WO2017173560A1 - Method and system for managing real estate construction progress - Google Patents

Method and system for managing real estate construction progress Download PDF

Info

Publication number
WO2017173560A1
WO2017173560A1 PCT/CN2016/078428 CN2016078428W WO2017173560A1 WO 2017173560 A1 WO2017173560 A1 WO 2017173560A1 CN 2016078428 W CN2016078428 W CN 2016078428W WO 2017173560 A1 WO2017173560 A1 WO 2017173560A1
Authority
WO
WIPO (PCT)
Prior art keywords
progress
construction progress
construction
photo
real estate
Prior art date
Application number
PCT/CN2016/078428
Other languages
French (fr)
Chinese (zh)
Inventor
盛玉伟
Original Assignee
盛玉伟
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 盛玉伟 filed Critical 盛玉伟
Priority to PCT/CN2016/078428 priority Critical patent/WO2017173560A1/en
Priority to CN201680000140.6A priority patent/CN105900129A/en
Publication of WO2017173560A1 publication Critical patent/WO2017173560A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • G06Q50/165Land development

Definitions

  • the present invention relates to the field of communications and real estate, and in particular, to a real estate construction schedule management method and system.
  • Real estate is the most discussed topic in people's daily life.
  • the existing real estate is not only the housing price is rising, but more importantly, the corresponding information in the real estate is not accurately obtained.
  • the user cannot judge the specific information, such as construction.
  • the approximate progress is a very difficult thing for an ordinary person.
  • the existing technology generally rescues professional personnel. Ordinary people cannot judge the construction progress of a real estate.
  • a real estate construction schedule management method is provided, which solves the shortcomings of the prior art that the construction progress cannot be judged.
  • a method for managing a real estate construction schedule includes the following steps:
  • the method further includes:
  • the method further includes:
  • a real estate construction progress management system is provided, where the system includes:
  • a setting unit configured to set a photo between different construction progresses
  • a receiving unit configured to receive a photo taken by a user
  • the calculating unit is configured to obtain a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
  • the system further includes:
  • the selecting unit is configured to obtain two closest pictures if the pictures are not aligned, and select a value from the duration intervals of the two closest pictures as the progress of the duration.
  • the system further includes:
  • a discarding unit configured to obtain a historical schedule progress, such as the current construction progress is lower than the historical schedule
  • the technical solution provided by the specific embodiment of the present invention sets a photo between different construction schedules, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress, and the construction is performed.
  • the progress is saved, so it has the advantage of judging the construction progress.
  • FIG. 1 is a flow chart of a real estate construction progress management method provided by the present invention
  • FIG. 2 is a structural diagram of a real estate construction progress management system provided by the present invention.
  • FIG. 1 is a flowchart of a real estate construction progress management method according to a first preferred embodiment of the present invention.
  • the method is implemented by a server.
  • the method is as shown in FIG. 1 , and includes the following steps:
  • Step S101 setting a photo between different construction schedules
  • Step S102 Receive a photo taken by a user
  • Step S103 Acquire a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
  • the technical solution provided by the specific embodiments of the present invention sets a photo between different construction schedules, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress, and the construction is performed.
  • the progress is saved, so it has the advantage of judging the construction progress.
  • the foregoing method may further include:
  • the two closest pictures are obtained, and a value is selected from the duration intervals of the two closest pictures as the progress of the duration.
  • the foregoing method may further include:
  • FIG. 2 is a real estate construction progress management system according to a second preferred embodiment of the present invention, and the system includes:
  • a setting unit 201 configured to set a photo between different construction progresses
  • the receiving unit 202 is configured to receive a photo taken by the user
  • the calculating unit 203 is configured to obtain a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
  • the technical solution provided by the specific embodiment of the present invention sets a photo between different construction progresses, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress.
  • the construction progress is saved, so it has the advantage of judging the construction progress.
  • the foregoing system may further include: [0040]
  • the selecting unit 204 is configured to obtain two closest pictures if the pictures are not aligned, and select a value from the duration intervals of the two closest pictures as the progress of the duration.
  • the foregoing system may further include:
  • the discarding unit 205 is configured to obtain a historical schedule progress. If the currently obtained construction progress is lower than the historical schedule progress, the construction progress is discarded.
  • Computer readable media includes both computer storage media and communication media including any medium that facilitates transfer of a computer program from one location to another.
  • the storage medium can be any available medium that the computer can access. Taking this as an example, but not limited to: Computer readable medium may include random access memory (Random Access)
  • RAM Random Access Memory
  • ROM Read-Only Memory
  • EEPROM Electrically Erasable Programmable Read-Only Memory
  • CD-ROM Compact Disc Read-Only Memory
  • Any connection can be adapted It becomes a computer readable medium.
  • a disk and a disc include a compact disc (CD), a laser disc, a compact disc, a digital versatile disc (DVD), a floppy disc, and a Blu-ray disc, wherein the disc is usually magnetically copied, and the disc is The laser is used to optically replicate the data. Combinations of the above should also be included within the scope of the computer readable media.

