WO2015192169A1 - A rail crossover control system - Google Patents
A rail crossover control system Download PDFInfo
- Publication number
- WO2015192169A1 WO2015192169A1 PCT/AU2015/000356 AU2015000356W WO2015192169A1 WO 2015192169 A1 WO2015192169 A1 WO 2015192169A1 AU 2015000356 W AU2015000356 W AU 2015000356W WO 2015192169 A1 WO2015192169 A1 WO 2015192169A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- rail
- crossover
- control system
- train
- mcu
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L19/00—Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
- B61L19/06—Interlocking devices having electrical operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L1/00—Devices along the route controlled by interaction with the vehicle or train
- B61L1/16—Devices for counting axles; Devices for counting vehicles
- B61L1/163—Detection devices
- B61L1/165—Electrical
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/22—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
- B61L23/30—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails using automatic section blocking
Definitions
- crossover track sections that facilitate passage of a train from a first track to a second adjacent track, and to control whether a train will transfer between the tracks or not by controlling a series of rail switches.
- each crossover track section has a first set of 2 rail switches associated with respective rails of a first track, and a second set of 2 rail switches
- Each set of rail switches is movable between a normal position wherein a train passing over the rail switches will continue on the same track, and a reverse position wherein a train passing over the rail switches will transfer between the current track and a crossover track section.
- both sets of rail switches move together between the normal and reverse positions such that all sets of rail switches are either in the normal position or the reverse position. In order for a train to transfer between adjacent tracks, both sets of rail switches must be in the reverse position.
- the positions of the rail switches on a rail network are controlled centrally using a train control system that manages train routes and controls the positions of the rail switches accordingly.
- trains are only allowed to pass through a track section having a crossover section if both sets of rail switches are working correctly and determined to be in the same position.
- controlled passage of trains through the tracks on both sides of the crossover is prevented, even though a set of rail switches on one side of the crossover track section is still operational .
- a train can only be allowed to pass through the operational side of the crossover if the operational rail switches are manually moved to the normal position and a paper based manually issued movement authority is provided to the train driver.
- the movement authority confirms that a relevant section of the rail network has been isolated for use by the train.
- a rail crossover control system for a rail track section of a rail network, the rail track section having first and second rail tracks, a crossover track section extending between the first and second rail tracks, at least one first set of rail
- switches arranged to controllably determine whether a train continues on the first track or is diverted from the first track onto the crossover track section, and at least one second set of rail switches arranged to controllably determine whether a train continues on the second track or is diverted from the second track onto the crossover track section, the system comprising:
- At least one interlocking control unit arranged to detect and control the first and second sets of rail switches according to determined train routes
- an obstruction detector arranged to detect presence of an obstruction on the crossover track section and generate an obstruction signal when an obstruction is detected, the at least one first set of rail switches is inoperative and the at least one second set of rail switches is operative;
- the interlocking control unit arranged to prevent trains from traveling over the at least one second set of operative rail switches when the obstruction signal is generated .
- the obstruction detector includes at least one wheel sensor arranged to sense presence of a wheel on a rail track.
- a plurality of wheel sensors may be provided, at least one wheel sensor being disposed adjacent a first end of the crossover track section, and at least one wheel sensor being disposed adjacent a second opposite end of the crossover track section.
- the obstruction detector includes an axle counter, the axle counter including at least two wheel sensors.
- the rail crossover control system comprises a maintenance control unit (MCU) disposed adjacent the rail track section, the MCU arranged to facilitate local control and monitoring of at least one set of rail switches.
- MCU maintenance control unit
- the rail crossover control system comprises a train control system arranged to manage train routes over the rail network.
- the rail crossover control system may be arranged to manage handover of control of the at least one set of rail switches of the rail track section between the train control system and the MCU.
- the handover of control of the at least one set of rail switches of the rail track section between the train control system and the MCU is at least partly managed by the MCU.
- the MCU may be arranged to facilitate sending of a request communication from the MCU to the train control system, the request communication indicative that an operator at the MCU wishes to transfer control of the at least one set of rail switches to the MCU.
