WO2013010441A1 - 一种调整发射功率的方法及装置 - Google Patents
一种调整发射功率的方法及装置 Download PDFInfo
- Publication number
- WO2013010441A1 WO2013010441A1 PCT/CN2012/078285 CN2012078285W WO2013010441A1 WO 2013010441 A1 WO2013010441 A1 WO 2013010441A1 CN 2012078285 W CN2012078285 W CN 2012078285W WO 2013010441 A1 WO2013010441 A1 WO 2013010441A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- transmit power
- preamble
- signal
- target transmit
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/04—Transmission power control [TPC]
Definitions
- TECHNICAL FIELD The present invention relates to the field of communications, and in particular, to a method and apparatus for adjusting transmit power.
- Background Art In an LTE system, a random access procedure is generally used to establish uplink synchronization between a UE and a base station.
- the UE transmits a preamble (preamble sequence) using a PRACH channel (physical random access channel) in an uplink subframe to implement random access.
- a preamble preamble sequence
- PRACH channel physical random access channel
- a carrier aggregation technology is introduced, that is, a plurality of component carriers are aggregated in the downlink and/or uplink direction to provide a higher peak rate.
- Each of the UEs is allocated a Pcell (Primary Cell) and a Secondary Cell (Secondary Cell).
- Pcell Primary Cell
- Secondary Cell Secondary Cell
- one cell includes one downlink carrier and one uplink carrier.
- TDD TDD
- the random access of the UE can only occur on the Pcell, that is, the UE can only use the PRACH channel to transmit the preamble through the carrier included in the Pcell to implement random access, and does not support preamble and Other uplink channels (eg, PUCCH (Physical Uplink Control Channel), PUSCH (Physical Uplink Shared Channel), etc.) are simultaneously transmitted in the same subframe.
- PUCCH Physical Uplink Control Channel
- PUSCH Physical Uplink Shared Channel
- the LTE Rel-11 system needs to support more complex carrier aggregation scenarios, including: 1) carrier aggregation in different uplink frequency bands; 2) Macro (macro base station) and RRH (remote radio head, radio frequency) Remote unit)
- a hybrid carrier aggregation deployment scheme can be implemented as follows: For example, the frequency F1 is used by the macro base station to provide macro coverage, and the frequency F2 is used by the RRH to provide higher throughput in the hotspot area.
- the UE in high-speed mobility works on F1 to maintain business continuity.
- F1 and F2 are in different frequency bands.
- the member carrier using F2 and the member using F1 can be used in the geographical area covered by FH's RRH.
- the carrier performs carrier aggregation.
- the frequencies F1 and F2 are used by the macro base station. Because of the frequency band, the F2 has a smaller coverage than the F1. Therefore, when the RRH is deployed on the cell edge of the F2 for coverage extension, the overlapping areas are covered by F1 and F2. Carrier aggregation using F1's component carrier and component carrier using F2 may be performed.
- the time when the two signals arrive at the base station may be different. For example, if the UE is in a geographical area covered by the macro base station and the RRH, and the carrier aggregation of F1 and F2 is performed, since F1 is used by the macro base station, F2 is used by the RRH, thereby causing signals on the two frequencies F1 and F2. Different propagation paths will pass through, so that the time when the UE sends signals simultaneously on F1 and F2 to the base station will be different.
- the uplink synchronization of the Scell UE and the base station is established by using the method of "initiating random access on the Scell". After the random access is performed on the Scell, the base station can detect the Pcell and The signal arrival time difference between the Scells is correct, so that the uplink timing of each cell is correctly controlled.
- preamble transmission may exist in the Pcell and the Scell (that is, on different UL CCs after aggregation), and on different UL CCs.
- the PRACH carrying the preamble is transmitted simultaneously with other uplink channels, which will greatly increase the total target transmit power of the UE (ie, the sum of the target transmit powers on each UL CC).
- Embodiments of the present invention provide a method and apparatus for adjusting transmit power, which are used to implement reasonable allocation of transmit power between uplink component carriers in a carrier aggregation scenario.
- a method for adjusting transmit power which is applied to a carrier aggregation scenario, including:
- Determining, according to the comparison result, that the total target transmit power is greater than the maximum allowable transmit power respectively determining power adjustment of each preamble and each of the other uplink signals in the at least one preamble and the at least one other uplink signal Priority, and down-regulating the target transmit power of the at least one preamble or/and at least one other uplink signal according to the power adjustment priority until the total target transmit power is not greater than the maximum allowable transmit power.
- a device for adjusting transmit power which is applied to a carrier aggregation scenario, and includes:
- a calculating unit configured to respectively determine target transmit power of each preamble and each other uplink signal in at least one preamble and at least one other uplink signal simultaneously transmitted on different UL CCs, and calculate a total target transmit power
- a comparing unit configured to compare the total target transmit power with a maximum allowable transmit power
- an adjusting unit configured to determine, according to the comparison result, that the total target transmit power is greater than the maximum allowable transmit power, respectively, determining a power adjustment priority of each preamble and each of the other uplink signals in the at least one preamble and the at least one other uplink signal, And down-regulating the target transmit power of the at least one preamble or/and the at least one other uplink signal according to the determined power adjustment priority until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE when the UE simultaneously transmits at least one preamble and at least one other uplink signal on different UL CCs, and the total target transmit power is greater than the maximum allowed transmit power, the UE needs to determine the power of each uplink signal according to a preset rule.
- FIG. 1 is a schematic diagram of a communication system architecture and a UE functional structure according to an embodiment of the present invention
- FIG. 2 is a flowchart of performing power allocation between UEs in each UE according to an embodiment of the present invention.
- the UE in the carrier aggregation scenario of the LTE Rel-11 system, the UE is allowed to simultaneously transmit at least one preamble and at least one other uplink signal on different UL CCs, and the so-called at least one other uplink signal may be The preamble, any one or any combination of the PUCCH signal and the PUSCH signal; when the other uplink signals are also preambles, the UE actually initiates a random access procedure to the base station by using the UL CC corresponding to the multiple cells, thereby implementing each cell.
- Uplink synchronization with the base station when the other uplink signals are PUCCH signals and/or PUSCH signals, the UE actually performs the following operations through the UL CCs corresponding to the multiple cells: Send uplink control signaling and/or uplink data.
- the total target transmit power of the UE is a linear sum of the target transmit powers of the UEs on the respective UL CCs, and the UE obtains the total calculation in the calculation.
- the total target transmit power is compared with the maximum allowed transmit power of the UE. When the total target transmit power is greater than the maximum allowable transmit power according to the comparison result, the UE determines the at least one preamble and the at least one other uplink signal, respectively.
- the power of each preamble and each of the other uplink signals is prioritized, and the target transmit power of the at least one preamble or/and the at least one other uplink signal is down-regulated according to the power adjustment priority until the total target transmit power is not Greater than the maximum allowable transmit power.
- the UE when determining the target transmit power of the Preamble, uses the following formula 1:
- PPRACH min ⁇ P CMAX i) , PREAMBLE RECEIVED TARGET POWER +
- PPRACH is the target transmit power used by the UE when transmitting the Preamble in the uplink subframe i of the component carrier c;
- P CMA c (i) is the maximum allowed transmit power of the UE on the component carrier c, which is pre-configured by the upper layer;
- P L ⁇ is a downlink path loss in a cell corresponding to the component carrier c measured by the UE according to the downlink signal
- PREAMBLE RECEIVED TARGET POWER is the Preamble receiving target power, which is calculated by the UE's MAC layer.
- the UE when determining the target transmit power of the PUCCH signal, uses the following formula 2:
- ⁇ ⁇ ⁇ ( ⁇ ) , ( ⁇ , , , , /, Bu
- p uccH ( Z ) is the target transmit power used by the UE when transmitting the PUCCH signal in the uplink subframe i of the component carrier c;
- CMAX'cA is the maximum allowed transmit power on component carrier c , pre-configured by the upper layer; parameter A F — PUCCH ) is configured by the higher layer, corresponding to the power offset of different pucCH formats relative to PUCCH format la, in Rel -8 contains multiple formats of PUCCH format l/la/lb/2/2a/2b;
- h(n CQ i , n HARQ , n SR ) is the power offset associated with the number of bits carried by the p UCCH , where " ⁇ corresponds to the number of CQI bits of the bearer," HARQ corresponds to the number of ACK/NACK bits of the bearer;
- P. - PUCCH is the target received power, by the cell-specific part 7 w. MINAL _ PU a H and ⁇ exclusive part P. - UE-PUCCH is added in two parts;
- g(i) is the cumulative amount of power control command words.
- the UE when determining the target transmit power of the PUSCH signal, uses the following formula 3
- PPUSCUA 1 is the target transmit power used by the UE when transmitting the PUSCH signal in the uplink subframe i of the component carrier c;
- CMAX'cA is the maximum allowed transmit power on component carrier c , pre-configured by the upper layer;
- PUSCH (the size of the resource allocated for the PUSCH signal that is valid for the i-th uplink subframe, expressed in terms of the number of resource blocks (RBs)
- 3 ⁇ 4 - PUSCH 'c U PUSCH signal received power target, which consists of an 8bit normalized cell-specific moiety 0_NOMINAL_PUSCH, c ⁇ 0 Exclusive portion) and a 41 ⁇ 2 - UE- PUSCH'c U) composed of the sum;
- the high-level signaling passes the 3bit indication.
- the PL is the downlink path loss measured by the UE. It is the UE-specific parameter deltaMCS-Enabled (that is, whether the power adjustment function is enabled according to the MCS).
- f (i) is the current PUSCH power control adjustment state.
- a UE in a communication system includes a computing unit 10, a comparing unit 11, and an adjusting unit 12, where
- the calculating unit 10 is configured to respectively determine target transmit power of each preamble and each other uplink signal in at least one preamble and at least one other uplink signal that are simultaneously transmitted on different UL CCs, and calculate a total target transmit power;
- the comparing unit 11 is configured to compare the total target transmit power with the maximum allowed transmit power
- the adjusting unit 12 is configured to determine, according to the comparison result, that the total target transmit power is greater than the maximum allowable transmit power, respectively, determining a power adjustment priority of each preamble and each of the other uplink signals in the at least one preamble and the at least one other uplink signal, and The target transmit power of the at least one preamble or/and the at least one other uplink signal is down-regulated according to the determined power adjustment priority until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE in a carrier aggregation scenario, when the UE simultaneously transmits at least one preamble and at least one other uplink signal on different UL CCs, the UE adjusts the transmit power.
- the detailed process is as follows:
- Step 200 Determine target transmit power of each preamble and each other uplink signal in at least one preamble and at least one other uplink signal simultaneously transmitted on different UL CCs, and calculate a total target transmit power.
- Equation 1 When determining the target transmit power of any one of the UL CCs, according to the type of the uplink signal sent by it, according to the former Equation 1, Equation 2 or Equation 3 described above determines the corresponding target transmit power, and will not be described here;
- the linear sum is the total target transmit power of the UE; for example, the above linear sum is denoted as P CM4 (0 , indicating that the UE is on the component carrier c
- P CM4 the above linear sum
- Step 210 Compare the calculated total target transmit power with a preset maximum allowable transmit power.
- the UE needs to perform target transmit power adjustment. If AMA (0, the UE does not need to perform target transmit power adjustment, it can directly transmit corresponding uplink signals according to the determined target transmit powers.
- Step 220 Determine, according to the comparison result, that the total target transmit power is greater than the maximum allowable transmit power, respectively determine a power adjustment priority of each preamble and each of the other uplink signals in the at least one preamble and the at least one other uplink signal, and according to the power. Adjusting the priority downgrades the target transmit power of the at least one preamble or/and at least one other uplink signal until the total target transmit power is not greater than the maximum allowed transmit power.
- the UE When performing step 220, the UE needs to determine the power adjustment priority of each preamble and each other uplink signal in at least one preamble and at least one other uplink signal according to the preset type according to the preset rule, and prioritize the specified power adjustment.
- the target transmit power of the at least one preamble or/and at least one other uplink signal corresponding to the level is down-regulated until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE needs to determine the power adjustment priority of each uplink signal according to the actual application environment. For example, when multiple preambles are simultaneously transmitted, the power adjustment preference levels of the respective preambles are respectively determined, and, for example, in the preamble, when the PUCCH signals or/and the PUSCH signals are simultaneously transmitted, the preamble, PUCCH signals, or/and the PUSCH signals are respectively determined.
