WO2013166765A1 - Pucch资源映射、配置方法及装置、用户设备、基站 - Google Patents

Pucch资源映射、配置方法及装置、用户设备、基站 Download PDF

Info

Publication number
WO2013166765A1
WO2013166765A1 PCT/CN2012/077441 CN2012077441W WO2013166765A1 WO 2013166765 A1 WO2013166765 A1 WO 2013166765A1 CN 2012077441 W CN2012077441 W CN 2012077441W WO 2013166765 A1 WO2013166765 A1 WO 2013166765A1
Authority
WO
WIPO (PCT)
Prior art keywords
uci
resource mapping
resource
frame structure
pucch
Prior art date
Application number
PCT/CN2012/077441
Other languages
English (en)
French (fr)
Inventor
张晓博
戴博
梁春丽
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2013166765A1 publication Critical patent/WO2013166765A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal

Definitions

  • the present invention relates to the field of communications, and in particular to a PUCCH resource mapping and configuration method and apparatus, a user equipment, and a base station.
  • the Physical Uplink Control Channel (referred to as the Physical Uplink Control Channel)
  • the resource mapping of the PUCCH is determined by the following two methods: If the PUCCH is in the format l/la/lb, the physical downlink control channel (Physical Downlink Control CHannel, PDCCH for short) whose resource mapping location is scheduled according to the corresponding PDSCH The index decision; if the PUCCH is format 2/2a/2b, its resource mapping location is configured by higher layer signaling; in addition, in the existing standard, the PUCCH of format 2/2a/2b has its resource mapped in bandwidth The outermost side, then the PUCCH of the format 1/la/lb.
  • PRB Physical Resource Block
  • N ⁇ , N respectively represent the number of PRBs occupied by the format 2/2a/2b and the format of the mixed PRB.
  • the resource code occupied by la/lb The resource code occupied by la/lb.
  • R11 ie Releasel l in 3GPP
  • the PUCCH mapping needs to be updated for the following reasons:
  • TDD dynamic frame structure characteristics In the LTE and LTE-A standards, the system frame of TDD is composed of ten subframes. 3GPP—supports a total of seven frame structures, as shown in Table 1. Table 1: Up and down frame structure of TDD system
  • the frame structure configured by the current serving cell of the user equipment (User Equipment, UE for short) is notified by the system information SIB-1.
  • SIB-1 system information
  • the minimum change period of SIB information is 640ms.
  • Shortening the variation period of the TDD system frame structure can fully utilize the characteristics of TDD to better support the transmission of asymmetric services. Although this feature does not enter the R11 version, it may still be discussed in the R12 release.
  • Table 2 is the timing relationship of PDSCH and UCI 1/la/lb defined in the existing standard - UCI 1/la/lb in subframe n for PDSCH of nk subframe.
  • the specific mapping method adopts the channel selection method (TS36.213).
  • Table 2 Timing relationship between downlink PDSCH and UCI ⁇ k 0 , k, , -k M _, ⁇
  • the method is applied to a TLD dynamic frame structure scenario, and the feedback of the specified uplink subframe is incompatible with the R10/R11 frame structure configuration.
  • the PUCCH format of the downlink subframe is l/la/lb, and the method includes: the base station sets the PUCCH into The resource mapping rule of the row mapping, where the resource mapping rule includes: mapping, for the downlink subframe that is incompatible with the R10/R11 frame structure configuration, the uplink control information UCI resource for the downlink subframe in the current frame, and then mapping Mapping the UCI resources of the downlink subframe in the previous frame; or mapping the UCI resources of the UE according to the frame structure of the previous frame, where the frame structure of the previous frame is mapped to the previous one in the current uplink subframe
  • the foregoing resource mapping rule further includes: reserving uplink control information UCI resources for downlink subframes compatible with the R10/R11 frame structure configuration according to the definition rule of R10/R11.
  • the uplink subframe of the current frame includes: uplink subframe #7.
  • the foregoing frame structure is obtained by: the base station dynamically configuring the frame structure of the current frame by using the broadcast signaling, and using the dedicated control signaling to instruct the UE to use the SIB-1 frame structure or the frame structure indicated by the broadcast signaling.
  • a physical uplink control channel resource mapping method is provided, which is applied to a downlink that is incompatible with a R10/R11 frame structure configuration, which is fed back in a specified uplink subframe in a TDD dynamic frame structure scenario.
  • the PUCCH format of the subframe is 1/la/lb
  • the method includes: the user equipment UE receives a resource mapping rule for mapping the uplink physical control channel PUCCH from the base station, and performs the PUCCH according to the received resource mapping rule.
  • the resource mapping rule includes: for the downlink subframe that is incompatible with the R10/R11 frame structure configuration, first mapping the uplink control information UCI resource for the downlink subframe in the current frame, and then mapping the previous frame to the previous frame The UCI resource of the medium and downlink subframes; or, the UCI resource of the UE is mapped according to the frame structure of the previous frame, where the frame structure of the previous frame is the maximum number of PDSCHs mapped to the previous frame in the current uplink subframe. Frame structure.
  • the foregoing resource mapping rule further includes: reserving uplink control information UCI resources for downlink subframes compatible with the R10/R11 frame structure configuration according to the definition rule of R10/R11.
  • a physical uplink control channel resource mapping configuration method is provided.
  • the foregoing method is applied to a PUCCH format of an EPDCCH of 1/1 a/lb.
  • the method includes: setting, by a base station, a physical uplink control channel PUCCH a mapping resource mapping rule, where the resource mapping rule includes: inserting a UCI resource corresponding to a PUCCH format 1/la/lb of the EPDCCH into a position between UCI2/2a/2b and UCI1/la/lb;
  • the user equipment UE sends the resource mapping rule.
  • the UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH is inserted into the position between UCI 2/2a/2b and UCI1/la/lb, including: index offset through the pre-configured UCI 1/la/lb
  • the quantity and UCI 2/2a/2b set UCI 1/la/lb near the center of the frequency band, wherein the index offset includes: a capacity of 1/la/lb of the PUCCH format of the EPDCCH; a PUCCH format to be combined with the EPDCCH
  • the UCI resource corresponding to 1/la/lb is inserted into the position between UCI 2/2a/2b and UCI1/la/lb.
  • another physical uplink control channel resource mapping method is provided.
  • the foregoing method is applied to the PUCCH format l/la/lb of the EPDCCH, where the method includes: the user equipment UE receives the physical pair from the base station.
  • the uplink control channel PUCCH performs mapping of the resource mapping rule, and performs resource mapping on the PUCCH according to the received resource mapping rule, where the resource mapping rule includes: corresponding to the PUCCH format 1/la/lb of the EPDCCH
  • the UCI resource is inserted into the location between UCI2/2a/2b and UCIl/la/lb.
  • the configured resource code channel is corresponding to a cell or a UE in a cell.
  • the method further includes: determining that the total capacity of the PDCCH and the E-PDCCH in the target downlink subframe exceeds the maximum number of CCEs that the R10 can support, where The PDSCH of the E-PDCCH scheduling of the CCEs of the maximum PDCCH, the resource mapping is performed on the PUCCH according to the resource mapping rule, and the target downlink subframe is a PDSCH scheduling corresponding to the PUCCH format 1/la/lb of the EPDCCH. Downstream subframe.
  • the PUCCH format of the EPDCCH is 1/la/lb and the UCI defined by R10 is 1/la/lb.
  • the physical resource location performs resource mapping on the PUCCH.
  • a physical uplink control channel resource mapping configuration apparatus is provided, which is located in a base station, and is applied to a R10/R11 frame fed back by a specified uplink subframe in a TDD dynamic frame structure scenario.
  • the device includes: The first setting module is configured to set a resource mapping rule for mapping the physical uplink control channel PUCCH, where the resource mapping rule includes: mapping the downlink subframe that is incompatible with the R10/R11 frame structure configuration, Mapping the UCI resources of the downlink subframes in the previous frame to the UCI resources of the downlink subframes in the current frame; or mapping the UCI resources of the UE according to the frame structure of the previous frame, where the The frame structure of one frame is a frame structure that is mapped to the most number of PDSCHs of the previous frame in the current uplink subframe.
  • the first sending module is configured to deliver the resource mapping rule to the user equipment UE.
  • the foregoing resource mapping rule further includes: reserving uplink control information UCI resources for downlink subframes compatible with the R10/R11 frame structure configuration according to the definition rule of R10/R11.
  • a physical uplink control channel resource mapping apparatus is provided, which is located in a user equipment UE, where the apparatus is applied to a frame corresponding to an R10/R11 framed by a specified uplink subframe in a TDD dynamic frame structure scenario.
  • the apparatus includes: a first receiving module, configured to receive a resource mapping rule for mapping an uplink physical control channel PUCCH from a base station, where
  • the resource mapping rule includes: for the downlink subframe that is incompatible with the R10/R11 frame structure configuration: first mapping the uplink control information UCI resource for the downlink subframe in the current frame, and then mapping the UCI for the downlink subframe in the previous frame Or mapping, according to the frame structure of the previous frame, the UCI resource of the UE, where the frame structure of the previous frame is the frame structure with the largest number of PDSCHs mapped to the previous frame in the current uplink subframe; And a mapping module, configured to perform resource mapping on the PUCCH according to the received resource mapping rule.
  • the foregoing resource mapping rule further includes: reserving uplink control information UCI resources for downlink subframes compatible with the R10/R11 frame structure configuration according to the definition rule of R10/R11.
  • a physical uplink control channel resource mapping configuration apparatus is provided, which is located in a base station, and the apparatus is applied to a PUCCH format 1/la/lb of an EPDCCH, and the apparatus includes: a second setting module, setting And a resource mapping rule for mapping the physical uplink control channel PUCCH, where the resource mapping rule includes: inserting UCI resources corresponding to the PUCCH format 1/la/lb of the EPDCCH into UCI2/2a/2b and UCIl/la a location between the / lbs; a second sending module, configured to deliver the resource mapping rule to the user equipment UE.
  • a UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH into a position between UCI2/2a/2b and UCI1/la/lb, including: an index offset through a pre-configured UCI 1/la/lb And UCI 2/2a/2b to set UCI 1/la/lb near the center of the frequency band, wherein the index offset includes: a capacity of a PUCCH format of 1/la/lb of the EPDCCH; a PUCCH format 1 to be combined with the EPDCCH
  • the UCI resource corresponding to /la/lb is inserted into the position between UCI 2/2a/2b and UCIl/la/lb.
  • a physical uplink control channel resource mapping apparatus which is located in a user equipment UE, and the apparatus is applied to a PUCCH format 1/la/lb of an EPDCCH, and the apparatus includes: a second receiving module, And the resource mapping rule for receiving the physical uplink control channel PUCCH from the base station, where the resource mapping rule includes: inserting the UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH into the UCI2/2a/ a location between 2b and UCI1/la/lb; a second mapping module, configured to perform resource mapping on the PUCCH according to the received resource mapping rule.
  • a UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH into a position between UCI2/2a/2b and UCI1/la/lb including: an index offset through a pre-configured UCI 1/la/lb And UCI 2/2a/2b to set UCI 1/la/lb near the center of the frequency band, wherein the index offset includes: a capacity of a PUCCH format of 1/la/lb of the EPDCCH; a PUCCH format 1 to be combined with the EPDCCH
  • the UCI resource corresponding to /la/lb is inserted into a position between UCI 2/2a/2b and UCI1/la/lb;
  • resource mapping of the PUCCH according to the received resource mapping rule includes: from a preset initial position The resource mapping is started on the PUCCH, where the initial location is a PUBCH format 1/la/lb and UCI2/2a/2b mixed PRB of the EPDCCH, and the resource code channel occupied by the P
  • a user equipment including: the physical uplink control channel resource mapping apparatus described above.
  • a base station is provided, including: the foregoing physical uplink control channel resource mapping configuration apparatus.
  • the present invention the resource mapping rule for mapping the physical uplink control channel PUCCH, and for different scenarios (the downlink subframes that are incompatible with the R10/R11 frame structure configuration fed back in the specified uplink subframe in the TDD dynamic frame structure scenario)
