WO2017139445A1 - Systems and methods for detecting turn-to-turn faults in transformer windings - Google Patents
Systems and methods for detecting turn-to-turn faults in transformer windings Download PDFInfo
- Publication number
- WO2017139445A1 WO2017139445A1 PCT/US2017/017140 US2017017140W WO2017139445A1 WO 2017139445 A1 WO2017139445 A1 WO 2017139445A1 US 2017017140 W US2017017140 W US 2017017140W WO 2017139445 A1 WO2017139445 A1 WO 2017139445A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- turn
- value
- phase
- current
- transformer
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/20—Measuring number of turns; Measuring transformation ratio or coupling factor of windings
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/52—Testing for short-circuits, leakage current or ground faults
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/62—Testing of transformers
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/72—Testing of electric windings
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/16—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass
- H02H3/162—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass for ac systems
- H02H3/165—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass for ac systems for three-phase systems
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/04—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for transformers
- H02H7/042—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for transformers for current transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/04—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for transformers
- H02H7/045—Differential protection of transformers
Definitions
- This disclosure relates to winding fault detectors, and more particularly, to turn-to-turn winding fault detector systems and methods.
- Winding coils are incorporated into a wide variety of products, for example, into inductors and transformers. More particularly, in electrical power transmission systems, various components, for example, a power transformer or a shunt reactor, can include one or more winding coils. Various types of faults can occur in these windings when in use. Some of these faults, for example, a short circuit between the output terminals of a power transformer are more readily detectible than other faults such as, an internal short circuit between a few turns of a primary winding or a secondary winding of the power transformer. The internal short circuit between the few turns may not necessarily result in a significant change in the amount of current being delivered by the power transformer to a power transmission line that is coupled to the power transformer. However, if timely remedial action is not taken, such a fault can eventually develop into a major fault that can severely impact power transmission through the power transmission line.
- Conventional fault detection devices which are typically configured to detect significant current changes in various types of windings may be unable to effectively detect small turn-to-turn faults in such windings. More particularly, conventional fault detection devices may lack adequate sensitivity to detect changes in low amplitude differential currents that are indicative of turn-to-turn faults. Consequently, some solutions have been proposed that are directed at detecting turn-to-turn faults using other techniques. For example, one conventional solution generally pertains to fault detection in a power transformer by using a negative sequence based algorithm incorporating a differential principle, while another conventional solution generally pertains to fault detection in a power transformer by using a negative sequence based algorithm incorporating a direction comparison principle.
- Embodiments of the disclosure are directed generally to systems and methods for detecting turn-to-turn faults in winding.
- a first exemplary system in accordance with an embodiment of the disclosure can include a transformer, a first current monitoring element, a second current monitoring element and a fault detector.
- the first current monitoring element can be configured to provide a first current measurement based on monitoring a primary winding current of the transformer.
- the second current monitoring element can configured to provide a second current measurement based on monitoring a secondary winding current of the transformer.
- the fault detector can be configured to receive each of the first current measurement and the second current measurement and to detect using the first current measurement and the second current
- a turn-to-turn fault in the transformer by executing a procedure that can include determining a steady-state differential current value, determining a steady-state voltage value, determining one or more compensating factors by dividing the steady-state differential current value by the steady-state voltage value, determining a magnetizing current amplitude indicator by multiplying the steady-state voltage value by the one or more compensating factors, determining a compensated differential current value by combining the steady-state differential current value with a modifier value, the modifier value incorporating the magnetizing current amplitude indicator, comparing the compensated differential current value against a threshold value, declaring an occurrence of the turn-to-turn fault in the transformer when the compensated differential current value exceeds the threshold value, and executing a remedial operation comprising at least one of transmitting an alarm or operating a protection relay.
- a second exemplary system in accordance with an embodiment of the disclosure can include a multi-phase transformer, an electrical current monitoring system, and a fault detector.
- the electrical current monitoring system can be configured to provide a set of primary electrical current measurements based on monitoring each of a plurality of primary winding currents of the multi-phase transformer and a set of secondary electrical current measurements based on monitoring each of a plurality of secondary winding currents of the multi- phase transformer.
- the fault detector can be configured to receive the set of primary electrical current measurements and the set of secondary electrical current measurements and to detect using the set of primary electrical current measurements and the set of secondary electrical current measurements, a turn-to-turn fault in the multi-phase transformer by executing a procedure that can include determining a steady-state differential current value for each phase of the multi-phase transformer, determining a steady-state differential voltage value for each phase of the multiphase transformer, determining one or more compensating factors by dividing the steady-state differential current value by the steady-state voltage value for each phase of the multi-phase transformer, determining a magnetizing current amplitude indicator for each phase of the multiphase transformer by multiplying a respective steady-state voltage value by one or more compensating factors, determining a compensated differential current value for each phase of the multi-phase transformer by combining a respective steady-state differential current value with a respective modifier value, each respective modifier value incorporating a respective magnetizing current amplitude indicator, comparing the compensated differential current value for each phase of the multi-phase transformer against a threshold value
- An exemplary method in accordance with an embodiment of the disclosure can include receiving in a fault detector, a first current measurement based on monitoring a primary winding current of a transformer, receiving in the fault detector, a second current measurement based on monitoring a secondary winding current of a transformer, using the first current measurement and the second current measurement to determine a steady-state differential current value and a steady-state voltage value, determining one or more compensating factors by dividing the steady-state differential current value by the steady-state voltage value, determining a magnetizing current amplitude indicator by multiplying the steady-state voltage value by the one or more compensating factors, determining a compensated differential current value by combining the steady-state differential current value with a modifier value, the modifier value incorporating the magnetizing current amplitude indicator, comparing the compensated differential current value against a threshold value, declaring an occurrence of the turn-to-turn fault in the transformer when the compensated differential current value exceeds the threshold value, and executing a remedial operation comprising at least one of transmitting an
- FIG. 1 illustrates an example three-phase power line system that can include a turn-to-turn fault detector configured to detect one or more turn-to-turn faults in a three- phase shunt reactor in accordance with an exemplary embodiment of the disclosure.
- FIG. 2 illustrates an example phase diagram pertaining to detecting one or more turn-to-turn faults in the three-phase shunt reactor shown in FIG. 1 on the basis of phase angle information.
- FIG. 3 illustrates an example power transmission system that can include a turn-to-turn fault detector system configured to detect a turn-to-turn fault in a single phase transformer in accordance with another exemplary embodiment of the disclosure.
- FIG. 4 illustrates an example power transmission system that can include a turn-to-turn fault detector system configured to detect a turn-to-turn fault in a three-phase transformer in accordance with another exemplary embodiment of the disclosure.
- FIG. 5 illustrates an example equivalent circuit diagram applicable to each of the single phase transformer shown in FIG. 3 and the three-phase transformer shown in FIG. 4.
- FIG. 6 illustrates an exemplary turn-to-turn fault detector in accordance with an exemplary embodiment of the disclosure.
