WO2016152695A1 - 機器制御装置 - Google Patents

機器制御装置 Download PDF

Info

Publication number
WO2016152695A1
WO2016152695A1 PCT/JP2016/058423 JP2016058423W WO2016152695A1 WO 2016152695 A1 WO2016152695 A1 WO 2016152695A1 JP 2016058423 W JP2016058423 W JP 2016058423W WO 2016152695 A1 WO2016152695 A1 WO 2016152695A1
Authority
WO
WIPO (PCT)
Prior art keywords
control
power consumption
demand response
unit
response control
Prior art date
Application number
PCT/JP2016/058423
Other languages
English (en)
French (fr)
Inventor
慎也 犬賀
Original Assignee
ダイキン工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ダイキン工業株式会社 filed Critical ダイキン工業株式会社
Publication of WO2016152695A1 publication Critical patent/WO2016152695A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/52The controlling of the operation of the load not being the total disconnection of the load, i.e. entering a degraded mode or in current limitation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems

Definitions

  • the present invention relates to a device control device, and more particularly to a device control device that controls a device in response to a request for adjustment of energy consumption during a predetermined period.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 2014-217157 discloses a power management device that adjusts the power consumption of various devices on the demand side such as a home, based on a power consumption adjustment request from the supply side. Is disclosed. The power management device adjusts the energy consumption of the device by controlling the operation of the device by a predetermined method when receiving an adjustment request for the power consumption.
  • energy usage and energy charges may be presented to consumers as information. Especially when there are no specialists in energy management such as homes, such information is presented. Even if it is done, it is difficult for a consumer to judge whether the control of the apparatus performed in response to the adjustment request
  • requirement of energy consumption is performed appropriately each time.
  • An object of the present invention is an apparatus control apparatus that controls an apparatus in response to a request for adjustment of energy consumption in a predetermined period, and a user of the apparatus performs demand response control (an apparatus in a predetermined period that is performed in response to an adjustment request. It is an object of the present invention to provide a device control device that can easily determine whether or not the energy consumption adjustment control) has been appropriately executed.
  • the device control apparatus controls a device in response to an adjustment request for energy consumption in a predetermined period.
  • the device control apparatus includes an output unit and a determination unit.
  • the output unit outputs information to the user of the device.
  • the determination unit determines whether or not the demand response control is successful based on at least information on the energy consumption of the device in a predetermined period, and causes the output unit to output it.
  • the demand response control is an adjustment control of the energy consumption amount of the device for a predetermined period performed in response to the adjustment request.
  • the success or failure of demand response control is output to the user of the device. Therefore, the user of the device can easily determine whether the demand response control has been properly executed. Can do.
  • a device control apparatus is the device control apparatus according to the first aspect, wherein the output unit executes the demand response control with respect to the demand response control for which success or failure has been determined by the determination unit.
  • the incentive amount obtained by the user is further output.
  • the incentive amount acquired by the demand response control is output to the user of the device in addition to the success or failure of the demand response control.
  • the user of the device can quantitatively grasp whether or not
  • the device control apparatus is the device control apparatus according to the first or second aspect, wherein the determination unit determines whether or not the demand response control is successful by executing the demand response control. Is further determined based on the incentive amount acquired.
  • the success or failure of demand response control can be determined based on the incentive amount acquired by the user of the device in addition to the information related to the energy consumption of the device.
  • the success or failure of response control can be determined.
  • a device control apparatus is the device control apparatus according to any one of the first to third aspects, wherein the determination unit determines whether or not the demand response control is successful during a predetermined period or when the predetermined period ends. The determination is further made based on an index relating to the user's comfort at the time.
  • the success or failure of demand response control can be determined based on the comfort of the user in addition to the information related to the energy consumption of the device. Can be determined.
  • the device control device is the device control device according to the fourth aspect, and the comfort-related index includes at least one of temperature, humidity, illuminance, and carbon dioxide concentration.
  • success or failure of demand response control can be determined based on a comfort index related to air conditioning, lighting, ventilation, or the like.
  • a device control device is the device control device according to the first aspect, and when the adjustment request does not include a target value of energy consumption, the determination unit Demand response control is performed by comparing the amount of monetary profits obtained by the user by adjusting demand energy control of the device and adjusting the energy consumption amount of the device as information related to energy consumption and the predetermined reference amount. Determine success or failure of control.
  • the user of the device can adjust the energy consumption of the device by executing a demand response.
  • the success or failure of demand response control can be determined based on the amount of the acquired financial profit.
  • the device control apparatus is the device control apparatus according to any one of the first to sixth aspects, and the output unit further outputs detailed information regarding success or failure of demand response control.
  • the device control apparatus in addition to the success or failure of demand response control, detailed information regarding the success or failure of demand response control is output. It is easy to grasp the room for further improvement.
  • An equipment control device is the equipment control device according to any of the first to seventh aspects, wherein the output unit provides advice on demand response control for which success or failure has been determined by the determination unit. Further output.
  • advice on demand response control is output in addition to the success or failure of demand response control, so that the user should improve the demand response control, It is easy to understand whether demand response control is the best.
  • the success or failure of demand response control is output to the user of the device. Therefore, the user of the device can easily determine whether the demand response control has been properly executed. Can do.
  • the user can quantitatively grasp how much benefit can be obtained by demand response control.
  • success or failure of demand response control can be determined from various aspects.
  • success or failure of demand response control can be determined based on a comfort index related to air conditioning, lighting, ventilation, or the like.
  • the user gained by adjusting the energy consumption of the device by executing a demand response
  • the success or failure of demand response control can be determined based on the amount of financial profit.
  • the device control apparatus In the device control apparatus according to the seventh aspect of the present invention, it is easy for the user to grasp the cause of demand response control failure and the room for further improvement.
  • the device control apparatus In the device control apparatus according to the eighth aspect of the present invention, it is easy for the user to understand how the demand response control should be improved or the current demand response control is the best.
  • FIG. 1 It is a schematic whole view for demonstrating an energy management system containing the aggregator which concerns on 1st Embodiment of the apparatus control apparatus of this invention. It is a block diagram of the aggregator contained in the energy management system of FIG. It is a block diagram of the control apparatus contained in the energy management system of FIG. In the energy management system of FIG. 1, it is an example of the control success / failure display screen displayed on the display part of a control apparatus. In the energy management system of FIG. 1, it is another example of the control success / failure display screen displayed on the display part of a control apparatus. In the energy management system of FIG. 1, it is an example of the detailed display screen displayed on the display part of a control apparatus. In the energy management system of FIG.
  • FIG. 1 is a schematic overall view of a power management system 100 including an aggregator 10 according to the first embodiment of the device control apparatus of the present invention.
  • the power management system 100 mainly includes a power company 1 as a power supplier, a plurality of buildings 2 as power consumers, and an aggregator 10 that manages power consumption (energy consumption) in the plurality of buildings 2 ( (See FIG. 1).
  • the power management system 100 includes one aggregator 10, but the present invention is not limited to this, and the power management system 100 may include a plurality of aggregators 10.
  • the electric power company 1 supplies electric power generated by itself and / or electric power generated by others to electric power consumers including a plurality of buildings 2.
  • the electric power company 1 has the management apparatus 1a as shown in FIG.
  • the management apparatus 1a is connected to the aggregator 10 via a communication network 3a such as the Internet.
  • the management device 1a predicts the power supply amount of the power company 1 and the power demand amount of the power consumer, and determines whether the power supply amount and the power demand amount are balanced.
  • the management device 1a requests the aggregator 10 to adjust power consumption in the building 2 managed by the aggregator 10. Specifically, when the management device 1a determines that the power demand exceeds the power supply, the management device 1a requests the aggregator 10 to suppress power consumption in the building 2 managed by the aggregator 10.
  • the management device 1a When the management device 1a requests the aggregator 10 to suppress power consumption, the management device 1a includes information related to a period for requesting suppression of power consumption (hereinafter sometimes referred to as a suppression request period), Information on the maximum power consumption allowed in the whole of the plurality of buildings 2 to be managed (hereinafter, sometimes referred to as “total allowable power consumption”), and a bounty when the power consumption is suppressed (hereinafter, a reward for the suppression) Information that may be referred to as money) is also sent.
  • a suppression request period Information on the maximum power consumption allowed in the whole of the plurality of buildings 2 to be managed
  • total allowable power consumption Information on the maximum power consumption allowed in the whole of the plurality of buildings 2 to be managed
  • a bounty when the power consumption is suppressed hereinafter, a reward for the suppression Information that may be referred to as money
  • the aggregator 10 is a device that manages power consumption in a plurality of buildings 2. As shown in FIG. 1, the aggregator 10 is connected to a management apparatus 1a of the electric power company 1 via a communication network 3a such as the Internet. Further, as shown in FIG. 1, the aggregator 10 is connected to a control device 20 and a power meter 50 (described later) installed in each building 2 by a communication network 3b such as the Internet.
  • the aggregator 10 receives a power consumption adjustment request from the power company 1 and transmits a power consumption suppression command to the control device 20 (described later) installed in the building 2 so as to realize the received adjustment request.
  • the aggregator 10 When the management device 1a requests suppression of power consumption in the building 2, the aggregator 10 receives information on the suppression request period, information on overall allowable power consumption, and information on rewards for suppression from the management device 1a. Accept as a request (adjustment request). Moreover, the aggregator 10 receives various information from the control apparatus 20 (the content of various information is mentioned later). Further, the aggregator 10 receives information related to the power consumption of each building 2 from the wattmeter 50.
  • the aggregator 10 controls each control device 20 so that the total power consumption in the plurality of buildings 2 managed by the aggregator 10 is less than the total allowable power consumption during the suppression request period.
  • a power consumption suppression command is transmitted to In the plurality of buildings 2, basically, based on the power consumption suppression command, during the suppression request period, adjustment control of power consumption of at least some of the later-described plurality of devices 30 installed in the building 2 (hereinafter, Sometimes called demand response control).
  • the operator of the aggregator 10 When the total power consumption in the plurality of buildings 2 managed by the aggregator 10 is adjusted to be equal to or less than the total allowable power consumption during the suppression request period, the operator of the aggregator 10 is notified of the suppression presented at the time of the power consumption adjustment request. A bounty is paid from the electric power company 1. The operator of the aggregator 10 pays a part of the reward for suppression to the user or the like (user of the device 30) of the building 2 where the demand response control is performed. The aggregator 10 pays the amount of money (hereinafter referred to as the user) of each building 2 based on the information on the power consumption of each building 2 after the suppression request period (after demand response control is executed in the building 2). Called the incentive amount).
  • the aggregator 10 determines success / failure of demand response control in each building 2 based on various information received from the control device 20 and information on power consumption received from the power meter 50, and the determination result is sent to the control device 20. Send.
  • Building 2 is a house here.
  • the building 2 does not have to mean the whole building, and may be, for example, one section in an apartment house.
  • the building 2 is not limited to a house, and may be an office building, a commercial facility, a factory, or the like.
  • a control device 20 In the building 2, a control device 20, a plurality of devices 30, a plurality of sensors 40, and a wattmeter 50 are installed (see FIG. 1).
  • a plurality of devices 30 and sensors 40 are installed in the building 2, but one device 30 and / or sensor 40 may be provided.
  • the control device 20 is connected to a plurality of sensors 40 and a power meter 50 via a communication network 3c such as a LAN (see FIG. 1).
  • the control device 20 is connected to at least some of the devices 30 via a communication network 3c such as a LAN (see FIG. 1). Note that the control device 20 may be connected to all the devices 30 via the communication network 3c.
  • the control device 20 is connected to the aggregator 10 via the communication network 3b (see FIG. 1).
  • the wattmeter 50 is also connected to the aggregator 10 via the communication network 3b (see FIG. 1).
  • the plurality of devices 30 are various electric devices.
  • the plurality of devices 30 include, for example, an air conditioner, a refrigerator, lighting, a ventilation fan, a washing machine, a dryer, and the like.
  • the type of the device 30 is an example, and is not limited to this.
  • the device 30 connected to the control device 20 via the communication network 3c provides the control device 20 with information related to operation / stop of the device 30 and operation conditions of the device 30 (for example, if the device 30 is an air conditioner, an operation mode). And information on the set temperature, etc.) are transmitted at predetermined time intervals (for example, at intervals of 1 minute).
  • the building 2 is provided with a measuring instrument 30a that individually measures the power consumption of the device 30 (see FIG. 1).
  • the measuring instrument 30a is connected to the control device 20 via a communication network 3c such as a LAN (see FIG. 1).
  • the measuring instrument 30 a is provided for each device 30, but is not limited to this.
  • One measuring instrument 30a may be capable of measuring the power consumption for two or more devices 30, or may be one that can measure the power consumption for all the devices 30.
  • the measuring instrument 30a transmits information related to the power consumption of the device 30 to the control device 20 at predetermined time intervals. For example, the measuring instrument 30 a measures the power consumption of the device 30 at intervals of 1 second, and transmits the measurement result to the control device 20.
  • the measuring instrument 30a continuously measures the power consumption of the device 30 and transmits the maximum power consumption and average power values measured in the past minute to the control device 20 at intervals of one minute. Good.
  • the plurality of sensors 40 are sensors that measure various values of indices related to the comfort of the user of the device 30 (hereinafter, sometimes referred to as comfort indices) in the building 2.
  • the plurality of sensors 40 include, for example, a temperature sensor that measures room temperature, an illuminance sensor that measures illuminance, a carbon dioxide concentration sensor that measures carbon dioxide concentration, and the like.
  • the type of the sensor 40 is an example, and is not limited to this.
  • the sensor 40 may include a humidity sensor that measures humidity. Further, the sensor 40 may not include some or all of the above types of sensors.
  • the sensor 40 measures the value of the comfort index that is a measurement target of the sensor 40 at a predetermined time interval (for example, every 5 minutes), and transmits the measured value to the control device 20.
  • a predetermined time interval for example, every 5 minutes
  • the operation of the sensor 40 is an example and is not limited to this.
  • the sensor 40 may be configured to measure the value of the comfort index at intervals of 1 minute and transmit the average value of the measurement results for 5 times to the control device 20 at intervals of 5 minutes.
  • the power meter 50 is a smart meter that can communicate with the aggregator 10 and the control device 20.
  • the wattmeter 50 measures power consumption, power consumption, and the like in the building 2.
  • the wattmeter 50 transmits information related to the power consumption of the building 2 to the aggregator 10 at predetermined time intervals.
  • the wattmeter 50 continuously measures the power consumption of the building 2 and transmits the value of the maximum power consumption measured in the past 1 minute to the aggregator 10 at 1 minute intervals.
  • the operation of the wattmeter 50 is an example, and is not limited to the above.
  • the wattmeter 50 continuously measures the power consumption of the building 2, acquires the value of the maximum power consumption measured in the past 1 minute at 1 minute intervals, and obtains the acquired value for 30 minutes as the hour.
  • the information may be transmitted to the aggregator 10 as a series of information.
  • the wattmeter 50 measures the power consumption of the building 2 at intervals of 1 second, and transmits the power consumption values measured in the past 1 minute to the aggregator 10 as time-series information at intervals of 1 minute. It may be configured as follows.
  • the control device 20 communicates with the device 30 connected via the communication network 3c, and receives information on the usage status of each device 30 by receiving information on the power consumption of the device 30 from the measuring instrument 30a.
  • the information regarding the usage status of each device 30 acquired by the control device 20 includes information regarding the operation / stop of each device 30, information regarding the operating condition of each device 30, and information regarding the power consumption of each device 30. Further, the control device 20 acquires various measurement values from the plurality of sensors 40.
  • the control device 20 receives a power consumption suppression command from the aggregator 10.
  • the control device 20 controls at least a part of the plurality of devices 30 during the suppression request period based on the power consumption suppression command from the aggregator 10 or the input of the user of the device 30 to the control device 20.
  • demand response control is executed, and the power consumption in the building 2 is adjusted.
  • the control device 20 transmits various settings input by the user of the device 30, information on the usage status of the device 30, and measurement values of the sensor 40 to the aggregator 10.
  • the aggregator 10 individually determines the success or failure of demand response control for each building 2 based on the information transmitted by the control device 20 and the information related to the power consumption transmitted by the power meter 50, and the determination result is determined as the determination target. It transmits with respect to the control apparatus 20 installed in the building 2.
  • the control device 20 that has received the success or failure of the demand response control displays the success or failure of the demand response control on the display unit 23 described later.
  • the aggregator 10 is a computer that manages power consumption in a plurality of buildings 2 to be managed.
  • the aggregator 10 is an example of a device control apparatus.
  • the aggregator 10 receives a power consumption adjustment request from the management device 1a, in particular, a power consumption suppression request in the suppression request period, and controls at least a part of the plurality of devices 30 installed in the building 2. Do.
  • the aggregator 10 mainly includes a communication unit 11, an input unit 12, a display unit 13, a storage unit 14, and a control unit 15 (see FIG. 2).
  • the communication unit 11 includes a management device 1a connected via the communication network 3a, a control device 20 and a wattmeter 50 connected via the communication network 3b, and the aggregator 10 It is a communication interface that enables communication.
  • the communication unit 11 receives various signals from the management device 1a, the control device 20, and the power meter 50. This will be specifically described below.
  • the communication unit 11 accepts a power consumption adjustment request for a predetermined period from the management device 1a. More specifically, when the management device 1a requests suppression of power consumption in the building 2, the communication unit 11 receives information regarding the suppression request period, information regarding overall allowable power consumption, and suppression against the suppression from the management device 1a. Information on bounty is received as a power consumption control request (adjustment request).
  • the content of the power consumption suppression request received by the communication unit 11, that is, the information regarding the suppression request period, the information regarding the total allowable power consumption, and the information regarding the bounty for suppression are stored in the adjustment request storage area 14 a of the storage unit 14 to be described later. Is done.
  • the communication unit 11 receives the target value of the comfort index from each of the control devices 20.
  • the target value of the comfort index is, for example, a target value of room temperature, illuminance, and carbon dioxide concentration.
  • the communication unit 11 receives a target value of an incentive amount that can be acquired by executing demand response control from each of the control devices 20.
  • the target value of the comfort index and the target value of the incentive amount are values that are input by the user of the device 30 to the input unit 22 described later of each control device 20.
  • the target value of the comfort index and the target value of the incentive amount received by the communication unit 11 are stored for each building 2 (for each control device 20) in a criterion storage area 14c of the storage unit 14 to be described later.
  • the communication unit 11 receives information on the usage status of the device 30 from each control device 20 at predetermined time intervals.
  • Information on the usage status of the device 30 is information for each device 30.
  • the information on the usage status of the device 30 includes information on the operation / stop of the device 30, information on the operation condition of the device 30, and information on the power consumption of the device 30.
  • Information relating to the usage status of the device 30 received by the communication unit 11 is stored in a device usage status storage area 14d of the storage unit 14 to be described later for each device 30 (information about which device 30 installed in which building 2). Is stored in such a manner that it can be determined.
  • information regarding the usage status of the device 30 is stored as time-series information.
  • the communication unit 11 receives the measurement value of the sensor 40 from each control device 20 at predetermined time intervals.
  • the measurement values of the sensor 40 received by the communication unit 11 are, for example, room temperature, illuminance, and carbon dioxide concentration.
  • the measured value of the sensor 40 received by the communication unit 11 is stored in a comfort index value storage area 14e of the storage unit 14 to be described later for each sensor 40 (measured value of which sensor 40 is installed in which building 2). It is stored so that it can be determined whether it is a value or not.
  • the measurement value of the sensor 40 is stored as time-series information.
  • the communication unit 11 receives information related to the power consumption of each building 2 from the power meter 50 at predetermined time intervals. Specifically, the communication unit 11 receives information related to the power consumption of the building 2 transmitted from the power meter 50 at intervals of 1 minute. The information regarding the power consumption of each building 2 received by the communication unit 11 is stored as time-series information for each building 2 (for each control device 20) in a power consumption storage area 14f of the storage unit 14 described later.
  • the communication unit 11 transmits various signals to the control device 20. This will be specifically described below.
  • the communication unit 11 transmits to the control device 20 of each building 2 a power consumption suppression command that the suppression command generation unit 15a of the control unit 15 described later generates individually for each of the buildings 2.
  • the communication unit 11 outputs information to the user of the device 30. That is, the communication unit 11 is an example of an output unit. Specifically, the communication unit 11 outputs (transmits) information to the control device 20. Information output to the control device 20 is displayed as information for the user of the device 30 on the display unit 23 of the control device 20 described later. For example, the communication unit 11 determines whether or not the adjustment control (demand response control) of the power consumption of the device 30 during the suppression request period in each building 2 is determined by the determination unit 15c of the control unit 15 described later. Output to the control device 20 installed in the building 2.
  • the communication unit 11 is installed, for example, in the building 2 that is the determination target of the success / failure of the demand response control, with the detailed information regarding the success / failure of the demand response control and the advice for the demand response control determined by the determination unit 15c. Output to the control device 20.
  • the input unit 12 is an input interface such as a keyboard or a mouse.
  • the operator of the aggregator 10 can input various commands and various information to the aggregator 10 via the input unit 12.
  • the display unit 13 is a liquid crystal display, for example. Various types of information related to the aggregator 10 can be displayed on the display unit 13.
  • the storage unit 14 mainly includes a RAM, a ROM, a hard disk, and the like.
  • the storage unit 14 stores various programs used by the control unit 15 and various types of information.
  • the storage unit 14 includes an adjustment request storage area 14a, a target power consumption storage area 14b, a determination reference storage area 14c, a device usage status storage area 14d, a comfort index value storage area 14e, and a power consumption storage area 14f as information storage areas. And an incentive amount storage area 14g.
  • Adjustment Request Storage Area In the adjustment request storage area 14a, information on the suppression request period, information on the total allowable power consumption, and a bounty for suppression received by the communication unit 11 from the management apparatus 1a. Information about is stored.
  • Target power consumption storage area 14b In the target power consumption storage area 14b, for each building 2, which is calculated when a suppression command generation unit 15a of the control unit 15 described later generates a suppression command, A target value of power consumption in the suppression request period (maximum value of power consumption allowed in the building 2 in the suppression request period) is stored.
  • the comfort index target values for example, room temperature, illuminance, and carbon dioxide concentration
  • the target value of the incentive amount are stored for each building 2 (for each control device 20).
  • the device usage status storage area 14d stores information regarding the usage status of the device 30 received by the communication unit 11 from each control device 20.
  • the information on the usage status of the device 30 stored in the device usage status storage area 14d includes information on the operation / stop of the device 30, information on the operating conditions of the device 30, and information on the power consumption of the device 30.
  • Information related to the usage status of the device 30 is stored in the device usage status storage area 14 d as time-series information for each device 30.
  • the comfort index value storage area 14e stores the measured values (comfort index values) of the sensors 40 received by the communication unit 11 from the respective control devices 20. . Specifically, the comfort index value storage area 14e stores room temperature, illuminance, and carbon dioxide concentration measured by the sensor 40 of each building 2. In the comfort index value storage area 14e, the measurement value of the sensor 40 is stored as time-series information for each sensor 40.
  • the power consumption storage area 14f stores information regarding the power consumption of each building 2 received by the communication unit 11 from the power meter 50. Information related to the power consumption of each building 2 received by the communication unit 11 is stored as time-series information for each building 2 in the power consumption storage area 14f.
  • the incentive amount storage area 14g stores the incentive amount calculated for each building 2 by the incentive amount calculation unit 15b of the control unit 15 described later.
  • Control Unit 15 mainly includes a CPU, and executes various processes by executing programs stored in the storage unit 14.
  • the control unit 15 mainly functions as a suppression command generation unit 15a, an incentive amount calculation unit 15b, a determination unit 15c, and a screen generation unit 15d by executing a program stored in the storage unit 14.
  • the suppression command generation unit 15a consumes the device 30 in the building 2 during the suppression request period when the communication unit 11 receives a power consumption adjustment request from the management device 1a.
  • a power consumption suppression command for the control device 20 is generated so that power adjustment control (demand response control) is executed.
  • the power consumption suppression command specifically controls how the control device 20 controls the operation of which device 30 among the devices 30 connected by the communication network 3c. This is a command for specifically instructing.
  • the suppression command generation unit 15a generates a power consumption suppression command as follows.
  • the suppression command generation unit 15a calculates, for each building 2, a target value of power consumption for each building 2 during demand response control (maximum power consumption allowed during the suppression request period). Specifically, the suppression command generation unit 15a is based on the information on the total allowable power consumption stored in the adjustment request storage area 14a and the information on the power consumption of each building 2 stored in the power consumption storage area 14f. Thus, a target value of power consumption for each building 2 is calculated.
  • the suppression command generation unit 15a uses the information on the latest power consumption of each building 2 stored in the power consumption storage area 14f so as to be proportional to the latest power consumption of each building 2.
