WO2017054518A1 - Service board device resource management method and apparatus, main control board and framed device - Google Patents

Service board device resource management method and apparatus, main control board and framed device Download PDF

Info

Publication number
WO2017054518A1
WO2017054518A1 PCT/CN2016/086023 CN2016086023W WO2017054518A1 WO 2017054518 A1 WO2017054518 A1 WO 2017054518A1 CN 2016086023 W CN2016086023 W CN 2016086023W WO 2017054518 A1 WO2017054518 A1 WO 2017054518A1
Authority
WO
WIPO (PCT)
Prior art keywords
service board
power
service
board
device resource
Prior art date
Application number
PCT/CN2016/086023
Other languages
French (fr)
Chinese (zh)
Inventor
王珂
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2017054518A1 publication Critical patent/WO2017054518A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0893Assignment of logical groups to network elements

Abstract

Provided are a service board device resource management method and apparatus, a main control board and a framed device. The management method comprises: detecting whether a service board in each slot position of a framed device is in a powered up state; respectively acquiring device resource information about each powered up service board which is in a powered up state and reporting the device resource information about the powered up service board to a main control board of the framed device.

Description

一种业务板的设备资源管理方法、装置、主控板及框式设备Device resource management method, device, main control board and frame device of service board 技术领域Technical field
本申请涉及但不限于通信技术领域,尤其涉及一种业务板的设备资源管理方法、装置、主控板及框式设备。The present application relates to, but is not limited to, the field of communication technologies, and in particular, to a device resource management method, apparatus, main control board, and frame device of a service board.
背景技术Background technique
对于路由器等设备来说,管理本单板上的设备及资源基于本板的设备资源管理模块就可以比较容易的实现。但是框内其他槽位的业务板,由于其上运行的是基于商用操作系统开发的业务软件,无法部署相关的设备资源管理的软件模块,因此业务板上设备和资源的管理不能使用已有的管理本槽位单板的设备和资源的方法。For devices such as routers, it is easier to manage the devices and resources on the board based on the device resource management module of the board. However, the service boards in other slots in the chassis cannot be deployed with the software modules of the device resource management because they are running business software based on commercial operating systems. Therefore, the management of devices and resources on the service board cannot be used. Method for managing the devices and resources of the board in this slot.
发明内容Summary of the invention
以下是对本文详细描述的主题的概述。本概述并非是为了限制权利要求的保护范围。The following is an overview of the topics detailed in this document. This Summary is not intended to limit the scope of the claims.
本发明实施例的目的在于提供一种业务板的设备资源管理方法、装置、主控板及框式设备,解决了相关技术中框式设备的其他槽位的业务板的设备资源无法统一管理的问题。The object of the embodiments of the present invention is to provide a device resource management method, a device, a main control board, and a frame device of a service board, which can solve the problem that the device resources of the service boards in other slots of the frame device cannot be uniformly managed. problem.
一种业务板的设备资源管理方法,包括:A device resource management method for a service board, including:
检测框式设备的每个槽位的业务板是否处于上电状态。Check whether the service board in each slot of the frame device is powered on.
分别获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板。The device resource information of each power-on service board in the power-on state is obtained, and the device resource information of the power-on service board is reported to the main control board of the frame device.
可选地,上述方法还包括:Optionally, the foregoing method further includes:
向所述主控板发送上报所述上电业务板的设备资源信息的上报请求,令所述主控板根据所述上报请求将所述上电业务板的设备资源信息上报至网络侧。Sending, to the main control board, a report request for reporting the device resource information of the power-on service board, and causing the main control board to report the device resource information of the power-on service board to the network side according to the report request.
可选地,上述方法还包括:Optionally, the foregoing method further includes:
接收所述主控板转发的由网络侧下发的对上电业务板的配置请求。 Receiving a configuration request for the power-on service board delivered by the network side, which is forwarded by the main control board.
根据所述配置请求,对所述上电业务板进行相应配置。The power-on service board is configured correspondingly according to the configuration request.
可选地,检测框式设备的每个槽位的业务板是否处于上电状态包括:Optionally, detecting whether the service board of each slot of the frame device is in a powered state includes:
向所述框式设备的每个槽位发送探测报文。Sending a probe packet to each slot of the frame device.
如果接收到业务板发送的针对所述探测报文的应答报文,则确定发送所述应答报文的业务板处于上电状态。If the response packet sent by the service board for the probe packet is received, it is determined that the service board that sends the response packet is in a power-on state.
可选地,获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板包括:Optionally, the acquiring the device resource information of each power-on service board in the power-on state and reporting the device resource information of the power-on service board to the main control board of the box device includes:
通过以太网通信通道获取处于上电状态的上电业务板的设备资源信息。The device resource information of the power-on service board in the power-on state is obtained through the Ethernet communication channel.
将所述上电业务板的设备资源信息写入一个业务数据库中,由所述业务数据库将所述上电业务板的设备资源信息上报至所述框式设备的主控板。The device resource information of the power-on service board is written into a service database, and the device resource information of the power-on service board is reported to the main control board of the box device.
一种业务板的设备资源管理装置,包括:A device resource management device for a service board, comprising:
检测模块,设置为检测框式设备的每个槽位的业务板是否处于上电状态。The detection module is configured to detect whether the service board in each slot of the frame device is in a power-on state.
获取模块,设置为分别获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板。The acquiring module is configured to separately obtain the device resource information of each power-on service board in the power-on state, and report the device resource information of the power-on service board to the main control board of the box device.
可选地,上述装置还包括:发送上报模块。Optionally, the foregoing apparatus further includes: a sending and reporting module.
