WO2012114851A1 - 液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法 - Google Patents

液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法 Download PDF

Info

Publication number
WO2012114851A1
WO2012114851A1 PCT/JP2012/052516 JP2012052516W WO2012114851A1 WO 2012114851 A1 WO2012114851 A1 WO 2012114851A1 JP 2012052516 W JP2012052516 W JP 2012052516W WO 2012114851 A1 WO2012114851 A1 WO 2012114851A1
Authority
WO
WIPO (PCT)
Prior art keywords
natural gas
liquefied natural
lng
tank
loaded
Prior art date
Application number
PCT/JP2012/052516
Other languages
English (en)
French (fr)
Inventor
石田 聡成
俊夫 小形
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to CN201280010359.6A priority Critical patent/CN103403435B/zh
Priority to KR1020137022029A priority patent/KR20130117859A/ko
Publication of WO2012114851A1 publication Critical patent/WO2012114851A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C6/00Methods and apparatus for filling vessels not under pressure with liquefied or solidified gases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J2/00Arrangements of ventilation, heating, cooling, or air-conditioning
    • B63J2/12Heating; Cooling
    • B63J2/14Heating; Cooling of liquid-freight-carrying tanks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C9/00Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/01Shape
    • F17C2201/0128Shape spherical or elliptical
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/05Size
    • F17C2201/052Size large (>1000 m3)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0169Liquefied gas, e.g. LPG, GPL subcooled
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/035High pressure (>10 bar)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/04Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by other properties of handled fluid before transfer
    • F17C2223/042Localisation of the removal point
    • F17C2223/046Localisation of the removal point in the liquid
    • F17C2223/047Localisation of the removal point in the liquid with a dip tube
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0146Two-phase
    • F17C2225/0153Liquefied gas, e.g. LPG, GPL
    • F17C2225/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0146Two-phase
    • F17C2225/0153Liquefied gas, e.g. LPG, GPL
    • F17C2225/0169Liquefied gas, e.g. LPG, GPL subcooled
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/03Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
    • F17C2225/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/03Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
    • F17C2225/035High pressure, i.e. between 10 and 80 bars
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/04Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by other properties of handled fluid after transfer
    • F17C2225/042Localisation of the filling point
    • F17C2225/043Localisation of the filling point in the gas
    • F17C2225/044Localisation of the filling point in the gas at several points, e.g. with a device for recondensing gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/04Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by other properties of handled fluid after transfer
    • F17C2225/042Localisation of the filling point
    • F17C2225/046Localisation of the filling point in the liquid
    • F17C2225/047Localisation of the filling point in the liquid with a dip tube
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/03Dealing with losses
    • F17C2260/031Dealing with losses due to heat transfer
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/011Barges

