WO2016111585A1 - Pile construction method using soil and grouting material - Google Patents

Pile construction method using soil and grouting material Download PDF

Info

Publication number
WO2016111585A1
WO2016111585A1 PCT/KR2016/000199 KR2016000199W WO2016111585A1 WO 2016111585 A1 WO2016111585 A1 WO 2016111585A1 KR 2016000199 W KR2016000199 W KR 2016000199W WO 2016111585 A1 WO2016111585 A1 WO 2016111585A1
Authority
WO
WIPO (PCT)
Prior art keywords
pile
grouting
soil
excavation
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2016/000199
Other languages
French (fr)
Korean (ko)
Inventor
송기용
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of WO2016111585A1 publication Critical patent/WO2016111585A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Definitions

  • the conventional method using such a screw pile has an inconvenience that the slime generated from the ground drilling is excessively generated and the slime coming from the drilling hole is removed by the excavator every time.
  • the drilling device and the injection device for injecting are developed separately, there is a very troublesome process for constructing the pile, and the grouting material is excessively economical by removing all the soil and grouting of the drilling hole while drilling.
  • the present invention is an invention that can save the construction period and the construction cost of the pile because there is almost no slime generated during the excavation, so that the slime removal process is not necessary, and the grouting liquid is mixed with the earth and sand, and the grouting material is reduced.
  • it is an invention that can be used as a foundation of high-rise buildings or important structures by inserting a steel pipe or PHC pile into the gel material mixed with soil and grouting liquid to form a foundation.
  • the present invention is composed of the steps (a) to (e) step is not necessary to remove the slime during the construction of the pile, the excavated place is formed in the gel state can be inserted by the weight of the pile to break the construction stage of the pile
  • the present invention relates to a pile construction method using soil and grouting materials which can reduce construction period and construction cost of piles.
  • the present invention has been proposed to solve the above problems, the object of the present invention can be used as a basis for high-rise buildings or important structures by forming a foundation using a steel pipe pile or PHC pile, etc. It is possible to grout using slime, so that almost no slime is generated, and grouting can be performed simultaneously with excavation, thereby providing a pile construction method using soil and grouting materials to minimize the process for making a foundation.
  • step (d) may be configured to further include the step of applying a load to one end of the pile to the pile is mounted on the mixed material in the gel state.
  • a load may be applied to one end of the pile to more quickly infiltrate the gel mixture.
  • the method of applying the load to one end of the pile may be performed by rotating the pile, by moving the pile using a vibrating device, or by entering the pile by hitting one end of the pile. It can be added by applying a load to it.
  • Step (e) is curing after step (d). That is, after the pile is incorporated into the mixture of the gel state, the curing step for a certain time to integrate the pile and the mixture.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention does not require a slime removal process because there is little slime generated during excavation, and requires only a small amount of grouting material during the excavation because a grouting solution is mixed with soil, so that the pile construction time and cost can be saved. Further, the present invention inserts a steel pipe, a PHC pile, or the like into a gel state of material, in which soil and a grouting solution are mixed with each other, so as to form a foundation that can be used as a foundation of a tall building or an important structure. In addition, the present invention allows the position where a pile is to be constructed to be in a gel state by simultaneously spraying a grouting solution while excavating the ground so that the pile can be easily inserted by its weight, thereby significantly reducing the construction step of the pile and thus saving the pile construction time and cost.

Description

토사와 그라우팅재를 이용한 파일 시공방법Pile construction method using soil and grouting material

본 발명은 구조물의 기초를 이루는 파일의 시공방법에 관한 것이다.The present invention relates to a construction method of the pile forming the basis of the structure.

일반적으로 고층 건축물이나 철근 콘크리트 구조물 등을 축조할 경우에는 그 기초를 견고히 하기 위하여 지반에 PHC 파일 또는 H형 빔을 박아서 매설하는 방법으로 기초공사를 진행하고 있으며, 상기 파일 등의 시공은 건축물 및 구조물 등을 축조하는데 있어서는 매우 중요한 공사이다.In general, when constructing high-rise buildings or reinforced concrete structures, in order to solidify the foundation, foundation construction is carried out by embedding PHC piles or H-beams in the ground and laying the foundations. It is a very important work in building structures.

