WO2016136045A1 - 改質装置 - Google Patents

改質装置 Download PDF

Info

Publication number
WO2016136045A1
WO2016136045A1 PCT/JP2015/082061 JP2015082061W WO2016136045A1 WO 2016136045 A1 WO2016136045 A1 WO 2016136045A1 JP 2015082061 W JP2015082061 W JP 2015082061W WO 2016136045 A1 WO2016136045 A1 WO 2016136045A1
Authority
WO
WIPO (PCT)
Prior art keywords
supply
gas
processing gas
reformer
discharge
Prior art date
Application number
PCT/JP2015/082061
Other languages
English (en)
French (fr)
Inventor
慶一 中川
大本 節男
新屋 謙治
航一郎 平山
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Publication of WO2016136045A1 publication Critical patent/WO2016136045A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B49/00Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated
    • C10B49/02Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated with hot gases or vapours, e.g. hot gases obtained by partial combustion of the charge
    • C10B49/04Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated with hot gases or vapours, e.g. hot gases obtained by partial combustion of the charge while moving the solid material to be treated
    • C10B49/06Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated with hot gases or vapours, e.g. hot gases obtained by partial combustion of the charge while moving the solid material to be treated according to the moving bed type
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B51/00Destructive distillation of solid carbonaceous materials by combined direct and indirect heating
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L9/00Treating solid fuels to improve their combustion
    • C10L9/02Treating solid fuels to improve their combustion by chemical means
    • C10L9/06Treating solid fuels to improve their combustion by chemical means by oxidation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K1/00Preparation of lump or pulverulent fuel in readiness for delivery to combustion apparatus
    • F23K1/04Heating fuel prior to delivery to combustion apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D7/00Forming, maintaining, or circulating atmospheres in heating chambers
    • F27D7/02Supplying steam, vapour, gases, or liquids

