WO2014047904A1 - 功率调整方法及系统、基站和用户设备 - Google Patents

功率调整方法及系统、基站和用户设备 Download PDF

Info

Publication number
WO2014047904A1
WO2014047904A1 PCT/CN2012/082388 CN2012082388W WO2014047904A1 WO 2014047904 A1 WO2014047904 A1 WO 2014047904A1 CN 2012082388 W CN2012082388 W CN 2012082388W WO 2014047904 A1 WO2014047904 A1 WO 2014047904A1
Authority
WO
WIPO (PCT)
Prior art keywords
power control
information
control value
tpc command
command word
Prior art date
Application number
PCT/CN2012/082388
Other languages
English (en)
French (fr)
Inventor
汪凡
唐臻飞
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to CN201280023572.0A priority Critical patent/CN103843419B/zh
Priority to PCT/CN2012/082388 priority patent/WO2014047904A1/zh
Priority to EP12885626.7A priority patent/EP2894908B1/en
Publication of WO2014047904A1 publication Critical patent/WO2014047904A1/zh
Priority to US14/671,688 priority patent/US9538476B2/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/146Uplink power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/24TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
    • H04W52/248TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters where transmission power control commands are generated based on a path parameter
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/54Signalisation aspects of the TPC commands, e.g. frame structure
    • H04W52/58Format of the TPC bits
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management

