WO2017173560A1 - Procédé et système de gestion de la progression de constructions immobilières - Google Patents
Procédé et système de gestion de la progression de constructions immobilières Download PDFInfo
- Publication number
- WO2017173560A1 WO2017173560A1 PCT/CN2016/078428 CN2016078428W WO2017173560A1 WO 2017173560 A1 WO2017173560 A1 WO 2017173560A1 CN 2016078428 W CN2016078428 W CN 2016078428W WO 2017173560 A1 WO2017173560 A1 WO 2017173560A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- progress
- construction progress
- construction
- photo
- real estate
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims abstract description 82
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000007726 management method Methods 0.000 claims description 10
- 230000008901 benefit Effects 0.000 abstract description 4
- 230000009471 action Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/16—Real estate
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/16—Real estate
- G06Q50/165—Land development
Definitions
- the present invention relates to the field of communications and real estate, and in particular, to a real estate construction schedule management method and system.
- Real estate is the most discussed topic in people's daily life.
- the existing real estate is not only the housing price is rising, but more importantly, the corresponding information in the real estate is not accurately obtained.
- the user cannot judge the specific information, such as construction.
- the approximate progress is a very difficult thing for an ordinary person.
- the existing technology generally rescues professional personnel. Ordinary people cannot judge the construction progress of a real estate.
- a real estate construction schedule management method is provided, which solves the shortcomings of the prior art that the construction progress cannot be judged.
- a method for managing a real estate construction schedule includes the following steps:
- the method further includes:
- the method further includes:
- a real estate construction progress management system is provided, where the system includes:
- a setting unit configured to set a photo between different construction progresses
- a receiving unit configured to receive a photo taken by a user
- the calculating unit is configured to obtain a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
- the system further includes:
- the selecting unit is configured to obtain two closest pictures if the pictures are not aligned, and select a value from the duration intervals of the two closest pictures as the progress of the duration.
- the system further includes:
- a discarding unit configured to obtain a historical schedule progress, such as the current construction progress is lower than the historical schedule
- the technical solution provided by the specific embodiment of the present invention sets a photo between different construction schedules, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress, and the construction is performed.
- the progress is saved, so it has the advantage of judging the construction progress.
- FIG. 1 is a flow chart of a real estate construction progress management method provided by the present invention
- FIG. 2 is a structural diagram of a real estate construction progress management system provided by the present invention.
- FIG. 1 is a flowchart of a real estate construction progress management method according to a first preferred embodiment of the present invention.
- the method is implemented by a server.
- the method is as shown in FIG. 1 , and includes the following steps:
- Step S101 setting a photo between different construction schedules
- Step S102 Receive a photo taken by a user
- Step S103 Acquire a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
- the technical solution provided by the specific embodiments of the present invention sets a photo between different construction schedules, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress, and the construction is performed.
- the progress is saved, so it has the advantage of judging the construction progress.
- the foregoing method may further include:
- the two closest pictures are obtained, and a value is selected from the duration intervals of the two closest pictures as the progress of the duration.
- the foregoing method may further include:
- FIG. 2 is a real estate construction progress management system according to a second preferred embodiment of the present invention, and the system includes:
- a setting unit 201 configured to set a photo between different construction progresses
- the receiving unit 202 is configured to receive a photo taken by the user
- the calculating unit 203 is configured to obtain a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
- the technical solution provided by the specific embodiment of the present invention sets a photo between different construction progresses, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress.
- the construction progress is saved, so it has the advantage of judging the construction progress.
- the foregoing system may further include: [0040]
- the selecting unit 204 is configured to obtain two closest pictures if the pictures are not aligned, and select a value from the duration intervals of the two closest pictures as the progress of the duration.
- the foregoing system may further include:
- the discarding unit 205 is configured to obtain a historical schedule progress. If the currently obtained construction progress is lower than the historical schedule progress, the construction progress is discarded.
- Computer readable media includes both computer storage media and communication media including any medium that facilitates transfer of a computer program from one location to another.
- the storage medium can be any available medium that the computer can access. Taking this as an example, but not limited to: Computer readable medium may include random access memory (Random Access)
- RAM Random Access Memory
- ROM Read-Only Memory
- EEPROM Electrically Erasable Programmable Read-Only Memory
- CD-ROM Compact Disc Read-Only Memory
- Any connection can be adapted It becomes a computer readable medium.
- a disk and a disc include a compact disc (CD), a laser disc, a compact disc, a digital versatile disc (DVD), a floppy disc, and a Blu-ray disc, wherein the disc is usually magnetically copied, and the disc is The laser is used to optically replicate the data. Combinations of the above should also be included within the scope of the computer readable media.