상기 파일을 시공하는 방법으로는 타설시공법과 굴착시공법 등이 소개된 바 있다. 전자의 타설시공법은 크롤러주행 장치에 수직으로 설치한 리더(Leader)의 상부에 설치된 권양로우프를 이용하여 중량체의 해머를 상승시켰다가 낙하시켜 파일을 타발하여 삽입시키는 방법과 콤푸레샤의 압축공기를 이용하여 해머를 상승시켰다가 하강시키면서 파일을 타설하여 지반에 삽입시키는 공법이다. 그리고, 후자의 굴착시공법은 파일연결부에 장착된 스크류 파일을 회전작동시켜 지반을 굴착하여 파일공을 형성시킨 다음 스크류 파일을 역회전시켜 굴착된 파일공에서 빼낸 다음 파일공에 파일을 삽입시키는 방법이다.As a method of constructing the pile has been introduced, such as the pouring method and excavation construction method. The former casting method uses the lifting rope installed on the upper part of the leader installed vertically on the crawler driving device to raise and drop the hammer of heavy weight, and then insert and insert the file by using the compressed air of the compressor. By placing the hammer up and down while placing the pile and inserting it into the ground. In the latter excavation method, the screw pile mounted on the pile connection part is rotated to excavate the ground to form a pile ball, and then the screw pile is reversely rotated to remove it from the drilled pile ball, and then the pile is inserted into the pile ball. .

그런데 이러한 스크류 파일을 이용한 기존방법은 지반 천공시 발생되는 슬라임이 과도하게 발생되어 천공 때 마다 굴삭기로 천공홀에서 올라오는 슬라임을 제거하여야 하는 불편함이 있었다. 또한, 천공장치 및 주입하는 주입장치가 별개로 개발되어 있어 파일을 시공하는데 공정이 매우 번거로운 문제가 있고, 천공하면서 천공 홀의 토사를 모두 제거하고 그라우팅을 함으로 그라우팅재가 과도하게 들어가 경제적인 문제가 있다.However, the conventional method using such a screw pile has an inconvenience that the slime generated from the ground drilling is excessively generated and the slime coming from the drilling hole is removed by the excavator every time. In addition, since the drilling device and the injection device for injecting are developed separately, there is a very troublesome process for constructing the pile, and the grouting material is excessively economical by removing all the soil and grouting of the drilling hole while drilling.

이를 해결하기 위해서 등록특허 제10-1441929호가 제시된 바 있으나 상기 특허는 단순히 천공하면서 생기 슬라임과 그라우팅재를 혼합하여 파일 형태로 만든 발명으로 안정적으로 설계상의 지지력을 충분히 발휘하지 못해 고층 빌딩이나 중요한 구조물의 기초로 활용할 수 없는 문제가 있다. 또한, 상기 특허를 이용하여 설계상의 지지력을 확보하기 위해서는 과도하게 파일의 수가 증가되어 경제적인 문제도 동시에 안고 있다.In order to solve this problem, Patent No. 10-1441929 has been proposed, but the patent is an invention made of a pile form by simply mixing a vibrating slime and grouting material. There is a problem that cannot be used as a basis. In addition, in order to secure design support by using the patent, the number of piles is excessively increased, which poses economic problems.

본 발명은 상기와 같은 문제점들을 해결하기 위하여 제안된 것으로서, 본 발명의 목적은 강관파일이나 PHC파일 등을 이용하여 기초를 형성함으로서 고층 빌딩이나 중요한 구조물의 기초로 활용할 수 있을 뿐만 아니라 굴착시 발생되는 슬라임을 이용하여 그라우팅을 할 수 있어 슬라임의 발생이 거의 생기지 않고, 굴착과 동시에 그라우팅을 할 수 있어 기초를 만들기 위한 공정을 최소화 하는 토사와 그라우팅재를 이용한 파일 시공방법을 제공함에 있다.The present invention has been proposed to solve the above problems, the object of the present invention can be used as a basis for high-rise buildings or important structures by forming a foundation using a steel pipe pile or PHC pile, etc. It is possible to grout using slime, so that almost no slime is generated, and grouting can be performed simultaneously with excavation, thereby providing a pile construction method using soil and grouting materials to minimize the process for making a foundation.

