WO2012016449A1 - 一种lte系统上行功率控制的方法和系统 - Google Patents

一种lte系统上行功率控制的方法和系统 Download PDF

Info

Publication number
WO2012016449A1
WO2012016449A1 PCT/CN2011/072883 CN2011072883W WO2012016449A1 WO 2012016449 A1 WO2012016449 A1 WO 2012016449A1 CN 2011072883 W CN2011072883 W CN 2011072883W WO 2012016449 A1 WO2012016449 A1 WO 2012016449A1
Authority
WO
WIPO (PCT)
Prior art keywords
user equipment
path loss
interference
base station
power
Prior art date
Application number
PCT/CN2011/072883
Other languages
English (en)
French (fr)
Inventor
杨晓玉
赵刚
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2012016449A1 publication Critical patent/WO2012016449A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/24TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
    • H04W52/243TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters taking into account interferences
    • H04W52/244Interferences in heterogeneous networks, e.g. among macro and femto or pico cells or other sector / system interference [OSI]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/146Uplink power control

Definitions

  • the present invention relates to the field of communications technologies, and in particular, to a method and system for uplink power control of an LTE (Long Term Evolution) system. Background technique
  • the 3GPP (3rd Generation Partnership Project) LTE uplink is based on Orthogonal Frequency Division Multiplexing (OFDM) single-carrier frequency division multiple access (SC-FDMA) technology
  • OFDM Orthogonal Frequency Division Multiplexing
  • SC-FDMA single-carrier frequency division multiple access
  • LTE uplink power control is mainly used to compensate the path loss of the channel and is used to suppress inter-cell interference.
  • the power control mechanism of small-area interference suppression is different from that of single-cell power control.
  • the single cell power control is only used for path loss compensation.
  • the base station can instruct the UE to increase the transmission power according to the needs of the UE.
  • simply increasing the transmission power of the cell edge UE may increase the interference to the neighboring cells.
  • the increase in interference in the small interval causes the overall system capacity to drop. Therefore, the power control technology of "partial path loss compensation" should be used, that is, from the perspective of maximizing the total capacity of the whole system, the power increase of the cell edge UE is limited.
  • the UE In the case of the same-frequency networking, the UE has a large transmit power, which will cause a large interference to the neighboring cell, but the UE's transmit power is small, which will reduce the system throughput. In addition, for the LTE system, it is in the unit resource.
  • the Power Spectrum Density (PSD) of the UE transmit power is considered on the Resource Block (RB). If the UE's transmit power is constant, the unit RB
  • the uplink transmit power varies with the number of RBs it occupies. Therefore, it is necessary to comprehensively consider factors such as interference, power, and resource allocation to reasonably determine the UE's transmit power, so that the overall performance of the network is optimal.
  • the domestic patent application number is 200710178093.7, and the invention name is "a wireless communication system uplink (reverse) link power control method".
  • a partial power control method is proposed, which belongs to the open loop power control mode, and does not consider the interference factor.
  • the domestic patent application number is 200810096198. 2.
  • the invention name is "Path loss compensation factor configuration method and device”.
  • a method for adjusting the path loss compensation coefficient for the LTE system is given. Considering the interference factor, the base station adjusts the path loss compensation coefficient.
  • the uplink transmit power is notified to the UE, but the transmission power utilization cannot be guaranteed to be maximized, and the power control and resource allocation are not considered to improve the overall system performance. Summary of the invention
  • the main technical problem to be solved by the present invention is to provide a method and system for uplink power control of an LTE system to improve system performance.
  • a method for uplink power control of an LTE system comprising:
  • the base station determines the average interference lowering limit M of the user equipment in the neighboring area and the average interference of the user equipment to the neighboring area, and then determines the path loss compensation coefficient of the base station according to the average interference upper and lower limits of the user equipment to the neighboring area and the path loss of the user equipment.
  • the base station calculates, according to the path loss compensation coefficient, the number of resource blocks M PUSCH W and the modulation and coding mode occupied by the power grant of the physical uplink shared channel PUSCH according to the power grant on the unit resource block when considering the neighboring interference; And the difference between the modulation and coding mode, the target signal to interference and noise ratio, and the actual received signal to interference and noise ratio is sent to the user equipment; and the user equipment obtains ⁇ by calculating or looking up the table according to the resource block number and the modulation and coding mode, and then according to the ⁇ ⁇ ⁇ ( and
  • the average lower interference limit M of the neighboring zone is equal to
  • MAX is the maximum transmit power of the user equipment
  • PL is the path loss the user equipment to a base station
  • PL ⁇ user equipment to the first w (n l, 2, ---, N) path loss of the neighbor cell base station.
  • the method for determining a path loss compensation coefficient of a base station is:
  • the process by which the base station determines the power grant ⁇ W on the unit resource block when considering neighbor interference includes:
  • the power grant ⁇ ⁇ (0 P CMAX -PL- (P 0 + f ⁇ i))-(l- fi)PL .
  • the process of obtaining, by the base station, the number of resource blocks and the modulation and coding mode includes: a lookup table, in a combination of all resource numbers and code modulation modes satisfying ⁇ ⁇ ⁇ )
  • the maximum number of resource blocks in the bandwidth, " 3 " is a non-negative integer, and the spectrum efficiency is maximized under the premise of satisfying the guaranteed bit rate GBR requirement, and the combination of the number of resource blocks and the modulation and coding mode with the largest modulation coding mode is selected.
  • the process of calculating ⁇ W by the device according to the number of resource blocks and the modulation and coding mode includes:
  • TBS is the transport block size, which is the length of the cyclic redundancy check code.
  • W is the number of allocated resource blocks,
  • ⁇ ⁇ is the number of subcarriers in the resource block, and N ⁇ b is the number of single carrier frequency division multiple access symbols occupied by the physical uplink shared channel in the subframe;
  • the base station configures the receiving power of the reference service of the user equipment to be a fixed value, and configures the user equipment.
  • the path loss compensation parameter is 1.
  • An LTE system including a base station and a user equipment, where the base station is configured to determine an average interference lower limit M of the user equipment in the neighboring area, and an average interference upper limit M′ of the user equipment to the neighboring area; on average interference, path loss limit, and the user equipment determines the path loss compensation coefficient calculating a power of the base station accordingly ⁇ authorization unit resource blocks thus obtained to a physical uplink shared channel resource occupied when considering the number M of blocks neighboring cell interference and a modulation coding mode; and transmitting the difference between the resource block number, the modulation and coding mode, the target signal to interference and noise ratio, and the actual received signal to interference and noise ratio (f) to the user equipment;
  • the user equipment is configured to obtain an A TF according to the number of resource blocks and a modulation and coding manner by calculating or looking up a table, and then adjusting the transmit power according to the ⁇ ⁇ ⁇ (and / (0, M PUSCH «.
  • the lower average interference limit of the neighboring zone M is equal to:
  • PL the path loss of the user equipment to the serving base station
  • ⁇ ⁇ the path loss of the neighboring base station of the user equipment to the W
  • An LTE system including a base station, is configured to determine an average interference lower limit of a user equipment to a neighboring cell, and an average interference upper limit of the user equipment to the neighboring cell, ;'; and then according to the average interference of the user equipment to the neighboring cell , the lower limit and the path loss of the user equipment determine the road loss compensation coefficient of the base station
  • the difference between the target signal to interference and noise ratio and the actual received signal to interference and noise ratio is sent to the user equipment.
  • the present invention dynamically adjusts the path loss compensation coefficient of the base station to determine the power grant on the unit RB when considering neighboring interference, according to the work.
  • the rate authorization determines the reasonable number of RBs and the MCS (Modulation and Code Scheme) and notifies the user equipment.
  • the user equipment obtains the ATF by calculating or looking up the table according to the number of resource blocks and the modulation and coding mode, and then the user equipment according to the ), m ⁇ CH (0 adjusts the transmit power, which improves the performance of the system.
