WO2015025846A1 - 移動通信方法 - Google Patents

移動通信方法 Download PDF

Info

Publication number
WO2015025846A1
WO2015025846A1 PCT/JP2014/071659 JP2014071659W WO2015025846A1 WO 2015025846 A1 WO2015025846 A1 WO 2015025846A1 JP 2014071659 W JP2014071659 W JP 2014071659W WO 2015025846 A1 WO2015025846 A1 WO 2015025846A1
Authority
WO
WIPO (PCT)
Prior art keywords
base station
radio base
small cell
cell radio
senb
Prior art date
Application number
PCT/JP2014/071659
Other languages
English (en)
French (fr)
Inventor
徹 内野
祥久 岸山
陳 嵐
柳 劉
Original Assignee
株式会社Nttドコモ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Nttドコモ filed Critical 株式会社Nttドコモ
Priority to EP14838288.0A priority Critical patent/EP3038408B1/en
Priority to CN201480045471.2A priority patent/CN105474698A/zh
Publication of WO2015025846A1 publication Critical patent/WO2015025846A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/02Buffering or recovering information during reselection ; Modification of the traffic flow during hand-off
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/04Reselecting a cell layer in multi-layered cells

Definitions

  • the present invention relates to a mobile communication method.
  • LTE Long Term Evolution
  • handover control is defined so that communication can be performed in an optimal cell even when the mobile station UE moves (see FIG. 9).
  • CA Carrier Aggregation, Carrier Aggregation
  • CCs Component Carriers, component carriers
  • Inter-node UP aggregation may be performed in order to achieve the same throughput as the LTE Release 10 Necessary.
  • the anchoring node distributes downlink data and transmits it to the mobile station UE.
  • the radio base station MeNB that manages a macro cell is an anchoring node
  • the gateway device S-GW is an anchoring node.
  • the present invention has been made in view of the above-described problems, and switches the radio base station SeNB from one radio base station SeNB # 1 to another radio base station SeNB # 2 in “Inter-node UP aggregation”.
  • it is an object to provide a mobile communication method capable of avoiding unnecessary transfer of downlink data addressed to the mobile station UE and quickly switching the radio base station SeNB.
  • a first feature of the present invention is a mobile communication method in a state where a mobile station performs carrier aggregation using a macro cell under the macro cell radio base station and a small cell under the first small cell radio base station.
  • the switching request that requests the second small cell radio base station to switch the small cell radio base station.
  • the scheduling of downlink data addressed to the mobile station is stopped, Transmitting a switching instruction to instruct the mobile station to switch the small cell radio base station, and the mobile station transmits the switching instruction.
  • the wireless radio base station includes a step of stopping transfer of downlink data addressed to the mobile station to the first small cell radio base station in response to the transfer stop request.
  • a second feature of the present invention is a mobile communication method in a state in which a mobile station performs carrier aggregation using a macro cell under the macro cell radio base station and a small cell under the first small cell radio base station.
  • the mobile station transmits a measurement report to the first small cell radio base station
  • the macro station radio base station is addressed to the mobile station for the first small cell radio base station.
  • a third feature of the present invention is a mobile communication method in a state where a mobile station performs carrier aggregation using a macro cell under a macro cell radio base station and a small cell under a first small cell radio base station.
  • the mobile station detects the deterioration of the quality of the radio link with the first small cell radio base station, the mobile station performs the macro cell radio base station with respect to the first small cell radio base station.
  • a fourth feature of the present invention is a mobile communication method in a state in which a mobile station performs carrier aggregation using a macro cell under a macro cell radio base station and a small cell under a first small cell radio base station.
  • the first small cell radio base station receives a measurement report from the mobile station
  • the second small cell radio base station requests the second small cell radio base station to switch the small cell radio base station. Transmitting a request to the macro cell radio base station and transmitting a transfer stop request for requesting the first small cell radio base station to stop transferring downlink data addressed to the mobile station;
  • the macro cell radio base station sends a downlink address to the mobile station to the first small cell radio base station.
  • Stopping data transfer and when the first small cell radio base station receives a switching request response from the second small cell radio base station, stops scheduling downlink data for the mobile station And a step of transmitting a switching instruction instructing the mobile station to switch the small cell radio base station.
  • a fifth feature of the present invention is a mobile communication method in a state in which a mobile station performs carrier aggregation using a macro cell under a macro cell radio base station and a small cell under a first small cell radio base station.
  • the first small cell radio base station detects the deterioration of the quality of the radio link with the mobile station, the macro cell radio base station is instructed to the first small cell radio base station.
  • FIG. 1 is an overall configuration diagram of a mobile communication system according to a first embodiment of the present invention.
  • FIG. 2 is a functional block diagram of the mobile station according to the first embodiment of the present invention.
  • FIG. 3 is a sequence diagram showing an example (operation example 1) of the operation of the mobile communication system according to the first embodiment of the present invention.
  • FIG. 4 is a sequence diagram showing an example (operation example 2) of the operation of the mobile communication system according to the first embodiment of the present invention.
  • FIG. 5 is a sequence diagram showing an example (operation example 3) of the operation of the mobile communication system according to the first embodiment of the present invention.
  • FIG. 6 is a functional block diagram of a radio base station according to the second embodiment of the present invention.
  • FIG. 1 is an overall configuration diagram of a mobile communication system according to a first embodiment of the present invention.
  • FIG. 2 is a functional block diagram of the mobile station according to the first embodiment of the present invention.
  • FIG. 3 is a sequence diagram showing an example (operation example 1) of the
  • FIG. 7 is a sequence diagram showing an example (operation example 1) of the operation of the mobile communication system according to the second embodiment of the present invention.
  • FIG. 8 is a sequence diagram showing an example (operation example 2) of the operation of the mobile communication system according to the second embodiment of the present invention.
  • FIG. 9 is a diagram for explaining the handover control process.
  • FIG. 10 is a diagram for explaining CA up to Release-10 and “Inter-node UP aggregation”.
  • FIG. 11 is a diagram for explaining distribution of downlink data in “Inter-node UP aggregation”.
  • FIG. 12 is a diagram for explaining switching of the small cell radio base station in “Inter-node UP aggregation”.
  • FIG. 13 is a diagram for explaining a handover control process in “Inter-node UP aggregation”.
  • the mobile communication system is an LTE mobile communication system, and manages a gateway device S-GW, a radio base station MeNB that manages a macro cell, and a small cell # 1.
  • a radio base station SeNB # 1 A radio base station SeNB # 1, a radio base station SeNB # 2 that manages the small cell # 2, and a mobile station UE.
  • the mobile station UE performs CA using a CC under the radio base station MeNB and a CC under the radio base station SeNB # 1 (or a CC under the radio base station SeNB # 2). It is configured to be able to do.
  • the mobile communication system according to the present embodiment is configured to be able to perform “Inter-node UP aggregation”.
  • the mobile station UE performs “Inter-node UP aggregation” between the radio base station MeNB and the radio base station SeNB # 1, and the radio base station MeNB. However, it may be configured to buffer all downlink data transmitted to the mobile station UE via the radio base station SeNB # 1.
  • the radio base station MeNB may be an anchoring node, and may be configured to transfer the above-described downlink data copy to the radio base station SeNB # 1.
  • the mobile station UE performs “Inter-node UP aggregation” between the radio base station MeNB and the radio base station SeNB # 1, and the radio base station MeNB. However, it is configured not to buffer all downlink data transmitted to the mobile station UE via the radio base station SeNB # 1.
  • the radio base station MeNB is configured to be unable to retransmit all downlink data transmitted to the mobile station UE via the radio base station SeNB # 1 to the mobile station UE. Also good.
  • the radio base station MeNB may be an anchoring node
  • the gateway device S-GW may be an anchoring node