Definitions

  • the present invention relates to a reformer for reforming by heating and solid-distilling solid organic matter.
  • Patent Document 1 includes a rotary furnace having a double cylinder structure of an inner cylinder and an outer cylinder, an external heating furnace that covers the outer periphery, and blades provided on the inner cylinder, and is supplied to the inner cylinder.
  • a rotary kiln is disclosed in which the raw material is indirectly heated with hot air supplied to an external heating furnace while flowing the raw material from one end to the other end of the inner tube and from the other end to the other end of the outer tube.
  • Patent Document 2 includes a rotating drum and a combustion-type medium-wavelength infrared light emitting tube disposed in the rotating drum.
  • the inside of the rotating drum is deprived of oxygen, and the combustion-type medium-wavelength infrared light emitting tube is set at around 850 ° C.
  • a rotary kiln type carbonization calcining apparatus that performs constant carbonization and dry carbonization calcining of a raw material supplied into a rotary drum by a heat ray having a wavelength of about 4 ⁇ m diffused from a combustion type medium wavelength infrared light emitting cylinder.
  • the present invention has been made to solve the above-described problems, and provides a reformer that can efficiently heat organic matter while having a simple configuration. It is an object.
  • a reforming apparatus that solves the above-described problems includes a preheating unit that preheats a solid organic material to 300 to 400 ° C., and a vertical packing in which the organic material preheated by the preheating unit is filled.
  • a main body of the reactor a processing gas supply means for supplying a processing gas containing oxygen into the main body of the packed reactor, and a lower portion of the main body of the packed reactor.
  • processing gas supply means is provided in the packed reactor main body so as to supply the processing gas above the packed bed of organic matter.
  • processing gas supply means is provided in the preheating means.
  • the processing gas supply means has a supply nozzle for supplying the processing gas into the organic material packed bed.
  • the supply nozzle is disposed on the lower side of the charged reactor main body, and the gas discharge means is provided connected to an upper portion of the charged reactor main body.
  • the gas discharge means has a plurality of discharge nozzles for discharging the gas in the packed reactor main body, and the plurality of discharge nozzles form a set with the plurality of supply nozzles and the plurality of the plurality of discharge nozzles forming a set. It is arranged below the supply nozzle.
  • the distance between the supply nozzle and the discharge nozzle forming a pair is 1 to 10 times the distance between the plurality of supply nozzles adjacent in the vertical direction.
  • L / D that is the size (L) of the plurality of supply nozzles with respect to the size (D) of the plurality of discharge nozzles is 0.1 to 1.
  • the plurality of supply nozzles and the plurality of discharge nozzles extend horizontally, and the plurality of supply nozzles and the plurality of discharge nozzles are orthogonal to each other in plan view.
  • At least three of the plurality of supply nozzles are arranged in the vertical direction, and the discharge nozzle forming a pair with the upper supply nozzle is in communication with the lower supply nozzle.
  • the present invention is characterized by having a header including the plurality of supply nozzles and the plurality of discharge nozzles.
  • the processing gas supply means has a supply header for supplying the processing gas into the packed bed of organic matter
  • the gas discharge means has a gas discharge header for discharging the gas in the packed reactor main body.
  • the supply header and the gas discharge header extend in the vertical direction in the charge reactor main body, and the supply header and the discharge header have holes provided at the same height in the vertical direction. It is characterized by.
  • an oxygen content adjusting means for adjusting the oxygen content of the processing gas
  • a processing gas supply amount adjusting means for adjusting the supply amount of the processing gas supplied by the processing gas supply means
  • the packed reactor main body Temperature measuring means for measuring the temperature of the solid reformed product
  • oxygen concentration measuring means for measuring the oxygen concentration of the gas discharged by the gas discharging means
  • the temperature measuring means and the oxygen concentration measuring means And a control means for controlling the oxygen content adjusting means and the processing gas supply amount adjusting means based on the measurement result obtained in (1).
  • control means is configured such that when the measured temperature measured by the temperature measuring means is lower than a first predetermined temperature and the measured oxygen concentration measured by the oxygen concentration measuring means is lower than a predetermined value, the processing gas
  • the oxygen concentration adjusting means is controlled to increase the oxygen concentration therein.
  • the control unit performs the processing
  • the processing gas supply amount adjusting means is controlled to reduce the gas supply amount.
  • control unit when the measured temperature measured by the temperature measuring unit is higher than a second predetermined temperature that is higher than the first predetermined temperature, the control unit is configured to reduce the oxygen concentration in the processing gas so as to reduce the oxygen concentration.
  • the density adjusting means is controlled.
  • the preheating means is an external heating kiln.
  • the organic matter is low-grade coal.
  • the preheated solid organic substance comes into contact with oxygen in the process gas and generates heat in the vertical filling reactor main body filled with the solid organic substance preheated to 300 to 400 ° C.
  • the temperature rises by reaction, and heat is transferred to the solid organic substance adjacent thereto to raise the temperature, and the generated tar also burns and rises in temperature, so compared with the case where the solid organic substance is heated indirectly.
  • the solid organic matter can be heated in a short time. That is, the organic substance can be efficiently heated. Thereby, the apparatus itself can be reduced in size.
  • the solid organic matter is simply processed by the preheater and the vertical packed reactor main body, and the apparatus configuration is simple.
  • FIG. 1 is a schematic configuration diagram of a reformer according to a first embodiment of the present invention. It is a figure which shows the control flow of the said reformer. It is a schematic block diagram of the reformer which concerns on 2nd embodiment of this invention. It is a schematic block diagram of the reformer which concerns on 3rd embodiment of this invention. It is a schematic block diagram of the reformer which concerns on 4th embodiment of this invention. It is an enlarged view of the header with which the said reformer is provided. It is a schematic block diagram of the reformer which concerns on 5th embodiment of this invention. It is a schematic block diagram of the reformer which concerns on 6th embodiment of this invention. It is a schematic block diagram of the reformer which concerns on 7th embodiment of this invention.
  • FIG. 14 is a cross-sectional view taken along arrow XIII-XIII in FIG. 13.
  • the reformer 100 includes a preheater 110, a vertical charging reactor 120, a process gas supply device 130, a discharge device 140, and a control device 160. .
  • the preheater 110 is an external heating kiln.
  • the preheater 110 includes an inner cylinder (furnace main body) 111 that is rotatably supported, and an outer cylinder 112 that covers and fixes the outer periphery of the inner cylinder 111.
  • a supply hopper 114 into which the dry coal 1 is put is provided on the base end side of the supply feeder 113.
  • the supply hopper 114 communicates with the leading end side of the transfer line 115 and can receive the dry coal 1 transferred by the transfer line 115.
  • the transport line 115 is sealed with an inert gas such as nitrogen gas, and the inert gas is supplied into the inner cylinder 111 through the supply hopper 114 and the supply feeder 113 together with the dry coal 1.
  • the vertical charging reactor 120 is connected to the front end side of the inner cylinder 111 while allowing the inner cylinder 111 to rotate.
  • the outer cylinder 112 is connected to the front end side of a heating gas supply line 116 for supplying the heating gas 21 (temperature: 900 to 1200 ° C.) into the outer cylinder 112, and the heating gas 22 after heating the inner cylinder 111 is supplied to the outer cylinder 112.
  • the base end side of the heated gas discharge line 117 to be discharged is connected.
  • the dry coal 1 is preheated to 300 to 400 ° C. to be preheated coal 2 while flowing from one end side to the other end side of the inner tube 111 in the inner tube 111.
  • the cylinder 111 is supplied from the discharge port 111 a of the inner cylinder 111 into the vertical charge reactor 120.
  • the vertical packed reactor 120 includes a packed reactor main body (processing tower) 121 filled with the preheated coal 2.
  • the vertical packed reactor 120 further includes a processing gas supply device 130 capable of directly blowing the processing gas (oxygen-containing gas) 13 into the packed bed 3 formed by filling the preheated coal 2 in the packed reactor main body 121.
  • a discharge device 140 is provided below the charged reactor main body 121.
  • the discharge device 140 is connected to the lower side of the charged reactor main body 121 and is a fixed amount for discharging the modified coal 4 (solid reformate) that has been processed and reformed in the charged reactor main body 121 in a fixed amount.
  • a discharger 141 is provided.
  • the quantitative discharger 141 is connected to the solid-gas separator 143 via the feed line 142.
  • the gas 14 generated in the preheated coal 2 when it is treated with the treatment gas 13, the treatment gas 13, and the gas 14 in the filling reactor main body 121 such as the inert gas are also charged with the reformed coal 4 by the quantitative discharger 141.
  • the container body 121 is discharged.
  • As the fixed amount ejector 141 for example, a table feeder or the like can be used.
  • the solid-gas separator 143 is a device that separates the modified coal 4 and the gas 14.
  • the solid-gas separator 143 for example, a device constituted by a hopper and an exhaust pipe, a cyclone, or the like can be used.
  • a reformed coal discharge line 144 for discharging the reformed coal 4 separated by the solid gas separator 143 to the outside of the system is connected to the solid gas separator 143 and separated by the solid gas separator 143.
  • a gas discharge line 145 for discharging the gas 14 out of the system is connected.
  • the gas discharge line 145 is provided with a blower 145a.
  • the processing gas supply device 130 includes an introduction pipe 135 provided with a plurality (four in the left-right direction in the illustrated example) supply nozzles (supply headers) 136 on the distal end side.
  • the plurality of supply nozzles 136 are arranged in the vicinity of the upper surface 3 a in the packed bed 3.
  • the distal end side of the feed pipe 133 is connected to the proximal end side of the introduction pipe 135 via the heater 134.
  • the proximal end side of the feed pipe 133 is connected to the distal end side of the air supply pipe 131 that supplies the air 11 and the distal end side of the inert gas supply pipe 132 that supplies the inert gas 12.
  • a blower 131 a is connected to the proximal end side of the air supply pipe 131.
  • An inert gas supply source 132 a such as an inert gas tank is connected to the proximal end side of the inert gas supply pipe 132.
  • the air supply pipe 131 and the inert gas supply pipe 132 are provided with flow control valves 131b and 132b, respectively.
  • As the inert gas it is possible to use preheated coal 2 or nitrogen gas that is not reactive with air.
  • the oxygen concentration is adjusted by the flow rate adjusting valves 131b and 132b, the blower 131a, etc., and the same temperature as the preheated coal 2 in the packed reactor main body 121 by the heater 134 (for example, 400 ° C.).
  • the processing gas 13 heated to can be supplied into the packed bed 3.
  • a temperature sensor 161 that is a temperature measuring means for measuring the temperature of the packed bed 3 (reformed coal 4) is provided on the lower side of the charged reactor main body 121.
  • the gas discharge line 145 is provided with an oxygen sensor 162 which is an oxygen concentration measuring means for measuring the oxygen concentration in the gas 14 flowing through the gas discharge line 145.
  • the sensors 161 and 162 are electrically connected to the input unit of the control device 160 serving as control means.
  • the output unit of the control device 160 is electrically connected to the flow rate adjusting valves 131b and 132b, the blowers 131a and 145a, the quantitative discharger 141, and the like.
  • the control device 160 can control the operations of the flow rate adjusting valves 131b and 132b, the blowers 131a and 145a, and the quantitative discharger 141 based on information input from the sensors 161 and 162 and the like.
  • the processing gas supply device 130 constitutes the processing gas supply means.
  • the flow rate adjusting valves 131b and 132b, the blower 131a, and the like constitute oxygen content adjusting means.
  • a processing gas supply amount adjusting means is constituted by the blower 131a, the inert gas supply source 132a, the flow rate adjusting valves 131b and 132b, and the like.
  • the heating gas 21 (temperature: 900 to 1200 ° C.) is supplied into the outer cylinder 112 through the heating gas supply line 116, and the inner cylinder 111 is heated with the heating gas 21 in the outer cylinder 112.
  • the heating gas 21 is supplied into the outer cylinder 112 via the heating gas supply line 116, and the heating gas after heating the inner cylinder 111. 22 is discharged out of the system via the heated gas discharge line 117.
  • the dry coal 1 is transported by the transport line 115 and put into the supply hopper 114.
  • the dry coal 1 put in the supply hopper 114 is supplied to the proximal end side of the inner cylinder 111 by the supply feeder 113.
  • the dry coal 1 supplied into the inner cylinder 111 circulates (moves) while being indirectly heated by the heated gas 21 while being stirred from the proximal end side to the distal end side of the inner cylinder 111 as the inner cylinder 111 rotates.
  • the dry coal 1 is preheated to a predetermined temperature (for example, 300 ° C. to 400 ° C.) by being indirectly heated by the heating gas 21 at the front end side of the inner cylinder 111 (the discharge port 111a side of the inner cylinder 111). As a result, the preheated coal 2 is obtained.
  • the preheated coal 2 is discharged from the discharge port 111 a of the inner cylinder 111 along with the rotation of the inner cylinder 111 and is charged into the charged reactor main body 121.
  • the processing gas 13 is directly supplied via the supply nozzle 136 in the vicinity of the upper surface 3 a inside the packed bed 3 formed by filling the preheated coal 2 in the packed reactor main body 121. Since the solid and gas in the packed reactor main body 121 are discharged from the lower side of the packed reactor main body 121 by the quantitative discharger 141, the processing gas 13 directly supplied into the packed bed 3 is moved upward in the packed bed 3. It will distribute
  • the preheated coal 2 in the packed bed 3 is heated by the processing gas 13 and the generated tar.
  • the preheated coal 2 supplied into the charged reactor main body 121 is directly heated by an exothermic reaction with the process gas 13 and combustion of the tar.
  • the reformed coal 4 obtained by reforming the preheated coal 2 by heating to 450 to 700 ° C. by dry distillation and the gas 14 in the charged reactor main body 121 are sent from below the charged reactor main body 121 by the quantitative discharger 141. It is discharged through the supply line 142 and fed to the solid-gas separator 143. The reformed coal 4 and the gas 14 are separated by the solid gas separator 143. The modified coal 4 is discharged out of the system through the modified coal discharge line 144. The gas 14 is discharged out of the system via the gas discharge line 145.
  • the above-described reformer 100 preferably controls each device as follows by the controller 160 in order to produce the reformed coal 4 more efficiently.
  • first step S1 it is determined whether or not the temperature (measured temperature) T measured by the temperature sensor 161 is lower than a first predetermined temperature T1 (for example, 500 ° C.) (first step S1).
  • the oxygen concentration (measured oxygen concentration) X measured by the oxygen sensor 162 is a predetermined oxygen concentration (predetermined value) X1 (for example, 1%). Or less (second step S2).
  • the measured temperature T is equal to or higher than the first predetermined temperature T1
  • the measured temperature T is higher than the second predetermined temperature T2 (for example, 510 ° C.) higher than the first predetermined temperature T1. Is determined to be higher (fifth step S5).
  • the flow rate adjusting valves 131b, 132b and the oxygen supply amount are increased (the oxygen concentration is increased).
  • the blower 131a is controlled (third step S3). That is, the operation of the blower 131a and the opening degree of the flow rate adjustment valve 132b are kept constant, while only the opening degree of the flow rate adjustment valve 131b is controlled to increase. Alternatively, the operation of the blower 131a and the opening degree of the flow rate adjustment valve 131b are kept constant, while only the opening degree of the flow rate adjustment valve 132b is controlled to be small. Alternatively, control is performed such that the operation of the blower 131a is kept constant, while the opening degree of the flow rate adjustment valve 131b is large and the opening degree of the flow rate adjustment valve 132b is small.
  • the flow rate adjusting valves 131b and 132b and the blower so as to decrease (reduce) the gas amount.
  • 131a is controlled (fourth step S4). That is, the operation of the blower 131a is kept constant while the opening degree of the flow rate adjusting valves 131b and 132b is controlled to be small.
  • the flow rate adjusting valve 131b When it is determined in the fifth step S5 that the measured temperature T is higher than the second predetermined temperature T2, the flow rate adjusting valve 131b, so as to reduce the oxygen supply amount (lower the oxygen concentration). 132b and the blower 131a are controlled (sixth step S6). That is, the operation of the blower 131a and the opening degree of the flow rate adjusting valve 132b are kept constant, while only the opening degree of the flow rate adjusting valve 131b is controlled to be small. Alternatively, the operation of the blower 131a and the opening degree of the flow rate adjustment valve 131b are kept constant, while only the opening degree of the flow rate adjustment valve 132b is controlled to be increased. Alternatively, control is performed such that the operation of the blower 131a is kept constant, while the opening degree of the flow rate adjustment valve 131b is small and the opening degree of the flow rate adjustment valve 132b is large.
  • the flow rate adjusting valve 131b, The opening degree of 132b and the operation of the blower 131a are kept constant.
  • control of the flow rate adjusting valves 131b and 132b and the blower 131a by the control device 160 is continued until the reforming by heating the dry coal 1 and continuously dry distillation is completed.
  • the vertical heater that includes the preheater 110 and the vertical charging reactor 120 and is charged with the preheated coal 2 that has been preheated to 300 to 400 ° C. by the preheater 110.
  • the filled reactor 120 of the mold it contacts with oxygen in the processing gas 13 supplied with the preheated coal 2 to increase the temperature by exothermic reaction, transfer heat to the preheated coal 2 adjacent thereto, and increase the temperature. Since the generated tar also burns and rises in temperature, the dry coal 1 can be raised in a shorter time than when the dry coal 1 is indirectly heated. That is, the dry coal 1 can be efficiently heated. Thereby, the apparatus itself can be reduced in size.
  • the dry coal 1 is only processed by the preheater 110 and the vertical filling reactor 120, and the apparatus configuration is simple. Since the generated tar is combusted and the temperature rises to 450 to 700 ° C., the preheated coal 2 is dry-distilled and reformed coal 4 is formed. That is, the modified coal 4 can be obtained efficiently.
  • the temperature of the reformed coal 4 obtained in the vertical charge reactor 120 (the temperature of the coal immediately before being discharged from the vertical charge reactor 120) and the gas 14 discharged from the vertical charge reactor 120
  • the supply amount of the processing gas 13 supplied to the vertical charge reactor 120 and the oxygen concentration in the processing gas 13 based on the oxygen concentration of the preheated coal 2 and the processing gas 13
  • the quality of the modified coal 4 can be improved.
  • the inner cylinder 111 is provided with a drive mechanism (not shown) for rotating the inner cylinder 111, and it is preferable to adjust the rotation speed of the inner cylinder 111 to be, for example, 1 rpm to 3 rpm. This is because if it is slower than 1 rpm, the processing amount itself is small, and if it is faster than 3 rpm, the dry coal 1 cannot be heated efficiently, which may lead to a decrease in production efficiency.
  • the filling rate of the dry coal 1 in the inner cylinder 111 is preferably 10% to 30%. This is because if the amount is less than 10%, the processing amount itself is small, and if it is more than 30%, the dry coal 1 cannot be heated efficiently, and the production efficiency may be reduced.
  • the supply amount of the processing gas 13 into the packed bed 3 is, for example, 0.01 (kg-O 2 / kg-preheating coal 2) or more and 0.2 (kg-O 2 / kg-preheating coal 2) or less. It is preferable to adjust so that This is because when the supply amount of the processing gas 13 into the packed bed 3 is less than 0.01 (kg-O 2 / kg-preheated coal 2), oxygen cannot be sufficiently supplied into the packed bed 3. If the supply amount of the processing gas 13 into the packed bed 3 is larger than 0.2 (kg-O 2 / kg-preheated coal 2), oxygen will be excessive and reaction will occur. This is because it may progress too much. Further, the supply amount of the processing gas 13 into the packed bed 3 is more preferably 0.03 to 0.1 (kg-O 2 / kg-preheated coal 2).