Definitions

  • the present invention relates to the field of communications, and in particular, to a power adjustment method and system, a base station, and a user equipment. Background technique
  • the physical uplink shared channel (Physical Uplink Shared Channel; PUSCH) uplink power control algorithm adopts a combination of open loop power control and closed loop power control, wherein power control According to whether the mobile station/terminal and the base station participate simultaneously, it is divided into open loop power control and closed loop power control. At present, most of the closed-loop power control is used to compensate the error of open-loop power control to achieve precise control of channel fading in Frequency Division Duplexing (FDD) mode.
  • FDD Frequency Division Duplexing
  • a 2-bit Transmit Power Control (TPC) command is used to indicate closed-loop power control, which is cumulative mode and absolute mode.
  • TPC command word is up-regulated to support 1 dB and 3 dB, that is, the power can be adjusted up by 1 dB or 3 dB based on the last power generated, and the down-regulation only supports -1 dB, that is, the power is generated last time. Based on a drop of -1 dB.
  • the benefit is that when the channel conditions or other conditions change, the U E transmit power can be quickly increased to accommodate the channel conditions.
  • the Physical Downlink Control Channel uses only a 16-bit Cyclic Redundancy Check (CRC), and the UE performs a Transmission Time Interval (TTI, unit ms).
  • CRC Cyclic Redundancy Check
  • TTI Transmission Time Interval
  • a maximum of 44 blind detection PDCCHs are generated. Therefore, when a long time is accumulated, for example, 1 s, the probability of false alarms or false detections is greatly improved.
  • the false alarm can be understood as that the base station does not transmit a certain PDCCH, and the UE detects the PDCCH. . Since the four code points in the accumulation mode have the same status, the TPC Command Field (TPC control command field: 0, 1, 2, or 3) can be set to have the same probability of false alarms.
  • the embodiments of the present invention provide a power adjustment method and system, a base station, and a user equipment, which are used to solve the problem that the UE power is not excessively high or too low due to PDCCH false alarm or misdetection in the prior art.
  • the problem is not excessively high or too low due to PDCCH false alarm or misdetection in the prior art.
  • an embodiment of the present invention provides a power adjustment method, including:
  • the user equipment UE receives the downlink control information sent by the base station and carries the transmission power control TPC command word;
  • the UE determines a power control value corresponding to the power control command domain according to a power control command field in the TPC command word and the first condition, Includes:
  • the UE determines a power control value corresponding to the power control command domain according to the first condition.
  • the method before the UE receives the downlink control information that is sent by the base station and carries the TPC command word, the method further includes:
  • the UE determines, according to the first condition, a power control value corresponding to the power control command domain, specifically: where in the UE After the power control of the PUSCH is used, the accumulation mode is used.
  • the power control command field in the TPC command word is 3, the UE determines a power control value corresponding to the power control command domain according to the first condition.
  • the first condition is: when the UE receives the time information of the downlink control information, the determining, by the UE, the power control value corresponding to the power control command domain according to the first condition, including:
  • the time information of the downlink control information is subframe N, and the UE determines that the power control value corresponding to the power control command domain is 3 dB;
  • the time information of the downlink control information is the subframe M, and the UE determines that the power control value corresponding to the power control command domain is -3d B;
  • N is an odd number and M is an even number; or, N is an even number and M is an odd number.
  • the UE when the first condition is: the PDCCH candidate location information, the UE is according to the foregoing Determining a power control value corresponding to the power control command field includes: if the PDCCH candidate location information is £ ⁇ ( + ) 111()(1 ⁇ ' /£ ” ⁇ + , and in the parameter m' is N if the PDCCH is m' is M, determining that the power control value corresponding to the power control command domain is -3 dB;
  • N is an odd number, M is an even number; or, N is an even number, and M is an odd number;
  • w CCE , * is the number of control channel elements CCE in the subframe numbered /;
  • /_ is the number of CCEs included in the current aggregation level of the PDCCH
  • the RNTI is the identity of the UE.
  • the first type, and the second possible implementation manner in a fifth possible implementation manner, when the first condition is: information about a non-TPC command word in the downlink control information, Determining, by the UE, a work corresponding to the power control command domain according to the first condition Rate control values, including:
  • any one of the information of the non-TPC command word in the downlink control information is M, determining that the power control value corresponding to the power control command field is -3 dB;
  • N is 0 and M is 1; or, N is 1 and M is 0.
  • the any one of the bits is used to indicate a centralized virtual resource indication, a distributed virtual resource indication, or a frequency hopping indication.
  • the preset power control value is O dB or reserved.
  • the indication information that is sent by the base station to indicate the power control value is to indicate that the power control value is 0 dB
  • the UE determines, according to the indication information, that the power control value corresponding to the power control command domain is 0 dB or reserved.
  • the power adjustment method further includes:
  • the UE adjusts a transmit power of the PUSCH according to the determined power control value
  • the UE adjusts the transmit power of the PUCCH according to the determined power control value.
  • an embodiment of the present invention provides a power adjustment method, including:
  • the base station acquires downlink control information carrying a transmission control TPC command word
  • the base station Sending, by the base station, the downlink control information to the user equipment UE, so that the UE determines a power control value corresponding to the power control command domain according to a power control command field and a first condition of the TPC command word;
  • the indication information indicating the power control value sent by the base station is not limited to the following information:
  • the determining, by the UE, the power control value corresponding to the power domain according to the power control command field and the first condition in the TPC command word including:
  • the UE determines a power control value corresponding to the power control command domain according to the first condition.
  • the method before the sending, by the base station, the downlink control information for controlling the transmit power of the uplink channel of the UE to the UE, the method further includes:
  • the power control of the PUSCH in the UE uses an accumulation mode, and when the power control command field in the TPC command word is 3, a power control value corresponding to the power control command domain is determined according to the first condition.
  • the embodiment of the present invention further provides a user equipment, including:
  • a receiving unit configured to receive downlink control information that is sent by the base station and carries a transmission power control TPC command word;
  • a determining unit configured to determine, according to the power control command field and the first condition in the TPC command word, a power control value corresponding to the power control command domain;
  • the determining unit is specifically configured to: when the power control command field in the TPC command word of the downlink control information received by the receiving unit is 3, Determining a work corresponding to the power control command domain according to the first condition Rate control value
  • the receiving unit is further configured to receive a first message sent by the base station, where the first message is used to indicate the
  • the power control of the PUSCH uses an accumulation mode
  • the determining unit is specifically configured to be used
  • the power control of the PUSCH in the UE uses an accumulation mode, and when the power control command field in the TPC command word of the downlink control information received by the receiving unit is 3, the UE is according to the first The condition determines a power control value corresponding to the power control command domain.
  • the foregoing user equipment further includes:
  • an adjusting unit configured to: when the TPC command word is a TPC command word corresponding to the PUSCH, adjust a transmit power of the PUSCH according to the determined power control value;
  • the transmit power of the PUCCH is adjusted according to the determined power control value.
  • the embodiment of the present invention further provides a base station, including:
  • An acquiring unit configured to acquire downlink control information that carries a transmission control TPC command word
  • a sending unit configured to send the downlink control information to the user equipment UE, so that the UE controls the command domain according to the power of the TPC command word And determining, by the first condition, a power control value corresponding to the power control command domain;
  • the indication information indicating the power control value sent by the sending unit is not limited to the following parameters.
  • the sending unit is further configured to send a first message to the UE, where the first message is used to indicate physical in the UE
  • the power control of the uplink shared channel PUSCH uses an accumulation mode to enable the UE to use the accumulation mode for power control of the PUSCH in the UE according to the first message, and the received by the receiving unit
  • the UE determines a power control value corresponding to the power control command domain according to the first condition.
  • the embodiment of the present invention further provides a communication system, including any one of the foregoing user equipments and any one of the base stations, where the user equipment communicates with the base station.
  • the power adjustment method and system, the base station, and the user equipment in the embodiment of the present invention enable the UE to determine the power control value corresponding to the power control command domain according to the power control command field and the first condition in the TPC command word.
  • the UE does not cause unnecessary or excessive accumulation of UE power due to PDCCH false alarm or misdetection within a certain statistical time.
  • FIG. 1 is a schematic flowchart of a power adjustment method according to an embodiment of the present invention.
  • FIG. 2A and FIG. 2B are schematic flowcharts of a power adjustment method according to another embodiment of the present invention
  • FIG. 3A and FIG. 3B are schematic flowcharts of a power adjustment method according to another embodiment of the present invention
  • FIG. 5 is a schematic structural diagram of a user equipment according to another embodiment of the present disclosure.
  • FIG. 6 is a schematic structural diagram of a base station according to another embodiment of the present invention. detailed description
  • LTE Long Term Evolution
  • a 2-bit TPC command is used to represent closed-loop power control, which is cumulative mode and absolute mode.
  • the 4 code points formed by 2 bits correspond to the power control value of [-1, 0, 1, 3] dB
  • the power control values corresponding to the 4 code points of the absolute mode are [-4, -1, 1 , 4] dB.
  • DCI Downlink Control Information
  • the TPC command word carried in the DCI supports up to 1 dB and 3 dB, that is, the power is up by 1 dB or 3 dB based on the previous transmit power, and the down-regulation supports -1 dB, that is, the power is on.
  • the secondary transmit power is reduced by -1 dB.
  • the transmission scheme of the PUSCH in the UE in the accumulation mode is that the UE transmission power can be quickly improved to adapt to the channel condition.
  • the uplink PUSCH corresponding power control command word is carried on the PDCCH DCI format 0/3/4, and the UE blindly detects the PDCCH DCI formant 0/3/4 according to the provisions of 3GPP TS36.213, and is divided into a UE search area and a public search area, which are divided into There are 4 aggregation levels, as shown in Table 2.
  • the UE performs a total of 44 blind checks.
  • the detection location is that the control channel unit (CCE) passes the logical number, and the search set contains four aggregation levels, each of which meets the aggregation level.
  • CCE control channel unit
  • S k L , L touch 4 / ⁇ ; where ⁇ * is the number of control channel elements CCE in the subframe numbered /;
  • /_ is the number of CCEs included in the current aggregation level of the PDCCH
  • the radio network Temporary Identifier is the identifier of the UE.
  • the PDCCH uses only a 16-bit CRC, and the UE performs a maximum of 44 blind detection PDCCHs per TTI (ms), when a long time is accumulated, such as 1 s, the probability of false alarm or false detection is greatly increased. It is understood that the base station does not transmit a certain PDCCH, and the terminal detects the PDCCH. Since the four code points have the same status, it can be assumed that the probability of false alarms in the TPC Command Field (ie 0, 1, 2, 3) is the same, and it is observed that 1dB and 3dB are supported in the accumulation mode, and only -1dB is supported in the downward adjustment.
  • the power control command field in the TPC command word is 0, 1, 2, 3, and the probability of the cumulative time is the same, and the TPC command word is 0 (corresponding to the accumulation mode is -1 dB) and The TPC command word is 2 (corresponding to the cumulative mode of 1 dB). The effect is offset from the overall accumulation time, and the TPC command word is 3 (corresponding to 3dB). From the overall effect of the cumulative time, it cannot be cancelled, thus When a police or misdetection occurs, the power of the UE is always increased, resulting in unnecessary waste.
  • the LTE supports the accumulation mode, and the PUCCH corresponding TPC command word and the power adjustment mapping relationship are as shown in Table 3.
  • PUCCH power may be unnecessarily increased, causing unnecessary power waste and interference to the uplink channel to affect uplink performance.
  • the PDCCH false alarm or misdetection causes an excessively high or too low accumulation of UE PUSCH transmission power.
  • the positive (3dB) and negative (-3dB) maps of the power control command word in the TPC command word can be completely symmetrical, so that the PDCCH false alarm or false check can be avoided.
  • the overall accumulation time, from the overall effect, the UE's rising power and the falling power are offset, so that it does not cause an excessively high or too low accumulation of the UE PUSCH transmission power.
  • FIG. 1 is a schematic flowchart of a power adjustment method according to an embodiment of the present invention. As shown in FIG. 1, the power adjustment method in this embodiment is as follows.
  • the UE receives downlink control information that is sent by the base station and carries a TPC command word. 102. The UE determines, according to a power control command field and a first condition in the TPC command word, a power control value corresponding to the power control command domain.
  • the first condition in this embodiment may be one of the following conditions:
  • PDCCH candidate location information (PDCCH Candidate location information);
  • step 102 may include:
  • N is an odd number and M is an even number; or, N is an even number and M is an odd number.
  • step 102 may include:
  • the UE determines the TPC.
  • the PDCCH candidate location information is ⁇ + ⁇ ⁇
  • the parameter ⁇ is M
  • N is an odd number, M is an even number; or, N is an even number, and M is an odd number;
  • ⁇ * is the number of control channel elements CCE in the subframe numbered *
  • /_ is the number of CCEs included in the current aggregation level of the PDCCH
  • the radio network Temporary Identifier is the identifier of the UE.
  • step 102 may include:
  • N is 0 and M is 1; or, N is 1 and M is 0.
  • N and M can be any one of the code points.
  • N can be all 1s
  • M can be all 0s; or, N can be all 0s, and M can be all 1s.
  • any one of the above bits may include: a centralized virtual resource indication
  • step 102 may be specifically:
  • the UE determines the TPC
  • step 102 can be specifically:
  • the downlink control information in step 101 above is TPC life
  • the command is a TPC command word corresponding to the PUSCH (ie, DCI format 0/3/4), and the UE adjusts the transmit power of the PUSCH according to the determined power control value;
  • the UE adjusts the PUCCH according to the determined power control value. Transmit power.
  • the downlink control information sent by the base station (eNB/NB) to the user equipment (UE) may be downlink control information for carrying uplink scheduling information, for example, DCI 0/4, etc., or may be used for carrying transmission power.
  • the downlink control information of the control command word is, for example, DCI 3/3A or the like.
  • a downlink physical control channel (PDCCH) is used to carry the eNB to issue
  • the downlink control information (DCI) of the UE, the PDCCH is a shared channel, and all UEs can be monitored. Therefore, a distinguishing mechanism is needed to let the UE know which DCI is sent to the UE.
  • the downlink control information (DCI) is carried on the PDCCH channel and has multiple formats, for example: DCI 0 is used to carry uplink scheduling information; DCI 1/1A/1 B/1 C/1 D/2/2A is used for bearer downlink scheduling Information; DCI3/3A is dedicated to bearer Transmission Power Control (TPC) command words, which can carry multiple UE's public command words at a time.
  • TPC Transmission Power Control
  • the rising power value and the falling power value of the UE cancel each other, which can solve the problem that the UE power is not excessively high or too low due to PDCCH false alarm or misdetection in the prior art.
  • power waste can be reduced, and interference to uplink channels of other UEs can be reduced.
  • FIG. 2A is a schematic flow chart of a power adjustment method according to an embodiment of the present invention. As shown in FIG. 2A, the power adjustment method in this embodiment is as follows.
  • the power control of the PUSCH is exemplified.
  • the UE receives the first message sent by the base station, where the first message is used to indicate the power control usage accumulation mode of the PUSCH in the UE, and the UE controls the power of the PUSCH in the UE according to the first message. Cumulative mode.
  • the UE receives the DCI format 0/3/4 that is sent by the base station and carries the TPC command word (that is, the PUSCH power control command word).
  • the TPC command word that is, the PUSCH power control command word.
  • the UE determines the power according to the first condition. Controls the power control value corresponding to the command field.
  • step 203 may be specifically:
  • the time information of the DCI format 0/3/4 is the subframe N.
  • N is an odd number
  • the UE determines that the power control value may be -3 dB
  • N is an even number
  • the UE determines that the power control value may be 3 dB
  • a positive number (3 dB) to which the power control command word in the TPC command word is mapped may be guaranteed.
  • the negative number (-3dB) is completely symmetrical, thereby avoiding unnecessary accumulation of too high or too low for the UE PUSCH transmission power due to PDCCH false alarm or false detection.
  • the UE determines that the power control value may be 3 dB.
  • the UE determines that the power control value may be -3 dB, and the embodiment is merely illustrative and is not limited.
  • the above step 203 can be exemplified as follows:
  • the parameter m' is an even number, the UE determines that the power control value may be 3 dB; or the parameter m' is an odd number, the UE determines that the power control value may be 3 dB; the parameter m' is an even number, the UE Determining the power control value can be -3dB;