상기와 같은 목적을 달성하기 위하여 본원발명은 지반에 파일을 근입하는 시공방법에 있어서, (a) 설계에 의해서 파일이 시공될 위치를 측량하는 단계와, (b) 굴착시 발생되는 토사와 혼합되어 겔(gel) 상태를 이루는 그라우팅액을 제조한 후 굴착 및 그라우팅액을 분사할 수 있는 장비에 주입하는 단계와, (c) 상기 (a)단계에서 측량된 지점을 굴착하면서 그라우팅액을 분사하여 굴착시 발생되는 토사와 그라우팅액이 혼합되어 겔(gel) 상태를 만드는 단계와, (d) 상기 겔 상태의 혼합 물질에 구조계산에 의해서 선정된 파일이 근입되어 안착되는 단계 및, (e) 상기 (d)단계 후 양생하는 단계로 이루어지는 것을 특징으로 하는 토사와 그라우팅재를 이용한 파일 시공방법을 제공한다.In order to achieve the above object, the present invention is a construction method of incorporating a pile into the ground, (a) measuring the position where the pile will be constructed by design, (b) mixing with the soil generated during excavation After preparing the grouting solution to form a gel (gel) and injecting into the equipment for injecting excavation and grouting solution, and (c) by spraying the grouting solution while excavating the point measured in step (a) A step of making a gel state by mixing the soil and grouting solution generated during the excavation; It provides a pile construction method using the earth and sand grouting material, characterized in that the step of curing after step (d).

본 발명은 다음과 같은 효과가 있다.The present invention has the following effects.

첫째, 본 발명은 굴착시 발생되는 슬라임이 거의 없어 슬라임의 제거공정이 필요치 않을 뿐만 아니라 그라우팅액이 토사와 혼합되어 굴착시 그라우팅하는 재료가 적게 들어 파일의 시공기간 및 시공비를 절약할 수 있는 발명이다. 또한, 토사와 그라우팅액이 혼합된 겔 상태의 물질에 강관 또는 PHC파일 등이 삽입되어 기초를 이룸으로써 고층빌딩이나 중요한 구조물의 기초로 사용가능하게 한 발명이다.First, the present invention is an invention that can save the construction period and the construction cost of the pile because there is almost no slime generated during the excavation, so that the slime removal process is not necessary, and the grouting liquid is mixed with the earth and sand, and the grouting material is reduced. . In addition, it is an invention that can be used as a foundation of high-rise buildings or important structures by inserting a steel pipe or PHC pile into the gel material mixed with soil and grouting liquid to form a foundation.

둘째, 본 발명은 지반을 굴착하면서 그라우팅액을 동시에 분사하여 파일이 시공될 위치가 겔 상태를 이루고 있어 파일의 자중에 의해서 손쉽게 삽입 가능하여 파일의 시공단계를 획기적으로 줄인 발명으로 파일의 시공기간 및 시공비를 절약할 수 있는 발명이다. Secondly, the present invention is an invention that can be easily inserted by the weight of the pile by spraying the grouting solution at the same time while excavating the ground, so that the construction period of the pile can be significantly reduced by the invention, the construction period of the pile and It is an invention that can save construction costs.

도1은 본원발명의 파일 시공방법에 관한 순서도이다.1 is a flowchart illustrating a file construction method of the present invention.

이하 첨부된 도면들을 참조하여 본 발명에 따른 토사와 그라우팅재를 이용한 파일 시공방법의 구체적인 내용을 상세히 설명하기로 한다.Hereinafter, with reference to the accompanying drawings will be described in detail the specific content of the pile construction method using the soil and grouting material according to the present invention.

도1은 본원발명의 파일 시공방법에 관한 순서도이다.1 is a flowchart illustrating a file construction method of the present invention.

본원발명은 토사와 그라우팅재를 이용한 파일 시공방법에 관한 것으로 상세하게는 지반에 파일을 근입하는 시공방법에 있어서, (a) 설계에 의해서 파일이 시공될 위치를 측량하는 단계와, (b) 굴착시 발생되는 토사와 혼합되어 겔(gel) 상태를 이루는 그라우팅액을 제조한 후 굴착 및 그라우팅액을 분사할 수 있는 장비에 주입하는 단계와, (c) 상기 (a)단계에서 측량된 지점을 굴착하면서 그라우팅액을 분사하여 굴착시 발생되는 토사와 그라우팅액이 혼합되어 겔(gel) 상태를 만드는 단계와, (d) 상기 겔 상태의 혼합 물질에 구조계산에 의해서 선정된 파일이 근입되어 안착되는 단계 및, (e) 상기 (d)단계 후 양생하는 단계로 이루어지는 것을 특징으로 한다.The present invention relates to a pile construction method using soil and grouting material, and in detail, in a construction method of incorporating piles into the ground, (a) measuring the position at which piles are to be constructed by design, and (b) Preparing a grouting solution mixed with the soil produced during the excavation to form a gel state and then injecting the excavation and grouting fluid into a device capable of injecting the grouting solution; and (c) measuring the point measured in step (a). Spraying the grouting liquid during excavation to mix the soil and grouting liquid generated during the excavation to make a gel state, and (d) a pile selected by structural calculation to the mixed material of the gel state is deposited and seated. And (e) curing after the step (d).

