WO2010145243A1 - 下行报文转发方法及服务网关 - Google Patents
下行报文转发方法及服务网关 Download PDFInfo
- Publication number
- WO2010145243A1 WO2010145243A1 PCT/CN2010/071241 CN2010071241W WO2010145243A1 WO 2010145243 A1 WO2010145243 A1 WO 2010145243A1 CN 2010071241 W CN2010071241 W CN 2010071241W WO 2010145243 A1 WO2010145243 A1 WO 2010145243A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- tunnel
- destination
- sheep
- received
- same
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/12—Reselecting a serving backbone network switching or routing node
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/02—Buffering or recovering information during reselection ; Modification of the traffic flow during hand-off
Definitions
- 2 method uses 2 special.
- 2340 describes the process force e of the transfer).
- the received e-received decision is changed to the e-replacement requirement a do eee.
- the message and the SW sheep complete the change and then need to re-arrange the purpose and/or destination S-W to the destination.
- the purpose of receiving the sheep is to change the name of the sheep in the first receiving SW or to change the SW.
- at least the S-W is not received from the e-tunnel, and is not received from the lower e of the P, but is not replaced by the e in the e of the e.
- the rabbits in the same use of e and SW have the weight of e and SW.
- the special waste that reduces the waste of e and S-W resources increases the rate.
- Other special features of this book will be made clear in the Ming and Qing dynasty. The purpose of this and its
- the following special method shown in the second method of the present special method mainly includes the following steps: step S20, step S203, step S20, and the first SW that receives the same tunnel of the e SW will receive the non-P ban.
- the next step is to receive the next special purpose of the e tunnel or the S-W destination.
- the following steps describe the various aspects. Step S20 in step 520 shown in the rest of the steps 520, in the following order, at 3, the order is expressed in
- Step e receives the measurement decision that has not been self-replaced. The message is changed to e ee ed). Step 2 If the S-W and the S-W sheep are not the same, the S-W and the destination S-W are different.
- Step S20 S-W no longer puts the e under P but the P.
- Step S203 e In the message to the do e Co d, the required tunneling SWSW of the SW will be the same tunneling purpose as the e or destination SW of the SW destination n. e will receive all the required
- the first tunnel to the S-W special de) S-W is received in the e S-W or the S-W is exchanged to delete the same tunnel as the e S-W.
- S-W will receive the S-W in the junction of the e-tunnel or the S-W will be replaced by the S-W.
- the special S-W is changed or the S-W is replaced with the S-W to delete the same tunnel.
- S-W can receive under the unsubscribe or under multiple P.
- the e-e can be the same as the S-W, ie, the S-W can be different from the S-W.
- the tunnel purpose e S-W is the same as the purpose of the tunnel.
- e S-W special S-W shown in S-W will be special to the purpose e) which is not included in the lower part of P, e-specific.
- the purpose of the ee but the different S-W is the purpose of the tunnel.
- the purpose of the S-W S-W is the same as the purpose of the tunnel.
- the purpose of the S-W is determined by the destination S-W. From the bottom of P, e special.
- the S-W receives the S-W special purpose S-W.
- the same tunnel will receive the S-W special purpose e in the destination S- W will delete the S-W special purpose S-W to delete the same tunnel as the destination e.
- the proposed scheme is to reduce the speciality of the change. Step by step to understand the mention of the wood below the description.
- SW the same tunnel needs to be changed) to S-W Step 502
- the SW receiving the e-th special will no longer be self-contained but will exist directly in the SW step 503
- SW will receive the e-pass tunnel destination e SW e special dae delete e the same tunnel in the rest of the SW in the e-special purpose e-the same tunnel special e.
- Step 504 S W will be the P tunnel special purpose e step 505 S W d a e special purpose e delete the destination e the same tunnel.
- SW is replaced. 6
- the flow direction of the change and the direction of the flow 6 is shown in the signalling 4 basic phase e to SW and then to the destination SW to the destination e 7 force this e to the a do e Co ad message special shown in the flow 7
- the SW main package includes the following steps in step 70 to change the ea do e Co ad message.
- Step 702 receives the e-out of the special S W no longer will not be from P e but directly exist S W
- Step 703 SW will be the special tunnel of the special tunnel step 704, the SW is deleted, the same tunnel, the P tunnel, the destination SW, the step 705, the SW, the destination tunnel, the same tunnel, the step 706, the destination SW, the SW, and the e
- the tunnel special e deletes the destination e.
