WO2014034166A1 PCT/JP2013/059269 JP2013059269W WO2014034166A1 WO 2014034166 A1 WO2014034166 A1 WO 2014034166A1 JP 2013059269 W JP2013059269 W JP 2013059269W WO 2014034166 A1 WO2014034166 A1 WO 2014034166A1
Authority
WO
WIPO (PCT)
Prior art keywords
steel pipe
blade
tip
pile
ground
Prior art date
Application number
PCT/JP2013/059269
Other languages
French (fr)
Japanese (ja)
Inventor
市村仁志
菅将憲
高橋秀一
Original Assignee
大和ハウス工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大和ハウス工業株式会社 filed Critical 大和ハウス工業株式会社
Priority to CN201380045463.3A priority Critical patent/CN104603366B/en
Publication of WO2014034166A1 publication Critical patent/WO2014034166A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/16Machines for digging other holes in the soil
    • E02F5/20Machines for digging other holes in the soil for vertical holes

Definitions

  • the present invention relates to a concrete pile built in-situ in the ground to support the foundation of a building, in particular, a method for building a cast-in-place concrete pile with a spiral node on the outer peripheral surface, and this construction method.
  • the present invention relates to an excavating blade-attached steel pipe for constructing a node-cast concrete pile with a knot and a spot-cast concrete pile with a knot constructed by the construction method.
  • the columnar improvement method is a method of constructing a columnar improvement pile in which soil is solidified with a solidifying material by mixing and stirring the solidified material in the excavated soil while excavating a pile hole in the ground.
  • Patent Document 1 a pile hole is excavated in the ground with an excavation auger having an excavation claw at the tip, and a hydraulic solidifying material liquid made of cement or the like is filled in the pile hole, Thereafter, a method of constructing a replacement column in which the hydraulic solidifying material liquid is solidified by lifting the excavating auger from the ground has been proposed.
  • the conventional columnar improvement method has the following problems. ⁇ Since soil and solidified material are mixed and stirred at the site, the quality of the built-up pillar-shaped piles varies depending on the soil quality at the site and the difference in the installer. -In order to avoid insufficient strength due to poor solidification or poor stirring, it may be necessary to inject a large amount of solidified material slurry, which places a heavy burden on the environment. -Depending on the soil, harmful substances such as hexavalent chromium may be eluted. Although it is possible to test whether hexavalent chromium or the like is eluted in advance and confirm that there is no dissolution, this requires cost and time.
  • the method of burying small diameter steel pipe piles has the following problems. -Since it is necessary to support the front-end
  • Patent Document 1 does not cause each problem of the conventional columnar improvement method because the soil at the site is not mixed with the solidifying material.
  • the outer peripheral surface of the replacement column formed by solidifying the hydraulic solidifying material liquid is cylindrical without a node, the shear resistance between the outer peripheral surface of the replacement column and the surrounding ground is low.
  • the replacement column diameter must be increased accordingly.
  • the object of the present invention is to build a concrete pile for ground reinforcement with stable quality without being affected by the soil condition at the site, and the pile peripheral surface resistance force of the built concrete pile is large.
  • the object is to provide a method for constructing a cast-in-place concrete pile with a knot and a steel pipe with a drilling blade attached in a simple configuration used in this construction method.
  • Another object of the present invention is to provide a knotted in-situ concrete pile having a large pile peripheral surface resistance.
  • a tip excavating blade having a blade body partially protruding from the outer peripheral surface of the steel pipe at one end of the steel pipe is removed or from the outer peripheral surface of the steel pipe.
  • a process of preparing a drilling blade mounting steel pipe attached to be able to be stored on the inner peripheral side Pushing down the steel pipe attached with the excavating blade while supporting the tip excavating blade to be on the lower side and rotating the steel pipe in a certain direction around the central axis of the steel pipe with the portion protruding from the outer peripheral surface of the steel pipe.
  • the process of digging downward by the tip excavation blade and inserting it into the ground while forming a spiral groove in the outer periphery of the steel pipe Filling the steel pipe with mortar, ready-mixed concrete or cement milk; Pulling up the steel pipe to separate the tip excavation blade from the steel pipe, or rotating the steel pipe reversely to store the tip excavation blade on the inner peripheral side of the outer diameter of the steel pipe, and pulling out the steel pipe from the ground And a process of pouring mortar, ready-mixed concrete, or cement milk in the steel pipe into the pile hole that becomes the trace of the steel pipe and the spiral groove.
  • a spiral groove is formed on the outer periphery of the pile hole by excavating the pile hole using the above-described excavating blade-attached steel pipe.
  • the tip excavation blade can be removed from the steel pipe, and by pulling up the steel pipe, the tip excavation blade is separated from the steel pipe and left at the bottom of the pile hole.
  • the tip excavation blade can be stored with respect to the steel pipe, and the tip excavation blade is stored on the inner peripheral side of the outer diameter of the steel pipe by rotating the steel pipe in the reverse direction. Therefore, it is possible to pull out only the steel pipe from the ground without breaking the spiral groove.
  • Mortar or ready-mixed concrete or cement milk is poured into the pile holes and spiral grooves formed in this way, and the mortar or ready-mixed concrete or cement milk is hardened, so that the spiral knotted concrete piles are cast in the field. Built in.
  • This construction method of on-site cast-in-place concrete piles with knots does not mix and agitate the soil and solidified material in the field unlike the conventional columnar improvement method, so it is not affected by the state of the soil at the site. It is possible to build concrete piles for stable ground reinforcement. In addition, there is no worry of toxic substances such as hexavalent chromium eluting depending on the soil.
  • the steel pipe is vibrated to give vibration to the mortar.
  • green concrete or cement milk may be compacted.
  • mortar, ready-mixed concrete, or cement milk can be spread to the corners of the pile hole and the spiral groove without any gap, and the quality of the built-in-placed cast-in-place concrete pile can be improved.
  • a drilling blade mounting steel pipe for building a cast-in-place concrete pile with a first knot is a steel pipe, and is attached to one end of the steel pipe by a mounting portion, and a part protrudes to the outer peripheral side from the outer peripheral surface of the steel pipe.
  • a tip excavating blade having a blade body is provided, and the tip excavating blade is detached from the steel pipe at the attachment portion by the resistance of the ground acting on the tip excavating blade by pulling up the steel pipe from the ground.
  • the tip excavation blade has, for example, a lid portion that closes the lower end of the steel pipe, the blade body is fixed to the lid portion, and the attachment portion protrudes upward from the lid portion and is provided on the steel pipe. It consists of a pin that detachably engages with the engaged portion. According to this configuration, the configuration of the tip excavation blade is simplified.
  • An excavating blade mounting steel pipe for building a cast-in-place concrete pile with a second node includes a steel pipe, a state in which a part of the steel pipe is attached to one end of the steel pipe and protrudes to the outer peripheral side from the outer peripheral surface of the steel pipe.
  • the rotation to one direction from the state which a part protrudes to the outer peripheral side rather than the outer peripheral surface of the said steel pipe is blocked
  • the direction in which the rotation is prevented is a direction in which the tip excavation blade is prevented from rotating due to the resistance of the ground when the steel pipe is rotated forward, that is, when the steel pipe is inserted into the ground.
  • the steel pipe of this structure can be used in the method of constructing the above-mentioned nodal cast-in-place concrete pile according to the present invention, and the steel pipe is inverted before pouring mortar, ready-mixed concrete or cement milk in the steel pipe into the pile hole and the spiral groove.
  • the tip excavation blade is accommodated on the inner peripheral side with respect to the outer peripheral surface of the steel pipe by the resistance of the ground.
  • the tip excavation blade is prevented from rotating by the stopper, and the tip excavation blade maintains the protruding state. Therefore, it is not necessary to separately provide a drive source and an operation mechanism for projecting and storing the tip excavation blade with respect to the steel pipe. Therefore, it is possible to simplify the construction of the excavating blade-attached steel pipe for constructing a knotted concrete pile with a knot.
  • the in-situ concrete pile with knots of this invention is a columnar shape made of mortar, concrete or cement milk, and has a spiral ridge that bites into the ground on the outer periphery. When the spiral ridges bite into the ground, the shear resistance of the pile peripheral surface increases and the pile peripheral surface resistance increases.
  • FIG. 7A It is a front view which shows the lower end part in the excavation blade protrusion state of the excavation blade attachment steel pipe. It is a bottom view of the steel pipe of Drawing 8A.
  • FIG. 8A It is explanatory drawing which shows each process of the construction method of the field cast-in-place concrete pile with a node performed using the excavation blade attachment steel pipe shown to FIG. 8A. It is a front view which shows the lower end part of the excavation blade attachment steel pipe concerning a proposal example. It is a bottom view of the steel pipe of Drawing 10A. It is a front view which shows the lower end part of the excavation blade attachment steel pipe concerning other proposal examples. It is a bottom view of the steel pipe of Drawing 11A.
  • This method for constructing a knotted cast-in-place concrete pile is a method of building a knotted cast-in-place concrete pile 20 shown as an example in FIG.
  • the constructed in-situ concrete pile 20 with a knot has a shape in which a spiral knot 22 is formed on the outer periphery of a columnar pile body 21.
  • FIG. 2 is a side view showing the overall configuration of an example of a construction apparatus for constructing the above-mentioned knotted concrete pile 20 with a knot.
  • the illustrated construction apparatus 1 includes a pile driving apparatus 1a, a mortar supply apparatus 1b, and a drilling blade mounting steel pipe 10.
  • the pile driving device 1a is supported by a self-propelled work vehicle 2 so that a guide column 3 can be changed in inclination, and an excavating blade-attached steel pipe 10 which will be described in detail later on an elevating head 4 which can be moved up and down along the guide column 3. The upper end of is held.
  • the excavating blade-attached steel pipe 10 can be rotated by a rotary motor 5 provided on the elevating head 4. Further, the elevating head 4 is provided with a vibrator 6 that vibrates the excavating blade mounting steel pipe 10.
  • the mortar supply device 1b has a tank 7 containing the mortar M and a hose 8 for sending out the mortar in the tank 7.
  • the tank 7 is a separate vehicle from the work vehicle 2.
  • the excavation blade mounting steel pipe 10 is composed of a steel pipe 11 and a tip excavation blade 12 attached to the lower end of the steel pipe 11 as shown in FIG.
  • the tip excavating blade 12 is provided with a plurality of (two in the illustrated example) blade bodies 12 b fixed to the lower surface of a disk-like lid portion 12 a that closes the lower end opening of the steel pipe 11.
  • Each blade body 12b is inclined so that the lower end is preceded when rotating in a predetermined excavation rotation direction (A direction).
  • a direction a predetermined excavation rotation direction
  • the outer diameter end portion 12ba of each blade body 12b protrudes to the outer peripheral side with respect to the mounting portion 12a. Therefore, when the tip excavation blade 12 is attached to the lower end of the steel pipe 11, the outer diameter end portion 12ba of each blade body 12b protrudes to the outer peripheral side from the outer peripheral surface of the steel pipe 11 as shown in FIG.
  • the tip excavation blade 12 is detachably attached to the lower end of the steel pipe 11 by the attachment portion 12c.
  • the mounting portion 12 c of this example includes a plurality (two in the illustrated example) of pins 12 ca protruding upward from the upper surface of the lid portion 12 a.
  • the respective pins 12 ca are engaged with engagement portions 11 a provided on the inner peripheral surface of the steel pipe 11 as shown in FIG. 5.
  • the tip excavating blade 12 does not come off the steel pipe 11 due to the frictional resistance between the pin 12ca and the engaging portion 11a, but when the steel pipe 11 is pulled up with the axial position of the tip excavating blade 12 fixed, the engaging portion The pin 12ca is removed from 11a, and the tip excavation blade 12 is detached from the end surface of the steel pipe 11. In a state where the tip excavation blade 12 is attached to the steel pipe 11, the rotation of the steel pipe 11 is transmitted to the tip excavation blade 12 through the protrusion 11a and the pin 12ca.
  • or FIG. 5 is demonstrated.
  • the upper end of the steel pipe 11 is held by the lifting head 4 of the construction apparatus 1, and the tip excavation blade 12 is attached to the lower end of the steel pipe 11 to prepare the excavation blade mounting steel pipe 10.
  • the position of the excavating blade-attached steel pipe 10 is adjusted by the work vehicle 2 so that the excavated blade-attached steel pipe 10 is located immediately above the site-built concrete pile pile construction site of the ground 15.
  • the rotary motor 5 is driven to rotate the excavating blade mounting steel pipe 10 around the central axis of the steel pipe 11 in the excavation rotation direction A, and the elevating head 4 is lowered along the guide pillar 3 at a constant speed.
  • the excavating blade mounting steel pipe 10 is pushed down.
  • FIG. 6 (A) the entire blade body 12b of the tip excavating blade 12 is excavated downward, and the outer diameter end portion 12ba of each blade body 12b is spirally formed on the outer soil of the steel pipe 10.
  • the excavating blade mounting steel pipe 10 is inserted into the ground 15 while forming the groove 16.
  • each of the blade bodies 12b of the tip excavation blade 12 is provided with the inclination angle, the forward excavation blade 12 rotates, and a downward driving force acts on the entire excavation blade attachment steel pipe 10. For this reason, a regular-shaped spiral groove 16 with a constant interval is easily formed.
  • the hose 8 of the mortar supply device 1b is extracted from the steel pipe 11, and then the elevating head 4 is raised to pull up the steel pipe 11. Since each blade body 12b of the tip excavation blade 12 is in a state of biting into the ground 15, the tip excavation blade 12 is attached to the mounting portion 12c (by the resistance of the ground 15 acting on the tip excavation blade 12 by pulling up the steel pipe 11. 4), the steel pipe 11 is detached. Further, by pulling up the steel pipe 11, only the steel pipe 11 is pulled out from the ground 15 as shown in FIG. 6D, and the pile hole 17 that becomes the trace of the steel pipe 11 and the spiral groove 16 in the steel pipe 11. Mortar M flows in. The tip excavating blade 12 is left at the bottom of the pile hole 17.
  • This in-situ concrete pile 20 with a knot has a spiral knot 22 on the outer periphery of a columnar pile body 21, and this helix knot 22 bites into the ground 15. Further, in the process of inserting the excavating blade-attached steel pipe 10 into the ground 15, the soil of the portion that becomes the pile hole 17 is pushed around by the steel pipe 11 and the ground 15 is compacted. Therefore, the shear resistance of the pile peripheral surface is large.
  • This construction method of on-site cast-in-place concrete piles with knots does not mix and agitate the soil and solidified material in the field unlike the conventional columnar improvement method, so it is not affected by the state of the soil at the site. It is possible to construct a cast-in-place concrete pile 20 with a knot for stable ground reinforcement. In addition, there is no worry of toxic substances such as hexavalent chromium eluting depending on the soil.
  • FIGS. 7A, 7B, 8A, and 8B respectively show a state where the excavating blade is mounted and an excavating blade protruding state of the excavating blade-attached steel pipe 10 used in the method for constructing a knotted concrete pile with a node according to the second embodiment.
  • the tip excavation blade 32 attached to one end of the steel pipe 11 in the excavation blade attachment steel pipe 10 can be freely protruded and stored instead of being configured to be attached to and detached from the steel pipe 11. That is, the tip excavation blade 32 is partially protruded from the outer peripheral surface of the steel pipe 11 as shown in FIGS. 8A and 8B, and the entire inner periphery of the outer peripheral surface of the steel pipe as shown in FIGS. 7A and 7B.
  • the posture can be changed to the state of being housed.
  • the tip excavation blade 32 is provided with an excavation blade body 32b having a groove-shaped blade body on the lower surface of a disk-shaped lid portion 32a that closes the lower end opening of the steel pipe 11, and this excavation is performed.
  • a pair of projecting blades 32c which are other blade bodies, are provided at both ends of the lower surface of the blade body 32b.
  • Each projecting blade 32c is supported by a support shaft 33 parallel to the axis of the steel pipe 11 so as to be rotatable in both forward and reverse directions in the circumferential direction of the steel pipe 11 with respect to the excavating blade body 32b.
  • Each of the projecting and retracting blades 32c is locked by a stopper 34 provided on the excavating blade main body 32b so as to protrude most outward from the outer peripheral surface of the steel pipe 11, and rotation in one direction from this posture is prevented. Is done.
  • the direction in which the rotation is prevented is that when the steel pipe 11 is rotated forward, that is, when the excavating blade mounting steel pipe 10 is inserted into the ground, each projecting blade 32c of the tip excavating blade 32b is caused by the resistance of the ground. The direction is prevented from rotating.
  • a discharge port portion 35 is provided in the lid portion 32 a that closes the lower end opening of the steel pipe 11.
  • the discharge port portion 35 is a port for discharging the mortar M to the outside of the steel pipe, and has a check valve (not shown).
  • a tip of a hose 8 (FIG. 9) inserted into the steel pipe 11 is connected to the discharge port portion 35.
  • FIG. 9 shows a method for constructing a knotted in-situ concrete pile using the excavating blade-attached steel pipe 10 of FIGS. 7A, 7B and 8A, 8B.
  • This construction method is substantially the same as the construction method described above with reference to FIG. In this method, as shown in FIG. 9A, when the excavating blade mounting steel pipe 10 is penetrated into the ground 15, the tip excavating blade 32 is in a protruding state as shown in FIGS. 7A and 7B. is required.
  • the tip excavation blade 32 protrudes and is prevented from rotating by the stopper 33, and the tip excavation blade 33 maintains the protruding state. Therefore, it is not necessary to separately provide a drive source and an operation mechanism for projecting and storing the tip excavation blade 32 with respect to the steel pipe 11.
  • FIGS. 10A and 10B show a proposed example of the excavating blade mounting steel pipe.
  • the tip excavating blade 32 is provided with an excavating blade main body 32b having a groove-shaped front surface on the lower surface of a disc-shaped lid portion 32a that closes the lower end opening of the steel pipe 11.
  • a pair of protruding blades 32c are provided at both ends of 32b.
  • the tip excavation blade 32 is projected when penetrating into the ground 15 using the excavation blade mounting steel pipe 10 of FIGS. 7A and 7B and FIGS. 8A and 8B.
  • the tip excavation blade 32 may be stored. That is, when the excavation blade mounting steel pipe 10 is inserted into the ground 15, the tip excavation blade 32 is placed in the retracted state by rotating the excavation blade 32 in the opposite direction. In this stored state, the pile construction depth is penetrated. Thereafter, the tip excavation blade 32 is brought into a projecting state by rotating in the direction opposite to that during penetration (the forward direction).
  • a spiral groove 16 is formed on the outer periphery of a circular hole serving as a trace portion of the steel pipe 10 in the ground.
  • the mortar is discharged from the discharge port 35 at the lower end while forming the hole having the spiral groove 16, so that the nodal on-site concrete pile with a spiral node is formed.
  • FIGS. 11A and 11B show proposed examples of excavating blade-attached steel pipes.
  • the end excavating blade 32 is provided with two excavating blade main bodies 32b having a groove shape on the lower surface of a disc-shaped lid portion 32a that closes the lower end opening of the steel pipe 11 in a cross shape.
  • a pair of protruding blades 32c are provided at both ends of one of the excavating blade main bodies 32b.
  • 10A, 10B, and FIGS. 11A, 11B are similar to the examples of FIGS. 7A, 7B, 8A, and 8B in that the discharge port 35 is provided in the lid portion 32a.
  • mortar M is used as a material for the in-situ concrete pile 20 with knots, but instead of mortar M, ready-mixed concrete or cement milk may be used.
  • SYMBOLS 10 Excavation blade attachment steel pipe 11 ... Steel pipe 12 ... Tip excavation blade 12a ... Cover part 12b ... Blade body 12ba ... Outer diameter end part 12c ... Pin (attachment part) DESCRIPTION OF SYMBOLS 15 ... Ground 16 ... Spiral groove 17 ... Pile hole 20 ... In-situ concrete pile 22 with a node ... Node 32 ... Tip excavation blade 32b ... Excavation blade main body 32c ... Projection blade 34 ... Stopper M ... Mortar