- FIGs. 7 A and 7B illustrate a flowchart of an example method of using a turn-to-turn fault detector to detect a fault in one or more windings of a three-phase shunt reactor in accordance with an exemplary embodiment of the disclosure.
- FIGs. 8A and 8B illustrate a flowchart of an example method of using a turn-to-turn fault detector to detect a turn-to-turn fault in one or more windings of a transformer in accordance with another exemplary embodiment of the disclosure.
- example as used herein is intended to be non-exclusionary and non-limiting in nature. More particularly, the word “exemplary” as used herein indicates one among several examples, and it should be understood that no undue emphasis or preference is being directed to the particular example being described.
- certain embodiments of the systems and methods described herein are directed to a fault detector that can be used to detect one or more turn-to-turn faults in a coil winding.
- coil windings are ubiquitously incorporated into a wide array of products.
- only two products, specifically a three-phase shunt reactor and a power transformer, are used herein to describe various embodiments and aspects in accordance with the disclosure.
- FIG. 1 illustrates an example three-phase power line system 100 that can include a turn-to-turn fault detector 120 configured to detect one or more turn-to-turn faults in a three-phase shunt reactor 155 in accordance with an exemplary embodiment of the disclosure.
- Three-phase power line system 100 can be used to propagate electric power over three power lines 101, 102, and 103 in a three-phase configuration as is known in the art.
- Each of the three power lines 101, 102, and 103 can be coupled to the three- phase shunt reactor 155 that is deployed in a manner that is known in the art.
- the three-phase shunt reactor 155 can include three windings that are collectively coupled to ground via a node 118.
- a first winding 114 of the three windings in the three-phase shunt reactor 155 is coupled to the power line 101 via a first current monitoring element 125 and a first isolating switch 140.
- the first isolating switch 140 can be controlled by the turn-to-turn fault detector 120 via a control line 113 in order to isolate the first winding 114 from the power line 101 when a turn-to-turn fault is detected in the first winding 114.
- a second winding 116 of the three windings in the three-phase shunt reactor 155 is coupled to the power line 102 via a second current monitoring element 130 and a second isolating switch 145.
- the second isolating switch 145 can be controlled by the turn- to-turn fault detector 120 via the control line 113 (or via a separate control line that is not shown) in order to isolate the second winding 116 from the power line 102 when a turn-to-turn fault is detected in the second winding 116.
- a third winding 117 of the three windings in the three-phase shunt reactor 155 is coupled to the power line 103 via a third current monitoring element 135 and a third isolating switch 150.
- the third isolating switch 150 can be controlled by the turn-to-turn fault detector 120, via the control line 113 (or via a separate control line that is not shown) in order to isolate the third winding 117 from the power line 103 when a turn-to-turn fault is detected in the third winding 117. It should be understood that more than one of the three optional switches 140, 145, and 150 (each of which can be implemented in the form of a relay, for example) can be operated by the turn-to-turn fault detector 120 when one or more turn-to-turn faults are detected in one or more of the three windings 114, 116, and 117. Furthermore, in place of using the three isolating switches, other protection elements and configurations can be used to provide remedial action upon detecting one or more turn-to-turn faults in one or more of the three windings 114, 116, and 117.
- the first current monitoring element 125 can be used to monitor the power line 101 and to output a current measurement that is a scaled-down version of a first phase current that is routed from the power line 101 into the first winding 114 of the three-phase shunt reactor 155 when three-phase electric power is being transmitted through the three-phase power line system 100.
- the current measurement output of the current monitoring element 125 is coupled into the turn-to-turn fault detector 120 via a line 109.
- the second current monitoring element 130 can be similarly used to monitor the power line 102 and to output a current measurement that is a scaled-down version of a second phase current that is routed from the power line 102 to the second winding 116 of the three-phase shunt reactor 155 when three-phase electric power is being transmitted through the three-phase power line system 100.
- the current measurement output of the current monitoring element 130 is coupled into the turn-to-turn fault detector 120 via a line 111.
- the third current monitoring element 135 can also be similarly used to monitor the power line 103 and to output a current measurement that is a scaled-down version of a third phase current that is routed from the power line 103 to the third winding 117 of the three-phase shunt reactor 155 when three-phase electric power is being transmitted through the three-phase power line system 100.
- the current measurement output of the current monitoring element 135 is coupled into the turn-to-turn fault detector 120 via a line 112.
- the three windings 114, 116, and 117 can be collectively contained within a single enclosure. Furthermore, the three windings 114, 116, and 117 can be provided in various configurations such as, for example, a ⁇ configuration or a wye configuration. In another exemplary embodiment in accordance with disclosure, each of the three windings 114, 116, and 117 can be contained in three separate enclosures.
- two or more of the three windings 114, 116, and 117 can be contained in a second enclosure that is different than a first enclosure in which the remaining of the three windings 114, 116, and 117 is contained.
- one or more additional windings can be provided in addition to the three windings 114, 116, and 117.
- a fourth winding can be coupled between the node 118 and ground.
- the turn-to-fault detector 120 can be used to detect one or more turn-to-turn faults in one or more of these various windings in accordance with the disclosure.
- a first voltage monitoring element 105 can be used to monitor the power line 101 and to output a voltage measurement that is a scaled-down version of a first phase voltage present on the power line 101 when three-phase electric power is transmitted through the three-phase power line system 100.
- the voltage measurement output of the voltage monitoring element 105 is coupled into the turn-to-turn fault detector 120 via a line 106.
- a second voltage monitoring element 115 can be used to monitor the power line 102 and to output a voltage measurement that is a scaled-down version of a second phase voltage present on the power line 102 when three- phase electric power is transmitted through the three-phase power line system 100.
- the voltage measurement output of the voltage monitoring element 110 is coupled into the turn-to-turn fault detector 120 via a line 107.
- a third voltage monitoring element 115 can be used to monitor the power line 103 and to output a voltage measurement that is a scaled-down version of a third phase voltage present on the power line 103 when three-phase electric power is transmitted through the three-phase power line system 100.
- the voltage measurement output of the voltage monitoring element 115 is coupled into the turn-to-turn fault detector 120 via a line 108.
- the turn-to-turn fault detector 120 includes various elements that will be described below in more detail using another figure.
- the turn-to-turn fault detector 120 is configured to execute a procedure that uses a differential protection algorithm to detect one or more turn-to-turn faults in one or more windings of the three-phase shunt reactor 155.
- the procedure includes using the voltage measurements provided by the voltage monitoring elements 105, 110, and 115, and the current measurements provided by the current monitoring elements 125, 130, and 135 to calculate a difference value between a voltage- based parameter and a current-based parameter.
- the voltage-based parameter is indicative of a normalized negative voltage imbalance and the current-based parameter is indicative of a normalized negative current imbalance.
- the procedure further includes declaring an occurrence of the turn-to-turn fault in at least one of the first winding 114, the second winding 116, or the third winding 117 of the three-phase shunt reactor 155 when the difference value is not equal to zero.