- the train control system is arranged to receive the request communication and in response to communicate the location of the at least one set of rail switches associated with the request to a train
- the train control system includes a display device arranged to display a representation of the track section to a train controller, and the location of the at least one set of rail switches associated with the request is communicated to the train controller by
- the train control system may be arranged to facilitate sending of an acknowledgement communication from the train control system to the MCU, the acknowledgement communication indicative that a train controller approves the request to transfer control of the at least one set of rail switches to the MCU.
- the MCU includes a maintenance switch disposable in an OFF position wherein control of the at least one set of rail switches is with the train control system, or a MAINTENANCE position wherein control of the at least one set of rail switches is transferred to the MCU, and the MCU is arranged to prevent the maintenance switch from moving to the MAINTENANCE position until the acknowledgement communication is received at the MCU.
- the train control system is arranged to facilitate selection of a section of rail track or
- crossover track section and to add an electronic block to the selected section of rail track or crossover track section, the electronic block serving to prevent the train control system from setting train routes that pass through the selected section of rail track or crossover track section .
- the train control system may be arranged to send the acknowledgement communication only if at least one local control criterion is satisfied.
- the at least one local control criterion may comprise any one or more of: i) all train routes are normal for both ends of the crossover track section;
- the rail track associated with the crossover end under request has an electronic block placed on it at the train control system; and v) the maintenance switch is in the OFF position.
- the MCU comprises at least one visual indicator arranged to communicate to an operator the status of handover of control of the at least one set of rail switches to the MCU, whether the crossover track section or rail tracks associated with the rail track section are occupied or clear, and/or whether the at least one set of rail switches are operating correctly when controlled by the MCU.
- the rail crossover control system is arranged to generate an audible and/or visible alarm at the rail track section when an obstruction is detected on the crossover track section.
- the rail crossover control system comprises a crossover interface unit arranged to interface with the MCU, the crossover interface unit arranged to instigate sending of the obstruction signal to the train control system when an obstruction is detected on the crossover track section.
- the rail crossover control system comprises an MCU associated with each end of the crossover track section, each MCU arranged to facilitate local control and monitoring of at least one set of rail switches associated with an end of the crossover track section .
- the interlocking control unit is arranged to prevent trains from traveling over the at least one second set of operative rail switches in
- Each crossover end may have an associated regular mode wherein monitoring and control of the set of rail switches associated with the crossover end is with the train control system, and degraded mode wherein monitoring and control of the set of rail switches associated with the crossover end is not with the train control system.
- Degraded mode may include a failed sub-mode wherein a failure has occurred in relation to a set of rail switches associated with the crossover end, and local control mode wherein the set of rail switches is monitored and
- a method of controlling a rail crossover of a rail track section of a rail network comprising:
- Figure 1 is a schematic block diagram illustrating a rail crossover control system according to an embodiment of the present invention
- Figure 2 is a diagrammatic representation of a control panel of a maintenance control unit of the
- Figures 3a to 3c show a flow diagram illustrating steps undertaken to implement a maintenance operation in the crossover control system shown in Figure 1;
- Figure 4 is a flow diagram illustrating steps
- a rail crossover control system is described in relation to a rail network of a mine operation that is arranged to transport a bulk commodity from multiple mine sites to one or more port facilities.
- the rail network may include single track sections, wherein trains travel in opposite directions on the same track and pass each other at sidings distributed along the track, and double track sections, wherein trains travel in opposite directions on respective adjacently disposed tracks.
- the double track sections include crossover track sections that extend between respective tracks of the double track.
- the crossover sections facilitate passage of a train temporarily to an adjacent track ordinarily used for a train travelling in the opposite direction, so that the train can travel across the rail network and at the same time maintenance can be carried out on a section of the track.
- control and monitoring of the trains on the network is carried out at a train control system in networked communication with the rail network.
- the train control system is arranged to enable train controller personnel to efficiently manage train routes in consideration of track sections that are undergoing maintenance, whilst ensuring that train collisions are avoided .