- the target transmit power of the uplink signal with the highest power adjustment priority is adjusted.
- the power adjustment priority may be the second highest. Or the lowest target transmit power is adjusted. In this embodiment, only the target transmit power of the uplink signal with the highest power adjustment priority is adjusted and adjusted.
- At least one other uplink signal sent simultaneously with the at least one preamble is also a preamble, that is, the UE is simultaneously Each cell initiates a random access procedure to achieve uplink synchronization with the base station.
- the most common application scenarios include: For example, the UE simultaneously transmits the preamble through the UL CCs in the Pcell and the Scell; for example, the UE simultaneously sends the preamble through the UL CCs in the multiple Scells.
- the UE adjusts the target transmit power for each Preamble the following ones of al, bl, cl, and dl can be used (for example, not limited to this):
- the UE determines that the power adjustment priorities of the preambles are the same, and the target transmit power of each preamble is down-scaled until the total target transmit power is not greater than the maximum allowable transmit power.
- the so-called equal-scale down-regulation refers to lowering the linear value of the target transmit power of each UL CC by the same ratio, which is also the meaning in the following embodiments, and will not be described again.
- the order in which the UE determines the power adjustment priority from high to low is: preamble in the Scell
- the UE determines that the power adjustment priority of the preamble transmitted on the UL CC in the Scell is the highest, and lowers the target transmit power of the preamble (better, the adjustment mode is also reduced by the same proportion, the same below, will no longer
- the target transmit power of the preamble transmitted on the UL CC maintained in the Pcell is unchanged until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE determines that the power adjustment priority is from high to low in the order of: preamble in the Scell -> preamble in the non-designated Scell; wherein, the Scell is specified
- the cell with the lowest Celllndex cell number
- the cell with the lowest frequency and the like.
- the UE determines that the power adjustment priority of the preamble transmitted on the UL CC in the designated Scell is the highest, and the target transmit power of the preamble is down-regulated, and the target transmit power of the preamble transmitted on the UL CC in the non-designated Scell is maintained. No change until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE determines that the power adjustment priority of the preamble of the contention type is the highest, and lowers the target transmit power of the preamble, and maintains the target transmit power of the preamble of the non-contention type until the total target transmit power is not greater than the maximum allowable The power is transmitted up to now.
- the at least one other uplink signal that is simultaneously transmitted with the at least one preamble is at least one PUSCH signal, that is, the UE simultaneously transmits the preamble and the uplink data on different UL CCs.
- the most common application scenarios include: For example, the UE sends a preamble on the UL CC in the Pcell, and simultaneously transmits the PUSCH signal on one or each of the multiple CCs in the Scell; for example, the UE is on the UL CC in the Pcell.
- the UE Transmitting the PUSCH signal, and simultaneously transmitting the preamble on one or each of the multiple CCs in the multiple Scells; for example, the UE simultaneously transmits the preamble and PUSCH signals (one or more) on the UL CCs in different Scells.
- any one of the following four modes a2, b2, c2, and d2 may be used (for example, not limited thereto):
- A2 The order in which the UE determines the power adjustment priority from high to low is: PUSCH signal -> preamble.
- the UE does not need to determine what kind of information is carried in the PUSCH signal, directly determines that the power adjustment priority of the at least one PUSCH signal is the highest, and downgrades the target transmit power of the at least one PUSCH signal, and maintains the target transmit power of the at least one preamble. Change until the total target transmit power is not greater than the maximum allowable transmit power.
- all PUSCH signals are processed in the same manner. B2.
- the UE determines that the power adjustment priority is from high to low: preamble _ > carrying UCI If the UCI is not carried in one or more (usually one) PUSCH signals sent by the UE, the UE determines that the power adjustment priority is from high to low: PUSCH signal without carrying UCI -> preamble .
- the UE needs to determine whether the transmitted at least one PUSCH signal carries the UCI, and if yes, determines that the power adjustment priority of the at least one preamble is the highest, and the target transmit power of the at least one preamble signal is down-regulated, and the target of the at least one PUSCH signal is maintained.
- the transmit power is unchanged until the total target transmit power is not greater than the maximum allowable transmit power; otherwise, determining that the power adjustment priority of the at least one PUSCH signal is the highest, and lowering the target transmit power of the at least one PUSCH signal, and maintaining at least one
- the target transmit power of the preamble is unchanged until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE determines the order of the power adjustment priorities from high to low: preamble -> carry The PUSCH signal of the UCI of the ACK/NACK information; if one or more (usually one) PUSCH signals transmitted by the UE do not carry the UCI including the ACK/NACK information, the UE determines the power adjustment priority from high to low.
- the order of the following is: a PUSCH signal that does not carry the UCI including the ACK/NACK information -> preamble; wherein the PUSCH signal carries the UCI including the ACK/NACK information in various cases, for example, the PUSCH signal carries only the ACK/ The UCI of the NACK information, or the UCI carrying the ACK/NACK information and the CSI (the channel state information), etc., in the same way, there are various cases in which the PUSCH does not carry the UCI including the ACK/NACK information, for example, The PUSCH signal carries the UCI containing only CSI, or carries UCI including CSI and other information, and the like.
- the UE not only needs to determine whether the transmitted at least one PUSCH signal carries the UCI, but also needs to further determine whether the UCI carried by the PUSCH signal includes ACK/NACK information, and if yes, determines that the power adjustment priority of the at least one preamble is the highest, and the at least Determining the target transmit power of a preamble signal, and maintaining the target transmit power of the at least one PUSCH signal unchanged until the total target transmit power is not greater than the maximum allowable transmit power; otherwise, determining that the power adjustment priority of the at least one PUSCH signal is the highest, And down-regulating the target transmit power of the at least one PUSCH signal, and maintaining the target transmit power of the at least one preamble unchanged until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE determines that the power adjustment priority of the at least one PUSCH signal that does not carry the UCI is the highest, and the at least The target transmit power of one PUSCH signal is down-converted, and the target transmit power of one PUSCH signal carrying the UCI and the at least one preamble is maintained until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE Further determining whether the UCI carried by the one PUSCH signal includes ACK/NACK information, and if yes, determining that the power adjustment priority of the at least one preamble is the highest, and lowering the target transmit power of the at least one preamble signal, and maintaining one of the UCI carrying
- the target transmit power of the PUSCH signal is unchanged until the total target transmit power is not greater than the maximum allowable transmit power; otherwise, it is determined that the power adjustment priority of one PUSCH carrying the UCI is the highest, and the target transmit power of the PUSCH signal is down-regulated, and The target transmit power of at least one preamble is maintained unchanged until the total target transmit power is not greater than the maximum allowable transmit power.
- the power adjustment mode of the UE may be adjusted according to the mode b4, and details are not described herein.
- At least one other uplink signal transmitted simultaneously with the at least one preamble is one
- the PUCCH signal that is, the UE simultaneously transmits preamble and uplink control signaling on different UL CCs.
- the UE transmits only one PUCCH signal, and the PUCCH signal must carry the UCI.
- the most common application scenarios include: For example, the UE sends the PUCCH signal on the UL CC in the Pcell, and is in one or multiple Scells respectively. Send a preamble on the UL CC.
- the UE may use any of the following three methods a3, b3, and c3 (for example only, not limited to this):
- the order in which the UE determines the power adjustment priority from high to low is: preamble _ > PUCCH signal.
- the UE does not need to determine what kind of information is carried in the PUCCH signal, directly determines that the power adjustment priority of the at least one preamble signal is the highest, and lowers the target transmit power of the at least one preamble signal, and maintains
- the target transmit power of the PUCCH signal is unchanged until the total target transmit power is not greater than the maximum allowable transmit power. b3.
- the order in which the UE determines the power adjustment priority from high to low is: PUCCH signal -> preamble.
- the UE does not need to determine what kind of information is carried in the PUCCH signal, determines that the power adjustment priority of the PUCCH signal is the highest, and lowers the target transmit power of the PUCCH signal, and maintains the target transmit power of at least one preamble signal unchanged until the total The target transmit power is not greater than the maximum allowable transmit power.
- the UE determines that the power adjustment priority is from high to low: preamble -> PUCCH signal; if the PUCCH signal sent by the UE is carried in the UCI If the ACK/NACK information is not included, the UE determines that the power adjustment priority is from high to low: PUCCH signal -> preamble; wherein the PUCCH signal carries UCI including ACK/NACK information, for example, PUCCH The signal carries the UCI containing only the ACK/NACK information, or carries the inclusion
- the PUCCH signal does not carry the UCI including the ACK/NACK information, for example, the PUCCH signal carries the UCI including only the CSI, or carries the inclusion. UCI and so on CSI and other information.
- the UE needs to determine whether the UCI carried by the at least one PUSCH signal includes ACK/NACK information, and if yes, confirm that the power adjustment priority of the at least one preamble is the highest, and the target transmit power of the at least one preamble signal is down-regulated, and maintained.
- the target transmit power of the PUCCH signal is unchanged until the total target transmit power is not greater than the maximum allowable transmit power; otherwise, the power adjustment priority of the PUCCH signal is determined to be the highest, and the target transmit power of the PUCCH signal is lowered, and at least one is maintained.
- the target transmit power of the preamble is unchanged until the total target transmit power is not greater than the maximum allowable transmit power.
- the at least one other uplink signal that is simultaneously transmitted with the at least one preamble is a PUCCH signal and at least one PUSCH signal, that is, the UE simultaneously transmits the preamble, the uplink control signaling, and the uplink data on different UL CCs.
- the UE transmits only one PUCCH signal, and the PUCCH signal must carry the UCI.
- the most common application scenarios include: For example, the UE sends the PUCCH signal on the UL CC in the Pcell, and is in one or multiple Scells respectively.
- the preamble and at least one PUSCH signal are transmitted on the UL CC.
- the UE may use any one of the following three methods, a4, b4, and c4 (for example, not limited to this): a4.
- the UE determines the power adjustment priority from high to low in the order of:
- the UE does not need to determine what kind of information is carried in the at least one PUSCH signal, directly determines that the power adjustment priority of the at least one PUSCH signal is the highest, and downgrades the target transmit power of the at least one PUSCH signal, and maintains at least one preamble and PUCCH signal.
- the target transmit power is unchanged until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE determines that the power adjustment priority is from high to low: preamble _ > carrying UCI PUSCH signal -> PUCCH signal, or preamble -> PUCCH signal -> PUSCH signal carrying UCI;
- the UE determines the power adjustment priority from high to low as follows: PUSCH signal without carrying UCI -> preamble -> PUCCH Signal, or, does not carry UCI PUSCH signal -> PUCCH signal -> preamble.
- the UE needs to determine whether the transmitted at least one PUSCH signal carries the UCI, and if yes, determines that the power adjustment priority of the at least one preamble is the highest, and the target transmit power of the at least one preamble signal is down-regulated, and the at least one PUSCH signal and the PUCCH are maintained.
- the target transmit power of the signal is unchanged until the total target transmit power is not greater than the maximum allowable transmit power; otherwise, determining that the power adjustment priority of the at least one PUSCH signal is the highest, and the target transmit power of the at least one PUSCH signal is down-regulated, and Maintain at least one preamble
- the target transmit power of the PUCCH signal is unchanged until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE determines that the power adjustment priority is from high to low: preamble -> carry PUSCH signal of UCI for ACK/NACK information -> PUCCH signal, or preamble -> PUCCH signal -> PUSCH signal carrying UCI containing ACK/NACK information;
- the UE determines that the power adjustment priority is from high to low: the unloaded ACK/NACK is included.
- the PUSCH signal carries the UCI including the ACK/NACK information.
- the PUSCH signal carries the UCI including only the ACK/NACK information, or carries the ACK/NACK information and the CSI (the channel status). UCI, etc. of the information)
- the PUSCH does not carry the UCI including the ACK/NACK information
- the PUSCH signal carries the UCI containing only the CSI, or carries the CSI and other information. UCI and so on.
- the UE not only needs to judge whether the transmitted at least one PUSCH signal carries the UCI, but also needs to further determine the
- the UCI carried by the PUSCH signal includes ACK/NACK information, and if yes, determining that the power adjustment priority of the at least one preamble is the highest, and the target transmit power of the at least one preamble signal is down-regulated, and maintaining at least one PUSCH signal and the PUCCH signal.