  • the foregoing step 203 can be as follows:
  • the power control value is determined to be OdB or reserved.
  • the foregoing step 203 can be as follows:
  • the indication information sent by the base station to indicate the power control value may be indicating that the UE is in the TPC
  • the power control value is OdB or reserved. After receiving the indication information, the UE determines that the power control value is OdB or reserved. Otherwise, the power control value is 3dB according to the LTE Re1 -1 specification.
  • the indication information in the step may be carried in the first message in the step 201, and the second message carrying the indication information may be separately sent, which is not limited in this embodiment.
  • the foregoing power adjustment method may further include the following step 204.
  • the UE adjusts the transmit power of the PUSCH according to the determined power control value (3 dB or -3 dB) to send the PUSCH.
  • the power adjustment method in the foregoing embodiment for the power control of the PUSCH, by the completely symmetric distribution of the positive and negative power control values, the rising power value and the falling power value of the UE cancel each other within a certain accumulation time.
  • the problem of excessive or low accumulation of UE power caused by PDCCH false alarm or misdetection in the prior art may be solved, thereby reducing power waste and reducing interference to uplink channels of other UEs.
  • FIG. 3A is a schematic flowchart of a power adjustment method according to an embodiment of the present invention. As shown in FIG. 3A, the power adjustment method in this embodiment is as follows.
  • the power control of the PUCCH is exemplified.
  • the UE receives the DCI format 1 A/1 B/1 D/1/2A/2B/2C/2/3 that is sent by the base station and carries the TPC command word (that is, the PUCCH power control command word).
  • the first condition is DCI format
  • step 302 can be exemplified as follows:
  • the step 203 may be specifically:
  • the time information of /2B/2C/2/3 is subframe N, and when N is an odd number, the UE determines that the power control value may be -3 dB; when N is an even number, the UE determines that the power control value may be 3 dB At this time, it can be ensured that the positive and negative numbers mapped to the power control command word in the TPC command word are completely symmetrical, thereby avoiding
  • the PDCCH false alarm or misdetection causes the transmission power of the PUCCH of the UE to be unnecessarily too high or too low.
  • the power control value may be determined to be 3 dB.
  • the UE determines that the power control value may be -3 dB. This embodiment is for illustrative purposes only and is not limited thereto.
  • the first condition is based on the PDCCH Candidate location information defined in the 3GPP TS36.213 protocol, that is, ⁇ / ” ⁇ receives the DCI format containing the power control command word of the PUCCH as the starting point
  • step 302 can be exemplified as follows:
  • the parameter m′ is an odd number, and the UE determines the power control value.
  • the parameter m' is an even number, the UE determines that the power control value may be 3 dB; or the parameter m' is an odd number, the UE determines that the power control value may be 3 dB; the parameter m' is an even number, the UE The power control value can be determined to be -3 dB.
  • the manner of determining the power control value is as follows: If the UE receives the DCI format 1A, where
  • Localized/Distributed VRB assignment flag 1
  • the UE determines the power control
  • the UE determines that the power control value can be 3 dB;
  • the foregoing step 302 can be as follows:
  • the power control value is determined to be OdB or reserved.
  • the foregoing step 302 can be as follows:
  • the indication information indicating the power control value sent by the base station may be indicating that the UE is in the TPC
  • the power control value is OdB or reserved. After receiving the indication information, the UE determines that the power control value is OdB or reserved. Otherwise, the power control value is 3dB according to the LTE Re1 -1 specification.
  • the indication information in the step may be that the second message carrying the indication information is separately sent, which is not limited in this embodiment.
  • the foregoing power adjustment method may further include the following step 303.
  • the UE adjusts a transmit power of the PUCCH according to the determined power control value (3 dB or -3 dB) to send the PUCCH.
  • the rising power value and the falling power value of the UE cancel each other in a certain accumulation time, thereby solving the PDCCH false alarm or the wrong detection in the prior art.
  • the problem that the UE power is unnecessarily excessive or too low is accumulated, thereby reducing power waste and reducing interference to other UEs' uplink channels.
  • FIG. 4 is a schematic flowchart diagram of a power adjustment method according to an embodiment of the present invention, as shown in FIG.
  • the power adjustment method in this embodiment is as follows.
  • the power control in this embodiment is applicable to both PUCCH and PUSCH.
  • the first condition may be one of the following conditions:
  • the indication information indicating the power control value sent by the base station is not limited to the following information:
  • the receiving UE sends the PUSCH transmit power according to the determined power control value.
  • the receiving UE sends the PUCCH transmit power according to the determined power control value.
  • the foregoing method further includes a step 401 a, which is not shown in the following figure, and the step 401 a is before the step 401.
  • the base station sends a first message to the UE, where the first message is used to indicate that a power control of the PUSCH in the UE uses an accumulation mode, so that the UE is to be used according to the first message.
  • the UE determines a power control value corresponding to the power control command domain according to the first condition.
  • the following example illustrates how the UE determines the power control value corresponding to the power control command domain according to the first condition when the first condition is different.
  • N is an odd number and M is an even number; or, N is an even number and M is an odd number.
  • the step 401 determines that the UE determines according to the first condition.
  • N is an odd number, M is an even number; or, N is an even number, and M is an odd number;
  • ⁇ * is the number of control channel elements CCE in the subframe numbered *
  • /_ is the number of CCEs included in the current aggregation level of the PDCCH
  • the RNTI is the identity of the UE.
  • the power control value can include:
  • N 0, M is 1; or, N is 1, M is 0;
  • N is all 0, M is all 1; or, N is all 1, M is all 0.
  • any one of the above bits includes: a localized VRB assignment flag, a distributed virtual resource indication (shorted VRB) The assignment flag), or the frequency hopping flag, etc., is only an example and is not limited.
  • the foregoing step 401 is performed.
  • the power adjustment method in the foregoing embodiment can solve the problem of excessive accumulation of UE power due to PDCCH false alarm or misdetection in the prior art, thereby reducing power waste and reducing uplink channels to other UEs. interference.
  • the probability distribution of up- and down-down in the actual application may be the same.
  • the existing PDCCH is up-regulated to 1 dB and 3 dB in the accumulation mode, and the down-regulation only supports -1 dB, and the up-and-down is not equal, thus the UE transmits each
  • the TTI performs 44 blind detection PDCCHs.
  • the PDCCH false alarm or misdetection is accumulated for a long time (such as 1 s, 3s, or 5s)
  • the UE's transmit power is unnecessarily increased.
  • the peer-to-peer distribution is adjusted up and down, and thus the problem that the power of the UE is too high or too low is not caused.
  • the user equipment in this embodiment includes: a receiving unit 51 and a determining unit 52;
  • the receiving unit 51 is configured to receive a DCI that is sent by the base station and that carries the TPC command word.
  • the determining unit 52 is configured to determine, according to the power control command field and the first condition in the TPC command word, the corresponding to the power control command field. Power control value.
  • the determining unit is specifically configured to use the DCI received by the receiving unit 51.
  • the power control value corresponding to the power control command field is determined according to the first condition.
  • the first condition described above may be any one of the following:
  • the receiving unit 51 receives time information of the DCI
  • the value is -3dB;
  • N is an odd number and M is an even number; or, N is an even number and M is an odd number.
  • the PDCCH candidate location information is +0 touch (1 ⁇ ⁇ ⁇ / ” ⁇ + , and the parameter m is M, it is determined to correspond to the power control command domain.
  • the power control value is -3d B;
  • N is an odd number, M is an even number; or, N is an even number, and M is an odd number;
  • ⁇ * is the number of control channel elements CCE in the subframe numbered *
  • the RNTI is the identity of the UE.
  • the receiving unit is further configured to: receive the first message sent by the base station, where the first message carries the indication in the UE The power control of the PUSCH is in the accumulation mode;
  • the determining unit 52 is specifically configured to use a cumulative mode for power control of the PUSCH in the UE, and a power control command in the TPC command word of downlink control information received by the receiving unit.
  • the domain is 3
  • the UE determines a power control value corresponding to the power control command domain according to the first condition.
  • the foregoing user equipment further includes an adjustment unit 53 not shown in the figure, where the adjustment unit 53 is configured to determine, according to the TPC command word that the TPC command word is a PUSCH corresponding to the PUSCH.
  • the power control value adjusts the transmit power of the PUSCH;
  • the transmit power of the PUCCH is adjusted according to the determined power control value.
  • the user equipment in the foregoing embodiment can solve the problem that the user equipment is not excessively high or too low due to false alarm or misdetection of the PDCCH in the prior art, thereby reducing power waste and reducing other UEs.
  • the interference of the upstream channel can be used to solve the problem that the user equipment is not excessively high or too low due to false alarm or misdetection of the PDCCH in the prior art, thereby reducing power waste and reducing other UEs.
  • each functional unit is only an example.
  • the foregoing functions may be allocated according to requirements, such as configuration requirements of corresponding hardware or convenience of implementation of software.
  • Different functional units are completed, that is, the internal structure of the user equipment is divided into different functional units to complete all or part of the functions described above.
  • the corresponding functional units in this embodiment may be implemented by corresponding hardware, or may be executed by corresponding hardware.
  • the foregoing sending unit may have the function of executing the foregoing sending unit.
  • the hardware such as a transmitter, may also be a general processor or other hardware device capable of executing a corresponding computer program to perform the foregoing functions; and the determining unit as described above may be hardware having a function of executing the determining unit, such as a processor. It may also be another hardware device capable of executing the corresponding computer program to: - (the various embodiments provided in this specification apply the above described principles).
  • the user equipment may include a processor and a memory, where the processor is configured to receive downlink control information that is sent by the base station and carries a transmission power control TPC command word; and, for receiving at the receiving unit, In the TPC command word of the downlink control information
  • the power control command field is 3, determining a power control value corresponding to the power control command domain according to the first condition;
  • the storage condition is used to store the first condition.
  • the first condition may be: time information of the downlink control information received by the processor; or PDCCH candidate location information; or: non-TPC in the downlink control information The information of the command word; or the power control value preset in the user equipment; or the indication information of the power control value sent by the base station and sent by the processor.
  • the memory is configured to store a preset power control value of 0 dB or reserved.
  • the processor of the user equipment receives the downlink control information that is sent by the base station and carries the TPC command word, and is in the TPC command word.
  • another aspect of the embodiment of the present invention further provides a user equipment.
  • the user equipment includes a bus, a processor, and a memory, and the processor and memory are mounted on the bus.
  • the memory is used to store the code of the steps performed by the user equipment in the power adjustment method of any of Figures 1 - 4.
  • the processor is configured to read the code stored in the memory through the bus, and perform the action of the user equipment in the power adjustment method described in any of FIGS. 1 - 4.
  • the user equipment in the foregoing embodiment can solve the problem that the user equipment in the prior art may cause unnecessary accumulation of UE power due to PDCCH false alarm or misdetection, thereby reducing power waste and reducing uplink channels to other UEs. interference.
  • an embodiment of the present invention further provides a base station.
  • the base station includes an obtaining unit 60 and a sending unit 61.
  • the obtaining unit 60 is configured to acquire downlink control information that carries a transmission control TPC command word.
  • the sending unit 61 is configured to send the downlink control information to the user equipment UE, so that the UE is configured according to the TPC command word.
  • the power control command field and the first condition determine a power control value corresponding to the power control command domain.
  • the first condition is:
  • the sending unit 61 sends the time information of the downlink control information; or the physical downlink control channel PDCCH candidate location information carried in the downlink control information; or
  • the indication information indicating the power control value sent by the sending unit 61 is not limited to the power control value sent by the sending unit 61.
  • the base station in this embodiment may further include a receiving unit 62.
  • the receiving unit 62 is configured to: when the TPC command word is a TPC command word corresponding to the PUSCH, receive a PUSCH that is sent by the UE after adjusting the transmit power of the PUSCH according to the determined power control value; or When the TPC command word is a TPC command word corresponding to the PUCCH, after receiving the UE, adjusting the transmit power of the PUCCH according to the determined power control value,
  • the foregoing sending unit 61 is further used to
  • the first message carries a power control processing accumulation mode indicating a physical uplink shared channel (PUSCH) in the UE, so that the UE sends the UE according to the first message.
  • the power control of the PUSCH uses an accumulation mode, and when the power control command field of the TPC command word received by the receiving unit is 3, it is determined to correspond to the power control command domain according to the first condition. Power control value.
  • the base station in this embodiment causes the user equipment to be in accordance with the DCI sent by the sending unit.
  • the TPC command word and the first condition determine a power control value corresponding to the power control command field in the TPC command word, and the symmetry of the positive (3dB) and negative (-3dB) power control values can be achieved; that is, the existing In the technology, the up-regulation (1 dB, 3 dB) and the down-regulation (-1 dB) of the power control value in the accumulation mode are not equal.
  • the equal-and-down distribution is up- and down-adjusted, and the same probability occurs in the up- and down-down.
  • the problem that the user equipment is not excessively high or too low in the UE power due to false alarm or misdetection of the PDCCH in the prior art may be solved, thereby reducing power waste and reducing uplink to other UEs.
  • Channel interference
  • each functional unit is merely an example. In actual applications, the foregoing function allocation may be different according to requirements, such as configuration requirements of corresponding hardware or convenience of implementation of software.
  • the functional unit is completed, that is, the internal structure of the base station is divided into different functional units to complete all or part of the functions described above.
  • the corresponding functional units in this embodiment may be implemented by corresponding hardware, or may be executed by corresponding hardware.
  • the foregoing sending unit may have the function of executing the foregoing sending unit.
  • Hardware such as a transmitter, may also be a general processor or other hardware device capable of executing a corresponding computer program to perform the aforementioned functions;
  • the receiving unit as described above may be hardware having the function of performing the foregoing receiving unit, such as a receiver, or a general processor or other hardware device capable of executing a corresponding computer program to perform the foregoing functions; (The various embodiments provided in the present specification) The above described principles can be applied).
  • the base station may include a processor and a memory, where the processor is configured to send downlink control information for controlling the transmit power of the uplink channel of the UE to the user equipment UE, if the transmit power carried in the downlink control information Controlling the power control command field of the TPC command word is 3, so that the UE determines a power control value corresponding to the power control command domain according to the first condition;
  • the first condition is: time information of the downlink control information sent by the processor; or PDCCH candidate location information carried in the downlink control information; or
  • the indication information sent by the processor indicating a power control value.
  • the memory is used to store information about the UE to be transmitted in the processor, such as the downlink control information for controlling the transmission power of the uplink channel of the UE, or the foregoing indication information for indicating the power control value. .
  • another aspect of the embodiment of the present invention further provides a base station.
  • the base station includes a bus, a processor, and a memory, and the processor and memory are mounted on the bus.
  • the memory is used to store code for the steps performed by the base station in the power adjustment method of any of Figures 1 - 4.
  • the processor is configured to read the code stored in the memory through the bus and perform the action of the base station in the power adjustment method of any of Figures 1 - 4.
  • the base station in this embodiment can solve the problem that the user equipment in the prior art may cause excessive or too low accumulation of UE power due to PDCCH false alarm or misdetection, thereby reducing power waste and reducing other resources. Interference of the uplink channel of the UE.
  • the present invention further provides a communication system, comprising: the user equipment according to any one of the foregoing embodiments, and the base station according to any one of the foregoing embodiments, where the user equipment and the base station communicate .
  • the aforementioned program can be stored in a computer readable storage medium.
  • the foregoing storage medium includes: a medium that can store program codes, such as a ROM, a RAM, a magnetic disk, or an optical disk.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本发明提供一种功率调整方法及系统、基站和用户设备,其中,所述方法包括:UE接收基站发送的承载有传输功率控制TPC命令字的下行控制信息,所述UE根据所述TPC命令字和第一条件确定与所述功率控制命令域对应的功率控制值,其中,所述第一条件为:所述UE接收所述下行控制信息的时间信息;或者,物理下行控制信道PDCCH候选位置信息;或者,所述下行控制信息中的非TPC命令字的信息;或者,所述UE中预设的功率控制值,或者,所述基站发送的用于指示功率控制值的指示信息。上述方法可以解决现有技术中由于PDCCH虚警或错检会导致UE功率不必要的过高或过低的累积的问题。

