WO2011027154A1 - Procédé de test d'un pipeline flexible non raccordé - Google Patents

Procédé de test d'un pipeline flexible non raccordé Download PDF

Info

Publication number
WO2011027154A1
WO2011027154A1 PCT/GB2010/051443 GB2010051443W WO2011027154A1 WO 2011027154 A1 WO2011027154 A1 WO 2011027154A1 GB 2010051443 W GB2010051443 W GB 2010051443W WO 2011027154 A1 WO2011027154 A1 WO 2011027154A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipeline
pressure sheath
polymer pressure
signal
testing
Prior art date
Application number
PCT/GB2010/051443
Other languages
English (en)
Inventor
Steve Banks
David Armitage
Peter Robinson
Anthony Peyton
Original Assignee
Genesis Oil & Gas Consultants Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Genesis Oil & Gas Consultants Limited filed Critical Genesis Oil & Gas Consultants Limited
Publication of WO2011027154A1 publication Critical patent/WO2011027154A1/fr

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/04Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point
    • G01M3/16Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point using electric detection means
    • G01M3/18Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point using electric detection means for pipes, cables or tubes; for pipe joints or seals; for valves; for welds; for containers, e.g. radiators
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/40Investigating fluid-tightness of structures by using electric means, e.g. by observing electric discharges
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0025Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings of elongated objects, e.g. pipes, masts, towers or railways
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0091Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by using electromagnetic excitation or detection
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N17/00Investigating resistance of materials to the weather, to corrosion, or to light
    • G01N17/04Corrosion probes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/26Measuring inductance or capacitance; Measuring quality factor, e.g. by using the resonance method; Measuring loss factor; Measuring dielectric constants ; Measuring impedance or related variables
    • G01R27/2617Measuring dielectric properties, e.g. constants
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/11Locating faults in cables, transmission lines, or networks using pulse reflection methods