  • the oxygen concentration of the processing gas 13 is preferably 1 to 21%. This is because if the oxygen concentration of the processing gas 13 is lower than 1%, the possibility that the packed bed 3 (preheated coal 2) cannot be sufficiently heated is increased, and the oxygen concentration of the processing gas 13 is higher than 21%. If it is high, a device for increasing the oxygen concentration is required, and the equipment cost increases.
  • the supply nozzle 136 has an opening for supplying the processing gas 13 and may have any shape that does not hinder the flow of the preheated coal 2.
  • the supply nozzle 136 has an inverted V shape in the longitudinal section and is provided with an opening on the lower side. Preferably it is. This is because blockage by the preheated coal 2 can be suppressed.
  • a reformer according to a second embodiment of the present invention will be described with reference to FIG.
  • the filling reactor, the processing gas supply device, the discharge device, and the control device included in the first embodiment shown in FIG. 1 and described above are changed, and a gas discharge device is added.
  • Other configurations are generally the same as those of the apparatus shown in FIG. 1 and described above, and the same devices are denoted by the same reference numerals, and redundant descriptions are omitted as appropriate.
  • the reformer 100A includes a preheater 110, a vertical charging reactor 120A, a process gas supply device 130A, a discharge device 140A, a control device 160A, a gas A discharge device 150.
  • the vertical packed reactor 120A includes a packed reactor main body 121A having an exhaust port 123 provided in the ceiling 121a, instead of the packed reactor main body 121 included in the vertical packed reactor 120 described above.
  • a temperature sensor 161 that is a temperature measuring means for measuring the temperature of the packed bed 3 (reformed coal 4) is provided on the lower side of the packed reactor main body 121A, similarly to the vertical packed reactor 120 described above.
  • the processing gas supply device 130A includes an air supply pipe 131, an inert gas supply pipe 132, a supply pipe 133, a heater 134, a blower 131a, an inert gas supply source 132a, and flow rate adjusting valves 131b and 132b, as described above.
  • the tip side is positioned on the lower side (near the quantitative discharger 141) in the charging reactor main body 121A, and a plurality (in the illustrated example, the left-right direction) And 4) supply nozzles (supply headers) 136A are provided. That is, the processing gas supply device 130 ⁇ / b> A can supply the processing gas 13 to the lower side in the packed bed 3.
  • the discharge device 140A includes a quantitative discharger 141 provided in the lower part of the charged reactor main body 121A, and a reformed coal discharge line 144 connected to the fixed discharger 141 at the base end side. .
  • the reformed coal 4 (solid reformate) that has been processed and reformed in the packed reactor main body 121A is quantitatively discharged from the packed reactor main body 121A by the quantitative discharger 141, and the reformed coal discharge line 144 is discharged. Through the system.
  • the gas discharge device 150 includes an exhaust pipe 151 provided at the base end side connected to the exhaust port 123 of the packed reactor main body 121A.
  • a blower 151 a is provided in the exhaust pipe 151. Thereby, the gas 14 in the packed reactor main body 121A is discharged out of the system through the exhaust pipe 151.
  • the exhaust pipe 151 is provided with an oxygen sensor 162A which is an oxygen concentration measuring means for measuring the oxygen concentration in the gas 14 flowing through the exhaust pipe 151.
  • the sensors 161 and 162A are electrically connected to an input unit of a control device 160A that is a control unit.
  • the output unit of the control device 160A is electrically connected to the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, and the fixed amount discharger 141, respectively.
  • the control device 160A can control the operations of the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, and the quantitative discharger 141 based on information input from the sensors 161 and 162A.
  • processing gas supply device 130A and the like constitute processing gas supply means.
  • the preheated coal 2 preheated to a predetermined temperature (for example, 300 ° C. to 400 ° C.) by the preheater 110 of the reformer 100A is discharged from the discharge port 111a of the inner tube 111 as the inner tube 111 rotates.
  • the vertical reactor 120A is filled in the packed reactor main body 121A.
  • the processing gas 13 is directly supplied to the lower side in the packed bed 3 formed by filling the preheated coal 2 in the packed reactor main body 121A through the supply nozzle 136A.
  • the gas 14 in the packed reactor main body 121A is discharged from above the packed bed 3 in the packed reactor main body 121A by the exhaust port 123 and the gas discharge device 150.
  • the coal (reformed coal 4) in the charged reactor main body 121A is discharged from below the charged reactor main body 121A by the quantitative discharger 141. Therefore, the preheated coal 2 comes into contact with the processing gas 13 supplied from the supply nozzle 136A, reacts with oxygen in the processing gas 13, and the generated tar moves from the upper side to the lower side while burning. Moreover, it heat-transfers to the preheating coal 2 adjacent to this, and this preheating coal 2 is also heated up. Such reaction and combustion continuously occur when moving from above the packed bed 3 to below, and the preheated coal 2 is heated to 450 to 700 ° C. As a result, the preheated coal 2 becomes the reformed coal 4 reformed by dry distillation. As a result, it is possible to shorten the processing time of the dry coal 1 and to reduce the size of the reformer 100A itself as compared with the case of only indirect heating with the heating gas 21.
  • the control device 160A of the reforming device 100A controls the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141 and the like based on information from the sensors 161 and 162A. By controlling, the reformed coal 4 can be produced more efficiently.
  • the reformed coal 4 is discharged out of the system through the reformed coal discharge line 144 from below the charged reactor main body 121A by the quantitative discharger 141.
  • the gas 14 in the packed reactor main body 121A is discharged out of the system by the blower 151a through the exhaust port 123 and the exhaust pipe 151 of the packed reactor main body 121A.
  • the charging is performed in the charging reactor main body 121A. Since the gas 14 in the reactor main body 121A and the preheated coal 2 (reformed coal 4) circulate opposite to each other, the temperature of the preheated coal 2 in the packed reactor main body 121A is started. The processing gas 13 is always supplied to the upper side, so that the preheated coal 2 can be efficiently reacted with oxygen in the processing gas 13.
  • FIG. 1 A reformer according to a third embodiment of the present invention will be described with reference to FIG.
  • This embodiment has a configuration in which the processing gas supply device and the control device included in the first embodiment shown in FIG. 1 and described above are changed.
  • Other configurations are substantially the same as those of the apparatus shown in FIG. 1 and described above, and the same devices are denoted by the same reference numerals, and redundant description is appropriately omitted.
  • the reformer 100B includes a preheater 110, a vertical charging reactor 120, a processing gas supply device 130B, a discharge device 140, and a control device 160B. .
  • the processing gas supply apparatus 130B includes an air supply pipe 131B whose front end side is branched into three and an inert gas supply pipe 132B whose front end side is branched into three.
  • the distal ends of the air supply pipe 131B and the inert gas supply pipe 132B are connected to the base ends of the introduction pipes 135Ba, 135Bb, and 135Bc via the supply pipes 133Ba, 133Bb, and 133Bc and the heaters 134Ba, 134Bb, and 134Bc. .
  • the introduction pipes 135Ba, 135Bb, and 135Bc include a plurality of (four in the left-right direction in the illustrated example) supply nozzles (supply headers) 136Ba, 136Bb, and 136Bc provided on the distal end side.
  • the supply nozzle 136Ba is positioned on the upper side in the packed bed 3 in the height direction.
  • the supply nozzle 136Bc is positioned on the lower side in the packed bed 3 in the height direction.
  • the supply nozzle 136Bb is positioned between the supply nozzle 136Ba and the supply nozzle 136Bc in the height direction and at the center in the packed bed 3.
  • the base end side of the air supply pipe 131B is connected to the blower 131a.
  • the base end side of the inert gas supply pipe 132B is connected to the inert gas supply source 132a.
  • Flow rate adjusting valves 131b and 132b are respectively provided at branched portions of the air supply pipe 131B and the inert gas supply pipe 132B.
  • the processing gas supply device 130B can supply the processing gases 13a, 13b, and 13c with the oxygen concentrations adjusted to the upper side, the center, and the lower side in the packed bed 3 in the height direction.
  • the control device 160B can control the operations of the flow rate adjusting valves 131b and 132b, the blowers 131a and 145a, the quantitative discharger 141 and the like based on information input from the temperature sensor 161 and the oxygen sensor 162. Therefore, the control device 160B controls the flow rate adjusting valves 131b and 132b, the blowers 131a and 145a, the quantitative discharger 141, and the like, so that the processing gases 13a, 13b, and 13c are supplied to the supply nozzles 136Ba, 136Bb, and 136Bc, respectively. .
  • processing gas supply device 130B and the like constitute processing gas supply means.
  • Control means is configured by the control device 160B and the like.
  • the operation of preheating the dry coal 1 by the preheater 110 of the reformer 100B, the operation of raising the temperature of the preheated coal 2 by the charging reactor 120 of the reformer 100B and reforming by dry distillation, and the reformer 100B The operation of separating and discharging the reformed coal 4 and the gas 14 by the discharge device 140 is the same as that in the above-described first embodiment, and the description thereof is omitted.
  • the control device 160B uses the flow rate adjustment valves 131b and 132b, the blowers 131a and 145a, and the fixed amount based on information from the sensors 161 and 162 and the like. It is preferable to control the discharger 141 and the like as follows.
  • control device 160B adjusts the oxygen concentration of the processing gas 13a supplied from the upper supply nozzle 136Ba to a higher concentration than the processing gases 13b and 13c supplied from the middle and lower supply nozzles 136Bb and 136Bc.
  • the flow rate adjusting valves 131b and 132b and the blowers 131a and 145a and The fixed amount ejector 141 is controlled.
  • the temperature of the preheated coal 2 can be adjusted more appropriately in the layer direction (vertical direction) in the packed bed 3 as compared with the case where the processing gas is supplied by only one stage of the supply nozzle, and the obtained modification is obtained.
  • the quality of the quality coal 4 can be improved.
  • the control nozzle 160B controls the flow rate adjusting valves 131b, 132b and the like, and the process gas supplied from the supply nozzles 136Ba, 136Bb, 136Bc at each stage is provided with the supply nozzles 136Ba, 136Bb, 136Bc arranged in a plurality of stages.
  • the oxygen concentration of 13a, 13b, and 13c so as to decrease from the upper side toward the lower side, the temperature distribution of coal is more appropriately controlled in the layer direction (vertical direction) in the packed bed 3 Can do.
  • the oxygen concentration in the processing gases 13a, 13b, and 13c can be adjusted according to the physical properties of coal such as specific heat and calorific value, and the coal particle size. Thereby, the quality of the reformed coal 4 can be improved, and the processing time can be shortened and the apparatus can be downsized.
  • the air supply pipe 131B and the inert gas supply pipe 132B branched at the front end side are provided, and the flow rate adjusting valves 131b and 132b are respectively provided at the branched portions, thereby corresponding to the supply nozzles 136Ba, 136Bb, and 136Bc.
  • the apparatus cost can be reduced as compared with the case where a supply line for supplying the processing gas is provided.
  • FIGS. 4 and 4 A reforming apparatus according to a fourth embodiment of the present invention will be described with reference to FIGS.
  • This embodiment has a configuration in which a gas discharge device is added by changing the filling reactor, the processing gas supply device, and the control device provided in the third embodiment shown in FIG. 4 and described above.
  • the other configuration is substantially the same as that of the apparatus shown in FIG. 4 and described above, and the same components are denoted by the same reference numerals, and redundant description is appropriately omitted.
  • the reformer 100C includes a preheater 110, a vertical charging reactor 120A, a process gas supply device 130C, a discharge device 140A, a control device 160C, a gas A discharge device 150C.
  • the vertical filling reactor 120A has an exhaust port 123 provided in the ceiling portion 121a in the same manner as in the second embodiment described above, instead of the filling reactor main body 121 included in the vertical filling reactor 120 described above.
  • a packed reactor main body 121A is
  • the processing gas supply device 130C includes an air supply pipe 131B, an inert gas supply pipe 132B, a supply pipe 133Ba, 133Bb, 133Bc, a heater 134Ba, 134Bb, 134Bc, a blower 131a, an inert gas supply source 132a, and a flow rate adjustment valve 131b.
  • 132b and instead of the introduction pipes 135Ba, 135Bb, 135Bc and the supply nozzles 136Ba, 136Bb, 136Bc provided in the processing gas supply device 130B, the supply headers (supply nozzles) 136Ca, 136Cb, 136Cc of the header 137 are located on the tip side.
  • the header 137 is disposed in the filling layer 3.
  • the header 137 includes supply headers 136Ca, 136Cb, 136Cc, and discharge headers (discharge nozzles) 152a, 152b, 152c provided below the supply headers 136Ca, 136Cb, 136Cc. Note that the proximal ends of the introduction pipes 135Ca, 135Cb, and 135Cc are connected to the heaters 134Ba, 134Bb, and 134Bc.
  • the discharge device 140 ⁇ / b> A is connected to the quantitative discharger 141 provided at the lower portion of the charged reactor main body 121 ⁇ / b> A and the proximal end side to the fixed discharger 141, as in the second embodiment described above. And a modified coal discharge line 144.
  • the gas discharge device 150C includes an exhaust pipe 151 provided on the base end side of the exhaust outlet 123 of the packed reactor main body 121A.
  • the gas discharge device 150 ⁇ / b> C further includes a connection pipe 153 connected to the discharge headers 152 a, 152 b, 152 c of the header 137 and the exhaust pipe 151.
  • the exhaust pipe 151 is provided with an oxygen sensor 162A which is an oxygen concentration measuring means for measuring the oxygen concentration in the gas 14 flowing through the exhaust pipe 151.
  • the control device 160C can control the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141, and the like based on information input from the temperature sensor 161 and the oxygen sensor 162A. Therefore, the control device 160C controls the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141, and the like, so that the processing gases 13a, 13b, and 13c are supplied to the supply headers 136Ca, 136Cb, and 136Cc, respectively. .
  • the header 137 described above includes, for example, a front side plate 137a and a rear side plate 137b, a left side plate 137c and a right side plate 137d, as shown in FIG.
  • the header 137 includes an upper supply header 136Ca, an intermediate supply header 136Cb, and a lower supply header 136Cc.
  • the supply header 136Cb is disposed so as not to overlap the supply header 136Ca in the vertical direction.
  • the supply header 136Cc is disposed so as not to overlap the supply header 136Cb in the vertical direction.
  • Discharge headers 152a, 152b, and 152c that discharge gas 14 are provided between the supply headers 136Ca and 136Cb, between the supply headers 136Cb and 136Cc, and below the supply header 136Cc, respectively.
  • the discharge header 152b is disposed so as not to overlap the discharge header 152a in the vertical direction.
  • the discharge header 152c is disposed so as not to overlap the discharge header 152b in the vertical direction. That is, the supply headers 136Ca, 136Cb, and 136Cc are disposed adjacent to each other in the layer direction (vertical direction) of the packed bed 3.
  • the discharge headers 152a, 152b, and 152c are connected to the exhaust pipe 151 via the connection pipe 153.
  • the preheated coal 2 charged from above is supplied as the coal on the lower side of the packed bed 3 (reformed coal 4) is discharged from the lower side of the charged reactor main body 121 by the quantitative discharger 141.
  • the gas 14 is efficiently discharged while efficiently contacting the processing gases 13a, 13b, 13c.
  • processing gas supply device 130C and the like constitute processing gas supply means.
  • Control means is configured by the control device 160C and the like.
  • the operation of preheating dry coal 1 by the preheater 110 of the reformer 100C and the operation of discharging the reformed coal 4 by the discharge device 140A of the reformer 100C are the same as in the case of the second embodiment described above.
  • the operation of heating the preheated coal 2 by the charge reactor 120A of the reforming apparatus 100C and reforming by dry distillation is the same as in the third embodiment described above, and the description thereof is omitted.
  • the gas 14 in the charged reactor main body 121 such as the gas generated when the preheated coal 2 is processed with the processing gases 13a, 13b, and 13c, the processing gases 13a, 13b, and 13c, and the inert gas is exhausted by the blower 151a. 123, the discharge headers 152a, 152b, and 152c, the connecting pipe 153, and the exhaust pipe 152.
  • the header 137 and the introduction pipe 135Ca are provided.
  • 135Cb, 135Cc and the connecting pipe 153 can more appropriately control the temperature distribution of coal in the packed bed 3 in the height direction. Thereby, the quality of the reformed coal 4 can be improved, and the processing time can be shortened and the apparatus can be downsized.
  • the supply headers 136Ca, 136Cb, 136Cc and the discharge headers 152a, 152b, 152c extend horizontally, and the supply headers 136Ca, 136Cb, 136Cc and the discharge headers 152a, 152b, 152c are orthogonal to each other in plan view. Preferably it is. Thereby, the obstruction
  • the downward movement of the preheated coal 2 becomes smooth, and the quality of the modified coal 4 can be improved by appropriately treating the preheated coal 2 with the processing gases 13a, 13b, and 13c.
  • the supply flow rates of the processing gases 13a, 13b, and 13c supplied to the supply headers 136Ca, 136Cb, and 136Cc are preferably 20 m / second or less. Thereby, generation
  • the supply headers 136Ca, 136Cb, 136Cc and the discharge headers 152a, 152b, 152c are L / Ds that are the sizes (L) of the supply headers 136Ca, 136Cb, 136Cc with respect to the size (D) of the discharge headers 152a, 152b, 152c. Is preferably 0.1 to 1.
  • the discharge headers 152a, 152b, and 152c may have an opening for discharging the gas 14, and may have any shape that does not hinder the flow of the preheated coal 2.
  • the discharge headers 152a, 152b, and 152c have an inverted V shape in the longitudinal section and have an opening on the lower side. It is preferable to be provided. This is because the discharge of the preheated coal 2 can be suppressed.
  • a reformer according to a fifth embodiment of the present invention will be described with reference to FIG.
  • This embodiment has a configuration in which the processing gas supply device and the control device included in the first embodiment shown in FIG. 1 and described above are changed.
  • Other configurations are substantially the same as those of the apparatus shown in FIG. 1 and described above, and the same devices are denoted by the same reference numerals, and redundant description is appropriately omitted.
  • the reformer 100D includes a preheater 110, a vertical charging reactor 120, a process gas supply device 130D, a discharge device 140, and a control device 160D. .
  • the processing gas supply device 130D includes an air supply pipe 131, an inert gas supply pipe 132, a supply pipe 133, a heater 134, a blower 131a, an inert gas supply source 132a, and flow rate adjusting valves 131b and 132b, as described above.
  • the tip side is positioned on the upper side (near the ceiling portion 121a) in the charged reactor main body 121, and a plurality (in the illustrated example, in the left-right direction) 4) supply nozzles (supply headers) 136D are provided.
  • the processing gas supply device 130 ⁇ / b> D can supply the processing gas 13 to the upper side of the packed bed 3.
  • the processing gas 13 is dispersed and the oxygen concentration becomes uniform above the packed bed 3 (in the vicinity of the upper surface 3a).
  • the control device 160D can control the flow rate adjusting valves 131b and 132b, the blowers 131a and 145a, the quantitative discharger 141 and the like based on information input from the temperature sensor 161 and the oxygen sensor 162. Therefore, the control device 160D controls the flow rate adjusting valves 131b and 132b, the blowers 131a and 145a, the quantitative discharger 141, and the like, so that the processing gas 13 is supplied to the supply nozzle 136D.
  • processing gas supply device 130D and the like constitute processing gas supply means.
  • Control means is configured by the control device 160D and the like.
  • the operation of preheating the dry coal 1 by the preheater 110 of the reformer 100D, the operation of raising the temperature of the preheated coal 2 by the charge reactor 120 of the reformer 100D, and reforming by dry distillation, and the reformer 100D The operation of separating and discharging the reformed coal 4 and the gas 14 by the discharge device 140 is the same as that in the above-described first embodiment, and the description thereof is omitted.
  • the reforming apparatus 100D according to the present embodiment, the same effect as the reforming apparatus 100 according to the first embodiment described above is obtained, and in addition, the reforming apparatus 100D is provided above the charged reactor main body 121. Since the processing gas 13 supplied from the supply nozzle 136D uniformly diffuses before reaching the upper surface 3a of the packed bed 3, the distribution of the oxygen concentration of the processing gas 13 in the horizontal direction disappears, and the processing gas 13 Is uniformly contacted in the horizontal direction of the packed bed 3, so that the quality of the modified coal 4 produced by treating the preheated coal 2 with the treatment gas 13 is improved. The processing time can be shortened and the apparatus can be downsized.