Abstract

This method for constructing a knotted cast-in-place concrete-based pile comprises: a step for preparing an excavation blade-equipped steel pipe (10) in which a leading end excavation blade (12) is detachably attached to the lower end thereof; a step for inserting the excavation blade-equipped steel pipe (10) into the ground (15) while excavating downward by the leading end excavation blade (12) and forming a spiral groove in soil around the periphery of the steel pipe (11) by pushing down the excavation blade-equipped steel pipe while rotating the excavation blade-equipped steel pipe around the center axis of a steel pipe (11) in a given direction; a step for filling mortar or ready-mixed concrete into the steel pipe (11); and a step for pulling out only the steel pipe (11) from the ground (15) and pouring the mortar or ready-mixed concrete in the steel pipe (11) into a pile hole (17) that is formed after the steel pipe (11) has been pulled out and the spiral groove (16). The leading end excavation blade (12) may be freely housed in the steel pipe (11) instead of being detachable.

Description

節付き現場打ちコンクリート系杭の築造方法および掘削刃取付け鋼管Construction method of on-site cast-in-place concrete piles and steel pipes with excavation blades 関連出願Related applications
 この出願は、2012年8月29日出願の特願2012-188723の優先権を主張するものであり、その全体を参照により本願の一部をなすものとして引用する。 This application claims the priority of Japanese Patent Application No. 2012-188723 filed on Aug. 29, 2012, which is incorporated herein by reference in its entirety.
 この発明は、建物の基礎を支えるために地中に現場打ちで築造されるコンクリート系杭、特に外周面に螺旋状の節を有する節付き現場打ちコンクリート系杭の築造方法、この築造方法に用いる節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管、および前記築造方法により築造される節付き現場打ちコンクリート系杭に関する。 The present invention relates to a concrete pile built in-situ in the ground to support the foundation of a building, in particular, a method for building a cast-in-place concrete pile with a spiral node on the outer peripheral surface, and this construction method. The present invention relates to an excavating blade-attached steel pipe for constructing a node-cast concrete pile with a knot and a spot-cast concrete pile with a knot constructed by the construction method.
 軟弱な地盤の上に建物を建てる場合、柱状改良工法、小口径鋼管杭を埋設する工法等により地盤を補強することが行われている。柱状改良工法は、地盤に杭孔を掘削しながら、掘削した土に固化材を混入して撹拌することにより、土を固化材で固めた柱状改良杭を築造する工法である。 When building a building on soft ground, the ground is reinforced by a columnar improvement method, a method of burying small-diameter steel pipe piles, and the like. The columnar improvement method is a method of constructing a columnar improvement pile in which soil is solidified with a solidifying material by mixing and stirring the solidified material in the excavated soil while excavating a pile hole in the ground.
 また、上記柱状改良工法に代わるものとして、特許文献1に、先端に掘削爪を有する掘削オーガにより地盤に杭孔を掘削し、その杭孔にセメント等からなる水硬性固化材液を充填し、その後、掘削オーガを地盤から引き上げることにより、水硬性固化材液が固化した置換コラムを築造する工法が提案されている。 Moreover, as an alternative to the above columnar improvement method, in Patent Document 1, a pile hole is excavated in the ground with an excavation auger having an excavation claw at the tip, and a hydraulic solidifying material liquid made of cement or the like is filled in the pile hole, Thereafter, a method of constructing a replacement column in which the hydraulic solidifying material liquid is solidified by lifting the excavating auger from the ground has been proposed.
特開2011-106253号公報JP 2011-106253 A
 前記従来の柱状改良工法は、次のような問題がある。
・現場の土と固化材を現場で混合撹拌するため、現場の土質、施工者の違い等により、築造された柱状改良杭の品質にばらつきが生じる。
・固化不良や撹拌不良による強度不足を回避するために、多量の固化材スラリーを注入する必要がある場合があり、環境への負荷が大きい。
・土質によっては、六価クロム等の有害な物質が溶出する可能性がある。事前に六価クロム等が溶出するか否かを試験して、溶出が無いことを確認することは可能であるが、それには費用と期間を要する。
The conventional columnar improvement method has the following problems.
・ Since soil and solidified material are mixed and stirred at the site, the quality of the built-up pillar-shaped piles varies depending on the soil quality at the site and the difference in the installer.
-In order to avoid insufficient strength due to poor solidification or poor stirring, it may be necessary to inject a large amount of solidified material slurry, which places a heavy burden on the environment.
-Depending on the soil, harmful substances such as hexavalent chromium may be eluted. Although it is possible to test whether hexavalent chromium or the like is eluted in advance and confirm that there is no dissolution, this requires cost and time.
 小口径鋼管杭を埋設する工法は、次のような問題がある。
・小口径鋼管杭の先端を比較的硬い地盤(一般的にN値>10)に支持させる必要があるため、地盤によっては適用できない場合がある。
・小口径鋼管杭の腐食による劣化が懸念される。そのため、予め腐食しろを見込んで設計している。
The method of burying small diameter steel pipe piles has the following problems.
-Since it is necessary to support the front-end | tip of a small diameter steel pipe pile on comparatively hard ground (generally N value> 10), it may not be applied depending on the ground.
・ Deterioration due to corrosion of small diameter steel pipe piles. For this reason, it is designed in advance to allow for corrosion.
 特許文献1の方法は、現場の土を固化材と混合させないので、従来の柱状改良工法の各問題が生じない。しかし、特許文献1の方法は、水硬性固化材液が固化して形成された置換コラムの外周面が節の無い円筒状であるため、置換コラムの外周面と周囲の地盤とのせん断抵抗があまり大きくなく、その分、置換コラム径を大きくしなければならない。 The method of Patent Document 1 does not cause each problem of the conventional columnar improvement method because the soil at the site is not mixed with the solidifying material. However, in the method of Patent Document 1, since the outer peripheral surface of the replacement column formed by solidifying the hydraulic solidifying material liquid is cylindrical without a node, the shear resistance between the outer peripheral surface of the replacement column and the surrounding ground is low. The replacement column diameter must be increased accordingly.
 この発明の目的は、現場の土の状態に影響されることなく品質の安定した地盤補強用のコンクリート系杭を築造することができ、かつ築造されたコンクリート系杭の杭周面抵抗力が大きい節付き現場打ちコンクリート系杭の築造方法と、この築造方法に用いられる簡易な構成の掘削刃取付け鋼管を提供することである。
 この発明の他の目的は、杭周面抵抗力が大きい節付き現場打ちコンクリート系杭を提供することである。
The object of the present invention is to build a concrete pile for ground reinforcement with stable quality without being affected by the soil condition at the site, and the pile peripheral surface resistance force of the built concrete pile is large. The object is to provide a method for constructing a cast-in-place concrete pile with a knot and a steel pipe with a drilling blade attached in a simple configuration used in this construction method.
Another object of the present invention is to provide a knotted in-situ concrete pile having a large pile peripheral surface resistance.
 この発明の節付き現場打ちコンクリート系杭の築造方法は、鋼管の一端にこの鋼管の外周面よりも外周側に一部分が突出した刃体を有する先端掘削刃が、取外しまたは前記鋼管の外周面よりも内周側に収納が可能に取り付けられた掘削刃取付け鋼管を準備する過程と、
 前記掘削刃取付け鋼管を、前記先端掘削刃が下側となるように支持しかつ前記鋼管の外周面から前記一部分を突出させた状態で前記鋼管の中心軸回りに一定方向に回転させつつ押し下げることによって、前記先端掘削刃により下方に掘削しかつ前記鋼管の外周の土に螺旋状の溝を形成しながら地盤に挿入する過程と、
 前記鋼管内にモルタルまたは生コンクリートまたはセメントミルクを充填する過程と、
 前記鋼管を引き上げて前記鋼管から前記先端掘削刃を分離させ、または前記鋼管を逆回転させて前記先端掘削刃を前記鋼管の外径よりも内周側に収納し、前記鋼管を地盤から引き抜くことによって、前記鋼管の抜き跡となる杭孔および前記螺旋状の溝に前記鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む過程とを含む。
In the method for constructing a knotted concrete pile with a node according to the present invention, a tip excavating blade having a blade body partially protruding from the outer peripheral surface of the steel pipe at one end of the steel pipe is removed or from the outer peripheral surface of the steel pipe. A process of preparing a drilling blade mounting steel pipe attached to be able to be stored on the inner peripheral side,
Pushing down the steel pipe attached with the excavating blade while supporting the tip excavating blade to be on the lower side and rotating the steel pipe in a certain direction around the central axis of the steel pipe with the portion protruding from the outer peripheral surface of the steel pipe. The process of digging downward by the tip excavation blade and inserting it into the ground while forming a spiral groove in the outer periphery of the steel pipe,
Filling the steel pipe with mortar, ready-mixed concrete or cement milk;
Pulling up the steel pipe to separate the tip excavation blade from the steel pipe, or rotating the steel pipe reversely to store the tip excavation blade on the inner peripheral side of the outer diameter of the steel pipe, and pulling out the steel pipe from the ground And a process of pouring mortar, ready-mixed concrete, or cement milk in the steel pipe into the pile hole that becomes the trace of the steel pipe and the spiral groove.
 この節付き現場打ちコンクリート系杭の築造方法は、上記掘削刃取付け鋼管を用いて杭孔を掘削することにより、杭孔の外周に螺旋状の溝が形成される。鋼管に対して先端掘削刃が取外し可能であり、鋼管を引き上げることにより、先端掘削刃は鋼管から分離して杭孔の底部に残される。または、鋼管に対して先端掘削刃が収納可能であり、鋼管を逆回転させることで前記先端掘削刃が前記鋼管の外径よりも内周側に収納される。そのため、上記螺旋状の溝を壊さずに、鋼管のみを地盤から引き抜くことができる。このように形成された杭孔および螺旋状の溝にモルタルまたは生コンクリートまたはセメントミルクが流し込まれ、そのモルタルまたは生コンクリートまたはセメントミルクが硬化することで、螺旋状の節付きコンクリート系杭が現場打ちで築造される。 築 In this method of building a cast-in-place concrete pile with a knot, a spiral groove is formed on the outer periphery of the pile hole by excavating the pile hole using the above-described excavating blade-attached steel pipe. The tip excavation blade can be removed from the steel pipe, and by pulling up the steel pipe, the tip excavation blade is separated from the steel pipe and left at the bottom of the pile hole. Alternatively, the tip excavation blade can be stored with respect to the steel pipe, and the tip excavation blade is stored on the inner peripheral side of the outer diameter of the steel pipe by rotating the steel pipe in the reverse direction. Therefore, it is possible to pull out only the steel pipe from the ground without breaking the spiral groove. Mortar or ready-mixed concrete or cement milk is poured into the pile holes and spiral grooves formed in this way, and the mortar or ready-mixed concrete or cement milk is hardened, so that the spiral knotted concrete piles are cast in the field. Built in.