- the difference value is approximately zero under steady state conditions and no turn-to-turn fault is present in the three windings 114, 116, and 117. Any small deviation from zero can be attributed to minor system imbalances that may be present under normal operating conditions of the three-phase power line system 100.
- the occurrence of the turn-to-turn fault can be declared only when the difference value exceeds a threshold value.
- the turn-to-turn fault detector 120 can be used to identify a specific faulty phase among the various phases of a target object, for example, among the three phases in the three-phase power line system 100. Also, the turn-to-turn fault detector 120 can be used to identify turn-to- turn faults in various types of windings without requiring impedance information of the windings (for example, impedance information pertaining to any of the three windings 114, 116, and 117) and without requiring information pertaining to a current flow through a neutral winding (not shown) of the three-phase shunt reactor 155.
- impedance information of the windings for example, impedance information pertaining to any of the three windings 114, 116, and 117
- a neutral winding not shown
- the turn-to-turn fault detector 120 can provide a satisfactory level of performance under various operational conditions of the three-phase power line system 100, for example, under normal system unbalances, off-nominal system frequencies, off-nominal system voltages, during load switching, in the presence of harmonics, and in the presence of faults external to the three-phase shunt reactor 155.
- the turn-to-turn fault detector 120 is configured to avoid using the differential protection algorithm when one or more of the current monitoring elements 125, 130, and 135 undergo one or more of a current saturation condition, a current inrush condition, or an offline condition.
- VA, VB, and Vc are phase voltage measurements provided to the turn-to-turn detector 120 by the voltage monitoring elements 105, 1 10, and 1 15 respectively;
- IA, IB, and Ic are phase current measurements provided to the turn-to-turn detector 120 by the current monitoring elements 125, 130, and 135;
- ZA, ZB, and Zc are phase impedances of the three windings 1 14, 1 16, and 1 17 of the three-phase shunt reactor 155;
- V2 and Vi are negative sequence and positive sequence voltages respectively;
- I2 and Ii are negative sequence and positive sequence currents respectively.
- An absolute value of the difference parameter (Diff) can be used by the turn-to-turn fault detector 120 to declare a fault condition.
- a fault condition can be declared when the absolute value of the difference parameter (Diff) exceeds a threshold percentage value "c."
- the threshold percentage value "c" can be a settable threshold value that can be set by an operator of the turn-to-turn fault detector 120.
- a fault condition can also be declared by examining vector representations of phases associated with each of the voltages VA, VB, and Vc. In one exemplary embodiment, this can be carried out by using the expression Z (Diff - Diffsteady).
- Z (Diff - Diffsteady) A faulty "phase A” may be declared when Z (Diff - Diffsteady) is in a range of 180° ⁇ D
- a faulty "phase B” may be declared when Z (Diff - Diffsteady) is in a range of -60° ⁇ D
- a faulty "phase C” may be declared when Z (Diff - Diffsteady) is in a range of +60 degrees ⁇ D
- "D" is a limit angle that can be set in a range of 20° to 60°.
- FIG. 2 illustrates an example phase diagram 200 pertaining to detecting one or more turn-to-turn faults in the three-phase shunt reactor 155 on the basis of phase angle information.
- the range of 180 degrees ⁇ D corresponding to "phase A” is indicated by an arrow 205
- the range of -60 degrees ⁇ D corresponding to "phase B” is indicated by an arrow 210
- the range of +60 degrees ⁇ D corresponding to "phase C” is indicated by an arrow 215.
- the turn- to-turn fault detector 120 can be configured to declare a fault in a particular phase among the three phases A, B, and C by employing the three ranges shown in the example phase diagram 200.
- FIG. 3 illustrates an example power transmission system 300 that can include a turn-to-turn fault detector system 120 configured to detect a turn-to-turn fault in the primary and secondary windings of a single phase transformer 310 in accordance with another exemplary embodiment of the disclosure.
- a first current monitoring element 305 can be used to monitor a primary current "Ip" that flows via line 306 and into a primary winding of the single phase transformer 310.
- the first current monitoring element 305 provides a scaled-down version of the primary current to the turn-to-turn fault detector 120 via a line 301.
- a second current monitoring element 315 can be used to monitor a secondary current "Is" that flows out to a line 307 from a secondary winding of the single phase transformer 310.
- the second current monitoring element 315 provides a scaled-down version of the secondary current to the turn-to- turn fault detector 120 via a line 302. Additional monitoring elements (not shown) can be used for monitoring voltages at various nodes of the power transmission system 300, such as, for example, to provide the turn-to-turn fault detector 120 with one or more steady-state voltage values or differential voltage values associated with the primary winding and the secondary winding of the single phase transformer 310.
- the turn-to-turn fault detector 120 is configured to execute a procedure that includes using the current values and the voltage values obtained via the various monitoring elements to determine various steady-state differential currents and various steady-state voltage values.
- Each of the steady-state differential currents typically includes a steady-state magnetizing current component that is dependent upon at least one steady-state voltage that is present at a terminal of the single phase transformer 310.
- one or more compensating factors are combined with the various steady-state differential current values to compensate for the steady-state magnetizing current component and also to compensate for any measurement errors in the steady-state differential current values.
- a modifier value that is equal to a magnetizing current component value can be used. The modifier value may be subtracted from a steady-state differential current value to provide the compensation.
- the compensated steady-state differential current value can then be used to detect a turn-to-turn fault, such as, for example, by comparing a compensated steady-state differential current value against a reference threshold value.
- the comparing may be carried out over a pre-settable period of time that can be pre-set by an operator, for example.
- the turn-to-turn fault detector 120 can carry out a remedial action. For example, the turn-to-turn fault detector 120 can provide a first control signal (via a line 303) to a first breaker 320 in order to isolate the primary winding of the single phase transformer 310 from the power line conductor 306. As another example, the turn-to-turn fault detector 120 can provide a second control signal (via a line 304) to a second breaker 325 in order to isolate the secondary winding of the single phase transformer 310 from the power line conductor 307.
- the turn-to-turn fault detector 120 can also provide a fault indicator signal via a line 412, to a fault monitoring unit (not shown) such as, for example, a computer that is located at a monitoring station, a display device located at the monitoring station, or an alarm (light, buzzer, siren etc.) located on or near the turn-to-turn fault detector 120.
- a fault monitoring unit such as, for example, a computer that is located at a monitoring station, a display device located at the monitoring station, or an alarm (light, buzzer, siren etc.) located on or near the turn-to-turn fault detector 120.
- FIG. 4 illustrates a power transmission system 400 that can include a turn- to-turn fault detector system 120 configured to detect a turn-to-turn fault in a three-phase transformer 410 in accordance with another exemplary embodiment of the disclosure.
- the three-phase transformer 410 is shown with three primary windings interconnected in a " ⁇ " arrangement and three secondary windings interconnected in a "Y" arrangement, solely as a matter of convenience for purposes of description.
- the description provided below in accordance with the disclosure is equally applicable to various other configurations and interconnections associated with the three three-phase transformer 410.
- a first current monitoring element 405 can be used to monitor a phase "A" primary current “IAP” that flows via line 401 into a first primary winding of the three-phase transformer 410.