Definitions

  • the present invention relates to a liquefied natural gas storage / transport ship used for liquefied natural gas storage / transport and the like, and a method for suppressing excessive gas generation in a liquefied natural gas storage / transport ship, and more particularly to a liquefied natural gas product for a liquefied natural gas storage / transport ship.
  • the present invention relates to a technique for suppressing surplus gas generated during charging.
  • liquefied natural gas carriers LNGC, SRV
  • LNG liquefied natural gas carriers
  • FSRU floating liquefied natural gas storage vessels
  • LNG liquefied natural gas storage / transport ship that handles LNG
  • LNG is vaporized when LNG is loaded into the LNG storage tank, and a large amount of natural gas is generated. Therefore, as shown in FIG. It is returned to the land base and processed on the base side (usually incineration processing).
  • a liquefied natural gas carrier 1 shown in FIG. 4 includes a spherical LNG inboard storage tank 2.
  • Each LNG inboard storage tank 2 includes an LNG loading piping system 12 indicated by a solid line used when loading LNG sent from the LNG land storage tank 10 on the land base side by the LNG pump 11, and each LNG storage tank 2.
  • a gas delivery pipe system 13 indicated by a broken line used when delivering the vaporized natural gas.
  • the gas discharge piping system 13 supplies the natural gas in each LNG inboard storage tank 2 to the engine unit 3 and guides it to the flare stack 14 on the land base side for combustion.
  • reference numeral 4 is an LNG pump
  • 5 is an onboard regasifier
  • 12 is an LNG loading piping system
  • 13 is a gas discharge piping system
  • 15 is high-pressure natural gas gasified by the onboard regasifier 5.
  • This is a high-pressure gas discharge piping system that supplies (CNG) to land facilities and the like.
  • the conventional technology related to the LNG ship includes a tank strength that allows an increase in the vapor pressure in the tank that is adjusted within a pressure range near normal pressure in order to reduce evaporative gas (BOG) generated from the LNG storage tank during transportation.
  • the technology to do is known.
  • Patent Document 1 Moreover, in the low temperature liquefied gas storage tank, the rollover generation
  • the processing of surplus gas generated during LNG loading is particularly difficult in a floating liquefied natural gas storage ship that cannot be processed on the land base side.
  • this surplus gas can be processed by the reliquefaction device, the reliquefaction device becomes larger as the surplus gas amount increases, which is disadvantageous in terms of securing installation space on the ship and cost. For this reason, if the amount of natural gas generated by vaporization at the time of LNG loading can be reduced, the amount of natural gas that becomes surplus gas also decreases and decreases, so that the processing of surplus gas becomes easy or unnecessary.
  • the present invention has been made in view of the above circumstances, and the object of the present invention is to reduce the amount of natural gas generated when LNG is loaded into a liquefied natural gas inboard storage tank, An object of the present invention is to provide a liquefied natural gas storage / transport ship that minimizes the amount of surplus gas generated by stagnation, and a method for suppressing excessive gas generation in a liquefied natural gas storage / transport ship.
  • the liquefied natural gas storage / transport ship is a liquefied natural gas storage / transport ship equipped with a liquefied natural gas storage tank for storing liquefied natural gas in a cryogenic state, wherein the liquefied natural gas
  • the tank internal pressure is raised to raise the boiling point so that the loaded liquefied natural gas becomes supercooled, and the loaded liquefied natural gas is introduced into the tank from near the top of the tank.
  • a top liquefied natural gas input system was installed for loading.
  • the liquefied natural gas storage / transport ship when the liquefied natural gas is loaded into the liquefied natural gas storage tank, the boiling point is increased by increasing the tank internal pressure so that the loaded liquefied natural gas is in a supercooled state.
  • a top liquefied natural gas charging system was provided for charging and loading the loaded liquefied natural gas into the tank from the vicinity of the top of the tank. Therefore, the loaded liquefied natural gas in the supercooled state is effectively used as a cold heat source for recondensing the natural gas in the tank, and the loaded liquefied natural gas charged into the tank from the top liquefied natural gas charging system is stored in the tank. Efficient heat exchange is possible by naturally falling from the upper part to the liquid level.
  • the top liquefied natural gas charging system is configured to drop the loaded liquefied natural gas in a curtain form from the top liquefied natural gas flow path, Either a natural drop from one or a plurality of injection holes drilled in the passage, or a natural drop in a spray form from one or a plurality of spray nozzles attached to the top liquefied natural gas flow path may be used.
  • this is not limited as long as the top liquefied natural gas flow path is provided so that the loaded liquefied natural gas is naturally dropped, such as a natural drop from the pipe end of the top liquefied natural gas flow path.
  • the surplus gas generation suppression method for a liquefied natural gas storage / transport ship according to the second aspect of the present invention is applied to a liquefied natural gas storage / transport ship equipped with a liquefied natural gas storage tank for storing liquefied natural gas in a cryogenic state.
  • a method for suppressing surplus gas generation in a liquefied natural gas storage / transport ship that suppresses the amount of natural gas that is vaporized when the loaded liquefied natural gas is loaded into the liquefied natural gas storage tank.
  • the inside pressure of the tank is raised to raise the boiling point so as to be in a supercooled state, and the loaded liquefied natural gas is naturally dropped into the tank from the vicinity of the top of the tank and loaded.
  • the tank is pressurized to increase the boiling point so that the loaded liquefied natural gas becomes supercooled, and the loaded liquefied natural gas is Is dropped naturally into the tank from near the top of the tank. Therefore, the supercooled liquefied natural gas is used as a cooling heat source for recondensing the natural gas in the tank. Good heat exchange is possible.
  • FIG. 1 shows an embodiment of a liquefied natural gas storage / transport ship and a method for suppressing surplus gas generation in a liquefied natural gas storage / transport ship according to the present invention, and shows loading liquefied natural gas from the vicinity of the top of the liquefied natural gas storage tank into the tank. It is a figure which shows the top liquefied natural gas charging system for charging and loading in.
  • FIG. 3 is an explanatory diagram showing an LNG loading operation for loading liquefied natural gas (LNG) from the liquefied natural gas shuttle carrier 1S to the floating liquefied natural gas storage ship 1F.
  • the floating liquefied natural gas storage ship 1F is an LNG ship equipped with an onboard regasification device 5 together with a spherical LNG inboard storage tank 2 capable of storing LNG, and is fixed on the ocean to the LNG LNG shuttle ship 1S to LNG.
  • the LNG in the LNG inboard storage tank 2 is gasified by the on-board regasifier 5 as necessary to become high-pressure natural gas (CNG), and through a high-pressure gas discharge piping system 15 laid on the seabed or the like, It is sent from the floating liquefied natural gas storage ship 1F to land facilities.
  • CNG high-pressure natural gas
  • the LNG ship of the type that transports the LNG mounted in the spherical LNG inboard storage tank 2 to the receiving point at the liquefaction base and sends it to the floating liquefied natural gas storage ship 1F described above Alternatively, there is a type of LNG ship that sends natural gas regasified on board to an onshore facility (storage facility, reliquefaction facility, etc.) by a pipeline or the like.
  • the illustrated liquefied natural gas shuttle ship 1S is an LNG ship of a type that sends LNG mounted in an LNG inboard storage tank 2 to a floating liquefied natural gas storage ship 1F using an LNG pump 4 disposed in the tank. It is.
  • the liquefied natural gas shuttle carrier 1 ⁇ / b> S and the floating liquefied natural gas storage ship 1 ⁇ / b> F are connected by an LNG loading piping system 12 indicated by a solid line and a gas discharge piping system 13 indicated by a broken line.
  • One LNG loading piping system 12 is used to send LNG from the liquefied natural gas shuttle carrier 1S to the floating liquefied natural gas storage ship 1F
  • the other gas discharge piping system 13 is a floating type at the time of LNG loading. Used to return surplus gas generated in the LNG inboard storage tank 2 on the liquefied natural gas storage ship 1F side.
  • the LNG loading piping system 12 and the gas discharge piping system 13 can be separated and connected for each liquefied natural gas shuttle carrier 1S that handles (sends) LNG.
  • a liquefied natural gas storage / transport ship such as the liquefied natural gas storage ship 1F and the liquefied natural gas shuttle transport ship 1S is a spherical LNG inboard storage tank 2 that stores LNG in a cryogenic state. It has. For this reason, in this embodiment, when LNG is loaded into the LNG inboard storage tank 2 mounted on the LNG ship, the tank internal pressure is raised so that the loaded liquefied natural gas (loaded LNG) is in a supercooled state, thereby increasing the boiling point. As shown in FIG. 1A, for example, a top liquefied natural gas charging system (top LNG charging system) 20 is provided for loading and loading the loaded LNG from the vicinity of the top of the LNG inboard storage tank 2 into the tank. is there.