 この節付き現場打ちコンクリート系杭の築造方法は、従来の柱状改良工法のように、現場の土と固化材を混合撹拌することがないので、現場の土の状態に影響されることなく、常に品質の安定した地盤補強用のコンクリート系杭を築造することができる。また、土質によって六価クロム等の有害な物質が溶出する心配がない。 This construction method of on-site cast-in-place concrete piles with knots does not mix and agitate the soil and solidified material in the field unlike the conventional columnar improvement method, so it is not affected by the state of the soil at the site. It is possible to build concrete piles for stable ground reinforcement. In addition, there is no worry of toxic substances such as hexavalent chromium eluting depending on the soil.
 この方法でコンクリート系杭を築造すると、杭孔の周囲の土が鋼管によって周囲に押しやられて地盤が締め固められる。また、築造されたコンクリート系杭は、外周面に螺旋状の節を有するため、杭周面のせん断抵抗が大きい。これらのことから、コンクリート系杭の杭周面抵抗力が大きくとれる。 ¡When a concrete pile is built in this way, the soil around the pile hole is pushed around by the steel pipe and the ground is compacted. Moreover, since the constructed concrete pile has a spiral node on the outer peripheral surface, the shear resistance of the peripheral surface of the pile is large. From these things, the pile peripheral surface resistance force of a concrete pile can be taken largely.
 コンクリート系杭の杭周面抵抗力が大きいと、以下の利点がある。
・杭径を小さくすることが可能となり、材料費の削減を図ることができる。
・コンクリート系杭の材料が少なくて済み、環境負荷を低減することができる。
・杭先端をN値が比較的小さな地盤に支持させることができるため、杭長を短くすることができる。
When the pile surface resistance of concrete piles is large, there are the following advantages.
-It is possible to reduce the pile diameter and reduce material costs.
-Less material is required for concrete piles, and environmental load can be reduced.
-Since the tip of the pile can be supported by the ground having a relatively small N value, the pile length can be shortened.
 この発明の節付き現場打ちコンクリート系杭の築造方法において、前記杭孔および螺旋状の溝に前記鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む過程中に、前記鋼管に振動を与えて前記モルタルまたは生コンクリートまたはセメントミルクを締め固めてもよい。
 これにより、モルタルまたは生コンクリートまたはセメントミルクを杭孔および螺旋状の溝の隅々まで空隙無く行き渡らせることができ、築造された節付き現場打ちコンクリート系杭の品質を向上させることができる。
In the method of constructing a knotted concrete pile with a knot according to the present invention, during the process of pouring mortar in the steel pipe or fresh concrete or cement milk into the pile hole and the spiral groove, the steel pipe is vibrated to give vibration to the mortar. Alternatively, green concrete or cement milk may be compacted.
Thereby, mortar, ready-mixed concrete, or cement milk can be spread to the corners of the pile hole and the spiral groove without any gap, and the quality of the built-in-placed cast-in-place concrete pile can be improved.
 この発明の第1の節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管は、鋼管と、この鋼管の一端に取付部によって取り付けられて前記鋼管の外周面よりも外周側に一部分が突出した刃体を有する先端掘削刃とを備え、この先端掘削刃は、前記鋼管を地盤から引き上げることで前記先端掘削刃に作用する地盤の抵抗によって前記取付部で前記鋼管から外れるようになっている。
 この構造であると、この発明の前記節付き現場打ちコンクリート系杭の築造方法に使用でき、この築造方法における杭孔および螺旋状の溝に鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む過程で鋼管を引き上げる際に、地盤の抵抗によって鋼管から先端掘削刃が外れるので、鋼管と先端掘削刃とを分離させる機構を別に設ける必要がない。そのため、節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管を簡易な構成とすることができる。
A drilling blade mounting steel pipe for building a cast-in-place concrete pile with a first knot according to the present invention is a steel pipe, and is attached to one end of the steel pipe by a mounting portion, and a part protrudes to the outer peripheral side from the outer peripheral surface of the steel pipe. A tip excavating blade having a blade body is provided, and the tip excavating blade is detached from the steel pipe at the attachment portion by the resistance of the ground acting on the tip excavating blade by pulling up the steel pipe from the ground.
With this structure, it can be used in the method for constructing the above-mentioned spot cast-in-place concrete pile according to the present invention, and in the process of pouring mortar, ready-mixed concrete or cement milk in a steel pipe into the pile hole and spiral groove in this construction method. When the steel pipe is pulled up, the tip excavation blade is detached from the steel pipe due to the resistance of the ground, so that it is not necessary to provide a separate mechanism for separating the steel pipe and the tip excavation blade. Therefore, it is possible to simplify the construction of the excavating blade-attached steel pipe for constructing a knotted concrete pile with a knot.
 前記先端掘削刃は、例えば、前記鋼管の下端を閉塞する蓋部を有し、この蓋部に、前記刃体が固定され、前記取付部は、前記蓋部から上方に突出して、鋼管に設けられた係合部に着脱自在に係合するピンからなっている。この構成によれば、先端掘削刃の構成が簡単になる。 The tip excavation blade has, for example, a lid portion that closes the lower end of the steel pipe, the blade body is fixed to the lid portion, and the attachment portion protrudes upward from the lid portion and is provided on the steel pipe. It consists of a pin that detachably engages with the engaged portion. According to this configuration, the configuration of the tip excavation blade is simplified.
 この発明の第2の節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管は、鋼管と、この鋼管の一端に取り付けられて前記鋼管の外周面よりも外周側に一部分が突出した状態と全体が前記鋼管の外周面よりも内周側に収納された状態とに姿勢変更可能な突没刃を有する先端掘削刃とを有し、この先端掘削刃は、前記鋼管の周方向に回動自在であって、前記鋼管の外周面よりも外周側に一部分が突出する状態から一方向への回動がストッパにより阻止される。この回動が阻止される方向は、鋼管を正回転させるとき、つまり鋼管の地盤への挿入時に回転させるときに、先端掘削刃が地盤の抵抗で回動しないように阻止させる方向とする。 An excavating blade mounting steel pipe for building a cast-in-place concrete pile with a second node according to the present invention includes a steel pipe, a state in which a part of the steel pipe is attached to one end of the steel pipe and protrudes to the outer peripheral side from the outer peripheral surface of the steel pipe. Has a tip excavating blade having a projecting and retracting blade whose posture can be changed to a state in which it is housed on the inner peripheral side with respect to the outer peripheral surface of the steel pipe, and the tip excavating blade is rotatable in the circumferential direction of the steel pipe And the rotation to one direction from the state which a part protrudes to the outer peripheral side rather than the outer peripheral surface of the said steel pipe is blocked | prevented by a stopper. The direction in which the rotation is prevented is a direction in which the tip excavation blade is prevented from rotating due to the resistance of the ground when the steel pipe is rotated forward, that is, when the steel pipe is inserted into the ground.
 この構造の鋼管は、この発明の前記節付き現場打ちコンクリート系杭の築造方法に使用でき、杭孔および螺旋状の溝に鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む前に、鋼管を逆回転させることで、地盤の抵抗によって先端掘削刃が鋼管の外周面よりも内周側に収納される。また、鋼管を正回転させて地盤へ挿入する時は、先端掘削刃が前記ストッパで回動阻止され、先端掘削刃が突出状態を維持する。そのため、先端掘削刃を鋼管に対して突出および収納させる駆動源や操作機構を別に設ける必要がない。そのため、節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管を簡易な構成とすることができる。 The steel pipe of this structure can be used in the method of constructing the above-mentioned nodal cast-in-place concrete pile according to the present invention, and the steel pipe is inverted before pouring mortar, ready-mixed concrete or cement milk in the steel pipe into the pile hole and the spiral groove. By rotating, the tip excavation blade is accommodated on the inner peripheral side with respect to the outer peripheral surface of the steel pipe by the resistance of the ground. Further, when the steel pipe is rotated forward and inserted into the ground, the tip excavation blade is prevented from rotating by the stopper, and the tip excavation blade maintains the protruding state. Therefore, it is not necessary to separately provide a drive source and an operation mechanism for projecting and storing the tip excavation blade with respect to the steel pipe. Therefore, it is possible to simplify the construction of the excavating blade-attached steel pipe for constructing a knotted concrete pile with a knot.
 この発明の節付き現場打ちコンクリート系杭は、モルタルまたはコンクリートまたはセメントミルクからなる円柱状であり、外周に地盤内に食い込んだ螺旋状の突条を有する。 螺旋状の突条が地盤内に食い込むことで、杭周面のせん断抵抗が増大し、杭周面抵抗力が大きくなる。 The in-situ concrete pile with knots of this invention is a columnar shape made of mortar, concrete or cement milk, and has a spiral ridge that bites into the ground on the outer periphery. When the spiral ridges bite into the ground, the shear resistance of the pile peripheral surface increases and the pile peripheral surface resistance increases.
 請求の範囲および/または明細書および/または図面に開示された少なくとも2つの構成のどのような組合せも、本発明に含まれる。特に、請求の範囲の各請求項の2つ以上のどのような組合せも、本発明に含まれる。 Any combination of at least two configurations disclosed in the claims and / or the specification and / or drawings is included in the present invention. In particular, any combination of two or more of each claim in the claims is included in the present invention.
 この発明は、添付の図面を参考にした以下の好適な実施形態の説明からより明瞭に理解されるであろう。しかしながら、実施形態および図面は単なる図示および説明のためのものであり、この発明の範囲を定めるために利用されるべきものではない。この発明の範囲は添付の請求の範囲によって定まる。添付図面において、複数の図面における同一の部品番号は、同一または相当部分を示す。
この発明の一実施形態にかかる節付き現場打ちコンクリート系杭が築造された地盤の断面図である。 図1に示す節付き現場打ちコンクリート系杭を築造する施工装置の一例の全体構成を示す側面図である。 図1に示す節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管の組立斜視図である。 同掘削刃取付け鋼管の先端掘削刃の斜視図である。 同掘削刃取付け鋼管の破断平面図である。 図3に示す掘削刃取付け鋼管を用いて行う節付き現場打ちコンクリート系杭の築造方法の各過程を示す説明図である。 第2の実施形態にかかる節付き現場打ちコンクリート系杭の築造方法に用いる掘削刃取付け鋼管の掘削刃収納状態における下端部を示す正面図である。 図7Aの鋼管の下面図である。 同掘削刃取付け鋼管の掘削刃突出状態における下端部を示す正面図である。 図8Aの鋼管の下面図である。 図8Aに示す掘削刃取付け鋼管を用いて行う節付き現場打ちコンクリート系杭の築造方法の各過程を示す説明図である。 提案例に係る掘削刃取付け鋼管の下端部を示す正面図である。 図10Aの鋼管の下面図である。 他の提案例に係る掘削刃取付け鋼管の下端部を示す正面図である。 図11Aの鋼管の下面図である。