  • FIG. 1 is a flow chart of a method according to an embodiment of the present invention.
  • FIG. 2 is a schematic diagram of calculating a lower average interference threshold of a UE to a neighboring cell
  • Figure 3 is a schematic diagram showing the relationship between the path loss compensation coefficient, the path loss and the UE's average interference to the neighboring area. detailed description
  • the purpose of the uplink power control method of the present invention is that the base station dynamically adjusts the path loss compensation coefficient according to the path loss of the user equipment UE under the limitation of the neighboring cell interference, thereby determining the power authorization on the unit RB when considering the neighboring area interference, and taking into consideration Resource allocation, determining a reasonable number of RBs and MCS according to the power grant and notifying the UE to adjust the transmit power, thereby improving the performance of the system.
  • the uplink power control of the LTE system is as follows: all UEs in the cell perform power setting on the transmit power of the Physical Uplink Shared Channel (PUSCH) in each subframe. Specifically for each subframe i, the 3GPP TS36.213 protocol gives the formula for the transmit power of the PUSCH as follows:
  • ⁇ PUSCH ( mini ⁇ CMAX ' 10 lo Sio ( M PUSCH (0) + ⁇ O_PUSCH (;) + « " ⁇ + ⁇ ⁇ (i) + ( ⁇ ( ⁇ )
  • p C uAx is the maximum transmit power of the UE M PUSCH W is the number of RBs occupied by PUSCH; corpse. - PUSCH) includes two " ⁇ points: cell-level parameter corpse. - NOMINAL-PUSCH" and JE-level parameter P. - TM - PUSCH ( ;
  • Indicator channel quality indicator
  • Number indicates the rth block size; the number of REs transmitted for data.
  • Receive power for maintaining the reference service (hereinafter abbreviated as p .); /('') is used to maintain the channel status Hold and adjust P. .
  • the UE For multi-cell, considering the UE's interference to the neighboring cell, the UE should do partial path loss compensation. However, by adjusting the formula, we can move the path loss compensation to ⁇ (in the adjustment of the path loss compensation coefficient of the base station). The power grant ⁇ ( ) on the unit RB in the neighboring area interference is still set to 1 in the UE path loss compensation coefficient, and the full path loss compensation is performed.
  • Step 102 The UE detects the downlink path loss. At this time, the transmit power on the unit RB is
  • Step 103 The base station determines ⁇ ').
  • /(0 is expressed by the difference between the Signal to Interference Pulse Noise Ratio (SINR) and the actual received SINR, reflecting the quality of the channel, thereby adjusting the received power.
  • SINR Signal to Interference Pulse Noise Ratio
  • the power grant varies with channel quality while ensuring that the actual transmit power is constant.
  • the ATFW is increased by 2 dB, that is, 2dB of the channel is improved for the MCS enhancement when the actual transmission power is constant.
  • Step 104 The base station determines an average interference lower limit of the UE to the neighboring cell.
  • PL is the path loss of the UE to the serving base station
  • PL «for the UE to the nth (n l, 2
  • the path loss of the neighboring base stations is shown in Figure 2.
  • the M value can be obtained by the formula (8).
  • Step 105 Configure an average interference upper limit M' of the UE to the neighboring area from the field test experience value.
  • Step 106 Determine a path loss compensation coefficient of the base station by using the UE's average interference upper and lower limits of the neighboring cell and the path loss of the UE.
  • the UE does not perform any path loss compensation, and the UE changes with the PL.
  • the average interference to the neighboring area is always maintained at M; if the maximum value is 1, the average interference to the neighboring area is the upper limit M' corresponding to the path loss value PL 1 , which can be regarded as the interference restricted area (the central area of the cell)
  • the path loss threshold of the power-constrained area (cell edge area); and when the path loss reaches the maximum value ⁇ ⁇ (obtained by the link budget), the average interference to the neighboring area is the base station path loss compensation coefficient corresponding to the upper limit for.
  • Step 107 The base station determines the power grant on the unit RB when considering the neighbor interference.
  • the path loss value PL of the UE is PL ⁇ PL 1
  • the power grant ⁇ W PcMAX-PL-[P 0 +f(i when the path loss value of the UE Power grant when P PL ⁇ PL
  • the RB number M PUSCH W must satisfy the following formula by considering the power grant on the unit RB when the neighboring cell interferes:
  • the ⁇ ⁇ table is obtained by specifically expressing the relationship between ⁇ and TBS (Transport Block Size) as:
  • the TBS is the transport block size
  • ⁇ c is the CRC length
  • is the number of subcarriers in one RB
  • ⁇ ymb is the number of SC-FDMA symbols occupied by the PUSCH in one subframe.
  • Step 109 The base station sends the ⁇ CH ( 3 ⁇ 4 MCS) of the current calculation to the UE.
  • DCI0 Downlink Control Information Type 0, DCI Format 0
  • DCI3 / 3A of TPC Transmit power
  • Step 110 The UE obtains the current power grant ⁇ ⁇ ' by calculating or looking up the table according to the RB number ⁇ ⁇ W and the MCS.
  • the physical layer of the base station transmits DCI0 information or DCI0 DCI3/3A information to the physical layer of the UE, and the MAC layer of the UE demodulates to obtain PUSCH ( 3 ⁇ 4 MCS information).
  • the UE obtains the current ⁇ W according to the RB number ⁇ ⁇ W and the MCS.
  • Step 111 The UE adjusts the transmission power according to ⁇ (and ! ⁇ ').
  • the embodiment further discloses an LTE system, which includes a base station and a user equipment.
  • the base station first determines an average interference lower limit of the user equipment to the neighboring cell, and an average interference upper limit of the user equipment to the neighboring cell, ⁇ ', where:
  • n l J .
  • P CMAX is the maximum transmit power of the user equipment
  • PL is the path loss of the user equipment to the serving base station
  • the power grant on the RB and then obtain the number of resource blocks M PU SCH « occupied by the physical uplink shared channel according to the power grant, and the modulation and coding mode, and then the number of resource blocks, the modulation and coding mode, the target signal to interference and noise ratio, and the actual received signal
  • the difference in the noise ratio is sent to the user equipment.
  • the user equipment obtains ⁇ W by calculation or look-up table according to the number of resource blocks and the modulation and coding mode, and then the user equipment adjusts the transmission power according to ⁇ W and M PU SCH (0).
  • the base station determines, according to the average interference upper and lower limits of the neighboring cell and the path loss of the user equipment, the path loss compensation coefficient ⁇ of the base station is specifically:
  • a maximum value less than or equal pathloss ⁇ ⁇ i.e. when ⁇ ⁇ ⁇ ⁇ ⁇ , then ( ⁇ - M) / PL .
  • the power authorization When the path loss value of the user equipment is greater than the path loss value corresponding to the upper limit of the average interference ⁇ , less than or equal to the maximum path loss PL, that is, PL 1 ⁇ ⁇ PL, the power authorization
  • a TP (i) P CMAX -P -(P 0 + f(i))-(l- ⁇ P ⁇
  • P the target signal to interference and noise ratio
  • P. the received power when the reference service is maintained.
  • the base station is authorized according to the power ⁇ ('' on the unit RB when considering neighboring interference.
  • the base station end table is obtained specifically according to the formula (11) and the LTE protocol TS36.213.
  • the TBS index specified in the TBS table and the determined TBS table can be used to obtain the corresponding and determined ⁇ ⁇ table.
  • the user equipment end is calculated according to the number of resource blocks and the modulation and coding mode.
  • ⁇ W is specifically: the UE obtains 1 by the correspondence between the TBS index and the index of the MCS in the LTE protocol TS36.213, and is obtained by the TBS table determined by (PUSCH (the number of allocated resource blocks) in the LTE protocol TS36.213) TBS, and then obtain the power grant ⁇ ⁇ ( ⁇ ) from the formula (11).
  • the user equipment adjusts the transmit power according to ⁇ (and «, M PU SCH « as follows:
  • the base station configures the received power of the reference service of the user equipment to be a fixed value, and the path loss compensation parameter of the user equipment is 1
  • the present invention places the influence of the path loss compensation in the power grant, and the path loss compensation coefficient of the RRC fixed configuration UE is 1 , and the base station obtains the upper and lower limits of the average interference of the UE to the neighboring area through measurement or simulation.
  • the path loss compensation coefficient of the base station is set to 1.
  • the power loss authorization on the unit RB in the neighboring area interference is determined by dynamically adjusting the path loss compensation coefficient of the base station, thereby determining a reasonable The RB number and the MCS, the base station notifies the UE of the RB number and the MCS and the f(i) to adjust the transmission power, so that the UE transmits in the cell center area with the maximum transmit power of the UE, and in the cell edge area, the interference to the neighboring area is guaranteed. Under the premise, the maximum power is allowed to be transmitted.

