WO2010142145A1 - U-shaped bifurcated pipe integral-forming process - Google Patents

U-shaped bifurcated pipe integral-forming process Download PDF

Info

Publication number
WO2010142145A1
WO2010142145A1 PCT/CN2010/001024 CN2010001024W WO2010142145A1 WO 2010142145 A1 WO2010142145 A1 WO 2010142145A1 CN 2010001024 W CN2010001024 W CN 2010001024W WO 2010142145 A1 WO2010142145 A1 WO 2010142145A1
Authority
WO
WIPO (PCT)
Prior art keywords
shaped
bifurcated pipe
forming process
welding
shaped bifurcated
Prior art date
Application number
PCT/CN2010/001024
Other languages
French (fr)
Chinese (zh)
Inventor
周菊明
Original Assignee
上海昌强电站配件有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海昌强电站配件有限公司 filed Critical 上海昌强电站配件有限公司
Publication of WO2010142145A1 publication Critical patent/WO2010142145A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/02Die forging; Trimming by making use of special dies ; Punching during forging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Abstract

An U-shaped bifurcated pipe integral-forming process includes the steps of: (1) heating a blank in a medium-frequency furnace to 850-1200 degrees centigrade, (2) forging the blank after medium-frequency heating to a Y-shaped bar by Y-shaped forging dies, (3) drilling the Y-shaped bar to form a Y-shaped inner channel by a drilling device, (4) bending the V-shaped head of the Y-shaped bar to U shape to form the U-shaped bifurcated pipe. The present invention utilizes the die forging and extruding technology to form the U-shaped bifurcated pipe, so that the pressure resistance of the U-shaped bifurcated pipe is far excessive to that of the welded bifurcated pipe, and the production cost is low.

Description

分叉管的 休成型工  Folding tube
木領域  Wood field
本 涉及分叉管制各 木領域 尤其涉及 U 分叉管的 休 成型工 。 背景 木  This is related to the fork control of various wood fields, especially the U-shaped forks. Background
在 沒有 休制造 木 U 分叉 內外制造此 焊接 且在 上注明"焊接不宜" 因U型分叉 在 中的工作 。  This welding is made inside and outside the manufacturing U-fork and the "welding is not suitable" due to the work of the U-branch.
高溫高 溫度大于400 C 大于 16 Mpa 所以焊接 有 多 因素的 、 焊接 力集 容易造成 二、 焊接力人工操作 手工保 所以 相 大 三、 拍片、 高 要求高 氫 打底再用 休 成本 高 且形成內向 至少降低20% 通 在 制造 是至 重要的 介 木 而直接 休 由于 不能 至 底部 所以拍片 合形成 有 假象  High temperature and high temperature greater than 400 C is greater than 16 Mpa. Therefore, welding has many factors, and the welding force set is easy to cause. 2. The welding force is manually operated by hand. Therefore, the film is large, the film is required, the high hydrogen base is used again, and the cost is high and the inward direction is formed. At least 20% reduction in manufacturing is the most important thing, and the direct rest is due to the inability to reach the bottom.
很大雅 。 上 在U 分叉 焊接上 直是 介 不 費工、 、 不 而且 、 很高。  Very elegant. On the U-fork welding, it is straightforward, not expensive, and very high.
內容 本 力克服現有 木的不足 中 加熱 休成型工 各 神不易爆裂、 的U 分叉 。 Content The force overcomes the shortcomings of the existing wood, and the U-fork which is not easy to burst, is heated by the molding workers.
上 目的 本 的 U 分叉管的 休成型工 其特 在于 如下加工步驟 將 好的料加熱至850 120 C 2 第一 休成型 將中 的料 The U-fork tube of the above purpose is characterized by the following processing steps: heating the good material to 850 120 C 2
3 內 成型 將  3 Inner molding will
各 內通道 4 成型 再將 的 U 形成U 狀分叉 。  Each inner channel 4 is formed and the U is formed into a U-shaped bifurcation.
的加工步驟 中 加熱完成 至 成型完成的60 90  Processing steps in the heating finish to 60 90
本 現有 木相比 、 木 U 分叉 休 成型 性能近近 焊接分叉 不易爆裂 且制造成本只 有焊接 的50 60 因 所以不必 同 。  Compared with the existing wood, the wood U bifurcation is close to the welding, the welding fork is not easy to burst, and the manufacturing cost is only 50 60 because of welding, so it is not necessary.
是 焊接 的U 分叉管的 示意Is the indication of the welded U-furcation tube
2是本 明中U 分叉管的 示意 。  2 is an illustration of the U-furcation tube in the present invention.
。 休 方式 . Hugh way
下面 合 本 一步的 、 各 U 分叉 休 成型 先 所要加工的U 分叉管的尺寸 模具 2。 One step below And each U is forked and formed into a size 2 mold of the U furcation tube to be processed first.
將 好的料 加熱 加熱至 850 2 C 然 上 各 的模具 利用成型 成型摩擦 再  Heat the good material to 850 2 C and then use the molding die to form the friction.
各 內通道 形成 再將 管的  Each inner channel is formed
各 U 形成U 分叉 形狀 在 流水 域 並中 完成中 至 U 管的 同控制在 60 g0s 內。  Each U forms a U-fork shape in the running water and the middle to the U tube is controlled within 60 g0s.
好的U 分叉 , 可用金 然 材料 她 去除 。  Good U fork, can be removed with gold material.
爆破 近近 焊接分叉 且制造成本只有焊接 的50 60 。 成型分叉 爆破  Blasting Near-welding forks and manufacturing costs are only 50 60 for welding. Forming fork blasting
項目 規格 爆破 Item specification blasting
60X4 40 pa  60X4 40 pa
爆破 blasting
M 5 X4 60 pa  M 5 X4 60 pa