The present invention will be more clearly understood from the following description of preferred embodiments with reference to the accompanying drawings. However, the embodiments and drawings are for illustration and description only and should not be used to define the scope of the present invention. The scope of the invention is defined by the appended claims. In the accompanying drawings, the same part numbers in a plurality of drawings indicate the same or corresponding parts.
It is a sectional view of the ground where a spot cast-in-place concrete pile according to one embodiment of the present invention is built. It is a side view which shows the whole structure of an example of the construction apparatus which builds the node cast-in-place concrete pile shown in FIG. It is an assembly perspective view of the excavation blade attachment steel pipe for construction of a spot cast-in-place concrete pile shown in FIG. It is a perspective view of the tip excavation blade of the excavation blade attachment steel pipe. It is a fracture | rupture top view of the same excavation blade attachment steel pipe. It is explanatory drawing which shows each process of the construction method of the field cast-in-place concrete pile with a node performed using the excavation blade attachment steel pipe shown in FIG. It is a front view which shows the lower end part in the excavation blade accommodation state of the excavation blade attachment steel pipe used for the construction method of the cast-in-place concrete pile with a node concerning 2nd Embodiment. It is a bottom view of the steel pipe of Drawing 7A. It is a front view which shows the lower end part in the excavation blade protrusion state of the excavation blade attachment steel pipe. It is a bottom view of the steel pipe of Drawing 8A. It is explanatory drawing which shows each process of the construction method of the field cast-in-place concrete pile with a node performed using the excavation blade attachment steel pipe shown to FIG. 8A. It is a front view which shows the lower end part of the excavation blade attachment steel pipe concerning a proposal example. It is a bottom view of the steel pipe of Drawing 10A. It is a front view which shows the lower end part of the excavation blade attachment steel pipe concerning other proposal examples. It is a bottom view of the steel pipe of Drawing 11A.
 この発明の節付き現場打ちコンクリート系杭の築造方法を図1ないし図6と共に説明する。
 この節付き現場打ちコンクリート系杭の築造方法は、掘削刃取付け鋼管を含む施工装置によって、図1に一例を示す節付き現場打ちコンクリート系杭20を築造する方法である。築造された節付き現場打ちコンクリート系杭20は、円柱状の杭本体21の外周に螺旋状の節22が形成された形状をしている。
The construction method of the field cast-in-place concrete pile of this invention is demonstrated with FIG. 1 thru | or FIG.
This method for constructing a knotted cast-in-place concrete pile is a method of building a knotted cast-in-place concrete pile 20 shown as an example in FIG. The constructed in-situ concrete pile 20 with a knot has a shape in which a spiral knot 22 is formed on the outer periphery of a columnar pile body 21.
 図2は、上記節付き現場打ちコンクリート系杭20を築造する施工装置の一例の全体構成を示す側面図である。図示の施工装置1は、杭打ち装置1aとモルタル供給装置1bと掘削刃取付け鋼管10とで構成される。 FIG. 2 is a side view showing the overall configuration of an example of a construction apparatus for constructing the above-mentioned knotted concrete pile 20 with a knot. The illustrated construction apparatus 1 includes a pile driving apparatus 1a, a mortar supply apparatus 1b, and a drilling blade mounting steel pipe 10.
 杭打ち装置1aは、自走可能な作業車両2にガイド柱3が傾斜変更可能に支持され、このガイド柱3に沿って昇降自在な昇降ヘッド4に、後で詳述する掘削刃取付け鋼管10の上端が保持される。掘削刃取付け鋼管10は、昇降ヘッド4に設けた回転モータ5により回転させることが可能である。また、昇降ヘッド4には、掘削刃取付け鋼管10に対して振動を与えるバイブレータ6が設けられている。 The pile driving device 1a is supported by a self-propelled work vehicle 2 so that a guide column 3 can be changed in inclination, and an excavating blade-attached steel pipe 10 which will be described in detail later on an elevating head 4 which can be moved up and down along the guide column 3. The upper end of is held. The excavating blade-attached steel pipe 10 can be rotated by a rotary motor 5 provided on the elevating head 4. Further, the elevating head 4 is provided with a vibrator 6 that vibrates the excavating blade mounting steel pipe 10.
 モルタル供給装置1bは、モルタルMの入ったタンク7と、このタンク7内のモルタルを送り出すホース8とを有する。タンク7は、前記作業車両2とは別車両からなる。 The mortar supply device 1b has a tank 7 containing the mortar M and a hose 8 for sending out the mortar in the tank 7. The tank 7 is a separate vehicle from the work vehicle 2.
 前記掘削刃取付け鋼管10は、図3に示すように、鋼管11と、この鋼管11の下端に取り付けられた先端掘削刃12とでなる。先端掘削刃12は、図4のように、鋼管11の下端開口を閉塞する円板状の蓋部12aの下面に、複数個(図示例では2個)の刃体12bを固定して設けたものである。各刃体12bは、所定の掘削回転方向(A方向)に回転するとき下端側が先行するように傾斜角度が付けられている。また、各刃体12bの外径端部分12baは、取付部12aよりも外周側に突出している。よって、鋼管11の下端に先端掘削刃12を取り付けると、図3のように、各刃体12bの外径端部分12baが鋼管11の外周面よりも外周側に突出した状態となる。 The excavation blade mounting steel pipe 10 is composed of a steel pipe 11 and a tip excavation blade 12 attached to the lower end of the steel pipe 11 as shown in FIG. As shown in FIG. 4, the tip excavating blade 12 is provided with a plurality of (two in the illustrated example) blade bodies 12 b fixed to the lower surface of a disk-like lid portion 12 a that closes the lower end opening of the steel pipe 11. Is. Each blade body 12b is inclined so that the lower end is preceded when rotating in a predetermined excavation rotation direction (A direction). Further, the outer diameter end portion 12ba of each blade body 12b protrudes to the outer peripheral side with respect to the mounting portion 12a. Therefore, when the tip excavation blade 12 is attached to the lower end of the steel pipe 11, the outer diameter end portion 12ba of each blade body 12b protrudes to the outer peripheral side from the outer peripheral surface of the steel pipe 11 as shown in FIG.
 先端掘削刃12は、取付部12cによって鋼管11の下端に取外し可能に取り付けられる。図4および図5に示すように、この例の取付部12cは、蓋部12aの上面から上向きに突出する複数本(図示例では2本)のピン12caからなる。鋼管11に先端掘削刃12を取り付けた状態では、図5のように、前記各ピン12caが鋼管11の内周面に設けられた係合部11aに係合する。通常時は、ピン12caと係合部11aの摩擦抵抗により先端掘削刃12が鋼管11から外れないが、先端掘削刃12の軸方向位置が固定された状態で鋼管11を引き上げると、係合部11aからピン12caが抜けて先端掘削刃12が鋼管11の端面から外れる。鋼管11に先端掘削刃12を取り付けた状態では、鋼管11の回転が突起11aとピン12caを介して先端掘削刃12に伝えられる。 The tip excavation blade 12 is detachably attached to the lower end of the steel pipe 11 by the attachment portion 12c. As shown in FIGS. 4 and 5, the mounting portion 12 c of this example includes a plurality (two in the illustrated example) of pins 12 ca protruding upward from the upper surface of the lid portion 12 a. In a state where the tip excavation blade 12 is attached to the steel pipe 11, the respective pins 12 ca are engaged with engagement portions 11 a provided on the inner peripheral surface of the steel pipe 11 as shown in FIG. 5. Normally, the tip excavating blade 12 does not come off the steel pipe 11 due to the frictional resistance between the pin 12ca and the engaging portion 11a, but when the steel pipe 11 is pulled up with the axial position of the tip excavating blade 12 fixed, the engaging portion The pin 12ca is removed from 11a, and the tip excavation blade 12 is detached from the end surface of the steel pipe 11. In a state where the tip excavation blade 12 is attached to the steel pipe 11, the rotation of the steel pipe 11 is transmitted to the tip excavation blade 12 through the protrusion 11a and the pin 12ca.
 上記図3ないし図5に示す掘削刃取付け鋼管10を用いて行う節付き現場打ちコンクリート系杭の築造方法を説明する。
 まず、図2のように、施工装置1の昇降ヘッド4で鋼管11の上端を保持し、その鋼管11の下端に先端掘削刃12を取り付けることで、掘削刃取付け鋼管10を準備する。この掘削刃取付け鋼管10が地盤15の節付き現場打ちコンクリート系杭構築箇所の真上に位置するように、作業車両2で位置調整する。
The construction method of the in-situ concrete pile with a node performed using the excavation blade attachment steel pipe 10 shown in the said FIG. 3 thru | or FIG. 5 is demonstrated.
First, as shown in FIG. 2, the upper end of the steel pipe 11 is held by the lifting head 4 of the construction apparatus 1, and the tip excavation blade 12 is attached to the lower end of the steel pipe 11 to prepare the excavation blade mounting steel pipe 10. The position of the excavating blade-attached steel pipe 10 is adjusted by the work vehicle 2 so that the excavated blade-attached steel pipe 10 is located immediately above the site-built concrete pile pile construction site of the ground 15.
 この状態で、回転モータ5を駆動して掘削刃取付け鋼管10を鋼管11の中心軸回りに前記掘削回転方向Aに回転させつつ、ガイド柱3に沿って昇降ヘッド4を一定速度で下降させて掘削刃取付け鋼管10を押し下げる。これにより、図6(A)のように、先端掘削刃12の各刃体12b全体により下方に掘削し、かつ各刃体12bの外径端部分12baにより鋼管10の外周の土に螺旋状の溝16を形成しながら、掘削刃取付け鋼管10が地盤15に挿入される。先端掘削刃12の各刃体12bに前記傾斜角度が付けられているため、先端掘削刃12が回転することにより、掘削刃取付け鋼管10全体に対して下向きへの推進力が働く。このため、間隔が一定した規則的な形状の螺旋状の溝16が形成され易い。 In this state, the rotary motor 5 is driven to rotate the excavating blade mounting steel pipe 10 around the central axis of the steel pipe 11 in the excavation rotation direction A, and the elevating head 4 is lowered along the guide pillar 3 at a constant speed. The excavating blade mounting steel pipe 10 is pushed down. As a result, as shown in FIG. 6 (A), the entire blade body 12b of the tip excavating blade 12 is excavated downward, and the outer diameter end portion 12ba of each blade body 12b is spirally formed on the outer soil of the steel pipe 10. The excavating blade mounting steel pipe 10 is inserted into the ground 15 while forming the groove 16. Since each of the blade bodies 12b of the tip excavation blade 12 is provided with the inclination angle, the forward excavation blade 12 rotates, and a downward driving force acts on the entire excavation blade attachment steel pipe 10. For this reason, a regular-shaped spiral groove 16 with a constant interval is easily formed.
