WO2016045344A1 - Building brick and wall built therewith - Google Patents

Building brick and wall built therewith Download PDF

Info

Publication number
WO2016045344A1
WO2016045344A1 PCT/CN2015/075895 CN2015075895W WO2016045344A1 WO 2016045344 A1 WO2016045344 A1 WO 2016045344A1 CN 2015075895 W CN2015075895 W CN 2015075895W WO 2016045344 A1 WO2016045344 A1 WO 2016045344A1
Authority
WO
WIPO (PCT)
Prior art keywords
groove
brick
wall
hole
brick body
Prior art date
Application number
PCT/CN2015/075895
Other languages
French (fr)
Chinese (zh)
Inventor
黄烈元
Original Assignee
黄烈元
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 黄烈元 filed Critical 黄烈元
Publication of WO2016045344A1 publication Critical patent/WO2016045344A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings
    • E04C1/39Building elements of block or other shape for the construction of parts of buildings characterised by special adaptations, e.g. serving for locating conduits, for forming soffits, cornices, or shelves, for fixing wall-plates or door-frames, for claustra

Definitions

  • the invention relates to the technical field of building materials, in particular to a building brick and a wall made of the brick.
  • the current construction methods are as follows: First, in When constructing the wall, these lines and pipes are laid in the wall of the building first, and then the construction is continued. Second, the wall is first built and then the wall is slotted and the line pipe is laid.
  • a building brick comprising a rectangular parallelepiped brick body, the brick body comprising a convex hull and a groove, wherein the convex hull and the groove are respectively disposed on two opposite sides; the brick body is provided with a plurality of through holes or And a plurality of open slots, each of which extends through two opposite sides of the tile body.
  • the groove of the upper brick body can be engaged with the convex hull of the lower brick body, which is beneficial to the brick body.
  • the through hole and the open groove can communicate with each other to form a receiving cavity, and the receiving cavity can be threaded, warmed through the pipeline or other pipes, and avoids the use of ordinary brick to construct the wall.
  • the brick body is cut off to form a accommodating cavity. Due to the high strength of the building brick, manual cutting is difficult, it is difficult to obtain the required shape, the building material is wasted, the construction cost is increased, and the cutting is performed.
  • the process chopper impacts the brick body, and the residue splashes, posing a threat to the personal safety of the workers.
  • the brick body may be sintered from clay, the size of which conforms to the building industry standard size is 240 mm ⁇ 115 mm ⁇ 53 mm, and the size of the convex hull is 80 mm ⁇ 20 mm ⁇ 240 mm, and the size of the groove is The size of the convex hull is uniform, the cross-sectional dimension of the through hole is 40 mm ⁇ 40 mm, the cross-sectional dimension of the first open groove is 20 mm ⁇ 40 mm, and the cross-sectional dimension of the second open groove is 20 mm. ⁇ 20 mm.
  • Clay bricks are made in situ, cheap and durable, and are widely used in civil engineering. Waste bricks can also be used as aggregates for concrete. In order to improve the shortcomings of ordinary clay bricks, self-importance and soil consumption, the development of light, high strength, hollow and large blocks is progressing.
  • the brick body may also be a lime sand brick, which is formed by grinding, mixing with water, mixing with water, semi-dry pressing and autoclaving with appropriate proportion of lime and quartz sand, sand or fine sandstone.
  • Fly ash brick uses fly ash as the main raw material, and is mixed with coal gangue powder or clay and other cementing materials. After being compounded, shaped, dried and calcined, it can make full use of industrial waste residue and save fuel.
  • the brick body can also be made of sintered shale as a production material, and the sintered shale is used as a new type of building energy-saving wall material, which can be used for masonry bearing wall and good thermal performance, conforming to the construction building modulus and reducing Loss during construction, high work efficiency; high hole rate, can reduce the weight of the wall and save the cost of basic engineering.
  • the product uses shale as raw material, and adopts brick machine high vacuum extrusion molding and one-time burning production process.
  • the convex hull is disposed on a lower surface of the brick body, the groove is disposed on an upper surface of the brick body, and the two sides of the groove are provided with an extending plate extending upward, and the groove is The space between the two extension plates,
  • the projection of the convex hull in a vertical plane perpendicular thereto is a rectangle, and the lower surface of the convex hull is a plane and is parallel to the lower surface of the brick body.
  • the convex hull is provided with a snap groove perpendicular to the extending direction of the convex hull, and the snap groove cooperates with the two extension plates forming the groove.
  • a snap groove can be formed on the convex hull to realize vertical stacking of the brick body and the lower brick body.
  • a center line of the through hole coincides with a line connecting a center point of the upper surface and a center point of the lower surface, the through hole penetrating through the upper and lower surfaces of the brick body, and the projection of the through hole in the horizontal plane is A square having a centerline perpendicular to an upper side of the tile body.
  • the open slot includes a first open slot and a second open slot, and the number of the first open slots is two, and the two first open slots are respectively disposed at left and right end faces of the brick body.
  • the direction of the first opening groove is parallel to the end surface of the brick body, the second opening groove is disposed in the groove, and the second opening groove penetrates the left and right sides of the brick body, and the second opening groove The direction is parallel to the direction of the groove.
  • the projection of the first open slot in the horizontal plane is a rectangle that is not closed on one side, and the length of the long side of the first open slot is equal to the length of the side of the through hole, and the length of the short side of the first open slot is equal to the pass One-half of the length of the side of the hole. It is ensured that the through hole of the brick body of the layer penetrates with the wall formed by the first open groove of the brick body of the adjacent layer.
  • At least one side of the front side and the rear side of the brick body is bonded with a smooth porcelain layer.
  • the porcelain layer is made of ceramic material and manufacturing process.
  • the front side and the back side of the brick are bonded with a porcelain layer. It has anti-oxidation effect; when only the inner wall surface needs to be painted and bonded, only the front side of the brick body is bonded to the porcelain layer; when only the outer wall surface needs to be painted and bonded, only The back side of the brick body is bonded to the porcelain layer.
  • the front and rear sides of the brick body have different colors; the front and back sides of the brick body have different styles, for example, one side is imitation marble, and one side is wood-like; one side of the brick body is a smooth porcelain layer, and one side is rough.
  • Table Face there are different colors separated by a center line, for example, the same side has black and white two colors separated by the center line.
  • the wall made of the brick body comprises a wall body, the wall body comprises a plurality of layers, and the second opening grooves of the brick body on the same layer overlap to form a horizontal receiving cavity, and the brick bodies on the adjacent layers are dislocated from each other.
  • the center line of the through hole of the brick body of the adjacent layer and the first opening groove receiving cavity coincide to form a through vertical receiving cavity.
  • a plurality of vertical accommodating cavities and a plurality of horizontal accommodating cavities are formed to form a reinforced filling cavity, wherein the reinforced filling cavity is filled with a reinforcing structure integrally connected; a plurality of vertical accommodating cavities and a plurality of horizontal accommodating cavities are formed to penetrate the pipeline Through the cavity.
