WO2014167780A1 - 分電盤、分電盤システム、自立分電盤 - Google Patents

分電盤、分電盤システム、自立分電盤 Download PDF

Info

Publication number
WO2014167780A1
WO2014167780A1 PCT/JP2014/001583 JP2014001583W WO2014167780A1 WO 2014167780 A1 WO2014167780 A1 WO 2014167780A1 JP 2014001583 W JP2014001583 W JP 2014001583W WO 2014167780 A1 WO2014167780 A1 WO 2014167780A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
distribution board
information
switch
communication
Prior art date
Application number
PCT/JP2014/001583
Other languages
English (en)
French (fr)
Inventor
傘谷 正人
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=51689204&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO2014167780(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to JP2015511082A priority Critical patent/JP6115000B2/ja
Publication of WO2014167780A1 publication Critical patent/WO2014167780A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/015Boards, panels, desks; Parts thereof or accessories therefor
    • H02B1/04Mounting thereon of switches or of other devices in general, the switch or device having, or being without, casing
    • H02B1/056Mounting on plugboards
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/40Wall-mounted casings; Parts thereof or accessories therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates to a distribution board to which a distributed power source is connected, a distribution board system including the distribution board, and a self-standing distribution board used in the distribution board system.
  • a distributed power source that allows reverse power flow (distributed power source that reverses generated power) and a distributed power source that does not allow reverse power flow (distributed power source that does not reverse power generated)
  • Document 1 A configuration of selecting and supplying power to a load is widely adopted (see, for example, Japanese Patent Application Publication No. 2013-13174; hereinafter referred to as Document 1).
  • the photovoltaic power generation apparatus is connected to the distribution board, and surplus power generated by the photovoltaic power generation apparatus can reversely flow into the power system.
  • the power storage device is charged with the power generated by the solar power generation device, and for the part of the load of the consumer, the power from the distribution board and the power from the power storage device are selectively supplied. Is possible.
  • the photovoltaic power generation device distributed power source that allows reverse power flow in Japan
  • the power storage device reverse power flow is prohibited in Japan
  • the distributed power source is not connected to the distribution board and has a problem that the distributed power source cannot be centrally managed.
  • An object is to provide a distribution board that can be concentrated at a location. It is another object of the present invention to provide a distribution board system including the distribution board and a self-standing distribution board used for the distribution board system.
  • the distribution board includes a main breaker that is electrically connected to a power line of a power system, and a plurality of branch breakers that branch a load-side electric circuit of the main breaker into a plurality of load circuits. Yes.
  • the distribution board includes a first mounting space and a second mounting space. In the first mounting space, a first switch connected between a first distributed power source that reversely flows generated power to the power system and the power source side of the main breaker is disposed. In the second mounting space, a second switch connected between the second distributed power source that does not allow the generated power to flow backward to the power system and the load side of the main breaker is disposed.
  • the distribution board further includes a linkage adapter.
  • the cooperation adapter includes a processing unit configured to generate output information to be output to another device based on input information.
  • the input information includes information regarding power received from the power system, information regarding power passing through each of the plurality of branch breakers, information regarding power passing through the first switch, and the second switch And at least one of the information on the power passing through the.
  • the input information includes at least information related to power received from the power system and information related to power passing through each of the plurality of branch breakers.
  • the distribution board further includes a measurement unit provided with a plurality of sensors each configured to measure electric power of the plurality of load circuits.
  • the cooperation adapter is configured to acquire information on power passing through the plurality of branch breakers and information on power passing through the second switch from the measurement unit.
  • the linkage adapter includes a communication interface unit configured to communicate with the other device.
  • the communication interface unit sends the output information to a communication device that communicates through a public network, sends the output information to a presentation device that presents information to a user, and the distribution board is attached. It is configured to perform at least one of sending the output information to a controller that manages equipment installed in a predetermined place.
  • the communication interface unit is further configured to communicate with equipment installed in the predetermined location.
  • the processing unit is configured to perform at least one of control and monitoring of the equipment.
  • the communication interface unit is further configured to communicate with a watt-hour meter having a communication function.
  • the processing unit is configured to add information acquired from the watt-hour meter to the input information.
  • the communication adapter unit is attached to the link adapter in a replaceable manner.
  • the communication interface unit is configured to communicate with the controller.
  • the processing unit acquires information about the equipment from the controller, adds information about the equipment acquired from the controller to the input information, and generates information for managing the equipment based on the input information.
  • the generated information is delivered to the controller as the output information.
  • the processing unit includes a processor that executes a program for generating the output information from the input information, and is configured to acquire the program through the communication interface unit.
  • the apparatus further includes a connection unit on which a storage medium is detachably mounted, and the processing unit includes a processor that executes a program for generating the output information from the input information, and the storage medium includes the processor. Configured to get a program.
  • the cooperation adapter is electrically connected to the first terminal part to which the power line of the power system is connected, to the first terminal part, and to the main breaker. A second terminal portion.
  • the cooperation adapter is electrically connected to the first terminal part to which the power line of the power system is connected, to the first terminal part, and to the main breaker.
  • a second terminal portion, and a third terminal portion electrically connected to the first terminal portion and the second terminal portion, and to which the first switch is electrically connected. .
  • the linkage adapter further includes a built-in sensor configured to measure the power that has passed through the first switch.
  • the processing unit obtains information on power passing through the first switch from the power measured by the built-in sensor.
  • the processing unit uses the relationship of the elements included in the input information, to calculate the power that has performed a reverse power flow to the power system out of the power generated by the first distributed power supply, The calculation result is output to the other device as the output information.
  • the processing unit obtains information on the use of the resource from a measuring device that measures the amount of use of resources other than electric power supplied to a predetermined place where the distribution board is attached, and the obtaining Configured to add to the input information information regarding the use of the selected resource.
  • the linkage adapter further includes a container that houses the processing unit and is attached to the distribution board.
  • the first mounting space is provided in the container.
  • the second mounting space is a part of a space for mounting the branch breaker, and has a size corresponding to one or more of the branch breakers.
  • the distribution board system includes any one of the above distribution boards connected to the second distributed power source, which is capable of outputting power in a state where power supply from the system power supply is stopped. And a self-supporting distribution board including a second branch breaker to which a device that requires power supply is connected in a state where power supply from the system power supply is stopped.
  • the stand-alone distribution board is fed through the main breaker during a period when power is supplied from the system power supply, and from the second distributed power supply during a period when power supply from the system power supply is stopped. Power is supplied.
  • the self-supporting distribution board receives a power from either the distribution board or the second distributed power source, and supplies the received power to the second branch breaker. Is provided.
  • a state in which power is received through the main breaker during a period in which power is supplied from the system power supply is selected as a path for power reception by the third switch, and power supply from the system power supply is stopped.
  • a switch for selecting a state of receiving power from the second distributed power source during the period is selected as a path for power reception by the third switch, and power supply from the system power supply is stopped.
  • the third switch and the switch are provided on the self-supporting distribution board.
  • the first switch to which the first distributed power source that allows reverse power flow to the power system is connected and the second switch that prohibits reverse power flow to the power system.
  • a space for attaching the second switch to which the distributed power source is connected is provided. Therefore, even when the first distributed power source and the second distributed power source are introduced in order, there is no need to replace the distribution board, and a new construction for the distribution network can be performed simply by connecting the distributed power source. There is an advantage that there is no need to do.
  • the first distributed power source and the second distributed power source are connected to the distribution board, it is possible to centrally manage a plurality of types of distributed power sources at one location.
  • the distribution board 30 of the present embodiment includes a main breaker 31, a plurality of branch breakers 32, and a cabinet 35 in which the main breaker 31 and the plurality of branch breakers 32 are attached.
  • the distribution board 30 of this embodiment is used in a state where the cabinet 35 is attached to a predetermined place (such as a residence).
  • the linkage adapter 10 is attached in the cabinet 35. That is, the cooperation adapter 10 is attached to the distribution board 30 as an internal unit.
  • the cooperation adapter 10 of the present embodiment has a function of acquiring information related to power passing through the distribution board 30, generating output information from the acquired information, and outputting the generated output information to the outside.
  • the information regarding the power passing through the distribution board 30 includes the amount of power supplied from the outside to the distribution board 30 and the amount of power supplied from the distribution board 30 to the outside.
  • the cooperation adapter 10 includes a communication interface unit (first communication interface unit 11 and second communication interface unit 12) that communicates with another device (external), a processing unit 13, and at least a processing unit. And a container 14 for storing 13.
  • the “communication interface unit” is abbreviated as “communication I / F unit”.
  • the first communication I / F unit 11 in the communication I / F unit communicates with the watt-hour meter 20 having a communication function.
  • the second communication I / F unit 12 in the communication I / F unit communicates with a device used by a consumer (a predetermined place where the distribution board 30 is attached) where the watt hour meter 20 is installed.
  • the 1st communication I / F part 11 for communicating with the watt-hour meter 20 is omissible.
  • devices devices used by consumers that communicate with the second communication I / F unit 12 are equipment such as lighting devices, air conditioning devices, kitchen devices, and video devices (distribution panels).
  • 30 equipment equipment installed in a predetermined location
  • equipment (controller) 70 that manages the equipment 72
  • equipment (presentation equipment) 71 that inputs and outputs information such as operation display equipment
  • a device (communication device) 73 such as a wireless router that communicates through a telecommunication line that is a public network such as the Internet network, CATV network, and telephone network.
  • the second communication I / F unit 12 has a function of sending output information to at least one of the equipment device 72, the controller 70, the presentation device 71, and the communication device 73.
  • the second communication I / F unit 12 communicates with the controller 70 and the communication device 73.
  • Output information sent from the second communication I / F unit 12 to the device includes management information for monitoring and / or controlling the facility device 72, presentation information presented to the user through the presentation device 71, and communication device 73, at least one of notification information notified to the outside through 73.
  • the second communication I / F unit 12 may exchange the management information directly with the equipment device 72, but usually exchanges the management information with the controller 70 that manages the equipment device 72, and the actual management of the equipment device 72 is performed by the controller. 70 is desirable.
  • This type of controller 70 is called a HEMS (Home Energy Management System) controller, and can monitor and control the operating state of the equipment 72.
  • the link adapter 10 manages the facility device 72 such as a digital home appliance that does not communicate with the HEMS controller but can communicate with the communication device 73
  • the second communication I / F unit 12 includes the communication device 73.
  • the management information may be transmitted to the facility device 72 through.
  • the presentation information is presented by the presentation device 71 and provides various information to the user.
  • the method of presenting information by the presentation device 71 includes display on a screen included in the presentation device 71 and generation of sound by a speaker included in the presentation device 71.
  • the presentation device 71 may have only a presentation function, but it is preferable that operation is possible like an operation display device.
  • the presentation device (operation display device) 71 can be used by the user who has recognized the information presented on the presentation device 71 for the purpose of changing the operating state of the equipment device 72. In this case, an instruction given from the user to the presentation device 71 is notified to the facility device 72 directly or via the controller 70.
  • the second communication I / F unit 12 (distribution panel 30 ) May transmit the presentation information to the presentation device 71 through the communication device 73 as illustrated in FIG. 3.
  • Notification information is used to notify information to electric utilities.
  • the second communication I / F unit 12 (distribution panel 30) transmits the notification information to the management device 61 operated by the electric power company through the communication device 73.
  • the first communication I / F unit 11 and the second communication I / F unit 12 are wireless communication using radio waves as a transmission medium, power line carrier communication using a power line as a communication line, RS485, ECHONET (registered trademark) Lite A communication technology selected from such wired communication is adopted.
  • the specification of the wireless signal is selected from WiFi (registered trademark), specific low-power wireless (for example, 920 MHz band), ZigBee (registered trademark), Bluetooth (registered trademark), and the like.
  • the communication method (first communication method; for example, power line carrier communication) of the first communication I / F unit 11 is the same as the communication method (second communication method; for example, wireless communication) of the second communication I / F unit 12. May be different.
  • the processing unit 13 includes a device including a processor that executes a program as a main hardware element.
  • a typical example of this type of device is a microcomputer having a memory. That is, the processing unit 13 includes a memory 131 for storing programs and data as shown in FIG.
  • the processing unit 13 may be a CPU (Central Processing Unit) that requires a separate memory. That is, the cooperation adapter 10 may include a memory (not shown) provided separately from the processing unit 13.
  • the program and data necessary for the operation of the processing unit 13 are given through either the first communication I / F unit 11 or the second communication I / F unit 12.
  • programs and data necessary for the operation of the processing unit 13 may be given through a storage medium 16 such as a memory card.
  • the processing unit 13 acquires the program and data through the first communication I / F unit 11, the program and data are received from the electric power company through a route via the watt-hour meter 20. That is, the watt-hour meter 20 needs to communicate with a host device operated by an electric power company or the like through a telecommunication line NT which is a public network such as an Internet line, a CATV network, and a telephone network.
  • a host device operated by an electric power company or the like through a telecommunication line NT which is a public network such as an Internet line, a CATV network, and a telephone network.
  • This type of host device includes a management device 61 operated by an electric power company, a management device 62 operated by a service provider that is not an electric power company, and the like (see FIG. 3).
  • the management device 62 operated by the service provider provides a service for performing energy management to the consumer. Further, the management device 62 provides a service for measuring the amount of power used by the consumer and notifying the electric utility, or a service for notifying the consumer of a demand response such as a power saving request from the electric utility.
  • a communication path is configured so that the management device 61 operated by the electric power company communicates with the management device 62 operated by the service provider.
  • the management device 62 communicates with the watt-hour meter 20 to perform remote meter reading of the power amount measured by the watt-hour meter 20, and also uses the watt-hour meter 20 for relaying information (so-called demand response). Information) to consumers.
  • the information on the power saving request notified from the management device 62 is received by the link adapter 10 through the watt hour meter 20.
  • the management device 62 can also transfer the program and data to the link adapter 10 using the watt-hour meter 20 for relaying, in the same manner as the power saving request described above. Furthermore, since the watt-hour meter 20 can communicate with the linkage adapter 10, it is also possible to transmit information regarding the measured power to the linkage adapter 10. Therefore, the processing unit 13 can acquire a program and data from the management device 62 (or 61) through the first communication I / F unit 11 (and the watt-hour meter 20).
  • the processing unit 13 acquires a program and data through the second communication I / F unit 12, the program and data are received from a support device (not shown) capable of communicating with the second communication I / F unit 12. Is transferred.
  • the support device downloads the program and data through an electric communication line such as the Internet line, and causes the processing unit 13 to read the program and data through the second communication I / F unit 12.
  • the support device may be a device that can communicate with both the second communication I / F unit 12 and the communication device 73 such as a personal computer, a smartphone, and a tablet terminal.
  • the link adapter 10 includes a connection unit 15 that allows the storage unit 16 to be attached and detached so that the processing unit 13 obtains a program and data from the storage medium 16. You may have.
  • the connection unit 15 includes a slot into which the memory card is inserted, and has a configuration in which contacts that are electrically connected to the electrodes of the memory card are disposed in the slot.
  • the processing unit 13 reads the program and data stored in the storage medium 16 when the storage medium 16 is attached to the connection unit 15. That is, when the user inserts the storage medium 16 into the connection unit 15 and the processing unit 13 confirms the information stored in the storage medium 16 and determines that it can be read, The stored information may be read into the processing unit 13.
  • the storage medium 16 can be removed from the connection unit 15, so that a plurality of different coordination adapters 10 can read the program and data using one storage medium 16. Is possible.
  • processing unit 13 Regardless of whether the processing unit 13 reads the program and data from the first communication I / F unit 11, the second communication I / F unit 12, or the storage medium 16, What is necessary is just to alert
  • the processing unit 13 when the processing unit 13 needs to read a program and data, the processing unit 13 sends presentation information for requesting the program and data to the support apparatus through the second communication I / F unit 12.
  • the support apparatus presents presentation information for requesting a program and data on a screen.
  • the support device receives an instruction to read the program and data from the user in response to the presentation information, the support device requests the program and data from the management device 62 through the telecommunication line.
  • the management device 62 that has received the request sends the requested program and data to the processing unit 13 through the first communication I / F unit 11.
  • the management device 62 that has received the request sends the requested program and data to the processing unit 13 through the support device and the second communication I / F unit 12.
  • the processing unit 13 reads the received program and data and stores them in the memory 131. When the reading of the program and data is completed, the processing unit 13 transmits presentation information indicating that the reading is completed to the support apparatus.
  • the processing unit 13 has a function of generating output information using, for example, information acquired through at least one of the first communication I / F unit 11 and the second communication I / F unit 12 as input information. For example, the processing unit 13 generates output information based on information acquired from the watt-hour meter 20 through the first communication I / F unit 11. The output information generated by the processing unit 13 is transmitted from at least one of the first communication I / F unit 11 and the second communication I / F unit 12. For example, the output information generated by the processing unit 13 is output from the second communication I / F unit 12 to a device used by a consumer.
  • the first communication I / F unit 11, the second communication I / F unit 12, and the processing unit 13 are accommodated in the container 14.
  • the size and shape of the container 14 of the present embodiment are determined so as to be attached to the cabinet 35 of the distribution board 30. Specifically, in the distribution board 30 to which a current limiter (ampere breaker) can be attached, the size and shape of the container body 14 are determined so that they can be attached instead of the current limiter. Therefore, the cooperation adapter 10 of this embodiment can be attached to the existing distribution board 30 without changing the design of the distribution board 30. However, it is not essential to determine the size and shape of the body 14 of the link adapter 10 so that it can be stored in the distribution board 30 to which the current limiter can be attached.