Landscapes

  • Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A method and system for managing real estate construction progress, wherein said method comprises the following steps: configuring photographs of different construction progress states (101); receiving photographs taken by a user (102); acquiring a construction progress state by comparing the photographs taken by the user with the preconfigured photographs of different construction progress states, and saving said construction progress state. Said method offers the advantage of obtaining a construction progress.

Description

说明书 发明名称:房地产施工进度管理方法及系统 技术领域  Manual Name: Real estate construction progress management method and system Technical field
[0001] 本发明涉及通信及房地产领域, 尤其涉及一种房地产施工进度管理方法及系统 背景技术  [0001] The present invention relates to the field of communications and real estate, and in particular, to a real estate construction schedule management method and system.
[0002] 房地产为现在人们日常生活中讨论最多的话题, 现有的房地产不仅仅是房价高 涨, 更重要的是房地产下相应的信息的获取方式不准确, 用户无法判断其具体 的信息, 例如施工进度大概多少, 对于一个普通人来说是一个非常困难的事情 , 现有的技术一般其救助于专业的人员, 普通人无法判断一个房地产的施工进 度。  [0002] Real estate is the most discussed topic in people's daily life. The existing real estate is not only the housing price is rising, but more importantly, the corresponding information in the real estate is not accurately obtained. The user cannot judge the specific information, such as construction. The approximate progress is a very difficult thing for an ordinary person. The existing technology generally rescues professional personnel. Ordinary people cannot judge the construction progress of a real estate.
技术问题  technical problem
[0003] 提供一种房地产施工进度管理方法, 其解决了现有技术的无法判断施工进度的 缺点。  [0003] A real estate construction schedule management method is provided, which solves the shortcomings of the prior art that the construction progress cannot be judged.
问题的解决方案  Problem solution
技术解决方案  Technical solution
[0004] 一方面, 提供一种房地产施工进度管理方法, 所述方法包括如下步骤:  [0004] In one aspect, a method for managing a real estate construction schedule is provided, and the method includes the following steps:
[0005] 设置不同施工进度之间的照片; [0005] setting photos between different construction schedules;
[0006] 接收用户拍摄的照片; Receiving a photo taken by a user;
[0007] 依据该照片与预设不同施工进度之间的照片比对来获取施工进度, 将该施工进 度保存。  [0007] According to the photo comparison between the photo and the preset different construction progress, the construction progress is obtained, and the construction progress is saved.
[0008] 可选的, 所述方法还包括:  [0008] Optionally, the method further includes:
[0009] 如未比对到一致的图片, 则获取两个最接近的图片, 从两个最接近的图片的工 期区间中选取一个数值作为工期的进度。  [0009] If the identical picture is not compared, the two closest pictures are obtained, and a value is selected from the duration intervals of the two closest pictures as the progress of the duration.
[0010] 可选的, 所述方法还包括: [0010] Optionally, the method further includes:
[0011] 获取历史工期进度, 如当前获取的施工进度低于历史工期进度, 舍弃该施工进 度。 [0012] 第二方面, 提供一种房地产施工进度管理系统, 所述系统包括: [0011] Obtaining the progress of the historical construction period, if the currently obtained construction progress is lower than the historical construction period progress, discarding the construction progress. [0012] In a second aspect, a real estate construction progress management system is provided, where the system includes:
[0013] 设置单元, 用于设置不同施工进度之间的照片; [0013] a setting unit, configured to set a photo between different construction progresses;
[0014] 接收单元, 用于接收用户拍摄的照片; [0014] a receiving unit, configured to receive a photo taken by a user;
[0015] 计算单元, 用于依据该照片与预设不同施工进度之间的照片比对来获取施工进 度, 将该施工进度保存。  [0015] The calculating unit is configured to obtain a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
[0016] 可选的, 所述系统还包括: [0016] Optionally, the system further includes:
[0017] 选取单元, 用于如未比对到一致的图片, 则获取两个最接近的图片, 从两个最 接近的图片的工期区间中选取一个数值作为工期的进度。  [0017] The selecting unit is configured to obtain two closest pictures if the pictures are not aligned, and select a value from the duration intervals of the two closest pictures as the progress of the duration.
[0018] 可选的, 所述系统还包括: [0018] Optionally, the system further includes:
[0019] 舍弃单元, 用于获取历史工期进度, 如当前获取的施工进度低于历史工期进度 [0019] a discarding unit, configured to obtain a historical schedule progress, such as the current construction progress is lower than the historical schedule
, 舍弃该施工进度。 , discard the construction progress.
发明的有益效果  Advantageous effects of the invention
有益效果  Beneficial effect
[0020] 本发明具体实施方式提供的技术方案设置不同施工进度之间的照片, 接收用户 拍摄的照片, 依据该照片与预设不同施工进度之间的照片比对来获取施工进度 , 将该施工进度保存, 所以其具有判断施工进度的优点。  [0020] The technical solution provided by the specific embodiment of the present invention sets a photo between different construction schedules, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress, and the construction is performed. The progress is saved, so it has the advantage of judging the construction progress.
对附图的简要说明  Brief description of the drawing
附图说明  DRAWINGS
[0021] 为了更清楚地说明本发明实施例或现有技术中的技术方案, 下面将对实施例或 现有技术描述中所需要使用的附图作简单地介绍, 显而易见地, 下面描述中的 附图仅仅是本发明的一些实施例, 对于本领域普通技术人员来讲, 在不付出创 造性劳动的前提下, 还可以根据这些附图获得其他的附图。  [0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings to be used in the embodiments or the prior art description will be briefly described below, and obviously, in the following description The drawings are only some of the embodiments of the present invention, and those skilled in the art can obtain other drawings based on these drawings without any creative work.
[0022] 图 1为本发明提供的一种房地产施工进度管理方法的流程图; 1 is a flow chart of a real estate construction progress management method provided by the present invention;
[0023] 图 2为本发明提供的一种房地产施工进度管理系统的结构图。 2 is a structural diagram of a real estate construction progress management system provided by the present invention.
本发明的实施方式 Embodiments of the invention
[0024] 下面将结合本发明实施例中的附图, 对本发明实施例中的技术方案进行清楚、 完整地描述, 显然, 所描述的实施例仅仅是本发明一部分实施例, 而不是全部 的实施例。 基于本发明中的实施例, 本领域普通技术人员在没有做出创造性劳 动前提下所获得的所有其他实施例, 都属于本发明保护的范围。 [0024] The technical solutions in the embodiments of the present invention will be clearly described below with reference to the accompanying drawings in the embodiments of the present invention. Throughout the description, it is apparent that the described embodiments are only a part of the embodiments of the invention, and not all of the embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments of the present invention without departing from the inventive scope are the scope of the present invention.
[0025] 参阅图 1, 图 1为本发明第一较佳实施方式提供的一种房地产施工进度管理方法 的流程图, 该方法由服务器来完成, 该方法如图 1所示, 包括如下步骤:  [0025] Referring to FIG. 1 , FIG. 1 is a flowchart of a real estate construction progress management method according to a first preferred embodiment of the present invention. The method is implemented by a server. The method is as shown in FIG. 1 , and includes the following steps:
[0026] 步骤 S101、 设置不同施工进度之间的照片;  [0026] Step S101: setting a photo between different construction schedules;
[0027] 步骤 S102、 接收用户拍摄的照片;  [0027] Step S102: Receive a photo taken by a user;
[0028] 步骤 S103、 依据该照片与预设不同施工进度之间的照片比对来获取施工进度, 将该施工进度保存。  [0028] Step S103: Acquire a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
[0029] 本发明具体实施方式提供的技术方案设置不同施工进度之间的照片, 接收用户 拍摄的照片, 依据该照片与预设不同施工进度之间的照片比对来获取施工进度 , 将该施工进度保存, 所以其具有判断施工进度的优点。  [0029] The technical solution provided by the specific embodiments of the present invention sets a photo between different construction schedules, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress, and the construction is performed. The progress is saved, so it has the advantage of judging the construction progress.