  • the PUCCH format l/la/lb, and the PUCCH format 1/la/lb mapping EPDCCH adopt different resource mapping rules, which avoids the introduction of the dynamic frame structure and the EPDCCH and the mapping position of the traditional PUCCH.
  • FIG. 1 is a schematic diagram of a PUCCH mapping scheme according to the related art
  • FIG. 2 is a flowchart of a physical uplink control channel resource mapping configuration method according to Embodiment 1 of the present invention
  • FIG. 3 is a physical uplink control channel resource mapping according to Embodiment 1 of the present invention
  • FIG. 4 is a flowchart of a physical uplink control channel resource mapping method according to Embodiment 1 of the present invention
  • FIG. 5 is a structural block diagram of a physical uplink control channel resource mapping apparatus according to Embodiment 1 of the present invention
  • FIG. 7 is a flowchart of a physical uplink control channel resource mapping configuration method according to Embodiment 3 of the present invention
  • FIG. 8 is a physical uplink control channel according to Embodiment 3 of the present invention
  • FIG. 9 is a block diagram of a physical uplink control channel resource mapping method according to Embodiment 3 of the present invention
  • FIG. 10 is a structural block diagram of a physical uplink control channel resource mapping apparatus according to Embodiment 3 of the present invention
  • 11 is a schematic diagram of a physical uplink control channel resource mapping scheme according to Embodiment 4 of the present invention
  • FIG. 12 is a structural block diagram of a base station according to an embodiment of the present invention
  • FIG. 13 is a structural block diagram of a user equipment according to an embodiment of the present invention.
  • the resource mapping scheme in different scenarios is described in the following embodiments.
  • the first embodiment and the second embodiment are applied to the PUCCH format l/la/lb for the downlink subframe that is incompatible with the R10/R11 frame structure configuration, which is fed back by the specified uplink subframe in the TDD dynamic frame structure scenario.
  • 3 and Embodiment 4 apply to the PUCCH format 1/la/lb of the EPDCCH. The details are as follows.
  • the frame structure of the UE is dynamically configured in the following manner:
  • the base station dynamically configures the frame structure of the current frame by using broadcast signaling, and uses dedicated control signaling to instruct the UE to use the SIB-1 frame structure or the broadcast.
  • the frame structure to which the R12 UE is allocated may be different from the frame structure currently used by the eNB.
  • FIG. 2 is a flowchart of a physical uplink control channel resource mapping configuration method according to Embodiment 1 of the present invention.
  • the method is applied to a PUCCH format l/la/lb for a downlink subframe that is incompatible with a R10/R11 frame structure configuration, which is fed back in a specified uplink subframe in a TDD dynamic frame structure scenario. As shown in FIG.
  • Step S202 A base station sets a resource mapping rule for mapping a PUCCH, where the resource mapping rule includes: for a downlink subframe that is incompatible with an R10/R11 frame structure configuration, Mapping the UCI resource for the downlink control information of the downlink subframe in the current frame, and mapping the UCI resource for the downlink subframe in the previous frame; or mapping the UCI resource of the UE according to the frame structure of the previous frame, where The frame structure of the previous frame is a frame structure that is mapped to the most number of PDSCHs of the previous frame in the current uplink subframe.
  • the base station sends the resource mapping rule to the UE.
  • the uplink control information UCI resources for the downlink subframes compatible with the R10/R11 frame structure configuration are reserved according to the definition rule of R10/R11; secondly, for the R10/R11 frame structure configuration Incompatible downlink subframes: first map the UCI resources for the downlink subframes in the current frame, and then map the UCI resources for the downlink subframes in the previous frame, or, regardless of what frame structure the UE allocates in the previous frame, The frame structure with the largest number of PDSCHs in the current frame in the current uplink subframe maps the resource mapping rule of the UCI resource of the UE. Therefore, the R12 UE is not known to know the actual frame structure after the dynamic frame structure is introduced. PUCCH conflict.
  • the foregoing resource mapping rule may further include: reserving uplink control information UCI resources for downlink subframes compatible with the R10/R11 frame structure configuration according to the definition rule of R10/R11.
  • the uplink subframe of the current frame includes: uplink subframe #7.
  • a physical uplink control channel resource mapping configuration apparatus is also provided, which is located in a base station, and is applied to the R10/R11 frame structure configuration in the TLD dynamic frame structure scenario.
  • the PUCCH format l/la/lb of the compatible downlink subframe is used to implement the foregoing embodiments and the preferred embodiments.
  • the descriptions of the modules and the preferred embodiments are omitted. The modules involved in the system are described below.
  • FIG. 3 is a structural block diagram of a physical uplink control channel resource mapping configuration apparatus according to Embodiment 1 of the present invention. As shown in FIG.
  • the apparatus includes: a first setting module 30, connected to the first sending module 32, configured to set a resource mapping rule for mapping a PUCCH, where the resource mapping rule includes: targeting and R10/R11
  • the downlink subframe that is incompatible in the frame structure configuration first maps the uplink control information UCI resources for the downlink subframe in the current frame, and then maps to the previous one. Mapping the UCI resources of the downlink subframes in the frame; or mapping the UCI resources of the UE according to the frame structure of the previous frame, where the frame structure of the previous frame is the number of PDSCHs mapped to the previous frame in the current uplink subframe
  • the first frame is configured to send the resource mapping rule to the UE.
  • the foregoing resource mapping rule may further include: reserving uplink control information UCI resources for downlink subframes compatible with the R10/R11 frame structure configuration according to the definition rule of R10/R11.
  • FIG. 4 is a flowchart of a physical uplink control channel resource mapping method according to Embodiment 1 of the present invention. The method is applied to the PUCCH format l/la/lb for the downlink subframe that is incompatible with the R10/R11 frame structure configuration, which is fed back by the specified uplink subframe in the TDD dynamic frame structure scenario. As shown in FIG.
  • the method includes Step S402: The UE receives the resource mapping rule for mapping the PUCCH from the base station, where the resource mapping rule includes: for the downlink subframe that is incompatible with the R10/R11 frame structure configuration, first mapping is performed in the current frame. Upgrading the UCI resource of the downlink subframe, and mapping the UCI resource for the downlink subframe in the previous frame; or mapping the UCI resource of the UE according to the frame structure of the previous frame, where the frame of the previous frame The structure is a frame structure that is mapped to the largest number of PDSCHs of the previous frame in the current uplink subframe.
  • Step S404 The UE performs resource mapping on the PUCCH according to the received resource mapping rule.
  • the foregoing resource mapping rule may further include: reserving uplink control information UCI resources for downlink subframes compatible with the R10/R11 frame structure configuration according to the definition rule of R10/R11.
  • the UE performs resource mapping on the UCI resources of each downlink subframe according to the resource mapping rule according to the CCE index in the PDCCH or the index of the eCCE in the EPDCCH.
  • a PUCCH resource mapping apparatus is further provided for implementing the embodiment shown in FIG. 4.
  • FIG. 5 is according to the present disclosure.
  • the apparatus includes: a first receiving module 50, coupled to the first mapping module 52, configured to receive a resource mapping rule for mapping an uplink physical control channel PUCCH from a base station, where the resource mapping
  • the rules include: for the downlink subframes that are incompatible with the R10/R11 frame structure configuration: first mapping the uplink control information UCI resources for the downlink subframes in the current frame, and then mapping the UCI resources for the downlink subframes in the previous frame; or Mapping the UCI resource of the UE according to the frame structure of the previous frame, where the frame structure of the previous frame is a frame structure that is mapped to the most PDSCH of the previous frame in the current uplink subframe;
  • the first mapping module 52 is configured to perform resource mapping on the PUCCH according to the received resource mapping rule.
  • the foregoing resource mapping rule may further include: reserving uplink control information UCI resources for downlink subframes compatible with the R10/R11 frame structure configuration according to the definition rule of R10/R11.
  • the following will be specifically described in conjunction with Embodiment 2 and related drawings.
  • Embodiment 2 In this embodiment, for the resource mapping scheme of the PUCCH, for the convenience of description, the following definition is made:
  • the PUCCH format 1/la/lb for the "traditional PDCCH in the R10 incompatible downlink subframe" fed back by an uplink subframe in the TDD dynamic frame structure scenario PUCCH format Id; one of the TDD dynamic frame structure scenarios
  • PUCCH format 1/la/lb for the "EPDCCH in the R10 incompatible downlink subframe” fed back by the uplink subframe PUCCH format le.
  • This embodiment allocates a UCI mapping scheme for a dynamic TDD frame structure (assuming that the scenario is supported by R12 or subsequent versions).
  • the following first adaptive interference management for TDD services Interference
  • UCI mapping The existing standard UCI 1/la/lb is mapped by channel selection, that is, for each frame structure, one uplink subframe is carried.
  • the UCI corresponding to one or more downlink subframe PDSCHs.
  • the index of each PDCCH configuring the PDSCH determines the location of UCI 1/la/lb.
  • the mapping between the downlink subframes carried by the uplink subframes is different due to the different interpretations of the frame structure of the R11 and the R12. Therefore, the UCI conflict is easy to occur.
  • UEs may be configured to perform frame structure interpretation in accordance with the configuration of SIB-1 (even if it can interpret the actual frame structure).
  • SIB-1 is frame structure 0
  • UE1 follows the SIB-1 configuration in frame n-1 (ie, the previous frame of the current frame), and frame structure 2 is dynamically configured in frame n (ie, the current frame) and occupies the child.
  • UCI of 3 downlink subframes is to be fed back in subframe #7 of frame n: subframe #1 of frame n:
  • subframe #1 of frame n In order to avoid the conflict in the above problem 1, the UCI should be completely in accordance with the R10 specification ( The EPDCCH part is reserved according to the R11 specification; the subframe n-1 is subframe #9: it is assumed that the subframe is occupied by the UE 2-N; Subframe #0 of frame n: This subframe is occupied by UE1; the following is further discussed in two cases:
  • the specific solution may be to dynamically configure the actual frame structure of the current frame by using broadcast signaling, and notify the UE of the R12 to comply with the UE-specific control signaling.
  • the frame structure of SIB-1 is also the frame structure indicated by dynamic broadcast signaling. In this way, although the UE1 observes the SIB-1 frame structure in the frame n-1, the UE2 can perceive the actual frame structure, and can avoid the subframe in the frame n-1 when the subframe #7 of the frame n feeds back the UCI# 9 UCI location.
  • this configuration scheme has the following problems: Dynamic broadcast signaling increases the number of blind detections of the UE; at the same time, in order to ensure the robustness of the broadcast signaling, a large signaling overhead needs to be added. (2) UE2 does not know the actual structure of frame n-1, so that it is frame structure 0. Another possibility is that UE1 does not perceive the actual frame structure in the n-1 frame, and it does not realize the downlink subframe #9 in frame n-1, so collision may occur. Based on the above solution, this embodiment proposes a robust UCI mapping scheme, that is, UE1 can avoid UCI collision even if it does not perceive the actual frame structure of frame n-1.
  • R10/R11 The rule is to allocate the UCI space corresponding to the RIO PDCCH and the R11 EPDCCH to: the UE of the R10/R11, and the R12 UE that is compatible with the R10/R11 PDSCH (that is, the downlink subframe corresponding to the uplink subframe in the current frame structure is the SIB-1 notification)
  • the UE of the R10/R11 the R12 UE that is compatible with the R10/R11 PDSCH