  • the reinforcing structure may be a reinforced concrete structure, which improves the strength of the wall and prolongs the service life of the wall; during the construction of the wall, the through hole, the first open groove receiving cavity and the second open groove penetrate to form a pipeline Pass through the cavity for the daily pipeline to pass through.
  • the through hole communicates with the pipeline through the cavity, and the water pipe, the electric wire or the communication cable passing through the cavity can be taken out from the through hole, thereby avoiding the hole in the wall, and the positioning of the hole in the wall is difficult, and often requires multiple operations.
  • the water pipes, wires or communication cables inside the wall damage the wall surface, and sometimes the holes may even be cut into pipes such as water pipes, wires or communication cables, causing losses, because the pipes are in the wall, Maintenance is difficult, this technical solution can smoothly lead out the pipeline to avoid damage to the wall and pipeline.
  • the brick body located on the side of the wall body is provided with a pipeline outlet hole communicating with the pipeline through the cavity, and the wall body further comprises a sealing blockage matched with the pipeline outlet hole.
  • the porcelain layer is sintered on the front and back sides of the brick body, and the porcelain layer is formed after the wall is built, which saves the process of scraping the wall paint, saves labor cost and reduces construction cost.
  • the "upper”, “lower”, “left”, “right”, “front” and “rear” mentioned in the technical solution are such that when the brick body is placed on a horizontal plane, the direction in which the opening of the groove is upward is “up”, " The lower “direction” is opposite to the “upper”, and the two ends of the open groove are respectively “left” and “right”, and the remaining two end faces are “front” and “back” respectively.
  • the convex hull and the groove cooperate to facilitate the positioning of the brick body, and the dependence on the technical proficiency of the worker is eliminated;
  • the wall structure is firm and has a long service life.
  • the wall body comprises a reinforcing filling cavity, and the reinforcing filling structure in the filling cavity is strengthened to improve the mechanical properties and the service life of the wall body;
  • the pipeline is formed through the cavity, and the pipeline outlet hole which is connected with the pipeline through the cavity is arranged, and the wire socket, the telephone line connector, the water pipe outlet or the radiator mounting port can be conveniently led out according to actual needs;
  • the wall is formed once, each part is a whole, without subsequent decoration such as: brushing cement, plastering, bonding ceramic tiles; porcelain layer using ceramic tile material and manufacturing process, porcelain layer has oxidation resistance, construction
  • subsequent decoration such as: brushing cement, plastering, bonding ceramic tiles; porcelain layer using ceramic tile material and manufacturing process, porcelain layer has oxidation resistance, construction
  • the side code with the porcelain layer is placed on the inner wall surface, which can save a lot of subsequent decoration such as plastering and bonding the cost of the tile.
  • FIG. 1 is a schematic perspective structural view of a building brick according to Embodiment 1;
  • Figure 2 is a perspective view showing the perspective of another view of Figure 1;
  • FIG. 3 is a schematic perspective structural view of a building brick according to Embodiment 3;
  • Figure 4 is a cross-sectional view of the wall made of building bricks perpendicular to the direction in which the wall extends;
  • Figure 5 is a cross-sectional view of a wall constructed of building bricks along the direction in which the wall extends.
  • a building brick includes a rectangular parallelepiped brick body, and the brick body includes a convex hull 1 and a groove 2, and the convex hull 1 and the groove 2 are respectively disposed on two opposite sides. a side surface; the brick body is provided with a plurality of through holes 3 or/and a plurality of open slots 4, and the through holes 3 or/and the open slots 4 extend through two opposite sides of the brick body.
  • the convex hull 1 is disposed on a lower surface of the brick body, the groove 2 is disposed on an upper surface of the brick body, and two sides of the groove 2 are provided with an extending plate 5 extending upward, the groove 2 is a space between the two extension plates 5, the projection of the convex hull 1 in a vertical plane perpendicular thereto is a rectangle, and the upper surface of the convex hull 1 is a plane and is parallel to the lower surface of the brick body.
  • the opening slot 4 includes a first opening slot 41 and a second opening slot 42.
  • the number of the first opening slots 41 is two, and the two first opening slots 41 are respectively disposed at the left and right end faces of the brick body.
  • the direction of the first opening groove 41 is parallel to the end surface of the brick body, the second opening groove 42 is disposed in the groove 2, and the second opening groove 42 penetrates the left and right sides of the brick body.
  • the direction of the second opening groove 42 is parallel to the direction of the groove 2.
  • the projection of the first opening slot 41 in the horizontal plane is a rectangle that is not closed on one side, the length of the long side of the first opening slot 41 is equal to the length of the side of the through hole 3, and the length of the short side of the first opening slot 41 is equal to the length One-half of the length of the side of the through hole 3.
  • the wall made of the building brick according to the embodiment includes a wall body, and the wall body comprises a plurality of layers, and the second opening grooves 42 of the brick body on the same layer are overlapped to form.
  • a horizontal accommodating cavity the bricks on the adjacent layers are offset from each other such that the first opening grooves 41 of the adjacent bricks on the same layer correspond to and conform to the shape of the through hole 3, and the first opening groove 41 accommodates the cavity.
  • the center line of the through hole 3 of the tile of the adjacent layer coincides with the center line of the receiving cavity of the first opening groove 41 to form a penetrating vertical receiving cavity.
  • the brick bodies on the adjacent layers are offset from each other such that the first opening grooves 41 of the adjacent brick bodies on the same layer correspond to and define a first open groove receiving cavity 7 conforming to the shape of the through hole 3, and the adjacent layer of the brick body
  • the center line of the through hole 3 coincides with the center line of the first open groove accommodating chamber 7 to form a penetrating vertical accommodating cavity.
  • a plurality of vertical receiving cavities and a plurality of horizontal receiving cavities are formed to form a reinforcing filling cavity, wherein the reinforcing filling cavity is filled with a reinforcing structure integrally connected; a plurality of vertical receiving cavities and a plurality of horizontal receiving cavities are penetrated to form a pipeline through the cavity.
  • a brick body located on a side of the wall is provided with a pipeline outlet hole communicating with the pipeline through the cavity, and the wall body further includes a sealing plug that cooperates with the pipeline outlet hole.
  • the building brick according to the embodiment is basically the same as the structure of the first embodiment, and the difference is that at least one side of the front side and the rear side of the brick body is bonded with a smooth porcelain layer.
  • the porcelain layer is made of the material and manufacturing process of the ceramic tile.
  • the side code with the porcelain layer is placed on the inner wall surface, which can save a lot of Subsequent decoration such as: plastering, bonding the cost of the tile; can open the snap groove 6 on the convex hull 1 to realize the vertical stacking of the brick body and the adjacent layer brick body, the layer formed by the adjacent brick body A lateral pulling force is formed to make the wall more stable.
  • the building brick according to the embodiment is basically the same as the structure of the first embodiment, and the difference is that the convex hull 1 is provided with a latching concave perpendicular to the extending direction of the convex hull 1. Slot 6, said The snap groove 6 cooperates with the two extension plates 5 forming the groove 2.