- the train control system incorporates operator monitoring stations from which train controllers may monitor and control movement of trains on the rail network.
- FIG. 1 there is shown an example crossover control system 10 for controlling operation of crossover track sections 12 of a rail network, in particular for controlling operation of rail switches on the rail network and thereby routing of trains on the rail network.
- Figure 1 illustrates one track section 11 of the rail network that has a crossover track section 12, although it will be understood that multiple similar track sections 11 having associated crossover track sections would typically be present on the rail network.
- the track section 11 includes a first rail track 14 used to transport trains in a first direction, and a second rail track 16 used to transport trains in the opposite direction.
- first point control machine 18 Associated with the first rail track 14 is a first point control machine 18 arranged to effect controlled movement of a first set of rail switches 20.
- the first set of rail switches 20 are disposable in a normal position, wherein a train traveling over the rail switches 20 will continue to travel along the first rail track 14, and a reverse position, wherein a train traveling over the rail switches 20 will divert from the first rail track 14 and travel along the crossover track section 12.
- a second point control machine 22 associated with the second rail track 16 is a second point control machine 22 arranged to effect
- the second set of rail switches 24 are disposable in a normal position, wherein a train traveling over the rail switches 24 will continue to travel along the second rail track 16, and a reverse position, wherein a train
- the crossover control system 10 also includes an
- interlocking control unit 26 that communicates through a communications network 28 with a train control system 30.
- the interlocking control unit 26 is arranged to carry out logic processing, and detection and control of the first and second point control machines 18, 22, and thereby the first and second sets of rail switches 20, 24, according to train routes determined and managed by the train control system 30.
- the interlocking control unit 26 is a Microlok II interlocking, although it will be understood that other types of interlocking control unit 26 are envisaged.
- the interlocking control unit 26 is also arranged to transfer movement signals and information to train
- the movement signals and information are detected by an interface unit on a train and decoded by the interface unit, and relevant information is communicated to the train driver, for example on a driver display device or using lineside signals.
- the displayed information includes the maximum permitted train speed over the track section 11, the target travel speed, the current location of the train, the distance to the track section 11, and the current determined route for the train.
- information is displayed to the driver to indicate whether the crossover track section is set to normal or reverse, and if reverse, whether the turnout is to the left or right .
- the communications network 28 may include a wireless communications network, a hard wired network such as an Ethernet network, or a combination of wired and wireless networks .
- the train control system 30 is remotely located relative to mine sites, the rail network and a port facility, although it will be understood that other arrangements are envisaged.
- the train control system 30 includes a train control unit 32 and an associated display 34.
- the train control unit 32 includes a computing device provided with appropriate software to facilitate control and management of trains on the rail network, and in
- the display 34 in this example shows a representation 36 of several sections of the rail network, although in practice the display would ordinarily show the entire rail network so that a train controller at the train control system 30 is able to quickly determine the current status of the rail network, failures on the rail network and current maintenance.
- the representation 36 of the sections of the rail network shows rail tracks 38 and crossover track sections 40, and in this example the train control system 30 is arranged to modify the appearance of a rail track 38 or crossover track section 40 depending on whether the rail track 38 or crossover track section 40 is operational or blocked and therefore not available for use, for example because maintenance is being carried out or scheduled to be carried out soon.
- the representation 36 also includes rail switch position identifiers 42 that indicate on the representation the locations of sets of rail switches associated with
- the appearance of the rail switch position identifiers 42 changes according to the status of the relevant sets of rail switches associated with the rail switch position identifiers 42, for example such that a rail switch position identifier 42 flashes when a request is received for local control of a set of rail switches, and such that the rail switch position identifier 42 is continuously illuminated when control of the set of rail switches has been transferred from the train control system 30 to maintenance personnel on site.