- the first current monitoring element 405 provides to the turn-to-turn fault detector 120, via a line 404, a scaled-down version "lap" of the primary current "IAP.”
- a second current monitoring element 420 can be used to monitor a phase "B” primary current "IBP” that flows via line 402 into a second primary winding of the three-phase transformer 410.
- the second current monitoring element 420 provides to the turn-to-turn fault detector 120, via a line 406, a scaled-down version "Ibp" of the primary current "IBP "
- a third current monitoring element 435 can be used to monitor a phase "C” primary current "ICP” that flows via line 403 into a third primary winding of the three-phase transformer 410.
- the third current monitoring element 435 provides to the turn-to-turn fault detector 120, via a line 407, a scaled-down version "I cp " of the primary current "ICP.”
- a fourth current monitoring element 415 can be used to monitor a phase
- a secondary current "IAS” that is provided by a first secondary winding of the three-phase transformer 410 to a line 413.
- the fourth current monitoring element 415 provides to the turn-to- turn fault detector 120, a first secondary current measurement “las” that is a scaled-down version of "IAS.”
- a fifth current monitoring element 430 can be used to monitor a phase “B” secondary current "IBS” that is provided by a second secondary winding of the three-phase transformer 410 to a line 414.
- the fifth current monitoring element 430 provides to the turn-to-turn fault detector 120, a second secondary current measurement "lbs” that is a scaled-down version of "IBS.”
- a sixth current monitoring element 445 can be used to monitor a phase "C” secondary current “Ics” that is provided by a third secondary winding of the three-phase transformer 410 to a line 416.
- the sixth current monitoring element 430 provides to the turn-to-turn fault detector 120, a third secondary current measurement "I cs " that is a scaled-down version of "Ics.”
- the three secondary current measurements (“las,” “lbs,” and “Ics" are coupled into the turn-to-turn fault detector 120 via a line arrangement that includes line 408, line 409, and line 41 1.
- Additional monitoring elements can be used for monitoring voltages at various nodes of the power transmission system 300, for example, to provide the turn- to-turn fault detector 120 with one or more steady-state voltage values or differential voltage values associated with one or more of the three primary windings and the three secondary windings of the three-phase transformer 410.
- the turn-to-turn fault detector 120 is configured to execute a procedure that includes using the current values and the voltage values obtained via the various monitoring elements described above to determine various steady-state differential currents and various steady-state voltage values.
- This procedure can be understood in view of the procedure described above with reference to the power transmission system 300 shown in FIG. 3, and further in view of the following description based on mathematical equations in accordance with the disclosure.
- Idiff A compensated Idiff A - KA* VRA Equation ( 10)
- Idiff B compensated Idiff B - KA*VRB Equation (1 1)
- Idiff C compensated Idiff C - K A* VRC Equation ( 12)
- VRA, VRB, and VRC are the phase A, phase B, and phase C voltages on the output side of the three-phase transformer 410.
- the phase A, phase B, and phase C voltages on the input side of the three-phase transformer 410 can be used instead.
- KA, KB, and KC are coefficients that are used during a steady state operation of the three-phase transformer 410 in order to make each of Idiff A compensated,
- Idiff B compensated, and Idiff C compensated equal to zero.
- Idiff A compensated, Idiff B compensated, and Idiff C compensated will increase to a value greater than zero when a turn-to-fault exists in one or more of the respective windings.
- the coefficients KA, KB, and KC can be defined as follows:
- An absolute value of each of Idiff A compensated, Idiff B compensated, and Idiff C compensated can be used by the turn-to-turn fault detector 120 to declare a fault condition in a respective phase of the three-phase transformer 410.
- Idiff A compensated, Idiff B compensated, and Idiff C compensated can be used by the turn-to-turn fault detector 120 to declare a fault condition in a respective phase of the three-phase transformer 410.
- a fault condition can be declared in phase A when the absolute value of
- a fault condition can be declared in phase B when the absolute value of Idiff B compensated exceeds (or equals) a threshold percentage value "b,” and a fault condition can be declared in phase C when the absolute value of Idiff C compensated exceeds (or equals) a threshold percentage value "c.”
- a turn-to-turn fault condition in phase A is declared when abs(Idiff A compensated) > "a”
- a turn-to-turn fault condition in phase B is declared when abs(Idiff B compensated) > "b”
- a turn-to-turn fault condition in phase C is declared when abs(Idiff C compensated) > "c.”
- the threshold percentage values "a,” “b,” and “c” can be settable threshold values that can be set, for example, by an operator of the turn-to-turn fault detector 120.
- the turn-to-turn fault detector 120 can carry out a remedial action. For example, the turn-to-turn fault detector 120 can provide a control signal (via a line 412) to one or more protection elements (not shown) in order to isolate one or more of the primary windings from a respective one or more input lines, and/or to isolate one or more of the secondary windings from a respective one or more output lines.
- the turn-to-turn fault detector 120 can provide a fault indicator signal via the line 412 to a fault monitoring unit (not shown) such as, for example, a computer that is located at a monitoring station, a display device located at the monitoring station, or an alarm (light, buzzer, siren etc.) located on or near the turn-to-turn fault detector 120.
- a fault monitoring unit such as, for example, a computer that is located at a monitoring station, a display device located at the monitoring station, or an alarm (light, buzzer, siren etc.) located on or near the turn-to-turn fault detector 120.
- FIG. 5 illustrates an example equivalent circuit diagram of the single phase transformer 310 shown in FIG. 3.
- the input current Ii is equal to the output current I 2 (typically with a phase difference of 180°) if no loss were to be incurred in the single phase transformer 310.
- a current loss does occur in the single phase transformer 310.
- This current loss can be attributed to a magnetizing current Io that is shown in the equivalent circuit diagram.
- the turn-to-turn fault detector 120 carries out a fault-to-fault detection by taking this magnetizing current Io into consideration in accordance with the disclosure.
- FIG. 6 illustrates some exemplary elements that can be contained in the turn-to-turn fault detector 120 in accordance with the disclosure.
- the turn-to-turn fault detector 120 shown in FIG. 6 contains various elements that can be used for implementing the exemplary embodiment shown in FIG. 4 and described above with respect to the three-phase transformer 410. Accordingly, the input lines and output lines are designated by the same reference numerals that are shown in FIG. 4.
- the number of various elements such as, for example, the number of input interfaces
- the turn-to-turn fault detector 120 can be different.
- some elements such as communication ports and user input/output interfaces that are not shown can be incorporated into the turn-to-turn fault detector 120 in accordance with the disclosure.
- the turn-to-turn fault detector 120 can include six input current interfaces 605, 625, 645, 620, 640 and 660 that are coupled to lines 404, 406, 407, 408, 409 and 41 1 respectively. Other input interfaces, such as for example voltage input interfaces (not shown) can be used for providing the turn-to-turn fault detector 120 with various kinds of voltage measurement inputs.