 上記動作を継続して、図6(B)のように、掘削刃取付け鋼管10が地盤15に地表から定められた深さまで挿入されると、回転モータ5の駆動および昇降ヘッド4の下降を停止する。次いで、図6(C)のように、モルタル供給装置1bのホース8を掘削刃取付け鋼管10の鋼管11内に上端側から挿入し、ホース8の先端を鋼管11の下端付近まで延ばす。そして、ホース8の先端からモルタルMを吐出させて、鋼管11内の上端までモルタルMを充填する。 When the above operation is continued and the excavating blade mounting steel pipe 10 is inserted into the ground 15 to a predetermined depth from the ground surface as shown in FIG. 6B, the driving of the rotary motor 5 and the lowering of the lifting head 4 are stopped. To do. Next, as shown in FIG. 6C, the hose 8 of the mortar supply device 1 b is inserted into the steel pipe 11 of the excavating blade-attached steel pipe 10 from the upper end side, and the tip of the hose 8 is extended to the vicinity of the lower end of the steel pipe 11. And the mortar M is discharged from the front-end | tip of the hose 8, and the mortar M is filled to the upper end in the steel pipe 11. FIG.
 モルタルMの充填が完了したら、モルタル供給装置1bのホース8を鋼管11から抜き取り、その後、昇降ヘッド4を上昇させて鋼管11を引き上げる。先端掘削刃12の各刃体12bが地盤15に食い込んだ状態となっているため、鋼管11を引き上げることで、先端掘削刃12に作用する地盤15の抵抗によって先端掘削刃12が取付部12c(図4)で鋼管11から外れる。さらに、鋼管11を引き上げることにより、図6(D)のように、鋼管11のみが地盤15から引き抜かれ、鋼管11の抜き跡となる杭孔17および前記螺旋状の溝16に鋼管11内のモルタルMが流れ込む。先端掘削刃12は、杭孔17の底に残される。鋼管11を引き上げる際にバイブレータ6(図2)により鋼管11に振動を与えることで、モルタルMが締め固められ、杭孔17および螺旋状の溝16の隅々までモルタルMを空隙無く行き渡らせることができる。 When the filling of the mortar M is completed, the hose 8 of the mortar supply device 1b is extracted from the steel pipe 11, and then the elevating head 4 is raised to pull up the steel pipe 11. Since each blade body 12b of the tip excavation blade 12 is in a state of biting into the ground 15, the tip excavation blade 12 is attached to the mounting portion 12c (by the resistance of the ground 15 acting on the tip excavation blade 12 by pulling up the steel pipe 11. 4), the steel pipe 11 is detached. Further, by pulling up the steel pipe 11, only the steel pipe 11 is pulled out from the ground 15 as shown in FIG. 6D, and the pile hole 17 that becomes the trace of the steel pipe 11 and the spiral groove 16 in the steel pipe 11. Mortar M flows in. The tip excavating blade 12 is left at the bottom of the pile hole 17. When the steel pipe 11 is pulled up, vibration is applied to the steel pipe 11 by the vibrator 6 (FIG. 2), so that the mortar M is compacted, and the mortar M is spread to the corners of the pile hole 17 and the spiral groove 16 without a gap. Can do.
 図6(E)のように、鋼管11を完全に引き抜いたなら、その後、杭孔17および螺旋状の溝16に流し込まれたモルタルMの頭頂部Maを平滑に均す。これにより施工が完了する。モルタルMが硬化することにより、図1に示す節付き現場打ちコンクリート系杭20となる。 If the steel pipe 11 is completely pulled out as shown in FIG. 6 (E), then the top portion Ma of the mortar M poured into the pile hole 17 and the spiral groove 16 is smoothed. This completes the construction. When the mortar M is hardened, it becomes a knotted concrete pile 20 with a node shown in FIG.
 この節付き現場打ちコンクリート系杭20は、円柱状の杭本体21の外周に螺旋状の節22を有し、この螺旋状の節22が地盤15に食い込んでいる。また、掘削刃取付け鋼管10を地盤15に挿入する過程において、杭孔17となる部分の土が鋼管11によって周囲に押しやられて地盤15が締め固められる。そのため、杭周面のせん断抵抗が大きい。 This in-situ concrete pile 20 with a knot has a spiral knot 22 on the outer periphery of a columnar pile body 21, and this helix knot 22 bites into the ground 15. Further, in the process of inserting the excavating blade-attached steel pipe 10 into the ground 15, the soil of the portion that becomes the pile hole 17 is pushed around by the steel pipe 11 and the ground 15 is compacted. Therefore, the shear resistance of the pile peripheral surface is large.
 節付き現場打ちコンクリート系杭20の杭周面抵抗力が大きいと、以下の利点がある。
・杭径を小さくすることが可能となり、材料費の削減を図ることができる。
・節付き現場打ちコンクリート系杭20の材料が少なくて済み、環境負荷を低減することができる。
・杭先端をN値が比較的小さな地盤に支持させることができるため、杭長を短くすることができる。
When the pile peripheral surface resistance force of the in-situ concrete pile 20 with a node is large, there are the following advantages.
-It is possible to reduce the pile diameter and reduce material costs.
-The material of the cast-in-place concrete pile 20 with a node is small, and the environmental load can be reduced.
-Since the tip of the pile can be supported by the ground having a relatively small N value, the pile length can be shortened.
 この節付き現場打ちコンクリート系杭の築造方法は、従来の柱状改良工法のように、現場の土と固化材を混合撹拌することがないので、現場の土の状態に影響されることなく、常に品質の安定した地盤補強用の節付き現場打ちコンクリート系杭20を築造することができる。また、土質によって六価クロム等の有害な物質が溶出する心配がない。 This construction method of on-site cast-in-place concrete piles with knots does not mix and agitate the soil and solidified material in the field unlike the conventional columnar improvement method, so it is not affected by the state of the soil at the site. It is possible to construct a cast-in-place concrete pile 20 with a knot for stable ground reinforcement. In addition, there is no worry of toxic substances such as hexavalent chromium eluting depending on the soil.
 図7A,7B、図8A,8Bは、それぞれ、第2の実施形態にかかる節付き現場打ちコンクリート系杭の築造方法に用いる掘削刃取付け鋼管10の掘削刃収納状態および掘削刃突出状態を示す。この実施形態では、掘削刃取付け鋼管10における鋼管11の一端に取付ける先端掘削刃32を、鋼管11に対して着脱する構成とする代わりに、突出・収納が自在なものとしている。すなわち、先端掘削刃32は、図8A,8Bのように鋼管11の外周面よりも外周側に一部分が突出した状態と、図7A,7Bのように全体が鋼管の外周面よりも内周側に収納された状態とに姿勢変更可能とされている。 FIGS. 7A, 7B, 8A, and 8B respectively show a state where the excavating blade is mounted and an excavating blade protruding state of the excavating blade-attached steel pipe 10 used in the method for constructing a knotted concrete pile with a node according to the second embodiment. In this embodiment, the tip excavation blade 32 attached to one end of the steel pipe 11 in the excavation blade attachment steel pipe 10 can be freely protruded and stored instead of being configured to be attached to and detached from the steel pipe 11. That is, the tip excavation blade 32 is partially protruded from the outer peripheral surface of the steel pipe 11 as shown in FIGS. 8A and 8B, and the entire inner periphery of the outer peripheral surface of the steel pipe as shown in FIGS. 7A and 7B. The posture can be changed to the state of being housed.
 この先端掘削刃32は、具体的には、鋼管11の下端開口を閉塞する円板状の蓋部32aの下面に、正面形状が溝形の刃体である掘削刃本体32bを設け、この掘削刃本体32bの下面の両端に、他の刃体である一対の突没刃32cをそれぞれ設けている。各突没刃32cは、鋼管11の軸心と平行な支軸33によって、掘削刃本体32bに対して鋼管11の周方向に正逆両方向に回動自在に支持される。これら各突没刃32cは、掘削刃本体32bに設けられたストッパ34により、鋼管11の外周面よりも外周側に最も突出する姿勢で係止され、この姿勢から一方向への回動が阻止される。この回動が阻止される方向は、鋼管11を正回転させるとき、つまり掘削刃取付け鋼管10の地盤への挿入時に回転させるときに、先端掘削刃32bの各突没刃32cが地盤の抵抗で回動しないように阻止される方向とする。 Specifically, the tip excavation blade 32 is provided with an excavation blade body 32b having a groove-shaped blade body on the lower surface of a disk-shaped lid portion 32a that closes the lower end opening of the steel pipe 11, and this excavation is performed. A pair of projecting blades 32c, which are other blade bodies, are provided at both ends of the lower surface of the blade body 32b. Each projecting blade 32c is supported by a support shaft 33 parallel to the axis of the steel pipe 11 so as to be rotatable in both forward and reverse directions in the circumferential direction of the steel pipe 11 with respect to the excavating blade body 32b. Each of the projecting and retracting blades 32c is locked by a stopper 34 provided on the excavating blade main body 32b so as to protrude most outward from the outer peripheral surface of the steel pipe 11, and rotation in one direction from this posture is prevented. Is done. The direction in which the rotation is prevented is that when the steel pipe 11 is rotated forward, that is, when the excavating blade mounting steel pipe 10 is inserted into the ground, each projecting blade 32c of the tip excavating blade 32b is caused by the resistance of the ground. The direction is prevented from rotating.
 鋼管11の下端開口を閉塞する蓋部32aには、吐出口部35が設けられている。この吐出口部35は、モルタルMを鋼管外へ吐出させる口であり、逆止弁(図示せず)を有している。吐出口部35には鋼管11内に挿入されたホース8(図9)の先端が接続される。 A discharge port portion 35 is provided in the lid portion 32 a that closes the lower end opening of the steel pipe 11. The discharge port portion 35 is a port for discharging the mortar M to the outside of the steel pipe, and has a check valve (not shown). A tip of a hose 8 (FIG. 9) inserted into the steel pipe 11 is connected to the discharge port portion 35.
 図9は、図7A,7B、図8A,8Bの掘削刃取付け鋼管10を用いる節付き現場打ちコンクリート杭の築造方法を示す。この構築方法は、特に説明する事項の他は、図6と共に前述した構築方法と略同様である。
 この方法では、図9(A)のように、掘削刃取付け鋼管10を地盤15へ貫入させるときに、先端掘削刃32は、突没刃32cが図7A,7Bのように突出状態であることが必要である。しかし、貫入開始前の突没刃32cの姿勢に係わらず、突没刃32cが地盤15に接して掘削刃取付け鋼管10が正方向に回転させられると、突没刃32cは回転に対する地盤15の反力で突出方向に回動し、図8A,8Bのように最も突出した状態で、ストッパ34で支持されて突出状態で維持される。そのため、突没刃32cを突出させる作業や操作は特には不要である。
FIG. 9 shows a method for constructing a knotted in-situ concrete pile using the excavating blade-attached steel pipe 10 of FIGS. 7A, 7B and 8A, 8B. This construction method is substantially the same as the construction method described above with reference to FIG.
In this method, as shown in FIG. 9A, when the excavating blade mounting steel pipe 10 is penetrated into the ground 15, the tip excavating blade 32 is in a protruding state as shown in FIGS. 7A and 7B. is required. However, regardless of the attitude of the submerged blade 32c before the start of penetration, when the submerged blade 32c is in contact with the ground 15 and the excavating blade mounting steel pipe 10 is rotated in the forward direction, the submerged blade 32c is rotated by the ground 15 against the rotation. It rotates in the protruding direction by the reaction force, and is supported by the stopper 34 and maintained in the protruding state in the most protruding state as shown in FIGS. 8A and 8B. Therefore, the work and operation for projecting the projecting and retracting blade 32c are not particularly required.