Definitions

  • the present invention involves a method of testing an unbonded flexible pipeline, particularly but not exclusively in or for an underwater or below the seabed pipeline, particularly but not exclusively in an in service or in- situ underwater pipeline, and particularly using reflectometry techniques such as time domain reflectometry (TDR).
  • TDR time domain reflectometry
  • Unbonded flexible pipelines are complex structures of overlapping metallic and polymer layers, each with a specific quality and function that combine to form a strong, versatile, corrosion resistant pipe.
  • the use of flexible pipelines in developing complex deepwater assets worldwide is proving to be a popular, cost effective and technically sound option. Their high strength-to-weight ratio and corrosion resistance compared to
  • each pipeline including the number and thickness of each layer, will depend on its final application and takes into consideration water depth, pressures, likely fatigue stresses and composition of production fluids.
  • one layer is an inner polymeric pressure sheath, acting as the only conveyed fluid sealing layer within the pipeline structure. Therefore, the integrity of this layer is usually crucial to the safe and reliable operation of the pipeline.
  • Figures 1 a and 1 b of the accompanying drawings show a part-cutaway perspective diagram and a cross-sectional diagram respectively of a typical flexible pipeline 2 comprising a number of concentric layers.
  • the thicknesses of the layers in Figure 1 b are not to scale to assist clarity.
  • the pipeline 2 shown in Figures 1 a and 1 b comprises an outermost layer 4 being an external thermoplastic sheath to protect the internal layers from the environment/water ingress.
  • an outermost layer 4 being an external thermoplastic sheath to protect the internal layers from the environment/water ingress.
  • a pressure vault layer 8 formed by an interlocked steel pressure wall. This is intended to resist internal and hydrostatic pressure, as well as radial compression.
  • the second innermost layer is a polymer pressure sheath 10.
  • the innermost layer of the flexible pipeline shown in Figures 1 a,b is an inner carcass 12 adapted to resist hydrostatic pressure and radial compression whilst supporting the polymer pressure sheath 10.
  • This layer can typically be 316 stainless steel.
  • Each one of the overlapping layers has a specific role to play in the overall performance of the flexible pipeline 2, and a failure in any one layer can lead to loss of integrity and possible catastrophic failure of the pipeline 2.
  • aging of the polymer pressure sheath 10 is known to be one of the major causes for loss of integrity as recorded in surveys conducted on flexible pipelines.
  • Such sheaths are generally formed by one or more polyamides, which can include one or more nylon polymers.
  • a range of materials under the Trade Mark RILSAN (RTM) are known in the art, the most common being polyamide 1 or "PA-1 1 ". Indeed, almost two thirds of the current flexible pipelines in service have PA- 11 pressure sheathes, and the ageing of PA- has been responsible for a number of pipe failures over the years.
  • the ageing of polyamide sheaths is due to hydrolysis reactions at elevated temperatures in the presence of water and acidic environments. This reaction breaks the chemical links within the polymer and leads to embrittlement. The material may progressively loose its ductility and finally become too brittle to resist to the curvature variations of the pipe.
  • the molecular weight of the polymer is usually characterised by solution viscosity measurements (by a sample being dissolved in a solvent), but other methods such as light scattering or size-exclusion chromatography can also be used.
  • US2005/0247103 A1 shows a method for assessing the life expectancy of a polymer lined pipe involving the use and creation of pre-aged witness coupons which characterises and monitors the rate and extent of chemical and physical ageing of the polymer in the structure during use in the field.
  • this requires regularly retrieving such coupons followed by a separate analysis in a laboratory.
  • US5317252 describes a dosimeter with reproducible changes in electrical permittivity characteristics, using an electrode pattern in the form of an interdigitated capacitor positioned on the substrate being tested, which is not readily practical for testing in situ or long underwater flexible pipes.
  • One object of the present invention is to provide a simpler method of inspection of a polymer pressure sheath in an unbonded flexible pipeline.
  • Another object of the present invention is to provide a direct assessment of a polymer pressure sheath in an unbonded flexible pipeline to provide a more accurate service life.
  • a method of testing an unbonded flexible pipeline comprising a polymer pressure sheath comprising at least the steps of:
  • a non-invasive electromagnetic signal can be generated to be passed along the polymer pressure sheath of the pipeline, and any reflected signals can be interpreted and analysed to ascertain any change in the dielectric properties of the polymer pressure sheath, in particular the presence or existence of one or more discontinuities such as cracks or holes, in advance of possible failure, in particular catastrophic failure, of the polymer pressure sheath.
  • Characteristics of the reflected signal(s) can include distance, extent, etc. of discontinuities along the pipeline.
  • the present invention can be applied both to new pipelines during their manufacture and/or instalment, as well as existing pipelines being in situ or in service, thereby providing a single method for analysing all forms of pipelines.