- the crossover control system 10 also includes a first maintenance control unit (MCU) 50 associated with the first rail track 14, and a second maintenance control unit (MCU) 52 associated with the second rail track 16. Each MCU 52 is arranged to facilitate local control and
- the axle counter serves to determine whether and to what extent a train, or other wheeled device such as a hi-rail or track machine used in maintenance or track inspection operations, is present on the crossover track section 12.
- the axle counter includes a plurality of wheel sensors 54, 56 arranged to detect presence of a wheel, the wheel sensors 54, 56 communicating wheel detection information to a crossover interface unit 58 which uses the wheel detection information to determine an axle count.
- the crossover interface unit 58 also interfaces with the interlocking control unit 26 and the first and second MCUs 50, 52, and in this way facilitates communications between the first and second MCUs 50, 52 and the train control system 30.
- each end of the crossover track section 12 and therefore each set of rail switches 20, 22 operates either in regular mode or degraded mode.
- the crossover end In regular mode, the crossover end is operating normally, and routes through the sets of rail switches 20, 22 associated with the crossover end are controlled from the train control system 30 by signaling the set of rail switches directly through the interlocking control unit 26.
- crossover end may be in failed mode or local control mode.
- failed mode a crossover end has failed, for example because a failure has occurred at the set of rail switches associated with the crossover end, but the crossover end is still under responsibility of the train control system 30.
- local control mode control of the crossover end has been transferred to maintenance personnel on site adjacent the crossover end and responsibility for
- Local control mode may be initiated because the crossover end has moved to failed mode from regular mode, or because the crossover end has been placed in local control mode because of planned maintenance.
- the crossover control system 10 When a crossover end moves to local control mode, the crossover control system 10 implements a control handover process whereby responsibility for control of a crossover end, and in particular a set of rail switches associated with the crossover end, is transferred between the train control system 10 and an MCU 50, 52 disposed locally relative to the crossover end in a managed way.
- the control panel 60 includes a test switch 62 usable to cause the MCU 50, 52 to carry out a self-test sequence that confirms whether the MCU 50, 52 is operating
- the control panel 60 also includes a request button 64 and associated request indicator, in this example a request LED 66.
- the request button 64 is used to send a request signal from the MCU 50, 52 to the train control system 30 indicative that the maintenance personnel at the MCU 50, 52 wishes to take control of the crossover end associated with the MCU 50, 52 from the train control system 30.
- the request indicator 66 is used to communicate to the
- the control panel 60 also includes an electrically
- the maintenance switch 68 is disposable in an OFF position and a MAINTENANCE position and in this way is used to activate and deactivate local control by the MCU 50, 52.
- the maintenance switch 68 is ordinarily electrically locked in the OFF position and is prevented from moving to the
- the maintenance indicator 70 is used to communicate the control status to the maintenance
- the control panel 60 also includes a normal position button 72, a normal position indicator, in this example a normal position LED 74, a reverse position button 76, and a reverse position indicator, in this example a reverse position LED 78.
- the normal and reverse position buttons 72, 76 are used to cause the set of rail switches associated with the MCU 50, 52 to move to the normal position or reverse position respectively for testing purposes when the MCU 50, 52 has local control of a crossover end.
- the normal and reverse position indicators 74, 78 serve to communicate to the maintenance personnel whether the relevant normal or reverse position of the set of rail switches associated with the MCU 50, 52 has been detected by the MCU.
- the control panel 60 also includes track section occupied and clear indicators, in this example track section occupied and clear LEDs 80, 82, and crossover occupied and clear indicators, in this example crossover occupied and clear LEDs 84, 86.
- the track section and crossover LEDs 80, 82, 84, 86 are used to indicate to the maintenance personnel whether the rail track 14, 16 adjacent the crossover end associated with the MCU 50, 52 is occupied or clear, and whether the crossover track section 12 is occupied or clear.
- maintenance personnel use the MCU 50, 52 to communicate with the train control system 30, to manage transfer of crossover end control to and from the MCU 50, 52, and to monitor operation of the crossover end during maintenance.
- a flow diagram 90 showing a process for transferal of control of the crossover end between the train control system 30 and an MCU 50, 52 is shown.
