WO2018077240A1 - Sealing device and grouping unit of natural gas storage system of cng transport ship - Google Patents

Sealing device and grouping unit of natural gas storage system of cng transport ship Download PDF

Info

Publication number
WO2018077240A1
WO2018077240A1 PCT/CN2017/108064 CN2017108064W WO2018077240A1 WO 2018077240 A1 WO2018077240 A1 WO 2018077240A1 CN 2017108064 W CN2017108064 W CN 2017108064W WO 2018077240 A1 WO2018077240 A1 WO 2018077240A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
sealing
loading
bottle container
pipeline
Prior art date
Application number
PCT/CN2017/108064
Other languages
French (fr)
Chinese (zh)
Inventor
王五开
李书磊
韦静静
邵海波
张志辉
王会赏
刘玉红
Original Assignee
石家庄安瑞科气体机械有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石家庄安瑞科气体机械有限公司 filed Critical 石家庄安瑞科气体机械有限公司
Publication of WO2018077240A1 publication Critical patent/WO2018077240A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/24Means for preventing unwanted cargo movement, e.g. dunnage

Definitions

  • the invention belongs to a compressed gas marine transportation system, and relates to a CNG transportation vessel, in particular to a sealing device of a CNG carrier natural gas storage system and a cylinder or bottle container grouping unit with the above sealing device.
  • a compressed natural gas (CNG) transport vessel is a cargo ship that transports compressed natural gas. It is increasingly favored because it does not require expensive equipment such as liquefaction equipment and regasification terminals, which is conducive to reducing shipping costs.
  • US Patent Application No. 96291260.X which is filed in the United States, discloses a compressed natural gas shipping system in which a compressed gas storage container is provided, each of which includes 3 to 30 compressed gas storage containers. Cylinders, cylinders are installed in the vertical direction in the cabin, and the cabin is covered with hatch covers to prevent seawater from entering. In the above system, the cylinders and pipelines are all covered with hatches, which increases the leakage of dangerous gases into the cargo compartment. The risk inside, and the risk of dangerous gas staying in the cargo compartment. On the other hand, the pipeline and the cylinder are placed in the cabin at the same time, the space is small, which increases the difficulty of pipeline maintenance and overhaul, especially when the pipeline system is set up multiple times.
  • System time such as loading and unloading pipeline system, safety discharge piping system. Since the collected natural gas may be mixed with other impurity components, after the gas cylinder is used for one time, some liquid or large molecular weight gas will remain at the bottom of the bottle, and it needs to be discharged in time to avoid reducing the purity of the natural gas.
  • the applicant's prior application No. 201510348091.2 discloses a CNG safe and efficient transport vessel gas cargo system, in which the sewage pipeline and the inlet and outlet pipeline pass through the upper plug assembly, the pipeline and the supporting root of the hatch.
  • the valve and the gas cylinders are connected to each other to achieve sewage discharge. Since the root valve is added to each cylinder, the cost is greatly increased, and the connection mode of the high pressure bottle valve is threaded connection, and a large number of threaded connection points become leakage points, thereby increasing the entire system. The risk of leakage.
  • the problem to be solved by the present invention is to provide a sealing device for a natural gas storage system of a CNG carrier, which is provided with a sewage pipeline sealing box at the bottom sewage outlet of the gas cylinder or the bottle container grouping unit and filled with a shielding gas, and the sewage discharging pipe is disposed outside the sewage outlet.
  • the road is located in the sealed tank of the sewage pipeline to protect the potential leak points at the bottom of the gas cylinder or the bottle container, thus ensuring the safety of the entire bottle unit.
  • the technical solution adopted by the present invention is: a sealing device for a natural gas storage system of a CNG carrier, which is disposed at the bottom of a gas cylinder or a bottle container of a gas cylinder or a bottle container grouping unit in a natural gas storage system; / or top, the key is: including the sewage pipeline sealing box and the loading and unloading gas pipeline sealing box.
  • the sewage pipeline sealing box is connected with the bottom of each gas cylinder or the bottle container in the gas cylinder or the bottle container grouping unit and is filled with a protective gas; the sewage pipeline is located in the sealed tank of the sewage pipeline, and is matched with the sewage pipeline Control valve is located in the cylinder or bottle container unit external.
  • the loading and unloading gas pipeline sealing box is connected with the top of each gas cylinder or the bottle container in the gas cylinder or the bottle container grouping unit and is filled with a protective gas; the loading and unloading gas pipeline is located in the sealing and discharging gas pipeline sealing box and the control valve matched with the loading and unloading gas pipeline Located outside the cylinder or bottle container unit.
  • the sewage pipeline sealing box comprises a connecting plate connected to each cylinder or bottle container in the gas cylinder or the bottle container grouping unit and a bottom cover fixed to the connecting plate.
  • the lower end of the gas cylinder or the bottle container is screwed with a spherical flange having a spherical boss, and the connecting plate is welded with a tapered hole seat having a relative rotational cooperation with the spherical flange, the spherical flange and the tapered hole a swing limit mechanism for a gas cylinder or a bottle container is disposed between the seats;
  • the swing limit mechanism includes a pre-tightening bolt fixedly connected to the spherical flange and passing through the connecting plate, a nut fixed on the pre-tightening bolt, and a limit A butterfly spring between the bottom surface of the connecting plate and the nut.
  • a sealing structure is disposed between the spherical flange and the connecting plate, and the sealing structure comprises a first sealing gasket disposed between the spherical flange and the top surface of the connecting plate, and is disposed on the pre-tightening bolt and located in the butterfly a second sealing gasket between the spring and the connecting plate.
  • sewage pipeline and the loading and unloading pipeline are welded by prefabricated pipe fittings.
  • the sewage gas sealing box and the loading and unloading gas pipeline sealing box are respectively fixed with a protective gas charging and discharging gas pipeline connected thereto, and the gas component detecting port and the shielding gas charging and discharging air port are provided at the end of the protective gas charging and discharging gas pipeline.
  • the loading and unloading gas pipeline sealing box comprises a bottom plate and a protective cover.
  • the bottom plate is connected to the connecting flange of the top of the gas cylinder or the bottle container by a bolt, and the protective cover is fixed on the bottom plate, and the sealing flange is disposed between the connecting flange and the bottom plate.
  • a positioning adjustment device is disposed between the loading and unloading gas pipeline sealing box and the sewage pipeline sealing box, and the positioning adjusting device comprises an intermediate plate, a connecting rod and a position adjusting rod.
  • the two ends of the connecting rod are respectively hinged with the intermediate plate and the sewage pipeline sealing box, one end of the position adjusting rod is hinged with the intermediate plate, and the other end passes through two position adjusting rods connected to the adjusting nut by the bottom plate of the sealing and discharging pipeline sealing box.
  • the positioning adjustment device is disposed in four planes between the loading and unloading gas pipeline sealing box and the sewage pipeline sealing box, and the positioning adjustment device on each side comprises a pair of connecting rods and a pair of position adjusting rods, connecting rods and position adjustment
  • the rods are arranged in a cross shape, and the intermediate plate is disposed between the pair of connecting rods and the pair of position adjusting rods in a vertical direction.
  • the present invention also provides a gas cylinder or bottle container grouping unit, the key point is that it comprises a gas cylinder or a bottle container, and has the above-mentioned sealing device, and the sealing device is disposed at the bottom of the gas cylinder or the bottle container and / or top.
  • the sealing device comprises a sewage pipeline sealing box, and the sewage pipeline sealing tank is provided with a sewage pipeline and a loading and unloading gas pipeline.
  • the sealing device comprises a sealing pipe for loading and unloading gas pipelines, and a sewage discharging conduit is provided in the sealing box of the loading and unloading gas pipeline And loading and unloading gas lines.
  • the beneficial technical effects of the present invention are as follows: 1.
  • the sewage pipeline outside the sewage outlet is disposed in the sealed tank of the sewage pipeline and the protective gas is filled in the sealed tank of the sewage pipeline, thereby ensuring the safety of the entire system;
  • the sewage line of a gas cylinder or bottle container grouping unit only has a control valve at the sewage outlet, which reduces the cost and leakage point;
  • the relative freedom of swing between the sealed pipeline sealing tank and the gas cylinder or the bottle container is beneficial to the fine adjustment of the position of the gas cylinder or the bottle container when the gas cylinder or the bottle container is grouped, and the gas cylinder when the vessel fluctuates at sea. Or the bottom of the bottle container swings with the ship; 3.
  • the part of the sewage pipeline located outside the sealed tank of the sewage pipeline is located in the protective gas filling and discharging gas pipeline to realize the protection of the overall sewage pipeline;