  • the flexible pipeline may be any suitable pipeline able to allow the transmission or conveyance of an electromagnetic signal along a polymer pressure sheath, usually being one or more longitudinal layers forming the pipeline, and also able to transmit or convey one or more reflected signals created by the electromagnetic signal, either in return, or along one or more other paths to a location where such reflected signals can be monitored and detected, and optionally also interpreted.
  • the pipeline may be formed from one or more pipes, for example a single pipe integrally formed as a single length of pipeline. More usually, the pipeline is formed from two or more, usually a number of, identical or similar pipes or pipe sections brought together by the use of one or more connection arrangements known in the art. The formation and
  • the method of the present invention is particularly suitable to provide a non-destructive evaluation of a polymer layer in a flexible pipeline which is usually hidden, and can extend some distance, generally being wholly or substantially underwater, including under the seabed.
  • the unbonded flexible pipeline is a hydrocarbon conductor such as a riser, generally for the passage of one or more hydrocarbons such as oil, gas, etc. between a source and a collector, being wholly or partly underwater.
  • the method of the present invention is useable on the flexible pipeline shown in the accompanying Figures 1a,b.
  • the skilled person in the art is aware of the possible construction, make-up and variations of flexible pipelines involving a polymer pressure sheath.
  • the electromagnetic signal can be created by any suitable signal generator, and conveyed using any suitable coupling antennas or other coupling device or devices, such as passing an electrical signal next to or near to the polymer pressure sheath, in particular forming an electrical circuit around the polymer pressure sheath.
  • the pipeline further comprises one or more metallic layers on either side of the polymer pressure sheath, such as one or more armours or armour layers, and a metallic carcass layer, on at least one side, preferably on either side, of the polymer pressure sheath.
  • metallic layers can assist in the propagation of an electromagnetic signal in the polymer pressure sheath, and/or act as a guide to the electromagnetic signal as it passes along the polymer pressure sheath.
  • One or more characteristics of the electromagnetic signal can be varied, such as the magnitude and/or phase of the signal at particular
  • Such characteristics may be based on variations in the electrical signal extracted from the electromagnetic signal wave in the polymer layer.
  • an electrical signal used to generate the electromagnetic signal of step (a) may comprise one or more components and/or pulses, and is preferably one or more voltage pulses, generally provided by a voltage pulse generator.
  • a voltage pulse generator may be used to generate a frequency swept sine wave or pseudo random noise, and the present invention is not limited to time domain methods with impulses or step waveforms.
  • the electrical signal generating the electromagnetic signal comprises one or more voltage pulses.
  • the electrical signal generating the electromagnetic signal comprises one or more frequency swept sine waves.
  • Reflectrometry can have a time domain basis, a frequency domain basis, and/or a cross-correlation with widenad signals, etc.
  • the method of the present invention uses time domain reflectometry.
  • Time Domain Reflectometry is a well known and proven technology for inspecting electrical transmission lines and cable harnesses.
  • TDR Time Domain Reflectometry
  • the skilled person is able to take account of known inhomogeneities, particularly when the or each reflected signal is interpreted using a system which is calibrated to take account of such inhomogeneities, for example by the use of one or more software analysis programs or processes.
  • Electrical TDR relies upon the ability of an item under test to support the transmission of electromagnetic waves. If a short pulse is transmitted at one end of a transmission line for example, and if the transmission line has a constant characteristic impedance, ZO and is terminated with a resistance equal to ZO, then the pulse will be completely absorbed by the termination resistance. If however there are discontinuities in the characteristic impedance of the transmission line or the termination of the transmission line is not matched, then a proportion of the transmitted wave or signal will be reflected from each discontinuity. These reflected waves will be further reflected as they encounter more discontinuities. A proportion of the energy in the reflections eventually returns to the point of transmission where it may be monitored as the received or reflected signal(s). The relative timing and magnitude of the monitored pulses is dependent upon the dielectric properties of the medium and the location of the discontinuities.
  • the characteristic impedance of a transmission line is determined by the geometry and the relative
  • polymer pressure sheaths are generally made from a polyamide such as RILSAN (RTM), these are generally relatively good electrical insulators or dielectric materials. Where the polymer pressure sheath is particularly sandwiched between good electrical conductors, this particular
  • the configuration represents a transmission path that is more capable of supporting the propagation of electromagnetic waves.
  • Layers in a flexible pipeline such as metallic carcass and armour layers forming a pressure vault, are normally made from steel/stainless steel, which is a relatively good electrical conductor.
  • the method of the present invention can comprise wavelength propagation or the further step of propagating the wavelength of the electromagnetic signal to extend the length of the pipeline being tested.
  • the present invention uses electromagnetic signals, in particular the application of reflectometry, to monitor such inhomogeneities by applying a short electrical pulse between for example the carcass and the pressure vault of a flexible oil pipe and observing the reflected signals.