Description

功率调整方法及系统、 基站和用户设备
技术领域 本发明实施例涉及通信领域, 尤其涉及一种功率调整方法及系统、 基 站和用户设备。 背景技术
在 3GPP长期演进( Long Term Evolution; 简称: LTE ) 中现有物理 上行共享信道(Physical Uplink Shared Channel; 简称: PUSCH ) 上行 功率控制算法采用结合开环功率控制和闭环功率控制的方式, 其中功率控 制按移动台 /终端和基站是否同时参与分为开环功率控制和闭环功率控制。 当前大多采用闭环功率控制补偿开环功率控制的误差用以达到精确控制 频分双工 ( Frequency Division Duplexing , 简称 FDD )模式下的信道衰 落。
对于 PUSCH的传输, 考虑到控制信令开销, 使用 2bit的传输功率控 制 ( Transmit Power Control , 简称 TPC )命令来表示闭环功率控制, 分 别为累积模式和绝对模式。 当前, 在累积模式下, TPC命令字往上调支持 1 dB和 3dB, 即功率在上次发生功率的基础上可上调 1 dB或 3dB,往下调 仅支持 -1 dB, 即功率在上次发生功率的基础上下降 -1 dB。 好处是当信道状 况或其它条件发生变化时 ,可以快速提高 U E发射功率从而适应信道状况。
由于物理下行控制信道 ( Physical Downlink Control Channel , 简称 PDCCH )仅采用 16比特循环冗余校验( Cyclic Redundancy Check, 简 称 CRC ) , 且 UE每传输时间间隔 (Transmission Time Interval , 简称 TTI , 单位 ms ) 进行最大 44次盲检测 PDCCH , 故当累积较长时间时, 比如 1 s,发生虚警或错检的概率会大大提高, 这里虚警可理解为基站没有 发送某个 PDCCH , 而 UE检测到该 PDCCH。 由于累积模式中 4个码点 的地位相同, 可以 殳设 TPC Command Field (TPC控制命令域: 0、 1、 2 或 3)发生虚警的概率相同, 观察到在累积模式下往上调支持 1 dB和 3dB, 往下调仅支持 -1 dB, 那么统计一定时间的累积, 由于 PDCCH虚警或错检 会导致 UE功率不必要的提高, 会造成不必要的功率浪费, 以及对上行信 道的干扰从而影响上行性能。 发明内容
有鉴于此,本发明实施例提供一种功率调整方法及系统、基站和用户设 备, 用以解决现有技术中由于 PDCCH虚警或错检会导致 UE功率不必要的 过高或过低的累积的问题。
第一方面, 本发明实施例提供一种功率调整方法, 包括:
用户设备 UE接收基站发送的承载有传输功率控制 TPC命令字的下 行控制信息;
所述 UE根据所述 TPC命令字中的功率控制命令域和第一条件确定 与所述功率控制命令域对应的功率控制值;
其中, 所述第一条件为:
所述 UE接收所述下行控制信息的时间信息; 或者,
物理下行控制信道 PDCCH候选位置信息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者,
所述 UE中预设的功率控制值, 或者,
所述基站发送的用于指示功率控制值的指示信息。
结合第一方面, 在第一种可能的实现方式中, 所述 UE根据所述 TPC 命令字中的功率控制命令域和所述第一条件确定与所述功率控制命令域 对应的功率控制值, 包括:
在所述 TPC命令字中的功率控制命令域为 3时, 所述 UE根据所述 第一条件确定与所述功率控制命令域对应的功率控制值。
结合第一种可能实现方式, 在第二种可能的实现方式中, 所述 UE接 收基站发送的承载有 TPC命令字的下行控制信息之前, 还包括:
所述 UE接收所述基站发送的第一消息, 所述第一消息用于指示所述 UE中的物理上行共享信道 PUSCH的功率控制使用累积模式;
相应地, 在所述 TPC命令字中的功率控制命令域为 3时, 所述 UE 根据第一条件确定与所述功率控制命令域对应的功率控制值, 具体为: 在所述 UE中的所述 PUSCH的功率控制使用累积模式之后, 且在所 述 TPC命令字中的功率控制命令域为 3时, 所述 UE根据第一条件确定 与所述功率控制命令域对应的功率控制值。
结合第一方面以及上述可能的实现方式, 在第三种可能的实现方式 中,
所述第一条件为: 所述 UE接收所述下行控制信息的时间信息时, 所 述 UE根据所述第一条件确定与所述功率控制命令域对应的功率控制值, 包括:
所述下行控制信息的时间信息为子帧 N, 则所述 UE确定与所述功率 控制命令域对应的功率控制值为 3dB;
所述下行控制信息的时间信息为子帧 M, 则所述 UE确定与所述功率 控制命令域对应的功率控制值为 -3d B;
N为奇数, M为偶数; 或者, N为偶数, M为奇数。
结合第一方面、 第一种或第二种可能的实现方式中, 在第四种可能的 实现方式中, 所述第一条件为: 所述 PDCCH候选位置信息时, 所述 UE 根据所述第一条件确定与所述功率控制命令域对应的功率控制值, 包括: 若所述 PDCCH候选位置信息为 £ {( + )111()(1^^' 」}+ ,且在所述 参数 m'为 N, 若 所述 PDCCH
Figure imgf000004_0001
m' 为 M, 则确定与所述功率控制命令域对应的功率控制值为 -3dB;
N为奇数, M为偶数; 或者, N为偶数, M为奇数;
其中,
wCCE,*为编号为 / 的子帧中控制信道单元 CCE的数目;
'=0,…, -1, /_为 PDCCH当前聚合级别包含的 CCE数目;
m' = m + MdnCI , "C/为载波指示, m = 0,---,M(L) -I ^ Yk = (A-Y^) mod D ? Υ_ = Wrnti≠ 0 ^ ^ = 3 827 , Z) = 65537 ; 当" C/存在时, "C/的取值为 0至 7中任意一个整数; 当 "C不存在时, m' = m ',
无线网络临时标识 RNTI为 UE的标识。
结合第一方面、 第一种和第二种可能的实现方式中, 在第五种可能的 实现方式中, 所述第一条件为: 所述下行控制信息中的非 TPC命令字的 信息时, 所述 UE根据所述第一条件确定与所述功率控制命令域对应的功 率控制值, 包括:
若所述下行控制信息中的非 TPC命令字的信息中任意一个比特为 N , 则确定与所述功率控制命令域对应的功率控制值为 3d B;
若所述下行控制信息中的非 TPC命令字的信息中的任意一个比特为 M , 则确定与所述功率控制命令域对应的功率控制值为 -3dB;
N为 0, M为 1 ; 或者, N为 1 , M为 0。
结合第五种可能的实现方式中, 在第六种可能实现方式中, 所述任意 一个比特用于指示集中式虚拟资源指示, 分布式虚拟资源指示, 或者频率 跳频指示。
结合第一方面、 第一种或第二种可能实现方式, 在第七种可能的实现 方式中, 所述预设的功率控制值为 O dB或者保留。
结合第一方面、 第一种或第二种可能实现方式, 在第八种可能的实现 方式中, 所述基站发送的用于指示功率控制值的指示信息为指示所述功率 控制值为 O dB或者保留, 则所述 UE根据所述指示信息确定与所述功率 控制命令域对应的功率控制值为 0 dB或者保留。
结合第一方面以及上述任一可能的实现方式中, 在第九种可能的实现 方式中, 功率调整方法还包括:
在所述 TPC命令字为 PUSCH对应的 TPC命令字时, 所述 UE根据 所述确定的功率控制值调整所述 PUSCH的发射功率;
或者,
在所述 TPC命令字为 PUCCH对应的 TPC命令字时, 所述 UE根据 所述确定的功率控制值调整所述 PUCCH的发射功率。
第二方面, 本发明实施例提供一种功率调整方法, 包括:
基站获取承载有传输控制 TPC命令字的下行控制信息;
所述基站向用户设备 UE发送所述下行控制信息, 以使得所述 UE根 据所述 TPC命令字的功率控制命令域和第一条件确定与所述功率控制命 令域对应的功率控制值;
其中, 所述第一条件为:
所述 UE接收所述下行控制信息的时间信息; 或者,
物理下行控制信道 PDCCH候选位置信息; 或者, 所述下行控制信息中的非 TPC命令字的信息; 或者,
所述 UE中预设的功率控制值; 或者,
所述基站发送的指示功率控制值的指示信息。
结合第二方面, 在第一种可能的实现方式中, 所述 UE根据所述 TPC 命令字中的功率控制命令域和所述第一条件确定与所述功率域对应的功 率控制值, 包括:
在所述 TPC命令字中的功率控制命令域为 3时, 所述 UE根据所述 第一条件确定与所述功率控制命令域对应的功率控制值。
结合第一种可能的实现方式, 在第二种可能实现方式中, 所述基站向 UE发送用于控制所述 UE的上行信道的发送功率的下行控制信息之前, 还包括:
所述基站向所述 UE发送第一消息, 所述第一消息用于指示所述 UE 中的物理上行共享信道 PUSCH的功率控制使用累积模式, 以使所述 UE 根据所述第一消息将所述 UE中的所述 PUSCH的功率控制使用累积模式, 且在在 TPC命令字中的功率控制命令域为 3时, 根据所述第一条件确定 与所述功率控制命令域对应的功率控制值。
第三方面, 本发明实施例还提供一种用户设备, 包括:
接收单元, 用于接收基站发送的承载有传输功率控制 TPC命令字的 下行控制信息;
确定单元, 用于根据所述 TPC命令字中的功率控制命令域和第一条 件确定与所述功率控制命令域对应的功率控制值;
其中, 所述第一条件为:
所述接收单元接收所述下行控制信息的时间信息; 或者,
物理下行控制信道 PDCCH候选位置信息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者,
用户设备中预设的功率控制值; 或者,
所述接收单元接收的所述基站发送的指示功率控制值的指示信息。 结合第三方面, 在第一种可能的实现方式中, 所述确定单元具体用于 在所述接收单元所接收到的下行控制信息的所述 TPC命令字中的功率控 制命令域为 3时,根据所述第一条件确定与所述功率控制命令域对应的功 率控制值
结合在第一种可能的实现方式中, 在第二种可能实现方式中, 所述接 收单元还用于接收所述基站发送的第一消息, 所述第一消息用于指示所述
UE中的物理上行共享信道 PUSCH的功率控制使用累积模式;
相应地, 所述确定单元, 具体用于
在所述 UE中的所述 PUSCH的功率控制使用累积模式, 且在所述接 收单元所接收的下行控制信息的所述 TPC命令字中的功率控制命令域为 3时, 所述 UE根据第一条件确定与所述功率控制命令域对应的功率控制 值。
结合第三方面以及上述可能的实现方式中, 在第三种可能的实现方式 中, 上述用户设备还包括:
调整单元,用于在所述 TPC命令字为 PUSCH对应的 TPC命令字时, 根据所述确定的功率控制值调整所述 PUSCH的发射功率;
或者,
在所述 TPC命令字为 PUCCH对应的 TPC命令字时, 根据所述确定 的功率控制值调整所述 PUCCH的发射功率。
第四方面, 本发明实施例还提供一种基站, 包括:
获取单元, 用于获取承载有传输控制 TPC命令字的下行控制信息; 发送单元, 用于向用户设备 UE发送所述下行控制信息, 以使得所述 UE根据所述 TPC命令字的功率控制命令域和第一条件确定与所述功率控 制命令域对应的功率控制值;
其中, 所述第一条件为:
所述发送单元发送所述下行控制信息的时间信息; 或者,
所述下行控制信息中携带的物理下行控制信道 PDCCH候选位置信 息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者,
所述 UE中预设的功率控制值; 或者,
所述发送单元发送的指示功率控制值的指示信息。
结合第四方面, 在一种可能的实现方式中, 所述发送单元还用于 向所述 UE发送第一消息, 所述第一消息用于指示所述 UE中的物理 上行共享信道 PUSCH的功率控制使用累积模式, 以使所述 UE根据所述 第一消息将所述 UE中的所述 PUSCH的功率控制使用累积模式, 且在所 述接收单元所接收到的所述 TPC命令字的功率控制命令域为 3时, 所述 UE根据所述第一条件确定与所述功率控制命令域对应的功率控制值。
第五方面, 本发明实施例还提供一种通信系统, 包括上述任一所述的 用户设备和任一所述的基站, 所述用户设备和所述基站通信。
由上述技术方案可知, 本发明实施例的功率调整方法及系统、 基站和 用户设备, 使得 UE可根据 TPC命令字中的功率控制命令域和第一条件 确定与功率控制命令域对应的功率控制值, 进而在一定的统计时间内 UE 不会由于 PDCCH虚警或错检会导致 UE功率不必要的过高或过低的累积的 问题。 附图说明
为了更清楚地说明本发明的技术方案, 下面将对实施例中所需要使用的 附图作一简单地介绍, 显而易见地: 下面附图只是本发明的一些实施例的附 图, 对于本领域普通技术人员来讲, 在不付出创造性劳动性的前提下, 还可 以根据这些附图获得同样能实现本发明技术方案的其它附图。
图 1为本发明一实施例提供的功率调整方法的流程示意图;
图 2A和图 2B为本发明另一实施例提供的功率调整方法的流程示意图; 图 3A和图 3B为本发明另一实施例提供的功率调整方法的流程示意图; 图 4为本发明另一实施例提供的功率调整方法的流程示意图;
图 5为本发明另一实施例提供的用户设备的结构示意图;
图 6为本发明另一实施例提供的基站的结构示意图。 具体实施方式