[0030] 可选的, 上述方法在步骤 S103之后还可以包括:  [0030] Optionally, after the step S103, the foregoing method may further include:
[0031] 如未比对到一致的图片, 则获取两个最接近的图片, 从两个最接近的图片的工 期区间中选取一个数值作为工期的进度。  [0031] If the identical picture is not compared, the two closest pictures are obtained, and a value is selected from the duration intervals of the two closest pictures as the progress of the duration.
[0032] 可选的, 上述方法在步骤 S103之后还可以包括: [0032] Optionally, after the step S103, the foregoing method may further include:
[0033] 获取历史工期进度, 如当前获取的施工进度低于历史工期进度, 舍弃该施工进 度。  [0033] Obtaining the progress of the historical construction period, if the currently obtained construction progress is lower than the historical construction period progress, the construction progress is discarded.
[0034] 参阅图 2, 图 2为本发明第二较佳实施方式提供的一种房地产施工进度管理系统 , 该系统包括:  [0034] Referring to FIG. 2, FIG. 2 is a real estate construction progress management system according to a second preferred embodiment of the present invention, and the system includes:
[0035] 设置单元 201, 用于设置不同施工进度之间的照片;  [0035] a setting unit 201, configured to set a photo between different construction progresses;
[0036] 接收单元 202, 用于接收用户拍摄的照片; [0036] The receiving unit 202 is configured to receive a photo taken by the user;
[0037] 计算单元 203, 用于依据该照片与预设不同施工进度之间的照片比对来获取施 工进度, 将该施工进度保存。  [0037] The calculating unit 203 is configured to obtain a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
[0038] 本发明具体实施方式提供的技术方案设置不同施工进度之间的照片, 接收用户 拍摄的照片, 依据该照片与预设不同施工进度之间的照片比对来获取施工进度[0038] The technical solution provided by the specific embodiment of the present invention sets a photo between different construction progresses, receives a photo taken by the user, and obtains a construction progress according to a photo comparison between the photo and a preset different construction progress.
, 将该施工进度保存, 所以其具有判断施工进度的优点。 The construction progress is saved, so it has the advantage of judging the construction progress.
[0039] 可选的, 上述系统还可以包括: [0040] 选取单元 204, 用于如未比对到一致的图片, 则获取两个最接近的图片, 从两 个最接近的图片的工期区间中选取一个数值作为工期的进度。 [0039] Optionally, the foregoing system may further include: [0040] The selecting unit 204 is configured to obtain two closest pictures if the pictures are not aligned, and select a value from the duration intervals of the two closest pictures as the progress of the duration.
[0041] 可选的, 上述系统还可以包括: [0041] Optionally, the foregoing system may further include:
[0042] 舍弃单元 205, 用于获取历史工期进度, 如当前获取的施工进度低于历史工期 进度, 舍弃该施工进度。  [0042] The discarding unit 205 is configured to obtain a historical schedule progress. If the currently obtained construction progress is lower than the historical schedule progress, the construction progress is discarded.
[0043] 需要说明的是, 对于前述的各方法实施方式或实施例, 为了简单描述, 故将其 都表述为一系列的动作组合, 但是本领域技术人员应该知悉, 本发明并不受所 描述的动作顺序的限制, 因为根据本发明, 某些步骤可以采用其他顺序或者同 吋进行。 其次, 本领域技术人员也应该知悉, 说明书中所描述实施方式或实施 例均属于优选实施例, 所涉及的动作和单元并不一定是本发明所必须的。  [0043] It should be noted that, for the foregoing method embodiments or embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should know that the present invention is not described. The order of the actions is limited, as some steps may be performed in other orders or peers in accordance with the present invention. In addition, those skilled in the art should also understand that the embodiments or embodiments described in the specification are all preferred embodiments, and the actions and units involved are not necessarily required by the present invention.
[0044] 在上述实施例中, 对各个实施例的描述都各有侧重, 某个实施例中没有详述的 部分, 可以参见其他实施例的相关描述。  [0044] In the foregoing embodiments, the descriptions of the various embodiments are different, and the parts that are not detailed in an embodiment may refer to related descriptions of other embodiments.