  • the radio base station MeNB may be configured to operate as a simple router without transferring a copy of the above-described downlink data to the radio base station SeNB # 1.
  • the mobile station UE includes a reception unit 11, a transmission unit 12, and a CA management unit 13.
  • the receiving unit 11 is configured to receive various signals transmitted by the radio base station MeNB, the radio base station SeNB # 1, and the radio base station SeNB # 2.
  • the transmission unit 12 is configured to transmit various signals to the radio base station MeNB, the radio base station SeNB # 1, and the radio base station SeNB # 2.
  • the CA management unit 13 is configured to control and manage the above-described CA, that is, “Inter-node UP aggregation” in cooperation with the reception unit 11 and the transmission unit 12.
  • the operation of the mobile communication system according to the present embodiment will be described with reference to FIGS. 3 to 5.
  • the radio base station SeNB that manages the small cell is An operation of switching from the radio base station SeNB # 1 to the radio base station SeNB # 2 will be described.
  • the radio base station SeNB # 1 receives “Measurement Report” from the mobile station UE in step S1001, and changes the radio base station SeNB from the radio base station SeNB # 1 to the radio base station SeNB # 2. If it decides to switch, in step S1002, “SeNB change request” requesting the radio base station SeNB # 2 to switch the radio base station SeNB is transmitted.
  • the radio base station SeNB # 1 receives “SeNB change request ack” from the radio base station SeNB # 2 in step S1003, in step S1004, the radio base station SeNB # 1 stops scheduling downlink data for the mobile station UE, and in step S1005. Then, “SeNB change command” is transmitted to the mobile station UE.
  • step S1006 the mobile station UE requests the radio base station MeNB to stop the downlink data addressed to the mobile station UE to the radio base station SeNB # 1 in response to the “SeNB change request”. Send a transfer stop request.
  • the radio base station MeNB stops the downlink data transfer addressed to the mobile station UE to the radio base station SeNB # 1 in response to the transfer stop request.
  • the radio base station MeNB stops the transfer of PDCP-PDUs with sequence numbers “25” and later to the radio base station SeNB # 1.
  • the downlink data (PDCP-PDU) that has not been transmitted to the mobile station UE (no positive acknowledgment information has been received) is transmitted to the radio base station MeNB by the radio base station SeNB # 1 or the mobile station UE. You may be notified. Further, the downlink data may be transferred to the radio base station MeNB by the radio base station SeNB # 1. In the example of FIG. 3, sequence numbers “9”, “15”, and “21” indicate downlink data that has not been transmitted to the mobile station UE.
  • the radio base station SeNB # 1 may discard downlink data that has stayed and has not been transmitted to the mobile station UE.
  • the subsequent operation is the same as the operation shown in FIG.
  • the mobile station UE transmits “Measurement Report” to the radio base station SeNB # 1 in step S2001, and in step S2002, the radio base station SeNB to the radio base station MeNB.
  • a transfer stop request for requesting to stop the transfer of downlink data addressed to the mobile station UE for # 1 is transmitted.
  • the radio base station MeNB stops the downlink data transfer addressed to the mobile station UE to the radio base station SeNB # 1 in response to the transfer stop request.
  • the radio base station MeNB stops transfer of PDCP-PDUs with sequence numbers “15” and later to the radio base station SeNB # 1.
  • the mobile station UE may transmit the above-described transfer stop request when receiving the MAC-ACK or RLC-ACK for the above-mentioned “Measurement Report” from the radio base station SeNB # 1.
  • the radio base station SeNB # 1 determines to switch the radio base station SeNB from the radio base station SeNB # 1 to the radio base station SeNB # 2 in accordance with the “Measurement Report” received from the mobile station UE. Accordingly, the radio base station SeNB # 1 transmits “SeNB change request” requesting the radio base station SeNB # 2 to switch the radio base station SeNB in step S2003.
  • the radio base station SeNB # 1 receives “SeNB change request ack” from the radio base station SeNB # 2 in step S2004, in step S2005, the radio base station SeNB # 1 stops scheduling of downlink data for the mobile station UE, and in step S2006. Then, “SeNB change command” is transmitted to the mobile station UE.
  • the subsequent operation is the same as the operation shown in FIG.
  • downlink data (PDCP-PDU) that has not been transmitted to the mobile station UE may be notified to the radio base station MeNB by the radio base station SeNB # 1 or the mobile station UE. Further, the downlink data may be transferred to the radio base station MeNB by the radio base station SeNB # 1.
  • the radio base station SeNB # 1 may discard downlink data that has stayed and transmission to the mobile station UE has not been completed.
  • step S3002 when the mobile station UE detects quality degradation of a radio link (downlink and uplink) with the radio base station SeNB # 1 in step S3001, in step S3002, the radio base station MeNB In response to this, a transfer stop request for requesting to stop the transfer of downlink data addressed to the mobile station UE to the radio base station SeNB # 1 is transmitted.
  • a transfer stop request for requesting to stop the transfer of downlink data addressed to the mobile station UE to the radio base station SeNB # 1 is transmitted.
  • the mobile station UE uses a value of RSRP (Reference Signal Received Power), a value of RSRQ (Reference Signal Received Quality), a value of CQI (Channel Quality Indicator), an HARQ (Hybrid) rate error rate, etc.
  • RSRP Reference Signal Received Power
  • RSRQ Reference Signal Received Quality
  • CQI Channel Quality Indicator
  • HARQ Hybrid rate error rate
  • the radio base station MeNB stops the downlink data transfer addressed to the mobile station UE to the radio base station SeNB # 1 in response to the transfer stop request.
  • the radio base station MeNB stops transfer of PDCP-PDUs with sequence numbers “9” and later to the radio base station SeNB # 1.
  • the radio base station SeNB # 1 receives “Measurement Report” from the mobile station UE, and determines to switch the radio base station SeNB from the radio base station SeNB # 1 to the radio base station SeNB # 2. . Accordingly, the radio base station SeNB # 1 transmits “SeNB change request” requesting the radio base station SeNB # 2 to switch the radio base station SeNB in step S3004.
  • the radio base station SeNB # 1 receives “SeNB change request ack” from the radio base station SeNB # 2 in step S3005, in step S3006, the radio base station SeNB # 1 stops scheduling and scheduling of downlink data for the mobile station UE, and in step S3007. Then, “SeNB change command” is transmitted to the mobile station UE.
  • the subsequent operation is the same as the operation shown in FIG.
  • downlink data (PDCP-PDU) that has not been transmitted to the mobile station UE may be notified to the radio base station MeNB by the radio base station SeNB # 1 or the mobile station UE. Further, the downlink data may be transferred to the radio base station MeNB by the radio base station SeNB # 1.
  • the radio base station SeNB # 1 may discard downlink data that has stayed and transmission to the mobile station UE has not been completed.
  • the radio base station SeNB # 1 transfers the “Measurement Report” described above to the radio base station MeNB, and the radio base station MeNB sets the radio base station SeNB. You may determine whether it switches from radio base station SeNB # 1 to radio base station SeNB # 2.
  • the radio base station SeNB when the radio base station SeNB is switched from the radio base station SeNB # 1 to the radio base station SeNB # 2 in “Inter-node UP aggregation”, the radio base station MeNB In response to the above-described transfer stop request, the transfer of downlink data addressed to the mobile station UE to the radio base station SeNB # 1 may be stopped at a time prior to the time of receiving the “Path switch request” (see FIG. 13). it can. For this reason, in this embodiment, the useless transfer of the downlink data addressed to the mobile station UE can be avoided, and the radio base station SeNB can be switched quickly.
  • the radio base station SeNB # 1 includes a reception unit 21, a transmission unit 22, and a CA management unit 23.
  • the receiving unit 21 is configured to receive various signals transmitted by the radio base station MeNB, the radio base station SeNB # 2, and the mobile station UE.
  • the transmission unit 22 is configured to transmit various signals to the radio base station MeNB, the radio base station SeNB # 2, and the mobile station UE.
  • the CA management unit 23 is configured to perform control and management related to the above-described CA, that is, “Inter-node UP aggregation”, in cooperation with the reception unit 21 and the transmission unit 22.
  • the operation of the mobile communication system according to the present embodiment will be described with reference to FIG. 7 and FIG. Specifically, referring to FIG. 7 and FIG. 8, in the mobile communication system according to the present embodiment, when “Inter-node UP aggregation” is performed, the radio base station SeNB is changed to the radio base station SeNB #. The operation of switching from 1 to the radio base station SeNB # 2 will be described.