为使本发明的目的、 技术方案和优点更加清楚, 下面将结合本发明实 施例中的附图, 对本发明的技术方案进行清楚、 完整地描述。 显然, 下述 的各个实施例都只是本发明一部分的实施例。 基于本发明下述的各个实施 例, 本领域普通技术人员即使没有作出创造性劳动, 也可以通过等效变换 部分甚至全部的技术特征, 而获得能够解决本发明技术问题, 实现本发明 技术效果的其它实施例, 而这些变换而来的各个实施例显然并不脱离本发 明所公开的范围。
本发明实施例可适用于长期演进( Long Term Evolution;简称: LTE )。 对于 PUSCH的传输, 考虑到控制信令开销, 使用 2bit的 TPC命令 来表示闭环功率控制, 分别为累积模式和绝对模式。 对于累积模式, 2bit 的形成的 4个码点对应功率控制值为 [-1 ,0, 1 , 3]dB,而绝对模式的 4个码点 对应的功率控制值为 [-4,-1 , 1 ,4] dB。
目前, 下行控制信息 ( Downlink Control Information , 简称 DCI ) format 0/3/4来作为上行 PUSCH的调度授权, 至少包含 TPC命令字, 其
TPC命令字和功率调整的映射关系如表 1所示。
表 1 PUSCH对应 TPC命令字和功率调整映射关系
Figure imgf000009_0001
由上表格 1可以看出, DCI中承载的 TPC命令字往上调支持 1 dB和 3dB,即功率在上次发射功率的基础上上调 1 dB或 3dB,往下调支持 -1 dB, 即功率在上次发射功率的基础上下降 -1 dB。 累积模式下 UE中 PUSCH的 传输方案是可以快速提高 UE发射功率从而适应信道状况。
上行 PUSCH对应功率控制命令字在 PDCCH DCI format 0/3/4上承 载, UE根据 3GPP TS36.213的规定盲检测 PDCCH DCI formant 0/3/4, 分为 UE搜索区和公共搜索区, 共分为 4个聚合级别, 如表 2所示。
表 2 UE检测的 PDCCH Candidate (搜索空间 ) Search space k Number of
PDCCH
Aggregation level candidates
Size [in
Type (类型)
(聚合级别) CCEs] ( PDCCH候选
位置)
1 6 6
UE-specific 2 12 6
( UE搜索区) 4 8 2
8 16 2
Common (公 4 16 4
共搜索区) 8 16 2
UE共进行最大 44次盲检, 其检测位置为控制信道单元( CCE )通过 逻辑编号后, 搜索集合包含 4个聚合级别, 每个聚合级别满足
其中, Sk L、=L 觸 4 / 」卜 ; 其中, ^*为编号为 / 的子帧中控制信道单元 CCE的数目;
'=0,…, -1, /_为 PDCCH当前聚合级别包含的 CCE数目;
m' = m + M、L、 ·ηα , "C/为载波指示, m = 0,---,M(L) -1 ? Yk =(A-Yk_l)modD ^ Υ_χ = Wrnti≠ 0 ^ ^4 = 39827 , Z) = 65537 ; 当" C/存在时, "C/的取值为 0至 7中任意一个整数; 当 "C/不存在时, m' = m ',
小区无线网络临时标 f、( Radio Network Temporary Identifier, RNTI ) 为 UE的标识。
由于 PDCCH仅采用 16比特 CRC, 且 UE每 TTI ( ms )进行最大 44 次盲检测 PDCCH, 故而当累积较长时间时, 比如 1s, 发生虚警或错检的 概率会大大提高, 这里虚警可理解为基站没有发送某个 PDCCH, 而终端 检测到该 PDCCH。 由于 4个码点的地位相同, 可以假设 TPC Command Field (即 0,1, 2, 3)发生虚警的概率相同, 观察到在累积模式下往上调支持 1dB和 3dB, 往下调仅支持 -1dB, 那么经过长时间的累积, 由于 PDCCH 虚警或错检会导致 UE功率不必要的提高, 从这段累计的时间上总体看, 会造成 UE不必要的功率浪费,以及对上行信道的干扰从而影响上行性能。 例如, 对于 UE, 接收到 TPC命令字中的功率控制命令域为 0,1 ,2,3在累 计时间上的概率是相同的, 对于 TPC命令字为 0 (对应累积模式为 -1 dB ) 和 TPC命令字为 2 (对应累积模式为 1 dB )从整个累积时间看得效果是相 互抵消的, 而 TPC命令字为 3 (对应 3dB )从整个累积时间总体效果看, 无法被抵消, 从而在虚警或错检发生时, 使得 UE的功率一直上升, 而造 成不必要的浪费。
另外, 对于 PUCCH的功率控制, LTE支持累积模式, 其 PUCCH对 应 TPC命令字和功率调整映射关系如表 3所示。 同样地, 由于 PDCCH 虚警或错检, 可能产生 PUCCH功率不必要的提高, 到一定程度后造成不 必要的功率浪费, 以及对上行信道的干扰从而影响上行性能。
表 3 PUCCH对应 TPC命令字和功率调整映射关系
Figure imgf000011_0001
为此, 本发明实施例中, 提供一种功率调整方法, 使得不会由于
PDCCH虚警或错检, 造成对 UE PUSCH发射功率不必要的过高或者过 低的累积。 例如, 在虚警或错检发生时, 可以使 TPC命令字中功率控制 命令字映射到的正数(3dB ) 和负数(-3dB ) 完全对称, 则可以避免由于 PDCCH虚警或错检, 在整个累积时间从整体效果上看, UE上升的功率 和下降的功率抵消, 从而不会造成对 UE PUSCH发射功率不必要的过高 或者过低的累积。
图 1示出了本发明一实施例提供的功率调整方法的流程示意图, 如图 1所示, 本实施例中的功率调整方法如下文所述。
101、 UE接收基站发送的承载有 TPC命令字的下行控制信息。 102、 所述 UE根据所述 TPC命令字中的功率控制命令域和第一条件 确定与所述功率控制命令域对应的功率控制值
可选的,在 TPC命令字中的功率控制命令域为 3(即 TPC Command Field=3) 时, UE根据第一条件确定与 TPC Command Field=3对应的功 率控制值。
举例来说, 本实施例中的第一条件可以为下述条件中的一种:
UE接收 DCI的时间信息;
PDCCH候选位置信息 (PDCCH Candidate位置信息) ;
DCI中的非 TPC命令字的信息;
所述 UE中预设的功率控制值;
接收所述基站发送的指示功率控制值的指示信息。
举例来说, 在一种可能的实现方式中, 若第一条件为 UE接收 DCI的 时间信息时, 步骤 102可包括:
在 DCI中的 TPC Command Field=3时,若 DCI的时间信息为子帧 N, 则 UE确定与 TPC Command Field=3对应的功率控制值为 3dB;
若 DCI的时间信息为子帧 M, 则 UE确定与 TPC Command Field=3 对应的功率控制值为 -3d B;
N为奇数, M为偶数; 或者, N为偶数, M为奇数。
在第二种可能的实现方式中, 若第一条件为 UE接收的 DCI中的 PDCCH候选位置信息时, 步骤 102可包括:
在 DCI中的 TPC Command Field=3时, PDCCH候选位置信息为 + 觸 dLNc^/ 」}", 且在参数 m,为 N, 则所述 UE确定与 TPC
Command Field=3对应的功率控制值为 3dB;
在 DCI中的 TPC Command Field=3时, PDCCH候选位置信息为 ^ + ^ ^^,且在所述参数^ 为 M,则所述 UE确定与 TPC
Command Field=3对应的功率控制值为 -3dB;
N为奇数, M为偶数; 或者, N为偶数, M为奇数;
其中, ^*为编号为 / 的子帧中控制信道单元 CCE的数目;
' =0,…, -1, /_为 PDCCH当前聚合级别包含的 CCE数目;
m' = m + ML、.nCI , "C/为载波指示, m = 0,--;MiL)-l ^ Yk =(A-Yk_l)modD 0 , ^ = 39827 , Z) = 65537 ; 当" C/存在时, "C/的取值为 0至 7中任意一个整数; 当 "C不存在时, m' = m ',
小区无线网络临时标 f、( Radio Network Temporary Identifier, RNTI ) 为 UE的标识。
在第三种可能的实现方式中, 若第一条件为 DCI中的非 TPC命令字 的信息, 步骤 102可包括:
在 DCI中的 TPC Command Field=3时 , 若 DCI中的非 TPC命令字 的信息中任意一个比特为 N , 则所述 UE确定与 TPC Command Field=3 对应的功率控制值为 3dB;
若 DCI中的非 TPC命令字的信息中任意一个比特为 M , 则所述 UE 确定与 TPC Command Field=3对应的功率控制值为 -3dB;
N为 0, M为 1 ; 或者, N为 1 , M为 0。
特别地, N和 M可为任意一个码点, 此时, N可为全 1 , M可为全 0; 或者, N可为全 0, M可为全 1。
举例来说, 上述的任意一个比特可包括: 集中式虚拟资源指示
( Localized VRB assignment flag ) , 分布式虚拟资源指示 ( Distributed VRB assignment flag ) , 或者频率兆频指示 ( Frequency hopping flag ) 等, 本实施例仅为举例说明, 不对其进行限制。
在第四种可能的实现方式中,若第一条件为 UE中预设的功率控制值; 步骤 102可具体为:
在 DCI中的 TPC Command Field=3时, 所述 UE确定与 TPC
Command Field=3对应的功率控制值为 OdB或保留 ( reserved ) 。 应了 解的是, 网络侧和 UE均获知 "保留" 的含义。 该保留可理解为该 TPC 功率控制命令域没有含义。
在第五种可能的实现方式中, 若第一条件为 UE接收的基站发送的指 示功率控制值的指示信息, 该处的指示信息可为基站发送的用于指示功率 控制值为 O dB或者保留, 此时, 步骤 102可具体为:
在 DCI中的 TPC Command Field=3时, UE根据所述指示信息确定 与 TPC Command Field=3对应的功率控制值为 O dB或者保留。
当然, 在实际应用中, 若上述步骤 101 中的下行控制信息中 TPC命 令字为 PUSCH对应的 TPC命令字(即 DCI format 0/3/4), UE根据所述 确定的功率控制值调整 PUSCH的发射功率;
或者,
若所述 TPC命令字为 PUCCH对应的 TPC命令字 (即 DCI format 1 A/1 B/1 D/1 /2A/2B/2C/2/3 ) , UE根据所述确定的功率控制值调整 PUCCH 的发射功率。
应了解的是, 基站 (eNB/NB ) 向用户设备 ( UE )发送的下行控制信 息可以是用于承载上行调度信息的下行控制信息例如: DCI 0/4等, 也可以 是用于承载传输功率控制命令字的下行控制信息例如: DCI 3/3A等。
在通信网络中, 下行物理控制信道(PDCCH ) 用于承载 eNB发给
UE的下行控制信息 (DCI ) , PDCCH是一个共享信道, 所有的 UE都可 以监听到。 因此需要有区分机制, 使 UE知道哪个 DCI是发给该 UE的。 下行控制信息 ( DCI )承载在 PDCCH信道上, 有多种格式, 例如: DCI 0 用于承载上行调度信息; DCI 1/1A/1 B/1 C/1 D/2/2A用于承载下行调度信息; DCI3/3A专用于承载传输功率控制 (TPC )命令字, 可以一次承载多个 UE的公开命令字。
由上述实施例可知, 本实施例的功率调整方法, 在基站发送的下行控 制信息中的 TPC Command Field=3时, 使得 UE可根据第一条件确定与 TPC Command Field=3对应的功率控制值, 在一定的累积时间内, UE 上升的功率值和下降的功率值相互抵消, 可解决现有技术中由于 PDCCH虚 警或错检会导致 UE功率不必要的过高或过低的累积的问题, 进而可以减 少功率浪费, 降低对其他 UE的上行信道的干扰。
图 2A示出了本发明一实施例提供的功率调整方法的流程示意图, 如 图 2A所示, 本实施例中的功率调整方法如下文所述。
本实施例中以 PUSCH的功率控制进行举例说明。
201、 UE接收基站发送的第一消息, 所述第一消息用于指示 UE中的 PUSCH的功率控制使用累积模式,所述 UE根据所述第一消息将所述 UE 中的 PUSCH的功率控制使用累积模式。
202、 UE接收基站发送的承载有 TPC命令字 (即 PUSCH功率控制 命令字) 的 DCI format 0/3/4。 203、 UE在 TPC Command Field=3时, 根据第一条件确定与 TPC Command Field=3对应的功率控制值。
也就是说, 在所述 UE中的所述 PUSCH的功率控制使用累积模式之 后, 且在所述 TPC命令字中的功率控制命令域为 3时, 所述 UE根据第 一条件确定与所述功率控制命令域对应的功率控制值。
在一种应用场景中, 若第一条件为 DCI format 0/3/4的时间信息, 则 步骤 203可具体为:
UE在 TPC Command Field=3时, 基于 DCI format 0/3/4的时间信 息确定与 TPC Command Field=3对应的功率控制值, 例如, DCI format 0/3/4的时间信息为子帧 N ,则 N为奇数时, UE确定功率控制值可为 -3dB; 在 N为偶数时, UE确定功率控制值可为 3dB, 此时可以保证 TPC 命令字中功率控制命令字映射到的正数( 3dB )和负数(-3dB )完全对称, 进而避免由于 PDCCH虚警或错检, 造成对 UE PUSCH发射功率不必要 的过高或者过低的累积。
