WO2013072195A1 - Method for drying a pipeline system - Google Patents

Method for drying a pipeline system Download PDF

Info

Publication number
WO2013072195A1
WO2013072195A1 PCT/EP2012/071569 EP2012071569W WO2013072195A1 WO 2013072195 A1 WO2013072195 A1 WO 2013072195A1 EP 2012071569 W EP2012071569 W EP 2012071569W WO 2013072195 A1 WO2013072195 A1 WO 2013072195A1
Authority
WO
WIPO (PCT)
Prior art keywords
suction fan
drying
pipe
operating time
valve
Prior art date
Application number
PCT/EP2012/071569
Other languages
German (de)
French (fr)
Inventor
Steffen SCHLENKER
Lars KAULFUSS
Original Assignee
Siemens Aktiengesellschaft
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Aktiengesellschaft filed Critical Siemens Aktiengesellschaft
Publication of WO2013072195A1 publication Critical patent/WO2013072195A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/035Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing by suction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/0321Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
    • B08B9/0328Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid by purging the pipe with a gas or a mixture of gas and liquid

Definitions

  • the invention relates to a method for drying a pipeline system in an industrial plant.
  • Amounts of flow medium usually according to conditioned water in the various components such as steam generator, turbine etc. initiated. Especially here piping systems must be designed pressure stable.
  • fittings such as measuring orifices, sieves, filters, etc.
  • valves such as shut-off valves, shut-off slide, check valves, etc.
  • delays sometimes result in the need to dry the piping system or individual piping of the system after a pressure test or watering.
  • the object of the invention is therefore to provide a method for drying a piping system in an industrial plant, which allows reliable drying of a pipe, in particular with fittings contained in a short time with relatively little technical effort.
  • a pipe of the piping system is provided on the input side with an air inlet and the output side, a suction fan is connected, wherein the suction fan is operated to dry the pipe.
  • the invention is based on the consideration that physically fundamentally different possibilities exist for drying a pipeline: evaporation, temperature increase below the boiling point and mass transport as a result of the concentration gradient at the interface, increase in temperature and reduction of the relative humidity to increase this concentration gradient and increase the air mass flow To increase the mass transfer coefficient. It has surprisingly been found by extensive and expensive experiments that the use of a suction fan allows complete removal of residual fluid without disassembly. The considerable increase in the air mass flow through the suction fan creates turbulence on the surface of the fluid. These improve on the one hand the mass transfer into the air, on the other hand, the strong air flow entrains fluid that precipitates on the pipe inner wall and wets them. Thus, the total fluid surface increases, which further accelerates the mass transfer into the air. This allows drying within a comparatively short time.
  • the pipeline for controlling and controlling the process parameters comprises one or more valves.
  • the drying is particularly difficult.
  • the tube inner wall here typically has edges, indentations and other structures that are in the The following generalization be referred to as fitting pockets. Fluid can accumulate in the fitting pockets, so that not only a film which wets the pipe wall but also a considerable fluid accumulation filling the respective valve pocket is to be dried, ie to be removed.
  • the inventive method has the advantage of easy to dry the area of the fitting pockets.
  • the pipeline is arranged horizontally and / or the valve arranged vertically.
  • the use of a suction fan is particularly effective, since in some other geometric arrangement, the fitting may cover the water surface in large parts under certain circumstances. This reduces the air flow at the water surface.
  • the valve is at least partially closed during part of the operating time of the suction fan.
  • the associated reduction in the pipe cross-section increases the speed of the air flow and thus improves the mass transfer to the air, which accelerates drying.
  • a fluid volume in the pipeline is determined prior to operation of the suction fan and, depending on the determined fluid volume, the operating time of the Suction fan selected.
  • the duration of the drying process can be estimated very well by this formula. The formula therefore offers a particularly simple way of predicting and planning the drying time.
  • the suction fan is designed in such a way that an air speed of more than 7 m / s, preferably more than 26 m / s, is established during the operating time in the pipeline.
  • an air speed of more than 7 m / s, preferably more than 26 m / s is established during the operating time in the pipeline.
  • the turbulences that form on the water surface are particularly suitable for achieving a rapid drying process through water discharge and the associated enlargement of the water surface.
  • dry air is introduced into the pipeline during and / or after the operating time of the suction fan.
  • the dry air has a significantly lower humidity, z. B. 11 to 12% and is provided by appropriate air dryers. In this way, any residual moisture can be reliably removed in dead space areas that are not detected by the turbulence of the suction air.
  • the advantages achieved by the invention are, in particular, that the use of a suction fan for removing fluid residues in a piping system a particularly rapid drying of the relevant pipe is made possible, especially if this includes a valve with the corresponding fitting pockets. Due to the high air velocities on the water surface, turbulence, which allow drying in a particularly fast time with technically comparatively simple means. In addition, the suction fan and other contaminants such. As by sanding dust, chips, welding wires, slag, etc., thus enabling a simultaneous cleaning of the pipeline.
  • FIG. 1 shows a circuit diagram of a pipeline system in which the method according to the invention is carried out
  • FIG. 2 shows a cross-sectional drawing of a wedge plate shut-off valve from the piping system of FIG. 1
  • the piping system 1 according to FIG 1 shows only a section of the entire pipeline system of an industrial plant, in the embodiment of FIG 1 of a nuclear power plant.
  • the piping system 1 is used in the operating state of the power plant of the line of vaporizable fluid.
  • the piping system 1 comprises a fitting 2, here a wedge plate gate valve.
  • the wedge plate gate valve is designed for the nominal diameter DN 300 and has a total mass of 1500 kg including actuating motor.
  • the armature 2 is arranged in a vertical position in a horizontal piping system.
  • the valve 2, a check valve 4, a branch 6 and another check valve 8 are connected in the piping system 1.
  • Dier fitting 2 is shown in the enlarged view in FIG. 2 shows the structure of the wedge plate gate valve.
  • the pipe 10 should be closed by the wedge plate gate valve.
  • the fitting 2 has a wedge plate 12 which completely closes the pipe 10 in the closed state (shown in FIG. 2).
  • the armature 2 further includes a respective actuating mechanism 14 which includes motor, transmission, etc., but the detailed function of which is immaterial to the understanding of the method.
  • the pipe 10 on the opposite side of the actuating mechanism 14 on a bulge the so-called fitting pocket 16.
  • the pipe 10 is pressure-tight.
  • the pipeline system 1 is now already used during the construction phase or commissioning of the power plant, for example, watered for test purposes or subjected to a pressure test. After these test phases, it is often necessary to re-dry the piping system 1. Particularly problematic here are the areas of the instrument pockets 16 in which fluid collects, represented by the water level 20 in FIG. 2.
  • a suction fan 18 is connected to the piping system 1, shown in FIG 1 to the check valve 8.
  • the valve 2 is preceded by an air inlet 22, which provides the air supply to the piping system 1 and suction fan 18.
  • the fitting pocket 16 is filled with 2.5 liters of deionized water.
  • an air volume flow of 6913 cubic meters per hour is established, which, with a nominal pipe diameter of DN 300 speed of 26 m / s corresponds.
  • the suction fan 18 has a power consumption of 14.4 kW.
  • the humidity outside the piping system 1 is 35% at a temperature of 22.4 ° C.
  • valve 2 After about 1/3 of the operating time of the suction fan 18, the valve 2 is closed to about 70%. As a result, stronger turbulence forms on the water level 20 and water is also discharged in the dead space areas 24 (see FIG. 2) of the fitting pocket 16. After only 1 minute, only residual moisture is left.
  • valve 2 After approx. 2/3 of the operating time, the valve 2 is closed at approx. 90%. As a result, even the edge areas of
  • Valve pocket 16 dried. After about 35 minutes of operation of the suction fan 18, the fitting pocket 16 is completely dried. This corresponds to a drying rate of 14 minutes per liter.
  • the drying time can be shortened by additional application of dry air at the air inlet 22 again. To illustrate the method described was the