- the turn-to-turn fault detector 120 can also include one or more output interfaces (such as an output interface 665 that is shown coupled to the line 412), for purposes of transmitting output signals such as a control signal, a fault indication signal, or an alarm signal.
- the turn-to-turn fault detector 120 can further include one or more analog- to-digital converters and digital-to-analog converters.
- the analog-to-digital converter 615 can be used to convert a current measurement provided by one of the input interfaces in an analog form into a digital current measurement value that can be processed by the processor 650.
- the digital-to-analog converter 635 can be used to convert various types of digital information that can be provided by the processor 650 to the digital-to-analog converter 635, into an analog output signal that is transmitted out of the turn-to-turn fault detector 120 via the output interface 665.
- One or more relays such as a relay 655, can be used for switching various types of signals (such as, for example, certain current signals associated with the power transmission system 400) when a turn-to-turn fault is detected in the three-phase transformer 410.
- processors such as the processor 650
- the processor 650 can be implemented and operated using appropriate hardware, software, firmware, or combinations thereof.
- Software or firmware implementations can include computer-executable or machine-executable instructions written in any suitable programming language to perform the various functions described.
- instructions associated with a function block language can be stored in the memory 630 and executed by the processor 650.
- the memory 630 can be used to store program instructions that are loadable and executable by the processor 650, as well as to store data generated during the execution of these programs.
- the memory 630 can be volatile (such as random access memory (RAM)) and/or non-volatile (such as read-only memory (ROM), flash memory, etc.).
- the memory devices can also (include additional removable storage (not shown) and/or non-removable storage (not shown) including, but not limited to, magnetic storage, optical disks, and/or tape storage.iDi]
- the disk drives and their associated computer-readable media can provide nonvolatile storage of computer-readable instructions, data structures, program modules, and other data.
- the memory 630 can include multiple different types of memory, such as static random access memory (SRAM), dynamic random access memory (DRAM), or ROM.
- the memory 630, the removable storage, and the non-removable storage are all examples of non-transient computer-readable storage media.
- Such non-transient computer- readable storage media can be implemented in any method or technology for storage of information such as computer-readable instructions, data structures, program modules or other data.
- non-transient computer storage media include, but are not limited to, programmable random access memory (PRAM), SRAM, DRAM, ROM, electrically erasable programmable read-only memory (EEPROM), compact disc read-only memory (CD-ROM), digital versatile discs (DVD) or other optical storage, magnetic cassettes, magnetic tapes, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to store the desired information and which can be accessed by the processor 650. Combinations of any of the above should also be included within the scope of non-transient computer-readable media.
- PRAM programmable random access memory
- SRAM static random access memory
- DRAM dynamic random access memory
- ROM read-only memory
- EEPROM electrically erasable programmable read-only memory
- CD-ROM compact disc read-only memory
- DVD digital versatile discs
- the memory 630 can include, but is not limited to, an operating system (OS) and one or more application programs or services for implementing the features and aspects disclosed herein.
- applications or services can include a turn-to-turn fault detection module (not shown).
- the turn-to-turn fault detection module can be implemented by software that is provided in configurable control block language and is stored in non-volatile memory. When executed by the processor 650, the performance turn-to-turn fault detection module implements the various functionalities and features described in this disclosure.
- FIGs. 7A and 7B illustrate an example flowchart of a method of using a turn-to-turn fault detection to detect a fault in one or more windings of a three-phase shunt reactor in accordance with an exemplary embodiment of the disclosure.
- the three-phase power line system 100 shown in FIG. 1 will be used here solely as a matter of convenience to describe the various operations shown in this example flowchart.
- a first phase current measurement that is based on monitoring a first phase current flowing through a first winding of the three-phase shunt reactor is received.
- This operation can correspond to the turn-to-turn fault detector 120 receiving the first phase current measurement via line 109 from the first current monitoring element 125.
- a second phase current measurement that is based on monitoring a second phase current flowing through a second winding of the three-phase shunt reactor is received.
- This operation can correspond to the turn-to-turn fault detector 120 receiving the second phase current measurement via line 111 from the second current monitoring element 130.
- a third phase current measurement that is based on monitoring a third phase current flowing through a third winding of the three-phase shunt reactor is received.
- This operation can correspond to the turn-to-turn fault detector 120 receiving the third phase current measurement via line 112 from the third current monitoring element 135.
- a first phase voltage measurement that is based on monitoring a first phase voltage present on a first power line conductor of a three-phase power line system is received.
- This operation can correspond to the turn-to-turn fault detector 120 receiving the first phase voltage measurement via line 106 from the first voltage monitoring element 105.
- a second phase voltage measurement that is based on monitoring a second phase voltage present on a second power line conductor of a three-phase power line system is received.
- This operation can correspond to the turn-to-turn fault detector 120 receiving the second phase voltage measurement via line 107 from the second voltage monitoring element 110.
- a third phase voltage measurement that is based on monitoring a third phase voltage present on a third power line conductor of a three-phase power line system is received.
- This operation can correspond to the turn-to-turn fault detector 120 receiving the third phase voltage measurement via line 108 from the third voltage monitoring element 115.
- the turn-to-turn fault detector uses each of the first phase current measurement, the second phase current measurement, the third phase current
- the detection is carried out by calculating a difference value between a voltage-based parameter and a current- based parameter, wherein the voltage-based parameter is indicative of a normalized negative voltage imbalance and the current-based parameter is indicative of a normalized negative current imbalance.
- the turn-to-turn fault detector declares the turn-to-turn fault in at least one of the first winding, the second winding, or the third winding of the three-phase shunt reactor when the difference value is not equal to zero.
- FIGs. 8A and 8B illustrate an example flowchart of a method of using a turn-to-turn fault detection to detect a turn-to-turn fault in one or more windings of a transformer in accordance with an exemplary embodiment of the disclosure.
- the power transmission system 300 shown in FIG. 3 will be used solely as a matter of convenience to describe the various operations shown in this example flowchart. It should be however understood that the method can be suitably applied to detect a turn-to-turn fault in one or more windings of a multi-phase transformer such as the three-phase transformer 410 shown in FIG. 4.
- a first current measurement that is based on monitoring a primary winding of a transformer is received. This operation can correspond to the turn-to-turn fault detector 120 receiving the first current measurement via line 301 from the first current monitoring element 305.
- a second current measurement that is based on monitoring a secondary winding of a transformer is received. This operation can correspond to the turn-to-turn fault detector 120 receiving the second current measurement via line 302 from the second current monitoring element 315.
- each of the first current measurement and the second current measurement is used to determine a steady-state differential current value and a steady- state voltage value.
- one or more compensating factors are determined by dividing the steady-state differential current value by the steady-state voltage value.
- a magnetizing current amplitude indicator is determined by multiplying the steady-state voltage value with the compensating factor.
- a compensated differential current value is determined by combining the steady-state differential current value with a modifier value, the modifier value incorporating the magnetizing current amplitude indicator.
- the compensated differential current value is compared against a threshold value.
- an occurrence of a turn-to-turn fault in the transformer is declared when the compensated differential current value exceeds the threshold value.