  • the amount of power suppression is assigned to each building 2.
  • the suppression amount of power consumption means the amount of power consumption suppressed with respect to the current power consumption.
  • the amount of power consumption allocated to each building 2 is the amount consumed by all buildings 2 when the power consumption is reduced by the amount of power allocated to each building 2 relative to the current power consumption of each building 2.
  • the total power is determined to be less than the total allowable power consumption.
  • generation part 15a was allocated to each building 2 from the information (The value of the newest maximum power consumption of each building 2) regarding the latest power consumption of each building 2 memorize
  • the power consumption target value of each building 2 during the suppression request period is calculated.
  • the calculated target value of power consumption for each building 2 is stored in the target power consumption storage area 14b.
  • the calculation method of the target value of the power consumption for each building 2 of the suppression command generation unit 15a is an exemplification, and is not limited to this.
  • the suppression command generation unit 15a may assign a power consumption suppression amount to each building 2 so that the power consumption suppression amount of all the buildings 2 is the same.
  • the suppression command generation unit 15 a may allocate a power consumption suppression amount to only a part of the entire building 2. Further, for example, the suppression command generation unit 15a may allocate a power consumption suppression amount to each building 2 such that the power consumption suppression amount allocated to each building 2 varies within the suppression request period.
  • the suppression command generation unit 15a causes the total power consumption of the building 2 to fall below the calculated power consumption target value.
  • the control of the device 30 is determined.
  • the control of the device 30 is determined by determining which device 30 is to be controlled (determination of a control target) and determining how to control the device 30 (determination of control contents). Including.
  • only the device 30 connected to the control device 20 via the communication network 3c is set as a control target.
  • the control contents of the device 30 determined by the suppression command generation unit 15a include, for example, a change in operating conditions of the device 30 (for example, a change in set temperature if the device 30 is an air conditioner), a stop of the device 30, and a device 30. (For example, if the device 30 is a washing machine, the reserved driving time is changed).
  • a change in operating conditions of the device 30 for example, a change in set temperature if the device 30 is an air conditioner
  • a stop of the device 30 for example, if the device 30 is an air conditioner
  • a device 30 for example, if the device 30 is a washing machine, the reserved driving time is changed.
  • the present invention is not limited to this, and appropriate control content may be determined according to the characteristics of the device 30.
  • the determination of the control target by the suppression command generation unit 15a is performed based on, for example, a predetermined priority order or based on a priority order input by the user of the device 30 to each control device 20.
  • generation part 15a will determine to stop the ventilation fan contained in the apparatus 30 first, for example based on a predetermined priority. If it is determined that the total power consumption of the building 2 does not fall below the target value of power consumption even if the ventilation fan is stopped, the suppression command generation unit 15a then sends the device 30 to the device 30 based on a predetermined priority order. It is further determined to change the set temperature of the included air conditioner by a predetermined temperature. If it is determined that the total power consumption of the building 2 does not fall below the target value of power consumption even if the set temperature of the air conditioner is changed, the suppression command generation unit 15a sets the operation time of the washing machine included in the device 30. Further decide to change.
  • the determination of the control target by the suppression command generation unit 15a is not limited to the above method.
  • the suppression command generation unit 15a is configured to select the devices 30 as control targets in descending order of the current power consumption based on information on the usage status of the devices 30 stored in the device usage status storage area 14d. Also good.
  • the suppression command generation unit 15a generates a power consumption suppression command for the control device 20 to control the device 30 so that the determined control target device 30 is controlled with the determined control content.
  • the power consumption suppression command generated by the suppression command generation unit 15a is transmitted to the control device 20 via the communication unit 11 before the start of the suppression control period.
  • the incentive amount calculation unit 15b calculates an incentive amount after the suppression request period ends (after demand response control is executed in each building 2).
  • the incentive amount is an amount that the user of the device 30 in each building 2 acquires for the demand response control executed in each building 2.
  • the acquisition by the user of the device 30 includes the case where the company or the like where the person using the device 30 is working acquires.
  • the incentive amount calculation unit 15b includes information related to the reward for suppression stored in the adjustment request storage area 14a, the target value of power consumption in the suppression request period for each building 2 stored in the target power consumption storage area 14b, and consumption Based on the information regarding the power consumption for each building 2 stored in the power storage area 14f, the incentive amount to be acquired by the user of the device 30 of each building 2 is calculated.
  • the incentive amount calculation unit 15b pays a predetermined percentage of the reward for restraint to the user of the device 30 of each building 2 based on the information regarding the reward for restraint stored in the adjustment request storage area 14a. Determine the total amount of incentives.
  • the incentive amount calculator 15b calculates the average value of the maximum power consumption during the suppression request period based on the information (maximum power consumption per minute) related to the power consumption by building 2 stored in the power consumption storage area 14f. And is compared with the target value of power consumption in the suppression request period, and the difference between the target value of power consumption in the suppression request period of each building 2 and the average value of maximum power consumption (specifically, the maximum A value obtained by subtracting the target value of power consumption from the average value of power consumption) is calculated.
  • the incentive amount calculation unit 15b uses information (maximum power consumption per minute) related to time series power consumption for each building 2 stored in the power consumption storage area 14f as the power consumption target value in the suppression request period. In comparison, the excess time during which the power consumption in each building 2 has exceeded the target value of the power consumption in the suppression request period is calculated. Then, the incentive amount calculation unit 15b calculates the difference between the target value of power consumption during the suppression request period and the average value of maximum power consumption for each building 2, and the target value of power consumption during the suppression request period. The total amount of the incentive amount is allocated to each building 2 based on the excess time that has been exceeded. For example, the incentive amount calculation unit 15b increases the value of the difference between the power consumption target value of the building 2 and the average value of the maximum power consumption, and the shorter the excess time of the building 2 is, Configured to allocate money.
  • the method of calculating the incentive amount by the incentive amount calculation unit 15b is an example, and is not limited to this.
  • the incentive amount calculation method in a certain building 2, if there is no excess time that has exceeded the target value of power consumption in the suppression request period, the incentive amount is set to a predetermined amount, and the target value of power consumption is set in the suppression request period. If the excess time has been exceeded, the incentive amount may be zero.
  • the incentive amount calculated by the incentive amount calculation unit 15b is stored in the incentive amount storage area 14g.
  • the determination unit 15c receives the power consumption adjustment request from the management device 1a, and performs power consumption adjustment control (demand on the device 30 during the suppression request period) performed in the building 2. Response control is determined for each building 2. The determination unit 15c determines the success or failure of demand response control for each building 2 every time the suppression request period ends.
  • the determination unit 15c determines whether or not demand response control is successful for each building 2, the determination unit 15c causes the communication unit 11 to output the determination result (success or failure of demand response control). Specifically, the determination unit 15c instructs the screen generation unit 15d to generate a screen indicating the success or failure of the demand response control of each building 2 using the result of the success or failure of the demand response control of each building 2. In response to the instruction from the determination unit 15c, the screen generation unit 15d generates a screen indicating success or failure of demand response control for each building 2, and the screen image data is transmitted to the control device 20 installed in the corresponding building 2. A command is given to the communication unit 11 so as to be output.
  • the determination unit 15c determines the target value of power consumption in the suppression request period for each building 2 stored in the target power consumption storage area 14b, and the determination.
  • the success or failure of each building 2 is determined.
  • the determination unit 15c performs determination regarding the following three conditions, and determines that demand response control is successful when all the conditions are satisfied. On the other hand, the determination unit 15c determines that the demand response control has failed when none of the following three conditions is satisfied.
  • the determination unit 15c suppresses a certain building 2 based on a target value of power consumption during the suppression request period for each building 2 and information regarding power consumption during the suppression request period for each building 2. It is determined whether or not there is a time during which the power consumption exceeds the target value of power consumption during the request period. The determination unit 15c determines that the demand response control satisfies the condition regarding power consumption when there is no time for which the power consumption exceeds the target value of power consumption during the suppression request period.
  • the determination unit 15c determines that the incentive amount allocated to the aggregator 10 in a certain building 2 is based on the target value of the incentive amount for each building 2 and the incentive amount for each building 2. It is determined whether or not the target value is greater than or equal to the target value. When the incentive amount allocated to the aggregator 10 is equal to or greater than the target value of the incentive amount, the determination unit 15c determines that the demand response control satisfies the condition regarding the incentive amount.
  • the determination part 15c is based on the target value of the comfort parameter according to the building 2 and the measured value according to the sensor 40. In a certain building 2, during the suppression request period or when the suppression request period ends. It is determined whether the measured value satisfies the target value of the comfort index.
  • the determination part 15c determines whether the room temperature is below the target value. For example, the determination unit 15c determines whether the illuminance value measured by the sensor 40 is equal to or greater than the illuminance target value during the suppression request period. For example, the determination unit 15c determines whether the value of the carbon dioxide concentration measured by the sensor 40 is equal to or less than the target value of the carbon dioxide concentration at the end of the suppression request period.
  • the determination unit 15c determines that the demand response control satisfies the condition related to comfort when the measured values of all the sensors 40 satisfy the target value of the comfort index for a certain building 2.
  • the screen generation unit 15d displays the success / failure of the demand response control using the determination result of the success / failure of the demand response control of the determination unit 15c according to the instruction of the determination unit 15c. (Control success / failure display screen) is generated.
  • the screen generator 15d generates a detailed information display screen (detailed display screen) related to demand response control.
  • the control success / failure display screen and the detailed display screen generated by the screen generation unit 15d are screens to be displayed on the display unit 23 described later of the control device 20 of each building 2.
  • the control success / failure display screen generated by the screen generator 15d is, for example, a screen such as the screen S1 shown in FIG. 4 or the screen S2 shown in FIG.
  • a screen S1 illustrated in FIG. 4 is an example of a control success / failure display screen when the demand response control is determined to be successful by the determination unit 15c.
  • a screen S2 illustrated in FIG. 5 is an example of a control success / failure display screen when the demand response control is determined to have failed by the determination unit 15c.
  • the screen generation unit 15d performs control based on information stored in the target power consumption storage area 14b, the determination reference storage area 14c, the comfort index value storage area 14e, the power consumption storage area 14f, and the incentive amount storage area 14g. Generate success / failure display screen.
  • the contents displayed on the control success / failure display screen include detailed information on the success / failure of demand response control in addition to the determination result of success / failure of demand response control, as shown in FIGS.
  • the detailed information regarding the success or failure of demand response control includes, for example, a target value of power consumption of each building 2 and a maximum value (actually measured value) of power consumption during the suppression request period.
  • the detailed information regarding the success or failure of the demand response control includes, for example, the target value of the incentive amount for each building 2 and the incentive amount actually acquired by the user of the device 30 by executing the demand response control.
  • the detailed information regarding the success or failure of demand response control includes, for example, the target room temperature value and the room temperature (actually measured value) at the end of the suppression request period for each building 2.
  • the detailed information related to success or failure of demand response control includes, for example, the target value of illuminance and the minimum value (actually measured value) of illuminance during the suppression request period for each building 2.
  • the detailed information regarding the success or failure of demand response control includes, for example, the target value of the carbon dioxide concentration and the carbon dioxide concentration (measured value) at the end of the suppression request period for each building 2.
  • the detailed information regarding the success or failure of demand response control includes a determination result of whether or not the power consumption, the incentive amount, the room temperature, the illuminance, and the carbon dioxide concentration satisfy the target values.
  • the determination result of each condition that is the basis of the determination of demand response control is displayed on one screen (control success / failure display screen) together with the determination result of success / failure of demand response control. If it is a failure, the cause can be easily confirmed.
  • the detail display screen generated by the screen generator 15d is a screen such as a screen S11 shown in FIG. 6, a screen S12 shown in FIG. 7, or a screen S13 shown in FIG.
  • the screen S12 illustrated in FIG. 7 is an example of a detail display screen when the demand response control is determined to be successful by the determination unit 15c.
  • a screen S11 illustrated in FIG. 6 is an example of a detail display screen when the demand response control is determined to have failed by the determination unit 15c.
  • the screen generation unit 15d S11 and screen S12 are generated.
  • the contents displayed on the screen S11 shown in FIG. 6 and the screen S12 shown in FIG. 7 include the time change of the power consumption during the suppression request time for each device 30 and the target of the power consumption of the entire building 2 during the suppression request time.
  • Detailed information regarding success or failure of demand response control is included, such as values and results, room temperatures before and after demand response control, and control details of demand response control.
  • the contents displayed on the screen S11 shown in FIG. 6 include the time when the power consumption exceeds the target value of power consumption, how much the actual power consumption exceeds the target value of power consumption, and the like.
  • success or failure of demand response control is included.
  • the control content of demand response control displayed on the screen S11 or the screen S12 is actually executed during the suppression request period, which is grasped from the information on the usage status of the device 30 stored in the device usage status storage area 14d. It is the content of the adjustment control of the power consumption of the used apparatus 30.
  • FIG. The control content of the demand response control may not match the control content of the device 30 determined by the suppression command generation unit 15a. Specifically, as described later, when the control content of the device 30 is changed from the control content of the device 30 determined by the suppression command generation unit 15a by an input to the control device 20, the control content of demand response control Does not match the control content of the device 30 determined by the suppression command generation unit 15a.
  • the contents displayed on the screen S11 shown in FIG. 6 and the screen S12 shown in FIG. 7 further include advice on demand response control for which success or failure is determined by the determination unit 15c.
  • the determination unit 15c For example, in the example shown in the screen S11, since the washing machine and the dryer included in the device 30 are used at the same time, the power consumption exceeds the target value of the power consumption.
  • the advice “Let's shift the usage time of the device” is displayed on the screen. Further, in the example shown in the screen S12, the power consumption is suppressed to the power consumption target value or less, but the power consumption can be further suppressed by changing the usage time of the dryer. The device that shifts the time will shift the usage time. "Is displayed on the screen.
  • the screen S13 shown in FIG. 8 is an example of a screen that displays a prediction of how the maximum power consumption, the incentive amount, and the room temperature will change when the control content is changed.
  • the screen S13 in particular, when the set temperature of the air conditioner is increased by 1 ° C, the set temperature of the air conditioner (an example of the device 30) during the cooling operation is increased by 2 ° C. In this case, the maximum power consumption, the incentive amount, and how the room temperature changes when the temperature is increased by 4 ° C. is displayed.
  • the content of the screen S13 illustrated in FIG. 8 is information calculated by the control unit 15 based on, for example, the characteristics of the device 30 stored in the storage unit 14, various information during past demand response control, and the like.
  • control success / failure display screen may be any screen that allows the user of the device 30 of the building 2 who has seen the screen to grasp at least the success / failure of the demand response control.
  • control success / failure display screen relates to the success / failure of the demand response control.
  • Detailed information may not be included.
  • the content displayed on the control success / failure display screen may include advice for demand response control.
  • the control device 20 is a controller used in, for example, a HEMS (Home Energy Management System).
  • the control device 20 is configured to be able to display the power consumption of the entire building 2, the usage status of the device 30 in the building 2, and the individual power consumption of the device 30.
  • the control device 20 uses the operation of the device 30 connected by the communication network 3c in the building 2 as an instruction for suppressing power consumption transmitted by the aggregator 10 or an input of a resident of the building 2 (user of the device 30). Control based on.
  • the control device 20 mainly includes a communication unit 21, an input unit 22, a display unit 23, a storage unit 24, and a control unit 25 (see FIG. 3).
  • the communication unit 21 includes the aggregator 10 connected via the communication network 3b, the device 30, the measuring instrument 30a, the sensor 40, and the wattmeter 50 connected via the communication network 3c. It is a communication interface that enables communication.
  • the communication unit 21 receives various signals from the aggregator 10.
  • the communication unit 21 receives, for example, a power consumption suppression command generated by the suppression command generation unit 15a of the aggregator 10, image data of a control success / failure display screen and a detail display screen generated by the screen generation unit 15d, and the like.
  • the communication unit 21 communicates with the device 30 connected via the communication network 3c, and receives information on the operation / stop of the device 30 and information on the operation condition of the device 30 at predetermined time intervals.
  • the communication part 21 communicates with the measuring device 30a connected via the communication network 3c, and receives the information regarding the power consumption of the apparatus 30 at predetermined time intervals.
  • the communication part 21 communicates with the sensor 40 connected via the communication network 3c, and receives the value of the comfort parameter
  • the communication part 21 communicates with the wattmeter 50 connected via the communication network 3c as needed, and receives the value of the power consumption and power consumption of the building 2.
  • the communication unit 21 transmits various information to the aggregator 10. For example, the communication unit 21 transmits the target value of the comfort index and the target value of the incentive amount input to the input unit 22 described later to the aggregator 10. In addition, the communication unit 21 transmits information on the usage status of the device 30 to the aggregator 10 at predetermined time intervals (for example, every 5 minutes). Information on the usage status of the device 30 is information for each device 30. The information on the usage status of the device 30 includes information on the operation / stop of the device 30, information on the operation condition of the device 30, and information on the power consumption of the device 30. In addition, the communication unit 21 transmits the measurement value of the sensor 40 to the aggregator 10 at predetermined time intervals (for example, every 5 minutes).
  • the communication unit 21 transmits a control command to the device 30 to be controlled when the control device 20 controls the device 30 connected via the communication network 3c.
  • the input unit 22 is an input interface such as a switch or a touch panel display provided in the control device 20.
  • a user of the device 30 of the building 2 can input various commands and various information to the control device 20 via the input unit 22.
  • the comfort value target value and the target value of the incentive amount are input to the input unit 22 by the user of the device 30.
  • the values are transmitted from the communication unit 21 to the aggregator 10.
  • an operation for changing (setting) the operation setting of the device 30 connected via the communication network 3c is input to the input unit 22 by the user of the device 30.
  • the operation setting of the device 30 changed from the input unit 22 includes operation / stop of the device 30, operation conditions of the device 30 (for example, in the case of an air conditioner, an operation mode such as cooling / heating / air blowing, Set temperature set by the user), the operation time of the device 30 (for example, in the case of an air conditioner, an operation start reservation time or an operation stop reservation time).
  • the operation setting of the device 30 can be changed in the input unit 22 even during the suppression request period (during demand response control).
  • the device 30 is basically operated with the operation setting based on the power consumption suppression command received by the communication unit 21 (generated by the aggregator 10). That is, when the aggregator 10 instructs to stop the operation of a certain device 30 (for example, a ventilation fan) by the power consumption suppression command, the operation of the device 30 is basically stopped. In addition, when the aggregator 10 has instructed to change the operating condition of a certain device 30 (for example, an air conditioner) (for example, to increase the set temperature by 2 ° C. from the set value), the operating condition of the device 30 is Basically, the contents are changed to the instructed contents.
  • a certain device 30 for example, an air conditioner
  • the device 30 that has been stopped according to the power consumption suppression command can be operated or consumed according to the request of the user of the device 30. It is possible to further change the operating conditions of the device 30 changed according to the power suppression command.
  • the display unit 23 is, for example, a touch panel display.
  • the display unit 23 can display the power consumption of the entire building 2, the usage status of the device 30 in the building 2, and the individual power consumption of the device 30.
  • the display unit 23 displays a control success / failure display screen (FIG. 4 and FIG. 5) indicating whether or not the demand response control is transmitted (received by the communication unit 21) from the aggregator 10 each time the demand response control is completed. Display). Further, when a display switching operation is performed on the input unit 22, the display unit 23 displays a detailed display screen (see FIGS. 6 to 8) transmitted from the aggregator 10 (received by the communication unit 21). Is possible.
  • the control success / failure display screen is preferably displayed at the end of the demand response control, but instead of this, or in addition to this, at any timing after the end of the demand response control, the device 30
  • the user may be configured to be able to display on the display unit 23 as necessary.
  • the storage unit 24 mainly includes a RAM, a ROM, a hard disk, and the like.
  • the storage unit 24 stores various programs used by the control unit 25 and various types of information.
  • the storage unit 24 stores, for example, a power consumption suppression command, a control success / failure display screen, and a detail display screen transmitted from the aggregator 10 received by the communication unit 21.
  • the storage unit 24 for example, information on the usage status of the device 30 acquired by the communication unit 21 communicating with the device 30 and the measuring instrument 30a is stored as time-series information. Further, in the storage unit 24, for example, measurement values of the sensor 40 acquired by the communication unit 21 communicating with the sensor 40 are stored as time-series information. In addition, the storage unit 24 stores, for example, the comfort index target value and the incentive amount target value input from the input unit 22.
  • the communication unit 21 transmits information on the usage status of the device 30, the measurement value of the sensor 40, the target value of the comfort index, and the target value of the incentive amount, these pieces of information stored in the storage unit 24. Is read and transmitted.
  • Control Unit 25 mainly includes a CPU, and executes various processes by executing programs stored in the storage unit 24.
  • the control unit 25 is connected by the communication network 3c based on a power consumption suppression command received by the communication unit 21 or an input to the user input unit 22 of the device 30 particularly during a suppression request period (during demand response control). Controlling at least a portion of the connected device 30.
  • the aggregator 10 as an example of the device control apparatus of the present embodiment controls the device 30 in response to a request for adjustment of power consumption (energy consumption) in the suppression request period (predetermined period).
  • the aggregator 10 includes a communication unit 11 as an example of an output unit, and a determination unit 15c.
  • the communication unit 11 outputs information to the user of the device 30.
  • the determination unit 15c determines whether or not the demand response control is successful based on information regarding the power consumption of the device 30 during the suppression request period.
  • the determination unit 15c causes the communication unit 11 to output the determined success or failure of demand response control.
  • the demand response control is an adjustment control of the power consumption of the device 30 during the suppression request period that is performed in response to the adjustment request.
  • the user of the device 30 can easily determine whether the demand response control has been appropriately executed.
  • the communication unit 11 outputs the incentive amount acquired by the user of the device 30 by executing the demand response control regarding the demand response control for which success or failure is determined by the determination unit 15c.
  • the incentive amount acquired by demand response control is also output to the user of the device 30, so how much merit can be obtained by demand response control? 30 users can grasp quantitatively.
  • the determination unit 15c determines whether the demand response control is successful based on the incentive amount acquired by the user by executing the demand response control.
  • the success or failure of demand response control can be determined based on the incentive amount acquired by the user of the device 30 in addition to the information related to the power consumption of the device 30, and the success or failure of demand response control can be determined in a multifaceted manner. Can do.
  • the determination unit 15c determines whether or not the demand response control is successful based on an index related to user comfort during the suppression request period or at the end of the suppression request period.
  • the success / failure of demand response control can be determined based on the comfort of the user of the device 30 in addition to the information related to the power consumption of the device 30, and the success / failure of demand response control can be determined in a multifaceted manner. .
  • the comfort index used for determining whether the demand response control is successful includes temperature, illuminance, and carbon dioxide concentration. Moreover, humidity may be contained in the parameter
  • success or failure of demand response control can be determined based on comfort indicators related to air conditioning, lighting, ventilation, and the like.
  • the communication unit 11 outputs detailed information regarding success or failure of demand response control.
  • the communication unit 11 outputs advice for demand response control for which success or failure has been determined by the determination unit 15c.
  • advice on demand response control is output. Therefore, how the user of the device 30 should improve demand response control, or is the current demand response control best? Etc. are easy to grasp.
  • the aggregator 10 functions as a device control device, but is not limited to this.
  • the control device 20 may function as a device control device.
  • control unit 25 of the control device 20 may function as the determination unit 15c and the screen generation unit 15d in the above embodiment.
  • the storage unit 24 of the control device 20 relates to the building 2 in which the control device 20 is installed, the target power consumption storage area 14b, the determination reference storage area 14c, the device usage status storage area 14d, and the comfort index in the above embodiment.
  • Information similar to the value storage area 14e, the power consumption storage area 14f, and the incentive amount storage area 14g may be stored.
  • the target value of power consumption stored in the target power consumption storage area 14b and the incentive amount stored in the incentive amount storage area 14g may be transmitted from the aggregator 10 to the communication unit 21.