  • the electrodes for an electrical signal can be one or more of the metallic (reinforcing) layers near to, generally in contact with, the inner and outer surfaces or the polymer pressure sheath.
  • the pipeline could be viewed as a coaxial cable, with the central conductor being an inner carcass layer (generally made with stainless steel, whose main function is preventing pipe collapse under hydrostatic pressure), the insulation layer being the polymer pressure sheath, and the outer conductor being the pressure vault and the tensile armour layers (generally made with carbon steel; to withstand the fluid pressure and the tensile stresses).
  • the method of the present invention can use a wide-ranging frequency sweep in order to determine the complex impedance of the polymer pressure sheath as a function of frequency.
  • a Vector Network Analyser VNA
  • VNA Vector Network Analyser
  • the method is able to measure the electrical properties of a nylon pressure sheath with frequency domain TDR by using inner carcass and armour layer(s) as electrical conductors to guide an electromagnetic pulse down the nylon layer to measure variations in its characteristic impedance through reflected signals.
  • the impedance changes caused by variations in permittivity due to aging and degradation will give a reflected signal(s) and a measurement thereof, generally one or more of its characteristics, can be correlated against known CIV values to evaluate, or assist in evaluating, the integrity of the nylon layer.
  • the present invention can be deployed for a number of different applications, in particular:
  • a monitoring role for new build projects and specifically risers and production jumpers. This involves attaching connections from a network analyser or the like to inner carcass and armour layers at the end termination during manufacture and end-termination assembly.
  • the network analyser could be marinised in a suitable pressure vessel and connected back to a manifold SCM via flying leads and electronic plug connections.
  • the or each reflected signal is interpreted by comparison against the corrected inherent viscosity of the polymer pressure sheath.
  • the reflected signal(s) can be analysed by comparing the characteristic impedance of the polymer pressure sheath along a given length of flexible pipeline and referencing this values against known CIV values for the same material.
  • the inspection range at each location will be dependant on a number of factors that include conductivity of the conductors, geometry and amount of ageing in the polymer pressure sheath.
  • the size of reflection from anomalous areas can also indicate the extent of
  • the technology can be applied to new build as well as installed pipelines.
  • the flexible pipeline can be tested while in situ.
  • the polymer pressure sheath such as a nylon layer can be screened over several meters rather than at localised locations like coupons.
  • the system can be fixed in place on new pipeline projects, so monitoring of defect areas can be carried out as the project progresses, rather than only when the pipeline or project is completed.
  • Results can be correlated with process data to give a more accurate integrity risk assessment of the flexible pipeline.
  • the electrodes are connected at end termination so there are no changes required to the manufacturing process of the flexible pipes and pipelines as such.
  • the technology can be deployed by conventional pigging methods or by a bi-directional vehicle for in-service pipe.
  • use of TDR allows testing to be carried out on a significant length of pipe rather than measurement of a small section or only a small coupon of material at a particular location along a pipeline.
  • Such pipelines can be many metres long, some being up to 1000m or beyond.
  • the present invention provides a very convenient non-invasive and nondestructive method of testing along a significant length of pipeline, which pipeline may already be in situ or in use/service.
  • the frequency of the electromagnetic signal is in the range 1 MHz to 2 GHz, preferably in the range 100 MHz to 2 GHz.
  • steps (a) and (b) are carried out from one end of the pipeline.
  • a metallic end- fitting is located and/or mounted at the end of the pipeline to which the required apparatus, units or devices are able to transmit an electrical signal to create the electromagnetic signal, and to seek one or more reflected signals.
  • the reflected signal may be monitored using the same antenna as the transmitter unit, and measuring changes in high frequency impedance or S-parameter reflection coefficients such as S1 1.
  • the analyser for example an oscilloscope with TDR facility or a Vector Network Analyser
  • step (b), preferably steps (a) and (b), are carried out in the pipeline, optionally using a pig (or other in-line tool).
  • a signal could be applied between two adjacent ends of two separate lengths of inner carcass that are mutually electrically isolated, for example by a flange.
  • the signal thus propagates in both directions of the pipeline despite there being no direct connection to the armour layer.
  • the wave is guided within the pressure sheath by means of the electrical conductors (inner carcass and armour layer) that enclose it.
  • Pigs, etc. are well known devices used in pipelines, either being self mobile or propelled by one or more other devices or the fluid passing along the pipeline, so as to be able to provide one or more services in or along the pipeline from an internal position.
  • the time of flight could be determined in steps (a) and (b) by means of measuring the round trip time (RTT).
  • RTT round trip time
  • the use of pigs for implementing TDR is also particularly useful to extend the method of the present invention beyond a pipe-pipe connection arrangement, such as a flanged gasket, forming the pipeline; in particular a pipe-pipe connection which is electrically and/or electromagnetically inhibiting and/or insulating.