  • the cabinet 35 of the distribution board 30 is a rectangular box that is long in one direction (left-right direction in FIG. 2) D ⁇ b> 1 and opens in one direction (front side in FIG. 2) perpendicular to the direction D ⁇ b> 1. It is formed in a shape. As shown in FIG. 3, an openable / closable door 36 that covers the opening of the cabinet 35 is attached to the cabinet 35.
  • the cooperation adapter 10 is attached in the cabinet 35.
  • the link adapter 10 is attached to the first terminal portion 21 to which the power line Lp of the power system to which the watt hour meter 20 is connected and the distribution board 30.
  • a second terminal portion 22 to which a connection line Lc for connecting the main breaker 31 is connected.
  • the first terminal portion 21 and the second terminal portion 22 are provided on one surface (front side in FIG. 2) of the container body 14.
  • the 1st terminal part 21 and the 2nd terminal part 22 are electrically connected inside the cooperation adapter 10 (inside the container 14).
  • each of the first terminal portion 21 and the second terminal portion 22 includes three connection terminals (first terminals corresponding to the neutral line, the first voltage line, and the second voltage line, respectively). To third connection terminal).
  • the power supply method is not intended to be limited, but is shown as a representative example that is adopted by many customers such as houses, offices and stores in Japan.
  • the power supply method from the system power supply 25 is not limited to the single-phase three-wire method, and may be a single-phase two-wire method.
  • the first terminal portion 21 and the second terminal portion 22 have two connection terminals respectively corresponding to one voltage line and one neutral line. (First and second connection terminals) may be provided.
  • the main breaker 31 is attached to the first side (right side in FIG. 2) in the direction D1 from the linkage adapter 10.
  • the power source side of the main breaker 31 is electrically connected to the power line Lp of the power system.
  • the first terminal (power source side) 310 of the main breaker 31 is connected to the second terminal portion 22 of the linkage adapter 10 via the connection line Lc, and the first terminal portion 21 of the linkage adapter 10 is connected.
  • connection line Lc that is an electric wire, but are connected using a plate-like conductive member. It may be configured.
  • a plurality of branch breakers 32 are connected to the load side of the main breaker 31.
  • the branch breaker 32 branches the main circuit into which the main circuit breaker 31 is inserted into a plurality of load circuits 38. Therefore, the branch breaker 32 is inserted for each load circuit 38.
  • the main circuit means an electric circuit from the power supply line Lp to the first terminal (terminal on the power supply side) of each branch breaker 32 inside the distribution board 30, and the load circuit 38 is the first circuit of each branch breaker 32. It means an electric circuit on the downstream side of the terminal (terminal on the power supply side).
  • a conductive bar set 37 is connected to the second terminal (load side terminal; not shown) of the main breaker 31.
  • a plurality of branch breakers 32 are connected to the conductive bar set 37. Thereby, the plurality of branch breakers 32 branches the main circuit into which the main circuit breaker 31 is inserted into the plurality of load circuits 38.
  • the conductive bar set 37 is disposed on the first side (right side in FIG. 1) in the direction D ⁇ b> 1 of the main breaker 31.
  • the conductive bar set 37 is formed long in the direction D1 (longitudinal direction of the cabinet 35).
  • the conductive bar set 37 includes three conductive bars corresponding to the neutral line, the first voltage line, and the second voltage line.
  • the plurality of branch breakers 32 are arranged on both sides of the direction D2 (vertical direction in FIG. 2) perpendicular to the direction D1 with respect to the conductive bar set 37.
  • the plurality of branch breakers 32 are arranged side by side in the direction D1 on both sides of the conductive bar set 37 in the direction D2.
  • Each branch breaker 32 has a first terminal (terminal on the power supply side; not shown) and a second terminal (terminal on the load side) 321.
  • a first terminal of each branch breaker 32 is connected to the conductive bar set 37.
  • the 2nd terminal 321 of each branch breaker 32 is connected to an outlet, an electric equipment, etc. via an electric wire.
  • the main breaker 31 of this embodiment is, for example, a 3P3E type breaker (number of poles: 3, number of elements: 3), and includes a neutral line, a first voltage line, and a second voltage line provided therein.
  • a tripping element (including a current detection unit) is provided in each electric path.
  • Each branch breaker 32 is, for example, a 2P1E type (number of poles: 2, number of elements: 1) breaker, and the first electric wire among the electric wires of the first electric wire and the second electric wire provided therein.
  • a tripping element (including a current detection unit) is provided in the electric circuit.
  • the first terminal of each branch breaker 32 includes two terminals, which are two of the three conductive bars of the conductive bar set 37 (e.g., conductive bars corresponding to the neutral pole and the first voltage pole). Connected to each.
  • the linkage adapter 10 in the cabinet 35 of the distribution board 30, from the second side in the direction D1 toward the first side (from the left side to the right side in FIG. 2), the linkage adapter 10, the main breaker 31, and a plurality of The branch breaker 32 (and the conductive bar set 37) are arranged side by side.
  • the measurement unit 33 that measures the power of each of the plurality of load circuits 38 will be described.
  • the distribution board 30 of this embodiment includes a measurement unit 33.
  • the measurement unit 33 includes a plurality of sensors 390 that measure the power passing through the branch breaker 32 for each load circuit 38 for all load circuits 38 branched by the branch breaker 32. That is, the measurement unit 33 includes a plurality of sensors 390 corresponding to the plurality of load circuits 38, respectively. Each sensor 390 detects the power flowing through the corresponding branch breaker 32.
  • the link adapter 10 of the present embodiment includes a connection port 17 to which a measurement unit 33 that measures power for each load circuit 38 is connected, and a measurement unit 33 connected to the connection port 17.
  • An acquisition unit 18 that acquires information on the use of power for each load circuit 38 is further provided. That is, the cooperation adapter 10 acquires information on the power passing through the branch breakers 32 from the measurement unit 33.
  • Each sensor 390 of the measurement unit 33 includes a current sensor that measures a current passing through the corresponding load circuit 38, and calculates power using the current value measured by the current sensor and the voltage value between the lines of the load circuit 38.
  • a Rogowski sensor is used as the current sensor.
  • the measurement unit 33 may be configured to include only a current sensor, and the processing unit 13 may calculate power by providing the current value and the voltage value as input information to the linkage adapter 10.
  • the information regarding the use of power for each load circuit 38 is a current value and a voltage value measured for each load circuit 38.
  • the measurement unit 33 includes a sensor block 39 provided with a plurality of sensors 390 as shown in FIG.
  • the sensor block 39 is formed in a rectangular plate shape, and a plurality of insertion holes 391 are provided in two rows along the longitudinal direction.
  • a sensor 390 (Rogowski coil) is provided around each of the lower insertion holes 391 in FIG.
  • each branch breaker 32 In the plurality of upper insertion holes 391 in FIG. 5, for example, a plurality of connection terminals of a conductive bar of a neutral electrode are respectively inserted, and in the plurality of lower insertion holes 391, for example, a first voltage electrode A plurality of connection terminals of the conductive bar are respectively inserted.
  • the two terminals of the first terminal of each branch breaker 32 are respectively connected to the connection terminal of the neutral electrode conductive bar and the connection terminal of the first voltage electrode conductive bar. Thereby, the current flowing through each branch breaker 32 can be measured by the sensor 390.
  • Information regarding the use of power for each load circuit 38 measured by the measurement unit 33 is given to the processing unit 13 as input information.
  • the information on the use of power measured by the measurement unit 33 may be an instantaneous value of a current value and a voltage value. However, the amount of power (considered as instantaneous power) every predetermined time (for example, 1 minute) and the instantaneous power are integrated. It is more desirable that it is at least one of the integrated electric energy.
  • the measurement unit 33 not only measures the power of each load circuit 38 but also measures the power of the main circuit. That is, it is preferable that the measurement unit 33 includes a sensor that measures electric power passing through the main breaker 31. Information on the use of power of the main circuit can be obtained as the instantaneous power or the total integrated power amount for each load circuit 38, but when the information obtained for each load circuit 38 is summed, the main circuit is measured. In many cases, errors are included in the information. Therefore, it is desirable to directly measure information on the power of the main circuit for the main circuit.
  • the processing unit 13 can acquire at least one of the instantaneous power and the integrated power amount for each load circuit 38 by using the input information obtained from the measurement unit 33 through the acquisition unit 18. Further, the processing unit 13 can acquire at least one of the instantaneous power and the integrated power amount for the main circuit.
  • the link adapter 10 is a first solar power generation device such as a photovoltaic power generator that reversely flows generated power to the power system (for example, reverse power flow to the power system is allowed).
  • the third terminal portion 23 is electrically connected to the first terminal portion 21 and the second terminal portion 22. That is, the third terminal portion 23 is electrically connected to the main breaker 31 through the second terminal portion 22, and is electrically connected to the system power supply 25 through the first terminal portion 21.
  • the first switch 51 is controlled to be turned on when the first distributed power source 41 is connected to the power system, and to be turned off when the first distributed power source 41 is disconnected from the power system. . That is, the first switch 51 turns off the first distributed power supply 41 when the power supply from the system power supply 25 is stopped, or when an abnormality occurs in the system power supply 25 or the first distributed power supply 41. Provided to disconnect. Moreover, the 1st switch 51 contains the earth-leakage breaker.
  • the first switch 51 is, for example, a 3P3E type (3 poles, 3 elements) breaker as shown in FIG.
  • the first switch 51 includes a terminal unit 510 to which the power cable of the first distributed power supply 41 is connected.
  • the terminal portion 510 includes three terminal portions corresponding to the neutral line, the first voltage line, and the second voltage line.
  • the first switch 51 can secure a space in the distribution board 30, the first switch 51 can be arranged in a different location from the linkage adapter 10 in the internal space of the distribution board 30.
  • the dimensions of the container body 14 of the linkage adapter 10 are designed so that a first mounting space for arranging the first switch 51 is formed inside the distribution board 30.
  • the space for arranging the first switch 51 is independent of the installation space for the coordination adapter 10. Therefore, it cannot be secured inside the distribution board 30.
  • the link adapter 10 of the present embodiment includes a first mounting space SP ⁇ b> 1 in which the first switch 51 is mounted in a part of the body 14.
  • the first switch 51 can be attached to and detached from the first attachment space SP1.
  • the first attachment space SP1 is a recess formed in the container body 14.
  • the first mounting space SP1 is a plug in which a terminal (not shown) of the first switch 51 is electrically connected when the first switch 51 is mounted in the first mounting space SP1. It has an expression connection (not shown).
  • this plug-in connection portion constitutes the third terminal portion 23.
  • the container body 14 includes one first mounting space SP1, but may include a plurality of first mounting spaces SP1.
  • the distribution board 30 of the present embodiment has a first mounting space in which the first switch 51 for connecting the first distributed power source 41 that reversely flows the generated power to the power system is disposed.
  • (Recess) SP1 is provided.
  • the first mounting space SP ⁇ b> 1 is provided in the container body 14 of the linkage adapter 10.
  • the third terminal portion 23 is provided in the attachment space SP1, and is connected to the first switch 51 when the first switch 51 is arranged in the first attachment space SP1.
  • the first distributed power supply 41 when the first switch 51 is connected to the third terminal portion 23 and the first distributed power supply 41 is connected to the first switch 51, the first distributed power supply 41 generates power. It becomes possible to supply electric power to the main breaker 31 via the second terminal unit 22, and electric power generated by the first distributed power source 41 is supplied to the system power source 25 via the first terminal unit 21. It becomes possible to reverse flow.
  • one of the terminal of the first switch 51 and the connection portion employs a structure in which two leaf springs face each other, and the other is between the two leaf springs.
  • a structure including a plate-like conductor piece to be inserted into is adopted.
  • This type of structure is similar to the structure employed in the relationship between the plug blade of the power plug and the blade receiving spring of the receptacle.
  • the coordination adapter 10 includes the first mounting space SP1
  • the distribution board 30 to which the coordination adapter 10 is installed is installed in a consumer, the first like a solar power generation device.
  • the first switch 51 can be retrofitted to the first mounting space SP1.
  • the first switch 51 is installed inside the distribution board 30 to connect the first distributed power supply 41 to the system. It becomes possible to make it.
  • the distribution board 30 of the present embodiment includes the first mounting space SP1, it is not necessary to replace the distribution board even when the first distributed power supply 41 is newly introduced. Furthermore, the first switch 51 is arranged in the first mounting space SP1 (connected to the third terminal portion 23), and the first distributed power source 41 is divided without performing a large-scale construction. The board 30 can be connected.
  • the link adapter 10 of the present embodiment further includes a built-in sensor 24 that measures the power that has passed through the first switch 51 as shown in FIG.
  • the built-in sensor 24 is provided between the second terminal portion 22 and the third terminal portion 23. That is, in the present embodiment, the power generated by the first distributed power supply 41 is measured by the built-in sensor 24 provided in the linkage adapter 10.
  • the built-in sensor 24 includes, for example, a current sensor that measures a current value passing through each line in order to measure the power received through the third terminal unit 23, and the current value measured by the current sensor and the voltage value between the lines. And to measure the power. In short, the built-in sensor 24 measures the electric power passing through the first switch 51.
  • Information on the power measured by the built-in sensor 24 is given to the processing unit 13 as input information through the acquisition unit 18. That is, the processing unit 13 obtains information regarding the power passing through the first switch 51 from the information regarding power measured by the built-in sensor 24.
  • the information related to the power measured by the built-in sensor 24 may be an instantaneous value of a current value and a voltage value, but the amount of power for each predetermined time (for example, 1 minute) (considered as instantaneous power) and the instantaneous power. It is desirable that it is at least one of the integrated electric energy.
  • the processing unit 13 uses the input information obtained from the built-in sensor 24 through the acquisition unit 18 (information on the power passing through the first switch 51), so that the power generated by the first distributed power source 41 is It is possible to acquire at least one of the instantaneous power and the integrated power amount. In addition, the processing unit 13 acquires the power used for each load circuit 38 based on the input information from the measurement unit 33 (information about the power passing through the branch breaker 32), so that the first distributed power source 41 generates power. It is possible to calculate surplus power (or power that has been subjected to reverse power flow) based on the difference from the generated power. That is, the processing unit 13 uses the information about the power passing through the branch breaker 32 and the information about the power passing through the first switch 51 to use the power system of the power generated by the first distributed power source 41. It is possible to calculate the power reversely flowed into
  • a switch may be provided between the first terminal portion 21 and the second terminal portion 22.
  • the power required by the load circuit 38 can be satisfied by the power of the first distributed power supply 41 and the power of the power storage device, the power system is disconnected from the load circuit 38 by the switch, and the load circuit 38 When power to be used is insufficient, an operation of connecting a power system is possible.
  • the operation of the switch is controlled by the processing unit 13.
  • the processing in which the processing unit 13 uses the information related to the power generated by the first distributed power supply 41 as input information to generate output information is necessary only when the first distributed power supply 41 is connected. Therefore, when the first distributed power supply 41 is connected, the corresponding program and data (program and data for processing information regarding the power passing through the first switch 51) are read by the processing unit 13. Is desirable. For example, when the processing unit 13 receives a predetermined radio signal from the first distributed power supply 41 via the second communication I / F unit, the processing unit 13 transmits the corresponding program and data to the first communication I / F unit 11. Alternatively, it is received through the second communication I / F unit 12.
  • the program and data may be registered in the processing unit 13 in advance, and the required program and data may be activated when the first distributed power supply 41 is connected. However, even when the program and data are registered in the processing unit 13 in advance, when the first distributed power supply 41 is connected, the latest program and data (program and data update information) are read again. It is preferable that the program and data are not configured to be selected from options but configured to be read when necessary.
  • the third terminal unit 23 is not necessary. Therefore, the cooperation adapter 10 that does not include the third terminal portion 23 may be attached to the distribution board 30.
  • the distribution board 30 of the present embodiment not only generates the generated power but also the first distributed power source 41 that reversely flows the generated power to the power system (for example, the reverse power flow to the power system is allowed). It is also possible to connect a second distributed power source 42 that does not cause reverse power flow to the power system (for example, reverse power flow to the power system is prohibited).
  • the distribution board 30 of the present embodiment is provided with a second switch 52 for connecting a second distributed power source 42 that does not reversely flow the generated power to the power system.
  • a mounting space SP2 is provided.
  • the second switch 52 is arranged in a part of the space where the branch breaker 32 is attached in order to connect the second distributed power source 42 as shown in FIG. 2.
  • a second mounting space SP2 is provided. Specifically, the second mounting space SP2 is provided on the first side in the direction D1 of the conductive bar set 37 and on one side in the direction D2 (lower right side in FIG. 2).
  • the mounting base 34 to which the second switch 52 is attached is mounted in the second mounting space SP2.
  • the mounting base 34 is connected to the conductive bar set 37. Therefore, the second switch 52 is connected between the second distributed power source 42 and the load side (conductive bar set 37) of the main breaker 31.
  • the mounting base 34 (second switch 52) is arranged in the mounting space SP2 corresponding to the three branch breakers 32, but the second mounting space SP2 is the second opening / closing.
  • the second mounting space SP2 is the second opening / closing.
  • the mounting base 34 is attached to the distribution board 30 before factory shipment or on-site construction at the customer, similarly to the linkage adapter 10.
  • the distribution board 30 can leave a second mounting space SP ⁇ b> 2 corresponding to the mounting table 34 without mounting the mounting table 34.
  • the mounting base 34 is left unattached to the distribution board 30, there is a possibility that the branch breaker 32 is erroneously attached to the second mounting space SP ⁇ b> 2, and the conductive portion (exposed conductive bar). There is a possibility that contact resistance may increase due to dust adhering to (part) or an oxide film. Due to the above circumstances, it is desirable that the mounting base 34 is attached to the distribution board 30 in advance. If it is clear that the second distributed power source 42 will not be used for the time being in the second mounting space SP2, a spare branch breaker 32 may be mounted.
  • the second distributed power source 42 is selected from a fuel cell, a power storage device, an electric vehicle equipped with a storage battery, and the like. It is assumed that the electric vehicle includes a converter that performs bidirectional power conversion between alternating current and direct current, and does not require a separate charger.
  • the second distributed power source 42 may be a distributed power source that converts renewable energy into electric power as in the case of a photovoltaic power generation device, as long as a reverse power flow to the power system is not performed.
  • the second distributed power source 42 is connected to the distribution board 30, the second distributed power source 41 and the main circuit are connected in the same manner as the first switch 51 is necessary between the first distributed power source 41 and the main circuit.
  • a second switch 52 is required between the mold power source 42 and the main circuit.
  • the electric power passing through the second switch 52 is measured by the measuring unit 33 (the sensor 390 of the measuring unit 33) in the same manner as the electric power passing through the branch breaker 32. That is, the link adapter 10 acquires information about the power passing through the second switch 52 from the measurement unit 33.
  • the second switch 52 can be attached to and detached from the mounting base 34.
  • the relationship between the second switch 52 and the mounting base 34 is the same as the relationship between the first switch 51 and the link adapter 10, and the second switch 52 is attached to and detached from the mounting base 34. It is installed so that it becomes possible.
  • the second switch 52 includes a leakage breaker and has a function of disconnecting the second distributed power source 42 from the main circuit when an abnormality occurs in the second distributed power source 42.
  • the second switch 52 may be directly connected to the conductive bar set 37 without using the mounting base 34.
  • An example of the second switch 52 in this case is shown in FIG.
  • the second switch 52 is, for example, a 3P3E type (3 poles, 3 elements) breaker.
  • the second switch 52 includes a terminal portion 520 to which a power cable of the second distributed power source 42 is connected.
  • the second switch 52 includes an insertion port 521 to which the conductive bar set 37 is connected.
  • a terminal (not shown) is provided in the insertion port 521.
  • the terminal portion 520 includes three terminal portions corresponding to the neutral line, the first voltage line, and the second voltage line.
  • the insertion port 521 includes three insertion ports, and three terminals are provided corresponding to the three insertion ports, respectively.
  • the load circuit 38 can be supplied.
  • the distribution board 30 of this embodiment is equipped with 2nd attachment space SP2, even when newly introducing the 2nd distributed power supply 42, it is not necessary to replace