Abstract

A method for drying a pipeline system (1) in an industrial plant is intended to make reliable drying of a pipeline, in particular with fittings which are contained, possible in a short time with comparatively low technical outlay. To this end, a pipeline (10) of the pipeline system (1) is provided on the inlet side with an air inlet (22) and an exhaust fan (18) is connected on the outlet side, wherein the exhaust fan (18) is operated in order to dry the pipeline (10).

Description

Beschreibung description
Verfahren zur Trocknung eines Rohrleitungssystems Die Erfindung betrifft ein Verfahren zur Trocknung eines Rohrleitungssystems in einer Industrieanlage. Method for drying a pipeline system The invention relates to a method for drying a pipeline system in an industrial plant.
Industrieanlagen wie z. B. Fabrikanlagen oder Kraftwerke umfassen häufig Rohrleitungssysteme für verschiedenste Arten von Flüssigkeiten. Insbesondere in Kraftwerken werden großeIndustrial plants such. B. Factories or power plants often include piping systems for various types of liquids. Especially in power plants are large
Mengen von Strömungsmedium, üblicherweise entsprechend konditioniertem Wasser in die verschiedenen Bauteile wie Dampferzeuger, Turbine etc. eingeleitet. Gerade hier müssen Rohrleitungssysteme auch druckstabil ausgelegt sein. Amounts of flow medium, usually according to conditioned water in the various components such as steam generator, turbine etc. initiated. Especially here piping systems must be designed pressure stable.
Zur Steuerung und Regelung der Fluidströmungen im Rohrleitungssystem umfasst dieses typischerweise eine Anzahl von Armaturen wie z. B. Messblenden, Siebe, Filter etc., insbesondere auch alle Arten von Ventilen wie Absperrhähne, Absperr- Schieber, Rückschlagklappen etc. To control and regulate the fluid flows in the piping this typically includes a number of fittings such. As measuring orifices, sieves, filters, etc., in particular all kinds of valves such as shut-off valves, shut-off slide, check valves, etc.
Während der Bau- oder Inbetriebsetzungsphase einer Industrieanlage besteht teilweise durch Verzögerungen die Notwendigkeit, das Rohrleitungssystem oder einzelne Rohrleitungen des Systems nach einer Druckprobe oder Wässerung zu trocknen.During the construction or commissioning phase of an industrial plant, delays sometimes result in the need to dry the piping system or individual piping of the system after a pressure test or watering.
Dies sollte möglichst schnell durchgeführt werden, um Ablagerungen in den Rohrleitungssystemen zu vermeiden. This should be done as quickly as possible to avoid deposits in the piping systems.
Üblicherweise wurde eine Trocknung des Rohrleitungssystems bzw. einer bestimmten Rohrleitung bisher mit Heizmatten von außen und mit Trockenluftbeaufschlagung durchgeführt. Gerade wenn die Rohrleitungen Abschnitte mit Armaturen umfasst, kann dies im Bereich der Armaturen aufgrund von Fluidansammlungen jedoch zu lange dauern und damit unpraktikabel sein. In der Praxis bleibt daher gerade im Bereich der Armaturen nur die Möglichkeit, die Armatur oder den betreffenden Rohrabschnitt mit erheblichem Aufwand auszubauen und manuell zu trocknen. „ Usually, a drying of the piping system or a specific pipeline has previously been carried out with heating mats from the outside and with Trockenluftbeaufschlagung. However, even if the piping comprises sections with fittings, this can take too long in the area of the fittings due to fluid accumulation and thus be impractical. In practice, therefore, just in the field of fittings only the possibility to expand the fitting or the relevant pipe section with considerable effort and dry manually. "
Aufgabe der Erfindung ist es daher, ein Verfahren zur Trocknung eines Rohrleitungssystems in einer Industrieanlage anzugeben, das eine zuverlässige Trocknung einer Rohrleitung, insbesondere mit enthaltenen Armaturen in kurzer Zeit mit vergleichsweise geringem technischen Aufwand ermöglicht. The object of the invention is therefore to provide a method for drying a piping system in an industrial plant, which allows reliable drying of a pipe, in particular with fittings contained in a short time with relatively little technical effort.
Diese Aufgabe wird erfindungsgemäß gelöst, indem eine Rohrleitung des Rohrleitungssystems eingangsseitig mit einem Lufteintritt versehen wird und ausgangsseitig ein Sauggebläse angeschlossen wird, wobei das Sauggebläse zur Trocknung der Rohrleitung betrieben wird. This object is achieved by a pipe of the piping system is provided on the input side with an air inlet and the output side, a suction fan is connected, wherein the suction fan is operated to dry the pipe.