  • the protective gas filling and discharging gas pipeline is provided with a protective gas aeration port and a gas detecting port, realizing real-time gas component detection and charging and discharging of the shielding gas to ensure system safety;
  • the loading and unloading gas pipeline sealing box on the top of the gas cylinder or the bottle container grouping unit.
  • the entire loading and unloading gas pipeline is located in the sealed box filled with the protective gas, further improving the safety of the whole system, and grouping a gas cylinder or a bottle container.
  • the loading and unloading gas pipeline of the unit only provides a control valve at the loading and unloading port, which greatly reduces the cost and leakage point;
  • Positioning adjustment device is installed between the sealing box of the loading and unloading gas pipeline and the sealing box of the sewage pipeline, so that the sealing box of the loading and unloading gas pipeline, the sealing tank of the sewage pipeline, and the gas between the sealing box of the loading and unloading gas pipeline and the sealing tank of the sewage pipeline
  • the bottle or the bottle container is formed into a whole body to realize the positioning and overall reinforcement of the gas bottle or the bottle container;
  • the sewage pipeline and the loading and unloading gas pipeline are welded by prefabricated pipe fittings, the overall structure is stable, the airtightness is high, and there is no leakage point.
  • FIG. 1 is a schematic structural view of a sealed tank sealing tank in a sealing device of a natural gas storage system of a CNG carrier of the present invention
  • Figure 2 is a partial enlarged view of M in Figure 1;
  • FIG. 3 is a schematic structural view of a sealing and discharging pipe of a loading and unloading gas pipeline in a sealing device of a natural gas storage system of a CNG carrier of the present invention
  • Figure 4 is a schematic structural view of a gas cylinder or bottle container grouping unit of the present invention.
  • Figure 5 is a plan view of Figure 4.
  • Figure 6 is a bottom plan view of Figure 5 with the undercover of the drain line sealed box removed.
  • 1 is a gas cylinder or bottle container
  • 2 is a sewage pipeline sealing box
  • 2-1 is a connecting plate
  • 2-2 is a bottom cover
  • 2-3 is a partition
  • 3 is a spherical flange
  • 5 is a pre-tightening bolt
  • 6 is a first sealing gasket
  • 7 is a butterfly spring
  • 8 is a second sealing gasket
  • 9 is a protective gas filling and discharging gas pipe
  • 10 is a loading and unloading gas pipe sealing box
  • 10 -1 is the bottom plate
  • 10-2 is the protective cover
  • 11 is the connecting flange
  • 12 is the loading and unloading air sealing washer
  • 13 is the connecting rod
  • 14 is the intermediate plate
  • 15 is the position adjusting rod
  • 16 is the adjusting nut
  • A is the drain pipe Road
  • B represents the loading and unloading gas pipeline.
  • the present invention provides a sealing device for a CNG carrier natural gas storage system disposed at the bottom and/or top of a gas cylinder or bottle container 1 of a gas cylinder or bottle container grouping unit in a natural gas storage system.
  • the key is that the sealing device comprises a sewage line sealing box 2 and/or a loading and unloading line sealing box 10.
  • the sewage line sealing box 2 is connected to the bottom of each cylinder or bottle container 1 in the gas cylinder or the bottle container grouping unit, and is filled with a shielding gas. Loading and unloading the gas line sealing box 10. It is connected to the top of each cylinder or bottle container 1 in the cylinder or bottle container group and is filled with a protective gas.
  • the sewage pipeline A is located in the sewage pipeline sealing box 2, and the control valve matched with the sewage pipeline A is located outside the gas cylinder or the bottle container grouping unit.
  • the loading and unloading gas pipeline B is located in the loading and unloading gas pipeline sealing box 10, and the control valve matched with the loading and unloading gas pipeline B is located outside the cylinder or bottle container grouping unit.
  • the sewage pipeline A is disposed in the corresponding sealing box except for the sewage outlet, the loading and unloading gas pipeline B except the loading and unloading port and the safety discharge port, thereby realizing potential Protection from leaks.
  • the above-mentioned filling protective gas is preferably nitrogen.
  • the sewage line sealing box 2 includes a connecting plate 2-1 connected to each cylinder or bottle container 1 in a gas cylinder or a bottle container grouping unit, and is fixed to the connecting plate 2-1.
  • the bottom cover 2-2 and the partition 2-3 fixed between the connecting plate 2-1 and the bottom cover 2-2.
  • a plurality of vent holes for passing gas and a through hole for the sewage pipe A to pass through are disposed in the partition 2-3, and a rubber buffer sleeve is disposed at a passing portion of the through hole and the drain line A to prevent transportation.
  • the drain line A is in direct contact with the partition 2-3 during the fluctuation of the ship.
  • the lower end of the gas cylinder or the bottle container 1 is screwed to the spherical flange 3 having a spherical boss.
  • the connecting plate 2-1 is welded with a tapered hole seat 4 having a relative rotational fit with the spherical flange 3, and the spherical flange 3 is A swinging stop mechanism for the gas cylinder or the bottle container is disposed between the tapered hole holders 4.
  • the swing limiting mechanism includes a pre-tightening bolt 5 fixedly connected to the spherical flange 3 and passing through the connecting plate 2-1, a nut fixed on the pre-tightening bolt 5, and a limit between the bottom surface of the connecting plate 2-1 and the nut.
  • a sealing structure is disposed between the spherical flange 3 and the connecting plate 2-1, and the sealing structure comprises a first sealing gasket 6 disposed between the spherical flange 3 and the top surface of the connecting plate 2-1 and a set of pre-tightening bolts 5 is located on the second sealing gasket 8 between the butterfly spring 7 and the connecting plate 2-1.
  • each cylinder or bottle container 1 in the gas cylinder or bottle container unit there is a loading and unloading gas line B communicating therewith and a control valve connected to the loading and unloading gas line B.
  • the end plug and the loading and unloading gas pipeline B at the top of each gas cylinder or bottle container in the gas cylinder or the bottle container grouping unit are located in the loading and unloading gas pipeline sealing box 10, and the loading and unloading gas port of the loading and unloading gas pipeline B and the supporting safety discharge port are located in the loading and unloading gas pipeline Outside the road sealing box 10,
  • the above-mentioned loading and unloading gas line sealing box 10 includes a bottom plate 10-1 and a protective cover 10-2 fixed above the bottom plate 10-1, and the bottom plate 10-1 is connected to the top of the gas cylinder or the bottle container by bolts.
  • the flange 11 is connected and located below the connecting flange 11, and a loading and unloading air sealing gasket 12 is disposed between the connecting flange 11 and the bottom
  • a protective gas charging and discharging gas pipe 9 communicating therewith is fixed to both the sewage line sealing box 2 and the loading and unloading gas line sealing box 10.
  • two interfaces are provided, one is a charging and discharging air interface, and the other is a gas component detecting interface.
  • the gas in the sewage pipeline sealing box 2 is evacuated through the charging and discharging air interface and a new pure shielding gas is added. If the increase rate of the combustible gas component exceeds a certain value when it is detected, consider whether there is a leak.
  • the protective gas charging and discharging gas pipeline 9 extends upward and passes through the loading and unloading gas pipeline sealing box 10.
  • the portion of the sewage pipe A located outside the sewage pipe sealing box 2 is located in the shielding gas charging and discharging gas pipe 9 and is sealingly connected to the end portion of the shielding gas charging and discharging gas pipe 9.
  • the part of the sewage pipeline A located outside the sealed pipeline sealing tank 2 is located in the protective gas charging and discharging gas pipeline 9, and the sealing of all the sewage pipeline A is realized, and the purpose of sealing the sewage pipeline A is achieved.
  • the sealing device further includes positioning adjustment means disposed between the loading and unloading gas line sealing box 10 and the sewage line sealing box 2.
  • the positioning adjustment device includes a vertical intermediate plate 14, a connecting rod 13, and a position adjusting rod 15.
  • Both ends of the connecting rod 13 are hinged to the intermediate plate 14 and the sewage line sealing box 2, respectively.
  • One end of the position adjusting lever 15 is hinged to the intermediate plate 14, and the other end passes through the bottom plate 10-1 of the loading and unloading gas line sealing case 10 and is connected to the adjusting nut 16.
  • the connection between the loading and unloading gas line sealing box 10 and the sewage line sealing box 2 is achieved by providing a positioning adjustment device.
  • the positioning adjustment device can be disposed in the four faces between the loading and unloading gas pipeline sealing box 10 and the sewage pipeline sealing box 2, thereby realizing the positioning adjustment of the gas cylinder or the bottle container.
  • the positioning adjustment device of each side includes a pair of connecting rods 13 and a pair of position adjusting rods 15, and the connecting rods 13 and the position adjusting rods 15 are disposed in a cross shape.
  • the present invention also provides a gas cylinder or bottle container grouping unit having the above-described sealing device.
  • the sealing device is placed at the bottom and/or top of the gas cylinder or bottle container.
  • the drain line A and the loading and unloading line B can also be disposed in the same sealed box.
  • the drain line A and the loading and unloading line B can be simultaneously disposed in the sealed box.