Abstract

A building brick and a wall built therewith, the building brick comprising a rectangular-shaped brick comprising a protrusion (1) and a recess (2) respectively provided on two opposite sides. Several through-holes (3) pass through the two opposite sides of the brick and/or several open slots (4) are provided on the brick. The open slots (4) comprise a first open slot (41) and a second open slot (42). The wall comprises several layers. An offset between bricks in adjacent layers causes the first open slots (41) in the same layer to cooperate and enclose a first open-slot accommodating chamber (7) consistent with the shape of the through-hole (3); the second open slots (42) of the brick in the same layer are superimposed to form a communicating horizontal accommodating chamber, and a center line of the through-hole (3) in adjacent layers of the bricks is superimposed with a center line of the first open slot accommodating chamber (7) to form a communicating vertical accommodating chamber. The building brick improves construction efficiency and reduces labor cost. The wall built with the bricks has a solid and firm structure, thus facilitating subsequent pipeline installation and maintenance.

Description

一种建筑用砖和由该砖建成的墙体Building brick and wall made of the brick 技术领域Technical field
本发明涉及建筑材料技术领域,具体涉及一种建筑用砖和由该砖建成的墙体。The invention relates to the technical field of building materials, in particular to a building brick and a wall made of the brick.
背景技术Background technique
作为建造建筑物的最小单元,砖的作用不容忽视,使用过程中其构成建筑结构、承受负荷。随着人们对办公、家居环境的要求越来越高,越来越多的家用电器、水暖管道、通讯电缆等需从墙体内穿过,现在的建造方法有以下两种:第一、在建造墙体的时候将这些线、管先铺设在建筑物墙体内,然后继续建造,第二、先建造墙体然后在墙体上凿槽,在铺设线管。上述两种做法严重影响施工作业,尤其是在当今劳动力成本日益上涨的今天,无疑极大提高了建筑成本;另现在建筑物通常采用钢筋混凝土框架加砌块填充的方式,由于框架和砌块不是同时建造起来的,其相互之间的结合力不够,墙体结构需二次施工,增加人力成本;并且现在的砖垒成墙体的过程中需要找平面,高度依赖工人的技术熟练程度。另,目前砖砌的墙体不美观,墙体建成后还需刷水泥、抹灰沾瓷砖等后续作业,增加相应的费用,人力成本。As the smallest unit for building a building, the role of bricks cannot be ignored, and it constitutes the building structure and bears the load during use. As people's requirements for office and home environment are getting higher and higher, more and more household appliances, plumbing pipes, communication cables, etc. need to pass through the wall. The current construction methods are as follows: First, in When constructing the wall, these lines and pipes are laid in the wall of the building first, and then the construction is continued. Second, the wall is first built and then the wall is slotted and the line pipe is laid. These two practices have seriously affected construction operations, especially today's rising labor costs, which undoubtedly greatly increased the cost of construction; in addition, buildings are usually built with reinforced concrete frames and blocks, because the frames and blocks are not At the same time, the joint force is not enough, the wall structure needs secondary construction, which increases the labor cost; and now the brick barrier needs to find a plane in the process of forming a wall, which is highly dependent on the skilled level of the workers. In addition, the current brick wall is not beautiful. After the wall is built, it is necessary to brush cement, plastering and tiling, etc., and increase the corresponding cost and labor cost.
发明内容Summary of the invention
本发明的目的是提供一种建筑用砖和由该砖建成的墙,以克服现有技术存在的上述不足。It is an object of the present invention to provide a building brick and a wall constructed from the brick to overcome the above-discussed deficiencies of the prior art.
本发明的目的是通过以下技术方案来实现的:The object of the present invention is achieved by the following technical solutions:
一种建筑用砖,包括长方体状的砖体,所述砖体包括凸包和凹槽,所述凸包和凹槽分别设置于两相对的侧面;所述砖体上设有若干通孔或/和若干开口槽,所述通孔或/和开口槽均贯穿所述砖体的两个相对侧面。使用本技术方案的砖建造建筑物时,上层砖体的凹槽可以与下层砖体的凸包相卡接,有利于砖体 定位,免除对工人的技术熟练度的依赖,所述通孔和开口槽相互之间可以连通形成容纳腔,容纳腔内可以穿线、走暖通管道或其他管道,避免采用普通砖建造墙体时为了留出容纳腔而将砖体砍去某一部分以形成容纳腔,由于建筑用砖的强度较高,手动砍削困难,不易得到需要的形状,浪费建筑材料,提高了建筑成本另外,砍削过程砍刀冲击砖体,残渣飞溅,对工人的人身安全构成威胁,采用本技术方案节省人力、施工方便、节约建筑材料,降低建筑成本,提高市场竞争力。A building brick comprising a rectangular parallelepiped brick body, the brick body comprising a convex hull and a groove, wherein the convex hull and the groove are respectively disposed on two opposite sides; the brick body is provided with a plurality of through holes or And a plurality of open slots, each of which extends through two opposite sides of the tile body. When the building is constructed using the brick of the technical solution, the groove of the upper brick body can be engaged with the convex hull of the lower brick body, which is beneficial to the brick body. Positioning, exempting the technical proficiency of the worker, the through hole and the open groove can communicate with each other to form a receiving cavity, and the receiving cavity can be threaded, warmed through the pipeline or other pipes, and avoids the use of ordinary brick to construct the wall. In order to leave the accommodating cavity, the brick body is cut off to form a accommodating cavity. Due to the high strength of the building brick, manual cutting is difficult, it is difficult to obtain the required shape, the building material is wasted, the construction cost is increased, and the cutting is performed. The process chopper impacts the brick body, and the residue splashes, posing a threat to the personal safety of the workers. This technical solution saves manpower, facilitates construction, saves building materials, reduces construction costs, and improves market competitiveness.
所述砖体可由粘土烧结而成,其尺寸符合建筑行业标尺寸为240毫米×115毫米×53毫米,所述凸包的尺寸为80毫米×20毫米×240毫米,所述凹槽的尺寸与所述凸包的尺寸一致,所述通孔的截面尺寸为40毫米×40毫米,所述第一开口槽的截面尺寸为20毫米×40毫米,所述第二开口槽的截面尺寸为20毫米×20毫米。粘土砖就地取材,价格便宜,经久耐用,在土木建筑工程中使用广泛。废碎砖块还可作混凝土的集料。为改进普通粘土砖块小、自重大、耗土多的缺点,正向轻质、高强度、空心、大块的方向发展。The brick body may be sintered from clay, the size of which conforms to the building industry standard size is 240 mm × 115 mm × 53 mm, and the size of the convex hull is 80 mm × 20 mm × 240 mm, and the size of the groove is The size of the convex hull is uniform, the cross-sectional dimension of the through hole is 40 mm×40 mm, the cross-sectional dimension of the first open groove is 20 mm×40 mm, and the cross-sectional dimension of the second open groove is 20 mm. × 20 mm. Clay bricks are made in situ, cheap and durable, and are widely used in civil engineering. Waste bricks can also be used as aggregates for concrete. In order to improve the shortcomings of ordinary clay bricks, self-importance and soil consumption, the development of light, high strength, hollow and large blocks is progressing.
