WO2010121310A1 - Procedes de construction de bâtiments et composants associes - Google Patents

Procedes de construction de bâtiments et composants associes Download PDF

Info

Publication number
WO2010121310A1
WO2010121310A1 PCT/AU2010/000454 AU2010000454W WO2010121310A1 WO 2010121310 A1 WO2010121310 A1 WO 2010121310A1 AU 2010000454 W AU2010000454 W AU 2010000454W WO 2010121310 A1 WO2010121310 A1 WO 2010121310A1
Authority
WO
WIPO (PCT)
Prior art keywords
floor panel
concrete
edge
soil
formers
Prior art date
Application number
PCT/AU2010/000454
Other languages
English (en)
Inventor
Paul Camilleri
Original Assignee
Heltech Industries Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2009901770A external-priority patent/AU2009901770A0/en
Application filed by Heltech Industries Pty Ltd filed Critical Heltech Industries Pty Ltd
Publication of WO2010121310A1 publication Critical patent/WO2010121310A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • B28B7/0032Moulding tables or similar mainly horizontal moulding surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0088Moulds in which at least one surface of the moulded article serves as mould surface, e.g. moulding articles on or against a previously shaped article, between previously shaped articles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould

Definitions

  • This invention relates to methods of constructing buildings and components therefor and in particular, methods of constructing dwelling houses and small commercial and industrial buildings.
  • a perimeter beam and/or underfloor cross beams may be formed integrally with the floor slab depending on size, soil conditions and other parameters.
  • on-ground concrete slabs are subject to soil movement and in particular a phenomenon known as "soil heave" which is due at least in part to expansion of soil particles when they become wet. Soil heave results in the surface of the soil rising and applying uplifting forces to the slab resting thereon. The uplifting forces can be high enough to lift the concrete slab which can cause cracking of the slab and the walls which rest on the slab. Soils which have a high clay content are highly reactive to moisture levels and thus can apply high uplifting forces thereby causing significant damage to the slab and the walls constructed thereon.
  • the present applicant has used a method of construction which involves loosening the soil on which the slab is to be ⁇ constructed so as to raise its surface level and then screwing steel piles into the ground through the loosened soil to a suitable founding depth in a predetermined array and then pouring the slab on the raised soil so that it is supported by the screw piles when cured.
  • the soil is loosened to a depth sufficient to raise the surface of the soil to a level which is equal to or greater than the level to which the surface would rise if the soil was to become wet, that is, such that the loosened soil can accommodate the swell potential of the soil- While the "loosened soil method" described has been found to substantially overcome the problem of soil heave it still requires significant on-site works in site preparation and slab construction which are subject to weather constraints.
  • the present invention is aimed at providing a method of construction which provides at least some of the advantages of the loosened soil method of slab-on-ground construction but in a manner which has benefits at least in terms of overall construction costs.
  • the invention in one aspect resides broadly in a method of constructing a building, including: driving a plurality of screw piles into the soil on which a building is to be constructed to a predetermined founding depth and in a predetermined array; casting a plurality of concrete floor panels remote from the soil on which the building is to be constructed, the floor panels being adapted to be joined together at predetermined edges to form the floor of the building to be constructed and to rest on selected ones of said plurality of screw piles respectively; and placing said concrete floor panels on the selected screw piles respectively such that they adjoin at said predetermined edges to form the floor of the building and such that at least a substantial part of each panel is spaced above the soil by a predetermined distance determined by reference to the swell potential of the soil .
  • the site is levelled prior to driving the screw piles into the soil and again after the piles have been driven if desirable to properly space the floor panels above the soil.
  • the method includes placing a load bearing cap on each screw pile and setting the upper faces of all screw pile caps for each panel to the same level. It is also preferred that the screw piles be cut off to the same level after being driven into the soil prior to the caps being fitted so that the caps may bear directly against the upper ends of their piles respectively.