  • FIG. 7 A reformer according to a sixth embodiment of the present invention will be described with reference to FIG.
  • This embodiment has a configuration in which the processing gas supply device and the control device provided in the fifth embodiment shown in FIG. 7 and described above are changed.
  • the other configuration is substantially the same as that of the apparatus shown in FIG.
  • the reformer 100E includes a preheater 110, a vertical charging reactor 120, a processing gas supply device 130E, a discharge device 140, and a control device 160E. .
  • the processing gas supply apparatus 130E includes an air supply pipe 131, an inert gas supply pipe 132, a blower 131a, an inert gas supply source 132a, and flow rate adjustment valves 131b and 132b, and a supply provided in the above-described processing gas supply apparatus 130D.
  • a feed pipe 133E having a distal end side connected to the proximal end side of the supply feeder 113 is provided.
  • the processing gas 13 is heated to 300 to 400 ° C. together with the dry coal 1 by the preheater 110, and the heated processing gas 13 is supplied into the packed reactor main body 121 of the packed reactor 120.
  • the control device 160E can control the flow rate adjusting valves 131b and 132b, the blowers 131a and 145a, the quantitative discharger 141 and the like based on information input from the temperature sensor 161 and the oxygen sensor 162. Therefore, the control device 160E controls the flow rate adjusting valves 131b and 132b, the blowers 131a and 145a, the quantitative discharger 141, and the like, so that the processing gas 13 enters the charged reactor main body 121 via the supply feeder 113 and the inner cylinder 111. Supplied.
  • processing gas supply device 130E and the like constitute processing gas supply means.
  • Control means is configured by the control device 160E and the like.
  • the operation of preheating the dry coal 1 by the preheater 110 of the reformer 100E, the operation of raising the temperature of the preheated coal 2 by the charge reactor 120 of the reformer 100E and reforming by dry distillation, and the reformer 100E The operation of separating and discharging the reformed coal 4 and the gas 14 by the discharge device 140 is substantially the same as in the case of the fifth embodiment described above, and the description thereof is omitted.
  • the processing gas supply device 130E is supplied to the preheater 110.
  • the processing gas 13 supplied to the supply feeder 113 is uniformly diffused and heated before reaching the upper surface 3a of the packed bed 3, so that the oxygen of the processing gas 13 in the horizontal direction. Since the density distribution of the concentration disappears and the processing gas 13 comes into uniform contact with the packed bed 3 in the horizontal direction, the quality of the modified coal 4 produced by processing the preheated coal 2 with the processing gas 13 is improved.
  • the processing time can be shortened and the apparatus can be downsized.
  • a reforming apparatus according to a seventh embodiment of the present invention will be described with reference to FIGS. 9 and 10.
  • the present embodiment has a configuration in which a gas discharge device is added by changing the filling reactor, the processing gas supply device, the discharge device, and the control device provided in the third embodiment shown in FIG. 4 and described above.
  • the other configuration is substantially the same as that of the apparatus shown in FIG. 4 and described above, and the same components are denoted by the same reference numerals, and redundant description is appropriately omitted.
  • the reformer 100F includes a preheater 110, a vertical charging reactor 120A, a processing gas supply device 130F, a discharge device 140A, a control device 160F, a gas A discharge device 150F.
  • the vertical filling reactor 120A has an exhaust port 123 provided in the ceiling portion 121a in the same manner as in the second embodiment described above, instead of the filling reactor main body 121 included in the vertical filling reactor 120 described above.
  • a packed reactor main body 121A is
  • the processing gas supply device 130F includes an air supply pipe 131B, an inert gas supply pipe 132B, a supply pipe 133Ba, 133Bb, 133Bc, a heater 134Ba, 134Bb, 134Bc, a blower 131a, an inert gas supply source 132a, and a flow rate adjustment valve 131b. , 132b and a plurality of (four in the left-right direction in the illustrated example) on the tip side instead of the introduction pipes 135Ba, 135Bb, 135Bc and the supply nozzles 136Ba, 136Bb, 136Bc provided in the processing gas supply apparatus 130B described above.
  • Introducing pipes 135Fa, 135Fb, 135Fc provided with supply nozzles (supply headers) 136Fa, 136Fb, 136Fc are provided.
  • the supply nozzle 136Fa is positioned on the upper side in the packed bed 3 in the height direction.
  • the supply nozzle 136Fc is positioned on the lower side in the filling layer 3 in the height direction.
  • the supply nozzle 136Fb is positioned in the center in the packed bed 3 between the supply nozzle 136Fa and the supply nozzle 136Fc in the height direction. Note that the proximal ends of the introduction pipes 135Fa, 135Fb, and 135Fc are connected to the heaters 134Ba, 134Bb, and 134Bc.
  • the discharge device 140 ⁇ / b> A is connected to the quantitative discharger 141 provided at the lower portion of the charged reactor main body 121 ⁇ / b> A and the proximal end side to the fixed discharger 141, as in the second embodiment described above. And a modified coal discharge line 144.
  • the gas discharge device 150F includes an exhaust pipe 151 provided on the base end side of the exhaust outlet 123 of the packed reactor main body 121A.
  • the gas discharge device 150F includes discharge nozzles (discharge headers) 152Fa, 152Fb, and 152Fc provided adjacent to the lower side of the supply nozzles 136Fa, 136Fb, and 136Fc.
  • the gas exhaust device 150F further includes a connecting pipe 153F connected to the exhaust nozzles 152Fa, 152Fb, 152Fc and the exhaust pipe 151.
  • the exhaust pipe 151 is provided with an oxygen sensor 162A which is an oxygen concentration measuring means for measuring the oxygen concentration in the gas 14 flowing through the exhaust pipe 151.
  • the control device 160F can control the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141, and the like based on information input from the temperature sensor 161 and the oxygen sensor 162A. Therefore, the control device 160F controls the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141, and the like, so that the processing gases 13a, 13b, and 13c are supplied to the supply nozzles 136Fa, 136Fb, and 136Fc, respectively. .
  • the supply nozzles 136Fa, 136Fb, 136Fc and the discharge nozzles 152Fa, 152Fb, 152Fc described above include a seal layer that suppresses the flow of gas and a reaction layer that reacts with the processing gases 13a, 13b, and 13c in the filling layer 3. It is arranged to make. As shown in FIG. 10, the upper supply nozzle 136 ⁇ / b> Fa is disposed so as to form a seal layer 3 ba between the supply nozzle 136 ⁇ / b> Fa and the lowermost portion of the upper surface 3 a of the filling layer 3.
  • the upper discharge nozzle 152Fa can discharge the processing gas 13a supplied into the packed bed 3 from the upper supply nozzle 136Fa, and below the upper supply nozzle 136Fa so as to form the reaction layer 3bb within the behavior range of the processing gas 13a. Placed on the side.
  • the middle supply nozzle 136Fb is disposed so as to form a seal layer 3ba between the supply nozzle 136Fb and the upper reaction layer 3bb.
  • the middle discharge nozzle 152Fb can discharge the processing gas 13b supplied from the middle supply nozzle 136Fb into the packed bed 3, and below the middle supply nozzle 136Fb so as to form the reaction layer 3bb within the behavior range of the processing gas 13b. Placed on the side.
  • the lower supply nozzle 136Fc is disposed so as to form a seal layer 3ba between the supply nozzle 136Fc and the upper reaction layer 3bb.
  • the lower discharge nozzle 152Fc can discharge the processing gas 13c supplied into the packed bed 3 from the lower supply nozzle 136Fc, and below the lower supply nozzle 136Fc so as to form the reaction layer 3bb within the behavior range of the processing gas 13c. Placed on the side.
  • the preheated coal 2 moves smoothly downward, and the preheated coal 2 is appropriately treated with the processing gases 13a, 13b, 13c.
  • the quality of the reformed coal 4 can be improved.
  • processing gas supply device 130F and the like constitute processing gas supply means.
  • Control means is configured by the control device 160F and the like.
  • the operation of the reformer 100F according to this embodiment will be described next.
  • the operation of preheating the dry coal 1 by the preheater 110 of the reformer 100F and the operation of discharging the reformed coal 4 by the discharge device 140A of the reformer 100F are the same as in the case of the second embodiment described above.
  • the operation of heating the preheated coal 2 by the charge reactor 120A of the reforming apparatus 100F and reforming by dry distillation is the same as in the case of the third embodiment described above, and the description thereof is omitted.
  • the preheated coal 2 preheated to a predetermined temperature (for example, 300 ° C. to 400 ° C.) by the preheater 110 of the reformer 100F is discharged from the discharge port 111a of the inner cylinder 111 as the inner cylinder 111 rotates.
  • the vertical reactor 120A is filled in the packed reactor main body 121A.
  • the processing gases 13a, 13b, 13F, and 13F are supplied through the supply nozzles 136Fa, 136Fb, and 136Fc on the upper side, the center, and the lower side. 13c is supplied directly.
  • Gases 14a, 13b, 13c react with preheated coal 2 and gas 14 such as process gas 13a, 13b, 13c and inert gas are combined with supply nozzles 136Fa, 136Fb, 136Fc by blower 151a.
  • the exhaust nozzles 152Fa, 152Fb, and 152Fc that are formed, the connection pipe 153F, the exhaust port 123, and the exhaust pipe 151 are discharged to the outside of the system.
  • the supply nozzle 136Fa forming a pair , 136Fb, 136Fc and the discharge nozzles 152Fa, 152Fb, 152Fc, the introduction pipes 135Fa, 135Fb, 135Fc, and the connection pipe 153F, the processing gases 13a, 13b, 13c and the preheating are provided in the height direction in the packed bed 3.
  • a plurality of reaction layers 3bb that react with the coal 2 and seal layers 3ba that control the flow of the processing gases 13a, 13b, and 13c can be alternately provided, and the temperature distribution of the coal in the packed bed 3 can be further increased in the height direction. It can be controlled appropriately. Thereby, the quality of the reformed coal 4 can be improved, and the processing time can be shortened and the apparatus can be downsized.
  • the supply nozzle 136Fa and the discharge nozzle 152Fa, the supply nozzle 136Fb and the discharge nozzle 152Fb, and the supply nozzle 136Fc and the discharge nozzle 152Fc are adjacent to each other in the vertical direction, and are arranged in pairs.
  • the passing distance of the processing gas 13a, 13b, 13c is short, the pressure loss is reduced, and the driving force of the blower 131a that supplies the processing gas 13a, 13b, 13c to the supply nozzles 136Fa, 136Fb, 136Fc can be reduced.
  • the height H2 of the reaction layer 3bb and the number of the reaction layers 3bb in the packed layer 3 are such that the flow rates of the processing gases 13a, 13b, and 13c supplied into the supply nozzles 136Fa, 136Fb, and 136Fc are 20 m / second or less. Is preferred. This is because the generation of erosion caused by the fine powder contained in the preheated coal 2 colliding with the wall surface of the packed reactor main body 121A due to the flow of the processing gases 13a, 13b, 13c can be suppressed.
  • the height H1 of the seal layer 3ba is preferably 1 to 10 times the height H2 of the reaction layer 3bb, and more preferably 2 to 5 times the height H2 of the reaction layer 3bb. This is because the ratio of the processing gas 13a, 13b, 13c flowing to the seal layer 3ba is suppressed to 1/6 to 1/3, and an increase in manufacturing cost due to the amount of the processing gas 13a, 13b, 13c used can be suppressed. is there.
  • FIGS. 11 and 12 A reformer according to an eighth embodiment of the present invention will be described with reference to FIGS. 11 and 12.
  • This embodiment has a configuration in which the processing gas supply device, the control device, and the gas discharge device provided in the seventh embodiment shown in FIG. 9 and described above are changed.
  • Other configurations are substantially the same as those of the apparatus shown in FIG. 9 and described above, and the same components are denoted by the same reference numerals, and redundant description is appropriately omitted.
  • the reformer 100G includes a preheater 110, a vertical charging reactor 120A, a process gas supply device 130G, a discharge device 140A, a control device 160G, a gas A discharge device 150G.
  • the processing gas supply device 130G includes an air supply pipe 131G whose front end is branched into two and an inert gas supply pipe 132G whose front end is branched into two.
  • the distal ends of the air supply pipe 131G and the inert gas supply pipe 132G are connected to the base ends of the introduction pipes 135Ga and 135Gb via the feed pipes 133Ga and 133Gb and the heaters 134Ga and 134Gb.
  • the introduction pipes 135Ga and 135Gb include a plurality of (four in the left-right direction in the illustrated example) supply nozzles (supply headers) 136Ga and 136Gb provided on the distal end side.
  • the supply nozzle 136Ga is positioned on the upper side in the packed bed 3 in the height direction.
  • the supply nozzle 136Gb is located at the center of the packed bed 3 in the height direction and below the supply nozzle 136Ga.
  • the processing gas supply device 130G includes a supply nozzle (supply header) 136Gc positioned on the lower side of the packed bed 3 in the height direction.
  • the supply nozzle 136Gc is provided on the distal end side of the communication pipe 139.
  • the connecting pipe 139 includes a discharge nozzle (discharge header) 138 provided adjacently below the upper supply nozzle 136Ga on the base end side.
  • the base end side of the air supply pipe 131G is connected to the blower 131a.
  • the base end side of the inert gas supply pipe 132G is connected to the inert gas supply source 132a.
  • Flow rate adjusting valves 131b and 132b are respectively provided at branches of the air supply pipe 131G and the inert gas supply pipe 132G.
  • the processing gas supply device 130G can supply the processing gases 13a and 13b whose oxygen concentrations are adjusted to the upper side and the center in the packed bed 3 in the height direction, and the processing gas 13a is preheated coal. 2 can be supplied to the lower side of the packed bed 3 through the discharge nozzle 138, the connecting pipe 139, and the supply nozzle 136Gc.
  • the control device 160G can control the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141 and the like based on information input from the temperature sensor 161 and the oxygen sensor 162A. Therefore, the control device 160G controls the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141, and the like, so that the processing gases 13a, 13b, and 14a are supplied to the supply nozzles 136Ga, 136Gb, and 136Gc, respectively. .
  • processing gas supply device 130G and the like constitute processing gas supply means.
  • Control means is constituted by the control device 160G and the like.
  • the operation of heating and reforming the coal 2 by heating is the same as in the seventh embodiment described above, and the description thereof is omitted.
  • the preheated coal 2 preheated to a predetermined temperature (for example, 300 ° C. to 400 ° C.) by the preheater 110 of the reformer 100G is discharged from the discharge port 111a of the inner tube 111 as the inner tube 111 rotates.
  • the vertical reactor 120A is filled in the packed reactor main body 121A.
  • the processing gas 13a, 13b is directly supplied to the inside of the packed bed 3 formed by filling the preheated coal 2 in the packed reactor main body 121A via the supply nozzles 136Ga, 136Gb on the upper side and the center, respectively. .
  • a gas generated by the reaction of the processing gas 13a with the preheated coal 2, the processing gas 13a, and a gas such as the inert gas (lower processing gas) 14a are filled through a discharge nozzle 138, a connecting pipe 139, and a supply nozzle 136Gc. 3 is supplied to the lower side of the interior.
  • the gas 14 produced by the reaction of the processing gas 13b, 14a with the preheated coal 2, the processing gas 13b, 14a, and the gas 14 such as the inert gas are discharged from the discharge nozzles 152Fb, 152Fc paired with the supply nozzles 136Gb, 136Gc by the blower 151a. And it is discharged out of the system through the connecting pipe 153G and the exhaust pipe 151.
  • the discharge nozzle that forms a pair with the upper supply nozzle 136Ga By connecting 138 and the lower supply nozzle 136Gc with the connecting pipe 139, the gas 14a can be used effectively, and the apparatus can be simplified. Moreover, as shown in FIG. 12, since the coal which became high temperature advances reaction with the process gas of low oxygen concentration at low speed, safety
  • FIGS. 13 and 14 A reformer according to a ninth embodiment of the present invention will be described with reference to FIGS. 13 and 14.
  • This embodiment has a configuration in which the processing gas supply device, the control device, and the gas discharge device provided in the first embodiment shown in FIG.
  • Other configurations are substantially the same as those of the apparatus shown in FIG. 1 and described above, and the same devices are denoted by the same reference numerals, and redundant description is appropriately omitted.
  • the reformer 100H includes a preheater 110, a vertical charging reactor 120A, a process gas supply device 130H, a discharge device 140A, a control device 160H, a gas A discharge device 150H.
  • the packed reactor 120A is a packed reaction having an exhaust port 123 provided in the ceiling 121a in the same manner as in the second embodiment described above, instead of the packed reactor main body 121 provided in the vertical packed reactor 120 described above.
  • a main body 121A is provided.
  • the processing gas supply device 130H includes an air supply pipe 131, an inert gas supply pipe 132, a supply pipe 133, a heater 134, a blower 131a, an inert gas supply source 132a, and flow rate adjusting valves 131b and 132b, as described above.
  • a supply header (supply nozzle) 136H and an introduction pipe 135H are provided.
  • the supply header 136H extends in the vertical direction in the packed reactor main body 121A. As shown in FIGS.
  • the supply header 136 ⁇ / b> H is a circular tube with a closed end, and a plurality of holes provided on the upper side, the center, and the lower side in the packed bed 3 in the height direction. Has 136 Ha. Thereby, the process gas 13 can be supplied to each of the upper side, the center, and the lower side in the packed bed 3.
  • the proximal end side of the introduction pipe 135H is connected to the heater 134.
  • the discharge device 140 ⁇ / b> A is connected to the quantitative discharger 141 provided at the lower portion of the charged reactor main body 121 ⁇ / b> A and the proximal end side to the fixed discharger 141, as in the second embodiment described above. And a modified coal discharge line 144.
  • the gas exhaust device 150H includes an exhaust pipe 151 provided on the base end side connected to the exhaust port 123 of the packed reactor main body 121A, and a blower 151a provided on the exhaust pipe 151. Is provided.
  • the gas discharge device 150H includes a discharge header (discharge nozzle) 152H provided in the charging reactor main body 121A, and a connecting pipe 153H connected to the discharge header 152H and the exhaust pipe 151.
  • the discharge header 152H is a circular tube with a closed end, and a plurality of holes provided on the upper side, the center, and the lower side in the packed bed 3 in the height direction. 152Ha.
  • the discharge header 152H has a hole 152Ha positioned at substantially the same height as the hole 136Ha of the supply header 136H.
  • a plurality of sealing layers and reaction layers can be alternately formed in the height direction of the packed bed 3.
  • the control device 160H can control the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141 and the like based on information input from the temperature sensor 161 and the oxygen sensor 162A. Therefore, the control device 160H controls the flow rate adjusting valves 131b and 132b, the blowers 131a and 151a, the quantitative discharger 141, and the like, so that the processing gas 13 is supplied to the supply header 136H.
  • the processing gas supply unit is configured by the processing gas supply device 130H and the like.
  • Control means is configured by the control device 160H and the like.
  • the operation of preheating the dry coal 1 by the preheater 110 of the reformer 100H and the operation of discharging the reformed coal 4 by the discharge device 140A of the reformer 100H are generally the same as in the case of the second embodiment described above. This is the same and the description thereof is omitted.
  • the preheated coal 2 preheated to a predetermined temperature (for example, 300 ° C. to 400 ° C.) by the preheater 110 of the reformer 100H is discharged from the discharge port 111a of the inner tube 111 as the inner tube 111 rotates.
  • the vertical reactor 120A is filled in the packed reactor main body 121A.
  • the processing gas 13 is provided on the upper side, the center, and the lower side through the hole (opening) 136Ha of the supply header 136H. Are supplied directly.
  • the gas 14 produced by the reaction of the processing gas 13 with the preheated coal 2, the processing gas 13 and the gas 14 such as the inert gas are blown by the blower 151 a to the hole (opening) 152 Ha of the discharge header 152 H, the connecting pipe 153 H and the exhaust port 123. And is discharged out of the system via the exhaust pipe 151.
  • the supply header 136H and the discharge header 152H include the packed bed 3 Since it extends in the vertical direction, the reaction and movement of the preheated coal 2 become smooth, the quality of the reformed coal 4 is improved, the processing time can be shortened, and the apparatus can be downsized. .
  • the supply header 136H and the discharge header 152H have a plurality of holes 136Ha and 152Ha provided at substantially the same height, so that the processing gas 13 and the preheated coal 2 react in the height direction of the packed bed 3.
  • the reaction layer to be formed can be formed, and the seal layer can be formed at a location away from the holes 136Ha and 152Ha.
  • the reformer according to the present invention has a simple configuration and can efficiently heat organic matter, it can be used extremely beneficially in the power generation industry and the like.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Combustion & Propulsion (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Furnace Details (AREA)
  • Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)