[0045] 本发明实施例方法中的步骤可以根据实际需要进行顺序调整、 合并和刪减。  [0045] The steps in the method of the embodiment of the present invention may be sequentially adjusted, merged, and deleted according to actual needs.
[0046] 本发明实施例装置中的单元可以根据实际需要进行合并、 划分和刪减。 本领域 的技术人员可以将本说明书中描述的不同实施例以及不同实施例的特征进行结 合或组合。  [0046] The units in the apparatus of the embodiment of the present invention may be combined, divided, and deleted according to actual needs. Those skilled in the art can combine or combine the different embodiments described in the specification and the features of the different embodiments.
[0047] 通过以上的实施方式的描述, 所属领域的技术人员可以清楚地了解到本发明可 以用硬件实现, 或固件实现, 或它们的组合方式来实现。 当使用软件实现吋, 可以将上述功能存储在计算机可读介质中或作为计算机可读介质上的一个或多 个指令或代码进行传输。 计算机可读介质包括计算机存储介质和通信介质, 其 中通信介质包括便于从一个地方向另一个地方传送计算机程序的任何介质。 存 储介质可以是计算机能够存取的任何可用介质。 以此为例但不限于: 计算机可 读介质可以包括随机存取存储器 (Random Access  [0047] Through the description of the above embodiments, those skilled in the art can clearly understand that the present invention can be implemented in hardware, firmware implementation, or a combination thereof. When implemented in software, the functions described above may be stored in or transmitted as one or more instructions or code on a computer readable medium. Computer readable media includes both computer storage media and communication media including any medium that facilitates transfer of a computer program from one location to another. The storage medium can be any available medium that the computer can access. Taking this as an example, but not limited to: Computer readable medium may include random access memory (Random Access)
Memory , RAM)、 只读存储器 (Read-Only Memory, ROM)、 电可擦可编程只读 存储器 (Electrically Erasable Programmable Read-Only Memory, EEPROM)、 只读 光盘 (Compact Disc Read-Only Memory , CD-ROM)或其他光盘存储、 磁盘存储介 质或者其他磁存储设备、 或者能够用于携带或存储具有指令或数据结构形式的 期望的程序代码并能够由计算机存取的任何其他介质。 此外。 任何连接可以适 当的成为计算机可读介质。 例如, 如果软件是使用同轴电缆、 光纤光缆、 双绞 线、 数字用户线 (Digital Subscriber Line, DSL) 或者诸如红外线、 无线电和微 波之类的无线技术从网站、 服务器或者其他远程源传输的, 那么同轴电缆、 光 纤光缆、 双绞线、 DSL或者诸如红外线、 无线和微波之类的无线技术包括在所属 介质的定影中。 如本发明所使用的, 盘 (Disk) 和碟 (disc) 包括压缩光碟 (CD ) 、 激光碟、 光碟、 数字通用光碟 (DVD) 、 软盘和蓝光光碟, 其中盘通常磁 性的复制数据, 而碟则用激光来光学的复制数据。 上面的组合也应当包括在计 算机可读介质的保护范围之内。 Memory, RAM), Read-Only Memory (ROM), Electrically Erasable Programmable Read-Only Memory (EEPROM), CD-ROM (Compact Disc Read-Only Memory, CD- ROM) or other optical disc storage, magnetic storage medium or other magnetic storage device, or any other medium that can be used to carry or store desired program code in the form of an instruction or data structure and that can be accessed by a computer. Also. Any connection can be adapted It becomes a computer readable medium. For example, if the software is transmitted from a website, server, or other remote source using coaxial cable, fiber optic cable, twisted pair, Digital Subscriber Line (DSL), or wireless technologies such as infrared, radio, and microwave, Then coaxial cable, fiber optic cable, twisted pair, DSL or wireless technologies such as infrared, wireless and microwave are included in the fixing of the associated medium. As used in the present invention, a disk and a disc include a compact disc (CD), a laser disc, a compact disc, a digital versatile disc (DVD), a floppy disc, and a Blu-ray disc, wherein the disc is usually magnetically copied, and the disc is The laser is used to optically replicate the data. Combinations of the above should also be included within the scope of the computer readable media.
总之, 以上所述仅为本发明技术方案的较佳实施例而已, 并非用于限定本发明 的保护范围。 凡在本发明的精神和原则之内, 所作的任何修改、 等同替换、 改 进等, 均应包含在本发明的保护范围之内。  In summary, the above description is only a preferred embodiment of the technical solution of the present invention, and is not intended to limit the scope of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and scope of the invention are intended to be included within the scope of the invention.