  • a subset of the corresponding downlink subframes in the frame structure for example, the current frame structure is 1, and the SIB-1 frame structure is 2).
  • the UCI channel selection principle of the uplink subframe #7 is: first mapping the UCI for the CCE in the downlink subframe of the current frame, and then mapping the UCI for the CCE in the downlink subframe of the previous frame:
  • FIG. 6 is used as an example to illustrate how to perform mapping of UCI ld/le.
  • the PCFICH value and the EPDCCH capacity of subframe #1 in the n frame are first reserved for subframe #1, respectively.
  • UCI 1/la/lb (UCI space 1) and UCI lc (UCI space 2) thus avoid collisions with R10/R11UE.
  • UCI ld (UCI space 3) for subframe #0 and subframe #3 in n frames is mapped behind UCI space 1 (closer to the center of the band), and then behind UCI space 2 (closer to the center of the band) ) UCI le (UCI space 4) for subframe #0 and subframe #3 in n frames.
  • UCI channel selection principle of the uplink subframe #7 is: Regardless of what frame structure is allocated by the R12 UE in the previous frame, it is reserved for the previous frame subframe 9
  • FIG. 6 is used as an example to illustrate how to perform mapping of UCI ld/le.
  • subframe #7 in n frames the PCFICH value and the EPDCCH capacity of subframe #1 in the n frame are first reserved for subframe #1, respectively.
  • UCI 1/la/lb (UCI space 1) and UCI lc (UCI space 2) thus avoid collisions with R10/R11UE. Then in the UCI space
  • FIG. 7 is a flowchart of a physical uplink control channel resource mapping configuration method according to Embodiment 3 of the present invention. The method is applied to the PUCCH format l/la/lb of the EPDCCH. As shown in FIG.
  • the method includes: Step S702: The base station sets a resource mapping rule for mapping the PUCCH, where the resource mapping rule includes: The UCI resource corresponding to the PUCCH format 1/la/lb is inserted into the location between UCI2/2a/2b and UCI1/la/lb; in step S704, the base station sends the resource mapping rule to the UE.
  • the resource mapping rule includes: The UCI resource corresponding to the PUCCH format 1/la/lb is inserted into the location between UCI2/2a/2b and UCI1/la/lb; in step S704, the base station sends the resource mapping rule to the UE.
  • the UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH is inserted into the position between UCI 2/2a/2b and UCI1/la/lb, including: index offset through the pre-configured UCI 1/la/lb
  • the quantity and UCI 2/2a/2b set UCI 1/la/lb near the center of the frequency band, wherein the index offset includes: a capacity of 1/la/lb of the PUCCH format of the EPDCCH; a PUCCH format to be combined with the EPDCCH
  • the UCI resource corresponding to 1/la/lb is inserted into the position between UCI 2/2a/2b and UCI1/la/lb.
  • a physical uplink control channel resource mapping configuration apparatus is further provided, where the apparatus is located in a base station, and is applied to the PUCCH format 1/la/lb of the EPDCCH, and is used to implement the foregoing embodiment and the preferred implementation manner.
  • the term "module” may implement a combination of software and/or hardware of a predetermined function.
  • FIG. 8 is a structural block diagram of a physical uplink control channel resource mapping configuration apparatus according to Embodiment 3 of the present invention.
  • the device includes: The second setting module 80 is connected to the second sending module 82, and is configured to set a resource mapping rule for mapping the PUCCH, where the resource mapping rule includes: the UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH
  • the second transmitting module 82 is configured to deliver the resource mapping rule to the UE.
  • the second sending module 82 is configured to send the resource mapping rule to the UE. Inserting UCI resources corresponding to PUCCH format 1/la/lb of EPDCCH into UCI2/2a/2b and
  • the location between UCIl/la/lb includes: UCI 1/la/lb is placed near the center of the band by the pre-configured index offset of UCI 1/la/lb and UCI 2/2a/2b, where
  • the index offset includes: a capacity of a PUCCH format of 1/la/lb of the EPDCCH; and a UCI resource corresponding to a PUCCH format 1/la/lb of the EPDCCH is inserted into UCI 2/2a/2b and UCI1/la/lb
  • the embodiment further provides a physical uplink control channel resource mapping method, where the method is applied to the PUCCH format l/la/lb of the EPDCCH. As shown in FIG.
  • Step S902 The UE receives a resource mapping rule for mapping a PUCCH from a base station, where the resource mapping rule includes: inserting a UCI resource corresponding to a PUCCH format 1/la/lb of an EPDCCH into UCI2/2a/2b and UCIl/la/lb a location between the steps; step S904, the UE performs resource mapping on the PUCCH according to the received resource mapping rule.
  • a UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH into a position between UCI2/2a/2b and UCI1/la/lb including: an index offset through a pre-configured UCI 1/la/lb And UCI 2/2a/2b to set UCI 1/la/lb near the center of the frequency band, wherein the index offset includes: a capacity of a PUCCH format of 1/la/lb of the EPDCCH; a PUCCH format 1 to be combined with the EPDCCH
  • the UCI resource corresponding to /la/lb is inserted into the position between UCI 2/2a/2b and UCIl/la/lb;
  • the resource mapping of the PUCCH by the UE according to the received resource mapping rule includes: the UE performs resource mapping on the PUCCH from a preset initial location, where the initial location is a PUCCH format of the EPDCCH 1/la/lb In the PRB mixed with UCI2/2a/2b, the resource code channel occupied by the PUCCH format 1/la/lb of the EPDCCH is configured.
  • the configured resource code channel is corresponding to a cell or a UE in a cell.
  • the method may further include: determining that the total capacity of the PDCCH and the E-PDCCH in the target downlink subframe exceeds the maximum number of CCEs that the R10 can support, where And performing resource mapping on the PUCCH according to the resource mapping rule, where the target downlink subframe is A scheduled downlink subframe of the PDSCH corresponding to the PUCCH format 1/la/lb of the EPDCCH.
  • the PUCCH format of the EPDCCH is 1/la/lb and the UCI defined by R10 is 1/la/lb.
  • the physical resource location performs resource mapping on the PUCCH.
  • the embodiment further provides a physical uplink control channel resource mapping device, which is located in the UE, and the device is applied to the PUCCH format l/la/lb of the EPDCCH. As shown in FIG.
  • the device includes: a second receiving module 1002, connected The second mapping module 1004 is configured to receive a resource mapping rule for mapping the PUCCH from the base station, where the resource mapping rule includes: inserting the UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH into the UCI2 a location between /2a/2b and UCI1/la/lb; a second mapping module 1004, configured to perform resource mapping on the PUCCH according to the received resource mapping rule.
  • a UCI resource corresponding to the PUCCH format 1/la/lb of the EPDCCH into a position between UCI2/2a/2b and UCI1/la/lb including: an index offset through a pre-configured UCI 1/la/lb And UCI 2/2a/2b to set UCI 1/la/lb near the center of the frequency band, wherein the index offset includes: a capacity of a PUCCH format of 1/la/lb of the EPDCCH; a PUCCH format 1 to be combined with the EPDCCH
  • the UCI resource corresponding to /la/lb is inserted into a position between UCI 2/2a/2b and UCI1/la/lb; the second mapping module 1004 is further configured to perform resource mapping on the PUCCH from a preset initial position.
  • the resource code channel occupied by the PUCCH format 1/la/lb of the EPDCCH is configured in the PRB in which the initial position is a PUCCH format of 1/la/lb and UCI2/2a/2b of the EPDCCH.
  • Embodiment 4 In order to better understand the above-described Embodiment 3, the following detailed description will be given in conjunction with the specific embodiments. First, the technical problem to be solved in this embodiment is explained. In order to avoid collision with the conventional PUCCH, it is relatively intuitive to map the PUCCH format lc to the PUCCH format 1/la/lb.
  • UCI lc is inserted between UCI2/2a/2b and UCIl/la/lb.
  • the implementation can be achieved by reusing the existing three parameters:
  • N ⁇ s For R11 and later UEs, the resource code occupied by UCI lc in the PRB that is a mixture of UCI lc and UCI2/2a/2b. R10 and the previous UE are also interpreting the resource code channel occupied by UCI 1/la/lb in the PRB in which the parameter is UCI 1/la/lb and UCI2/2a/2b.
  • N ⁇ UCCH The definition is unchanged, indicating the index offset of UCI 1/la/lb. However, when specifying the value, the capacity of UCI lc should be included. As shown in Figure 11, UCI l/la/lb is moved closer to the center of the band by setting the appropriate value (0 2047), and UCI lc is inserted between UCI 1/la/lb and UCI 2/2a/2b. . UCI lc ⁇ mapped starting from the marked position, the index may be mapped to up to ⁇ c ⁇ - 1 position identifier. In addition, similar to UCI 1/la/lb, the offset of the UCI lc index of the high-level configuration can be set to control the starting position of the UCI ic.
  • the scheme requires the UE to know the capacity of the E-PDCCH in the system, that is, the index of the allocated eCCE. If the E-PDCCH finally defined by R11 does not support the requirement (for example, the UE only knows part of the E-PDCCH capacity), the foregoing may be proposed. Variables can be UE specific.
  • UCI lc is placed in a space that is completely independent of UCI 1/la/lb.
  • UCI lc can be reused (or completely) in UCI l/la/lb space. As described below:
  • a base station is further provided. As shown in FIG. 12, the base station may include: a physical uplink control channel resource mapping configuration in the embodiment shown in FIG. 3 and/or FIG. Device.
  • the base station in this embodiment sets the resource mapping rule by using the first setting module 30 in the physical uplink control channel resource mapping configuration apparatus in the embodiment shown in FIG. 3, and then uses the first sending module 32 to set the resource mapping rule.
  • the UE is sent to the UE, so that the resource mapping rule between the base station and the UE can be negotiated, so that the base station and the UE use the resource mapping rule to perform resource mapping on the PUCCH, thereby avoiding the specified uplink subframe in the TDD dynamic frame structure scenario.
  • the feedback of the PUCCH format 1/la/lb of the downlink subframe that is incompatible with the R10/R11 frame structure configuration is in conflict with the traditional PUCCH mapping location.
  • the second mapping module 80 in the physical uplink control channel resource mapping device in the embodiment shown in FIG. 8 is used to set the resource mapping rule, and then the second mapping module 82 sends the resource mapping rule to the UE.
  • the resource mapping rule between the base station and the UE can be negotiated, so that the base station and the UE perform resource mapping on the PUCCH by using the resource mapping rule, thereby avoiding the resource mapping between the PUCCH format 1/la/lb of the EPDCCH and the traditional The PUCCH mapping locations conflict.
  • a UE is further provided. As shown in FIG. 13, the apparatus includes: a physical uplink control channel resource mapping apparatus in the embodiment shown in FIG. 5 and/or FIG.
  • the UE in this embodiment receives the resource mapping rule sent by the base station by using the first receiving module 50 in the physical uplink control channel resource mapping device in the embodiment shown in FIG. 5, and then uses the first mapping module 52 according to the first mapping module 52.
  • the resource mapping rule performs resource mapping on the PUCCH, thereby avoiding the PUCCH format 1/la/ for the downlink subframe that is incompatible with the R10/R11 frame structure configuration fed back in the TDD dynamic frame structure scenario.
  • the UE in this embodiment may also use the second receiving module 1002 in the physical uplink control channel resource mapping device in the embodiment shown in FIG. 10 to receive the resource mapping protocol delivered by the base station.
  • the second mapping module 1004 performs resource mapping on the PUCCH according to the resource mapping rule, thereby avoiding the structure of the R10/R11 frame that is fed back by specifying the uplink subframe in the TDD dynamic frame structure scenario.
  • the PUCCH format ⁇ /la/lb of the incompatible downlink subframe is used for resource mapping, it conflicts with the traditional PUCCH mapping location.
  • the computing device may be implemented by program code executable by the computing device, such that they may be stored in the storage device by the computing device and, in some cases, may be different from the order herein.
  • the steps shown or described are performed, or they are separately fabricated into individual integrated circuit modules, or a plurality of modules or steps are fabricated as a single integrated circuit module.
  • the invention is not limited to any specific combination of hardware and software.
  • the above is only the preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes can be made to the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and scope of the present invention are intended to be included within the scope of the present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本发明提供了一种PUCCH资源映射、配置方法及装置、用户设备、基站,其中,上述配置方法包括:基站设置对PUCCH进行映射的资源映射规则,该资源映射规则包括:针对与R10/R11帧结构配置中不兼容的下行子帧,先映射针对当前帧中下行子帧的UCI资源,再映射针对上一帧中下行子帧的UCI资源;或者,按照上一帧的帧结构映射UE的UCI资源,其中,上一帧的帧结构为映射到当前上行子帧中的上一帧PDSCH数量最多的帧结构;基站向UE下发资源映射规则。采用上述方案,避免了和传统的PUCCH的映射位置相冲突。