  • top LNG charging system top LNG charging system
  • the LNG inboard storage tank 2 when LNG is loaded into the LNG inboard storage tank 2, if the LNG inboard storage tank 2 is pressurized to a pressure higher than the conventional operating pressure (maximum 0.25 barG or less), the boiling point of the loaded LNG increases in the tank. And it becomes a supercooled state. For this reason, inside the LNG ship storage tank 2, the sensible heat of the loaded LNG can be used as a cold heat source for recondensing the natural gas (residual gas and generated gas) in the tank. In this case, if the LNG inboard storage tank 2 is made spherical, it is possible to pressurize to a higher pressure than that of the membrane type structurally, so the boiling point of the loaded LNG is set to a higher temperature and a large amount of cold heat is generated. Obtainable. In the case of the membrane type, the upper limit of pressurization is estimated to be about 0.6 BarG, but in the case of a spherical shape, it is easy to pressurize to 0.6 BarG or more.
  • the loaded LNG charged into the LNG inboard storage tank 2 is pressurized to 0.25 BarG or more and is in a supercooled state at the temperature T1, and therefore the temperature of the natural gas.
  • the temperature is lower than T2 (T1 ⁇ T2).
  • the supercooled loading LNG having a relatively low temperature absorbs heat from the natural gas in the tank and cools as shown by the white arrow H in the figure.
  • the LNG can be used as a cold heat source that changes its state.
  • the internal pressurization of the LNG inboard storage tank 2 can be easily achieved by utilizing the self-evaporation of the loaded LNG. That is, by starting the loading operation of LNG, the loading LNG charged into the LNG inboard storage tank 2 is vaporized to become natural gas, and this natural gas raises the tank internal pressure, thereby The boiling point of the loaded LNG is increased and the supercooled state is reached. Therefore, the supercooled loading LNG serves as a cooling source for cooling the natural gas that is present in the tank and causes excess gas, and can be condensed into LNG by absorbing heat from the natural gas. In addition, when performing the internal pressurization mentioned above, the on-off valve not shown provided in the gas discharge piping system 13 is closed.
  • the top LNG charging system 20 is a piping system that is branched from the LNG loading piping system 12, and a top liquefied natural gas flow path is located near the top of the LNG inboard storage tank 2.
  • (Top LNG flow path) 21 is provided. That is, the existing LNG loading piping system 12 is led to the vicinity of the tank bottom of the LNG inboard storage tank 2, and therefore heat exchange due to the sensible heat difference is as indicated by the white arrow H shown in FIG. It is only performed locally between the liquid phase and the gas phase at the LNG liquid level in the tank, and the amount of condensation is not sufficient.
  • the loading LNG charged from the top LNG charging system 20 and the natural gas present in the tank are the same as the loading LNG from the upper part in the tank.
  • heat exchange as indicated by the white arrow Ha in FIG. 1A is performed, so that a long contact time can be secured in addition to an increase in the contact area.
  • mutual heat exchange is promoted between the loading LNG and the natural gas present in the tank, and the heat exchange efficiency is improved.
  • the white arrow Hb in the figure indicates heat exchange between the LNG inboard storage tank 2 and the outside air.
  • top LNG charging system 20 there is one configured to freely drop the loading LNG in a tank shape like a top LNG charging system 20 ⁇ / b> A shown in FIG. 2A.
  • the top LNG flow path 21A in this case is a bowl-shaped LNG flow path 22 having an open upper portion, and overflows the loaded LNG from the outer peripheral side wall face 22b set lower than the inner peripheral side wall face 22a over substantially the entire circumference.
  • the loaded LNG is naturally dropped into a curtain shape by gravity.
  • the contact area between the curtain-like loading LNG and the natural gas in the tank is shown in FIG. 1B.
  • the area is increased by a curtain-like area.
  • the loading LNG thrown in from the top part LNG flow path 21A is a natural fall, it can also ensure comparatively long contact time. That is, the loading LNG charged from the top LNG charging system 20A and the natural gas existing in the tank can secure a long contact time in addition to an increase in the contact area. It is promoted to improve the heat exchange efficiency.
  • the top LNG charging system 20 described above is not limited to the top LNG charging system 20A that naturally drops the loading LNG from the top LNG flow path 21A in a curtain shape, and for example, the following modifications are possible.
  • the top LNG charging system 20B of the first modification shown in FIG. 2B is one in which one or a plurality of injection holes 23 for injecting the loading LNG into the top LNG flow path 21B.
  • the injection hole 23 is an injection method in which the injected loading LNG is diffused in a substantially conical shape from each of the injection holes 23 and the injected loading LNG is naturally dropped by gravity to the LNG liquid level in the tank.
  • the injection holes 23 in this case are desirably arranged at an equal pitch over the entire surface of the top LNG flow path 21B in order to improve heat exchange efficiency.
  • the top LNG charging system 20C of the second modified example shown in FIG. 2C is obtained by attaching one or a plurality of spray nozzles 24 for injecting the loaded LNG in a spray form to the top LNG flow path 21C. It becomes a spray system in which the loaded LNG is sprayed from the spray nozzle 24 in a spray form and is naturally dropped.
  • the spray nozzles 24 in this case are also desirably arranged at an equal pitch over the entire surface of the top LNG flow path 21C in order to improve heat exchange efficiency.
  • any one of the curtain system, the injection system, and the spray system is adopted, and the loaded LNG is naturally dropped from the top LNG charging system 20 and is introduced into the tank, so that the loaded LNG and the natural gas in the tank are Since a large contact area and contact time can be ensured during this period, efficient heat exchange becomes possible.
  • the spray method it is effective to improve the efficiency of heat exchange by making the loaded LNG that naturally falls in the tank into particles with a small diameter because the contact area with the natural gas in the tank is further increased. It is.
  • a curtain system, an injection system, and a spray system it is not limited to single adoption, What combined several systems suitably may be used.
  • the tank internal pressure is increased so that the boiling LNG is in a supercooled state to raise the boiling point.
  • a top LNG charging system 20 for loading and loading the loaded LNG into the tank from the vicinity of the tank top is provided. Therefore, it is possible to effectively use the cold heat held by the loading LNG in the supercooled state as a cold heat source for recondensing the natural gas in the tank.
  • the loading LNG charged into the tank from the top LNG charging system 20 was allowed to fall naturally into a curtain shape, a substantially conical shape by spraying, and / or a spray shape. Therefore, the efficiency of heat exchange can be improved by increasing the contact time and contact area with the natural gas in the tank.
  • the method for suppressing excessive gas generation in the LNG ship is to increase the boiling point by increasing the tank internal pressure of the LNG ship storage tank 2 so that the load LNG becomes supercooled, and the load LNG from the vicinity of the tank top. It is loaded by being naturally dropped by gravity to the LNG liquid level in the tank. As a result, it is possible to effectively use the cold heat held by the loading LNG in the supercooled state as a cold heat source for recondensing the natural gas in the tank. Moreover, since the loading LNG introduced from the upper part in the tank naturally falls by gravity from the top of the tank, the contact time with the natural gas in the tank and the contact area are increased, and efficient heat exchange becomes possible.
  • the above-described liquefied natural gas storage / transport ship and the surplus gas generation suppression method for the liquefied natural gas storage / transport ship are more redundant cargo operations, that is, natural gas by reducing the tank internal pressure of the LNG inboard storage tank 2.
  • the gasification amount can be adjusted according to the reduced pressure, and therefore natural gas can be intentionally generated.
  • Such gasification amount adjustment is compared with a method of adjusting the gasification amount with a forced gasifier (vaporizer) generally installed in a conventional LNG ship, such as the regasification device 5.
  • a forced gasifier vaporizer
  • it is an efficient and simple method such that a heat source such as steam is unnecessary.
  • the above-described embodiment is applied to the case where the LNG is loaded into the LNG inboard storage tank 2 in a ship such as an LNG ship provided with the LNG inboard storage tank 2.
  • the present invention is not limited to the above-described embodiment, and can be changed as appropriate without departing from the scope of the invention.
  • liquefied natural gas carrier 1 liquefied natural gas carrier 1S liquefied natural gas shuttle carrier 1F floating liquefied natural gas storage vessel 2 liquefied natural gas (LNG) inboard storage tank 12 liquefied natural gas (LNG) loading piping system 13 gas discharge piping system 20, 20A-20C Top liquefied natural gas input system (top LNG input system) 21, 21A-21C Top liquefied natural gas flow path (top LNG flow path) 22 liquefied natural gas (LNG) flow path 23 spray hole 24 spray nozzle