所述砖体也可为灰砂砖,其以适当比例的石灰和石英砂、砂或细砂岩,经磨细、加水拌和、半干法压制成型并经蒸压养护而成。粉煤灰砖以粉煤灰为主要原料,掺入煤矸石粉或粘土等胶结材料,经配料、成型、干燥和焙烧而成,可充分利用工业废渣,节约燃料。The brick body may also be a lime sand brick, which is formed by grinding, mixing with water, mixing with water, semi-dry pressing and autoclaving with appropriate proportion of lime and quartz sand, sand or fine sandstone. Fly ash brick uses fly ash as the main raw material, and is mixed with coal gangue powder or clay and other cementing materials. After being compounded, shaped, dried and calcined, it can make full use of industrial waste residue and save fuel.
所述砖体还可采用烧结页岩作为制作材料,烧结页岩作为一种新型建筑节能墙体材料,既可用于砌筑承重墙,又具有良好的热工性能,符合施工建筑模数,减少施工过程中的损耗,损高工作效率;孔洞率高、可减少墙体的自重,节约基础工程费用。与普通烧结多孔砖相比,具有轻质、高强和施工高效等特点。该产品以页岩为原料,采用砖机高真空挤出成型、一次码烧的生产工艺。The brick body can also be made of sintered shale as a production material, and the sintered shale is used as a new type of building energy-saving wall material, which can be used for masonry bearing wall and good thermal performance, conforming to the construction building modulus and reducing Loss during construction, high work efficiency; high hole rate, can reduce the weight of the wall and save the cost of basic engineering. Compared with ordinary sintered porous bricks, it has the characteristics of light weight, high strength and high efficiency of construction. The product uses shale as raw material, and adopts brick machine high vacuum extrusion molding and one-time burning production process.
进一步的,所述凸包设置在所述砖体的下表面,所述凹槽设置在所述砖体的上表面,所述凹槽两侧设有向上延伸的延伸板,所述凹槽为两延伸板之间的空间, 所述凸包在与其垂直的竖直平面的投影为一矩形,所述凸包的下表面为一平面并且与砖体的下表面平行。建造墙体时,当本层砖体与下层砖体平行放置时,仅需要向下一层的凹槽上摊上粘接泥浆然后将本层砖体的凸起与凹槽对应起来即可,不依赖工人的技术熟练程度,提高施工效率。Further, the convex hull is disposed on a lower surface of the brick body, the groove is disposed on an upper surface of the brick body, and the two sides of the groove are provided with an extending plate extending upward, and the groove is The space between the two extension plates, The projection of the convex hull in a vertical plane perpendicular thereto is a rectangle, and the lower surface of the convex hull is a plane and is parallel to the lower surface of the brick body. When constructing a wall, when the brick body of this layer is placed in parallel with the lower brick body, it is only necessary to spread the bonding mud on the groove of the next layer and then associate the protrusion of the brick body with the groove. Do not rely on the technical proficiency of workers to improve construction efficiency.
进一步的,凸包上设有与凸包的延伸方向垂直的卡接凹槽,所述卡接凹槽与形成凹槽的两延伸板相配合。可以将凸包上开设卡接凹槽,可以实现本层砖体与下层砖体的垂直码放。Further, the convex hull is provided with a snap groove perpendicular to the extending direction of the convex hull, and the snap groove cooperates with the two extension plates forming the groove. A snap groove can be formed on the convex hull to realize vertical stacking of the brick body and the lower brick body.
进一步的,所述通孔的中心线与上表面的中心点和下表面的中心点的连线相重合,所述通孔贯穿所述砖体的上下表面,所述通孔在水平面的投影为正方形,所述通孔的中心线垂直于所述砖体的上侧面。Further, a center line of the through hole coincides with a line connecting a center point of the upper surface and a center point of the lower surface, the through hole penetrating through the upper and lower surfaces of the brick body, and the projection of the through hole in the horizontal plane is A square having a centerline perpendicular to an upper side of the tile body.
进一步的,所述开口槽包括第一开口槽和第二开口槽,所述第一开口槽的数量为两个,所述两个第一开口槽分别设置在所述砖体的左右端面,所述第一开口槽的方向与所述砖体的端面平行,所述第二开口槽设置在凹槽内并且所述第二开口槽贯通所述砖体的左右侧面,所述第二开口槽的方向与所述凹槽的方向平行。Further, the open slot includes a first open slot and a second open slot, and the number of the first open slots is two, and the two first open slots are respectively disposed at left and right end faces of the brick body. The direction of the first opening groove is parallel to the end surface of the brick body, the second opening groove is disposed in the groove, and the second opening groove penetrates the left and right sides of the brick body, and the second opening groove The direction is parallel to the direction of the groove.
进一步的,所述第一开口槽在水平面的投影为一边未封闭的矩形,第一开口槽的长边的长度等于所述通孔的边长,第一开口槽短边的长度等于所述通孔的边长的的二分之一。保证本层砖体的通孔与相邻层的砖体的第一开口槽对接后组成的墙体相贯通。Further, the projection of the first open slot in the horizontal plane is a rectangle that is not closed on one side, and the length of the long side of the first open slot is equal to the length of the side of the through hole, and the length of the short side of the first open slot is equal to the pass One-half of the length of the side of the hole. It is ensured that the through hole of the brick body of the layer penetrates with the wall formed by the first open groove of the brick body of the adjacent layer.
优选的,所述砖体的前侧面和后侧面的至少一个侧面粘接有光滑的瓷质层。瓷质层采用瓷砖的材料和制造工艺,建造墙体时,当墙体的内外墙面均需要粘贴粉刷和粘接瓷砖时,所述砖体的前侧面和后侧面均粘接瓷质层,起到抗氧化作用;当只有内墙面需要粉刷和粘接瓷砖时,只需所述砖体的前侧面粘接瓷质层;当只有外墙面需要粉刷和粘接瓷砖时,只需所述砖体的后侧面粘接瓷质层。所述砖体的前后两面的颜色不同;所述砖体的前后两面风格不同,例如一面是仿大理石的,一面是仿木的;所述砖体的一面是光滑的瓷质层,一面是粗糙表 面;有不同的颜色由一个中心线分开,例如同一面有黑白两种颜色由中心线分开。Preferably, at least one side of the front side and the rear side of the brick body is bonded with a smooth porcelain layer. The porcelain layer is made of ceramic material and manufacturing process. When the wall is built, when the inner and outer walls of the wall need to be pasted and bonded, the front side and the back side of the brick are bonded with a porcelain layer. It has anti-oxidation effect; when only the inner wall surface needs to be painted and bonded, only the front side of the brick body is bonded to the porcelain layer; when only the outer wall surface needs to be painted and bonded, only The back side of the brick body is bonded to the porcelain layer. The front and rear sides of the brick body have different colors; the front and back sides of the brick body have different styles, for example, one side is imitation marble, and one side is wood-like; one side of the brick body is a smooth porcelain layer, and one side is rough. Table Face; there are different colors separated by a center line, for example, the same side has black and white two colors separated by the center line.
将带有瓷质层的一面码放在内墙面,可节省大量的后续装修如:抹灰、粘接瓷砖的成本。Putting a side code with a porcelain layer on the inner wall saves a lot of subsequent decoration such as plastering and bonding the cost of the tile.
采用所述的砖体制成的墙包括墙体,所述墙体包括若干层,同一层上的砖体的第二开口槽重合以形成贯通的水平容纳腔,相邻层上的砖体彼此错位使所同一层上的相邻砖体的第一开口槽对应并围成与通孔形状一致第一开口槽容纳腔,相邻层的砖体的通孔的中心线与第一开口槽容纳腔的中心线相重合以形成贯通的竖直容纳腔。The wall made of the brick body comprises a wall body, the wall body comprises a plurality of layers, and the second opening grooves of the brick body on the same layer overlap to form a horizontal receiving cavity, and the brick bodies on the adjacent layers are dislocated from each other. Corresponding to the first opening groove receiving cavity of the adjacent brick body on the same layer and surrounding the shape of the through hole, the center line of the through hole of the brick body of the adjacent layer and the first opening groove receiving cavity The centerlines coincide to form a through vertical receiving cavity.