Description

PUCCH资源映射、 配置方法及装置、 用户设备、 基站 技术领域 本发明涉及通信领域, 具体而言, 涉及一种 PUCCH资源映射、 配置方法及装置、 用户设备、 基站。 背景技术 长期演进 (Long-Term Evolution, 简称为 LTE)及高级长期演进系统 (Long-Term Evolution Advance,简称为 LTE-Advance)的现有标准中,物理上行控制信道( Physical Uplink Control Channel, 简称为 PUCCH) 的资源映射是由下面 2种方式确定的: 如果该 PUCCH是格式 l/la/lb, 则其资源映射位置根据相应 PDSCH进行调度的 物理下行控制信道(Physical Downlink Control CHannel,简称为 PDCCH)的索引决定; 如果该 PUCCH是格式 2/2a/2b, 则其资源映射位置由高层信令配置; 此夕卜, 在现有标准中, 格式 2/2a/2b的 PUCCH其资源映射在带宽的最外侧, 然后 是格式 1/la/lb的 PUCCH。二者中间可能存在一个混合物理资源块(Physical Resource Block, 简称为 PRB), 如图 1所示(其中 N^, N 分别表示格式 2/2a/2b占用的 PRB 数量和混合 PRB中格式 1/la/lb占用的资源码道)。 然而 R11 (即 3GPP中的 Releasel l ) 及以后的版本中, PUCCH的映射需要进行 更新, 其原因如下:
E-PDCCH的引入, 如何把 PUCCH和 E-PDCCH关联起来并且和现有规范兼容;
TDD动态帧结构特性, LTE及 LTE-A标准中, TDD的系统帧是由十个子帧组成。 3GPP—共支持 7种帧结构, 如表 1所示。 表 1 : TDD系统上下行帧结构
Figure imgf000003_0001
4 10 ms D S u u D D D D D D
5 10 ms D S u D D D D D D D
6 5 ms D s u U U D S U U D 目前 3GPP标准中是通过系统信息 SIB-1来通知用户设备(User Equipment, 简称 为 UE)当前服务小区所配置的帧结构。跟据现有标准, SIB信息最小变动周期是 640ms。 在 3GPP于 RAN54 ( 2011年 12月)次全会正式批准的"动态 TDD帧结构 "的预研项目 中, 更加动态的分配 TDD系统的帧结构成为可能。 缩短 TDD系统帧结构的变动周期 可以充分利用 TDD的特性以更好地支持非对称业务的传输。该特性虽然没有进入 R11 版本, 但是仍有可能会在 R12版本中继续讨论。 引入 TDD动态帧结构以后, 需要研 究如何避免和传统的 PUCCH的映射位置相冲突。 表 2是现有标准中定义的 PDSCH和 UCI 1/la/lb的时序关系 -子帧 n中的 UCI 1/la/lb针对 n-k子帧的 PDSCH。 具体的映射方式采用信道选择的方法 (TS36.213 )。 表 2: 下行 PDSCH和 UCI的时序关系 {k0 , k, , -kM_, }
Figure imgf000004_0001
针对相关技术中在 R11 以后的版本中引入动态帧结构以后, 如何避免和传统的 PUCCH的映射位置相冲突的问题, 目前尚未提出有效的解决方案。 发明内容 针对相关技术中, 在 R11以后的版本中引入动态帧结构以后, 尚无有效地避免和 传统的 PUCCH的映射位置相冲突等技术问题, 本发明提供一种 PUCCH资源映射、 配置方法及装置、 用户设备、 基站, 以至少解决上述技术问题。 根据本发明的一个实施例, 提供了一种物理上行控制信道资源映射配置方法, 该 方法应用于 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配 置中不兼容的下行子帧的 PUCCH格式 l/la/lb, 该方法包括: 基站设置对 PUCCH进 行映射的资源映射规则, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结构配置 中不兼容的下行子帧, 先映射针对当前帧中下行子帧的上行控制信息 UCI资源, 再映 射针对上一帧中下行子帧的 UCI资源;或者,按照上一帧的帧结构映射所述 UE的 UCI 资源, 其中, 所述上一帧的帧结构为映射到当前上行子帧中的上一帧 PDSCH数量最 多的帧结构; 基站向用户设备 UE下发所述资源映射规则。 上述资源映射规则, 还包括: 按照 R10/R11的定义规则, 预留针对与 R10/R11帧 结构配置中兼容的下行子帧的上行控制信息 UCI资源。 当前帧的上行子帧包括: 上行子帧 #7。 上述帧结构通过以下方式获取: 基站通过广播信令动态配置当前帧的帧结构, 同 时使用专用的控制信令指示 UE使用 SIB-1帧结构或者所述广播信令指示的帧结构。 根据本发明的又一方面, 提供了一种物理上行控制信道资源映射方法, 该方法应 用于 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置中不 兼容的下行子帧的 PUCCH格式 l/la/lb, 该方法包括: 用户设备 UE接收来自于基站 的对上行物理控制信道 PUCCH进行映射的资源映射规则, 并按照接收的所述资源映 射规则对所述 PUCCH进行资源映射,其中,所述资源映射规则包括: 针对与 R10/R11 帧结构配置中不兼容的下行子帧, 先映射针对当前帧中下行子帧的上行控制信息 UCI 资源, 再映射针对上一帧中下行子帧的 UCI资源; 或者, 按照上一帧的帧结构映射所 述 UE 的 UCI 资源, 其中, 所述上一帧的帧结构为映射到当前上行子帧中的上一帧 PDSCH数量最多的帧结构。 上述资源映射规则还包括: 按照 R10/R11的定义规则, 预留针对与 R10/R11帧结 构配置中兼容的下行子帧的上行控制信息 UCI资源。 上述 UE根据 PDCCH中的 CCE索引或者 EPDCCH中的 eCCE的索引对每一下行 子帧的 UCI资源进行资源映射。 根据本发明的又一个实施例, 提供了一种物理上行控制信道资源映射配置方法, 上述方法应用于 EPDCCH的 PUCCH格式 1/1 a/lb,该方法包括:基站设置对物理上行 控制信道 PUCCH进行映射的资源映射规则, 其中, 所述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之 间的位置; 基站向用户设备 UE下发所述资源映射规则。 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI 2/2a/2b和 UCIl/la/lb 之间的位置, 包括: 通过预先配置的 UCI 1/la/lb 的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置,其中,所述索引偏移量包括: EPDCCH 的 PUCCH格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置。 根据本发明的又一个实施例, 提供了另一种物理上行控制信道资源映射方法, 上 述方法应用于 EPDCCH的 PUCCH格式 l/la/lb, 该方法包括: 用户设备 UE接收来自 于基站的对物理上行控制信道 PUCCH进行映射的资源映射规则, 并按照接收的所述 资源映射规则对所述 PUCCH 进行资源映射, 其中, 所述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之 间的位置。 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb 之间的位置, 包括: 通过预先配置的 UCI 1/la/lb 的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置,其中,所述索引偏移量包括: EPDCCH 的 PUCCH格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置; 按照接收的所述资源映射规则对所 述 PUCCH进行资源映射包括:所述 UE从预先设置的初始位置开始对 PUCCH进行资 源映射, 其中, 所述初始位置为 EPDCCH的 PUCCH格式 1/la/lb和 UCI2/2a/2b混合 的 PRB中, 配置 EPDCCH的 PUCCH格式 1/la/lb占用的资源码道。 配置的所述资源码道是与小区或小区内 UE对应的。 上述 UE按照所述资源映射规则对所述 PUCCH进行资源映射之前, 还包括: 确 定目标下行子帧中 PDCCH和 E-PDCCH的总容量超过 R10能支持的最大 PDCCH的 CCE个数, 其中, 对于超过最大 PDCCH的 CCE个数的 E-PDCCH调度的 PDSCH, 按照所述资源映射规则对所述 PUCCH 进行资源映射, 所述目标下行子帧为和 EPDCCH的 PUCCH格式 1/la/lb对应的 PDSCH的调度下行子帧。 如果所述目标下行子帧中 PDCCH和 E-PDCCH的总容量未超过 R10能支持的最 大 PDCCH的 CCE个数, 则 EPDCCH的 PUCCH格式 1/la/lb重用 R10定义的 UCI 1/la/lb的物理资源位置对 PUCCH进行资源映射。 根据本发明的又一个实施例, 提供了一种物理上行控制信道资源映射配置装置, 位于基站中, 该装置应用于 TDD 动态帧结构场景中的指定上行子帧所反馈的针对与 R10/R11帧结构配置中不兼容的下行子帧的 PUCCH格式 l/la/lb, 该装置包括: 第一设置模块, 设置为设置对物理上行控制信道 PUCCH进行映射的资源映射规 贝 U, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结构配置中不兼容的下行子帧, 先映射针对当前帧中下行子帧的上行控制信息 UCI资源, 再映射针对上一帧中下行子 帧的 UCI资源; 或者, 按照上一帧的帧结构映射所述 UE的 UCI资源, 其中, 所述上 一帧的帧结构为映射到当前上行子帧中的上一帧 PDSCH数量最多的帧结构; 第一发 送模块, 设置为向用户设备 UE下发所述资源映射规则。 上述资源映射规则还包括: 按照 R10/R11的定义规则, 预留针对与 R10/R11帧结 构配置中兼容的下行子帧的上行控制信息 UCI资源。 