  • the display unit 23 of the control device 20 may be configured to function as an output unit that outputs information to the user of the device 30.
  • the communication unit 21 of the control device 20 may be configured to function as an output unit that outputs information to a mobile terminal (not shown) held by the user of the device 30.
  • the aggregator 10 receives the adjustment request for the power consumption of the management device 1a and adjusts the power consumption so that the total power consumption of the plurality of buildings 2 is equal to or less than the total allowable power consumption. It is not limited.
  • the aggregator 10 receives the adjustment request for the power consumption of the management device 1a, so that the total power consumption of specific devices 30 (for example, air conditioners) in the plurality of buildings 2 is less than the total allowable power consumption. You may adjust.
  • the aggregator 10 determines the success or failure of demand response control based on the information related to the power consumption of the specific device 30 in the building 2 (without considering the power consumption other than the specific device 30). It may be configured to do.
  • the control device 20 may be a device that controls only the specific device 30 (for example, a thermostat if the specific device 30 is an air conditioner).
  • the communication unit 11 serving as the output unit transmits the image data of the determination result display screen and the detail display screen to the communication unit 21 of the control device 20, but is not limited thereto.
  • the communication unit 11 as an output unit may be configured to output image data to a portable terminal (not shown) held by the user of the device 30.
  • the determination unit 15c determines whether or not the demand response control is successful based on the condition regarding power consumption, the condition regarding the incentive amount, and the condition regarding comfort, but is not limited thereto. For example, the determination unit 15c determines whether or not the demand response control is successful based only on the condition related to power consumption or based on either the condition related to power consumption, the condition related to the incentive amount, and the condition related to comfort. Also good.
  • the image data of the determination result display screen and the detailed display screen is transmitted from the aggregator 10 to the control device 20, but the present invention is not limited to this.
  • the aggregator 10 may be configured such that only information necessary for generating the determination result display screen and the detailed display screen is transmitted to the control device 20 and the control device 20 generates the screen.
  • the management device 1a requests suppression of power consumption as a power consumption adjustment request, but is not limited to this.
  • the management device 1a requests an increase in power consumption as a power consumption adjustment request, and the determination unit 15c determines the demand response when the power consumption is equal to or higher than the power consumption target value as a result of demand response control. It may be determined that the control satisfies a condition regarding power consumption.
  • the power consumption of the device 30 is individually measured by the measuring instrument 30a.
  • the present invention is not limited to this, and the individual power consumption of the device 30 may not be measured.
  • the power consumption of the device 30 is individually measured by the measuring instrument 30a.
  • FIG. 9 is a schematic overall view of a power management system 200 including a control device 220 according to the second embodiment of the device control device of the present invention.
  • the power management system 200 mainly includes a power company 1 as a power supplier and a plurality of buildings 2 as power consumers (see FIG. 9).
  • the power management system 200 does not include the aggregator 10.
  • the electric power company 1 supplies electric power generated by itself and / or electric power generated by others to electric power consumers including a plurality of buildings 2.
  • the electric power company 1 has a management device 201a as shown in FIG.
  • the management device 201a is connected to the control device 220 of each building 2 via a communication network 3a such as the Internet.
  • the management device 201a predicts the power supply amount of the power company 1 and the power demand amount of the power consumer, and determines whether the power supply amount and the power demand amount are balanced.
  • the management device 201a requests the control device 220 to adjust the power consumption. Specifically, when the management device 201a determines that the power demand exceeds the power supply, the management device 201a requests the control device 220 to suppress power consumption.
  • the management apparatus 201a transmits a power unit price for each period as a power consumption adjustment request.
  • the management apparatus 201a does not tell the control apparatus 220 how much power consumption should be suppressed. That is, the power consumption adjustment request of the management apparatus 201a does not include the power consumption target value.
  • the management device 201a requests the control device 220 to reduce power consumption by setting a high power unit price during a period in which it is determined that the power demand exceeds the power supply.
  • the building 2 is a house here as in the first embodiment.
  • the building 2 does not have to mean the whole building, and may be, for example, one section in an apartment house.
  • the building 2 is not limited to a house, and may be an office building, a commercial facility, a factory, or the like.
  • a control device 220 In the building 2, a control device 220, a plurality of devices 30, a plurality of measuring instruments 30a, a plurality of sensors 40, and a wattmeter 50 are installed.
  • the some apparatus 30, the measuring device 30a, and the sensor 40 are installed in the building 2 here, the apparatus 30, and / or the measuring device 30a, and / or the sensor 40 are one. There may be.
  • the control device 220 is connected to the measuring instrument 30a, the sensor 40, and the wattmeter 50 via a communication network 3c such as a LAN.
  • the control device 220 is connected to at least one device 30 via a communication network 3c such as a LAN.
  • control device 220 may be connected to all the devices 30 through a communication network 3c such as a LAN.
  • the control device 220 is connected to the management device 201a via the communication network 3a.
  • the wattmeter 50 is also connected to the management apparatus 201a via the communication network 3a.
  • the wattmeter 50 is a smart meter that can communicate with the management device 201a and the control device 220.
  • the wattmeter 50 measures power consumption, power consumption, and the like in the building 2.
  • the wattmeter 50 transmits information related to the power consumption of the building 2 to the control device 220 at predetermined time intervals.
  • the wattmeter 50 continuously measures the power consumption of the building 2 and transmits the value of the maximum power consumption measured in the past 1 minute to the control device 220 at 1 minute intervals.
  • the operation of the wattmeter 50 is an example, and is not limited to the above.
  • the control device 220 communicates with the device 30 connected via the communication network 3c, and acquires information on the usage status of each device 30 by receiving information on the power consumption of the device 30 from the measuring instrument 30a. .
  • the information on the usage status of each device 30 acquired by the control device 220 includes information on operation / stop of each device 30 and operation conditions of each device 30 (if the device 30 is an air conditioner, for example, an operation mode or a set temperature). And information on power consumption of each device 30 and the like.
  • the control device 220 acquires various measurement values from the plurality of sensors 40.
  • the control device 220 receives a power consumption adjustment request (a power unit price for each period) from the management device 201a, and a high power unit price period (a period in which the power unit price is equal to or higher than a reference value input by the user of the device 30 described later). In addition, adjustment control (demand response control) of the power consumption of the device 30 is performed. The control device 220 controls the operation of the device 30 connected to the control device 220 through the communication network 3c for demand response control. In addition, the control device 220 determines whether the demand response control is successful in the high power unit price period, information on the power consumption of the device 30 in the high power unit price period, more specifically, the power consumption of the device 30 in the high power unit price period. Judgment is made based on the electricity bill (suppression amount) that can be suppressed by suppressing. The control device 220 causes the display unit 223, which will be described later, to output the determination result of success or failure of the demand response control.
  • a power consumption adjustment request a power unit price for each
  • the control device 220 is a controller used in, for example, a HEMS (Home Energy Management System), like the control device 20 of the first embodiment.
  • the control device 220 is configured to be able to display the power consumption of the entire building 2, the usage status of the device 30 in the building 2, and the individual power consumption of the device 30.
  • the control apparatus 220 controls the operation
  • the control device 220 mainly includes a communication unit 221, an input unit 222, a display unit 223, a storage unit 224, and a control unit 225 (see FIG. 10).
  • the communication unit 221 includes a management device 201a connected via the communication network 3a, a device 30, a measuring instrument 30a, a sensor 40, and a wattmeter connected via the communication network 3c.
  • 50 is a communication interface that enables communication with 50.
  • the communication unit 221 receives the power unit price for each period from the management apparatus 201a.
  • the communication unit 221 receives information on the power consumption of the building 2 from the power meter 50 at predetermined time intervals.
  • the wattmeter 50 continuously measures the power consumption of the building 2 and transmits the value of the maximum power consumption measured in the past 1 minute to the communication unit 221 at 1 minute intervals.
  • the operation of the wattmeter 50 is not limited to the above-described operation, similarly to the transmission operation of the information related to the power consumption of the building 2 to the aggregator 10 of the wattmeter 50 according to the first embodiment.
  • the input unit 222 is an input interface such as a switch or a touch panel display provided in the control device 220.
  • a user of the device 30 can input various commands and various information to the control device 220 via the input unit 222.
  • the user of the device 30 inputs the reference value of the power unit price, the target value of the comfort index, and the target value of the suppression amount to the input unit 222.
  • the reference value of the power unit price is input to the input unit 222
  • demand response control is executed by the control device 220 during a period in which the power unit price is equal to or higher than the reference value (high power unit price period).
  • the target value of the control amount is a target value of the control amount of the electric charge that can be acquired by suppressing the power consumption of the device 30 during the high power unit price period.
  • the power unit price reference value, the comfort index target value, and the control amount target value are input from the input unit 222, these values are stored in a determination reference storage area 224c of the storage unit 224, which will be described later. .
  • the input unit 222 is used by the user of the device 30 to change (set) the operation setting of the device 30 connected via the communication network 3c at a normal time (for a period other than the high power unit price period). An operation is entered. Note that the operation setting of the device 30 changed from the input unit 222 is the same as the operation setting of the device 30 changed from the input unit 22 in the first embodiment.
  • control content of the device 30 during the high power unit price period is input to the input unit 222 by the user of the device 30.
  • the input unit 222 has demand response control (that is, adjustment control of power consumption of the device 30 during the high power unit price period performed in response to an adjustment request (a power unit price for each period) from the management apparatus 201a).
  • the content is entered.
  • the content of demand response control can be changed from the input unit 222 even during the demand response control.
  • the display unit 223 is, for example, a touch panel display.
  • the display unit 223 can display the power consumption of the entire building 2, the usage status of the device 30 in the building 2, and the individual power consumption of the device 30.
  • the display unit 223 is an example of an output unit.
  • the display unit 223 When the demand response control ends, the display unit 223 generates a control success / failure display screen indicating whether or not the demand response control is generated, which is generated by the screen generation unit 225d of the control unit 225 described later (see screen S201 in FIG. 11). Is displayed (output).
  • the display unit 223 is displayed on a detail display screen (screen S212 in FIG. 12 and FIG. 13) generated by a screen generation unit 225d of the control unit 225 described later. Screen S213) can be displayed.
  • the control success / failure display screen is preferably displayed at the end of the demand response control, but instead of this, or in addition to this, at any timing after the end of the demand response control, the device 30
  • the user may be configured to be able to display on the display unit 223 as necessary.
  • the storage unit 224 mainly includes a RAM, a ROM, a hard disk, and the like.
  • the storage unit 224 stores various programs used by the control unit 225 and various information.
  • the storage unit 224 includes, as information storage areas, a power unit price storage area 224a, a control content storage area 224b, a determination reference storage area 224c, a device usage status storage area 224d, a comfort index value storage area 224e, a power consumption storage area 224f, And the suppression amount storage area 224g is included.
  • Electric power unit price storage area 224a stores the electric power unit price for each period received by the communication unit 221 from the management apparatus 201a.
  • the content of demand response control input from the input unit 222 is stored in the control content storage area 224b.
  • the content of the demand response control is, for example, that the ventilation fan included in the device 30 is stopped during the high power unit price period, the set temperature of the air conditioner included in the device 30 during the high power unit price period, and the cooling operation. If there is, the temperature is increased by 2 ° C., if it is in heating operation, the temperature is decreased by 2 ° C.
  • the device usage status storage area 224d includes information regarding operation / stop of the device 30 and information regarding operation conditions of the device 30 received by the communication unit 221 from the device 30, and communication.
  • the information regarding the power consumption of the device 30 received by the unit 221 from the measuring instrument 30a is stored in time series as information regarding the usage status of the device 30.
  • the comfort index value storage area 224e stores measurement values (comfort index values) received from the sensor 40 by the communication unit 221. Specifically, the comfort index value storage area 224e stores room temperature, illuminance, and carbon dioxide concentration measured by the sensor 40 of each building 2. In the comfort index value storage area 224e, the measurement value of the sensor 40 is stored as time-series information for each sensor 40.
  • the power consumption storage area 224f stores information related to the power consumption of the building 2 in which the control device 20 is installed, received from the power meter 50 by the communication unit 221 in time series. To do.
  • the suppression amount storage area 224g stores the suppression amount calculated by the suppression amount calculation unit 225b of the control unit 225 described later.
  • Control Unit 225 is mainly composed of a CPU, and executes various processes by executing programs stored in the storage unit 224.
  • the control unit 225 mainly functions as the control command generation unit 225a, the suppression amount calculation unit 225b, the determination unit 225c, and the screen generation unit 225d by executing the program stored in the storage unit 224.
  • Control command Generating Unit receives the power consumption adjustment request (electric power unit price for each period) and uses the consumption of the device 30 so that demand response control is executed. A control command for power adjustment control is generated.
  • control command generation unit 225a exceeds the power unit price stored in the determination reference storage area 224c based on the period-specific power unit price stored in the power unit price storage area 224a.
  • a control command for the device 30 is generated for the period (high power unit price period).
  • the control command generation unit 225a issues a command to control the device 30 to the device 30 that is the target of the power consumption adjustment control so that the control content stored in the control content storage area 224b is realized during the high power unit price period.
  • the control command generation unit 225a generates a control command at the start of the high power unit price period, and transmits the control command to the device 30 that is the target of power consumption adjustment control.
  • control command generation unit 225a when the contents of the control content storage area 224b are rewritten by input from the input unit 222 during the high power unit price period, the control command generation unit 225a generates a control command and sets the power consumption adjustment target. A control command is transmitted to the device 30.
  • the suppression amount calculation unit 225b calculates a suppression amount after the high power unit price period ends (after demand response control is executed in the building 2).
  • the suppression amount is the amount of monetary profit that the user of the device 30 acquires by executing demand response control on the high power unit price engine and adjusting the power consumption of the device 30.
  • the amount-of-suppression calculation unit 225b first suppresses the amount of power that has been suppressed by performing demand response control during the high power unit price period based on the information about the power consumption stored in the power consumption storage area 224f. Is calculated. More specifically, the suppression amount calculation unit 225b first executes the power consumption before the execution of the demand response control and the execution of the demand response control based on the information regarding the power consumption stored in the power consumption storage area 224f. Calculate the difference from the average power consumption. Next, the suppression amount calculation unit 225b multiplies the difference between the power consumption before the start of the demand response control and the average value of the power consumption during the execution of the demand response control by the length (time) of the high power unit price period.
  • the suppression amount calculation unit 225b sets the power in the high power unit price period to the power amount suppressed by executing the demand response control. By multiplying the unit price, a suppression amount that is suppressed by executing demand response control is calculated.
  • the calculation method of the suppression amount by the suppression amount calculation part 225b is an example, and is not limited to this.
  • the suppression amount created by the suppression amount calculation unit 225b is stored in the suppression amount storage area 224g.
  • the determination unit 225c receives the power consumption adjustment request from the management apparatus 201a, and performs the power consumption adjustment control of the device 30 during the high power unit price period performed in the building 2 ( Demand response control) is determined. The determination unit 225c determines the success or failure of demand response control for the building 2 every time the high power unit price period ends.
  • the determination unit 225c each time the determination unit 225c determines the success or failure of demand response control, the determination unit 225c causes the display unit 223 to output the determination result (success or failure of demand response control). Specifically, the determination unit 225c instructs the screen generation unit 225d to generate a screen indicating success or failure of the demand response control using the result of success or failure of the demand response control. In response to the instruction from the determination unit 225c, the screen generation unit 225d generates a screen indicating whether the demand response control is successful, and causes the display unit 223 to output the screen.
  • the determination unit 225c stores the comfort index target value and the target value of the control amount stored in the determination reference storage area 224c, and comfort.
  • the success or failure of demand response control is determined based on the measured value (comfort index value) for each sensor 40 stored in the index value storage area 224e and the suppression amount stored in the suppression amount storage area 224g.
  • the determination unit 225c performs determination regarding the following two conditions, and determines that demand response control is successful when all the conditions are satisfied. On the other hand, the determination unit 225c determines that the demand response control has failed when none of the following two conditions is satisfied.
  • the determination unit 225c adjusts the power consumption of the device 30 by executing demand response control during the high power unit price period as information on the power consumption of the device 30 in the high power unit price period.
  • the success or failure of demand response control is determined by comparing the amount of money (suppression amount) acquired by the user of the device 30 with a predetermined reference amount.
  • the determination unit 225c determines that the building 2 is the suppression amount when the actual suppression amount stored in the suppression amount storage area 224g is equal to or more than the target value of the suppression amount stored in the determination reference storage area 224c. It is determined that the condition regarding is satisfied.
  • the determination unit 225c determines whether the measured value during the high power unit price period or at the end of the high power unit price period is the comfort level. Determine whether the target value of the index is satisfied.
  • the determination part 225c determines whether the temperature is below the target value. Further, for example, the determination unit 225c determines whether the illuminance value measured by the sensor 40 is equal to or higher than the illuminance target value during the high power unit price period. For example, the determination unit 225c determines whether the value of the carbon dioxide concentration measured by the sensor 40 is equal to or less than the target value of the carbon dioxide concentration at the end of the high power unit price period.
  • the determination unit 225c determines that the building 2 satisfies the condition related to comfort when the measured values of all the sensors 40 satisfy the target value of the comfort index.
  • the screen generation unit 225d displays the success / failure of the demand response control using the determination result of the success / failure of the demand response control of the determination unit 225c according to the instruction of the determination unit 225c. (Control success / failure display screen) is generated. Further, the screen generation unit 225d generates a display screen (detail display screen) for detailed information related to demand response control.
  • the control success / failure display screen and the detail display screen are screens to be displayed on the display unit 223.
  • the control success / failure display screen generated by the screen generation unit 225d is, for example, a screen like a screen S201 shown in FIG.
  • a screen S201 illustrated in FIG. 11 is an example of a control success / failure display screen when the demand response control is determined to be successful by the determination unit 225c.
  • the screen generation unit 225d generates a control success / failure display screen based on information stored in the determination criterion storage area 224c, the comfort index value storage area 224e, the power consumption storage area 224f, and the suppression amount storage area 224g.
  • the contents displayed on the control success / failure display screen include detailed information on the success / failure of demand response control as well as the determination result of success / failure of demand response control as shown in FIG.
  • the detailed information regarding the success or failure of demand response control includes, for example, the maximum power consumption during the high power unit price period.
  • the detailed information related to the success or failure of demand response control includes, for example, the target value of the suppression amount and the suppression amount actually acquired by the user of the device 30 by executing the demand response control.
  • the detailed information regarding the success or failure of demand response control includes, for example, the room temperature target value of each building 2 and the room temperature (actually measured value) at the end of the high power unit price period.
  • the detailed information regarding the success or failure of demand response control includes, for example, the target value of illuminance and the minimum value (actually measured value) of illuminance during the high power unit price period of each building 2.
  • the detailed information regarding the success or failure of demand response control includes, for example, the target value of carbon dioxide concentration and the carbon dioxide concentration (actually measured value) at the end of the high power unit price period for each building 2.
  • the detailed information regarding the success / failure of demand response control includes a determination result as to whether the suppression amount, the room temperature, the illuminance, and the carbon dioxide concentration satisfy the target values.
  • the detail display screen generated by the screen generator 15d is a screen such as a screen S212 shown in FIG. 12 or a screen S213 shown in FIG.
  • the screen S212 shown in FIG. 12 is partially different from the screen S12 of FIG. 7 generated by the screen generator 15d of the aggregator 10 in the first embodiment.
  • the screen S212 is substantially the same as the screen S12 except that the display regarding the target value of power consumption is not performed, and thus the description thereof is omitted.
  • the screen S213 shown in FIG. 13 is substantially the same as the screen S13 of FIG. 8 generated by the screen generator 15d of the aggregator 10 in the first embodiment except that a suppression amount is displayed instead of the incentive amount. Therefore, the description is omitted.
  • the control device 220 as an example of the device control device of the present embodiment controls the device 30 in response to an adjustment request for power consumption (energy consumption) in the high power unit price period (predetermined period).
  • the control device 220 includes a display unit 223 as an example of an output unit, and a determination unit 225c.
  • the display unit 223 outputs (displays) information to the user of the device 30.
  • the determination unit 225c determines whether or not the demand response control is successful based on information regarding the power consumption of the device 30 in the high power unit price period.
  • the determination unit 225c causes the display unit 223 to output the determined success / failure of demand response control.
  • the demand response control is an adjustment control of the power consumption of the device 30 during the high power unit price period, which is performed in response to the adjustment request.
  • the user of the device 30 can easily determine whether the demand response control has been appropriately executed.
  • the target value of power consumption is not included in the adjustment request of the management device 201a received by the control device 220.
  • the determination unit 225c performs the demand response control during the high power unit price period as information on the power consumption of the device during the high power unit price period, and adjusts the energy consumption of the device 30 to obtain the monetary amount acquired by the user of the device 30
  • the success / failure of demand response control is determined by comparing the amount of profit (suppression amount) with the target value (predetermined reference amount) of the suppression amount.
  • the adjustment request of the management apparatus 201a does not include the target value of power consumption
  • the financial benefit obtained by the user of the device 30 by executing the demand response and adjusting the power consumption of the device 30 The success or failure of demand response control can be determined based on the amount of
  • the display unit 223 outputs detailed information regarding success or failure of demand response control.
  • the display unit 223 outputs advice on demand response control for which success or failure has been determined by the determination unit 225c.
  • advice on demand response control is output. Therefore, how the user of the device 30 should improve demand response control, or is the current demand response control best? Etc. are easy to grasp.
  • the determination unit 225c determines whether or not the demand response control is successful based on an index related to user comfort during the high power unit price period or at the end of the high power unit price period.
  • the success / failure of demand response control can be determined based on the comfort of the user of the device 30 in addition to the information related to the power consumption of the device 30, and the success / failure of demand response control can be determined in a multifaceted manner. .
  • the comfort-related indicators used for determining whether or not demand response control is successful include temperature, illuminance, and carbon dioxide concentration. Moreover, humidity may be contained in the parameter
  • success or failure of demand response control can be determined based on comfort indicators related to air conditioning, lighting, ventilation, and the like.
  • control device 220 calculates the suppressed power amount based on the change in the total power consumption of the building 2 before the demand response control and during the demand response control, and calculates the suppression amount.
  • the present invention is not limited to this.
  • control device 220 may calculate the suppression amount based on a change in power consumption of the device 30 that is a demand response control target before the demand response control and during the demand response control. That is, the control device 220 does not determine the success or failure of demand response control for the entire device 30 in the building 2, but determines the success or failure of demand response control only for the device 30 that is the target of demand response control. May be.
  • the display unit 223 as the output unit outputs (displays) the determination result display screen and the detailed display screen, but the present invention is not limited to this.
  • the communication unit 221 functions as an output unit, and is configured to output (send) image data of a determination result display screen and a detailed display screen to a portable terminal (not shown) held by the user of the device 30. Also good.
  • the communication unit 221 outputs to a mobile terminal or the like, information necessary for generating the determination result display screen and the detailed display screen instead of the image data of the determination result display screen and the detailed display screen. May be transmitted to the mobile terminal and a screen may be generated on the mobile terminal.
  • the determination unit 225c determines whether or not the demand response control is successful based on the condition related to the suppression amount (power consumption) and the condition related to comfort, but is not limited thereto. For example, the determination unit 225c may determine whether or not the demand response control is successful based only on the condition related to the suppression amount.
  • the power consumption of the device 30 is individually measured by the measuring instrument 30a.
  • the present invention is not limited to this, and the individual power consumption of the device 30 may not be measured.
  • the power consumption of the device 30 is individually measured by the measuring instrument 30a.
  • the present invention is applicable to a device control device that controls a device in response to a request for adjustment of energy consumption, and is useful as a device control device that can easily determine whether demand response control has been appropriately executed. is there.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Power Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Selective Calling Equipment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