进一步的,若干竖直容纳腔和若干水平容纳腔相贯通形成加强填充腔,所述加强填充腔内填充有连接为一体的加强结构;若干竖直容纳腔和若干水平容纳腔相贯通形成管线穿过腔。所述加强结构可为钢筋混凝土结构,提高墙体的强度,延长所述墙体的使用寿命;墙体建造过程中通孔、第一开口槽容纳腔和第二开口槽相贯通,形成管线穿过腔以供日常的管线穿过。Further, a plurality of vertical accommodating cavities and a plurality of horizontal accommodating cavities are formed to form a reinforced filling cavity, wherein the reinforced filling cavity is filled with a reinforcing structure integrally connected; a plurality of vertical accommodating cavities and a plurality of horizontal accommodating cavities are formed to penetrate the pipeline Through the cavity. The reinforcing structure may be a reinforced concrete structure, which improves the strength of the wall and prolongs the service life of the wall; during the construction of the wall, the through hole, the first open groove receiving cavity and the second open groove penetrate to form a pipeline Pass through the cavity for the daily pipeline to pass through.
通孔与所述管线通过腔相连通,可将通过腔内的水管、电线或通信线缆从通孔内引出,避免在墙上凿孔,墙面凿孔定位较难,往往需要多次操作才能找到墙体内部的水管、电线或通信线缆等,损坏墙面,某些时候凿孔甚至会凿到水管、电线或通信光缆等管线,造成损失,由于所述管线在墙体内,其维修难度大,本技术方案可将管线顺利的引出,避免损坏墙面和管线。The through hole communicates with the pipeline through the cavity, and the water pipe, the electric wire or the communication cable passing through the cavity can be taken out from the through hole, thereby avoiding the hole in the wall, and the positioning of the hole in the wall is difficult, and often requires multiple operations. In order to find the water pipes, wires or communication cables inside the wall, damage the wall surface, and sometimes the holes may even be cut into pipes such as water pipes, wires or communication cables, causing losses, because the pipes are in the wall, Maintenance is difficult, this technical solution can smoothly lead out the pipeline to avoid damage to the wall and pipeline.
进一步的,位于所述墙体的侧面的砖体上设有与所述管线通过腔相连通的管线引出孔,所述墙体还包括与所述管线引出孔相配合的封堵塞。将瓷质层烧结在砖体的前后两个侧面上,墙体建造起来后便有了瓷质层,节省了墙体刮涂料的工艺,节约人力成本,降低建筑成本。Further, the brick body located on the side of the wall body is provided with a pipeline outlet hole communicating with the pipeline through the cavity, and the wall body further comprises a sealing blockage matched with the pipeline outlet hole. The porcelain layer is sintered on the front and back sides of the brick body, and the porcelain layer is formed after the wall is built, which saves the process of scraping the wall paint, saves labor cost and reduces construction cost.
本技术方案所提及的“上”“下”“左”“右”“前”“后”为将所述砖体放置于水平面时,使凹槽开口朝上的方向为“上”,“下”方向与“上”相反,设有开口槽的两端分别为“左”“右”,剩下的两个端面分别为“前”“后”。 The "upper", "lower", "left", "right", "front" and "rear" mentioned in the technical solution are such that when the brick body is placed on a horizontal plane, the direction in which the opening of the groove is upward is "up", " The lower "direction" is opposite to the "upper", and the two ends of the open groove are respectively "left" and "right", and the remaining two end faces are "front" and "back" respectively.
本发明的有益效果为:The beneficial effects of the invention are:
1)提高施工效率、降低人力成本1) Improve construction efficiency and reduce labor costs
凸包与凹槽相配合,有利于砖体定位,免除对工人的技术熟练度的依赖;The convex hull and the groove cooperate to facilitate the positioning of the brick body, and the dependence on the technical proficiency of the worker is eliminated;
2)节约材料、避免浪费2) Save materials and avoid waste
避免采用普通砖建造墙体时为了留出容纳腔而将砖体砍去某一部分以形成容纳腔,由于建筑用砖的强度较高,手动砍削困难,不易得到需要的形状,浪费建筑材料,提高了建筑成本另外,砍削过程砍刀冲击砖体,残渣飞溅,对工人的人身安全构成威胁,采用本技术方案节省人力、保障建筑工人的人身安全;When the wall is built with ordinary bricks, the brick body is cut off to form a receiving cavity in order to leave the accommodating cavity. Due to the high strength of the building brick, manual cutting is difficult, the desired shape is not easily obtained, and the building material is wasted. In addition, the chopping process impacts the brick body and the residue splashes, which poses a threat to the personal safety of the workers. This technical solution saves manpower and protects the personal safety of construction workers;
3)墙体结构坚固、使用寿命长3) The wall structure is firm and has a long service life.
墙体包括加强填充腔,加强填充腔内填充加强结构,提高墙体的力学性能和使用寿命;The wall body comprises a reinforcing filling cavity, and the reinforcing filling structure in the filling cavity is strengthened to improve the mechanical properties and the service life of the wall body;
4)方便后续管线的安装、维修4) Facilitate the installation and maintenance of subsequent pipelines
墙体建造完成后,便形成管线通过腔,设置与管线通过腔相贯通的管线引出孔,可根据实际需要,方便引出电线插座、电话线接头、水管出水口或暖气片安装口;After the wall is completed, the pipeline is formed through the cavity, and the pipeline outlet hole which is connected with the pipeline through the cavity is arranged, and the wire socket, the telephone line connector, the water pipe outlet or the radiator mounting port can be conveniently led out according to actual needs;
5)防氧化能力强、节省后续装修成本5) Strong anti-oxidation ability and save on subsequent renovation costs
墙体是一次成型,每个部位都是一个整体,没有经过后续装修如:刷水泥,抹灰、粘接瓷砖;瓷质层采用瓷砖的材料和制造工艺,瓷质层具有抗氧化性,建造墙体时,将带有瓷质层的一面码放在内墙面,可节省大量的后续装修如:抹灰、粘接瓷砖的成本。The wall is formed once, each part is a whole, without subsequent decoration such as: brushing cement, plastering, bonding ceramic tiles; porcelain layer using ceramic tile material and manufacturing process, porcelain layer has oxidation resistance, construction When the wall is placed, the side code with the porcelain layer is placed on the inner wall surface, which can save a lot of subsequent decoration such as plastering and bonding the cost of the tile.
附图说明DRAWINGS
图1是实施例一所述的建筑用砖的立体结构示意图; 1 is a schematic perspective structural view of a building brick according to Embodiment 1;
图2是图1另一视角的立体结构示意图;Figure 2 is a perspective view showing the perspective of another view of Figure 1;
图3是实施例三所述的建筑用砖的立体结构示意图;3 is a schematic perspective structural view of a building brick according to Embodiment 3;
图4是由建筑用砖建成的墙的沿与墙的延伸方向相垂直的剖视图;Figure 4 is a cross-sectional view of the wall made of building bricks perpendicular to the direction in which the wall extends;
图5是由建筑用砖建成的墙的沿墙的延伸方向的剖视图。Figure 5 is a cross-sectional view of a wall constructed of building bricks along the direction in which the wall extends.
图中,1、凸包;2、凹槽;3、通孔;4、开口槽;41、第一开口槽;42、第二开口槽;5、延伸板;6、卡接凹槽;7、第一开口槽容纳腔。In the figure, 1, convex hull; 2, groove; 3, through hole; 4, open slot; 41, first open slot; 42, second open slot; 5, extension plate; 6, snap groove; The first open slot receives the cavity.
具体实施方式detailed description
实施例一 Embodiment 1
如图1-图2所示,一种建筑用砖,包括长方体状的砖体,所述砖体包括凸包1和凹槽2,所述凸包1和凹槽2分别设置于两相对的侧面;所述砖体上设有若干通孔3或/和若干开口槽4,所述通孔3或/和开口槽4均贯穿所述砖体的两个相对侧面。As shown in FIG. 1 to FIG. 2, a building brick includes a rectangular parallelepiped brick body, and the brick body includes a convex hull 1 and a groove 2, and the convex hull 1 and the groove 2 are respectively disposed on two opposite sides. a side surface; the brick body is provided with a plurality of through holes 3 or/and a plurality of open slots 4, and the through holes 3 or/and the open slots 4 extend through two opposite sides of the brick body.