- the target transmit power is unchanged until the total target transmit power is not greater than the maximum allowable transmit power; otherwise, determining that the power adjustment priority of the at least one PUSCH signal is the highest, and lowering the target transmit power of the at least one PUSCH signal, and maintaining at least The target transmit power of a preamble and PUCCH signal is unchanged until the total target transmit power is not greater than the maximum allowable transmit power.
- the UE may continue to perform any of the following operations (for example only, not limited to this):
- the UE determines that the power adjustment priority of the at least one preamble signal is the highest, and downgrades the target transmit power of the at least one preamble signal, and maintains the target transmit power of the PUCCH signal unchanged until the total target transmit power is not greater than the maximum allowable Up to the transmission power;
- the UE determines whether the UCI carried by the PUCCH signal includes ACK/NACK information, and if yes, determines that the current power adjustment priority of the at least one preamble is the highest, and lowers the target transmit power of the at least one preamble signal, and maintains the PUCCH signal.
- the target transmit power is unchanged until the total target transmit power is not greater than the maximum allowable transmit power; otherwise, the power adjustment priority of the current PUCCH signal is determined to be the highest, and the target transmit power of the PUCCH signal is down-regulated, and at least one preamble is maintained.
- Target transmit power remains the same until total The target transmit power is not greater than the maximum allowable transmit power.
- the power adjustment priorities determined by the UE are in the order of high to low, The power adjustment priority of the PUSCH signal carrying the UCI is the highest, and the power adjustment priorities of the PUSCH signal, the preamble and the PUCCH signal carrying the UCI are still arranged according to the manners described in a4, b4, and c4, for example: PUSCH not carrying UCI Signal -> PUSCH signal carrying UCI -> PUCCH signal - > preamble; or
- the UE needs to first lower the target transmit power of the PUSCH signal that does not carry the UCI, and ensure that the target transmit power of other uplink signals does not change until the total target transmit power is not greater than the maximum allowable transmit power. After the adjustment, if the total target transmit power is still greater than the maximum allowable transmit power, the UE needs to adjust the priorities from high to low according to the determined power in the manner described in a 4, b4, and c4, and continue to adjust other uplink signals. The target transmit power is not until the total target transmit power is greater than the maximum allowable transmit power.
- the UE in any one of the foregoing second case, the third case, and the fourth case, if it is determined that the power adjustment priority of the at least one preamble is the highest, the UE is in the at least one When the target transmit power of the preamble signal is down-regulated, it can be performed according to the following principles (for example, not limited to this):
- the UE If there is only one preamble signal to be adjusted, the UE directly lowers the target transmit power of the preamble signal; If there are two or more preamble signals to be adjusted, the UE performs a proportional downgrade on the target transmit power of each preamble; or, the target transmit power of the preamble transmitted on the UL CC in the Scell is down-regulated and maintained in the Pcell.
- the target transmit power of the preamble transmitted on the UL CC in the specified Scell is not changed; or, when the preamble is not transmitted on the UL CC in the Pcell, the target transmit power of the preamble transmitted on the UL CC in the specified Scell is lowered, and Maintaining the target transmit power of the preamble transmitted on the UL CC in the non-designated Scell is unchanged; lowering the target transmit power of the preamble of the competitive type and maintaining the target transmit power of the preamble of the non-contention type unchanged.
- the UE after performing the target transmit power adjustment on the uplink signal with the highest power priority adjustment priority, if the total target transmit power is still greater than the maximum allowable transmit power, the UE needs to further follow the priority. In the order from high to low, the transmit power of the power adjustment priority second highest, the power adjustment priority second high, and the like are further adjusted, until the total target transmit power is not greater than the maximum allowable transmit power, this embodiment For example, the target transmit power is down-regulated for the uplink signal with the highest power adjustment priority in each case.
- the subsequent process can be performed according to the same logical reference, and details are not described herein again.
- the UE when the UE simultaneously transmits at least one preamble and at least one other uplink signal on different UL CCs, and the total target transmit power is greater than the maximum allowed transmit power, the UE needs to determine the preset rule.
- the power of each uplink signal is adjusted in priority, and the target transmit power of the at least one preamble or/and at least one other uplink signal is adjusted according to the power until the total target transmit power is not greater than the maximum allowable transmit power, thus, the carrier is
- the UE can allocate the transmit power reasonably between different UL CCs to avoid uplink signal transmission due to excessive total target transmit power. The situation improves the stability and robustness of the system and improves the overall performance of the system.
- embodiments of the present invention can be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment, or a combination of software and hardware. Moreover, the present invention can be embodied in the form of a computer program product embodied on one or more computer-usable storage interfaces (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer usable program code.
- computer-usable storage interfaces including but not limited to disk storage, CD-ROM, optical storage, etc.
- the computer program instructions can also be stored in a computer readable memory that can direct a computer or other programmable data processing device to operate in a particular manner, such that the instructions stored in the computer readable memory produce an article of manufacture comprising the instruction device.
- the apparatus implements the functions specified in one or more blocks of a flow or a flow and/or block diagram of the flowchart.
- These computer program instructions can also be loaded onto a computer or other programmable data processing device such that a series of operational steps are performed on a computer or other programmable device to produce computer-implemented processing for execution on a computer or other programmable device.