본원발명은 (a)단계 내지 (e)단계로 구성되는 것으로 파일의 시공시 슬라임의 제거공정이 필요치 않고 굴착된 곳이 겔 상태를 이루고 있어 파일의 자중에 의해서 삽입 가능하여 파일의 시공단계를 획기적으로 줄인 발명으로 파일의 시공기간 및 시공비를 절약할 수 있는 토사와 그라우팅재를 이용한 파일 시공방법에 관한 것이다.The present invention is composed of the steps (a) to (e) step is not necessary to remove the slime during the construction of the pile, the excavated place is formed in the gel state can be inserted by the weight of the pile to break the construction stage of the pile The present invention relates to a pile construction method using soil and grouting materials which can reduce construction period and construction cost of piles.

일반적으로 고층 건축물이나 철근 콘크리트 구조물 등을 축조할 경우에는 그 기초를 견고히 하기 위하여 지반에 PHC 파일 또는 H형 빔을 박아서 매설하는 방법으로 기초공사를 진행하고 있으며, 상기 파일 등의 시공은 건축물 및 구조물 등을 축조하는데 있어서는 매우 중요한 공사이다.In general, when constructing high-rise buildings or reinforced concrete structures, in order to solidify the foundation, foundation construction is carried out by embedding PHC piles or H-beams in the ground and laying the foundations. It is a very important work in building structures.

상기 파일을 시공하는 방법으로는 타설시공법과 굴착시공법 등이 소개된 바 있다. 전자의 타설시공법은 크롤러주행 장치에 수직으로 설치한 리더(Leader)의 상부에 설치된 권양로우프를 이용하여 중량체의 해머를 상승시켰다가 낙하시켜 파일을 타발하여 삽입시키는 방법과 콤푸레샤의 압축공기를 이용하여 해머를 상승시켰다가 하강시키면서 파일을 타설하여 지반에 삽입시키는 공법이다. 그리고, 후자의 굴착시공법은 파일연결부에 장착된 스크류 파일을 회전작동시켜 지반을 굴착하여 파일공을 형성시킨 다음 스크류 파일을 역회전시켜 굴착된 파일공에서 빼낸 다음 파일공에 파일을 삽입시키는 방법이다.As a method of constructing the pile has been introduced, such as the pouring method and excavation construction method. The former casting method uses the lifting rope installed on the upper part of the leader installed vertically on the crawler driving device to raise and drop the hammer of heavy weight, and then insert and insert the file by using the compressed air of the compressor. By placing the hammer up and down while placing the pile and inserting it into the ground. In the latter excavation method, the screw pile mounted on the pile connection part is rotated to excavate the ground to form a pile ball, and then the screw pile is reversely rotated to remove it from the drilled pile ball, and then the pile is inserted into the pile ball. .

그런데 이러한 스크류 파일을 이용한 기존방법은 지반 천공시 발생되는 슬라임이 과도하게 발생되어 천공 때 마다 굴삭기로 천공홀에서 올라오는 슬라임을 제거하여야 하는 불편함이 있었다. 또한, 천공장치 및 주입하는 주입장치가 별개로 개발되어 있어 파일을 시공하는데 공정이 매우 번거로운 문제가 있고, 천공하면서 천공 홀의 토사를 모두 제거하고 그라우팅을 함으로 그라우팅재가 과도하게 들어가 경제적인 문제가 있다.However, the conventional method using such a screw pile has an inconvenience that the slime generated from the ground drilling is excessively generated and the slime coming from the drilling hole is removed by the excavator every time. In addition, since the drilling device and the injection device for injecting are developed separately, there is a very troublesome process for constructing the pile, and the grouting material is excessively economical by removing all the soil and grouting of the drilling hole while drilling.

