WO2010142136A1 - Preparation method and device for organic soil conditioner - Google Patents

Preparation method and device for organic soil conditioner Download PDF

Info

Publication number
WO2010142136A1
WO2010142136A1 PCT/CN2010/000693 CN2010000693W WO2010142136A1 WO 2010142136 A1 WO2010142136 A1 WO 2010142136A1 CN 2010000693 W CN2010000693 W CN 2010000693W WO 2010142136 A1 WO2010142136 A1 WO 2010142136A1
Authority
WO
WIPO (PCT)
Prior art keywords
roller
small
drum
sludge
base
Prior art date
Application number
PCT/CN2010/000693
Other languages
French (fr)
Chinese (zh)
Inventor
张大伟
Original Assignee
Zhang Dawei
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN2009201085656U external-priority patent/CN201458915U/en
Priority claimed from CN200910086006.4A external-priority patent/CN101921595B/en
Application filed by Zhang Dawei filed Critical Zhang Dawei
Publication of WO2010142136A1 publication Critical patent/WO2010142136A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C05FERTILISERS; MANUFACTURE THEREOF
    • C05FORGANIC FERTILISERS NOT COVERED BY SUBCLASSES C05B, C05C, e.g. FERTILISERS FROM WASTE OR REFUSE
    • C05F7/00Fertilisers from waste water, sewage sludge, sea slime, ooze or similar masses
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • C02F11/13Treatment of sludge; Devices therefor by de-watering, drying or thickening by heating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/20Fertilizers of biological origin, e.g. guano or fertilizers made from animal corpses

Definitions

  • This field of soil fertilizers involves various methods of soil modification.
  • the city or the sewage she has a certain amount of sludge in her sewage, and a certain amount of sludge or / and biological sludge components are very formed by multi-microbes or / and have a collection of things It contains 99% high water content and contains pathogenic microorganisms and parasites.
  • the sludge has a high content of spoilage. A large amount of sludge is deposited and discharged to cause pollution.
  • the sludge contains a large number of germs, parasites and diseases, causing disease.
  • a further object of the present invention is to provide the same device of the above method.
  • the sludge is dehydrated in the apparatus at 200-300 C and then input into the sludge.
  • the sludge dehydrated and dehydrated at 200-300 C in each unit is 25-5% at 700-850.
  • the present invention provides the same special device, and the device includes a base, a sludge, a sludge device, and a sludge device.
  • small drum, large drum, small drum, material chamber heating the sludge in the storage of the sludge, and the large drum is connected to the large drum in the indoor sludge device to input the sludge sludge into the large drum to the large
  • the sludge inside the drum is inside the big drum
  • the small rollers are connected to the large drum and the chamber respectively. She has a small roller to the chamber.
  • the same devices provided in the above methods mainly include
  • the rest of the base can be used as a corner force 0-3.
  • the heating, the chamber, the large roller, the small roller, the small roller, the device, the screw and the control are respectively installed.
  • the straight roller is straighter than the small roller and the small roller straight to the end of the large roller
  • the small roller is connected to the other end of the large roller.
  • the small roller is connected to the large roller. There are many small rollers and small rollers.
  • the other end of the small roller extends into the other end of the small drum in the material chamber. There is a sealing device inside.
  • the outside of the book is equipped with steam, seal, spiral spiral to the big roller, small roller, picking her edge, spiral
  • the steam outlet is a pipe.
  • the cleaning device is connected.
  • the steam outlet is installed with an outlet.
  • the outlet pipe is heated.
  • the small roller of this section is equipped with a small roller, a large roller and a small roller.
  • the large roller and the small roller are connected to the rest.
  • the coke fuel-based device is equipped with a plurality of cokes mounted on a wall fixed above the fixed row. There are many and many fixed installations on the wall. Where the pipe is connected to the mortal.
  • the device is equipped with a natural, or/and fuel, device, and a combustion device.
  • the lifting device installed under the end of the base is connected.
  • the end of the material chamber is fixed at the end of the base.
  • the base is fixed with the lifting device.
  • the front of the base is lowered, and the base is not changed.
  • the method and apparatus of the present invention have various soils, such as harmful bacteria, parasites, and viruses in the sludge, which contain carbon, nitrogen, oxidation, potassium oxide, etc., and have soil-reducing and plant-promoting functions. 1 The power of the soil is changed.
  • the lifting device will rest the base 38 1-3. Special spiral, the sludge in the sludge is transferred from the end to the large drum. The dirt in the large drum is inclined to the front of the large drum.
  • the lifting device will rest the base 38 0.
  • the steam outlet valve is the same as the heated one.
  • the amount of sludge input is 25%-35% of the large roller
  • the small roller is 20-30% straight.
  • the small roller 1 500- 80 m extends straight into the material chamber.
  • the small roller 1 000- m extends straight into the room 6n.
  • the outside is fitted with steam, seal, spiral helix to the large roller and a small roller to connect her 5 edges, and the spiral is installed with sludge.
  • the small rollers are equipped with small rollers, large rollers and small rollers.
  • the small drum chamber is connected to her and the small drum is connected to her with a sealing device.
  • the large roller and the small roller are connected to the rest.
  • Heating is installed with a temperature sensor, thousands.
  • the chamber is equipped with a temperature device.
  • the unit can be fixed by heating with coke fuel, and multi-coke is installed on the heating wall above the fixed row. There are many and many fixed installations on the wall.
  • the heat exchangers are connected by any of the pipes.
  • the unit can also be installed with natural combustion or fuel heating.
  • Heating outlet is installed with air, heated, discharged
  • the lifting device installed under one end of the base is connected.
  • One end of the chamber is connected to the base and the bracket is installed.
  • Control functions include heating chamber temperature and control, temperature, steam outlet temperature, drum characteristics and specific direction and control, screw and control, device control, Fant and control, Hume combustion control, and lift control.
  • This device was made on a special device.
  • the special device usually only has the same size
  • the angle of inclination of this extra large drum is fixed.
  • the retention of the material in the drum is caused by the roller, the inclination and the special satisfaction of the processing.
  • the heating chamber is divided into different temperatures to control and treat the material in the material due to the large roller. Therefore, the roller material looks down in the in-situ and in the first half of the processing.
  • the device is divided into three parts: a small roller, a large roller, and a small roller.
  • the straight roller of the large roller is enlarged.
  • the straight roller of the small roller and the small roller are formed so that the large roller of the small roller and the small roller are formed. Since the sludge before dewatering contains a large amount of water, it is very large. Once the water is small, the partially dehydrated sludge can stay in the large drum and cannot be discharged. Therefore, the dewatered sludge can be input into the small drum.
  • the large roller in the large drum maintains the dehydration temperature of 200C-300C.
  • the dehydrated sludge is 2-3 % of the fixed sludge, and the temperature is raised to the temperature of 700C-850C.
  • the frequency in the large drum is not necessary.
  • the sludge stays in the drum is the same as or shortens the special control of the drum, and can be processed by sludge. Different temperature requirements The temperature of the heating chamber can be
  • the water containing less than 8 % of the water is used to change the soil. Whether the heavy amount of sludge in the sludge before the soil is changed to 10 is consistent with that of the husband.
  • the lifting device 29 will rest the base 38 3 .
  • the special screw 2 has the sludge in the sludge order 1 from the 30 end to the sludge in the large drum 41 in the large drum 41.
  • the large drum 41 is inclined to the front of the large drum 41 and the large roller 41 is moved forward.
  • Base 38 0. 30 valves with steam 26 at the top, with 33 for heating 43.
  • the amount of sludge input is 35% of the large roller 41
  • the steam discharged from c 30 is greatly reduced in steam.
  • the lifting device 29 is used to lower the base 38 1 .
  • the special screw 2 has the sludge in the sludge 1 from the end 30 to the large drum 41, and the sludge in the large drum 41 is inclined to the front of the large drum 41 and the large roller 41 is moved forward.
  • the amount of sludge input is 25% of the large roller 41