发送上报模块,设置为向所述主控板发送上报所述上电业务板的设备资源信息的上报请求,令所述主控板根据所述上报请求将所述上电业务板的设备资源信息上报至网络侧。The sending and reporting module is configured to send, to the main control board, a report request for reporting the device resource information of the power-on service board, so that the main control board sends the device resource information of the power-on service board according to the report request Report to the network side.
可选地,所述设备资源管理装置还包括:接收模块和配置模块。Optionally, the device resource management apparatus further includes: a receiving module and a configuration module.
接收模块,设置为接收所述主控板转发的由网络侧下发的对上电业务板的配置请求。The receiving module is configured to receive a configuration request for the power-on service board delivered by the network side, which is forwarded by the main control board.
配置模块,设置为根据所述配置请求,对所述上电业务板进行相应配置。The configuration module is configured to perform corresponding configuration on the power-on service board according to the configuration request.
可选地,所述检测模块包括探测子模块和应答子模块。Optionally, the detecting module includes a detecting submodule and an answering submodule.
所述检测模块检测框式设备的每个槽位的业务板是否处于上电状态包括:The detecting module detects whether the service board of each slot of the frame device is in a power-on state, including:
探测子模块,设置为向所述框式设备的每个槽位发送探测报文。 The detecting submodule is configured to send a probe message to each slot of the frame device.
应答子模块,设置为如果接收到业务板发送的针对所述探测报文的应答报文,则确定发送所述应答报文的业务板处于上电状态。The response sub-module is configured to determine that the service board that sends the response message is in a power-on state if the response packet sent by the service board is received.
可选地,所述获取模块包括:信息获取子模块和写入子模块。Optionally, the obtaining module includes: an information acquiring submodule and a writing submodule.
所述获取模块获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板包括:The obtaining, by the acquiring module, the device resource information of each power-on service board in the power-on state, and reporting the device resource information of the power-on service board to the main control board of the box device includes:
信息获取子模块,设置为通过以太网通信通道获取处于上电状态的上电业务板的设备资源信息。The information acquisition sub-module is configured to obtain the device resource information of the power-on service board in the power-on state through the Ethernet communication channel.
写入子模块,设置为将所述上电业务板的设备资源信息写入一个业务数据库中,由所述业务数据库将所述上电业务板的设备资源信息上报至所述框式设备的主控板。Writing to the sub-module, the device resource information of the power-on service board is written into a service database, and the device resource information of the power-on service board is reported to the main device of the box device by the service database Control board.
一种主控板,所述主控板上设置有如上所述的业务板的设备资源管理装置。A main control board is provided with a device resource management device of the service board as described above.
一种框式设备,包括如上所述的主控板。A frame type device comprising a main control board as described above.
一种计算机可读存储介质,存储有计算机可执行指令,所述计算机可执行指令被处理器执行时实现所述的业务板的设备资源管理方法。A computer readable storage medium storing computer executable instructions that, when executed by a processor, implement a device resource management method of the service board.
本发明实施例的上述技术方案具有如下有益效果:The above technical solutions of the embodiments of the present invention have the following beneficial effects:
本发明实施例的业务板的设备资源管理方法及装置中,通过在框式设备的主控板上增加管理其他操作的业务板的功能,不影响已有的主控板设备和资源的处理流程的基础上,实现对其他槽位的业务板的设备资源的统一管理,在一定程序上降低了业务板的开发和测试的工作量;且满足每个业务板之间的操作的独立性,便于每个业务板驱动的动态加载,使框式设备能够支持业务板的热插拔操作。In the device resource management method and device of the service board according to the embodiment of the present invention, the function of managing the service board of other operations is added to the main control board of the frame device, and the processing process of the existing main control board device and resources is not affected. On the basis of this, the unified management of the device resources of the service boards in other slots is implemented, and the workload of development and testing of the service boards is reduced in a certain procedure; and the independence of operations between each service board is satisfied, and it is convenient. The dynamic loading of each service board driver enables the frame device to support the hot plug operation of the service board.
附图概述BRIEF abstract
图1表示本发明实施例提供的业务板的设备资源管理方法的基本步骤流程图;1 is a flow chart showing the basic steps of a device resource management method for a service board according to an embodiment of the present invention;
图2表示本发明实施例提供的主控板的软件架构示意图;2 is a schematic diagram showing a software architecture of a main control board according to an embodiment of the present invention;
图3表示本发明实施例提供的业务板上电时设备资源信息上报至网络侧 的流程图;FIG. 3 is a diagram showing the device resource information reported to the network side when the service is powered on. Flow chart
图4表示本发明实施例提供的业务板的上电时设备资源信息上报至主控板的流程图;FIG. 4 is a flowchart of reporting device resource information to the main control board when the service board is powered on according to the embodiment of the present invention;
图5表示本发明实施例提供的业务板的属性配置流程图;FIG. 5 is a flowchart of attribute configuration of a service board according to an embodiment of the present invention;
图6表示本发明实施例提供的业务板的设备资源管理装置的组成结构图。FIG. 6 is a structural diagram showing the structure of a device resource management apparatus of a service board according to an embodiment of the present invention.
本发明的实施方式Embodiments of the invention
下文中将结合附图对本发明的实施例进行详细说明。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互任意组合。Embodiments of the present invention will be described in detail below with reference to the accompanying drawings. It should be noted that, in the case of no conflict, the features in the embodiments and the embodiments in the present application may be arbitrarily combined with each other.
本发明实施例针对相关技术中框式设备的其他槽位的业务板的设备资源无法统一管理的问题,提供一种业务板的设备资源管理方法及装置,通过在框式设备的主控板上增加管理其他操作的业务板的功能,不影响已有的主控板设备和资源的处理流程的基础上,实现对其他槽位的业务板的设备资源的统一管理,在一定程序上降低了业务板的开发和测试的工作量;且满足每个业务板之间的操作的独立性,便于每个业务板驱动的动态加载,使框式设备能够支持业务板的热插拔操作。The embodiment of the present invention provides a device resource management method and device for a service board, which is provided on a main control board of a frame device, in which the device resources of the service boards in other slots of the device in the related art cannot be uniformly managed. On the basis of the process of managing the service boards of other operations, the device management of the service boards of other slots is unified, and the services are reduced in certain procedures. The workload of the development and testing of the board; and the independence of operations between each service board is satisfied, and the dynamic loading of each service board driver is facilitated, so that the box type device can support the hot plug operation of the service board.