  • the pigs can provide or support an electrical connection having an electrically conducting path on either side of such a pipe-pipe connection, so that any electrical signal and the electromagnetic signal can transverse the break in the polymer pressure sheath created by the pipe-pipe connection arrangement.
  • the method of the present invention can be extended along a pipeline comprising a number of otherwise electrically isolated or insulated pipes or pipe sections.
  • the method of the present invention could include wherein at least a portion of the flexible pipeline comprises two pipes and a flange
  • the present invention particularly provides a method of testing an unbonded flexible pipeline for its ageing, degradation or both.
  • a system for testing an unbonded flexible polymer pressure sheath comprising at least:
  • Figure 2 shows a first method of testing a flexible pipeline according to a first embodiment of the present invention
  • Figure 3 shows a second method of testing a flexible pipeline according to a second embodiment of the present invention
  • Figure 4 is a graph of several CIV against relative permittivity
  • FIGS 1 a and 1 b are described hereinbefore, and show a typical flexible pipeline 2 created by five concentric layers, with the armour layer comprising two crosswound layers. Due to the positioning of the polymer pressure layer 10 between the inner carcass 12 and the pressure vault layer 8, inspection and integrity assessments of a polymer pressure sheath layer in a flexible pipeline such as that shown in Figures 1 a and 1 b while in service or in situ is extremely difficult. Lack of electrical continuity, interfaces between different materials, and the number and orientation of the layers are just a few of the problems facing non-destructive testing techniques conventionally used to inspect critical sections.
  • the conventional inspection and assessment techniques used to consider the integrity of an in service pipeline are limited, and often only comprise a visual inspection of the external thermoplastic sheath by ROV or divers, or monitoring of the annulus and video survey of the internal carcass. None of these provide a direct inspection of the polymer process sheath layer despite the high probability of loss of integrity caused directly by the ageing of the polymer process sheath.
  • Figure 2 shows a first method of the present invention for testing an unbonded flexible pipeline 20.
  • the pipeline 20 shown in Figure 2 at least comprises a polymer pressure sheath 22, an inner carcass layer 24, one or more armour layers 26, and a polymeric external sheath layer 28.
  • FIG. 2 also shows a TDR unit 30, generally including a vector network analyser (VNA).
  • VNA vector network analyser
  • the TDR unit 30 is able to implement a frequency domain electrical signal to pass along the inner carcass layer 24 and armour layers 26 via two electrical conductors 32, an end-fitting 34, generally a metallic or metallic-based end fitting, more particularly an end termination, and a metal brush 38 within the inner carcass layer 24.
  • VNA vector network analyser
  • the armour layers 26 and inner carcass layer 24 need not electrically connected, for example if the different sections of the pipeline are not electrically connected.
  • the armour layers 26 can couple with the electrically conducting seawater ( ⁇ 5 S/m) through the external sheath layer 28, and so form an electrical circuit thereby, with the two sections of 'coaxial line' connected in series, but in antiphase.
  • the coupling through the external sheath layer 28 may not be perfect, so that signals may also able to propagate along two lengths of an external sheath, being guided by the armour layers and the seawater.
  • the signals could be pulsed DC, in the case of TDR or Time of flight (TOF) when implemented directly in the time domain, or swept AC signals in the case of the VNA in the frequency domain.
  • DC pulsed DC
  • TOF Time of flight
  • the end-fitting 34 could be provided and/or fitted during manufacture of the pipeline 20 so as to conduct testing of the pipeline 20 during its manufacture and/or initial installation.
  • the end-fitting 34 could also be maintained on the pipeline 20 during installation and/or after installation and in service, so as to provide further and continued testing of the pipeline 20 after its manufacture and/or installation.
  • the end-fitting 34 could be marinised in a manner known in the art, optionally with inclusion of the TDR unit 30 therewith, or with remote location of the TDR unit 30 by the electrical conductors 32.
  • one or more insulators such as an insulating ring 36, between the inner carcass layer 24 and the end-fitting 34, so as to provide or create electrical insulation thereinbetween, especially to avoid galvanic corrosion issues thereinbetween.
  • the inner carcass and armour layers 24, 26 act as electrical conductors for an electrical signal to create an electromagnetic signal, in particular an electromagnetic pulse, which can travel along the polymer pressure sheath 22, guided between the electrically conducting inner carcass and armour layers 24, 26.
  • the electromagnetic signal is preferably based on a frequency sweep of the electrically applied signal to the inner carcass and armours between 1 MHz and 1.6GHz.
  • This frequency range creates signals having wavelengths in the range 300m - 0. 875m, which are generally much smaller than the length of the pipeline 20 under test (usually several hundred metres up to 1000m and beyond), and/or the length of testing desired along the pipeline 20.
  • Using longer wavelengths may increase possible wave propagation of the electromagnetic signal along the polymer pressure sheath 22, to allow long or longer lengths of pipeline 20 to be tested.