  • the large drum 41, the small drum 16, and the small drum 31 of the same device are specially oriented from the end of 30, so that the soil in the large drum 41 is changed to 39, 42 and 4, and the small drum 16 is inserted into the small drum 16 and then the spiral in the small drum 16
  • the action of 18 is directed to the discharge chamber 15 and the discharge 9 is discharged from 13 below the chamber 15. That is, each of the 9
  • the large drum 41 and the small drum 16 have a soil change 10 and 30 steam 26 of the same heating 43
  • the large drum 41, the small drum 31, and the small drum 16 of the special device 3 are spun from the end of 30, and the sludge in the sludge is 30 to the sludge in the large drum 41 in the large drum 41 in the large drum 41.
  • the action of the tilting and 39 is forwarded to the large roller 41, and the lifting device 29 will rest the base 38 0.
  • the amount of sludge input is 35% of that of the large roller 41.
  • the temperature of the internal device 3 is heated by 43.
  • the same device 3 of the above method includes
  • the rest base 38 is equipped with heating 43, a chamber 15, 30, and a large Roller 41, small drum 16, small drum 31, device 11, 12, spiral
  • the rest base 38 can be angularly 0-3. .
  • the outer 300 mm large drum 41 in the 43 heats up the inside of the bottom 43 of the 70 mm
  • the large roller 41, the small roller 16, and the small roller 31 are particularly 3-6/m in a special direction.
  • Small roller 16 is connected to the small roller 16 with a screw 8.
  • the vertical angular force of the screw 18 small roller 16 is left 5.
  • the height of the screw 18 is 20% of the diameter of the small roller 16
  • the other end of the large drum 41 has a small roller 31 having a spiral 18 in the small roller 31.
  • the vertical angular force of the spiral 18 small roller 31 is right-handed 5.
  • the height of the spiral 18 is 20% of the straight roller 31 straight
  • the small roller 16 15 mm extends straight into the chamber 15 up to 80 mm.
  • the small roller 31 10 m extends straight into the 30 mm.
  • the outer side of the 30 has a spiral 2 spiral 2 to the large roller 4 small roller 31 connects her along the spiral 2 to install the sludge 1 .
  • Pipeline cleanup device 8 is connected, steam P26 is installed. Sealing 40 on each of the 30 panels of the cleaning device 8 facilitates the condition of the sludge in the drum. 30 under 47 to periodically clear within 30 possible.
  • a plurality of 39 are mounted in the large drum 41. Phase 39 is the same as the 20,000 m. It consists of more than 9 and 39. The height of 39 is 39 mm. The 80 m of each 39 has the same 5mm.
  • the outer casing 19 19 of the small drum 31 is seated on 11.
  • the device 12 17 has a small roller 16, a large roller 41 and a small roller 31.
  • connection of the small drum 16 to the chamber 15 and the connection of the small drum 31 30 is fitted with a sealing device 20. This labyrinth is sealed.
  • the same device 3 can be, natural or fueled
  • the heating 43 is installed with a combustion of 44. Same as the device 3, this will be, natural or to heat 43 of the combustion of each of the 44 burns each of the 44 and the temperature within the control heating 43.
  • Heating 43 25 is installed with air heater 4 heating 43 discharge of the 7 heat. Heater 4 force each.
  • the discharged heat exchanger 4 re-purifies each of her 5 to the prescribed large discharge 6 discharge. Purify each of the 5 collectives of granite water.
  • the 30-side rest base 38 has a lifting device 29.
  • the chamber 15 has a rest at one end.
  • the base 38 has a 45-way lifting device 29 between the brackets 46 and the front base 38 and the base 38 of the high rest.
  • the special device 3 temperature sensor 23 and temperature device 14 will be controlled 28.
  • the functions of the control 28 include heating 43 temperature and control, temperature, steam outlet 26 temperature, drum special and special direction and control, spiral 2 special and control, ie each 9 control, van 7 special and control, Hugh combustion each 44 control, lifting
  • the device 29 controls and the like.
  • the sludge and organisms in the bottom of the lake are in accordance with each other.
  • the lifting device 29 will rest the base 38 3 .
  • the special screw 2 has the sludge in the sludge 1 from the end of 30 to the sludge in the large drum 41 in the large drum 41.
  • the large drum 41 is inclined to the front of the large drum 41 and the large roller 41 is moved forward.
  • the steam discharged from the steam 47 of C 30 is greatly reduced, and the base 38 1 is retracted by the lifting device 29.
  • the special screw 2 spreads the sludge in the sludge 1 from the 30 end to the sludge in the large drum 41 in the large drum 41, and the large roller 41 is forwardly inclined by the action of the large roller 41, and the lifting device 29 will be closed.
  • the amount of dirt input is 25% of the large roller 41
  • the large drum 41, the small drum 16, and the small drum 31 of the same device 3 are made to change the soil in the large drum 41 to 40, 42 into and out of the small drum 16 and then from the small drum 16
  • the action of the screw 18 is fed into the discharge chamber 15 and then from the chamber 15
  • the large drum 41, the small drum 31, and the small drum 16 of the same apparatus 3 are metered from the end of the 30-point spiral 2 to the sludge in the sludge from the end of 30 to the sludge in the large drum 41 in the large drum 41.
  • the action of the tilting lever 39 of the large roller 41 is forwardly covered with the large roller 41, and the lifting device 29 will rest the base 38 0.
  • the input sludge is 35% of the amount of the large drum 41, and the temperature of the various units 3 is heated to the dehydration temperature of 20 C-300 °C.
  • step b- the same device 3 of the above method comprises a rest period base 38 on which a heating 43, a chamber 15, 30, a large drum 41, a small drum 16, a small drum 31, devices 11, 12, Spiral
  • the rest base 38 can be angularly 0-3. .
  • the outside of the large drum 41 is heated by 43.
  • the 300m large drum 41 is heated outside the 43mm 300mm large drum 41.
  • the outer part of the heating 43 is 9 m.
  • the large roller 41, the small roller 16, and the small roller 31 are particularly 3-6/m in a special direction.
  • the small drum 16 is connected to the small drum 16 with a spiral 18 therein.
  • the vertical angular force of the screw 18 small roller 16 is left 15.
  • the height of the screw 18 is 30% of the diameter of the small roller 16
  • the other end of the large drum 41 has a small roller 31 having a spiral 18 in the small roller 31.
  • the vertical angular force of the spiral 18 small drum 31 is right-handed 1 . , the height of the spiral 18 30% of the small roller 31 straight
  • the small roller 16 180 mm has a diameter of 5 mm and projects into the chamber 15.
  • the small roller 31 1 mm extends straight into the 30 mm outside 40 mm.
  • the outer side of the 30 has a spiral 2 spiral 2 to the large roller 41 the small roller 31 connects her along the spiral 2 with a sludge order 1
  • the outer rollers 17 of the small rollers 16 are seated on the outer casings 17, 19 19 .
  • the outside of the small drum 31 is 19 19 seated at 11
  • the device 12 17 has a small roller 16, a large roller 41 and a small roller 31.
  • the small drum 16 is connected to the chamber 15 and the small drum 31 30 is attached with a sealing device 20, and the sealing device 20 is steam-sealed.
  • the chamber 15 is equipped with a temperature device 14.
  • the same device 3 can be coke fuel, 2 is shown, heating 43 is fixed, 35 is fixed above the fixed 35, and 43 is installed on the wall.
  • Heater 4 where the 32 phase of the pipe is 34.
  • the same apparatus 3 adds coke from coke 37 to heating 4 and fixed 3 combustion, coke addition and control of the temperature within heating 43.
  • Heating 43 Outlet 25 is installed with air heater 4 heating 43 discharge of the 7th heating. Heater 4 force each. 43 discharged heat exchanger 4 and then cleaned each of her 5 to the specified large discharge 6 emissions. Purify each of the 5 forces and each bag.
  • the chamber 15 has a rest base 38 and a uniform bracket 46.
  • the 45-way lifting device 29 rests the front of the base 38 and the base 38 of the high rest.
  • Control 08 The temperature sensor 23 and the temperature device of the same device 3 will be controlled 28.
  • the functions of Control 08 include heating 43 temperature and control, temperature, steam 26 temperature, drum special and special direction and control, spiral 2 special and control, each 9 control, van 7 and control, lifting device 29 control and so on.
  • the sludge contains less than 85% of the sewage, or the sludge or / and organisms in the sewage. Whether the heavy amount of sludge in the sludge before the soil change is consistent with that of the husband.
  • the above methods and devices have soil modification.
  • the high temperature contains harmful carbon, nitrogen, oxidation, potassium oxide, etc. in the sludge, such as harmful bacteria, parasitic hosts and viruses.
  • This soil which is formed by the formation of symbiotic plants, can be formed on a black surface with soil modification, avoiding cultivation. And And the health and color of vegetables have improved.
  • the soil can increase the C 2 content of the soil, and absorb the harmful gold in the soil to increase the vitality of the soil microbe.
  • the plant provides a healthy life that enhances the disease resistance of the plant.
  • Plants provide the amount of fertilizer needed to grow.