所定期間におけるエネルギー消費量の調整要求を受けて機器の制御を行う機器制御装置であって、機器のユーザが、デマンドレスポンス制御(調整要求を受けて行われる所定期間の機器のエネルギー消費量の調整制御)が適切に実行されたか否かを容易に判断可能な機器制御装置を提供する。アグリゲータ(10)は、抑制要求期間における消費電力の調整要求を受けて機器の制御を行う。アグリゲータは、通信部(11)と、判定部(15c)と、を備える。通信部は、機器のユーザに対して情報を出力する。判定部は、デマンドレスポンス制御の成否を、抑制要求期間における機器の消費電力に関する情報に基づいて判定し、通信部に出力させる。デマンドレスポンス制御は、調整要求を受けて行われる抑制要求期間の機器の消費電力の調整制御である。

Description

機器制御装置
 本発明は、機器制御装置、特に、所定期間におけるエネルギー消費量の調整要求を受けて機器の制御を行う機器制御装置に関する。
 エネルギーの需給バランスを図るため、エネルギーの供給側が需要側にエネルギー消費量の調整を要求し、その要求に基づいて需要側がエネルギー消費量を調整する、デマンドレスポンスの導入が進められつつある。
 例えば、特許文献1(特開2014-217157号公報)には、供給側からの電力消費量の調整要求に基づいて、家庭等の需要側において、各種機器の電力消費量を調整する電力管理機器が開示されている。電力管理機器は、電力消費量の調整要求受付時に、所定の方式で機器の動作を制御することで、機器のエネルギー消費量を調整している。
 しかし、実際には、エネルギーの需要側の事情等によって、エネルギー消費量の調整要求時に、機器の動作が所定の方式通りに制御されない事態が起こりうる。そのため、エネルギーの需要者(機器のユーザ)は供給側からの要求に応じて適切な機器の制御を実行しているつもりであっても、実際には、十分なエネルギー消費量の調整が実現されないという事態が発生しうる。また、所定の方式通りに全ての機器の動作が制御されるとしても、所定の方式が適切でない場合には、需要側において十分なエネルギー消費量の調整が実現されないという事態が発生しうる。
 このような事態に対し、需要者に対し、エネルギー使用量やエネルギー料金が情報として提示される場合があるが、特に、家庭等、エネルギー管理に関する専門家がいない場合には、これらの情報が提示されたとしても、需要者が、エネルギー消費量の調整要求を受けて行われる機器の制御が、毎回、適切に行われているかを判断することは困難である。
 本発明の課題は、所定期間におけるエネルギー消費量の調整要求を受けて機器の制御を行う機器制御装置であって、機器のユーザが、デマンドレスポンス制御(調整要求を受けて行われる所定期間の機器のエネルギー消費量の調整制御)が適切に実行されたか否かを容易に判断可能な機器制御装置を提供することにある。
 本発明の第1観点に係る機器制御装置は、所定期間におけるエネルギー消費量の調整要求を受けて機器の制御を行う。当該機器制御装置は、出力部と、判定部と、を備える。出力部は、機器のユーザに対して情報を出力する。判定部は、デマンドレスポンス制御の成否を、所定期間における機器の消費エネルギーに関する情報に少なくとも基づいて判定し、出力部に出力させる。デマンドレスポンス制御は、調整要求を受けて行われる所定期間の機器のエネルギー消費量の調整制御である。
 本発明の第1観点に係る機器制御装置では、機器のユーザに対し、デマンドレスポンス制御の成否が出力されるため、機器のユーザは、デマンドレスポンス制御が適切に実行されたかを容易に判断することができる。
 本発明の第2観点に係る機器制御装置は、第1観点に係る機器制御装置であって、出力部は、判定部により成否が判定されたデマンドレスポンス制御に関し、該デマンドレスポンス制御を実行することでユーザが獲得したインセンティブ金額を更に出力する。
 本発明の第2観点に係る機器制御装置では、機器のユーザに対し、デマンドレスポンス制御の成否に加え、デマンドレスポンス制御により獲得されるインセンティブ金額も出力されるため、デマンドレスポンス制御によりどれだけのメリットを得ることができたのかを機器のユーザが定量的に把握することができる。
 本発明の第3観点に係る機器制御装置は、第1観点又は第2観点に係る機器制御装置であって、判定部は、デマンドレスポンス制御の成否を、該デマンドレスポンス制御を実行することでユーザが獲得したインセンティブ金額に更に基づいて判定する。
 本発明の第3観点に係る機器制御装置では、デマンドレスポンス制御の成否を、機器の消費エネルギーに関する情報に加え、機器のユーザが獲得したインセンティブ金額に基づいて判定することができ、多面的にデマンドレスポンス制御の成否を判定することができる。
 本発明の第4観点に係る機器制御装置は、第1観点から第3観点のいずれかに係る機器制御装置であって、判定部は、デマンドレスポンス制御の成否を、所定期間中又は所定期間終了時のユーザの快適性に関する指標に更に基づいて判定する。
 本発明の第4観点に係る機器制御装置では、デマンドレスポンス制御の成否を、機器の消費エネルギーに関する情報に加え、ユーザの快適性に基づいて判定することができ、多面的にデマンドレスポンス制御の成否を判定することができる。
 本発明の第5観点に係る機器制御装置は、第4観点に係る機器制御装置であって、快適性に関する指標には、温度、湿度、照度、および二酸化炭素濃度の少なくとも1つを含む。
 本発明の第5観点に係る機器制御装置では、空調、照明、換気等に関連する快適性指標に基づいて、デマンドレスポンス制御の成否を判定することができる。
 本発明の第6観点に係る機器制御装置は、第1観点に係る機器制御装置であって、調整要求にエネルギー消費量の目標値が含まれない場合に、判定部は、所定期間における機器の消費エネルギーに関する情報としての、所定期間にデマンドレスポンス制御を実行し機器のエネルギー消費量を調整することでユーザが獲得した金銭的利益の額と、所定の基準額とを比較することで、デマンドレスポンス制御の成否を判定する。
 本発明の第6観点に係る機器制御装置では、調整要求がエネルギー消費量の目標値を含まない場合であっても、デマンドレスポンスを実行して機器の消費エネルギーを調整することで機器のユーザが獲得した金銭的利益の額に基づいてデマンドレスポンス制御の成否を判定することができる。
 本発明の第7観点に係る機器制御装置は、第1観点から第6観点のいずれかに係る機器制御装置であって、出力部は、デマンドレスポンス制御の成否に関する詳細情報を更に出力する。
 本発明の第7観点に係る機器制御装置では、デマンドレスポンス制御の成否に加え、デマンドレスポンス制御の成否に関する詳細情報が出力されるため、機器のユーザは、例えば、デマンドレスポンス制御の失敗の原因や、さらなる改善の余地等を把握することが容易である。
 本発明の第8観点に係る機器制御装置は、第1観点から第7観点のいずれかに係る機器制御装置であって、出力部は、判定部により成否が判定されたデマンドレスポンス制御に対するアドバイスを更に出力する。
 本発明の第8観点に係る機器制御装置では、デマンドレスポンス制御の成否に加え、デマンドレスポンス制御に対するアドバイスが出力されるため、ユーザは、デマンドレスポンス制御をどのように改善すべきか、あるいは、現状のデマンドレスポンス制御がベストなのか等を把握することが容易である。
 本発明の第1観点に係る機器制御装置では、機器のユーザに対し、デマンドレスポンス制御の成否が出力されるため、機器のユーザは、デマンドレスポンス制御が適切に実行されたかを容易に判断することができる。
 本発明の第2観点に係る機器制御装置では、デマンドレスポンス制御によりどれだけのメリットを得ることができたのかをユーザが定量的に把握することができる。
 本発明の第3観点および第4観点に係る機器制御装置では、多面的にデマンドレスポンス制御の成否を判定することができる。
 本発明の第5観点に係る機器制御装置では、空調、照明、換気等に関連する快適性指標に基づいて、デマンドレスポンス制御の成否を判定することができる。
 本発明の第6観点に係る機器制御装置では、調整要求がエネルギー消費量の目標値を含まない場合であっても、デマンドレスポンスを実行して機器の消費エネルギーを調整することでユーザが獲得した金銭的利益の額に基づいてデマンドレスポンス制御の成否を判定することができる。
 本発明の第7観点に係る機器制御装置では、ユーザが、デマンドレスポンス制御の失敗の原因や、さらなる改善の余地等を把握することが容易である。
 本発明の第8観点に係る機器制御装置では、ユーザが、デマンドレスポンス制御をどのように改善すべきか、あるいは、現状のデマンドレスポンス制御がベストなのか等を把握することが容易である。
本発明の機器制御装置の第1実施形態に係るアグリゲータを含む、エネルギー管理システムを説明するための概略全体図である。 図1のエネルギー管理システムに含まれるアグリゲータのブロック図である。 図1のエネルギー管理システムに含まれる制御装置のブロック図である。 図1のエネルギー管理システムにおいて、制御装置の表示部に表示される制御成否表示画面の一例である。 図1のエネルギー管理システムにおいて、制御装置の表示部に表示される制御成否表示画面の他の例である。 図1のエネルギー管理システムにおいて、制御装置の表示部に表示される詳細表示画面の一例である。 図1のエネルギー管理システムにおいて、制御装置の表示部に表示される詳細表示画面の他の例である。 図1のエネルギー管理システムにおいて、制御装置の表示部に表示される詳細表示画面の他の例である。 本発明の機器制御装置の第2実施形態に係る制御装置を含む、エネルギー管理システムを説明するための概略全体図である。 図9のエネルギー管理システムに含まれる制御装置のブロック図である。 図9のエネルギー管理システムにおいて、制御装置の表示部に表示される制御成否表示画面の一例である。 図9のエネルギー管理システムにおいて、制御装置の表示部に表示される詳細表示画面の一例である。 図9のエネルギー管理システムにおいて、制御装置の表示部に表示される詳細表示画面の他の例である。
 本発明に係る機器制御装置の実施形態について、図面を参照して説明する。なお、下記の実施形態は、具体例にすぎず、本発明の趣旨を逸脱しない範囲で適宜変更可能である。
 <第1実施形態>
 (1)全体構成
 図1は、本発明の機器制御装置の第1実施形態に係るアグリゲータ10を含む、電力管理システム100の概略全体図である。
 電力管理システム100は、電力供給者としての電力会社1と、電力需要者としての複数の建物2と、複数の建物2における消費電力(エネルギー消費量)を管理するアグリゲータ10とを主に含む(図1参照)。なお、本実施形態では、電力管理システム100に含まれるアグリゲータ10は1台であるが、これに限定されるものではなく、電力管理システム100には複数のアグリゲータ10が含まれてもよい。
 電力会社1は、自ら発電した電力、および/又は、他者が発電した電力を、複数の建物2を含む電力需要者に供給する。電力会社1は、図1のように、管理装置1aを有している。
 管理装置1aは、図1のように、アグリゲータ10と、インターネット等の通信ネットワーク3aにより接続されている。管理装置1aは、電力会社1の電力供給量および電力需要者の電力需要量を予測し、電力供給量と電力需要量とがバランスするかを判断する。管理装置1aは、電力需要量と電力供給量とがバランスしないと判断した場合に、アグリゲータ10に対して、アグリゲータ10が管理する建物2における消費電力の調整を要求する。具体的には、管理装置1aは、電力需要が電力供給を上回ると判断した場合に、アグリゲータ10に対して、アグリゲータ10が管理する建物2における消費電力の抑制を要求する。
 管理装置1aは、アグリゲータ10に対して消費電力の抑制を要求する際に、消費電力の抑制を要求する期間(以後、抑制要求期間と呼ぶ場合がある)に関する情報、抑制要求期間にアグリゲータ10の管理する複数の建物2の全体において許容される最大消費電力(以後、全体許容消費電力と呼ぶ場合がある)に関する情報、および、消費電力の抑制に応じた場合の報奨金(以後、抑制に対する報奨金と呼ぶ場合がある)に関する情報を併せて送信する。
 アグリゲータ10は、複数の建物2における消費電力を管理する装置である。アグリゲータ10は、図1のように、電力会社1の管理装置1aと、インターネット等の通信ネットワーク3aにより接続されている。また、アグリゲータ10は、図1のように、各建物2に設置された後述する制御装置20および電力計50と、インターネット等の通信ネットワーク3bにより接続されている。
 アグリゲータ10は、電力会社1から消費電力の調整要求を受け付け、受け付けた調整要求を実現するよう、建物2に設置された後述する制御装置20に対し、消費電力の抑制指令を送信する。
 アグリゲータ10は、管理装置1aが建物2における消費電力の抑制を要求する際に、管理装置1aから、抑制要求期間に関する情報、全体許容消費電力に関する情報、抑制に対する報奨金に関する情報を消費電力の抑制要求(調整要求)として受け付ける。また、アグリゲータ10は、制御装置20から各種情報を受け付ける(各種情報の内容は後述する)。また、アグリゲータ10は、電力計50から各建物2の消費電力に関する情報を受け付ける。
 アグリゲータ10は、管理装置1aからの消費電力の抑制要求に対し、抑制要求期間に、アグリゲータ10が管理する複数の建物2における消費電力の合計が全体許容消費電力以下になるよう、各制御装置20に対して消費電力の抑制指令を送信する。複数の建物2では、基本的に、消費電力の抑制指令に基づいて、抑制要求期間中に、建物2に設置される後述の複数の機器30の少なくとも一部の消費電力の調整制御(以後、デマンドレスポンス制御と呼ぶ場合がある)が行われる。
 抑制要求期間に、アグリゲータ10が管理する複数の建物2における消費電力の合計が全体許容消費電力以下に調整されると、アグリゲータ10の運用者には、消費電力の調整要求時に提示された抑制に対する報奨金が、電力会社1から支払われる。アグリゲータ10の運用者は、抑制に対する報奨金の一部を、デマンドレスポンス制御が行われた建物2の使用者等(機器30のユーザ)に対して支払う。アグリゲータ10は、抑制要求期間後(建物2においてデマンドレスポンス制御が実行された後)に、各建物2の消費電力に関する情報に基づいて、各建物2の使用者等に対して支払う金額(以後、インセンティブ金額と呼ぶ)を決定する。
 また、アグリゲータ10は、制御装置20から受信する各種情報や、電力計50から受信する消費電力に関する情報に基づいて、各建物2におけるデマンドレスポンス制御の成否を判定し、判定結果を制御装置20に送信する。
 建物2は、ここでは住宅である。建物2は、建物全体を意味するものでなくてもよく、例えば集合住宅内の1つの区画であってもよい。また、建物2は、住宅に限定されるものではなく、オフィスビル、商業施設、工場等であってもよい。
 建物2には、制御装置20、複数の機器30、複数のセンサ40、および電力計50が設置されている(図1参照)。なお、図1では、建物2に、複数の機器30およびセンサ40が設置されているが、機器30、および/又は、センサ40は、1台であってもよい。制御装置20は、複数のセンサ40、および電力計50と、LAN等の通信ネットワーク3cにより接続されている(図1参照)。また、制御装置20は、少なくとも一部の機器30とLAN等の通信ネットワーク3cにより接続されている(図1参照)。なお、制御装置20は、全ての機器30と通信ネットワーク3cにより接続されていてもよい。また、制御装置20は、アグリゲータ10と、通信ネットワーク3bにより接続されている(図1参照)。電力計50も、アグリゲータ10と、通信ネットワーク3bにより接続されている(図1参照)。
 複数の機器30は、各種電気機器である。複数の機器30には、例えば、エアコン、冷蔵庫、照明、換気扇、洗濯機、ドライヤー等を含む。ただし、機器30の種類は、例示であって、これに限定されるものではない。通信ネットワーク3cを介して制御装置20と接続された機器30は、制御装置20に対し、機器30の運転/停止に関する情報や、機器30の運転条件(例えば機器30がエアコンであれば、運転モードや設定温度等)に関する情報を、所定時間間隔(例えば1分間隔)で送信する。
 建物2には、機器30の消費電力を個別に計測する計測器30aが設けられている(図1参照)。計測器30aは、LAN等の通信ネットワーク3cにより、制御装置20と接続されている(図1参照)。なお、図1では、計測器30aは機器30毎に設けられているが、これに限定されるものではない。計測器30aは、1台で2台以上の機器30について消費電力を計測可能なものであってもよく、1台で全ての機器30について消費電力を計測可能なものであってもよい。計測器30aは、機器30の消費電力に関する情報を、所定時間間隔で制御装置20に送信する。例えば、計測器30aは、1秒間隔で機器30の消費電力を測定し、測定結果を制御装置20に送信する。ただし、上記の計測器30aの動作は一例であって、これに限定されるものではない。例えば、計測器30aは、連続的に機器30の消費電力の計測を行い、1分間隔で、過去1分間に計測された最大消費電力や平均電力の値を、制御装置20に送信してもよい。
 複数のセンサ40は、建物2において、各種の、機器30のユーザの快適性に関する指標(以後、快適性指標と呼ぶ場合がある)の値を測定するセンサである。複数のセンサ40には、例えば、室温を測定する温度センサ、照度を測定する照度センサ、二酸化炭素濃度を測定する二酸化炭素濃度センサ等を含む。ただし、センサ40の種類は、例示であって、これに限定されるものではない。例えば、センサ40は、湿度を測定する湿度センサを含んでもよい。また、センサ40には、上記の種類のセンサの一部又は全部が含まれなくてもよい。センサ40は、所定時間間隔(例えば5分間隔)で、そのセンサ40の計測対象である快適性指標の値を測定し、測定した値を制御装置20に送信する。ただし、センサ40の動作は一例であって、これに限定されない。例えば、センサ40は、1分間隔で快適性指標の値を測定し、5回分の測定結果の平均値を、5分間隔で制御装置20に送信するよう構成されてもよい。
 電力計50は、アグリゲータ10および制御装置20と通信可能なスマートメータである。電力計50は、建物2における消費電力、消費電力量等を計測する。電力計50は、所定時間間隔でアグリゲータ10に建物2の消費電力に関する情報を送信する。例えば、電力計50は、連続的に建物2の消費電力の計測を行い、1分間隔で、過去1分間に計測された最大消費電力の値を、アグリゲータ10に送信する。ただし、電力計50の動作は一例であって、上記のものに限定されない。例えば、電力計50は、連続的に建物2の消費電力の計測を行い、1分間隔で過去1分間に計測された最大消費電力の値を取得し、取得した30分間分の値を、時系列の情報として、アグリゲータ10に一括して送信するよう構成されてもよい。また、例えば、電力計50は、建物2の消費電力の計測を1秒間隔で行い、過去1分間に計測された消費電力の値を時系列の情報として、1分間隔でアグリゲータ10に送信するよう構成されてもよい。
 制御装置20は、通信ネットワーク3cを介して接続された機器30と通信を行い、また計測器30aから機器30の消費電力に関する情報を受信することで、各機器30の使用状況に関する情報を取得する。制御装置20が取得する各機器30の使用状況に関する情報には、各機器30の運転/停止に関する情報、各機器30の運転条件に関する情報、および、各機器30の消費電力に関する情報が含まれる。また、制御装置20は、複数のセンサ40から各種測定値を取得する。
 制御装置20は、アグリゲータ10から消費電力の抑制指令を受け付ける。制御装置20は、アグリゲータ10からの消費電力の抑制指令や、機器30のユーザの制御装置20に対する入力に基づいて、抑制要求期間中に、複数の機器30の少なくとも一部を制御する。その結果、建物2では、デマンドレスポンス制御が実行され、建物2における消費電力が調整される。
 制御装置20は、機器30のユーザにより入力された各種設定や、機器30の使用状況に関する情報や、センサ40の測定値を、アグリゲータ10に対して送信する。アグリゲータ10は、制御装置20が送信するこれらの情報や、電力計50が送信する消費電力に関する情報に基づいて、デマンドレスポンス制御の成否を各建物2について個別に判定し、その判定結果を判定対象の建物2に設置された制御装置20に対して送信する。デマンドレスポンス制御の成否を受信した制御装置20は、後述する表示部23に、デマンドレスポンス制御の成否を表示する。
 (2)詳細構成
 以下に、電力管理システム100に含まれる、アグリゲータ10および制御装置20について詳細に説明する。
 (2-1)アグリゲータ
 アグリゲータ10は、管理対象の複数の建物2における消費電力を管理するコンピュータである。アグリゲータ10は、機器制御装置の一例である。アグリゲータ10は、管理装置1aから、消費電力の調整要求、特にここでは、抑制要求期間における消費電力の抑制要求を受けて、建物2内に設置された複数の機器30の少なくとも一部の制御を行う。
 アグリゲータ10は、主に、通信部11、入力部12、表示部13、記憶部14、および制御部15を備える(図2参照)。
 (2-1-1)通信部
 通信部11は、通信ネットワーク3aを介して接続される管理装置1a、および、通信ネットワーク3bを介して接続される制御装置20および電力計50と、アグリゲータ10との通信を可能にする通信インターフェイスである。
 通信部11は、管理装置1a、制御装置20、および、電力計50から各種信号を受け付ける。以下に具体的に説明する。
 通信部11は、管理装置1aから、所定期間における消費電力の調整要求を受け付ける。より具体的には、通信部11は、管理装置1aが建物2における消費電力の抑制を要求する際に、管理装置1aから、抑制要求期間に関する情報、全体許容消費電力に関する情報、および、抑制に対する報奨金に関する情報を消費電力の抑制要求(調整要求)として受信する。通信部11が受信した消費電力の抑制要求の内容、つまり、抑制要求期間に関する情報、全体許容消費電力に関する情報、抑制に対する報奨金に関する情報は、後述する記憶部14の調整要求記憶領域14aに記憶される。
 通信部11は、制御装置20のそれぞれから、快適性指標の目標値を受信する。快適性指標の目標値は、具体的には、例えば、室温、照度、および二酸化炭素濃度の目標値である。また、通信部11は、制御装置20のそれぞれから、デマンドレスポンス制御を実行することで獲得できるインセンティブ金額の目標値を受信する。快適性指標の目標値、および、インセンティブ金額の目標値は、各制御装置20の後述する入力部22に、機器30のユーザにより入力される値である。通信部11が受信した、快適性指標の目標値、および、インセンティブ金額の目標値は、後述する記憶部14の判定基準記憶領域14cに、建物2別に(制御装置20別に)記憶される。