 図9(B)のように掘削刃取付け鋼管10の貫入が完了し、同図(C)のようにモルタル充填を開始した後、同図(D)のように掘削刃取付け鋼管10を引き上げるときに、掘削刃取付け鋼管10を貫入時は逆方向に回転させる。この逆回転により、先端掘削刃32の突没刃32cは、回転に対する地盤15の反力により、図7A,7Bのように突没刃32cが鋼管11の外周面よりも内周側に収納された状態となる。そのため、この実施形態においても、地盤15に形成された螺旋状の溝16を壊さずに、掘削刃取付け鋼管10を地盤15から引き抜くことができる。また、鋼管11を正回転させて地盤15へ挿入する時は、先端掘削刃32が突出してストッパ33で回動阻止され、先端掘削刃33が突出状態を維持する。そのため、先端掘削刃32を鋼管11に対して突出および収納させる駆動源や操作機構を別に設ける必要がない。 When the penetration of the excavating blade mounting steel pipe 10 is completed as shown in FIG. 9B and mortar filling is started as shown in FIG. 9C, and then the excavating blade mounting steel pipe 10 is pulled up as shown in FIG. The excavating blade mounting steel pipe 10 is rotated in the reverse direction when penetrating. By this reverse rotation, the projecting blade 32c of the tip excavating blade 32 is housed on the inner peripheral side of the outer peripheral surface of the steel pipe 11 as shown in FIGS. 7A and 7B by the reaction force of the ground 15 with respect to the rotation. It becomes a state. Therefore, also in this embodiment, the excavating blade mounting steel pipe 10 can be pulled out from the ground 15 without breaking the spiral groove 16 formed in the ground 15. Further, when the steel pipe 11 is rotated forward and inserted into the ground 15, the tip excavation blade 32 protrudes and is prevented from rotating by the stopper 33, and the tip excavation blade 33 maintains the protruding state. Therefore, it is not necessary to separately provide a drive source and an operation mechanism for projecting and storing the tip excavation blade 32 with respect to the steel pipe 11.
 この実施形態においても、上記実施形態と同様な各効果が得られる。上記実施形態における説明と重複するが、作用・効果を纏め直して次に示す。
・杭周面抵抗力が大きいため、杭径を小さくすることができ、節の効果によりさらに小さくすることができるため、材料費の削減をすることができる。
・材料のボリュームを小さくできるため、環境負荷を低減することができる。
・先端掘削刃32が突没可能であるため、鋼管引き抜き時のみ節を付けることが可能で、節の数を少なくすることができる。
・先端掘削刃32を地中に残すことなく施工できるため、先端掘削刃32が使い捨てとならず、コストを削減できる。
・杭周面の締固め効果と節により杭周面のせん断抵抗が増大するため、杭周面抵抗力が大きく取れる。
・現場の土の状態に影響されることなく、安定した品質の節付き現場打ちコンクリート系杭20を築造できる。
・杭周面抵抗力が大きいため、杭先端地盤のN値が比較的小さなところでも支持することができ、杭長を短くすることができる。
・吐出口35の下方に先端掘削刃32が設けられることで、吐出口35に当たる地盤をほぐし、吐出口35の損傷を和らげることができる。
Also in this embodiment, the same effects as in the above embodiment can be obtained. Although overlapping with the description in the above embodiment, the actions and effects are summarized below.
-Since the pile peripheral surface resistance force is large, the pile diameter can be reduced, and since it can be further reduced by the effect of the node, the material cost can be reduced.
-Since the volume of the material can be reduced, the environmental load can be reduced.
-Since the tip excavation blade 32 can project and retract, it is possible to attach nodes only when the steel pipe is pulled out, and the number of nodes can be reduced.
-Since it can construct without leaving the tip excavation blade 32 in the ground, the tip excavation blade 32 is not disposable, and cost can be reduced.
・ Shear resistance of pile peripheral surface is increased by pile compaction effect and joints, so that pile peripheral surface resistance can be increased.
-It is possible to build a stable cast-in-place concrete pile 20 with a knot without being affected by the soil condition at the site.
-Since the pile peripheral surface resistance is large, it can be supported even when the N value of the pile tip ground is relatively small, and the pile length can be shortened.
By providing the tip excavation blade 32 below the discharge port 35, the ground hitting the discharge port 35 can be loosened, and damage to the discharge port 35 can be reduced.
 図10A,10Bは、掘削刃取付け鋼管の提案例を示す。この掘削刃取付け鋼管10Aでは、先端掘削刃32が、鋼管11の下端開口を閉塞する円板状の蓋部32aの下面に、正面形状が溝形の掘削刃本体32bを設け、この掘削刃本体32bの両端に、一対の突出刃32cをそれぞれ設けた構成とされている。 FIGS. 10A and 10B show a proposed example of the excavating blade mounting steel pipe. In this excavating blade-attached steel pipe 10A, the tip excavating blade 32 is provided with an excavating blade main body 32b having a groove-shaped front surface on the lower surface of a disc-shaped lid portion 32a that closes the lower end opening of the steel pipe 11. A pair of protruding blades 32c are provided at both ends of 32b.
 なお、図9の実施形態では、図7A,7Bおよび図8A,8Bの掘削刃取付け鋼管10を用いて、地盤15へ貫入させるときに先端掘削刃32を突出させたが、前記とは逆に、掘削刃取付け鋼管10を地盤15へ貫入させるときに先端掘削刃32を収納状態としても良い。すなわち、掘削刃取付け鋼管10を地盤15へ貫入させるときに、前記とは逆方向に回転させることで、先端掘削刃32は突没刃32cが収納状態になる。この収納状態で、杭構築深さまで貫入させる。この後、貫入時とは逆の方向(前記の正方向)に回転させることで、先端掘削刃32が突出状態となる。この方向に回転させながら掘削刃取付け鋼管10を引き上げることにより、地盤に、鋼管10の抜き跡部分となる円形の孔の外周に螺旋状の溝16が形成される。このように、鋼管10の引き上げ時に、螺旋状の溝16を有する孔を形成しながら、モルタルを下端の吐出口35から吐出させることで、螺旋状の節を有する節付き現場打ちコンクリート系杭が構築される。 In the embodiment of FIG. 9, the tip excavation blade 32 is projected when penetrating into the ground 15 using the excavation blade mounting steel pipe 10 of FIGS. 7A and 7B and FIGS. 8A and 8B. When the excavation blade mounting steel pipe 10 is penetrated into the ground 15, the tip excavation blade 32 may be stored. That is, when the excavation blade mounting steel pipe 10 is inserted into the ground 15, the tip excavation blade 32 is placed in the retracted state by rotating the excavation blade 32 in the opposite direction. In this stored state, the pile construction depth is penetrated. Thereafter, the tip excavation blade 32 is brought into a projecting state by rotating in the direction opposite to that during penetration (the forward direction). By pulling up the excavating blade-attached steel pipe 10 while rotating in this direction, a spiral groove 16 is formed on the outer periphery of a circular hole serving as a trace portion of the steel pipe 10 in the ground. As described above, when the steel pipe 10 is pulled up, the mortar is discharged from the discharge port 35 at the lower end while forming the hole having the spiral groove 16, so that the nodal on-site concrete pile with a spiral node is formed. Built.
 この場合も、掘削刃取付け鋼管10の貫入時と引き上げ時とのうち、片方だけで螺旋状の溝16を形成することになるため、形成済みの螺旋状の溝16に先端掘削刃32が再度通って溝形状を崩したり、二重に溝を形成するという問題を生じることなく、綺麗な螺旋状の節22(図1)が形成される。 Also in this case, since the spiral groove 16 is formed by only one of the drilling blade mounting steel pipe 10 when it is inserted and pulled, the tip excavation blade 32 is again formed in the formed spiral groove 16. A beautiful spiral node 22 (FIG. 1) is formed without causing the problem of breaking through the groove shape or forming a double groove.
 図11A,11Bは、掘削刃取付け鋼管の提案例を示す。この掘削刃取付け鋼管10Bでは、先端掘削刃32が、鋼管11の下端開口を閉塞する円板状の蓋部32aの下面に、正面形状が溝形の掘削刃本体32bを十字状に2枚設け、片方の掘削刃本体32bの両端に、一対の突出刃32cをそれぞれ設けている。
 図10A,10B、図11A,11Bの両例とも、蓋部32aに吐出口35を設けたことについては、図7A,7B、図8A,8Bの例と同様である。
11A and 11B show proposed examples of excavating blade-attached steel pipes. In this excavating blade-attached steel pipe 10B, the end excavating blade 32 is provided with two excavating blade main bodies 32b having a groove shape on the lower surface of a disc-shaped lid portion 32a that closes the lower end opening of the steel pipe 11 in a cross shape. A pair of protruding blades 32c are provided at both ends of one of the excavating blade main bodies 32b.
10A, 10B, and FIGS. 11A, 11B are similar to the examples of FIGS. 7A, 7B, 8A, and 8B in that the discharge port 35 is provided in the lid portion 32a.
 これら図10A,10Bまたは図11A,11Bの掘削刃取付け鋼管10A,10Bにおいても、節付き現場打ちコンクリート系杭の築造は可能であるが、これらの例では先端掘削刃32が鋼管11の外周から突出した状態で掘削刃取付け鋼管10A,10Bが引き抜かれるため、鋼管貫入時に地盤に形成されたらせん状の溝が、掘削刃取付け鋼管10A,10Bの引き抜き時に損傷するという課題がある。 10A, 10B or FIGS. 11A, 11B, it is possible to construct a knotted concrete pile with a knot in place, but in these examples, the tip excavating blade 32 extends from the outer periphery of the steel pipe 11. Since the drilling blade mounting steel pipes 10A and 10B are pulled out in a protruding state, there is a problem that the spiral groove formed in the ground when the steel pipe penetrates is damaged when the drilling blade mounting steel pipes 10A and 10B are pulled out.
 なお、上記各築造方法では、節付き現場打ちコンクリート系杭20の材料としてモルタルMを使用しているが、モルタルMの代わりに生コンクリートまたはセメントミルクを使用してもよい。 In each of the above construction methods, mortar M is used as a material for the in-situ concrete pile 20 with knots, but instead of mortar M, ready-mixed concrete or cement milk may be used.
 以上のとおり、図面を参照しながら好適な実施形態を説明したが、当業者であれば、本件明細書を見て、自明な範囲内で種々の変更および修正を容易に想定するであろう。したがって、そのような変更および修正は、添付の特許請求の範囲から定まるこの発明の範囲内のものと解釈される。 As described above, the preferred embodiments have been described with reference to the drawings. However, those skilled in the art will readily assume various changes and modifications within the obvious scope by looking at the present specification. Accordingly, such changes and modifications are to be construed as within the scope of the invention as defined by the appended claims.
10…掘削刃取付け鋼管
11…鋼管
12…先端掘削刃
12a…蓋部
12b…刃体
12ba…外径端部分
12c…ピン(取付部)
15…地盤
16…螺旋状の溝
17…杭孔
20…節付き現場打ちコンクリート系杭
22…節
32…先端掘削刃
32b…掘削刃本体
32c…突没刃
34…ストッパ
M…モルタル
DESCRIPTION OF SYMBOLS 10 ... Excavation blade attachment steel pipe 11 ... Steel pipe 12 ... Tip excavation blade 12a ... Cover part 12b ... Blade body 12ba ... Outer diameter end part 12c ... Pin (attachment part)
DESCRIPTION OF SYMBOLS 15 ... Ground 16 ... Spiral groove 17 ... Pile hole 20 ... In-situ concrete pile 22 with a node ... Node 32 ... Tip excavation blade 32b ... Excavation blade main body 32c ... Projection blade 34 ... Stopper M ... Mortar