当然, 上述 N为偶数时, 所述 UE确定功率控制值可为 3dB; 在 N为 奇数时, 所述 UE确定功率控制值可为 -3dB, 本实施例仅为举例说明, 不 对其进行限制。
在第二种应用场景中, 若第一条件为基于 3GPP TS36.213协议中定 义的 PDCCH Candidate位置信息, 即 {
Figure imgf000015_0001
/ 」 }为起点的 位置接收到包含有 PUSCH的功率控制命令字的 DCI format 0/3/4, 则上 述步骤 203可举例如下:
UE在 TPC Command Field=3时,基于 3GPP TS36.213协议中定义 的 PDCCH Candidate位置信息确定与 TPC Command Field=3对应的功 率控制值, 例如, 参数 m'为奇数, 所述 UE确定功率控制值可为 -3dB; 参 数 m'为偶数, 所述 UE确定功率控制值可为 3dB; 或者, 参数 m'为奇数, 所述 UE确定功率控制值可为 3dB; 参数 m'为偶数, 所述 UE确定功率控 制值可为 -3dB;
该处公式中的参数可参照其他实施例中的含义, 该处不再详述。
在第三种应用场景中,若第一条件为非 TPC Command Field的信息, 如下确定功率控制值的方式:若 UE接收到 DCI format 0,其中 Frequency hopping flag=1 , 贝' J所述 UE确定功率控制值可为 -3dB; Frequency hopping flag=0, 则所述 UE确定功率控制值可为 3dB;
或者, Frequency hopping flag=0, 贝' J所述 UE确定功率控制值可为 -3dB; Frequency hopping flag=1 ,贝' J所述 UE确定功率控制值可为 3dB。
在第四种应用场景中, 若第一条件为 UE侧预设的功率控制值, 则上 述步骤 203可举例如下:
UE在 TPC Command Field=3时, 确定功率控制值为 OdB或保留。 在第五种应用场景中, 若第一条件为基站发送的指示功率控制值的指 示信息, 则上述步骤 203可举例如下:
所述基站发送的用于指示功率控制值的指示信息可为指示 UE在 TPC
Command Field=3时, 功率控制值为 OdB或保留, 则 UE在接收到指示 信息之后, 则确定功率控制值为 OdB或保留, 否则, 功率控制值按照 LTE Re1 -1 1规范执行即 3dB。
需要说明的是,该步骤中的指示信息可以是在步骤 201的第一消息中 携带, 也可以单独发送携带指示信息的第二消息等, 本实施例不对其进行 限定。
可选地, 如图 2B所示, 上述功率调整方法还可包括如下的步骤 204。 204、 UE根据确定的功率控制值 (3dB或 -3dB ) 调整 PUSCH的发 射功率, 以发送 PUSCH。
上述实施例中的功率调整方法, 针对 PUSCH的功率控制, 通过功率 控制值的正数和负数的完全对称的分布, 在一定的累积时间内, UE上升 的功率值和下降的功率值相互抵消, 进而可解决现有技术中由于 PDCCH虚 警或错检会导致 UE功率不必要的过高或过低的累积的问题, 进而可以减 少功率浪费, 降低对其他 UE的上行信道的干扰。
图 3A示出了本发明一实施例提供的功率调整方法的流程示意图, 如 图 3A所示, 本实施例中的功率调整方法如下文所述。
本实施例中以 PUCCH的功率控制进行举例说明。
301、 UE接收基站发送的承载有 TPC命令字 (即 PUCCH功率控制 命令字 ) 的 DCI format 1 A/1 B/1 D/1/2A/2B/2C/2/3„
302、 UE在 TPC Command Field=3时, 根据第一条件确定与 TPC Command Field=3对应的功率控制值。
在一种应用场景中, 若第一条件为 DCI format
1A/1 B/1 D/1/2A/2B/2C/2/3的时间信息, 则步骤 302可举例如下:
若第一条件为 DCI format 1 A/1 B/1 D/1/2A/2B/2C/2/3的时间信息, 则 步骤 203可具体为:
UE在 TPC Command Field=3时, 基于 DCI format
1A/1 B/1 D/1/2A/2B/2C/2/3的时间信息确定与 TPC Command Field=3对 应的功率控制值, 例如, DCI format 1A/1 B/1 D/1/2A/2B/2C/2/3的时间信 息为子帧 N , 则 N为奇数时, 所述 UE确定功率控制值可为 -3dB; 在 N 为偶数时, 所述 UE确定功率控制值可为 3dB, 此时可以保证 TPC命令 字中功率控制命令字映射到的正数和负数完全对称, 进而避免由于
PDCCH虚警或错检, 造成对 UE的 PUCCH的发射功率不必要的过高或 者过低的累积。
当然, 上述 N为偶数时, 确定功率控制值可为 3dB; 在 N为奇数时, 所述 UE确定功率控制值可为 -3dB, 本实施例仅为举例说明, 不对其进行 限制。
在第二种应用场景中, 若第一条件为基于 3GPP TS36.213协议中定 义的 PDCCH Candidate位置信息, 即 {
Figure imgf000017_0001
/ 」 }为起点的 位置接收到包含有 PUCCH的功率控制命令字的 DCI format
1 A/1 B/1 D/1 /2A/2B/2C/2/3 , 则上述步骤 302可举例如下:
UE在 TPC Command Field=3时,基于 3GPP TS36.213协议中定义 的 PDCCH Candidate位置信息确定与 TPC Command Field=3对应的功 率控制值, 例如, 参数 m'为奇数, 所述 UE确定功率控制值可为 -3dB; 参 数 m'为偶数, 所述 UE确定功率控制值可为 3dB; 或者, 参数 m'为奇数, 所述 UE确定功率控制值可为 3dB; 参数 m'为偶数, 所述 UE确定功率控 制值可为 -3dB。
上述公式中的参数可参照其他实施例中的含义, 该处不再详述。
在第三种应用场景中,若第一条件为非 TPC Command Field的信息, 如下确定功率控制值的方式: 若 UE接收到 DCI format 1A, 其中
Localized/Distributed VRB assignment flag =1 ,贝' J所述 UE确定功率控制 值可为 -3dB; Localized/Distributed VRB assignment flag =0, 贝' J所述
UE确定功率控制值可为 3dB;
或者, Localized/Distributed VRB assignment flag =0, 贝' J所述 UE确 定功率控制值可为 -3dB; Localized/Distributed VRB assignment flag =1 , 则所述 UE确定功率控制值可为 3dB。
在第四种应用场景中, 若第一条件为 UE侧预设的功率控制值, 则上 述步骤 302可举例如下:
UE在 TPC Command Field=3时, 确定功率控制值为 OdB或保留。 在第五种应用场景中, 若第一条件为基站发送的指示功率控制值的指 示信息, 则上述步骤 302可举例如下:
基站发送的指示功率控制值的指示信息可为指示 UE在 TPC
Command Field=3时, 功率控制值为 OdB或保留, 则 UE在接收到指示 信息之后, 则确定功率控制值为 OdB或保留, 否则, 功率控制值按照 LTE Re1 -1 1规范执行即 3dB。
需要说明的是, 该步骤中的指示信息可以是单独发送携带指示信息的 第二消息, 本实施例不对其进行限定。
可选地, 如图 3B所示, 上述功率调整方法还可包括如下的步骤 303。 303、 UE根据确定的功率控制值 (3dB或 -3dB ) 调整 PUCCH的发 射功率, 以发送 PUCCH。
上述实施例中的功率调整方法, 针对 PUCCH的功率控制, 实在一定 的累积时间内, UE上升的功率值和下降的功率值相互抵消, 进而可解决 现有技术中由于 PDCCH虚警或错检会导致 UE功率不必要的过高或过低 的累积的问题, 进而可以减少功率浪费, 降低对其他 UE的上行信道的干 扰。
图 4示出了本发明一实施例提供的功率调整方法的流程示意图, 如图
4所示, 本实施例中的功率调整方法如下文所述。
本实施例中的功率控制对 PUCCH和 PUSCH均适用。
401、 基站向 UE发送用于控制 UE的上行信道的发送功率的 DCI。 若 DCI中承载的 TPC Command Field=3, 则使得 UE根据第一条件确定 与 TPC Command Field=3对应的功率控制值。 其中, 第一条件可为下述条件中的一种:
UE接收 DCI的时间信息或基站发送 DCI的时间信息;
PDCCH候选位置信息;
DCI中的非 TPC命令字的信息;
UE中预设的功率控制值;
基站发送的指示功率控制值的指示信息。
402、 在 TPC命令字为 PUSCH对应的 TPC命令字时, 接收 UE根 据所述确定的功率控制值调整所述 PUSCH的发射功率之后发送的
PUSCH;
或者, 在 TPC命令字为 PUCCH对应的 TPC命令字时, 接收 UE根 据所述确定的功率控制值调整所述 PUCCH的发射功率之后发送的
PUCCH。
需要说明的是, 若上述功率控制为对 PUSCH功率的调整, 则上述方 法还包括如下图中未示出的步骤 401 a, 该步骤 401 a位于步骤 401之前。
401 a, 所述基站向所述 UE发送第一消息, 所述第一消息用于指示所 述 UE中的 PUSCH的功率控制使用累积模式, 以使所述 UE根据所述第 一消息将所述 UE中的所述 PUSCH的功率控制使用累积模式之后, 所述 UE根据所述第一条件确定与所述功率控制命令域对应的功率控制值。
以下举例说明第一条件不同时, 如何使 UE根据第一条件确定与所述 功率控制命令域对应的功率控制值。
在一种可选的实现场景中, 若第一条件为基站发送 DCI的时间信息, 则上述步骤 401 中的使得 UE根据第一条件确定与 TPC Command Field=3对应的功率控制值, 可包括:
所述基站发送 DCI的时间信息为子帧 N ,则使得所述 UE确定与 TPC Command Field=3对应的功率控制值为 3dB;
所述基站发送 DCI的时间信息为子帧 M ,则使得所述 UE确定与 TPC Command Field=3的功率控制值为 -3dB;
N为奇数, M为偶数; 或者, N为偶数, M为奇数。
在第二种可选的实现场景中,若第一条件为基站发送的 DCI中携带的 PDCCH候选位置信息, 则上述步骤 401 中的使得 UE根据第一条件确定 与 TPC Command Field=3对应的功率控制值, 可包括:
若所述基站发送 DCI中携带的 PDCCH候选位置信息为
+ 觸 dLNcc^/iJ ,且在所述参数 m,为 N, 则使得所述 UE确定与
TPC Command Field=3对应的功率控制值为 3dB;
若所述基站发送 DCI中携带的 PDCCH候选位置信息为
+ 觸 dLNcc^/iJ ,且在所述参数 m, 为 M, 则使得所述 UE确定 与 TPC Command Field=3对应的功率控制值为 -3dB;
N为奇数, M为偶数; 或者, N为偶数, M为奇数;
其中,
^*为编号为 / 的子帧中控制信道单元 CCE的数目;
'=0,…, -1, /_为 PDCCH当前聚合级别包含的 CCE数目;
m' = m + M、L、 ·ηα , "C/为载波指示, m = 0,---,M(L) -1 ? Yk =(A-Yk_l)modD ^ Υ_χ = Wrnti≠ 0 ^
^ = 39827 , Z) = 65537 ; 当" C/存在时, "C/的取值为 0至 7中任意一个整数; 当 "C不存在时, m' = m ',
无线网络临时标识 RNTI为 UE的标识。
在第三种可选的实现场景中, 若第一条件为基站发送的 DCI中的非 TPC命令字的信息, 则上述步骤 401 中的使得 UE根据第一条件确定与 TPC Command Field=3对应的功率控制值, 可包括:
若 DCI中的非 TPC命令字的信息中任意一个比特为 N, 则使得所述 UE确定与 TPC Command Field=3对应的功率控制值为 3dB;
若 DCI中的非 TPC命令字的信息中任意一个比特为 M, 则使得所述 UE确定与 TPC Command Field=3对应的功率控制值为 -3dB;
N为 0, M为 1; 或者, N为 1, M为 0;
可选地, 若 DCI中的非 TPC命令字的信息中任意一个码点为 M, 则 使得所述 UE确定与 TPC Command Field=3对应的功率控制值为 -3dB; 若 DCI中的非 TPC命令字的信息中任意一个码点为 N, 则使得所述 UE 确定与 TPC Command Field=3对应的功率控制值为 3dB;
相应地, N为全 0, M为全 1; 或者, N为全 1, M为全 0。
举例来说,上述的任意一个比特包括:集中式虚拟资源指示( Localized VRB assignment flag ) 、 分布式虚拟资源指示 ( Distributed VRB assignment flag ) , 或者频率兆频指示 ( Frequency hopping flag ) 等, 本实施例仅为举例说明, 不对其进行限制。
在第四种可选的实现场景中,若第一条件为 UE中预设的功率控制值, 且预设的功率控制值为 O dB或者保留, 则上述步骤 401 中的使得 UE根 据第一条件确定与 TPC Command Field=3对应的功率控制值, 可包括: 使得 UE确定与 TPC Command Field=3对应的功率控制值为 0 dB 或者保留。