  • step S4001 the radio base station SeNB # 1 receives “Measurement Report” from the mobile station UE, and changes the radio base station SeNB from the radio base station SeNB # 1 to the radio base station SeNB # 2. Decide to switch.
  • the radio base station SeNB # 1 issues a transfer stop request for requesting the radio base station MeNB to stop transferring the downlink data addressed to the mobile station UE to the radio base station SeNB # 1.
  • a “SeNB change request” requesting the radio base station SeNB # 2 to switch the radio base station SeNB is transmitted.
  • the radio base station MeNB stops the downlink data transfer addressed to the mobile station UE to the radio base station SeNB # 1 in response to the transfer stop request.
  • the radio base station MeNB stops the transfer of PDCP-PDUs with sequence numbers “23” and later to the radio base station SeNB # 1.
  • step S4005 the radio base station SeNB # 1 stops scheduling of downlink data for the mobile station UE, and in step S4006. Then, “SeNB change command” is transmitted to the mobile station UE.
  • the subsequent operation is the same as the operation shown in FIG.
  • downlink data (PDCP-PDU) that has not been transmitted to the mobile station UE may be notified to the radio base station MeNB by the radio base station SeNB # 1 or the mobile station UE. Further, the downlink data may be transferred to the radio base station MeNB by the radio base station SeNB # 1.
  • the radio base station SeNB # 1 may discard downlink data that has stayed and has not been transmitted to the mobile station UE.
  • the radio base station SeNB # 1 detects quality degradation of the radio link (downlink and uplink) with the mobile station UE in step S5001
  • the radio base station MeNB in step S5002
  • a transfer stop request for requesting to stop the transfer of downlink data addressed to the mobile station UE to the radio base station SeNB # 1 is transmitted.
  • the radio base station SeNB # 1 may detect the quality degradation by observing the value of CQI, the reception quality of SRS (Sounding Reference Signal), the HARQ error rate, and the like.
  • the radio base station MeNB stops the downlink data transfer addressed to the mobile station UE to the radio base station SeNB # 1 in response to the transfer stop request.
  • the radio base station MeNB stops the transfer of PDCP-PDUs after the sequence number “19” to the radio base station SeNB # 1.
  • radio base station SeNB # 1 receives “Measurement Report” from the mobile station UE and decides to switch the radio base station SeNB from the radio base station SeNB # 1 to the radio base station SeNB # 2, in step S5003 Then, “SeNB change request” requesting to switch the radio base station SeNB is transmitted to the radio base station SeNB # 2.
  • step S5005 the radio base station SeNB # 1 stops scheduling downlink data for the mobile station UE, and in step S5006, “SeNB change command” is transmitted to the mobile station UE.
  • the subsequent operation is the same as the operation shown in FIG.
  • downlink data (PDCP-PDU) that has not been transmitted to the mobile station UE may be notified to the radio base station MeNB by the radio base station SeNB # 1 or the mobile station UE. Further, the downlink data may be transferred to the radio base station MeNB by the radio base station SeNB # 1.
  • the radio base station SeNB # 1 may discard downlink data that has stayed and transmission to the mobile station UE has not been completed.
  • the radio base station SeNB when the radio base station SeNB is switched from the radio base station SeNB # 1 to the radio base station SeNB # 2 in “Inter-node UP aggregation”, the radio base station MeNB In response to the above-described transfer stop request, the transfer of downlink data addressed to the mobile station UE to the radio base station SeNB # 1 may be stopped at a time prior to the time of receiving the “Path switch request” (see FIG. 13). it can. For this reason, in this embodiment, the useless transfer of the downlink data addressed to the mobile station UE can be avoided, and the radio base station SeNB can be switched quickly.
  • the first feature of the present embodiment is that the mobile station UE includes a macro cell under the radio base station MeNB (macro cell radio base station) and a small cell under the radio base station SeNB # 1 (first small cell radio base station).
  • the base station SeNB # 1 receives “SeNB change request” from the radio base station SeNB # 2.
  • the second feature of the present embodiment is a mobile communication method in a state where the mobile station UE performs CA using a macro cell under the radio base station MeNB and a small cell under the radio base station SeNB # 1,
  • the station UE transmits “Measurement Report” to the radio base station SeNB # 1
  • the station UE stops the transfer of downlink data addressed to the mobile station UE to the radio base station SeNB # 1 to the radio base station MeNB.
  • a step of transmitting a transfer stop request to request and a step in which the radio base station MeNB stops transferring downlink data addressed to the mobile station UE to the radio base station SeNB # 1 in response to the transfer stop request
  • the radio base station SeNB # 1 receives “Measurement Report” from the mobile station UE
  • the radio base station SeNB # A process of transmitting “SeNB change request” to the mobile station UE when the radio base station SeNB # 1 receives “SeNB change request ack” from the radio base station SeNB # 2.
  • a step of transmitting “SeNB change command” to the mobile station UE is
  • a third feature of the present embodiment is a mobile communication method in a state in which the mobile station UE performs CA using a macro cell under the radio base station MeNB and a small cell under the radio base station SeNB # 1,
  • the station UE detects deterioration of the quality of the radio link with the radio base station SeNB # 1
  • the downlink data addressed to the mobile station UE for the radio base station SeNB # 1 is transferred to the radio base station MeNB.
  • a fourth feature of the present embodiment is a mobile communication method in a state where the mobile station UE performs CA using a macro cell under the radio base station MeNB and a small cell under the radio base station SeNB # 1,
  • the base station SeNB # 1 receives the “Measurement Report” from the mobile station UE
  • the base station SeNB # 1 transmits the “SeNB change request” to the radio base station SeNB # 2
  • the radio base station MeNB A step of transmitting a transfer stop request for requesting to stop the transfer of downlink data addressed to the mobile station UE to the station SeNB # 1, and the radio base station SeNB # 1 in response to the transfer stop request
  • the step of stopping the transfer of downlink data addressed to the mobile station UE, and the radio base station SeNB # 1 When receiving “SeNB change request ack” from the local station SeNB # 2, it has a step of stopping scheduling of downlink data for the mobile station UE and transmitting “SeNB change command” to the mobile station UE. Is the gist
  • a fifth feature of the present embodiment is a mobile communication method in a state in which the mobile station UE performs CA using a macro cell under the radio base station MeNB and a small cell under the radio base station SeNB # 1,
  • the base station SeNB # 1 detects deterioration of the quality of the radio link with the mobile station UE, the base station SeNB # 1 transfers downlink data addressed to the mobile station UE to the radio base station SeNB # 1 to the radio base station MeNB.
  • the operations of the mobile station UE and the radio base stations MeNB, SeNB # 1, SeNB # 2 described above may be implemented by hardware, may be implemented by a software module executed by a processor, or both. It may be implemented by a combination of
  • the software modules include RAM (Random Access Memory), flash memory, ROM (Read Only Memory), EPROM (Erasable Programmable ROM), EEPROM (Electronically Erasable and Programmable, Removable ROM, Hard Disk, and Removable ROM).
  • RAM Random Access Memory
  • flash memory ROM (Read Only Memory)
  • EPROM Erasable Programmable ROM
  • EEPROM Electrically Erasable and Programmable, Removable ROM, Hard Disk, and Removable ROM.
  • it may be provided in a storage medium of an arbitrary format such as a CD-ROM.
  • Such a storage medium is connected to the processor so that the processor can read and write information from and to the storage medium. Further, such a storage medium may be integrated in the processor. Such a storage medium and processor may be provided in the ASIC. Such an ASIC may be provided in the mobile station UE and the radio base station MeNB, SeNB # 1, SeNB # 2. Further, the storage medium and the processor may be provided in the mobile station UE and the radio base station MeNB, SeNB # 1, SeNB # 2 as discrete components.
  • the mobile station UE in “Inter-node UP aggregation”, when the radio base station SeNB is switched from one radio base station SeNB # 1 to another radio base station SeNB # 2, the mobile station UE It is possible to provide a mobile communication method capable of avoiding useless transfer of downlink data addressed to and quickly switching the radio base station SeNB.
  • S-GW ... gateway device MeNB, SeNB # 1, SeNB # 2 ... radio base station UE ... mobile station 11, 21 ... receiving unit 12, 22 ... transmitting unit 13, 23 ... CA managing unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

