CN103714436A - 电力工程施工进度跟踪系统 - Google Patents
电力工程施工进度跟踪系统 Download PDFInfo
- Publication number
- CN103714436A CN103714436A CN201410008987.1A CN201410008987A CN103714436A CN 103714436 A CN103714436 A CN 103714436A CN 201410008987 A CN201410008987 A CN 201410008987A CN 103714436 A CN103714436 A CN 103714436A
- Authority
- CN
- China
- Prior art keywords
- terminal
- processing module
- central processing
- client
- entry terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明涉及一种电力工程施工进度跟踪系统,包括现场输入终端、中央服务器和客户查询终端;现场输入终端从中央服务器调取节点工程完成时间表,在节点工程完成时间表中输入最近节点工程的完成时间及相关备注信息,并将更新过的节点工程完成时间表经通信网络实时发送给中央服务器;中央服务器上设有中央处理模块和数据库;中央处理模块接收更新过的节点工程完成时间表,提取最近节点工程的完成时间等,存储到数据库中;中央处理模块接收客户查询终端发来的查询进度请求,并将更新过的节点工程完成时间表经通信网络发送给客户查询终端,并在客户查询终端上进行显示。该系统有利于及时了解工程施工进度及现场情况,从而保证工程按期完成。
Description
技术领域
本发明涉及电力建设自动化技术领域,特别是一种电力工程施工进度跟踪系统。
背景技术
随着我国经济的飞速发展,社会用电需求不断提高。为了适应社会用电的发展需求,电网建设规模不断扩大,电力工程施工项目也越来越多。但是,由于施工现场情况复杂,工程进度往往无法按计划完成。因此,有必要设计一种可以及时跟踪工程进度,便于了解现场情况以便排查问题的工程进度跟踪系统。
发明内容
本发明的目的在于提供一种电力工程施工进度跟踪系统,该系统有利于及时了解工程施工进度及现场情况,从而保证工程按期完成。
为实现上述目的,本发明采用的技术方案是:一种电力工程施工进度跟踪系统,包括现场输入终端、中央服务器和客户查询终端,所述现场输入终端经第一通信网络与中央服务器相连接,所述客户查询终端经第二通信网络与中央服务器相连接;
所述现场输入终端用于从中央服务器调取节点工程完成时间表并下载至现场输入终端中,还用于在节点工程完成时间表中输入最近节点工程的完成时间及相关备注信息,并将更新过的节点工程完成时间表经第一通信网络实时发送给中央服务器;
所述中央服务器上设有中央处理模块和数据库;所述中央处理模块用于接收现场输入终端发来的更新过的节点工程完成时间表,提取最近节点工程的完成时间及相关备注信息,存储到数据库中;所述中央处理模块还用于接收客户查询终端发来的查询进度请求,并将更新过的节点工程完成时间表经第二通信网络发送给客户查询终端;
所述客户查询终端用于向中央处理模块发送查询进度请求,以及接收节点工程完成时间表并进行显示。
进一步的,所述现场输入终端上设有摄像装置;所述客户查询终端向中央处理模块发送查看现场请求,所述中央处理模块接到查看现场请求后,向现场输入终端发送摄像命令,所述现场输入终端接到摄像命令后,通过摄像装置采集施工现场的图像信息,并将图像信息经中央处理模块发送给客户查询终端。
进一步的,所述现场输入终端上设有RFID阅读器;所述客户查询终端向中央处理模块发送查看人员请求,所述中央处理模块接到查看人员请求后,向现场输入终端发送识读命令,所述现场输入终端接到识读命令后,通过RFID阅读器识读在其工作范围内的RFID电子标签,并将识读到的标签信息经中央处理模块发送给客户查询终端。
进一步的,所述第一通信网络为GPRS或CDMA无线网络,所述现场输入终端上对应设有GPRS模块或CDMA模块,以接入GPRS或CDMA无线网络。
进一步的,所述第二通信网络为GPRS或CDMA无线网络,所述现场输入终端上对应设有GPRS模块或CDMA模块,以接入GPRS或CDMA无线网络。
本发明的有益效果是能够及时跟踪到各节点工程的完成情况,从而及时了解工程施工进度。当施工计划未能如期完成时,可查看施工现场情况及人员到岗情况,从而更进一步了解进度拖延的原因,为排查问题提供依据。此外,本系统结构简单,易于实现,实用性强,可广泛应用于电力工程施工中。
附图说明
图1是本发明实施例的系统结构示意图。
具体实施方式
下面结合附图及具体实施例对本发明作进一步的详细说明。
请参见图1,本发明电力工程施工进度跟踪系统,包括现场输入终端、中央服务器和客户查询终端,所述现场输入终端经第一通信网络与中央服务器相连接,所述客户查询终端经第二通信网络与中央服务器相连接;
所述现场输入终端用于从中央服务器调取节点工程完成时间表并下载至现场输入终端中,还用于在节点工程完成时间表中输入最近节点工程的完成时间及相关备注信息,并将更新过的节点工程完成时间表经第一通信网络实时发送给中央服务器;
如图1所示,所述中央服务器上设有中央处理模块和数据库;所述中央处理模块用于接收现场输入终端发来的更新过的节点工程完成时间表,提取最近节点工程的完成时间及相关备注信息,存储到数据库中;所述中央处理模块还用于接收客户查询终端发来的查询进度请求,并将更新过的节点工程完成时间表经第二通信网络发送给客户查询终端;
所述客户查询终端用于向中央处理模块发送查询进度请求,以及接收节点工程完成时间表并进行显示。