  • the use of high frequencies improves sensitivity to some molecular changes in the polymer pressure sheath 22, especially those related to dipolar mobility.
  • a TDR oscilloscope or VNA can provide yield graphs of the reflected signal as a function of time.
  • the reflected signal(s) are created by discontinuities or inhomogeneities in the polymer pressure sheath 22. For example, one or more cracks or holes in the polymer pressure sheath 22 will create a change in the impedance of the polymer pressure sheath 22. As such, a proportion of the transmitted electromagnetic signal will be reflected from each discontinuity. These reflected signals may be further reflected as they encounter more discontinuities. Such reflections can then be monitored.
  • the method of testing in Figure 2 is to monitor for the receipt of reflected signals at the point of transmission of the electromagnetic signal.
  • the or each reflected signal can then be interpreted to determine a characteristic of the electrical permittivity of the polymer pressure sheath 22, particularly by correlating it against the known CIV values of the polymer pressure sheath 22.
  • Figure 4 shows graphs of the real relative permittivity of a Rilsan [PA-1 1] layer against corrective intrinsic viscosities (CIV) based on different frequencies of the electrical signal causing the electromagnetic wave.
  • CIV intrinsic viscosities
  • the real relative permittivity can affect the speed of propagation of the electromagnetic wave, (approximately and based on the inverse root law), whilst the imaginary permittivity (not shown in Figure 4 but also depending on the ageing) can affect the absorption of the electromagnetic wave. Step changes in either of these parameters will also cause reflections, whose analysis can also show characteristics of the electrical permittivity of the polymer pressure sheath, and hence be a test of the pipeline.
  • Figure 3 shows a second method according to the present invention of testing a second pipeline 40.
  • the second pipeline 40 comprises two pipes 40a, 40b with a gasket 42 forming a flange connection between the pipes 40a, 40b in a manner known in the art.
  • a flange connection arrangement is typical of a situation for existing in service or in situ flexible pipes where end fittings are not directly achievable, whilst directed visual inspection of the polymer pressure sheath layer in pipes 40a, 40b is also not directly achievable.
  • each of the pipes 40a, 40b comprising the pipeline 40 comprise an inner carcass layer 42, a polymer pressure sheath layer 44 preferably being a nylon and even PA-11 material, one or more armour layers 46, and an external sheath 48.
  • the TDR unit and optionally also an analyser such as a vector network analyser, can be located in an internal-pipeline vehicle such as a pig 50.
  • Pigs are well known in the pipeline art, and can be self propelled, but are more usually propelled either by the product in the pipeline itself, or by one or more propelling vehicles such as a SIG tractor vehicle (IMV).
  • An umbilical 52 or other type of tether can be provided from a launcher or from the launch for the pigs 50 to provide power and communications thereto.
  • the pigs 50 include means such as wheels or rollers 54 known in the art to allow their movement against the inner surface of the pipeline 40.
  • the pigs 50 can support one or more electrical connections, such as the metal brushes 56 shown, to provide an electrical path between the inner carcasses 42 of the pipes 40a, b.
  • Figure 3 also shows one pig 50 including a video camera 58 to assist location of the pigs 50 in use.
  • each section of pipe 40a, 40b is electrically isolated by the gasket 42.
  • Each pig 50 is then located on either side of the gasket 42 and is preferably stationary during the testing method.
  • an electrical signal is provided and measured between either the inner carcass and armour layers 42, 46, or two adjacent ends of separate lengths of inner carcass 42, to generate an electromagnetic signal which is able to transmit along the polymer pressure sheath layer 44.
  • An impedance matching device may be needed to match the impedance of the TDRA NA to the pipeline, which may have a much lower impedance.
  • Any discontinuities or inhomogeneities in the polymer pressure sheath 44 will create a reflected signal, which can be monitored by a relevant analyser in the pig 50 to determine the receipt of one or more reflected signals. Such reflected signals can then be analysed by the VNA in the pigs 50 for interpretation against the expected electrical permittivity of the polymer pressure sheath layer 44 based on its known CIV values.
  • TDR Transmission-Radjustment and analysis of reflected signals based on TDR is well known in the art to provide calculation of one or more characteristics (such as size) of the electrical impedance of the material under test.
  • the distance of any discontinuity can also be estimated based on the time domain nature of TDR.
  • the use of metal or metallic-based layers co-axially within and without the polymer pressure sheath layer provides particular guide or guidance for the electromagnetic signal.
  • VNA vector network analyser
  • frequency domain TDR can be used with frequency domain TDR to more accurately determine the size, extent and position of discontinuities in a polymer pressure sheath such as the RILSAN materials, based on a comparison with previously determined permittivity measurements. This can determine different degrees of ageing.
  • impedance analysers can be used to measure the real and imaginary components of the impendence of the polymer pressure sheath to determine a correlation between its permittivity properties and its CIV values.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Ecology (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Electromagnetism (AREA)
  • Investigating Or Analyzing Materials By The Use Of Magnetic Means (AREA)