「Inter-node UP aggregation」において、無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替える際に、移動局UE宛ての下りデータの無駄な転送を回避し、かかる切り替えを迅速に行う。本発明に係る移動通信方法は、移動局UEが、「SeNB change command」に応じて、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、無線基地局MeNBが、かかる転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する工程とを有する。

Description

移動通信方法
 本発明は、移動通信方法に関する。
 LTE(Long Term Evolution)方式では、移動局UEが移動した場合であっても最適なセルで通信ができるようにハンドオーバ制御が規定されている(図9参照)。
 また、LTE方式のRelease-10までで規定されているCA(Carrier Aggregation、キャリアアグリゲーション)では、図10(a)に示すように、同一の無線基地局eNB配下のCC(Component Carrier、コンポーネントキャリア)#1及びCC#2を用いて同時通信を行うことで高いスループットを実現することが可能であった。
 一方、LTE方式のRelease-12では、LTE方式のRelease-10までのCAを拡張して、図10(b)に示すように、異なる無線基地局eNB#1およびeNB#2配下のCC#1とCC#2とを用いて同時通信を行うことで高いスループットを実現する「Inter-node UP aggregation」が検討されている(非特許文献1参照)。
 例えば、全てのCCを単一の無線基地局eNB内に収容することができない場合に、LTE方式のRelease10と同程度のスループットを実現するためには、「Inter-node UP aggregation」を行うことが必要となる。
 なお、「Inter-node UP aggregation」では、アンカーリングノード(anchoring node)で、下りデータを分配して移動局UEに送信することが想定される。
 例えば、図11(a)の例では、マクロセルを管理する無線基地局MeNBが、アンカーリングノードであり、図11(b)の例では、ゲートウェイ装置S-GWが、アンカーリングノードである。
3GPP寄書R2-131782
 しかしながら、「Inter-node UP aggregation」において、スモールセルを管理する無線基地局SeNBを切り替える際に、既存のハンドオーバ制御を流用することが考えられるが、図12に示すように、無線基地局MeNBと無線基地局SeNBとの間のバックホール回線としてxDSL回線等の低速回線が用いられることが想定されている。
 「Inter-node UP aggregation」において、既存のハンドオーバ制御を流用されると、図13に示すように、移動局UE宛ての下りデータが、無線基地局MeNBから無線基地局SeNB#1に転送された後に、さらに、無線基地局SeNB#1から無線基地局SeNB#2に転送されることになる。
 ここで、上述のバックホール回線に低速回線が用いられると、上述の移動局UE宛ての下りデータの無線基地局MeNBから無線基地局SeNB#1への転送は、時間がかかるにも関わらず、無駄な転送になってしまうという問題点があった。
 そこで、本発明は、上述の課題に鑑みてなされたものであり、「Inter-node UP aggregation」において、無線基地局SeNBをある無線基地局SeNB#1から他の無線基地局SeNB#2に切り替える際に、移動局UE宛ての下りデータの無駄な転送を回避し、無線基地局SeNBの切り替えを迅速に行うことができる移動通信方法を提供することを目的とする。
 本発明の第1の特徴は、移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、前記第1スモールセル用無線基地局が、前記移動局から測定報告を受信した際に、第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信する工程と、前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局宛ての下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程と、前記移動局が、前記切替指示に応じて、前記マクロセル用無線基地局に対して、前記第1スモールセル用無線基地局に対する前記移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程とを有することを要旨とする。
 本発明の第2の特徴は、移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、前記移動局が、前記第1スモールセル用無線基地局に対して測定報告を送信する際に、前記マクロセル用無線基地局に対して、該第1スモールセル用無線基地局に対する該移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程と、前記第1スモールセル用無線基地局が、前記移動局から前記測定報告を受信した際に、第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信する工程と、前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局宛ての下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程とを有することを要旨とする。
 本発明の第3の特徴は、移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、前記移動局が、前記第1スモールセル用無線基地局との間の無線リンクの品質劣化を検出した際に、前記マクロセル用無線基地局に対して、該第1スモールセル用無線基地局に対する該移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程と、前記第1スモールセル用無線基地局が、前記移動局から測定報告を受信した際に、第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信する工程と、前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局宛ての下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程とを有することを要旨とする。
 本発明の第4の特徴は、移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、前記第1スモールセル用無線基地局が、前記移動局から測定報告を受信した際に、前記第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信すると共に、前記マクロセル用無線基地局に対して、該第1スモールセル用無線基地局に対する該移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程と、前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局に対する下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程とを有することを要旨とする。
 本発明の第5の特徴は、移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、前記第1スモールセル用無線基地局が、前記移動局との間の無線リンクの品質劣化を検出した際に、前記マクロセル用無線基地局に対して、該第1スモールセル用無線基地局に対する該移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程と、前記第1スモールセル用無線基地局が、前記移動局から測定報告を受信した際に、第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信する工程と、前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局に対する下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程とを有することを要旨とする。