为了在需要时,特别是工程进度无法按期完成时,能够查看现场施工情况,所述现场输入终端上设有摄像装置;所述客户查询终端向中央处理模块发送查看现场请求,所述中央处理模块接到查看现场请求后,向现场输入终端发送摄像命令,所述现场输入终端接到摄像命令后,通过摄像装置采集施工现场的图像信息,并将图像信息经中央处理模块发送给客户查询终端。
为了排查施工问题,查看施工人员现场到岗情况,所述现场输入终端上设有RFID阅读器;所述客户查询终端向中央处理模块发送查看人员请求,所述中央处理模块接到查看人员请求后,向现场输入终端发送识读命令,所述现场输入终端接到识读命令后,通过RFID阅读器识读在其工作范围内的RFID电子标签,并将识读到的标签信息经中央处理模块发送给客户查询终端。
在本发明的较佳实施例中,所述第一通信网络为GPRS或CDMA无线网络,所述现场输入终端上对应设有GPRS模块或CDMA模块,以接入GPRS或CDMA无线网络。
在本发明的较佳实施例中,所述第二通信网络为GPRS或CDMA无线网络,所述现场输入终端上对应设有GPRS模块或CDMA模块,以接入GPRS或CDMA无线网络。
以上是本发明的较佳实施例,凡依本发明技术方案所作的改变,所产生的功能作用未超出本发明技术方案的范围时,均属于本发明的保护范围。
Claims (5)
1.一种电力工程施工进度跟踪系统,其特征在于:包括现场输入终端、中央服务器和客户查询终端,所述现场输入终端经第一通信网络与中央服务器相连接,所述客户查询终端经第二通信网络与中央服务器相连接;
所述现场输入终端用于从中央服务器调取节点工程完成时间表并下载至现场输入终端中,还用于在节点工程完成时间表中输入最近节点工程的完成时间及相关备注信息,并将更新过的节点工程完成时间表经第一通信网络实时发送给中央服务器;
所述中央服务器上设有中央处理模块和数据库;所述中央处理模块用于接收现场输入终端发来的更新过的节点工程完成时间表,提取最近节点工程的完成时间及相关备注信息,存储到数据库中;所述中央处理模块还用于接收客户查询终端发来的查询进度请求,并将更新过的节点工程完成时间表经第二通信网络发送给客户查询终端;
所述客户查询终端用于向中央处理模块发送查询进度请求,以及接收节点工程完成时间表并进行显示。
2.根据权利要求1所述的电力工程施工进度跟踪系统,其特征在于:所述现场输入终端上设有摄像装置;所述客户查询终端向中央处理模块发送查看现场请求,所述中央处理模块接到查看现场请求后,向现场输入终端发送摄像命令,所述现场输入终端接到摄像命令后,通过摄像装置采集施工现场的图像信息,并将图像信息经中央处理模块发送给客户查询终端。
3.根据权利要求1所述的电力工程施工进度跟踪系统,其特征在于:所述现场输入终端上设有RFID阅读器;所述客户查询终端向中央处理模块发送查看人员请求,所述中央处理模块接到查看人员请求后,向现场输入终端发送识读命令,所述现场输入终端接到识读命令后,通过RFID阅读器识读在其工作范围内的RFID电子标签,并将识读到的标签信息经中央处理模块发送给客户查询终端。
4.根据权利要求1所述的电力工程施工进度跟踪系统,其特征在于:所述第一通信网络为GPRS或CDMA无线网络,所述现场输入终端上对应设有GPRS模块或CDMA模块,以接入GPRS或CDMA无线网络。
5.根据权利要求1所述的电力工程施工进度跟踪系统,其特征在于:所述第二通信网络为GPRS或CDMA无线网络,所述现场输入终端上对应设有GPRS模块或CDMA模块,以接入GPRS或CDMA无线网络。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410008987.1A CN103714436A (zh) | 2014-01-09 | 2014-01-09 | 电力工程施工进度跟踪系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410008987.1A CN103714436A (zh) | 2014-01-09 | 2014-01-09 | 电力工程施工进度跟踪系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103714436A true CN103714436A (zh) | 2014-04-09 |
Family
ID=50407389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410008987.1A Pending CN103714436A (zh) | 2014-01-09 | 2014-01-09 | 电力工程施工进度跟踪系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103714436A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105900129A (zh) * | 2016-04-05 | 2016-08-24 | 盛玉伟 | 房地产施工进度管理方法及系统 |
CN106709695A (zh) * | 2016-11-17 | 2017-05-24 | 国家电网公司 | 一种电力建设工程数据同步设备及其同步方法 |
CN107680003A (zh) * | 2016-08-01 | 2018-02-09 | 北京地厚云图科技有限公司 | 工程监理任务的节点树生成方法及装置 |