 また、通信部11は、各制御装置20から、所定時間間隔毎に機器30の使用状況に関する情報を受信する。機器30の使用状況に関する情報は、機器30別の情報である。機器30の使用状況に関する情報には、機器30の運転/停止に関する情報、機器30の運転条件に関する情報、機器30の消費電力に関する情報を含む。通信部11が受信した、機器30の使用状況に関する情報は、後述する記憶部14の機器使用状況記憶領域14dに、機器30別に(情報が、どの建物2に設置された、どの機器30に関する情報であるかを判別可能に)記憶される。機器使用状況記憶領域14dには、機器30の使用状況に関する情報が、時系列の情報として記憶される。
 また、通信部11は、各制御装置20から、所定時間間隔毎にセンサ40の測定値を受信する。通信部11が受信するセンサ40の測定値は、例えば、室温、照度、および二酸化炭素濃度である。通信部11が受信した、センサ40の測定値は、後述する記憶部14の快適性指標値記憶領域14eに、センサ40別に(測定値が、どの建物2に設置された、どのセンサ40の測定値であるかを判別可能に)記憶される。快適性指標値記憶領域14eには、センサ40の測定値が、時系列の情報として記憶される。
 通信部11は、所定時間間隔毎に電力計50から各建物2の消費電力に関する情報を受信する。具体的には、通信部11は、電力計50から1分間隔で送信されてくる建物2の消費電力に関する情報を受信する。通信部11が受信した、各建物2の消費電力に関する情報は、時系列の情報として、後述する記憶部14の消費電力記憶領域14fに、建物2別に(制御装置20別に)記憶される。
 通信部11は、制御装置20に各種信号を送信する。以下に具体的に説明する。
 通信部11は、後述する制御部15の抑制指令生成部15aが建物2のそれぞれに対して個別に生成する消費電力の抑制指令を、各建物2の制御装置20に送信する。
 また、通信部11は、機器30のユーザに対して情報を出力する。つまり、通信部11は、出力部の一例である。具体的には、通信部11は、制御装置20に対して情報を出力(送信)する。制御装置20に対して出力された情報は、後述する制御装置20の表示部23に、機器30のユーザに対する情報として表示される。通信部11は、例えば、後述する制御部15の判定部15cにより判定される、各建物2における、抑制要求期間の機器30の消費電力の調整制御(デマンドレスポンス制御)の成否を、判定対象の建物2に設置された制御装置20に出力する。また、通信部11は、例えば、デマンドレスポンス制御の成否に関する詳細情報、および、判定部15cにより成否が判定されたデマンドレスポンス制御に対するアドバイスを、デマンドレスポンス制御の成否の判定対象の建物2に設置された制御装置20に出力する。
 (2-1-2)入力部
 入力部12は、キーボードやマウス等の入力インターフェイスである。アグリゲータ10の運用者は、アグリゲータ10に対する各種指令や各種情報を、入力部12を介して入力可能である。
 (2-1-3)表示部
 表示部13は、例えば、液晶ディスプレイである。表示部13には、アグリゲータ10に関する各種情報を表示可能である。
 (2-1-4)記憶部
 記憶部14は、主に、RAM、ROM、およびハードディスク等を含む。記憶部14には、制御部15により使用される各種プログラムや、各種情報が記憶される。
 記憶部14は、情報の記憶領域として、調整要求記憶領域14a、目標消費電力記憶領域14b、判定基準記憶領域14c、機器使用状況記憶領域14d、快適性指標値記憶領域14e、消費電力記憶領域14f、および、インセンティブ金額記憶領域14gを有する。
 (2-1-4-1)調整要求記憶領域
 調整要求記憶領域14aには、通信部11が管理装置1aから受信した、抑制要求期間に関する情報、全体許容消費電力に関する情報、および抑制に対する報奨金に関する情報が記憶される。
 (2-1-4-2)目標消費電力記憶領域
 目標消費電力記憶領域14bには、後述する制御部15の抑制指令生成部15aが抑制指令を生成する際に算出する、建物2別の、抑制要求期間における消費電力の目標値(抑制要求期間に建物2で許容される消費電力の最大値)が記憶される。
 (2-1-4-3)判定基準記憶領域
 判定基準記憶領域14cには、通信部11が各制御装置20から受信した、快適性指標の目標値(例えば、室温、照度、および二酸化炭素濃度の目標値)と、インセンティブ金額の目標値とが、建物2別に(制御装置20別に)記憶される。
 (2-1-4-4)機器使用状況記憶領域
 機器使用状況記憶領域14dは、通信部11が各制御装置20から受信した、機器30の使用状況に関する情報を記憶する。機器使用状況記憶領域14dに記憶される機器30の使用状況に関する情報には、機器30の運転/停止に関する情報、機器30の運転条件に関する情報、機器30の消費電力に関する情報を含む。機器使用状況記憶領域14dには、機器30の使用状況に関する情報が、機器30別の時系列の情報として記憶される。
 (2-1-4-5)快適性指標値記憶領域
 快適性指標値記憶領域14eは、通信部11が各制御装置20から受信した、センサ40の測定値(快適性指標値)を記憶する。具体的には、快適性指標値記憶領域14eは、各建物2のセンサ40が測定した、室温、照度、および二酸化炭素濃度を記憶する。快適性指標値記憶領域14eには、センサ40の測定値が、センサ40別の時系列の情報として記憶される。
 (2-1-4-6)消費電力記憶領域
 消費電力記憶領域14fは、通信部11が電力計50から受信した、各建物2の消費電力に関する情報を記憶する。消費電力記憶領域14fには、通信部11が受信した各建物2の消費電力に関する情報が、建物2別に、時系列の情報として記憶される。
 (2-1-4-7)インセンティブ金額記憶領域
 インセンティブ金額記憶領域14gは、後述する制御部15のインセンティブ金額算出部15bが各建物2に関して算出したインセンティブ金額を記憶する。
 (2-1-5)制御部
 制御部15は、主にCPUからなり、記憶部14に記憶されたプログラムを実行することで各種処理を実行する。
 制御部15は、記憶部14に記憶されたプログラムを実行することで、主に抑制指令生成部15a、インセンティブ金額算出部15b、判定部15c、および画面生成部15dとして機能する。
 (2-1-5-1)抑制指令生成部
 抑制指令生成部15aは、通信部11が管理装置1aから消費電力の調整要求を受信した時に、抑制要求期間に、建物2で機器30の消費電力の調整制御(デマンドレスポンス制御)が実行されるように、制御装置20に対する消費電力の抑制指令を生成する。なお、消費電力の抑制指令は、具体的には、制御装置20に対し、その制御装置20が、通信ネットワーク3cにより接続された機器30のうち、どの機器30の運転を、どのように制御するかを具体的に指示する指令である。
 具体的には、抑制指令生成部15aは、以下の様に、消費電力の抑制指令を生成する。
 初めに、抑制指令生成部15aは、建物2別に、デマンドレスポンス制御中の、建物2別の消費電力の目標値(抑制要求期間に許容される消費電力の最大値)を算出する。具体的には、抑制指令生成部15aは、調整要求記憶領域14aに記憶された全体許容消費電力に関する情報と、消費電力記憶領域14fに記憶された各建物2の消費電力に関する情報と、に基づいて、建物2別の消費電力の目標値を算出する。
 例えば、抑制指令生成部15aは、消費電力記憶領域14fに記憶された、各建物2の最新の消費電力に関する情報に基づき、各建物2の最新の消費電力の大きさに比例するように、消費電力の抑制量を各建物2に割り当てる。ここで、消費電力の抑制量とは、現在の消費電力に対して抑制される消費電力の量を意味する。なお、各建物2に割り当てられる消費電力の抑制量は、各建物2の現在の消費電力に対し、各建物2に割り当てられた抑制量だけ消費電力が削減された場合に、全建物2の消費電力の合計が、全体許容消費電力を下回るように決定される。そして、抑制指令生成部15aは、消費電力記憶領域14fに記憶された各建物2の最新の消費電力に関する情報(各建物2の最新の最大消費電力の値)から、各建物2に割り当てられた消費電力の抑制量を減じることで、各建物2の、抑制要求期間における消費電力の目標値を算出する。算出された、建物2別の、消費電力の目標値は、目標消費電力記憶領域14bに記憶される。
 なお、抑制指令生成部15aの建物2別の消費電力の目標値の算出方法は例示であって、これに限定されるものではない。例えば、抑制指令生成部15aは、全建物2の消費電力の抑制量が同一となるように、各建物2に消費電力の抑制量を割り当ててもよい。また、例えば、抑制指令生成部15aは、全建物2の一部だけに、消費電力の抑制量を割り当ててもよい。また、例えば、抑制指令生成部15aは、抑制要求期間内で、各建物2に割り当てられる消費電力の抑制量が変動するように、各建物2に消費電力の抑制量を割り当ててもよい。
 次に、抑制指令生成部15aは、機器使用状況記憶領域14dに記憶された機器30の使用状況に関する情報に基づき、その建物2の消費電力の合計が算出された消費電力の目標値を下回るような、機器30の制御を決定する。ここでの機器30の制御の決定には、どの機器30を制御の対象とするかの決定(制御対象の決定)と、その機器30をどのように制御するかの決定(制御内容の決定)とを含む。なお、ここでは、制御装置20に通信ネットワーク3cにより接続された機器30だけを制御の対象とする。
 抑制指令生成部15aにより決定される機器30の制御内容には、例えば、機器30の運転条件の変更(例えば、機器30がエアコンであれば設定温度の変更等)、機器30の停止、機器30の運転時刻の変更(例えば、機器30が洗濯機であれば、予約されている運転時刻を変更)を含む。ただし、これに限定されるものではなく、機器30の特性に応じ適切な制御内容が決定されればよい。
 抑制指令生成部15aによる制御対象の決定は、例えば、予め定められた優先順位に基づいて、あるいは、各制御装置20に対して機器30のユーザが入力した優先順位に基づいて行われる。
 具体例を挙げて説明すれば、抑制指令生成部15aは、所定の優先順位に基づいて、例えば、初めに機器30に含まれる換気扇を停止することを決定する。抑制指令生成部15aは、換気扇を停止しても、建物2の消費電力の合計が消費電力の目標値を下回らないと判断される場合、所定の優先順位に基づいて、次に、機器30に含まれるエアコンの設定温度を所定温度だけ変更することを更に決定する。抑制指令生成部15aは、エアコンの設定温度を変更しても、建物2の消費電力の合計が消費電力の目標値を下回らないと判断される場合、機器30に含まれる洗濯機の運転時刻を変更することを更に決定する。
 なお、抑制指令生成部15aによる制御対象の決定は、上記の方法に限定されるものではない。例えば、抑制指令生成部15aは、機器使用状況記憶領域14dに記憶された機器30の使用状況に関する情報に基づき、現在の消費電力が多い順に、機器30を制御対象に選択するように構成されてもよい。
 最後に、抑制指令生成部15aは、決定された制御対象の機器30が、決定された制御内容で制御されるよう、制御装置20が機器30を制御するための消費電力の抑制指令を生成する。抑制指令生成部15aに生成された消費電力の抑制指令は、抑制制御期間の開始前に、通信部11を介して制御装置20に送信される。
 (2-1-5-2)インセンティブ金額算出部
 インセンティブ金額算出部15bは、抑制要求期間の終了後(各建物2においてデマンドレスポンス制御が実行された後)に、インセンティブ金額を算出する。インセンティブ金額は、各建物2でデマンドレスポンス制御が実行されたことに対して、各建物2の機器30のユーザが獲得する金額である。なお、建物2が例えばオフィスビルや工場等である場合には、機器30のユーザが獲得するとは、機器30を使用する人が勤務している会社等が獲得する場合を含む。
 インセンティブ金額算出部15bは、調整要求記憶領域14aに記憶された抑制に対する報奨金に関する情報と、目標消費電力記憶領域14bに記憶された建物2別の抑制要求期間における消費電力の目標値と、消費電力記憶領域14fに記憶された建物2別の消費電力に関する情報とに基づいて、各建物2の機器30のユーザが獲得するインセンティブ金額を算出する。
 例えば、インセンティブ金額算出部15bは、調整要求記憶領域14aに記憶された抑制に対する報奨金に関する情報に基づき、抑制に対する報奨金のうち所定の割合を、各建物2の機器30のユーザに対して支払うインセンティブ金額の総額に決定する。次に、インセンティブ金額算出部15bは、消費電力記憶領域14fに記憶された建物2別の消費電力に関する情報(1分間毎の最大消費電力)に基づいて、抑制要求期間における最大消費電力の平均値を算出し、これを抑制要求期間における消費電力の目標値と比較して、各建物2の抑制要求期間における消費電力の目標値と最大消費電力の平均値との差(具体的には、最大消費電力の平均値から消費電力の目標値を減じた値)を算出する。また、インセンティブ金額算出部15bは、消費電力記憶領域14fに記憶された建物2別の時系列の消費電力に関する情報(1分間毎の最大消費電力)を、抑制要求期間における消費電力の目標値と比較して、各建物2において消費電力が、抑制要求期間における消費電力の目標値を超過していた超過時間を算出する。その上で、インセンティブ金額算出部15bは、各建物2の、抑制要求期間における消費電力の目標値と最大消費電力の平均値との差と、消費電力が抑制要求期間における消費電力の目標値を超過していた超過時間とに基づいて、インセンティブ金額の総額を各建物2に割り振る。例えば、インセンティブ金額算出部15bは、建物2の消費電力の目標値と最大消費電力の平均値との差の値が大きいほど、また、建物2の超過時間が短いほど、その建物2に多くの金額を割り当てるよう構成される。
 ただし、インセンティブ金額算出部15bによるインセンティブ金額の算出方法は一例である、これに限定されるものではない。例えば、インセンティブ金額の算出方法は、ある建物2において、抑制要求期間における消費電力の目標値を超過していた超過時間がなければインセンティブ金額を所定額とし、抑制要求期間において消費電力の目標値を超過していた超過時間があればインセンティブ金額をゼロにするという方法であってもよい。
 インセンティブ金額算出部15bにより算出されたインセンティブ金額は、インセンティブ金額記憶領域14gに記憶される。
 (2-1-5-3)判定部
 判定部15cは、管理装置1aからの消費電力の調整要求を受けて、建物2において行われる、抑制要求期間の機器30の消費電力の調整制御(デマンドレスポンス制御)の成否を建物2別に判定する。判定部15cは、抑制要求期間が終了する度に、建物2別にデマンドレスポンス制御の成否を判定する。
 さらに、判定部15cは、建物2別にデマンドレスポンス制御の成否を判定する度に、通信部11に、その判定結果(デマンドレスポンス制御の成否)を出力させる。具体的には、判定部15cは、各建物2のデマンドレスポンス制御の成否の結果を用いて、各建物2のデマンドレスポンス制御の成否を示す画面を生成するよう画面生成部15dに指示する。画面生成部15dは、判定部15cの指示を受けて、デマンドレスポンス制御の成否を示す画面を建物2別に生成し、画面の画像データが、対応する建物2に設置された制御装置20に対して出力されるように、通信部11に指令を与える。
 以下に、判定部15cによるデマンドレスポンス制御の成否の判定処理について説明する。
 (2-1-5-3-1)デマンドレスポンス制御の成否の判定処理
 判定部15cは、目標消費電力記憶領域14bに記憶された建物2別の抑制要求期間における消費電力の目標値と、判定基準記憶領域14cに記憶された、建物2別の、快適性指標の目標値およびインセンティブ金額の目標値と、快適性指標値記憶領域14eに記憶されたセンサ40別の測定値(快適性指標値)と、消費電力記憶領域14fに記憶された建物2別の抑制要求期間における消費電力に関する情報と、インセンティブ金額記憶領域14gに記憶された建物2別のインセンティブ金額と、に基づいて、デマンドレスポンス制御の成否を建物2別に判定する。
 具体的には、判定部15cは、以下の3つの条件に関して判定を行い、全ての条件を満たす場合に、デマンドレスポンス制御が成功したと判定する。一方、判定部15cは、以下の3つの条件を1つでも満たさない場合、デマンドレスポンス制御が失敗したと判定する。
 (A)消費電力に関する条件
 判定部15cは、建物2別の抑制要求期間における消費電力の目標値と、建物2別の抑制要求期間における消費電力に関する情報とに基づいて、ある建物2において、抑制要求期間中に、消費電力が、消費電力の目標値を超過した時間が存在したか否かを判定する。判定部15cは、抑制要求期間中に、消費電力の目標値を、消費電力が超過した時間が存在しない場合、デマンドレスポンス制御が消費電力に関する条件を満たしたと判定する。
 (B)インセンティブ金額に関する条件
 判定部15cは、建物2別のインセンティブ金額の目標値と、建物2別のインセンティブ金額に基づいて、ある建物2において、アグリゲータ10に割り当てられたインセンティブ金額が、インセンティブ金額の目標値以上であるか否かを判定する。判定部15cは、アグリゲータ10に割り振られたインセンティブ金額が、インセンティブ金額の目標値以上である場合に、デマンドレスポンス制御がインセンティブ金額に関する条件を満たしたと判定する。
 (C)快適性に関する条件
 判定部15cは、建物2別の快適性指標の目標値と、センサ40別の測定値とに基づいて、ある建物2において、抑制要求期間中又は抑制要求期間終了時の測定値が、快適性指標の目標値を満足するかを判定する。
 具体例を挙げて説明すれば、例えば、判定部15cは、建物2で冷房が行われている場合であれば、センサ40で計測された室温の値が、抑制要求期間中および抑制要求期間終了時に、室温の目標値以下であるか判定する。また、例えば、判定部15cは、センサ40で計測された照度の値が、抑制要求期間中に、照度の目標値以上であるか判定する。また、例えば、判定部15cは、センサ40で計測された二酸化炭素濃度の値が、抑制要求期間終了時に、二酸化炭素濃度の目標値以下であるか判定する。
 判定部15cは、ある建物2に関し、全てのセンサ40の測定値が、快適性指標の目標値を満足する場合、デマンドレスポンス制御が快適性に関する条件を満たしたと判定する。
 (2-1-5-4)画面生成部
 画面生成部15dは、判定部15cの指示に従い、判定部15cのデマンドレスポンス制御の成否の判定結果を用いて、デマンドレスポンス制御の成否を表示する画面(制御成否表示画面)を生成する。また、画面生成部15dは、デマンドレスポンス制御に関する詳細情報の表示画面(詳細表示画面)を生成する。なお、画面生成部15dが生成する制御成否表示画面および詳細表示画面は、各建物2の制御装置20の後述する表示部23に表示させるための画面である。
 画面生成部15dの生成する制御成否表示画面は、例えば、図4に示す画面S1や、図5に示す画面S2のような画面である。図4に示す画面S1は、判定部15cによりデマンドレスポンス制御が成功と判定された場合の制御成否表示画面の例である。図5に示す画面S2は、判定部15cによりデマンドレスポンス制御が失敗と判定された場合の制御成否表示画面の例である。画面生成部15dは、目標消費電力記憶領域14b、判定基準記憶領域14c、快適性指標値記憶領域14e、消費電力記憶領域14f、および、インセンティブ金額記憶領域14gに記憶された情報に基づいて、制御成否表示画面を生成する。
 制御成否表示画面に表示される内容には、図4および図5のように、デマンドレスポンス制御の成否の判定結果のほか、デマンドレスポンス制御の成否に関する詳細情報を含む。デマンドレスポンス制御の成否に関する詳細情報には、例えば、各建物2の消費電力の目標値および抑制要求期間中の消費電力の最大値(実測値)を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、例えば、各建物2の、インセンティブ金額の目標値、および、デマンドレスポンス制御を実行することで機器30のユーザが実際に獲得したインセンティブ金額を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、例えば、各建物2の、室温の目標値および抑制要求期間終了時の室温(実測値)を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、例えば、各建物2の、照度の目標値および抑制要求期間中の照度の最小値(実測値)を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、例えば、各建物2の、二酸化炭素濃度の目標値および抑制要求期間終了時の二酸化炭素濃度(実測値)を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、消費電力、インセンティブ金額、室温、照度、二酸化炭素濃度が、目標値を満足しているか否かの判定結果が含まれる。このように、1つの画面(制御成否表示画面)に、デマンドレスポンス制御の成否の判定結果と共に、デマンドレスポンス制御の判定の基礎となった各条件の判定結果が表示されるため、デマンドレスポンス制御が失敗であった場合に、その原因を容易に確認することができる。
 画面生成部15dの生成する詳細表示画面は、例えば、図6に示す画面S11や、図7に示す画面S12や、図8に示す画面S13のような画面である。
 図7に示す画面S12は、判定部15cによりデマンドレスポンス制御が成功と判定された場合の詳細表示画面の一例である。図6に示す画面S11は、判定部15cによりデマンドレスポンス制御が失敗と判定された場合の詳細表示画面の一例である。画面生成部15dは、目標消費電力記憶領域14b、判定基準記憶領域14c、機器使用状況記憶領域14d、快適性指標値記憶領域14e、および消費電力記憶領域14fに記憶された情報に基づいて、画面S11および画面S12を生成する。
 図6に示す画面S11および図7に示す画面S12に表示される内容には、機器30別の抑制要求時間中の消費電力の時間変化や、抑制要求時間中の建物2全体の消費電力の目標値および実績値、デマンドレスポンス制御の前後の室温、デマンドレスポンス制御の制御内容等の、デマンドレスポンス制御の成否に関する詳細情報が含まれる。また、図6に示す画面S11に表示される内容には、消費電力が消費電力の目標値を超過した時刻や、実際の消費電力が消費電力の目標値に対してどれだけ超過したか等の、デマンドレスポンス制御の成否に関する詳細情報が含まれる。