根据本发明的又一个实施例, 提供了一种物理上行控制信道资源映射装置, 位于 用户设备 UE中,上述装置应用于 TDD动态帧结构场景中指定上行子帧所反馈的针对 与 R10/R11帧结构配置中不兼容的下行子帧的 PUCCH格式 1/la/lb, 该装置包括: 第 一接收模块, 设置为接收来自于基站的对上行物理控制信道 PUCCH进行映射的资源 映射规则, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结构配置中不兼容的下 行子帧: 先映射针对当前帧中下行子帧的上行控制信息 UCI资源, 再映射针对上一帧 中下行子帧的 UCI资源; 或者,按照上一帧的帧结构映射所述 UE的 UCI资源,其中, 所述上一帧的帧结构为映射到当前上行子帧中的上一帧 PDSCH数量最多的帧结构; 第一映射模块, 设置为按照接收的所述资源映射规则对所述 PUCCH进行资源映射。 上述资源映射规则还包括: 按照 R10/R11的定义规则, 预留针对与 R10/R11帧结 构配置中兼容的下行子帧的上行控制信息 UCI资源。 根据本发明的又一个实施例, 提供了一种物理上行控制信道资源映射配置装置, 位于基站中, 该装置应用于 EPDCCH的 PUCCH格式 1/la/lb, 该装置包括: 第二设置 模块, 设置为设置对物理上行控制信道 PUCCH进行映射的资源映射规则, 其中, 所 述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置; 第二发送模块, 设置为向用户设备 UE下发所 述资源映射规则。 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb 之间的位置, 包括: 通过预先配置的 UCI 1/la/lb 的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置,其中,所述索引偏移量包括: EPDCCH 的 PUCCH格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置。 根据本发明的又一个实施例, 提供了一种物理上行控制信道资源映射装置, 位于 用户设备 UE中, 该装置应用于 EPDCCH的 PUCCH格式 1/la/lb, 该装置包括: 第二 接收模块, 设置为接收来自于基站的对物理上行控制信道 PUCCH进行映射的资源映 射规则, 其中, 所述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应 的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置; 第二映射模块, 设置为按 照接收的所述资源映射规则对所述 PUCCH进行资源映射。 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb 之间的位置, 包括: 通过预先配置的 UCI 1/la/lb 的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置,其中,所述索引偏移量包括: EPDCCH 的 PUCCH格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置; 按照接收的所述资源映射规则对所述 PUCCH进行资源映射包括: 从预先设置的 初始位置开始对 PUCCH进行资源映射, 其中, 所述初始位置为 EPDCCH的 PUCCH 格式 1/la/lb和 UCI2/2a/2b混合的 PRB中, 配置 EPDCCH的 PUCCH格式 1/la/lb占 用的资源码道。 根据本发明的又一个实施例, 提供了一种用户设备, 包括: 以上所述的物理上行 控制信道资源映射装置。 根据本发明的再一个实施例, 提供了一种基站, 包括: 以上所述的物理上行控制 信道资源映射配置装置。 通过本发明, 对物理上行控制信道 PUCCH进行映射的资源映射规则, 并且对于 不同场景(TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置 中不兼容的下行子帧的 PUCCH格式 l/la/lb, 以及映射 EPDCCH 的 PUCCH格式 1/la/lb)采用不同的资源映射规则的方式,避免了引入动态帧结构以及 EPDCCH以后, 和传统的 PUCCH的映射位置相冲突等问题, 进而达到了在动态帧结构场景下不会和 传统的 PUCCH的映射位置相冲突的效果。 附图说明 此处所说明的附图用来提供对本发明的进一步理解, 构成本申请的一部分, 本发 明的示意性实施例及其说明用于解释本发明, 并不构成对本发明的不当限定。 在附图 中: 图 1为根据相关技术的 PUCCH映射方案示意图; 图 2为根据本发明实施例 1的物理上行控制信道资源映射配置方法的流程图; 图 3为根据本发明实施例 1的物理上行控制信道资源映射配置装置的结构框图; 图 4为根据本发明实施例 1的物理上行控制信道资源映射方法的流程图; 图 5为根据本发明实施例 1的物理上行控制信道资源映射装置的结构框图; 图 6为根据本发明实施例 2的 UCI资源映射场景示意图; 图 7为根据本发明实施例 3的物理上行控制信道资源映射配置方法的流程图; 图 8为根据本发明实施例 3的物理上行控制信道资源映射配置装置的结构框图; 图 9为根据本发明实施例 3的物理上行控制信道资源映射方法的流程图; 图 10为根据本发明实施例 3的物理上行控制信道资源映射装置的结构框图; 图 11为根据本发明实施例 4的物理上行控制信道资源映射方案的示意图; 图 12为根据本发明实施例基站的结构框图; 图 13为根据本发明实施例的用户设备的结构框图。 具体实施方式 下文中将参考附图并结合实施例来详细说明本发明。 需要说明的是, 在不冲突的 情况下, 本申请中的实施例及实施例中的特征可以相互组合。 以下实施例中以不同场景下的资源映射方案进行说明。 其中, 实施例 1和实施例 2应用于 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置中 不兼容的下行子帧的 PUCCH格式 l/la/lb, 实施例 3和实施例 4应用于 EPDCCH的 PUCCH格式 1/la/lb。 以下详细说明。 实施例 1 该实施例中, 采用如下方式动态配置 UE的帧结构: 基站通过广播信令动态配置 当前帧的帧结构, 同时使用专用的控制信令指示 UE使用 SIB-1帧结构或者所述广播 信令指示的帧结构。 R12UE被分配的帧结构可以不同于 eNB当前实际采用的帧结构。 图 2为根据本发明实施例 1的物理上行控制信道资源映射配置方法的流程图。 该 方法应用于 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配 置中不兼容的下行子帧的 PUCCH格式 l/la/lb。 如图 2所示, 该方法包括: 步骤 S202, 基站设置对 PUCCH进行映射的资源映射规则, 其中, 所述资源映射 规则包括: 针对与 R10/R11帧结构配置中不兼容的下行子帧, 先映射针对当前帧中下 行子帧的上行控制信息 UCI资源, 再映射针对上一帧中下行子帧的 UCI资源; 或者, 按照上一帧的帧结构映射所述 UE的 UCI资源, 其中, 所述上一帧的帧结构为映射到 当前上行子帧中的上一帧 PDSCH数量最多的帧结构; 步骤 S204, 基站向 UE下发所述资源映射规则。 通过上述处理过程, 由于采用先按照 R10/R11的定义规则, 预留针对与 R10/R11 帧结构配置中兼容的下行子帧的上行控制信息 UCI资源; 其次, 针对与 R10/R11帧结 构配置中不兼容的下行子帧: 先映射针对当前帧中下行子帧的 UCI资源, 再映射针对 上一帧中下行子帧的 UCI资源, 或者, 不论 UE在上一帧分配了什么帧结构, 均按照 当前上行子帧中的上一帧 PDSCH数量最多的帧结构映射所述 UE的 UCI资源的资源 映射规则, 因此, 从根本上避免了引入动态帧结构以后, R12UE因为不知道实际帧结 构而产生的 PUCCH冲突。 上述资源映射规则,还可以包括:按照 R10/R11的定义规则,预留针对与 R10/R11 帧结构配置中兼容的下行子帧的上行控制信息 UCI资源。 当前帧的上行子帧包括: 上行子帧 #7。 在本实施例中还提供了一种物理上行控制信道资源映射配置装置, 位于基站中, 该装置应用于 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构 配置中不兼容的下行子帧的 PUCCH格式 l/la/lb, 用于实现上述实施例及优选实施方 式, 已经进行过说明的不再赘述, 下面对该系统中涉及到模块进行说明。 如以下所使 用的, 术语 "模块"可以实现预定功能的软件和 /或硬件的组合。 尽管以下实施例所描 述的装系统较佳地以软件来实现, 但是硬件, 或者软件和硬件的组合的实现也是可能 并被构想的。 图 3为根据本发明实施例 1的物理上行控制信道资源映射配置装置的结 构框图。 如图 3所示, 该装置包括: 第一设置模块 30, 连接至第一发送模块 32, 设置为设置对 PUCCH进行映射的资 源映射规则, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结构配置中不兼容的 下行子帧, 先映射针对当前帧中下行子帧的上行控制信息 UCI资源, 再映射针对上一 帧中下行子帧的 UCI资源; 或者, 按照上一帧的帧结构映射所述 UE的 UCI资源, 其 中, 所述上一帧的帧结构为映射到当前上行子帧中的上一帧 PDSCH数量最多的帧结 构; 第一发送模块 32, 设置为向 UE下发所述资源映射规则。 上述资源映射规则还可以包括: 按照 R10/R11的定义规则, 预留针对与 R10/R11 帧结构配置中兼容的下行子帧的上行控制信息 UCI资源。 图 4为根据本发明实施例 1的物理上行控制信道资源映射方法的流程图。 该方法 应用于 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置中 不兼容的下行子帧的 PUCCH格式 l/la/lb, 如图 4所示, 该方法包括: 步骤 S402, UE接收来自于基站的对 PUCCH进行映射的资源映射规则, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结构配置中不兼容的下行子帧, 先映射针 对当前帧中下行子帧的上行控制信息 UCI资源, 再映射针对上一帧中下行子帧的 UCI 资源; 或者, 按照上一帧的帧结构映射所述 UE的 UCI资源, 其中, 所述上一帧的帧 结构为映射到当前上行子帧中的上一帧 PDSCH数量最多的帧结构; 步骤 S404, UE按照接收的所述资源映射规则对所述 PUCCH进行资源映射。 