在第五种可选的实现场景中, 若第一条件为基站发送的指示功率控制 值的指示信息, 且指示信息为指示所述功率控制值为 O dB或者保留, 则 上述步骤 401 中的使得 UE根据第一条件确定与 TPC Command Field=3 对应的功率控制值, 可包括:
使得 UE根据指示信息确定与 TPC Command Field=3对应的功率控 制值。 否则, 功率控制值按照 LTE Re1 -1 1规范执行即 3dB。 也就是说, UE没有收到上述的指示信息时, UE按照 LTE Re1 -1 1规范确定功率控制 值即 3dB。
上述实施例中的功率调整方法, 能够解决现有技术中由于 PDCCH虚警 或错检会导致 UE功率不必要的过高的累积的问题, 进而可以减少功率浪 费, 降低对其他 UE的上行信道的干扰。
具体地, 实际应用中上调和下调的概率分布可相同, 然而, 现有的 PDCCH在累积模式下上调为 1 dB和 3dB, 下调仅支持 -1 dB, 上调和下调 不对等, 由此 UE每传输 TTI进行 44次盲检测 PDCCH , 当累积较长时间 (如 1 s、 3s或 5s ) 时, PDCCH虚警或错检会导致 UE的发射功率不必 要的提高。 在本实施例中, 通过设置第一条件使得上调和下调对等分布, 进而不会导致 UE的功率过高或过低的问题。
图 5示出了本发明另一实施例提供的用户设备的结构示意图, 如图 5 所示, 本实施例中的用户设备包括: 接收单元 51和确定单元 52;
其中, 接收单元 51用于接收基站发送的承载有 TPC命令字的 DCI ; 确定单元 52用于根据所述 TPC命令字中的功率控制命令域和第一条件确 定与所述功率控制命令域对应的功率控制值。
可选地, 所述确定单元具体用于在所述接收单元 51所接收的 DCI的 所述 TPC命令字中的功率控制命令域为 3 (即 TPC Command Field=3 ) 时, 根据第一条件确定与所述功率控制命令域对应的功率控制值。
上述的第一条件可为下述中的任一种:
所述接收单元 51接收所述 DCI的时间信息;
PDCCH候选位置信息;
所述 DCI中的非 TPC命令字的信息;
UE中预设的功率控制值;
所述接收单元 51接收的所述基站发送的指示功率控制值的指示信 息。
举例来说, 若第一条件为接收单元 51接收所述 DCI的时间信息, 则 上述的确定单元 52具体用于,在 DCI的 TPC Command Field=3,且 DCI 的时间信息为子帧 N, 则所述确定单元 52用于确定与 TPC Command Field=3对应的功率控制值为 3dB, DCI的时间信息为子帧 M, 则所述确 定单元 52用于确定与 TPC Command Field=3对应的功率控制值为 -3dB;
N为奇数, M为偶数; 或者, N为偶数, M为奇数。
另一应用场景中, 若第一条件为 PDCCH候选位置信息, 则上述的确 定单元 52具体用于, 在 DCI 0 TPC Qpmmand Field=3, 若所述 PDCCH 候选位置信息为 L ί1 ( +τ m') mιιιoυd Nνr^' I^ L」ί+' , 且在所述参数 m,为 Ν, 则确 定与所述功率控制命令域对应的功率控制值为 3dB;
在 DCI ½ TPC Command Field=3, 若所述 PDCCH候选位置信息为 + 0觸(1^^/ 」}+ , 且在所述参数 m, 为 M, 则确定与所述功率控 制命令域对应的功率控制值为 -3d B;
N为奇数, M为偶数; 或者, N为偶数, M为奇数;
其中, ^*为编号为 / 的子帧中控制信道单元 CCE的数目;
'· =。,···, -1, /_为 PDCCH当前聚合级别包含的 CCE数目;
m' = m + M(" ·ηα , "C/为载波指示, m = 0,---,M(L) -1 ? Yk =(A-Yk_l)modD ^ Υ_χ = ¾RNTI≠ 0 ^
^4 = 39827 , Z) = 65537 ; 当" C/存在时, "C/的取值为 0至 7中任意一个整数; 当 "C不存在时, m' = m ',
无线网络临时标识 RNTI为 UE的标识。
针对其他的第一条件的举例说明, 可参照上述实施例中的描述, 该处 不再伴述。 可选地, 在上述的 TPC命令字为 PUSCH的功率控制命令字时, 所 述接收单元还用于, 接收所述基站发送的第一消息, 所述第一消息中携带 指示所述 UE中的 PUSCH的功率控制处于累积模式;
相应地, 所述确定单元 52具体用于在所述 UE中的所述 PUSCH的 功率控制使用累积模式, 且在所述接收单元所接收的下行控制信息的所述 TPC命令字中的功率控制命令域为 3时,所述 UE根据第一条件确定与所 述功率控制命令域对应的功率控制值。
在另一优选的实施例中, 上述的用户设备还包括图中未示出的调整单 元 53, 该调整单元 53用于在所述 TPC命令字为 PUSCH对应的 TPC命 令字时, 根据所述确定的功率控制值调整所述 PUSCH的发射功率;
或者,
在所述 TPC命令字为 PUCCH对应的 TPC命令字时, 根据所述确定 的功率控制值调整所述 PUCCH的发射功率。
上述实施例中的用户设备, 能够解决现有技术中用户设备由于 PDCCH 虚警或错检会导致 UE功率不必要的过高或过低的累积的问题, 进而可以 减少功率浪费, 降低对其他 UE的上行信道的干扰。
需要说明的是, 以上用户设备的实施例中, 各功能单元的划分仅是举 例说明, 实际应用中可以根据需要, 例如相应硬件的配置要求或者软件的 实现的便利考虑, 而将上述功能分配由不同的功能单元完成, 即将所述用 户设备的内部结构划分成不同的功能单元, 以完成以上描述的全部或者部 分功能。 而且, 实际应用中, 本实施例中的相应的功能单元可以是由相应 的硬件实现, 也可以由相应的硬件执行相应的软件完成, 例如, 前述的发 送单元, 可以是具有执行前述发送单元功能的硬件, 例如发射器, 也可以 是能够执行相应计算机程序从而完成前述功能的一般处理器或者其他硬 件设备; 再如前述的确定单元, 可以是具有执行确定单元的功能的硬件, 例如处理器, 也可以是能够执行相应计算机程序从而: ¾成前述功能的其他 硬件设备(本说明书提供的各个实施例都可应用上述描述原则 ) 。
在实际应用中, 用户设备可以包括处理器和存储器, 其中, 所述处理 器用于接收基站发送的承载有传输功率控制 TPC命令字的下行控制信息; 以及, 用于在所述接收单元所接收的下行控制信息的所述 TPC命令字中 的功率控制命令域为 3时,根据第一条件确定与所述功率控制命令域对应 的功率控制值;
存储条件用于存储第一条件, 例如, 第一条件可为: 所述处理器接收 的所述下行控制信息的时间信息; 或者, PDCCH候选位置信息; 或者, 所述下行控制信息中的非 TPC命令字的信息; 或者, 用户设备中预设的 功率控制值; 或者, 所述处理器接收的所述基站发送的指示功率控制值的 指示信息。
举例来说, 存储器用于存储预设的功率控制值为 O dB或者保留, 此 时, 用户设备的处理器在接收基站发送的承载有 TPC命令字的下行控制 信息, 并在 TPC命令字中的功率控制命令域为 3 (即 TPC Command Field=3 ) 时, UE根据存储器中存储的功率控制值为 0 dB或者保留确定 与 TPC Command Field=3对应的功率控制值为 O dB或者保留。
作为另一种实现方式, 本发明实施例另一方面还提供一种用户设备。 该用户设备包括总线、 处理器和存储器, 处理器和存储器挂载在总线上。 存储器用于存储图 1 -图 4任意一个所述的功率调整方法中用户设备所执行 步骤的代码。 处理器用于通过总线读取存储器中存储的代码, 并执行图 1 - 图 4任意一个所述的功率调整方法中用户设备的动作。
上述实施例中的用户设备, 能够解决现有技术中用户设备由于 PDCCH 虚警或错检会导致 UE功率不必要的过高累积的问题, 进而可以减少功率 浪费, 降低对其他 UE的上行信道的干扰。
根据本发明的另一方面,本发明实施例还提供一种基站,如图 6所示, 该基站包括获取单元 60和发送单元 61。 所述获取单元 60用于获取承载 有传输控制 TPC命令字的下行控制信息; 所述发送单元 61用于向用户设 备 UE发送所述下行控制信息,以使得所述 UE根据所述 TPC命令字的功 率控制命令域和第一条件确定与所述功率控制命令域对应的功率控制值。
其中, 第一条件为:
所述发送单元 61发送所述下行控制信息的时间信息; 或者, 所述下行控制信息中携带的物理下行控制信道 PDCCH候选位置信 息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者, 所述 UE中预设的功率控制值; 或者,
所述发送单元 61发送的指示功率控制值的指示信息。
本实施例中的基站还可包括接收单元 62。 所述接收单元 62用于在所 述 TPC命令字为 PUSCH对应的 TPC命令字时, 接收所述 UE根据所述 确定的功率控制值调整所述 PUSCH的发射功率之后发送的 PUSCH; 或 者, 在所述 TPC命令字为 PUCCH对应的 TPC命令字时, 接收所述 UE 根据所述确定的功率控制值调整所述 PUCCH的发射功率之后发送的
PUCCH。
可选地, 上述的发送单元 61还用于
向所述 UE发送第一消息, 所述第一消息中携带指示所述 UE中的物 理上行共享信道 PUSCH的功率控制处理累积模式, 以使所述 UE根据所 述第一消息将所述 UE中的所述 PUSCH的功率控制使用累积模式, 且在 所述接收单元所接收到的所述 TPC命令字的功率控制命令域为 3时, 根 据所述第一条件确定与所述功率控制命令域对应的功率控制值。
由此,本实施例中的基站使得用户设备根据发送单元发送的 DCI中的
TPC命令字以及第一条件确定与 TPC命令字中的功率控制命令域对应的 功率控制值, 可以实现功率控制值的正数(3dB )和负数(-3dB )的对称; 也就是说, 现有技术中由于累积模式下功率控制值的上调 (1 dB、 3dB ) 和下调 (-1 dB ) 不对等, 而本实施例中, 上调和下调对等分布, 进而在上 调和下调出现相同概率的情况下, 本实施例可解决现有技术中用户设备由 于 PDCCH虚警或错检会导致 UE功率不必要的过高或过低的累积的问题, 由此可以减少功率浪费, 降低对其他 UE的上行信道的干扰。
需要说明的是, 以上基站的实施例中, 各功能单元的划分仅是举例说 明, 实际应用中可以根据需要, 例如相应硬件的配置要求或者软件的实现 的便利考虑, 而将上述功能分配由不同的功能单元完成, 即将所述基站的 内部结构划分成不同的功能单元, 以完成以上描述的全部或者部分功能。 而且, 实际应用中, 本实施例中的相应的功能单元可以是由相应的硬件实 现, 也可以由相应的硬件执行相应的软件完成, 例如, 前述的发送单元, 可以是具有执行前述发送单元功能的硬件, 例如发射器, 也可以是能够执 行相应计算机程序从而完成前述功能的一般处理器或者其他硬件设备; 再 如前述的接收单元, 可以是具有执行前述接收单元功能的硬件, 例如接收 器, 也可以是能够执行相应计算机程序从而完成前述功能的一般处理器或 者其他硬件设备; (本说明书提供的各个实施例都可应用上述描述原则)。
在实际应用中, 基站可包括处理器和存储器, 其中处理器用于向用户 设备 UE发送用于控制所述 UE的上行信道的发送功率的下行控制信息, 若所述下行控制信息中承载的传输功率控制 TPC命令字的功率控制命令 域为 3, 则使得所述 UE根据第一条件确定与所述功率控制命令域对应的 功率控制值;
其中, 第一条件为: 处理器发送所述下行控制信息的时间信息; 或者, 所述下行控制信息中携带的 PDCCH候选位置信息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者,
所述 UE中预设的功率控制值; 或者,
所述处理器发送的指示功率控制值的指示信息。
另外, 存储器用于存储处理器中的欲发送 UE的信息, 如上述的用于 控制所述 UE的上行信道的发送功率的下行控制信息, 或者, 上述的用于 指示功率控制值的指示信息等。
作为另一种实现方式, 本发明实施例另一方面还提供一种基站。 该基 站包括总线、 处理器和存储器, 处理器和存储器挂载在总线上。 存储器用 于存储图 1 -图 4任意一个所述的功率调整方法中基站所执行步骤的代码。 处理器用于通过总线读取存储器中存储的代码,并执行图 1 -图 4任意一个 所述的功率调整方法中基站的动作。
本实施例中的基站使得用户设备可解决现有技术中用户设备由于 PDCCH虚警或错检会导致 UE功率不必要的过高或过低的累积的问题,进而 可以减少功率浪费, 降低对其他 UE的上行信道的干扰。
根据本发明的再一方面, 本发明还提供一种通信系统, 该通信系统包 括上述任一实施例所述的用户设备, 和上述任一实施例所述的基站, 所述 用户设备和基站通信。
本领域普通技术人员可以理解: 实现上述各方法实施例的全部或部分 步骤可以通过程序指令相关的硬件来完成。 前述的程序可以存储于一计算 机可读取存储介质中。 该程序在执行时, 执行包括上述各方法实施例的步 骤; 而前述的存储介质包括: ROM、 RAM, 磁碟或者光盘等各种可以存 储程序代码的介质。
对其限制; 尽管参照前述各实施例对本发明进行了详细的说明, 本领域的 普通技术人员应当理解: 其依然可以对前述各实施例所记载的技术方案进 行修改, 或者对其中部分或者全部技术特征进行等同替换; 而这些修改或 者替换, 并不使相应技术方案的本质脱离本发明各实施例技术方案的范 围。