이를 해결하기 위해서 등록특허 제10-1441929호가 제시된 바 있으나 상기 특허는 단순히 천공하면서 생기 슬라임과 그라우팅재를 혼합하여 파일 형태로 만든 발명으로 안정적으로 설계상의 지지력을 충분히 발휘하지 못해 고층 빌딩이나 중요한 구조물의 기초로 활용할 수 없는 문제가 있다. 또한, 상기 특허를 이용하여 설계상의 지지력을 확보하기 위해서는 과도하게 파일의 수가 증가되어 경제적인 문제도 동시에 안고 있다.In order to solve this problem, Patent No. 10-1441929 has been proposed, but the patent is an invention made of a pile form by simply mixing a vibrating slime and grouting material. There is a problem that cannot be used as a basis. In addition, in order to secure design support by using the patent, the number of piles is excessively increased, which poses economic problems.

본 발명은 상기와 같은 문제점들을 해결하기 위하여 제안된 것으로서, 본 발명의 목적은 강관파일이나 PHC파일 등을 이용하여 기초를 형성함으로서 고층 빌딩이나 중요한 구조물의 기초로 활용할 수 있을 뿐만 아니라 굴착시 발생되는 슬라임을 이용하여 그라우팅을 할 수 있어 슬라임의 발생이 거의 생기지 않고, 굴착과 동시에 그라우팅을 할 수 있어 기초를 만들기 위한 공정을 최소화 하는 토사와 그라우팅재를 이용한 파일 시공방법을 제공함에 있다.The present invention has been proposed to solve the above problems, the object of the present invention can be used as a basis for high-rise buildings or important structures by forming a foundation using a steel pipe pile or PHC pile, etc. It is possible to grout using slime, so that almost no slime is generated, and grouting can be performed simultaneously with excavation, thereby providing a pile construction method using soil and grouting materials to minimize the process for making a foundation.

즉, 본 발명은 굴착시 발생되는 슬라임이 거의 없어 슬라임의 제거공정이 필요치 않을 뿐만 아니라 그라우팅액이 토사와 혼합되어 굴착시 그라우팅하는 재료가 적게 들어 파일의 시공기간 및 시공비를 절약할 수 있는 발명이다. 또한, 토사와 그라우팅액이 혼합된 겔 상태의 물질에 강관 또는 PHC파일 등이 삽입되어 기초를 이룸으로써 고층빌딩이나 중요한 구조물의 기초로 사용가능하게 한 발명이다. 또한, 본 발명은 지반을 굴착하면서 그라우팅액을 동시에 분사하여 파일이 시공될 위치가 겔 상태를 이루고 있어 파일의 자중에 의해서 손쉽게 삽입 가능하여 파일의 시공단계를 획기적으로 줄인 발명으로 파일의 시공기간 및 시공비를 절약할 수 있는 발명이다. That is, the present invention is an invention that can save the construction period and the construction cost of the pile because there is almost no slime generated during the excavation, so that the slime removal process is not necessary and the grouting liquid is mixed with the earth and sand, and the grouting material is reduced when excavating. . In addition, it is an invention that can be used as a foundation of high-rise buildings or important structures by inserting a steel pipe or PHC pile into the gel material mixed with soil and grouting liquid to form a foundation. In addition, the present invention excavates the ground while spraying the grouting solution at the same time to form the location of the pile construction gel state can be easily inserted by the weight of the pile to significantly reduce the construction stage of the pile file construction period and It is an invention that can save construction costs.

(a)단계는 설계에 의해서 파일이 시공될 위치를 측량하는 단계이다. 즉, (a)단계는 파일을 시공하여 기초를 만드는 지반에 설계에 맞게 파일이 정확하게 시공될 수 있도록 파일이 시공될 위치를 정확하게 측량하여 표시하는 단계이다.Step (a) is the step of surveying the location where the pile will be constructed by design. That is, step (a) is to accurately measure and display the location where the file will be constructed so that the file can be accurately constructed according to the design on the ground from which the file is constructed.

(b)단계는 천공될 홀에 분사할 그라우팅액을 배합하여 그라우팅액을 분사할 수 있는 장비에 주입하는 단계이다. 즉, (b)단계는 굴착시 발생되는 토사(슬라임)와 혼합되어 겔(gel) 상태를 이루는 그라우팅액을 배합하여 제조한 후 천공 및 그라우팅액을 분사할 수 있는 장비에 주입하는 단계이다. 그라우팅액은 투입되는 그라우팅재를 물과 함께 일정비율로 배합하여 제조하는 물질이다. 굴착 및 그라우팅액을 분사할 수 있는 장비는 건설현장에서 일반적으로 사용되는 장비이다.Step (b) is a step of injecting the grouting solution to be injected into the hole to be drilled into the equipment capable of spraying the grouting solution. That is, step (b) is a step of preparing a grouting solution mixed with the soil (slime) generated during the excavation to form a gel (gel), and then injecting it into the equipment capable of spraying the punching and grouting solution. The grouting liquid is a material prepared by blending the grouting material introduced with water at a predetermined ratio. Equipment that can spray excavation and grouting liquid is the equipment generally used in construction sites.