  • the processing unit 13 of the linkage adapter 10 When the second distributed power source 42 is connected to the distribution board 30, a program and data corresponding to the second distributed power source 42 are set in the processing unit 13 of the linkage adapter 10. That is, since the second distributed power source 42 does not always perform reverse power flow to the power system (for example, reverse power flow to the power system is prohibited), the processing unit 13 of the link adapter 10 is connected to the power system. Control is performed to prevent reverse power flow.
  • the processing unit 13 compares the power supplied from the second distributed power source 42 to the main circuit and the power supplied to the load circuit 38, and the power supplied from the second distributed power source 42 is The output of the second distributed power source 42 is adjusted so as to be smaller than the power supplied to the load circuit 38.
  • the processing unit 13 adjusts the output of the second distributed power source 42 by wireless communication through the second communication I / F unit 12.
  • the processing unit 13 does not directly adjust the output of the second distributed power source 42, but the power supplied from the second distributed power source 42 to the main circuit with respect to the second distributed power source 42.
  • the power supplied to the load circuit 38 may be transmitted.
  • the second distributed power source 42 compares the power supplied to the load circuit 38 with the power supplied from the second distributed power source 42 to the main circuit, and adjusts its output.
  • the second distributed power source 42 is configured to supply only electric power, such as a fuel cell or a solar power generation device, and stores not only electric power (discharge) but also electric power storage (electric storage) like an electric storage device or an electric vehicle. ) Can be selected.
  • the second distributed power source 42 that only supplies power is only prevented from the reverse power flow by the above-described operation, but the second distributed power source 42 that performs charging and discharging prevents the reverse power flow. As well as managing the amount of electricity stored. Therefore, the program and data set in the cooperation adapter 10 are changed according to the type of the second distributed power source 42.
  • the storage battery of the power storage device or the electric vehicle is charged using the power of the system power supply 25 or charged using the power of the first distributed power supply 41.
  • the timing of charging is managed so that nighttime power whose unit price is relatively low is used.
  • the storage amount of the storage battery of the power storage device or the electric vehicle is managed according to various conditions such as the amount of power used on the next day or the life of the battery.
  • the link adapter 10 can respond to the purpose. Control.
  • the processing unit 13 generates output information based on the input information, and sends the generated output information to the outside (another device).
  • the input information includes at least information related to power received from the power system and information related to power passing through each of the plurality of branch breakers 32. That is, when neither the first distributed power source 41 nor the second distributed power source 42 is connected to the distribution board 30, the processing unit 13 includes information on the power received from the power system and the plurality of branch breakers 32.
  • Output information is generated using information on the power passing through each of the two.
  • the information regarding the power received from the power system is, for example, the amount of power supplied from the power system.
  • the information regarding the power passing through each of the plurality of branch breakers 32 is, for example, the amount of power consumed by each of the plurality of load circuits 38.
  • the processing unit 13 may acquire information related to the power received from the power system from the watt-hour meter 20 through the first communication I / F unit 11 or to measure the power passing through the power line 25. You may acquire from the provided dedicated sensor. The processing unit 13 acquires information about the power passing through each of the plurality of branch breakers 32 from the measurement unit 33.
  • the processing unit 13 adds information regarding the power passing through the first switch 51 to the input information.
  • the information regarding the power passing through the first switch 51 is, for example, the amount of power supplied from the first distributed power supply 41 to the distribution board 30.
  • the processing unit 13 acquires information about the power passing through the first switch 51 from the built-in sensor 24.
  • the processing unit 13 adds information related to the power passing through the second switch 52 to the input information.
  • the information regarding the power passing through the second switch 52 is, for example, the amount of power supplied from the second distributed power source 42 to the distribution board 30.
  • the information regarding the power passing through the second switch 52 further indicates the amount of power supplied from the distribution board 30 to the second distributed power source 42. May be included.
  • the processing unit 13 acquires information regarding the power passing through the second switch 52 from the measurement unit 33.
  • the processing unit 13 acquires information on the power for each load circuit 38 measured by the measurement unit 33 through the acquisition unit 18, generates output information using this information as input information, and outputs the output information to the second communication I / F unit. 12 to output.
  • the processing unit 13 generates output information in an easy-to-understand format when presented to the user by performing processing such as input information aggregation and graphing. In this case, the output information is sent to the presentation device 71 having a display (screen) through the second communication I / F unit 12.
  • the coordination adapter 10 When the coordination adapter 10 generates a plurality of types of output information and not all output information can be displayed on one screen of the presentation device 71, the content displayed on the screen is switched. Therefore, it is desirable that the presentation device 71 is an operation display device provided with an operation unit operated by the user in addition to the display.
  • the operation unit of this type of operation display device uses a switch provided separately from the display, or a touch switch superimposed on the screen of the display.
  • the presentation device 71 is a device that presents information to the user.
  • a smartphone or tablet terminal that communicates through the second communication I / F unit 12 A device selected from the above is used.
  • terminal devices such as a smart phone and a tablet terminal, what is necessary is just to make a terminal device run the application program which functions a terminal device as the presentation apparatus 71.
  • the processing unit 13 when the watt-hour meter 20 having the communication function is not installed at the consumer, the processing unit 13 cannot acquire input information from the watt-hour meter 20.
  • the processing unit 13 when the electricity meter 20 having a communication function is installed in the consumer, the processing unit 13 also acquires input information from the electricity meter 20. Therefore, the processing unit 13 can use the input information obtained from the watt-hour meter 20 in order to generate output information to be presented to the presentation device 71. That is, the processing unit 13 adds the information acquired from the watt-hour meter 20 to the input information, and generates output information based on the input information (including information acquired from the watt-hour meter 20).
  • the input information obtained from the watt-hour meter 20 includes the amount of power used by the consumer measured by the watt-hour meter 20, information on demand response notified from the management device 62, and the like.
  • the processing unit 13 processes the input information acquired from the watt-hour meter 20 into a format that can be presented to the presentation device 71 and outputs the processed information to the presentation device 71.
  • the second communication I / F unit 12 can communicate not only with the presentation device 71 but also with the equipment device 72, the controller 70, and the communication device (wireless router) 73 as described above.
  • the second communication I / F unit 12 incorporated in advance in the linkage adapter 10 may be configured to be able to communicate only with any of the presentation device 71, the facility device 72, the controller 70, and the communication device 73. .
  • the cooperation adapter 10 when the cooperation adapter 10 has a function of sending output information to the presentation device 71 as in the above-described operation example, the presentation device 71 is required to communicate with the cooperation adapter 10. Communication with the incorporated second communication I / F unit 12 is possible. On the other hand, in this case, communication with the facility device 72, the controller 70, and the communication device 73 is not essential for the minimum function of the link adapter 10. In this case, the cooperation adapter 10 may be configured to add a second communication I / F unit 12A for communicating with the facility device 72, the controller 70, and the communication device 73 as a retrofit.
  • the second communication I / F unit 12A is added to communicate with these devices.
  • the structure to be adopted is adopted.
  • the second communication I / F unit 12 ⁇ / b> A added to the cooperation adapter 10 is attached to the body 14 of the cooperation adapter 10.
  • the second communication I / F unit 12A is replaceable and employs a configuration corresponding to the type of device (controller 70, presentation device 71, facility device 72, communication device 73) that is a communication partner.
  • the link adapter 10 performs wireless communication with the communication device 73 and WiFi (registered trademark) by updating the firmware of the processing unit 13 and adding the second communication I / F unit 12A.
  • WiFi registered trademark
  • a configuration is employed in which wireless communication is performed with the controller 70 using specific low-power wireless communication.
  • the communication device 73 communicates with a terminal device that functions as the management device 61, the controller 70, the facility device 72, and the presentation device 71.
  • the second communication I / F unit 12 incorporated in the link adapter 10 communicates only with the presentation device 71
  • the second communication I / F unit 12 is, for example, wirelessly based on WiFi (registered trademark). It only needs to be able to communicate.
  • a second communication I / F unit 12 ⁇ / b> A having a specific low power wireless communication function is attached to the link adapter 10.
  • the second communication I / F unit 12 incorporated in the link adapter 10 enables the processing unit 13 to communicate with the communication device 73.
  • the firmware is updated.
  • the link adapter 10 When communicating with the facility equipment 72, the link adapter 10 is provided with a function of managing the equipment 72. That is, the processing unit 13 generates output information that manages the operation state of the equipment device 72 using the input information.
  • the input information used when managing the operating state of the equipment 72 includes information on the amount of power used by the consumer acquired from the wattmeter 20 or the demand response, and information on the power for each load circuit 38 acquired from the measurement unit 33. including. Further, the processing unit 13 may include the information regarding the operation state of the equipment device 72 acquired from the equipment device 72 as the input information used for generating output information for managing the operation state of the equipment device 72.
  • Information (input information) used for generating output information is given to the processing unit 13 through, for example, the first communication I / F unit 11 and the second communication I / F unit 12.
  • the processing unit 13 executes the program for managing the equipment device 72 to generate output information using the input information as described above, and controls the equipment device 72.
  • the link adapter 10 controls the equipment device 72 having a low priority to stop or controls the equipment device 72 to shift to an operation state in which power consumption is reduced. To the equipment 72.
  • movement mentioned above is operation
  • the coordination adapter 10 and the controller 70 try to manage the equipment 72 at the same time, there is a possibility that they interfere with each other. For this reason, when the second communication I / F unit 12 communicates with the controller 70, the processing unit 13 is prohibited from processing the facility device 72. Note that the second communication I / F unit 12 uses, for example, a radio transmission path by specific low power radio when communicating with the controller 70.
  • the processor used in the controller 70 has a higher processing capability than the processing unit 13, and the interface unit provided in the controller 70 has a higher function than the cooperative adapter 10.
  • the link adapter 10 when the facility device 72 is simply managed, the link adapter 10 is used, and when advanced processing is required by the management of the facility device 72, the controller 70 is used.
  • This type of processing performed by the controller 70 includes processing for managing the operating state of the equipment device 72 in accordance with the time schedule, handling of an abnormality in the equipment device 72, and the like.
  • the link adapter 10 can communicate with the management device 61 or the management device 62 through the communication device 73.
  • the link adapter 10 can use this communication path when receiving firmware updater.
  • the presentation apparatus 71 mentioned above may communicate with the cooperation adapter 10 via the communication apparatus 73, without communicating directly with the cooperation adapter 10, as shown in FIG. That is, when a wireless LAN (Local Area Network) using the communication device 73 as an access point is constructed in the consumer, the presentation device 71 adopts a configuration that communicates with the coordination adapter 10 via the communication device 73. Also good. Furthermore, when the equipment device 72 capable of communicating with the communication device 73 is installed in the consumer, or when the controller 70 capable of communicating with the communication device 73 is provided in the consumer, the presentation device 71 is The facility device 72 or the controller 70 may be managed through the communication device 73.
  • LAN Local Area Network
  • the linkage adapter 10 and the measurement unit 33 described above are attached to the distribution board 30 together.
  • the distribution board 30 including not only the main breaker 31 and the branch breaker 32 but also the linkage adapter 10 and the measurement unit 33 is shipped from the factory.
  • the cooperation adapter 10 and the measurement unit 33 may be attached to the distribution board 30 at the construction site of the customer.
  • the distribution board system of this embodiment is connected to a second distributed power source 42 that can output power while power supply from the system power supply 25 is stopped.
  • An electric panel 30 and a self-supporting distribution board 80 are provided.
  • a photovoltaic power generation device a power storage device, an electric vehicle equipped with a storage battery, and the like provide AC power to the equipment 72 even when the power supply from the system power source 25 is stopped. It is possible to output.
  • Such a second distributed power source 42 includes a terminal that outputs AC power in a state where power supply from the system power source 25 is stopped, separately from a terminal that is connected to the main circuit of the distribution board 30. Yes.
  • the power output from this terminal is referred to as a self-supporting output.
  • the self-sustained output is supplied only to specific equipment 72 in the consumer.
  • the specific equipment 72 that receives the self-sustained output is connected to a second branch breaker 82 provided in the self-sustained distribution board 80.
  • the second branch breaker 82 is provided so as to distribute power to the plurality of load circuits 83, similarly to the branch breaker 32 provided in the distribution board 30.
  • the self-supporting distribution board 80 includes a plurality of second branch breakers 82.
  • Each of the second branch breakers 82 is a 2P1E type breaker like the branch breaker 32, for example.
  • a space corresponding to one to a plurality of second branch breakers 82 is secured as a third mounting space SP3.
  • a third switch 53 that is an earth leakage breaker and is inserted into the power receiving path of the self-supporting distribution board 80 is attached.
  • the third attachment space SP3 has a space corresponding to the three second branch breakers 82.
  • the self-standing distribution board 80 receives power from the distribution board 30 through the main breaker 31 during normal times. However, when the power supply from the system power supply 25 is stopped, the self-standing distribution board 80 receives the independent output of the second distributed power supply 42. .
  • the power receiving source of the independent distribution board 80 is selected by the switch 54.
  • the switch 54 monitors the power supply state of the system power supply 25 and switches the mechanical contact according to the power supply state. While the power supply of the system power supply 25 continues, the switch 54 selects the state of receiving power from the distribution board 30 and when the power supply stops, the switch 54 receives power from the self-sustained output of the second distributed power supply 42. Select a state. When the power supply state from the system power supply 25 is restored, the switch 54 returns to the normal state.
  • the switch 54 can be provided separately from the third switch 53, it is desirable that the third switch 53 is also used as the switch 54. That is, in FIG. 1, the third switch 53 and the switch 54 are individually described. However, as shown in FIG. 8, the function of the switch 54 is built in the third switch 53. It is desirable. In this configuration, since the switch 54 is built in the self-supporting distribution board 80, it is possible to arrange the distribution board 30 and the self-supporting distribution board 80 side by side without a gap, as shown in FIG.
  • FIG. 3 and 4 show a state where the door 36 of the distribution board 30 and the door 84 of the self-standing distribution board 80 are closed, and FIG. 2 shows a state where the door is opened with respect to the distribution board 30. Yes.
  • the switch 54 preferably selects the power supply after several seconds have elapsed after detecting the stop and return of the system power supply 25 when selecting the power supply for supplying power to the independent distribution board 80. This is to prevent the contacts of the switch 54 from being consumed or welded by waiting until the electric charge remaining in the equipment 72 connected to the self-standing distribution board 80 is consumed.
  • the equipment 72 connected to the second branch breaker 82 of the stand-alone distribution board 80 is mainly related to safety such as communication and lighting, and includes equipment related to food preservation such as a refrigerator in summer. It may be. Note that the facility device 72 that supplies power through the second branch breaker 82 may be selectable according to various conditions such as daytime and nighttime, summer and winter, and the presence and absence of people.
  • the main breaker 31 and the branch breaker 32 are incorporated before shipment from the factory, and the link adapter 10 that can communicate with the watt hour meter 20 is at least until construction on site (preferably before shipment from the factory). Incorporated.
  • the distribution board 30 with the minimum configuration is, for example, a function of presenting information related to the power measured by the watt hour meter 20 to the presentation device 71 and a demand response notified from the management devices 61 and 62 through the watt hour meter 20. Only the function of presenting information to the presentation device 71 is provided. In other words, information on the amount of power used by the consumer is presented to the user, information from the management devices 61 and 62 is presented to the user, and there is a request for power saving, a unit price of the electricity bill, and a power shortage on the supply side. Information about the time of concern is presented to the user. By presenting such information, the user is made aware of the amount of power used.
  • the cooperation adapter 10 When a customer introduces the first distributed power source 41 that reversely flows power generated like a solar power generation device to the power system (for example, reverse power flow to the power system is allowed), the cooperation adapter 10, a first switch 51 for connecting the first distributed power source 41 to the main circuit is attached. Further, the program and data of the processing unit 13 in the linkage adapter 10 are updated so that processing when the first distributed power supply 41 is connected is possible.
  • a second communication I / F unit 12A is added as necessary, and the program and data of the processing unit 13 in the linkage adapter 10 are updated.
  • the controller 70 is not provided, when the equipment 72 is managed by the linkage adapter 10, the second communication I / F unit 12A is added as necessary, and the processing unit 13 in the linkage adapter 10 is added. Update programs and data.
  • the second mounting space SP2 provided in the distribution board 30 has the second Two switches 52 are attached. Also in this case, similarly to the case where the first distributed power supply 41 is introduced, the program and data of the processing unit 13 in the cooperation adapter 10 are updated so as to be suitable for the management of the second distributed power supply 42.
  • one second mounting space SP2 is provided in the distribution board 30, but a plurality of second mounting spaces SP2 may be provided.
  • the second distributed power source 42 includes a configuration that only supplies power, such as a fuel cell and a solar power generation device, and a configuration that performs charging and discharging, such as an electric vehicle equipped with a power storage device and a storage battery. .
  • the program and data of the processing unit 13 are updated so as to manage the power and timing of charging and discharging.
  • the independent distribution board 80 is introduced to consumers.
  • the self-supporting distribution board 80 is introduced as necessary when the second distributed power source 42 is introduced. That is, the independent distribution board 80 is introduced simultaneously with or in addition to the second distributed power source 42.
  • the distribution board 30 to which the coordination adapter 10 is attached is installed in the consumer, the information obtained by communicating with the watt hour meter 20 is presented to the user through the presentation device 71. It can have a minimum function. Thereafter, each time a facility selected from the first distributed power source 41, the second distributed power source 42, the controller 70, the stand-alone distribution board 80, etc. is introduced to the consumer, the necessary members for these facilities are It is incorporated in the distribution board 30. Further, programs and data necessary for management and operation of the installed equipment are installed in the processing unit 13 of the linkage adapter 10.
  • the power distribution board 30 having the basic configuration to which the coordination adapter 10 is installed is first introduced, the customer does not need a significant change such as replacement of the power distribution board 30 later.
  • Various facilities can be introduced as needed.
  • a distribution board 30 having a basic configuration is prepared by a customer, it is possible to construct a multifunction distribution board 30 by adding members as the facilities are enhanced.
  • the processing unit 13 of the linkage adapter 10 uses only information regarding power as input information. However, when resources such as gas, water, heat, etc., and measuring devices for measuring the amount used by consumers are installed, the processing unit 13 includes information on the use of these resources in the input information. Also good. In other words, the processing unit 13 may add information related to resource use to input information and generate output information based on the input information (including information related to resource use). By including information on resources other than electric power in the input information, the processing unit 13 can comprehensively manage the use of resources by consumers.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Distribution Board (AREA)