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)

Abstract

液化天然ガス(LNG)を液化天然ガス船内貯蔵タンクに積み込むLNG積込時に発生する天然ガス量を低減し、LNG積込により発生する余剰ガス量を最小限に抑えた液化天然ガス貯蔵・運搬船を提供する。極低温状態の液化天然ガスを貯蔵する液化天然ガス船内貯蔵タンク(2)を備えている液化天然ガス貯蔵・運搬船であって、液化天然ガス船内貯蔵タンク(2)に液化天然ガスを積み込む際、積込液化天然ガスが過冷却状態となるようにタンク内圧を上げて沸点を上昇させるとともに、積込液化天然ガスをタンク頂部近傍からタンク内に投入して積み込むための頂部液化天然ガス投入系統(20)を設けた。

Description

液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法
 本発明は、液化天然ガスの貯蔵・運搬等に用いられる液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法に係り、特に、液化天然ガス貯蔵・運搬船に対する液化天然ガス積込時に発生する余剰ガスを抑制する技術に関する。
 従来、液化天然ガス(以下、「LNG」と呼ぶ)の運搬に使用される液化天然ガス運搬船(LNGC,SRV)や、再ガス化装置を備えた浮体式液化天然ガス貯蔵船(FSRU)のように、LNGを取り扱う液化天然ガス貯蔵・運搬船が知られている。
 既存の液化天然ガス運搬船では、LNG貯蔵タンクへのLNG積込時にLNGが気化して大量の天然ガスを発生するので、運搬船側で消費できない大半の余剰ガスについては、たとえば図4に示すように、陸上基地へ返送して基地側で処理(通常は焼却処理)することが行われている。
 図4に示す液化天然ガス運搬船1は、球形のLNG船内貯蔵タンク2を備えている。各LNG船内貯蔵タンク2は、陸上基地側のLNG陸上貯蔵タンク10等からLNGポンプ11により送出されるLNGを積み込む際に使用する実線表示のLNG積込配管系統12と、各LNG貯蔵タンク2から気化した天然ガスを払い出す際に使用する破線表示のガス払出配管系統13とを備えている。
 ガス払出配管系統13は、各LNG船内貯蔵タンク2内の天然ガスを機関部3に供給するとともに、陸上基地側のフレアスタック14に導いて燃焼させる。
 液化天然ガス運搬船1において、LNG船内貯蔵タンク2へのLNG積込時に大量の余剰ガスが発生する主な理由としては、下記の2点があげられる。
 1)LNG船内貯蔵タンク2を予冷してからLNG積込を開始するが、LNG船内貯蔵タンク2は積込LNGの飽和温度まで冷却されていない。このため、LNG船内貯蔵タンク2内に極低温のLNGを積み込むことにより、図5に矢印で示すような熱の移動が生じ、積込LNGはLNG船内貯蔵タンク2や天然ガスとの接触面で飽和温度まで昇温する。この結果、LNG船内貯蔵タンク2の内部では、大量の天然ガスが発生する。
 2)積込オペレーション前にLNG船内貯蔵タンク2内に残留しているLNGは、長期間放置されて重質化(メタン成分の揮発)が進んでおり、この結果、液温が上昇した状態にある。このため、残留LNGよりも液温の低い新たなLNGが流入することにより、LNG船内貯蔵タンク2の内部では突沸現象が生じるので、特に積込初期において大量の天然ガスが発生する。
 浮体式液化天然ガス貯蔵船の場合、LNG積込時に発生する余剰ガスの処理は、より一層困難になる。すなわち、図3に示すように、液化天然ガスシャトル運搬船(SHUTTLE LNGC)1Sから浮体式液化天然ガス貯蔵船1FへのLNG積込オペレーション時には、液化天然ガスシャトル運搬船1S側への返送可能ガス量は、基本的に液化天然ガスシャトル運搬船1Sから供給したLNG容積と同一の容量に制約される。
 このため、大気放出が許可されない状況では、浮体式液化天然ガス貯蔵船1Fの船上適所に再液化装置(不図示)を装備し、余剰ガスを液化して再度LNG船内貯蔵タンク2へ戻すしかない。なお、図中の符号4はLNGポンプ、5は船上再ガス化装置、12はLNG積込配管系統、13はガス払出配管系統、15は船上再ガス化装置5でガス化した高圧の天然ガス(CNG)を陸上施設等へ供給する高圧ガス払出配管系統である。
 LNG船に関する従来技術としては、運送中にLNG貯蔵タンクから発生する蒸発ガス(BOG)を低減するため、常圧付近の圧力範囲内で調節されるタンク内蒸気圧力の上昇を許容するタンク強度とする技術が知られている。(たとえば、特許文献1参照)
 また、低温液化ガス貯蔵タンクにおいては、層状化防止運転中の急激なBOG発生を防止するロールオーバー発生防止方法が提案されている。(たとえば、特許文献2参照)
特開2008-196685号公報 特開2000-179798号公報
 上述したように、LNG積込時に発生する余剰ガスの処理については、陸上基地側での処理ができない浮体式液化天然ガス貯蔵船において特に困難となる。この余剰ガスは、再液化装置による処理も可能ではあるが、余剰ガス量が多いほど再液化装置も大型化するので、船上の設置スペース確保やコストの面で不利になる。
 このため、LNG積込時に気化して発生する天然ガス量を減少させることができれば、余剰ガスとなる天然ガス量も減少して少なくなるので、余剰ガスの処理が容易または不要となる。
 このような背景から、液化天然ガス貯蔵・運搬船の液化天然ガス船内貯蔵タンクに液化天然ガスを積み込むLNG積込時において、タンク内での気化を抑制して発生する天然ガス量の低減が可能な液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法が望まれる。
 本発明は、上記の事情に鑑みてなされたものであり、その目的とするところは、液化天然ガスを液化天然ガス船内貯蔵タンクに積み込むLNG積込時に発生する天然ガス量を低減し、LNG積込により発生する余剰ガス量を最小限に抑えた液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法を提供することにある。
 本発明は、上記の課題を解決するため、下記の手段を採用した。
 本発明の第1の態様に係る液化天然ガス貯蔵・運搬船は、極低温状態の液化天然ガスを貯蔵する液化天然ガス貯蔵タンクを備えている液化天然ガス貯蔵・運搬船であって、前記液化天然ガス貯蔵タンクに前記液化天然ガスを積み込む際、積込液化天然ガスが過冷却状態となるようにタンク内圧を上げて沸点を上昇させるとともに、前記積込液化天然ガスをタンク頂部近傍からタンク内に投入して積み込むための頂部液化天然ガス投入系統を設けた。
 前記第1の態様に係る液化天然ガス貯蔵・運搬船によれば、液化天然ガス貯蔵タンクに液化天然ガスを積み込む際、積込液化天然ガスが過冷却状態となるようにタンク内圧を上げて沸点を上昇させるとともに、積込液化天然ガスをタンク頂部近傍からタンク内に投入して積み込むための頂部液化天然ガス投入系統を設けた。従って、タンク内の天然ガスを再凝縮させる冷熱源として過冷却状態にある積込液化天然ガスを有効利用し、かつ、頂部液化天然ガス投入系統からタンク内に投入した積込液化天然ガスがタンク内の上部から液面まで自然落下することで、効率のよい熱交換が可能になる。
 前記第1の態様において、前記頂部液化天然ガス投入系統は、前記積込液化天然ガスを頂部液化天然ガス流路からカーテン状に自然落下させるもの、前記積込液化天然ガスを頂部液化天然ガス流路に穿設したひとつまたは複数の噴射穴から自然落下させるもの、前記積込液化天然ガスを頂部液化天然ガス流路に取り付けたひとつまたは複数のスプレーノズルから噴霧状に自然落下させるもののいずれでもよいが、頂部液化天然ガス流路の管端から自然落下させる等、頂部液化天然ガス流路を設け、積込液化天然ガスを自然落下させるものであればこの限りではない。
 このように、頂部液化天然ガス投入系統から液化天然ガスを重力により自然落下させてタンク内に投入すれば、積込液化天然ガスとタンク内天然ガスとの間は、接触面積が増すとともに接触時間も長くなる。このため、積込液化天然ガスとタンク内天然ガスとの間では熱交換が促進され、効率のよい熱交換を行うことができる。