図1は、本発明の第1の実施形態に係る移動通信システムの全体構成図である。 図2は、本発明の第1の実施形態に係る移動局の機能ブロック図である。 図3は、本発明の第1の実施形態に係る移動通信システムの動作の一例(動作例1)を示すシーケンス図である。 図4は、本発明の第1の実施形態に係る移動通信システムの動作の一例(動作例2)を示すシーケンス図である。 図5は、本発明の第1の実施形態に係る移動通信システムの動作の一例(動作例3)を示すシーケンス図である。 図6は、本発明の第2の実施形態に係る無線基地局の機能ブロック図である。 図7は、本発明の第2の実施形態に係る移動通信システムの動作の一例(動作例1)を示すシーケンス図である。 図8は、本発明の第2の実施形態に係る移動通信システムの動作の一例(動作例2)を示すシーケンス図である。 図9は、ハンドオーバ制御処理を説明するための図である。 図10は、Release-10までのCAと、「Inter-node UP aggregation」を説明するための図である。 図11は、「Inter-node UP aggregation」における下りデータの分配を説明するための図である。 図12は、「Inter-node UP aggregation」におけるスモールセル用無線基地局の切り替えを説明するための図である。 図13は、「Inter-node UP aggregation」におけるハンドオーバ制御処理を説明するための図である。
 (本発明の第1の実施形態)
 図1乃至図5を参照して、本発明の第1の実施形態に係る移動通信システムについて説明する。
 図1に示すように、本実施形態に係る移動通信システムは、LTE方式の移動通信システムであって、ゲートウェイ装置S-GWと、マクロセルを管理する無線基地局MeNBと、スモールセル#1を管理する無線基地局SeNB#1と、スモールセル#2を管理する無線基地局SeNB#2と、移動局UEとを具備している。
 本実施形態に係る移動通信システムでは、移動局UEは、無線基地局MeNB配下のCC及び無線基地局SeNB#1配下のCC(或いは、無線基地局SeNB#2配下のCC)を用いてCAを行うことができるように構成されている。
 すなわち、本実施形態に係る移動通信システムは、「Inter-node UP aggregation」を行うことができるように構成されている。
 また、本実施形態に係る移動通信システムでは、移動局UEが、無線基地局MeNB及び無線基地局SeNB#1との間で「Inter-node UP aggregation」を行っている状態において、無線基地局MeNBが、無線基地局SeNB#1を介して移動局UEに送信する全ての下りデータをバッファリングするように構成されていてもよい。
 すなわち、この状態において、無線基地局MeNBが、アンカーリングノードであり、無線基地局SeNB#1に対して、上述の下りデータのコピーを転送するように構成されていてもよい。
 或いは、本実施形態に係る移動通信システムでは、移動局UEが、無線基地局MeNB及び無線基地局SeNB#1との間で「Inter-node UP aggregation」を行っている状態において、無線基地局MeNBが、無線基地局SeNB#1を介して移動局UEに送信する全ての下りデータをバッファリングしないように構成されている。
 すなわち、この状態において、無線基地局MeNBが、移動局UEに対して、無線基地局SeNB#1を介して移動局UEに送信する全ての下りデータを再送することができないように構成されていてもよい。
 ここで、無線基地局MeNBが、アンカーリングノードであってもよいし、ゲートウェイ装置S-GWが、アンカーリングノードであってもよい。
 なお、無線基地局MeNBは、無線基地局SeNB#1に対して、上述の下りデータのコピーを転送することなく、単なるルータとして動作するように構成されていてもよい。
 図2に示すように、本実施形態に係る移動局UEは、受信部11と、送信部12と、CA管理部13とを具備している。
 受信部11は、無線基地局MeNB、無線基地局SeNB#1および無線基地局SeNB#2によって送信された各種信号を、受信するように構成されている。送信部12は、無線基地局MeNB、無線基地局SeNB#1および無線基地局SeNB#2に対して、各種信号を送信するように構成されている。
 CA管理部13は、受信部11及び送信部12と協働して、上述のCA、すなわち、「Inter-node UP aggregation」に関する制御および管理を行うように構成されている。
 以下、図3乃至図5を参照して、本実施形態に係る移動通信システムの動作について説明する。具体的には、図3乃至図5を参照して、本実施形態に係る移動通信システムにおいて、「Inter-node UP aggregation」が行われている際に、スモールセルを管理する無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替える動作について説明する。
 第1に、図3を参照して、本実施形態に係る移動通信システムの動作例1について説明する。
 図3に示すように、無線基地局SeNB#1は、ステップS1001において、移動局UEから「Measurement Report」を受信し、無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替えることを決定すると、ステップS1002において、無線基地局SeNB#2に対して、無線基地局SeNBを切り替えるように要求する「SeNB change request」を送信する。
 その後、無線基地局SeNB#1は、ステップS1003において、無線基地局SeNB#2から「SeNB change request ack」を受信すると、ステップS1004において、移動局UEに対する下りデータのスケジューリングを停止すると共に、ステップS1005において、移動局UEに対して「SeNB change command」を送信する。
 ステップS1006において、移動局UEは、前記「SeNB change request」に応じて、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する。
 ここで、無線基地局MeNBは、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する。なお、図3の例では、無線基地局MeNBは、シーケンス番号「25」以降のPDCP-PDUの無線基地局SeNB#1に対する転送を停止している。
 なお、移動局UEに対する送信が完了していない(肯定的な送達確認情報を受信していない)下りデータ(PDCP-PDU)は、無線基地局SeNB#1又は移動局UEによって無線基地局MeNBに対して通知されてもよい。また、当該下りデータは、無線基地局SeNB#1によって無線基地局MeNBに転送されてもよい。図3の例では、シーケンス番号「9」、「15」、「21」が、移動局UEに対する送信が完了していない下りデータを示している。
 また、本動作例1において、無線基地局SeNB#1は、滞留しており移動局UEに対する送信が完了していない下りデータについて破棄してもよい。
 その後の動作は、図13に示す動作と同様である。
 第2に、図4を参照して、本実施形態に係る移動通信システムの動作例2について説明する。
 図4に示すように、移動局UEは、ステップS2001において、無線基地局SeNB#1に対して「Measurement Report」を送信すると共に、ステップS2002において、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する。
 ここで、無線基地局MeNBは、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する。なお、図4の例では、無線基地局MeNBは、シーケンス番号「15」以降のPDCP-PDUの無線基地局SeNB#1に対する転送を停止している。
 なお、移動局UEは、無線基地局SeNB#1から、上述の「Measurement Report」に対するMAC-ACK或いはRLC-ACKを受信した時点で、上述の転送停止要求を送信してもよい。
 無線基地局SeNB#1は、移動局UEから受信した「Measurement Report」に応じて、無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替えることを決定する。これにより、無線基地局SeNB#1は、ステップS2003において、無線基地局SeNB#2に対して、無線基地局SeNBを切り替えるように要求する「SeNB change request」を送信する。
 その後、無線基地局SeNB#1は、ステップS2004において、無線基地局SeNB#2から「SeNB change request ack」を受信すると、ステップS2005において、移動局UEに対する下りデータのスケジューリングを停止すると共に、ステップS2006において、移動局UEに対して「SeNB change command」を送信する。
 その後の動作は、図13に示す動作と同様である。
 なお、移動局UEに対する送信が完了していない下りデータ(PDCP-PDU)は、無線基地局SeNB#1又は移動局UEによって無線基地局MeNBに対して通知されてもよい。また、当該下りデータは、無線基地局SeNB#1によって無線基地局MeNBに転送されてもよい。
 また、本動作例2において、無線基地局SeNB#1は、滞留しており移動局UEに対する送信が完了していない下りデータについて破棄してもよい。
 第3に、図5を参照して、本実施形態に係る移動通信システムの動作例3について説明する。