Abstract

 分電盤(30)は、電力系統の電源線(Lp)と電気的に接続される主幹ブレーカ(31)と、主幹ブレーカ(31)の負荷側の電路を複数の負荷回路(38)に分岐する複数個の分岐ブレーカ(32)とを備える。分電盤(30)は、発電した電力を電力系統へ逆潮流させる第1の分散型電源(41)と主幹ブレーカ(31)の電源側との間に接続される第1の開閉器(51)が配置される第1の取付スペース(SP1)と、発電した電力を電力系統へ逆潮流させない第2の分散型電源(42)と主幹ブレーカ(31)の負荷側との間に接続される第2の開閉器(52)が配置される第2の取付スペース(SP2)とを備える。

Description

分電盤、分電盤システム、自立分電盤
 本発明は、分散型電源が接続される分電盤、この分電盤を備える分電盤システム、分電盤システムに用いられる自立分電盤に関する。
 近年、太陽光発電装置、燃料電池、蓄電装置、蓄電池を搭載した電動車両のように、需要家において電力を得る分散型電源が種々製品化されている。しかし、たとえば日本国では、太陽光発電装置などは電力系統への逆潮流が許容されているが、燃料電池、蓄電装置、電動車両などは電力系統への逆潮流が禁止されている。
 そのため、逆潮流が許容されている分散型電源(発電した電力を逆潮流させる分散型電源)と、逆潮流が禁止されている分散型電源(発電した電力を逆潮流させない分散型電源)とを選択して負荷に給電する構成が広く採用されている(たとえば日本国特許出願公開番号2013-13174号参照;以下、文献1と称する)。文献1に記載された構成では、太陽光発電装置が分電盤に接続され、太陽光発電装置が発電した余剰電力は、電力系統に逆潮流を行うことが可能になっている。また、蓄電装置は、太陽光発電装置が発電した電力により充電され、需要家の一部の負荷に対しては、分電盤からの電力と蓄電装置からの電力とを選択して供給することが可能になっている。
 しかし、文献1に記載された構成では、太陽光発電装置(日本国で逆潮流が許容された分散型電源)は分電盤に接続されているが、蓄電装置(日本国で逆潮流が禁止されている分散型電源)は分電盤には接続されておらず、分散型電源を集中して管理することができないという問題を有している。
 ところで、複数種類の分散型電源を組み合わせて用いると、電力系統への電圧や周波数の影響を低減することや、需要家が電力系統から購入する電力を低減することが可能になるという効果が得られる。しかしながら、分散型電源は、比較的高価であることから、複数種類の分散型電源を需要家が一度に導入するには初期投資が膨大になり、需要家の負担が大きい。そこで、異なる種類の分散型電源を需要家に順に導入させることが考えられる。しかし、この場合、新たな分散型電源が導入されるたびに、需要家における配電網に分散型電源を接続するための工事が必要になるから、需要家にとっては分散型電源の購入費に加えて、工事費の負担が大きくなるという問題がある。
 本発明は、需要家が複数種類の分散型電源を順に導入する場合でも分散型電源を接続するだけで配電網に対する新たな工事を行う必要がなく、しかも、複数の分散型電源の管理を1箇所で集中して行うことを可能にした分電盤を提供することを目的とする。本発明はさらに、この分電盤を備える分電盤システム、および分電盤システムに用いられる自立分電盤を提供することを目的とする。
 本発明に係る分電盤は、電力系統の電源線と電気的に接続される主幹ブレーカと、前記主幹ブレーカの負荷側の電路を複数の負荷回路に分岐する複数の分岐ブレーカとが取りつけられている。この分電盤は、第1の取付スペースと第2の取付スペースとを備える。第1の取付スペースは、発電した電力を前記電力系統へ逆潮流させる第1の分散型電源と前記主幹ブレーカの電源側との間に接続される第1の開閉器が配置される。第2の取付スペースは、発電した電力を前記電力系統へ逆潮流させない第2の分散型電源と前記主幹ブレーカの負荷側との間に接続される第2の開閉器が配置される。
 一実施形態において、分電盤は連携アダプタをさらに備える。前記連携アダプタは、入力情報に基づいて他装置に出力する出力情報を生成するよう構成される処理部を備える。前記入力情報は、前記電力系統から受電する電力に関する情報と、前記複数の分岐ブレーカをそれぞれ通過する電力に関する情報と、前記第1の開閉器を通過する電力に関する情報と、前記第2の開閉器を通過する電力に関する情報との少なくとも一つを含む。
 一実施形態において、前記入力情報は、少なくとも前記電力系統から受電する電力に関する情報と、前記複数の分岐ブレーカをそれぞれ通過する電力に関する情報とを含む。
 一実施形態において、分電盤は、前記複数の負荷回路の電力をそれぞれ計測するよう構成される複数のセンサが設けられた計測ユニットをさらに備える。前記連携アダプタは、前記複数の分岐ブレーカをそれぞれ通過する電力に関する情報と、前記第2の開閉器を通過する電力に関する情報とを、前記計測ユニットから取得するよう構成される。
 一実施形態において、前記連携アダプタは、前記他装置と通信するよう構成される通信インターフェイス部を備える。前記通信インターフェイス部は、公衆網を通して通信する通信機器に前記出力情報を送出することと、利用者に情報を提示する提示機器に前記出力情報を送出することと、前記分電盤が取り付けられた所定場所に設置される設備機器を管理するコントローラに前記出力情報を送出することとのうちの少なくとも1つを行うよう構成される。
 一実施形態において、前記通信インターフェイス部は、さらに、前記所定場所に設置される設備機器と通信するよう構成される。前記処理部は、前記設備機器の制御と監視との少なくとも一方を行うよう構成される。
 一実施形態において、前記通信インターフェイス部は、さらに、通信機能を有した電力量計と通信するよう構成される。前記処理部は、前記電力量計から取得した情報を前記入力情報に加えるよう構成される。
 一実施形態において、前記連携アダプタは、前記通信インターフェイス部が取り替え可能に装着される。
 一実施形態において、前記通信インターフェイス部は、前記コントローラと通信するよう構成される。前記処理部は、前記コントローラから前記設備機器に関する情報を取得し、前記コントローラから取得した前記設備機器に関する情報を前記入力情報に加え、前記入力情報に基づいて前記設備機器を管理する情報を生成し、生成した情報を前記出力情報として前記コントローラに引き渡すよう構成される。
 一実施形態において、前記処理部は、前記入力情報から前記出力情報を生成するためのプログラムを実行するプロセッサを備え、前記通信インターフェイス部を通して前記プログラムを取得するよう構成される。
 一実施形態において、記憶媒体が着脱可能に装着される接続部をさらに備え、前記処理部は、前記入力情報から前記出力情報を生成するためのプログラムを実行するプロセッサを備え、前記記憶媒体から前記プログラムを取得するよう構成される。
 一実施形態において、前記連携アダプタは、前記電力系統の電源線が接続される第1の端子部と、前記第1の端子部と電気的に接続され、かつ前記主幹ブレーカが電気的に接続される第2の端子部とを備える。
 一実施形態において、前記連携アダプタは、前記電力系統の電源線が接続される第1の端子部と、前記第1の端子部と電気的に接続され、かつ前記主幹ブレーカが電気的に接続される第2の端子部と、前記第1の端子部および前記第2の端子部と電気的に接続され、かつ前記第1の開閉器が電気的に接続される第3の端子部とを備える。
 一実施形態において、前記連携アダプタは、前記第1の開閉器を通過した電力を計測するよう構成される内蔵センサをさらに備える。前記処理部は、前記内蔵センサが計測した電力から、前記第1の開閉器を通過する電力に関する情報を求める。
 一実施形態において、前記処理部は、前記入力情報に含まれる要素の関係を用いて、前記第1の分散型電源が発電した電力のうち前記電力系統に逆潮流を行った電力を算出し、算出結果を前記出力情報として前記他装置に出力する。
 一実施形態において、前記処理部は、前記分電盤が取り付けられた所定場所に供給される電力以外の資源の使用量を計測する計測装置から前記資源の使用に関する情報を取得し、かつ前記取得した資源の使用に関する情報を前記入力情報に加えるよう構成される。
 一実施形態において、前記連携アダプタは、前記処理部を収納し、且つ前記分電盤に取り付けられる器体をさらに備える。前記第1の取付スペースが前記器体に設けられている。
 一実施形態において、前記第2の取付スペースは、前記分岐ブレーカを取りつけるためのスペースの一部であって、前記分岐ブレーカの1乃至複数個分に相当する寸法を有する。
 本発明に係る分電盤システムは、系統電源からの電力供給が停止している状態で電力の出力が可能である前記第2の分散型電源が接続された上述したいずれかの分電盤と、前記系統電源からの電力供給が停止している状態で電力供給が必要である機器が接続された第2の分岐ブレーカを備える自立分電盤とを備える。前記自立分電盤は、前記系統電源から電力が供給されている期間には前記主幹ブレーカを通して給電され、前記系統電源からの電力供給が停止している期間には前記第2の分散型電源から給電される。
 一実施形態において、前記自立分電盤は、前記分電盤と前記第2の分散型電源とのいずれかから受電し、受電した電力を前記第2の分岐ブレーカに給電する第3の開閉器を備える。
 一実施形態において、前記第3の開閉器が受電する経路に、前記系統電源から電力が供給されている期間に前記主幹ブレーカを通して受電する状態を選択し、前記系統電源からの電力供給が停止している期間に前記第2の分散型電源から受電する状態を選択する切替器をさらに備える。
 一実施形態において、前記第3の開閉器と前記切替器とが前記自立分電盤に設けられている。
 本発明の構成によれば、電力系統への逆潮流が許容されている第1の分散型電源が接続される第1の開閉器と、電力系統への逆潮流が禁止されている第2の分散型電源が接続される第2の開閉器とを取り付けるスペースを備える。したがって、第1の分散型電源と第2の分散型電源とを順に導入する場合であっても分電盤を交換する必要がなく、また分散型電源を接続するだけで配電網に対する新たな工事を行う必要がないという利点がある。さらに、第1の分散型電源と第2の分散型電源とが分電盤に接続されるから、複数種類の分散型電源の管理を1箇所で集中して行うことが可能になる。
実施形態の分電盤および自立分電盤を示すブロック図である。 同上の分電盤および自立分電盤の外観を示す正面図である。 同上の分電盤および自立分電盤の使用例を示す概略構成図である。 同上の分電盤および自立分電盤の外観を示す正面図である。 同上の分電盤に設けられる計測ユニットのセンサブロックの斜視図である。 同上の分電盤に取り付けられる第1の開閉器の正面図である。 同上の分電盤に取り付けられる第2の開閉器の斜視図である。 同上の自立分電盤の他例を示すブロック図である。
 本実施形態の分電盤30は、図1、2に示すように、主幹ブレーカ31と、複数の分岐ブレーカ32と、主幹ブレーカ31および複数の分岐ブレーカ32が内部に取り付けられたキャビネット35とを備える。本実施形態の分電盤30は、所定場所(住居など)にキャビネット35を取り付けた状態で使用される。また、キャビネット35内には、連携アダプタ10が取り付けられる。すなわち、連携アダプタ10は、分電盤30に内器として取り付けられる。
 まず、図1~3を参照して、連携アダプタ10について説明する。
 本実施形態の連携アダプタ10は、分電盤30を通過する電力に関する情報を取得し、取得した情報から出力情報を生成し、生成した出力情報を外部に出力する機能を有する。分電盤30を通過する電力に関する情報は、外部から分電盤30に供給される電力の量、および分電盤30から外部に供給される電力の量を含む。
 図1に示すように、連携アダプタ10は、他装置(外部)と通信する通信インターフェイス部(第1の通信インターフェイス部11、第2の通信インターフェイス部12)と、処理部13と、少なくとも処理部13を収納する器体14とを備える。以下、「通信インターフェイス部」を「通信I/F部」と略称する。
 通信I/F部のうちの第1の通信I/F部11は、通信機能を有した電力量計20と通信する。通信I/F部のうちの第2の通信I/F部12は、電力量計20が設置された需要家(分電盤30が取り付けられた所定場所)で利用される機器と通信する。なお、電力量計20と通信するための第1の通信I/F部11は省略可能である。
 図3に示すように、第2の通信I/F部12と通信する機器(需要家で利用される機器)は、照明機器、空調機器、厨房機器、映像機器などの設備機器(分電盤30が取り付けられた所定場所に設置される設備機器)72と、設備機器72の管理を行う機器(コントローラ)70と、操作表示機器のように情報の入出力を行う機器(提示機器)71と、インターネット網、CATV網、電話網などの公衆網である電気通信回線を通して通信する無線ルータのような機器(通信機器)73とのうちの少なくとも一つを含む。すなわち、第2の通信I/F部12は、設備機器72、コントローラ70、提示機器71、通信機器73の少なくとも1種類に対して出力情報を送出する機能を有する。図3の例では、第2の通信I/F部12はコントローラ70および通信機器73と通信する。
 第2の通信I/F部12から機器に送出される出力情報は、設備機器72の監視と制御との少なくとも一方を行う管理情報、提示機器71を通して利用者に提示される提示情報、通信機器73を通して外部に通知される通知情報のうちの少なくとも一つを含む。
 第2の通信I/F部12は、管理情報を設備機器72と直接授受してもよいが、通常は、設備機器72を管理するコントローラ70と授受し、設備機器72の実際の管理はコントローラ70が行うことが望ましい。この種のコントローラ70は、HEMS(Home Energy Management System)コントローラと呼ばれており、設備機器72の動作状態について監視および制御が可能になっている。なお、連携アダプタ10が、HEMSコントローラとは通信しないが通信機器73とは通信可能なデジタル家電のような設備機器72の管理を行う場合、第2の通信I/F部12は、通信機器73を通して設備機器72に管理情報を伝送してもよい。
 提示情報は、提示機器71にて提示され、利用者に種々の情報を提供する。提示機器71による情報の提示方法は、提示機器71が備える画面上への表示、提示機器71が備えるスピーカによる音声の発生を含む。
 提示機器71は、提示の機能のみを有していてもよいが、操作表示機器のように、操作も可能になっていることが好ましい。この場合には、提示機器(操作表示機器)71は、提示機器71に提示された情報を認識した利用者が、設備機器72の動作状態を変更する目的でも使用可能である。この場合、提示機器71に利用者から与えられた指示は、設備機器72に直接またはコントローラ70を介して通知される。なお、利用者が、スマートフォン、タブレット端末、テレビジョン受像機、パーソナルコンピュータなど、通信機器73と通信可能な機器を提示機器71として用いる場合、第2の通信I/F部12(分電盤30)は、図3に例示するように、通信機器73を通して提示機器71に提示情報を伝送してもよい。
 通知情報は、電気事業者に対して情報を通知するために用いられる。第2の通信I/F部12(分電盤30)は、図3に例示するように、通信機器73を通して、通知情報を電気事業者が運営する管理装置61などに伝送する。
 第1の通信I/F部11および第2の通信I/F部12は、電波を伝送媒体とする無線通信、電力線を通信線に兼用する電力線搬送通信、RS485、ECHONET(登録商標)Liteのような有線通信などから選択される通信技術を採用する。無線信号の仕様は、WiFi(登録商標)、特定小電力無線(たとえば、920MHz帯)、ZigBee(登録商標)、Bluetooth(登録商標)などから選択される。第1の通信I/F部11の通信方式(第1の通信方式;たとえば電力線搬送通信)は、第2の通信I/F部12の通信方式(第2の通信方式;たとえば無線通信)とは異なっていてもよい。
 処理部13は、プログラムを実行するプロセッサを備えたデバイスを主なハードウェア要素として備える。この種のデバイスは、メモリを備えるマイコンが代表例である。すなわち、処理部13は、図1に示すように、プログラムやデータを格納するためのメモリ131を備える。処理部13は、メモリを別途に必要とするCPU(Central Processing Unit)であってもよい。すなわち、連携アダプタ10は、処理部13とは別に設けられたメモリ(図示せず)を備えていてもよい。
 処理部13の動作に必要なプログラムとデータは、第1の通信I/F部11と第2の通信I/F部12とのいずれかを通して与えられる。あるいはまた、処理部13の動作に必要なプログラムとデータは、メモリカードのような記憶媒体16を通して与えられてもよい。
 処理部13が第1の通信I/F部11を通してプログラムとデータを取得する場合、電力量計20を経由する経路で電気事業者からプログラムとデータを受け取ることになる。すなわち、電力量計20は、インターネット回線、CATV網、電話網のような公衆網である電気通信回線NTを通して電気事業者などが運営する上位装置と通信することが必要である。この種の上位装置は、電気事業者が運営する管理装置61のほか、電気事業者ではないサービス提供者が運営する管理装置62などを含む(図3参照)。