  • the screw piles be cut off at ground level prior to the caps being fitted if the caps are to be encased in concrete. However, if the caps are not to be encased, the piles are preferably cut off at a predetermined height above ground level to allow for clearance under the perimeter beams or to provide greater clearance between the suspended portion and the soil thereunder.
  • each floor panel is constructed with an integrally formed perimeter beam along at least one side which is adapted to seat on the selected screw piles (or the caps when fitted) for that beam and a suspended portion spanning between the opposite portions of the perimeter beam or in the case where thre is no opposite portion spanning between the one side portion of the beam and the perimeter beam of the adjoin panel.
  • the bottom face of the perimeter beam is lower than the bottom face of the suspended portion whereby in use, the suspended portion spans the soil between the rows of piles.
  • the floor panels are constructed such that the suspended portion is at least 100mm above the soil surface for M category soils, 150mm for H category soils and 200mm for E category soils.
  • each floor panel is cast with a width of about 3.6m or less so as to be reasonably transportable by truck from a manufacturing facility to the relevant building site. It is also preferred that the length of each panel be about 12m or less so that transport can be carried out by a common length semi-trailer but greater width and length panels can be manufactured if desired.
  • selected floor panels are fitted with plumbing fixtures such as floor wastes, bathtub wastes, vanity basin wastes, shower waste and toilet wastes and discharge pipes which are accommodated substantially in the void between the lower surface of the suspended portion and the lower surface of the perimeter beam.
  • plumbing fixtures such as floor wastes, bathtub wastes, vanity basin wastes, shower waste and toilet wastes and discharge pipes which are accommodated substantially in the void between the lower surface of the suspended portion and the lower surface of the perimeter beam.
  • the void is not of sufficient height to accommodate the discharge pipes, they can be hung from the underside of the slab and rest in a complementary trench suitably formed in the underlying soil.
  • the invention resides broadly in a building including a concrete floor constructed according to the method previously described.
  • the invention resides broadly in a method of constructing a concrete floor panel of the type having a deck and a beam depending from said deck and formed integrally therewith, the method including forming the concrete floor panel in an upside down disposition, allowing the floor panel to at least partially cure and then turning the panel over.
  • the invention resides broadly in a method of constructing a concrete floor panel of the type having a deck and a beam depending from said deck and formed integrally therewith, the method including: providing a horizontal forming surface for forming thereon the floor panel in an upside down disposition; mounting outer edge formers on said horizontal forming surface for forming the perimeter edges of the floor panel, the horizontal forming surface and the upper edge of at least one outer edge former defining the thickness of the deck, and the horizontal forming surface and the upper edge of another outer edge former defining the thickness of the beam; placing reinforcing material between said outer formers in a predetermined position for reinforcing the concrete therebetween; supporting an inner edge former above the horizontal forming surface and spaced from said other outer edge former, the upper edge of said inner edge former being in the same plane as the upper edge of said other outer edge former, and the lower edge of said inner edge former lying in the same plane as the upper edge of said at least one outer edge former and together with the upper surface of the horizontal forming surface defining the thickness of the deck
  • the invention resides broadly in a method of constructing a concrete floor panel of the type having a deck and a perimeter beam depending therefrom and formed integrally therewith, the method including: providing a horizontal forming surface for forming thereon the floor panel in an upside down disposition; mounting outer edge formers on said horizontal forming surface for forming the perimeter edges of the floor panel, the horizontal forming surface and the upper edges of said edge formers defining the depth of the beam relative to the upper surface of the deck; placing reinforcing material between said edge formers in a predetermined position for reinforcing the concrete between the edge formers; supporting inner edge formers above the horizontal forming surface and spaced from respective ones of said outer edge formers, the upper edges of said internal edge formers being in the same plane as the upper edges of said outer edge formers, and the lower edge of said inner edge formers together with the horizontal forming surface defining the depth of the deck; filling the space between opposed inner formers to their lower edges and the space between respective adjacent spaced apart outer and inner edge formers to
