WO2018014714A1 PCT/CN2017/091399 CN2017091399W WO2018014714A1 WO 2018014714 A1 WO2018014714 A1 WO 2018014714A1 CN 2017091399 W CN2017091399 W CN 2017091399W WO 2018014714 A1 WO2018014714 A1 WO 2018014714A1
Authority
WO
WIPO (PCT)
Prior art keywords
point
segment
large cavity
loader
pressure signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2017/091399
Other languages
English (en)
French (fr)
Inventor
侯亮
王少杰
卜祥建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen University
Original Assignee
Xiamen University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen University filed Critical Xiamen University
Publication of WO2018014714A1 publication Critical patent/WO2018014714A1/zh
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2218/00Aspects of pattern recognition specially adapted for signal processing
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2218/00Aspects of pattern recognition specially adapted for signal processing
    • G06F2218/02Preprocessing
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2218/00Aspects of pattern recognition specially adapted for signal processing
    • G06F2218/08Feature extraction

Definitions

  • the invention relates to a method for identifying an effective working section of an engineering vehicle, and more particularly to a method for identifying an effective working section of a loader shoveling process.
  • the loader uses hydraulic transmission to obtain high torque and large inertia load demand. Due to the harsh working environment, complicated working conditions, as well as equipment automation and information technology, how to ensure the engineering Mechanically reliable and efficient operation is a technical problem that needs to be solved urgently. In order to solve these problems, it is necessary to analyze the load spectrum of the loader, including the extraction of the work cycle, the analysis of the work phase and the identification of the working conditions.
  • the analysis of the operation phase plays a role in the work spectrum analysis, how to effectively segment, for the later working conditions Don't wait for a crucial relationship.
  • the loader operates in the 'V' type, 'I' type, 'L' type, 'T 'Type work, etc., according to the original work segment classification standard, mainly includes 6 working segments, namely no-load forward 1 , shovel 2, full-load retreat 3, full-load advance 4, unloading 5, no-load retreat 6 etc. 1 is shown.
  • the loader is generally separated from the pile before the initial excavation.
  • the object of the present invention is to overcome the deficiencies of the prior art and to provide a loader effective working segment identification method for defining an effective working segment and realizing a work spectrum based on characteristic information of an effective working segment.
  • a method for identifying an effective working section of a loader includes excavation, heavy-duty transportation, and unloading, and the steps are as follows:
  • the work segment in the work cycle is extracted according to the feature information of the predefined valid work segment, and the effective work segment is recognized.
  • step 2 The feature information of the effective work segment described in the above is a preset specific threshold value, and the segmentation points of the respective work segments are extracted by a specific threshold.
  • the effective working segment omits the no-load advancement and no-load of the standard working segment
  • Backward, heavy-duty transport includes full-load retreat and full-load advancement of the standard active section.
  • the minimum point before the pressure of the large cavity pressure contact material is defined as the starting time point of the excavation working section; the first maximum point of the pressure of the large cavity of the bucket is defined as the ending time point of the excavation working section;
  • the starting time of the heavy-duty transportation operation section is the end time of the excavation operation section; before the material is unloaded, the time point of the large-cavity pressure of the bucket is greater than the preset change threshold value is the end time point of the heavy-duty transportation operation section;
  • the starting time of the unloading operation section is the end time of the heavy-duty transportation operation section; after the material is unloaded, the minimum value point reached by the boom large-cavity pressure is defined as the end time point of the unloading operation section;
  • the valid job segment includes four segment points A1, A2, A3, and A4.
  • the extraction of the segmentation points of each work segment is specifically:
  • step 2.1 In the first step, the iterative filtering is performed on the large cavity pressure of the boom first, and then the signal obtained by the two iterative filtering is subjected to the minimum value point.
  • step 2.2 In the process, the iterative filtering and one hundred iterative filtering are performed on the large cavity pressure of the bucket respectively, and the first-order derivation of the values obtained by the two iterative filtering is obtained, and the rate of change is obtained; Data to obtain the maximum maximum point C .
  • the method of the invention solves the problem that the engineering machinery working section is difficult to identify, defines the effective working section, and divides the working phase of the loader, which is beneficial to realize the analysis of the working process, especially the analysis of the working condition identification.
  • the effective working segment identification of the working spectrum is realized; the identification of the effective working segment plays a foundation for the analysis of the working condition, the data analysis of the working spectrum and the coding.
  • the method of the invention is advantageous for realizing the refinement of the work spectrum data, facilitating the statistical analysis, and making the work spectrum data more regular.
  • Figure 1 is a schematic view of a standard working section of a loader in the prior art
  • Figure 2 is a schematic view showing an effective working section of the loader in the present invention
  • FIG. 3 is a schematic diagram of the basic frame of identification of the present invention.
  • FIG. 4 is a flow chart of an effective operating segment identification algorithm of the present invention.
  • Embodiments, a method for identifying an effective working segment of a loader refer to FIG. 2.
  • the effective working segment includes: excavation 10, heavy haul transport 40 Unloading 50
  • the effective working segment omits the no-load advancement of the standard working segment and the no-load retreat; the heavy-duty transport includes the full-load retreat of the standard action segment and the full-load advancement.