 ここで、サービス提供者が運営する管理装置62は、需要家に対してはエネルギー管理を行うサービスなどを提供する。また、管理装置62は、需要家における電力の使用量を計測して電気事業者に通知するサービス、あるいは、電気事業者からの節電要求のようなデマンドレスポンスを需要家に通知するサービスなどを提供する。図3に示す例では、電気事業者が運営する管理装置61は、サービス提供者が運営する管理装置62と通信するように通信路が構成されている。管理装置62は、電力量計20と通信することにより、電力量計20が計測した電力量の遠隔検針を行い、また、電力量計20を中継に用いて節電要求の情報(いわゆる、デマンドレスポンス情報)を需要家に通知する機能を有する。本実施形態では、管理装置62から通知された節電要求の情報は、電力量計20を通して連携アダプタ10が受信する。
 管理装置62は、上述の節電要求と同様に、電力量計20を中継に用いて、連携アダプタ10にプログラムとデータを転送することも可能になっている。さらに、電力量計20は、連携アダプタ10と通信可能であるから、計測した電力に関する情報を連携アダプタ10に送信することも可能である。したがって、処理部13は、第1の通信I/F部11(および電力量計20)を通して、管理装置62(あるいは61)からプログラムとデータを取得することができる。
 処理部13が第2の通信I/F部12を通してプログラムとデータを取得する場合、第2の通信I/F部12との間で通信が可能な支援装置(図示せず)からプログラムとデータが転送される。支援装置は、インターネット回線のような電気通信回線を通してプログラムとデータのダウンロードを行い、第2の通信I/F部12を通してプログラムとデータを処理部13に読み込ませる。支援装置は、パーソナルコンピュータ、スマートフォン、タブレット端末など、第2の通信I/F部12と通信機器73との両方に対して通信可能な機器であってもよい。
 図1に示すように、連携アダプタ10は、処理部13が記憶媒体16からプログラムとデータを取得するために、器体14に、記憶媒体16の取り付けと取り外しとが可能になる接続部15を備えていてもよい。接続部15は、メモリカードが挿入されるスロットを備え、メモリカードの電極に電気的に接続される接触子がスロット内に配置された構成を備える。
 ここに、処理部13は、接続部15に記憶媒体16が装着されると、記憶媒体16が記憶しているプログラムとデータを読み出すことが望ましい。すなわち、利用者が記憶媒体16を接続部15に挿入するという操作を契機にして、処理部13が記憶媒体16に格納された情報を確認し、読出可能と判断した場合に、記憶媒体16に格納された情報を処理部13に読み込むようにすればよい。
 処理部13がプログラムとデータを読み込んだ後は、接続部15から記憶媒体16を取り外すことができるから、1つの記憶媒体16を用いて、異なる複数の連携アダプタ10にプログラムとデータを読み込ませることが可能になる。
 処理部13が第1の通信I/F部11と第2の通信I/F部12と記憶媒体16とのいずれからプログラムとデータを読み込むかにかかわらず、支援装置によって読み込みのタイミングの指示と読み込みの終了の報知とを行えばよい。
 たとえば、処理部13は、プログラムとデータの読み込みが必要となったときに、第2の通信I/F部12を通して、支援装置にプログラムとデータを要求する提示情報を送出する。支援装置は、プログラムとデータを要求する提示情報を画面に提示する。支援装置は、提示情報に対して使用者からプログラムとデータの読み込みの指示を受け取ると、電気通信回線を通して管理装置62にプログラムとデータを要求する。要求を受けとった管理装置62は、第1の通信I/F部11を通して、要求されたプログラムとデータを処理部13に送出する。或いは、要求を受け取った管理装置62は、支援装置および第2の通信I/F部12を通して、要求されたプログラムとデータを処理部13に送出する。処理部13は、受信したプログラムとデータを読み込んでメモリ131に格納する。また処理部13は、プログラムとデータの読み込みが終了すると、支援装置に、読み込みが終了したことを示す提示情報を送信する。
 処理部13は、たとえば、第1の通信I/F部11と第2の通信I/F部12との少なくとも一方を通して取得した情報を入力情報として出力情報を生成する機能を有している。たとえば、処理部13は、第1の通信I/F部11を通して電力量計20から取得した情報に基づいて、出力情報を生成する。また、処理部13が生成した出力情報は、第1の通信I/F部11と第2の通信I/F部12との少なくとも一方から送出される。たとえば、処理部13で生成された出力情報は、第2の通信I/F部12から、需要家で利用される機器に出力される。
 第1の通信I/F部11、第2の通信I/F部12、処理部13は、器体14に収納される。本実施形態の器体14は、分電盤30のキャビネット35に取り付けられるように、寸法および形状が定められる。具体的には、電流制限器(アンペアブレーカ)を取り付けることができる分電盤30において、電流制限器に代えて取り付けることができるように器体14の寸法および形状が定められている。したがって、本実施形態の連携アダプタ10は、既存の分電盤30に、分電盤30の設計を変更することなく取り付けることが可能である。ただし、連携アダプタ10の器体14の寸法および形状を、電流制限器が取付可能である分電盤30に収納できるように定めることは必須ではない。
 次に、図1~3を参照して、本実施形態の分電盤30について説明する。
 分電盤30のキャビネット35は、図2に示すように、一の方向(図2の左右方向)D1に長く、方向D1に直交する方向の一面(図2の正面側)が開口した矩形箱状に形成されている。図3に示すように、キャビネット35には、キャビネット35の開口を覆う開閉可能な扉36が取り付けられる。
 図2に示すように、連携アダプタ10は、キャビネット35内に取り付けられている。連携アダプタ10は、図1および図2に示すように、電力量計20が接続されている電力系統の電源線Lpが接続される第1の端子部21と、分電盤30に取り付けられた主幹ブレーカ31を接続する接続線Lcが接続される第2の端子部22とを備える。第1の端子部21と第2の端子部22とは、器体14における一面(図2の正面側)に設けられている。第1の端子部21と第2の端子部22とは、連携アダプタ10の内部(器体14の内部)で電気的に接続される。
 本実施形態は、系統電源25からの電力供給方式が単相三線方式である場合を想定しており、図2に示すように、電源線Lpおよび接続線Lcは3線(中性線、第1の電圧線、および第2の電圧線)で構成されている。したがって本実施形態では、第1の端子部21および第2の端子部22の各々は、中性線、第1の電圧線、および第2の電圧線にそれぞれ対応する3つの接続端子(第1~第3の接続端子)を備えている。
 なお、電力供給方式は、限定する趣旨ではなく、日本国において、住宅、事務所、店舗などの多くの需要家で採用されている代表例として示している。系統電源25からの電力供給方式は、単相三線方式に限られず、単相二線方式などであってもよい。単相二線方式の系統電源25に接続する場合、第1の端子部21および第2の端子部22は、1本の電圧線と1本の中性線とにそれぞれ対応する2つの接続端子(第1および第2の接続端子)を備えていればよい。
 キャビネット35内において、連携アダプタ10よりも方向D1の第1側(図2の右側)には、主幹ブレーカ31が取り付けられている。主幹ブレーカ31の電源側は、電力系統の電源線Lpと電気的に接続されている。具体的には、主幹ブレーカ31の第1端子(電源側の端子)310が接続線Lcを介して連携アダプタ10の第2の端子部22に接続され、連携アダプタ10の第1の端子部21が電力系統の電源線Lpを介して系統電源25に接続されている。すなわち、主幹ブレーカ31の電源側は、連携アダプタ10を介して系統電源25(電力系統の電源線Lp)に電気的に接続されている。
 なお、本実施形態では、連携アダプタ10の第2の端子部22と主幹ブレーカ31とは、電線である接続線Lcにより電気的に接続されているが、板状の導電部材を用いて接続される構成でもよい。
 図1、2に示すように、主幹ブレーカ31の負荷側には、複数の分岐ブレーカ32が接続されている。分岐ブレーカ32は、主幹ブレーカ31が挿入されている主幹回路を複数の負荷回路38に分岐させる。したがって、負荷回路38ごとに、分岐ブレーカ32が挿入される。ここに、主幹回路は、分電盤30の内部において電源線Lpから各分岐ブレーカ32の第1端子(電源側の端子)までの電路を意味し、負荷回路38は各分岐ブレーカ32の第1端子(電源側の端子)よりも下流側の電路を意味する。
 具体的には、図1に示すように、主幹ブレーカ31の第2端子(負荷側の端子;図示せず)には、導電バーセット37が接続されている。また、導電バーセット37には、複数の分岐ブレーカ32が接続されている。これにより、複数の分岐ブレーカ32は、主幹ブレーカ31が挿入されている主幹回路を複数の負荷回路38に分岐させる。
 図1に示すように、導電バーセット37は、主幹ブレーカ31の方向D1の第1側(図1の右側)に配置されている。導電バーセット37は、方向D1(キャビネット35の長手方向)に長く形成されている。本実施形態では、中性線、第1の電圧線、および第2の電圧線に対応して、導電バーセット37は3本の導電バーを備えている。
 複数の分岐ブレーカ32は、導電バーセット37に対して、方向D1と直交する方向D2(図2の上下方向)の両側に配置されている。複数の分岐ブレーカ32は、導電バーセット37の方向D2の両側に、方向D1に並んで配置されている。
 各分岐ブレーカ32は、第1端子(電源側の端子;図示せず)と第2端子(負荷側の端子)321とを有している。各分岐ブレーカ32の第1端子が、導電バーセット37に接続されている。各分岐ブレーカ32の第2端子321は、電線を介して、コンセントや電気機器などに接続される。
 本実施形態の主幹ブレーカ31は、たとえば3P3E型(極数3、素子数3)のブレーカであって、自己の内部に設けられた中性線、第1の電圧線、第2の電圧線の電路に、それぞれ引き外し素子(電流検出部を含む)が設けられる。主幹ブレーカ31は、中性線、第1の電圧線、第2の電圧線のいずれかの電路を流れる電流が所定の定格電流を超えたことを検知すると、複数の分岐ブレーカ32と系統電源25との間の電路を遮断する。
 また各分岐ブレーカ32は、たとえば2P1E型(極数2、素子数1)のブレーカであって、自己の内部に設けられた第1の電線、第2の電線の電路のうち、第1の電線の電路に引き外し素子(電流検出部を含む)が設けられる。各分岐ブレーカ32は、第1の電線の電路を流れる電流が所定の定格電流を超えたことを検知すると、対応する負荷回路38と主幹ブレーカ31(系統電源25)との間の電路を遮断する。各分岐ブレーカ32の第1端子は2つの端子を含み、これらは導電バーセット37の3本の導電バーのうちの2本(たとえば、中性極と第1の電圧極に対応する導電バー)にそれぞれ接続される。
 図2に示すように、分電盤30のキャビネット35内には、方向D1の第2側から第1側(図2の左側から右側)に向かって、連携アダプタ10、主幹ブレーカ31、複数の分岐ブレーカ32(および導電バーセット37)が並んで配置されている。
 次に、図1を参照して、複数の負荷回路38の電力をそれぞれ計測する計測ユニット33について説明する。
 本実施形態の分電盤30は、計測ユニット33を備えている。計測ユニット33は、分岐ブレーカ32により分岐されたすべての負荷回路38を対象として、負荷回路38ごとに分岐ブレーカ32を通過する電力を計測する複数のセンサ390を備える。すなわち、計測ユニット33は、複数の負荷回路38にそれぞれ対応する複数のセンサ390を備える。各センサ390は、対応する分岐ブレーカ32を流れる電力を検出する。
 一方、本実施形態の連携アダプタ10は、図1に示すように、負荷回路38ごとに電力を計測する計測ユニット33が接続される接続口17と、接続口17に接続された計測ユニット33から負荷回路38ごとの電力の使用に関する情報を取得する取得部18とを、さらに備えている。すなわち、連携アダプタ10は、分岐ブレーカ32をそれぞれ通過する電力に関する情報を計測ユニット33から取得する。
 計測ユニット33の各センサ390は、対応する負荷回路38を通過する電流を計測する電流センサを備え、電流センサが計測した電流値と負荷回路38の線間の電圧値とを用いて電力を算出する。電流センサは、たとえば、ロゴスキーセンサが用いられる。なお、計測ユニット33は、電流センサのみを備える構成とし、電流値と電圧値とを、連携アダプタ10に入力情報として与えることにより、処理部13が電力を算出する構成であってもよい。この場合、負荷回路38ごとの電力の使用に関する情報は、負荷回路38ごとに計測された電流値と電圧値とになる。
 たとえば計測ユニット33は、図5に示すように、複数のセンサ390が設けられたセンサブロック39を備える。センサブロック39は、矩形板状に形成されており、複数の差込孔391が長手方向に沿って2列に設けられている。図5の下側の差込孔391の各々の周りに、センサ390(ロゴスキーコイル)が設けられている。
 図5の上側の複数の差込孔391には、たとえば中性極の導電バーの複数の接続端子がそれぞれ挿入され、下側の複数の差込孔391には、たとえば第1の電圧極の導電バーの複数の接続端子がそれぞれ挿入される。各分岐ブレーカ32の第1端子の2つの端子は、中性極の導電バーの接続端子と第1の電圧極の導電バーの接続端子とに、それぞれ接続される。これにより、各分岐ブレーカ32を流れる電流を、センサ390によって計測することが可能になる。
 計測ユニット33が計測した負荷回路38ごとの電力の使用に関する情報は、入力情報として処理部13に与えられる。計測ユニット33が計測した電力の使用に関する情報は、電流値と電圧値との瞬時値でよいが、所定時間(たとえば、1分)ごとの電力量(瞬時電力とみなす)と、瞬時電力を積算した積算電力量との少なくとも一方であることがより望ましい。
 計測ユニット33は、負荷回路38ごとの電力を計測するだけではなく、主幹回路についても電力を計測することが望ましい。すなわち、計測ユニット33は、主幹ブレーカ31を通過する電力を計測するセンサを備えていることが好ましい。主幹回路の電力の使用に関する情報は、負荷回路38ごとの瞬時電力あるいは積算電力量の合計として求めることが可能であるが、負荷回路38ごとに求められた情報を合計した場合、主幹回路について計測した情報に対して誤差を含むことが多い。したがって、主幹回路の電力に関する情報は、主幹回路について直接計測することが望ましい。
 処理部13は、取得部18を通して計測ユニット33から得られた入力情報を用いることにより、負荷回路38ごとの瞬時電力と積算電力量との少なくとも一方を取得することが可能になる。また、処理部13は、主幹回路についても瞬時電力と積算電力量との少なくとも一方を取得することが可能になる。
 (第1の分散型電源との連携)
 本実施形態における連携アダプタ10は、図1に示すように、発電した電力を電力系統へ逆潮流させる(たとえば、電力系統への逆潮流が許容されている)太陽光発電装置のような第1の分散型電源41と主幹ブレーカ31の電源側の主幹回路との間に接続される第1の開閉器51が接続可能な第3の端子部23を備える。第3の端子部23は、第1の端子部21および第2の端子部22と電気的に接続される。すなわち、第3の端子部23は、第2の端子部22を通して主幹ブレーカ31に電気的に接続されており、第1の端子部21を通して系統電源25に電気的に接続されている。
 第1の開閉器51は、第1の分散型電源41を電力系統と連系させる場合にオンになり、第1の分散型電源41を電力系統から切り離す場合にオフになるように制御される。すなわち、第1の開閉器51は、系統電源25からの電力供給が停止した場合、系統電源25あるいは第1の分散型電源41に異常が生じた場合などに、第1の分散型電源41を解列するために設けられる。また、第1の開閉器51は、漏電ブレーカを含んでいる。
 第1の開閉器51は、たとえば、図6に示すように3P3E型(極数3、素子数3)のブレーカである。第1の開閉器51は、第1の分散型電源41の電源ケーブルが接続される、端子部510を備える。本実施形態では、中性線、第1の電圧線、第2の電圧線に対応して、端子部510は3つの端子部を含む。
 第1の開閉器51は、分電盤30にスペースを確保できる場合には、分電盤30の内部空間において、連携アダプタ10とは別の場所に配置することが可能である。この場合、分電盤30の内部に第1の開閉器51を配置する第1の取付スペースが形成されるように、連携アダプタ10の器体14の寸法が設計される。しかし、本実施形態のように、連携アダプタ10の器体14を電流制限器と同程度の寸法に形成した場合、第1の開閉器51を配置するスペースを連携アダプタ10の取付スペースと独立して分電盤30の内部に確保することはできない。