Abstract

 簡易な構成でありながらも、有機物を効率良く加熱できる改質装置を提供することにある。固形状の有機物を300~400℃まで予熱する予熱器(110)と、予熱器(110)で予熱された前記有機物が内部に充填される縦型の充填反応器(120)と、充填反応器(120)内に、酸素を含有する処理ガス(13)を供給する処理ガス供給装置(130)と、充填反応器(120)の下部に設けれ、当該充填反応器(120)内にて前記有機物が前記処理ガス(13)と反応し450~700℃まで昇温し乾留されることにより改質された固形状の改質物と前記充填反応器(120)内のガス(14)を排出する定量排出機(141)とを備えるようにした。

Description

改質装置
 本発明は、固形状の有機物を加熱して連続的に乾留することにより改質する改質装置に関する。
 上述のような改質装置は種々開発されており、例えば、有機物を内筒内に供給し、内筒の回転に伴い、有機物を当該内筒の一端から他端に流通させつつ、内筒を覆う外筒内に供給される加熱ガスで間接加熱する外熱式キルンなどのロータリーキルンを用いることが検討されている。このような外熱式キルンでは、有機物を450℃~700℃まで加熱しようとすると、内筒の他端側では加熱源である前記加熱ガスの温度(例えば、1000℃)との差が当該内筒の一端側と比べて小さく伝熱効率が低下することから、ロータリーキルンのサイズが大きくなってしまうという課題があった。そのため、小型化する技術が種々検討されている。
 例えば、下記特許文献1には、内筒と外筒の2重筒構造の回転炉と、この外周を覆う外熱炉と、内筒に設けられた羽根とを備え、内筒に供給された原料を内筒の一端から他端へさらに外筒の他端から一端へ流通させつつ、外熱炉に供給される熱気で間接加熱するロータリーキルンが開示されている。
 下記特許文献2には、回転胴と、回転胴内に配置される燃焼式中波長赤外線発光筒とを備え、回転胴内を酸欠状態にし、燃焼式中波長赤外線発光筒を850℃近辺に恒温制御して、燃焼式中波長赤外線発光筒から放散される4μm前後の波長を有する熱線により回転胴内に供給された原料を乾燥炭化焼成するロータリーキルン型炭化焼成装置が記載されている。
特開2004-3826号公報 特開2003-313559号公報
 しかしながら、前記特許文献1に記載のロータリーキルンでは、前記原料が前記内筒内および前記外筒内を通過することで加熱することができるものの、この内部構造が複雑であることから、その分装置コスト増を招いてしまう可能性があった。
 前記特許文献2に記載のロータリーキルン型炭化焼成装置では、原料の炭化焼成によりタールが生成し燃焼式中波長赤外線発光筒に付着しコーキングが生じると、燃焼式中波長赤外線発光筒からの熱線の放散が妨げられて当該原料の乾燥石炭化焼成を行うことができなくなってしまう可能性があった。
 このようなことから、本発明は、前述した課題を解決するために為されたものであって、簡易な構成でありながらも、有機物を効率良く加熱することができる改質装置を提供することを目的としている。
 上述した課題を解決する本発明に係る改質装置は、固形状の有機物を300~400℃まで予熱する予熱手段と、前記予熱手段で予熱された前記有機物が内部に充填される縦型の充填反応器本体と、前記充填反応器本体内に、酸素を含有する処理ガスを供給する処理ガス供給手段と、前記充填反応器本体の下部に設けられ、当該充填反応器本体内にて前記有機物が前記処理ガスと反応し450~700℃まで昇温し乾留されることにより改質された固形状の改質物を排出する排出手段と、前記充填反応器本体内のガスを排出するガス排出手段と、を備えることを特徴とする。
 また、前記処理ガス供給手段は、前記有機物の充填層よりも上方へ前記処理ガスを供給するように前記充填反応器本体に設けられることを特徴とする。
 また、前記処理ガス供給手段は、前記予熱手段に設けられることを特徴とする。
 また、前記処理ガス供給手段は、前記有機物の充填層内に前記処理ガスを供給する供給ノズルを有することを特徴とする。
 また、前記供給ノズルは、前記充填反応器本体の下方側に配置され、前記ガス排出手段は、前記充填反応器本体の上部に接続して設けられることを特徴とする。
 また、前記供給ノズルは複数あり、前記複数の供給ノズルは、上下方向で隣接して配置されることを特徴とする。
 また、前記ガス排出手段は、前記充填反応器本体内のガスを排出する排出ノズルを複数有し、前記複数の排出ノズルは、前記複数の供給ノズルと組みをなすと共に、組をなす前記複数の供給ノズルの下方側に配置されることを特徴とする。
 また、組みをなす前記供給ノズルと前記排出ノズルとの距離は、上下方向で隣接する前記複数の供給ノズルの距離に対して1倍~10倍であることを特徴とする。
 また、前記複数の排出ノズルの大きさ(D)に対する前記複数の供給ノズルの大きさ(L)であるL/Dが0.1~1であることを特徴とする。
 また、前記複数の供給ノズルおよび前記複数の排出ノズルは、水平に延在し、前記複数の供給ノズルと前記複数の排出ノズルは、平面視で直交していることを特徴とする。
 また、前記複数の供給ノズルは、上下方向で少なくとも3つ配置され、上段の前記供給ノズルと組みをなす前記排出ノズルは、下段の前記供給ノズルと連絡していることを特徴とする。
 また、前記複数の供給ノズルと前記複数の排出ノズルとを備えるヘッダを有することを特徴とする。
 また、前記処理ガス供給手段は、前記有機物の充填層内に前記処理ガスを供給する供給ヘッダを有し、前記ガス排出手段は、前記充填反応器本体内のガスを排出するガス排出ヘッダを有し、前記供給ヘッダおよび前記ガス排出ヘッダは、前記充填反応器本体内にて上下方向に延在し、前記供給ヘッダおよび前記排出ヘッダは、上下方向で同じ高さに設けられた穴を有することを特徴とする。
 また、前記処理ガスの酸素含有量を調整する酸素含有量調整手段と、前記処理ガス供給手段により供給される前記処理ガスの供給量を調整する処理ガス供給量調整手段と、前記充填反応器本体内の前記固形状の改質物の温度を計測する温度計測手段と、前記ガス排出手段により排出される前記ガスの酸素濃度を計測する酸素濃度計測手段と、前記温度計測手段および前記酸素濃度計測手段で得られた計測結果に基づき、前記酸素含有量調整手段および前記処理ガス供給量調整手段を制御する制御手段と、をさらに備えることを特徴とする。
 また、前記制御手段は、前記温度計測手段で計測された計測温度が第1の所定温度より低く、かつ、前記酸素濃度計測手段で計測された計測酸素濃度が所定値より低い場合、前記処理ガス中の酸素濃度を増やすように前記酸素濃度調整手段を制御することを特徴とする。
 また、前記制御手段は、前記温度計測手段で計測された計測温度が第1の所定温度より低く、かつ、前記酸素濃度計測手段で計測された計測酸素濃度が所定値以上である場合、前記処理ガスの供給量を減らすように前記処理ガス供給量調整手段を制御することを特徴とする。
 また、前記制御手段は、前記温度計測手段で計測された計測温度が第1の所定温度より高温である第2の所定温度よりも高い場合、前記処理ガス中の酸素濃度を減らすように前記酸素濃度調整手段を制御することを特徴とする。
 また、前記予熱手段は、外熱式キルンであることを特徴とする。
 また、前記有機物は、低品位石炭であることを特徴とする。
 本発明によれば、300~400℃まで予熱された固形状の有機物が充填される縦型の充填反応器本体内にて、予熱された固形状の有機物が処理ガス中の酸素と接触し発熱反応して昇温し、これに隣接する固形状の有機物に伝熱して昇温すると共に、生成したタールも燃焼して昇温することから、前記固形状の有機物を間接加熱する場合と比べて、固形状の有機物を短時間で昇温することができる。すなわち、有機物を効率良く加熱することができる。これにより、装置自体を小型化できる。また、固形状の有機物を予熱器と縦型の充填反応器本体で処理するだけであり、装置構成が簡易である。
本発明の第一の実施形態に係る改質装置の概略構成図である。 前記改質装置の制御フローを示す図である。 本発明の第二の実施形態に係る改質装置の概略構成図である。 本発明の第三の実施形態に係る改質装置の概略構成図である。 本発明の第四の実施形態に係る改質装置の概略構成図である。 前記改質装置が備えるヘッダの拡大図である。 本発明の第五の実施形態に係る改質装置の概略構成図である。 本発明の第六の実施形態に係る改質装置の概略構成図である。 本発明の第七の実施形態に係る改質装置の概略構成図である。 前記改質装置が備える充填反応器本体内におけるガス流れを説明するための図である。 本発明の第八の実施形態に係る改質装置の概略構成図である。 前記改質装置が備える充填反応器本体内における充填層の高さと石炭温度との関係を示すグラフである。 本発明の第九の実施形態に係る改質装置の概略構成図である。 図13におけるXIII-XIII矢視断面図である。
 本発明に係る改質装置の各実施形態を図面に基づいて説明するが、本発明は、図面に基づいて説明する以下の実施形態のみに限定されるものではない。
 [第一の実施形態]
 本発明の第一の実施形態に係る改質装置について、図1および図2に基づいて説明する。
 本実施形態に係る改質装置100は、図1に示すように、予熱器110と、縦型の充填反応器120と、処理ガス供給装置130と、排出装置140と、制御装置160とを備える。
 予熱器110は、外熱式キルンである。予熱器110は、回転可能に支持される内筒(炉本体)111と、内筒111の外周を覆い固定支持された外筒112とを備える。内筒111の基端側には、固形状の有機物である乾燥された褐炭や亜瀝青炭等のような低品位石炭(乾燥石炭)1を供給する供給フィーダ113が当該内筒111の回転を可能としつつ連結される。
 供給フィーダ113の基端側には、前記乾燥石炭1が入れられる供給ホッパ114が設けられる。供給ホッパ114は、搬送ライン115の先端側と連絡しており、搬送ライン115により搬送された前記乾燥石炭1を受け入れ可能になっている。なお、搬送ライン115は、窒素ガスなどの不活性化ガスでシールされており、当該不活性ガスが前記乾燥石炭1と共に供給ホッパ114および供給フィーダ113を介して内筒111内に供給される。
 内筒111の先端側には、当該内筒111の回転を可能としつつ前記縦型の充填反応器120が連結される。
 外筒112には、当該外筒112内に加熱ガス21(温度:900~1200℃)を供給する加熱ガス供給ライン116の先端側が連結され、前記内筒111を加熱した後の加熱ガス22を排出する加熱ガス排出ライン117の基端側が連結される。前記乾燥石炭1は、内筒111内にて当該内筒111の一端側から他端側まで流通する間に、300~400℃まで予熱されて予熱石炭2となり、前記予熱石炭2は、前記内筒111の回転に伴い、当該内筒111の排出口111aから縦型の充填反応器120内に供給される。
 縦型の充填反応器120は、予熱石炭2が充填される充填反応器本体(処理塔)121を備える。縦型の充填反応器120は、充填反応器本体121内にて予熱石炭2が充填してなる充填層3内に処理ガス(酸素含有ガス)13を直接吹き込み可能な処理ガス供給装置130をさらに備える。充填反応器本体121の下方には、排出装置140が設けられる。
 排出装置140は、充填反応器本体121の下方に接続して設けられ、当該充填反応器本体121内で処理されて改質した改質石炭4(固形状の改質物)を定量で排出する定量排出機141を備える。定量排出機141は、送給ライン142を介して固気分離機143と接続している。予熱石炭2を処理ガス13で処理したときに生成したガス、処理ガス13および前記不活性ガスなどの充填反応器本体121内のガス14も、定量排出機141により、改質石炭4と共に充填反応器本体121内から排出される。定量排出機141として、例えば、テーブルフィーダなどを用いることが可能である。
 固気分離機143は、前記改質石炭4と前記ガス14とを分離する機器である。前記固気分離機143として、例えば、ホッパおよび排気管などで構成される機器や、サイクロンなどを用いることが可能である。固気分離機143には、当該固気分離機143で分離された改質石炭4を系外へ排出する改質石炭排出ライン144が接続されると共に、当該固気分離機143で分離されたガス14を系外へ排出するガス排出ライン145が接続される。ガス排出ライン145にはブロア145aが設けられる。
 処理ガス供給装置130は、先端側に複数(図示例では左右方向にて4つ)の供給ノズル(供給ヘッダ)136が設けられた導入管135を備える。複数の供給ノズル136は、充填層3内における上面3a近傍に配置される。導入管135の基端側には、加熱器134を介して送給管133の先端側が接続される。送給管133の基端側には、空気11を供給する空気供給管131の先端側が接続されると共に、不活性ガス12を供給する不活性ガス供給管132の先端側が接続される。空気供給管131の基端側には、ブロア131aが接続される。不活性ガス供給管132の基端側には、不活性ガスタンクなどの不活性ガス供給源132aが接続される。空気供給管131および不活性ガス供給管132には流量調整弁131b,132bがそれぞれ設けられる。なお、不活性ガスとして、予熱石炭2や空気との反応性の無い、窒素ガスなどを用いることが可能である。よって、前記処理ガス供給装置130は、流量調整弁131b,132bやブロア131aなどにより酸素濃度が調整され、加熱器134により充填反応器本体121内の予熱石炭2と同じ温度(例えば、400℃)に加熱された処理ガス13を充填層3内に供給することができる。
 充填反応器本体121の下方側には、充填層3(改質石炭4)の温度を計測する温度計測手段である温度センサ161が設けられる。ガス排出ライン145には、ガス排出ライン145内を流通するガス14中の酸素濃度を計測する酸素濃度計測手段である酸素センサ162が設けられる。前記センサ161,162は、制御手段である制御装置160の入力部とそれぞれ電気的に接続している。制御装置160の出力部は、前記流量調整弁131b,132b、前記ブロア131a,145aおよび前記定量排出機141などとそれぞれ電気的に接続している。制御装置160は、センサ161,162などから入力された情報に基づき、前記流量調整弁131b,132b、前記ブロア131a,145aおよび前記定量排出機141の作動を制御できるようになっている。
 なお、本実施形態においては、処理ガス供給装置130などにより処理ガス供給手段を構成している。流量調整弁131b,132bおよびブロア131aなどにより酸素含有量調整手段を構成している。ブロア131a、不活性ガス供給源132a、流量調整弁131b,132bなどにより処理ガス供給量調整手段を構成している。
 このような本実施形態に係る改質装置100の作動を次に説明する。
 先ず、加熱ガス供給ライン116により外筒112内に加熱ガス21(温度:900~1200℃)を供給し、外筒112内の加熱ガス21により内筒111を加熱する。なお、前記乾燥石炭1を内筒111内にて熱処理している際、加熱ガス21は、加熱ガス供給ライン116を介して外筒112内に供給され、内筒111を加熱した後の加熱ガス22は、加熱ガス排出ライン117を介して系外へ排出される。
 前記乾燥石炭1は、搬送ライン115により搬送されて供給ホッパ114に入れられる。供給ホッパ114に入れられた前記乾燥石炭1は、供給フィーダ113により前記内筒111の基端側へ供給される。内筒111内に供給された前記乾燥石炭1は、内筒111の回転に伴い、加熱ガス21により間接加熱されつつ内筒111の基端側から先端側へ撹拌されながら流通(移動)する。前記乾燥石炭1は、内筒111の先端側(内筒111の排出口111a側)にあっては、前記加熱ガス21により間接加熱されて所定の温度(例えば、300℃~400℃)まで予熱されて予熱石炭2となる。
 予熱石炭2は、内筒111の回転に伴い、内筒111の排出口111aから排出されて充填反応器本体121内に充填される。充填反応器本体121内にて予熱石炭2が充填してなる充填層3の内部における上面3a近傍には、供給ノズル136を介して処理ガス13が直接供給される。定量排出機141により充填反応器本体121内の固体および気体を充填反応器本体121の下方から排出することから、充填層3内に直接供給された処理ガス13は、充填層3内にて上方側から下方側へ予熱石炭2と共に流通し、充填層3全体と直接接触することになる。このとき、充填層3の予熱石炭2は、処理ガス13および発生したタールにより昇温される。これは、予熱石炭2が前記所定の温度まで高められると、酸素との反応性が高くなり、処理ガス13中の酸素と反応して発熱する一方、発生したタールが燃焼するからである。このように充填反応器本体121内に供給された予熱石炭2は、処理ガス13との発熱反応および前記タールの燃焼により直接加熱されることになる。また、これに隣接する予熱石炭2に伝熱してこの予熱石炭2も昇温される。その結果、前記加熱ガス21による間接加熱だけの場合と比べて、前記乾燥石炭1の処理時間を短くできると共に、改質装置100自体を小型化することができる。
 予熱石炭2を例えば450~700℃まで加熱し乾留して改質した改質石炭4と、充填反応器本体121内のガス14とは、定量排出機141により充填反応器本体121の下方から送給ライン142を通じて排出されて固気分離機143に送給される。固気分離機143により改質石炭4およびガス14が分離される。改質石炭4は、改質石炭排出ライン144を介して系外へ排出される。ガス14は、ガス排出ライン145を介して系外へ排出される。
 上述した改質装置100は、改質石炭4をさらに効率良く製造するために、制御装置160により各機器を以下のように制御することが好ましい。
 図2に示すように、温度センサ161により計測された温度(計測温度)Tが第1の所定温度T1(例えば、500℃)よりも低いか否かを判定する(第1のステップS1)。前記計測温度Tが前記第1の所定温度T1よりも低い場合には、酸素センサ162により計測された酸素濃度(計測酸素濃度)Xが所定の酸素濃度(所定値)X1(例えば、1%)よりも低いか否かを判定する(第2のステップS2)。他方、前記計測温度Tが前記第1の所定温度T1以上である場合には、当該計測温度Tが前記第1の所定温度T1より高温である第2の所定温度T2(例えば、510℃)よりも高いか否かを判定する(第5のステップS5)。
 第2のステップS2にて、前記計測酸素濃度Xが前記所定値X1よりも低いと判定した場合には、酸素供給量を増やす(酸素濃度を上げる)ように、前記流量調整弁131b,132bおよび前記ブロア131aを制御する(第3のステップS3)。すなわち、前記ブロア131aの動作と前記流量調整弁132bの開度とを一定に保つ一方、前記流量調整弁131bの開度のみが大きくなるように制御する。または、前記ブロア131aの動作と前記流量調整弁131bの開度とを一定に保つ一方、前記流量調整弁132bの開度のみが小さくなるように制御する。または、前記ブロア131aの動作を一定に保つ一方、前記流量調整弁131bの開度が大きく、前記流量調整弁132bの開度が小さくなるように制御する。
 他方、第2のステップS2にて、前記計測酸素濃度Xが前記所定値X1以上であると判定した場合には、ガス量を下げる(減らす)ように、前記流量調整弁131b,132bおよび前記ブロア131aを制御する(第4のステップS4)。すなわち、前記ブロア131aの動作を一定に保つ一方、前記流量調整弁131b,132bの開度を小さくなるように制御する。
 第5のステップS5にて、前記計測温度Tが前記第2の所定温度T2よりも高いと判定した場合には、酸素供給量を減らす(酸素濃度を下げる)ように、前記流量調整弁131b,132bおよび前記ブロア131aを制御する(第6のステップS6)。すなわち、前記ブロア131aの動作と前記流量調整弁132bの開度とを一定に保つ一方、前記流量調整弁131bの開度のみが小さくなるように制御する。または、前記ブロア131aの動作と前記流量調整弁131bの開度とを一定に保つ一方、前記流量調整弁132bの開度のみが大きくなるように制御する。または、前記ブロア131aの動作を一定に保つ一方、前記流量調整弁131bの開度が小さく、前記流量調整弁132bの開度が大きくなるように制御する。
 他方、第5のステップS5にて、前記計測温度Tが前記第2の所定温度T2以下であると判定した場合には、酸素供給量およびガス量を調整せずに、前記流量調整弁131b,132bの開度と前記ブロア131aの動作を一定に保つことになる。
 そして、制御装置160による前記流量調整弁131b,132bおよび前記ブロア131aの制御は、乾燥石炭1を加熱して連続的に乾留することによる改質が終了するまで継続される。
 したがって、本実施形態に係る改質装置100によれば、予熱器110と縦型の充填反応器120とを備え、予熱器110により300~400℃まで予熱された予熱石炭2が充填される縦型の充填反応器120内にて、予熱石炭2が供給された処理ガス13中の酸素と接触し発熱反応して昇温し、これに隣接する予熱石炭2に伝熱して昇温すると共に、生成したタールも燃焼して昇温することから、乾燥石炭1を間接加熱する場合と比べて、乾燥石炭1を短時間で昇温することができる。すなわち、乾燥石炭1を効率良く加熱することができる。これにより、装置自体を小型化できる。また、乾燥石炭1を予熱器110と縦型の充填反応器120で処理するだけであり、装置構成が簡易である。発熱すると共に発生するタールが燃焼して450~700℃まで昇温することから、前記予熱石炭2が乾留して改質した改質石炭4となる。すなわち、改質石炭4を効率良く得ることができる。
 縦型の充填反応器120で得られる改質石炭4の温度(縦型の充填反応器120から排出される直前の石炭の温度)と、縦型の充填反応器120から排出されるガス14中の酸素濃度とに基づき、縦型の充填反応器120に供給する処理ガス13の供給量および処理ガス13中の酸素濃度を調整するようにしたことにより、予熱石炭2と処理ガス13中の酸素との反応を効率良く行うことでき、改質石炭4の品質を向上させることができる。
 縦型の充填反応器120に供給する処理ガス13を加熱器134により加熱しておくことにより、予熱石炭2と処理ガス13中の酸素とが反応するときの熱エネルギの損失を防ぐことができ、改質石炭4を効率良く製造することができる。
 なお、内筒111は当該内筒111を回転駆動する駆動機構(図示せず)を備えており、内筒111の回転速度を例えば1rpm~3rpmとなるように調整することが好ましい。これは、1rpmより遅いと処理量自体が少なく、3rpmより速いと乾燥石炭1を効率良く加熱できず、生産効率の低下を招いてしまう可能性があるからである。
 内筒111での乾燥石炭1の充填率は、10%~30%であることが好ましい。これは、10%より少ないと処理量自体が少なく、30%より多いと乾燥石炭1を効率良く加熱できず、生産効率の低下を招いてしまう可能性があるからである。
 充填層3内への処理ガス13の供給量は、例えば、0.01(kg-O2/kg-前記予熱石炭2)以上0.2(kg-O2/kg-前記予熱石炭2)以下となるように調整されると好ましい。これは、前記処理ガス13の前記充填層3内への供給量が0.01(kg-O2/kg-前記予熱石炭2)よりも少ないと、充填層3内に十分に酸素を供給できない可能性があるからであり、前記処理ガス13の前記充填層3内への供給量が0.2(kg-O2/kg-前記予熱石炭2)よりも多いと、酸素が過多となり反応が進行しすぎてしまう可能性があるからである。さらには、充填層3内への処理ガス13の供給量は、0.03~0.1(kg-O2/kg-前記予熱石炭2)であるとより好ましい。