所述凸包1设置在所述砖体的下表面,所述凹槽2设置在所述砖体的上表面,所述凹槽2两侧设有向上延伸的延伸板5,所述凹槽2为两延伸板5之间的空间,所述凸包1在与其垂直的竖直平面的投影为一矩形,所述凸包1的上表面为一平面并且与砖体的下表面平行。所述通孔3的中心线与上表面的中心点和下表面的中心点的连线相重合,所述通孔3贯穿所述砖体的上下表面,所述通孔3在水平面的投影为正方形,所述通孔3的中心线垂直于所述砖体的上侧面。所述开口槽4包括第一开口槽41和第二开口槽42,所述第一开口槽41的数量为两个,所述两个第一开口槽41分别设置在所述砖体的左右端面,所述第一开口槽41的方向与所述砖体的端面平行,所述第二开口槽42设置在凹槽2内并且所述第二开口槽42贯通所述砖体的左右侧面,所述第二开口槽42的方向与所述凹槽2的方向平行。所述第一开口槽41在水平面的投影为一边未封闭的矩形,第一开口槽41的长边的长度等于所述通孔3的边长,第一开口槽41短边的长度等于所述通孔3的边长的的二分之一。 The convex hull 1 is disposed on a lower surface of the brick body, the groove 2 is disposed on an upper surface of the brick body, and two sides of the groove 2 are provided with an extending plate 5 extending upward, the groove 2 is a space between the two extension plates 5, the projection of the convex hull 1 in a vertical plane perpendicular thereto is a rectangle, and the upper surface of the convex hull 1 is a plane and is parallel to the lower surface of the brick body. a center line of the through hole 3 coincides with a line connecting a center point of the upper surface and a center point of the lower surface, the through hole 3 penetrating the upper and lower surfaces of the brick body, and the projection of the through hole 3 in the horizontal plane is A square, the center line of the through hole 3 is perpendicular to the upper side of the tile body. The opening slot 4 includes a first opening slot 41 and a second opening slot 42. The number of the first opening slots 41 is two, and the two first opening slots 41 are respectively disposed at the left and right end faces of the brick body. The direction of the first opening groove 41 is parallel to the end surface of the brick body, the second opening groove 42 is disposed in the groove 2, and the second opening groove 42 penetrates the left and right sides of the brick body. The direction of the second opening groove 42 is parallel to the direction of the groove 2. The projection of the first opening slot 41 in the horizontal plane is a rectangle that is not closed on one side, the length of the long side of the first opening slot 41 is equal to the length of the side of the through hole 3, and the length of the short side of the first opening slot 41 is equal to the length One-half of the length of the side of the through hole 3.
如图4-图5所示,采用本实施例所述的建筑用砖制成的墙包括墙体,所述墙体包括若干层,同一层上的砖体的第二开口槽42重合以形成贯通的水平容纳腔,相邻层上的砖体彼此错位使所同一层上的相邻砖体的第一开口槽41对应并围成与通孔3形状一致第一开口槽41容纳腔,相邻层的砖体的通孔3的中心线与第一开口槽41容纳腔的中心线相重合以形成贯通的竖直容纳腔。As shown in FIG. 4 to FIG. 5, the wall made of the building brick according to the embodiment includes a wall body, and the wall body comprises a plurality of layers, and the second opening grooves 42 of the brick body on the same layer are overlapped to form. a horizontal accommodating cavity, the bricks on the adjacent layers are offset from each other such that the first opening grooves 41 of the adjacent bricks on the same layer correspond to and conform to the shape of the through hole 3, and the first opening groove 41 accommodates the cavity. The center line of the through hole 3 of the tile of the adjacent layer coincides with the center line of the receiving cavity of the first opening groove 41 to form a penetrating vertical receiving cavity.
相邻层上的砖体彼此错位使所同一层上的相邻砖体的第一开口槽41对应并围成与通孔3形状一致的第一开口槽容纳腔7,相邻层的砖体的通孔3的中心线与第一开口槽容纳腔7的中心线相重合以形成贯通的竖直容纳腔。The brick bodies on the adjacent layers are offset from each other such that the first opening grooves 41 of the adjacent brick bodies on the same layer correspond to and define a first open groove receiving cavity 7 conforming to the shape of the through hole 3, and the adjacent layer of the brick body The center line of the through hole 3 coincides with the center line of the first open groove accommodating chamber 7 to form a penetrating vertical accommodating cavity.
若干竖直容纳腔和若干水平容纳腔相贯通形成加强填充腔,所述加强填充腔内填充有连接为一体的加强结构;若干竖直容纳腔和若干水平容纳腔相贯通形成管线穿过腔。A plurality of vertical receiving cavities and a plurality of horizontal receiving cavities are formed to form a reinforcing filling cavity, wherein the reinforcing filling cavity is filled with a reinforcing structure integrally connected; a plurality of vertical receiving cavities and a plurality of horizontal receiving cavities are penetrated to form a pipeline through the cavity.
位于所述墙体的侧面的砖体上设有与所述管线通过腔相连通的管线引出孔,所述墙体还包括与所述管线引出孔相配合的封堵塞。A brick body located on a side of the wall is provided with a pipeline outlet hole communicating with the pipeline through the cavity, and the wall body further includes a sealing plug that cooperates with the pipeline outlet hole.
实施例二 Embodiment 2
本实施例所述的建筑用砖与实施例一的结构基本相同,其不同之处在于:所述砖体的前侧面和后侧面的至少一个侧面粘接有光滑的瓷质层。The building brick according to the embodiment is basically the same as the structure of the first embodiment, and the difference is that at least one side of the front side and the rear side of the brick body is bonded with a smooth porcelain layer.
当建筑物采用实施例二所述的墙体制成时,瓷质层采用瓷砖的材料和制造工艺,建造墙体时,将带有瓷质层的一面码放在内墙面,可节省大量的后续装修如:抹灰、粘接瓷砖的成本;可以将凸包1上开设卡接凹槽6,可以实现本层砖体与相邻层砖体的垂直码放,在相邻砖体构成的层之间形成横向拉力,使墙体更加稳固。When the building is made of the wall described in the second embodiment, the porcelain layer is made of the material and manufacturing process of the ceramic tile. When the wall is built, the side code with the porcelain layer is placed on the inner wall surface, which can save a lot of Subsequent decoration such as: plastering, bonding the cost of the tile; can open the snap groove 6 on the convex hull 1 to realize the vertical stacking of the brick body and the adjacent layer brick body, the layer formed by the adjacent brick body A lateral pulling force is formed to make the wall more stable.
实施例三 Embodiment 3
如图3所示,本实施例所述的建筑用砖与实施例一的结构基本相同,其不同之处在于:所述凸包1上设有与凸包1的延伸方向垂直的卡接凹槽6,所述 卡接凹槽6与形成凹槽2的两延伸板5相配合。As shown in FIG. 3, the building brick according to the embodiment is basically the same as the structure of the first embodiment, and the difference is that the convex hull 1 is provided with a latching concave perpendicular to the extending direction of the convex hull 1. Slot 6, said The snap groove 6 cooperates with the two extension plates 5 forming the groove 2.
本发明不局限于上述最佳实施方式,任何人在本发明的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本申请相同或相近似的技术方案,均落在本发明的保护范围之内。 The present invention is not limited to the above-described preferred embodiments, and any other form of product can be derived by anyone of the present invention, but without any change in shape or structure, it is the same as or equivalent to the present application. Approximate technical solutions are all within the scope of the present invention.