 図5に示すように、移動局UEは、ステップS3001において、無線基地局SeNB#1との間の無線リンク(下りリンク及び上りリンク)の品質劣化を検出すると、ステップS3002において、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する。
 例えば、移動局UEは、RSRP(Reference Signal Received Power)の値、RSRQ(Reference Signal Received Quality)の値、CQI(Channel Quality Indicator)の値、HARQ(Hybrid-ARQ)の誤り率等を観測することによって、品質劣化を検出してもよい。
 ここで、無線基地局MeNBは、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する。なお、図5の例では、無線基地局MeNBは、シーケンス番号「9」以降のPDCP-PDUの無線基地局SeNB#1に対する転送を停止している。
 その後、無線基地局SeNB#1は、ステップS3003において、移動局UEから「Measurement Report」を受信し、無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替えることを決定する。これにより、無線基地局SeNB#1は、ステップS3004において、無線基地局SeNB#2に対して、無線基地局SeNBを切り替えるように要求する「SeNB change request」を送信する。
 その後、無線基地局SeNB#1は、ステップS3005において、無線基地局SeNB#2から「SeNB change request ack」を受信すると、ステップS3006において、移動局UEに対する下りデータのスケジューリングと停止すると共に、ステップS3007において、移動局UEに対して「SeNB change command」を送信する。
 その後の動作は、図13に示す動作と同様である。
 なお、移動局UEに対する送信が完了していない下りデータ(PDCP-PDU)は、無線基地局SeNB#1又は移動局UEによって無線基地局MeNBに対して通知されてもよい。また、当該下りデータは、無線基地局SeNB#1によって無線基地局MeNBに転送されてもよい。
 また、本動作例3において、無線基地局SeNB#1は、滞留しており移動局UEに対する送信が完了していない下りデータについて破棄してもよい。
 ここで、本実施形態に係る移動通信システムにおいて、無線基地局SeNB#1が、無線基地局MeNBに対して、上述の「Measurement Report」を転送し、無線基地局MeNBが、無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替えるか否かについて決定してもよい。
 本実施形態に係る移動通信システムによれば、「Inter-node UP aggregation」において無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替える際に、無線基地局MeNBが、「Path switch request」(図13参照)を受信する時点よりも前の時点で、上述の転送停止要求に応じて、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止することができる。このため、本実施形態では、移動局UE宛ての下りデータの無駄な転送を回避し、無線基地局SeNBの切り替えを迅速に行うことができる。
 (本発明の第2の実施形態)
 以下、図6乃至図8を参照して、本発明の第2の実施形態に係る移動通信システムについて、上述の第1の実施形態に係る移動通信システムとの相違点に着目して説明する。
 図6に示すように、本実施形態に係る無線基地局SeNB#1は、受信部21と、送信部22と、CA管理部23とを具備している。
 受信部21は、無線基地局MeNB、無線基地局SeNB#2および移動局UEによって送信された各種信号を、受信するように構成されている。送信部22は、無線基地局MeNB、無線基地局SeNB#2、移動局UEに対して、各種信号を送信するように構成されている。
 CA管理部23は、受信部21及び送信部22と協働して、上述のCA、すなわち、「Inter-node UP aggregation」に関する制御および管理を行うように構成されている。
 以下、図7及び図8を参照して、本実施形態に係る移動通信システムの動作について説明する。具体的には、図7及び図8を参照して、本実施形態に係る移動通信システムにおいて、「Inter-node UP aggregation」が行われている際に、無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替える動作について説明する。
 第1に、図7を参照して、本実施形態に係る移動通信システムの動作例1について説明する。
 図7に示すように、無線基地局SeNB#1は、ステップS4001において、移動局UEから「Measurement Report」を受信し、無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替えることを決定する。これにより、無線基地局SeNB#1は、ステップS4002において、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信すると共に、ステップS4003において、無線基地局SeNB#2に対して、無線基地局SeNBを切り替えるように要求する「SeNB change request」を送信する。
 ここで、無線基地局MeNBは、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する。なお、図7の例では、無線基地局MeNBは、シーケンス番号「23」以降のPDCP-PDUの無線基地局SeNB#1に対する転送を停止している。
 その後、無線基地局SeNB#1は、ステップS4004において、無線基地局SeNB#2から「SeNB change request ack」を受信すると、ステップS4005において、移動局UEに対する下りデータのスケジューリングを停止すると共に、ステップS4006において、移動局UEに対して「SeNB change command」を送信する。
 その後の動作は、図13に示す動作と同様である。
 なお、移動局UEに対する送信が完了していない下りデータ(PDCP-PDU)は、無線基地局SeNB#1又は移動局UEによって無線基地局MeNBに対して通知されてもよい。また、当該下りデータは、無線基地局SeNB#1によって無線基地局MeNBに転送されてもよい。
 また、本動作例1において、無線基地局SeNB#1は、滞留しており移動局UEに対する送信が完了していない下りデータについて破棄してもよい。
 第2に、図8を参照して、本実施形態に係る移動通信システムの動作例2について説明する。
 図8に示すように、無線基地局SeNB#1は、ステップS5001において、移動局UEとの間の無線リンク(下りリンク及び上りリンク)の品質劣化を検出すると、ステップS5002において、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する。
 例えば、無線基地局SeNB#1は、CQIの値、SRS(Sounding Reference Signal)の受信品質、HARQの誤り率等を観測することによって、品質劣化を検出してもよい。
 ここで、無線基地局MeNBは、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する。なお、図8の例では、無線基地局MeNBは、シーケンス番号「19」以降のPDCP-PDUの無線基地局SeNB#1に対する転送を停止している。
 その後、無線基地局SeNB#1は、移動局UEから「Measurement Report」を受信し、無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替えることを決定すると、ステップS5003において、無線基地局SeNB#2に対して、無線基地局SeNBを切り替えるように要求する「SeNB change request」を送信する。
 無線基地局SeNB#1は、ステップS5004において、無線基地局SeNB#2から「SeNB change request ack」を受信すると、ステップS5005において、移動局UEに対する下りデータのスケジューリングと停止すると共に、ステップS5006において、移動局UEに対して「SeNB change command」を送信する。
 その後の動作は、図13に示す動作と同様である。
 なお、移動局UEに対する送信が完了していない下りデータ(PDCP-PDU)は、無線基地局SeNB#1又は移動局UEによって無線基地局MeNBに対して通知されてもよい。また、当該下りデータは、無線基地局SeNB#1によって無線基地局MeNBに転送されてもよい。
 また、本動作例2において、無線基地局SeNB#1は、滞留しており移動局UEに対する送信が完了していない下りデータについて破棄してもよい。