 なお、画面S11や画面S12に表示されるデマンドレスポンス制御の制御内容とは、機器使用状況記憶領域14dに記憶された機器30の使用状況に関する情報から把握される、抑制要求期間中に実際に実行された機器30の消費電力の調整制御の内容である。デマンドレスポンス制御の制御内容は、抑制指令生成部15aが決定した機器30の制御内容と一致しない場合がある。具体的には、後述するように制御装置20に対する入力により、機器30の制御内容が抑制指令生成部15aの決定した機器30の制御内容から変更されている場合には、デマンドレスポンス制御の制御内容は、抑制指令生成部15aが決定した機器30の制御内容とは一致しない。
 図6に示す画面S11および図7に示す画面S12に表示される内容は、更に、判定部15cにより成否が判定されたデマンドレスポンス制御に対するアドバイスも含まれる。例えば、画面S11に示した事例では、機器30に含まれる洗濯機およびドライヤーが同時刻に使用されたことで、消費電力が消費電力の目標値を超過しているため、「使用時間をずらせる機器は、使用時間をずらしましょう。」というアドバイスが画面に表示される。また、画面S12に示した事例では、消費電力は、消費電力の目標値以下に抑えられているものの、ドライヤーの使用時間を変更することで消費電力を更に抑制することができることから、「使用時間をずらせる機器は、使用時間をずらしましょう。」というアドバイスが画面に表示される。
 図8に示す画面S13は、制御内容を変更した場合に、最大消費電力、インセンティブ金額、および、室温がどのように変化するかの予測を表示する画面の一例である。画面S13では、特に、冷房運転中のエアコン(機器30の一例)の設定温度を2℃上昇させるという今回実行された制御内容に対し、エアコンの設定温度を1℃上昇させた場合、3℃上昇させた場合、4℃上昇させた場合に、最大消費電力、インセンティブ金額、および、室温がどのように変化するかを表示している。図8に示す画面S13の内容は、例えば、制御部15が、記憶部14に記憶された機器30の特性や、過去のデマンドレスポンス制御時の各種情報等に基づいて算出した情報である。
 なお、以上に説明した制御成否表示画面および詳細表示画面の表示内容や、表示のレイアウト等は一例であり、これに限定されるものではない。制御成否表示画面は、その画面を見た建物2の機器30のユーザが、少なくともデマンドレスポンス制御の成否を把握できる画面であればよく、例えば、制御成否表示画面には、デマンドレスポンス制御の成否に関する詳細情報は含まれていなくてもよい。また、例えば、制御成否表示画面に表示される内容に、デマンドレスポンス制御に対するアドバイスが含まれていてもよい。
 (2-2)制御装置
 制御装置20は、例えば、HEMS(Home Energy Management System)で用いられるコントローラである。制御装置20は、建物2全体の消費電力や、建物2内の機器30の使用状況や、機器30の個別の消費電力を表示可能に構成される。また、制御装置20は、建物2内の通信ネットワーク3cにより接続された機器30の動作を、アグリゲータ10が送信する消費電力の抑制指令や、建物2の居住者(機器30のユーザ)の入力に基づいて制御する。
 制御装置20は、主に、通信部21、入力部22、表示部23、記憶部24、および制御部25を備える(図3参照)。
 (2-2-1)通信部
 通信部21は、通信ネットワーク3bを介して接続されるアグリゲータ10、通信ネットワーク3cを介して接続される機器30、計測器30a、センサ40、および電力計50との通信を可能にする通信インターフェイスである。
 通信部21は、アグリゲータ10から各種信号を受信する。通信部21は、例えば、アグリゲータ10の抑制指令生成部15aが生成する消費電力の抑制指令や、画面生成部15dが生成する制御成否表示画面および詳細表示画面の画像データ等を受け付ける。
 また、通信部21は、通信ネットワーク3cを介して接続された機器30と通信を行い、機器30の運転/停止に関する情報や、機器30の運転条件に関する情報を、所定時間間隔で受け付ける。また、通信部21は、通信ネットワーク3cを介して接続された計測器30aと通信を行い、機器30の消費電力に関する情報を、所定時間間隔で受け付ける。また、通信部21は、通信ネットワーク3cを介して接続されたセンサ40と通信を行い、所定時間間隔で、そのセンサ40の計測対象である快適性指標の値を受け付ける。また、通信部21は、通信ネットワーク3cを介して接続された電力計50と必要に応じて通信を行い、建物2の消費電力や消費電力量の値を受け付ける。
 また、通信部21は、アグリゲータ10に各種情報を送信する。例えば、通信部21は、後述する入力部22に入力された、快適性指標の目標値およびインセンティブ金額の目標値を、アグリゲータ10に送信する。また、通信部21は、所定時間間隔毎(例えば5分毎)に機器30の使用状況に関する情報をアグリゲータ10に送信する。機器30の使用状況に関する情報は、機器30別の情報である。機器30の使用状況に関する情報には、機器30の運転/停止に関する情報、機器30の運転条件に関する情報、機器30の消費電力に関する情報を含む。また、通信部21は、所定時間間隔毎(例えば5分毎)にセンサ40の測定値をアグリゲータ10に送信する。
 また、通信部21は、制御装置20が通信ネットワーク3cを介して接続される機器30を制御する場合に、制御対象の機器30に対して制御指令を送信する。
 (2-2-2)入力部
 入力部22は、制御装置20に設けられたスイッチやタッチパネル式ディスプレイ等の入力インターフェイスである。建物2の機器30のユーザは、制御装置20に対する各種指令や各種情報を、入力部22を介して入力可能である。
 具体的には、入力部22には、機器30のユーザにより、快適性指標の目標値およびインセンティブ金額の目標値が入力される。入力部22から快適性指標の目標値およびインセンティブ金額の目標値が入力されると、その値は、通信部21からアグリゲータ10に対して送信される。
 また、入力部22には、機器30のユーザにより、通信ネットワーク3cを介して接続される機器30の運転設定を変更(設定)するための操作が入力される。なお、入力部22から変更される機器30の運転設定には、機器30の運転/停止、機器30の運転条件(例えばエアコンであれば、冷房/暖房/送風等の運転モードや、機器30のユーザが設定した設定温度)、機器30の運転時間(例えばエアコンであれば、運転開始予約時間や運転停止予約時間)等を含む。
 なお、入力部22には、抑制要求期間中(デマンドレスポンス制御中)であっても、機器30の運転設定を変更することが可能である。
 抑制要求期間中には、基本的に、機器30は、通信部21が受信した(アグリゲータ10が生成した)消費電力の抑制指令に基づいた運転設定で運転される。つまり、アグリゲータ10が、消費電力の抑制指令により、ある機器30(例えば換気扇)の運転の停止を指示していた場合には、その機器30の運転は基本的には停止される。また、アグリゲータ10が、ある機器30(例えばエアコン)の運転条件の変更(例えば、設定温度を設定値よりも2℃上昇させること)を指示していた場合には、その機器30の運転条件は基本的には指示された内容に変更される。しかし、入力部22から機器30の運転設定を変更することが可能であるため、機器30のユーザの要望に応じて、消費電力の抑制指令に応じて停止された機器30を運転したり、消費電力の抑制指令に応じて変更された機器30の運転条件を更に変更したりすることが可能である。
 (2-2-3)表示部
 表示部23は、例えば、タッチパネル式ディスプレイである。表示部23には、建物2全体の消費電力や、建物2内の機器30の使用状況や、機器30の個別の消費電力が表示可能である。
 また、表示部23は、デマンドレスポンス制御が終了すると、その度に、アグリゲータ10から送信されてくる(通信部21が受信する)デマンドレスポンス制御の可否を示す制御成否表示画面(図4および図5参照)を表示する。さらに、入力部22に対し、表示切替操作が行われることで、表示部23は、アグリゲータ10から送信されてくる(通信部21が受信する)詳細表示画面(図6~図8参照)を表示可能である。
 なお、制御成否表示画面は、デマンドレスポンス制御の終了時に表示されることが好ましいが、これに代えて、あるいは、これに加えて、デマンドレスポンス制御の終了後の、任意のタイミングで、機器30のユーザが必要に応じて表示部23に表示可能に構成されてもよい。
 (2-2-4)記憶部
 記憶部24は、主に、RAM、ROM、およびハードディスク等を含む。記憶部24には、制御部25により使用される各種プログラムや、各種情報が記憶される。
 記憶部24には、例えば、通信部21が受信した、アグリゲータ10から送信された消費電力の抑制指令や、制御成否表示画面、および、詳細表示画面が記憶される。
 また、記憶部24には、例えば、通信部21が機器30や計測器30aと通信を行うことで取得される機器30の使用状況に関する情報が時系列の情報として記憶される。また、記憶部24には、例えば、通信部21がセンサ40と通信を行うことで取得されるセンサ40の計測値が時系列の情報として記憶される。また、記憶部24には、例えば、入力部22から入力された、快適性指標の目標値およびインセンティブ金額の目標値が記憶される。
 通信部21が、機器30の使用状況に関する情報や、センサ40の計測値や、快適性指標の目標値およびインセンティブ金額の目標値を送信する際には、記憶部24に記憶されたこれらの情報が読み出されて送信される。
 (2-2-5)制御部
 制御部25は、主にCPUを有し、記憶部24に記憶されたプログラムを実行することで各種処理を実行する。
 制御部25は、特に抑制要求期間(デマンドレスポンス制御中)には、通信部21が受け付けた消費電力の抑制指令や、機器30のユーザの入力部22に対する入力に基づいて、通信ネットワーク3cにより接続された機器30の少なくとも一部を制御する。
 (3)特徴
 (3-1)
 本実施形態の機器制御装置の一例としてのアグリゲータ10は、抑制要求期間(所定期間)における消費電力(エネルギー消費量)の調整要求を受けて機器30の制御を行う。アグリゲータ10は、出力部の一例としての通信部11と、判定部15cと、を備える。通信部11は、機器30のユーザに対して情報を出力する。判定部15cは、デマンドレスポンス制御の成否を、抑制要求期間における機器30の消費電力に関する情報に基づいて判定する。判定部15cは、判定したデマンドレスポンス制御の成否を、通信部11に出力させる。デマンドレスポンス制御は、調整要求を受けて行われる抑制要求期間の機器30の消費電力の調整制御である。
 ここでは、機器30のユーザに対し、デマンドレスポンス制御の成否が出力されるため、機器30のユーザは、デマンドレスポンス制御が適切に実行されたかを容易に判断することができる。
 (3-2)
 本実施形態のアグリゲータ10では、通信部11は、判定部15cにより成否が判定されたデマンドレスポンス制御に関し、デマンドレスポンス制御を実行することで機器30のユーザが獲得したインセンティブ金額を出力する。
 ここでは、機器30のユーザに対し、デマンドレスポンス制御の成否に加え、デマンドレスポンス制御により獲得されるインセンティブ金額も出力されるため、デマンドレスポンス制御によりどれだけのメリットを得ることができたのかを機器30のユーザが定量的に把握することができる。
 (3-3)
 本実施形態のアグリゲータ10では、判定部15cは、デマンドレスポンス制御の成否を、該デマンドレスポンス制御を実行することでユーザが獲得したインセンティブ金額に基づいて判定する。
 ここでは、デマンドレスポンス制御の成否を、機器30の消費電力に関する情報に加え、機器30のユーザが獲得したインセンティブ金額に基づいて判定することができ、多面的にデマンドレスポンス制御の成否を判定することができる。
 (3-4)
 本実施形態のアグリゲータ10では、判定部15cは、デマンドレスポンス制御の成否を、抑制要求期間中又は抑制要求期間終了時のユーザの快適性に関する指標に更に基づいて判定する。
 ここでは、デマンドレスポンス制御の成否を、機器30の消費電力に関する情報に加え、機器30のユーザの快適性に基づいて判定することができ、多面的にデマンドレスポンス制御の成否を判定することができる。
 なお、本実施形態のアグリゲータ10では、デマンドレスポンス制御の成否の判定に用いられる快適性に関する指標には、温度、照度、および二酸化炭素濃度を含む。また、快適性に関する指標には、湿度が含まれてもよい。
 ここでは、空調、照明、換気等に関連する快適性指標に基づいて、デマンドレスポンス制御の成否を判定することができる。
 (3-5)
 本実施形態のアグリゲータ10では、通信部11は、デマンドレスポンス制御の成否に関する詳細情報を出力する。
 ここでは、デマンドレスポンス制御の成否に加え、デマンドレスポンス制御の成否に関する詳細情報が出力されるため、機器30のユーザは、例えば、デマンドレスポンス制御の失敗の原因や、さらなる改善の余地等を把握することが容易である。
 (3-6)
 本実施形態のアグリゲータ10では、通信部11は、判定部15cにより成否が判定されたデマンドレスポンス制御に対するアドバイスを出力する。
 ここでは、デマンドレスポンス制御の成否に加え、デマンドレスポンス制御に対するアドバイスが出力されるため、機器30のユーザは、デマンドレスポンス制御をどのように改善すべきか、あるいは、現状のデマンドレスポンス制御がベストなのか等を把握することが容易である。
 (4)変形例
 以下に本実施形態の変形例を示す。なお、互いに矛盾しない限り、変形例は適宜組み合わせられてもよい。
 (4-1)変形例1A
 上記実施形態では、アグリゲータ10が機器制御装置として機能するが、これに限定されるものではない。例えば、アグリゲータ10に代わって制御装置20が機器制御装置として機能してもよい。
 具体的には、制御装置20の制御部25は、上記実施形態における判定部15cおよび画面生成部15dとして機能してもよい。また、制御装置20の記憶部24は、その制御装置20が設置された建物2に関し、上記実施形態における目標消費電力記憶領域14b、判定基準記憶領域14c、機器使用状況記憶領域14d、快適性指標値記憶領域14e、消費電力記憶領域14f、および、インセンティブ金額記憶領域14gと同様の情報を記憶するよう構成されてもよい。この場合には、目標消費電力記憶領域14bに記憶される消費電力の目標値、および、インセンティブ金額記憶領域14gに記憶されるインセンティブ金額は、アグリゲータ10から通信部21に送信されればよい。制御装置20の表示部23は、機器30のユーザに対して情報を出力する出力部として機能するよう構成されてもよい。また、制御装置20の通信部21は、機器30のユーザの持つ携帯端末(図示せず)等に対して情報を出力する出力部として機能するよう構成されてもよい。
 このように構成されることで、アグリゲータ10で全建物2に関してデマンドレスポンス制御の成否を判定する必要がなくなり、アグリゲータ10の演算負荷を低減することができる。
 (4-2)変形例1B
 上記実施形態では、アグリゲータ10は、管理装置1aの消費電力の調整要求を受けて、複数の建物2の消費電力の合計が全体許容消費電力以下になるよう、消費電力を調整するが、これに限定されるものではない。例えば、アグリゲータ10は、管理装置1aの消費電力の調整要求を受けて、複数の建物2内の特定の機器30(例えばエアコン)の消費電力の合計が全体許容消費電力以下になるよう、消費電力を調整するものであってもよい。このような場合には、アグリゲータ10は、建物2内の特定の機器30の消費電力に関する情報に基づいて(特定の機器30以外の消費電力は考慮せずに)、デマンドレスポンス制御の成否を判定するよう構成されてもよい。また、このような場合には、制御装置20は、特定の機器30だけを制御する装置(例えば、特定の機器30がエアコンであればサーモスタット等)であってもよい。
 (4-3)変形例1C
 上記実施形態では、出力部としての通信部11は、判定結果表示画面および詳細表示画面の画像データを制御装置20の通信部21に対して送信するが、これに限定されるものではない。出力部としての通信部11は、機器30のユーザの持つ携帯端末(図示せず)等に対して画像データを出力するよう構成されてもよい。
 (4-4)変形例1D
 上記実施形態では、判定部15cは、消費電力に関する条件、インセンティブ金額に関する条件、および快適性に関する条件に基づいて、デマンドレスポンス制御の成否を判定するが、これに限定されるものではない。例えば、判定部15cは、消費電力に関する条件だけに基づいて、あるいは、消費電力に関する条件と、インセンティブ金額に関する条件および快適性に関する条件のいずれかと、に基づいて、デマンドレスポンス制御の成否を判定してもよい。
 (4-5)変形例1E
 上記実施形態では、アグリゲータ10から判定結果表示画面および詳細表示画面の画像データが制御装置20に対して送信されるが、これに限定されるものではない。アグリゲータ10からは、判定結果表示画面および詳細表示画面を生成する上で必要な情報だけが制御装置20に対して送信され、制御装置20で画面が生成されるよう構成されてもよい。
 (4-6)変形例1F
 上記実施形態では、管理装置1aは、消費電力の調整要求として、消費電力の抑制を要求するが、これに限定されるものではない。例えば、管理装置1aは、消費電力の調整要求として消費電力の増大を要求し、判定部15cは、デマンドレスポンス制御の結果、消費電力が消費電力の目標値以上になっている場合に、デマンドレスポンス制御が消費電力に関する条件を満たしていると判定するものであってもよい。
 (4-7)変形例1G
 上記実施形態では、機器30の消費電力が計測器30aにより個別に測定されるが、これに限定されるものではなく、機器30の個別の消費電力は測定されなくてもよい。ただし、デマンドレスポンス制御を精度よく行い、デマンドレスポンス制御の成否の原因を把握する上では、機器30の消費電力が計測器30aにより個別に測定されることが好ましい。
 <第2実施形態>
 (1)全体構成
 図9は、本発明の機器制御装置の第2実施形態に係る制御装置220を含む、電力管理システム200の概略全体図である。
 電力管理システム200は、電力供給者としての電力会社1と、電力需要者としての複数の建物2とを主に含む(図9参照)。電力管理システム200には、アグリゲータ10は含まれない。
 電力会社1は、自ら発電した電力、および/又は、他者が発電した電力を、複数の建物2を含む電力需要者に供給する。電力会社1は、図9のように、管理装置201aを有する。
 管理装置201aは、図9のように、各建物2の制御装置220と、インターネット等の通信ネットワーク3aにより接続されている。管理装置201aは、電力会社1の電力供給量と、電力需要者の電力需要量とを予測し、電力供給量と電力需要量とがバランスするかを判断する。管理装置201aは、電力需要量と電力供給量とがバランスしないと判断した場合に、制御装置220に消費電力の調整を要求する。具体的には、管理装置201aは、電力需要が電力供給を上回ると判断した場合に、制御装置220に消費電力の抑制を要求する。
 管理装置201aは、第1実施形態とは異なり、期間別の電力単価を、消費電力の調整要求として送信する。言い換えれば、管理装置201aは、第1実施形態とは異なり、消費電力をどこまで抑制すればよいかを制御装置220に伝えない。つまり、管理装置201aの消費電力の調整要求には、消費電力の目標値は含まれない。管理装置201aは、電力需要が電力供給を上回ると判断した期間の電力単価を高く設定することで、制御装置220に対して消費電力の抑制を要求する。
 建物2は、第1実施形態と同様に、ここでは住宅である。建物2は、建物全体を意味するものでなくてもよく、例えば集合住宅内の1つの区画であってもよい。また、建物2は、住宅に限定されるものではなく、オフィスビル、商業施設、工場等であってもよい。
 建物2には、制御装置220、複数の機器30、複数の計測器30a、複数のセンサ40、および電力計50が設置されている。なお、ここでは、建物2に、複数の機器30、計測器30a、およびセンサ40が設置されているが、機器30、および/又は、計測器30a、および/又は、センサ40は、1台であってもよい。制御装置220は、計測器30a、センサ40、および電力計50と、LAN等の通信ネットワーク3cにより接続されている。また、制御装置220は、少なくとも1台の機器30とLAN等の通信ネットワーク3cにより接続されている。なお、制御装置220は、全ての機器30とLAN等の通信ネットワーク3cにより接続されていてもよい。また、制御装置220は、管理装置201aと、通信ネットワーク3aにより接続されている。電力計50も、管理装置201aと、通信ネットワーク3aにより接続されている。
 機器30、センサ40については、第1実施形態と同様であるので、説明は省略する。
 電力計50は、管理装置201aおよび制御装置220と通信可能なスマートメータである。電力計50は、建物2における消費電力、消費電力量等を計測する。電力計50は、所定時間間隔で制御装置220に建物2の消費電力に関する情報を送信する。例えば、電力計50は、連続的に建物2の消費電力の計測を行い、1分間隔で、過去1分間に計測された最大消費電力の値を、制御装置220に送信する。ただし、電力計50の動作は一例であって、上記のものに限定されない。
 制御装置220は、通信ネットワーク3cを介して接続された機器30と通信を行い、また計測器30aから機器30の消費電力に関する情報を受信することで、各機器30の使用状況に関する情報を取得する。制御装置220が取得する各機器30の使用状況に関する情報には、各機器30の運転/停止に関する情報、各機器30の運転条件(機器30が例えばエアコンであれば、運転モードや設定温度等)に関する情報、および、各機器30の消費電力に関する情報等が含まれる。また、制御装置220は、複数のセンサ40から各種測定値を取得する。
 制御装置220は、管理装置201aの消費電力の調整要求(期間別の電力単価)を受けて、高電力単価期間(電力単価が、後述する機器30のユーザにより入力された基準値以上の期間)に、機器30の消費電力の調整制御(デマンドレスポンス制御)を行う。制御装置220は、デマンドレスポンス制御のため、通信ネットワーク3cにより制御装置220と接続された機器30の運転を制御する。また、制御装置220は、高電力単価期間における、デマンドレスポンス制御の成否を、高電力単価期間における機器30の消費電力に関する情報、より具体的には、高電力単価期間に機器30の消費電力を抑制することで抑制できた電気料金(抑制金額)に基づいて判定する。制御装置220は、デマンドレスポンス制御の成否の判定結果を、後述する表示部223に出力させる。