  • the effective working segment is mainly considered from the perspective of the value of the working segment. Because the standard operation section, no-load advancement, no-load retreat, etc. are small in use for working condition identification, intelligent shifting and vehicle performance testing, and the analysis value is small and the identification is difficult. Therefore, the present invention does not allow in the effective working section. Considering; similar working segments such as full load back, full load forward, etc. can be combined for consideration of heavy haul transport segments.
  • the main steps of the identification method of the present invention are as follows:
  • the work segment in the work cycle is extracted according to the feature information of the predefined valid work segment, and the effective work segment is identified.
  • the feature information of the valid work segment is a preset specific threshold, and the segment points of each work segment are extracted by a specific threshold.
  • segmentation points of the respective working segments are as follows:
  • the minimum point before the boom cavity pressure contact material is defined as the starting time point of the excavation working section; the first maximum point of the bucket large cavity pressure is defined as the end point of the excavation working section;
  • the starting time of the heavy-duty transportation operation section is the end time of the excavation operation section; before the material is unloaded, the time point of the large-cavity pressure of the bucket is greater than the preset change threshold value is the end time point of the heavy-duty transportation operation section;
  • the starting time of the unloading operation section is the end time of the heavy-duty transportation operation section; after the material is unloaded, the minimum value point reached by the boom large-cavity pressure is defined as the end time point of the unloading operation section;
  • the valid job segment includes four segment points A1, A2, A3, and A4.
  • the pressure of the large cavity of the boom begins to increase drastically, and the pressure of the large cavity of the boom will give a minimum extreme point before the change. It is caused by the placement of the bucket before the shovel and the ground. At this time, the pressure value of the large cavity of the boom is smaller than that during normal driving. Therefore, the minimum value before the pressure change of the large cavity of the boom is defined as the starting time of the excavation section. point;
  • the end time of the excavation work section is when the bucket is full of material and is separated from the work surface. At this time, it is generally accompanied by a fighting action (generally 1-2) Times), the pressure of the large cavity of the bucket will have a maximum value at each bucket. After the bucket is completed, the pressure of the large chamber will drop smoothly. The first maximum point of the pressure of the large cavity of the bucket is defined as excavation. End of the job segment.
  • the starting time of the heavy-duty transport operation section is the end time of the excavation work section
  • the start time of the unloading operation section is the end time of the heavy-duty transportation operation section
  • the pressure value of the large cavity of the boom will be abruptly changed to a minimum value.
  • the minimum point at which the pressure of the large cavity of the boom is reached is the end of the unloading operation section. time.
  • the starting point and ending point of the excavation working segment are defined as A1 and A2, and A1A2 is used.
  • A2A3 represents the heavy-duty transport operation section
  • A3A4 represents the unloading operation section.
  • the segment extraction mainly adopts the method of iterative filtering and extremum point extraction, and the segmentation points of each working segment are extracted by setting a specific threshold, as shown in FIG. as follows:
  • Step 2.1 In the first step, the iterative filtering is performed on the large cavity pressure of the boom first, and the processing mainly makes the signal smoother and eliminates the burrs. Then, the signal obtained by the two iterative filtering is subjected to the minimum value point to obtain the minimum minimum point B. Then, the minimum value point around the smallest minimum value point B is obtained, and the minimum value point on the left side is the segmentation point A1, and the minimum value point on the right side is the segmentation point A4.
  • Step 2.2 In the process, the iterative filtering and one hundred iterative filtering are performed on the large cavity pressure of the bucket respectively, and the first-order derivation of the values obtained by the two iterative filtering is obtained, and the rate of change is obtained; Data to obtain the maximum maximum point C A hundred iterations of filtering can eliminate all the burrs that interfere with the maximum maximum point C. After completing the first-order derivation and obtaining the maximum maximum point C, the nearest maximum maximum point C is obtained. The first one-order derivative of the left and right is greater than the change point of 0.5, and the two points obtained are the effective working segment segment points A2 and A3.
  • Embodiments of the present invention provide a method for identifying an effective working segment of a loader, as shown in FIG. 4
  • the continuity between the working segments is defined, that is, the starting point of the excavation working segment is marked as A1; the starting point of the excavating working segment is marked as A2 for the starting point of the heavy-duty transport working segment; and the end of the heavy-duty transport working segment is the heavy unloading material.
  • the starting point of the job segment is marked as A3;
  • the end point of the heavy unloading section is marked A3.
  • the boom pressure signal is cleaned and calculated to obtain the minimum point B.
  • the starting point A1 and the end point of the working segment are calculated according to the minimum point B.
  • the specific steps include:
  • the A1, A2, A3, and A4 point information is obtained, and the effective job information is extracted.
  • the invention relates to a method for identifying an effective working segment of a loader, defining an effective working segment, and realizing the effective working segment identification of the working spectrum according to the characteristic information of the effective working segment, which is beneficial to realizing the refinement of the working spectrum data and facilitating statistical analysis. To make the work spectrum data more regular and have good industrial applicability.