如图1所示,本发明实施例提供一种业务板的设备资源管理方法,包括步骤11-15:As shown in FIG. 1 , an embodiment of the present invention provides a device resource management method for a service board, including steps 11-15:
步骤11,检测框式设备的每个槽位的业务板是否处于上电状态。Step 11: Detect whether the service board in each slot of the frame device is in a power-on state.
本发明实施例提供的业务板的设备资源管理方法应用于框式设备的主控板侧,为了不影响主控板的其他功能,在主控板上增加一个“外围板管理模块”,该外围板管理模块检测框式设备的每个槽位的业务板的上电状态。The device resource management method of the service board provided by the embodiment of the present invention is applied to the main control board side of the frame device. To not affect other functions of the main control board, a “peripheral board management module” is added to the main control board. The board management module detects the power-on status of the service board in each slot of the frame device.
步骤12,分别获取处于上电状态的上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板。In step 12, the device resource information of the power-on service board in the power-on state is obtained, and the device resource information of the power-on service board is reported to the main control board of the box device.
如果有业务板上电,则通过内部以太网控制报文的交互来获取上电的业务板的设备资源信息,并将业务板的设备资源信息上报至框式设备的主控板的“设备资源管理模块”,由主控板的“设备资源管理模块”同一管理其他 槽位的业务的设备资源信息。其中,主控板的“设备资源管理模块”为已有模块,该模块用于管理该主控板的设备资源信息;本发明实施例通过设置一个“外围板管理模块”来获取其他槽位的业务板的设备资源信息从而上报给主控板的“设备资源管理模块”,进而扩展已有的“设备资源管理模块”的功能,使得“设备资源管理模块”能够管理其他槽位的业务板的信息,实现对其他业务板信息的同一管理。If the service is powered on, the device exchanges the internal Ethernet control packet to obtain the device resource information of the service board. The device resource information of the service board is reported to the device resource of the main control board of the frame device. Management module", the same is managed by the "Device Resource Management Module" of the main control board. Device resource information of the service in the slot. The device resource management module of the main control board is an existing module, and the module is used to manage device resource information of the main control board. The embodiment of the present invention obtains other slots by setting a “peripheral board management module”. The device resource information of the service board is reported to the device resource management module of the main control board, and the function of the existing device resource management module is extended, so that the device resource management module can manage the service boards of other slots. Information to achieve the same management of information on other business boards.
本发明实施例通过在主控板上增加“外围板管理模块”实现对框内其他槽位的业务板上设备资源的管理,在不影响已有的主控板的设备资源的处理流程的基础上,使当前框式设备具有很好的可扩展性和鲁棒性,在一定程度上降低了业务板的开发和测试的工作量。In the embodiment of the present invention, by adding a “peripheral board management module” on the main control board, the device resources of the service board in other slots in the frame are managed, and the processing flow of the device resources of the existing main control board is not affected. Therefore, the current frame device has good scalability and robustness, which reduces the workload of development and testing of the service board to a certain extent.
可选地,本发明实施例中,将所述上电业务板的设备资源信息上报至所述框式设备的主控板后,该方法还包括步骤13。Optionally, in the embodiment of the present invention, after the device resource information of the power-on service board is reported to the main control board of the frame device, the method further includes step 13.
步骤13,向所述主控板发送上报所述上电业务板的设备资源信息的上报请求,令所述主控板根据所述上报请求将所述上电业务板的设备资源信息上报至网络侧。Step 13: Send a report request for reporting the device resource information of the power-on service board to the main control board, and enable the main control board to report the device resource information of the power-on service board to the network according to the report request. side.
即“外围板管理模块”发现业务板上电后,向主控板发送上报请求,该上报请求设置为请求主控板将上电业务板的设备资源信息上报至网络侧;主控板的“设备资源管理模块”通过相关的数据上报通道将上电业务板的设备资源信息上报至网络侧的平台,从而达到统一管理此类业务板的设备资源信息的目的。That is, after the "peripheral board management module" finds that the service board is powered on, it sends a report request to the main control board, and the report request is set to request the main control board to report the device resource information of the power-on service board to the network side; The device resource management module reports the device resource information of the power-on service board to the platform on the network side through the related data reporting channel, so as to achieve the purpose of unified management of device resource information of such service boards.
可选地,本发明实施例中业务板的设备资源管理除了上报上电业务板的设备资源信息,还包括接收网络侧下发的针对业务板的配置信息,并转发给业务板,实现业务板的配置;即该业务板的设备资源管理方法还包括步骤14。Optionally, in the embodiment of the present invention, the device resource management of the service board is not only reported to the device resource information of the power-on service board, but also includes the configuration information of the service board delivered by the network side, and is forwarded to the service board to implement the service board. The configuration of the device resource management method of the service board further includes step 14.
步骤14,接收所述主控板转发的由网络侧下发的对上电业务板的配置请求;网络侧可对上电业务板的属性进行设置;本发明实施例中网络侧按照已有相关通道与主控板的“设备资源管理模块”进行通信,即主控板的“设备资源管理模块”接收网络侧下发的对上电业务板的配置请求,并将该配置请求转发给新增的“外围板管理模块”。 Step 14: The configuration request of the power-on service board sent by the network side that is forwarded by the main control board is received; the network side can set the attributes of the power-on service board; The channel communicates with the device resource management module of the main control board, that is, the device resource management module of the main control board receives the configuration request for the power-on service board delivered by the network, and forwards the configuration request to the new one. "Peripheral Board Management Module".