Description

一种 LTE系统上行功率控制的方法和系统 技术领域
本发明属于通信技术领域, 具体涉及一种 LTE ( Long Term Evolution, 长期演进) 系统上行功率控制的方法和系统。 背景技术
由于 3GPP ( 3rd Generation Partnership Project ) LTE上行釆用基于正交 频分复用 ( Orthogonal Frequency Division Multiplexing, OFDM ) 的单载波 频分多址 ( Single-Carrier Frequency Division Multiple Access, SC-FDMA ) 技术, 一个小区内不同用户设备( User Equipment, UE )的上行信号之间是 相互正交的, 因此不存在码分多址( Code Division Multiple Access, CDMA ) 系统因远近效应而进行功率控制的必要性。
LTE上行功率控制主要用于补偿信道的路径损耗, 并用于抑制小区间 干扰。 小区间干扰抑制的功控机制和单小区功控不同。 单小区功控只用于 路损补偿, 当一个 UE的上行信道质量下降时, 基站可以完全根据该 UE的 需要指示 UE加大发射功率。但当考虑多个小区的总频谱效率最大化时, 简 单地提高小区边缘 UE的发射功率反而会增加对相邻小区的干扰。小区间干 扰的增加造成整个系统容量的下降。 故应该釆用 "部分路损补偿" 的功控 技术, 即从整个系统总容量最大化角度考虑, 限制小区边缘 UE功率提升的 幅度。
对于 LTE系统, 在同频组网的情况下, UE发射功率大, 会对邻区产生 较大的干扰, 但 UE发射功率小, 会降低系统吞吐量; 另外, 对于 LTE系 统, 是在单位资源块(Resource Block, RB )上考虑 UE发射功率的功率语 密度(Power Spectrum Density, PSD ), 若 UE的发射功率一定, 单位 RB 上的发射功率随其所占 RB数的不同而变化,故需要综合考虑干扰、功率和 资源分配数量等因素来合理确定 UE 的发射功率, 使网络整体性能达到最 优。
国内专利申请号为 200710178093.7、 发明名称为 "一种无线通信系统 上行(反向)链路功率控制方法" 提出了一种部分功率控制方法, 属于开 环功控方式, 且没有考虑干扰的因素。 国内专利申请号为 200810096198.2、 发明名称为 "路损补偿因子配置方法和装置" 给出了针对 LTE系统的一种 路损补偿系数调整方法, 考虑了干扰因素, 基站通过调整路损补偿系数从 而调整上行发射功率并通知给 UE, 但不能保证将发射功率利用最大化, 也 没有考虑将功率控制与资源分配相结合来整体提升系统性能。 发明内容
本发明要解决的主要技术问题是, 提供一种 LTE系统上行功率控制的 方法和系统, 以提高系统的性能。
为了达到上述目的, 本发明的技术方案是这样实现的:
一种 LTE系统上行功率控制的方法, 包括:
基站确定用户设备对邻区的平均干扰下限 M以及配置用户设备对邻区 的平均干扰上 然后根据用户设备对邻区的平均干扰上、 下限及用户 设备的路损确定基站的路损补偿系数^
基站根据所述路损补偿系数 计算在考虑邻区干扰时单位资源块上的 功率授权 据此获得物理上行共享信道 PUSCH 所占用的资源块数 MPUSCH W以及调制编码方式; 将所述资源块数、 调制编码方式、 目标信干噪 比与实际接收信干噪比的差值 下发给用户设备; 由用户设备根据所述资 源块数和调制编码方式通过计算或查表得到 Δτρ , 再根据所述 ΔτΡ( 及
/(0、 ^PUSCH W调整发射功率。 所述邻区的平均干扰下限 M等于
Figure imgf000005_0001
其中, MAX为用户设备的最大发射功率, PL为用户设备到基站的路损, PL«为用户设备到第 w ( n = l,2,---,N )个邻区基站的路损。
所述确定基站的路损补偿系数 的方法为:
当用户设备的路损值不大于平均干扰为上限 所对应的路损值 ,即 当 PL≤ PL1时, β = Υ
当用户设备的路损值大于平均干扰为上限 所对应的路损值 PL1 ,不大 于路损最大值 pLmax , 即当 PL1 <PL< PL 时, =Μ -M)IPL 所述基站确定在考虑邻区干扰时单位资源块上的功率授权 Δτρ W的过 程包括:
当用户设备的路损值不大于平均干扰为上限 所对应的路损值^^ 1 ,即
PL < PL1时, 功率授权 Δτρ (z) = PcMAX _PL_(P + f (
当用户设备的路损值大于平均干扰为上限 所对应的路损值^^ ,不大 于 路 损 最 大 值 PL , 即 PL1 < PL≤ PL 时 , 功 率 授 权 ΔΤΡ (0 = PCMAX -PL-(P0 +f{i))-(l- fi)PL . 其中 为用户设备的最大发射功率, PL为用户设备物理层测量的下 行路损, 为功率调整量等于目标信干噪比与实际接收信干噪比的差值,
P。为维持基准业务时的接收功率。
基站获得所述资源块数和调制编码方式的过程包括: 查找 表,在满足 Δτρ≤Δτρ )的所有资源数及编码调制方式的组合中, 资源块数^ ^同时满足公式^ 赠 和 TS36.211 中 规定 MR Pi CT = 2 Us≤ A ; 其中, M R P H=MPUSCHW为物理上行共享信道 puscH所占资源数, 为上行系统带宽最大单位资源块数, 、 "3、 为非负整数, 在满足保证 比特速率 GBR要求的前提下保证频谱效率最大化, 选取调制编码方式最大 的资源块数及调制编码方式组合。 所述用户设备根据资源块数和调制编码方式通过计算得到 Δτρ W的过 程包括:
用户设备根据调制编码方式索引 获得传输块大小索引 ζ , 再根据 与 ^ 查找传输块大小表以获得传输块大小, 然后根据公式
Figure imgf000006_0001
计算得到 Δτρ (); 其中, TBS为传输 块大小, 为循环冗余校验码的长度,
Figure imgf000006_0002
W为分配的资源块数,
Λ ^为资源块中的子载波数, N^b 为子帧中物理上行共享信道所占用的单 载波频分多址符号数;
或者, 用户设备根据调制编码方式索引 ^获得传输块大小索引 ! , 然后根据 及 Zras查找 表即可获得 ΔΤΡ( ; 其中 =MPUSCHW为分配的 资源块数。