- a remedial operation comprising at least one of transmitting an alarm or operating a protection relay is executed.
- the turn-to- turn fault detector 120 can activate the first protection element 320 and/or the second protection element 325.
- a first exemplary system in accordance with an embodiment of the disclosure is a three-phase power line system that can include a first power line conductor, a second power line conductor, a third power line conductor, a three-phase shunt reactor, a first electrical current monitoring element, a second electrical current monitoring element, a third electrical current monitoring element, a first voltage monitoring element, a second voltage monitoring element, a third voltage monitoring element, and a fault detector.
- the first power line conductor can transfer power in a first phase
- the second power line conductor can transfer power in a second phase
- the third power line conductor can transfer power in a third phase.
- the three-phase shunt reactor can be coupled to the three-phase power line system.
- the first electrical current monitoring element can be configured to provide a first current measurement based on monitoring a first phase current flowing through a first winding of the three-phase shunt reactor.
- the second electrical current monitoring element can be configured to provide a second current measurement based on monitoring a second phase current flowing through a second winding of the three-phase shunt reactor.
- the third electrical current monitoring element can be configured to provide a third current measurement based on monitoring a third phase current flowing through a third winding of the three-phase shunt reactor.
- the first voltage monitoring element can be configured to provide a first voltage measurement based on monitoring a first phase voltage present on the first power line conductor.
- the second voltage monitoring element can be configured to provide a second voltage measurement based on monitoring a second phase voltage present on the second power line conductor.
- the third voltage monitoring element can be configured to provide a third voltage measurement based on monitoring a third phase voltage present on the third power line conductor.
- the fault detector can be configured to receive and to use each of the first phase current measurement, the second phase current measurement, the third phase current measurement, the first phase voltage measurement, the second phase voltage measurement, and the third phase voltage measurement to detect a turn-to-turn fault in at least one of the first winding, the second winding, or the third winding of the three-phase shunt reactor by executing a procedure.
- the procedure can include calculating a difference value between a voltage-based parameter and a current-based parameter, wherein the voltage-based parameter is indicative of a normalized negative voltage imbalance and the current-based parameter is indicative of a normalized negative current imbalance, and can further include declaring an occurrence of the turn-to-turn fault in at least one of the first winding, the second winding, or the third winding of the three-phase shunt reactor when the difference value is not equal to zero.
- the voltage-based parameter can be a first normalized value derived at least in part by comparing a negative sequence voltage value to a positive sequence voltage value
- the current-based parameter can be a second normalized value derived at least in part by comparing a negative sequence current value to a positive sequence current value.
- Each of the negative sequence voltage value and the positive sequence voltage value can be represented in a vector representation of phase voltages present in the three-phase power line system.
- the first normalized value can be indicated as a first percentage and the second normalized value can be indicated as a second percentage.
- the first normalized value can be equal to the second normalized value when the turn-to-turn fault is not present in the three-phase shunt reactor.
- the fault detector can be further configured to execute a remedial operation upon the occurrence of the turn-to-turn fault, the remedial action comprising operating a protection relay.
- the remedial action can be executed based on the difference value exceeding a settable threshold value.
- the difference value can be defined as at least one of an absolute numerical value or an angular value, and the settable threshold value can be correspondingly based on the at least one of an absolute numerical value or an angular value.
- the difference value can be defined as an angular value, and an identification of the turn-to-turn fault in a particular one of the first winding, the second winding, or the third winding of the three-phase shunt reactor can be determined based on the angular value.
- the first winding can be identified when the angular value is substantially equal to about (180 degrees ⁇ a tolerance value), the second winding can be identified when the angular value is substantially equal to about (-60 degrees ⁇ the tolerance value), and the third winding can be identified when the angular value is substantially equal to about (+60 degrees ⁇ the tolerance value).
- a second exemplary system in accordance with an embodiment of the disclosure is a turn-to-turn fault detector that can include a first input interface, a second input interface, a third input interface, a fourth input interface, a fifth input interface, a sixth input interface, and at least one processor.
- the first input interface can be configured to receive a first phase current measurement that is based on monitoring a first phase current flowing through a first winding of a three-phase shunt reactor, wherein the first winding is coupled to a first power line conductor of a three-phase power line system.
- the second input interface can be configured to receive a second phase current measurement that is based on monitoring a second phase current flowing through a second winding of the three-phase shunt reactor, wherein the second winding is coupled to a second power line conductor of the three-phase power line system.
- the third input interface can be configured to receive a third phase current measurement that is based on monitoring a third phase current flowing through a third winding of the three-phase shunt reactor, wherein the third winding is coupled to a third power line conductor of the three-phase power line system.
- the fourth input interface can be configured to receive a first phase voltage measurement that is based on monitoring a first phase voltage present on the first power line conductor of the three-phase power line system.
- the fifth input interface can be configured to receive a second phase voltage measurement that is based on monitoring a second phase voltage present on the second power line conductor of the three-phase power line system.
- the sixth input interface can be configured to receive a third phase voltage measurement that is based on monitoring a third phase voltage present on the third power line conductor of the three-phase power line system.
- the processor can be configured to use each of the first phase current measurement, the second phase current measurement, the third phase current measurement, the first phase voltage measurement, the second phase voltage measurement, and the third phase voltage measurement to detect a turn-to-turn fault in at least one of the first winding, the second winding, or the third winding of the three-phase shunt reactor by executing a procedure that can include calculating a difference value between a voltage-based parameter and a current-based parameter, wherein the voltage-based parameter is indicative of a normalized negative voltage imbalance and the current- based parameter is indicative of a normalized negative current imbalance, and can further include declaring a turn-to-turn fault in at least one of the first winding, the second winding, or the third winding of the three-phase shunt reactor when the difference value is not equal to zero.
- the voltage-based parameter can be a first normalized value derived at least in part by comparing a negative sequence voltage value to a positive sequence voltage value
- the current-based parameter can be a second normalized value derived at least in part by comparing a negative sequence current value to a positive sequence current value.
- Each of the negative sequence voltage value and the positive sequence voltage value can be represented in a vector representation of phase voltages present in the three-phase power line system
- the first normalized value can be indicated as a first percentage
- the second normalized value can be indicated as a second percentage.
- the first normalized value can be equal to the second normalized value when the turn-to-turn fault is not present in the three-phase shunt reactor.
- the difference value can be defined as at least one of an absolute numerical value or an angular value, and an identification of the turn-to-turn fault in a particular one of the first winding, the second winding, or the third winding of the three-phase shunt reactor can be determined based on the at least one of the absolute numerical value or the angular value.
- the first winding can be identified when the angular value is substantially equal to about (180 degrees ⁇ a tolerance value)
- the second winding can be identified when the angular value is substantially equal to about (-60 degrees ⁇ the tolerance value)
- the third winding can be identified when the angular value is substantially equal to about (+60 degrees ⁇ the tolerance value).
- An example method is a method for detecting a turn-to-turn fault in a three-phase shunt reactor coupled to a three-phase power line system.