Claims

要求 Claim
1 分叉管的 休成型工 其特 在于 如下加工步 驟 1 中 中 將 好的料加熱至850 2 C 2 第一 休成型 將中 的料 Y Y 3 內 成型 將Y 各 Y 內通道 4 成型 再將Y 的V 形成 分叉 。 2、 要求1 的 分叉管的 休成型工 ,其特 在于 的加工步驟中 加熱完成 至 成型完成的 同 60~g0so  1 The forming process of the bifurcated tube is characterized in that the material in the processing step 1 is heated to 850 2 C 2 in the first processing step. The first material is formed in the material YY 3, and the Y inner channel 4 is formed and then Y is formed. The V forms a fork. 2. The die-forming worker of the furcation pipe of claim 1 is characterized in that the heating process is completed in the processing step to the same 60~g0so
PCT/CN2010/001024 2009-06-09 2010-07-09 U-shaped bifurcated pipe integral-forming process WO2010142145A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200910052780.3 2009-06-09
CN2009100527803A CN101574778B (en) 2009-06-09 2009-06-09 Process of integrally shaping U-shaped bifurcated pipe

Publications (1)

Publication Number Publication Date
WO2010142145A1 true WO2010142145A1 (en) 2010-12-16

Family

ID=41269917

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2010/001024 WO2010142145A1 (en) 2009-06-09 2010-07-09 U-shaped bifurcated pipe integral-forming process

Country Status (2)

Country Link
CN (1) CN101574778B (en)
WO (1) WO2010142145A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106584019A (en) * 2015-10-20 2017-04-26 良丰机械股份有限公司 Manufacturing method of front forked arms and manufacturing method of front fork

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101574778B (en) * 2009-06-09 2010-08-04 上海昌强电站配件有限公司 Process of integrally shaping U-shaped bifurcated pipe
CN104942530B (en) * 2014-03-24 2017-06-06 亚猎士科技股份有限公司 Integrally formed Al-alloy bicycle front fork manufacture method
CN103878290A (en) * 2014-03-27 2014-06-25 昆山土山建设部件有限公司 Step shaft machining method
CN105033155B (en) * 2015-04-23 2017-03-01 山东神力索具有限公司 A kind of electric railway processing technique of ears wedge clamp shell
CN105327970A (en) * 2015-12-03 2016-02-17 应敏燕 Red punching forming process for three-way pipe joint
CN106334775A (en) * 2016-08-23 2017-01-18 哈尔滨汽轮机厂有限责任公司 Forging method for three-way pipe
CN110899586B (en) * 2019-11-26 2021-06-08 江阴市龙玉锻压有限公司 All-fiber forging process for U-shaped forging piece