所述用户设备根据 )及 、 MPUSCH 调整发射功率的过程包括: 用户设备通过 JPPUSCH() = min{/J CMAX,101og1。(MPUSCH()) + JPQ + JPL + ATF() + /()}调 整发射功率。
还包括:
基站配置用户设备的基准业务的接收功率为定值, 以及配置用户设备 的路损补偿参数为 1。
一种 LTE系统, 包括基站和用户设备, 所述基站, 用于确定用户设备 对邻区的平均干扰下限 M以及配置用户设备对邻区的平均干扰上限 M'; 再 根据用户设备对邻区的平均干扰上、 下限及用户设备的路损确定基站的路 损补偿系数^ 据此计算在考虑邻区干扰时单位资源块上的功率授权 据此获得物理上行共享信道所占用的资源块数 M 以及调制编码方式; 以及将所述资源块数、 调制编码方式、 目标信干噪比与实际接收信干噪比 的差值 f )下发给用户设备;
所述用户设备, 用于根据所述资源块数和调制编码方式通过计算或查 表得到 ATF ( , 再根据所述 ΔτΡ ( 及 /(0、 M PUSCH«调整发射功率。
所述邻区的平均干扰下限 M等于:
M = pCMAX +mg
Figure imgf000007_0001
, 其中, 为用户设备的最大发射功率, PL为用户设备到服务基站的 路损, ^ ^为用户设备到第 W ( " = 12,· ··,^ )个邻区基站的路损。
一种 LTE系统, 包括基站, 所述基站, 用于确定用户设备对邻区的平 均干扰下限 Μ以及配置用户设备对邻区的平均干扰上限 Μ' ; 再根据用户设 备对邻区的平均干扰上、 下限及用户设备的路损确定基站的路损 卜偿系数
Ρ , 据此计算在考虑邻区干扰时单位资源块上的功率授权 据此获得 物理上行共享信道所占用的资源块数 SCH W以及调制编码方式; 以及将所 述资源块数、调制编码方式、 目标信干噪比与实际接收信干噪比的差值 下发给用户设备。
本发明的有益效果是: 与现有技术相比, 本发明通过动态调整基站端 的路损补偿系数,从而确定考虑邻区干扰时单位 RB上的功率授权,根据功 率授权确定合理的 RB数和 MCS ( Modulation and Code Scheme, 调制编码 方式) 并通知给用户设备, 用户设备根据资源块数和调制编码方式通过计 算或查表得到 ATF ) , 然后用户设备根据 )及 )、 m^CH(0调整发射功 率, 提高了系统的性能。 附图说明
图 1为本发明提供的一种实施例方法流程图;
图 2为 UE对邻区的平均干扰下限计算示意图;
图 3为路损补偿系数、 路损与 UE对邻区平均干扰的关系示意图。 具体实施方式
下面通过具体实施方式结合附图对本发明作进一步详细说明。
本发明的上行功率控制方法的目的是在邻小区干扰的限制下, 基站根 据用户设备 UE的路损来动态调整路损补偿系数,从而确定考虑邻区干扰时 单位 RB上的功率授权, 同时兼顾资源分配, 根据功率授权确定合理的 RB 数和 MCS并通知给 UE进行发射功率调整, 提高了系统的性能。
首先对 LTE系统上行功率控制相关内容进行介绍。
LTE系统的上行功率控制如下:小区内所有 UE在每一子帧内对其物理 上行共享信道 ( Physical Uplink Shared Channel, PUSCH ) 的发射功率均要 进行一次功率设置。 具体到每一子帧 i 而言, 3GPP TS36.213协议给出了 PUSCH的发射功率的公式如下:
^PUSCH ( = mini ^CMAX ' 10 loSio (M PUSCH (0) + ^O_PUSCH (;) + « " ^ + ΔΤΡ (i) + ( } ( γ ) 其中, p CuAx为 UE的最大发射功率; M PUSCHW为 PUSCH占用的 RB数; 尸。— PUSCH )包括两" ^分:小区级参数尸。—NOMINAL— PUSCH )和 JE级参数 P。—™— PUSCH ( ;
"为路损补偿系数; 为 UE物理层测量的下行路损; Δτ^)为 MCS补偿 因子; 为功率调整量。
另外, 由于本发明涉及 的计算, 故将协议 TS36.213中 相关 公式介绍如下: 当 =1·25时, (0 = 1010§1 ((2 当 =0时,
ATF = . Ks的具体取值通过高层参数 deltaMCS-Enabled给定; 其中, 若
C-1
PUSCH只承载控制信息, MPR = OCQI INRE ^且^ Γ=^,否则,慰 1^
Figure imgf000009_0001
且 r=l,其中, C为码块个数; 表示第 r个码块大小; 0^表示包含 CRC
( Cyclic Redundancy Check, 循环冗余校验)在内的 CQI ( Channel Quality
A7-PUSCH-initial
Indicator, 信道质量指示) 比特数, Ν = Μ ·Ν 为数据传输的
RE ( Resource Element, 资源单元 )数。
本发明中涉及的 RRC ( Radio Resource Control, 无线资源控制)参数 deltaMCS-Enabled使能, 且 PUSCH 不是只承载控制信息, 故 Ks = 1 ·25 ,
Figure imgf000009_0002
, 其中 C为石马
f , 7 ― TPUSCH-initial
个数; 表示第 r个码块大小; 为数据传输的 RE 数。
下面对于单 RB的情况进行分析:
在不考虑 PcMAX的限制的情况下, 单位 RB上的发射功率可以表示为: 尸 puscH 0) =尸。— puscH + PL + ΔΤΡ (i) + f(i) ( 2 )
各参数的物理意义为: 路损补偿系数 "用于控制对相邻小区的干扰;
ATF 用于进行 UE的功率授权, 假设 ΔΤΡ( = ()对应的业务即为基准业务, 根据公式 ^ ^。^ ^可知,此时的 MCS对应调制方式为 QPSK ( Quadrature Phase Shift Keying,正交相移键控)且编码速率为 2/5;
Figure imgf000009_0003
为维持基准业务时的接收功率 (以下简写为 p。); /('')用于根据信道状态维 持和调整 P。。
对于单小区, 不考虑对邻区的干扰,取 " = 1, UE做全路损补偿,此时: 尸匿 H ('·) = P0+PL + ΔΤΡ (i) + f(i) (^ ) 单位 RB上的功率授权为