- the method can include operations such as receiving a first phase current measurement that is based on monitoring a first phase current flowing through a first winding of the three-phase shunt reactor, receiving a second phase current that is based on monitoring a second phase current flowing through a second winding of the three-phase shunt reactor, receiving a third phase current measurement that is based on monitoring a third phase current flowing through a third winding of the three-phase shunt reactor, receiving a first phase voltage measurement that is based on monitoring a first phase voltage present on a first power line conductor of the three-phase power line system, receiving a second phase voltage
- a turn-to-turn fault in at least one of the first winding, the second winding, or the third winding of the three-phase shunt reactor can be declared when the difference value is not equal to zero.
- the voltage-based parameter can be a first normalized value derived at least in part by comparing a negative sequence voltage value to a positive sequence voltage value
- the current-based parameter can be a second normalized value derived at least in part by comparing a negative sequence current value to a positive sequence current value.
- the difference value can be defined as at least one of an absolute numerical value or an angular value, and an identification of the turn-to-turn fault in a particular one of the first winding, the second winding, or the third winding of the three-phase shunt reactor can be determined based on the at least one of the absolute numerical value or the angular value.
- the first winding can be identified when the angular value is substantially equal to about (180 degrees ⁇ a tolerance value)
- the second winding can be identified when the angular value is substantially equal to about (-60 degrees ⁇ the tolerance value)
- the third winding can be identified when the angular value is substantially equal to about (+60 degrees ⁇ the tolerance value).
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
- Protection Of Transformers (AREA)
- Measurement Of Current Or Voltage (AREA)
Abstract
Description
Claims
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE1850958A SE544616C2 (en) | 2016-02-10 | 2017-02-09 | Systems and methods for detecting turn-to-turn faults in windings |
CA3012835A CA3012835A1 (en) | 2016-02-10 | 2017-02-09 | Systems and methods for detecting turn-to-turn faults in transformer windings |
JP2018541136A JP6976258B2 (en) | 2016-02-10 | 2017-02-09 | Systems and methods for detecting inter-turn failures in transformer windings |
MX2018009707A MX2018009707A (en) | 2016-02-10 | 2017-02-09 | Systems and methods for detecting turn-to-turn faults in transformer windings. |
BR112018014997A BR112018014997A2 (en) | 2016-02-10 | 2017-02-09 | winding loop failure detection systems and method |
CN201780010984.3A CN108603908B (en) | 2016-02-10 | 2017-02-09 | System and method for detecting turn-to-turn faults in transformer windings |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/040,549 | 2016-02-10 | ||
US15/040,549 US9726706B1 (en) | 2016-02-10 | 2016-02-10 | Systems and methods for detecting turn-to-turn faults in windings |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017139445A1 true WO2017139445A1 (en) | 2017-08-17 |
Family
ID=58098698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2017/017140 WO2017139445A1 (en) | 2016-02-10 | 2017-02-09 | Systems and methods for detecting turn-to-turn faults in transformer windings |
Country Status (8)
Country | Link |
---|---|
US (1) | US9726706B1 (en) |
JP (1) | JP6976258B2 (en) |
CN (1) | CN108603908B (en) |
BR (1) | BR112018014997A2 (en) |
CA (1) | CA3012835A1 (en) |
MX (1) | MX2018009707A (en) |
SE (1) | SE544616C2 (en) |
WO (1) | WO2017139445A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU188169U1 (en) * | 2018-05-24 | 2019-04-02 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Южно-Уральский государственный аграрный университет" (ФГБОУ ВО Южно-Уральский ГАУ) | DEVICE FOR DIAGNOSTIC OF INTERCONNECTIVE CIRCUITS IN WINDINGS OF THREE-PHASE TRANSFORMER |
CN110967654A (en) * | 2019-10-17 | 2020-04-07 | 国网浙江省电力有限公司检修分公司 | Dry-type hollow series reactor turn-to-turn fault monitoring and protection identification method |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10088516B2 (en) * | 2016-02-10 | 2018-10-02 | General Electric Company | Systems and methods for detecting turn-to-turn faults in windings |
EP3214713B1 (en) * | 2016-03-03 | 2022-05-04 | General Electric Technology GmbH | Improvements in or relating to electrical power systems |
RU2687987C2 (en) * | 2016-05-11 | 2019-05-17 | Федеральное государственное казенное военное образовательное учреждение высшего образования "Военный учебно-научный центр Военно-Морского Флота "Военно-морская академия имени Адмирала флота Советского Союза Н.Г. Кузнецова" | Method of early detection of interturn circuit in the winding of a working electric machine |
CN108008242A (en) * | 2017-10-31 | 2018-05-08 | 中国电力科学研究院有限公司 | Dry reactor turn-to-turn fault protective device and recognition methods |
JP6927892B2 (en) * | 2018-01-16 | 2021-09-01 | 日立Geニュークリア・エナジー株式会社 | Electric circuit failure detection device |
EP3553539B1 (en) * | 2018-04-13 | 2020-07-01 | General Electric Technology GmbH | Apparatus and method for locating a fault in a plurality of windings of a transformer |
CN109507520B (en) * | 2018-12-20 | 2021-03-16 | 国网北京市电力公司 | Transformer turn-to-turn fault detection method and device, storage medium and processor |
CN109738739A (en) * | 2018-12-20 | 2019-05-10 | 国网北京市电力公司 | Fault detection method and device |
RU196111U1 (en) * | 2019-01-24 | 2020-02-18 | Николай Михайлович Александров | Device for assessing the mechanical state of power transformer windings |
CN109950891B (en) * | 2019-03-29 | 2020-11-10 | 云南电网有限责任公司电力科学研究院 | Controllable voltage source full-compensation tracking compensation method based on healthy phase voltage amplitude |
CN109782117B (en) * | 2019-03-29 | 2020-05-08 | 云南电网有限责任公司电力科学研究院 | Ground fault disappearance discrimination method based on amplitude adjustment of controllable voltage source |
EP3811094A4 (en) * | 2019-08-05 | 2022-03-16 | SembCorp Industries Ltd | A method and a system of detecting winding fault under online operation of an electrical machine |
CN110794331B (en) * | 2019-11-12 | 2021-05-04 | 西南交通大学 | Track traffic traction transformer turn-to-turn short circuit detection and protection device |
MX2019015169A (en) * | 2019-12-13 | 2021-06-14 | Prolec S A De C V | Apparatus and method for identifying a failure in windings of a distribution transformer. |
CN111722152B (en) * | 2020-06-29 | 2023-04-28 | 成都工百利自动化设备有限公司 | Transformer winding deformation monitoring method and monitoring system |
FR3124268B1 (en) * | 2021-06-16 | 2023-06-30 | Sagemcom Energy & Telecom Sas | Detection of the opening of an external transformer |