 (2)詳細構成
 以下に、制御装置220について説明する。
 (2-1)制御装置
 制御装置220は、第1実施形態の制御装置20と同様に、例えば、HEMS(Home Energy Management System)で用いられるコントローラである。制御装置220は、建物2全体の消費電力や、建物2内の機器30の使用状況や、機器30の個別の消費電力を表示可能に構成される。また、制御装置220は、高電力単価期間に、建物2内の通信ネットワーク3cにより接続された機器30の動作を、予め記憶していた制御内容や、機器30のユーザの入力に基づいて制御する。
 制御装置220は、主に、通信部221、入力部222、表示部223、記憶部224、および制御部225を備える(図10参照)。
 (2-1-1)通信部
 通信部221は、通信ネットワーク3aを介して接続される管理装置201aや、通信ネットワーク3cを介して接続される機器30、計測器30a、センサ40、および電力計50との通信を可能にする通信インターフェイスである。
 通信部221は、管理装置201aから期間別の電力単価を受信する。
 また、通信部221は、電力計50から所定時間間隔で建物2の消費電力に関する情報を受信する。例えば、電力計50は、連続的に建物2の消費電力の計測を行い、1分間隔で、過去1分間に計測された最大消費電力の値を通信部221に送信する。ただし、第1実施形態に係る電力計50のアグリゲータ10に対する建物2の消費電力に関する情報の送信動作と同様に、電力計50の動作は上記のものに限定されない。
 通信部221と、機器30、計測器30a、およびセンサ40との通信については、第1実施形態と同様であるので、説明を省略する。
 (2-1-2)入力部
 入力部222は、制御装置220に設けられたスイッチやタッチパネル式ディスプレイ等の入力インターフェイスである。機器30のユーザは、制御装置220に対する各種指令や各種情報を、入力部222を介して入力可能である。
 具体的には、入力部222には、機器30のユーザにより、電力単価の基準値、快適性指標の目標値、および、抑制金額の目標値が入力される。入力部222に電力単価の基準値が入力されることで、電力単価が基準値以上の期間(高電力単価期間)に、制御装置220によりデマンドレスポンス制御が実行される。抑制金額の目標値とは、高電力単価期間に機器30の消費電力を抑制することで獲得できる電気料金の抑制額の目標値である。電力単価の基準値、快適性指標の目標値、および、抑制金額の目標値が入力部222から入力されると、これらの値は、後述する記憶部224の判定基準記憶領域224cに記憶される。
 入力部222には、機器30のユーザにより、通信ネットワーク3cを介して接続される機器30の、通常時の(高電力単価期間以外の期間のための)運転設定を変更(設定)するための操作が入力される。なお、入力部222から変更される機器30の運転設定は、第1実施形態における入力部22から変更される機器30の運転設定と同様である。
 また、入力部222には、機器30のユーザにより、高電力単価期間の機器30の制御内容も入力される。言い換えれば、入力部222には、デマンドレスポンス制御(すなわち、管理装置201aからの調整要求(期間別の電力単価)を受けて行われる、高電力単価期間の機器30の消費電力の調整制御)の内容が入力される。なお、デマンドレスポンス制御の内容は、デマンドレスポンス制御の途中であっても、入力部222から変更可能に構成されている。
 (2-1-3)表示部
 表示部223は、例えば、タッチパネル式ディスプレイである。表示部223には、建物2全体の消費電力や、建物2内の機器30の使用状況や、機器30の個別の消費電力が表示可能である。
 表示部223は、出力部の一例である。表示部223は、デマンドレスポンス制御が終了すると、その度に、後述する制御部225の画面生成部225dにより生成される、デマンドレスポンス制御の可否を示す制御成否表示画面(図11の画面S201参照)を表示(出力)する。さらに、入力部222に対し、画面の切替操作が行われることで、表示部223は、後述する制御部225の画面生成部225dにより生成される、詳細表示画面(図12の画面S212および図13の画面S213参照)を表示可能である。
 なお、制御成否表示画面は、デマンドレスポンス制御の終了時に表示されることが好ましいが、これに代えて、あるいは、これに加えて、デマンドレスポンス制御の終了後の、任意のタイミングで、機器30のユーザが必要に応じて表示部223に表示可能に構成されてもよい。
 (2-1-4)記憶部
 記憶部224は、主に、RAM、ROM、およびハードディスク等を含む。記憶部224には、制御部225により使用される各種プログラムや、各種情報が記憶される。
 記憶部224は、情報の記憶領域として、電力単価記憶領域224a、制御内容記憶領域224b、判定基準記憶領域224c、機器使用状況記憶領域224d、快適性指標値記憶領域224e、消費電力記憶領域224f、および、抑制金額記憶領域224gを含む。
 (2-1-4-1)電力単価記憶領域
 電力単価記憶領域224aには、通信部221が管理装置201aから受信した、期間別の電力単価が記憶される。
 (2-1-4-2)制御内容記憶領域
 制御内容記憶領域224bには、入力部222から入力されたデマンドレスポンス制御の内容が記憶される。デマンドレスポンス制御の内容は、具体的には、例えば、高電力単価期間に機器30に含まれる換気扇を停止する、高電力単価の期間に機器30に含まれるエアコンの設定温度を、冷房運転時であれば2℃上昇させる、暖房運転時であれば2℃低下させる、等である。
 (2-1-4-3)判定基準記憶領域
 判定基準記憶領域224cには、入力部222から入力された、電力単価の基準値、快適性指標の目標値、および、抑制金額の目標値が記憶される。
 (2-1-4-4)機器使用状況記憶領域
 機器使用状況記憶領域224dは、通信部221が機器30から受信する機器30の運転/停止に関する情報および機器30の運転条件に関する情報と、通信部221が計測器30aから受信する機器30の消費電力に関する情報とを、機器30の使用状況に関する情報として時系列に記憶する。
 (2-1-4-5)快適性指標値記憶領域
 快適性指標値記憶領域224eは、通信部221がセンサ40から受信する測定値(快適性指標値)を記憶する。具体的には、快適性指標値記憶領域224eは、各建物2のセンサ40が測定した、室温、照度、および二酸化炭素濃度を記憶する。快適性指標値記憶領域224eには、センサ40の測定値が、センサ40別の時系列の情報として記憶される。
 (2-1-4-6)消費電力記憶領域
 消費電力記憶領域224fは、通信部221が電力計50から受信した、制御装置20の設置された建物2の消費電力に関する情報を時系列に記憶する。
 (2-1-4-7)抑制金額記憶領域
 抑制金額記憶領域224gは、後述する制御部225の抑制金額算出部225bが算出する抑制金額を記憶する。
 (2-1-5)制御部
 制御部225は、主にCPUからなり、記憶部224に記憶されたプログラムを実行することで各種処理を実行する。
 制御部225は、記憶部224に記憶されたプログラムを実行することで、主に制御指令生成部225a、抑制金額算出部225b、判定部225c、および画面生成部225dとして機能する。
 (2-1-5-1)制御指令生成部
 制御指令生成部225aは、消費電力の調整要求(期間別の電力単価)を受けて、デマンドレスポンス制御が実行されるように、機器30の消費電力の調整制御のための制御指令を生成する。
 具体的には、制御指令生成部225aは、電力単価記憶領域224aに記憶された期間別の電力単価に基づいて、電力単価が判定基準記憶領域224cに記憶された電力単価の基準値を超過する期間(高電力単価期間)に関して、機器30の制御指令を生成する。制御指令生成部225aは、高電力単価期間に制御内容記憶領域224bに記憶された制御内容が実現されるよう、消費電力の調整制御の対象となる機器30に対し、機器30を制御する指令を生成する。制御指令生成部225aは、高電力単価期間開始時に制御指令を生成し、消費電力の調整制御の対象となる機器30に対し制御指令を送信する。また、高電力単価期間に入力部222からの入力により制御内容記憶領域224bの内容が書き換えられた場合にも、制御指令生成部225aは、制御指令を生成し、消費電力の調整制御の対象となる機器30に対し制御指令を送信する。
 (2-1-5-2)抑制金額算出部
 抑制金額算出部225bは、高電力単価期間の終了後(建物2においてデマンドレスポンス制御が実行された後)に、抑制金額を算出する。抑制金額は、高電力単価機関にデマンドレスポンス制御を実行し、機器30の消費電力を調整することで機器30のユーザが獲得する金銭的利益の額である。
 具体的には、抑制金額算出部225bは、まず、消費電力記憶領域224fに記憶された消費電力に関する情報に基づいて、高電力単価期間にデマンドレスポンス制御が実行されたことで抑制された電力量を算出する。より具体的には、抑制金額算出部225bは、初めに、消費電力記憶領域224fに記憶された消費電力に関する情報に基づいて、デマンドレスポンス制御の実行開始前の消費電力と、デマンドレスポンス制御の実行中の消費電力の平均値との差を算出する。次に、抑制金額算出部225bは、デマンドレスポンス制御の実行開始前の消費電力とデマンドレスポンス制御の実行中の消費電力の平均値との差に、高電力単価期間の長さ(時間)を乗ずることで、デマンドレスポンス制御中に抑制された電力量を算出する。抑制金額算出部225bは、次に、電力単価記憶領域224aに記憶された期間別の電力単価に基づいて、デマンドレスポンス制御が実行されたことで抑制された電力量に、高電力単価期間の電力単価を乗ずることで、デマンドレスポンス制御が実行されたことで抑制された抑制金額を算出する。ただし、抑制金額算出部225bによる抑制金額の算出方法は一例であり、これに限定されるものではない。
 抑制金額算出部225bにより作成された抑制金額は、抑制金額記憶領域224gに記憶される。
 (2-1-5-3)判定部
 判定部225cは、管理装置201aからの消費電力の調整要求を受けて、建物2において行われる、高電力単価期間の機器30の消費電力の調整制御(デマンドレスポンス制御)の成否を判定する。判定部225cは、高電力単価期間が終了する度に、建物2について、デマンドレスポンス制御の成否を判定する。
 さらに、判定部225cは、デマンドレスポンス制御の成否を判定する度に、表示部223に、その判定結果(デマンドレスポンス制御の成否)を出力させる。具体的には、判定部225cは、デマンドレスポンス制御の成否の結果を用いて、デマンドレスポンス制御の成否を示す画面を生成するよう画面生成部225dに指示する。画面生成部225dは、判定部225cの指示を受けて、デマンドレスポンス制御の成否を示す画面を生成し、その画面を表示部223に出力させる。
 以下に、デマンドレスポンス制御の成否の判定処理について説明する。
 (2-1-5-3-1)デマンドレスポンス制御の成否の判定処理
 判定部225cは、判定基準記憶領域224cに記憶された、快適性指標の目標値および抑制金額の目標値と、快適性指標値記憶領域224eに記憶されたセンサ40別の測定値(快適性指標値)と、抑制金額記憶領域224gに記憶された抑制金額と、に基づいて、デマンドレスポンス制御の成否を判定する。
 具体的には、判定部225cは、以下の2つの条件に関して判定を行い、全ての条件を満たす場合に、デマンドレスポンス制御が成功したと判定する。一方、判定部225cは、以下の2つの条件を1つでも満たさない場合、デマンドレスポンス制御が失敗したと判定する。
 (A)抑制金額(消費電力)に関する条件
 判定部225cは、高電力単価期間における機器30の消費電力に関する情報としての、高電力単価期間にデマンドレスポンス制御を実行し機器30の消費電力を調整することで機器30のユーザが獲得した金銭的利益の額(抑制金額)と、所定の基準額とを比較することで、デマンドレスポンス制御の成否を判定する。具体的には、判定部225cは、抑制金額記憶領域224gに記憶された実際の抑制金額が、判定基準記憶領域224cに記憶された抑制金額の目標値以上である場合に、建物2が抑制金額に関する条件を満たしたと判定する。
 (B)快適性に関する条件
 判定部225cは、快適性指標の目標値と、センサ40別の測定値とに基づいて、高電力単価期間中又は高電力単価期間終了時の測定値が、快適性指標の目標値を満足するかを判定する。
 具体例を挙げて説明すれば、例えば、判定部225cは、建物2で冷房が行われている場合であれば、センサ40で計測された温度の値が、高電力単価期間中および高電力単価期間終了時に、温度の目標値以下であるか判定する。また、例えば、判定部225cは、センサ40で計測された照度の値が、高電力単価期間中に、照度の目標値を以上であるか判定する。また、例えば、判定部225cは、センサ40で計測された二酸化炭素濃度の値が、高電力単価期間終了時に、二酸化炭素濃度の目標値を以下であるか判定する。
 判定部225cは、全てのセンサ40の測定値が、快適性指標の目標値を満足する場合、建物2が快適性に関する条件を満たしたと判定する。
 (2-1-5-4)画面生成部
 画面生成部225dは、判定部225cの指示に従い、判定部225cのデマンドレスポンス制御の成否の判定結果を用いて、デマンドレスポンス制御の成否を表示する画面(制御成否表示画面)を生成する。また、画面生成部225dは、デマンドレスポンス制御に関する詳細情報の表示画面(詳細表示画面)を生成する。制御成否表示画面および詳細表示画面は、表示部223に表示させるための画面である。
 画面生成部225dの生成する制御成否表示画面は、例えば、図11に示す画面S201のような画面である。図11に示す画面S201は、判定部225cによりデマンドレスポンス制御が成功と判定された場合の制御成否表示画面の例である。画面生成部225dは、判定基準記憶領域224c、快適性指標値記憶領域224e、消費電力記憶領域224f、および、抑制金額記憶領域224gに記憶された情報に基づいて、制御成否表示画面を生成する。
 制御成否表示画面に表示される内容には、図11のように、デマンドレスポンス制御の成否の判定結果のほか、デマンドレスポンス制御の成否に関する詳細情報を含む。デマンドレスポンス制御の成否に関する詳細情報には、例えば、高電力単価期間の最大消費電力を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、例えば、抑制金額の目標値、および、デマンドレスポンス制御を実行することで機器30のユーザが実際に獲得した抑制金額を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、例えば、各建物2の、室温の目標値および高電力単価期間終了時の室温(実測値)を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、例えば、各建物2の、照度の目標値および高電力単価期間中の照度の最小値(実測値)を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、例えば、各建物2の、二酸化炭素濃度の目標値および高電力単価期間終了時の二酸化炭素濃度(実測値)を含む。また、デマンドレスポンス制御の成否に関する詳細情報には、抑制金額、室温、照度、二酸化炭素濃度が、目標値を満足しているか否かの判定結果が含まれる。このように、1つの画面(制御成否表示画面)に、デマンドレスポンス制御の成否の判定結果と共に、デマンドレスポンス制御の判定の基礎となった各条件の判定結果が表示されるため、デマンドレスポンス制御が失敗であった場合に、その原因を容易に確認することができる。
 画面生成部15dの生成する詳細表示画面は、例えば、図12に示す画面S212や、図13に示す画面S213のような画面である。
 第2実施形態では、消費電力の目標値が存在しないため、図12に示す画面S212は、第1実施形態においてアグリゲータ10の画面生成部15dが生成する図7の画面S12と一部が異なるが、画面S212には消費電力の目標値に関する表示がなされない点を除いては、概ね画面S12と同様であるため、説明は省略する。
 また、図13に示す画面S213は、第1実施形態においてアグリゲータ10の画面生成部15dが生成する図8の画面S13と、インセンティブ金額の代わりに抑制金額が表示される点を除いては概ね同様であるため、説明は省略する。
 (3)特徴
 (3-1)
 本実施形態の機器制御装置の一例としての制御装置220は、高電力単価期間(所定期間)における消費電力(エネルギー消費量)の調整要求を受けて機器30の制御を行う。制御装置220は、出力部の一例としての表示部223と、判定部225cと、を備える。表示部223は、機器30のユーザに対して情報を出力(表示)する。判定部225cは、デマンドレスポンス制御の成否を、高電力単価期間における機器30の消費電力に関する情報に基づいて判定する。判定部225cは、判定したデマンドレスポンス制御の成否を、表示部223に出力させる。デマンドレスポンス制御は、調整要求を受けて行われる高電力単価期間の機器30の消費電力の調整制御である。
 ここでは、機器30のユーザに対し、デマンドレスポンス制御の成否が出力されるため、機器30のユーザは、デマンドレスポンス制御が適切に実行されたかを容易に判断することができる。
 (3-2)
 本実施形態の制御装置220では、制御装置220が受ける管理装置201aの調整要求に消費電力の目標値が含まれない。判定部225cは、高電力単価期間における機器の消費電力に関する情報としての、高電力単価期間にデマンドレスポンス制御を実行し機器30のエネルギー消費量を調整することで機器30のユーザが獲得した金銭的利益の額(抑制金額)と、抑制金額の目標値(所定の基準額)とを比較することで、デマンドレスポンス制御の成否を判定する。
 ここでは、管理装置201aの調整要求が消費電力の目標値を含まない場合であっても、デマンドレスポンスを実行して機器30の消費電力を調整することで機器30のユーザが獲得した金銭的利益の額に基づいてデマンドレスポンス制御の成否を判定することができる。
 (3-3)
 本実施形態の制御装置220では、表示部223は、デマンドレスポンス制御の成否に関する詳細情報を出力する。
 ここでは、デマンドレスポンス制御の成否に加え、デマンドレスポンス制御の成否に関する詳細情報が出力されるため、機器30のユーザは、例えば、デマンドレスポンス制御の失敗の原因や、さらなる改善の余地等を把握することが容易である。
 (3-4)
 本実施形態の制御装置220では、表示部223は、判定部225cにより成否が判定されたデマンドレスポンス制御に対するアドバイスを出力する。
 ここでは、デマンドレスポンス制御の成否に加え、デマンドレスポンス制御に対するアドバイスが出力されるため、機器30のユーザは、デマンドレスポンス制御をどのように改善すべきか、あるいは、現状のデマンドレスポンス制御がベストなのか等を把握することが容易である。
 (3-5)
 本実施形態の制御装置220では、判定部225cは、デマンドレスポンス制御の成否を、高電力単価期間中又は高電力単価期間終了時のユーザの快適性に関する指標に基づいて判定する。
 ここでは、デマンドレスポンス制御の成否を、機器30の消費電力に関する情報に加え、機器30のユーザの快適性に基づいて判定することができ、多面的にデマンドレスポンス制御の成否を判定することができる。
 なお、本実施形態の制御装置220では、デマンドレスポンス制御の成否の判定に用いられる快適性に関する指標には、温度、照度、および二酸化炭素濃度を含む。また、快適性に関する指標には、湿度が含まれてもよい。
 ここでは、空調、照明、換気等に関連する快適性指標に基づいて、デマンドレスポンス制御の成否を判定することができる。
 (4)変形例
 以下に本実施形態の変形例を示す。なお、互いに矛盾しない限り、変形例は適宜組み合わせられてもよい。
 (4-1)変形例2A
 上記実施形態では、制御装置220は、デマンドレスポンス制御前と、デマンドレスポンス制御中との、建物2の消費電力の合計の変化に基づいて、抑制された電力量を算出し、抑制金額を算出するが、これに限定されるものではない。
 例えば、制御装置220は、デマンドレスポンス制御前と、デマンドレスポンス制御中との、デマンドレスポンス制御対象の機器30の消費電力の変化に基づいて抑制金額を算出するものであってもよい。つまり、制御装置220は、建物2の機器30の全体についてデマンドレスポンス制御の成否を判定するものではなく、デマンドレスポンス制御の対象である機器30についてのみ、デマンドレスポンス制御の成否を判定するものであってもよい。
 (4-2)変形例2B
 上記実施形態では、出力部としての表示部223が、判定結果表示画面および詳細表示画面を出力(表示)するが、これに限定されるものではない。例えば、通信部221が出力部として機能し、機器30のユーザの持つ携帯端末(図示せず)等に対して判定結果表示画面および詳細表示画面の画像データを出力(送信)するよう構成されてもよい。なお、通信部221が携帯端末等に対して出力を行う場合には、判定結果表示画面および詳細表示画面の画像データに代えて、判定結果表示画面および詳細表示画面を生成する上で必要な情報だけが携帯端末に対して送信され、携帯端末で画面が生成されるよう構成されてもよい。
 (4-3)変形例2C
 上記実施形態では、判定部225cは、抑制金額(消費電力)に関する条件、快適性に関する条件に基づいて、デマンドレスポンス制御の成否を判定するが、これに限定されるものではない。例えば、判定部225cは、抑制金額に関する条件だけに基づいて、デマンドレスポンス制御の成否を判定してもよい。
 (4-4)変形例2D
 上記実施形態では、機器30の消費電力が計測器30aにより個別に測定されるが、これに限定されるものではなく、機器30の個別の消費電力は測定されなくてもよい。ただし、デマンドレスポンス制御を精度よく行い、デマンドレスポンス制御の成否の原因を把握する上では、機器30の消費電力が計測器30aにより個別に測定されることが好ましい。
 本発明は、エネルギー消費量の調整要求を受けて機器の制御を行う機器制御装置に適用可能であり、デマンドレスポンス制御が適切に実行されたか否かを容易に判断可能な機器制御装置として有用である。
10 アグリゲータ(機器制御装置)
11 通信部(出力部)
15c 判定部
30 機器
220 制御装置(機器制御装置)
221 通信部(出力部)
223 表示部(出力部)
225c 判定部
特開2014-217157号公報