在本实施例中, 上述资源映射规则还可以包括: 按照 R10/R11的定义规则, 预留 针对与 R10/R11帧结构配置中兼容的下行子帧的上行控制信息 UCI资源。 上述 UE根据 PDCCH中的 CCE索引或者 EPDCCH中的 eCCE的索引按照所述资 源映射规则对每一下行子帧的 UCI资源进行资源映射。 在本实施例中, 还提供了一种 PUCCH的资源映射装置, 用于实现图 4所示实施 例。该装置位于 UE中, 应用于 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置中不兼容的下行子帧的 PUCCH格式 l/la/lb, 图 5为根据本发明 实施例 1的物理上行控制信道资源映射装置的结构框图。 如图 5所示, 该装置包括: 第一接收模块 50,连接至第一映射模块 52, 设置为接收来自于基站的对上行物理 控制信道 PUCCH进行映射的资源映射规则, 其中, 所述资源映射规则包括: 针对与 R10/R11 帧结构配置中不兼容的下行子帧: 先映射针对当前帧中下行子帧的上行控制 信息 UCI资源, 再映射针对上一帧中下行子帧的 UCI资源; 或者, 按照上一帧的帧结 构映射所述 UE的 UCI资源, 其中, 所述上一帧的帧结构为映射到当前上行子帧中的 上一帧 PDSCH数量最多的帧结构; 第一映射模块 52, 设置为按照接收的所述资源映射规则对所述 PUCCH进行资源 映射。 正如上面所述, 上述资源映射规则还可以包括: 按照 R10/R11的定义规则, 预留 针对与 R10/R11帧结构配置中兼容的下行子帧的上行控制信息 UCI资源。 为了更好地理解上述实施例 1及其优选实施方式, 以下结合实施例 2和相关附图 具体说明。 实施例 2 在该实施例中, 针对 PUCCH的资源映射方案, 为了描述方便, 做如下定义:
TDD动态帧结构场景中的某个上行子帧所反馈的针对 "R10不兼容的下行子帧中 传统 PDCCH" 的 PUCCH格式 1/la/lb: PUCCH格式 Id; TDD动态帧结构场景中的 某个上行子帧所反馈的针对 "R10 不兼容的下行子帧中 EPDCCH" 的 PUCCH格式 1/la/lb: PUCCH格式 le。 本实施例针对动态 TDD帧结构分配场景 (假定 R12或后续版本支持了该场景) 的 UCI映射方案。 为了更好地理解本实施例, 以下先对 TDD 业务自适应干扰管理 (Interference
Management Traffic Adaptation, 简称为 IMTA) 中 UCI映射会遇到的问题进行说明: 现有标准的 UCI 1/la/lb采用信道选择的方式进行映射, 即针对每一种帧结构, 一个上 行子帧承载着一个或者多个下行子帧 PDSCH对应的 UCI。每个配置 PDSCH的 PDCCH 的索引决定了 UCI 1/la/lb的位置。 动态切换场景中, 由于 R11和 R12对帧结构的解 读不同, 导致上行子帧承载的下行子帧的映射关系不同, 因此很容易发生 UCI冲突。 对于 R12 UE, 例如 UE 1, 可能被配置为按照 SIB-1的配置进行帧结构解读 (即 使其能解读到实际帧结构)。 假设 SIB-1是帧结构 0; UE1在帧 n-1 (即当前帧的上一 帧) 遵守 SIB-1配置, 在帧 n (即当前帧) 被动态的配置了帧结构 2并且占用了子帧 #0; 实际传输中帧 n-1是帧结构 1, 帧 n是帧结构 2。 如图 6所示, 则在帧 n的子帧 #7 要反馈 3个下行子帧的 UCI: 帧 n的子帧 #1 : 为了避免上面问题 1 中的冲突, 该 UCI应该完全按照 R10规范 (EPDCCH部分按照 R11规范)预留出来; 帧 n-1中子帧 #9: 假定该子帧被 UE 2-N占用; 帧 n的子帧 #0: 该子帧被 UE1占用; 以下进一步分 2种情况讨论:
( 1 ) UE1知道帧 n-1的实际结构是帧结构 1, 具体的方案可以是通过广播信令动 态的配置当前帧实际的帧结构, 同时使用 UE特定的控制信令通知 R12的 UE是遵守 SIB-1的帧结构还是动态广播信令指示的帧结构。 这样使得 UE1虽然在帧 n-1遵守了 SIB-1帧结构, 但是 UE2可以感知到实际的帧结构, 在帧 n的子帧 #7反馈 UCI时可以 避开针对帧 n-1中子帧 #9的 UCI的位置。 然而, 这种配置方案存在以下问题: 动态广播信令增加了 UE盲检测次数; 同时 为了保证广播信令的鲁棒性需要增加较大的信令开销。 (2) UE2不知道帧 n-1的实际结构, 以为其是帧结构 0。 另外一种可能性是 UE1 在 n-1帧没有感知到实际帧结构, 则其没有意识到帧 n-1 中的下行子帧 #9, 所以可能 会发生冲突。 基于上述方案, 本实施例提出一种鲁棒的 UCI映射方案, 即 UE1没有感知到帧 n-1的实际帧结构的情况下也能避免 UCI的冲突, 具体方案如下: 按照 R10/R11的定义规则,将对应 RIO PDCCH和 Rll EPDCCH的 UCI空间分配 给: R10/R11的 UE, 以及分配了兼容 R10/R11PDSCH的 R12UE (即当前帧结构中上 行子帧对应的下行子帧是 SIB-1通知的帧结构中对应下行子帧的子集, 例如当前帧结 构为 1, SIB-1帧结构为 2)。 与 R10/R11PDSCH不兼容的下行子帧, 上行子帧 #7的 UCI信道选择原则为: 先 映射针对当前帧下行子帧中 CCE的 UCI,再映射针对上一帧下行子帧中 CCE的 UCI: 下面以图 6为例说明如何进行 UCI ld/le的映射, 在 n帧中的子帧 #7中, 首先按照 n 帧中子帧 #1的 PCFICH值和 EPDCCH容量分别预留针对子帧 #1的 UCI 1/la/lb (UCI 空间 1 )和 UCI lc (UCI空间 2) 从而避免了和 R10/R11UE的冲突。 然后在 UCI空间 1的后面 (更靠近频带中心方向) 映射针对 n帧中的子帧 #0和子帧 #3的 UCI ld (UCI 空间 3 ), 再在 UCI空间 2的后面 (更靠近频带中心方向) 映射针对 n帧中的子帧 #0 和子帧 #3的 UCI le (UCI空间 4)。 或者, 与 R10/R11PDSCH不兼容的下行子帧, 上行子帧 #7的 UCI信道选择原则 为: 不论 R12 UE在上一帧分配了什么帧结构, 其都要预留针对上一帧子帧 9的 UCI 资源: 以图 6为例说明如何进行 UCI ld/le的映射, 在 n帧中的子帧 #7中, 首先按照 n 帧中子帧 #1的 PCFICH值和 EPDCCH容量分别预留针对子帧 #1的 UCI 1/la/lb (UCI 空间 1 )和 UCI lc (UCI空间 2) 从而避免了和 R10/R11UE的冲突。 然后在 UCI空间
1 的后面 (更靠近频带中心方向) 按照预定义的方法 (例如块交织等等) 映射针对 n 帧中的子帧 #0和子帧 #3和帧 n-1中的子帧 #9的 UCI。该方法的好处是可以尽量重用现 有的 UCI映射方案, 然而带来了一定 UCI开销损失。 实施例 3 图 7为根据本发明实施例 3的物理上行控制信道资源映射配置方法的流程图。 该 方法应用于 EPDCCH的 PUCCH格式 l/la/lb, 如图 7所示, 该方法包括: 步骤 S702, 基站设置对 PUCCH进行映射的资源映射规则, 其中, 所述资源映射 规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b 和 UCIl/la/lb之间的位置; 步骤 S704, 基站向 UE下发所述资源映射规则。 通过上述处理过程, 由于按照将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI 资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置的资源映射规则对 PUCCH进行映射, 因此, 同样可以避免引入动态帧结构以后, 和传统的 PUCCH的映射位置相冲突。 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI 2/2a/2b和 UCIl/la/lb 之间的位置, 包括: 通过预先配置的 UCI 1/la/lb 的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置,其中,所述索引偏移量包括: EPDCCH 的 PUCCH格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置。 在本实施例中还提供了一种物理上行控制信道资源映射配置装置, 该装置位于基 站中,应用于 EPDCCH的 PUCCH格式 1/la/lb,用于实现上述实施例及优选实施方式, 已经进行过说明的不再赘述, 下面对该系统中涉及到模块进行说明。如以下所使用的, 术语 "模块"可以实现预定功能的软件和 /或硬件的组合。 尽管以下实施例所描述的系 统较佳地以软件来实现, 但是硬件, 或者软件和硬件的组合的实现也是可能并被构想 的。 图 8为根据本发明实施例 3的物理上行控制信道资源映射配置装置的结构框图。 如图 8所示, 该装置包括: 第二设置模块 80, 连接至第二发送模块 82, 设置为设置对 PUCCH进行映射的资 源映射规则, 其中, 所述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb 对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置; 第二发送模块 82, 设置为向 UE下发所述资源映射规则。 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和