 本発明の第2の態様に係る液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法は、極低温状態の液化天然ガスを貯蔵する液化天然ガス貯蔵タンクを備えている液化天然ガス貯蔵・運搬船に適用され、積込液化天然ガスを前記液化天然ガス貯蔵タンクに積み込む際に気化する天然ガスの発生量を抑制する液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法であって、前記積込液化天然ガスが過冷却状態となるようにタンク内圧を上げて沸点を上昇させた状態とし、前記積込液化天然ガスをタンク頂部近傍からタンク内へ自然落下させて積み込む。
 このような液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法によれば、積込液化天然ガスが過冷却状態となるようにタンク内圧を上げて沸点を上昇させた状態とし、積込液化天然ガスをタンク頂部近傍からタンク内へ自然落下させて積み込む。従って、タンク内の天然ガスを再凝縮させる冷熱源として過冷却状態の積込液化天然ガスを用い、しかも、積込液化天然ガスがタンク頂部から重力により自然落下して投入されるため、効率のよい熱交換が可能になる。
 上述した本発明によれば、液化天然ガスを液化天然ガス船内貯蔵タンクに積み込むLNG積込時において、液化天然ガスを加圧すれば過冷却状態になるという低温物質の挙動を応用することにより、気化によりタンク内で発生する天然ガス量を低減し、LNG積込により発生する余剰ガス量を最小限に抑えた液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法を提供するという顕著な効果が得られる。
本発明に係る液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法に関する一実施形態を示しており、積込液化天然ガスを液化天然ガス貯蔵タンクのタンク頂部近傍からタンク内に投入して積み込むための頂部液化天然ガス投入系統を示す図である。 本発明に係る液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法に関する一実施形態を示しており、液化天然ガス貯蔵タンクに積込液化天然ガスを投入して積み込む際、積込液化天然ガスが過冷却状態となるようにタンク内圧を上げて沸点を上昇させることを示す説明図である。 本発明に係る頂部液化天然ガス投入系統の具体例であるカーテン方式を示す図である。 本発明に係る頂部液化天然ガス投入系統の第1変形例である噴射方式を示す図である。 本発明に係る頂部液化天然ガス投入系統の第2変形例であるスプレー方式図を示すである。 浮体式液化天然ガス貯蔵船(FSRU)に液化天然ガスシャトル運搬船から液化天然ガスを積み込むLNG積込オペレーションを示す説明図である。 液化天然ガス運搬船(LNGC,SRV)に陸上基地から液化天然ガスを積み込むLNG積込オペレーションを示す説明図である。 液化天然ガス貯蔵タンクにおける熱移動を示す説明図である。
 以下、本発明に係る液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法の一実施形態を図面に基づいて説明する。
 図3は、浮体式液化天然ガス貯蔵船1Fに対し、液化天然ガスシャトル運搬船1Sから液化天然ガス(LNG)を積み込むLNG積込オペレーションを示す説明図である。浮体式液化天然ガス貯蔵船1Fは、LNGを貯蔵可能な球形のLNG船内貯蔵タンク2とともに船上再ガス化装置5を備えたLNG船であり、洋上に固定して液化天然ガスシャトル船1SからLNGを受け入れる。LNG船内貯蔵タンク2内のLNGは、必要に応じて船上再ガス化装置5でガス化されて高圧の天然ガス(CNG)となり、海底等に敷設された高圧ガス払出配管系統15を介して、浮体式液化天然ガス貯蔵船1Fから陸上施設等へ送出される。
 一方、液化天然ガスシャトル運搬船1Sには、液化基地で球形のLNG船内貯蔵タンク2に搭載したLNGを受入地点まで輸送し、上述した浮体式液化天然ガス貯蔵船1Fに送出するタイプのLNG船、あるいは、船上で再ガス化した天然ガスをパイプライン等により陸上施設(貯蔵施設や再液化施設等)に送出するタイプのLNG船がある。図示の液化天然ガスシャトル船1Sは、LNG船内貯蔵タンク2に搭載したLNGを、タンク内に配設されたLNGポンプ4を用いて、浮体式液化天然ガス貯蔵船1Fに送出するタイプのLNG船である。
 図3において、液化天然ガスシャトル運搬船1Sと浮体式液化天然ガス貯蔵船1Fとの間は、実線表示のLNG積込配管系統12と破線表示のガス払出配管系統13とにより連結されている。
 一方のLNG積込配管系統12は、液化天然ガスシャトル運搬船1Sから浮体式液化天然ガス貯蔵船1FへLNGを送出するために使用され、他方のガス払出配管系統13は、LNG積込時に浮体式液化天然ガス貯蔵船1F側のLNG船内貯蔵タンク2で発生する余剰ガスの返送に使用される。
 なお、LNG積込配管系統12及びガス払出配管系統13は、LNGの荷役(送出)を行う液化天然ガスシャトル運搬船1S毎に分離及び連結が可能となっている。
 上述したように、液化天然ガス貯蔵船1Fや液化天然ガスシャトル運搬船1Sのような液化天然ガス貯蔵・運搬船(以下、LNG船)は、極低温状態のLNGを貯蔵する球形のLNG船内貯蔵タンク2を備えている。
 このため、本実施形態では、LNG船に搭載されたLNG船内貯蔵タンク2にLNGを積み込む際、積込液化天然ガス(積込LNG)が過冷却状態となるようにタンク内圧を上げて沸点を上昇させるとともに、たとえば図1Aに示すように、積込LNGをLNG船内貯蔵タンク2の頂部近傍からタンク内に投入して積み込むための頂部液化天然ガス投入系統(頂部LNG投入系統)20を設けてある。
 すなわち、LNG船内貯蔵タンク2にLNGを積み込む際には、LNG船内貯蔵タンク2を従来の運転圧力(最大0.25barG以下)より高い圧力に加圧すると、積込LNGの沸点がタンク内で上昇して過冷却状態となる。このため、LNG船内貯蔵タンク2の内部では、タンク内の天然ガス(残存ガス及び発生ガス)を再凝縮させるための冷熱源として、積込LNGの顕熱を利用することができる。
 この場合、LNG船内貯蔵タンク2を球形とすれば、構造上メンブレンタイプのものより高い圧力まで加圧することが可能であるから、積込LNGの沸点をより高い温度に設定して大きな冷熱量を得ることができる。なお、メンブレンタイプの場合には、加圧の上限が0.6BarG程度と推測されるが、球形の場合には、0.6BarG以上に加圧することは容易である。
 換言すれば、図1Bに示すように、LNG船内貯蔵タンク2内に投入された積込LNGは、0.25BarG以上に加圧されて温度T1の過冷却状態にあり、従って、天然ガスの温度T2よりも低温の状態(T1<T2)になっている。これにより、相対的に温度が低い過冷却状態の積込LNGは、図中に白抜矢印Hで示すように、タンク内の天然ガスから吸熱して冷却するので、天然ガスを凝縮させて液体のLNGに状態変化させる冷熱源として利用可能になる。
 このとき、LNG船内貯蔵タンク2の内部加圧は、積込LNGの自己蒸発を利用することで容易に達成できる。
 すなわち、LNGの積込作業を開始することにより、LNG船内貯蔵タンク2の内部に投入された積込LNGが気化して天然ガスとなり、この天然ガスがタンク内圧を上昇させることにより、タンク内に投入された積込LNGの沸点が上昇して過冷却状態となる。従って、過冷却状態の積込LNGは、タンク内に存在して余剰ガスの原因となる天然ガスを冷却する冷熱源となり、天然ガスから吸熱することにより凝縮させてLNGとすることができる。なお、上述した内部加圧を行う場合、ガス払出配管系統13に設けた図示省略の開閉弁は閉じられる。
 頂部LNG投入系統20は、たとえば図1Aに示すように、LNG積込配管系統12から分岐して設けられた配管系統であり、LNG船内貯蔵タンク2の頂部付近には、頂部液化天然ガス流路(頂部LNG流路)21を備えている。
 すなわち、既存のLNG積込配管系統12は、LNG船内貯蔵タンク2のタンク底部付近まで導かれており、従って、顕熱差による熱交換は、図1Bに示した白抜矢印Hのように、タンク内のLNG液面において液相とガス相との間で局所的に行われるのみであり、凝縮量は充分でない。