- SW the same tunnel has received the required SW to step 902.
- the special SW received by the eth is no longer the same as P e but is directly present in the SW.
- Step 903 SW will be the special tunnel of the special tunnel. Delete the tunnel with the same tunnel as the destination tunnel.
- Step 905 SW Delete the destination SW with the same tunnel.
- Step 906 The destination SW deletes the tunnel with the same destination e as the destination tunnel. This article mentions each. 0 The main indications of this are shown in the main package: the first sheep, the first sheep 3, the sheep 5 and the sheep 7. Among them, the first collection of the same tunnel in each e-received e-package e-received the need for the user to change and the special S W
- the first sheep received 3 the sheep that were not self-divided 5 the first sheep 3 received the first in the first sheep received e special
- the first sheep received by the third sheep 7 the first sheep and the slow sheep 5 will receive the special purpose of receiving the sheep in the first harvest or the next special purpose of the sheep 5 will be described in the SW For special purposes.
- the reduction of the tunnel is not in the package.
- the sheep are removed.
- the first sheep is received at the first sheep.
- Delete the tunnels of the same e. Delete the sheep 2 to remove the same purpose tunnel for the purpose of the sheep 5 in the sheep.
- the wood SW according to the present invention is replaced by the e-tuner that is not received from the e-tunnel, and is not received from the lower e-receiver. Or the lower special rate is increased by the special purpose of the SW and the lowering of the e and the SW.
- the use of the above-mentioned force is not used to make the wood in the field. Any repairs, equivalent substitutions, etc. made within the spirit and principles of this article are included in this warranty.
Abstract
Description
Claims
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012515324A JP5663568B2 (ja) | 2009-06-19 | 2010-03-23 | ダウンリンク・メッセージ中継方法及びサービス・ネットワーク・ゲートウェイ |
IN481DEN2012 IN2012DN00481A (zh) | 2009-06-19 | 2012-01-17 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101494648A CN101931937B (zh) | 2009-06-19 | 2009-06-19 | 下行报文转发方法及服务网关 |
CN200910149464.8 | 2009-06-19 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010145243A1 true WO2010145243A1 (zh) | 2010-12-23 |
Family
ID=43355742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2010/071241 WO2010145243A1 (zh) | 2009-06-19 | 2010-03-23 | 下行报文转发方法及服务网关 |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP5663568B2 (zh) |
CN (1) | CN101931937B (zh) |
IN (1) | IN2012DN00481A (zh) |
WO (1) | WO2010145243A1 (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109845327A (zh) * | 2016-08-12 | 2019-06-04 | 株式会社Ntt都科摩 | 核心网络以及基站 |
CN113196714A (zh) * | 2018-12-19 | 2021-07-30 | 斯纳普公司 | 映射发现系统 |
CN113271652A (zh) * | 2021-04-13 | 2021-08-17 | 复旦大学 | 基于反向传播算法的中继网络性能优化方法 |
CN114157344A (zh) * | 2021-12-09 | 2022-03-08 | 成都天奥集团有限公司 | 一种支持卫星馈电链路无损切换的方法 |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3145229B1 (en) | 2014-06-05 | 2020-03-11 | Huawei Technologies Co. Ltd. | Method and device for sending packet |
WO2018211627A1 (ja) * | 2017-05-17 | 2018-11-22 | 富士通株式会社 | 無線基地局装置、端末装置、無線通信システム、及び無線通信方法 |
CN111901900A (zh) * | 2020-04-01 | 2020-11-06 | 中兴通讯股份有限公司 | 一种通信方法、装置、设备和存储介质 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101365239A (zh) * | 2007-08-09 | 2009-02-11 | 华为技术有限公司 | 数据转发的方法、演进基站和长期演进网络 |