Claims

权利要求书 Claim
[权利要求 1] 一种房地产施工进度管理方法, 其特征在于, 所述方法包括如下步骤 设置不同施工进度之间的照片;  [Claim 1] A real estate construction progress management method, characterized in that the method comprises the following steps: setting a photo between different construction progresses;
接收用户拍摄的照片;  Receiving photos taken by the user;
依据该照片与预设不同施工进度之间的照片比对来获取施工进度, 将 该施工进度保存。  According to the photo comparison between the photo and the preset construction progress, the construction progress is obtained, and the construction progress is saved.
[权利要求 2] 根据权利要求 1所述的方法, 其特征在于, 所述方法还包括:  [Claim 2] The method according to claim 1, wherein the method further comprises:
如未比对到一致的图片, 则获取两个最接近的图片, 从两个最接近的 图片的工期区间中选取一个数值作为工期的进度。  If the matching picture is not matched, the two closest pictures are obtained, and a value is selected from the duration intervals of the two closest pictures as the progress of the construction period.
[权利要求 3] 根据权利要求 1所述的方法, 其特征在于, 所述方法还包括:  [Claim 3] The method according to claim 1, wherein the method further comprises:
获取历史工期进度, 如当前获取的施工进度低于历史工期进度, 舍弃 该施工进度。  Obtain the progress of the historical construction period. If the current construction progress is lower than the historical construction period, the construction progress will be abandoned.
[权利要求 4] 一种房地产施工进度管理系统, 其特征在于, 所述系统包括:  [Claim 4] A real estate construction progress management system, wherein the system includes:
设置单元, 用于设置不同施工进度之间的照片; 接收单元, 用于接收用户拍摄的照片;  a setting unit, configured to set a photo between different construction progress; a receiving unit, configured to receive a photo taken by the user;
计算单元, 用于依据该照片与预设不同施工进度之间的照片比对来获 取施工进度, 将该施工进度保存。  The calculation unit is configured to obtain a construction progress according to a photo comparison between the photo and a preset different construction progress, and save the construction progress.
[权利要求 5] 根据权利要求 4所述的系统, 其特征在于, 所述系统还包括: [Claim 5] The system according to claim 4, wherein the system further comprises:
选取单元, 用于如未比对到一致的图片, 则获取两个最接近的图片, 从两个最接近的图片的工期区间中选取一个数值作为工期的进度。  The selection unit is used to obtain two closest pictures if the pictures are not matched, and select a value from the duration intervals of the two closest pictures as the progress of the construction period.
[权利要求 6] 根据权利要求 4所述的系统, 其特征在于, 所述系统还包括: [Claim 6] The system according to claim 4, wherein the system further comprises:
舍弃单元, 用于获取历史工期进度, 如当前获取的施工进度低于历史 工期进度, 舍弃该施工进度。  The abandonment unit is used to obtain the progress of the historical construction period. If the current construction progress is lower than the historical construction period, the construction progress is abandoned.
PCT/CN2016/078428 2016-04-05 2016-04-05 Method and system for managing real estate construction progress WO2017173560A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/CN2016/078428 WO2017173560A1 (en) 2016-04-05 2016-04-05 Method and system for managing real estate construction progress
CN201680000140.6A CN105900129A (en) 2016-04-05 2016-04-05 Real estate construction schedule management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2016/078428 WO2017173560A1 (en) 2016-04-05 2016-04-05 Method and system for managing real estate construction progress