- the instructions provide steps for implementing the functions specified in one or more of the flow or in a block or blocks of a flow diagram.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
本发明涉及通信领域,公开了一种调整发射功率的方法及装置,用以在各上行成员载波之间,实现发射功率的合理分配。该方法为:当UE在不同的ULCC上同时发送至少一个preamble和至少一个其他上行信号,且总目标发射功率大于最大允许发射功率时,UE需要根据预设规则确定各上行信号中,每个preamble和每个其他上行信号的功率调整优先级,并按照该功率调整优先级对至少一个preamble或/和至少一个其他上行信号的目标发射功率,直到总目标发射功率不大于最大允许发射功率为止,这样,UE可以在不同的ULCC之间,实现发射功率的合理分配,避免出现因总目标发射功率过大而影响上行信号发送的情况,提升了系统的运行稳定性和鲁棒性,也提高了系统的整体性能。
Description
一种调整发射功率的方法及装置 本申请要求在 2011年 07月 15日提交中国专利局、 申请号为 201110198500.7、 发明名称为
"一种调整发射功率的方法及装置 "的中国专利申请的优先权,其全部内容通过引用结合在本申 请中。 技术领域 本发明涉及通信领域, 特别涉及一种调整发射功率的方法及装置。 背景技术 在 LTE系统内, Random access procedure (随机接入过程 )通常用于建立 UE与基站 的上行同步。
在 LTE Rel-8系统内, UE在上行子帧中使用 PRACH信道(物理随机接入信道)发送 preamble (前导序列 ) 来实现随机接入。
在 LTE Rel-10系统中, 引入了载波聚合技术, 即在下行和 /或上行方向将多个成员载 波聚合使用, 以提供更高的峰值速率, 在 LTE Rel- 10系统的载波聚合场景下, 每个 UE被 基站分配一个 Pcell ( Primary cell, 主小区 )和若千 Scell ( Secondary cell, 辅小区 ), 对于 FDD系统而言, 一个 cell包含一个下行载波和一个上行载波, 对于 TDD系统而言, 一个 载波即成为一个 cell。 在现有的 LTE Rel-10相关标准中规定, UE的随机接入仅能发生在 Pcell上, 即 UE只能通过 Pcell包含的载波使用 PRACH信道发送 preamble来实现随机接 入, 并且不支持 preamble与其他上行信道〔如, PUCCH (物理上行控制信道)、 PUSCH (物 理上行共享信道)等〕在同一子帧中同时发送。 例如, 现有的 LTE相关标准不支持表 1所 示的发送方式。
preamble与其他上行信道同时发送的组合方式
而 LTE Rel-11系统相比 LTE Rel-10系统, 需要支持更为复杂的载波聚合场景, 包括: 1 )上行不同频段的载波聚合; 2 ) Macro (宏基站)和 RRH ( Remote Radio Head, 射频拉 远单元) 混合的载波聚合部署方案。 其中, 宏基站和 RRH混合的载波聚合部署方案可以 按照以下方式实施:
例如, 频率 Fl由宏基站使用, 提供宏覆盖, 频率 F2由 RRH使用, 提供热点地区的 更高吞吐量。 高速移动中的 UE在 F1上进行工作, 维持业务连续性。 F1和 F2处于不同的 频段,如, F1位于 800MHz或 2GHz频段上, F2位于 3.5GHz频段上,则在使用 F2的 RRH 覆盖的地理区域内, 可以将使用 F2的成员载波与使用 F 1的成员载波进行载波聚合。
又例如, 频率 F1和 F2由宏基站使用, 由于频段的原因, F2相比 F1具有更小的覆盖 范围, 因此在 F2的小区边缘部署 RRH进行覆盖扩展, 则在 F1和 F2覆盖重叠的区域, 可 以将使用 F1的成员载波和使用 F2的成员载波进行载波聚合。
在上述载波聚合场景下, 由于不同频段的无线信号传播特性不同, 因此如果 UE分别 在两个频段距离较远的成员载波上同时向基站发送信号, 则两信号到达基站的时间会出现 差异。 如, 假设 UE处于宏基站和 RRH共同覆盖的地理区域, 并进行了 F1和 F2的载波 聚合, 则由于 F1为宏基站使用, F2为 RRH使用, 从而导致 F1和 F2这两个频率上的信 号会经过不同的传播路径, 这样, UE在 F1和 F2上同时发送的信号到达基站的时间将出 现差异。
为了解决上述问题, 目前标准化讨论中, 倾向于釆用 "在 Scell上发起随机接入" 的 方式建立 Scell的 UE与基站的上行同步,在 Scell进行了随机接入后,基站能够检测到 Pcell 和 Scell之间的信号到达时间差, 从而正确的对各个 cell的上行定时进行控制; 这样, 在 Pcell和 Scell内 (即聚合后的不同 UL CC上)都可能存在 preamble的传输, 并且在不同 UL CC上, 可能会存在携带 preamble的 PRACH与其他上行信道同时发送的情况, 这将会 大大增加 UE的总目标发射功率 (即各 UL CC上的目标发射功率之和)。
在这种情况下, 一旦 UE的总目标发射功率超出了 UE的最大允许发射功率, 按照已 有的 LTE相关标准, 无法实现发射功率在各 UL CC之间的合理分配。 发明内容 本发明实施例提供一种调整发射功率的方法及装置, 用以在载波聚合场景下, 在各上 行成员载波之间, 实现发射功率的合理分配。
本发明实施例提供的具体技术方案如下:
一种调整发射功率的方法, 应用于载波聚合场景, 包括:
分别确定在不同波 UL CC上同时发送的至少一个 preamble和至少一个其他上行信号 中, 每个 preamble和每个其他上行信号的目标发射功率, 并计算总目标发射功率;
将所述总目标发射功率与最大允许发射功率进行比较;
根据比较结果确定所述总目标发射功率大于最大允许发射功率时, 分别确定所述至少 一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的功率调整
优先级, 并按照所述功率调整优先级对所述至少一个 preamble或 /和至少一个其他上行信 号的目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止。
一种调整发射功率的装置, 应用于载波聚合场景, 包括:
计算单元, 用于分别确定在不同 UL CC上同时发送的至少一个 preamble和至少一个 其他上行信号中, 每个 preamble和每个其他上行信号的目标发射功率, 并计算总目标发射 功率;
比较单元, 用于将所述总目标发射功率与最大允许发射功率进行比较;
调整单元, 用于根据比较结果确定总目标发射功率大于最大允许发射功率时, 分别确 定所述至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号 的功率调整优先级, 并按照确定的功率调整优先级对所述述至少一个 preamble或 /和至少 一个其他上行信号的目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功 率为止。
本发明实施例中,当 UE在不同的 UL CC上同时发送至少一个 preamble和至少一个其 他上行信号, 且总目标发射功率大于最大允许发射功率时, UE 需要根据预设规则确定各 上行信号的功率调整优先级, 并按照该功率调整优先级对至少一个 preamble或 /和至少一 个其他上行信号的目标发射功率, 直到总目标发射功率不大于最大允许发射功率为止, 这 样, 在载波聚合场景下, 当 preamble和其他上行信号在不同的 UL CC同时传输时, UE可 以在不同的 UL CC之间, 实现发射功率的合理分配,避免出现因总目标发射功率过大而影 响上行信号发送的情况, 从而提升了系统的运行稳定性和鲁棒性, 也提高了系统的整体性 能。 附图说明 图 1为本发明实施例中通信系统体系架构及 UE功能结构示意图;
图 2为本发明实施例中 UE在各 UL CC之间进行功率分配流程图。 具体实施方式 本发明实施例中,在 LTE Rel-11系统的载波聚合场景下, 允许 UE在不同的 UL CC上 同时发送至少一个 preamble和至少一个其他上行信号,所谓的至少一个其他上行信号可以 是 preamble, PUCCH信号和 PUSCH信号中的任意一种或任意组合; 当其他上行信号也是 preamble时, UE实际上是分别通过多个 cell对应的 UL CC向基站同时发起随机接入流程 , 从而实现各 cell与基站的上行同步; 而当其他上行信号是 PUCCH信号和 /或 PUSCH信号 时, UE实际上分别通过多个 cell对应的 UL CC同时执行以下操作: 发起随机接入流程、
发送上行控制信令和 /或上行数据。
当 UE在不同的 UL CC上同时发送至少一个 preamble和至少一个其他上行信号此时, UE的总目标发射功率为 UE在各个 UL CC上的目标发射功率的线性和, 则 UE在计算获 得计算总目标发射功率后, 将总目标发射功率与本 UE的最大允许发射功率进行比较, 当 根据比较结果确定总目标发射功率大于最大允许发射功率时, UE分别确定上述至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的功率调整优先 级, 并按照所述功率调整优先级对至少一个 preamble或 /和至少一个其他上行信号的目标 发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止。
本实施例中, UE在确定 Preamble的目标发射功率时, 釆用以下公式 1:
PPRACH = min { PCMAX i) , PREAMBLE RECEIVED TARGET POWER +
PLC }_[dBm] ——公式 1 其巾,
PPRACH为 UE在成员载波 c的上行子帧 i中发射 Preamble时釆用的目标发射功率; PCMA c (i)为 UE在成员载波 c上的最大允许发射功率, 由高层预先配置;
PL^为 UE根据下行信号测量到的成员载波 c对应的小区内的下行路径损耗;
PREAMBLE RECEIVED TARGET POWER为 Preamble接收目标功率,由 UE的 MAC 层计算得到。
本实施例中, UE在确定 PUCCH信号的目标发射功率时, 釆用以下公式 2:
„ 、
ΡΡΤ ΙΓΓΗ(ί ) = ,( \ , 、 , 、 /、卜
puccH (Z)为 UE在成员载波 c的上行子帧 i中发射 PUCCH信号时釆用的目标发射功率;
CMAX'cA 为^在成员载波 c上的最大允许发射功率, 由高层预先配置; 参数 AF— PUCCH )由高层配置, 对应于不同的 pucCH format相对于 PUCCH format la 的功率偏移量, 在 Rel-8中包含 PUCCH format l/la/lb/2/2a/2b多种格式;
h(nCQi , nHARQ , nSR ) 为与 pUCCH承载的比特数目相关的功率偏移量, 其中" ^对 应于承载的 CQI比特数目, "HARQ对应于承载的 ACK/NACK比特数目;
P。- PUCCH为目标接收功率,由小区专属部分7 w。MINAL_PUa H和 ^专属部分 P。- UE-PUCCH两 部分相加构成;
ATXD (F' 为 PUCCH发射分集时釆用的功率调整量
g(i)为功率控制命令字累积量。
——公式 3 其巾,
PPUSCUA1)为 UE在成员载波 c的上行子帧 i中发射 PUSCH信号时釆用的目标发射功率;
CMAX'cA 为^在成员载波 c上的最大允许发射功率, 由高层预先配置;
PUSCH( 为在第 i个上行子帧生效的为 PUSCH信号分配的资源大小, 以资源块( RB) 数目表示
¾-PUSCH'c U)为 PUSCH 信号的目标接收功率, 它由 8bit 的小区专属归一化部分 0_NOMINAL_PUSCH,c 0)和 4½的 ^专属部分 — UE— PUSCH'c U)之和组成;
为路径损耗补偿因子, 由高层信令通过 3bit指示 PL是 UE测量的下行路径损耗; 为 UE专属参数 deltaMCS-Enabled (即根据 MCS进行功率调整功能是否开启指示 参数), 由高层信令指示;
f(i)为当前的 PUSCH功率控制调整状态。
下面结合附图对本发明优选的实施方式进行详细说明。
参阅图 1所示, 本发明实施例中, 通信系统内的 UE包括计算单元 10、 比较单元 11 和调整单元 12, 其中,
计算单元 10, 用于分别确定在不同 UL CC上同时发送的至少一个 preamble和至少一 个其他上行信号中, 每个 preamble和每个其他上行信号的目标发射功率, 并计算总目标发 射功率;
比较单元 11 , 用于将总目标发射功率与最大允许发射功率进行比较;
调整单元 12, 用于根据比较结果确定总目标发射功率大于最大允许发射功率时, 分别 确定至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的 功率调整优先级, 并按照确定的功率调整优先级对上述至少一个 preamble或 /和至少一个 其他上行信号的目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为 止。
基于上述技术方案, 参阅图 2所示, 本发明实施例中, 在载波聚合场景下, 当 UE分 别在不同的 UL CC上同时发送至少一个 preamble和至少一个其他上行信号时, UE调整发 射功率的详细流程如下:
步骤 200:分别确定在不同 UL CC上同时发送的至少一个 preamble和至少一个其他上 行信号中, 每个 preamble和每个其他上行信号的目标发射功率, 并计算总目标发射功率。
确定任意一个 UL CC的目标发射功率时,可以根据其发送的上行信号的类型,按照前
述的公式 1、 公式 2或公式 3确定相应的目标发射功率, 在此不再赘述;
在获得各 UL CC的目标发射功率后, 对其求线性和, 则该线性和即是 UE的总目标发 射功率; 例如, 将上述线性和记为 PCM4 (0 , 表示 UE在成员载波 c的上行子帧 i内的总目 标发射功率。
步骤 210: 将计算获得的总目标发射功率与预设的最大允许发射功率进行比较。
步骤 220: 根据比较结果确定总目标发射功率大于最大允许发射功率时, 分别确定上 述至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的功 率调整优先级, 并按照功率调整优先级对该至少一个 preamble或 /和至少一个其他上行信 号的目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止。
在执行步骤 220时, UE需要根据预设规则按照信号类型分别确定至少一个 preamble 和至少一个其他上行信号中, 每个 preamble和每个其他上行信号的功率调整优先级, 并对 指定的功率调整优先级对应的至少一个 preamble或 /和至少一个其他上行信号的目标发射 功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止。
本实施例中, 对于不同类型的上行信号, 在不同的载波聚合场景下, 分别设置了不同 的功率调整优先级, 因此, UE 需要根据实际应用环境, 来确定各个上行信号的功率调整 优先级, 例如, 在多个 preamble同时发送时, 分别确定各个 preamble的功率调整优选级, 又例如,在 preamble,与 PUCCH信号或 /和 PUSCH信号同时发送时,分别确定 preamble , PUCCH信号或 /和 PUSCH信号的功率调整优先级; 本实施例中, 在确定各上行信号的功 率调整优先级后,首先对功率调整优先级最高的上行信号的目标发射功率进行调整, 当然, 也可以对功率调整优先级次高或最低的目标发射功率进行调整, 本实施例仅以调整调整 "功率调整优先级最高" 的上行信号的目标发射功率为例进行说明。