步骤15,根据所述配置请求,对所述上电业务板进行相应配置。新增的“外围板管理模块”根据所述配置请求中的配置信息,例如“配置业务板1的1号端口为自协商属性”,并通过板间以太网通信通道与对应的业务板交互,对所述上电业务板进行配置。Step 15: Perform corresponding configuration on the power-on service board according to the configuration request. The new "peripheral board management module" is configured according to the configuration information in the configuration request, for example, "the port 1 of the service board 1 is configured as an auto-negotiation attribute", and interacts with the corresponding service board through the inter-board Ethernet communication channel. Configure the power-on service board.
本发明实施例中,对网络侧的配置过程进行详细描述,充实了对于业务板的设备资源管理方法,使得本申请的方案更加完善,即使得本发明实施例提供的业务板的设备资源管理不仅包括针对业务板的上行信息的管理,也包括针对业务板的下行信息的管理。In the embodiment of the present invention, the network side configuration process is described in detail, and the device resource management method for the service board is enriched, so that the solution of the present application is more perfect, that is, the device resource management of the service board provided by the embodiment of the present invention is not only It includes management of uplink information for the service board, and management of downlink information for the service board.
本发明的上述实施例中步骤11检测框式设备的每个槽位的业务板是否处于上电状态包括步骤111-112: Step 11 in the above embodiment of the present invention detects whether the service board of each slot of the frame device is in a power-on state, including steps 111-112:
步骤111,向所述框式设备的每个槽位发送探测报文。Step 111: Send a probe packet to each slot of the frame device.
新增的“外围板管理模块”定时发送探测报文,由于不同的业务板可采用不同的方式收发报文,故其探测报文的形式根据不同的业务板的不同而不同,例如传输控制协议TCP报文或用户数据报协议UDP报文。需要说明的是,探测报文可为实时发送,也可为定时发送(即按照一定周期发送),可根据框式设备的业务确定,在此不作限定。The new "peripheral board management module" periodically sends probe packets. Since different service boards can send and receive packets in different ways, the format of the probe packets varies according to different service boards, such as the transmission control protocol. TCP packet or user datagram protocol UDP packet. It should be noted that the detection packet may be sent in real time, or may be sent periodically (that is, according to a certain period), and may be determined according to the service of the box device, and is not limited herein.
步骤112,如果接收到业务板发送的针对所述探测报文的应答报文,则确定发送所述应答报文的业务板处于上电状态。Step 112: If the response packet sent by the service board for the probe packet is received, it is determined that the service board that sends the response packet is in a power-on state.
如果业务板上电,则该上电业务板会发送与探测报文对应的应答报文,新增的“外围板管理模块”收到该应答报文,则确定发送该应答报文的业务板上电。If the service board is powered on, the power-on service board sends a response packet corresponding to the probe packet. If the new peripheral board management module receives the response packet, it determines the service board that sends the response packet. Power-on.
本发明实施例中利用发送探测报文和接收应答报文的方式来判断是否有业务板上电,其准确率较高,避免了遗落上电业务板的情况,提高检测的准确率。In the embodiment of the present invention, the method for sending a detection packet and receiving a response packet is used to determine whether there is a service board, and the accuracy is high, which avoids the situation of the power-off service board and improves the detection accuracy.
可选地,本发明实施例中,步骤12分别获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板包括步骤121-122:Optionally, in the embodiment of the present invention, the device resource information of each power-on service board in the power-on state is obtained, and the device resource information of the power-on service board is reported to the main device of the box device. The control board includes steps 121-122:
步骤121,通过以太网通信通道获取处于上电状态的上电业务板的设备 资源信息。Step 121: Obtain a device of the power-on service board in the power-on state through the Ethernet communication channel. Resource information.
步骤122,将所述上电业务板的设备资源信息写入一个业务数据库中,由所述业务数据库将所述上电业务板的设备资源信息上报至所述框式设备的主控板。Step 122: The device resource information of the power-on service board is written into a service database, and the device resource information of the power-on service board is reported to the main control board of the frame device by the service database.
本发明实施例中,由于存在多个业务板同时上电的情况,为了实现每个业务板之间的解耦,在主控板上设置一个业务数据库,本发明实施例获取的上电业务板的设备资源信息先写入上述业务数据库中,由所述业务数据库将设备资源信息定时或实时上报至主控板的“设备资源管理模块”;需要说明的是,为了实现多个业务板的设备资源信息管理之间的解耦,在上述新增的“外围板管理模块”上设置多个代理任务,该多个代理任务分别管理对应槽位上的业务板;例如代理任务1管理槽位1上的业务板;代理任务2管理槽位2上的业务板等,在此不一一枚举。In the embodiment of the present invention, the power-on service board obtained by the embodiment of the present invention is provided in the embodiment of the present invention, because a plurality of service boards are powered on at the same time, in order to implement decoupling between each service board, a service database is set on the main control board. The device resource information is first written into the service database, and the device resource information is reported to the device resource management module of the main control board in a timely manner or in real time. Decoupling between resource information management, setting a plurality of proxy tasks on the newly added "peripheral board management module", the plurality of proxy tasks respectively managing the service boards in the corresponding slots; for example, the proxy task 1 management slot 1 The business board on the agent; the service board on the agent task 2 management slot 2, etc., is not enumerated here.
另,需要说明是的,由于多个业务板收发报文的方式可能不同,故在新增的“外围板管理模块”上设置多个收发不同报文的业务代理,每个业务代理管理与该业务代理收发报文方式对应的业务板;例如,业务板1和业务板2使用UDP方式收发报文,业务板3使用TCP方式收发报文;业务代理A管理业务板1和业务板2,而业务代理B管理业务板3,同上,在此不一一枚举。In addition, it should be noted that, because multiple service boards may send and receive packets in different ways, a plurality of service agents that send and receive different messages are set on the newly added “peripheral board management module”, and each service agent manages and The service board sends and receives the packet to the service board. For example, the service board 1 and the service board 2 use the UDP mode to send and receive packets, the service board 3 uses the TCP mode to send and receive packets, and the service agent A manages the service board 1 and the service board 2. Business Agent B manages the business board 3, ibid., not enumerated here.