Abstract

A sealing device of a natural gas storage system of a CNG transport ship, comprising a sealing box (2) for a pollution discharge pipeline and a sealing box (10) for a gas loading and discharging pipeline. The sealing box (2) for a pollution discharge pipeline and the sealing box (10) for a gas loading and discharging pipeline are provided on bottom portions and/or top portions of gas bottles or bottle type containers of a grouping unit for gas bottles (1) or bottle type containers in the natural gas storage system, and are filled with a protective gas. A pollution discharge pipeline (A) is located in the sealing box (2) for a pollution discharge pipeline, and a control valve matching the pollution discharge pipeline is located outside the gas bottles (1). A gas loading and discharging pipeline (B) is located in the sealing box (10) for a gas loading and discharging pipeline, and a control valve matching the gas loading and discharging pipeline is located outside the gas bottles (1). The sealing device has no root valves of gas bottles, reducing leakage points, ensuring the safety of the whole natural gas storage system.

Description

CNG运输船天然气存储系统的密封装置及编组单元Sealing device and grouping unit of natural gas storage system of CNG carrier 技术领域Technical field
本发明属于压缩气体海上运输系统,涉及一种CNG运输船,尤其是一种CNG运输船天然气存储系统的密封装置及带有上述密封装置的气瓶或瓶式容器编组单元。The invention belongs to a compressed gas marine transportation system, and relates to a CNG transportation vessel, in particular to a sealing device of a CNG carrier natural gas storage system and a cylinder or bottle container grouping unit with the above sealing device.
背景技术Background technique
压缩天然气(CNG)运输船是指运送压缩天然气的货船,由于无需液化装置和再气化终端等昂贵的设备,有利于降低船运成本,因此日益受到青睐。A compressed natural gas (CNG) transport vessel is a cargo ship that transports compressed natural gas. It is increasingly favored because it does not require expensive equipment such as liquefaction equipment and regasification terminals, which is conducive to reducing shipping costs.
美国恩朗液化天然气发展有限公司在中国申请的申请为96191260.X的专利公开了一种压缩天然气船运系统,其在船上设置了压缩气体储存容器,每个压缩气体储存容器包括3~30个气瓶,气瓶以垂直方向安装在船舱内,船舱用舱口盖盖住,以防在海水进入,上述系统中将气瓶和管路全部用舱盖盖住,增加了危险气体泄漏到货舱内的风险,以及危险气体在货舱内滞留的风险,另一方面管路与气瓶同时设置在舱内,空间狭小,增加了管路维护和检修的难度,尤其是当管路系统设置多个系统时,比如装卸气管路系统、安全排放管路系统。由于采集的天然气中可能夹杂着其它杂质成分,气瓶使用一端时间后,在瓶底会残留一些液体或大分子量的气体,需要及时排出,以免降低天然气的纯度。US Patent Application No. 96291260.X, which is filed in the United States, discloses a compressed natural gas shipping system in which a compressed gas storage container is provided, each of which includes 3 to 30 compressed gas storage containers. Cylinders, cylinders are installed in the vertical direction in the cabin, and the cabin is covered with hatch covers to prevent seawater from entering. In the above system, the cylinders and pipelines are all covered with hatches, which increases the leakage of dangerous gases into the cargo compartment. The risk inside, and the risk of dangerous gas staying in the cargo compartment. On the other hand, the pipeline and the cylinder are placed in the cabin at the same time, the space is small, which increases the difficulty of pipeline maintenance and overhaul, especially when the pipeline system is set up multiple times. System time, such as loading and unloading pipeline system, safety discharge piping system. Since the collected natural gas may be mixed with other impurity components, after the gas cylinder is used for one time, some liquid or large molecular weight gas will remain at the bottom of the bottle, and it needs to be discharged in time to avoid reducing the purity of the natural gas.
本申请人在先申请的申请号为201510348091.2的专利公开了一种CNG安全高效运输船气货系统,其排污管路和进出气管路通过伸出舱盖的上端塞组件、管路及配套的根阀与各个气瓶实现通、断连接实现排污,由于为每个气瓶加入根阀大大增加了成本,而高压瓶阀的连接方式为螺纹连接,大量螺纹连接点成为泄露点,增加了整个系统的泄露风险。The applicant's prior application No. 201510348091.2 discloses a CNG safe and efficient transport vessel gas cargo system, in which the sewage pipeline and the inlet and outlet pipeline pass through the upper plug assembly, the pipeline and the supporting root of the hatch. The valve and the gas cylinders are connected to each other to achieve sewage discharge. Since the root valve is added to each cylinder, the cost is greatly increased, and the connection mode of the high pressure bottle valve is threaded connection, and a large number of threaded connection points become leakage points, thereby increasing the entire system. The risk of leakage.
发明内容Summary of the invention
本发明要解决的问题是提供一种CNG运输船天然气存储系统的密封装置,通过对气瓶或瓶式容器编组单元底部排污口处设置排污管路密封箱并填充保护气体,除排污口外排污管路位于排污管路密封箱内,对气瓶或瓶式容器底部潜在的泄漏点进行防护,保证了整个瓶组单元的安全。The problem to be solved by the present invention is to provide a sealing device for a natural gas storage system of a CNG carrier, which is provided with a sewage pipeline sealing box at the bottom sewage outlet of the gas cylinder or the bottle container grouping unit and filled with a shielding gas, and the sewage discharging pipe is disposed outside the sewage outlet. The road is located in the sealed tank of the sewage pipeline to protect the potential leak points at the bottom of the gas cylinder or the bottle container, thus ensuring the safety of the entire bottle unit.
为解决上述技术问题,本发明采用的技术方案是:一种CNG运输船天然气存储系统的密封装置,设置在天然气存储系统中气瓶或瓶式容器编组单元的气瓶或瓶式容器的底部和/或顶部,关键在于:包括排污管路密封箱和装卸气管路密封箱。排污管路密封箱与气瓶或瓶式容器编组单元中各气瓶或瓶式容器底部相连并填充有保护气体;排污管路位于所述排污管路密封箱内,与所述排污管路配套的控制阀门位于该气瓶或瓶式容器编组单元的 外部。装卸气管路密封箱与气瓶或瓶式容器编组单元中各气瓶或瓶式容器顶部相连并填充有保护气体;所述装卸气管路位于装卸气管路密封箱、与装卸气管路配套的控制阀门位于该气瓶或瓶式容器编组单元的外部。In order to solve the above technical problem, the technical solution adopted by the present invention is: a sealing device for a natural gas storage system of a CNG carrier, which is disposed at the bottom of a gas cylinder or a bottle container of a gas cylinder or a bottle container grouping unit in a natural gas storage system; / or top, the key is: including the sewage pipeline sealing box and the loading and unloading gas pipeline sealing box. The sewage pipeline sealing box is connected with the bottom of each gas cylinder or the bottle container in the gas cylinder or the bottle container grouping unit and is filled with a protective gas; the sewage pipeline is located in the sealed tank of the sewage pipeline, and is matched with the sewage pipeline Control valve is located in the cylinder or bottle container unit external. The loading and unloading gas pipeline sealing box is connected with the top of each gas cylinder or the bottle container in the gas cylinder or the bottle container grouping unit and is filled with a protective gas; the loading and unloading gas pipeline is located in the sealing and discharging gas pipeline sealing box and the control valve matched with the loading and unloading gas pipeline Located outside the cylinder or bottle container unit.