i) = P '^CMA,Xv-P一L-( VR-Ό+ ' J fi \i-)) ( 4 ) 此时 UE最大允许发射功率 ^皿 = PCMAX 。
对于多小区, 考虑 UE对邻区的干扰, UE应做部分路损补偿, 不过通 过公式的调整, 我们可以将路损补偿移到在 Δτρ( 中, 通过基站的路损补偿 系数 的调整得到考虑邻区干扰时单位 RB上的功率授权 Δτρ( ),而 UE端 路损补偿系数仍配置为 1, 做全路损补偿。
在基站端, 用 来替换"对公式(2)做如下调整:
尸匿 H (0 = P0+fiPL + ^(i) + f(i)
= P0 + PL + (ΔΤΡ ( )-(1- β)Ρϋ) + f(i) ( 5 ) 令 ΔΤΡ ( = ΔΤΡ ( _ (1 _ )PL为考虑小区间干扰的功率授权。 则有: Pm(i) = P0+PL + ^F (i) + f(i) 考虑邻区干扰时单位 RB上的功率授权为: ΔΤΡ (0 = PCMAX -PL-(P0 +f{i))-(l- fi)PL
(7)
因此考虑小区间干扰控制因素后的 UE 最大允许发射功率为
H 壓- ( 。
对比公式(6)与公式(3)可知, 两者的差别在于功率授权的不同。 由于^ {0,0·4,0·5,0· ·7,0·8,0·9,1}, 而 [0,1], 故在基站对 的调整更加 灵活, 通过其对 ^^的影响 (见公式(7)) 来调整 MCS, 从而调整发射 功率。
请参考图 1, 本发明实施例提供的功率控制方案, 具体步骤如下: 步骤 101: 基站 RRC层为 UE配置初始的开环功控参数: 配置 P。 (基 准业务的接收功率, 为定值); 配置路损补偿系数" =1。
步骤 102: UE 端测量下行路损 此时单位 RB 上的发射功率为
^PUSCH () =尸0 + PL。 步骤 103: 基站确定^' )。
/(0用目标信干噪比 ( SINR, Signal to Interference pulse Noise Ratio ) 与实际接收 SINR的差值来表示,反映信道质量的好坏,从而调整接收功率
P。, 在保证实际发射功率不变的情况下, 功率授权会随着信道质量而变化。
举例说明: 若某 MCS下的目标 SINR为 10dB , 而实际接收的 SINR为 i2dB, 则说明此时信道条件较好, =-i气 则可以将基准业务的接收功 率 + /(0降低 2dB,从而使 ATFW提高 2dB, 即在实际发射功率不变的情况 下, 将信道变好的 2dB用于 MCS的提升。
步骤 104: 基站确定 UE对邻区的平均干扰下限^。
Figure imgf000011_0001
其中, PL为 UE到服务基站的路损, PL«为 UE到第 n (n=l, 2,
Figure imgf000011_0002
个邻区基站的路损, 如图 2所示。
PL和 PL n实际中可以测得, 则可以通过公式( 8 )获得 M值。
步骤 105: 由外场测试经验值配置 UE对邻区的平均干扰上限 M'。
步骤 106: 通过 UE对邻区的平均干扰上、 下限及 UE的路损确定基站 的路损补偿系数
请参阅图 3, 若取 = 0, UE不做任何路损补偿, 则随着 PL的变化 UE 对邻区的平均干扰始终维持在 M ; 若 取最大值 1时,对邻区的平均干扰为 上限 M'所对应的路损值为 PL1, 可看作干扰受限区域(小区中心区域)与功 率受限区域(小区边缘区域)的路损临界值; 而当路损达到最大值^ ^ (可 由链路预算获得) 时, 对邻区的平均干扰为上限 所对应的基站路损补偿 系数为 。
当 UE的路损值^^^1时, β =
当 PL1 < PL≤ PL 时,
Figure imgf000012_0001
步骤 107: 基站确定考虑邻区干扰时单位 RB上的功率授权 当 UE的路损值 PL < PL1时, 功率授权 Δ W = PcMAX-PL-[P0+f(i 当 UE 的 路 损 值 P PL≤PL 时 , 功 率 授 权
△TF (0 = PcMAX -PL-{P0+f(i))-(l- fi)PL 步骤 108: 确定 RB数 M SCH 及 MCS
由于 UE的发射功率对资源分配有很大的影响, 对于多 RB的情况, 由 考虑邻区干扰时单位 RB上的功率授权 , 可使 RBM PUSCHW必须满 足下述公式:
Μ ;
SCH \ < 1
^丄 n u(¾iAx- PL- A'
^PU (10) 其中, 该 RB数为调度和资源分配提供了 RB数分配上限。
由 值查找 ΔΤΡ表, 在满足 ΔτΡ ≤ ΔτΡ( 的所有 RB数及 MCS的组合 中, RB数同时满足公式( 10 )和 TS36.211中规定71^ 11 =2 '3 '5 ≤A (其 中 MRTeH=MPUSCHW为 PUSCH所占资源数, 为上行系统带宽最大 RB数, «23, 5为非负整数), 且依据在满足 GBR ( Guaranteed Bit Rate, 保证比特 速率 )要求的前提下保证频谱效率最大化的原则, 选取 MCS最大的 RB数 及 MCS组合。
Δτρ表的获得具体为, Α 、与 TBS ( Transport Block Size, 传输块大小) 的关系表达式为:
Figure imgf000013_0001
其中, TBS为传输块大小, ^c为 CRC长度, 为分配的 RB数, ^ 为一个 RB中的子载波数, ^ymb 为一个子帧中 PUSCH所占用的 SC-FDMA 符号数。根据公式( 11 )及^^协议 TS36.213中规定的 TBS索引 ν 确定的 TBS表, 即可得到相应的 与 确定的 ATF表。
步骤 109: 基站将本次计算的 ^CH( ¾ MCS下发给 UE
基站端 MAC层将 M CHW MCS等信息以上行授权的形式通过 DCI0 ( Downlink Control Information Type 0, 下行控制信息格式 0 ) 下发给物理 层, 将 W通过 DCI0或 DCI3/3A的 TPC ( Transmit power control, 传输功 率控制)域下发给物理层。
步骤 110: UE根据 RB数^ ∞ W及 MCS通过计算或查表获得本次的 功率授权 Δτ^')。