业务板上的设备资源的管理由主控板的设备资源管理模块通过同步调用驱动对应槽位的代理任务完成管理的动作,这样可以做到每个业务板操作的独立性,并且便于每个业务板驱动的动态加载,使软件能够支持业务板的热插拔操作。The device resource management on the service board is managed by the device resource management module of the main control board by synchronously calling the agent task that drives the corresponding slot. This can ensure the independence of operation of each service board and facilitate each service. The dynamic loading of the board driver enables the software to support the hot plug operation of the service board.
下面结合图2所示的主控板的软件架构示意图对本发明实施例提供的业务板的设备资源管理方法进行详细描述:The device resource management method of the service board according to the embodiment of the present invention is described in detail below with reference to the software architecture diagram of the main control board shown in FIG. 2:
假设外围板管理模块中部署的代理任务1、代理任务2和代理任务3分别对应系统中三个不同槽位的业务板1、业务板2和业务板3。驻留在外围板管理模块中的业务A代理对应业务板1和业务板2,业务B代理对应业务板3。业务板1和业务板2使用UDP方式收发控制报文,业务板3使用TCP方式收发控制报文。以下分别以业务板1为例进行描述。 Assume that the agent task 1, the agent task 2, and the agent task 3 deployed in the peripheral board management module correspond to the service board 1, the service board 2, and the service board 3 of three different slots in the system. The service A agent that resides in the peripheral board management module corresponds to the service board 1 and the service board 2, and the service B agent corresponds to the service board 3. The service board 1 and the service board 2 use UDP to send and receive control messages, and the service board 3 uses TCP to send and receive control messages. The following describes the service board 1 as an example.
如图3所示,业务板1上电时上报设备资源基本信息包括步骤31-33:As shown in Figure 3, the basic information about reporting device resources when the service board 1 is powered on includes steps 31-33:
步骤31,由外围板管理模块中的检测子模块定时发送UDP和TCP探测报文,业务板1上电后应答UDP报文,发现业务板1上电。Step 31: The UDP and TCP detection packets are sent periodically by the detection sub-module in the peripheral board management module. After the service board 1 is powered on, the UDP packet is acknowledged, and the service board 1 is powered on.
步骤32,外围板模块中的检测子模块通知本板的设备管理模块上报对应业务板1的设备资源信息。Step 32: The detection sub-module in the peripheral board module notifies the device management module of the board to report the device resource information of the corresponding service board 1.
步骤33,通过相关的数据发送通道上报业务板1的设备和资源信息至平台模块。Step 33: Report the device and resource information of the service board 1 to the platform module through the related data sending channel.
如图4所示,业务板1上的端口属性信息上报包括步骤41-43:As shown in FIG. 4, the port attribute information reporting on the service board 1 includes steps 41-43:
步骤41,由外围板管理模块中的业务A代理定时通过板间以太网通信通道与业务板1交互,获取业务板1上端口相关属性信息。Step 41: The service A agent in the peripheral board management module periodically interacts with the service board 1 through the inter-board Ethernet communication channel to obtain the port-related attribute information on the service board 1.
步骤42,业务A代理将业务板1的端口属性写入业务数据库。Step 42: The service A agent writes the port attribute of the service board 1 to the service database.
步骤43,本板的设备资源模块定时通过代理任务1访问业务数据库表上报业务板1的端口的属性信息。Step 43: The device resource module of the board periodically accesses the attribute information of the port of the service board 1 reported by the service database table through the proxy task 1.
如图5所示,业务板1的1号端口协商模式属性配置包括步骤51-54:As shown in Figure 5, the port 1 negotiation mode attribute configuration of service board 1 includes steps 51-54:
步骤51,从网管或是OAM命令通知本板的设备资源模块需要配置业务板1的1号端口为自协商属性。Step 51: If the device resource module of the local device is notified from the NMS or the OAM command, you need to configure port 1 of service board 1 as the auto-negotiation attribute.
步骤52,本板的设备资源模块通过代理任务1写入业务数据库表。In step 52, the device resource module of the board writes the service database table through the proxy task 1.
步骤53,业务数据库表变更通知外围板管理模块中的业务A代理。In step 53, the service database table change notifies the service A agent in the peripheral board management module.
步骤54,业务A代理通过板间以太网通信通道与业务板1交互,将业务板1上的1号端口的自协商属性设置至芯片。Step 54: The service A agent interacts with the service board 1 through the inter-board Ethernet communication channel, and sets the auto-negotiation attribute of the port 1 on the service board 1 to the chip.
为了更好的实现上述目的,如图6所示,本发明实施例还提供一种业务板的设备资源管理装置,包括:In order to achieve the above objective, as shown in FIG. 6, the embodiment of the present invention further provides a device resource management device for a service board, including:
检测模块61,设置为检测框式设备的每个槽位的业务板是否处于上电状态。The detecting module 61 is configured to detect whether the service board in each slot of the frame device is in a power-on state.
获取模块62,设置为分别获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板。The obtaining module 62 is configured to separately obtain the device resource information of each power-on service board in the power-on state and report the device resource information of the power-on service board to the main control board of the box device.
可选地,本发明实施例中,该设备资源管理装置还包括:发送上报模块。 Optionally, in the embodiment of the present invention, the device resource management apparatus further includes: a sending and reporting module.
发送上报模块,设置为向所述主控板发送上报所述上电业务板的设备资源信息的上报请求,令所述主控板根据所述上报请求将所述上电业务板的设备资源信息上报至网络侧。The sending and reporting module is configured to send, to the main control board, a report request for reporting the device resource information of the power-on service board, so that the main control board sends the device resource information of the power-on service board according to the report request Report to the network side.
可选地,本发明实施例中,所述设备资源管理装置还包括:接收模块和配置模块。Optionally, in the embodiment of the present invention, the device resource management apparatus further includes: a receiving module and a configuration module.
接收模块,设置为接收所述主控板转发的由网络侧下发的对上电业务板的配置请求。The receiving module is configured to receive a configuration request for the power-on service board delivered by the network side, which is forwarded by the main control board.
配置模块,设置为根据所述配置请求,对所述上电业务板进行相应配置。The configuration module is configured to perform corresponding configuration on the power-on service board according to the configuration request.
可选地,本发明实施例中,所述检测模块61包括:探测子模块和应答子模块。Optionally, in the embodiment of the present invention, the detecting module 61 includes: a detecting submodule and an answering submodule.
所述检测模块检测框式设备的每个槽位的业务板是否处于上电状态包括:The detecting module detects whether the service board of each slot of the frame device is in a power-on state, including:
探测子模块,设置为向所述框式设备的每个槽位发送探测报文。The detecting submodule is configured to send a probe message to each slot of the frame device.
应答子模块,设置为如果接收到业务板发送的针对所述探测报文的应答报文,则确定发送所述应答报文的业务板呈上电状态。The response sub-module is configured to determine that the service board that sends the response message is powered on if the response packet sent by the service board is received.
可选地,本发明实施例中,所述获取模块62包括:信息获取子模块和写入子模块。Optionally, in the embodiment of the present invention, the obtaining module 62 includes: an information acquiring submodule and a writing submodule.
所述获取模块获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板包括:The obtaining, by the acquiring module, the device resource information of each power-on service board in the power-on state, and reporting the device resource information of the power-on service board to the main control board of the box device includes:
信息获取子模块,设置为通过以太网通信通道获取处于上电状态的上电业务板的设备资源信息。The information acquisition sub-module is configured to obtain the device resource information of the power-on service board in the power-on state through the Ethernet communication channel.
写入子模块,设置为将所述上电业务板的设备资源信息写入一个业务数据库中,由所述业务数据库将所述上电业务板的设备资源信息上报至所述框式设备的主控板。Writing to the sub-module, the device resource information of the power-on service board is written into a service database, and the device resource information of the power-on service board is reported to the main device of the box device by the service database Control board.
需要说明的是,本发明实施例提供的业务板的设备资源管理装置是应用上述业务板的设备资源管理方法的管理装置,则上述业务板的设备资源管理方法的所有实施例均适设置为该管理装置,且均能达到相同或相似的有益效果。 It should be noted that, the device resource management device of the service board according to the embodiment of the present invention is a management device that applies the device resource management method of the service board, and all embodiments of the device resource management method of the service board are appropriately set to Manage the devices and achieve the same or similar benefits.
为了更好的实现上述目的,本发明实施例还提供一种主控板,所述主控板上设置有如上所述的业务板的设备资源管理装置。In order to achieve the above objective, the embodiment of the present invention further provides a main control board, where the main control board is provided with a device resource management device of the service board as described above.
需要说明的是,本发明实施例提供的主控板是设置有上述业务板的设备资源管理装置的主控板,则上述业务板的设备资源管理装置的所有实施例均适设置为该主控板,且均能达到相同或相似的有益效果。It should be noted that, the main control board provided by the embodiment of the present invention is a main control board of the device resource management apparatus provided with the service board, and all embodiments of the device resource management apparatus of the service board are appropriately set as the main control Boards, and all can achieve the same or similar benefits.
为了更好的实现上述目的,本发明实施例还提供一种框式设备,包括如上所述的主控板。In order to achieve the above objective, the embodiment of the present invention further provides a frame device, including the main control board as described above.
需要说明的是,本发明实施例提供的框式设备是设置有上述主控板的框式设备,则上述主控板的所有实施例均适设置为该框式设备,且均能达到相同或相似的有益效果。It should be noted that, the frame device provided by the embodiment of the present invention is a frame device provided with the above main control board, and all embodiments of the main control board are appropriately configured as the frame device, and both can achieve the same or Similar benefits.
一种计算机可读存储介质,存储有计算机可执行指令,所述计算机可执行指令被处理器执行时实现所述的业务板的设备资源管理方法。A computer readable storage medium storing computer executable instructions that, when executed by a processor, implement a device resource management method of the service board.
本领域普通技术人员可以理解上述实施例的全部或部分步骤可以使用计算机程序流程来实现,所述计算机程序可以存储于一个计算机可读存储介质中,所述计算机程序在相应的硬件平台上(如系统、设备、装置、器件等)执行,在执行时,包括方法实施例的步骤之一或其组合。One of ordinary skill in the art will appreciate that all or a portion of the steps of the above-described embodiments can be implemented using a computer program flow, which can be stored in a computer readable storage medium, such as on a corresponding hardware platform (eg, The system, device, device, device, etc. are executed, and when executed, include one or a combination of the steps of the method embodiments.
可选地,上述实施例的全部或部分步骤也可以使用集成电路来实现,这些步骤可以被分别制作成一个个集成电路模块,或者将它们中的多个模块或步骤制作成单个集成电路模块来实现。Alternatively, all or part of the steps of the above embodiments may also be implemented by using an integrated circuit. These steps may be separately fabricated into individual integrated circuit modules, or multiple modules or steps may be fabricated into a single integrated circuit module. achieve.
上述实施例中的装置/功能模块/功能单元可以采用通用的计算装置来实现,它们可以集中在单个的计算装置上,也可以分布在多个计算装置所组成的网络上。The devices/function modules/functional units in the above embodiments may be implemented by a general-purpose computing device, which may be centralized on a single computing device or distributed over a network of multiple computing devices.
上述实施例中的装置/功能模块/功能单元以软件功能模块的形式实现并作为独立的产品销售或使用时,可以存储在一个计算机可读取存储介质中。上述提到的计算机可读取存储介质可以是只读存储器,磁盘或光盘等。When the device/function module/functional unit in the above embodiment is implemented in the form of a software function module and sold or used as a stand-alone product, it can be stored in a computer readable storage medium. The above mentioned computer readable storage medium may be a read only memory, a magnetic disk or an optical disk or the like.
工业实用性Industrial applicability
本发明实施例的业务板的设备资源管理方法及装置中,通过在框式设备的主控板上增加管理其他操作的业务板的功能,不影响已有的主控板设备和 资源的处理流程的基础上,实现对其他槽位的业务板的设备资源的统一管理,在一定程序上降低了业务板的开发和测试的工作量;且满足每个业务板之间的操作的独立性,便于每个业务板驱动的动态加载,使框式设备能够支持业务板的热插拔操作。 In the device resource management method and device of the service board according to the embodiment of the present invention, the function of managing the service board of other operations is added to the main control board of the frame device, and the existing main control board device and the device are not affected. Based on the process of resource processing, unified management of device resources of service boards in other slots is implemented, and the workload of development and testing of service boards is reduced in a certain procedure; and the operations between each service board are satisfied. Independence, the dynamic loading of each service board driver is facilitated, so that the frame device can support the hot plug operation of the service board.