进一步的,所述排污管路密封箱包括与气瓶或瓶式容器编组单元中各气瓶或瓶式容器相连的连接板以及与连接板固定的底罩。Further, the sewage pipeline sealing box comprises a connecting plate connected to each cylinder or bottle container in the gas cylinder or the bottle container grouping unit and a bottom cover fixed to the connecting plate.
进一步的,所述气瓶或瓶式容器下端螺纹连接有具有球面凸台的球面法兰,连接板上焊接有与球面法兰具有相对转动配合的锥形孔座,球面法兰与锥形孔座间设置有气瓶或瓶式容器的摆动限位机构;所述摆动限位机构包括与球面法兰固定连接并穿过连接板的预紧螺栓、固定在预紧螺栓上的螺母及限位在连接板底面与螺母之间的蝶形弹簧。Further, the lower end of the gas cylinder or the bottle container is screwed with a spherical flange having a spherical boss, and the connecting plate is welded with a tapered hole seat having a relative rotational cooperation with the spherical flange, the spherical flange and the tapered hole a swing limit mechanism for a gas cylinder or a bottle container is disposed between the seats; the swing limit mechanism includes a pre-tightening bolt fixedly connected to the spherical flange and passing through the connecting plate, a nut fixed on the pre-tightening bolt, and a limit A butterfly spring between the bottom surface of the connecting plate and the nut.
进一步的,在球面法兰与连接板之间设置有密封结构,所述密封结构包括设置有在球面法兰与连接板顶面之间的第一密封垫圈以及套装在预紧螺栓上并位于蝶形弹簧与连接板之间的第二密封垫圈。Further, a sealing structure is disposed between the spherical flange and the connecting plate, and the sealing structure comprises a first sealing gasket disposed between the spherical flange and the top surface of the connecting plate, and is disposed on the pre-tightening bolt and located in the butterfly a second sealing gasket between the spring and the connecting plate.
进一步的,所述排污管路和装卸气管路均通过预制管件焊接而成。Further, the sewage pipeline and the loading and unloading pipeline are welded by prefabricated pipe fittings.
进一步的,排污管路密封箱和装卸气管路密封箱上均固定有与其连通的保护气体充放气管道,保护气体充放气管道的端部设有气体成分检测口和保护气体充放气口。Further, the sewage gas sealing box and the loading and unloading gas pipeline sealing box are respectively fixed with a protective gas charging and discharging gas pipeline connected thereto, and the gas component detecting port and the shielding gas charging and discharging air port are provided at the end of the protective gas charging and discharging gas pipeline.
进一步的,所述装卸气管路密封箱包括底板和保护罩。底板通过螺栓与气瓶或瓶式容器顶部的连接法兰相连,保护罩固定在底板上方,所述连接法兰与底板间设置有装卸气密封垫圈。Further, the loading and unloading gas pipeline sealing box comprises a bottom plate and a protective cover. The bottom plate is connected to the connecting flange of the top of the gas cylinder or the bottle container by a bolt, and the protective cover is fixed on the bottom plate, and the sealing flange is disposed between the connecting flange and the bottom plate.
进一步的,在所述装卸气管路密封箱和排污管路密封箱间设有定位调整装置,所述定位调整装置包括中间板、连接杆及位置调整杆。连接杆的两端分别与中间板和排污管路密封箱铰接,位置调整杆的一端与中间板铰接,另一端穿过装卸气管路密封箱的底板与调整螺母相连的两个位置调整杆。Further, a positioning adjustment device is disposed between the loading and unloading gas pipeline sealing box and the sewage pipeline sealing box, and the positioning adjusting device comprises an intermediate plate, a connecting rod and a position adjusting rod. The two ends of the connecting rod are respectively hinged with the intermediate plate and the sewage pipeline sealing box, one end of the position adjusting rod is hinged with the intermediate plate, and the other end passes through two position adjusting rods connected to the adjusting nut by the bottom plate of the sealing and discharging pipeline sealing box.
进一步的,定位调整装置设置在装卸气管路密封箱和排污管路密封箱之间的四个面内,每一面的定位调整装置包括一对连接杆和一对位置调整杆,连接杆和位置调整杆呈交叉状设置,中间板沿竖直方向设置在该对连接杆和该对位置调整杆之间。Further, the positioning adjustment device is disposed in four planes between the loading and unloading gas pipeline sealing box and the sewage pipeline sealing box, and the positioning adjustment device on each side comprises a pair of connecting rods and a pair of position adjusting rods, connecting rods and position adjustment The rods are arranged in a cross shape, and the intermediate plate is disposed between the pair of connecting rods and the pair of position adjusting rods in a vertical direction.
另外,本发明还提供了一种气瓶或瓶式容器编组单元,关键在于:其包括气瓶或瓶式容器,并具有上述的密封装置,密封装置设置在气瓶或瓶式容器的底部和/或顶部。In addition, the present invention also provides a gas cylinder or bottle container grouping unit, the key point is that it comprises a gas cylinder or a bottle container, and has the above-mentioned sealing device, and the sealing device is disposed at the bottom of the gas cylinder or the bottle container and / or top.
进一步的,所述密封装置包括排污管路密封箱,排污管路密封箱内设有排污管路和装卸气管路。Further, the sealing device comprises a sewage pipeline sealing box, and the sewage pipeline sealing tank is provided with a sewage pipeline and a loading and unloading gas pipeline.
进一步的,所述密封装置包括装卸气管路密封箱,装卸气管路密封箱内设有排污管路 和装卸气管路。Further, the sealing device comprises a sealing pipe for loading and unloading gas pipelines, and a sewage discharging conduit is provided in the sealing box of the loading and unloading gas pipeline And loading and unloading gas lines.
本发明的有益技术效果是:1、将除排污口外的排污管路设置于排污管路密封箱内并在排污管路密封箱内填充保护气体,能够保证整个系统的安全;The beneficial technical effects of the present invention are as follows: 1. The sewage pipeline outside the sewage outlet is disposed in the sealed tank of the sewage pipeline and the protective gas is filled in the sealed tank of the sewage pipeline, thereby ensuring the safety of the entire system;
2、一个气瓶或瓶式容器编组单元的排污管路仅在排污口处设置一个控制阀门,减少了成本和泄露点;2. The sewage line of a gas cylinder or bottle container grouping unit only has a control valve at the sewage outlet, which reduces the cost and leakage point;
3、排污管路密封箱与气瓶或瓶式容器之间具有相对的摆动自由度,有利于气瓶或瓶式容器编组时气瓶或瓶式容器位置的微调以及船舶在海上波动时气瓶或瓶式容器底部的随船摆动;3、排污管路位于排污管路密封箱外的部分位于保护气体充放气管道内实现了整体排污管路的保护;3. The relative freedom of swing between the sealed pipeline sealing tank and the gas cylinder or the bottle container is beneficial to the fine adjustment of the position of the gas cylinder or the bottle container when the gas cylinder or the bottle container is grouped, and the gas cylinder when the vessel fluctuates at sea. Or the bottom of the bottle container swings with the ship; 3. The part of the sewage pipeline located outside the sealed tank of the sewage pipeline is located in the protective gas filling and discharging gas pipeline to realize the protection of the overall sewage pipeline;
4、保护气体充放气管道设置了保护气体充气口及气体检测口,实现了实时气体成分检测及保护气体的充放,以保证系统安全;4. The protective gas filling and discharging gas pipeline is provided with a protective gas aeration port and a gas detecting port, realizing real-time gas component detection and charging and discharging of the shielding gas to ensure system safety;