WO2009057684A1 (ja) * | 2007-10-30 | 2009-05-07 | Ntt Docomo, Inc. | 移動通信方法及び無線基地局 |
CN101448249A (zh) * | 2008-01-25 | 2009-06-03 | 中兴通讯股份有限公司 | 一种释放服务网关缓存数据的方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005012718A (ja) * | 2003-06-23 | 2005-01-13 | Hitachi Ltd | 移動体ipデータ通信システム |
JP2009060156A (ja) * | 2007-08-03 | 2009-03-19 | Ntt Docomo Inc | 通信方法及び無線基地局 |
-
2009
- 2009-06-19 CN CN2009101494648A patent/CN101931937B/zh not_active Expired - Fee Related
-
2010
- 2010-03-23 WO PCT/CN2010/071241 patent/WO2010145243A1/zh active Application Filing
- 2010-03-23 JP JP2012515324A patent/JP5663568B2/ja not_active Expired - Fee Related
-
2012
- 2012-01-17 IN IN481DEN2012 patent/IN2012DN00481A/en unknown
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101365239A (zh) * | 2007-08-09 | 2009-02-11 | 华为技术有限公司 | 数据转发的方法、演进基站和长期演进网络 |
WO2009057684A1 (ja) * | 2007-10-30 | 2009-05-07 | Ntt Docomo, Inc. | 移動通信方法及び無線基地局 |
CN101448249A (zh) * | 2008-01-25 | 2009-06-03 | 中兴通讯股份有限公司 | 一种释放服务网关缓存数据的方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109845327A (zh) * | 2016-08-12 | 2019-06-04 | 株式会社Ntt都科摩 | 核心网络以及基站 |
CN113196714A (zh) * | 2018-12-19 | 2021-07-30 | 斯纳普公司 | 映射发现系统 |
CN113196714B (zh) * | 2018-12-19 | 2023-06-06 | 斯纳普公司 | 用于交换数据的方法和服务器系统 |
CN113271652A (zh) * | 2021-04-13 | 2021-08-17 | 复旦大学 | 基于反向传播算法的中继网络性能优化方法 |
CN114157344A (zh) * | 2021-12-09 | 2022-03-08 | 成都天奥集团有限公司 | 一种支持卫星馈电链路无损切换的方法 |
CN114157344B (zh) * | 2021-12-09 | 2023-12-05 | 成都天奥集团有限公司 | 一种支持卫星馈电链路无损切换的方法 |
Also Published As
Publication number | Publication date |
---|---|
IN2012DN00481A (zh) | 2015-06-05 |
CN101931937A (zh) | 2010-12-29 |
JP2012530418A (ja) | 2012-11-29 |
CN101931937B (zh) | 2013-06-12 |
JP5663568B2 (ja) | 2015-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2010145243A1 (zh) | 下行报文转发方法及服务网关 | |
CN101945429B (zh) | 移动网络用户面数据路由的方法、装置和系统 | |
CN113630827B (zh) | 支持切换的方法及对应的基站和网络节点 | |
KR101175217B1 (ko) | 자원 처리 방법, 통신 시스템, 및 이동성 관리 요소 | |
ES2545502T3 (es) | Sistema de comunicaciones y método de control de comunicaciones | |
JP6321643B2 (ja) | 複数の基地局に向けての端末の多重的な接続性を可能とする、ベアラのサブセットをハンドオーバさせるためのノード及び方法 | |
JP5406220B2 (ja) | ユーザ装備の位置情報を更新するための方法 | |
US8391151B2 (en) | Inter-network-nodes flow control | |
CN102763456A (zh) | 用于在网络中路由业务的方法和网络 | |
US10531319B2 (en) | Information exchange between a mobile transport network and a core network | |
US8867471B2 (en) | Method, device, and system for reporting radio access network element information | |
CN101622830A (zh) | 基站、移动站、通信系统及其重排方法 | |
JP2011514068A5 (zh) | ||
CN112911726A (zh) | 一种用户平面承载建立的方法及装置 | |
WO2010148681A1 (zh) | 用于确定上行反传结束时间的方法和系统 | |
CN102348245B (zh) | 一种lte系统中s1切换失败的处理方法与装置 | |
JP2009296149A (ja) | 移動通信システム | |
CN103299672B (zh) | 业务恢复方法和移动管理网元 | |
JP5655138B2 (ja) | S1ハンドオーバ方法、s1ハンドオーバのデータ伝送方法及び移動通信システム | |
CN103379546A (zh) | 数据分流的方法和装置 | |
CN104853344A (zh) | 一种选择分流网关的方法和控制器 | |
JP6507313B2 (ja) | Gtpでのieタイプを拡張するためのメカニズム | |
CN105264979A (zh) | 用于传输下行数据的方法、移动性管理网元、接入网设备和服务网关 | |
CN103139752B (zh) | 传输通道表修改方法及装置 | |
CN103313327A (zh) | 支持中继节点切换的方法、供者基站和中继节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10788639 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012515324 Country of ref document: JP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 481/DELNP/2012 Country of ref document: IN |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 10788639 Country of ref document: EP Kind code of ref document: A1 |