Claims (13)

  1. 一种业务板的设备资源管理方法,包括:A device resource management method for a service board, including:
    检测框式设备的每个槽位的业务板是否处于上电状态;Check whether the service board in each slot of the frame device is in the power-on state.
    分别获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板。The device resource information of each power-on service board in the power-on state is obtained, and the device resource information of the power-on service board is reported to the main control board of the frame device.
  2. 根据权利要求1所述的业务板的设备资源管理方法,所述方法还包括:The device resource management method of the service board according to claim 1, further comprising:
    向所述主控板发送上报所述上电业务板的设备资源信息的上报请求,令所述主控板根据所述上报请求将所述上电业务板的设备资源信息上报至网络侧。Sending, to the main control board, a report request for reporting the device resource information of the power-on service board, and causing the main control board to report the device resource information of the power-on service board to the network side according to the report request.
  3. 根据权利要求2所述的业务板的设备资源管理方法,所述方法还包括:The device resource management method of the service board according to claim 2, the method further comprising:
    接收所述主控板转发的由所述网络侧下发的对上电业务板的配置请求;Receiving a configuration request for the power-on service board delivered by the network side that is forwarded by the main control board;
    根据所述配置请求,对所述上电业务板进行相应配置。The power-on service board is configured correspondingly according to the configuration request.
  4. 根据权利要求1所述的业务板的设备资源管理方法,其中,所述检测框式设备的每个槽位的业务板是否处于上电状态包括:The device resource management method of the service board according to claim 1, wherein the detecting whether the service board of each slot of the frame device is in a power-on state comprises:
    向所述框式设备的每个槽位发送探测报文;Sending a probe message to each slot of the frame device;
    如果接收到业务板发送的针对所述探测报文的应答报文,则确定发送所述应答报文的业务板处于上电状态。If the response packet sent by the service board for the probe packet is received, it is determined that the service board that sends the response packet is in a power-on state.
  5. 根据权利要求1所述的业务板的设备资源管理方法,其中,所述获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板包括:The device resource management method of the service board according to claim 1, wherein the device resource information of each power-on service board in the power-on state is obtained, and the device resource information of the power-on service board is reported to the The main control board of the framed device includes:
    通过以太网通信通道获取处于上电状态的上电业务板的设备资源信息;Obtaining device resource information of the power-on service board in the power-on state through the Ethernet communication channel;
    将所述上电业务板的设备资源信息写入一个业务数据库中,由所述业务数据库将所述上电业务板的设备资源信息上报至所述框式设备的主控板。The device resource information of the power-on service board is written into a service database, and the device resource information of the power-on service board is reported to the main control board of the box device.
  6. 一种业务板的设备资源管理装置,包括:A device resource management device for a service board, comprising:
    检测模块,设置为检测框式设备的每个槽位的业务板是否处于上电状态;The detecting module is configured to detect whether the service board in each slot of the frame device is in a power-on state;
    获取模块,设置为分别获取处于上电状态的每个上电业务板的设备资源 信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板。Obtain the module, and set the device resources of each power-on service board in the power-on state. And reporting the device resource information of the power-on service board to the main control board of the box device.
  7. 根据权利要求6所述的业务板的设备资源管理装置,所述装置还包括:发送上报模块;The device resource management device of the service board according to claim 6, the device further comprising: a sending and reporting module;
    所述发送上报模块,设置为向所述主控板发送上报所述上电业务板的设备资源信息的上报请求,令所述主控板根据所述上报请求将所述上电业务板的设备资源信息上报至网络侧。The sending and reporting module is configured to send, to the main control board, a report request for reporting the device resource information of the power-on service board, so that the main control board sends the device of the power-on service board according to the report request The resource information is reported to the network side.
  8. 根据权利要求7所述的业务板的设备资源管理装置,所述装置还包括:接收模块和配置模块;The device resource management device of the service board according to claim 7, the device further comprising: a receiving module and a configuration module;
    所述接收模块,设置为接收所述主控板转发的由所述网络侧下发的对上电业务板的配置请求;The receiving module is configured to receive a configuration request of the power-on service board sent by the network side that is forwarded by the main control board;
    所述配置模块,设置为根据所述配置请求,对所述上电业务板进行相应配置。The configuration module is configured to perform corresponding configuration on the power-on service board according to the configuration request.
  9. 根据权利要求6所述的业务板的设备资源管理装置,其中,所述检测模块包括探测子模块和应答子模块;The device resource management device of the service board according to claim 6, wherein the detecting module comprises a detecting submodule and a response submodule;
    所述检测模块检测框式设备的每个槽位的业务板是否处于上电状态包括:The detecting module detects whether the service board of each slot of the frame device is in a power-on state, including:
    所述探测子模块,设置为向所述框式设备的每个槽位发送探测报文;The detecting submodule is configured to send a probe packet to each slot of the frame device;
    所述应答子模块,设置为如果接收到业务板发送的针对所述探测报文的应答报文,则确定发送所述应答报文的业务板处于上电状态。The response sub-module is configured to determine that the service board that sends the response message is in a power-on state if the response packet sent by the service board is received.
  10. 根据权利要求6所述的业务板的设备资源管理装置,其中,所述获取模块包括:信息获取子模块和写入子模块;The device resource management device of the service board according to claim 6, wherein the obtaining module comprises: an information acquiring submodule and a writing submodule;
    所述获取模块获取处于上电状态的每个上电业务板的设备资源信息并将所述上电业务板的设备资源信息上报至所述框式设备的主控板包括:The obtaining, by the acquiring module, the device resource information of each power-on service board in the power-on state, and reporting the device resource information of the power-on service board to the main control board of the box device includes:
    所述信息获取子模块,设置为通过以太网通信通道获取处于上电状态的上电业务板的设备资源信息;The information acquisition sub-module is configured to acquire device resource information of a power-on service board in a power-on state through an Ethernet communication channel;
    所述写入子模块,设置为将所述上电业务板的设备资源信息写入一个业务数据库中,由所述业务数据库将所述上电业务板的设备资源信息上报至所 述框式设备的主控板。The writing sub-module is configured to write the device resource information of the power-on service board into a service database, and the device resource information of the power-on service board is reported to the service database by the service database. The main control board of the frame device.
  11. 一种主控板,所述主控板上设置有如权利要求6-10任一项所述的业务板的设备资源管理装置。A main control board, wherein the main control board is provided with a device resource management device of the service board according to any one of claims 6-10.
  12. 一种框式设备,包括如权利要求11所述的主控板。A frame type device comprising the main control board according to claim 11.
  13. 一种计算机可读存储介质,存储有计算机可执行指令,所述计算机可执行指令被处理器执行时实现权利要求1至5任意一项所述的业务板的设备资源管理方法。 A computer readable storage medium storing computer executable instructions, the computer executable instructions being executed by a processor to implement a device resource management method of the service board according to any one of claims 1 to 5.
PCT/CN2016/086023 2015-09-28 2016-06-16 Service board device resource management method and apparatus, main control board and framed device WO2017054518A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510628856.8 2015-09-28
CN201510628856.8A CN106559236B (en) 2015-09-28 2015-09-28 Equipment resource management method and device of service board, main control board and frame type equipment