 しかし、上述した頂部LNG投入系統20を設けることにより、頂部LNG投入系統20から投入される積込LNGとタンク内に存在している天然ガスとは、積込LNGがタンク内の上部からLNG液面まで自然落下することにより、図1Aに白抜矢印Haで示すような熱交換が行われるので、接触面積が増大することに加えて長い接触時間を確保できるようになる。この結果、積込LNGとタンク内に存在している天然ガスとの間では、互いの熱交換が促進されて熱交換効率が向上する。なお、図中の白抜矢印Hbは、LNG船内貯蔵タンク2と外気との熱交換を示している。
 頂部LNG投入系統20の具体的な構成例としては、たとえば図2Aに示す頂部LNG投入系統20Aのように、タンク内において積込LNGをカーテン状に自由落下させるように構成されたものがある。この場合の頂部LNG流路21Aは、上部を開放した樋状のLNG流路22とされ、内周側壁面22aより低く設定した外周側壁面22bから積込LNGを略全周にわたって溢流させることにより、重力により積込LNGをカーテン状に自然落下させるものである。
 このように、積込LNGがLNG船内貯蔵タンク2の内部で頂部LNG流路21Aからカーテン状に自然落下すると、カーテン状の積込LNGとタンク内の天然ガスとの接触面積は、図1Bに示したタンク内底部付近から投入される場合のように、LNG液面のみと接触する場合の接触面積と比較して、カーテン状の面積分だけ増大する。また、頂部LNG流路21Aから投入される積込LNGは自然落下であるため、比較的長い接触時間を確保することもできる。
 すなわち、頂部LNG投入系統20Aから投入される積込LNGとタンク内に存在している天然ガスとは、接触面積の増大に加えて長い接触時間を確保できるようになるので、互いの熱交換が促進されて熱交換効率が向上する。
 ところで、上述した頂部LNG投入系統20は、積込LNGを頂部LNG流路21Aからカーテン状に自然落下させる頂部LNG投入系統20Aに限定されることはなく、たとえば下記の変形例が可能である。
 図2Bに示す第1変形例の頂部LNG投入系統20Bは、配管材料を頂部LNG流路21Bに、積込LNGを噴射する1または複数の噴射穴23を穿設したものである。この噴射穴23は、噴射した積込LNGを各噴射穴23から略円錐状に拡散させるとともに、噴射した積込LNGをタンク内のLNG液面まで重力により自然落下させる噴射方式となる。この場合の噴射穴23は、熱交換効率を向上させるため、頂部LNG流路21Bの全面にわたって等ピッチに配置することが望ましい。
 図2Cに示す第2変形例の頂部LNG投入系統20Cは、配管材料を頂部LNG流路21Cに、積込LNGを噴霧状に噴射する1または複数のスプレーノズル24を取り付けたものであり、各スプレーノズル24から積込LNGを噴霧状に噴射して自然落下させるスプレー方式となる。この場合のスプレーノズル24についても、熱交換効率を向上させるため、頂部LNG流路21Cの全面にわたって等ピッチに配置することが望ましい。
 このように、カーテン方式、噴射方式及びスプレー方式のいずれかを採用し、頂部LNG投入系統20から積込LNGを自然落下させてタンク内に投入することにより、積込LNGとタンク内天然ガスとの間に大きな接触面積や接触時間を確保できるので、効率のよい熱交換が可能になる。また、たとえばスプレー方式のように、タンク内を自然落下する積込LNGを径の小さい粒子にすることは、タンク内天然ガスとの接触面積がより一層大きくなるので、熱交換の効率向上に有効である。
 なお、カーテン方式、噴射方式及びスプレー方式については、単独採用に限定されることはなく、複数の方式を適宜組み合わせたものでもよい。
 このように、上述した本実施形態のLNG船では、LNG船内貯蔵タンク2に積込LNGを投入して積み込む際、積込LNGが過冷却状態となるようにタンク内圧を上げて沸点を上昇させるとともに、積込LNGをタンク頂部近傍からタンク内に投入して積み込むための頂部LNG投入系統20を設けた。従って、タンク内の天然ガスを再凝縮させる冷熱源として過冷却状態にある積込LNGが保有する冷熱を有効利用することができる。さらに、頂部LNG投入系統20からタンク内に投入した積込LNGは、カーテン状、噴射による略円錐形状、及び/または噴霧状に自然落下させるようにした。従って、タンク内天然ガスとの接触時間や接触面積が増すことにより、熱交換の効率を向上させることができる。
 そして、上述した構成のLNG船では、すなわち、極低温状態のLNGを貯蔵するLNG船内貯蔵タンク2を備えているLNG船では、積込LNGをLNG船内貯蔵タンク2へ積み込む際に気化する天然ガスの発生量について、以下に説明する方法で積込LNGを投入することにより、抑制が可能となる。
 すなわち、LNG船の余剰ガス発生抑制方法は、積込LNGが過冷却状態となるようにLNG船内貯蔵タンク2のタンク内圧を上げて沸点を上昇させた状態とし、積込LNGをタンク頂部近傍からタンク内のLNG液面まで重力により自然落下させて積み込むものである。この結果、タンク内の天然ガスを再凝縮させる冷熱源として、過冷却状態にある積込LNGが保有する冷熱を有効に利用することができる。しかも、タンク内の上部から投入される積込LNGは、タンク頂部から重力により自然落下するので、タンク内天然ガスとの接触時間や接触面積を増して効率のよい熱交換が可能になる。
 そして、上述した液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法は、より冗長性のある貨物オペレーション、すなわち、LNG船内貯蔵タンク2のタンク内圧を減圧することによる天然ガス生成を可能にする。
 具体的に説明すると、十分に加圧されたLNG船内貯蔵タンク2内のLNGは、沸点が高く過冷却状態になっている。このため、LNG船内貯蔵タンク2内のLNGが入熱を受けても、その沸点に到達するまでは液温が上がるだけでガスは発生しない。このことは、熱をLNG内に溜めた状態と言い換えることができる。
 逆に、ガス払出配管系統13に設けた図示省略の開閉弁を開くなどしてLNG船内貯蔵タンク2のタンク内圧を下げると、LNGの飽和温度が下がるため、一部のLNGがガス化することになる。この原理を利用すれば、LNG積込後のオペレーションにおいて、たとえばLNG船機関部3等のようなガス消費先の必要に応じて、LNG船内貯蔵タンク2のタンク内圧をコントロールすれば、天然ガスを自由に生成できるようになる。
 上述した本実施形態によれば、LNGをLNG船内貯蔵タンク2に積み込むLNG積込時において、LNGを加圧すれば過冷却状態になるという低温物質の挙動を応用することにより、気化によりタンク内で発生する天然ガス量を低減し、LNG積込により発生する余剰ガス量を最小限に抑えることができる。
 従って、LNG船内貯蔵タンク2にLNGを積み込む際には余剰の天然ガスが発生しないため、従来のように船上の圧縮機にて天然ガスを陸上基地へ返送し、焼却処理をする必要がない。すなわち、天然ガスを返送する圧縮機の運転に必要な動力や、天然ガスを無駄に消費するガス焼却処理が不要となる。また、浮体式液化天然ガス貯蔵船1FのようなLNG船では、再液化処理装置のような余剰ガスの処理装置について、不要または小型化することが可能になる。
 また、LNG船内貯蔵タンク2の内圧を減圧すれば、減圧に応じたガス化量の調整が可能になり、従って、天然ガスを意図的に生成することができる。このようなガス化量調整は、たとえば再ガス化装置5のように、従来のLNG船で一般的に設置されている強制ガス化装置(ベーパライザー)でガス化量を調整する手法と比較して、蒸気等の熱源が不要であるなど効率的かつ簡易な手法となる。
 このように、上述した本実施形態は、LNG船内貯蔵タンク2を備えたLNG船等の船舶において、LNG船内貯蔵タンク2にLNGを積み込む場合に適用されるものであり、船舶の種類等について上述した実施形態に限定されることはなく、その要旨を逸脱しない範囲内において適宜変更することができる。
  1  液化天然ガス運搬船
  1S  液化天然ガスシャトル運搬船
  1F  浮体式液化天然ガス貯蔵船
  2  液化天然ガス(LNG)船内貯蔵タンク
 12  液化天然ガス(LNG)積込配管系統
 13  ガス払出配管系統
 20,20A~20C  頂部液化天然ガス投入系統(頂部LNG投入系統)
 21,21A~21C  頂部液化天然ガス流路(頂部LNG流路)
 22  液化天然ガス(LNG)流路
 23  噴射穴
 24  スプレーノズル