 そのため、図2に示すように、本実施形態の連携アダプタ10は、第1の開閉器51が装着される第1の取付スペースSP1を器体14の一部に備えている。第1の開閉器51は、第1の取付スペースSP1に対して取り付けと取り外しとが可能になっている。第1の取付スペースSP1は、器体14に形成された凹所である。第1の取付スペースSP1は、第1の開閉器51が第1の取付スペースSP1に装着されたときに第1の開閉器51の端子(図示せず)が電気的に接続される、差込式の接続部(図示せず)を備える。本実施形態では、この差込式の接続部が、第3の端子部23を構成している。なお、図2に示す例では、器体14は、第1の取付スペースSP1を1つ備えているが、第1の取付スペースSP1を複数備えていてもよい。
 すなわち、本実施形態の分電盤30は、発電した電力を電力系統へ逆潮流させる第1の分散型電源41を接続するための第1の開閉器51が配置される、第1の取付スペース(凹所)SP1を備えている。本実施形態では、図1および図2に示すように、第1の取付スペースSP1は連携アダプタ10の器体14に設けられている。第3の端子部23は、取付スペースSP1内に設けられており、第1の開閉器51が第1の取付スペースSP1に配置されたときに、第1の開閉器51に接続される。
 したがって、第1の開閉器51が第3の端子部23に接続され、第1の分散型電源41が第1の開閉器51に接続されると、第1の分散型電源41で発電された電力を第2の端子部22を介して主幹ブレーカ31へ供給することが可能となり、また、第1の分散型電源41で発電された電力を第1の端子部21を介して系統電源25へ逆潮流することが可能となる。
 第1の開閉器51の端子と接続部(第3の端子部23)との一方は、たとえば、2枚の板ばねを向かい合わせた構造が採用され、他方は、2枚の板ばねの間に差し込まれる板状の導体片を備える構造が採用される。この種の構造は、電源プラグの栓刃とレセプタクルの刃受ばねとの関係において採用されている構造に類似している。この構成により、第1の開閉器51が第1の取付スペースSP1に装着されると、第1の開閉器51と第3の端子部23とが電気的に接続される。第1の開閉器51の端子は、電源プラグの栓刃と同様の構造(雄コネクタ)を有し、連携アダプタ10の第3の端子部23は、レセプタクルと同様の構造(雌コネクタ)を有することが好ましい。
 上述した構成(連携アダプタ10が第1の取付スペースSP1を備えた構成)では、連携アダプタ10を取り付けた分電盤30が需要家に設置されていれば、太陽光発電装置のような第1の分散型電源41が需要家に設置された時点で、第1の開閉器51を第1の取付スペースSP1に後付けで取り付けることができる。つまり、需要家において、第1の分散型電源41が必要になったときに、分電盤30の内部に第1の開閉器51を取り付けることによって、第1の分散型電源41を系統と連系させることが可能になる。
 このように、本実施形態の分電盤30は第1の取付スペースSP1を備えているので、第1の分散型電源41を新たに導入する場合でも、分電盤を交換する必要がない。さらに、第1の開閉器51を第1の取付スペースSP1に配置する(第3の端子部23に接続する)だけで、大規模な工事を行わずに第1の分散型電源41を分電盤30に接続することができる。
 本実施形態の連携アダプタ10は、図1に示すように、第1の開閉器51を通過した電力を計測する内蔵センサ24をさらに備えている。内蔵センサ24は、第2の端子部22と第3の端子部23との間に設けられている。すなわち本実施形態では、第1の分散型電源41が発電した電力は、連携アダプタ10に設けられた内蔵センサ24が計測する。内蔵センサ24は、第3の端子部23を通して受電した電力を計測するために、たとえば線路ごとに通過する電流値を計測する電流センサを備え、電流センサが計測した電流値と線間の電圧値とを用いて電力を計測する。要するに、内蔵センサ24は第1の開閉器51を通過する電力を計測する。
 内蔵センサ24が計測した電力に関する情報は、取得部18を通して入力情報として処理部13に与えられる。すなわち、処理部13は、内蔵センサ24が計測した電力に関する情報から、第1の開閉器51を通過する電力に関する情報を求める。ここに、内蔵センサ24が計測した電力に関する情報は、電流値と電圧値との瞬時値でよいが、所定時間(たとえば、1分)ごとの電力量(瞬時電力とみなす)と、瞬時電力を積算した電力量との少なくとも一方であることが望ましい。
 処理部13は、取得部18を通して内蔵センサ24から得られた入力情報(第1の開閉器51を通過する電力に関する情報)を用いることにより、第1の分散型電源41が発電した電力について、瞬時電力と積算電力量との少なくとも一方を取得することが可能になる。また、処理部13は、計測ユニット33からの入力情報(分岐ブレーカ32をそれぞれ通過する電力に関する情報)により、負荷回路38ごとに使用した電力を取得するから、第1の分散型電源41が発電した電力との差分により、余剰電力(あるいは、逆潮流を行った電力)の算出が可能になる。すなわち、処理部13は、分岐ブレーカ32をそれぞれ通過する電力に関する情報と第1の開閉器51を通過する電力に関する情報とを用いて、第1の分散型電源41が発電した電力のうち電力系統に逆潮流された電力を算出することができる。
 図示していないが、第1の分散型電源41を蓄電装置と組み合わせて用いる場合には、第1の端子部21と第2の端子部22との間に開閉器を設けてもよい。この構成では、第1の分散型電源41の電力と蓄電装置の電力とにより負荷回路38が要求する電力を充足できる場合に、開閉器によって負荷回路38から電力系統を切り離し、負荷回路38が要求する電力が不足する場合に、電力系統を接続するという動作が可能になる。このような開閉器の動作は、処理部13が制御する。
 第1の分散型電源41が発電した電力に関する情報を処理部13が入力情報に用いて出力情報を生成する処理は、第1の分散型電源41が接続されている場合にのみ必要になる。そのため、第1の分散型電源41が接続されたときに、該当するプログラムとデータ(第1の開閉器51を通過する電力に関する情報を処理するためのプログラムとデータ)を処理部13で読み込むことが望ましい。たとえば処理部13は、第1の分散型電源41から所定の無線信号を第2の通信I/F部を介して受信したときに、該当するプログラムとデータを第1の通信I/F部11または第2の通信I/F部12を通して受信する。なお、プログラムとデータを処理部13にあらかじめ登録しておき、第1の分散型電源41が接続されたときに所要のプログラムとデータを起動するようにしてもよい。ただし、処理部13にプログラムとデータをあらかじめ登録している場合でも、第1の分散型電源41が接続されたときに、あらためて最新のプログラムとデータ(プログラムとデータの更新情報)を読み込むから、プログラムとデータは、選択肢から選ぶ構成ではなく、必要なときに読み込む構成であることが好ましい。
 なお、第1の分散型電源41を用いないことが明らかである場合、第3の端子部23は不要である。したがって、第3の端子部23を備えていない連携アダプタ10を分電盤30に取り付けてもよい。
 (第2の分散型電源との連携)
 本実施形態の分電盤30は、発電した電力を電力系統へ逆潮流させる(たとえば、電力系統への逆潮流が許容されている)第1の分散型電源41だけではなく、発電した電力を電力系統へ逆潮流させない(たとえば、電力系統への逆潮流が禁止されている)第2の分散型電源42を接続することも可能になっている。このために、本実施形態の分電盤30は、発電した電力を電力系統へ逆潮流させない第2の分散型電源42を接続するための第2の開閉器52が配置される、第2の取付スペースSP2を備えている。すなわち、分電盤30のキャビネット35には、第2の分散型電源42を接続するために、分岐ブレーカ32を取り付けるスペースの一部に、図2に示すように第2の開閉器52が配置される第2の取付スペースSP2が設けられている。具体的には、第2の取付スペースSP2は、導電バーセット37の方向D1の第1側且つ方向D2の一方側(図2の右下側)に設けられている。
 また本実施形態では、第2の取付スペースSP2に、第2の開閉器52が取りつけられる取付台34が装着されている。取付台34は、導電バーセット37に接続される。したがって、第2の開閉器52は、第2の分散型電源42と主幹ブレーカ31の負荷側(導電バーセット37)との間に接続される。
 図2に示す例では、3個の分岐ブレーカ32に相当する取付スペースSP2に取付台34(第2の開閉器52)を配置しているが、第2の取付スペースSP2は、第2の開閉器52のサイズと個数とに応じて、分岐ブレーカ52の1乃至複数個分に相当する寸法が空いていればよい。
 取付台34は、連携アダプタ10と同様に、工場出荷前あるいは需要家での現場施工時に分電盤30に取り付けられる。分電盤30は、取付台34を取り付けずに、取付台34に相当する第2の取付スペースSP2を空けておくことが可能である。しかしながら、分電盤30に取付台34が装着されずに放置されていると、第2の取付スペースSP2に誤って分岐ブレーカ32が装着される可能性があり、また導電部分(導電バーの露出部分)に埃が付着したり酸化膜が生じることにより、接触抵抗が増加する可能性がある。以上のような事情により、取付台34は分電盤30にあらかじめ取りつけられていることが望ましい。なお、第2の取付スペースSP2は、第2の分散型電源42を当面使用しないことが明らかである場合には、予備の分岐ブレーカ32を装着しておいてもよい。
 第2の分散型電源42は、燃料電池、蓄電装置、蓄電池を搭載した電動車両などから選択される。なお、電動車両は、交流と直流との間で双方向に電力変換を行う変換器を搭載し、充電器を別途に必要としない構成である場合を想定する。また、第2の分散型電源42は、電力系統への逆潮流を行わなければ、太陽光発電装置のように再生可能エネルギーを電力に変換する分散型電源であってもよい。分電盤30に第2の分散型電源42を接続する場合、第1の分散型電源41と主幹回路との間に第1の開閉器51が必要であるのと同様に、第2の分散型電源42と主幹回路との間に第2の開閉器52が必要である。第2の開閉器52を通過する電力は、分岐ブレーカ32を通過する電力と同様に、計測ユニット33(計測ユニット33のセンサ390)によって計測される。すなわち、連携アダプタ10は、第2の開閉器52を通過する電力に関する情報を、計測ユニット33から取得する。
 第2の開閉器52は、取付台34に対して取り付けと取り外しとが可能になっている。第2の開閉器52と取付台34との関係は、第1の開閉器51と連携アダプタ10との関係と同様であり、第2の開閉器52は取付台34に対して取り付けと取り外しとが可能になるように装着される。
 第2の開閉器52は、漏電ブレーカを含み、第2の分散型電源42における異常発生時に、第2の分散型電源42を主幹回路から切り離す機能を有する。
 なお、第2の開閉器52は、取付台34を介さずに直接導電バーセット37に接続される構成であってもよい。この場合の第2の開閉器52の例を、図7に示す。第2の開閉器52は、たとえば、3P3E型(極数3、素子数3)のブレーカである。第2の開閉器52は、第2の分散型電源42の電源ケーブルが接続される、端子部520を備える。また第2の開閉器52は、導電バーセット37が接続される、差込口521を備える。差込口521内には端子(図示せず)が設けられている。本実施形態では、中性線、第1の電圧線、第2の電圧線に対応して、端子部520は3つの端子部を含む。また、差込口521は3つの差込口を含み、3つの差込口にそれぞれ対応して3つの端子が設けられている。
 第2の分散型電源42が第2の開閉器52を介して導電バーセット37に接続されると、第2の分散型電源42で発電された電力を、導電バーセット37を介して複数の負荷回路38に供給することが可能になる。
 このように、本実施形態の分電盤30は第2の取付スペースSP2を備えているので、第2の分散型電源42を新たに導入する場合でも、分電盤を交換する必要がなく、また、第2の開閉器52を第2の取付スペースSP2に配置する(導電バーセット37に接続する)だけで、大規模な工事を行わずに第2の分散型電源42を分電盤30に接続することができる。
 第2の分散型電源42が分電盤30に接続された場合、連携アダプタ10の処理部13には第2の分散型電源42に対応したプログラムとデータが設定される。すなわち、第2の分散型電源42は、電力系統への逆潮流を常に行わない(たとえば電力系統への逆潮流が禁止されている)から、連携アダプタ10の処理部13は、電力系統への逆潮流が生じないように制御を行う。
 すなわち、処理部13は、第2の分散型電源42から主幹回路に供給される電力と、負荷回路38に供給される電力とを比較し、第2の分散型電源42から供給される電力が負荷回路38に供給される電力より小さくなるように、第2の分散型電源42の出力を調節する。たとえば、処理部13は、第2の通信I/F部12を通して、無線通信によって第2の分散型電源42の出力を調節する。
 なお、処理部13は、第2の分散型電源42の出力を直接調節する代わりに、第2の分散型電源42に対して、第2の分散型電源42から主幹回路に供給される電力と、負荷回路38に供給される電力とを送信してもよい。この場合、第2の分散型電源42が、負荷回路38に供給される電力と第2の分散型電源42から主幹回路に供給される電力とを比較し、自身の出力を調節する。
 第2の分散型電源42は、燃料電池あるいは太陽光発電装置のように電力の供給のみを行う構成と、蓄電装置あるいは電動車両のように電力の供給(放電)だけではなく電力の蓄積(蓄電)を行う構成とが選択可能である。電力の供給のみを行う第2の分散型電源42は、上述した動作による逆潮流の防止が行われるだけであるが、充電と放電とを行う第2の分散型電源42は、逆潮流の防止だけではなく、蓄電量の管理も行われる。したがって、連携アダプタ10に設定されるプログラムとデータは、第2の分散型電源42の種類に応じて変更される。
 たとえば、蓄電装置あるいは電動車両の蓄電池は、系統電源25の電力を用いて充電されるか、第1の分散型電源41の電力を用いて充電される。系統電源25の電力により充電される場合は、電力料金の単価が比較的低額である夜間の電力が用いられるように、充電のタイミングが管理される。また、蓄電装置あるいは電動車両の蓄電池は、翌日に利用する電力量あるいは電池の寿命などの種々の条件に応じて充電量が管理される。また、蓄電装置あるいは電動車両の蓄電池が、系統電源25から購入する電力を低減させる目的、あるいは逆潮流の電力を調節する目的などに用いられる場合には、連携アダプタ10は、それらの目的に応じた制御を行う。
 (出力情報の生成)
 上述のように、処理部13は、入力情報に基づいて出力情報を生成し、生成した出力情報を外部(他装置)に送出する。入力情報は、少なくとも、電力系統から受電する電力に関する情報と、複数の分岐ブレーカ32をそれぞれ通過する電力に関する情報とを含む。すなわち、分電盤30に第1の分散型電源41も第2の分散型電源42もともに接続されていない場合、処理部13は、電力系統から受電する電力に関する情報と、複数の分岐ブレーカ32をそれぞれ通過する電力に関する情報とを用いて出力情報を生成する。電力系統から受電する電力に関する情報は、たとえば電力系統から供給される電力の量である。複数の分岐ブレーカ32をそれぞれ通過する電力に関する情報は、たとえば複数の負荷回路38でそれぞれ消費される電力の量である。
 処理部13は、電力系統から受電する電力に関する情報を、電力量計20から第1の通信I/F部11を通して取得してもよいし、或いは電源線25を通過する電力を計測するために設けられた専用のセンサから取得してもよい。処理部13は、複数の分岐ブレーカ32をそれぞれ通過する電力に関する情報を、計測ユニット33から取得する。
 処理部13は、分電盤30に第1の分散型電源41が接続されると、第1の開閉器51を通過する電力に関する情報を入力情報に加える。第1の開閉器51を通過する電力に関する情報は、たとえば第1の分散型電源41から分電盤30へ供給される電力の量である。処理部13は、第1の開閉器51を通過する電力に関する情報を、内蔵センサ24から取得する。
 処理部13は、分電盤30に第2の分散型電源42が接続されると、第2の開閉器52を通過する電力に関する情報を入力情報に加える。第2の開閉器52を通過する電力に関する情報は、たとえば第2の分散型電源42から分電盤30へ供給される電力の量である。なお、第2の分散型電源42が蓄電装置の場合、第2の開閉器52を通過する電力に関する情報は、分電盤30から第2の分散型電源42へ供給される電力の量をさらに含んでもよい。処理部13は、第2の開閉器52を通過する電力に関する情報を、計測ユニット33から取得する。
 (提示機器との連携)
 以下では、連携アダプタ10の動作について説明する。ここでは、連携アダプタ10に第1の分散型電源41および第2の分散型電源42が接続されていない場合を想定する。通信機能を有する電力量計20が需要家において未設置であっても、計測ユニット33が設けられていれば、連携アダプタ10は以下の動作を行う。
 処理部13は、取得部18を通して計測ユニット33が計測した負荷回路38ごとの電力に関する情報を取得し、この情報を入力情報として出力情報を生成し、出力情報を第2の通信I/F部12から出力する。処理部13は、入力情報の集計、グラフ化などの処理を行うことによって、利用者に提示したときに分かりやすい形式の出力情報を生成する。この場合、出力情報は、第2の通信I/F部12を通して表示器(画面)を備える提示機器71に送出される。