下面针对实际应用中的不同载波聚合场景, 介绍目标发射功率的具体调整方式如下: 在第一种情况下, 与上述至少一个 preamble 同时发送的至少一个其他上行信号也为 preamble, 即 UE 同时在多个小区发起随机接入流程, 实现与基站的上行同步。 最常见的 应用场景包括: 例如, UE分别通过 Pcell和 Scell内的 UL CC同时发送 preamble; 又例如, UE分别通过多个 Scell 内的 UL CC 同时发送 preamble。 在这种情况下, UE在针对各 Preamble的目标发射功率进行调整时, 可以釆用以下 al、 bl、 cl和 dl四种方式中的任意 一种 (仅为举例, 不限于此):
al、 UE确定各 preamble的功率调整优先级相同, 并对各 preamble的目标发射功率进 行等比例下调, 直至总目标发射功率不大于最大允许发射功率为止。
其中, 所谓的等比例下调即是指将各 UL CC 的目标发射功率的线性值下调相同的比 值, 后续实施例中亦是此含义, 将不再赘述。
bl、 UE确定功率调整优先级从高到低的顺序为: Scell内的 preamble
- >Pcell内的 preamble。
即 UE确定在 Scell内的 UL CC上发送的 preamble的功率调整优先级最高, 并对该 preamble的目标发射功率进行下调 (较佳的, 调整方式也釆用等比例下调, 下同, 将不再 赘述), 以及维持在 Pcell内的 UL CC上发送的 preamble的目标发射功率不变, 直至总目 标发射功率不大于最大允许发射功率为止。
cl、若 UE确认在 Pcell内的 UL CC上未发送 preamble,则 UE确定功率调整优先级从 高到低的顺序为:指定 Scell内的 preamble - >非指定 Scell内的 preamble;其中,指定 Scell 的设置方法有多种, 例如, 可以是 Celllndex (小区编号)最低的小区, 也可以是频点最低 的小区等等。
即 UE确定在指定 Scell内的 UL CC上发送的 preamble的功率调整优先级最高, 并对 该 preamble 的目标发射功率进行下调, 以及维持在非指定 Scell 内的 UL CC 上发送的 preamble的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止。
dl、 UE确定功率调整优先级从高到低的顺序为: 竟争类型的 preamble
- >非竟争类型的 preamble。
即 UE确定竟争类型的 preamble的功率调整优先级最高,并对该 preamble的目标发射 功率进行下调, 以及维持非竟争类型的 preamble的目标发射功率不变, 直至总目标发射功 率不大于最大允许发射功率为止。
在第二种情况下,与上述至少一个 preamble同时发送的至少一个其他上行信号为至少 一个 PUSCH信号, 即 UE在不同的 UL CC上同时发送 preamble和上行数据。 最常见的应 用场景包括: 例如, UE在 Pcell内的 UL CC上发送 preamble , 同时, 在一个或分别在多个 Scell内的 UL CC上发送 PUSCH信号; 又例如, UE在 Pcell内的 UL CC上发送 PUSCH 信号, 同时, 在一个或分别在多个 Scell内的 UL CC上发送 preamble; 又例如, UE分别在 不同的 Scell内的 UL CC上同时发送 preamble和 PUSCH信号(一个或多个)。在这种情况 下, UE在针对 preamble和 PUSCH信号的目标发射功率进行调整时, 可以釆用以下 a2、 b2、 c2和 d2四种方式中的任意一种 (仅为举例, 不限于此):
a2、 UE确定功率调整优先级从高到低的顺序为: PUSCH信号 - >preamble。
即 UE无需判断 PUSCH信号内携带了何种信息,直接确定至少一个 PUSCH信号的功 率调整优先级最高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以及维持至 少一个 preamble的目标发射功率不变,直至总目标发射功率不大于最大允许发射功率为止。 在 a2方式下, 所有的 PUSCH信号均按照相同方式进行处理。
b2、 若 UE发送的一个或多个(通常情况下为一个) PUSCH信号中均携带 UCI (上行 控制信息), 则 UE 确定功率调整优先级从高到低的顺序为: preamble _ >携带 UCI 的 PUSCH信号;若 UE发送的一个或多个(通常情况下为一个)PUSCH信号中均未携带 UCI, 则 UE确定功率调整优先级从高到低的顺序为: 未携带 UCI的 PUSCH信号 - >preamble。
即 UE需要判断发送的至少一个 PUSCH信号是否携带 UCI, 若是, 则确定至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功率进行下调, 以及维持至少一个 PUSCH信号的目标发射功率不变, 直至总目标发射功率不大于最大允 许发射功率为止; 否则, 确定至少一个 PUSCH信号的功率调整优先级最高, 并对该至少 一个 PUSCH信号的目标发射功率进行下调, 以及维持至少一个 preamble的目标发射功率 不变, 直至总目标发射功率不大于最大允许发射功率为止。
c2、 若 UE 发送的一个或多个 (通常情况下为一个) PUSCH信号中均携带包含 ACK/NACK信息的 UCI, 则 UE确定功率调整优先级从高到低的顺序为: preamble - >携 带包含 ACK/NACK信息的 UCI的 PUSCH信号; 若 UE发送的一个或多个(通常情况下 为一个) PUSCH信号中均未携带包含 ACK/NACK信息的 UCI, 则 UE确定功率调整优先 级从高到低的顺序为: 未携带包含 ACK/NACK信息的 UCI的 PUSCH信号- >preamble; 其中, PUSCH信号中携带包含 ACK/NACK信息的 UCI的情况有多种, 如, PUSCH信号 中携带了仅包含 ACK/NACK信息的 UCI , 或者, 携带了包含 ACK/NACK信息和 CSI (信 信道状态信息) 的 UCI等等, 同理, PUSCH信号中未携带包含 ACK/NACK信息的 UCI 的情况有多种, 如, PUSCH信号中携带了仅包含 CSI的 UCI, 或者, 携带了包含 CSI和 其他信息的 UCI等等。
即 UE不但要判断发送的至少一个 PUSCH信号是否携带 UCI, 还需要进一步判断该 PUSCH信号携带的 UCI是否包含 ACK/NACK信息, 若是, 则确定至少一个 preamble的 功率调整优先级最高, 并对该至少一个 preamble信号的目标发射功率进行下调, 以及维持 至少一个 PUSCH信号的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功 率为止;否则,确定至少一个 PUSCH信号的功率调整优先级最高,并对该至少一个 PUSCH 信号的目标发射功率进行下调, 以及维持至少一个 preamble的目标发射功率不变, 直至总 目标发射功率不大于最大允许发射功率为止。
d2、 若 UE发送的多个 PUSCH信号中的一个 PUSCH信号携带 UCI, 而其他 PUSCH 信号未携带 UCI, 则 UE确定功率调整优先级从高到低的顺序为:
未携带 UCI的 PUSCH信号 - >携带 UCI的 PUSCH信号 - >preamble
或者
未携带 UCI的 PUSCH信号- >preamble - >携带 UCI的 PUSCH信号。
即 UE确定未携带 UCI的至少一个 PUSCH信号的功率调整优先级最高, 并对该至少
一个 PUSCH信号的目标发射功率进行下调, 以及维持携带 UCI的一个 PUSCH信号和至 少一个 preamble的目标发射功率不变,直至总目标发射功率不大于最大允许发射功率为止。
若将至少一个 PUSCH信号的目标发射功率下调至最低门限值, 以及维持携带 UCI的 一个 PUSCH信号和至少一个 preamble的目标发射功率不变后, 总目标发射功率仍大于最 大允许发射功率,则 UE进一步判断上述一个 PUSCH信号携带的 UCI是否包含 ACK/NACK 信息, 若是, 则确定至少一个 preamble的功率调整优先级最高, 并对该至少一个 preamble 信号的目标发射功率进行下调, 以及维持携带 UCI的一个 PUSCH信号的目标发射功率不 变,直至总目标发射功率不大于最大允许发射功率为止;否则,确定携带 UCI的一个 PUSCH 的功率调整优先级最高, 并对该 PUSCH信号的目标发射功率进行下调, 以及维持至少一 个 preamble的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止。
当然, 若存在多个携带 UCI的 PUSCH信号, 则 UE的功率调整方式可以参照方式 b4 进行相应调整即可, 在此不再赘述。
在第三种情况下,与上述至少一个 preamble同时发送的至少一个其他上行信号为一个
PUCCH信号,即 UE在不同的 UL CC上同时发送 preamble和上行控制信令。通常情况下, UE仅发送一个 PUCCH信号, 且该 PUCCH信号必携带 UCI, 最常见的应用场景包括: 例 如, UE在 Pcell内的 UL CC上发送 PUCCH信号,而在一个或分别在多个 Scell内的 UL CC 上发送 preamble。在这种情况下, UE可以釆用以下 a3、b3和 c3三种方式中的任意一种(仅 为举例, 不限于此):
a3、 UE确定功率调整优先级从高到低的顺序为: preamble _ > PUCCH信号。
即 UE无需判断 PUCCH信号内携带了何种信息, 直接确定至少一个 preamble信号的 功率调整优先级最高, 并对该至少一个 preamble信号的目标发射功率进行下调, 以及维持
PUCCH信号的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止; b3、 UE确定功率调整优先级从高到低的顺序为: PUCCH信号- >preamble。
即 UE无需判断 PUCCH信号内携带了何种信息, 确定 PUCCH信号的功率调整优先 级最高, 并对该 PUCCH信号的目标发射功率进行下调, 以及维持至少一个 preamble信号 的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止。
c3、若 UE发送的 PUCCH信号中携带的 UCI内包含 ACK/NACK信息, 则 UE确定功 率调整优先级从高到低的顺序为: preamble - > PUCCH信号; 若 UE发送的 PUCCH信号 携带的 UCI内未包含 ACK/NACK信息, 则 UE确定功率调整优先级从高到低的顺序为: PUCCH信号- >preamble; 其中, PUCCH信号中携带包含 ACK/NACK信息的 UCI的情况 有多种, 如, PUCCH信号中携带了仅包含 ACK/NACK信息的 UCI, 或者, 携带了包含
ACK/NACK信息和 CSI的 UCI等等, 同理, PUCCH信号中未携带包含 ACK/NACK信息 的 UCI的情况有多种, 如, PUCCH信号中携带了仅包含 CSI的 UCI, 或者, 携带了包含
CSI和其他信息的 UCI等等。
即 UE需要判断发送的至少一个 PUSCH信号携带的 UCI是否包含 ACK/NACK信息, 若是,则确认至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的 目标发射功率进行下调, 以及维持 PUCCH信号的目标发射功率不变, 直至总目标发射功 率不大于最大允许发射功率为止; 否则, 确定 PUCCH信号的功率调整优先级最高, 并对 该 PUCCH信号的目标发射功率进行下调, 以及维持至少一个 preamble的目标发射功率不 变, 直至总目标发射功率不大于最大允许发射功率为止。
在第四种情况下, 与上述至少一个 preamble 同时发送的至少一个其他上行信号为 PUCCH信号和至少一个 PUSCH信号, 即 UE在不同的 UL CC上同时发送 preamble, 上 行控制信令和上行数据。 通常情况下, UE仅发送一个 PUCCH信号, 且该 PUCCH信号必 携带 UCI, 最常见的应用场景包括: 例如, UE在 Pcell内的 UL CC上发送 PUCCH信号, 而在一个或分别在多个 Scell内的 UL CC上发送 preamble和至少一个 PUSCH信号。 在这 种情况下, UE可以釆用以下 a4、 b4和 c4三种方式中的任意一种(仅为举例, 不限于此): a4、 UE确定功率调整优先级从高到低的顺序为:
PUSCH信号- > PUCCH信号- >preamble
或者
PUSCH信号- > preamble - > PUCCH信号。
即 UE无需判断至少一个 PUSCH信号中携带何种信息, 直接确定该至少一个 PUSCH 信号的功率调整优先级最高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以 及维持至少一个 preamble和 PUCCH信号的目标发射功率不变, 直至总目标发射功率不大 于最大允许发射功率为止。
b4、 若 UE发送的一个或多个(通常情况下为一个) PUSCH信号中均携带 UCI (上行 控制信息), 则 UE 确定功率调整优先级从高到低的顺序为: preamble _ >携带 UCI 的 PUSCH信号- >PUCCH信号, 或者, preamble - > PUCCH信号- >携带 UCI的 PUSCH信 号;
若 UE发送的一个或多个(通常情况下为一个) PUSCH信号中均未携带 UCI, 则 UE 确定功率调整优先级从高到低的顺序为: 未携带 UCI 的 PUSCH 信号 - >preamble - >PUCCH信号, 或者, 未携带 UCI的 PUSCH信号- > PUCCH信号- > preamble。
即 UE需要判断发送的至少一个 PUSCH信号是否携带 UCI, 若是, 则确定至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功率进行下调, 以及维持至少一个 PUSCH信号和 PUCCH信号的目标发射功率不变, 直至总目标发射功 率不大于最大允许发射功率为止; 否则, 确定至少一个 PUSCH信号的功率调整优先级最 高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以及维持至少一个 preamble
和 PUCCH信号的目标发射功率不变,直至总目标发射功率不大于最大允许发射功率为止。 c4、 若 UE 发送的一个或多个 (通常情况下为一个) PUSCH信号中均携带包含 ACK/NACK信息的 UCI, 则 UE确定功率调整优先级从高到低的顺序为: preamble - >携 带包含 ACK/NACK信息的 UCI的 PUSCH信号 - >PUCCH信号,或者, preamble - >PUCCH 信号- >携带包含 ACK/NACK信息的 UCI的 PUSCH信号;
若 UE 发送的一个或多个 (通常情况下为一个) PUSCH 信号中均未携带包含 ACK/NACK信息的 UCI , 则 UE 确定功率调整优先级从高到低的顺序为: 未携带包含 ACK/NACK信息的 UCI的 PUSCH信号 - >preamble - >PUCCH信号, 或者, 未携带包含 ACK/NACK信息的 UCI的 PUSCH信号 - > PUCCH信号 - > preamble;
其中, PUSCH信号中携带包含 ACK/NACK信息的 UCI的情况有多种, 如, PUSCH 信号中携带了仅包含 ACK/NACK信息的 UCI , 或者, 携带了包含 ACK/NACK信息和 CSI (信信道状态信息) 的 UCI等等, 同理, PUSCH信号中未携带包含 ACK/NACK信息的 UCI的情况有多种, 如, PUSCH信号中携带了仅包含 CSI的 UCI, 或者, 携带了包含 CSI 和其他信息的 UCI等等。
即 UE不但要判断发送的至少一个 PUSCH信号是否携带 UCI, 还需要进一步判断该
PUSCH信号携带的 UCI是否包含 ACK/NACK信息, 若是, 则确定至少一个 preamble的 功率调整优先级最高, 并对该至少一个 preamble信号的目标发射功率进行下调, 以及维持 至少一个 PUSCH信号和 PUCCH信号的目标发射功率不变, 直至总目标发射功率不大于 最大允许发射功率为止; 否则, 确定至少一个 PUSCH信号的功率调整优先级最高, 并对 该至少一个 PUSCH信号的目标发射功率进行下调,以及维持至少一个 preamble和 PUCCH 信号的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止。