 処理ガス13の酸素濃度は、1~21%であることが好ましい。これは、処理ガス13の酸素濃度が1%より低いと、充填層3(予熱石炭2)を十分に昇温できない可能性を高めてしまうからであり、処理ガス13の酸素濃度が21%より高いと、酸素濃度を高くするための装置が必要となり、設備コストが上昇してしまうからである。
 供給ノズル136は、処理ガス13を供給する開口部を有し、予熱石炭2の流通を阻害しない形状であれば良く、縦断面にて逆V字形状であり下方側に開口部が設けられていることが好ましい。これは、予熱石炭2による閉塞を抑制できるからである。
 [第二の実施形態]
 本発明の第二の実施形態に係る改質装置について、図3に基づいて説明する。
 本実施形態は、図1に示し上述した第一の実施形態が備える充填反応器および処理ガス供給装置および排出装置および制御装置を変更し、ガス排出装置を追加した構成となっている。その他の構成は、図1に示し上述した装置と概ね同様であり、同一機器には同一符号を付記し重複する説明を適宜省略する。
 本実施形態に係る改質装置100Aは、図3に示すように、予熱器110と、縦型の充填反応器120Aと、処理ガス供給装置130Aと、排出装置140Aと、制御装置160Aと、ガス排出装置150とを備える。
 縦型の充填反応器120Aは、上述した縦型の充填反応器120が備える充填反応器本体121の代わりに、天井部121aに設けられた排気口123を有する充填反応器本体121Aを備える。充填反応器本体121Aの下方側には、上述した縦型の充填反応器120と同様、充填層3(改質石炭4)の温度を計測する温度計測手段である温度センサ161が設けられる。
 処理ガス供給装置130Aは、空気供給管131,不活性ガス供給管132,送給管133,加熱器134,ブロア131a,不活性ガス供給源132a,流量調整弁131b,132bを備えると共に、上述した処理ガス供給装置130が備える導入管135および供給ノズル136の代わりに、先端側が充填反応器本体121A内における下方側(定量排出機141近傍)に位置付けられ、先端側に複数(図示例では左右方向にて4つ)の供給ノズル(供給ヘッダ)136Aが設けられた導入管135Aを備える。すなわち、処理ガス供給装置130Aは、充填層3における下方側へ処理ガス13を供給可能になっている。
 排出装置140Aは、上述した排出装置140とは異なり、充填反応器本体121Aの下部に設けられた定量排出機141と、定量排出機141に基端側が接続する改質石炭排出ライン144とを備える。充填反応器本体121A内で処理されて改質した改質石炭4(固形状の改質物)は、定量排出機141により充填反応器本体121A内から定量で排出され、改質石炭排出ライン144を介して系外へ排出される。
 ガス排出装置150は、充填反応器本体121Aの排気口123に基端側が連結して設けられた排気管151を備える。排気管151にブロア151aが設けられる。これにより、充填反応器本体121A内のガス14は、排気管151を通じて系外へ排出される。
 排気管151には、排気管151内を流通するガス14中の酸素濃度を計測する酸素濃度計測手段である酸素センサ162Aが設けられる。前記センサ161,162Aは、制御手段である制御装置160Aの入力部とそれぞれ電気的に接続している。制御装置160Aの出力部は、前記流量調整弁131b,132b、前記ブロア131a,151aおよび前記定量排出機141とそれぞれ電気的に接続している。制御装置160Aは、センサ161,162Aなどから入力された情報に基づき、前記流量調整弁131b,132b、前記ブロア131a,151aおよび前記定量排出機141の作動を制御できるようになっている。
 なお、本実施形態においては、処理ガス供給装置130Aなどにより処理ガス供給手段を構成している。
 このような本実施形態に係る改質装置100Aの作動を次に説明する。なお、改質装置100Aの予熱器110により乾燥石炭1を予熱する作動は、上述の第一の実施形態の場合と同じであり、その説明を省略する。
 改質装置100Aの予熱器110で所定の温度(例えば、300℃~400℃)まで予熱されてなる予熱石炭2は、内筒111の回転に伴い、内筒111の排出口111aから排出されて縦型の充填反応器120Aの充填反応器本体121A内に充填される。充填反応器本体121A内にて予熱石炭2が充填してなる充填層3の内部における下方側には、供給ノズル136Aを介して処理ガス13が直接供給される。充填反応器本体121A内のガス14は、排気口123およびガス排出装置150によって充填反応器本体121A内の充填層3よりも上方から排出される。他方、充填反応器本体121A内の石炭(改質石炭4)は、定量排出機141により充填反応器本体121Aの下方から排出される。よって、予熱石炭2は、供給ノズル136Aから供給される処理ガス13と接触して当該処理ガス13中の酸素と反応し、発生するタールが燃焼しながら上方から下方へ移動していく。また、これに隣接する予熱石炭2に伝熱してこの予熱石炭2も昇温される。このような反応および燃焼は、充填層3の上方から下方に移動しているときに継続的に生じ、予熱石炭2は、450~700℃まで昇温される。これにより、予熱石炭2は、乾留して改質した改質石炭4となる。その結果、前記加熱ガス21による間接加熱だけの場合と比べて、前記乾燥石炭1の処理時間を短くできると共に、改質装置100A自体を小型化することができる。
 改質装置100Aの制御装置160Aは、改質装置100の制御装置160と同様、センサ161,162Aなどからの情報に基づき、流量調整弁131b,132bおよびブロア131a,151aおよび定量排出機141などを制御することにより、改質石炭4をさらに効率良く製造することができる。
 改質石炭4は、定量排出機141により充填反応器本体121Aの下方から改質石炭排出ライン144を通じて系外へ排出される。充填反応器本体121A内のガス14は、ブロア151aにより充填反応器本体121Aの排気口123および排気管151を介して系外へ排出される。
 したがって、本実施形態に係る改質装置100Aによれば、上述の第一の実施形態に係る改質装置100と同様な作用効果を奏することに加え、充填反応器本体121A内にて、当該充填反応器本体121A内のガス14と予熱石炭2(改質石炭4)とが対向して流通することから、充填反応器本体121A内にて予熱石炭2の昇温が開始される充填層3の上方側に対して、処理ガス13を常に供給することになり、予熱石炭2を処理ガス13中の酸素と効率良く反応させることができる。充填反応器本体121A内の充填層3よりも上方に設けられた排気口123を介して、充填反応器本体121A内のガス14を排出するようにしたことで、固気分離機が不要となり、その分装置コストを低減することができる。充填反応器本体121A内のガス14を定量排出機141と異なる箇所から排出することにより、タールに起因した、改質石炭4の排出経路を閉塞する可能性を抑制できる。
 [第三の実施形態]
 本発明の第三の実施形態に係る改質装置について、図4に基づいて説明する。
 本実施形態は、図1に示し上述した第一の実施形態が備える処理ガス供給装置および制御装置を変更した構成となっている。その他の構成は図1に示し上述した装置と概ね同様であり、同一機器には同一符号を付記し重複する説明を適宜省略する。
 本実施形態に係る改質装置100Bは、図4に示すように、予熱器110と、縦型の充填反応器120と、処理ガス供給装置130Bと、排出装置140と、制御装置160Bとを備える。
 処理ガス供給装置130Bは、上述した処理ガス供給装置130とは異なり、先端側が3つに分岐した空気供給管131Bと、先端側が3つに分岐した不活性ガス供給管132Bとを備える。空気供給管131Bおよび不活性ガス供給管132Bの先端は、送給管133Ba,133Bb,133Bcおよび加熱器134Ba,134Bb,134Bcを介して、導入管135Ba,135Bb,135Bcの基端と接続している。導入管135Ba,135Bb,135Bcは、先端側に設けられた複数(図示例では左右方向にて4つ)の供給ノズル(供給ヘッダ)136Ba,136Bb,136Bcを備える。供給ノズル136Baは、高さ方向で充填層3内の上方側に位置づけられる。供給ノズル136Bcは、高さ方向で充填層3内の下方側に位置づけられる。供給ノズル136Bbは、高さ方向で供給ノズル136Baと供給ノズル136Bcの間であって、充填層3内の中央に位置づけられる。なお、空気供給管131Bの基端側は、ブロア131aと接続している。不活性ガス供給管132Bの基端側は、不活性ガス供給源132aと接続している。空気供給管131Bおよび不活性ガス供給管132Bにおける分岐した箇所には流量調整弁131b,132bがそれぞれ設けられる。
 すなわち、処理ガス供給装置130Bは、高さ方向で、充填層3内の上方側,中央,下方側へ酸素濃度をそれぞれ調整した処理ガス13a,13b,13cを供給可能になっている。
 制御装置160Bは、温度センサ161および酸素センサ162などから入力された情報に基づき、各流量調整弁131b,132b、ブロア131a,145aおよび定量排出機141などの作動を制御できるようなっている。よって、制御装置160Bが各流量調整弁131b,132b、ブロア131a,145aおよび定量排出機141などを制御することで、処理ガス13a,13b,13cが供給ノズル136Ba,136Bb,136Bcへそれぞれ供給される。
 なお、本実施形態においては、処理ガス供給装置130Bなどにより処理ガス供給手段を構成している。制御装置160Bなどにより制御手段を構成している。
 このような本実施形態に係る改質装置100Bの作動を次に説明する。なお、改質装置100Bの予熱器110により乾燥石炭1を予熱する作動と、改質装置100Bの充填反応器120により予熱石炭2を昇温し乾留して改質する作動と、改質装置100Bの排出装置140により改質石炭4およびガス14を分離し排出する作動とは、上述の第一の実施形態の場合と同じであり、その説明を省略する。
 上述した改質装置100Bは、改質石炭4をさらに効率良く製造するために、制御装置160Bにより、センサ161,162などからの情報に基づき、流量調整弁131b,132bおよびブロア131a,145aおよび定量排出機141などを以下のように制御することが好ましい。
 制御装置160Bは、例えば、上段の供給ノズル136Baから供給される処理ガス13aの酸素濃度を中段および下段の供給ノズル136Bb,136Bcから供給される処理ガス13b,13cよりも高濃度に調整し、中段の供給ノズル136Bbから供給される処理ガス13bの酸素濃度を下段の供給ノズル136Bcから供給される処理ガス13cよりも高濃度に調整するように、各流量調整弁131b,132bおよびブロア131a,145aおよび定量排出機141を制御する。これにより、1段の供給ノズルのみで処理ガスを供給する場合と比べて充填層3内の層方向(上下方向)にて予熱石炭2の温度をより適切に調整することができ、得られる改質石炭4の品質を向上させることができる。
 したがって、本実施形態に係る改質装置100Bによれば、上述の第一の実施形態に係る改質装置100と同様な作用効果を奏することに加え、充填層3における層方向(上下方向)にて複数段に配置された供給ノズル136Ba,136Bb,136Bcを備え、制御装置160Bが各流量調整弁131b,132bなどを制御して、各段の供給ノズル136Ba,136Bb,136Bcから供給される処理ガス13a,13b,13cの酸素濃度を上段側から下段側に向けて低くなるように調整することにより、充填層3内の層方向(上下方向)にて石炭の温度分布をより適切に制御することができる。また、比熱や発熱量などの石炭物性や石炭粒径に応じて処理ガス13a,13b,13c中の酸素濃度を調整できる。これにより、改質石炭4の品質が向上し、処理時間の短縮や装置の小型化を行うことができる。また、先端側が分岐した空気供給管131Bおよび不活性ガス供給管132Bを設けると共に、分岐している箇所に流量調整弁131b,132bをそれぞれ設けたことにより、各供給ノズル136Ba,136Bb,136Bcに対応して処理ガスを供給する供給ラインを設ける場合と比べて装置コストを低減することができる。
 [第四の実施形態]
 本発明の第四の実施形態に係る改質装置について、図5および図6に基づいて説明する。
 本実施形態は、図4に示し上述した第三の実施形態が備える充填反応器および処理ガス供給装置および制御装置を変更し、ガス排出装置を追加した構成となっている。その他の構成は図4に示し上述した装置と概ね同様であり、同一機器には同一符号を付記し重複する説明を適宜省略する。
 本実施形態に係る改質装置100Cは、図5に示すように、予熱器110と、縦型の充填反応器120Aと、処理ガス供給装置130Cと、排出装置140Aと、制御装置160Cと、ガス排出装置150Cとを備える。
 縦型の充填反応器120Aは、上述した縦型の充填反応器120が備える充填反応器本体121の代わりに、上述した第二の実施形態と同様、天井部121aに設けられた排気口123を有する充填反応器本体121Aを備える。
 処理ガス供給装置130Cは、空気供給管131B,不活性ガス供給管132B,送給管133Ba,133Bb,133Bc,加熱器134Ba,134Bb,134Bc,ブロア131a,不活性ガス供給源132a,流量調整弁131b,132bを備えると共に、上述した処理ガス供給装置130Bが備える導入管135Ba,135Bb,135Bcおよび供給ノズル136Ba,136Bb,136Bcの代わりに、先端側がヘッダ137の供給ヘッダ(供給ノズル)136Ca,136Cb,136Ccと接続する導入管135Ca,135Cb,135Ccを備える。ヘッダ137は、充填層3内に配置される。ヘッダ137は、供給ヘッダ136Ca,136Cb,136Ccと、供給ヘッダ136Ca,136Cb,136Ccの下方側に設けられた排出ヘッダ(排出ノズル)152a,152b,152cとを備える。なお、導入管135Ca,135Cb,135Ccの基端側は、加熱器134Ba,134Bb,134Bcと接続している。
 排出装置140Aは、上述した排出装置140とは異なり、上述した第二の実施形態と同様、充填反応器本体121Aの下部に設けられた定量排出機141と、定量排出機141に基端側が接続する改質石炭排出ライン144とを備える。
 ガス排出装置150Cは、上述した第二の実施形態と同様、充填反応器本体121Aの排気口123に基端側が連結して設けられた排気管151を備える。ガス排出装置150Cは、ヘッダ137の排出ヘッダ152a,152b,152cおよび排気管151と接続する連結管153をさらに備える。なお、排気管151には、排気管151内を流通するガス14中の酸素濃度を計測する酸素濃度計測手段である酸素センサ162Aが設けられる。
 制御装置160Cは、温度センサ161および酸素センサ162Aなどから入力された情報に基づき、各流量調整弁131b,132b、ブロア131a,151aおよび定量排出機141などを制御できるようになっている。よって、制御装置160Cが各流量調整弁131b,132b、ブロア131a,151aおよび定量排出機141などを制御することで、処理ガス13a,13b,13cが供給ヘッダ136Ca,136Cb,136Ccへそれぞれ供給される。
 上述したヘッダ137は、例えば、図6に示すように、前側板137aおよび後側板137bと左側板137cおよび右側板137dとを備え、上方および下方が開放した箱型形状をなしている。ヘッダ137は、上段の供給ヘッダ136Caと、中段の供給ヘッダ136Cbと、下段の供給ヘッダ136Ccとを備える。供給ヘッダ136Cbは、供給ヘッダ136Caと上下方向で重ならないように配置される。供給ヘッダ136Ccは、供給ヘッダ136Cbと上下方向で重ならないように配置される。供給ヘッダ136Ca,136Cbの間と供給ヘッダ136Cb,136Ccの間と供給ヘッダ136Ccの下方には、ガス14を排出する排出ヘッダ152a,152b,152cがそれぞれ設けられる。排出ヘッダ152bは、排出ヘッダ152aと上下方向で重ならないように配置される。排出ヘッダ152cは、排出ヘッダ152bと上下方向で重ならないように配置される。すなわち、供給ヘッダ136Ca,136Cb,136Ccは、充填層3の層方向(上下方向)で隣接して配置される。排出ヘッダ152a,152b,152cは、連結管153を介して排気管151と連結される。これにより、上方から充填された予熱石炭2は、充填層3の下方側の石炭(改質石炭4)が充填反応器本体121の下方から定量排出機141により排出されることに伴い、前記供給ヘッダ136Ca,136Cb,136Ccおよび前記排出ヘッダ152a,152b,152cの間を円滑に流通しつつ、処理ガス13a,13b,13cと効率良く接触する一方、ガス14が効率良く排出される。
 なお、本実施形態においては、処理ガス供給装置130Cなどにより処理ガス供給手段を構成している。制御装置160Cなどにより制御手段を構成している。
 このような本実施形態に係る改質装置100Cの作動を次に説明する。なお、改質装置100Cの予熱器110により乾燥石炭1を予熱する作動と、改質装置100Cの排出装置140Aにより改質石炭4を排出する作動とは、上述の第二の実施形態の場合と同じであり、改質装置100Cの充填反応器120Aにより予熱石炭2を昇温し乾留して改質する作動は、上述の第三の実施形態の場合と同じであり、その説明を省略する。
 予熱石炭2を処理ガス13a,13b,13cで処理したときに生成したガス、処理ガス13a,13b,13cおよび前記不活性ガスなどの充填反応器本体121内のガス14は、ブロア151aにより排気口123および排出ヘッダ152a,152b,152cおよび連結管153および排気管152を介して系外へ排出される。
 したがって、本実施形態に係る改質装置100Cによれば、上述の第二および第三の実施形態に係る改質装置100A,100Bと同様な作用効果を奏することに加え、ヘッダ137と導入管135Ca,135Cb,135Ccと連結管153を設けることにより、高さ方向で充填層3内における石炭の温度分布をより適切に制御することができる。これにより、改質石炭4の品質が向上し、処理時間の短縮や装置の小型化を行うことができる。
 なお、供給ヘッダ136Ca,136Cb,136Ccおよび排出ヘッダ152a,152b,152cは、水平に延在し、供給ヘッダ136Ca,136Cb,136Ccと排出ヘッダ152a,152b,152cとは、平面視にて直交していることが好ましい。これにより、予熱石炭2が供給ヘッダ136Ca,136Cb,136Ccと排出ヘッダ152a,152b,152cとの間に詰まることによる閉塞を抑制することができる。予熱石炭2の下方への移動が円滑になり、予熱石炭2を処理ガス13a,13b,13cで適切に処理して、改質石炭4の品質を向上させることができる。
 各供給ヘッダ136Ca,136Cb,136Ccへ供給する処理ガス13a,13b,13cの供給流速は、20m/秒以下であることが好ましい。これにより、予熱石炭2に含まれる微粉が充填反応器本体121Aなどの壁面に衝突することによるエロージョンの発生を抑制することができる。
 供給ヘッダ136Ca,136Cb,136Ccと排出ヘッダ152a,152b,152cとは、排出ヘッダ152a,152b,152cの大きさ(D)に対する供給ヘッダ136Ca,136Cb,136Ccの大きさ(L)であるL/Dが0.1~1であることが好ましい。これにより、ガス14が排出ヘッダ152a,152b,152cおよび排気口123を介して排出されるときの流速を抑えることができ、予熱石炭2に含まれる微粉が充填反応器本体121Aなどの壁面に衝突することによるエロージョンの発生を抑制することができる。
 排出ヘッダ152a,152b,152cは、ガス14を排出する開口部を有し、予熱石炭2の流通を阻害しない形状であれば良く、縦断面にて逆V字形状であり下方側に開口部が設けられていることが好ましい。これは、予熱石炭2の排出を抑制できるからである。
 [第五の実施形態]
 本発明の第五の実施形態に係る改質装置について、図7に基づいて説明する。
 本実施形態は、図1に示し上述した第一の実施形態が備える処理ガス供給装置および制御装置を変更した構成となっている。その他の構成は図1に示し上述した装置と概ね同様であり、同一機器には同一符号を付記し重複する説明を適宜省略する。
 本実施形態に係る改質装置100Dは、図7に示すように、予熱器110と、縦型の充填反応器120と、処理ガス供給装置130Dと、排出装置140と、制御装置160Dとを備える。
 処理ガス供給装置130Dは、空気供給管131,不活性ガス供給管132,送給管133,加熱器134,ブロア131a,不活性ガス供給源132a,流量調整弁131b,132bを備えると共に、上述した処理ガス供給装置130が備える導入管135および供給ノズル136の代わりに、先端側が充填反応器本体121内における上方側(天井部121a近傍)に位置付けられ、先端側に複数(図示例では左右方向にて4つ)の供給ノズル(供給ヘッダ)136Dが設けられた導入管135Dを備える。すなわち、処理ガス供給装置130Dは、充填層3の上方側へ処理ガス13を供給可能になっている。これにより、充填層3の上方(上面3a近傍)にあっては、処理ガス13が分散して酸素濃度が均一になる。
 制御装置160Dは、温度センサ161および酸素センサ162などから入力された情報に基づき、流量調整弁131b,132b、ブロア131a,145aおよび定量排出機141などを制御できるようなっている。よって、制御装置160Dが流量調整弁131b,132b、ブロア131a,145aおよび定量排出機141などを制御することで、処理ガス13が供給ノズル136Dへ供給される。
 なお、本実施形態においては、処理ガス供給装置130Dなどにより処理ガス供給手段を構成している。制御装置160Dなどにより制御手段を構成している。
 このような本実施形態に係る改質装置100Dの作動を次に説明する。なお、改質装置100Dの予熱器110により乾燥石炭1を予熱する作動と、改質装置100Dの充填反応器120により予熱石炭2を昇温し乾留して改質する作動と、改質装置100Dの排出装置140により改質石炭4およびガス14を分離し排出する作動とは、上述の第一の実施形態の場合と同じであり、その説明を省略する。
 したがって、本実施形態に係る改質装置100Dによれば、上述の第一の実施形態に係る改質装置100と同様な作用効果を奏することに加え、充填反応器本体121の上方に設けられた供給ノズル136Dから供給された処理ガス13が充填層3の上面3aに到達するまでに、均一に拡散することから、水平方向にて処理ガス13の酸素濃度の濃淡の分布がなくなり、処理ガス13が充填層3の水平方向で均一に接触することから、予熱石炭2を処理ガス13で処理して生成する改質石炭4の品質が向上する。処理時間の短縮や装置の小型化を行うことができる。
 [第六の実施形態]
 本発明の第六の実施形態に係る改質装置について、図8に基づいて説明する。