(c)단계는 설계에 맞게 파일을 시공하기 위하여 지반을 굴착하면서 그라우팅액을 분사하는 단계이다. 즉, (c)단계는 상기 (a)단계에서 측량된 지점을 굴착하면서 그라우팅액을 분사하여 굴착시 발생되는 토사와 그라우팅액이 혼합되어 겔(gel) 상태를 만드는 단계이다. 또한, (c)단계는 설계상 요구되는 겔 상태를 만들기 위하여 측량된 지점을 반복적으로 굴착장비를 회전하여 굴착하면서 그라우팅액을 분사하는 단계이다. (c)단계에서 토사와 그라우팅액이 혼합되어 만들어지는 겔 상태는 파일이 삽입될 때 파일이 용이하게 근입되어 안착되도록 하는 상태이다.Step (c) is the step of spraying grouting liquid while excavating the ground to construct the pile according to the design. That is, step (c) is a step of making a gel state by mixing the soil and grouting liquid generated during the excavation by spraying the grouting liquid while excavating the point measured in the step (a). In addition, step (c) is a step of spraying the grouting liquid while excavating by repeatedly rotating the excavation equipment to the surveyed point to make the gel state required by the design. In the step (c), the gel is made by mixing the soil and grouting solution is a state in which the pile is easily inserted and settled when the pile is inserted.

(d)단계는 현장에 맞게 구조계산에 의해서 선정된 파일이 근입되어 안착되는 단계이다. 즉, (d)단계는 (c)단계에서 시공된 겔 상태의 혼합 물질에 구조계산에 의해서 선정된 파일이 근입되어 안착되는 단계이다. 일례로 겔 상태는 파일이 삽입될 때 파일의 자중에 의해서 용이하게 근입될 수 있는 상태이다. (d)단계는 안정적인 지내력을 확보하기 위해 파일이 삽입되는 단계로서 고층 구조물이나 중요한 구조물의 기초로 활용가능하도록 겔 상태의 혼합 물질에 파일이 근입되는 단계이다. 즉, 파일과 겔 상태의 혼합물질이 일체화 되어 상부에서 내려오는 하중을 효과적으로 지지할 수 있도록 파일이 겔 상태의 혼합물질에 근입되는 단계이다. 파일은 기초의 목적 및 현장에 맞게 구조계산에 의해서 선정된 파일로서 강관, PHC 등이 사용될 수 있다. In step (d), the pile selected by structural calculation according to the site is entered and settled. That is, step (d) is a step in which the pile selected by structural calculation is incorporated into the mixed material of the gel state constructed in step (c). In one example, the gel state is a state that can be easily entered by the weight of the pile when the pile is inserted. Step (d) is a step in which piles are inserted in order to secure stable bearing strength, and piles are incorporated into the mixed material in a gel state so that they can be used as a basis for high-rise structures or important structures. In other words, the pile is incorporated into the gel mixture so that the mixture of the pile and gel can be integrated to effectively support the load from the top. The pile is a pile selected by structural calculation according to the purpose of the foundation and the site, and steel pipe, PHC, etc. may be used.

또한, (d)단계는 파일의 일단에 하중을 가해 겔 상태의 혼합 물질에 파일이 근입되어 안착되는 단계를 더 포함하여 구성될 수 있다. 즉, 기초를 시공하는 공기에 따라 파일의 근입을 신속히 하기 위하여 파일의 일단에 하중을 가해 좀 더 빨리 겔 상태의 혼합물질에 근입시킬 수 있다. 여기서 파일의 일단에 하중을 가하여 근입시키는 방법은 파일을 회전시키면서 근입시키거나, 진동장치를 이용하여 파일을 진동시키면서 근입시키거나, 파일의 일단을 타격시켜서 근입시키는 등 다양한 방법으로 파일의 일단에 하중을 가해서 근입시킬 수 있다. In addition, step (d) may be configured to further include the step of applying a load to one end of the pile to the pile is mounted on the mixed material in the gel state. In other words, in order to quickly infiltrate the pile according to the air for constructing the foundation, a load may be applied to one end of the pile to more quickly infiltrate the gel mixture. Here, the method of applying the load to one end of the pile may be performed by rotating the pile, by moving the pile using a vibrating device, or by entering the pile by hitting one end of the pile. It can be added by applying a load to it.