上述第四种情况下, 若确认至少一个 PUSCH信号的功率调整优先级最高, 将至少一 个 PUSCH信号的目标发射功率下调至最低门限值, 并维持至少一个 preamble和 PUCCH 信号的目标发射功率不变后, 总目标发射功率仍大于最大允许发射功率, 则 UE可以继续 执行以下任意一种操作 (仅为举例, 不限于此):
c41、 UE确定当前至少一个 preamble信号的功率调整优先级最高, 并对该至少一个 preamble信号的目标发射功率进行下调, 以及维持 PUCCH信号的目标发射功率不变, 直 至总目标发射功率不大于最大允许发射功率为止;
c42、 UE判断 PUCCH信号携带的 UCI是否包含 ACK/NACK信息, 若是, 则确定当 前至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功 率进行下调 , 以及维持 PUCCH信号的目标发射功率不变, 直至总目标发射功率不大于最 大允许发射功率为止;否则,确定当前 PUCCH信号的功率调整优先级最高,并对该 PUCCH 信号的目标发射功率进行下调, 以及维持至少一个 preamble的目标发射功率不变, 直至总
目标发射功率不大于最大允许发射功率为止。
另一方面,在上述第四种情况下,若至少一个 PUSCH信号中的一个 PUSCH信号携带 有 UCI而其他 PUSCH信号未携带 UCI,则 UE确定的功率调整优先级从高到低的顺序中, 未携带 UCI的 PUSCH信号的功率调整优先级最高,而携带 UCI的 PUSCH信号、 preamble 和 PUCCH信号的功率调整优先级则仍然按照 a4、 b4和 c4中记载的方式进行排列, 例如: 未携带 UCI的 PUSCH信号 - >携带 UCI的 PUSCH信号 - > PUCCH信号 - >preamble; 或者
未携带 UCI的 PUSCH信号 - >携带 UCI的 PUSCH信号 - > preamble - > PUCCH信号; 或者
未携带 UCI的 PUSCH信号- >preamble - >携带 UCI的 PUSCH信号- >PUCCH信号; 或者
未携带 UCI的 PUSCH信号- >preamble - > PUCCH信号- >携带 UCI的 PUSCH信号; 或者
未携带 UCI 的 PUSCH信号- > preamble _ >携带包含 ACK/NACK信息的 UCI 的 PUSCH信号- >PUCCH信号;
或者
未携带 UCI的 PUSCH信号- >preamble - >PUCCH信号- >携带包含 ACK/NACK信 息的 UCI的 PUSCH信号;
未携带 UCI的 PUSCH信号- >未携带包含 ACK/NACK信息的 UCI的 PUSCH信号 - >preamble - >PUCCH信号;
或者
未携带 UCI的 PUSCH信号- >未携带包含 ACK/NACK信息的 UCI的 PUSCH信号- > PUCCH信号 - > preamble;
总之, 在这种情况下, UE需要首先将未携带 UCI的 PUSCH信号的目标发射功率进 行下调, 保证其他上行信号的目标发射功率不变, 直到总目标发射功率不大于最大允许发 射功率为止, 若调整后, 总目标发射功率仍大于最大允许发射功率为止, 则 UE需要按照 a4、 b4和 c4中记载的方式按照已确定的功率调整优先级从高到低的顺序, 继续调整其他 上行信号的目标发射功率, 直到总目标发射功率不大于最大允许发射功率为止, 在此不再 赘述。
基于上述各实施例, 无论在上述第二种情况、 第三种情况和第四种情况中的哪一种情 况下, 若确定至少一个 preamble的功率调整优先级最高, 则 UE在对该至少一个 preamble 信号的目标发射功率进行下调时, 可以按照以下原则执行(仅为举例, 不限于此):
若待调整的 preamble信号仅有一个,则 UE直接下调该 preamble信号的目标发射功率;
若待调整的 preamble信号有两个及以上,则 UE对各 preamble的目标发射功率进行等 比例下调; 或者, 对在 Scell内的 UL CC上发送的 preamble的目标发射功率进行下调, 并 维持在 Pcell内的 UL CC上发送的 preamble的目标发射功率不变; 或者, 当在 Pcell内的 UL CC上未发送 preamble时,对在指定 Scell内的 UL CC上发送的 preamble的目标发射功 率进行下调 , 并维持在非指定 Scell内的 UL CC上发送的 preamble的目标发射功率不变; 对竟争类型的 preamble的目标发射功率进行下调,并维持非竟争类型的 preamble的目标发 射功率不变。
实际应用中, 在上述各种情况下, UE在对当前功率调整优先级最高的上行信号进行 目标发射功率调整后, 若总目标发射功率仍然大于最大允许发射功率, 则 UE需要进一步 地按照优先级从高到低的顺序, 依次继续对功率调整优先级次高、 功率调整优先级次次高 等上行信号的发射功率作进一步地调整, 直到总目标发射功率不大于最大允许发射功率为 止, 本实施例中, 仅以各种情况下对功率调整优先级最高的上行信号进行目标发射功率下 调为例进行相关说明, 后续流程可以按照同样的逻辑参考执行, 在此不再赘述。
综上所述, 本发明实施例中, 当 UE在不同的 UL CC上同时发送至少一个 preamble 和至少一个其他上行信号, 且总目标发射功率大于最大允许发射功率时, UE 需要 居预 设规则确定各上行信号的功率调整优先级, 并按照该功率调整优先级对至少一个 preamble 或 /和至少一个其他上行信号的目标发射功率,直到总目标发射功率不大于最大允许发射功 率为止, 这样, 在载波聚合场景下, 当 preamble和其他上行信号在不同的 UL CC同时传 输时, UE可以在不同的 UL CC之间, 实现发射功率的合理分配, 避免出现因总目标发射 功率过大而影响上行信号发送的情况, 从而提升了系统的运行稳定性和鲁棒性, 也提高了 系统的整体性能。
本领域内的技术人员应明白, 本发明的实施例可提供为方法、 系统、 或计算机程序产 品。 因此, 本发明可釆用完全硬件实施例、 完全软件实施例、 或结合软件和硬件方面的实 施例的形式。 而且, 本发明可釆用在一个或多个其中包含有计算机可用程序代码的计算机 可用存储介盾 (包括但不限于磁盘存储器、 CD-ROM、 光学存储器等)上实施的计算机程 序产品的形式。
本发明是参照根据本发明实施例的方法、 设备(系统)、 和计算机程序产品的流程图 和 /或方框图来描述的。 应理解可由计算机程序指令实现流程图和 /或方框图中的每一流 程和 /或方框、 以及流程图和 /或方框图中的流程和 /或方框的结合。 可提供这些计算机 程序指令到通用计算机、 专用计算机、 嵌入式处理机或其他可编程数据处理设备的处理器 以产生一个机器, 使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用 于实现在流程图一个流程或多个流程和 /或方框图一个方框或多个方框中指定的功能的 装置。
这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方 式工作的计算机可读存储器中, 使得存储在该计算机可读存储器中的指令产生包括指令装 置的制造品, 该指令装置实现在流程图一个流程或多个流程和 /或方框图一个方框或多个 方框中指定的功能。
这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上, 使得在计算机 或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理, 从而在计算机或其他 可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和 /或方框图一个 方框或多个方框中指定的功能的步骤。
尽管已描述了本发明的优选实施例, 但本领域内的技术人员一旦得知了基本创造性概 念, 则可对这些实施例作出另外的变更和修改。 所以, 所附权利要求意欲解释为包括优选 实施例以及落入本发明范围的所有变更和修改。
显然, 本领域的技术人员可以对本发明实施例进行各种改动和变型而不脱离本发明实 施例的精神和范围。 这样, 倘若本发明实施例的这些修改和变型属于本发明权利要求及其 等同技术的范围之内, 则本发明也意图包含这些改动和变型在内。
Claims
1、 一种调整发射功率的方法, 应用于载波聚合场景, 其特征在于, 包括:
分别确定在不同上行成员载波 UL CC上同时发送的至少一个前导序列 preamble和至 少一个其他上行信号中, 每个 preamble和每个其他上行信号的目标发射功率, 并计算总目 标发射功率;
将所述总目标发射功率与最大允许发射功率进行比较;
根据比较结果确定所述总目标发射功率大于最大允许发射功率时, 分别确定所述至少 一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的功率调整 优先级, 并按照所述功率调整优先级对所述至少一个 preamble或 /和至少一个其他上行信 号的目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止。
2、如权利要求 1所述的方法,其特征在于,所述至少一个其他上行信号包括 preamble, 物理上行控制信道 PUCCH信号和物理上行共享信道 PUSCH信号中的一种或任意组合。
3、 如权利要求 2所述的方法, 其特征在于, 分别确定所述至少一个 preamble和至少 一个其他上行信号中, 每个 preamble和每个其他上行信号的功率调整优先级, 并按照所述 功率调整优先级对所述至少一个 preamble或 /和至少一个其他上行信号的目标发射功率进 行下调, 直至总目标发射功率不大于最大允许发射功率为止, 包括:
根据预设规则按照信号类型分别确定所述至少一个 preamble和至少一个其他上行信号 中, 每个 preamble和每个其他上行信号的功率调整优先级, 并对指定的功率调整优先级对 应的至少一个 preamble或 /和至少一个其他上行信号的目标发射功率进行下调, 直至总目 标发射功率不大于最大允许发射功率为止。
4、如权利要求 3所述的方法,其特征在于,若所述至少一个其他上行信号为 preamble, 则根据预设规则按照信号类型分别确定所述至少一个 preamble 和至少一个其他上行信号 中, 每个 preamble和每个其他上行信号的功率调整优先级, 并对指定的功率调整优先级对 应的至少一个 preamble或 /和至少一个其他上行信号的目标发射功率进行下调, 直至总目 标发射功率不大于最大允许发射功率为止, 包括:
确定各 preamble的功率调整优先级相同,并对各 preamble的目标发射功率进行等比例 下调, 直至总目标发射功率不大于最大允许发射功率为止; 或者,
确定在辅小区内的 UL CC上发送的 preamble的功率调整优先级最高,并对该 preamble 的目标发射功率进行下调, 以及维持在主小区内的 UL CC上发送的 preamble的目标发射 功率不变, 直至总目标发射功率不大于最大允许发射功率为止; 或者,
当在主小区内的 UL CC上未发送 preamble时, 确定在指定辅小区内的 UL CC上发送 的 preamble的功率调整优先级最高,并对该 preamble的目标发射功率进行下调, 以及维持 在非指定辅小区内的 UL CC上发送的 preamble的目标发射功率不变, 直至总目标发射功 率不大于最大允许发射功率为止; 或者,
确定竟争类型的 preamble的功率调整优先级最高,并对该 preamble的目标发射功率进 行下调, 以及维持非竟争类型的 preamble的目标发射功率不变, 直至总目标发射功率不大 于最大允许发射功率为止。
5、 如权利要求 3 所述的方法, 其特征在于, 若所述至少一个其他上行信号为至少一 个 PUSCH信号, 则根据预设规则按照信号类型分别确定所述至少一个 preamble和至少一 个其他上行信号中, 每个 preamble和每个其他上行信号的功率调整优先级, 并对指定的功 率调整优先级对应的至少一个 preamble或 /和至少一个其他上行信号的目标发射功率进行 下调, 直至总目标发射功率不大于最大允许发射功率为止, 包括:
确定所述至少一个 PUSCH信号的功率调整优先级最高,并对该至少一个 PUSCH信号 的目标发射功率进行下调, 以及维持所述至少一个 preamble的目标发射功率不变, 直至总 目标发射功率不大于最大允许发射功率为止; 或者,
确认所述至少一个 PUSCH信号携带上行控制信息 UCI,或,携带包含 ACK/NACK信 息的 UCI时,确定所述至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble 信号的目标发射功率进行下调, 以及维持所述至少一个 PUSCH信号的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止; 或者,
确认所述至少一个 PUSCH信号未携带上行控制信息 UCI,或,未携带包含 ACK/NACK 信息的 UCI时, 确定所述至少一个 PUSCH信号的功率调整优先级最高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble的目标发射功率 不变, 直至总目标发射功率不大于最大允许发射功率为止;
确认所述至少一个 PUSCH信号中的一个 PUSCH信号携带上行控制信息 UCI以及至 少一个 PUSCH信号未携带 UCI时, 确定未携带 UCI的至少一个 PUSCH信号的功率调整 优先级最高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以及维持携带 UCI 的一个 PUSCH信号和至少一个 preamble的目标发射功率不变, 直至总目标发射功率不大 于最大允许发射功率为止。
6、 如权利要求 5所述的方法, 其特征在于, 将所述至少一个 PUSCH信号的目标发射 功率下调至最低门限值, 以及维持携带 UCI的一个 PUSCH信号和至少一个 preamble的目 标发射功率不变后, 若总目标发射功率仍大于最大允许发射功率, 则进一步判断所述一个 PUSCH信号携带的 UCI是否包含 ACK/NACK信息,若是, 则确定所述至少一个 preamble 的功率调整优先级最高, 并对该至少一个 preamble信号的目标发射功率进行下调, 以及维 持携带 UCI的一个 PUSCH信号的目标发射功率不变, 直至总目标发射功率不大于最大允 许发射功率为止; 否则, 确定携带 UCI 的一个 PUSCH 的功率调整优先级最高, 并对该 PUSCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble的目标发射功率 不变, 直至总目标发射功率不大于最大允许发射功率为止。
7、 如权利要求 3所述的方法, 其特征在于, 若所述至少一个其他上行信号为 PUCCH 信号,则根据预设规则按照信号类型分别确定所述至少一个 preamble和至少一个其他上行 信号中, 每个 preamble和每个其他上行信号的功率调整优先级, 并对指定的功率调整优先 级对应的至少一个 preamble或 /和至少一个其他上行信号的目标发射功率进行下调, 直至 总目标发射功率不大于最大允许发射功率为止, 包括:
确定所述至少一个 preamble信号的功率调整优先级最高, 并对该至少一个 preamble 信号的目标发射功率进行下调, 以及维持所述 PUCCH信号的目标发射功率不变, 直至总 目标发射功率不大于最大允许发射功率为止; 或者,
确定所述 PUCCH信号的功率调整优先级最高, 并对所述 PUCCH信号的目标发射功 率进行下调, 以及维持所述至少一个 preamble信号的目标发射功率不变, 直至总目标发射 功率不大于最大允许发射功率为止; 或者,
确认所述 PUCCH信号携带包含 ACK/NACK信息的上行控制信息 UCI时, 确定所述 至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功率 进行下调, 以及维持所述 PUCCH信号的目标发射功率不变, 直至总目标发射功率不大于 最大允许发射功率为止; 或者,
确认所述 PUCCH信号未携带包含 ACK/NACK信息的上行控制信息 UCI时, 确定所 述 PUCCH信号的功率调整优先级最高, 并对该 PUCCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble的目标发射功率不变,直至总目标发射功率不大于最大允 许发射功率为止。