Landscapes

  • Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Artificial Intelligence (AREA)
  • Evolutionary Biology (AREA)
  • Evolutionary Computation (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

本发明涉及一种装载机有效作业段识别方法,步骤如下: 1 )从装载机上获取转斗大腔压力信号、动臂大腔压力信号,提取转斗大腔压力信号、动臂大腔压力信号的作业周期; 2 )依据得到的作业周期,对作业周期内的作业段根据预定义的有效作业段的特征信息,进行作业段提取,实现有效作业段的识别。本发明定义有效作业段,装载机作业阶段的划分,有利于实现对作业过程的分析,特别是对作业工况识别的分析。并依据有效作业段的特征信息实现作业谱的有效作业段识别;有效作业段的识别为作业工况的分析、作业谱的数据分析及编谱等起到奠定基础的作用;有利于实现对作业谱数据的细化,便于进行统计分析,使作业谱数据更加规整化。

Description

一种装载机铲装过程的有效作业段的识别方法 技术领域
本发明涉及工程车辆有效作业段的识别方法,更具体地说,涉及一种装载机铲装过程的有效作业段的识别方法。
背景技术
装载机作为一种工程机械,多采用液力传动,以便获得大扭矩、大惯量载荷需求,由于作业环境恶劣,作业工况复杂多变,以及设备自动化、信息化程度的不断提高,如何确保工程机械可靠、高效的运行,是目前亟待解决的技术难题。为了解决这些难题,就需要对装载机的作业谱进行分析,包括作业周期的提取、作业阶段分析和作业工况的识别等。
其中,作业阶段分析在作业谱分析中起到承前启后的作用,如何有效的进行分段,对于后面的作业工况识 别等起到至关重要的关系。
装载机的作业方式有' V '型作业、' I '型作业、' L '型作业、' T '型作业等,按照原始的作业段分类标准主要包含 6 个作业段,即空载前进 1 、铲掘 2 、满载后退 3 、满载前进 4 、卸料 5 、空载后退 6 等,如附图 1 所示。装载机在初始铲掘前一般离料堆 10 米左右,由此开始向料堆空载前进,接近物料后动臂和转斗等联合动作,开始铲掘物料,物料铲满斗后倒挡后退回原处,接着转向后满载驶向自卸车,接近自卸车后动臂和转斗再联合动作,提斗并卸料,完成卸料后退出原处,接着进行下一次铲装过程。
由于原始作业分段标准是按照作业过程划分,分类数目多,造成识别难度大,部分分段信息重复且不重要。
发明内容
本发明的目的在于克服现有技术的不足,提供一种定义有效作业段,并依据有效作业段的特征信息实现作业谱的装载机有效作业段识别方法。
本发明的技术方案如下:
一种装载机有效作业段识别方法,有效作业段包括铲掘、重载运输、卸料,步骤如下:
1 )从装载机上获取转斗大腔压力信号、动臂大腔压力信号,清洗、计算转斗大腔压力信号、动臂大腔压力信号提取作业周期;
2 )依据得到的作业周期,对作业周期内的作业段根据预定义的有效作业段的特征信息,进行作业段提取,实现有效作业段的识别。
作为优选,步骤 2 )中所述的有效作业段的特征信息为预设的特定阈值,通过特定阈值提取各个作业段的分段点。
作为优选,有效作业段省略标准作业段的空载前进、空载 后退,重载运输包括标准作用段的满载后退、满载前进。
作为优选,动臂大腔压力接触物料前的极小值点定义为挖掘作业段起始时间点;转斗大腔压力的第一个极大值点定义为挖掘作业段结束时间点;
重载运输作业段起始时间为挖掘作业段结束时间点;卸载物料前,转斗大腔压力大于预设的变化阀值的时间点为重载运输作业段结束时间点;
卸料作业段起始时间为重载运输作业段结束时间点;卸载物料后,动臂大腔压力达到的极小值点定义为卸料作业段结束时间点;
则有效作业段包括 A1 、 A2 、 A3 和 A4 四个分段点。
作为优选,各个作业段的分段点的提取具体为:
2.1 )对动臂大腔压力进行极小值点求取,并求取最小的极小值点 B ;接着求取最邻近最小的极小值点 B 左右的极小值点,则左边的极小值点为分段点 A1 ,右边的极小值点为分段点 A4 ;
2.2 )然后对转斗大腔压力进行一阶求导,求取其变化率,再对转斗大腔压力求取最大极大值点 C ;然后求取最邻近最大极大值点 C 的左右第一个一阶导数大于预设极大阀值的变化点,则左边的变化点为分段点 A2 ,右边的变化点为分段点 A3 。
作为优选,步骤 2.1 )中,先对动臂大腔压力进行两次迭代滤波,再对两次迭代滤波后得到的信号进行极小值点求取。
作为优选,步骤 2.2 )中,对转斗大腔压力分别进行两次迭代滤波和一百次迭代滤波,对两次迭代滤波得到的数值进行一阶求导,求取其变化率;对一百次迭代滤波后得到的数据求取最大极大值点 C 。
本发明的有益效果如下:
本发明所述的方法解决工程机械作业段识别难的问题,定义有效作业段,装载机作业阶段的划分,有利于实现对作业过程的分析,特别是对作业工况识别的分析。并依据有效作业段的特征信息实现作业谱的有效作业段识别;有效作业段的识别为作业工况的分析、作业谱的数据分析及编谱等起到奠定基础的作用。本发明所述的方法有利于实现对作业谱数据的细化,便于进行统计分析,使作业谱数据更加规整化。
附图说明
图 1 是现有技术中,装载机的标准作业段示意图;
图 2 是本发明中,装载机的有效作业段示意图;
图 3 是本发明的识别基本框架示意图;
图 4 是本发明的有效作业段识别算法的流程图。
具体实施方式
以下结合附图及实施例对本发明进行进一步的详细说明。
实施例,一种装载机有效作业段识别方法,参考图 2. ,其有效作业段:包括铲掘 10 、重载运输 40 、卸料 50 ;有效作业段省略标准作业段的空载前进、空载后退;重载运输包括标准作用段的满载后退、满载前进。有效作业段主要是从作业段的价值角度考虑。由于标准作业段中,空载前进、空载后退等对于工况识别、智能换挡和整车性能测试用途小、分析价值不大且识别难度大,因此,本发明在有效作业段中不予考虑;而对于满载后退、满载前进等相似的作业段则可以合并为重载运输段进行考虑。
本发明所述的识别方法,主要步骤如下:
1 )从装载机上获取转斗大腔压力信号、动臂大腔压力信号,清洗、计算转斗大腔压力信号、动臂大腔压力信号提取作业周期;其中,作业周期主要是指将装载机铲掘过程的每个作业循环段的划分。
2 )依据得到的作业周期对作业周期内的作业段根据预定义的有效作业段的特征信息,进行作业段提取,实现有效作业段的识别。本实施例中,所述的有效作业段的特征信息为预设的特定阈值,通过特定阈值提取各个作业段的分段点。
本发明中,各作业段的分段点如下:
动臂大腔压力接触物料前的极小值点定义为挖掘作业段起始时间点;转斗大腔压力的第一个极大值点定义为挖掘作业段结束时间点;
重载运输作业段起始时间为挖掘作业段结束时间点;卸载物料前,转斗大腔压力大于预设的变化阀值的时间点为重载运输作业段结束时间点;
卸料作业段起始时间为重载运输作业段结束时间点;卸载物料后,动臂大腔压力达到的极小值点定义为卸料作业段结束时间点;
则有效作业段包括 A1 、 A2 、 A3 和 A4 四个分段点。
具体地,本实施例中,挖掘作业段起始时间为铲斗与物料接触时,动臂大腔压力开始剧烈变大,动臂大腔压力在变化前会有给最小的极值点,这是由于铲掘前铲斗放置与地面造成的,此时动臂大腔压力值比正常行驶时还小,因此定义动臂大腔压力剧烈变化前的极小值点为挖掘作业段起始时间点;
挖掘作业段结束时间为铲斗装满物料脱离工作面时,此时一般伴随收斗动作(一般 1-2 次),转斗大腔压力在每次收斗时都会出现一个极大值,完成收斗后转斗大腔压力将平稳下降,定义转斗大腔压力的第一个极大值点为挖掘作业段结束时间。
重载运输作业段起始时间为挖掘作业段结束时间;
重载运输作业段结束时间为铲斗举升准备卸载物料时,此时转斗即将产生翻斗动作,转斗大腔压力发生急速变化,定义转斗大腔压力的急速变化点为重载运输作业段结束时间。
卸料作业段起始时间为重载运输作业段结束时间;