5、在气瓶或瓶式容器编组单元顶部设置装卸气管路密封箱,整个装卸气管路位于填充保护气体的密封箱内,进一步提高了整个系统的安全性,并且一个气瓶或瓶式容器编组单元的装卸气管路仅在装卸气口处设置一个控制阀门,大大减少了成本和泄露点;5. Install the loading and unloading gas pipeline sealing box on the top of the gas cylinder or the bottle container grouping unit. The entire loading and unloading gas pipeline is located in the sealed box filled with the protective gas, further improving the safety of the whole system, and grouping a gas cylinder or a bottle container. The loading and unloading gas pipeline of the unit only provides a control valve at the loading and unloading port, which greatly reduces the cost and leakage point;
6、在装卸气管路密封箱和排污管路密封箱间设有定位调整装置,使得装卸气管路密封箱、排污管路密封箱及处于装卸气管路密封箱和排污管路密封箱之间的气瓶或瓶式容器形成一个整体,实现气瓶或瓶式容器定位、整体加固的作用;6. Positioning adjustment device is installed between the sealing box of the loading and unloading gas pipeline and the sealing box of the sewage pipeline, so that the sealing box of the loading and unloading gas pipeline, the sealing tank of the sewage pipeline, and the gas between the sealing box of the loading and unloading gas pipeline and the sealing tank of the sewage pipeline The bottle or the bottle container is formed into a whole body to realize the positioning and overall reinforcement of the gas bottle or the bottle container;
7、排污管路及装卸气管路采用预制管件焊接而成,整体结构稳定,气密程度高,无泄露点。7. The sewage pipeline and the loading and unloading gas pipeline are welded by prefabricated pipe fittings, the overall structure is stable, the airtightness is high, and there is no leakage point.
下面结合附图对本发明进行详细说明。The invention will be described in detail below with reference to the accompanying drawings.
附图说明DRAWINGS
图1是本发明CNG运输船天然气存储系统的密封装置中排污管路密封箱的结构示意图;1 is a schematic structural view of a sealed tank sealing tank in a sealing device of a natural gas storage system of a CNG carrier of the present invention;
图2是图1中M处的局部放大图;Figure 2 is a partial enlarged view of M in Figure 1;
图3是本发明CNG运输船天然气存储系统的密封装置中装卸气管路密封箱的结构示意图3 is a schematic structural view of a sealing and discharging pipe of a loading and unloading gas pipeline in a sealing device of a natural gas storage system of a CNG carrier of the present invention;
图4是本发明气瓶或瓶式容器编组单元的结构示意图;Figure 4 is a schematic structural view of a gas cylinder or bottle container grouping unit of the present invention;
图5是图4的俯视图; Figure 5 is a plan view of Figure 4;
图6是图5去除排污管路密封箱的底罩后的仰视图。Figure 6 is a bottom plan view of Figure 5 with the undercover of the drain line sealed box removed.
在附图中:1是气瓶或瓶式容器,2是排污管路密封箱,2-1是连接板,2-2是底罩,2-3是隔板,3是球面法兰,4是锥形孔座,5是预紧螺栓,6是第一密封垫圈,7是蝶形弹簧,8是第二密封垫圈,9是保护气体充放气管道,10是装卸气管路密封箱,10-1是底板,10-2是保护罩,11是连接法兰,12是装卸气密封垫圈,13是连接杆,14是中间板,15是位置调整杆,16是调整螺母,A代表排污管路,B代表装卸气管路。In the drawings: 1 is a gas cylinder or bottle container, 2 is a sewage pipeline sealing box, 2-1 is a connecting plate, 2-2 is a bottom cover, 2-3 is a partition, 3 is a spherical flange, 4 It is a conical hole seat, 5 is a pre-tightening bolt, 6 is a first sealing gasket, 7 is a butterfly spring, 8 is a second sealing gasket, 9 is a protective gas filling and discharging gas pipe, 10 is a loading and unloading gas pipe sealing box, 10 -1 is the bottom plate, 10-2 is the protective cover, 11 is the connecting flange, 12 is the loading and unloading air sealing washer, 13 is the connecting rod, 14 is the intermediate plate, 15 is the position adjusting rod, 16 is the adjusting nut, A is the drain pipe Road, B represents the loading and unloading gas pipeline.
具体实施方式detailed description
参见附图4,本发明提供了一种CNG运输船天然气存储系统的密封装置,设置在天然气存储系统中气瓶或瓶式容器编组单元的气瓶或瓶式容器1的底部和/或顶部,关键在于:密封装置包括排污管路密封箱2和/或装卸气管路密封箱10。Referring to Figure 4, the present invention provides a sealing device for a CNG carrier natural gas storage system disposed at the bottom and/or top of a gas cylinder or bottle container 1 of a gas cylinder or bottle container grouping unit in a natural gas storage system. The key is that the sealing device comprises a sewage line sealing box 2 and/or a loading and unloading line sealing box 10.
排污管路密封箱2和与气瓶或瓶式容器编组单元中各气瓶或瓶式容器1底部相连,并填充有保护气体。装卸气管路密封箱10。与气瓶或瓶式容器编组单元中各气瓶或瓶式容器1顶部相连并填充有保护气体。The sewage line sealing box 2 is connected to the bottom of each cylinder or bottle container 1 in the gas cylinder or the bottle container grouping unit, and is filled with a shielding gas. Loading and unloading the gas line sealing box 10. It is connected to the top of each cylinder or bottle container 1 in the cylinder or bottle container group and is filled with a protective gas.
所述排污管路A位于排污管路密封箱2内、与排污管路A配套的控制阀门位于该气瓶或瓶式容器编组单元的外部。所述装卸气管路B位于装卸气管路密封箱10,与装卸气管路B配套的控制阀门位于该气瓶或瓶式容器编组单元的外部。The sewage pipeline A is located in the sewage pipeline sealing box 2, and the control valve matched with the sewage pipeline A is located outside the gas cylinder or the bottle container grouping unit. The loading and unloading gas pipeline B is located in the loading and unloading gas pipeline sealing box 10, and the control valve matched with the loading and unloading gas pipeline B is located outside the cylinder or bottle container grouping unit.
通过设置排污管路密封箱2、装卸气管路密封箱10并填充保护气体,使得排污管路A除排污口外、装卸气管路B除装卸气口及安全排放口外均位于对应密封箱内,实现对潜在泄漏点的防护。上述填充保护气体优先选用氮气。By setting the sewage pipeline sealing box 2, loading and unloading the gas pipeline sealing box 10 and filling the shielding gas, the sewage pipeline A is disposed in the corresponding sealing box except for the sewage outlet, the loading and unloading gas pipeline B except the loading and unloading port and the safety discharge port, thereby realizing potential Protection from leaks. The above-mentioned filling protective gas is preferably nitrogen.
参见附图1、2和6,上述排污管路密封箱2包括与气瓶或瓶式容器编组单元中各气瓶或瓶式容器1相连的连接板2-1、与连接板2-1固定的底罩2-2及固定在连接板2-1和底罩2-2间的隔板2-3。隔板2-3内设置有多个供气体通过的通气孔以及供排污管路A穿过的穿过孔,在穿过孔与排污管路A的穿过处设置有橡胶缓冲套,防止运输船在波动过程中排污管路A与隔板2-3直接接触。Referring to Figures 1, 2 and 6, the sewage line sealing box 2 includes a connecting plate 2-1 connected to each cylinder or bottle container 1 in a gas cylinder or a bottle container grouping unit, and is fixed to the connecting plate 2-1. The bottom cover 2-2 and the partition 2-3 fixed between the connecting plate 2-1 and the bottom cover 2-2. A plurality of vent holes for passing gas and a through hole for the sewage pipe A to pass through are disposed in the partition 2-3, and a rubber buffer sleeve is disposed at a passing portion of the through hole and the drain line A to prevent transportation. The drain line A is in direct contact with the partition 2-3 during the fluctuation of the ship.
上述气瓶或瓶式容器1下端螺纹连接具有球面凸台的球面法兰3,连接板2-1上焊接有与球面法兰3具有相对转动配合的锥形孔座4,球面法兰3与锥形孔座4间设置有气瓶或瓶式容器的摆动限位机构。The lower end of the gas cylinder or the bottle container 1 is screwed to the spherical flange 3 having a spherical boss. The connecting plate 2-1 is welded with a tapered hole seat 4 having a relative rotational fit with the spherical flange 3, and the spherical flange 3 is A swinging stop mechanism for the gas cylinder or the bottle container is disposed between the tapered hole holders 4.