(e)단계는 상기 (d)단계 후 양생하는 단계이다. 즉, 겔 상태의 혼합물질에 파일이 근입되고 난 후 파일과 혼합물질이 일체화되도록 일정시간 양생하는 단계이다.Step (e) is curing after step (d). That is, after the pile is incorporated into the mixture of the gel state, the curing step for a certain time to integrate the pile and the mixture.

이상으로 본 발명에 따른 토사와 그라우팅재를 이용한 파일 시공방법의 바람직한 실시 예를 설명하였으나 이는 적어도 하나의 실시예로서 설명되는 것이며, 이에 의하여 본 발명의 기술적 사상과 그 구성 및 작용이 제한되지는 아니하는 것으로, 본 발명의 기술적 사상의 범위가 도면 또는 도면을 참조한 설명에 의해 한정/제한되지는 아니하는 것이다. 또한 본 발명에서 제시된 발명의 개념과 실시예가 본 발명의 동일 목적을 수행하기 위하여 다른 구조로 수정하거나 설계하기 위한 기초로써 본 발명이 속하는 기술분야의 통상의 지식을 가진 자에 의해 사용되어질 수 있을 것인데, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자에 의한 수정 또는 변경된 등가 구조는 특허청구범위에서 기술되는 본 발명의 기술적 범위에 구속되는 것으로서, 특허청구범위에서 기술한 발명의 사상이나 범위를 벗어나지 않는 한도 내에서 다양한 변화, 치환 및 변경이 가능한 것이다.The preferred embodiment of the pile construction method using the soil and grouting material according to the present invention described above is described as at least one embodiment, whereby the technical spirit and its configuration and operation of the present invention is not limited. It is to be understood that the scope of the technical idea of the present invention is not limited or limited by the drawings or the description with reference to the drawings. In addition, the concept and embodiment of the invention presented in the present invention may be used by those skilled in the art as a basis for modifying or designing to other structures for carrying out the same purpose of the present invention. The equivalent structure modified or changed by those skilled in the art to which the present invention pertains is to be bound by the technical scope of the present invention described in the claims, and the spirit or scope of the invention described in the claims. Various changes, substitutions and alterations are possible without departing from the scope of the invention.

Claims (3)

지반에 파일을 근입하는 시공방법에 있어서,In the construction method of incorporating a pile into the ground, (a) 설계에 의해서 파일이 시공될 위치를 측량하는 단계;(a) surveying the location where the pile will be constructed by design; (b) 굴착시 발생되는 토사와 혼합되어 겔(gel) 상태를 이루는 그라우팅액을 제조한 후 굴착 및 그라우팅액을 분사할 수 있는 장비에 주입하는 단계;(b) preparing a grouting solution mixed with the soil generated during the excavation to form a gel, and then injecting the excavation and grouting solution into a device capable of spraying; (c) 상기 (a)단계에서 측량된 지점을 굴착하면서 그라우팅액을 분사하여 굴착시 발생되는 토사와 그라우팅액이 혼합되어 겔(gel) 상태를 만드는 단계;(c) spraying the grouting solution while digging the point measured in step (a) to mix the soil and grouting solution generated during the excavation to make a gel state; (d) 상기 겔 상태의 혼합 물질에 구조계산에 의해서 선정된 파일이 근입되어 안착되는 단계; 및,(d) placing the pile selected by structural calculation into the mixed material in the gel state and being seated; And, (e) 상기 (d)단계 후 양생하는 단계로 이루어지는 것을 특징으로 하는 토사와 그라우팅재를 이용한 파일 시공방법.(e) pile construction method using the soil and grouting material comprising the step of curing after the step (d). 제1항에 있어서,The method of claim 1, 상기 (c)단계는 설계상 요구되는 겔 상태를 만들기 위하여 측량된 지점을 반복적으로 굴착장비를 회전하여 굴착하면서 그라우팅액을 분사하는 단계인 것을 특징으로 하는 토사와 그라우팅재를 이용한 파일 시공방법.Wherein step (c) is a pile construction method using the soil and grouting material, characterized in that the step of spraying the grouting liquid while excavating by rotating the excavation equipment to repeatedly measure the surveyed point to make the gel state required by the design. 제1항에 있어서,The method of claim 1, 상기 (d)단계는 파일의 일단에 하중을 가해 겔 상태의 혼합 물질에 파일이 근입되어 안착되는 단계를 더 포함하여 구성되는 것을 특징으로 하는 토사와 그라우팅재를 이용한 파일 시공방법.The step (d) is a pile construction method using the soil and grouting material comprising the step of applying a load to one end of the pile, the pile is mounted in the gel material mixed.
PCT/KR2016/000199 2015-01-08 2016-01-08 Pile construction method using soil and grouting material Ceased WO2016111585A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020150002671A KR20160085544A (en) 2015-01-08 2015-01-08 The construction method of pile using soil and grouting
KR10-2015-0002671 2015-01-08