Abstract

L'invention concerne un procédé de test d'un pipeline flexible non raccordé comprenant une gaine de pression polymère, ce procédé comprenant au moins les étapes consistant à : (a) envoyer un signal électromagnétique le long de la gaine de pression polymère; (b) rechercher un ou plusieurs signaux réfléchis, et (c) analyser le signal ou chaque signal réfléchi afin de déterminer au moins une caractéristique de la permittivité électrique de la gaine de pression polymère. De cette façon, un signal électromagnétique non invasif peut être généré pour le faire passer le long de la gaine de pression polymère du pipeline, et tout signal réfléchi peut être interprété et analysé de façon à s'assurer de tout changement dans les propriétés diélectriques de la gaine de pression polymère, notamment la présence ou l'existence d'au moins une discontinuité, telle que des fissures ou des trous, avant une éventuelle avarie, notamment une rupture catastrophique, de la gaine de pression polymère. Les caractéristiques du signal réfléchi ou des signaux réfléchis peuvent être la distance, l'extension, etc., des discontinuités le long du pipeline. Cette invention peut s'appliquer à la fois à de nouveaux pipelines en cours de fabrication et/ou d'installation, ainsi qu'à des pipelines existants in situ ou en service, ce qui permet de proposer un procédé unique d'analyse de toutes les formes de pipelines.
PCT/GB2010/051443 2009-09-02 2010-09-02 Procédé de test d'un pipeline flexible non raccordé WO2011027154A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB0915252A GB2473201A (en) 2009-09-02 2009-09-02 Testing a pipeline using reflectometry
GB0915252.1 2009-09-02

Publications (1)

Publication Number Publication Date
WO2011027154A1 true WO2011027154A1 (fr) 2011-03-10

Family

ID=41203018

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2010/051443 WO2011027154A1 (fr) 2009-09-02 2010-09-02 Procédé de test d'un pipeline flexible non raccordé

Country Status (2)

Country Link
GB (1) GB2473201A (fr)
WO (1) WO2011027154A1 (fr)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013093068A1 (fr) * 2011-12-21 2013-06-27 Technip France Méthode de suivi de l'intégrité d'une ligne flexible s'étendant à travers une installation d'exploitation de fluide, ligne flexible, nécessaire et procédé de fabrication associés
CN103487727A (zh) * 2013-06-21 2014-01-01 深圳供电局有限公司 一种高压电力电缆外护套故障在线定位方法
WO2017025099A1 (fr) * 2015-08-10 2017-02-16 National Oilwell Varco Denmark I/S Procédé d'essai d'un tuyau souple non lié
WO2018187730A1 (fr) * 2017-04-07 2018-10-11 The Texas A & M University System Dispositifs de réflectométrie et procédés de détection de défauts de tuyau
WO2019129806A1 (fr) 2017-12-29 2019-07-04 Technip France Embout de connexion d'une ligne flexible, procédé de fabrication et méthode de surveillance associés

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201319105D0 (en) 2013-10-29 2013-12-11 Wellstream Int Ltd Detection apparatus and method
RU2555493C1 (ru) * 2014-02-06 2015-07-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Иркутский государственный университет путей сообщения (ФГБОУ ВПО ИрГУПС) Способ выявления металлических и воздушных включений в изделиях из полимерных материалов
CN106525142B (zh) * 2017-01-12 2019-02-15 厦门精图信息技术有限公司 一种新型管线安全监测系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5905194A (en) * 1997-11-21 1999-05-18 Strong; Thomas P. Pipe line with integral fault detection
WO2006097112A2 (fr) * 2005-03-18 2006-09-21 Nkt Flexibles I/S Utilisation d'une composition a base d'acier pour la production d'une couche d'armature d'une conduite flexible et conduite flexible
US20080191706A1 (en) * 2003-05-06 2008-08-14 Burnett Gale D Systems and methods for testing conductive members employing electromagnetic back scattering

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2182331C1 (ru) * 2001-05-25 2002-05-10 ЗАО "Нефтегазкомплектсервис" Способ внутритрубной ультразвуковой дефектоскопии
US6686745B2 (en) * 2001-07-20 2004-02-03 Shell Oil Company Apparatus and method for electrical testing of electrically heated pipe-in-pipe pipeline