Claims (5)

  1.  極低温状態の液化天然ガスを貯蔵する液化天然ガス貯蔵タンクを備えている液化天然ガス貯蔵・運搬船であって、
     前記液化天然ガス貯蔵タンクに前記液化天然ガスを積み込む際、積込液化天然ガスが過冷却状態となるようにタンク内圧を上げて沸点を上昇させるとともに、
     前記積込液化天然ガスをタンク頂部近傍からタンク内に投入して積み込むための頂部液化天然ガス投入系統を設けた液化天然ガス貯蔵・運搬船。
  2.  前記頂部液化天然ガス投入系統は、前記積込液化天然ガスを頂部液化天然ガス流路からカーテン状に自然落下させる請求項1に記載の液化天然ガス貯蔵・運搬船。
  3.  前記頂部液化天然ガス投入系統は、前記積込液化天然ガスを頂部液化天然ガス流路に穿設したひとつまたは複数の噴射穴から自然落下させる請求項1に記載の液化天然ガス貯蔵・運搬船。
  4.  前記頂部液化天然ガス投入系統は、前記積込液化天然ガスを頂部液化天然ガス流路に取り付けたひとつまたは複数のスプレーノズルから噴霧状に自然落下させる請求項1に記載の液化天然ガス貯蔵・運搬船。
  5.  極低温状態の液化天然ガスを貯蔵する液化天然ガス貯蔵タンクを備えている液化天然ガス貯蔵・運搬船に適用され、積込液化天然ガスの前記液化天然ガス貯蔵タンクへの積込時に気化する天然ガスの発生量を抑制する液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法であって、
     前記積込液化天然ガスが過冷却状態となるようにタンク内圧を上げて沸点を上昇させた状態とし、前記積込液化天然ガスをタンク頂部近傍からタンク内へ自然落下させて積み込む液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法。
PCT/JP2012/052516 2011-02-25 2012-02-03 液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法 WO2012114851A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201280010359.6A CN103403435B (zh) 2011-02-25 2012-02-03 液化天然气储藏/搬运船及液化天然气储藏/搬运船的剩余气体产生抑制方法
KR1020137022029A KR20130117859A (ko) 2011-02-25 2012-02-03 액화 천연 가스 저장ㆍ운반선 및 액화 천연 가스 저장ㆍ운반선의 잉여 가스 발생 억제 방법

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-040369 2011-02-25
JP2011040369A JP5769445B2 (ja) 2011-02-25 2011-02-25 液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法

Publications (1)

Publication Number Publication Date
WO2012114851A1 true WO2012114851A1 (ja) 2012-08-30

Family

ID=46720639

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/052516 WO2012114851A1 (ja) 2011-02-25 2012-02-03 液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法

Country Status (4)