Publications (1)

Publication Number Publication Date
WO2016111585A1 true WO2016111585A1 (en) 2016-07-14

Family

ID=56356197

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2016/000199 Ceased WO2016111585A1 (en) 2015-01-08 2016-01-08 Pile construction method using soil and grouting material

Country Status (2)

Country Link
KR (1) KR20160085544A (en)
WO (1) WO2016111585A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489143A (en) * 2017-08-30 2017-12-19 中建四局第建筑工程有限公司 A kind of concrete pouring of punched hole piles structure and its plain fill layer leakproof paste-making method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3182586B2 (en) * 1992-04-28 2001-07-03 株式会社テノックス Construction method of soil cement composite pile
JP2001248147A (en) * 2000-03-07 2001-09-14 Fumio Kosaka Excavating/stirring blade for soil cement composite pile
JP2002021072A (en) * 2000-07-12 2002-01-23 Tenox Corp Construction method of steel pipe soil cement pile
KR100888166B1 (en) * 2008-01-22 2009-03-10 (주)진산이엔지 Construction Method of Soil Concrete Pile and Soil Concrete Pile
JP5558314B2 (en) * 2010-11-04 2014-07-23 株式会社テノックス九州 Construction method of soil cement composite pile

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101441929B1 (en) 2014-02-03 2014-09-22 스키너스 주식회사 Foundation method for complex pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3182586B2 (en) * 1992-04-28 2001-07-03 株式会社テノックス Construction method of soil cement composite pile
JP2001248147A (en) * 2000-03-07 2001-09-14 Fumio Kosaka Excavating/stirring blade for soil cement composite pile
JP2002021072A (en) * 2000-07-12 2002-01-23 Tenox Corp Construction method of steel pipe soil cement pile
KR100888166B1 (en) * 2008-01-22 2009-03-10 (주)진산이엔지 Construction Method of Soil Concrete Pile and Soil Concrete Pile
JP5558314B2 (en) * 2010-11-04 2014-07-23 株式会社テノックス九州 Construction method of soil cement composite pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489143A (en) * 2017-08-30 2017-12-19 中建四局第建筑工程有限公司 A kind of concrete pouring of punched hole piles structure and its plain fill layer leakproof paste-making method

Also Published As

Publication number Publication date
KR20160085544A (en) 2016-07-18

Similar Documents

Publication Publication Date Title
CN106958256B (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN101864773B (en) Deep foundation pit support process
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN101550692B (en) Constructing method for reinforcing mixing stake around built shield tunnel
CN105155550B (en) Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN105951711A (en) Enclosing construction method of underground continuous wall of seashore power station
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN109630127A (en) A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft
CN106245655A (en) Utilize the deep foundation pit supporting construction method of miniature steel pipe pile
CN103603508B (en) Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter
CN103015431B (en) Foundation pit supporting method for manual dig-hole cement-soil steel pile
CN110042843A (en) A kind of large deep foundation pit construction method of complex condition
US9856622B2 (en) Retaining wall system, method of supporting same, and kit for use in constructing same
CN101994314A (en) Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN106988305A (en) A kind of pile-column pier construction method of underground integrated molding
CN107034894A (en) Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method
CN109440779A (en) Active X-shaped foundation pit supporting method with double rows of piles
CN103046539B (en) Antiskid pile with outer isosceles trapezoid cross section and in unequal interval arrangement
CN105735335B (en) Method for constructing foundation pile and foundation pile structure
CN107700497A (en) A kind of building basement pattern foundation pit supporting structure and earth excavation construction method
WO2011068329A2 (en) Beam penetrating after lower part casting type cast-in-place pile method
CN101649614A (en) Variable-diameter multi-direction anchor pile
CN108118689B (en) Partially recyclable prefabricated underground diaphragm wall, spreader and construction method
WO2016111585A1 (en) Pile construction method using soil and grouting material
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16735206

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16735206

Country of ref document: EP

Kind code of ref document: A1