Die Erfindung geht dabei von der Überlegung aus, dass physikalisch grundsätzlich verschiedene Möglichkeiten zur Trocknung einer Rohrleitung existieren: Verdampfung, Temperaturerhöhung unterhalb des Siedepunkts und Stofftransport in Folge des Konzentrationsgefälles an der Phasengrenzfläche, Temperaturerhöhung und Senkung der relativen Luftfeuchtigkeit zur Erhöhung dieses Konzentrationsgefälles und Erhöhung des Luftmassenstroms zur Erhöhung des Stoffübergangskoeffizien- ten. Hierbei hat sich durch umfangreiche und aufwendige Versuche überraschend herausgestellt, dass die Nutzung eines Sauggebläses eine vollständige Entfernung von Restfluid ohne Demontage ermöglicht. Die erhebliche Erhöhung des Luftmassenstroms durch das Sauggebläse erzeugt Turbulenzen auf der Flu- idoberfläche . Diese verbessern einerseits den Stoffübergang in die Luft, andererseits reißt der starke Luftstrom Fluid mit sich, dass sich auf der Rohrinnenwand niederschlägt und diese benetzt. Somit erhöht sich die Gesamtfluidoberfläche, was den Stoffübergang in die Luft weiter beschleunigt. Dadurch ist die Trocknung innerhalb einer vergleichsweise kurzen Zeit möglich. The invention is based on the consideration that physically fundamentally different possibilities exist for drying a pipeline: evaporation, temperature increase below the boiling point and mass transport as a result of the concentration gradient at the interface, increase in temperature and reduction of the relative humidity to increase this concentration gradient and increase the air mass flow To increase the mass transfer coefficient. It has surprisingly been found by extensive and expensive experiments that the use of a suction fan allows complete removal of residual fluid without disassembly. The considerable increase in the air mass flow through the suction fan creates turbulence on the surface of the fluid. These improve on the one hand the mass transfer into the air, on the other hand, the strong air flow entrains fluid that precipitates on the pipe inner wall and wets them. Thus, the total fluid surface increases, which further accelerates the mass transfer into the air. This allows drying within a comparatively short time.
Vorteilhafterweise umfasst die Rohrleitung zur Regelung und Steuerung der Prozessparameter eine oder mehrere Armaturen. Gerade im Bereich der Armaturen gestaltet sich die Trocknung besonders schwierig. Die Rohrinnenwand weist hier typischerweise Kanten, Einbuchtungen und andere Strukturen auf, die im Folgenden verallgemeinernd als Armaturentaschen bezeichnet werden. In den Armaturentaschen kann sich Fluid ansammeln, so dass nicht lediglich ein die Rohrwand benetzender Film, sondern eine beträchtliche, die jeweilige Armaturentasche aus- füllende Fluidansammlung zu trocknen, d. h. zu entfernen ist. Gerade hier bietet das erfindungsgemäße Verfahren den Vorteil, den Bereich der Armaturentaschen einfach zu trocknen. Advantageously, the pipeline for controlling and controlling the process parameters comprises one or more valves. Especially in the field of fittings, the drying is particularly difficult. The tube inner wall here typically has edges, indentations and other structures that are in the The following generalization be referred to as fitting pockets. Fluid can accumulate in the fitting pockets, so that not only a film which wets the pipe wall but also a considerable fluid accumulation filling the respective valve pocket is to be dried, ie to be removed. Especially here, the inventive method has the advantage of easy to dry the area of the fitting pockets.
In vorteilhafter Ausgestaltung ist die Rohrleitung horizontal angeordnet und/oder die Armatur vertikal angeordnet. Bei einer derartigen Anordnung von Rohrleitung mit Armatur ist die Nutzung eines Sauggebläses besonders effektiv, da bei einer anderen geometrischen Anordnung die Armatur unter Umständen die Wasseroberfläche zu großen Teilen abdecken kann. Dadurch wird der Luftfluss an der Wasseroberfläche vermindert. In an advantageous embodiment, the pipeline is arranged horizontally and / or the valve arranged vertically. In such an arrangement of piping with armature, the use of a suction fan is particularly effective, since in some other geometric arrangement, the fitting may cover the water surface in large parts under certain circumstances. This reduces the air flow at the water surface.
In weiterer vorteilhafter Ausgestaltung des Verfahrens wird die Armatur während eines Teils der Betriebszeit des Sauggebläses zumindest teilweise geschlossen. Die damit verbunde- ne Verringerung des Rohrquerschnitts erhöht nämlich die Geschwindigkeit des Luftflusses und verbessert somit den Stoffübergang in die Luft, was die Trocknung beschleunigt. In a further advantageous embodiment of the method, the valve is at least partially closed during part of the operating time of the suction fan. The associated reduction in the pipe cross-section increases the speed of the air flow and thus improves the mass transfer to the air, which accelerates drying.
Vorteilhafterweise wird dabei die Armatur für jeweils etwa ein Drittel der Betriebszeit des Sauggebläses geöffnet, zuAdvantageously, while the fitting for each about one third of the operating time of the suction fan is opened to