基站端物理层将 DCI0信息或 DCI0 DCI3/3A信息传输给 UE端物理 层, UE端 MAC层解调获得 PUSCH( ¾ MCS信息。
UE根据 RB数^ ∞ W及 MCS通过计算获得本次的 Δτρ W具体为: UE 由 LTE协议 TS36.213中的 TBS索引 与 MCS的索引 的对应关系获得 , 由 LTE协议 TS36.213中的 与 ( = PUSCH (i)为分配的资源块 数)确定的 TBS表获得 TBS , 再由公式(11 )得到功率授权 Δτρ ( 或者, UE根据 RB数7^^ ')及 MCS通过查表获得本次的 Δ ( 具体 为: UE由 LTE协议 TS36.213中的 与 MCS的索引 的对应关系获得 , 然后根据协议规定由 ( NPRB = puscH(i)为分配的资源块数 )及^ s查 找^表即可获得功率授权 Δ ( , 此处 UE端维护的 ^表与基站端维护的
Δ 表一致。 步骤 111: UE根据 Δτρ( 及 !^数 ^ ')调整发射功率。
根据上述方法, 本实施例还公开一种 LTE系统, 包括基站和用户设备, 基站首先确定用户设备对邻区的平均干扰下限 Μ以及配置用户设备对邻区 的平均干扰上限 Μ', 其中:
M= +101g l0_(— 。、
n=l J . 其中, PCMAX为用户设备的最大发射功率, PL为用户设备到服务基站的 路损, ΡΖ ^为用户设备到第 "(" = 12,''',^ )个邻区基站的路损; 其次, 再根据 UE对邻区的平均干扰上限 M'、 下限 Μ及用户设备的路损确定基站 的路损补偿系数 ; 再者, 根据路损补偿系数 计算考虑邻区干扰时的单位
RB上的功率授权 ,然后根据功率授权 获得物理上行共享信道所占 用的资源块数 MPUSCH«以及调制编码方式,然后将资源块数、调制编码方式、 目标信干噪比与实际接收信干噪比的差值 下发给用户设备。 用户设备根据资源块数和调制编码方式通过计算或查表得到 Δτρ W , 然 后用户设备根据 Δτρ W及 、 MPUSCH(0调整发射功率。
所述基站根据 UE对邻区的平均干扰上、下限及用户设备的路损确定基 站的路损补偿系数 β具体为:
当用户设备的路损值小于等于平均干扰为上限 所对应的路损值 PL1 , 即当 PL≤ PL1时, 则 = l;
当用户设备的路损值大于平均干扰为上限 所对应的路损值^^ ,小于 等于路损最大值^^ \ 即当 ^<ΡΖ^≤ΡΖΤΧ时, 则 = (ΜM)/PL。 基站确定考虑邻区干扰时单位 RB上的功率授权 ^ W具体为: 当用户设备的路损值小于等于平均干扰为上限 M '所对应的路损值 PL1 即 PZ^PL1时, 功率授权 Δ ΤΡ('·) = Ρ<^χ_^^_(Ρ。 + /('·)), 其中 为用户设备 的最大发射功率, PL为用户设备物理层测量的下行路损, 为功率调整 量等于目标信干噪比与实际接收信干噪比的差值, P。为维持基准业务时的 接收功率;
当用户设备的路损值大于平均干扰为上限 所对应的路损值^^ ,小于 等 于 路 损 最 大 值 PL 即 PL1 < ≤ PL 时 , 功 率 授 权
ATP(i) = PCMAX -P -(P0 +f(i))-(l-^P ^ 其中 为用户设备的最大发射 功率, PL为用户设备物理层测量的下行路损, 为功率调整量等于目标 信干噪比与实际接收信干噪比的差值, P。为维持基准业务时的接收功率。 进一步的, 基站根据考虑邻区干扰时单位 RB上的功率授权 Δτρ('')获得 资源块数和调制编码方式具体为: 查找 Δ 表, 在满足 Δτρ≤Δτρ 的所有资 源数及编码调制方式的组合中, 资源块数7^^ ')同时满足公式 MPUSCH("s1u 和 TS36.211中规 MrbJ ° S VRB (其 中 MRTeH =MPUSCHW为 PUSCH所占资源数, ^为上行系统带宽最大 RB数, «2,《3,《5为非负整数), 在满足 GBR要求的前提下保证频谱效率最大化, 选 取调制编码方式最大的资源块数及调制编码方式组合。
其中,基站端 表的获得具体为,根据公式( 11 )及 LTE协议 TS36.213 中规定的 TBS索引 与 确定的 TBS表, 即可得到相应的 与 确 定的 ΔΤΡ表。
进一步的, 用户设备端根据资源块数和调制编码方式通过计算得到
Δτρ W具体为: UE由 LTE协议 TS36.213中的 TBS索引 与 MCS的索引 的对应关系获得 1 , 由 LTE协议 TS36.213中的 与 ( PUSCH( 为分配的资源块数)确定的 TBS表获得 TBS , 再由公式(11 )得到功率授 权 ΔΤΡ (Ζ·) 或者, 用户设备根据资源块数和调制编码方式通过查表得到 ΔΤΡ (0具体 为: UE由 LTE协议 TS36.213中的 与 MCS的索引 的对应关系获得 , 然后根据协议规定由 ( NPRB = PUSCH( 为分配的资源块数 )及 Zras查 找^表即可获得 Δτρ W , 此处 UE维护的 ΔΤΡ表与基站端维护的 表一致。 进一步的, 用户设备根据 Δτρ ( 及 «、 MPUSCH«调整发射功率具体为: 用户设备通过公式 PPUSCHW = min{ CMAX , 10 log10 ( PUSCH (0) + P0 + PL + ΔΤΡ ( + ( }调 整其发射功率。 基站配置用户设备的基准业务的接收功率为定值、 用户设 备的路损补偿参数为 1
综上所述, 本发明将路损补偿的影响放在功率授权中, RRC 固定配置 UE端的路损补偿系数为 1 , 而在基站通过测量或仿真获得 UE对邻区的平 均干扰上下限, 在小区中心区域将基站端的路损补偿系数置 1 , 在小区边缘 区域随着 UE路损的变化,通过动态调整基站的路损补偿系数确定考虑邻区 干扰时单位 RB上的功率授权, 进而确定合理的 RB数和 MCS , 基站将 RB 数和 MCS及 f(i)通知给 UE进行发射功率调整,从而使 UE在小区中心区域 以 UE 最大发射功率发射, 在小区边缘区域在保证对邻区干扰一定的前提 下, 以可允许的最大功率发射。
以上内容是结合具体的实施方式对本发明所作的进一步详细说明, 不 能认定本发明的具体实施只局限于这些说明。 对于本发明所属技术领域的 普通技术人员来说, 在不脱离本发明构思的前提下, 还可以做出若干简单 推演或替换, 都应当视为属于本发明的保护范围。