8、 如权利要求 3所述的方法, 其特征在于, 若所述至少一个其他上行信号为 PUCCH 信号和至少一个 PUSCH信号, 则根据预设规则按照信号类型分别确定所述至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的功率调整优先 级, 并对指定的功率调整优先级对应的至少一个 preamble或 /和至少一个其他上行信号的 目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止, 包括:
确定所述至少一个 PUSCH信号的功率调整优先级最高,并对该至少一个 PUSCH信号 的目标发射功率进行下调, 以及维持所述至少一个 preamble和 PUCCH信号的目标发射功 率不变, 直至总目标发射功率不大于最大允许发射功率为止;
确认所述至少一个 PUSCH信号携带上行控制信息 UCI,或,携带包含 ACK/NACK信 息的 UCI时,确定所述至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble 信号的目标发射功率进行下调,以及维持所述携带 UCI的至少一个 PUSCH信号和 PUCCH 信号的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止; 或者, 确认所述至少一个 PUSCH信号未携带上行控制信息 UCI,或,未携带包含 ACK/NACK 信息的 UCI时, 确定所述至少一个 PUSCH信号的功率调整优先级最高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble和 PUCCH信号 的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止。
9、 如权利要求 8所述的方法, 其特征在于, 若确认所述至少一个 PUSCH信号的功率 调整优先级最高, 将所述至少一个 PUSCH信号的目标发射功率下调至最低门限值, 并维 持所述至少一个 preamble和 PUCCH信号的目标发射功率不变后, 总目标发射功率仍大于 最大允许发射功率, 则继续执行以下操作:
确定所述至少一个 preamble信号的功率调整优先级最高, 并对该至少一个 preamble 信号的目标发射功率进行下调, 以及维持所述 PUCCH信号的目标发射功率不变, 直至总 目标发射功率不大于最大允许发射功率为止; 或者,
确认所述 PUCCH信号携带包含 ACK/NACK信息的 UCI 时, 确定所述至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功率进行下调, 以及维持所述 PUCCH信号的目标发射功率不变, 直至总目标发射功率不大于最大允许发 射功率为止; 或者,
确认所述 PUCCH信号未携带包含 ACK/NACK信息的 UCI时, 确定所述 PUCCH信 号的功率调整优先级最高, 并对该 PUCCH信号的目标发射功率进行下调, 以及维持所述 至少一个 preamble的目标发射功率不变,直至总目标发射功率不大于最大允许发射功率为 止。
10、 如权利要求 5 _ 9任一项所述的方法, 其特征在于, 确定所述至少一个 preamble 的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功率进行下调时,包括: 若待调整的 preamble信号仅有一个, 则直接下调该 preamble信号的目标发射功率; 若待调整的 preamble信号有两个及以上,则对各 preamble的目标发射功率进行等比例 下调; 或者, 对在辅小区内的 UL CC上发送的 preamble的目标发射功率进行下调, 并维 持在主小区内的 UL CC上发送的 preamble的目标发射功率不变; 或者, 当在主小区内的 UL CC上未发送 preamble时, 对在指定辅小区内的 UL CC上发送的 preamble的目标发射 功率进行下调, 并维持在非指定辅小区内的 UL CC上发送的 preamble的目标发射功率不 变;对竟争类型的 preamble的目标发射功率进行下调,并维持非竟争类型的 preamble的目 标发射功率不变。
11、 一种调整发射功率的装置, 应用于载波聚合场景, 其特征在于, 包括: 计算单元,用于分别确定在不同上行成员载波 UL CC上同时发送的至少一个前导序列 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的目标发射功率, 并计算总目标发射功率; 比较单元, 用于将所述总目标发射功率与最大允许发射功率进行比较; 调整单元, 用于根据比较结果确定总目标发射功率大于最大允许发射功率时, 分别确 定所述至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号 的功率调整优先级, 并按照确定的功率调整优先级对所述述至少一个 preamble或 /和至少 一个其他上行信号的目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功 率为止。
12、 如权利要求 11所述的装置, 其特征在于, 所述计算单元计算目标发射功率时, 针 对的至少一个其他上行信号包括 preamble, 物理上行控制信道 PUCCH信号和物理上行共 享信道 PUSCH信号中的一种或任意组合。
13、 如权利要求 12 所述的装置, 其特征在于, 所述调整单元分别确定所述至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的功率调整优先 级, 并按照所述功率调整优先级对所述至少一个 preamble或 /和至少一个其他上行信号的 目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止时, 包括: 所述调整单元根据预设规则按照信号类型分别确定所述至少一个 preamble和至少一个 其他上行信号中, 每个 preamble和每个其他上行信号的功率调整优先级, 并对指定的功率 调整优先级对应的至少一个 preamble或 /和至少一个其他上行信号的目标发射功率进行下 调, 直至总目标发射功率不大于最大允许发射功率为止。
14、 如权利要求 13 所述的装置, 其特征在于, 若所述至少一个其他上行信号为 preamble, 则所述调整单元根据预设规则按照信号类型分别确定所述至少一个 preamble和 至少一个其他上行信号中, 每个 preamble和每个其他上行信号的功率调整优先级, 并对指 定的功率调整优先级对应的至少一个 preamble或 /和至少一个其他上行信号的目标发射功 率进行下调, 直至总目标发射功率不大于最大允许发射功率为止, 包括:
所述调整单元确定各 preamble的功率调整优先级相同,并对各 preamble的目标发射功 率进行等比例下调, 直至总目标发射功率不大于最大允许发射功率为止; 或者,
所述调整单元确定在辅小区内的 UL CC上发送的 preamble的功率调整优先级最高, 并对该 preamble 的目标发射功率进行下调, 以及维持在主小区内的 UL CC 上发送的 preamble的目标发射功率不变,直至总目标发射功率不大于最大允许发射功率为止;或者, 当在主小区内的 UL CC上未发送 preamble时, 所述调整单元确定在指定辅小区内的 UL CC上发送的 preamble的功率调整优先级最高, 并对该 preamble的目标发射功率进行 下调, 以及维持在非指定辅小区内的 UL CC上发送的 preamble的目标发射功率不变, 直 至总目标发射功率不大于最大允许发射功率为止; 或者,
所述调整单元确定竟争类型的 preamble的功率调整优先级最高,并对该 preamble的目 标发射功率进行下调, 以及维持非竟争类型的 preamble的目标发射功率不变, 直至总目标 发射功率不大于最大允许发射功率为止。
15、 如权利要求 13 所述的装置, 其特征在于, 若所述至少一个其他上行信号为至少 一个 PUSCH信号, 则所述调整单元根据预设规则按照信号类型分别确定所述至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的功率调整优先 级, 并对指定的功率调整优先级对应的至少一个 preamble或 /和至少一个其他上行信号的 目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止, 包括:
所述调整单元确定所述至少一个 PUSCH信号的功率调整优先级最高, 并对该至少一 个 PUSCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble的目标发射功 率不变, 直至总目标发射功率不大于最大允许发射功率为止; 或者,
所述调整单元确认所述至少一个 PUSCH信号携带上行控制信息 UCI, 或, 携带包含
ACK/NACK信息的 UCI时, 确定所述至少一个 preamble的功率调整优先级最高, 并对该 至少一个 preamble信号的目标发射功率进行下调, 以及维持所述至少一个 PUSCH信号的 目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止; 或者,
所述调整单元确认所述至少一个 PUSCH信号未携带上行控制信息 UCI, 或, 未携带 包含 ACK/NACK信息的 UCI时,确定所述至少一个 PUSCH信号的功率调整优先级最高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble 的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止;
所述调整单元确认所述至少一个 PUSCH信号中的一个 PUSCH信号携带上行控制信息 UCI以及至少一个 PUSCH信号未携带 UCI时, 确定未携带 UCI的至少一个 PUSCH信号 的功率调整优先级最高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以及维 持携带 UCI的一个 PUSCH信号和至少一个 preamble的目标发射功率不变, 直至总目标发 射功率不大于最大允许发射功率为止。
16、 如权利要求 15所述的装置, 其特征在于, 所述调整单元将所述至少一个 PUSCH 信号的目标发射功率下调至最低门限值, 以及维持携带 UCI的一个 PUSCH信号和至少一 个 preamble的目标发射功率不变后, 若总目标发射功率仍大于最大允许发射功率, 则进一 步判断所述一个 PUSCH信号携带的 UCI是否包含 ACK/NACK信息, 若是, 则确定所述 至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功率 进行下调, 以及维持携带 UCI的一个 PUSCH信号的目标发射功率不变, 直至总目标发射 功率不大于最大允许发射功率为止; 否则, 确定携带 UCI的一个 PUSCH的功率调整优先 级最高, 并对该 PUSCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble 的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止。
17、如权利要求 13所述的装置,其特征在于,若所述至少一个其他上行信号为 PUCCH 信号,则所述调整单元根据预设规则按照信号类型分别确定所述至少一个 preamble和至少 一个其他上行信号中, 每个 preamble和每个其他上行信号的功率调整优先级, 并对指定的 功率调整优先级对应的至少一个 preamble或 /和至少一个其他上行信号的目标发射功率进 行下调, 直至总目标发射功率不大于最大允许发射功率为止, 包括:
所述调整单元确定所述至少一个 preamble信号的功率调整优先级最高,并对该至少一 个 preamble信号的目标发射功率进行下调, 以及维持所述 PUCCH信号的目标发射功率不 变, 直至总目标发射功率不大于最大允许发射功率为止; 或者,
所述调整单元确定所述 PUCCH信号的功率调整优先级最高, 并对所述 PUCCH信号 的目标发射功率进行下调,以及维持所述至少一个 preamble信号的目标发射功率不变, 直 至总目标发射功率不大于最大允许发射功率为止; 或者,
所述调整单元确认所述 PUCCH信号携带包含 ACK/NACK信息的上行控制信息 UCI 时,确定所述至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的 目标发射功率进行下调, 以及维持所述 PUCCH信号的目标发射功率不变, 直至总目标发 射功率不大于最大允许发射功率为止; 或者,
所述调整单元确认所述 PUCCH信号未携带包含 ACK/NACK信息的上行控制信息 UCI 时, 确定所述 PUCCH信号的功率调整优先级最高, 并对该 PUCCH信号的目标发射功率 进行下调, 以及维持所述至少一个 preamble的目标发射功率不变, 直至总目标发射功率不 大于最大允许发射功率为止。
18、如权利要求 13所述的装置,其特征在于,若所述至少一个其他上行信号为 PUCCH 信号和至少一个 PUSCH信号, 则所述调整单元根据预设规则按照信号类型分别确定所述 至少一个 preamble和至少一个其他上行信号中,每个 preamble和每个其他上行信号的功率 调整优先级, 并对指定的功率调整优先级对应的至少一个 preamble或 /和至少一个其他上 行信号的目标发射功率进行下调, 直至总目标发射功率不大于最大允许发射功率为止, 包 括:
所述调整单元确定所述至少一个 PUSCH信号的功率调整优先级最高, 并对该至少一 个 PUSCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble和 PUCCH信 号的目标发射功率不变, 直至总目标发射功率不大于最大允许发射功率为止;
所述调整单元确认所述至少一个 PUSCH信号携带上行控制信息 UCI, 或, 携带包含 ACK/NACK信息的 UCI时, 确定所述至少一个 preamble的功率调整优先级最高, 并对该 至少一个 preamble信号的目标发射功率进行下调, 以及维持所述携带 UCI 的至少一个 PUSCH信号和 PUCCH信号的目标发射功率不变,直至总目标发射功率不大于最大允许发 射功率为止; 或者,
所述调整单元确认所述至少一个 PUSCH信号未携带上行控制信息 UCI, 或, 未携带 包含 ACK/NACK信息的 UCI时,确定所述至少一个 PUSCH信号的功率调整优先级最高, 并对该至少一个 PUSCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble 和 PUCCH信号的目标发射功率不变,直至总目标发射功率不大于最大允许发射功率为止。
19、 如权利要求 18 所述的装置, 其特征在于, 若所述调整单元确认所述至少一个 PUSCH信号的功率调整优先级最高,将所述至少一个 PUSCH信号的目标发射功率下调至 最低门限值, 并维持所述至少一个 preamble和 PUCCH信号的目标发射功率不变后, 总目 标发射功率仍大于最大允许发射功率, 则继续执行以下操作:
所述调整单元确定所述至少一个 preamble信号的功率调整优先级最高,并对该至少一 个 preamble信号的目标发射功率进行下调, 以及维持所述 PUCCH信号的目标发射功率不 变, 直至总目标发射功率不大于最大允许发射功率为止; 或者,
所述调整单元确认所述 PUCCH信号携带包含 ACK/NACK信息的 UCI时, 确定所述 至少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功率 进行下调, 以及维持所述 PUCCH信号的目标发射功率不变, 直至总目标发射功率不大于 最大允许发射功率为止; 或者,
所述调整单元确认所述 PUCCH信号未携带包含 ACK/NACK信息的 UCI时, 确定所 述 PUCCH信号的功率调整优先级最高, 并对该 PUCCH信号的目标发射功率进行下调, 以及维持所述至少一个 preamble的目标发射功率不变,直至总目标发射功率不大于最大允 许发射功率为止。