卸料作业段结束时间为铲斗卸掉所有物料时,动臂大腔压力值会发生突变,达到一个极小值点,定义动臂大腔压力达到的极小值点为卸料作业段结束时间。
根据上述有效作业段的定义,将挖掘作业段的起点与终点定义为 A1 、 A2 ,并用 A1A2 代表挖掘作业段;同理, A2A3 代表重载运输作业段, A3A4 代表卸料作业段。
在完成作业周期提取后,分别对各作业周期内的动臂大腔压力和转斗大腔压力进行分析处理,则各个作业段的分段点的提取具体为:
2.1 )对动臂大腔压力进行极小值点求取,并求取最小的极小值点 B ;接着求取最邻近最小的极小值点 B 左右的极小值点,则左边的极小值点为分段点 A1 ,右边的极小值点为分段点 A4 ;
2.2 )然后对转斗大腔压力进行一阶求导,求取其变化率,再对转斗大腔压力求取最大极大值点 C ;然后求取最邻近最大极大值点 C 的左右第一个一阶导数大于预设极大阀值的变化点,则左边的变化点为分段点 A2 ,右边的变化点为分段点 A3 。
为了使提取的结果更准确,本实施例中,作业段提取主要采用迭代滤波与极值点求取的方法,通过设定特定阈值提取各个作业段的分段点, 如图4所示, 具体如下:
步骤 2.1 )中,先对动臂大腔压力进行两次迭代滤波,该处理主要是使信号更加平滑,消除毛躁点。再对两次迭代滤波后得到的信号进行极小值点求取,求取最小的极小值点 B ;接着求取最邻近最小的极小值点 B 左右的极小值点,则左边的极小值点为分段点 A1 ,右边的极小值点为分段点 A4 。
步骤 2.2 )中,对转斗大腔压力分别进行两次迭代滤波和一百次迭代滤波,对两次迭代滤波得到的数值进行一阶求导,求取其变化率;对一百次迭代滤波后得到的数据求取最大极大值点 C ,进行一百次迭代滤波,能够尽量消除所有干扰最大极大值点 C 的毛躁点。在完成一阶求导和求取最大极大值点 C 后,进行求取最邻近最大极大值点 C 的左右第一个一阶导数大于 0.5 的变化点,所得的两个点即为有效作业段分段点 A2 、 A3 。
至此,得到全部的有效作业段分段点 A1 、 A2 、 A3 和 A4 ,根据这些分段点对作业周期内的数据进行提取分离,即可得到有效作业段。
实施例,本发明一种装载机有效作业段识别方法,如附图 4 所示,定义各作业段间为连续性,即:挖掘作业段起点标为 A1 ;挖掘作业段终点的为重载运输作业段的起点标为 A2 ;重载运输作业段终点的为重卸料作业段的起点标为 A3 ;重卸料作业段的终点标为 A3. 。
主要步骤如下:
1 )采集压力信号 100 :从装载机上分别获取转斗大腔压力信号 211 、动臂大腔压力信号 201 ;
2 )作业周期提取 200 :
对动臂大腔压力信号进行清洗、计算获得极小值点 B ,依据极小值点 B 计算获得作业段的起点 A1 和终点 A4
具体步骤包括:
2.1 对动臂大腔压力信号 201 进行两次迭代滤波 202
2.2 求极小值点 B203
2.3 求最邻近 B 的左右极小值点 204
2.4 得到 A1 、 A4 点;
对转斗大腔压力信号进行清洗、计算获得极大值点 C ,依据极大值点 C 计算获得作业段的节点 A2 和 A3 :
2.5 转斗大腔压力信号 211 进行两次迭代滤波 212 ,再进行一阶求导 213
2.6 转斗大腔压力信号 211 进行一百次迭代滤波 214 ,求极大值点 C215 ;
2.7 求最邻近 C 的左右第一阶导数大于 0.5 的点 216
2.8 得到 A2 、 A3 点
3 )有效作业提取 300
根据以上计算获得 A1 、 A2 、 A3 、 A4 点信息,提取有效作业信息。
上述实施例仅是用来说明本发明,而并非用作对本发明的限定。只要是依据本发明的技术实质,对上述实施例进行变化、变型等都将落在本发明的权利要求的范围内。
工业实用性
本发明涉及一种装载机有效作业段识别方法,定义有效作业段,并依据有效作业段的特征信息实现作业谱的有效作业段识别,有利于实现对作业谱数据的细化,便于进行统计分析,使作业谱数据更加规整化,具有良好的工业实用性。