70 % geschlossen und zu 90 % geschlossen. Hierdurch wird eine besonders effektive Trocknung erreicht. Zunächst erfolgt eine Trocknung des gesamten Rohrbereiches, die Schließung auf 70 % verstärkt die Bildung von Turbulenzen an der Wasseroberfläche und den Wasseraustrag in den Totraumbereichen der Armaturentaschen, so dass vergleichsweise schnell nur noch Restfeuchte in den Randbereichen der Armaturentaschen vorhanden ist. 70% closed and 90% closed. As a result, a particularly effective drying is achieved. First, a drying of the entire pipe area, the closure to 70% increases the formation of turbulence on the water surface and the water discharge in the dead space of the fitting pockets, so that comparatively quickly only residual moisture in the edge regions of the fitting pockets is present.
Durch das Schließen zu 90 % werden die Turbulenzen weiter verstärkt und die Randbereiche ebenfalls getrocknet. By closing to 90%, the turbulence is further enhanced and the edges also dried.
In vorteilhafter Ausgestaltung wird vor dem Betrieb des Sauggebläses ein Fluidvolumen in der Rohrleitung ermittelt und abhängig vom ermittelten Fluidvolumen die Betriebszeit des Sauggebläses gewählt. Dadurch ist eine optimierte, vorausbestimmte Trocknungszeit ermittelbar und somit ein besonders effektiver und planbarer Trocknungsprozess möglich. Dabei wird vorteilhafterweise die Betriebszeit näherungsweise nach der Formel t = V*14 min/1 bestimmt, wobei t die Betriebszeit und V das Fluidvolumen ist. Wie umfangreiche Versuche mit dem beschriebenen Verfahren ergeben haben, ist die Dauer des Trocknungsprozesses durch diese Formel besonders gut abschätzbar. Die Formel bietet daher eine besonders einfache Möglichkeit der Vorausberechnung und Planung der Trockendauer . In an advantageous embodiment, a fluid volume in the pipeline is determined prior to operation of the suction fan and, depending on the determined fluid volume, the operating time of the Suction fan selected. As a result, an optimized, predetermined drying time can be determined and thus a particularly effective and predictable drying process possible. In this case, the operating time is advantageously determined approximately according to the formula t = V * 14 min / 1, where t is the operating time and V is the fluid volume. As extensive experiments have shown with the described method, the duration of the drying process can be estimated very well by this formula. The formula therefore offers a particularly simple way of predicting and planning the drying time.
Vorteilhafterweise ist das Sauggebläse dabei derart ausge- legt, dass sich während der Betriebszeit in der Rohrleitung eine Luftgeschwindigkeit von mehr als 7 m/s, vorzugsweise mehr als 26 m/s einstellt. Bei diesen Geschwindigkeiten sind die sich bildenden Turbulenzen auf der Wasseroberfläche besonders geeignet, einen schnellen Trocknungsprozess durch Wasseraustrag und die damit verbundene Vergrößerung der Wasseroberfläche zu erreichen. Advantageously, the suction fan is designed in such a way that an air speed of more than 7 m / s, preferably more than 26 m / s, is established during the operating time in the pipeline. At these speeds, the turbulences that form on the water surface are particularly suitable for achieving a rapid drying process through water discharge and the associated enlargement of the water surface.
In weiterer vorteilhafter Ausgestaltung wird in die Rohrleitung während und/oder nach der Betriebszeit des Sauggebläses Trockenluft eingebracht. Die Trockenluft hat eine deutlich niedrigere Luftfeuchtigkeit, z. B. 11 bis 12 % und wird von entsprechenden Lufttrocknern bereitgestellt. Hierdurch kann in Totraumbereichen, die nicht von den Turbulenzen der Saugluft erfasst werden, eventuelle Restfeuchte zuverlässig ent- fernt werden. In a further advantageous embodiment, dry air is introduced into the pipeline during and / or after the operating time of the suction fan. The dry air has a significantly lower humidity, z. B. 11 to 12% and is provided by appropriate air dryers. In this way, any residual moisture can be reliably removed in dead space areas that are not detected by the turbulence of the suction air.
Die mit der Erfindung erzielten Vorteile bestehen insbesondere darin, dass durch die Verwendung eines Sauggebläses zur Entfernung von Fluidrückständen in einem Rohrleitungssystem eine besonders schnelle Trocknung der betreffenden Rohrleitung ermöglicht wird, insbesondere wenn diese eine Armatur mit den entsprechenden Armaturentaschen umfasst. Durch die hohen Luftgeschwindigkeiten entstehen auf der Wasseroberflä- che Turbulenzen, die eine Trocknung in besonders schneller Zeit mit technisch vergleichsweise einfachen Mitteln ermöglichen. Zudem kann das Sauggebläse auch sonstige Verunreinigungen wie z. B. durch Schleifstäube , Späne, Schweißdrähte, Schlacke etc. entfernen und ermöglicht so eine gleichzeitige Reinigung der Rohrleitung. The advantages achieved by the invention are, in particular, that the use of a suction fan for removing fluid residues in a piping system a particularly rapid drying of the relevant pipe is made possible, especially if this includes a valve with the corresponding fitting pockets. Due to the high air velocities on the water surface, turbulence, which allow drying in a particularly fast time with technically comparatively simple means. In addition, the suction fan and other contaminants such. As by sanding dust, chips, welding wires, slag, etc., thus enabling a simultaneous cleaning of the pipeline.