 本実施形態に係る移動通信システムによれば、「Inter-node UP aggregation」において無線基地局SeNBを無線基地局SeNB#1から無線基地局SeNB#2に切り替える際に、無線基地局MeNBが、「Path switch request」(図13参照)を受信する時点よりも前の時点で、上述の転送停止要求に応じて、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止することができる。このため、本実施形態では、移動局UE宛ての下りデータの無駄な転送を回避し、無線基地局SeNBの切り替えを迅速に行うことができる。
 以上に述べた本実施形態の特徴は、以下のように表現されていてもよい。
 本実施形態の第1の特徴は、移動局UEが無線基地局MeNB(マクロセル用無線基地局)配下のマクロセル及び無線基地局SeNB#1(第1スモールセル用無線基地局)配下のスモールセルを用いてCA(キャリアアグリゲーション)を行っている状態における移動通信方法であって、無線基地局SeNB#1が、移動局UEから「Measurement Report(測定報告)」を受信した際に、無線基地局SeNB#2(第2スモールセル用無線基地局)に対して、無線基地局SeNB(スモールセル用無線基地局)を切り替えるように要求する「SeNB change request(切替要求)」を送信する工程と、無線基地局SeNB#1が、無線基地局SeNB#2から「SeNB change request ack(切替要求応答)」を受信した際に、移動局UEに対する下りデータのスケジューリングを停止すると共に、移動局UEに対して無線基地局SeNBを切り替えるように指示する「SeNB change command(切替指示)」を送信する工程と、移動局UEが、「SeNB change command」に応じて、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、無線基地局MeNBが、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する工程とを有することを要旨とする。
 本実施形態の第2の特徴は、移動局UEが無線基地局MeNB配下のマクロセル及び無線基地局SeNB#1配下のスモールセルを用いてCAを行っている状態における移動通信方法であって、移動局UEが、無線基地局SeNB#1に対して「Measurement Report」を送信する際に、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、無線基地局MeNBが、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する工程と、無線基地局SeNB#1が、移動局UEから「Measurement Report」を受信した際に、無線基地局SeNB#2に対して「SeNB change request」を送信する工程と、無線基地局SeNB#1が、無線基地局SeNB#2から「SeNB change request ack」を受信した際に、移動局UEに対する下りデータのスケジューリングを停止すると共に、移動局UEに対して「SeNB change command」を送信する工程とを有することを要旨とする。
 本実施形態の第3の特徴は、移動局UEが無線基地局MeNB配下のマクロセル及び無線基地局SeNB#1配下のスモールセルを用いてCAを行っている状態における移動通信方法であって、移動局UEが、無線基地局SeNB#1との間の無線リンクの品質劣化を検出した際に、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、無線基地局MeNBが、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する工程と、無線基地局SeNB#1が、移動局UEから「Measurement Report」を受信した際に、無線基地局SeNB#2に対して「SeNB change request」を送信する工程と、無線基地局SeNB#1が、無線基地局SeNB#2から「SeNB change request ack」を受信した際に、移動局UEに対する下りデータのスケジューリングを停止すると共に、移動局UEに対して「SeNB change command」を送信する工程とを有することを要旨とする。
 本実施形態の第4の特徴は、移動局UEが無線基地局MeNB配下のマクロセル及び無線基地局SeNB#1配下のスモールセルを用いてCAを行っている状態における移動通信方法であって、無線基地局SeNB#1が、移動局UEから「Measurement Report」を受信した際に、無線基地局SeNB#2に対して「SeNB change request」を送信すると共に、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、無線基地局MeNBが、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する工程と、無線基地局SeNB#1が、無線基地局SeNB#2から「SeNB change request ack」を受信した際に、移動局UEに対する下りデータのスケジューリングを停止すると共に、移動局UEに対して「SeNB change command」を送信する工程とを有することを要旨とする。
 本実施形態の第5の特徴は、移動局UEが無線基地局MeNB配下のマクロセル及び無線基地局SeNB#1配下のスモールセルを用いてCAを行っている状態における移動通信方法であって、無線基地局SeNB#1が、移動局UEとの間の無線リンクの品質劣化を検出した際に、無線基地局MeNBに対して、無線基地局SeNB#1に対する移動局UE宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、無線基地局MeNBが、前記転送停止要求に応じて、無線基地局SeNB#1に対して、移動局UE宛ての下りデータの転送を停止する工程と、無線基地局SeNB#1が、移動局UEから「Measurement Report」を受信した際に、無線基地局SeNB#2に対して「SeNB change request」を送信する工程と、無線基地局SeNB#1が、無線基地局SeNB#2から「SeNB change request ack」を受信した際に、移動局UEに対する下りデータのスケジューリングを停止すると共に、移動局UEに対して「SeNB change command」を送信する工程とを有することを要旨とする。
 なお、上述の移動局UEおよび無線基地局MeNB、SeNB#1、SeNB#2の動作は、ハードウェアによって実施されてもよいし、プロセッサによって実行されるソフトウェアモジュールによって実施されてもよいし、両者の組み合わせによって実施されてもよい。
 ソフトウェアモジュールは、RAM(Random Access Memory)や、フラッシュメモリや、ROM(Read Only Memory)や、EPROM(Erasable Programmable ROM)や、EEPROM(Electronically Erasable and Programmable ROM)や、レジスタや、ハードディスクや、リムーバブルディスクや、CD-ROMといった任意形式の記憶媒体内に設けられていてもよい。
 かかる記憶媒体は、プロセッサが当該記憶媒体に情報を読み書きできるように、当該プロセッサに接続されている。また、かかる記憶媒体は、プロセッサに集積されていてもよい。また、かかる記憶媒体及びプロセッサは、ASIC内に設けられていてもよい。かかるASICは、移動局UEおよび無線基地局MeNB、SeNB#1、SeNB#2内に設けられていてもよい。また、かかる記憶媒体及びプロセッサは、ディスクリートコンポーネントとして移動局UEおよび無線基地局MeNB、SeNB#1、SeNB#2内に設けられていてもよい。
 以上、上述の実施形態を用いて本発明について詳細に説明したが、当業者にとっては、本発明が本明細書中に説明した実施形態に限定されるものではないということは明らかである。本発明は、請求の範囲の記載により定まる本発明の趣旨及び範囲を逸脱することなく修正及び変更態様として実施することができる。従って、本明細書の記載は、例示説明を目的とするものであり、本発明に対して何ら制限的な意味を有するものではない。
 なお、日本国特許出願第2013-170314号(2013年8月20日出願)の全内容が、参照により、本願明細書に組み込まれている。
 以上説明したように、本発明によれば、「Inter-node UP aggregation」において、無線基地局SeNBをある無線基地局SeNB#1から他の無線基地局SeNB#2に切り替える際に、移動局UE宛ての下りデータの無駄な転送を回避し、無線基地局SeNBの切り替えを迅速に行うことができる移動通信方法を提供することができる。
S-GW…ゲートウェイ装置
MeNB、SeNB#1、SeNB#2…無線基地局
UE…移動局
11、21…受信部
12、22…送信部
13、23…CA管理部