UCIl/la/lb 之间的位置, 包括: 通过预先配置的 UCI 1/la/lb 的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置,其中,所述索引偏移量包括: EPDCCH 的 PUCCH格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置。 基于上述配置方案, 本实施例还提供了一种物理上行控制信道资源映射方法, 该 方法应用于 EPDCCH的 PUCCH格式 l/la/lb, 如图 9所示, 该方法包括: 步骤 S902, UE接收来自于基站的对 PUCCH进行映射的资源映射规则, 其中, 所述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入 到 UCI2/2a/2b和 UCIl/la/lb之间的位置; 步骤 S904, UE按照接收的所述资源映射规则对所述 PUCCH进行资源映射。 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb 之间的位置, 包括: 通过预先配置的 UCI 1/la/lb 的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置,其中,所述索引偏移量包括: EPDCCH 的 PUCCH格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置;
UE按照接收的所述资源映射规则对所述 PUCCH进行资源映射包括: 所述 UE从 预先设置的初始位置开始对 PUCCH进行资源映射, 其中, 所述初始位置为 EPDCCH 的 PUCCH格式 1/la/lb和 UCI2/2a/2b混合的 PRB中,配置 EPDCCH的 PUCCH格式 1/la/lb占用的资源码道。 配置的所述资源码道是与小区或小区内 UE对应的。 述 UE按照接收的所述资源映射规则对所述 PUCCH进行资源映射之前, 还可以 包括: 确定目标下行子帧中 PDCCH和 E-PDCCH 的总容量超过 R10 能支持的最大 PDCCH的 CCE个数, 其中, 对于超过最大 PDCCH的 CCE个数的 E-PDCCH调度的 PDSCH, 按照所述资源映射规则对所述 PUCCH进行资源映射, 所述目标下行子帧为 和 EPDCCH的 PUCCH格式 1/la/lb对应的 PDSCH的调度下行子帧。如果所述目标下 行子帧中 PDCCH和 E-PDCCH的总容量未超过 R10能支持的最大 PDCCH的 CCE个 数,则 EPDCCH的 PUCCH格式 1/la/lb重用 R10定义的 UCI 1/la/lb的物理资源位置 对 PUCCH进行资源映射。 本实施例还提供一种物理上行控制信道资源映射装置, 位于 UE中, 该装置应用 于 EPDCCH的 PUCCH格式 l/la/lb, 如图 10所示, 该装置包括: 第二接收模块 1002, 连接至第二映射模块 1004, 设置为接收来自于基站的对 PUCCH进行映射的资源映射规则, 其中, 所述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置; 第二映射模块 1004, 设置为按照接收的所述资源映射规则对所述 PUCCH进行资 源映射。 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb 之间的位置, 包括: 通过预先配置的 UCI 1/la/lb 的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置,其中,所述索引偏移量包括: EPDCCH 的 PUCCH格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置; 上述第二映射模块 1004, 还设置为从预先设置的初始位置开始对 PUCCH进行资 源映射, 其中, 所述初始位置为 EPDCCH的 PUCCH格式 1/la/lb和 UCI2/2a/2b混合 的 PRB中, 配置 EPDCCH的 PUCCH格式 1/la/lb占用的资源码道。 实施例 4 为了更好地理解上述实施例 3, 以下结合具体实施例详细说明。 首先将本实施例 要解决的技术问题进行说明:为了避免和传统的 PUCCH冲突,比较直观的是将 PUCCH 格式 lc映射到 PUCCH格式 1/la/lb后面。 然而这样有潜在的问题: (1 ) 为了不和传 统的 PUCCH冲突, 需要按照最大可能的 UCI l/la/lb容量预留资源, 其中的某些资源 可能不会被使用, 造成资源浪费, 尤其系统带宽比较窄的时候; (2 此外, 如果 TDD 动态帧结构被支持, 即使 UE被通知的实际帧结构不同于 SIB-1的指示,该 UE也需要 检测所有的 SIB-1指示的帧结构中下行子帧中的 PCFICH以便其知道最大 UCI 1/la/lb 的容量。 这样不利于节省功耗。 在本实施例中, 为了叙述方便, 现作以下定义: 针对 EPDCCH的 PUCCH格式 1/la/lb定义为 PUCCH格式 lc。 实施例 4
UCI lc插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置, 具体实现可以通过重用现 有的三个参数来实现:
: 定义不变, 表示 UCI 2/2a/2b占用的 PRB数量
N^s: 对于 R11和以后的 UE, 代表 UCI lc和 UCI2/2a/2b混合的 PRB中, UCI lc 占用的资源码道。 R10及以前的 UE还是解读该参数为 UCI 1/la/lb和 UCI2/2a/2b混合 的 PRB中, UCI 1/la/lb占用的资源码道。
N^UCCH: 定义不变, 表示 UCI 1/la/lb的索引偏移量。 但是具体赋值的时候, 要 包含 UCI lc的容量。 如图 11所示, 通过设置合适的 数值 (0 2047) 将 UCI l/la/lb搬移到更靠 近频带中心的位置,在 UCI 1/la/lb和 UCI 2/2a/2b之间插入 UCI lc。 UCI lc从^ 标 示的位置开始映射,最多可以映射到索引 ^c^—1标识的位置。此夕卜,类似 UCI 1/la/lb 中的 , 可以设置一个高层配置的 UCI lc索引的偏移量 ^^^ϊ来控制 UCI ic的 起始位置。 该方案需要 UE知道系统中 E-PDCCH的容量即其分配的 eCCE的索引,如果 R11 最终定义的 E-PDCCH不支持这一需求 (例如 UE只知道部分 E-PDCCH容量), 则可 以上述提出的变量 可以是 UE特定的。
上面方案中, UCI lc放在完全独立于 UCI 1/la/lb的空间, 作为一个候选方案, 可以使 UCI lc部分的 (或完全的) 重用 UCI l/la/lb空间。 如下描述:
A1. 目标下行子帧中 PDCCH和 E-PDCCH的总容量如果没有超过 R10能支持的 最大 PDCCH的 CCE个数 (Ncor, 3~4个 OFDM符号), 贝 U UCI lc重用 R10定义的 UCI 1/la/lb的物理资源位置 -其中 E-PDCCH的 eCCE索引计算为 neCCE = N cE + k , 其中 NccE是目标下行子帧中的 CCE个数, k是 eCCE在 E-PDCCH中的编号。 A2. 目标下行子帧中 PDCCH和 E-PDCCH的总容量如果超过 R10能支持的最大 PDCCH的 CCE个数 ( Ncor, 3-4个 OFDM符号), 对于超过部分的 E-PDCCH调度 的 PDSCH, 首先更新 CCE索引为 n eccE = nECCE _ ^CCE, 然后执行上面步骤 a的操作。 上面步骤 a中 UCI lc的映射可以重用现有的块交织方案。 另外, 在本发明的一个优选实施例中, 还提供了一种基站, 如图 12所示, 该基站 可以包括: 图 3和 /或图 8所示实施例中的物理上行控制信道资源映射配置装置。 本实施例中的基站, 利用图 3所示实施例中的物理上行控制信道资源映射配置装 置中的第一设置模块 30设置上述资源映射规则, 然后通过第一发送模块 32将上述资 源映射规则下发给 UE, 这样, 可以实现基站与 UE之间资源映射规则的协商, 从而使 得基站和 UE利用上述资源映射规则对 PUCCH进行资源映射, 从而避免了对 TDD动 态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置中不兼容的下行子 帧的 PUCCH格式 1/la/lb进行资源映射时与传统的 PUCCH映射位置相冲突。 和上述类似, 利用图 8所示实施例中的物理上行控制信道资源映射装置中的第二 设置模块 80设置上述资源映射规则, 然后通过第二发送模块 82将上述资源映射规则 下发给 UE, 这样, 可以实现基站与 UE之间资源映射规则的协商, 从而使得基站和 UE 利用上述资源映射规则对 PUCCH 进行资源映射, 从而避免了对 EPDCCH 的 PUCCH格式 1/la/lb进行资源映射时与传统的 PUCCH映射位置相冲突。 在本发明的另一个优选实施方式中, 还提供了一种 UE, 如图 13所示, 该装置包 括: 图 5和 /或图 10所示实施例中的物理上行控制信道资源映射装置。 本实施例中的 UE,利用图 5所示实施例中的物理上行控制信道资源映射装置中的 第一接收模块 50, 接收由基站下发的上述资源映射规则, 然后通过第一映射模块 52 根据该资源映射规则对 PUCCH进行资源映射,从而避免了在对 TDD动态帧结构场景 中指定上行子帧所反馈的针对与 R10/R11 帧结构配置中不兼容的下行子帧的 PUCCH 格式 1/la/lb进行资源映射时, 与传统的 PUCCH映射位置相冲突。 和上面类似, 本实施例中的 UE, 还可以利用利用图 10所示实施例中的物理上行 控制信道资源映射装置中的第二接收模块 1002, 接收由基站下发的上述资源映射规 贝 U, 然后通过第二映射模块 1004根据该资源映射规则对 PUCCH进行资源映射, 从而 避免了在对 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配 置中不兼容的下行子帧的 PUCCH格式 Ι/la/lb进行资源映射时, 与传统的 PUCCH映 射位置相冲突。 显然, 本领域的技术人员应该明白, 上述的本发明的各模块或各步骤可以用通用 的计算装置来实现, 它们可以集中在单个的计算装置上, 或者分布在多个计算装置所 组成的网络上, 可选地, 它们可以用计算装置可执行的程序代码来实现, 从而, 可以 将它们存储在存储装置中由计算装置来执行, 并且在某些情况下, 可以以不同于此处 的顺序执行所示出或描述的步骤, 或者将它们分别制作成各个集成电路模块, 或者将 它们中的多个模块或步骤制作成单个集成电路模块来实现。 这样, 本发明不限制于任 何特定的硬件和软件结合。 以上所述仅为本发明的优选实施例而已, 并不用于限制本发明, 对于本领域的技 术人员来说, 本发明可以有各种更改和变化。 凡在本发明的精神和原则之内, 所作的 任何修改、 等同替换、 改进等, 均应包含在本发明的保护范围之内。