 連携アダプタ10が複数種類の出力情報を生成し、提示機器71の1画面ではすべての出力情報を表示しきれない場合は、画面に表示する内容を切り替える。そのため、提示機器71は、表示器に加えて利用者が操作する操作部を備えた操作表示機器であることが望ましい。この種の操作表示機器の操作部は、表示器とは別に設けられたスイッチ、あるいは表示器の画面に重ねたタッチスイッチが用いられる。
 提示機器71は、利用者に情報を提示する装置であって、第2の通信I/F部12と通信する専用機器のほか、第2の通信I/F部12を通して通信するスマートフォン、タブレット端末などから選択される機器が用いられる。なお、スマートフォン、タブレット端末などの端末装置を用いるためには、端末装置を提示機器71として機能させるアプリケーションプログラムを端末装置に実行させればよい。
 上述の動作例のように、通信機能を有した電力量計20が需要家に設置されていない場合には、処理部13は、電力量計20からは入力情報を取得できない。一方、需要家に通信機能を有した電力量計20が設置されている場合、処理部13は、電力量計20からも入力情報を取得する。したがって、処理部13は、提示機器71に提示する出力情報を生成するために、電力量計20から得られた入力情報を用いることが可能である。すなわち、処理部13は、電力量計20から取得した情報を入力情報に加え、入力情報(電力量計20から取得した情報を含む)に基づいて出力情報を生成する。電力量計20から得られる入力情報は、電力量計20が計測した需要家での電力の使用量、管理装置62から通知されたデマンドレスポンスの情報などがある。処理部13は、電力量計20から取得した入力情報も提示機器71に提示可能な形式に加工する処理を行って提示機器71に出力する。
 (設備機器との連携)
 第2の通信I/F部12は、提示機器71だけではなく、上述のように、設備機器72、コントローラ70、通信機器(無線ルータ)73と通信することも可能である。ここで、連携アダプタ10に予め組み込まれている第2の通信I/F部12は、提示機器71、設備機器72、コントローラ70、通信機器73のいずれかとのみ通信可能に構成されていてもよい。
 たとえば、上述の動作例のように、連携アダプタ10が提示機器71に出力情報を送出する機能を有する場合、提示機器71は、連携アダプタ10と通信することが必須であるから、連携アダプタ10に組み込まれている第2の通信I/F部12と通信可能である。一方この場合、連携アダプタ10の最小限の機能では、設備機器72、コントローラ70、通信機器73との通信は必須ではない。この場合、連携アダプタ10は、設備機器72、コントローラ70、通信機器73と通信するための第2の通信I/F部12Aを、後付けで増設する構成であってもよい。
 図2に示す連携アダプタ10は、設備機器72、コントローラ70、通信機器73との通信が必要になったときに、これらの機器と通信を行うための第2の通信I/F部12Aを増設する構成を採用している。連携アダプタ10に付加される第2の通信I/F部12Aは、連携アダプタ10の器体14に装着される。第2の通信I/F部12Aは、取り替え可能であって、通信相手となる機器(コントローラ70、提示機器71、設備機器72、通信機器73)の種類に応じた構成が採用される。
 図3に示す使用例において、連携アダプタ10は、処理部13のファームウェアの更新および第2の通信I/F部12Aを付加することによって、通信機器73とWiFi(登録商標)による無線通信を行い、コントローラ70と特定小電力無線による無線通信を行う構成を採用している。この構成において、通信機器73は、管理装置61、コントローラ70、設備機器72、提示機器71として機能する端末装置と通信する。
 連携アダプタ10に組み込まれた第2の通信I/F部12が、提示機器71のみと通信する構成の場合には、第2の通信I/F部12は、たとえばWiFi(登録商標)による無線通信だけが行えればよい。この連携アダプタ10に対して、コントローラ70との通信が必要になる場合には、特定小電力無線による通信機能を有する第2の通信I/F部12Aが連携アダプタ10に装着される。また、通信機器73との通信が必要になる場合には、連携アダプタ10に組み込まれた第2の通信I/F部12は、通信機器73との通信が可能になるように、処理部13のファームウェアが更新される。
 設備機器72と通信する場合、連携アダプタ10は、設備機器72の管理を行う機能が付与される。すなわち、処理部13は、入力情報を用いて、設備機器72の動作状態を管理する出力情報を生成する。設備機器72の動作状態を管理する際に用いる入力情報は、電力量計20から取得する需要家で使用した電力の使用量あるいはデマンドレスポンス、計測ユニット33から取得する負荷回路38ごとの電力に関する情報を含む。さらに、処理部13は、設備機器72の動作状態を管理する出力情報を生成するために用いる入力情報は、設備機器72から取得する設備機器72の動作状態に関する情報を含む場合もある。
 出力情報の生成に用いられる情報(入力情報)は、たとえば第1の通信I/F部11と第2の通信I/F部12とを通して処理部13に与えられる。処理部13は、設備機器72を管理するためのプログラムを実行することにより、上述のような入力情報を用いて出力情報を生成し、設備機器72を制御する。連携アダプタ10は、たとえば、デマンドレスポンスに応じた節電を行うために、優先度の低い設備機器72を停止させる制御、あるいは設備機器72の動作状態を消費電力が低減される動作状態に移行させる制御などを設備機器72に指示する。
 ところで、上述した動作はコントローラ70と同様の動作であり、コントローラ70は設備機器72を管理する場合、電力量計20から取得する情報、計測ユニット33から取得する情報、設備機器72から取得する情報を必要とする。コントローラ70は、設備機器72と通信するから、設備機器72に関する情報を設備機器72から直接取得する。また、コントローラ70は、電力量計20および計測ユニット33からの情報は、連携アダプタ10から取得する。
 ここに、連携アダプタ10とコントローラ70とが同時に設備機器72を管理しようとすると、互いに干渉する可能性がある。そのため、第2の通信I/F部12がコントローラ70と通信する場合には、処理部13は設備機器72を管理する処理が禁止される。なお、第2の通信I/F部12は、コントローラ70と通信する場合は、たとえば、特定小電力無線による無線伝送路を用いる。
 通常、処理部13に用いられるプロセッサは、コスト上の制約があることなどから、高い処理能力を望むことは困難であり、設備機器72を管理する際の処理内容には制限がある。これに対して、一般に、コントローラ70に用いられるプロセッサは、処理部13に比べて処理能力が高く、また、コントローラ70に設けられるインターフェイス部も連携アダプタ10に比べて高機能である。
 したがって、設備機器72を簡便に管理する場合、連携アダプタ10が用いられ、設備機器72の管理により高度な処理が求められる場合は、コントローラ70が用いられる。コントローラ70が行うこの種の処理には、設備機器72の動作状態をタイムスケジュールに従って管理する処理、設備機器72の異常に対する対処などがある。
 (通信機器との連携)
 第2の通信I/F部12がルータのような通信機器73と通信する場合には、連携アダプタ10は、通信機器73を通して管理装置61あるいは管理装置62と通信することが可能になる。連携アダプタ10は、ファームウェアのアップデータを受信する場合などに、この通信経路を利用することが可能である。
 なお、上述した提示機器71は、図3に示すように、連携アダプタ10と直接通信せずに、通信機器73を介して連携アダプタ10と通信してもよい。すなわち、需要家において、通信機器73をアクセスポイントとする無線LAN(Local Area Network)が構築されている場合、提示機器71は、通信機器73を介して連携アダプタ10と通信する構成を採用してもよい。さらに、需要家に通信機器73との通信が可能な設備機器72が設置されている場合、あるいは需要家に通信機器73との通信が可能なコントローラ70が設けられている場合、提示機器71は、通信機器73を通して設備機器72あるいはコントローラ70を管理してもよい。
 上述した連携アダプタ10および計測ユニット33は、主幹ブレーカ31および分岐ブレーカ32を分電盤30に取り付けるときに、合わせて分電盤30に取り付けられる。たとえば、主幹ブレーカ31および分岐ブレーカ32だけではなく、連携アダプタ10および計測ユニット33も併せて内蔵された分電盤30が工場から出荷される。もちろん、需要家の施工現場において、連携アダプタ10および計測ユニット33が分電盤30に取り付けられてもよい。
 (自立分電盤との連携)
 以下、本実施形態の分電盤システムについて説明する。図1に示すように、本実施形態の分電盤システムは、系統電源25からの電力供給が停止している状態で電力の出力が可能である第2の分散型電源42が接続された分電盤30と、自立分電盤80とを備える。
 上述した第2の分散型電源42のうち、太陽光発電装置、蓄電装置、蓄電池を搭載した電動車両などは、系統電源25からの電力供給が停止した状態でも設備機器72に対して交流電力を出力することが可能である。このような第2の分散型電源42は、系統電源25からの電力供給が停止している状態で交流電力を出力する端子を、分電盤30の主幹回路に接続する端子とは別に備えている。以下、この端子から出力される電力を自立出力と呼ぶ。
 自立出力は、供給可能な容量に限りがあるから、需要家における特定の設備機器72にのみ供給される。自立出力を受電する特定の設備機器72は自立分電盤80に設けられた第2の分岐ブレーカ82に接続される。第2の分岐ブレーカ82は、分電盤30に設けられた分岐ブレーカ32と同様に、電力を複数の負荷回路83に分配するように設けられる。
 自立分電盤80は、第2の分岐ブレーカ82を複数個備える。第2の分岐ブレーカ82の各々は、たとえば分岐ブレーカ32と同様に2P1E型のブレーカである。自立分電盤80には、1乃至複数個分の第2の分岐ブレーカ82に相当するスペースが第3の取付スペースSP3として確保されている。第3の取付スペースSP3には、漏電ブレーカであって、自立分電盤80の受電経路に挿入される第3の開閉器53が取りつけられる。図2に示す例では、第3の取付スペースSP3は、3個の第2の分岐ブレーカ82に相当するスペースを有している。
 自立分電盤80は、平時は、主幹ブレーカ31を通して分電盤30から電力を受電しているが、系統電源25からの給電が停止すると、第2の分散型電源42の自立出力を受電する。自立分電盤80の受電元は、切替器54により選択される。切替器54は、系統電源25の給電状態を監視し、給電状態に応じて機械式の接点を切り替える。系統電源25の給電が継続している間、切替器54は分電盤30から受電する状態を選択し、給電が停止すると、切替器54は第2の分散型電源42の自立出力から受電する状態を選択する。系統電源25からの給電状態が復旧すれば、切替器54は平時の状態に復帰する。
 切替器54は、第3の開閉器53とは別に設けることが可能であるが、第3の開閉器53が切替器54と兼用されていることが望ましい。すなわち、図1には、第3の開閉器53と切替器54とを個別に記載しているが、図8に示すように、切替器54の機能は第3の開閉器53に内蔵されていることが望ましい。この構成では、切替器54が自立分電盤80に内蔵されることにより、図4に示すように、分電盤30と自立分電盤80とを隙間なく並べて配置することが可能になる。
 図3および図4には分電盤30の扉36および自立分電盤80の扉84を閉じた状態が示されており、図2には分電盤30について扉を開いた状態を示している。
 なお、切替器54は、自立分電盤80に給電する電源を選択する際に、系統電源25の停止と復帰を検出した後に、数秒程度が経過してから電源を選択することが望ましい。これは、自立分電盤80に接続されている設備機器72に残留する電荷が消費されるまで待つことによって、切替器54の接点の消耗や溶着を防止するためである。
 自立分電盤80の第2の分岐ブレーカ82に接続される設備機器72は、主として通信、照明のように安全に関わる機器であり、夏季における冷蔵庫のように、食品の保存に関わる機器が含まれていてもよい。なお、日中と夜間、夏季と冬季、人の存在と不在とのように、種々の条件に応じて第2の分岐ブレーカ82を通して給電する設備機器72が選択可能になっていてもよい。
 (使用例)
 たとえば、分電盤30は、主幹ブレーカ31、分岐ブレーカ32が工場出荷前に組み込まれ、さらに、電力量計20と通信可能な連携アダプタ10が少なくとも現場施工まで(望ましくは、工場出荷前)に組み込まれる。
 最小構成の分電盤30は、たとえば、電力量計20が計測した電力に関する情報を提示機器71に提示する機能と、電力量計20を通して管理装置61,62から通知されるデマンドレスポンスのような情報を提示機器71に提示する機能とだけを有している。すなわち、需要家における電力の使用量に関する情報が利用者に提示され、また、管理装置61,62からの情報が利用者に提示され、節電の要請、電気料金の単価、供給側の電力不足が懸念される時間帯などの情報が利用者に提示される。このような情報の提示により、利用者にとって電力の使用量に関する意識付けが行われる。
 太陽光発電装置のように発電した電力を電力系統へ逆潮流させる(たとえば、電力系統への逆潮流が許容されている)第1の分散型電源41を需要家が導入する場合は、連携アダプタ10に、第1の分散型電源41を主幹回路に接続するための第1の開閉器51が取りつけられる。さらに、第1の分散型電源41が接続された場合の処理が可能になるように、連携アダプタ10における処理部13のプログラムとデータの更新が行われる。
 需要家が設備機器72を管理するためのコントローラ70を設ける場合には、必要に応じて第2の通信I/F部12Aを付加し、連携アダプタ10における処理部13のプログラムとデータを更新する。コントローラ70を設けない場合であっても、連携アダプタ10によって設備機器72の管理を行う場合には、必要に応じて第2の通信I/F部12Aを付加し、連携アダプタ10における処理部13のプログラムとデータを更新する。提示機器71と同じ通信方式を採用した通信機器73との通信を可能にする場合には、第2の通信I/F部12Aを付加することは必須ではないが、通信機器73との通信を行うために処理部13のプログラムとデータを更新する。
 発電した電力を逆潮流させない(たとえば逆潮流が禁止されている)第2の分散型電源42を需要家が導入する場合は、分電盤30に設けられた第2の取付スペースSP2に、第2の開閉器52が取りつけられる。この場合も、第1の分散型電源41を導入する場合と同様に、連携アダプタ10における処理部13のプログラムとデータが、第2の分散型電源42の管理に適するように更新される。なお、図示例は、分電盤30に第2の取付スペースSP2が1つ設けられているが、第2の取付スペースSP2は複数設けられていてもよい。
 第2の分散型電源42は、燃料電池、太陽光発電装置のように電力の供給のみを行う構成と、蓄電装置、蓄電池を搭載した電動車両のように充電と放電とを行う構成とを含む。充電と放電とを行う第2の分散型電源42を用いる場合は、充電および放電の電力の管理およびタイミングの管理を行うように、処理部13のプログラムとデータが更新される。
 さらに、第2の分散型電源42が導入されている場合に、系統電源25からの給電が停止している期間でも特定の設備機器72への給電を可能とする場合には、自立分電盤80が需要家に導入される。自立分電盤80は、第2の分散型電源42が導入されている場合に必要に応じて導入される。すなわち、自立分電盤80は、第2の分散型電源42と同時または追加して導入される。
 以上説明したように、連携アダプタ10を取りつけた分電盤30が需要家に設置されていれば、電力量計20と通信することにより得られる情報を、提示機器71を通して利用者に提示するという最小限の機能を持たせることができる。その後、第1の分散型電源41、第2の分散型電源42、コントローラ70、自立分電盤80などから選択される設備が需要家に導入されるたびに、これらの設備に必要な部材が分電盤30に組み込まれる。さらに、導入した設備の管理や動作に必要なプログラムとデータが、連携アダプタ10の処理部13に実装される。
 言い換えると、需要家は、連携アダプタ10が取りつけられた基本構成の分電盤30が最初に導入されていれば、後に、分電盤30の入れ替えのような大幅な変更を要さずに、種々の設備を必要に応じて導入することが可能になる。要するに、基本構成の分電盤30が需要家に用意されていれば、設備の充実に伴って部材を付加することにより、多機能の分電盤30を構築することが可能になる。
 上述した構成例において、連携アダプタ10の処理部13は、電力に関する情報のみを入力情報に用いている。ただし、ガス、水道、熱などの資源であって、需要家での使用量を計測する計測装置が設置されている場合、処理部13は、これらの資源の使用に関する情報を入力情報に含めてもよい。すなわち、処理部13は、資源の使用に関する情報を入力情報に加え、入力情報(資源の使用に関する情報を含む)に基づいて出力情報を生成してもよい。処理部13が電力以外の資源の情報も入力情報に含めることにより、需要家での資源の利用を総合的に管理することが可能になる。