Claims (6)

  1.  鋼管の一端にこの鋼管の外周面よりも外周側に一部分が突出した刃体を有する先端掘削刃が、取外しまたは前記鋼管の外周面よりも内周側に収納が可能に取り付けられた掘削刃取付け鋼管を準備する過程と、
     前記掘削刃取付け鋼管を、前記先端掘削刃が下側となるように支持しかつ前記鋼管の外周面から前記一部分を突出させた状態で前記鋼管の中心軸回りに一定方向に回転させつつ押し下げることによって、前記先端掘削刃により下方に掘削しかつ前記鋼管の外周の土に螺旋状の溝を形成しながら地盤に挿入する過程と、
     前記鋼管内にモルタルまたは生コンクリートまたはセメントミルクを充填する過程と、
     前記鋼管を引き上げて前記鋼管から前記先端掘削刃を分離させ、または前記鋼管を逆回転させて前記先端掘削刃を前記鋼管の外径よりも内周側に収納し、前記鋼管を地盤から引き抜くことによって、前記鋼管の抜き跡となる杭孔および前記螺旋状の溝に前記鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む過程と、
     を含む節付き現場打ちコンクリート系杭の築造方法。
    Excavation blade attachment in which a tip excavation blade having a blade body partially protruding from the outer peripheral surface of the steel pipe is attached to one end of the steel pipe so that it can be removed or stored on the inner peripheral side of the outer peripheral surface of the steel pipe The process of preparing the steel pipe,
    Pushing down the steel pipe attached with the excavating blade while supporting the tip excavating blade to be on the lower side and rotating the steel pipe in a certain direction around the central axis of the steel pipe with the portion protruding from the outer peripheral surface of the steel pipe. The process of digging downward by the tip excavation blade and inserting it into the ground while forming a spiral groove in the outer periphery of the steel pipe,
    Filling the steel pipe with mortar, ready-mixed concrete or cement milk;
    Pulling up the steel pipe to separate the tip excavation blade from the steel pipe, or rotating the steel pipe reversely to store the tip excavation blade on the inner peripheral side of the outer diameter of the steel pipe, and pulling out the steel pipe from the ground The process of pouring mortar, ready-mixed concrete, or cement milk in the steel pipe into the pile hole and the spiral groove that are traces of the steel pipe,
    Method for construction of cast-in-place concrete piles with knots.
  2.  請求項1に記載の節付き現場打ちコンクリート系杭の築造方法において、前記杭孔および螺旋状の溝に前記鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む過程中に、前記鋼管に振動を与えて前記モルタルまたは生コンクリートまたはセメントミルクを締め固める節付き現場打ちコンクリート系杭の築造方法。 2. The method for constructing a cast-in-place concrete pile with a node according to claim 1, wherein vibration is applied to the steel pipe during a process of pouring mortar, ready-mixed concrete or cement milk in the steel pipe into the pile hole and a spiral groove. A method for building a cast-in-place concrete pile with a knot that compacts the mortar, ready-mixed concrete or cement milk.
  3.  鋼管と、この鋼管の一端に取付部によって取り付けられて前記鋼管の外周面よりも外周側に一部分が突出した刃体を有する先端掘削刃とでなり、この先端掘削刃は、前記鋼管を地盤から引き上げることで前記先端掘削刃に作用する地盤の抵抗によって前記取付部で前記鋼管から外れる節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管。 A steel pipe, and a tip excavating blade having a blade body attached to one end of the steel pipe by a mounting portion and protruding partly on the outer peripheral side of the outer peripheral surface of the steel pipe. The tip excavating blade is configured to remove the steel pipe from the ground. An excavating blade-attached steel pipe for building a cast-in-place concrete pile with a node that is detached from the steel pipe at the attaching portion due to the resistance of the ground acting on the tip excavating blade by being pulled up.
  4.  請求項3に記載の掘削刃取付け鋼管において、前記先端掘削刃は、前記鋼管の下端を閉塞する蓋部を有し、この蓋部に、前記刃体が固定され、前記取付部は、前記蓋部から上方に突出して、鋼管に設けられた係合部に着脱自在に係合するピンからなる節付き現場打ちコンクリート杭築造用の掘削刃取付け鋼管。 4. The excavating blade-attached steel pipe according to claim 3, wherein the tip excavating blade has a lid portion that closes a lower end of the steel pipe, and the blade body is fixed to the lid portion, and the attaching portion includes the lid An excavating blade-attached steel pipe for building a cast-in-place concrete pile with a knot, comprising a pin that protrudes upward from the part and detachably engages with an engaging part provided on the steel pipe.
  5.  鋼管と、この鋼管の一端に取り付けられて前記鋼管の外周面よりも外周側に一部分が突出した状態と全体が前記鋼管の外周面よりも内周側に収納された状態とに姿勢変更可能な突没刃を有する先端掘削刃とを有し、この先端掘削刃は、前記鋼管の周方向に回動自在であって、前記鋼管の外周面よりも外周側に一部分が突出する状態から一方向への回動がストッパにより阻止される節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管。 The posture can be changed between a steel pipe and a state where a part of the steel pipe is attached to one end of the steel pipe and protrudes to the outer peripheral side from the outer peripheral surface of the steel pipe and a state in which the whole is housed on the inner peripheral side of the outer peripheral surface of the steel pipe. A tip excavating blade having a projecting and subtracting blade, and the tip excavating blade is rotatable in the circumferential direction of the steel pipe and is unidirectional from a state in which a part projects to the outer peripheral side of the outer peripheral surface of the steel pipe. Drilling blade-attached steel pipe for construction of a cast-in-place concrete pile with a knot that prevents rotation to a stopper.
  6.  モルタルまたはコンクリートまたはセメントミルクからなる円柱状であり、外周に地盤内に食い込んだ螺旋状の突条を有する節付き現場打ちコンクリート系杭。 ¡A cast-in-place concrete pile with a knot that has a cylindrical shape made of mortar, concrete, or cement milk, and has spiral ridges that bite into the ground.
PCT/JP2013/059269 2012-08-29 2013-03-28 Method for constructing knotted cast-in-place concrete-based pile, and excavation blade-equipped steel pipe WO2014034166A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201380045463.3A CN104603366B (en) 2012-08-29 2013-03-28 The building method of nodiform in situ concrete pile and be equipped with the steel pipe excavating sword