CN107688922A (zh) * | 2016-08-04 | 2018-02-13 | 北京地厚云图科技有限公司 | 基于节点树的工程监理任务处理方法及装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1350253A (zh) * | 2000-10-23 | 2002-05-22 | Pc网络大厦株式会社 | 工程进度状况管理方法 |
CN101261700A (zh) * | 2008-04-25 | 2008-09-10 | 广东高新兴通信股份有限公司 | 一种工程进度管理系统 |
CN103136618A (zh) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | 工程进度计划的在线管理方法 |
CN103440687A (zh) * | 2013-09-13 | 2013-12-11 | 苏州大学 | 一种基于rfid技术的考勤方法及系统 |
-
2014
- 2014-01-09 CN CN201410008987.1A patent/CN103714436A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1350253A (zh) * | 2000-10-23 | 2002-05-22 | Pc网络大厦株式会社 | 工程进度状况管理方法 |
CN101261700A (zh) * | 2008-04-25 | 2008-09-10 | 广东高新兴通信股份有限公司 | 一种工程进度管理系统 |
CN103136618A (zh) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | 工程进度计划的在线管理方法 |
CN103440687A (zh) * | 2013-09-13 | 2013-12-11 | 苏州大学 | 一种基于rfid技术的考勤方法及系统 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105900129A (zh) * | 2016-04-05 | 2016-08-24 | 盛玉伟 | 房地产施工进度管理方法及系统 |
CN107680003A (zh) * | 2016-08-01 | 2018-02-09 | 北京地厚云图科技有限公司 | 工程监理任务的节点树生成方法及装置 |
CN107688922A (zh) * | 2016-08-04 | 2018-02-13 | 北京地厚云图科技有限公司 | 基于节点树的工程监理任务处理方法及装置 |
CN106709695A (zh) * | 2016-11-17 | 2017-05-24 | 国家电网公司 | 一种电力建设工程数据同步设备及其同步方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103714436A (zh) | 电力工程施工进度跟踪系统 | |
CN204614046U (zh) | 新型楼宇办公考勤系统 | |
CN202210296U (zh) | 变电智能巡检一体化装置和监控系统 | |
CN104134111A (zh) | 一种物业管理系统及管理方法 | |
CN105117860A (zh) | 一种基于人脸识别设备的互联网考勤系统和方法 | |
CN202351939U (zh) | 一种基于射频识别技术的实时巡更系统 | |
CN104346839A (zh) | 一种基于局域网的员工电子考勤系统 | |
CN204331799U (zh) | 实时车载冷链运输信息监控系统 | |
CN104537498A (zh) | 一种基于二维码的电力信息设备管理系统 | |
CN104123613A (zh) | 一种基于云计算的移动展会管理系统 | |
CN104881692A (zh) | 一种智能化图书检索监控系统及方法 | |
CN204557558U (zh) | 基于rfid的航空教学工器具可视化管理系统 | |
CN102300367A (zh) | 基于rfid的人员定位照明控制系统及其控制方法 | |
CN103676878A (zh) | 一种车间生产过程控制系统 | |
CN204650581U (zh) | 一种电力现场安全质量监察系统 | |
CN204390295U (zh) | 一种配电箱信息管理系统 | |
CN114944022A (zh) | 一种基于nfc技术的厂区安防巡更系统及其使用方法 | |
CN202422147U (zh) | 产品条形码的跟踪装置 | |
CN207216704U (zh) | 一种校园巡更系统 | |
Li et al. | Intelligent cable joint quality management system based on rfid technology | |
CN203930073U (zh) | 基于rfid 与卫星定位系统的实验装置 | |
Wu et al. | Innovative application of information management of prefabricated construction components based on BIM | |
CN204178391U (zh) | 一种基于rfid的实验室设备管理装置 | |
Wang | Design for Attendance System with the Direction Identification Based on RFID | |
CN202217326U (zh) | 上班考勤装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140409 |