上述摆动限位机构包括与球面法兰3固定连接并穿过连接板2-1的预紧螺栓5、固定在预紧螺栓5上的螺母及限位在连接板2-1底面与螺母之间的蝶形弹簧7。 The swing limiting mechanism includes a pre-tightening bolt 5 fixedly connected to the spherical flange 3 and passing through the connecting plate 2-1, a nut fixed on the pre-tightening bolt 5, and a limit between the bottom surface of the connecting plate 2-1 and the nut. The butterfly spring 7.
在球面法兰3与连接板2-1之间设置有密封结构,上述密封结构包括设置在球面法兰3与连接板2-1顶面之间的第一密封垫圈6以及套装在预紧螺栓5上并位于蝶形弹簧7与连接板2-1之间的第二密封垫圈8。A sealing structure is disposed between the spherical flange 3 and the connecting plate 2-1, and the sealing structure comprises a first sealing gasket 6 disposed between the spherical flange 3 and the top surface of the connecting plate 2-1 and a set of pre-tightening bolts 5 is located on the second sealing gasket 8 between the butterfly spring 7 and the connecting plate 2-1.
参见附图3-5,在气瓶或瓶式容器编组单元中各气瓶或瓶式容器1上方设置有与其相通的装卸气管路B、连接在装卸气管路B上的控制阀门。上述气瓶或瓶式容器编组单元中各气瓶或瓶式容器顶部的端塞及装卸气管路B位于装卸气管路密封箱10内,装卸气管路B的装卸气口及配套安全排放口位于装卸气管路密封箱10外部,上述装卸气管路密封箱10包括底板10-1以及固定在底板10-1上方的保护罩10-2,上述底板10-1借助螺栓与气瓶或瓶式容器顶部的连接法兰11相连,且位于连接法兰11的下方,并在连接法兰11与底板10-1间设置有装卸气密封垫圈12。Referring to Figures 3-5, in each cylinder or bottle container 1 in the gas cylinder or bottle container unit, there is a loading and unloading gas line B communicating therewith and a control valve connected to the loading and unloading gas line B. The end plug and the loading and unloading gas pipeline B at the top of each gas cylinder or bottle container in the gas cylinder or the bottle container grouping unit are located in the loading and unloading gas pipeline sealing box 10, and the loading and unloading gas port of the loading and unloading gas pipeline B and the supporting safety discharge port are located in the loading and unloading gas pipeline Outside the road sealing box 10, the above-mentioned loading and unloading gas line sealing box 10 includes a bottom plate 10-1 and a protective cover 10-2 fixed above the bottom plate 10-1, and the bottom plate 10-1 is connected to the top of the gas cylinder or the bottle container by bolts. The flange 11 is connected and located below the connecting flange 11, and a loading and unloading air sealing gasket 12 is disposed between the connecting flange 11 and the bottom plate 10-1.
参见附图1和4,在排污管路密封箱2和装卸气管路密封箱10外均固定有与其连通的保护气体充放气管道9。在保护气体充放气管道9的末端设置有两个接口,一个是充放气接口,另一个是气体成分检测接口。当检测到排污管路密封箱2内可燃气较多时,则通过充放气接口将排污管路密封箱2内的气体排空并加入新的纯净保护气体。若检测到时可燃气体成分增加速度超过一定值,考虑是否有泄漏情况产生。Referring to Figures 1 and 4, a protective gas charging and discharging gas pipe 9 communicating therewith is fixed to both the sewage line sealing box 2 and the loading and unloading gas line sealing box 10. At the end of the shielding gas charging and discharging gas pipe 9, two interfaces are provided, one is a charging and discharging air interface, and the other is a gas component detecting interface. When it is detected that there is more gas in the sewage pipeline sealing box 2, the gas in the sewage pipeline sealing box 2 is evacuated through the charging and discharging air interface and a new pure shielding gas is added. If the increase rate of the combustible gas component exceeds a certain value when it is detected, consider whether there is a leak.
在具体实施时,为方便对装卸气管路密封箱10进行充放气及成分检测,保护气体充放气管道9向上延伸并穿过装卸气管路密封箱10。上述排污管路A位于排污管路密封箱2外部的部分位于保护气体充放气管道9内,并与保护气体充放气管道9端部密封连接。排污管路A位于排污管路密封箱2外部的部分位于保护气体充放气管道9内,实现了排污管路A的所有地方的密封,达到了密封排污管路A的目的。In the specific implementation, in order to facilitate the charging and discharging and component detection of the loading and unloading gas pipeline sealing box 10, the protective gas charging and discharging gas pipeline 9 extends upward and passes through the loading and unloading gas pipeline sealing box 10. The portion of the sewage pipe A located outside the sewage pipe sealing box 2 is located in the shielding gas charging and discharging gas pipe 9 and is sealingly connected to the end portion of the shielding gas charging and discharging gas pipe 9. The part of the sewage pipeline A located outside the sealed pipeline sealing tank 2 is located in the protective gas charging and discharging gas pipeline 9, and the sealing of all the sewage pipeline A is realized, and the purpose of sealing the sewage pipeline A is achieved.
参见附图4,密封装置还包括定位调整装置,其设于上述装卸气管路密封箱10和排污管路密封箱2间。上述定位调整装置包括竖直向的中间板14、连接杆13及位置调整杆15。Referring to Figure 4, the sealing device further includes positioning adjustment means disposed between the loading and unloading gas line sealing box 10 and the sewage line sealing box 2. The positioning adjustment device includes a vertical intermediate plate 14, a connecting rod 13, and a position adjusting rod 15.
连接杆13的两端分别与中间板14和排污管路密封箱2铰接。位置调整杆15的一端与中间板14铰接,另一端穿过装卸气管路密封箱10的底板10-1并与调整螺母16相连。通过设置定位调整装置实现了装卸气管路密封箱10和排污管路密封箱2之间的连接。Both ends of the connecting rod 13 are hinged to the intermediate plate 14 and the sewage line sealing box 2, respectively. One end of the position adjusting lever 15 is hinged to the intermediate plate 14, and the other end passes through the bottom plate 10-1 of the loading and unloading gas line sealing case 10 and is connected to the adjusting nut 16. The connection between the loading and unloading gas line sealing box 10 and the sewage line sealing box 2 is achieved by providing a positioning adjustment device.
具体实施时,定位调整装置可在装卸气管路密封箱10和排污管路密封箱2之间的四个面内均有设置,实现对气瓶或瓶式容器的定位调整。并且,每一面的定位调整装置包括一对连接杆13和一对位置调整杆15,连接杆13和位置调整杆15呈交叉状设置。In a specific implementation, the positioning adjustment device can be disposed in the four faces between the loading and unloading gas pipeline sealing box 10 and the sewage pipeline sealing box 2, thereby realizing the positioning adjustment of the gas cylinder or the bottle container. Further, the positioning adjustment device of each side includes a pair of connecting rods 13 and a pair of position adjusting rods 15, and the connecting rods 13 and the position adjusting rods 15 are disposed in a cross shape.
参见附图4,本发明还提供了一种气瓶或瓶式容器编组单元,具有上述的密封装置。密封装置设置在气瓶或瓶式容器的底部和/或顶部。 Referring to Figure 4, the present invention also provides a gas cylinder or bottle container grouping unit having the above-described sealing device. The sealing device is placed at the bottom and/or top of the gas cylinder or bottle container.
排污管路A和装卸气管路B还可以设置于同一密封箱内。例如,当仅设有排污管路密封箱2和装卸气管路密封箱10二者之一时,可在该密封箱内同时设置排污管路A和装卸气管路B。 The drain line A and the loading and unloading line B can also be disposed in the same sealed box. For example, when only one of the drain line sealing box 2 and the loading and unloading line line sealing box 10 is provided, the drain line A and the loading and unloading line B can be simultaneously disposed in the sealed box.