Claims (10)

  1. 一种装载机有效作业段识别方法,其特征在于,包括以下步骤如下:
    1 )从装载机上获取转斗大腔压力信号、动臂大腔压力信号,清洗、计算转斗大腔压力信号、动臂大腔压力信号提取作业周期;
    2 )依据得到的作业周期,对作业周期内的作业段根据预定义的有效作业段的特征信息,进行作业段提取,实现有效作业段的识别;
    有效作业段包括装载机的铲掘、重载运输、卸料。
  2. 根据权利要求 1 所述的装载机有效作业段识别方法,其特征在于,步骤 2 )中所述的有效作业段的特征信息为预设的特定阈值,通过特定阈值提取各个作业段的分段点。
  3. 根据权利要求 1 所述的装载机有效作业段识别方法,其特征在于,有效作业段省略标准作业段的空载前进、空载后退,重载运输包括标准作业段 的满载后退、满载前进。
  4. 根据权利要求 2 所述的装载机有效作业段识别方法,其特征在于,动臂大腔压力接触物料前的极小值点定义为挖掘作业段起始时间点;转斗大腔压力的第一个极大值点定义为挖掘作业段结束时间点;
    重载运输作业段起始时间为挖掘作业段结束时间 点 ;卸载物料前,转斗大腔压力大于预设的变化阀值的时间点为重载运输作业段结束时间点;
    卸料作业段起始时间为重载运输作业段结束时间 点 ;卸载物料后,动臂大腔压力达到的极小值点定义为卸料作业段结束时间点;
    则有效作业段包括 A1 、 A2 、 A3 和 A4 四个分段点。
  5. 根据权利要求 4 所述的装载机有效作业段识别方法,其特征在于,各个作业段的分段点的提取具体为:
    2.1 )对动臂大腔压力进行极小值点求取,并求取最小的极小值点 B ;接着求取最邻近最小的极小值点 B 左右的极小值点,则左边的极小值点为分段点 A1 ,右边的极小值点为分段点 A4 ;
    2.2 )然后对转斗大腔压力进行一阶求导,求取其变化率,再对转斗大腔压力求取最大极大值点 C ;然后求取最邻近最大极大值点 C 的左右第一个一阶导数大于预设极大阀值的变化点,则左边的变化点为分段点 A2 ,右边的变化点为分段点 A3 。
  6. 根据权利要求 5 所述的装载机有效作业段识别方法,其特征在于,步骤 2.1 )中,先对动臂大腔压力进行两次迭代滤波,再对两次迭代滤波后得到的信号进行极小值点求取。
  7. 根据权利要求 5 所述的装载机有效作业段识别方法,其特征在于,步骤 2.2 )中,对转斗大腔压力分别进行两次迭代滤波和一百次迭代滤波,对两次迭代滤波得到的数值进行一阶求导,求取其变化率;对一百次迭代滤波后得到的数据求取最大极大值点 C 。
  8. 根据权利要求 1 所述的装载机有效作业段识别方法,其特征在于, 定义各作业段间为连续性,即:挖掘作业段起点标为 A1 ;挖掘作业段终点的为重载运输作业段的起点标为 A2 ;重载运输作业段终点的为重卸料作业段的起点标为 A3 ;重卸料作业段的终点标为 A3. ;
    主要步骤如下:
    1 )采集压力信号:
    从装载机上分别采集转斗大腔压力信号、动臂大腔压力信号;
    2 )作业周期提取:
    对动臂大腔压力信号进行清洗、计算获得极小值点 B ,依据极小值点 B 计算获得作业段的起点 A1 和终点 A4
    对转斗大腔压力信号进行清洗、计算获得极大值点 C ,依据极大值点 C 计算获得作业段的节点 A2 和 A3
    3 )有效作业提取:
    根据以上计算获得 A1 、 A2 、 A3 、 A4 即可获得有效作业信息。
  9. 根据权利要求 8 所述的装载机有效作业段识别方法,其特征在于, 所述 A1 和 A4 获得,包括以下步骤:
    2.1 对动臂大腔压力信号 201 进行两次迭代滤波 202
    2.2 求极小值点 B203
    2.3 求最邻近 B 的左右极小值点 204
    2.4 得到 A1 、 A4 点。
  10. 根据权利要求 8 所述的装载机有效作业段识别方法,其特征在于, 所述 A2 和 A3 获得,包括以下步骤:
    2.5 转斗大腔压力信号 211 进行两次迭代滤波 212 ,再进行一阶求导 213
    2.6 转斗大腔压力信号 211 进行一百次迭代滤波 214 ,求极大值点 C215 ;
    2.7 求最邻近 C 的左右第一阶导数大于 0.5 的点 216
    2.8 得到 A2 、 A3 点。
PCT/CN2017/091399 2016-07-22 2017-07-03 一种装载机铲装过程的有效作业段的识别方法 Ceased WO2018014714A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610585014.3A CN106096593B (zh) 2016-07-22 2016-07-22 一种装载机铲装过程的有效作业段的识别方法
CN201610585014.3 2016-07-22