Claims (8)

  1.  所定期間におけるエネルギー消費量の調整要求を受けて機器(30)の制御を行う機器制御装置であって、
     前記機器のユーザに対して情報を出力する出力部(11,221,223)と、
     前記調整要求を受けて行われる前記所定期間の前記機器のエネルギー消費量の調整制御である、デマンドレスポンス制御の成否を、前記所定期間における前記機器の消費エネルギーに関する情報に少なくとも基づいて判定し、前記出力部に出力させる判定部(15c,225c)と、
    を備えた、機器制御装置(10,220)。
  2.  前記出力部は、前記判定部により成否が判定された前記デマンドレスポンス制御に関し、該デマンドレスポンス制御を実行することで前記ユーザが獲得したインセンティブ金額を更に出力する、
    請求項1に記載の機器制御装置。
  3.  前記判定部(15c)は、前記デマンドレスポンス制御の成否を、該デマンドレスポンス制御を実行することで前記ユーザが獲得したインセンティブ金額に更に基づいて判定する、
    請求項1又は2に記載の機器制御装置(10)。
  4.  前記判定部は、前記デマンドレスポンス制御の成否を、前記所定期間中又は前記所定期間終了時の前記ユーザの快適性に関する指標に更に基づいて判定する、
    請求項1から3のいずれか1項に記載の機器制御装置。
  5.  前記快適性に関する指標には、温度、湿度、照度、および二酸化炭素濃度の少なくとも1つを含む、
    請求項4に記載の機器制御装置。
  6.  前記調整要求にエネルギー消費量の目標値が含まれない場合に、前記判定部(225c)は、前記所定期間における前記機器の消費エネルギーに関する情報としての、前記所定期間に前記デマンドレスポンス制御を実行し前記機器のエネルギー消費量を調整することで前記ユーザが獲得した金銭的利益の額と、所定の基準額とを比較することで、前記デマンドレスポンス制御の成否を判定する、
    請求項1に記載の機器制御装置(220)。
  7.  前記出力部は、前記デマンドレスポンス制御の成否に関する詳細情報を更に出力する、
    請求項1から6のいずれか1項に記載の機器制御装置。
  8.  前記出力部は、前記判定部により成否が判定された前記デマンドレスポンス制御に対するアドバイスを更に出力する、
    請求項1から7のいずれか1項に記載の機器制御装置。
PCT/JP2016/058423 2015-03-20 2016-03-17 機器制御装置 WO2016152695A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015058535A JP2016178824A (ja) 2015-03-20 2015-03-20 機器制御装置
JP2015-058535 2015-03-20

Publications (1)

Publication Number Publication Date
WO2016152695A1 true WO2016152695A1 (ja) 2016-09-29

Family

ID=56977394

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/058423 WO2016152695A1 (ja) 2015-03-20 2016-03-17 機器制御装置

Country Status (2)

Country Link
JP (1) JP2016178824A (ja)
WO (1) WO2016152695A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018207226A1 (ja) * 2017-05-08 2018-11-15 株式会社日立製作所 アグリゲータ側システム、プロシューマ側システム、及びアグリゲーションシステム、並びにアグリゲーション方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009247188A (ja) * 2008-03-31 2009-10-22 Osaka Gas Co Ltd 電力デマンド制御システム
JP2013106381A (ja) * 2011-11-10 2013-05-30 Sony Corp 電力管理装置、電力管理方法およびデマンド通知装置
JP2014120787A (ja) * 2012-12-13 2014-06-30 Toshiba Corp 電子機器および機器システム
JP2015047005A (ja) * 2013-08-28 2015-03-12 ダイキン工業株式会社 制御装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5914860B2 (ja) * 2012-10-12 2016-05-11 パナソニックIpマネジメント株式会社 管理装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009247188A (ja) * 2008-03-31 2009-10-22 Osaka Gas Co Ltd 電力デマンド制御システム
JP2013106381A (ja) * 2011-11-10 2013-05-30 Sony Corp 電力管理装置、電力管理方法およびデマンド通知装置
JP2014120787A (ja) * 2012-12-13 2014-06-30 Toshiba Corp 電子機器および機器システム
JP2015047005A (ja) * 2013-08-28 2015-03-12 ダイキン工業株式会社 制御装置

Also Published As

Publication number Publication date
JP2016178824A (ja) 2016-10-06

Similar Documents

Publication Publication Date Title
JP6225419B2 (ja) 空調機の制御装置
JP5643791B2 (ja) 電力需給制御装置及び電力需給制御方法
EP3067840A1 (en) Energy control unit, energy control system, and energy management method
CN104040568B (zh) 能量管理系统及管理装置
JP5967265B2 (ja) 機器制御装置
US20180299160A1 (en) Control apparatus
MX2014004192A (es) Provision de respuesta de demanda adaptativa basada en el control de cargas distribuidas.
JP5158236B2 (ja) 設備機器の制御装置
JP6289759B2 (ja) 制御装置、制御システム、制御方法、及び、プログラム
JP5088436B1 (ja) 設備機器の制御装置
JP5736983B2 (ja) 同時同量制御システム、その購入電力計画生成装置
WO2016152669A1 (ja) デマンドレスポンス制御結果提示装置
WO2016152695A1 (ja) 機器制御装置
JP5573789B2 (ja) エネルギー制御装置
WO2019176546A1 (ja) 空調制御装置、空調システム、空調制御方法及びプログラム
WO2016017587A1 (ja) 機器制御装置
JP6074843B2 (ja) コントローラ
JP2012037222A (ja) エネルギー制御装置
JP2016073072A (ja) 機器制御装置
US20120166003A1 (en) System for Evaluating, Measuring and Verifying Power Consumption Based on Price-Point Control
JP5533809B2 (ja) 設備機器の制御装置
US9797762B2 (en) Controlling device
JP2011257049A (ja) 電力診断システム
JP6010682B2 (ja) 電力需給制御装置及び電力需給制御方法
WO2016186069A1 (ja) インセンティブ予測量提示装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16768598

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16768598

Country of ref document: EP

Kind code of ref document: A1