- the control transfer process is described in this example in relation to a crossover end associated with the first set of rail switches 20 and the first MCU 50, although it will be understood that the process applies to any
- crossover end of the rail network that is associated with the present crossover control system.
- the set of rail switches 20 are in regular mode and either the rail switches fail or a decision is made to carry out maintenance on the crossover end associated with the set of rail switches 20, as shown at steps 92 and 94.
- maintenance personnel travels to the crossover end location, as indicated at step 96, and contacts a train controller at the train control system 30 by radio to verbally request local control of the crossover end, as indicated at step 98.
- the maintenance personnel also communicates his/her location to the train control system 30 by connecting a track shorting cable across the train track 14, as
- the train controller In response to determining the location of the maintenance personnel, the train controller places an electronic block on the track section corresponding to the location of the maintenance personnel in order to prevent the train control system from creating train routes that pass through the crossover end, as indicated at step 102.
- the electronic block is maintained on the track section until control transfers back to the train control system 30.
- the electronic block may be placed on the track section in any suitable way, and in this example this is achieved by the train controller selecting the or each relevant track section (s) 38 on the track representation 36 shown on the display 34 of the train control system 30.
- the transition to local control fails, as indicated at steps 104 and 106. If verbal permission is given, then the maintenance personnel presses the request button 64 on the MCU control panel 60, as indicated at step 108. This causes the request LED 66 to illuminate on the MCU control panel 60, and the MCU to communicate a local control request signal to the train control system 30 that causes the train control system to illuminate and flash a position
- the train controller is provided with confirmation as to the location of the maintenance personnel on the rail network .
- the train controller can choose to cancel the request, which causes the transition to local control to fail, as indicated at steps 114 and 116, or to acknowledge the request.
- the train control system carries out a safety check to determine whether the transfer request can be authorized by the train control system based on local control transfer criteria, as indicated at steps 118 and 120.
- the local control transfer criteria include whether: i) all train routes are normal for both ends of the crossover;
- the crossover section is unoccupied according to the axle counter; iii) the set of rail switches at the crossover end opposite to the crossover end under request are normal or in local control mode;
- the track section associated with the crossover end under request has an electronic block placed on it at the train control system
- an acknowledge signal is sent from the train control system 30 to the requesting MCU 50 which causes the request LED 66 on the control panel 60 to extinguish, and the
- the acknowledge signal received from the train control system 30 also causes the maintenance switch 68 on the control panel 60 to electrically unlock, which allows the maintenance personnel to move the maintenance switch 66 from the OFF position to the MAINTENANCE position, as indicated at steps 126 and 128. It will be understood that it is not possible for the maintenance personnel to move the maintenance switch 66 to the MAINTENANCE position until the acknowledgement signal is received from the train control system 30.
- Movement of the maintenance switch 66 to the MAINTENANCE position causes activation of local control by the MCU 50, which enables the maintenance personnel to monitor
- the maintenance personnel is able to safely carry out maintenance on the crossover end, as indicated at step 136.
- the maintenance personnel is able to directly control the position of the set of rail switches 20 by pressing the normal and reverse position buttons 72, 76 on the control panel, observing whether the rail switches have moved accordingly and observing that the MCU 50 has detected the change of position by viewing the normal and reverse position LEDs 74, 78.
- the maintenance personnel is also able to determine from the occupied and clear LEDs 80, 82, 84, 86 whether the rail track 14, 16 adjacent the crossover end and the crossover track section 12 are occupied.
- the opposite crossover end associated with the second set of rail switches 24 is still able to remain in regular mode since the train control system 30 has placed a block on trains passing through the first set of rail switches 20; the train control system 30 has confirmed with the MCU 50 that the first set of rail switches 20 are under local control through a rigorous electronic handover process; and the train control system, in response to acknowledging the train control request from the MCU 50, ensures that second set of rail switches 24 at the opposite crossover end are fixed in the normal position . As indicated at steps 138-146, after control has been transferred to the MCU 50, the MCU 50, through the
- crossover interface unit 58 continuously monitors the crossover track section 12 to make sure that no
- an obstruction is present on the crossover track section 12 that may cause an accident should a train pass through the second set of rail switches at the opposite crossover end.