Publications (1)

Publication Number Publication Date
WO2018014714A1 true WO2018014714A1 (zh) 2018-01-25

Family

ID=57449288

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/091399 Ceased WO2018014714A1 (zh) 2016-07-22 2017-07-03 一种装载机铲装过程的有效作业段的识别方法

Country Status (2)

Country Link
CN (1) CN106096593B (zh)
WO (1) WO2018014714A1 (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111538953A (zh) * 2020-04-17 2020-08-14 上海华兴数字科技有限公司 物料识别方法、装置、设备及存储介质
CN113882457A (zh) * 2021-09-27 2022-01-04 徐州徐工挖掘机械有限公司 一种液压挖掘机工况识别与统计方法、系统及液压挖掘机
CN115264047A (zh) * 2022-07-18 2022-11-01 华侨大学 一种电动装载机的自动换挡方法、装置、设备和存储介质

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018014718A1 (zh) * 2016-07-22 2018-01-25 厦门大学 一种装载机作业工况难易程度识别方法
CN106096593B (zh) * 2016-07-22 2019-06-04 厦门大学 一种装载机铲装过程的有效作业段的识别方法
CN108978769B (zh) * 2018-07-03 2021-03-16 柳州柳工挖掘机有限公司 挖掘机工况识别计时方法及系统和挖掘机
CN109359524B (zh) * 2018-09-07 2021-06-22 长安大学 一种装载机工况识别模型构建及识别方法
CN110965597B (zh) * 2019-12-17 2022-02-15 广西柳工机械股份有限公司 一种自动铲装触发方法、自动铲装触发装置和装载机