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Treatment Of Sludge (AREA)

Abstract

A preparation method for organic soil conditioner and a device for realizing the method are provided. Sludge is dehydrated at 200-300 degree Celsius in a dry distilling apparatus, and then the sludge is inputted into an intermittent rotary preparation device and is dehydrated at 200-300 degree Celsius. The dehydrated sludge is dry distilled at 700-850 degree Celsius, when its volume occupies 25-35 percent of the volume of the intermittent rotary preparation device. The distilled product is taken out after being cooled to below 100 degree Celsius. The organic soil conditioner prepared by the method and device contains organic nutrition and has soil improvement function after high temperature sterilization.

Description

有 土壤改良 的 各方法和裝置 木領域  Various methods and devices for soil improvement
本 于 此土壤 肥料領域 休 涉及 有 土壤改 的 各方法。  This field of soil fertilizers involves various methods of soil modification.
本 涉及用于 上 方法的裝置。 背景 木  This relates to a device for use in the above method. Background
城市或 並的污水她 在她 污水 中 一定數量的污泥 在 、 中也合 一定數量的污泥或/和 生物 污 泥的成份非常 是由多 微生物形成的 或/和有 、 物組 成的集合休 含有大量的水份 可高 99% 含有病原微生物和寄 生 等。 污泥中有 含量高 腐敗 大量 她理 的污泥堆放和排放 造成污染。 污泥中含有大量病菌、 寄生 及病 , 造成 染病的 。  The city or the sewage she has a certain amount of sludge in her sewage, and a certain amount of sludge or / and biological sludge components are very formed by multi-microbes or / and have a collection of things It contains 99% high water content and contains pathogenic microorganisms and parasites. The sludge has a high content of spoilage. A large amount of sludge is deposited and discharged to cause pollution. The sludge contains a large number of germs, parasites and diseases, causing disease.
自上世紀 80年代以后 看化肥 此的快速 以及在 此生 中 的迅速 作用 我 化肥用量 上升 有 投入 下降。  Since the 1980s, the rapid development of chemical fertilizers and the rapid effects in this life have led to a decline in the use of chemical fertilizers.
到了本世紀 有 只 到 此 投入的 %左右。  In this century, there are only about % of this investment.
追求高 化肥怪有 的做法 了土壤自然 于下降 化肥的施用量 的 能力之同出現 失衡 相夫 1995-2004 我 化肥用量由3 95 ( 4636.8 增加了22.5 而 由4650 公斤只增加到4697 公斤, 增加了 1 在 有土壤 上再 提高 水平已成力 行此 看的 大 。  The pursuit of high-fertilization and grotesque practices has naturally increased the ability of the soil to reduce the amount of fertilizer applied. The amount of chemical fertilizer was increased from 3,95 (4636.8 to 22.5 and from 4,650 kg to 4,697). Kg, an increase of 1 in the soil to raise the level has been made to see this big.
家預測 至2030 我因人口將由 13化增加至 16 仍 增加 1000 公斤。而目前我 肥料的 只有 改 土壤、 有 入手 才有望提升 提高土地 。 因此 土壤 尚前 此可持 的 項緊迫 。  Home predicted that by 2030 I will increase my population by 1,000 to 16 and still increase by 1000 kg. At present, my fertilizers are only expected to improve the land if they change the soil and start with it. Therefore, the soil is still in the forefront.
能否 方法和裝置將上 污泥中的有害病菌、 寄生生 及病毒 等高溫 將污泥中有 物所 的碳元素和有 保留, 成一 有碳元素和氮、 氧化 、 氧化鉀等有 具有土壤改 、 和促迸植物生 功能的有 土壤改良 至今未凡 。 內容 Is it possible to use methods and devices to treat the carbonous substances in the sludge and the high temperature of harmful bacteria, parasites and viruses in the sludge into one? Soil improvement with carbon and nitrogen, oxidation, potassium oxide, etc., which has soil changes and promotes plant growth, is still uncommon. content
本 的目的在于提供 有 土壤改 的 各方法。  The purpose of this book is to provide methods for soil modification.
本 的又一目的在于提供 于 上 方法的同 特 各裝置。  A further object of the present invention is to provide the same device of the above method.
上 目的, 本 提供的有 土壤改良 的 各方法 主要步 驟如下  For the above purposes, the main steps of the methods provided for soil improvement are as follows:
將污泥 于 裝置中于 200-300 C下脫水 之 再輸入污泥于同 特 各裝置中于 200-300 C下脫水 脫水 的污泥休 同 特 各裝置休 的25- 5% 于700-850 C 的  The sludge is dehydrated in the apparatus at 200-300 C and then input into the sludge. The sludge dehydrated and dehydrated at 200-300 C in each unit is 25-5% at 700-850. C
 .
至 10 C以下 取出。  Remove below 10 C.
本 提供 同 特 各裝置, 裝置 于有 土壤改 的 各 裝置包括 底座、 上安裝有污泥 、 污泥 裝置、  The present invention provides the same special device, and the device includes a base, a sludge, a sludge device, and a sludge device.
、 小滾筒、 大滾筒、 小滾筒、 料室、 加熱 其中 污泥 于存放 她理的污泥 小滾筒 分別 和 大滾筒 連接 大滾筒 于 室內 污泥 裝置將污泥 污泥 至大滾筒內 輸入到大滾筒內的污泥在大滾筒內 她  , small drum, large drum, small drum, material chamber, heating the sludge in the storage of the sludge, and the large drum is connected to the large drum in the indoor sludge device to input the sludge sludge into the large drum to the large The sludge inside the drum is inside the big drum
小滾筒 分別 大滾筒和 料室連接 將她 的 有出 小滾筒 至 料室。 The small rollers are connected to the large drum and the chamber respectively. She has a small roller to the chamber.
本 提供的 于 上 各方法的同 特 各裝置 其主要 包括  The same devices provided in the above methods mainly include
整休 底座 休 底座可 角力0-3 上面分別安裝有加熱 、 料室、 、 大滾筒、 小滾筒、 小滾筒、 裝置、 、 螺旋 和控制 其中  The rest of the base can be used as a corner force 0-3. The heating, the chamber, the large roller, the small roller, the small roller, the device, the screw and the control are respectively installed.
大滾筒的直往大于 小滾筒和小滾筒的直往 大滾筒一端  The straight roller is straighter than the small roller and the small roller straight to the end of the large roller
小滾筒連接 大滾筒的另一端 小滾筒 接 大滾筒內 有多 小滾筒和小滾筒內 有螺旋  The small roller is connected to the other end of the large roller. The small roller is connected to the large roller. There are many small rollers and small rollers.
小滾筒的另一端伸入到 料室內 小滾筒的另一端伸入 內 有密封裝置。 The other end of the small roller extends into the other end of the small drum in the material chamber. There is a sealing device inside.
本 的外側安裝有蒸汽 、 密封 、 螺旋 螺旋 至大滾筒 小滾筒 接她的 沿, 螺旋  The outside of the book is equipped with steam, seal, spiral spiral to the big roller, small roller, picking her edge, spiral
上安裝有污泥 有蒸汽出口 蒸汽出口 管道 休淨化 裝置連接 蒸汽出口安裝有 有 出口 出口 管道 加熱 的 接 千 安裝有 There is a sludge installed on it. There is a steam outlet. The steam outlet is a pipe. The cleaning device is connected. The steam outlet is installed with an outlet. The outlet pipe is heated.
本 的 小滾筒的外 裝有 裝置 小 滾筒、 大滾筒和小滾筒 。  The small roller of this section is equipped with a small roller, a large roller and a small roller.
本 的大滾筒 小滾筒 接的 休 內安裝有 。  The large roller and the small roller are connected to the rest.
本 明以焦炭 燃料的裝置, 下 安裝有固定 在固定 排上方 的 壁上安裝有多 焦炭 。 固定 的下 凡 凡 的壁上安裝有多 和 凡 。 的 凡 由管道 凡 的 凡 相連。  The coke fuel-based device is equipped with a plurality of cokes mounted on a wall fixed above the fixed row. There are many and many fixed installations on the wall. Where the pipe is connected to the mortal.
本 明以 、天然 或/和 燃料的裝置, 下 安裝有 休燃燒 各。  The device is equipped with a natural, or/and fuel, device, and a combustion device.
本 的 端 休 底座 下方安裝的 升降裝置之同有 連接 。  The lifting device installed under the end of the base is connected.
本 的 料室一端 休 底座勻支架之同安裝有 接 通 升降裝置 休 底座前、 高 未改 休 底座的 。  The end of the material chamber is fixed at the end of the base. The base is fixed with the lifting device. The front of the base is lowered, and the base is not changed.
本 的方法和裝置 各的有 土壤改 將污泥中的有害病 菌、 寄生 及病毒等高溫 含有碳元素和氮、 氧化 、 氧化鉀 等有 , 具有土壤改 、 和促迸植物生 功能。 1力本 的有 土壤改 各流程示意 The method and apparatus of the present invention have various soils, such as harmful bacteria, parasites, and viruses in the sludge, which contain carbon, nitrogen, oxidation, potassium oxide, etc., and have soil-reducing and plant-promoting functions. 1 The power of the soil is changed.