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5905194A (en) * 1997-11-21 1999-05-18 Strong; Thomas P. Pipe line with integral fault detection
US20080191706A1 (en) * 2003-05-06 2008-08-14 Burnett Gale D Systems and methods for testing conductive members employing electromagnetic back scattering
WO2006097112A2 (fr) * 2005-03-18 2006-09-21 Nkt Flexibles I/S Utilisation d'une composition a base d'acier pour la production d'une couche d'armature d'une conduite flexible et conduite flexible

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
DR BOYUN GUO: "Offshore Pipelines", REFEREX, 2005, pages 302PP, XP040426110 *
OUT J M M ET AL: "Integrity of flexible pipe: search for an inspection strategy", ENGINEERING STRUCTURES, vol. 17, no. 4, May 1995 (1995-05-01), pages 305 - 314, XP002614976, DOI: 10.1016/0141-0296(95)00028-6 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013093068A1 (fr) * 2011-12-21 2013-06-27 Technip France Méthode de suivi de l'intégrité d'une ligne flexible s'étendant à travers une installation d'exploitation de fluide, ligne flexible, nécessaire et procédé de fabrication associés
FR2985020A1 (fr) * 2011-12-21 2013-06-28 Technip France Methode de suivi de l'integrite d'une ligne flexible s'etendant a travers une installation d'exploitation de fluide, ligne flexible, necessaire et procede de fabrication associes
AU2012356795B2 (en) * 2011-12-21 2015-09-03 Technip France Method for monitoring the integrity of a flexible line extending through a fluid exploitation facility, and associated flexible line, kit and production process
US9588074B2 (en) 2011-12-21 2017-03-07 Technip France Method for monitoring the integrity of a flexible line extending through a fluid exploitation facility, and associated flexible line, kit and production process
CN103487727A (zh) * 2013-06-21 2014-01-01 深圳供电局有限公司 一种高压电力电缆外护套故障在线定位方法
WO2017025099A1 (fr) * 2015-08-10 2017-02-16 National Oilwell Varco Denmark I/S Procédé d'essai d'un tuyau souple non lié
WO2018187730A1 (fr) * 2017-04-07 2018-10-11 The Texas A & M University System Dispositifs de réflectométrie et procédés de détection de défauts de tuyau
CN110691969A (zh) * 2017-04-07 2020-01-14 德克萨斯A&M大学系统 用于检测管线缺陷的反射测量装置和方法
US11340185B2 (en) 2017-04-07 2022-05-24 The Texas A&M University System Reflectometry devices and methods for detecting pipe defects
CN110691969B (zh) * 2017-04-07 2023-09-15 德克萨斯A&M大学系统 用于检测管线缺陷的反射测量装置和方法
WO2019129806A1 (fr) 2017-12-29 2019-07-04 Technip France Embout de connexion d'une ligne flexible, procédé de fabrication et méthode de surveillance associés

Also Published As

Publication number Publication date
GB2473201A (en) 2011-03-09
GB0915252D0 (en) 2009-10-07

Similar Documents

Publication Publication Date Title
WO2011027154A1 (fr) Procédé de test d'un pipeline flexible non raccordé
US20200300725A1 (en) Detection apparatus and method
CA2671083C (fr) Systemes et procedes pour detecter des anomalies sur des surfaces internes de structures allongees creuses en utilisant une reflectrometrie de domaine temporel ou de domaine de frequence
US11169106B2 (en) Device and method for nondestructive inspection of a flexible underwater pipe
US10809217B2 (en) Corrosion detection system
WO2017078670A1 (fr) Surveillance d'intégrité en temps réel de canalisations à terre
US9207192B1 (en) Monitoring dielectric fill in a cased pipeline
CA3058909C (fr) Dispositifs de reflectometrie et procedes de detection de defauts de tuyau
JP2017167063A (ja) 漏洩位置検出方法、及び漏洩位置検出システム
US10551335B2 (en) Hydrocarbon salinity measurement system at bottom of well at extreme conditions of pressure and temperature by means of time domain reflectometry
Korde et al. Condition Monitoring and Fault Detection in Cables using Line Impedance Resonance Analysis
Xu et al. Embedded health monitoring strategies for aircraft wiring systems
Xu et al. Acoustic system for online wiring test on aircraft

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10760752

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10760752

Country of ref document: EP

Kind code of ref document: A1