Die Erfindung wird anhand einer Zeichnung näher erläutert. Darin zeigen: The invention will be explained in more detail with reference to a drawing. Show:
FIG 1 einen Schaltplan eines Rohrleitungssystems, in dem das erfindungsgemäße Verfahren durchgeführt wird, und 1 shows a circuit diagram of a pipeline system in which the method according to the invention is carried out, and
FIG 2 eine Querschnittszeichnung eines Keilplatten-Absperr- Schiebers aus dem Rohrleitungssystem der FIG 1. 2 shows a cross-sectional drawing of a wedge plate shut-off valve from the piping system of FIG. 1
Gleiche Teile sind in allen FIGs mit denselben Bezugszeichen versehen . Das Rohrleitungssystem 1 gemäß der FIG 1 zeigt lediglich einen Ausschnitt des gesamten Rohrleitungssystems einer Industrieanlage, im Ausführungsbeispiel gemäß der FIG 1 eines Kernkraftwerks. Das Rohrleitungssystem 1 dient im Betriebszustand des Kraftwerks der Leitung von verdampfbarem Fluid. Identical parts are provided with the same reference numerals in all FIGS. The piping system 1 according to FIG 1 shows only a section of the entire pipeline system of an industrial plant, in the embodiment of FIG 1 of a nuclear power plant. The piping system 1 is used in the operating state of the power plant of the line of vaporizable fluid.
Das Rohrleitungssystem 1 umfasst eine Armatur 2, hier ein Keilplatten-Absperrschieber. Im Ausführungsbeispiel ist der Keilplatten-Absperrschieber für die Nennweite DN 300 ausgelegt und hat eine Gesamtmasse von 1500 kg einschließlich Be- tätigungsmotor . Die Armatur 2 ist in vertikaler Position in einem horizontalen Rohrleitungssystem angeordnet. The piping system 1 comprises a fitting 2, here a wedge plate gate valve. In the exemplary embodiment, the wedge plate gate valve is designed for the nominal diameter DN 300 and has a total mass of 1500 kg including actuating motor. The armature 2 is arranged in a vertical position in a horizontal piping system.
Der Armatur 2 sind im Rohrleitungssystem 1 ein Rückschlagventil 4, eine Verzweigung 6 sowie ein weiteres Rückschlagventil 8 angeschlossen. Dier Armatur 2 ist in der Großdarstellung in FIG 2 gezeigt. FIG 2 zeigt den Aufbau des Keilplatten-Absperrschiebers. Die Rohrleitung 10 soll durch den Keilplatten-Absperrschieber verschlossen werden. Hierzu weist die Armatur 2 eine Keilplatte 12 auf, die die Rohrleitung 10 im geschlossenen Zu- stand (in FIG 2 gezeigt) vollständig verschließt. Die Armatur 2 weist weiterhin einen entsprechenden Betätigungsmechanismus 14 auf, der Motor, Getriebe, etc. umfasst, dessen detaillierte Funktion jedoch für das Verständnis des Verfahrens unwesentlich ist. The valve 2, a check valve 4, a branch 6 and another check valve 8 are connected in the piping system 1. Dier fitting 2 is shown in the enlarged view in FIG. 2 shows the structure of the wedge plate gate valve. The pipe 10 should be closed by the wedge plate gate valve. For this purpose, the fitting 2 has a wedge plate 12 which completely closes the pipe 10 in the closed state (shown in FIG. 2). The armature 2 further includes a respective actuating mechanism 14 which includes motor, transmission, etc., but the detailed function of which is immaterial to the understanding of the method.
Um eine entsprechende Dichtigkeit und Druckbeständigkeit zu gewährleisten, weist die Rohrleitung 10 an der dem Betätigungsmechanismus 14 gegenüberliegenden Seite eine Ausbuchtung auf, die sogenannte Armaturentasche 16. Diese ist der Keil- platte 12 angeformt, so dass diese im geschlossenen Zustand der Armatur 2 in der Armaturentasche 16 anliegt. Dadurch ist die Rohrleitung 10 druckfest verschlossen. In order to ensure appropriate tightness and pressure resistance, the pipe 10 on the opposite side of the actuating mechanism 14 on a bulge, the so-called fitting pocket 16. This is the wedge plate 12 integrally formed, so that these in the closed state of the valve 2 in the fitting pocket 16 is present. As a result, the pipe 10 is pressure-tight.
Das Rohrleitungssystem 1 wird nun während der Bauphase bzw. Inbetriebsetzung des Kraftwerks bereits genutzt, beispielsweise zu Testzwecken gewässert oder einer Druckprüfung unterzogen. Nach diesen Testphasen ist es häufig erforderlich, das Rohrleitungssystem 1 wieder zu trocknen. Problematisch sind hier besonders die Bereiche der Armaturentaschen 16, in denen sich Fluid sammelt, dargestellt durch den Wasserspiegel 20 in FIG 2. The pipeline system 1 is now already used during the construction phase or commissioning of the power plant, for example, watered for test purposes or subjected to a pressure test. After these test phases, it is often necessary to re-dry the piping system 1. Particularly problematic here are the areas of the instrument pockets 16 in which fluid collects, represented by the water level 20 in FIG. 2.