 本実施形態は、図7に示し上述した第五の実施形態が備える処理ガス供給装置および制御装置を変更した構成となっている。その他の構成は図7に示し上述した装置と概ね同様であり、同一機器には同一符号を付記し重複する説明を適宜省略する。
 本実施形態に係る改質装置100Eは、図8に示すように、予熱器110と、縦型の充填反応器120と、処理ガス供給装置130Eと、排出装置140と、制御装置160Eとを備える。
 処理ガス供給装置130Eは、空気供給管131,不活性ガス供給管132,ブロア131a,不活性ガス供給源132a,流量調整弁131b,132bを備えると共に、上述した処理ガス供給装置130Dが備える送給管133および加熱器134および導入管135Dおよび供給ノズル136Dの代わりに、先端側が供給フィーダ113の基端側に接続される送給管133Eを備える。これにより、処理ガス13は予熱器110により乾燥石炭1と共に300~400℃まで加熱され、加熱された処理ガス13が充填反応器120の充填反応器本体121内に供給されることになる。
 制御装置160Eは、温度センサ161および酸素センサ162などから入力された情報に基づき、流量調整弁131b,132b、ブロア131a,145aおよび定量排出機141などを制御できるようなっている。よって、制御装置160Eが流量調整弁131b,132b、ブロア131a,145aおよび定量排出機141などを制御することで、処理ガス13が供給フィーダ113および内筒111を介して充填反応器本体121内へ供給される。
 なお、本実施形態においては、処理ガス供給装置130Eなどにより処理ガス供給手段を構成している。制御装置160Eなどにより制御手段を構成している。
 このような本実施形態に係る改質装置100Eの作動を次に説明する。なお、改質装置100Eの予熱器110により乾燥石炭1を予熱する作動と、改質装置100Eの充填反応器120により予熱石炭2を昇温し乾留して改質する作動と、改質装置100Eの排出装置140により改質石炭4およびガス14を分離し排出する作動は、上述の第五の実施形態の場合と概ね同じであり、その説明を省略する。
 したがって、本実施形態に係る改質装置100Eによれば、上述の第五の実施形態に係る改質装置100Dと同様な作用効果を奏することに加え、処理ガス供給装置130Eを予熱器110の供給フィーダ113に設けることにより、供給フィーダ113に供給された処理ガス13が充填層3の上面3aに到達するまでに、均一に拡散すると共に加熱されることから、水平方向にて処理ガス13の酸素濃度の濃淡の分布がなくなり、処理ガス13が充填層3の水平方向で均一に接触することから、予熱石炭2を処理ガス13で処理して生成する改質石炭4の品質が向上する。処理時間の短縮や装置の小型化を行うことができる。
 [第七の実施形態]
 本発明の第七の実施形態に係る改質装置について、図9および図10に基づいて説明する。
 本実施形態は、図4に示し上述した第三の実施形態が備える充填反応器および処理ガス供給装置および排出装置および制御装置を変更し、ガス排出装置を追加した構成となっている。その他の構成は図4に示し上述した装置と概ね同様であり、同一機器には同一符号を付記し重複する説明を適宜省略する。
 本実施形態に係る改質装置100Fは、図9に示すように、予熱器110と、縦型の充填反応器120Aと、処理ガス供給装置130Fと、排出装置140Aと、制御装置160Fと、ガス排出装置150Fとを備える。
 縦型の充填反応器120Aは、上述した縦型の充填反応器120が備える充填反応器本体121の代わりに、上述した第二の実施形態と同様、天井部121aに設けられた排気口123を有する充填反応器本体121Aを備える。
 処理ガス供給装置130Fは、空気供給管131B,不活性ガス供給管132B,送給管133Ba,133Bb,133Bc,加熱器134Ba,134Bb,134Bc,ブロア131a,不活性ガス供給源132a,流量調整弁131b,132bを備えると共に、上述した処理ガス供給装置130Bが備える導入管135Ba,135Bb,135Bcおよび供給ノズル136Ba,136Bb,136Bcの代わりに、先端側に複数(図示例では左右方向にて4つ)の供給ノズル(供給ヘッダ)136Fa,136Fb,136Fcが設けられた導入管135Fa,135Fb,135Fcを備える。供給ノズル136Faは、高さ方向で充填層3内の上方側に位置づけられる。供給ノズル136Fcは、高さ方向で充填層3内の下方側に位置づけられる。供給ノズル136Fbは、高さ方向で供給ノズル136Faと供給ノズル136Fcの間であって、充填層3内の中央に位置づけられる。なお、導入管135Fa,135Fb,135Fcの基端側は、加熱器134Ba,134Bb,134Bcと接続している。
 排出装置140Aは、上述した排出装置140とは異なり、上述した第二の実施形態と同様、充填反応器本体121Aの下部に設けられた定量排出機141と、定量排出機141に基端側が接続する改質石炭排出ライン144とを備える。
 ガス排出装置150Fは、上述した第二の実施形態と同様、充填反応器本体121Aの排気口123に基端側が連結して設けられた排気管151を備える。ガス排出装置150Fは、供給ノズル136Fa,136Fb,136Fcの下方側に隣接して設けられた排出ノズル(排出ヘッダ)152Fa,152Fb,152Fcを備える。ガス排出装置150Fは、排出ノズル152Fa,152Fb,152Fcおよび排気管151と接続する連結管153Fをさらに備える。なお、排気管151には、排気管151内を流通するガス14中の酸素濃度を計測する酸素濃度計測手段である酸素センサ162Aが設けられる。
 制御装置160Fは、温度センサ161および酸素センサ162Aなどから入力された情報に基づき、各流量調整弁131b,132b、ブロア131a,151aおよび定量排出機141などを制御できるようになっている。よって、制御装置160Fが各流量調整弁131b,132b、ブロア131a,151aおよび定量排出機141などを制御することで、処理ガス13a,13b,13cが供給ノズル136Fa,136Fb,136Fcへそれぞれ供給される。
 上述した供給ノズル136Fa,136Fb,136Fcおよび排出ノズル152Fa,152Fb,152Fcは、充填層3内にて、ガスの流通を抑制するシール層と、処理ガス13a,13b,13cと反応する反応層とをなすように配置される。図10に示すように、上段の供給ノズル136Faは、当該供給ノズル136Faと充填層3の上面3aの最下部との間でシール層3baをなすように配置される。上段の排出ノズル152Faは、上段の供給ノズル136Faから充填層3内に供給される処理ガス13aを排出でき、当該処理ガス13aの挙動範囲で反応層3bbをなすように上段の供給ノズル136Faの下方側に配置される。
 中段の供給ノズル136Fbは、当該供給ノズル136Fbと上方の反応層3bbとの間でシール層3baをなすように配置される。中段の排出ノズル152Fbは、中段の供給ノズル136Fbから充填層3内に供給される処理ガス13bを排出でき、当該処理ガス13bの挙動範囲で反応層3bbをなすように中段の供給ノズル136Fbの下方側に配置される。
 下段の供給ノズル136Fcは、当該供給ノズル136Fcと上方の反応層3bbとの間でシール層3baをなすように配置される。下段の排出ノズル152Fcは、下段の供給ノズル136Fcから充填層3内に供給される処理ガス13cを排出でき、当該処理ガス13cの挙動範囲で反応層3bbをなすように下段の供給ノズル136Fcの下方側に配置される。
 上述したように供給ノズル136Fa,136Fb,136Fcおよび排出ノズル152Fa,152Fb,152Fcを配置することにより、予熱石炭2が下方へ円滑に移動し、予熱石炭2を処理ガス13a,13b,13cで適切に処理することができ、改質石炭4の品質が向上する。
 なお、本実施形態においては、処理ガス供給装置130Fなどにより処理ガス供給手段を構成している。制御装置160Fなどにより制御手段を構成している。
 このような本実施形態に係る改質装置100Fの作動を次に説明する。なお、改質装置100Fの予熱器110により乾燥石炭1を予熱する作動と、改質装置100Fの排出装置140Aにより改質石炭4を排出する作動とは、上述の第二の実施形態の場合と同じであり、改質装置100Fの充填反応器120Aにより予熱石炭2を昇温し乾留して改質する作動は、上述の第三の実施形態の場合と同じであり、その説明を省略する。
 改質装置100Fの予熱器110で所定の温度(例えば、300℃~400℃)まで予熱されてなる予熱石炭2は、内筒111の回転に伴い、内筒111の排出口111aから排出されて縦型の充填反応器120Aの充填反応器本体121A内に充填される。充填反応器本体121A内にて予熱石炭2が充填してなる充填層3の内部には、上方側および中央および下方側にて、供給ノズル136Fa,136Fb,136Fcを介して処理ガス13a,13b,13cがそれぞれ直接供給される。処理ガス13a,13b,13cが予熱石炭2と反応し生成するガス、処理ガス13a,13b,13cおよび前記不活性ガスなどのガス14は、ブロア151aにより、供給ノズル136Fa,136Fb,136Fcと組みをなす排出ノズル152Fa,152Fb,152Fcおよび連結管153Fおよび排気口123および排気管151を介して系外へ排出される。
 したがって、本実施形態に係る改質装置100Fによれば、上述の第二および第三の実施形態に係る改質装置100A,100Bと同様な作用効果を奏することに加え、組をなす供給ノズル136Fa,136Fb,136Fcおよび排出ノズル152Fa,152Fb,152Fcと導入管135Fa,135Fb,135Fcと連結管153Fとを備えることにより、充填層3内の高さ方向にて、処理ガス13a,13b,13cと予熱石炭2とが反応する反応層3bbと処理ガス13a,13b,13cの流れを制御するシール層3baとを交互に複数設けることができ、高さ方向で充填層3内における石炭の温度分布をより適切に制御することができる。これにより、改質石炭4の品質が向上し、処理時間の短縮や装置の小型化を行うことができる。
 上述したように、供給ノズル136Faと排出ノズル152Fa、供給ノズル136Fbと排出ノズル152Fb、供給ノズル136Fcと排出ノズル152Fcとをそれぞれ上下方向で隣接し、組をなして配置したことにより、充填層3内にて処理ガス13a,13b,13cの通過距離が短く、圧力損失が小さくなり、処理ガス13a,13b,13cを供給ノズル136Fa,136Fb,136Fcへ供給するブロア131aの駆動力を低減できる。
 なお、反応層3bbの高さH2および充填層3内における反応層3bbの数は、供給ノズル136Fa,136Fb,136Fc内へ供給する処理ガス13a,13b,13cの流速が20m/秒以下であることが好ましい。これは、処理ガス13a,13b,13cの流れに起因し予熱石炭2に含まれる微粉が充填反応器本体121Aなどの壁面に衝突することによるエロージョンの発生を抑制できるからである。
 シール層3baの高さH1は、反応層3bbの高さH2の1倍~10倍であることが好ましく、反応層3bbの高さH2の2倍~5倍であることがより好ましい。これは、シール層3baへ流れる処理ガス13a,13b,13cの割合を1/6~1/3に抑制し、処理ガス13a,13b,13cの使用量に起因する製造コスト増を抑制できるからである。
 [第八の実施形態]
 本発明の第八の実施形態に係る改質装置について、図11および図12に基づいて説明する。
 本実施形態は、図9に示し上述した第七の実施形態が備える処理ガス供給装置および制御装置およびガス排出装置を変更した構成となっている。その他の構成は図9に示し上述した装置と概ね同様であり、同一機器には同一符号を付記し重複する説明を適宜省略する。
 本実施形態に係る改質装置100Gは、図11に示すように、予熱器110と、縦型の充填反応器120Aと、処理ガス供給装置130Gと、排出装置140Aと、制御装置160Gと、ガス排出装置150Gとを備える。
 処理ガス供給装置130Gは、上述した処理ガス供給装置130Fと異なり、先端側が2つに分岐した空気供給管131Gと、先端側が2つに分岐した不活性ガス供給管132Gとを備える。空気供給管131Gおよび不活性ガス供給管132Gの先端は、送給管133Ga,133Gbおよび加熱器134Ga,134Gbを介して、導入管135Ga,135Gbの基端と接続している。導入管135Ga,135Gbは、先端側に設けられた複数(図示例では左右方向にて4つ)の供給ノズル(供給ヘッダ)136Ga,136Gbを備える。供給ノズル136Gaは、高さ方向で充填層3内の上方側に位置づけられる。供給ノズル136Gbは、高さ方向で充填層3の中央であり、供給ノズル136Gaの下方側に位置づけられる。処理ガス供給装置130Gは、高さ方向で充填層3の下方側に位置づけられる供給ノズル(供給ヘッダ)136Gcを備える。供給ノズル136Gcは、連絡管139の先端側に設けられる。連絡管139は、基端側にて、上段の供給ノズル136Gaの下方で隣接して設けられた排出ノズル(排出ヘッダ)138を備える。なお、空気供給管131Gの基端側は、ブロア131aと接続している。不活性ガス供給管132Gの基端側は、不活性ガス供給源132aと接続している。空気供給管131Gおよび不活性ガス供給管132Gにおける分岐した箇所には流量調整弁131b,132bがそれぞれ設けられる。
 すなわち、処理ガス供給装置130Gは、高さ方向で、充填層3内の上方側および中央へ酸素濃度をそれぞれ調整した処理ガス13a,13bを供給可能になっていると共に、処理ガス13aが予熱石炭2と反応した後のガス(下段用処理ガス)14aを排出ノズル138および連絡管139および供給ノズル136Gcを介して充填層3の下方側へ供給可能になっている。
 制御装置160Gは、温度センサ161および酸素センサ162Aなどから入力された情報に基づき、各流量調整弁131b,132b、ブロア131a,151aおよび定量排出機141などを制御できるようなっている。よって、制御装置160Gが各流量調整弁131b,132b、ブロア131a,151aおよび定量排出機141などを制御することで、処理ガス13a,13b,14aが供給ノズル136Ga,136Gb,136Gcへそれぞれ供給される。
 なお、本実施形態においては、処理ガス供給装置130Gなどにより処理ガス供給手段を構成している。制御装置160Gなどにより制御手段を構成している。
 このような本実施形態に係る改質装置100Gの作動を次に説明する。なお、改質装置100Gの予熱器110により乾燥石炭1を予熱する作動と、改質装置100Gの排出装置140Aにより改質石炭4を排出する作動と、改質装置100Gの充填反応器120Aにより予熱石炭2を昇温し乾留して改質する作動は、上述の第七の実施形態の場合と同じであり、その説明を省略する。
 改質装置100Gの予熱器110で所定の温度(例えば、300℃~400℃)まで予熱されてなる予熱石炭2は、内筒111の回転に伴い、内筒111の排出口111aから排出されて縦型の充填反応器120Aの充填反応器本体121A内に充填される。充填反応器本体121A内にて予熱石炭2が充填してなる充填層3の内部には、上方側および中央にて、供給ノズル136Ga,136Gbを介して処理ガス13a,13bがそれぞれ直接供給される。処理ガス13aが予熱石炭2と反応し生成するガス、処理ガス13aおよび前記不活性ガスなどのガス(下段用処理ガス)14aは、排出ノズル138および連絡管139および供給ノズル136Gcを介して充填層3内部の下方側へ供給される。処理ガス13b,14aが予熱石炭2と反応し生成するガス、処理ガス13b,14aおよび前記不活性ガスなどのガス14は、ブロア151aにより、供給ノズル136Gb,136Gcと組みをなす排出ノズル152Fb,152Fcおよび連結管153Gおよび排気管151などを介して系外へ排出される。
 したがって、本実施形態に係る改質装置100Gによれば、上述の第七の実施形態に係る改質装置100Fと同様な作用効果を奏することに加え、上段の供給ノズル136Gaと組みをなす排出ノズル138と下段の供給ノズル136Gcとを連絡管139で接続したことにより、ガス14aを有効活用することができ、装置の簡易化を図ることができる。また、図12に示すように、高温となった石炭が低酸素濃度の処理ガスと低速で反応が進むことから、安全性を高めることができる。
 [第九の実施形態]
 本発明の第九の実施形態に係る改質装置について、図13および図14に基づいて説明する。
 本実施形態は、図1に示し上述した第一の実施形態が備える処理ガス供給装置および制御装置およびガス排出装置を変更した構成となっている。その他の構成は図1に示し上述した装置と概ね同様であり、同一機器には同一符号を付記し重複する説明を適宜省略する。
 本実施形態に係る改質装置100Hは、図13に示すように、予熱器110と、縦型の充填反応器120Aと、処理ガス供給装置130Hと、排出装置140Aと、制御装置160Hと、ガス排出装置150Hとを備える。
 充填反応器120Aは、上述した縦型の充填反応器120が備える充填反応器本体121の代わりに、上述した第二の実施形態と同様、天井部121aに設けられた排気口123を有する充填反応器本体121Aを備える。
 処理ガス供給装置130Hは、空気供給管131,不活性ガス供給管132,送給管133,加熱器134,ブロア131a,不活性ガス供給源132a,流量調整弁131b,132bを備えると共に、上述した処理ガス供給装置130が備える導入管135および供給ノズル136の代わりに、供給ヘッダ(供給ノズル)136Hおよび導入管135Hを備える。供給ヘッダ136Hは、充填反応器本体121A内にて上下方向に延在する。供給ヘッダ136Hは、図13および図14に示すように、先端が閉塞された円管であり、高さ方向にて、充填層3内における上方側および中央および下方側に設けられた複数の穴136Haを有する。これにより、充填層3内における上方側および中央および下方側のそれぞれに処理ガス13を供給することができる。なお、導入管135Hの基端側は、加熱器134と接続している。
 排出装置140Aは、上述した排出装置140とは異なり、上述した第二の実施形態と同様、充填反応器本体121Aの下部に設けられた定量排出機141と、定量排出機141に基端側が接続する改質石炭排出ライン144とを備える。
 ガス排出装置150Hは、上述した第二の実施形態と同様、充填反応器本体121Aの排気口123に基端側が連結して設けられた排気管151と、排気管151に設けられたブロア151aとを備える。ガス排出装置150Hは、充填反応器本体121A内に設けられた排出ヘッダ(排出ノズル)152Hと、排出ヘッダ152Hおよび排気管151に接続する連結管153Hとを備える。排出ヘッダ152Hは、図13および図14に示すように、先端が閉塞された円管であり、高さ方向にて、充填層3内における上方側および中央および下方側に設けられた複数の穴152Haを有する。すなわち、排出ヘッダ152Hは、供給ヘッダ136Hの穴136Haとほぼ同じ高さに位置づけられる穴152Haを有する。これにより、第七の実施形態と同様、充填層3の高さ方向にて、シール層と反応層とを交互に複数なすことができる。
 制御装置160Hは、温度センサ161および酸素センサ162Aなどから入力された情報に基づき、流量調整弁131b,132b、ブロア131a,151aおよび定量排出機141などを制御できるようになっている。よって、制御装置160Hが流量調整弁131b,132b、ブロア131a,151aおよび定量排出機141などを制御することで、処理ガス13が供給ヘッダ136Hへ供給される。
 なお、本実施形態においては、処理ガス供給装置130Hなどにより処理ガス供給手段を構成している。制御装置160Hなどにより制御手段を構成している。
 このような本実施形態に係る改質装置100Hの作動を次に説明する。なお、改質装置100Hの予熱器110により乾燥石炭1を予熱する作動と、改質装置100Hの排出装置140Aにより改質石炭4を排出する作動は、上述の第二の実施形態の場合と概ね同じであり、その説明を省略する。
 改質装置100Hの予熱器110で所定の温度(例えば、300℃~400℃)まで予熱されてなる予熱石炭2は、内筒111の回転に伴い、内筒111の排出口111aから排出されて縦型の充填反応器120Aの充填反応器本体121A内に充填される。充填反応器本体121A内にて予熱石炭2が充填してなる充填層3の内部には、上方側および中央および下方側にて、供給ヘッダ136Hの穴(開口部)136Haを介して処理ガス13がそれぞれ直接供給される。処理ガス13が予熱石炭2と反応し生成するガス、処理ガス13および前記不活性ガスなどのガス14は、ブロア151aにより、排出ヘッダ152Hの穴(開口部)152Haおよび連結管153Hおよび排気口123および排気管151を介して系外へ排出される。
 したがって、本実施形態に係る改質装置100Hによれば、上述の第一の実施形態に係る改質装置100と同様な作用効果を奏することに加え、供給ヘッダ136Hおよび排出ヘッダ152Hが充填層3内にて上下方向に延在していることから、予熱石炭2の反応および移動が円滑になり、改質石炭4の品質が向上し、処理時間の短縮や装置の小型化を行うことができる。
 供給ヘッダ136Hおよび排出ヘッダ152Hは、ほぼ同じ高さとなる箇所に設けられた複数の穴136Ha,152Haを有することにより、充填層3の高さ方向にて、処理ガス13と予熱石炭2とが反応する反応層を形成することができると共に、穴136Ha,152Haから離れた箇所にシール層を形成することできる。これにより、予熱石炭2が下方へ円滑に移動することができると共に、予熱石炭2と処理ガス13とが効率良く接触することができ、改質石炭4の品質を向上させることができる。
 [他の実施形態]
 なお、上記では、空気11と不活性ガス12とを混合してなる処理ガス13を用いて予熱石炭2を処理する場合について説明したが、空気と燃焼排ガス(例えば、酸素含有量1~3%)とを混合してなる処理ガスを用いることも可能である。このような場合であっても、上述の実施形態と同様な作用効果を奏する。
 上記では、乾燥された低品位石炭(乾燥石炭)1を予熱し処理ガス13との接触により反応させて昇温(加熱)することで乾留して改質する場合について説明したが、固形状の有機物を加熱し乾留して改質する場合であれば、上述の実施形態を適用することも可能である。このような場合であっても、上述の実施形態と同様な作用効果を奏する。
 本発明に係る改質装置は、簡易な構成でありながらも、有機物を効率良く加熱できるので、発電産業などにおいて、極めて有益に利用することができる。
1 乾燥石炭、2 予熱石炭、3 充填層、4 改質石炭(乾留石炭)、11 空気、12 不活性ガス(窒素ガス)、13,13a,13b,13c 処理ガス(酸素含有ガス)、14 ガス、100,100A~H 改質装置、110 予熱器、120,120A 縦型の充填反応器、121,121A 充填反応器本体(処理塔)、130,130A~H 処理ガス供給装置、140,140A 排出装置、141 定量排出機、142 送給ライン、143 固気分離機、144 改質石炭排出ライン、145 ガス排出ライン、150,150C,150F,150G,150H ガス排出装置、160,160A~H 制御装置、161 温度センサ、162,162A 酸素センサ