Claims (10)

  1. 一种建筑用砖,包括长方体状的砖体,其特征在于:所述砖体包括凸包和凹槽,所述凸包和凹槽分别设置于两相对的侧面;所述砖体上设有若干通孔或/和若干开口槽,所述通孔或/和开口槽均贯穿所述砖体的两个相对侧面。A building brick comprising a rectangular parallelepiped brick body, wherein the brick body comprises a convex hull and a groove, and the convex hull and the groove are respectively disposed on two opposite sides; the brick body is provided with A plurality of through holes or/and a plurality of open slots, each of which extends through two opposite sides of the tile body.
  2. 根据权利要求1所述的建筑用砖,其特征在于:所述凸包设置在所述砖体的下表面,所述凹槽设置在所述砖体的上表面,所述凹槽两侧设有向上延伸的延伸板,所述凹槽为两延伸板之间的空间,所述凸包在与其垂直的竖直平面的投影为一矩形,所述凸包的下表面为一平面并且与砖体的下表面平行。The building brick according to claim 1, wherein the convex hull is disposed on a lower surface of the brick body, and the groove is disposed on an upper surface of the brick body, and the two sides of the groove are disposed There is an extending plate extending upwardly, the groove is a space between two extending plates, a projection of the convex hull in a vertical plane perpendicular thereto is a rectangle, and a lower surface of the convex hull is a plane and a brick The lower surface of the body is parallel.
  3. 根据权利要求2所述的建筑用砖,其特征在于:凸包上设有与凸包的延伸方向垂直的卡接凹槽,所述卡接凹槽与形成凹槽的两延伸板相配合。The building brick according to claim 2, wherein the convex hull is provided with a locking groove perpendicular to the extending direction of the convex hull, and the engaging groove cooperates with the two extending plates forming the groove.
  4. 根据权利要求3所述的建筑用砖,其特征在于:所述通孔的中心线与上表面的中心点和下表面的中心点的连线相重合,所述通孔贯穿所述砖体的上下表面,所述通孔在水平面的投影为正方形,所述通孔的中心线垂直于所述砖体的上侧面。The building brick according to claim 3, wherein a center line of the through hole coincides with a line connecting a center point of the upper surface and a center point of the lower surface, the through hole penetrating the brick body The upper and lower surfaces, the projection of the through hole in the horizontal plane is a square, and the center line of the through hole is perpendicular to the upper side of the brick body.
  5. 根据权利要求4所述的建筑用砖,其特征在于:所述开口槽包括第一开口槽和第二开口槽,所述第一开口槽的数量为两个,所述两个第一开口槽分别设置在所述砖体的左右端面,所述第一开口槽的方向与所述砖体的端面平行,所述第二开口槽设置在凹槽内并且所述第二开口槽贯通所述砖体的左右侧面,所述第二开口槽的方向与所述凹槽的方向平行。The building brick according to claim 4, wherein the opening groove comprises a first opening groove and a second opening groove, and the number of the first opening grooves is two, the two first opening grooves Arranging respectively on the left and right end faces of the brick body, the direction of the first opening groove is parallel to the end surface of the brick body, the second opening groove is disposed in the groove and the second opening groove passes through the brick The left and right sides of the body, the direction of the second opening groove is parallel to the direction of the groove.
  6. 根据权利要求5所述的建筑用砖,其特征在于:所述第一开口槽在水平面的投影为一边未封闭的矩形,第一开口槽的长边的长度等于所述通孔的边长,第一开口槽短边的长度等于所述通孔的边长的的二分之一。The building brick according to claim 5, wherein the projection of the first opening groove in the horizontal plane is a rectangle that is not closed on one side, and the length of the long side of the first opening groove is equal to the length of the side of the through hole. The length of the short side of the first opening slot is equal to one-half of the length of the side of the through hole.
  7. 根据权利要求6所述的建筑用砖,其特征在于:所述砖体的前侧面和后侧面的至少一个侧面粘接有光滑的瓷质层。The building brick according to claim 6, wherein at least one side of the front side and the rear side of the brick body is bonded with a smooth porcelain layer.
  8. 用权利要求7所述的建筑用砖建造的墙,其特征在于:包括墙体,所述 墙体包括若干层,同一层上的砖体的第二开口槽重合以形成贯通的水平容纳腔,相邻层上的砖体彼此错位使所同一层上的相邻砖体的第一开口槽对应并围成与通孔形状一致第一开口槽容纳腔,相邻层的砖体的通孔的中心线与第一开口槽容纳腔的中心线相重合以形成贯通的竖直容纳腔。A wall constructed using the building brick of claim 7 comprising: a wall, said The wall comprises a plurality of layers, and the second open slots of the bricks on the same layer overlap to form a through horizontal receiving cavity, and the bricks on the adjacent layers are offset from each other such that the first open slots of adjacent bricks on the same layer Corresponding to and surrounding the shape of the through hole, the first open groove receiving cavity, the center line of the through hole of the brick of the adjacent layer coincides with the center line of the first open groove receiving cavity to form a penetrating vertical receiving cavity.
  9. 根据权利要求8所述的墙体,其特征在于:若干竖直容纳腔和若干水平容纳腔相贯通形成加强填充腔,所述加强填充腔内填充有连接为一体的加强结构;若干竖直容纳腔和若干水平容纳腔相贯通形成管线穿过腔。The wall according to claim 8, wherein a plurality of vertical receiving cavities and a plurality of horizontal receiving cavities are formed to form a reinforcing filling cavity, wherein the reinforcing filling cavity is filled with a reinforcing structure integrally connected; and several vertically accommodated The cavity and the plurality of horizontal receiving cavities penetrate to form a pipeline through the cavity.
  10. 根据权利要求9所述的墙体,其特征在于:位于所述墙体的侧面的砖体上设有与所述管线通过腔相连通的管线引出孔,所述墙体还包括与所述管线引出孔相配合的封堵塞。 The wall according to claim 9, wherein the brick body on the side of the wall body is provided with a pipeline take-out hole communicating with the pipeline through the cavity, and the wall body further includes the pipeline The plugging holes are matched with the plugging.
PCT/CN2015/075895 2014-09-26 2015-04-03 Building brick and wall built therewith WO2016045344A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410498426.4A CN104294993A (en) 2014-09-26 2014-09-26 Building brick and wall built by brick
CN201410498426.4 2014-09-26