CN113702877B (en) * | 2021-09-09 | 2024-03-26 | 杭州电力设备制造有限公司 | Transformer winding turn-to-turn short circuit detection device |
CN114019298B (en) * | 2021-09-28 | 2023-12-05 | 中电华创(苏州)电力技术研究有限公司 | On-line monitoring method for turn-to-turn short circuit of generator rotor based on PCC-SVM |
CN114089058B (en) * | 2021-11-05 | 2024-05-14 | 许继集团有限公司 | Parallel reactor turn-to-turn protection method and device suitable for bus voltage |
CN114740313B (en) * | 2022-03-30 | 2024-04-05 | 国网安徽省电力有限公司马鞍山供电公司 | System and method for detecting turn-to-turn insulation defect of dry type air-core reactor |
CN115166425B (en) * | 2022-05-12 | 2024-04-16 | 国网安徽省电力有限公司马鞍山供电公司 | System and method for monitoring turn-to-turn insulation defect of dry type air-core reactor |
WO2023228061A1 (en) * | 2022-05-23 | 2023-11-30 | Mahdi Davarpanah | Inter-turn fault detection in current transformers |
CN115800195B (en) * | 2022-12-16 | 2024-09-24 | 国网浙江省电力有限公司电力科学研究院 | Inter-turn protection method for shunt reactor |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070007943A1 (en) * | 2004-05-10 | 2007-01-11 | Myungji University | Compensated current differential relaying method and system for protecting transformer |
EP2474832A2 (en) * | 2010-12-16 | 2012-07-11 | General Electric Company | Method and system for monitoring transformer health |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3863109A (en) * | 1973-08-27 | 1975-01-28 | High Voltage Power Corp | Short circuit sensing device for electromagnetic induction apparatus |
JPS57211932A (en) * | 1981-06-23 | 1982-12-25 | Mitsubishi Electric Corp | Transformer protecting relay |
US4377833A (en) | 1981-08-17 | 1983-03-22 | Electric Power Research Institute, Inc. | Methods and apparatus for protecting electrical reactors |
JP2765907B2 (en) * | 1989-01-20 | 1998-06-18 | 株式会社日立製作所 | Transformer fault detection method and device |
SE0303615D0 (en) * | 2003-12-31 | 2003-12-31 | Abb Ab | Method and device for Fault Detection in Transformers |
US7873496B2 (en) * | 2005-12-09 | 2011-01-18 | Abb Technology Ltd. | Method and device for fault detection in an N-winding three-phase power transformer |
US7903381B2 (en) | 2008-03-11 | 2011-03-08 | Schweitzer Engineering Laboratories, Inc. | Negative sequence differential element |
EP2730023B1 (en) * | 2011-07-04 | 2015-11-25 | ABB Research Ltd. | System for detecting internal winding faults of a synchronous generator, computer program product and method |
-
2016
- 2016-02-10 US US15/040,549 patent/US9726706B1/en active Active
-
2017
- 2017-02-09 CN CN201780010984.3A patent/CN108603908B/en active Active
- 2017-02-09 CA CA3012835A patent/CA3012835A1/en active Pending
- 2017-02-09 MX MX2018009707A patent/MX2018009707A/en unknown
- 2017-02-09 SE SE1850958A patent/SE544616C2/en unknown
- 2017-02-09 WO PCT/US2017/017140 patent/WO2017139445A1/en active Application Filing
- 2017-02-09 BR BR112018014997A patent/BR112018014997A2/en not_active IP Right Cessation
- 2017-02-09 JP JP2018541136A patent/JP6976258B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070007943A1 (en) * | 2004-05-10 | 2007-01-11 | Myungji University | Compensated current differential relaying method and system for protecting transformer |
EP2474832A2 (en) * | 2010-12-16 | 2012-07-11 | General Electric Company | Method and system for monitoring transformer health |
Non-Patent Citations (1)
Title |
---|
BHIDE R S ET AL: "Detection of inter-turn fault in transformers at incipient level", 2014 INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES (ICEM), IEEE, 2 September 2014 (2014-09-02), pages 1542 - 1548, XP032687518, DOI: 10.1109/ICELMACH.2014.6960387 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU188169U1 (en) * | 2018-05-24 | 2019-04-02 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Южно-Уральский государственный аграрный университет" (ФГБОУ ВО Южно-Уральский ГАУ) | DEVICE FOR DIAGNOSTIC OF INTERCONNECTIVE CIRCUITS IN WINDINGS OF THREE-PHASE TRANSFORMER |
CN110967654A (en) * | 2019-10-17 | 2020-04-07 | 国网浙江省电力有限公司检修分公司 | Dry-type hollow series reactor turn-to-turn fault monitoring and protection identification method |
CN110967654B (en) * | 2019-10-17 | 2022-05-17 | 国网浙江省电力有限公司检修分公司 | Dry-type hollow series reactor turn-to-turn fault monitoring and protection identification method |
Also Published As
Publication number | Publication date |
---|---|
MX2018009707A (en) | 2019-01-24 |
CA3012835A1 (en) | 2017-08-17 |
BR112018014997A2 (en) | 2018-12-18 |
CN108603908B (en) | 2021-02-26 |
JP6976258B2 (en) | 2021-12-08 |
SE1850958A1 (en) | 2018-08-08 |
US20170227591A1 (en) | 2017-08-10 |
JP2019506831A (en) | 2019-03-07 |
SE544616C2 (en) | 2022-09-27 |
CN108603908A (en) | 2018-09-28 |
US9726706B1 (en) | 2017-08-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA3012838C (en) | Systems and methods for detecting turn-to-turn faults in windings | |
US9726706B1 (en) | Systems and methods for detecting turn-to-turn faults in windings | |
US8698504B2 (en) | System for detection of a ground fault in a high resistance ground network | |
JP6894443B2 (en) | Systems and methods for determining fault locations in three-phase series-compensated transmission lines | |
JP6503322B2 (en) | Ground fault detection device | |
JPWO2007004698A1 (en) | Leakage current detection device and leakage current detection method | |
JPS5893422A (en) | Protecting device for high voltage transmission line | |
US11364810B2 (en) | Monitoring device for leakage currents | |
WO2019142574A1 (en) | Electric circuit failure detecting device | |
KR101986036B1 (en) | Protection relay device | |
JP6887906B2 (en) | Zero-phase current differential relay | |
EP2378296A9 (en) | Method and arrangement for determining impedance values | |
RU2358369C1 (en) | Device for protecting generator stator winding against fault to ground | |
JP2001352663A (en) | Method and apparatus for detecting electrical leak in low-voltage ground electrical circuit | |
CN111512512B (en) | Phase selection for multi-terminal measurements using transmission lines | |
CA3222196A1 (en) | Determination of electrical making instants using load voltage for coupled loads | |
Rodríguez-Valdez et al. | Method for line-ground fault detection in variable frequency drives | |
JPH0546767B2 (en) | ||
JPH0245414B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17706633 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 3012835 Country of ref document: CA |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112018014997 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 2018541136 Country of ref document: JP Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2018/009707 Country of ref document: MX |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 112018014997 Country of ref document: BR Kind code of ref document: A2 Effective date: 20180723 |
|
122 | Ep: pct application non-entry in european phase |