- such obstructions occur because of maintenance equipment that may be used by the maintenance personnel, such as hi-rail or track machines. If such an obstruction is detected by the axle counter, an audible and visible warning signal is generated at the MCU 50. In response to the detected obstruction, a warning signal is sent from the MCU 50 to the interlocking control unit 26 through the crossover interface unit 58 and to the train control unit 30, which causes the interlocking control unit 26 to prevent train routes from passing through the opposite crossover end.
- the opposite crossover end can only return to regular mode if a clear signal is received at the interlocking control unit 26.
- the axle counter determines that the crossover track section 12 is
- an occupied indicator 59 is displayed on the display 34 adjacent the relevant crossover track section 12.
- the train controller may check whether track sections adjacent the crossover track section 12 are clear, and/or speak to the maintenance personnel on site.
- the clear signal sent to the MCU 50 may be initiated by selecting the occupied indicator 59 on the display 34. These steps are shown at 138 - 146 of the flow diagram.
- step 150 which de- activates local control.
- This causes the maintenance switch 68 to automatically electrically lock in the OFF position.
- the maintenance personnel also calls the train controller at the train control system 30 by radio and verbally requests transition of control from the MCU 50 back to the train control system 30, as
- the MCU 50 In response to moving the maintenance switch 68 to the OFF position, the MCU 50 turns off the maintenance LED 70, the MCU 50 sends a communication to the train control system 30 indicative that control is to pass back to the train control system 30, and the train control system 30 turns off the position identifier 42 corresponding to the crossover end on the display 34, as indicated at steps 158 and 160.
- the train controller is then able to remove the electronic block placed on the track section adjacent the crossover end associated with the first set of rail switches 20.
- crossover end moves from local control mode back to regular mode or failed mode, depending on whether the crossover end is determined to be operational or not.
- a flow diagram 170 showing steps 172 - 180 of a process for setting a train route with a crossover end in degraded mode is shown.
- the degraded mode train route setting process is used when one end of a crossover track section is in degraded mode (failed mode or local control mode) and the opposite crossover end is in regular mode.
- the route setting process is described in this example in relation to a crossover end associated with the first set of rail switches 20 and the first MCU 50, although it will be understood that the process applies to any crossover end of the rail network that is associated with the present crossover control system 10.
- the display 34 at the train control system 30 displays a continuously illuminated rail switch position identifier 42.
- the display 34 at the train control system 30 displays a flashing rail switch position identifier 42.
- the train control system 30 Prior to setting a route over the opposite crossover end, the train control system 30 prompts the train controller to acknowledge that the crossover end is in degraded mode, as indicated at step 174. When the train controller has provided acknowledgement, the train control system 30 determines a route through the opposite crossover end. The train route is allowed through the opposite crossover end unless the crossover track section 12 is determined to be occupied by the axle counter, otherwise the route setting fails, as indicated at steps 176 to 186.
- the present system enables a crossover end of a crossover track section to remain open even though the opposite crossover end is inoperative, and as a consequence throughput of trains is increased.
- route setting over a crossover end is possible independent of the position of the set of rail switches on the other crossover end, and the impact on train operations during periods of maintenance or failure of point machines within a rail crossover is reduced by continuing to provide route setting functionality on the track containing the unaffected sets of rail switches. This is particularly significant for a mining operation wherein a bulk commodity is transported from mine sites to port facilities, because significant reductions in
- the present crossover control system improves maintenance personnel safety by ensuring that an electronic block is in place prior to allowing local control mode and thereby transfer of rail switches control to the MCU.
- the present crossover control system improves maintenance personnel safety because the position of the maintenance personnel is determined electronically in response to activation of the request button 64 on the MCU.