Claims

权 利 要 求 书
1. 一种物理上行控制信道资源映射配置方法, 所述方法应用于 TDD 动态帧结构 场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置中不兼容的下行子帧 的 PUCCH格式 l/la/lb, 该方法包括:
基站设置对物理上行控制信道 PUCCH进行映射的资源映射规则, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结构配置中不兼容的下行子帧, 先 映射针对当前帧中下行子帧的上行控制信息 UCI资源, 再映射针对上一帧中下 行子帧的 UCI资源; 或者, 按照上一帧的帧结构映射所述 UE的 UCI资源, 其 中, 所述上一帧的帧结构为映射到当前上行子帧中的上一帧 PDSCH数量最多 的帧结构;
所述基站向用户设备 UE下发所述资源映射规则。
2. 根据权利要求 1所述的方法, 其中, 所述资源映射规则, 还包括:
按照 R10/R11的定义规则, 预留针对与 R10/R11帧结构配置中兼容的下行 子帧的上行控制信息 UCI资源。
3. 根据权利要求 1所述的方法, 其中, 当前帧的上行子帧包括: 上行子帧 #7。
4. 根据权利要求 1至 3任一项所述的方法,其中,所述帧结构通过以下方式获取: 所述基站通过广播信令动态配置当前帧的帧结构, 同时使用专用的控制信令指 示 UE使用 SIB-1帧结构或者所述广播信令指示的帧结构。
5. 一种物理上行控制信道资源映射方法, 其中, 所述方法应用于 TDD 动态帧结 构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置中不兼容的下行子 帧的 PUCCH格式 l/la/lb, 该方法包括:
用户设备 UE接收来自于基站的对上行物理控制信道 PUCCH进行映射的 资源映射规则,并按照接收的所述资源映射规则对所述 PUCCH进行资源映射, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结构配置中不兼容的下行子 帧, 先映射针对当前帧中下行子帧的上行控制信息 UCI资源, 再映射针对上一 帧中下行子帧的 UCI资源; 或者, 按照上一帧的帧结构映射所述 UE的 UCI资 源, 其中, 所述上一帧的帧结构为映射到当前上行子帧中的上一帧 PDSCH数 量最多的帧结构。
6. 根据权利要求 5所述的方法, 其中, 所述资源映射规则还包括: 按照 R10/R11的定义规则, 预留针对与 R10/R11帧结构配置中兼容的下行 子帧的上行控制信息 UCI资源。
7. 根据权利要求 5所述的方法, 其中, 所述 UE根据 PDCCH中的 CCE索引或者 EPDCCH中的 eCCE的索引按照所述资源映射规则对每一下行子帧的 UCI资源 进行资源映射。
8. —种物理上行控制信道资源映射配置方法,其中,所述方法应用于 EPDCCH的 PUCCH格式 l/la/lb, 该方法包括:
基站设置对物理上行控制信道 PUCCH进行映射的资源映射规则, 其中, 所述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资 源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置;
所述基站向用户设备 UE下发所述资源映射规则。
9. 根据权利要求 8所述的方法, 其中, 将与 EPDCCH的 PUCCH格式 1/la/lb对 应的 UCI资源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置, 包括:
通过预先配置的 UCI 1/la/lb的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb 设置在靠近频带中心位置, 其中, 所述索引偏移量包括: EPDCCH的 PUCCH 格式 1/la/lb的容量;将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插 入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置。
10. 一种物理上行控制信道资源映射方法,所述方法应用于 EPDCCH的 PUCCH格 式 1/1 a/lb, 该方法包括:
用户设备 UE接收来自于基站的对物理上行控制信道 PUCCH进行映射的 资源映射规则,并按照接收的所述资源映射规则对所述 PUCCH进行资源映射, 其中, 所述资源映射规则包括: 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置。
11. 根据权利要求 10所述的方法, 其中,
将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b 和 UCIl/la/lb之间的位置, 包括: 通过预先配置的 UCI 1/la/lb的索引偏移量 和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带中心位置, 其中, 所述索引偏移 量包括: EPDCCH的 PUCCH格式 1/la/lb的容量; 将与 EPDCCH的 PUCCH 格式 1/la/lb对应的 UCI资源插入到 UCI 2/2a/2b和 UCIl/la/lb之间的位置; 按照接收的所述资源映射规则对所述 PUCCH进行资源映射包括:所述 UE 从预先设置的初始位置开始对 PUCCH进行资源映射, 其中, 所述初始位置为 EPDCCH的 PUCCH格式 1/la/lb和 UCI2/2a/2b混合的 PRB中,配置 EPDCCH 的 PUCCH格式 1/la/lb占用的资源码道。
12. 根据权利要求 11 所述的方法, 其中, 配置的所述资源码道是与小区或小区内 UE对应的。
13. 根据权利要求 10所述的方法, 其中, 所述 UE按照接收的所述资源映射规则对 所述 PUCCH进行资源映射之前, 还包括:
确定目标下行子帧中 PDCCH和 E-PDCCH的总容量超过 R10能支持的最 大 PDCCH的 CCE个数,其中,对于超过最大 PDCCH的 CCE个数的 E-PDCCH 调度的 PDSCH, 按照所述资源映射规则对所述 PUCCH进行资源映射, 所述目 标下行子帧为和 EPDCCH的 PUCCH格式 1/la/lb对应的 PDSCH的调度下行子 帧。
14. 根据权利要求 13所述的方法,其中,还包括:如果所述目标下行子帧中 PDCCH 和 E-PDCCH 的总容量未超过 R10 能支持的最大 PDCCH 的 CCE个数, 则 EPDCCH的 PUCCH格式 1/la/lb重用 R10定义的 UCI 1/la/lb的物理资源位置 对 PUCCH进行资源映射。
15. 一种物理上行控制信道资源映射配置装置,位于基站中,,所述装置应用于 TDD 动态帧结构场景中的指定上行子帧所反馈的针对与 R10/R11帧结构配置中不兼 容的下行子帧的 PUCCH格式 l/la/lb, 该装置包括:
第一设置模块, 设置为设置对物理上行控制信道 PUCCH进行映射的资源 映射规则, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结构配置中不兼 容的下行子帧, 先映射针对当前帧中下行子帧的上行控制信息 UCI资源, 再映 射针对上一帧中下行子帧的 UCI 资源; 或者, 按照上一帧的帧结构映射所述 UE的 UCI资源, 其中, 所述上一帧的帧结构为映射到当前上行子帧中的上一 帧 PDSCH数量最多的帧结构;
第一发送模块, 设置为向用户设备 UE下发所述资源映射规则。
16. 根据权利要求 15所述的装置, 其中, 所述资源映射规则还包括: 按照 R10/R11 的定义规则, 预留针对与 R10/R11帧结构配置中兼容的下行子帧的上行控制信 息 UCI资源。
17. 一种物理上行控制信道资源映射装置, 位于用户设备 UE中, 所述装置应用于 TDD动态帧结构场景中指定上行子帧所反馈的针对与 R10/R11帧结构配置中不 兼容的下行子帧的 PUCCH格式 l/la/lb, 该装置包括:
第一接收模块, 设置为接收来自于基站的对上行物理控制信道 PUCCH进 行映射的资源映射规则, 其中, 所述资源映射规则包括: 针对与 R10/R11帧结 构配置中不兼容的下行子帧: 先映射针对当前帧中下行子帧的上行控制信息 UCI资源, 再映射针对上一帧中下行子帧的 UCI资源; 或者, 按照上一帧的帧 结构映射所述 UE的 UCI资源, 其中, 所述上一帧的帧结构为映射到当前上行 子帧中的上一帧 PDSCH数量最多的帧结构;
第一映射模块, 设置为按照接收的所述资源映射规则对所述 PUCCH进行 资源映射。
18. 根据权利要求 17所述的装置, 其中, 所述资源映射规则还包括: 按照 R10/R11 的定义规则, 预留针对与 R10/R11帧结构配置中兼容的下行子帧的上行控制信 息 UCI资源。
19. 一种物理上行控制信道资源映射配置装置, 位于基站中,, 所述装置应用于 EPDCCH的 PUCCH格式 l/la/lb, 该装置包括:
第二设置模块, 设置为设置对物理上行控制信道 PUCCH进行映射的资源 映射规则,其中,所述资源映射规则包括:将与 EPDCCH的 PUCCH格式 1/la/lb 对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置;
第二发送模块, 设置为向用户设备 UE下发所述资源映射规则。
20. 根据权利要求 19所述的装置, 其中, 将与 EPDCCH的 PUCCH格式 1/la/lb对 应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置, 包括: 通过预先 配置的 UCI 1/la/lb的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带 中心位置, 其中, 所述索引偏移量包括: EPDCCH的 PUCCH格式 1/la/lb的容 量; 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI 2/2a/2b 和 UCIl/la/lb之间的位置。
21. 一种物理上行控制信道资源映射装置, 位于用户设备 UE中, 所述装置应用于 EPDCCH的 PUCCH格式 l/la/lb, 该装置包括:
第二接收模块, 设置为接收来自于基站的对物理上行控制信道 PUCCH进 行映射的资源映射规则, 其中, 所述资源映射规则包括: 将与 EPDCCH 的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的 位置;
第二映射模块, 设置为按照接收的所述资源映射规则对所述 PUCCH进行 资源映射。
22. 根据权利要求 21所述的装置, 其中, 将与 EPDCCH的 PUCCH格式 1/la/lb对 应的 UCI资源插入到 UCI2/2a/2b和 UCIl/la/lb之间的位置, 包括: 通过预先 配置的 UCI 1/la/lb的索引偏移量和 UCI 2/2a/2b将 UCI 1/la/lb设置在靠近频带 中心位置, 其中, 所述索引偏移量包括: EPDCCH的 PUCCH格式 1/la/lb的容 量; 将与 EPDCCH的 PUCCH格式 1/la/lb对应的 UCI资源插入到 UCI 2/2a/2b 和 UCIl/la/lb之间的位置;
所述第二映射模块, 还设置为从预先设置的初始位置开始对 PUCCH进行 资源映射,其中,所述初始位置为 EPDCCH的 PUCCH格式 1/la/lb和 UCI2/2a/2b 混合的 PRB中, 配置 EPDCCH的 PUCCH格式 1/la/lb占用的资源码道。
23. 一种用户设备, 包括: 权利要求 17、 18、 21和 22中任一项所述的装置。
24. 一种基站, 包括: 权利要求 15、 16、 19和 20中任一项所述的装置。
PCT/CN2012/077441 2012-05-10 2012-06-25 Pucch资源映射、配置方法及装置、用户设备、基站 WO2013166765A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210143252.0 2012-05-10
CN201210143252.0A CN103391178B (zh) 2012-05-10 2012-05-10 Pucch资源映射、配置方法及装置、用户设备、基站

Publications (1)

Publication Number Publication Date
WO2013166765A1 true WO2013166765A1 (zh) 2013-11-14

Family

ID=49535343

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/077441 WO2013166765A1 (zh) 2012-05-10 2012-06-25 Pucch资源映射、配置方法及装置、用户设备、基站

Country Status (2)

Country Link
CN (1) CN103391178B (zh)
WO (1) WO2013166765A1 (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104901775B (zh) * 2014-03-09 2018-12-21 上海朗帛通信技术有限公司 一种在非授权频谱上的通信方法和装置
JPWO2017026159A1 (ja) * 2015-08-11 2018-05-31 三菱電機株式会社 通信システム
WO2017028042A1 (zh) * 2015-08-14 2017-02-23 华为技术有限公司 上行控制信息的发送方法、接收方法、用户设备以及基站
AU2017390583A1 (en) * 2017-01-05 2019-06-13 Telefonaktiebolaget Lm Ericsson (Publ) Device and node in a wireless communication system for transmitting uplink control information
CN111713152B (zh) * 2018-02-13 2023-10-20 华为技术有限公司 一种通信方法及装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101448332A (zh) * 2008-12-31 2009-06-03 中兴通讯股份有限公司 大带宽系统中上行控制信道资源映射方法及装置
CN102355325A (zh) * 2011-08-11 2012-02-15 电信科学技术研究院 一种pucch资源映射的方法及装置
US20120087254A1 (en) * 2010-10-08 2012-04-12 Sharp Laboratories Of Ameria, Inc. Uplink control information transmission on backward compatible pucch formats with carrier aggregation

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252775B (zh) * 2008-04-02 2013-06-05 中兴通讯股份有限公司 一种时分双工系统物理随机接入信道参数配置及指示方法
CN102045141B (zh) * 2009-10-10 2013-06-12 中兴通讯股份有限公司 一种利用上行子帧发送秩指示信息的方法及终端
CN102377537B (zh) * 2010-08-10 2014-07-09 电信科学技术研究院 一种上行控制信息uci传输和接收方法及设备
CN102355733B (zh) * 2011-09-30 2017-09-26 中兴通讯股份有限公司 一种物理上行控制信道的发送方法和用户设备

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101448332A (zh) * 2008-12-31 2009-06-03 中兴通讯股份有限公司 大带宽系统中上行控制信道资源映射方法及装置
US20120087254A1 (en) * 2010-10-08 2012-04-12 Sharp Laboratories Of Ameria, Inc. Uplink control information transmission on backward compatible pucch formats with carrier aggregation
CN102355325A (zh) * 2011-08-11 2012-02-15 电信科学技术研究院 一种pucch资源映射的方法及装置

Also Published As

Publication number Publication date
CN103391178B (zh) 2017-12-12
CN103391178A (zh) 2013-11-13

Similar Documents

Publication Publication Date Title
TWI798562B (zh) 無需特許頻段新無線電操作之頻道存取方法及先聽候送解決方案
JP7435689B2 (ja) 無線端末、基地局、無線端末における方法及び基地局における方法
CN111918349B (zh) Wtru及其实施的方法
US10887793B2 (en) Radio station, radio terminal apparatus, and method for these
US11310779B2 (en) Method and apparatus for transmitting/receiving control information in wireless communication system
US10581559B2 (en) User Equipment, base stations and methods
JP2019216481A (ja) Eノードb間のキャリアアグリゲーションのためのul tdmの方法
US9137787B2 (en) Method and apparatus for hybrid automatic repeat request signaling
US20170111923A1 (en) User equipments, base stations and methods for low latency radio communications
US20220304059A1 (en) Method and Apparatus for Sharing Channel Occupancy Time on Unlicensed Spectrum
WO2014005529A1 (zh) 一种跨频带载波聚合下的dci传输方法及装置
WO2018170655A1 (zh) 传输数据的方法、终端设备和网络设备
WO2013155705A1 (en) Resource allocation in different tdd configurations with cross carrier scheduling
JP2020145759A (ja) 通信システム
JP2023171855A (ja) 通信システム
US20230039648A1 (en) Transport Block Repetition with Multiple Uplink Configured Grant Configurations
WO2014205930A1 (zh) 无线通信方法、装置及系统
CN114531938B (zh) 具有重复的配置的ul
JPWO2017026324A1 (ja) 端末装置、通信方法、および、集積回路
US10327179B2 (en) Telecommunications apparatus and methods
WO2013166765A1 (zh) Pucch资源映射、配置方法及装置、用户设备、基站
WO2021136373A1 (zh) 由用户设备执行的方法以及用户设备
CN118235496A (zh) 对于侧行链路通信的调度
JP7416206B2 (ja) 上りリンク信号の送受信方法及び装置
JP2023023409A (ja) ユーザ装置及び通信制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12876415

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12876415

Country of ref document: EP

Kind code of ref document: A1