2力本 明以焦炭 燃料的同 特 各裝置示意 2 Li Benming shows the same equipment with coke fuel
3力本 明以 、天然 或 燃料的同 特 各裝置 4力本 明同 特 各裝置 示意 即 2和團3中沿 A A 的剖面 。 3 Forces, natural or fuel 4 Force Benming's various devices indicate the section along AA in 2 and Group 3.
中主要 Main
1-污泥 、 2-螺旋 、 3- 特 各裝置、 4- 熱器、 5- 化 各、 6- 、 7- 凡 、 8- 休淨化裝置、 9- 各、 10- 有 土壤改 、 11- 裝置、 - 、 13- 、 14-溫度 裝置、 - 料室、 - 小滾筒、 - 、 -螺旋 、 - 、 20-密封 裝置、 21- 、 22-金 外 、 23-溫度 感器、 24-高溫耐火保溫材料 2 - 出口、 26-蒸汽出口、 27- 、 28-控制 、 29- 升降裝置、 30- 、 31-小滾筒、 32- 凡 、 33- 、 34-凡 、 35-固定 、 - 、 - 焦炭 38- 休 底座、 39- 、 40-密封 、 41大滾筒、 42- 、 43- 、 44- 休燃燒 各、 45- 接 、 46-支 架、 47-蒸汽 、 48- 、 49- 出口。 休 方式  1-Sludge, 2-Spiral, 3-Special, 4-heater, 5-individual, 6-, 7-fan, 8-Hui purification unit, 9- each, 10- soil modification, 11- Device, -, 13-, 14-temperature device, - chamber, - small roller, -, - spiral, -, 20-seal, 21-, 22-gold, 23-temperature sensor, 24-high temperature fire resistant Insulation 2 - outlet, 26-steam outlet, 27-, 28-control, 29-lift, 30-, 31-small roller, 32-fan, 33-, 34-fan, 35-fixed, -, - coke 38- Hugh base, 39-, 40-seal, 41-drum, 42-, 43-, 44- Hugh combustion, 45-connection, 46-bracket, 47-steam, 48-, 49- outlet. Hugh way
合 1 本 的 各方法 其主要步驟  Method of combining 1 main steps
a 將同 特 各裝置加熱室內的溫度加熱 20 C-300C 將 同 特 各裝置的大滾筒、 小滾筒、 小滾筒自 一端  a Heat the temperature in the heating chamber of the same unit. 20 C-300C. The large drum, small roller and small roller of the same device are from the other end.
方向 特  Direction
b 升降裝置將 休 底座38 1-3。 特 螺旋 , 將污泥 中的污泥由 端 到大滾筒內 大滾筒內的污 泥在大滾筒傾斜特 和 的作用向前 布滿大滾筒 然  b The lifting device will rest the base 38 1-3. Special spiral, the sludge in the sludge is transferred from the end to the large drum. The dirt in the large drum is inclined to the front of the large drum.
升降裝置將 休 底座38 0。 蒸汽出口 的閥門, 同 加熱 的 的 。輸入的污泥數量力大滾筒 休 的25%-35%  The lifting device will rest the base 38 0. The steam outlet valve is the same as the heated one. The amount of sludge input is 25%-35% of the large roller
c 的蒸汽 管排出的蒸汽大量減少 再用 升降裝 置將 休 底座 1-3。 特 螺旋 將污泥 中的污泥由 一端 到大滾筒內 大滾筒內的污泥在滾筒傾斜特 和 的作用向前 , 布滿大滾筒 然 升降裝置將 休 底座 0。 筒內的 休 2 X 、 The steam discharged from the steam pipe of c is greatly reduced, and then the base is 1-3 with the lifting device. The special spiral will move the sludge in the sludge from one end to the sludge in the large drum inside the large drum, and the drum will be tilted to the front, and the full drum will be lifted to lift the base. 0. Hugh 2 X in the tube,
室 汽 管 有 室  Room steam pipe has room
口的胸 同 加 的 的 將 內的 到7口 85 C 6 20  The mouth of the chest with the addition of the inside to the 7 port 85 C 6 20
5 熱 、 將 休 5 。  5 hot, will rest 5 .
大 、 出 小 小 自 一 逆 向 特 大 、、  Big and small, from one to the other,
內 的有 土 在 料 、 作用下  There is soil under the action of
再由出 小 內的 的作 下 出料 再由 下 的 出 口 各 由 各將制 的有 土 在 Then, the output from the small one is made out of the lower one.
0 的 下 至 C以下 的有 土 改 在高 下 接 或氧化 0 to below C, there is a soil change in the high or low oxidation
C 大 和 小 內的有 土壤  C large and small within the soil
部 的 同 的 的 將同 特 制各 的大 、 小 、 料 自 一 The same ones will be the same as the special ones.
- 、 - ,
5 向 特 特 合中的 由 一 到大  5 to special combination from one to large
 ,
內 大 內的 在大 特 和 的- 向前 功 滿大 , 然 休 的 休 大 休 的 2 3 X。 特 內的 到 20 C C Inside the big inside of the big special - the forward is full, and the rest of the rest of the 2 3 X. Special to 20 C C
0 b才。  0 b only.
本 的 是在 休 上 別安 有 、 、 、 大 、 心 、 小 、 置、 、 、 。 休鋼 可 。
Figure imgf000007_0001
金 內 力高 、
This is in the rest of the rest, there,, big, heart, small, set, ,,. Hugh Steel can.
Figure imgf000007_0001
Gold is high,
火 料。 大 、 料小、 、 小、 3 可以特 功 向。 大 于 、室內 大 筒的直 1 00 力 000mm 0mm。大 內 安裝有多 。大 一  Fire material. Large, small, small, and 3 can be special. Larger than the indoor large cylinder, the straight force of 000 mm 0mm. There are many installations inside. Big one
出 小 接 出 小、滾 內有 早 。 板 的 直 左 5。 的高 小 直往的 20 。 大 的 小 筒 接 小 內有 端有30 27。 料 小滾 的 直 右 5。 1北 的高 小滾筒直往的 20-30%。 小滾筒 1 500- 80 m 直往 外 伸入到 料室內。 小滾筒 1 000- m 直往 6n 外 伸入 室內。 的外側安裝有蒸汽 、 密封 、 螺旋 螺旋 至大滾筒 小滾筒連接她的 5 沿, 螺旋 上安裝有污泥 。 有蒸汽出口 蒸汽出 口 管道 休淨化裝置連接 蒸汽出口安裝有閥門。 有 出口 出口 管道 加熱 的 連接 It’s small and small, and it’s early in the roll. Straight left of the board 5. The height is 20 straight. The large small tube has 30 27 in the small end. The small right of the small roll is 5. 1 north high The small roller is 20-30% straight. The small roller 1 500- 80 m extends straight into the material chamber. The small roller 1 000- m extends straight into the room 6n. The outside is fitted with steam, seal, spiral helix to the large roller and a small roller to connect her 5 edges, and the spiral is installed with sludge. There is a steam outlet steam outlet pipe, a clean-up device connected to the steam outlet, and a valve is installed. Connection with heated outlet pipe outlet
安裝有閥門。 小滾筒的外 裝有 裝置 小 滾筒、 大滾筒和小滾筒特 。 小滾筒 料室的連接她以及小滾筒 的連接她 安裝有密封裝置。大滾筒 小滾筒 接的 休 內安裝有 。加熱 安裝有溫度 感器、千 。 料室 安裝有溫度 裝置。  Installed with a valve. The small rollers are equipped with small rollers, large rollers and small rollers. The small drum chamber is connected to her and the small drum is connected to her with a sealing device. The large roller and the small roller are connected to the rest. Heating is installed with a temperature sensor, thousands. The chamber is equipped with a temperature device.
本 的裝置可以用焦炭 燃料 加熱 下 安裝有固定 , 在固 定 排上方 的加熱 壁上安裝有多 焦炭 。固定 的下 凡 凡 的壁上安裝有多 和 凡 。 熱器的 凡 由 管道 凡 的 凡 相連。  The unit can be fixed by heating with coke fuel, and multi-coke is installed on the heating wall above the fixed row. There are many and many fixed installations on the wall. The heat exchangers are connected by any of the pipes.
本 的裝置也可以用 、 天然 或 燃料 加熱 下 安裝 有 休燃燒 各。  The unit can also be installed with natural combustion or fuel heating.
加熱 出口安裝有空 加熱 排出的  Heating outlet is installed with air, heated, discharged
凡 的 加熱。 加熱 排出的 熱器她 再 化 各她 通 排放。  Where the heating. Heat the discharged heat exchanger and she re-discharged each other.
一端 休 底座 下方安裝的 升降裝置之同有連接 。 料室一端 休 底座勻支架之同安裝有連接 。 升降裝置 休 底座前、 高 , 未改 休 底座的  The lifting device installed under one end of the base is connected. One end of the chamber is connected to the base and the bracket is installed. Lifting device, rest, front, high, unrepaired
控制 的功能包括加熱室溫度 和控制、 溫度 、 蒸汽出口 溫度 、滾筒特 和特 方向 和控制、螺旋 特 和控制、 裝置控制、 凡 特 和控制、 休燃燒 各控制、 升降 各控制等。  Control functions include heating chamber temperature and control, temperature, steam outlet temperature, drum characteristics and specific direction and control, screw and control, device control, Fant and control, Hume combustion control, and lift control.
本 的裝置是在 的 特 各裝置上作了 。  This device was made on a special device.
的 特 各裝置通常 這特 裝置只有 往相等的大 , 這特 大滾筒的傾斜角度是固定的。 物料在滾筒內的停留 同是由滾 筒的 、 傾斜 度和特 了滿足加工 的停留 同要求 滾 筒需要很 各制造和安裝造成很多 。 滿足物料加工 不同溫 度 要求 將加熱室內分成 不同溫度 也 以控制和 在她 理物料的 由于大滾筒 一直 因此 滾筒 物料 看滾 筒特 向下 在原位停留 而且在加工 中 滾筒前半 多 而 少。 其不足之她是 大、 能高、 效率低。 The special device usually only has the same size The angle of inclination of this extra large drum is fixed. The retention of the material in the drum is caused by the roller, the inclination and the special satisfaction of the processing. To meet the different temperature requirements of material processing, the heating chamber is divided into different temperatures to control and treat the material in the material due to the large roller. Therefore, the roller material looks down in the in-situ and in the first half of the processing. Her shortcomings are big, high and inefficient.