- the present crossover control system improves train driver safety because the reliance on manually issued movement authorities during periods of maintenance or failure of one end of the crossover is removed.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automation & Control Theory (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
Description
Claims
Priority Applications (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/319,226 US10384698B2 (en) | 2014-06-16 | 2015-06-16 | Rail crossover control system |
| AU2015278235A AU2015278235C1 (en) | 2014-06-16 | 2015-06-16 | A rail crossover control system |
| BR112016029097-6A BR112016029097B1 (en) | 2014-06-16 | 2015-06-16 | RAIL CROSSING CONTROL SYSTEM AND METHOD |
| CA2952264A CA2952264C (en) | 2014-06-16 | 2015-06-16 | A rail crossover control system |
| ZA2017/00287A ZA201700287B (en) | 2014-06-16 | 2017-01-12 | A rail crossover control system |
| AU2020286181A AU2020286181A1 (en) | 2014-06-16 | 2020-12-07 | A rail crossover control system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2014902300A AU2014902300A0 (en) | 2014-06-16 | A rail crossover control system | |
| AU2014902300 | 2014-06-16 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2015192169A1 true WO2015192169A1 (en) | 2015-12-23 |
Family
ID=54934564
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/AU2015/000356 Ceased WO2015192169A1 (en) | 2014-06-16 | 2015-06-16 | A rail crossover control system |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US10384698B2 (en) |
| AU (2) | AU2015278235C1 (en) |
| BR (1) | BR112016029097B1 (en) |
| CA (1) | CA2952264C (en) |
| WO (1) | WO2015192169A1 (en) |
| ZA (1) | ZA201700287B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3216673A1 (en) * | 2016-03-08 | 2017-09-13 | ALSTOM Transport Technologies | Simplified interlocking system for rail switch |
| EP4166414A4 (en) * | 2021-06-28 | 2024-03-20 | Casco Signal Ltd. | EXIT CONTROL METHOD AND APPARATUS FOR A RAIL TRAFFIC SIGNALING SYSTEM |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108416362B (en) * | 2018-01-29 | 2022-02-08 | 同济大学 | Turnout abnormity early warning and fault diagnosis method |
| CN113184023B (en) * | 2021-05-13 | 2023-02-28 | 浙江众合科技股份有限公司 | Novel turnout zone control system capable of supporting train autonomous control |
| EP4169799A1 (en) * | 2021-10-21 | 2023-04-26 | Frauscher sensortechnik GmbH | Monitoring unit for monitoring a railway track and method for monitoring a railway track |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2454249A (en) * | 1946-04-25 | 1948-11-16 | Union Switch & Signal Co | Traffic protection apparatus |
| US20070014532A1 (en) * | 2005-01-28 | 2007-01-18 | Parisi Anthony R | Decoder for a Stationary Switch Machine |
| EP2090491B1 (en) * | 2008-02-14 | 2011-08-17 | ALSTOM Transport SA | System for the detection of trains on railway lines |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1999011497A1 (en) * | 1997-09-04 | 1999-03-11 | L.B. Foster Company | Railway wheel counter and block control systems |
| US8214092B2 (en) | 2007-11-30 | 2012-07-03 | Siemens Industry, Inc. | Method and apparatus for an interlocking control device |
-
2015
- 2015-06-16 CA CA2952264A patent/CA2952264C/en active Active
- 2015-06-16 WO PCT/AU2015/000356 patent/WO2015192169A1/en not_active Ceased
- 2015-06-16 BR BR112016029097-6A patent/BR112016029097B1/en not_active IP Right Cessation
- 2015-06-16 AU AU2015278235A patent/AU2015278235C1/en not_active Ceased
- 2015-06-16 US US15/319,226 patent/US10384698B2/en active Active
-
2017
- 2017-01-12 ZA ZA2017/00287A patent/ZA201700287B/en unknown
-
2020
- 2020-12-07 AU AU2020286181A patent/AU2020286181A1/en not_active Abandoned
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2454249A (en) * | 1946-04-25 | 1948-11-16 | Union Switch & Signal Co | Traffic protection apparatus |
| US20070014532A1 (en) * | 2005-01-28 | 2007-01-18 | Parisi Anthony R | Decoder for a Stationary Switch Machine |