Hierzu wird an das Rohrleitungssystem 1 ein Sauggebläse 18 angeschlossen, in FIG 1 dargestellt an das Rückschlagventil 8. Der Armatur 2 vorgeschaltet ist ein Lufteintritt 22, der die Luftzufuhr zu Rohrleitungssystem 1 und Sauggebläse 18 bereitstellt . For this purpose, a suction fan 18 is connected to the piping system 1, shown in FIG 1 to the check valve 8. The valve 2 is preceded by an air inlet 22, which provides the air supply to the piping system 1 and suction fan 18.
Im dargestellten Ausführungsbeispiel des Verfahrens ist die Armaturentasche 16 mit 2,5 1 Deionat gefüllt. Nach Einschalten des Sauggebläses 18, d. h. zu Beginn der Betriebszeit stellt sich ein Luftvolumenstrom von 6913 Kubikmeter pro Stunde ein, was bei einer Rohrnennweite DN 300 einer Luft- geschwindigkeit von 26 m/s entspricht. Das Sauggebläse 18 hat eine Leistungsaufnahme von 14,4 kW. Die Luftfeuchtigkeit außerhalb des Rohrleitungssystems 1 beträgt 35 % bei einer Temperatur von 22,4 °C. In the illustrated embodiment of the method, the fitting pocket 16 is filled with 2.5 liters of deionized water. After switching on the suction fan 18, ie at the beginning of the operating time, an air volume flow of 6913 cubic meters per hour is established, which, with a nominal pipe diameter of DN 300 speed of 26 m / s corresponds. The suction fan 18 has a power consumption of 14.4 kW. The humidity outside the piping system 1 is 35% at a temperature of 22.4 ° C.
Durch die hohe Luftgeschwindigkeit entstehen Verwirbelungen auf dem Wasserspiegel 20. Gleichzeitig wird Wasser ausgetragen, welches sich in der anschließenden Rohrleitung 10 verteilt. Das ausgetragene Wasser benetzt die Rohrinnenwand und verdunstet praktisch sofort. Due to the high air velocity turbulence on the water level 20. At the same time water is discharged, which is distributed in the subsequent pipeline 10. The discharged water wets the pipe inner wall and evaporates almost immediately.
Nach ca. 1/3 der Betriebszeit des Sauggebläses 18 wird die Armatur 2 zu ca. 70 % geschlossen. Dadurch bilden sich stärkere Turbulenzen am Wasserspiegel 20 und es wird auch in den Totraumbereichen 24 (siehe FIG 2) der Armaturentasche 16 Wasser ausgetragen. Bereits nach ca. 1 Minute ist nur noch Restfeuchte vorhanden. After about 1/3 of the operating time of the suction fan 18, the valve 2 is closed to about 70%. As a result, stronger turbulence forms on the water level 20 and water is also discharged in the dead space areas 24 (see FIG. 2) of the fitting pocket 16. After only 1 minute, only residual moisture is left.
Nach ca. 2/3 der Betriebszeit wird die Armatur 2 zu ca. 90 % geschlossen. Dadurch werden auch noch die Randbereiche derAfter approx. 2/3 of the operating time, the valve 2 is closed at approx. 90%. As a result, even the edge areas of
Armaturentasche 16 getrocknet. Nach etwa 35 Minuten Betriebszeit des Sauggebläses 18 ist die Armaturentasche 16 vollständig getrocknet. Dies entspricht einer Trocknungsrate von 14 Minuten pro Liter. Die Betriebszeit des Sauggebläses lässt sich durch die Formel t = V*14 min/1 abschätzen, wobei t die Betriebszeit und V das Fluidvolumen in den Armaturentaschen ist. Die Trockenzeit lässt sich durch zusätzliche Beaufschlagung mit Trockenluft am Lufteintritt 22 nochmals verkürzen. Zur Verdeutlichung des beschriebenen Verfahrens wurde zumValve pocket 16 dried. After about 35 minutes of operation of the suction fan 18, the fitting pocket 16 is completely dried. This corresponds to a drying rate of 14 minutes per liter. The operating time of the suction fan can be estimated by the formula t = V * 14 min / 1, where t is the operating time and V is the volume of fluid in the fitting pockets. The drying time can be shortened by additional application of dry air at the air inlet 22 again. To illustrate the method described was the
Vergleich dieselbe Armatur 2 wie in FIG 1 und 2 dargestellt mittels zwei Elektro-Heizstrahlern (je 6 kW) getrocknet, die jeweils im Winkel von 30° unter der Armatur 2 angeordnet wurden. Zusätzlich wurde eine Beaufschlagung mit Trockenluft am Lufteintritt 22 vorgesehen, wobei ein Trockenluftvolumenstrom von 407 Kubikmetern pro Stunde zur Anwendung kam. Die gleiche Menge Deionat (2,5 1) konnte hier jedoch erst in ca. 5 Stunden vollständig getrocknet werden. Insbesondere der Vergleich zeigt, dass die Verwendung eines Sauggebläses 18 eine erhebliche Beschleunigung der Trocknung des Rohrleitungssystems 1 ermöglicht. Gleichzeitig können Verschmutzungen des Rohrleitungssystems 1 vergleichsweise einfach entfernt werden. Comparison of the same fitting 2 as shown in Figures 1 and 2 by means of two electric radiant heaters (each 6 kW) dried, which were each arranged at an angle of 30 ° below the valve 2. In addition, a supply of dry air at the air inlet 22 was provided, with a dry air volume flow of 407 cubic meters per hour was used. However, the same amount of deionized water (2.5 liters) could not be dried completely in about 5 hours. In particular, the comparison shows that the use of a suction fan 18 allows a significant acceleration of the drying of the piping system 1. At the same time soiling of the piping system 1 can be relatively easily removed.