本 的裝置是將滾筒分成三部分 小滾筒、 大滾筒、 小滾筒。 加大了大滾筒的直往 相 小滾筒和小滾筒的直往而言 使出 小 滾筒和小滾筒之 的大滾筒形成一 。 由于脫水前的污泥由于含有大量 的水份 其休 非常大 一旦 水份 休 至很小, 而 部分脫水 的污泥可以停留在大滾筒中不合 看 特排出 因此可以 小滾筒 輸入 脫水的污泥至大滾筒內 脫水 大滾筒 保持脫水溫度 200C-300C 。 脫水 的污泥 到 定休 污泥休 大滾筒休 的2 -3 % 再將溫度升到 溫度 700C-850C 千 不必 頻繁 大滾筒中的溫度。污泥在滾筒內的停留 同是 或縮短滾 筒 特功的 同 控制, 且可以 污泥加工 不同溫度要求 加熱室內溫度 容易控制和 。 The device is divided into three parts: a small roller, a large roller, and a small roller. The straight roller of the large roller is enlarged. The straight roller of the small roller and the small roller are formed so that the large roller of the small roller and the small roller are formed. Since the sludge before dewatering contains a large amount of water, it is very large. Once the water is small, the partially dehydrated sludge can stay in the large drum and cannot be discharged. Therefore, the dewatered sludge can be input into the small drum. The large roller in the large drum maintains the dehydration temperature of 200C-300C. The dehydrated sludge is 2-3 % of the fixed sludge, and the temperature is raised to the temperature of 700C-850C. The frequency in the large drum is not necessary. The sludge stays in the drum is the same as or shortens the special control of the drum, and can be processed by sludge. Different temperature requirements The temperature of the heating chamber can be easily controlled.
1  1
以污水她 含水 低于8 %的污泥 原料 以 燃料 各有 土壤改 10。 污泥在 各有 土壤改 10前 污泥中的重金 是否符合 相夫的 。 In the case of sewage, the water containing less than 8 % of the water is used to change the soil. Whether the heavy amount of sludge in the sludge before the soil is changed to 10 is consistent with that of the husband.
1 力有 土壤改 各流程示意  1 force has soil reform
a 將同 特 各裝置 3 的加熱 43 內的溫度加熱到脫水溫度 20 °C-300C 將同 特 各裝置3的大滾筒41、 小滾筒31、 小滾筒16自 30一端 計方向  a Heat the temperature in the heating 43 of the same unit 3 to the dehydration temperature 20 °C-300C. The large drum 41, the small drum 31, and the small drum 16 of the same device 3 are oriented from the end of 30
b 升降裝置29將 休 底座38 3。 特 螺旋 2 將污泥令 1中的污泥由 30 端 到大滾筒41內 大滾筒41 內的污泥在大滾筒41傾斜特 和 39的作用向前 布滿大滾筒41 然 升降裝置29將 休 底座38 0。, 30頂部蒸汽 26的閥門, 同 加熱 43的 33的 。 輸入的污泥數量力大滾筒41休 的35% b The lifting device 29 will rest the base 38 3 . The special screw 2 has the sludge in the sludge order 1 from the 30 end to the sludge in the large drum 41 in the large drum 41. The large drum 41 is inclined to the front of the large drum 41 and the large roller 41 is moved forward. Base 38 0. , 30 valves with steam 26 at the top, with 33 for heating 43. The amount of sludge input is 35% of the large roller 41
c 30的蒸汽 47排出的蒸汽大量減少 再用 升降裝置29將 休 底座38 1。 特 螺旋 2 將污泥 1中的污泥由 30 端 到大滾筒41 內, 大滾筒41內的 污泥在大滾筒 41傾斜特 和 39的作用向前 布滿大滾筒 41 然 升降裝置29將 休 底座38 0。 輸入的污 泥數量力大滾筒41休 的25% The steam discharged from c 30 is greatly reduced in steam. The lifting device 29 is used to lower the base 38 1 . The special screw 2 has the sludge in the sludge 1 from the end 30 to the large drum 41, and the sludge in the large drum 41 is inclined to the front of the large drum 41 and the large roller 41 is moved forward. Base 38 0. The amount of sludge input is 25% of the large roller 41
30的蒸汽 47沒有蒸汽排出 30 蒸汽 2 的 同 加熱 43的 33的 將 加熱 43內的溫度 到千 溫度 700C-850C 停留60-120  30 steam 47 no steam discharge 30 steam 2 same heating 43 33 will heat 43 temperature to thousands temperature 700C-850C stay 60-120
e 加熱 43加熱 升降裝置29將 休 底座38 e heating 43 heating lifting device 29 will rest base 38
15。 將同 特 各裝置的大滾筒 41、 小滾筒 16、 小滾筒 31 自 30一端 方向 特 使大滾筒41內 的有 土壤 改 在 39、 42 可 4 作用下 入出 小滾 筒 16 再由 小滾筒 16內的螺旋 18的作用下 入出料室 15 再由 料室 15下方的 13排出 各9。 即 各9力公 的 各 本  15. The large drum 41, the small drum 16, and the small drum 31 of the same device are specially oriented from the end of 30, so that the soil in the large drum 41 is changed to 39, 42 and 4, and the small drum 16 is inserted into the small drum 16 and then the spiral in the small drum 16 The action of 18 is directed to the discharge chamber 15 and the discharge 9 is discharged from 13 below the chamber 15. That is, each of the 9
大滾筒41和 小滾筒16內的有 土壤改 10排出 30 蒸汽 26的 同 加熱 43的  The large drum 41 and the small drum 16 have a soil change 10 and 30 steam 26 of the same heating 43
33的 。 將 特 各裝置3的大滾筒41、 小滾筒31、 小滾 筒 16 自 30一端 方向 特 螺旋 2 將污泥 合中的污泥由 30 到大滾筒41 內 大滾筒41 內的污 泥在大滾筒41傾斜特 和 39的作用向前 布滿大滾筒41 然 升降裝置29將 休 底座38 0。 輸入的污泥 數量力大滾筒41休 的35% 將 特 各裝置3加熱 43內的溫 。 33 of the. The large drum 41, the small drum 31, and the small drum 16 of the special device 3 are spun from the end of 30, and the sludge in the sludge is 30 to the sludge in the large drum 41 in the large drum 41 in the large drum 41. The action of the tilting and 39 is forwarded to the large roller 41, and the lifting device 29 will rest the base 38 0. The amount of sludge input is 35% of that of the large roller 41. The temperature of the internal device 3 is heated by 43.
度 到脫水溫度 20 C 300C Degree to dehydration temperature 20 C 300C
9 步驟b 。  9 step b.
本 于 上 方法的同 特 各裝置3 其包括  The same device 3 of the above method includes
休 底座38 上面安裝有加熱 43、 料室15、 30、 大 滾筒41、 小滾筒 16、 小滾筒31、 裝置11、 12、 螺旋 The rest base 38 is equipped with heating 43, a chamber 15, 30, and a large Roller 41, small drum 16, small drum 31, device 11, 12, spiral
2、 控制 28。 休 底座38可 角力0-3。。2. Control 28. The rest base 38 can be angularly 0-3. .
43外部 金 22, 內部 高溫耐火保溫材料24 大滾筒4 于加熱 43內 大滾筒41的直往 15 mm 43 exterior gold 22, internal high temperature refractory insulation material 24 large drum 4 in heating 43 straight roller 41 straight up 15 mm
20 mm 20 mm
大滾筒41外 加熱 43 內 的 萬 2 mm 大滾筒41 Large drum 41 outside heating 43 10,000 2 mm large drum 41
43 內 的 萬 300mm 大滾筒41外 加熱 43底部 內 的 萬 70 mmo  The outer 300 mm large drum 41 in the 43 heats up the inside of the bottom 43 of the 70 mm
大滾筒41、 小滾筒 16、 小滾筒31特 3-6/m 可以特 特 方向。  The large roller 41, the small roller 16, and the small roller 31 are particularly 3-6/m in a special direction.
大滾筒41 21 小滾筒16 接 小滾筒16內 有螺旋 8。 螺旋 18 小滾筒16的垂直 角力左 5。 螺旋 18的高度力出 小滾筒 16直往的20%  Large roller 41 21 Small roller 16 is connected to the small roller 16 with a screw 8. The vertical angular force of the screw 18 small roller 16 is left 5. The height of the screw 18 is 20% of the diameter of the small roller 16
大滾筒41的另一端 小滾筒31 接 小滾筒31內有螺旋 18 有 27。 螺旋 18 小滾筒 31的垂直 角力右旋 5。 螺旋 18的高度 小滾筒31直往的20%  The other end of the large drum 41 has a small roller 31 having a spiral 18 in the small roller 31. The vertical angular force of the spiral 18 small roller 31 is right-handed 5. The height of the spiral 18 is 20% of the straight roller 31 straight
小滾筒16 15 mm, 直往80 mm 外 伸入到 料室 15內。 小滾筒31 10 m 直往60 mm 外 伸入 30內。 The small roller 16 15 mm extends straight into the chamber 15 up to 80 mm. The small roller 31 10 m extends straight into the 30 mm.
30的外側有螺旋 2 螺旋 2 至大滾筒4 小滾筒31連接她的 沿 螺旋 2 安裝有污泥 1。 The outer side of the 30 has a spiral 2 spiral 2 to the large roller 4 small roller 31 connects her along the spiral 2 to install the sludge 1 .
30 有 49 49 管道 43側面的 33連接 30 Yes 49 49 Pipe 43 Side 33 connection