Claims (12)

  1. 一种CNG运输船天然气存储系统的密封装置,设置在天然气存储系统中气瓶或瓶式容器编组单元的气瓶或瓶式容器的底部和/或顶部,其特征在于:所述密封装置包括:A sealing device for a CNG carrier natural gas storage system, disposed at the bottom and/or top of a gas cylinder or a bottle container of a gas cylinder or a bottle container grouping unit in a natural gas storage system, wherein the sealing device comprises:
    排污管路密封箱(2),与气瓶或瓶式容器编组单元中各气瓶或瓶式容器(1)底部相连并填充有保护气体;排污管路(A)位于所述排污管路密封箱(2)内,与所述排污管路(A)配套的控制阀门位于该气瓶或瓶式容器编组单元的外部;和/或The sewage pipeline sealing box (2) is connected to the bottom of each cylinder or bottle container (1) in the cylinder or bottle container grouping unit and filled with shielding gas; the sewage pipeline (A) is located in the sewage pipeline sealing In the tank (2), a control valve associated with the sewage line (A) is located outside the gas cylinder or bottle container grouping unit; and/or
    装卸气管路密封箱(10),与气瓶或瓶式容器编组单元中各气瓶或瓶式容器(1)顶部相连并填充有保护气体;装卸气管路(B)位于装卸气管路密封箱(10),与所述装卸气管路(B)配套的控制阀门位于该气瓶或瓶式容器编组单元的外部。The loading and unloading gas pipeline sealing box (10) is connected with the top of each cylinder or bottle container (1) in the gas cylinder or the bottle container grouping unit and is filled with a protective gas; the loading and unloading gas pipeline (B) is located in the loading and unloading gas pipeline sealing box ( 10) The control valve associated with the loading and unloading gas line (B) is located outside the gas cylinder or the bottle container grouping unit.
  2. 根据权利要求1所述的CNG运输船天然气存储系统的密封装置,其特征在于:所述排污管路密封箱(2)包括与气瓶或瓶式容器编组单元中各气瓶或瓶式容器(1)相连的连接板(2-1)以及与连接板(2-1)固定的底罩(2-2)The sealing device for a natural gas storage system of a CNG carrier according to claim 1, wherein the sewage line sealing box (2) comprises a gas cylinder or a bottle container in a gas cylinder or a bottle container grouping unit ( 1) Connected connecting plate (2-1) and bottom cover fixed with connecting plate (2-1) (2-2)
  3. 根据权利要求2所述的CNG运输船天然气存储系统的密封装置,其特征在于:所述气瓶或瓶式容器(1)下端螺纹连接有具有球面凸台的球面法兰(3),连接板(2-1)上焊接有与球面法兰(3)具有相对转动配合的锥形孔座(4),球面法兰(3)与锥形孔座(4)间设置有气瓶或瓶式容器的摆动限位机构;所述摆动限位机构包括与球面法兰(3)固定连接并穿过连接板(2-1)的预紧螺栓(5)、固定在预紧螺栓(5)上的螺母及限位在连接板(2-1)底面与螺母之间的蝶形弹簧(7)。The sealing device for a natural gas storage system of a CNG carrier according to claim 2, characterized in that the lower end of the gas cylinder or the bottle container (1) is screwed with a spherical flange (3) having a spherical boss, and the connecting plate (2-1) A tapered hole seat (4) having a relative rotational fit with the spherical flange (3) is welded thereon, and a gas cylinder or a bottle type is disposed between the spherical flange (3) and the tapered hole seat (4). a swing limit mechanism of the container; the swing limit mechanism comprises a pre-tightening bolt (5) fixedly connected to the spherical flange (3) and passing through the connecting plate (2-1), and fixed on the pre-tightening bolt (5) The nut and the butterfly spring (7) are defined between the bottom surface of the connecting plate (2-1) and the nut.
  4. 根据权利要求3所述的CNG运输船天然气存储系统的密封装置,其特征在于:球面法兰(3)与连接板(2-1)之间设置有密封结构,所述密封结构包括设置在球面法兰(3)与连接板(2-1)顶面之间的第一密封垫圈(6)以及套装在预紧螺栓(5)上并位于蝶形弹簧(7)与连接板(2-1)之间的第二密封垫圈(8)。A sealing device for a CNG carrier natural gas storage system according to claim 3, characterized in that a sealing structure is provided between the spherical flange (3) and the connecting plate (2-1), the sealing structure comprising a spherical surface a first sealing gasket (6) between the flange (3) and the top surface of the connecting plate (2-1) and a set on the pre-tightening bolt (5) and located in the butterfly spring (7) and the connecting plate (2-1) ) between the second sealing gasket (8).
  5. 根据权利要求1所述的CNG运输船天然气存储系统的密封装置,其特征在于:所述排污管路(A)和装卸气管路(B)均通过预制管件焊接而成。The sealing device for a natural gas storage system of a CNG carrier according to claim 1, wherein the sewage pipe (A) and the loading and unloading gas pipe (B) are both welded by prefabricated pipe fittings.
  6. 根据权利要求1所述的CNG运输船天然气存储系统的密封装置,其特征在于:排污管路密封箱(2)和装卸气管路密封箱(10)上均固定有与其连通的保护气体充放气管道(9),保护气体充放气管道(9)的端部设有气体成分检测口和保护气体充放气口。The sealing device for a natural gas storage system of a CNG carrier according to claim 1, characterized in that: the sewage sealing pipe sealing box (2) and the loading and unloading gas pipeline sealing box (10) are fixed with a shielding gas charging and discharging gas connected thereto The pipe (9), the end of the protective gas charging and discharging gas pipe (9) is provided with a gas component detecting port and a shielding gas charging and discharging port.
  7. 根据权利要求1所述的CNG运输船天然气存储系统的密封装置,其特征在于:所述装卸气管路密封箱(10)包括底板(10-1)和保护罩(10-2),底板(10-1)通过螺栓 与气瓶或瓶式容器顶部的连接法兰(11)相连,保护罩(10-2)固定在底板(10-1)上方,所述连接法兰(11)与底板(10-1)间设置有装卸气密封垫圈(12)。The sealing device for a CNG carrier natural gas storage system according to claim 1, wherein the loading and unloading gas line sealing box (10) comprises a bottom plate (10-1) and a protective cover (10-2), and the bottom plate (10) -1) by bolt Connected to the connecting flange (11) at the top of the cylinder or bottle container, the protective cover (10-2) is fixed above the bottom plate (10-1), between the connecting flange (11) and the bottom plate (10-1) A loading and unloading gas seal gasket (12) is provided.
  8. 根据权利要求1-7任一项所述的CNG运输船天然气存储系统的密封装置,其特征在于:在所述装卸气管路密封箱(10)和排污管路密封箱(2)间设有定位调整装置,所述定位调整装置中包括中间板(14)、连接杆(13)及位置调整杆(15),连接杆(13)的两端分别与中间板(14)和排污管路密封箱(2)铰接,位置调整杆(15)的一端与中间板(14)铰接,另一端穿过装卸气管路密封箱(10)的底板(10-1)与调整螺母(16)相连。The sealing device for a natural gas storage system of a CNG carrier according to any one of claims 1 to 7, characterized in that: positioning between the loading and unloading gas pipeline sealing box (10) and the sewage pipeline sealing box (2) The adjusting device comprises an intermediate plate (14), a connecting rod (13) and a position adjusting rod (15), and two ends of the connecting rod (13) and the intermediate plate (14) and the sewage line sealing box respectively (2) Hinged, one end of the position adjusting rod (15) is hinged to the intermediate plate (14), and the other end is connected to the adjusting nut (16) through the bottom plate (10-1) of the sealing and sealing pipe (10).
  9. 根据权利要求8所述的CNG运输船天然气存储系统的密封装置,其特征在于:定位调整装置设置在装卸气管路密封箱(10)和排污管路密封箱(2)之间的四个面内,每一面的定位调整装置包括一对连接杆(13)和一对位置调整杆(15),连接杆(13)和位置调整杆(15)呈交叉状设置,中间板(14)沿竖直方向设置在该对连接杆(13)和该对位置调整杆(15)之间。A sealing device for a CNG carrier natural gas storage system according to claim 8, wherein the positioning adjustment device is disposed in four planes between the loading and unloading gas line sealing box (10) and the sewage line sealing box (2) The positioning adjustment device of each side comprises a pair of connecting rods (13) and a pair of position adjusting rods (15), the connecting rods (13) and the position adjusting rods (15) are arranged in a cross shape, and the intermediate plate (14) is vertical The direction is disposed between the pair of connecting rods (13) and the pair of position adjusting levers (15).
  10. 一种气瓶或瓶式容器编组单元,其特征在于:其包括气瓶或瓶式容器和权利要求1-9任一项所述的密封装置,密封装置设置在气瓶或瓶式容器的底部和/或顶部。A gas cylinder or bottle container grouping unit, comprising: a gas cylinder or a bottle container and the sealing device according to any one of claims 1 to 9, the sealing device being disposed at the bottom of the gas cylinder or the bottle container And / or top.
  11. 根据权利要求10所述的气瓶或瓶式容器编组单元,其特征在于:所述密封装置包括排污管路密封箱(2),排污管路密封箱(2)内设有排污管路(A)和装卸气管路。The gas cylinder or bottle container grouping unit according to claim 10, wherein the sealing device comprises a sewage line sealing box (2), and the sewage line sealing box (2) is provided with a sewage line (A) ) and loading and unloading gas lines.
  12. 根据权利要求10所述的气瓶或瓶式容器编组单元,其特征在于:所述密封装置包括装卸气管路密封箱(10),装卸气管路密封箱(10)内设有排污管路(A)和装卸气管路。 The gas cylinder or bottle container grouping unit according to claim 10, wherein the sealing device comprises a loading and unloading gas pipeline sealing box (10), and the loading and unloading gas pipeline sealing box (10) is provided with a sewage pipeline (A). ) and loading and unloading gas lines.
PCT/CN2017/108064 2016-10-28 2017-10-27 Sealing device and grouping unit of natural gas storage system of cng transport ship WO2018077240A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201621188192.4 2016-10-28
CN201621188192.4U CN206171728U (en) 2016-10-28 2016-10-28 Sealing device and marshalling unit of CNG transport ship gas cylinder or bottle formula container marshalling unit

