICT-317669-METIS/D1.1, 30 April 2013 (2013-04-30), Retrieved from the Internet <URL:https://www.metis2020.com/documents/deliverables>
3GPP RL-1609068
3GPP RL-165364
3GPP RL-166104
3GPP SL-083461
3GPP TR 23.799 VI.1.0
3GPP TR 36.814 V9.0.0
3GPP TR 36.912 V13.0.0
3GPP TR 38.801 V0.4.0
3GPP TR 38.802 V0.3.0
3GPP TR 38.804 V0.3.0
3GPP TR 38.912 V0.0.2
3GPP TS36.300 V14.0.0
NOKIA, ALCATEL -LUCENT SHANGHAI BELL: "On the synchronization signal design principle in NR", 3GPP TSG-RAN WG1#86B R1-1610287, 14 October 2016 (2016-10-14), XP051150304, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_86b/Docs/Rl-1610287.zip> [retrieved on 20180305] *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3834459A4 (en) * 2018-08-21 2021-11-10 Guangdong Oppo Mobile Telecommunications Corp., Ltd. BEAM MEASUREMENT PROCESS, NETWORK DEVICE, AND USER EQUIPMENT
CN111586740A (zh) * 2019-02-15 2020-08-25 华为技术有限公司 最小化路测技术配置方法和基站
JP2022521712A (ja) * 2019-02-15 2022-04-12 華為技術有限公司 送信方法および通信装置
JP7299329B2 (ja) 2019-02-15 2023-06-27 華為技術有限公司 送信方法および通信装置
US12022312B2 (en) 2019-02-15 2024-06-25 Huawei Technologies Co., Ltd. Minimization of drive tests configuration method and base station
US12089251B2 (en) 2019-02-15 2024-09-10 Huawei Technologies Co., Ltd. Transmission method and communications apparatus
US11627613B2 (en) 2019-12-13 2023-04-11 Apple Inc. Mechanism for low latency communication using historical beam information
WO2023073939A1 (ja) * 2021-10-29 2023-05-04 株式会社Nttドコモ 端末、無線通信方法及び基地局

Also Published As

Publication number Publication date
EP4274346A3 (en) 2024-01-17
JP7507825B2 (ja) 2024-06-28
US20200045725A1 (en) 2020-02-06
CN110115090A (zh) 2019-08-09
EP4274346A2 (en) 2023-11-08
JP2023015051A (ja) 2023-01-31
EP3562243A4 (en) 2020-07-22
EP3562243A1 (en) 2019-10-30
JPWO2018117248A1 (ja) 2019-10-31
US20240121793A1 (en) 2024-04-11
CN110115090B (zh) 2024-06-11
JP7320948B2 (ja) 2023-08-04
US20220159704A1 (en) 2022-05-19

Similar Documents

Publication Publication Date Title
JP7507825B2 (ja) 通信システム、基地局装置および通信端末装置
JP7405911B2 (ja) 無線通信システム、基地局
JP7399242B2 (ja) 通信システム、基地局、及び、ユーザ装置
JP7341135B2 (ja) ユーザ装置、基地局および通信システム
JP7507821B2 (ja) 通信システム、セントラルユニット、およびユーザ装置
WO2017026159A1 (ja) 通信システム
JP7420732B2 (ja) ユーザ装置および通信システム
WO2019194021A1 (ja) 通信システム、基地局および端末装置
US20230284162A1 (en) Communication system and receiver

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018558085

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17885215

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2017885215

Country of ref document: EP

Effective date: 20190722