30 有蒸汽 6 蒸汽出口26 管道 休淨化裝置 8連接, 蒸汽 P26上安裝有 。 休淨化裝置8力公 的 各 30 面板上 密封 40 方便 滾筒內污泥的狀況。 30下 47 以便定期清除 30內可能的 。 大滾筒41內 安裝有多 39。相卻 39 沿之同的 萬 2 m 由多 9 組成 39 的高度5 mm 39的 80 m 每 的 39之同有 5mm的 。 30 There is steam 6 steam outlet 26 Pipeline cleanup device 8 is connected, steam P26 is installed. Sealing 40 on each of the 30 panels of the cleaning device 8 facilitates the condition of the sludge in the drum. 30 under 47 to periodically clear within 30 possible. A plurality of 39 are mounted in the large drum 41. Phase 39 is the same as the 20,000 m. It consists of more than 9 and 39. The height of 39 is 39 mm. The 80 m of each 39 has the same 5mm.
小滾筒 16的外 裝有 17、 19 19座落在 11 上  The outside of the small roller 16 is mounted on 17, 11 19 is located on the 11
小滾筒31的外 裝有 19 19座落在 11上。  The outer casing 19 19 of the small drum 31 is seated on 11.
裝置12 17 小滾筒 16、大滾筒41和小滾筒31 特 。  The device 12 17 has a small roller 16, a large roller 41 and a small roller 31.
小滾筒16 料室 15的連接她以及小滾筒31 30的連 接她 安裝有密封裝置20。 本 迷宮 密封。  The connection of the small drum 16 to the chamber 15 and the connection of the small drum 31 30 is fitted with a sealing device 20. This labyrinth is sealed.
大滾筒41 小滾筒 16 接的 21 休 21內安裝 有 42  Large drum 41 small drum 16 connected 21 rest 21 installed 42
加熱 43 安裝有溫度 感器23  Heating 43 with temperature sensor 23
料室 1 安裝有溫度 裝置14  Compartment 1 installed with temperature device 14
同 特 各裝置3可以 、 天然 或 燃料 其  The same device 3 can be, natural or fueled
3所示, 加熱 43 安裝有 休燃燒 各44。 同 特 各裝置 3 這 ,將 、天然 或 到加熱 43的 休燃燒 各44 休燃燒 各44的 和 凡 控制加熱 43內的溫度。 加熱 43 25安裝有空 熱器4 加熱 43排出的 凡 7 的 加熱。 熱器4力公 的 各。 43排出的 熱器4 再 淨化 各5她 到 規定的大 排放 通 6排放。 淨化 各5力公 各 本 花崗岩水 。As shown in Figure 3, the heating 43 is installed with a combustion of 44. Same as the device 3, this will be, natural or to heat 43 of the combustion of each of the 44 burns each of the 44 and the temperature within the control heating 43. Heating 43 25 is installed with air heater 4 heating 43 discharge of the 7 heat. Heater 4 force each. 43 The discharged heat exchanger 4 re-purifies each of her 5 to the prescribed large discharge 6 discharge. Purify each of the 5 collectives of granite water.
30一端的 休 底座38 方有 升降裝置29 料室 15 一端的 休 底座38勻支架46之間有 接 45 通 升降裝置29 休 底座38前、 高 休 底座38的 。  The 30-side rest base 38 has a lifting device 29. The chamber 15 has a rest at one end. The base 38 has a 45-way lifting device 29 between the brackets 46 and the front base 38 and the base 38 of the high rest.
特 各裝置 3 溫度 感器23和溫度 裝置 14將 到控制 28。 控制 28的功能包括加熱 43溫度 和 控制、 溫度 、 蒸汽出口 26溫度 、 滾筒特 和特 方向 和控制、 螺旋 2特 和控制、 即 各9控制、 凡 7特 和控制、 休燃燒 各44控制、 升降裝置29控制等。 The special device 3 temperature sensor 23 and temperature device 14 will be controlled 28. The functions of the control 28 include heating 43 temperature and control, temperature, steam outlet 26 temperature, drum special and special direction and control, spiral 2 special and control, ie each 9 control, van 7 special and control, Hugh combustion each 44 control, lifting The device 29 controls and the like.
2, 以含水 低于85%的湖底 中的污泥和 生物力原料 以焦 炭 燃料 各有 土壤改良 10 2, Soil improvement with coke fuel in sludge and biological raw materials in the bottom of the lake with water content below 85% 10
湖底 中的污泥和 生物在 各有 土壤改 10前 污泥中的重金 符合 相夫的 。 The sludge and organisms in the bottom of the lake are in accordance with each other.
1 力有 土壤改 各流程示意  1 force has soil reform
a 將同 特 各裝置 3 的加熱 43 內的溫度加熱到脫水溫度 20 C-30 C 將同 特 各裝置3的大滾筒41、小滾筒31、 小滾筒 16自 30一端 方向 特  a Heat the temperature in the heating 43 of the same unit 3 to the dehydration temperature 20 C-30 C. The large drum 41, the small drum 31, and the small drum 16 of the same device 3 are oriented from the end of 30
b 升降裝置29將 休 底座38 3。 特 螺旋 2 將污泥 1中的污泥由 30一端 到大滾筒41 內 大滾筒41 內的污泥在大滾筒41傾斜特 和 39的作用向前 布滿大滾筒41 然 升降裝置29將 休 底座38 b The lifting device 29 will rest the base 38 3 . The special screw 2 has the sludge in the sludge 1 from the end of 30 to the sludge in the large drum 41 in the large drum 41. The large drum 41 is inclined to the front of the large drum 41 and the large roller 41 is moved forward. 38
0。 30 蒸汽出口 26的 同 加熱 43的 33的 。 輸入的污泥數量力大滾筒41休 的35% 0. 30 steam outlets 26 of the same heating 43 of 33. The amount of sludge input is 35% of that of the large drum 41
C 30的蒸汽 47排出的蒸汽大量減少 再用 升降裝置29將 休 底座38 1。 特 螺旋 2 將污泥 1中的污泥由 30 端 到大滾筒41 內 大滾筒41 內的 污泥在大滾筒 41傾斜特 和 39的作用向前 布滿大滾筒 41 , 然 升降裝置29將 休 底座38 0。 輸入的污 數量力大滾筒41休 的25%  The steam discharged from the steam 47 of C 30 is greatly reduced, and the base 38 1 is retracted by the lifting device 29. The special screw 2 spreads the sludge in the sludge 1 from the 30 end to the sludge in the large drum 41 in the large drum 41, and the large roller 41 is forwardly inclined by the action of the large roller 41, and the lifting device 29 will be closed. Base 38 0. The amount of dirt input is 25% of the large roller 41
d 30的蒸汽 47 有蒸汽排出 30 蒸汽出口 26的閥門 同 加熱 43的 33的 將加熱 43內的溫度加熱到 溫度 700C-850C 停留60-120  d 30 steam 47 steam discharge 30 steam outlet 26 valve same heating 43 33 heating the temperature inside the heating 43 to the temperature 700C-850C stay 60-120
e 停止加熱 43加熱 升降裝置29將 休 底座38 e stop heating 43 heating lifting device 29 will rest base 38
3。, 將同 特 各裝置3的大滾筒41、 小滾筒 16、 小滾筒 31 自 30一端 的計方向 特 使大滾筒41內 的有 土壤 改 在 40、 42 下 入出 小滾筒16 再由 小滾 筒 16內的螺旋 18的作用下 入出料室15 再由 料室 15 的 3. The large drum 41, the small drum 16, and the small drum 31 of the same device 3 are made to change the soil in the large drum 41 to 40, 42 into and out of the small drum 16 and then from the small drum 16 The action of the screw 18 is fed into the discharge chamber 15 and then from the chamber 15
13排出 即 各9。 各9力公 的 各 本 大滾筒41和 小滾筒 16內的有 土壤改 10排出13 discharge is 9 each. Each of the nine powers The soil in the large drum 41 and the small drum 16 is changed to 10
30 蒸汽 P26的閥門 同 43的  30 steam P26 valve with 43
49的 。 將同 特 各裝置3的大滾筒41、 小滾筒31、 小滾 筒 16 自 30一端 計方向 特 特 螺旋 2 將污泥 中的污泥由 30一端 到大滾筒41 內 大滾筒41 內的污 泥在大滾筒41傾斜特 和 39的作用向前 布滿大滾筒41 , 然 升降裝置29將 休 底座38 0。 輸入的污泥 數量力大滾筒41休 的35% 將同 特 各裝置3加熱 43內的溫 度 到脫水溫度 20 C-300°C49. The large drum 41, the small drum 31, and the small drum 16 of the same apparatus 3 are metered from the end of the 30-point spiral 2 to the sludge in the sludge from the end of 30 to the sludge in the large drum 41 in the large drum 41. The action of the tilting lever 39 of the large roller 41 is forwardly covered with the large roller 41, and the lifting device 29 will rest the base 38 0. The input sludge is 35% of the amount of the large drum 41, and the temperature of the various units 3 is heated to the dehydration temperature of 20 C-300 °C.
9 步驟b- 本 于 上 方法的同 特 各裝置3 其包括 一整休 底座38 上面安裝有加熱 43、 料室 15、 30、 大 滾筒41、 小滾筒 16、 小滾筒31、 裝置11、 12、 螺旋  9 step b- the same device 3 of the above method comprises a rest period base 38 on which a heating 43, a chamber 15, 30, a large drum 41, a small drum 16, a small drum 31, devices 11, 12, Spiral
2、 控制 28。 休 底座38可 角力0-3。。2. Control 28. The rest base 38 can be angularly 0-3. .
43外部 金 22 內部 高溫耐火保溫材料24 大滾筒41 于加熱 43 內 大滾筒41的直往 10 mm 43 exterior gold 22 interior high temperature refractory insulation material 24 large drum 41 in heating 43 inside straight roller 41 straight up 10 mm
0 mm  0 mm
大滾筒41外 加熱 43 內 的 萬 300m 大滾筒41外 加熱 43 內 的 萬 300mm 大滾筒41外 加熱 43底部 內 的 萬 9 m.  The outside of the large drum 41 is heated by 43. The 300m large drum 41 is heated outside the 43mm 300mm large drum 41. The outer part of the heating 43 is 9 m.