Publications (1)

Publication Number Publication Date
WO2018077240A1 true WO2018077240A1 (en) 2018-05-03

Family

ID=58681867

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/108064 WO2018077240A1 (en) 2016-10-28 2017-10-27 Sealing device and grouping unit of natural gas storage system of cng transport ship

Country Status (2)

Country Link
CN (1) CN206171728U (en)
WO (1) WO2018077240A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108016570B (en) * 2016-10-28 2024-02-27 石家庄安瑞科气体机械有限公司 Sealing device of CNG transport ship gas cylinder or cylinder container marshalling unit and marshalling unit
CN206171728U (en) * 2016-10-28 2017-05-17 石家庄安瑞科气体机械有限公司 Sealing device and marshalling unit of CNG transport ship gas cylinder or bottle formula container marshalling unit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7757621B2 (en) * 2005-07-06 2010-07-20 Compressed Energy Technology A/S Vessel for transport of compressed natural gas
FI20125227A (en) * 2012-02-29 2013-08-30 Waertsilae Finland Oy LNG tank
CN105083477A (en) * 2015-06-23 2015-11-25 石家庄安瑞科气体机械有限公司 Gas bottle positioning system of CNG transport ship
CN204879442U (en) * 2015-06-23 2015-12-16 石家庄安瑞科气体机械有限公司 Deliver from vault seal structure of CNG transport ship gas bomb
CN105270569A (en) * 2015-06-23 2016-01-27 石家庄安瑞科气体机械有限公司 Gas cargo system for CNG safe and efficient transport ship
CN206171728U (en) * 2016-10-28 2017-05-17 石家庄安瑞科气体机械有限公司 Sealing device and marshalling unit of CNG transport ship gas cylinder or bottle formula container marshalling unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7757621B2 (en) * 2005-07-06 2010-07-20 Compressed Energy Technology A/S Vessel for transport of compressed natural gas
FI20125227A (en) * 2012-02-29 2013-08-30 Waertsilae Finland Oy LNG tank
CN105083477A (en) * 2015-06-23 2015-11-25 石家庄安瑞科气体机械有限公司 Gas bottle positioning system of CNG transport ship
CN204879442U (en) * 2015-06-23 2015-12-16 石家庄安瑞科气体机械有限公司 Deliver from vault seal structure of CNG transport ship gas bomb
CN105270569A (en) * 2015-06-23 2016-01-27 石家庄安瑞科气体机械有限公司 Gas cargo system for CNG safe and efficient transport ship
CN206171728U (en) * 2016-10-28 2017-05-17 石家庄安瑞科气体机械有限公司 Sealing device and marshalling unit of CNG transport ship gas cylinder or bottle formula container marshalling unit

Also Published As

Publication number Publication date
CN206171728U (en) 2017-05-17

Similar Documents

Publication Publication Date Title
WO2016206581A1 (en) Safe and efficient cng transport ship gas cargo system
CN104379440B (en) Vessel for transporting compressed gas
WO2016206580A1 (en) Gas bottle positioning system of cng transport ship
US10625840B2 (en) Arrangement of cryogenic containers for LNG or CNG on a deck of a tugboat
CN104019359B (en) Protection device of fuel gas system of LNG single-fuel ship
CN102398672B (en) Pneumatic drainage system for ship cargo hold sewage well
WO2018077240A1 (en) Sealing device and grouping unit of natural gas storage system of cng transport ship
US6651703B2 (en) Transportation and storage of ultra-high purity products
CN105090745B (en) CNG cargo ship pipe-line systems
CN212029160U (en) Gas recovery device
CN108016570B (en) Sealing device of CNG transport ship gas cylinder or cylinder container marshalling unit and marshalling unit
CN209943988U (en) Marine liquefied natural gas fuel tank
CN204979152U (en) Dedicated spacing system of CNG transport ship gas cylinder
CN210424472U (en) Infusion system between LNG ship and LNG tank box (or tank car)
CN204756447U (en) CNG transport ship loading and unloading gas pipe -line system
CN102107759B (en) Oil steam zero-discharge oil storage tank device
KR200491182Y1 (en) Overhaul structure for liquefied compressed natural gas vessel
CN204756442U (en) A end plug subassembly for CNG transport ship gas bomb
CN204756448U (en) CNG transport ship pipe -line system
CN204739420U (en) Compound protective structure in gas cylinder cabin on CNG transport ship
CN205026388U (en) Pipe -line system is discharged to CNG transport ship safety
CN218400880U (en) Nitrogen inerting system of B-type fuel chamber
CN211667584U (en) LNG tank wagon unloads hydraulic pressure force controlling means
CN202011573U (en) Oil-vapor zero-discharge oil tank device
CN218368173U (en) Liquid tank structure capable of effectively reducing strength requirement of liquid tank

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17864274

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17864274

Country of ref document: EP

Kind code of ref document: A1