Claims

Patentansprüche claims
1. Verfahren zur Trocknung eines Rohrleitungssystems (1) in einer Industrieanlage, bei dem eine Rohrleitung (10) des Rohrleitungssystems (1) eingangsseitig mit einem Lufteintritt (22) versehen wird und ausgangsseitig ein Sauggebläse (18) angeschlossen wird, wobei das Sauggebläse (18) zur Trocknung der Rohrleitung (10) betrieben wird. 1. A method for drying a piping system (1) in an industrial plant, in which a pipe (10) of the piping system (1) on the input side with an air inlet (22) is provided and the output side, a suction fan (18) is connected, wherein the suction fan (18 ) is operated to dry the pipe (10).
2. Verfahren nach Anspruch 1, bei dem die Rohrleitung (10) eine Armatur (2) umfasst. 2. The method of claim 1, wherein the conduit (10) comprises a valve (2).
3. Verfahren nach einem der vorhergehenden Ansprüche, bei dem die Rohrleitung (10) horizontal angeordnet ist. 3. The method according to any one of the preceding claims, wherein the pipe (10) is arranged horizontally.
4. Verfahren nach Anspruch 2, bei dem die Armatur (2) vertikal angeordnet ist. 4. The method of claim 2, wherein the valve (2) is arranged vertically.
5. Verfahren nach Anspruch 2 oder 4, bei dem die Armatur (2) während eines Teils der Betriebszeit des Sauggebläses (18) zumindest teilweise geschlossen wird. 5. The method of claim 2 or 4, wherein the valve (2) during a part of the operating time of the suction fan (18) is at least partially closed.
6. Verfahren nach Anspruch 5, bei dem die Armatur (2) für jeweils etwa ein Drittel der Betriebszeit des Sauggebläses (18) geöffnet, zu 70 % geschlossen und zu 90 % geschlossen wird . 6. The method of claim 5, wherein the valve (2) for each approximately one third of the operating time of the suction fan (18) opened, closed at 70% and closed at 90%.
7. Verfahren nach einem der vorhergehenden Ansprüche, bei dem vor dem Betrieb des Sauggebläses (18) ein Fluidvolumen in der Rohrleitung (10) ermittelt wird und abhängig vom ermittelten Fluidvolumen die Betriebszeit des Sauggebläses (18) gewählt wird. 7. The method according to any one of the preceding claims, wherein before the operation of the suction fan (18), a fluid volume in the pipe (10) is determined and depending on the determined fluid volume, the operating time of the suction fan (18) is selected.
8. Verfahren nach Anspruch 7, bei dem die Betriebszeit nähe- rungsweise nach der Formel t = V*14 min/1 bestimmt wird, wobei t die Betriebszeit und V das Fluidvolumen ist. 8. The method of claim 7, wherein the operating time is approximately determined by the formula t = V * 14 min / 1, where t is the operating time and V is the fluid volume.
9. Verfahren nach einem der vorhergehenden Ansprüche, bei dem das Sauggebläse (18) derart ausgelegt ist, dass sich während der Betriebszeit in der Rohrleitung (10) eine Luftgeschwindigkeit von mehr als 7 m/s, vorzugsweise mehr als 26 m/s einstellt. 9. The method according to any one of the preceding claims, wherein the suction fan (18) is designed such that during the operating time in the pipe (10) an air velocity of more than 7 m / s, preferably more than 26 m / s.
10. Verfahren nach einem der vorhergehenden Ansprüche, bei dem in die Rohrleitung (10) während und/oder nach der Betriebszeit des Sauggebläses (18) Trockenluft eingebracht wird. 10. The method according to any one of the preceding claims, wherein in the pipe (10) during and / or after the operating time of the suction fan (18) dry air is introduced.
PCT/EP2012/071569 2011-11-17 2012-10-31 Method for drying a pipeline system WO2013072195A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102011086578.0 2011-11-17
DE201110086578 DE102011086578A1 (en) 2011-11-17 2011-11-17 Method for drying a pipeline system

Publications (1)

Publication Number Publication Date
WO2013072195A1 true WO2013072195A1 (en) 2013-05-23