大滾筒41、 小滾筒 16、 小滾筒31特 3-6/m 可以特 特 方向。  The large roller 41, the small roller 16, and the small roller 31 are particularly 3-6/m in a special direction.
大滾筒41一端 21 小滾筒 16 接 小滾筒 16內 有螺旋 18。螺旋 18 小滾筒16的垂直 角力左 15。 螺旋 18的高度力出 小滾筒 16直徑的30%  One end of the large drum 41 21 The small drum 16 is connected to the small drum 16 with a spiral 18 therein. The vertical angular force of the screw 18 small roller 16 is left 15. The height of the screw 18 is 30% of the diameter of the small roller 16
大滾筒41的另一端 小滾筒31 接 小滾筒31內有螺旋 18 有 27。 螺旋 18 小滾筒31的垂直 角力右旋 1 。, 螺旋 18的高度 小滾筒31直往的30%  The other end of the large drum 41 has a small roller 31 having a spiral 18 in the small roller 31. The vertical angular force of the spiral 18 small drum 31 is right-handed 1 . , the height of the spiral 18 30% of the small roller 31 straight
小滾筒16 180 mm 直徑5 mm 外 伸入到 料室15內。 小滾筒31 1 mm 直往40 mm 外 伸入 30內。 30的外側有螺旋 2 螺旋 2 至大滾筒 41 小滾筒31連接她的 沿 螺旋 2 安裝有污泥令 1The small roller 16 180 mm has a diameter of 5 mm and projects into the chamber 15. The small roller 31 1 mm extends straight into the 30 mm outside 40 mm. The outer side of the 30 has a spiral 2 spiral 2 to the large roller 41 the small roller 31 connects her along the spiral 2 with a sludge order 1
30 有 出口 49 出口 49 管道 加熱 43側面的 33連接 30 have exit 49 exit 49 pipe heating 43 side 33 connection
30 有蒸汽 26 蒸汽 26 管道 休淨化裝置 8連接 蒸汽出口26 F安裝有 。 休淨化裝置8力公 的 各 本 。 30 With steam 26 Steam 26 Pipes Purification unit 8 connection Steam outlet 26 F is installed. The rest of the cleaning device 8 is the same.
30 面板上 密封 40 方便 滾筒內污泥的狀況。 30 47 以便定期清除 30內可能的 。 大滾筒41內 安裝有多 39。相卻 39上沿之同的 萬 300mm 由多 39 組成 39 的高度 8 mm 39的 10 mm每一 的 39之同有 mm的 。  30 On the panel Seal 40 Convenient The condition of the sludge in the drum. 30 47 in order to periodically remove the possible within 30. A large number of 39 is mounted in the large drum 41. The phase of the same 39 is the same as the 300mm of the 39mm. The height of 39 is 8 mm 39 and 10 mm each of the 39 has the same mm.
小滾筒 16的外 裝有 17、 19 19座落在 11 上。  The outer rollers 17 of the small rollers 16 are seated on the outer casings 17, 19 19 .
小滾筒31的外 裝有 19 19座落在 11  The outside of the small drum 31 is 19 19 seated at 11
裝置 12 17 小滾筒16、大滾筒41和小滾筒31 特 。  The device 12 17 has a small roller 16, a large roller 41 and a small roller 31.
小滾筒 16 料室15的連接她以及小滾筒31 30的 接 安裝有密封裝置20, 本 密封裝置20 蒸汽密封。  The small drum 16 is connected to the chamber 15 and the small drum 31 30 is attached with a sealing device 20, and the sealing device 20 is steam-sealed.
大滾筒41 小滾筒16 接的 21 休, 21內安裝 有 42 Large drum 41 small drum 16 connected 21 rest, 21 installed 42
43 安裝有溫度 感器23  43 installed with temperature sensor 23
料室15 安裝有溫度 裝置14.  The chamber 15 is equipped with a temperature device 14.
本 的同 特 各裝置3可以焦炭 燃料 其 2所示 加熱 43 安裝有固定 35 在固定 35上方 的加熱 43 壁上安裝有多 焦炭 37  The same device 3 can be coke fuel, 2 is shown, heating 43 is fixed, 35 is fixed above the fixed 35, and 43 is installed on the wall.
固定 35的下 凡 34 凡 34 的壁上安裝有多  Fixed 35 under the 34 34 where the wall is installed
36和 凡 32。 熱器4的 凡 由管道 凡 34的 凡 32相 。 同 特 各裝置 3 將焦炭由 焦炭 37加入到加 熱 4 內且固定 3 燃燒, 焦炭的添加 和 凡 控制 加熱 43內的溫度。 36 and where 32. Heater 4 where the 32 phase of the pipe is 34. The same apparatus 3 adds coke from coke 37 to heating 4 and fixed 3 combustion, coke addition and control of the temperature within heating 43.
加熱 43 出口25安裝有空 熱器4 加熱 43排出的 凡 7 的 加熱。 熱器4力公 的 各。 43排出的 熱器4 再 淨化技各5她 到固 規定的大 排放 通 6排放。 淨化 各5力公 各 本 布袋 。 Heating 43 Outlet 25 is installed with air heater 4 heating 43 discharge of the 7th heating. Heater 4 force each. 43 discharged heat exchanger 4 and then cleaned each of her 5 to the specified large discharge 6 emissions. Purify each of the 5 forces and each bag.
30一端的 休 底座38下方有 升降裝置29 料室 15 端的 休 底座38勻支架46之同有 接 45 通 升降裝置29 休 底座38前、 高 休 底座38的 。  There is a lifting device 29 at the end of the 30-side recess 38. The chamber 15 has a rest base 38 and a uniform bracket 46. The 45-way lifting device 29 rests the front of the base 38 and the base 38 of the high rest.
同 特 各裝置3這 溫度 感器23和溫度 裝置將 到控制 28。控制 08的功能包括加熱 43溫度 和控制、 溫度 、 蒸汽 26溫度 、 滾筒特 和特 方向 和控制、 螺旋 2特 和控制、 各9控制、 凡 7特 和 控制、 升降裝置29控制等。 The temperature sensor 23 and the temperature device of the same device 3 will be controlled 28. The functions of Control 08 include heating 43 temperature and control, temperature, steam 26 temperature, drum special and special direction and control, spiral 2 special and control, each 9 control, van 7 and control, lifting device 29 control and so on.
在上 方法 ,污泥 含水 低于85%的污水她 生的污泥或 、 中的污泥或/和 生物。污泥在 各有 土壤改 前 污泥中的重金 是否符合 相夫的 。  In the above method, the sludge contains less than 85% of the sewage, or the sludge or / and organisms in the sewage. Whether the heavy amount of sludge in the sludge before the soil change is consistent with that of the husband.
本 各的有 土壤改 的參數如下  The parameters of soil modification are as follows
含量  Content
水分 0.7-1  Moisture 0.7-1
60-80  60-80
% 2-3  % 2-3
固定 1521 熱量 J g 4-6  Fixed 1521 heat J g 4-6
全 0.3-0.6 All 0.3-0.6
C含量 9-12 項目 含量 氧化 2o5 % 15.9319.91 C content 9-12 item content Oxidation 2o5 % 15.9319.91
氧化 K2 % 0.530.66 二氧化 SO2 % 15.6519.56 氧化 A2O3 % 5.78-7.22  Oxidation K2 % 0.530.66 Dioxide SO2 % 15.6519.56 Oxidation A2O3 % 5.78-7.22
氧化 Fe2O3 % 11.17-13.96  Oxidation Fe2O3 % 11.17-13.96
氧化鈣 CaO % 12.5915.74  Calcium oxide CaO % 12.5915.74
氧化 gO % 1.02-1.28 二氧化 TO2 % 0.30.37 氧化硫 so3 % 3.47-4.34  Oxidation gO % 1.02-1.28 Dioxide TO2 % 0.30.37 Sulfur oxide so3 % 3.47-4.34
氧化 a2O % 9.79-12.24 項目 數量 千  Oxidation a2O % 9.79-12.24 Item Quantity Thousand
分析水 % 1.36-1.66 氮 % 0.63-0.77 Analytical water % 1.36-1.66 Nitrogen % 0.63-0.77
g 106-130  g 106-130
758-927 758-927
g 772-943  g 772-943
汞 g 0.032-0.039 Mercury g 0.032-0.039
g 0.54-0.66 g 0.54-0.66
g 342-418 g 342-418
g 4847-5924  g 4847-5924
ug 396-485 冠上述方法和裝置 各的有 土壤改 將上述污泥中的有害病 菌、 寄生主 及病毒等高溫 含有碳元素和氮、 氧化 、 氧化鉀 等有 具有土壤改 、 和促迸植物生長功能。 Ug 396-485 The above methods and devices have soil modification. The high temperature contains harmful carbon, nitrogen, oxidation, potassium oxide, etc. in the sludge, such as harmful bacteria, parasitic hosts and viruses. Features.
1 有 土壤改良 中黑色 吸收太 熱能 使土壤溫度升高 促迸 子 。 1 There is soil improvement. Black absorbs too much heat to raise the temperature of the soil and promote the lice.
2 在有 土壤改 的黑色 表面上可以生成 因而形 成道合植物栽培的 此土壤, 避免了 耕作 。 且 、 和蔬菜的生 、 色澤、 都有改善。2 This soil, which is formed by the formation of symbiotic plants, can be formed on a black surface with soil modification, avoiding cultivation. And And the health and color of vegetables have improved.
3 有 土壤改 的黑色 不 可以 植物根部所需水分 同 可改善土壤的 和排水性 力有益于植物的微生物提供 好的 生存空同。 3 Black with soil change No Water required for plant roots can improve soil and drainage. Microorganisms that benefit plants provide good survival.
4 有 土壤改 中的 可以 土壤 增加土壤C 2含 量, 吸附土壤中有害金 提高土壤微生物的活力 植物提供健康的生 那 增強植物的抗病 能力。  4 If there is soil change, the soil can increase the C 2 content of the soil, and absorb the harmful gold in the soil to increase the vitality of the soil microbe. The plant provides a healthy life that enhances the disease resistance of the plant.
有 土壤改 中的氮、 氧化 、 氧化鉀 二氧化 、 氧 化鈉 植物提供生長所需的 減少化肥的使用量。  There are soil-modified nitrogen, oxidation, potassium oxide, and sodium oxide. Plants provide the amount of fertilizer needed to grow.