Publications (1)

Publication Number Publication Date
WO2017173560A1 true WO2017173560A1 (en) 2017-10-12

Family

ID=56718760

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2016/078428 WO2017173560A1 (en) 2016-04-05 2016-04-05 Method and system for managing real estate construction progress

Country Status (2)

Country Link
CN (1) CN105900129A (en)
WO (1) WO2017173560A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136618A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress plan
CN104166892A (en) * 2014-06-19 2014-11-26 国家电网公司 Engineering management and control method and system based on three-dimensional design system
CN104636840A (en) * 2013-11-09 2015-05-20 吴晓铭 Construction project field management information acquisition and subsequent application processing technology
CN105354653A (en) * 2015-08-26 2016-02-24 吕曼 Intelligent management system for engineering construction project

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103714436A (en) * 2014-01-09 2014-04-09 国家电网公司 Electric power engineering construction progress tracking system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136618A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress plan
CN104636840A (en) * 2013-11-09 2015-05-20 吴晓铭 Construction project field management information acquisition and subsequent application processing technology
CN104166892A (en) * 2014-06-19 2014-11-26 国家电网公司 Engineering management and control method and system based on three-dimensional design system
CN105354653A (en) * 2015-08-26 2016-02-24 吕曼 Intelligent management system for engineering construction project

Also Published As

Publication number Publication date
CN105900129A (en) 2016-08-24

Similar Documents

Publication Publication Date Title
US10025629B2 (en) System and method for dynamic rescheduling of multiple varying resources with user social mapping
US10210484B2 (en) Altering a functional characteristic of a computer used by an invitee to a meeting
US20210334303A1 (en) Data sharing method, device and system
US20130007121A1 (en) Predictive collaboration management
WO2016061395A2 (en) Tagged proximity training and timning
WO2015196996A1 (en) Photo storage method and device
CN105224545A (en) A kind of position recommend method and device
WO2015196999A1 (en) Photograph storage method and device
US10694361B2 (en) Computer-implemented agent assisted electronic business cards
JP2014146364A5 (en)
WO2017173564A1 (en) Real estate price estimation method and system
WO2017173560A1 (en) Method and system for managing real estate construction progress
WO2017107108A1 (en) Method and system for managing camera of monitoring system
WO2017173562A1 (en) Real estate sales data counting method and system
WO2017066988A1 (en) Mobile phone internet of things control method and system
WO2017127961A1 (en) Method and system for sorting on dining app platform
CA3010392A1 (en) Social network application for real estate
WO2017173565A1 (en) Method and system for generating house property effect graph
WO2017066979A1 (en) Mobile phone indoor positioning method and system
WO2020221230A1 (en) Information processing method and apparatus
CN106296508A (en) Residue class hour computational methods and system during English lesson
WO2017173574A1 (en) Mobile-phone alert method and system for ktv
EP4222927A1 (en) Meeting robot
WO2017173563A1 (en) Method and system for detecting real estate quality
US20190075151A1 (en) Facility for initiating automatic exchange of file(s) between mobile devices

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16897495

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 16897495

Country of ref document: EP

Kind code of ref document: A1