Claims (23)

  1.  電力系統の電源線と電気的に接続される主幹ブレーカと、
     前記主幹ブレーカの負荷側の電路を複数の負荷回路に分岐する複数の分岐ブレーカと
     を備え、
     発電した電力を前記電力系統へ逆潮流させる第1の分散型電源と前記主幹ブレーカの電源側との間に接続される第1の開閉器が配置される、第1の取付スペースと、
     発電した電力を前記電力系統へ逆潮流させない第2の分散型電源と前記主幹ブレーカの負荷側との間に接続される第2の開閉器が配置される、第2の取付スペースと
     を備える
     分電盤。
  2.  連携アダプタをさらに備え、
     前記連携アダプタは、入力情報に基づいて他装置に出力する出力情報を生成するよう構成される処理部を備え、
     前記入力情報は、
      前記電力系統から受電する電力に関する情報と、
      前記複数の分岐ブレーカをそれぞれ通過する電力に関する情報と、
      前記第1の開閉器を通過する電力に関する情報と、
      前記第2の開閉器を通過する電力に関する情報と
     の少なくとも一つを含む
     請求項1記載の分電盤。
  3.  前記入力情報は、少なくとも、前記電力系統から受電する電力に関する情報と、前記複数の分岐ブレーカをそれぞれ通過する電力に関する情報とを含む
     請求項2記載の分電盤。
  4.  前記複数の負荷回路の電力をそれぞれ計測するよう構成される複数のセンサが設けられた計測ユニットをさらに備え、
     前記連携アダプタは、前記複数の分岐ブレーカをそれぞれ通過する電力に関する情報と、前記第2の開閉器を通過する電力に関する情報とを、前記計測ユニットから取得するよう構成される
     請求項2または3記載の分電盤。
  5.  前記連携アダプタは、前記他装置と通信するよう構成される通信インターフェイス部を備え、
     前記通信インターフェイス部は、
      公衆網を通して通信する通信機器に前記出力情報を送出することと、
      利用者に情報を提示する提示機器に前記出力情報を送出することと、
      前記分電盤が取り付けられた所定場所に設置される設備機器を管理するコントローラに前記出力情報を送出することと
     のうちの少なくとも一つを行うよう構成される
     請求項2~4のいずれか一項に記載の分電盤。
  6.  前記通信インターフェイス部は、さらに、前記所定場所に設置される設備機器と通信するよう構成され、
     前記処理部は、前記設備機器の制御と監視との少なくとも一方を行うよう構成される
     請求項5記載の分電盤。
  7.  前記通信インターフェイス部は、さらに、通信機能を有した電力量計と通信するよう構成され、
     前記処理部は、前記電力量計から取得した情報を前記入力情報に加えるよう構成される
     よう構成される
     請求項5又は6記載の分電盤。
  8.  前記連携アダプタは、前記通信インターフェイス部が取り替え可能に装着される
     請求項5~7のいずれか1項に記載の分電盤。
  9.  前記通信インターフェイス部は、前記コントローラと通信するよう構成され、
     前記処理部は、
      前記コントローラから前記設備機器に関する情報を取得し、
      前記コントローラから取得した前記設備機器に関する情報を前記入力情報に加え、
      前記入力情報に基づいて前記設備機器を管理する情報を生成し、生成した情報を前記出力情報として前記コントローラに引き渡す
     よう構成される
     請求項5~8のいずれか1項に記載の分電盤。
  10.  前記処理部は、前記入力情報から前記出力情報を生成するためのプログラムを実行するプロセッサを備え、前記通信インターフェイス部を通して前記プログラムを取得するよう構成される
     請求項5~9のいずれか1項に記載の分電盤。
  11.  記憶媒体が着脱可能に装着される接続部をさらに備え、
     前記処理部は、前記入力情報から前記出力情報を生成するためのプログラムを実行するプロセッサを備え、前記記憶媒体から前記プログラムを取得するよう構成される
     請求項2~9のいずれか1項に記載の分電盤。
  12.  前記連携アダプタは、
      前記電力系統の電源線が接続される第1の端子部と、
      前記第1の端子部と電気的に接続され、かつ前記主幹ブレーカが電気的に接続される第2の端子部と
     を備える
     請求項2~11のいずれか1項に記載の分電盤。
  13.  前記連携アダプタは、
      前記電力系統の電源線が接続される第1の端子部と、
      前記第1の端子部と電気的に接続され、かつ前記主幹ブレーカが電気的に接続される第2の端子部と、
      前記第1の端子部および前記第2の端子部と電気的に接続され、かつ前記第1の開閉器が電気的に接続される第3の端子部と
     を備える
     請求項2~11のいずれか1項に記載の分電盤。
  14.  前記連携アダプタは、前記第1の開閉器を通過した電力を計測するよう構成される内蔵センサをさらに備え、
     前記処理部は、前記内蔵センサが計測した電力から、前記第1の開閉器を通過する電力に関する情報を求める
     請求項13記載の分電盤。
  15.  前記処理部は、前記入力情報に含まれる情報の関係を用いて、前記第1の分散型電源が発電した電力のうち前記電力系統に逆潮流を行った電力を算出し、算出結果を前記出力情報として前記他装置に出力する
     請求項14記載の分電盤。
  16.  前記処理部は、
      前記分電盤が取り付けられた所定場所に供給される電力以外の資源の使用量を計測する計測装置から前記資源の使用に関する情報を取得し、
      前記取得した資源の使用に関する情報を前記入力情報に加えるよう構成される
     よう構成される
     請求項2~15のいずれか1項に記載の分電盤。
  17.  前記連携アダプタは、前記処理部を収納し、且つ前記分電盤に取り付けられる器体をさらに備え、
     前記第1の取付スペースが前記器体に設けられている
     請求項2~16のいずれか1項に記載の分電盤。
  18.  前記第2の取付スペースは、前記分岐ブレーカを取りつけるためのスペースの一部であって、前記分岐ブレーカの1乃至複数個分に相当する寸法を有する
     請求項1~17のいずれか1項に記載の分電盤。
  19.  系統電源からの電力供給が停止している状態で電力の出力が可能である前記第2の分散型電源が接続された、請求項1~18のいずれか1項に記載の分電盤と、
     前記系統電源からの電力供給が停止している状態で電力供給が必要である機器が接続された第2の分岐ブレーカを備える自立分電盤と
     を備え、
     前記自立分電盤は、前記系統電源から電力が供給されている期間には前記主幹ブレーカを通して給電され、前記系統電源からの電力供給が停止している期間には前記第2の分散型電源から給電される
     分電盤システム。
  20.  前記自立分電盤は、前記分電盤と前記第2の分散型電源とのいずれかから受電し、受電した電力を前記第2の分岐ブレーカに給電する第3の開閉器を備える
     請求項19記載の分電盤システム。
  21.  前記第3の開閉器が受電する経路に、前記系統電源から電力が供給されている期間に前記主幹ブレーカを通して受電する状態を選択し、前記系統電源からの電力供給が停止している期間に前記第2の分散型電源から受電する状態を選択する切替器をさらに備える
     請求項20記載の分電盤システム。
  22.  前記第3の開閉器と前記切替器とが前記自立分電盤に設けられている
     請求項21記載の分電盤システム。
  23.  請求項19~22のいずれか1項に記載の分電盤システムに用いられる自立分電盤。
PCT/JP2014/001583 2013-04-08 2014-03-19 分電盤、分電盤システム、自立分電盤 WO2014167780A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015511082A JP6115000B2 (ja) 2013-04-08 2014-03-19 分電盤、分電盤システム、自立分電盤

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013080766 2013-04-08
JP2013-080766 2013-04-08

Publications (1)

Publication Number Publication Date
WO2014167780A1 true WO2014167780A1 (ja) 2014-10-16

Family

ID=51689204

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/001583 WO2014167780A1 (ja) 2013-04-08 2014-03-19 分電盤、分電盤システム、自立分電盤

Country Status (3)

Country Link
JP (1) JP6115000B2 (ja)
TW (1) TWI521817B (ja)
WO (1) WO2014167780A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016166809A (ja) * 2015-03-10 2016-09-15 パナソニックIpマネジメント株式会社 計測ユニット、プログラム、電力計測方法、分電盤、分電盤システム
JP2017034924A (ja) * 2015-08-05 2017-02-09 パナソニックIpマネジメント株式会社 電流計測装置及びそれを用いた分電盤
JP2017224444A (ja) * 2016-06-14 2017-12-21 日東工業株式会社 切替開閉器
JP2017225230A (ja) * 2016-06-14 2017-12-21 日東工業株式会社 分電盤

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001103622A (ja) * 1999-09-28 2001-04-13 Osaki Electric Co Ltd 宅内電気エネルギ計測システム
JP2001298814A (ja) * 2000-04-14 2001-10-26 Sekisui Chem Co Ltd 電力供給装置
JP2004328856A (ja) * 2003-04-23 2004-11-18 Nitto Electric Works Ltd 分電盤システム
JP2007300703A (ja) * 2006-04-28 2007-11-15 Kawamura Electric Inc 分電盤

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3319264B2 (ja) * 1996-01-31 2002-08-26 松下電工株式会社 太陽光発電システム
JP2013013174A (ja) * 2011-06-28 2013-01-17 Eishin:Kk 電力供給システム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001103622A (ja) * 1999-09-28 2001-04-13 Osaki Electric Co Ltd 宅内電気エネルギ計測システム
JP2001298814A (ja) * 2000-04-14 2001-10-26 Sekisui Chem Co Ltd 電力供給装置
JP2004328856A (ja) * 2003-04-23 2004-11-18 Nitto Electric Works Ltd 分電盤システム
JP2007300703A (ja) * 2006-04-28 2007-11-15 Kawamura Electric Inc 分電盤

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016166809A (ja) * 2015-03-10 2016-09-15 パナソニックIpマネジメント株式会社 計測ユニット、プログラム、電力計測方法、分電盤、分電盤システム
JP2017034924A (ja) * 2015-08-05 2017-02-09 パナソニックIpマネジメント株式会社 電流計測装置及びそれを用いた分電盤
JP2017224444A (ja) * 2016-06-14 2017-12-21 日東工業株式会社 切替開閉器
JP2017225230A (ja) * 2016-06-14 2017-12-21 日東工業株式会社 分電盤

Also Published As

Publication number Publication date
JP6115000B2 (ja) 2017-04-19
TWI521817B (zh) 2016-02-11
TW201505303A (zh) 2015-02-01
JPWO2014167780A1 (ja) 2017-02-16

Similar Documents

Publication Publication Date Title
US11552500B2 (en) Systems and methods for managing electrical loads
US11770006B2 (en) Integrated electrical panel
EP2780995B1 (en) Electrical power distribution systems, smart electricity meters, and methods of controlling local power connection
JP5899464B2 (ja) 分電盤システム
US9590422B2 (en) Power supply system, power conversion apparatus, and measurement point switching apparatus
JP6179590B2 (ja) 連携アダプタ、分電盤、分電盤システム
CN114144683B (zh) 用于电连接计量设备和分布式能源设备的系统
JP2014504145A (ja) エネルギーインターフェースシステム
JP7046836B2 (ja) 分散型発電装置を使用するためのユーティリティメータ
JP6115000B2 (ja) 分電盤、分電盤システム、自立分電盤
CN106688155A (zh) 在公用电力断电中将电气系统切换到备用电力的系统和方法
EP4275256A1 (en) Multilayer control for managing power flow
KR20120138145A (ko) 스마트 그리드 환경에서 에너지 관리기능을 갖는 지능형 분전반
WO2011042784A1 (ja) 電力メータ
WO2015104787A1 (ja) エネルギー管理装置、およびエネルギー管理システム
WO2015104740A1 (ja) 制御システムおよび分電盤
WO2014001814A2 (en) Telemetry device
JP6350936B2 (ja) 分電盤用内器、通信アダプタ装置、分電盤
WO2017011339A1 (en) Interconnection meter socket adapters
JP5845455B2 (ja) 系統連系保護装置
JP2013221759A (ja) 電力量計

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14782722

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015511082

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14782722

Country of ref document: EP

Kind code of ref document: A1