Country Link
JP (1) JP5769445B2 (ja)
KR (1) KR20130117859A (ja)
CN (1) CN103403435B (ja)
WO (1) WO2012114851A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016016647A1 (en) * 2014-07-30 2016-02-04 Liquid Gas Equipment Limited Lng bunker vessel
WO2019233770A1 (fr) * 2018-06-07 2019-12-12 Gaztransport Et Technigaz Dispositif d'alimentation en fluide et/ou d'evacuation de fluide pour une cuve de stockage de gaz liquefie

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9493216B2 (en) * 2013-04-12 2016-11-15 Excelerate Liquefaction Solutions, Llc Systems and methods for floating dockside liquefaction of natural gas
JP7398264B2 (ja) 2019-12-19 2023-12-14 三菱造船株式会社 船舶
JP7350647B2 (ja) 2019-12-19 2023-09-26 三菱造船株式会社 船舶、船舶における液化二酸化炭素の積込方法
JP7346276B2 (ja) 2019-12-19 2023-09-19 三菱造船株式会社 船舶
JP7221856B2 (ja) 2019-12-23 2023-02-14 三菱造船株式会社 タンクシステム、船舶
JP7499654B2 (ja) 2020-09-08 2024-06-14 三菱造船株式会社 液化ガスの移載方法、ボイルオフガスの移載方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58207596A (ja) * 1982-05-25 1983-12-03 Ishikawajima Harima Heavy Ind Co Ltd 液化ガス受入れ時の液化ガスタンク内圧力保持方法
JP2008196685A (ja) * 2007-02-12 2008-08-28 Daewoo Shipbuilding & Marine Engineering Co Ltd Lng貯蔵タンク及びlng運搬船

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3233457B2 (ja) * 1992-07-15 2001-11-26 石川島播磨重工業株式会社 蒸発ガス制御装置
JPH06341598A (ja) * 1993-05-31 1994-12-13 Chiyoda Corp 低温液化ガス貯槽の蒸発ガス処理方法
JPH07113498A (ja) * 1993-10-19 1995-05-02 Tokyo Gas Co Ltd 液化天然ガスの受け入れ方法及びその装置
JPH09126394A (ja) * 1995-10-30 1997-05-13 Ishikawajima Harima Heavy Ind Co Ltd 低温液化ガス貯蔵設備
JP4255151B2 (ja) * 1998-11-05 2009-04-15 Ihiプラント建設株式会社 中圧lng貯槽の落圧方法
JP2000266295A (ja) * 1999-03-17 2000-09-26 Ishikawajima Harima Heavy Ind Co Ltd 蒸発ガス量制御装置
JP2001324096A (ja) * 2000-05-16 2001-11-22 Mitsubishi Heavy Ind Ltd 液化天然ガス受入時におけるボイルオフガス発生量のコントロール方法
ES2333301T3 (es) * 2002-03-29 2010-02-19 Excelerate Energy Limited Partnership Buque metanero mejorado.
KR100991994B1 (ko) * 2008-03-28 2010-11-04 삼성중공업 주식회사 액화가스 로딩/언로딩 시스템을 가지는 액화천연가스운반선
JP5347694B2 (ja) * 2009-04-30 2013-11-20 株式会社Ihi 低温タンク

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58207596A (ja) * 1982-05-25 1983-12-03 Ishikawajima Harima Heavy Ind Co Ltd 液化ガス受入れ時の液化ガスタンク内圧力保持方法
JP2008196685A (ja) * 2007-02-12 2008-08-28 Daewoo Shipbuilding & Marine Engineering Co Ltd Lng貯蔵タンク及びlng運搬船

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016016647A1 (en) * 2014-07-30 2016-02-04 Liquid Gas Equipment Limited Lng bunker vessel
WO2019233770A1 (fr) * 2018-06-07 2019-12-12 Gaztransport Et Technigaz Dispositif d'alimentation en fluide et/ou d'evacuation de fluide pour une cuve de stockage de gaz liquefie
FR3082278A1 (fr) * 2018-06-07 2019-12-13 Gaztransport Et Technigaz Dispositif d'alimentation en fluide et/ou d'evacuation de fluide pour une cuve de stockage de gaz liquefie

Also Published As

Publication number Publication date
JP5769445B2 (ja) 2015-08-26
JP2012177419A (ja) 2012-09-13
CN103403435B (zh) 2016-07-13
CN103403435A (zh) 2013-11-20
KR20130117859A (ko) 2013-10-28

Similar Documents

Publication Publication Date Title
JP5769445B2 (ja) 液化天然ガス貯蔵・運搬船及び液化天然ガス貯蔵・運搬船の余剰ガス発生抑制方法
KR100814593B1 (ko) Lng 저장탱크 내에서의 증발가스 발생 저감 방법
KR20160088183A (ko) 선박의 증발가스 처리 시스템
FR3066248A1 (fr) Procede et systeme de traitement de gaz d'une installation de stockage de gaz pour un navire de transport de gaz
KR20090107805A (ko) 천연가스 발열량 저감방법 및 장치
KR20180099692A (ko) 액화 연료 가스 시스템 및 방법
WO2016103618A1 (ja) 液化ガス運搬船
FR3077867A1 (fr) Procede et systeme de traitement de gaz d'une installation de stockage de gaz pour un navire de transport de gaz
KR100912169B1 (ko) 응축액 순환장치 및 순환방법
KR100885796B1 (ko) 증발가스 재액화 장치
KR20140086204A (ko) 액화천연가스 재기화 장치
JP7119063B2 (ja) 液化ガスを容器内に貯蔵し蒸発ガスを容器から引き出す方法及び装置
KR101403611B1 (ko) 재기화 장치를 구비한 lng fsru
KR100878976B1 (ko) 벤추리 효과를 이용한 응축액 순환장치 및 순환방법
KR100834272B1 (ko) Lng 저장탱크, 그 탱크가 설치된 lng운반선, 및lng운반방법
KR102153825B1 (ko) 가스 처리 시스템, 이를 이용한 가스 처리 방법 및 이를 포함하는 선박
KR20070045172A (ko) 가스 관리 방법
KR20110087464A (ko) 증발가스 처리장치 및 방법
KR20080095391A (ko) Bog 처리 방법
WO2020109607A1 (fr) Dispositif de generation de gaz sous forme gazeuse a partir de gaz liquefie
KR102296697B1 (ko) 가스 처리 시스템
KR101610245B1 (ko) Lng 저장탱크의 쿨다운 및 증발가스 재액화용 능동형 스프레이 노즐
KR101403610B1 (ko) 재기화 장치를 구비한 lng rv
KR101369485B1 (ko) 안전밸브의 개폐방법
KR20090117336A (ko) 증발가스 저장용 압력용기를 갖는 액화가스 운반선

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12749894

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20137022029

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12749894

Country of ref document: EP

Kind code of ref document: A1