Claims (5)

  1.  移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、
     前記第1スモールセル用無線基地局が、前記移動局から測定報告を受信した際に、第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信する工程と、
     前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局宛ての下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程と、
     前記移動局が、前記切替指示に応じて、前記マクロセル用無線基地局に対して、前記第1スモールセル用無線基地局に対する前記移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、
     前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程とを有することを特徴とする移動通信方法。
  2.  移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、
     前記移動局が、前記第1スモールセル用無線基地局に対して測定報告を送信する際に、前記マクロセル用無線基地局に対して、該第1スモールセル用無線基地局に対する該移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、
     前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程と、
     前記第1スモールセル用無線基地局が、前記移動局から前記測定報告を受信した際に、第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信する工程と、
     前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局宛ての下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程とを有することを特徴とする移動通信方法。
  3.  移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、
     前記移動局が、前記第1スモールセル用無線基地局との間の無線リンクの品質劣化を検出した際に、前記マクロセル用無線基地局に対して、該第1スモールセル用無線基地局に対する該移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、
     前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程と、
     前記第1スモールセル用無線基地局が、前記移動局から測定報告を受信した際に、第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信する工程と、
     前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局宛ての下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程とを有することを特徴とする移動通信方法。
  4.  移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、
     前記第1スモールセル用無線基地局が、前記移動局から測定報告を受信した際に、前記第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信すると共に、前記マクロセル用無線基地局に対して、該第1スモールセル用無線基地局に対する該移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、
     前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程と、
     前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局に対する下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程とを有することを特徴とする移動通信方法。
  5.  移動局がマクロセル用無線基地局配下のマクロセル及び第1スモールセル用無線基地局配下のスモールセルを用いてキャリアアグリゲーションを行っている状態における移動通信方法であって、
     前記第1スモールセル用無線基地局が、前記移動局との間の無線リンクの品質劣化を検出した際に、前記マクロセル用無線基地局に対して、該第1スモールセル用無線基地局に対する該移動局宛ての下りデータの転送を停止するように要求する転送停止要求を送信する工程と、
     前記マクロセル用無線基地局が、前記転送停止要求に応じて、前記第1スモールセル用無線基地局に対して、前記移動局宛ての下りデータの転送を停止する工程と、
     前記第1スモールセル用無線基地局が、前記移動局から測定報告を受信した際に、第2スモールセル用無線基地局に対して、スモールセル用無線基地局を切り替えるように要求する切替要求を送信する工程と、
     前記第1スモールセル用無線基地局が、前記第2スモールセル用無線基地局から切替要求応答を受信した際に、前記移動局に対する下りデータのスケジューリングを停止すると共に、該移動局に対してスモールセル用無線基地局を切り替えるように指示する切替指示を送信する工程とを有することを特徴とする移動通信方法。
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
PCT/JP2014/071659 2013-08-20 2014-08-19 移動通信方法 WO2015025846A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP14838288.0A EP3038408B1 (en) 2013-08-20 2014-08-19 Mobile communication method
CN201480045471.2A CN105474698A (zh) 2013-08-20 2014-08-19 移动通信方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013170314A JP6175308B2 (ja) 2013-08-20 2013-08-20 移動通信方法
JP2013-170314 2013-08-20

Publications (1)

Publication Number Publication Date
WO2015025846A1 true WO2015025846A1 (ja) 2015-02-26

Family

ID=52483620

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/071659 WO2015025846A1 (ja) 2013-08-20 2014-08-19 移動通信方法

Country Status (4)

Country Link
EP (1) EP3038408B1 (ja)
JP (1) JP6175308B2 (ja)
CN (1) CN105474698A (ja)
WO (1) WO2015025846A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11736976B2 (en) 2017-10-25 2023-08-22 Fujitsu Limited Wireless communication system, base station, user equipment, and wireless communication method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012081501A1 (ja) * 2010-12-16 2012-06-21 株式会社 エヌ・ティ・ティ・ドコモ 無線アクセス装置及びハンドオーバ方法
US20130028236A1 (en) * 2010-04-05 2013-01-31 Pantech Co., Ltd. Handover device of wireless communication system using multi-component carrier and method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6227930B2 (ja) * 2013-08-20 2017-11-08 株式会社Nttドコモ 移動通信方法
JP6227933B2 (ja) * 2013-08-21 2017-11-08 株式会社Nttドコモ 移動通信方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130028236A1 (en) * 2010-04-05 2013-01-31 Pantech Co., Ltd. Handover device of wireless communication system using multi-component carrier and method thereof
WO2012081501A1 (ja) * 2010-12-16 2012-06-21 株式会社 エヌ・ティ・ティ・ドコモ 無線アクセス装置及びハンドオーバ方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
HUAWEI ET AL.: "Considerations on the CP Architecture", 3GPP R2-132878, 3GPP, 8 October 2013 (2013-10-08), XP050718579 *
HUAWEI, HISILICON: "Throughput results for inter-frequency deployment of small cells", 3GPP TSG-RAN WG2 MEETING #82 (TDOCS R2-131782), 20 May 2013 (2013-05-20) - 24 May 2013 (2013-05-24)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11736976B2 (en) 2017-10-25 2023-08-22 Fujitsu Limited Wireless communication system, base station, user equipment, and wireless communication method
US11950132B2 (en) 2017-10-25 2024-04-02 Fujitsu Limited Wireless communication system, base station, user equipment, and wireless communication method

Also Published As

Publication number Publication date
EP3038408A1 (en) 2016-06-29
JP6175308B2 (ja) 2017-08-02
EP3038408A4 (en) 2017-01-18
EP3038408B1 (en) 2017-10-04
CN105474698A (zh) 2016-04-06
JP2015041786A (ja) 2015-03-02

Similar Documents

Publication Publication Date Title
WO2015025888A1 (ja) 移動通信方法
CN106716936B (zh) 基站发起的用于支持补充链路的控制机制
WO2015025804A1 (ja) 移動通信方法
KR101052371B1 (ko) 무선 통신 시스템에서 서빙 및 비-서빙 섹터들에 의한역방향 링크 프로세싱
JP4429363B2 (ja) 移動通信方法、交換局及び無線基地局
KR101467965B1 (ko) 반송파 집성을 갖는 무선 통신 네트워크에서 이용된 핸드오버 방법 및 그의 장치
KR20110057130A (ko) 이동통신방법, 이동국 및 교환국
JP5871750B2 (ja) 移動通信システム、無線基地局及び移動局
JP4510117B2 (ja) 移動通信方法及び移動局
WO2015046039A1 (ja) 移動通信システム及び無線基地局
JP2015070317A5 (ja)
WO2015030109A1 (ja) 移動通信方法及び無線基地局
US20150365867A1 (en) Traffic offload
WO2015025846A1 (ja) 移動通信方法
JP2010093838A (ja) 移動通信方法、交換局及び無線基地局
WO2014156727A1 (ja) 移動通信方法
JP5950785B2 (ja) 無線基地局及び移動局
JP2013102292A (ja) 移動通信方法
WO2014181636A1 (ja) ハンドオーバ方法、無線基地局及び移動局
JP2009201073A (ja) 移動通信システム、移動通信方法及び無線制御装置
JP2010004565A (ja) 移動通信方法及び移動局

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201480045471.2

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14838288

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2014838288

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2014838288

Country of ref document: EP