Landscapes
- Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
L'invention concerne un procédé et un système de gestion de la progression de constructions immobilières, ledit procédé comprenant les étapes suivantes consistant : à configurer les photographies de différents états de progression de la construction (101) ; à recevoir les photographies prises par un utilisateur (102) ; à acquérir un état de progression de la construction en comparant les photographies prises par l'utilisateur avec les photographies préconfigurées de différents états de progression de la construction, et sauvegarder ledit état de progression de la construction. Ce procédé offre l'avantage d'obtenir un progression de la construction.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2016/078428 WO2017173560A1 (fr) | 2016-04-05 | 2016-04-05 | Procédé et système de gestion de la progression de constructions immobilières |
CN201680000140.6A CN105900129A (zh) | 2016-04-05 | 2016-04-05 | 房地产施工进度管理方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2016/078428 WO2017173560A1 (fr) | 2016-04-05 | 2016-04-05 | Procédé et système de gestion de la progression de constructions immobilières |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017173560A1 true WO2017173560A1 (fr) | 2017-10-12 |
Family
ID=56718760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2016/078428 WO2017173560A1 (fr) | 2016-04-05 | 2016-04-05 | Procédé et système de gestion de la progression de constructions immobilières |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105900129A (fr) |
WO (1) | WO2017173560A1 (fr) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136618A (zh) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | 工程进度计划的在线管理方法 |
CN104166892A (zh) * | 2014-06-19 | 2014-11-26 | 国家电网公司 | 一种基于三维设计系统的工程管控方法及系统 |
CN104636840A (zh) * | 2013-11-09 | 2015-05-20 | 吴晓铭 | 一种建设项目现场管理信息采集及后续应用处理技术 |
CN105354653A (zh) * | 2015-08-26 | 2016-02-24 | 吕曼 | 一种工程建设项目智能管理系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103714436A (zh) * | 2014-01-09 | 2014-04-09 | 国家电网公司 | 电力工程施工进度跟踪系统 |
-
2016
- 2016-04-05 CN CN201680000140.6A patent/CN105900129A/zh active Pending
- 2016-04-05 WO PCT/CN2016/078428 patent/WO2017173560A1/fr active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136618A (zh) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | 工程进度计划的在线管理方法 |
CN104636840A (zh) * | 2013-11-09 | 2015-05-20 | 吴晓铭 | 一种建设项目现场管理信息采集及后续应用处理技术 |
CN104166892A (zh) * | 2014-06-19 | 2014-11-26 | 国家电网公司 | 一种基于三维设计系统的工程管控方法及系统 |
CN105354653A (zh) * | 2015-08-26 | 2016-02-24 | 吕曼 | 一种工程建设项目智能管理系统 |
Also Published As
Publication number | Publication date |
---|---|
CN105900129A (zh) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10025629B2 (en) | System and method for dynamic rescheduling of multiple varying resources with user social mapping | |
US10210484B2 (en) | Altering a functional characteristic of a computer used by an invitee to a meeting | |
US20210334303A1 (en) | Data sharing method, device and system | |
WO2016061395A2 (fr) | Formation et chronométrage de proximité étiquetés | |
WO2015196996A1 (fr) | Procédé et dispositif de stockage de photo | |
CN105224545A (zh) | 一种位置推荐方法及装置 | |
US20220164739A1 (en) | Real-time scheduling and synchronization of real estate transactions | |
US10057425B2 (en) | Context-driven teleconference session management | |
US10694361B2 (en) | Computer-implemented agent assisted electronic business cards | |
US20180267998A1 (en) | Contextual and cognitive metadata for shared photographs | |
WO2017173564A1 (fr) | Procédé et système d'estimation de prix de biens immobiliers | |
WO2017127971A1 (fr) | Procédé et système de gestion d'informations sur des coupons d'une application de repas | |
WO2017173560A1 (fr) | Procédé et système de gestion de la progression de constructions immobilières | |
WO2017107108A1 (fr) | Procédé et système de gestion d'une caméra d'un système de surveillance | |
WO2017173562A1 (fr) | Procédé et système de comptage de données de ventes immobilières | |
WO2017066988A1 (fr) | Procédé et système de commande de l'internet des objets par téléphone mobile | |
WO2017127961A1 (fr) | Procédé et système de tri sur une plate-forme d'application de repas | |
WO2017173565A1 (fr) | Procédé et système pour générer un graphe d'effet de propriété immobilière | |
WO2017066979A1 (fr) | Procédé et système de positionnement intérieur de téléphone mobile | |
WO2020221230A1 (fr) | Procédé et appareil de traitement d'informations | |
CN106296508A (zh) | 英文课时的剩余课时计算方法及系统 | |
WO2017173574A1 (fr) | Procédé et système d'alerte de téléphone mobile pour ktv | |
WO2017173563A1 (fr) | Procédé et système de détection de la qualité immobilière | |
US20190075151A1 (en) | Facility for initiating automatic exchange of file(s) between mobile devices | |
WO2017070968A1 (fr) | Procédé, dispositif et terminal pour un traitement de données de cycle menstruel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16897495 Country of ref document: EP Kind code of ref document: A1 |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 16897495 Country of ref document: EP Kind code of ref document: A1 |