| EP2090491B1 (en) * | 2008-02-14 | 2011-08-17 | ALSTOM Transport SA | System for the detection of trains on railway lines |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3216673A1 (en) * | 2016-03-08 | 2017-09-13 | ALSTOM Transport Technologies | Simplified interlocking system for rail switch |
| FR3048669A1 (en) * | 2016-03-08 | 2017-09-15 | Alstom Transp Tech | SIMPLIFIED INITIATION SYSTEM FOR A CUTTING SECTION |
| EP4166414A4 (en) * | 2021-06-28 | 2024-03-20 | Casco Signal Ltd. | EXIT CONTROL METHOD AND APPARATUS FOR A RAIL TRAFFIC SIGNALING SYSTEM |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2015278235B2 (en) | 2020-09-24 |
| CA2952264A1 (en) | 2015-12-23 |
| AU2020286181A1 (en) | 2021-01-07 |
| BR112016029097A2 (en) | 2017-08-22 |
| ZA201700287B (en) | 2020-05-27 |
| US10384698B2 (en) | 2019-08-20 |
| BR112016029097B1 (en) | 2022-10-18 |
| AU2015278235C1 (en) | 2022-11-17 |
| US20170120938A1 (en) | 2017-05-04 |
| CA2952264C (en) | 2023-06-13 |
| AU2015278235A1 (en) | 2017-01-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2020286181A1 (en) | A rail crossover control system | |
| US8214091B2 (en) | System and method to determine train location in a track network | |
| JP5275962B2 (en) | Wireless train control system | |
| CA2219756C (en) | Vehicle control system | |
| US8742925B2 (en) | Device for preventing and detecting the falling of an object on a railway line, and method for detecting the falling of an object on the line | |
| WO2018113762A1 (en) | Zone controller and control method for same, and automatic train control system | |
| WO2016039789A1 (en) | Broken rail detection system for railway systems | |
| CA2928591A1 (en) | Vehicle navigation system and method | |
| US20200172131A1 (en) | Method and Apparatus for Vehicle-Based Switch Locking in a Rail Network | |
| CA2885132A1 (en) | Equipment for a secondary rail detection system and signalization system integrating such equipment | |
| KR102008924B1 (en) | Safety System for Track Crossing Worker | |
| JP6943986B2 (en) | Vehicle information control device | |
| JP2023506871A (en) | Signal operation center cooperation type worker warning system | |
| CN104334436A (en) | Method for the auxiliary operation of a track element, and operation control system | |
| KR101621217B1 (en) | Apparatus and system for detecting obstruction | |
| JP2014083902A (en) | Ground device for wireless train control system | |
| KR101830388B1 (en) | Apparatus for preventing train accident | |
| JP2010076653A (en) | Signal system provided with backup function having common system signal and backup system signal using movement closure system atc logical device | |
| CN206287568U (en) | Die change equipment and the system with such die change equipment and forming machine | |
| JP7349384B2 (en) | central device | |
| JP2007326485A (en) | Train operation state monitoring system | |
| KR101550240B1 (en) | Method and apparatus for controlling train based on two light LED(light emitting diode) signal transmitter having five different lights | |
| RU193496U1 (en) | RAILWAY SECURITY CONTROL DEVICE | |
| KR101538220B1 (en) | Apparatus and method for controlling track circuit | |
| CA3120279C (en) | Method and apparatus for vehicle-based switch locking in a rail network |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15810577 Country of ref document: EP Kind code of ref document: A1 |
|
| DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
| ENP | Entry into the national phase |
Ref document number: 2952264 Country of ref document: CA |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 15319226 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112016029097 Country of ref document: BR |
|
| ENP | Entry into the national phase |
Ref document number: 2015278235 Country of ref document: AU Date of ref document: 20150616 Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 15810577 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 112016029097 Country of ref document: BR Kind code of ref document: A2 Effective date: 20161212 |