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-188723 2012-08-29
JP2012188723 2012-08-29

Publications (1)

Publication Number Publication Date
WO2014034166A1 true WO2014034166A1 (en) 2014-03-06

Family

ID=50182994

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/059269 WO2014034166A1 (en) 2012-08-29 2013-03-28 Method for constructing knotted cast-in-place concrete-based pile, and excavation blade-equipped steel pipe

Country Status (4)

Country Link
JP (1) JP5852038B2 (en)
CN (1) CN104603366B (en)
MY (1) MY171501A (en)
WO (1) WO2014034166A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6517082B2 (en) * 2014-05-19 2019-05-22 大和ハウス工業株式会社 Pipes for piling construction of nodular cast-in-place concrete piles
JP5935193B2 (en) * 2014-10-30 2016-06-15 Ogata住宅基盤株式会社 Ground improvement method, excavation rod and ground improvement device used for ground improvement method
JP2016132909A (en) * 2015-01-19 2016-07-25 千代田ソイルテック株式会社 Construction device and construction method for on-site constructed pile
JP6507390B2 (en) * 2015-03-03 2019-05-08 株式会社テノックス Hydraulic solidifying material liquid displacement column construction device and hydraulic solidifying material liquid displacement column construction method
KR101775621B1 (en) * 2015-11-20 2017-09-19 김종성 Method for constructing breast wall of cip technical by using scratch structure
CN109469053B (en) * 2018-10-24 2024-01-02 中国海洋大学 Rotary steel pipe pile suitable for coral island geology and use method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6383316A (en) * 1986-09-27 1988-04-14 Toshio Enoki Embeding method for pile
JPH0420613A (en) * 1990-05-15 1992-01-24 Maruzen Soil Kk Method and device for constructing cast-in-place pile
JP2006057404A (en) * 2004-08-23 2006-03-02 Norihiro Watanabe Front-end head and construction tool for foundation pile, and foundation pile

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6347416A (en) * 1986-12-17 1988-02-29 Yasuyuki Yoshida Steel tubular pile and its embedding work
JP3372627B2 (en) * 1993-12-27 2003-02-04 千代田工営株式会社 Burying method of inverted conical multi-wing steel pipe pile
JP3404301B2 (en) * 1998-11-09 2003-05-06 理研ダイヤモンド工業株式会社 Anchor construction method and cutting bit
JP2001193376A (en) * 2000-01-06 2001-07-17 Okumura Corp Pile pit widening method of cast-in-place concrete pile and its device
CN101413263B (en) * 2008-09-27 2014-02-05 余安南 Rotary enlarging reducing cone spiral tray concrete filling pile and pile-forming apparatus and construction method
CN102312427A (en) * 2011-04-26 2012-01-11 王庆伟 Half soil squeezing screw expansion pile forming method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6383316A (en) * 1986-09-27 1988-04-14 Toshio Enoki Embeding method for pile
JPH0420613A (en) * 1990-05-15 1992-01-24 Maruzen Soil Kk Method and device for constructing cast-in-place pile
JP2006057404A (en) * 2004-08-23 2006-03-02 Norihiro Watanabe Front-end head and construction tool for foundation pile, and foundation pile

Also Published As

Publication number Publication date
CN104603366B (en) 2016-12-14
MY171501A (en) 2019-10-15
JP2014062446A (en) 2014-04-10
JP5852038B2 (en) 2016-02-03
CN104603366A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
JP5852038B2 (en) Construction method of on-site cast-in-place concrete piles and steel pipes with excavation blades
JP5075091B2 (en) Casting method for cast-in-place piles
JP2014062446A5 (en)
JP4852732B2 (en) Column replacement construction method
JP6247065B2 (en) Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile
JP6147507B2 (en) Construction method and steel pipe for construction of in-situ tapered concrete piles with knots
JP5075094B2 (en) Construction method and foundation structure of foundation structure in structure
JP6246599B2 (en) Ground reinforcement method using small-diameter concrete cast-in-place pile.
JP6640175B2 (en) Construction method of excavated blade-mounted steel pipe and cast-in-place concrete pile for construction of cast-in-place concrete pile
JP2005282063A (en) Composite field preparation pile, its construction method and device for preparing composite field preparation pile
JPH11217829A (en) Construction of footing pile, footing pile, and precast hollow pile
JP4378752B2 (en) Ready-made piles for large-diameter ready-made concrete pile foundations
JP2014066010A (en) Method of ground improvement around pile head
JP5075093B2 (en) Construction method and foundation structure of foundation structure in structure
JP5992464B2 (en) Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile
JP3450774B2 (en) Steel pipe pile and its burial method
JP6336259B2 (en) Steel pipe with blade for construction of cast-in-place concrete piles with knots
JP2020204226A (en) Installation method for soil cement column row wall in circular vertical shaft
JPH03447B2 (en)
JP6035355B2 (en) Low strength pipe burial method and excavation head used for it
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JP3122336U (en) Foundation pile
JP2000144727A (en) Construction method of footing pile
JPS60164510A (en) Shaft excavation work
JP4006838B2 (en) Drilling and stirring method and equipment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13833524

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13833524

Country of ref document: EP

Kind code of ref document: A1