Claims

权利要求书
1、 一种长期演进 LTE系统上行功率控制的方法, 其特征在于, 包括: 基站确定用户设备对邻区的平均干扰下限 M以及配置用户设备对邻区 的平均干扰上 然后根据用户设备对邻区的平均干扰上、 下限及用户 设备的路损确定基站的路损补偿系数 ;
基站根据所述路损补偿系数 计算在考虑邻区干扰时单位资源块上的 功率授权 据此获得物理上行共享信道 PUSCH 所占用的资源块数 MPUSCHW以及调制编码方式; 将所述资源块数、 调制编码方式、 目标信干噪 比与实际接收信干噪比的差值 /(0下发给用户设备; 由用户设备根据所述资 源块数和调制编码方式通过计算或查表得到 Δτρ 再根据所述 ΔτΡ(0及
/( 、 PUSCH( 调整发射功率。
2 如权利要求 1所述的方法, 其特征在于, 所述邻区的平均干扰下限 M等于:
M = +101g l0_(— 。、
n=l J . 其中, AMAX为用户设备的最大发射功率, PL为用户设备到基站的路损, PZ ^为用户设备到第 W ( n = l, 2, - - , N )个邻区基站的路损。
3、 如权利要求 1所述的方法, 其特征在于, 所述确定基站的路损补偿 系数 的方法为:
当用户设备的路损值不大于平均干扰为上限 所对应的路损值^^ ,即 当 PL≤ PL1时, β = ;
当用户设备的路损值大于平均干扰为上限 所对应的路损值^^ ,不大 于路损最大值 PL , 即当 PL1 < PL≤ PL 时, P =M _ M )/PL
4、 如权利要求 1所述的方法, 其特征在于, 所述基站确定在考虑邻区 干扰时单位资源块上的功率授权 Δτρ ('')的过程包括:
当用户设备的路损值不大于平均干扰为上限 所对应的路损值^^ ,即
PL < PL1时, 功率授权 ΔΤΡ ('·) = PCMAX -pL-(p 0 + f (0) . 当用户设备的路损值大于平均干扰为上限 所对应的路损值^^ ,不大 于 路 损 最 大 值 PL , 即 PL1 < ≤ PL 时 , 功 率 授 权
TF (0 = PcMAX -PL-(P0+f{i))-(l- fi)PL . 其中 皿为用户设备的最大发射功率, PL为用户设备物理层测量的下 行路损, 为功率调整量等于目标信干噪比与实际接收信干噪比的差值, P。为维持基准业务时的接收功率。
5、 如权利要求 1所述的方法, 其特征在于, 基站获得所述资源块数和 调制编码方式的过程包括: 查找 表,在满足 Δτρ≤Δτρ )的所有资源数及编码调制方式的组合中 , 资源块数 U '')同时满足公式 ^USCH('')1。和 TS36.211 中 规定 MR p B USCH = 2 . 3. N^; 其中, M R P H=MPUSCHW为物理上行共享信道 PUSCH所占资源数, 为上行系统带宽最大单位资源块数, "2、 《3、 《5为非负整数, 在满足保证 比特速率 GBR要求的前提下保证频谱效率最大化, 选取调制编码方式最大 的资源块数及调制编码方式组合。
6、 如权利要求 1所述的方法, 其特征在于, 所述用户设备根据资源块 数和调制编码方式通过计算得到 Δτρ('')的过程包括:
用户设备根据调制编码方式索引 ^获得传输块大小索引 , 再根据 与 查找传输块大小表以获得传输块大小, 然后根据公式
Figure imgf000020_0001
计算得到 Atf W ; 其中, TBS为传输 块大小, 为循环冗余校验码的长度, ^^ MPUSCH W为分配的资源块数, 为资源块中的子载波数, N^b 为子帧中物理上行共享信道所占用的单 载波频分多址符号数;
或者, 用户设备根据调制编码方式索引 z 获得传输块大小索引 然后根据 及 查找 ΔΤΡ表即可获得 F (''); 其中 NPRB = MPUSCH W为分配的 资源块数。
7、 如权利要求 1至 6任一项所述的方法, 其特征在于, 所述用户设备 根据 ATFW及/ (0 MPUSCH(0调整发射功率的过程包括:
用户设备通过 USCH W = mm{PCMAX ,mog10 (MPUSCH (i)) + P0 + PL + ATP(i) + f(i)}调 整发射功率。
8、 如权利要求 1至 6任一项所述的方法, 其特征在于, 还包括: 基站配置用户设备的基准业务的接收功率为定值, 以及配置用户设备 的路损补偿参数为 1
9、 一种 LTE系统, 包括基站和用户设备, 其特征在于,
所述基站, 用于确定用户设备对邻区的平均干扰下限 M以及配置用户 设备对邻区的平均干扰上限 Μ' ; 再根据用户设备对邻区的平均干扰上、 下 限及用户设备的路损确定基站的路损补偿系数 据此计算在考虑邻区干扰 时单位资源块上的功率授权 ('') 据此获得物理上行共享信道所占用的资 源块数 MPUSCHW以及调制编码方式; 以及将所述资源块数、 调制编码方式、 目标信干噪比与实际接收信干噪比的差值 下发给用户设备;
所述用户设备, 用于根据所述资源块数和调制编码方式通过计算或查 表得到 ATF(0 , 再根据所述 ΔΤΡ(0及/ (0、 MPUSCHW调整发射功率。
10、 如权利要求 9所述的系统, 其特征在于, 所述邻区的平均干扰下 限 M等于:
Figure imgf000021_0001
其中, PCMAX为用户设备的最大发射功率, PL为用户设备到服务基站的 路损, ^ ^为用户设备到第 W ( " = 12,· ··,^ )个邻区基站的路损。
11、 一种 LTE系统, 包括基站, 其特征在于,
所述基站, 用于确定用户设备对邻区的平均干扰下限 Μ以及配置用户 设备对邻区的平均干扰上限 Μ' ; 再根据用户设备对邻区的平均干扰上、 下 限及用户设备的路损确定基站的路损补偿系数 ,据此计算在考虑邻区干扰 时单位资源块上的功率授权 (''), 据此获得物理上行共享信道所占用的资 源块数 MPUSCHW以及调制编码方式; 以及将所述资源块数、 调制编码方式、 目标信干噪比与实际接收信干噪比的差值 下发给用户设备。
PCT/CN2011/072883 2010-08-03 2011-04-15 一种lte系统上行功率控制的方法和系统 WO2012016449A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201010244201.8A CN102348268B (zh) 2010-08-03 2010-08-03 一种lte系统上行功率控制的方法和系统
CN201010244201.8 2010-08-03