Publications (1)

Publication Number Publication Date
WO2017054518A1 true WO2017054518A1 (en) 2017-04-06

Family

ID=58415790

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2016/086023 WO2017054518A1 (en) 2015-09-28 2016-06-16 Service board device resource management method and apparatus, main control board and framed device

Country Status (2)

Country Link
CN (1) CN106559236B (en)
WO (1) WO2017054518A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112799361A (en) * 2020-12-30 2021-05-14 杭州加速科技有限公司 Monitoring system and method of semiconductor test equipment

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109039717B (en) * 2018-07-19 2021-05-07 烽火通信科技股份有限公司 Service resource management method and system
CN109286537B (en) * 2018-10-23 2020-11-17 智强通达科技(北京)有限公司 Board management system and management method for frame type multi-service board
CN111124514B (en) * 2019-12-19 2023-03-28 杭州迪普科技股份有限公司 Method and system for realizing loose coupling of frame type equipment service plates and frame type equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1592217A (en) * 2003-08-26 2005-03-09 大唐移动通信设备有限公司 Managing method for resources in communication system
CN101097563A (en) * 2006-06-27 2008-01-02 中兴通讯股份有限公司 System and method for realizing board centralized management and controlling
CN101197716A (en) * 2007-11-21 2008-06-11 上海华为技术有限公司 Method and device for capturing single plate ability
CN101741618A (en) * 2009-12-10 2010-06-16 中兴通讯股份有限公司 Service processing method of data communication equipment and data communication equipment
US20150078747A1 (en) * 2012-04-20 2015-03-19 Zte Corporation Optical line terminal device and implementation method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7840732B2 (en) * 2006-09-25 2010-11-23 Honeywell International Inc. Stacked card address assignment
CN101123511B (en) * 2007-09-21 2010-06-02 杭州华三通信技术有限公司 A pci quick bus system and its energy management method
CN102332989B (en) * 2011-06-21 2014-12-24 杭州华三通信技术有限公司 Method for sending configuration information and service boards
CN104125097A (en) * 2014-07-29 2014-10-29 瑞斯康达科技发展股份有限公司 Management control communication method and equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1592217A (en) * 2003-08-26 2005-03-09 大唐移动通信设备有限公司 Managing method for resources in communication system
CN101097563A (en) * 2006-06-27 2008-01-02 中兴通讯股份有限公司 System and method for realizing board centralized management and controlling
CN101197716A (en) * 2007-11-21 2008-06-11 上海华为技术有限公司 Method and device for capturing single plate ability
CN101741618A (en) * 2009-12-10 2010-06-16 中兴通讯股份有限公司 Service processing method of data communication equipment and data communication equipment
US20150078747A1 (en) * 2012-04-20 2015-03-19 Zte Corporation Optical line terminal device and implementation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112799361A (en) * 2020-12-30 2021-05-14 杭州加速科技有限公司 Monitoring system and method of semiconductor test equipment

Also Published As

Publication number Publication date
CN106559236A (en) 2017-04-05
CN106559236B (en) 2020-11-20

Similar Documents

Publication Publication Date Title
WO2017107018A1 (en) Method, device, and system for discovering the relationship of applied topology
WO2017054518A1 (en) Service board device resource management method and apparatus, main control board and framed device
CN103051468B (en) The operating system management of network interface device
WO2020135575A1 (en) System and method for obtaining network topology, and server
US8606407B2 (en) Energy management application server and processes
TWI423039B (en) Server system and operation method thereof
US20150363340A1 (en) Providing multiple synchronous serial console sessions using data buffering
US9535482B2 (en) Methods, systems, and computer readable media for controlling processor card power consumption in a network test equipment chassis that includes a plurality of processor cards
WO2019057089A1 (en) Network card image packet capture method, terminal, and readable storage medium
US20160028589A1 (en) Data loop detection
WO2011153757A1 (en) Maintenance system and method for service operation
CN108989089A (en) A kind of device data acquisition methods, equipment and system
WO2018153355A1 (en) Control information transmission method, server, and system
JP2011502432A (en) Network location service
US10608889B2 (en) High-level interface to analytics engine
US20200220786A1 (en) Statistics increment for multiple publishers
CN114553867A (en) Cloud-native cross-cloud network monitoring method and device and storage medium
US8825825B2 (en) SNMP request processing within distributed device architecture
WO2016197603A1 (en) Method and apparatus for checking vrrp configuration
WO2017032159A1 (en) Network element management method and system
CN108683540B (en) Cross-platform lightweight implementation method and system for network management protocol channel
Bolla et al. Network connectivity proxy: Architecture, implementation, and performance analysis
CN110535904A (en) A kind of asynchronous push method, system and device
WO2023005543A1 (en) Query method and apparatus, and device
WO2021052248A1 (en) Link resource discovery method, apparatus and device, and computer-readable storage medium

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16850143

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16850143

Country of ref document: EP

Kind code of ref document: A1