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202187764U (zh) * 2011-08-15 2012-04-11 王兴龙 整体移动式砂矿采选机组
CN106096593A (zh) * 2016-07-22 2016-11-09 厦门大学 一种装载机铲装过程的有效作业段的识别方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071717B (zh) * 2010-12-16 2012-07-04 重庆航天工业公司 挖掘机自适应控制方法
CN102518163A (zh) * 2011-12-07 2012-06-27 三一重机有限公司 挖掘机工作特征提取系统及提取方法
CN102535573B (zh) * 2012-03-19 2014-10-29 广西柳工机械股份有限公司 装载机智能自动变速控制系统及控制方法
CN102877500B (zh) * 2012-09-29 2014-10-29 浙江大学 一种挖掘机工作循环阶段自动识别方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202187764U (zh) * 2011-08-15 2012-04-11 王兴龙 整体移动式砂矿采选机组
CN106096593A (zh) * 2016-07-22 2016-11-09 厦门大学 一种装载机铲装过程的有效作业段的识别方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
WANG, SHAOJIE: "Research and Application of Intelligent Gear Shift Technology for Engineering Vehicles Based on Working Spectrum Analysis and Pattern Recognition", WANGFANG DATA KNOWLEDGE SERVICE PLATFORM, 21 June 2017 (2017-06-21), pages 78 - 100 *
WU, YONGPING: "Research on the method of Reasonable Match of Construction Machine in the Multi-constructing Section", CONSTRUCTION MACHINERY TECHNOLOGY & MANAGEMENT, no. 5, 20 May 2008 (2008-05-20), pages 105 - 107, ISSN: 1004-0005 *
ZHANG, YINGSHUANG ET AL.: "Compilation Method of Power Train Load Spectrum of Engineering Vehicle", TRANSACTIONS OF THE CHINESE SOCIETY OF AGRICULTURAL ENGINEERING, vol. 27, no. 4, 30 April 2011 (2011-04-30), pages 179 - 183, ISSN: 1002-6819 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111538953A (zh) * 2020-04-17 2020-08-14 上海华兴数字科技有限公司 物料识别方法、装置、设备及存储介质
CN111538953B (zh) * 2020-04-17 2023-06-16 上海华兴数字科技有限公司 物料识别方法、装置、设备及存储介质
CN113882457A (zh) * 2021-09-27 2022-01-04 徐州徐工挖掘机械有限公司 一种液压挖掘机工况识别与统计方法、系统及液压挖掘机
CN115264047A (zh) * 2022-07-18 2022-11-01 华侨大学 一种电动装载机的自动换挡方法、装置、设备和存储介质
CN115264047B (zh) * 2022-07-18 2023-05-02 华侨大学 一种电动装载机的自动换挡方法、装置、设备和存储介质

Also Published As

Publication number Publication date
CN106096593A (zh) 2016-11-09
CN106096593B (zh) 2019-06-04

Similar Documents

Publication Publication Date Title
WO2018014714A1 (zh) 一种装载机铲装过程的有效作业段的识别方法
CN110404688A (zh) 一种融合静电与风力的机采棉清杂信息处理方法和装置
CN109359524B (zh) 一种装载机工况识别模型构建及识别方法
CN102809965A (zh) 一种基于故障频繁模式的液压设备故障预警方法
CN113374021A (zh) 基于操作手柄先导控制信号的挖掘机工况识别方法
CN116384781B (zh) 基于bim技术的工程建设数据智能化分析系统及方法
CN117591850A (zh) 基于扩展坞的数据处理方法、装置、电子设备及介质
CN110888915A (zh) 一种基于大数据平台的挖泥船疏浚作业分析方法
WO2024066061A1 (zh) 基于图像识别的斗轮损伤判定方法及其系统
CN102493522A (zh) 矿用挖掘机产量统计方法
CN116304557A (zh) 一种装载机循环工况作业阶段识别方法
CN114299320A (zh) 基于YOLOv4目标检测模型的矿车运载量检测系统及方法
JP3937341B2 (ja) 計算機システム性能測定分析用のトランザクションプロファイルの生成システム、その生成方法及びプログラム
CN116842417B (zh) 基于小波分解的水电站故障识别方法、系统、设备及介质
CN114330058A (zh) 一种挖掘机载荷谱编制方法及系统
CN106296474B (zh) 一种装载机作业工况难易程度识别方法
CN115979622A (zh) 带式输送机减速器异常振动故障诊断方法、系统及介质
WO2018014718A1 (zh) 一种装载机作业工况难易程度识别方法
CN107843779B (zh) 一种基于模糊聚类的电力系统故障录波分类分析方法和系统
CN102866158B (zh) 面向隧道巡检的输配电线缆检测方法
CN108999228A (zh) 一种双层结构的挖掘机控制系统
CN113362333A (zh) 一种垃圾分类箱管理方法、装置
CN107748819B (zh) 一种基于自然语言处理的电气二次设备建模方法及系统
CN117661671A (zh) 一种具有智能识别功能的自适应挖掘控制方法及设备
CN116416574A (zh) 基于视频的流水线加工作业分析方法及系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17830348

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17830348

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 17830348

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS (EPO FORM 1205A DATED 05.08.2019)

122 Ep: pct application non-entry in european phase

Ref document number: 17830348

Country of ref document: EP

Kind code of ref document: A1