Claims

权 利 要 求 书
1、 一种功率调整方法, 其特征在于, 包括:
用户设备 UE接收基站发送的承载有传输功率控制 TPC命令字的下 行控制信息;
所述 UE根据所述 TPC命令字中的功率控制命令域和第一条件确定 与所述功率控制命令域对应的功率控制值;
其中, 所述第一条件为:
所述 UE接收所述下行控制信息的时间信息; 或者,
物理下行控制信道 PDCCH候选位置信息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者,
所述 UE中预设的功率控制值; 或者,
所述基站发送的用于指示功率控制值的指示信息。
2、根据权利要求 1所述的方法,其特征在于,所述 UE根据所述 TPC 命令字中的功率控制命令域和所述第一条件确定与所述功率控制命令域 对应的功率控制值, 包括:
在所述 TPC命令字中的功率控制命令域为 3时, 所述 UE根据所述 第一条件确定与所述功率控制命令域对应的功率控制值。
3、 根据权利要求 2所述的方法, 其特征在于, 所述 UE接收基站发 送的承载有 TPC命令字的下行控制信息之前, 还包括:
所述 UE接收所述基站发送的第一消息, 所述第一消息用于指示所述
UE中的物理上行共享信道 PUSCH的功率控制使用累积模式;
在所述 TPC命令字中的功率控制命令域为 3时, 所述 UE根据第一 条件确定与所述功率控制命令域对应的功率控制值, 具体为:
在所述 UE中的所述 PUSCH的功率控制使用累积模式, 且在所述 TPC命令字中的功率控制命令域为 3时,所述 UE根据第一条件确定与所 述功率控制命令域对应的功率控制值。
4、 根据权利要求 1 -3任意一项所述的方法, 其特征在于, 所述第一 条件为: 所述 UE接收所述下行控制信息的时间信息时, 所述 UE根据所 述第一条件确定与所述功率控制命令域对应的功率控制值, 包括:
所述 UE接收所述下行控制信息的时间信息为子帧 N时, 则所述 UE 确定与所述功率控制命令域对应的功率控制值为 3d B;
所述 UE接收所述下行控制信息的时间信息为子帧 M时, 则所述 UE 确定与所述功率控制命令域对应的功率控制值为 -3dB;
N为奇数, M为偶数; 或者, N为偶数, M为奇数。
5、 根据权利要求 1-3任意一项所述的方法, 其特征在于, 所述第一 条件为: 所述 PDCCH候选位置信息时, 所述 UE根据所述第一条件确定 与所述功率控制命令域对应的功率控制 , 包括:
若所述 PDCCH候选位置信息为£ i¾+w')modL^/Lj}+ ,且在所述 参数 m'为 N,则所述 UE确定与所述功率控制命令域对应的功率控制值为 3dB;
若所述 PDCCH候选位置信息为£ {¾+w')modL^/Lj}+ ,且在所述 参数 m' 为 M, 则所述 UE确定与所述功率控制命令域对应的功率控制值 为 -3dB;
N为奇数, M为偶数; 或者, N为偶数, M为奇数;
其中,
wCCE,*为编号为 / 的子帧中控制信道单元 CCE的数目;
'=0,…, -1, /_为 PDCCH当前聚合级别包含的 CCE数目;
m' = m + ML、.nCI , "C/为载波指示, m = 0,---,M(L)-l ^ Yk =(A-Yk_l)modD 0 , ^ = 39827 , Z) = 65537 ; 当" C/存在时, "C/的取值为 0至 7中任意一个整数; 当 "C不存在时, ' = m
无线网络临时标识 RNTI为 UE的标识。
6、 根据权利要求 1-3任意一项所述的方法, 其特征在于, 所述第一 条件为: 所述下行控制信息中的非 TPC命令字的信息时, 所述 UE根据 所述第一条件确定与所述功率控制命令域对应的功率控制值, 包括:
若所述下行控制信息中的非 TPC命令字的信息中任意一个比特为 N, 则所述 UE确定与所述功率控制命令域对应的功率控制值为 3dB;
若所述下行控制信息中的非 TPC命令字的信息中的任意一个比特为 M , 则所述 U E确定与所述功率控制命令域对应的功率控制值为 -3dB;
N为 0, M为 1; 或者, N为 1, M为 0
7、 根据权利要求 6所述的方法, 其特征在于, 所述任意一个比特用 于指示是集中式虚拟资源指示,分布式虚拟资源指示,或者频率跳频指示。
8、 根据权利要求 1 -3任意一项所述的方法, 其特征在于, 所述预设 的功率控制值为 0 dB或者保留 reserved
9、 根据权利要求 1 -3任意一项所述的方法, 其特征在于, 所述基站 发送的用于指示功率控制值的指示信息为指示所述功率控制值为 0 dB或 者保留 reserved , 则所述 UE根据所述指示信息确定与所述功率控制命令 域对应的功率控制值为 0 dB或者保留 reserved
10、 根据权利要求 1 -9任一所述的方法, 其特征在于, 还包括: 在所述 TPC命令字为 PUSCH对应的 TPC命令字时, 所述 UE根据 所述确定的功率控制值调整所述 PUSCH的发射功率;
或者,
在所述 TPC命令字为 PUCCH对应的 TPC命令字时, 所述 UE根据 所述确定的功率控制值调整所述 PUCCH的发射功率。
1 1、 一种功率调整方法, 其特征在于, 包括:
基站获取承载有传输控制 TPC命令字的下行控制信息;
所述基站向用户设备 UE发送所述下行控制信息, 在以使得所述 UE 根据所述 TPC命令字的功率控制命令域和第一条件确定与所述功率控制 命令域对应的功率控制值;
其中, 所述第一条件为:
所述 UE接收所述下行控制信息的时间信息; 或者,
物理下行控制信道 PDCCH候选位置信息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者,
所述 UE中预设的功率控制值; 或者,
所述基站发送的用于指示功率控制值的指示信息。
12、 根据权利要求 1 1所述的方法, 其特征在于, 所述 UE根据所述
TPC命令字中的功率控制命令域和所述第一条件确定与所述功率域对应 的功率控制值, 包括:
在所述 TPC命令字中的功率控制命令域为 3时, 所述 UE根据所述 第一条件确定与所述功率控制命令域对应的功率控制值。
13、 根据权利要求 12所述的方法, 其特征在于, 所述基站向所述 UE 发送承载有传输控制 TPC命令字的下行控制信息之前, 还包括: 所述基站向所述 UE发送第一消息, 所述第一消息用于指示所述 UE 中的物理上行共享信道 PUSCH的功率控制使用累积模式, 以使所述 UE 根据所述第一消息将所述 UE中的所述 PUSCH的功率控制使用累积模式, 且在 TPC命令字中的功率控制命令域为 3时, 根据所述第一条件确定与 所述功率控制命令域对应的功率控制值。
14、 一种用户设备, 其特征在于, 包括:
接收单元, 用于接收基站发送的承载有传输功率控制 TPC命令字的 下行控制信息;
确定单元, 用于根据所述 TPC命令字中的功率控制命令域和第一条 件确定与所述功率控制命令域对应的功率控制值;
其中, 所述第一条件为:
所述接收单元接收所述下行控制信息的时间信息; 或者,
物理下行控制信道 PDCCH候选位置信息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者,
用户设备中预设的功率控制值; 或者,
所述基站发送的指示功率控制值的指示信息。
15、 根据权利要求 14所述的用户设备, 其特征在于, 所述确定单元 具体用于在所述接收单元所接收到的下行控制信息的所述 TPC命令字中 的功率控制命令域为 3时,根据所述第一条件确定与所述功率控制命令域 对应的功率控制值。
16、 根据权利要求 15所述的用户设备, 其特征在于, 所述接收单元 还用于接收所述基站发送的第一消息, 所述第一消息用于指示所述 UE中 的物理上行共享信道 PUSCH的功率控制使用累积模式;
相应地, 所述确定单元, 具体用于在所述 UE中的所述 PUSCH的功 率控制使用累积模式, 且在所述接收单元所接收的下行控制信息的所述 TPC命令字中的功率控制命令域为 3时 ,根据所述第一条件确定与所述功 率控制命令域对应的功率控制值。
17、 根据权利要求 14-16任意一项所述的用户设备, 其特征在于, 还 包括: 调整单元,用于在所述 TPC命令字为 PUSCH对应的 TPC命令字时, 根据所述确定的功率控制值调整所述 PUSCH的发射功率;
或者,
在所述 TPC命令字为 PUCCH对应的 TPC命令字时, 根据所述确定 的功率控制值调整所述 PUCCH的发射功率。
18、 一种基站, 其特征在于, 包括:
获取单元, 用于获取承载有传输控制 TPC命令字的下行控制信息; 发送单元, 用于向用户设备 UE发送所述下行控制信息, 以使得所述 UE根据所述 TPC命令字的功率控制命令域和第一条件确定与所述功率控 制命令域对应的功率控制值;
其中, 所述第一条件为:
所述发送单元发送所述下行控制信息的时间信息; 或者,
所述下行控制信息中携带的物理下行控制信道 PDCCH候选位置信 息; 或者,
所述下行控制信息中的非 TPC命令字的信息; 或者,
所述 UE中预设的功率控制值; 或者,
所述发送单元发送的指示功率控制值的指示信息。
19、 根据权利要求 18所述的基站, 其特征在于, 所述发送单元还用 于
向所述 UE发送第一消息, 所述第一消息用于指示所述 UE中的物理 上行共享信道 PUSCH的功率控制使用累积模式, 以使所述 UE根据所述 第一消息将所述 UE中的所述 PUSCH的功率控制使用累积模式, 且在所 述接收单元所接收到的所述 TPC命令字的功率控制命令域为 3时, 所述 UE根据所述第一条件确定与所述功率控制命令域对应的功率控制值。
20、 一种通信系统, 其特征在于, 包括如上权利要求 14至 17任一所 述的用户设备, 和如上权利要求 18或 19所述的基站, 所述用户设备和所 述基站通信。
PCT/CN2012/082388 2012-09-28 2012-09-28 功率调整方法及系统、基站和用户设备 WO2014047904A1 (zh)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201280023572.0A CN103843419B (zh) 2012-09-28 2012-09-28 功率调整方法及系统、基站和用户设备
PCT/CN2012/082388 WO2014047904A1 (zh) 2012-09-28 2012-09-28 功率调整方法及系统、基站和用户设备
EP12885626.7A EP2894908B1 (en) 2012-09-28 2012-09-28 Method for power adjustment, base station, and user equipment
US14/671,688 US9538476B2 (en) 2012-09-28 2015-03-27 Method and system for power adjustment, base station, and user equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2012/082388 WO2014047904A1 (zh) 2012-09-28 2012-09-28 功率调整方法及系统、基站和用户设备

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/671,688 Continuation US9538476B2 (en) 2012-09-28 2015-03-27 Method and system for power adjustment, base station, and user equipment

Publications (1)

Publication Number Publication Date
WO2014047904A1 true WO2014047904A1 (zh) 2014-04-03

Family

ID=50386876

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/082388 WO2014047904A1 (zh) 2012-09-28 2012-09-28 功率调整方法及系统、基站和用户设备

Country Status (4)

Country Link
US (1) US9538476B2 (zh)
EP (1) EP2894908B1 (zh)
CN (1) CN103843419B (zh)
WO (1) WO2014047904A1 (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10117183B2 (en) * 2014-11-06 2018-10-30 Huawei Technologies Co., Ltd. Data transmission method and device
US10568040B2 (en) 2016-02-19 2020-02-18 Ntt Docomo, Inc. Terminal and radio communication method
US10608856B2 (en) 2016-06-16 2020-03-31 Samsung Electronics Co., Ltd. Transmission of reference signals in a communication system
CN108235417B (zh) * 2016-12-22 2021-03-30 华为技术有限公司 下行传输方法、基站和终端设备
CN108135028B (zh) * 2018-02-27 2022-08-19 中兴通讯股份有限公司 一种功率控制方法、装置及通信节点
US10856234B2 (en) * 2018-05-11 2020-12-01 Qualcomm Incorporated Power control with flexible scheduling delay
CN110876187A (zh) * 2018-09-03 2020-03-10 普天信息技术有限公司 一种上行功率控制方法及装置
CN110138536B (zh) * 2019-06-11 2022-02-08 深圳市锐尔觅移动通信有限公司 物理下行控制信道的发送方法、装置和存储介质
WO2022030849A1 (ko) 2020-08-07 2022-02-10 엘지전자 주식회사 무선 통신 시스템에서 상향링크 송수신 방법 및 장치
WO2023010469A1 (zh) * 2021-08-05 2023-02-09 富士通株式会社 信号发送方法、装置和系统
CN117858208A (zh) * 2022-09-30 2024-04-09 中兴通讯股份有限公司 功率控制方法、设备和存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101835255A (zh) * 2009-01-21 2010-09-15 美商威睿电通公司 自适应确认和功率控制装置、方法和系统
WO2011040858A1 (en) * 2009-10-02 2011-04-07 Telefonaktiebolaget Lm Ericsson (Publ) Uplink power control in a wireless communication system
CN102291812A (zh) * 2011-09-13 2011-12-21 电信科学技术研究院 上行功控参数配置及上行功控方法、系统和设备
CN102300304A (zh) * 2011-09-20 2011-12-28 电信科学技术研究院 一种上行功控的实现方法及装置

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100254329A1 (en) * 2009-03-13 2010-10-07 Interdigital Patent Holdings, Inc. Uplink grant, downlink assignment and search space method and apparatus in carrier aggregation
EP3745616A1 (en) * 2009-04-24 2020-12-02 LG Electronics Inc. Method and apparatus for transmitting and receiving control signal for merging carriers in transmission
KR101697782B1 (ko) * 2009-05-14 2017-01-19 엘지전자 주식회사 다중 반송파 시스템에서 제어채널을 모니터링하는 장치 및 방법
JP5106477B2 (ja) * 2009-05-18 2012-12-26 株式会社エヌ・ティ・ティ・ドコモ 無線基地局及び移動通信方法
US9037183B2 (en) * 2010-02-19 2015-05-19 Lg Electronics Inc. Controlling uplink transmission power using offset value based on antenna number or diversity scheme
KR101861661B1 (ko) * 2010-03-15 2018-05-28 엘지전자 주식회사 무선통신 시스템에서 제어정보를 송신 및 수신하기 위한 장치 및 그 방법
WO2012036409A2 (ko) * 2010-09-13 2012-03-22 엘지전자 주식회사 제어 정보를 전송하는 방법 및 이를 위한 장치
DE112011103064B4 (de) * 2010-09-13 2015-10-29 Lg Electronics Inc. Verfahren und Vorrichtung zum Übertragen von Steuerinformation
KR101882278B1 (ko) * 2010-11-18 2018-07-26 엘지전자 주식회사 제어 정보를 전송하는 방법 및 이를 위한 장치
KR20200008016A (ko) * 2011-06-29 2020-01-22 엘지전자 주식회사 무선 통신 시스템에서 제어 정보의 전송 방법 및 장치
ES2663837T3 (es) * 2011-09-21 2018-04-17 Lg Electronics Inc. Dispositivo terminal de control de potencia de transmisión de señal de enlace ascendente, y procedimiento para el mismo
US9635660B2 (en) * 2011-11-16 2017-04-25 Lg Electronics Inc. Data receiving method and wireless device
WO2014021632A1 (ko) * 2012-07-31 2014-02-06 엘지전자 주식회사 데이터 송신 및 수신 방법 및 장치
US9504037B2 (en) * 2012-08-01 2016-11-22 Lg Electronics Inc. Method and apparatus for transmitting and receiving data

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101835255A (zh) * 2009-01-21 2010-09-15 美商威睿电通公司 自适应确认和功率控制装置、方法和系统
WO2011040858A1 (en) * 2009-10-02 2011-04-07 Telefonaktiebolaget Lm Ericsson (Publ) Uplink power control in a wireless communication system
CN102291812A (zh) * 2011-09-13 2011-12-21 电信科学技术研究院 上行功控参数配置及上行功控方法、系统和设备
CN102300304A (zh) * 2011-09-20 2011-12-28 电信科学技术研究院 一种上行功控的实现方法及装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2894908A4 *

Also Published As

Publication number Publication date
US20150201382A1 (en) 2015-07-16
EP2894908A4 (en) 2015-11-04
EP2894908A1 (en) 2015-07-15
EP2894908B1 (en) 2019-12-04
CN103843419A (zh) 2014-06-04
CN103843419B (zh) 2018-05-29
US9538476B2 (en) 2017-01-03

Similar Documents

Publication Publication Date Title
WO2014047904A1 (zh) 功率调整方法及系统、基站和用户设备
EP3179787B1 (en) Terminal device and method for transmit power control
US11671982B2 (en) Method, apparatus, and system for allocating resources in wireless communication system
CN111971920B (zh) 基于码块组的动态harq-ack码本的sps释放处理方法和装置
CN106465302B (zh) 终端装置、基站装置以及通信方法
US20170230913A1 (en) Terminal device, base station device, and method
JP2022520229A (ja) マルチセグメントpuschについての送信フォーマット
US9769771B2 (en) Terminal device, base station device, and communication method
CN106416390B (zh) 终端装置、基站装置以及通信方法
US10244534B2 (en) Terminal device, base station device, integrated circuit, and wireless communication method
EP2939491A1 (en) Methods for device-to-device communication
EP2939359A2 (en) Method and apparatus for device-to-device communication
US10349356B2 (en) Terminal device, base station apparatus, integrated circuit, and communication method
CN106465294B (zh) 终端装置、基站装置以及通信方法
WO2017193377A1 (zh) 下行控制信息的发送方法、检测方法和设备
US20180375613A1 (en) Method and device for transmitting control information in wireless communication system
JPWO2016163464A1 (ja) 端末装置、基地局装置、通信方法、および、集積回路
CN116264859A (zh) 用于发送csi报告的方法和装置
JPWO2016163186A1 (ja) 端末装置、基地局装置、集積回路、および、通信方法
US20220279525A1 (en) Method performed by user equipment, and user equipment
EP4133642A1 (en) Prioritization between sr and harq-ack
WO2019049929A1 (ja) 端末装置、および、通信方法
US20240049201A1 (en) Resource Allocation for Cellular and Device-to-Device Communications
JP2024514256A (ja) 複数のスロットにわたるトランスポートブロック送信のためのul電力制御
JP2023547406A (ja) フィードバック構成のための方法、端末デバイス、ネットワークデバイス、およびコンピュータ可読媒体

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12885626

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2012885626

Country of ref document: EP