Family

ID=47178611

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2012/071569 WO2013072195A1 (en) 2011-11-17 2012-10-31 Method for drying a pipeline system

Country Status (2)

Country Link
DE (1) DE102011086578A1 (en)
WO (1) WO2013072195A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106311686A (en) * 2015-09-09 2017-01-11 无锡亮慧环保机械有限公司 Waste gas purification pipe of environmental protection equipment
CN106322108A (en) * 2015-09-30 2017-01-11 无锡威胜环保设备制造有限公司 Exhaust gas conveying pipe with electrostatic treatment function
CN106322109A (en) * 2015-09-30 2017-01-11 无锡威胜环保设备制造有限公司 Waste gas delivery pipe based on timing ultrasonic dust removal
CN106247165A (en) * 2015-09-30 2016-12-21 无锡威胜环保设备制造有限公司 New waste gas electrostatic depuration conveying pipe

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0170226A2 (en) * 1984-08-03 1986-02-05 Energietechnik Steinhaus GmbH Method and device for cleaning and/or drying the interior surfaces of pipe lines
DE3713396A1 (en) * 1987-04-21 1988-11-10 Siemens Ag Process for cleaning vessels, pipeline systems and components
WO1999029470A1 (en) * 1997-12-05 1999-06-17 Jens Werner Kipp Blasting method for cleaning pipes
DE102005006225B3 (en) * 2005-02-10 2006-01-19 Fachhochschule Lübeck Körperschaft des öffentlichen Rechts Method for cleaning of incrustated pipelines, especially water mains, involves subjecting heated incrustations in impacting fashion to rough vacuum
WO2010041116A1 (en) * 2008-10-06 2010-04-15 Bazzica Engineering Di Carlo Bazzica & C. S.A.S. Plastic foam molding machine material change method, and molding machine implementing such a method
AT12131U1 (en) * 2010-07-09 2011-11-15 Glogar Holding Gmbh METHOD AND DEVICE FOR CLEANING A LEAVED HYDRAULIC TUBE

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2444882A1 (en) * 1978-12-18 1980-07-18 Pipeline Service Sa METHOD FOR DRYING AND GASTING VACUUM OF PIPES

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0170226A2 (en) * 1984-08-03 1986-02-05 Energietechnik Steinhaus GmbH Method and device for cleaning and/or drying the interior surfaces of pipe lines
DE3713396A1 (en) * 1987-04-21 1988-11-10 Siemens Ag Process for cleaning vessels, pipeline systems and components
WO1999029470A1 (en) * 1997-12-05 1999-06-17 Jens Werner Kipp Blasting method for cleaning pipes
DE102005006225B3 (en) * 2005-02-10 2006-01-19 Fachhochschule Lübeck Körperschaft des öffentlichen Rechts Method for cleaning of incrustated pipelines, especially water mains, involves subjecting heated incrustations in impacting fashion to rough vacuum
WO2010041116A1 (en) * 2008-10-06 2010-04-15 Bazzica Engineering Di Carlo Bazzica & C. S.A.S. Plastic foam molding machine material change method, and molding machine implementing such a method
AT12131U1 (en) * 2010-07-09 2011-11-15 Glogar Holding Gmbh METHOD AND DEVICE FOR CLEANING A LEAVED HYDRAULIC TUBE

Also Published As

Publication number Publication date
DE102011086578A1 (en) 2013-05-23

Similar Documents

Publication Publication Date Title
EP1960128A1 (en) Method and device for cleaning components of a power station by injection of a medium and measuring device for measuring the degree of purity of the medium
WO2013072195A1 (en) Method for drying a pipeline system
EP3265199B1 (en) Device for degassing a liquid
EP2924286A2 (en) Testing device for pumps
DE2801328A1 (en) METHOD AND DEVICE FOR COOLING COOKING GAS
WO1998051952A1 (en) Method and device for heating a valve system
EP2387449A1 (en) Device for the sorptive separation of a gas flow with a vortex tube for regeneration
EP3376118B1 (en) Heating fitting
DE202014103898U1 (en) Fitting arrangement for water treatment of water for heating circuits
DE4420579A1 (en) Method for cleaning pipelines
DE7007952U (en) CONDENSER HOUSING.
EP3597080B1 (en) Device and method for preparing food stored in a vessel
DE19613910A1 (en) Cross stream heat exchanger
WO2021028333A1 (en) Component cleaning device using a cleaning fluid
WO2008003663A1 (en) Humidification exchanger with a cleaning system
DE202015101027U1 (en) Connector with two flanges for connection of water treatment devices and associated connection arrangement
DE102007031084A1 (en) Sewage pipe, has slots attached at top forming open connection to interior of sewage pipe for piping system of heat exchange medium, where insulation is attached at top of sewage pipe
DE19601325C2 (en) Air humidification method and apparatus
DE2937873B2 (en) System circuit
DE202011051876U1 (en) solar shower
AT505751B1 (en) GAS CHANNEL WITH EMERGENCY SEQUENCE DEVICE AND METHOD FOR AVOIDING CORROSION AT THE EMERGENCY SEQUENCE DEVICE
WO2001081832A1 (en) Steam injector
DE10228535B4 (en) Arrangement for the storage of a filter insert for a heating system
DE202018106792U1 (en) Ion exchanger arrangement
DE657920C (en) Method and device for keeping the steam outlet temperature constant with contact-heated superheaters for steam boiler systems

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12786885

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12786885

Country of ref document: EP

Kind code of ref document: A1