20、 如权利要求 15 - 19任一项所述的装置, 其特征在于, 所述调整单元确定所述至 少一个 preamble的功率调整优先级最高,并对该至少一个 preamble信号的目标发射功率进 行下调时, 包括:
若待调整的 preamble信号仅有一个,则所述调整单元直接下调该 preamble信号的目标 发射功率;
若待调整的 preamble信号有两个及以上,则所述调整单元对各 preamble的目标发射功 率进行等比例下调; 或者, 对在辅小区内的 UL CC上发送的 preamble的目标发射功率进 行下调, 并维持在主小区内的 UL CC上发送的 preamble的目标发射功率不变; 或者, 当 在主小区内的 UL CC上未发送 preamble时,对在指定辅小区内的 UL CC上发送的 preamble 的目标发射功率进行下调, 并维持在非指定辅小区内的 UL CC上发送的 preamble的目标 发射功率不变; 对竟争类型的 preamble 的目标发射功率进行下调, 并维持非竟争类型的 preamble的目标发射功率不变。
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011101985007A CN102238716A (zh) | 2011-07-15 | 2011-07-15 | 一种调整发射功率的方法及装置 |
| CN201110198500.7 | 2011-07-15 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2013010441A1 true WO2013010441A1 (zh) | 2013-01-24 |
Family
ID=44888769
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2012/078285 Ceased WO2013010441A1 (zh) | 2011-07-15 | 2012-07-06 | 一种调整发射功率的方法及装置 |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN102238716A (zh) |
| WO (1) | WO2013010441A1 (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111357333A (zh) * | 2018-03-14 | 2020-06-30 | Oppo广东移动通信有限公司 | 数据传输方法及装置 |
Families Citing this family (38)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9392515B2 (en) | 2010-02-12 | 2016-07-12 | Interdigital Technology Corporation | Data split between multiple sites |
| FI3319395T3 (fi) | 2010-12-03 | 2023-08-01 | Interdigital Patent Holdings Inc | Menetelmä ja laite moniradioliityntätekniikan kantoaaltojen yhdistämisen suorittamiseksi |
| CN102238716A (zh) * | 2011-07-15 | 2011-11-09 | 电信科学技术研究院 | 一种调整发射功率的方法及装置 |
| EP2737768A1 (en) | 2011-07-29 | 2014-06-04 | Interdigital Patent Holdings, Inc. | Method and apparatus for radio resources management in multi-radio access technology wireless systems |
| CN102573030B (zh) | 2011-12-08 | 2014-11-05 | 电信科学技术研究院 | 一种上行功率控制方法及装置 |
| CN104902554B (zh) | 2011-12-19 | 2018-05-29 | 华为技术有限公司 | 一种上行发射功率控制方法及用户设备 |
| CN103200663B (zh) * | 2012-01-09 | 2016-03-09 | 华为技术有限公司 | 上行信道功率控制方法、装置及系统 |
| CN103327596B (zh) * | 2012-03-20 | 2018-03-13 | 华为技术有限公司 | 一种功率控制方法和装置 |
| CN103369650B (zh) | 2012-03-26 | 2017-02-08 | 电信科学技术研究院 | 一种上行功率控制方法及用户设备 |
| CN102651907B (zh) * | 2012-05-03 | 2014-12-31 | 华为技术有限公司 | 一种上行传输处理方法、基站和用户设备 |
| CN103428868B (zh) * | 2012-05-15 | 2016-08-24 | 华为技术有限公司 | 上行发射方法和用户设备 |
| TWI632823B (zh) * | 2012-08-23 | 2018-08-11 | 內數位專利控股公司 | 在無線系統中多層操作之實體層操作 |
| RU2603626C2 (ru) | 2012-08-23 | 2016-11-27 | Интердиджитал Пэйтент Холдингз, Инк. | Работа с множеством планировщиков в беспроводной системе |
| HK1207784A1 (zh) * | 2012-09-10 | 2016-02-05 | 美国博通公司 | 在站點間載波聚合中的上行鏈路配置和傳輸控制 |
| US9590791B2 (en) * | 2012-11-12 | 2017-03-07 | Qualcomm Incorporated | Uplink transmission for carrier aggregation via multiple nodes |
| CN104025690B (zh) * | 2012-12-03 | 2017-12-29 | 华为技术有限公司 | 一种调整发送时间的方法及用户设备 |
| CN104871448B (zh) | 2012-12-18 | 2018-04-13 | Lg电子株式会社 | 在无线通信系统中发送下行链路控制信息的方法和设备 |
| US10932205B2 (en) * | 2013-08-02 | 2021-02-23 | Blackberry Limited | Uplink power sharing control |
| CN104349441B (zh) * | 2013-08-07 | 2020-03-17 | 夏普株式会社 | 主基站、用户设备及其控制方法 |
| KR101611825B1 (ko) * | 2013-11-08 | 2016-04-14 | 주식회사 케이티 | 상향링크 전송 전력을 제어하는 방법과 그 장치 |
| CN104683082B (zh) * | 2013-12-03 | 2018-10-09 | 索尼公司 | 无线通信系统和在无线通信系统中进行无线通信的方法 |
| WO2015089840A1 (zh) | 2013-12-20 | 2015-06-25 | 华为技术有限公司 | 一种无线资源优化管理的方法、集中控制器和设备 |
| WO2015109544A1 (zh) * | 2014-01-24 | 2015-07-30 | 华为技术有限公司 | 一种信道功率分配优先级的确定方法和设备 |
| KR102298357B1 (ko) * | 2014-03-21 | 2021-09-07 | 삼성전자 주식회사 | 무선통신 시스템에서 다중 기지국과 랜덤 엑세스 수행 방법 및 장치 |
| KR101969786B1 (ko) | 2014-07-03 | 2019-04-17 | 후아웨이 테크놀러지 컴퍼니 리미티드 | 사용자 장비 및 전력 할당 방법 |
| CN105532048B (zh) * | 2014-08-05 | 2019-09-03 | 华为技术有限公司 | 终端、网络设备和上行控制信息处理方法 |
| WO2016019514A1 (zh) * | 2014-08-05 | 2016-02-11 | 华为技术有限公司 | 终端、网络设备和上行控制信息处理方法 |
| CN109691187B (zh) * | 2016-11-03 | 2020-12-18 | Oppo广东移动通信有限公司 | 通信方法、终端设备和网络设备 |
| CN108811128B (zh) * | 2017-05-05 | 2021-02-05 | 华为技术有限公司 | 一种功率控制方法及终端设备 |
| CN108702278B (zh) * | 2017-06-16 | 2022-10-04 | 华为技术有限公司 | 一种业务传输方法、设备及系统 |
| CN109995464B (zh) * | 2017-12-29 | 2021-10-26 | 普天信息技术有限公司 | 检测处理的方法、装置、电子设备和存储介质 |
| CN113890685B (zh) * | 2018-02-28 | 2024-04-12 | 上海朗帛通信技术有限公司 | 一种被用于无线通信的用户设备、基站中的方法和装置 |
| CN111182626A (zh) | 2018-11-09 | 2020-05-19 | 北京展讯高科通信技术有限公司 | 信息发送方法及用户终端、计算机可读存储介质 |
| US11310834B2 (en) * | 2019-03-18 | 2022-04-19 | Qualcomm Incorporated | Priority handling for a random access message that includes a preamble and a payload |
| CN111836276B (zh) * | 2019-04-17 | 2022-09-09 | 华为技术有限公司 | 优化数据传输的方法及装置、无线局域网设备及芯片 |
| WO2020215262A1 (zh) * | 2019-04-24 | 2020-10-29 | Oppo广东移动通信有限公司 | 功率分配方法和终端设备 |
| CN116438858B (zh) * | 2021-03-24 | 2025-12-09 | Oppo广东移动通信有限公司 | 配置发射功率的方法和终端设备 |
| US12200694B2 (en) * | 2021-10-01 | 2025-01-14 | Qualcomm Incorporated | Considerations for intra-UE multiplexing and simultaneous transmission |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102014476A (zh) * | 2009-10-10 | 2011-04-13 | 大唐移动通信设备有限公司 | 上行同步方法、系统和设备 |
| CN102118801A (zh) * | 2011-03-31 | 2011-07-06 | 电信科学技术研究院 | 多载波聚合系统中的上行传输方法和设备 |
| CN102238716A (zh) * | 2011-07-15 | 2011-11-09 | 电信科学技术研究院 | 一种调整发射功率的方法及装置 |
-
2011
- 2011-07-15 CN CN2011101985007A patent/CN102238716A/zh active Pending
-
2012
- 2012-07-06 WO PCT/CN2012/078285 patent/WO2013010441A1/zh not_active Ceased
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102014476A (zh) * | 2009-10-10 | 2011-04-13 | 大唐移动通信设备有限公司 | 上行同步方法、系统和设备 |
| CN102118801A (zh) * | 2011-03-31 | 2011-07-06 | 电信科学技术研究院 | 多载波聚合系统中的上行传输方法和设备 |
| CN102238716A (zh) * | 2011-07-15 | 2011-11-09 | 电信科学技术研究院 | 一种调整发射功率的方法及装置 |
Non-Patent Citations (2)
| Title |
|---|
| CATT: "Considerations on uplink power control in LTE-Advanced", 3GPP TSG RAN WG1 MEETING #59 BIS RL-100071, 22 January 2010 (2010-01-22), pages 1 - 2 * |
| ERICSSON ET AL.: "Uplink Power Control for Carrier Aggregation", 3GPP TSG RAN WG1 MEETING #59BIS R1-100045, 22 January 2010 (2010-01-22), pages 2 - 3 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111357333A (zh) * | 2018-03-14 | 2020-06-30 | Oppo广东移动通信有限公司 | 数据传输方法及装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102238716A (zh) | 2011-11-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2013010441A1 (zh) | 一种调整发射功率的方法及装置 | |
| US11856523B2 (en) | Uplink transmissions in wireless communications | |
| US10568052B2 (en) | Device-to-device (D2D) cross link power control | |
| CN102348269B (zh) | 一种上行功率控制的方法和设备 | |
| US9622186B2 (en) | Uplink power control method, user equipment, and base station | |
| EP2934055B1 (en) | User device and transmission control method | |
| JP6298329B2 (ja) | ユーザ端末、無線基地局および無線通信方法 | |
| CN107113740A (zh) | 双连接性中的上行链路功率共享 | |
| JP2012244378A (ja) | 無線通信システム、基地局装置、移動局装置、無線通信方法および集積回路 | |
| CN102378341A (zh) | 一种上行功率控制方法及装置 | |
| CN107926028B (zh) | 在未授权带中发送数据的方法和设备 | |
| CN103124428A (zh) | 一种上行功率控制方法及装置 | |
| WO2015115197A1 (ja) | ユーザ装置及び送信制御方法 | |
| JP6037963B2 (ja) | 基地局装置、移動局装置、無線通信方法および集積回路 | |
| JP6357567B2 (ja) | ユーザ装置及び送信制御方法 | |
| WO2013067976A1 (zh) | 一种上行传输的功率控制方法及装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12814850 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 12814850 Country of ref document: EP Kind code of ref document: A1 |