Claims

要 求 1、 同 特 各裝置 裝置 于有 土壤改 的 各 裝置包括 Requirements 1. Each device is included in each device with soil modification.
底座、 上安裝有污泥合、污泥輸送裝置、 、 小滾筒、大滾筒 小滾筒、 料室、 加熱  Slurry, sludge conveying device, small roller, large roller, small drum, material chamber, heating
其中 污泥合用于存放 她理的污泥 大滾筒 于 加熱室內  Among them, the sludge is used to store her sludge, the large roller in the heating chamber.
污泥 裝置將污泥  Sludge plant will sludge
輸入到大滾筒內的污泥在大滾筒內 她 將她 的 由 小滾筒 至 料室。  The sludge that was fed into the large drum was inside the large drum. She took her from the small drum to the chamber.
2. 要求1 的同 特 各裝置 其 底座 休 底座。  2. The base unit of claim 1 has its base resting on the base.
3 要求1或2 的同 特 各裝置 其中 包括 升降裝置 利用 升降裝置可以使 底座在0-3。角度 園內傾 斜。  3 The same equipment that requires 1 or 2 includes the lifting device. The lifting device can be used to make the base 0-3. Angle The garden is tilted.
4 要求1 的同 特 各裝置 其中 包括 裝 置 裝置 大滾筒、 小滾筒和 小滾筒 特。  4 The same special equipment for requirement 1 includes the installation unit large drum, small drum and small drum.
5. 要求 1 的同 特 各裝置 其中 大滾筒內  5. Requirement 1 of the same special device
6 要求 1 的同 特 各裝置 其中 小滾 筒內 螺旋 利用螺旋 大滾筒輸入的 物輸入到 料室。 6 Requirement 1 The same device in which the screw in the small roller is input to the chamber using the input from the spiral roller.
7. 要求 1 的 特 各裝置 其中 的 外側安裝有蒸汽 、 蒸汽出口 蒸汽出口 管道 休淨化裝置連 接, 蒸汽出口安裝有 有 出口 出口 管 道 加熱 的千 連接 安裝有閥門。 7. In the special equipment of requirement 1, the steam is installed on the outside, the steam outlet is connected to the steam outlet pipe, and the steam outlet is installed with the outlet pipe.
8. 有 土壤改良 的 各方法, 其包括如下步驟 將污泥 于 裝置中于200-300C 脫水 8. Various methods for soil improvement, including the following steps Dewatering the sludge in the unit at 200-300C
之 再輸入污泥于同 特 各裝置中于200-3 0C下脫水 脫水 的污泥休 同 特 各裝置休 的 2 -35% 于 。  The re-injected sludge is dehydrated and dehydrated at 200-3 0C in the same facility. 2 -35% of the equipment is used.
700-850C下  700-850C
的 即至 1 C以下 取出。  It is taken below 1 C.
9. 于 要求8 各方法的同 特 各裝置 其 包括  9. In the case of claim 8, each device of the same method includes
一整休 底座 上面分別安裝有加熱 、 料室、 、 大滾筒、 小滾筒、 小滾筒、 裝置、 螺旋 和控制 其中 0 大滾筒的直往大于 小滾筒和小滾筒的直往 大滾筒一端  A full-time base is equipped with heating, material chamber, large drum, small roller, small roller, device, screw and control. The 0 large roller is straighter than the small roller and the small roller.
小滾筒連接 大滾筒的另一端 小滾筒 接  Small roller connection, the other end of the large roller, small roller
小滾筒的另一端伸入到 料室內 小滾筒的另一端伸入 室 內 5 有密封裝置。  The other end of the small roller extends into the chamber. The other end of the small roller extends into the chamber. 5 There is a sealing device.
10. 要求9 的 特 各裝置,其中 休 底座 可 可 角力03。。  10. Requires a special device of 9, in which the base can be coke force 03. .
11. 要求9 的同 特 各裝置 其中 大滾筒內 有 多 小滾筒和小滾筒內 有螺旋 。  11. The same special device of claim 9 has a small roller and a small roller inside the large roller.
20 12 . 要求 9 的同 特 各裝置 其 的外側 安裝有蒸汽 、 密封 、 螺旋 螺旋 至大 滾筒 小滾筒連接 的 沿 螺旋 上安裝有污泥 20 12 . The outer device of the requirement 9 is equipped with a steam, a seal, a spiral spiral to the large drum, and a small drum connected to the spiral.
頂部有蒸汽出口, 蒸汽出口 管道 休 化裝置連接 蒸汽出口安裝 有 □ 有千 出口 出口 管道 的于 25 連接 安裝有閥門。  There is a steam outlet at the top, the steam outlet pipe is connected to the steaming device, and the steam outlet is installed with □ there are thousands of outlets.
13. 要求9 的同 特 各裝置 其中 小滾筒的外 裝有 裝置 小滾筒、 大滾筒和小滾筒特 。 13. A special device of claim 9 is equipped with a small roller, a large roller and a small roller.
4 要求9 的同 特 各裝置 其中 大滾筒 小 滾筒 接的 休 內安裝有 。  4 The same special device is required for the 9th, where the large roller and the small roller are connected to the rest.
30 15如 要求9 的 各裝置,其中,加熱 下 安裝 有 休燃燒 各 或 30 15 as in claim 9, wherein the device is installed under heating Have a burning or each
加熱 下 安裝有固定 在固定 排上方 的加熱 壁上安裝 有多 焦炭 固定 的下 凡 , 凡 的壁上安裝有多  Under heating, the heating wall fixed above the fixed row is installed with a lot of coke fixed, and the wall is installed more.
和 凡 。  And Fan.
. 要求9 的同 特 各裝置 其中 一端 休 底座 下方安裝的 升降裝置之 有連接 。  . The unit of claim 9 has a connection to the lifting device installed under the base.
17. 要求9 的同 特 各裝置,其中 料室一端 休 底座勻支架之同安裝有連接 通 升降裝置 休 底座前、 高 未改 休 底座的 。  17. Requirement 9 of the same special device, in which one end of the chamber is rested with the base and the bracket is installed with the connection lifting device before the base is lowered, and the base is not changed.
PCT/CN2010/000693 2009-06-10 2010-05-17 Preparation method and device for organic soil conditioner WO2010142136A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN200920108565.6 2009-06-10
CN2009201085656U CN201458915U (en) 2009-06-10 2009-06-10 Intermittent rotary preparation device for preparing organic soil modifier
CN200910086006.4A CN101921595B (en) 2009-06-10 2009-06-10 Preparation method and device of organic soil conditioner
CN200910086006.4 2009-06-10

Publications (1)

Publication Number Publication Date
WO2010142136A1 true WO2010142136A1 (en) 2010-12-16

Family

ID=43308391

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2010/000693 WO2010142136A1 (en) 2009-06-10 2010-05-17 Preparation method and device for organic soil conditioner

Country Status (1)

Country Link
WO (1) WO2010142136A1 (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2842126A1 (en) * 1978-09-28 1980-04-10 Anlagen Leasing Service Refuse pyrolysis reactor drum - with internal spiral ribs of decreasing pitch and adjustable inclination
JP2005230788A (en) * 2004-02-23 2005-09-02 Daido Steel Co Ltd Apparatus for carbonization treatment of organic material-containing sludge
JP2005298586A (en) * 2004-04-08 2005-10-27 Japan Sewage Works Agency Method for carbonizing organic material-containing sludge
JP2008031262A (en) * 2006-07-27 2008-02-14 Japan Sewage Works Agency Method for stabilization-treating carbonized product
CN101134899A (en) * 2006-08-28 2008-03-05 李延韬 Biomass energy converter
US20080210538A1 (en) * 2005-07-12 2008-09-04 Item Technology Solutions Ltd. Pyrolysis System
CN201288111Y (en) * 2008-07-09 2009-08-12 密西西比国际水务有限公司 Apparatus for treating sewage sludge and/or waste slag
CN101624256A (en) * 2008-07-09 2010-01-13 密西西比国际水务有限公司 Method and device for processing sludge and/or waste residues
CN201458915U (en) * 2009-06-10 2010-05-12 张大伟 Intermittent rotary preparation device for preparing organic soil modifier

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2842126A1 (en) * 1978-09-28 1980-04-10 Anlagen Leasing Service Refuse pyrolysis reactor drum - with internal spiral ribs of decreasing pitch and adjustable inclination
JP2005230788A (en) * 2004-02-23 2005-09-02 Daido Steel Co Ltd Apparatus for carbonization treatment of organic material-containing sludge
JP2005298586A (en) * 2004-04-08 2005-10-27 Japan Sewage Works Agency Method for carbonizing organic material-containing sludge
US20080210538A1 (en) * 2005-07-12 2008-09-04 Item Technology Solutions Ltd. Pyrolysis System
JP2008031262A (en) * 2006-07-27 2008-02-14 Japan Sewage Works Agency Method for stabilization-treating carbonized product
CN101134899A (en) * 2006-08-28 2008-03-05 李延韬 Biomass energy converter
CN201288111Y (en) * 2008-07-09 2009-08-12 密西西比国际水务有限公司 Apparatus for treating sewage sludge and/or waste slag
CN101624256A (en) * 2008-07-09 2010-01-13 密西西比国际水务有限公司 Method and device for processing sludge and/or waste residues
CN201458915U (en) * 2009-06-10 2010-05-12 张大伟 Intermittent rotary preparation device for preparing organic soil modifier

Similar Documents

Publication Publication Date Title
CN1098235C (en) Method and apparatus for disposal and treatment of waste
CN106116736A (en) Scale livestock farming Animal fecal pollution and dead livestock and poultry Placenta Hominis governing system and method
CN101803582B (en) System for culturing reeves shads
US5942022A (en) Composting plant for organic waste and method for composting such waste
CN104861996B (en) A kind of technique for biomass pyrolysis carbon gas oil polygenerations systeme
CN206963605U (en) A kind of green pig house
CN2928276Y (en) Organic garbage biochemical processor
CN207113496U (en) A kind of drum-type Chinese medicine medicine materical crude slice hot air drying stove
CN107096790A (en) Polluted soil pyrolysis desorption prosthetic appliance and method
CN101921595B (en) Preparation method and device of organic soil conditioner
CN204509040U (en) A kind of rural domestic sewage treatment system
CN108358427A (en) A kind of integrated sludge drying and incinerating machine
CN104893745B (en) A kind of biomass carbonizing furnace smoke waste heat utilization system
WO2010142136A1 (en) Preparation method and device for organic soil conditioner
CN206389965U (en) A kind of air exchange system of full-automatic pig house
CN205740699U (en) A kind of new and effective sludge drying apparatus
CN205492061U (en) Novel hog house
CN201458915U (en) Intermittent rotary preparation device for preparing organic soil modifier
CN106185952B (en) A kind of method that high dispersancy nano white carbon is prepared using rice husk
CN214936918U (en) Cow dung regeneration sanitary bed-lying pad production system based on anaerobic dry fermentation
CN201825737U (en) Device for producing biocarbons
CN107903917A (en) A kind of effective integrated retort of vacuum
CN206902116U (en) Efficient energy-saving brewing device
CN208717146U (en) A kind of integrated sludge drying and incinerating machine
CN207259243U (en) A kind of water purifying device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10785649

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10785649

Country of ref document: EP

Kind code of ref document: A1