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60121030A (en) * 1983-12-05 1985-06-28 Toraji Mochizuki Method of forming end of metallic tube to u-shaped articulated body
JPH04135031A (en) * 1990-09-27 1992-05-08 Kubota Tekkosho:Kk Manufacture of york member
US6049982A (en) * 1998-05-22 2000-04-18 Tseng; Shao-Chien Integrated molding method for the front fork of a bicycle
CN1792496A (en) * 2004-12-24 2006-06-28 株式会社电装 Method for manufacturing high-pressure piping part and structure thereof
CN101269398A (en) * 2008-05-07 2008-09-24 四川振强模锻有限公司 U shaped suspension clamp swaging technique
CN101574778A (en) * 2009-06-09 2009-11-11 上海昌强电站配件有限公司 Process of integrally shaping U-shaped bifurcated pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60121030A (en) * 1983-12-05 1985-06-28 Toraji Mochizuki Method of forming end of metallic tube to u-shaped articulated body
JPH04135031A (en) * 1990-09-27 1992-05-08 Kubota Tekkosho:Kk Manufacture of york member
US6049982A (en) * 1998-05-22 2000-04-18 Tseng; Shao-Chien Integrated molding method for the front fork of a bicycle
CN1792496A (en) * 2004-12-24 2006-06-28 株式会社电装 Method for manufacturing high-pressure piping part and structure thereof
CN101269398A (en) * 2008-05-07 2008-09-24 四川振强模锻有限公司 U shaped suspension clamp swaging technique
CN101574778A (en) * 2009-06-09 2009-11-11 上海昌强电站配件有限公司 Process of integrally shaping U-shaped bifurcated pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106584019A (en) * 2015-10-20 2017-04-26 良丰机械股份有限公司 Manufacturing method of front forked arms and manufacturing method of front fork

Also Published As

Publication number Publication date
CN101574778A (en) 2009-11-11
CN101574778B (en) 2010-08-04

Similar Documents

Publication Publication Date Title
WO2010142145A1 (en) U-shaped bifurcated pipe integral-forming process
CN105013908B (en) For the assembling die and manufacturing process of the shaping of flange pipe nipple
WO2015053984A8 (en) Process for upset forging of drill pipe
CN103921065A (en) Manufacturing method of vehicle seamless steel tubes
CN105935732A (en) Embryo mold forging process for forge piece with holes in step at one end
CN105032982B (en) A kind of hot-pressed three-way pipe fitting process
CN102641936A (en) Tubing bulging device and method using internal heating and pressing
CN103752666A (en) Bending method of pipes with flexible chained-ball mandrel
CN110125314A (en) A kind of forging method of high-carbon-chromium bearing steel forging stock
CN103658478B (en) The manufacture method of nuclear power evaporator transition cone forge piece
CN101704044A (en) Rectangular thin walled tube stock tracking deformation bending mould
CN102773398A (en) Method for forging slender and thick-walled pipe fittings
CN108758142B (en) Main pipe reducing tee joint and production process thereof
CN201625700U (en) Hot-press forming device for thick-walled elbows without inner cores
CN103934306B (en) Manufacturing method for steel-made welded tilted three-way pipe
CN101767131A (en) Hot-press molding method for thick-walled elbow without inner core
CN101862949A (en) Backward extrusion forging method
RU2414983C2 (en) Method of oilwell tubing pipe-end upsetting
WO2014009571A8 (en) Method of material forming processes in preheated or melted state to strongly reduce the production cost of the produced parts
KR101273927B1 (en) A forming device for tube bulging by gas pressure and the method thereof
RU2015126235A (en) METHOD AND DEVICE FOR DROPPING FOR PRODUCTION OF PARTS WITH EQUIPMENT SUCH AS SHAFT OR ROD
CN105195625B (en) A kind of necking threeway processing mold and the method using mould processing threeway
CN204726509U (en) For the beam of vehicle
CN107520310A (en) Slip yoke preform, slip yoke and the manufacturing process of the two
RU2548872C2 (en) Pipe end upsetting method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10785658

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10785658

Country of ref document: EP

Kind code of ref document: A1