Publications (1)

Publication Number Publication Date
WO2016045344A1 true WO2016045344A1 (en) 2016-03-31

Family

ID=52314917

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2015/075895 WO2016045344A1 (en) 2014-09-26 2015-04-03 Building brick and wall built therewith

Country Status (2)

Country Link
CN (1) CN104294993A (en)
WO (1) WO2016045344A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108658610A (en) * 2017-03-28 2018-10-16 五冶集团上海有限公司 A kind of casting material prefabricated brick and production method of dry coke quenching slope air course support portion
CN113322736A (en) * 2021-05-11 2021-08-31 利辛县汝集镇南阳墙体材料有限公司 Environment-friendly gangue brick

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294993A (en) * 2014-09-26 2015-01-21 黄烈元 Building brick and wall built by brick
CN108149831A (en) * 2018-02-23 2018-06-12 王国辉 Modular architectural brick
CN110487097A (en) * 2019-08-26 2019-11-22 周封 Constitute the accumulation of heat brick structure of a variety of space multistory air path systems
CN112095845B (en) * 2020-09-14 2021-10-22 中国水电基础局有限公司 House building wall structure and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122154A (en) * 2007-08-31 2008-02-13 何荣灿 Positioning embedded bricklaying
FR2957370B1 (en) * 2010-03-10 2012-08-03 Sas Raymond Josse BRICK FULL IN EARTH FOR THE PRODUCTION OF PARTITIONS OR WALLS WITH INTERNAL CONDUITS.
BRPI1004610A2 (en) * 2010-11-03 2013-02-26 Inblock Servicos E Consultadoria Lda building blocks and process for building construction using these blocks
CN203514614U (en) * 2013-07-26 2014-04-02 株洲博尔曼科技发展有限公司 Novel double-H molded engagement block
CN203684497U (en) * 2013-12-18 2014-07-02 株洲博尔曼科技发展有限公司 Novel chain block
CN203684515U (en) * 2013-12-18 2014-07-02 株洲博尔曼科技发展有限公司 Novel self-insulation chain block
CN104294993A (en) * 2014-09-26 2015-01-21 黄烈元 Building brick and wall built by brick
CN204112570U (en) * 2014-09-26 2015-01-21 黄烈元 A kind of building brick and the body of wall built up by this brick

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2088133U (en) * 1990-10-23 1991-11-06 陆义仁 Multi-function brick
AU2003222714A1 (en) * 2003-02-07 2004-08-30 Dimitrios Papachatzis Brick system with horizontal and vertical connective king-slots, for complete construction works and decoration
US6962028B2 (en) * 2003-11-24 2005-11-08 Aldo Banova Interlocking masonry articles and methods thereof
JP5321973B2 (en) * 2009-08-17 2013-10-23 Sayyas Japan株式会社 Reinforcement method for brick wall decoration in brick building

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122154A (en) * 2007-08-31 2008-02-13 何荣灿 Positioning embedded bricklaying
FR2957370B1 (en) * 2010-03-10 2012-08-03 Sas Raymond Josse BRICK FULL IN EARTH FOR THE PRODUCTION OF PARTITIONS OR WALLS WITH INTERNAL CONDUITS.
BRPI1004610A2 (en) * 2010-11-03 2013-02-26 Inblock Servicos E Consultadoria Lda building blocks and process for building construction using these blocks
CN203514614U (en) * 2013-07-26 2014-04-02 株洲博尔曼科技发展有限公司 Novel double-H molded engagement block
CN203684497U (en) * 2013-12-18 2014-07-02 株洲博尔曼科技发展有限公司 Novel chain block
CN203684515U (en) * 2013-12-18 2014-07-02 株洲博尔曼科技发展有限公司 Novel self-insulation chain block
CN104294993A (en) * 2014-09-26 2015-01-21 黄烈元 Building brick and wall built by brick
CN204112570U (en) * 2014-09-26 2015-01-21 黄烈元 A kind of building brick and the body of wall built up by this brick

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108658610A (en) * 2017-03-28 2018-10-16 五冶集团上海有限公司 A kind of casting material prefabricated brick and production method of dry coke quenching slope air course support portion
CN113322736A (en) * 2021-05-11 2021-08-31 利辛县汝集镇南阳墙体材料有限公司 Environment-friendly gangue brick

Also Published As

Publication number Publication date
CN104294993A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
WO2016045344A1 (en) Building brick and wall built therewith
US10526783B2 (en) Recyclable building block and building system used for constructing building
US10889983B2 (en) Recyclable builidng block and building system used for constructing building
CN205776884U (en) A kind of assembled Novel light wall body
CN204112570U (en) A kind of building brick and the body of wall built up by this brick
CN204343622U (en) A kind of syndeton of combined floor
CN204728562U (en) A kind of building brick, the wall at band turning built up by this brick
CN205153303U (en) Energy -conserving prefabricated wallboard
CN204663016U (en) For the seat slurry device of hollow blocks built
CN208023830U (en) One kind exempting from plastering and exempts from common brick ribbed panel
CN204199478U (en) Novel seal body of wall
CN205840114U (en) A kind of waterproof building block brick
CN202152539U (en) Plastic building template
CN113152777B (en) Fabricated concrete brick based on machine-made sand material and preparation method thereof
CN207794505U (en) A kind of furring tile modelled after an antique
CN204510659U (en) A kind of Ceramic Tiles combination being applicable to body of wall external corner
CN205421685U (en) Decorate building brick
CN201347601Y (en) L-shaped energy-saving building block
CN201486014U (en) Z-shaped energy-saving building block
CN205531131U (en) Ceramic brick gives sound insulation
CN206205253U (en) A kind of wall block
CN104047375A (en) Structure for brickwork connection and construction method
CN203347112U (en) Tile-type ridge central gland
CN216405902U (en) Green building energy-saving wall
CN205369660U (en) Building brick is decorated to outer wall

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15844671

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15844671

Country of ref document: EP

Kind code of ref document: A1