Claims (19)

  1.  固形状の有機物を300~400℃まで予熱する予熱手段と、
     前記予熱手段で予熱された前記有機物が内部に充填される縦型の充填反応器本体と、
     前記充填反応器本体内に、酸素を含有する処理ガスを供給する処理ガス供給手段と、
     前記充填反応器本体の下部に設けられ、当該充填反応器本体内にて前記有機物が前記処理ガスと反応し450~700℃まで昇温し乾留されることにより改質された固形状の改質物を排出する排出手段と、
     前記充填反応器本体内のガスを排出するガス排出手段と、
    を備える
    ことを特徴とする改質装置。
  2.  請求項1に記載された改質装置であって、
     前記処理ガス供給手段は、前記有機物の充填層よりも上方へ前記処理ガスを供給するように前記充填反応器本体に設けられる
    ことを特徴とする改質装置。
  3.  請求項1に記載された改質装置であって、
     前記処理ガス供給手段は、前記予熱手段に設けられる
    ことを特徴とする改質装置。
  4.  請求項1に記載された改質装置であって、
     前記処理ガス供給手段は、前記有機物の充填層内に前記処理ガスを供給する供給ノズルを有する
    ことを特徴とする改質装置。
  5.  請求項4に記載された改質装置であって、
     前記供給ノズルは、前記充填反応器本体の下方側に配置され、
     前記ガス排出手段は、前記充填反応器本体の上部に接続して設けられる
    ことを特徴とする改質装置。
  6.  請求項4に記載された改質装置であって、
     前記供給ノズルは複数あり、
     前記複数の供給ノズルは、上下方向で隣接して配置される
    ことを特徴とする改質装置。
  7.  請求項6に記載された改質装置であって、
     前記ガス排出手段は、前記充填反応器本体内のガスを排出する排出ノズルを複数有し、
     前記複数の排出ノズルは、前記複数の供給ノズルと組みをなすと共に、組をなす前記複数の供給ノズルの下方側に配置される
    ことを特徴とする改質装置。
  8.  請求項7に記載された改質装置であって、
     組みをなす前記供給ノズルと前記排出ノズルとの距離は、上下方向で隣接する前記複数の供給ノズルの距離に対して1倍~10倍である
    ことを特徴とする改質装置。
  9.  請求項7または請求項8に記載された改質装置であって、
     前記複数の排出ノズルの大きさ(D)に対する前記複数の供給ノズルの大きさ(L)であるL/Dが0.1~1である
    ことを特徴とする改質装置。
  10.  請求項7から請求項9の何れか一項に記載された改質装置であって、
     前記複数の供給ノズルおよび前記複数の排出ノズルは、水平に延在し、
     前記複数の供給ノズルと前記複数の排出ノズルは、平面視で直交している
    ことを特徴とする改質装置。
  11.  請求項7から請求項9の何れか一項に記載された改質装置であって、
     前記複数の供給ノズルは、上下方向で少なくとも3つ配置され、
     上段の前記供給ノズルと組みをなす前記排出ノズルは、下段の前記供給ノズルと連絡している
    ことを特徴とする改質装置。
  12.  請求項7から請求項11の何れか一項に記載された改質装置であって、
     前記複数の供給ノズルと前記複数の排出ノズルとを備えるヘッダを有する
    ことを特徴とする改質装置。
  13.  請求項1に記載された改質装置であって、
     前記処理ガス供給手段は、前記有機物の充填層内に前記処理ガスを供給する供給ヘッダを有し、
     前記ガス排出手段は、前記充填反応器本体内のガスを排出するガス排出ヘッダを有し、
     前記供給ヘッダおよび前記ガス排出ヘッダは、前記充填反応器本体内にて上下方向に延在し、
     前記供給ヘッダおよび前記排出ヘッダは、上下方向で同じ高さに設けられた穴を有する
    ことを特徴とする改質装置。
  14.  請求項1から請求項13の何れか一項に記載された改質装置であって、
     前記処理ガスの酸素含有量を調整する酸素含有量調整手段と、
     前記処理ガス供給手段により供給される前記処理ガスの供給量を調整する処理ガス供給量調整手段と、
     前記充填反応器本体内の前記固形状の改質物の温度を計測する温度計測手段と、
     前記ガス排出手段により排出される前記ガスの酸素濃度を計測する酸素濃度計測手段と、
     前記温度計測手段および前記酸素濃度計測手段で得られた計測結果に基づき、前記酸素含有量調整手段および前記処理ガス供給量調整手段を制御する制御手段と、
    をさらに備える
    ことを特徴とする改質装置。
  15.  請求項14に記載された改質装置であって、
     前記制御手段は、前記温度計測手段で計測された計測温度が第1の所定温度より低く、かつ、前記酸素濃度計測手段で計測された計測酸素濃度が所定値より低い場合、前記処理ガス中の酸素濃度を増やすように前記酸素濃度調整手段を制御する
    ことを特徴とする改質装置。
  16.  請求項14に記載された改質装置であって、
     前記制御手段は、前記温度計測手段で計測された計測温度が第1の所定温度より低く、かつ、前記酸素濃度計測手段で計測された計測酸素濃度が所定値以上である場合、前記処理ガスの供給量を減らすように前記処理ガス供給量調整手段を制御する
    ことを特徴とする改質装置。
  17.  請求項14に記載された改質装置であって、
     前記制御手段は、前記温度計測手段で計測された計測温度が第1の所定温度より高温である第2の所定温度よりも高い場合、前記処理ガス中の酸素濃度を減らすように前記酸素濃度調整手段を制御する
    ことを特徴とする改質装置。
  18.  請求項1から請求項17の何れか一項に記載された改質装置であって、
     前記予熱手段は、外熱式キルンであることを特徴とする改質装置。
  19.  請求項1から請求項18の何れか一項に記載された改質装置であって、
     前記有機物は、低品位石炭であることを特徴とする改質装置。
PCT/JP2015/082061 2015-02-26 2015-11-16 改質装置 WO2016136045A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015036184A JP2016155972A (ja) 2015-02-26 2015-02-26 改質装置
JP2015-036184 2015-02-26

Publications (1)

Publication Number Publication Date
WO2016136045A1 true WO2016136045A1 (ja) 2016-09-01

Family

ID=56788131

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/082061 WO2016136045A1 (ja) 2015-02-26 2015-11-16 改質装置

Country Status (2)

Country Link
JP (1) JP2016155972A (ja)
WO (1) WO2016136045A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109652131A (zh) * 2018-11-30 2019-04-19 浙江天禄环境科技有限公司 一种低阶煤气化还原制备合成气的方法和系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB716667A (en) * 1951-06-05 1954-10-13 Tech Ind Soc D Apparatus for effecting oxidation of coal
JPS60248791A (ja) * 1984-05-23 1985-12-09 Hitachi Ltd 移動層式乾留装置
JPS6164788A (ja) * 1984-09-07 1986-04-03 Hitachi Ltd 低品位炭の高品質化方法
JPS61103986A (ja) * 1984-10-26 1986-05-22 Nippon Steel Corp 高炉用コ−クスの連続製造方法および設備
JPH07300589A (ja) * 1994-03-07 1995-11-14 Nkk Corp 連続式竪型コークス炉及びコークスの製造方法
JP2013139536A (ja) * 2012-01-06 2013-07-18 Mitsubishi Heavy Ind Ltd 石炭不活性化処理装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB716667A (en) * 1951-06-05 1954-10-13 Tech Ind Soc D Apparatus for effecting oxidation of coal
JPS60248791A (ja) * 1984-05-23 1985-12-09 Hitachi Ltd 移動層式乾留装置
JPS6164788A (ja) * 1984-09-07 1986-04-03 Hitachi Ltd 低品位炭の高品質化方法
JPS61103986A (ja) * 1984-10-26 1986-05-22 Nippon Steel Corp 高炉用コ−クスの連続製造方法および設備
JPH07300589A (ja) * 1994-03-07 1995-11-14 Nkk Corp 連続式竪型コークス炉及びコークスの製造方法
JP2013139536A (ja) * 2012-01-06 2013-07-18 Mitsubishi Heavy Ind Ltd 石炭不活性化処理装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109652131A (zh) * 2018-11-30 2019-04-19 浙江天禄环境科技有限公司 一种低阶煤气化还原制备合成气的方法和系统

Also Published As

Publication number Publication date
JP2016155972A (ja) 2016-09-01

Similar Documents

Publication Publication Date Title
JP4713036B2 (ja) 有機物質又は有機物質混合物の熱分解ガス化方法及び装置
JPH01144493A (ja) 固体炭素質材料をガス化もしくは燃焼させる方法及び装置
JPS6233284B2 (ja)
JP5010686B2 (ja) 流動層反応器の温度を制御する方法および装置
US10538433B2 (en) Activated carbon production at biomass-fueled steam/electric power plants
BRPI0618018A2 (pt) processo e sistema para a preparação de um material carbonáceo apassivado, processos para reduzir umidade inerente e/ou aumentar uma energia especìfica de um material carbonáceo, para aperfeiçoar as caracterìsticas de coqueificação de material carbonáceo não-coqueificado, para resfriar bruscamente carbonizado apassivado quente e aparelho para apassivar material carbonáceo
JP2009535478A (ja) ガス化による凝縮燃料処理方法及び前記方法を実施するためのデバイス
CN107743567A (zh) 预氧化的钛铁矿在流化床锅炉中的应用
CN116981900A (zh) 竖窑和在竖窑中燃烧含碳酸盐材料的方法
CN117222858A (zh) 并流蓄热式竖窑和用于燃烧碳酸盐岩的方法
WO2016136045A1 (ja) 改質装置
US20180291272A1 (en) System and method for rapid pyrolysis of coal
JP6374468B2 (ja) 含炭塊成鉱、含炭塊成鉱の製造方法及びその製造装置
JPS6247929B2 (ja)
CA3016821C (en) System having a furnace and method for operating such a system
US3140985A (en) Method of oxidation hardening of briquettes
JP5640415B2 (ja) 水素ガスの製造方法
GB723455A (en) Improvements in preparation of a charge for a calcium carbide furnace
FI70567B (fi) Foerfarande foer braenning av kalk i en cirkulationsugn
EP2435771B1 (fr) Procede de traitement thermique de biomasse avec un solide caloporteur
US5771820A (en) Method for the thermal treatment of waste material, particularly refuse, and a rotary tubular furnace for applying the method
KR102029315B1 (ko) 철-옥사이드 함유 공급 원료를 환원시키기 위한 방법 및 디바이스
WO2016024421A1 (ja) 改質装置
CN112625754A (zh) 有机固废套筒式导气湿式排灰固定床气化炉及气化方法
CN103052606B (zh) 用于利用有机的废物的方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15883335

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15883335

Country of ref document: EP

Kind code of ref document: A1