Publications (1)

Publication Number Publication Date
WO2012016449A1 true WO2012016449A1 (zh) 2012-02-09

Family

ID=45546448

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/072883 WO2012016449A1 (zh) 2010-08-03 2011-04-15 一种lte系统上行功率控制的方法和系统

Country Status (2)

Country Link
CN (1) CN102348268B (zh)
WO (1) WO2012016449A1 (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014056131A1 (zh) * 2012-10-08 2014-04-17 富士通株式会社 一种数据传输控制方法和装置
WO2014132196A1 (en) 2013-02-28 2014-09-04 Pirelli Tyre S.P.A. Winter tyre

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9271244B2 (en) 2012-03-16 2016-02-23 Nec (China) Co., Ltd. Method and apparatus for performing D2D communication
US8977313B2 (en) 2012-05-18 2015-03-10 Futurewei Technologies, Inc. Method for optimizing uplink power-control parameters in LTE
CN103813434B (zh) * 2012-11-12 2017-07-07 上海贝尔股份有限公司 一种用于为小区内的用户设备进行功率补偿的方法与设备
CN104038970B (zh) * 2013-03-05 2017-12-19 电信科学技术研究院 一种通信处理方法及设备
CN104254121B (zh) * 2013-06-28 2018-05-29 电信科学技术研究院 一种pusch功率控制方法及装置
EP3070988B1 (en) * 2013-12-13 2019-06-19 Huawei Technologies Co., Ltd. Scheduling method, device and system
US10772092B2 (en) * 2013-12-23 2020-09-08 Qualcomm Incorporated Mixed numerology OFDM design
CN105025581A (zh) * 2014-04-28 2015-11-04 普天信息技术有限公司 一种上行载波无线资源分配方法
CN105307253B (zh) * 2014-07-29 2019-04-26 普天信息技术有限公司 对大功率集群终端的功率控制方法、系统及装置
CN106455090B (zh) * 2015-08-12 2020-02-11 成都鼎桥通信技术有限公司 一种lte集群终端的上行信号传输方法
CN106488543A (zh) * 2015-09-01 2017-03-08 中兴通讯股份有限公司 一种功率确定方法、服务基站、用户设备和系统
CN106879058B (zh) * 2015-12-11 2020-08-04 诸暨市元畅信息技术咨询服务部 发射功率控制方法、基站以及用户设备ue
CN107347206B (zh) * 2016-05-04 2019-12-20 普天信息技术有限公司 一种功率控制方法
CN110612749B (zh) * 2017-05-10 2022-08-26 上海朗帛通信技术有限公司 一种被用于无线通信的用户、基站中的方法和装置
CN108882350B (zh) * 2017-05-10 2024-04-16 中兴通讯股份有限公司 一种功率控制方法及装置
CN110832914B (zh) * 2017-07-28 2021-03-30 华为技术有限公司 上行功率控制方法及装置
WO2019097116A1 (en) * 2017-11-16 2019-05-23 Nokia Technologies Oy Maximum power reduction for uplink bandwidth part for wireless networks
CN110856236B (zh) * 2018-08-21 2023-01-24 成都鼎桥通信技术有限公司 业务调度方法和装置
US11153828B2 (en) 2018-08-22 2021-10-19 Qualcomm Incorporated Spectral efficiency determination for power control for uplink control information transmission on an uplink data channel
CN111447667A (zh) * 2019-01-17 2020-07-24 普天信息技术有限公司 一种pusch的上行资源调度方法及装置
US11844030B2 (en) 2020-04-02 2023-12-12 Parallel Wireless, Inc. Uplink link adaptation in 5G base stations
CN113873630B (zh) * 2020-06-30 2023-07-11 华为技术有限公司 一种上行功率控制方法及终端

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101729106A (zh) * 2008-10-30 2010-06-09 上海贝尔阿尔卡特股份有限公司 基于干扰管理和传输质量控制的增强的上行链路功率控制
CN101741437A (zh) * 2008-11-19 2010-06-16 中国移动通信集团公司 一种上行功率控制方法、系统及设备

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8260341B2 (en) * 2007-11-02 2012-09-04 Interdigital Patent Holdings, Inc. Power control for combined dynamically and persistently scheduled PUSCH in E-UTRA
CN101369834B (zh) * 2008-10-17 2013-08-28 华为技术有限公司 联合功率控制方法、系统和设备
CN101527958B (zh) * 2009-04-09 2014-09-10 中兴通讯股份有限公司 发射功率的确定方法、基站及终端

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101729106A (zh) * 2008-10-30 2010-06-09 上海贝尔阿尔卡特股份有限公司 基于干扰管理和传输质量控制的增强的上行链路功率控制
CN101741437A (zh) * 2008-11-19 2010-06-16 中国移动通信集团公司 一种上行功率控制方法、系统及设备

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014056131A1 (zh) * 2012-10-08 2014-04-17 富士通株式会社 一种数据传输控制方法和装置
CN104641675A (zh) * 2012-10-08 2015-05-20 富士通株式会社 一种数据传输控制方法和装置
WO2014132196A1 (en) 2013-02-28 2014-09-04 Pirelli Tyre S.P.A. Winter tyre

Also Published As

Publication number Publication date
CN102348268B (zh) 2014-08-13
CN102348268A (zh) 2012-02-08

Similar Documents

Publication Publication Date Title
WO2012016449A1 (zh) 一种lte系统上行功率控制的方法和系统
US11818602B2 (en) Power headroom reporting for carrier aggregation
TWI717570B (zh) 在無線通訊系統中觸發功率餘量回報用於波束運作之方法與設備
US10517049B2 (en) Uplink scheduling apparatus and method based on uplink report in wireless communication system
JP6648316B2 (ja) 移動通信システムにおいて端末がパワーヘッドルームを計算する方法及び装置
EP1876854B1 (en) Power control of a mobile station based on noise and interference information of a neighboring cell
EP2590447B1 (en) Uplink scheduling support in multi-carrier wireless communication systems
ES2798599T3 (es) Ampliación de la notificación de informes del margen de potencia
CN107071882B (zh) 在wtru中进行上行链路功率控制的方法和wtru
US9049700B2 (en) Method and apparatus for handling uplink transmissions using multiple uplink carriers
EP3197230B1 (en) Uplink power headroom reporting for carrier aggregation
US9107175B2 (en) Uplink transmission power configuration method and apparatus for mobile communication system
US20100273515A1 (en) Uplink Scheduling Support in Multi-Carrier Wireless Communication Systems
CN107182115B (zh) 在移动通信系统中确定每载波最大传输功率的方法和装置
JP2013533702A (ja) 移動通信システムで逆方向最大送信電力を報告する方法及び装置
CN104080157A (zh) 集群终端的上行功率控制方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11814033

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11814033

Country of ref document: EP

Kind code of ref document: A1