  • said inner edge formers are supported from above the horizontal forming surface and are selectively retractable away from their positions above the horizontal forming surface.
  • the concrete floor panel is placed on a tilting device after curing, the device being arranged to turn the floor panel over so that it can then be stored in its in use disposition and subsequently loaded by forklift, transported in that disposition and unloaded by forklift on site and carried to its final resting place on predetermined screw piles also by forklift.
  • Fig. 1 is a plan of a concrete floor for a dwelling house constructed according to the present invention
  • Fig. 2 is a cross-sectional elevation of one of the floor panels of the concrete floor of Fig. 1 along line 2 - 2;
  • Fig. 3 is an isometric view of a different concrete floor for a dwelling house with the floor panels shown separated and in line for assembly;
  • Fig. 4 is a lateral cross-sectional elevation of the leftmost one of the floor panels shown in Fig. 3 along line 4 - 4 after erection;
  • Fig. 5 is a longitudinal cross-sectional elevation of the leftmost one of the floor panels shown in Fig. 3 along line 5 - 5 after erection;
  • Fig. 6 is a lateral cross-sectional elevation of the rightmost one of the floor panels shown in Fig. 3 along line 6 - ⁇ after erection with an external wall erected thereon;
  • Fig. 7 is a lateral cross-sectional elevation of the edge portions of two adjoining intermediate ones of the floor panels shown in Fig. 3;
  • Fig. 8 is a longitudinal cross-sectional elevation of the a rear edge portion of an intermediate one of the floor panels shown in Fig. 3 which forms part of the bathroom floor;
  • Fig. 9 is a plan of a concrete floor for a different dwelling house constructed according to the present invention with a forklift shown overlaid to depict the method of erecting the floor panels on the screw piles;
  • Fig. 10a is a schematic floor plan layout of a factory designed for manufacturing floor panels according to the invention.
  • Fig. 10b is a flow chart of the basic operations being carried out in the factory of Fig. 10a;
  • Fig. 11 is an isometric view of a forming bed at a workstation of the factory of Fig. 10 with outer wall formwork arranged thereon for manufacturing the floor panels shown in Fig. 3 according to the invention;
  • Fig. 12 is an isometric view of the forming bed shown in Fig. 11 with steel reinforcing mesh laid withing the formwork;
  • Fig. 13 is an isometric view of the forming bed shown in Fig. 11 with inner and outer formwork thereon;
  • Fig. 14 is an isometric view of the forming bed shown in Fig. 11 after the concrete has been poured in the formwork;
  • Fig. 15 is an isometric view of the concrete floor panel formed on the forming bed shown in Fig. 11 after the formwork has been removed.
  • the concrete floor 10 illustrated in Fig. 1 is made up of seven separate floor panels 11 to 17 of generally rectangular form in top view which are joined one to another along their long side edges as required.
  • the panels are all constructed of reinforced concrete in accordance with known principles and has the necessary steel reinforcing fabric and bar as well as cables if required to achieve normal floor strength and deflection requirements.
  • Each floor panel includes a perimeter beam 21 extending fully around the perimeter of the panel, the perimeter beam being integrally formed with a suspended floor portion 22 as can be seen by way of example in panel 11 as shown in section in Fig. 2.
  • the portion of the perimeter beam along outside edges 11a, lib and Hd have a setdown 23 formed therein for supporting a brick wall 24 thereon, the level of the setdown being below the upper face of the floor shown as floor level 26.
  • a timber frame wall 25 rests on the upper face 26 of the floor panel spaced from the brick wall in the usual manner of brick veneer house construction.
  • Edge Hc of the beam has an elongate recess 27 for receiving therein a complementary elongate protuberance or tongue 28 formed on the adjoining edge 13a of the perimeter beam of adjacent panel 12.
  • portions of the perimeter beam of different panels are different depending on whether they are outside edge portions or adjoining edge portions.
  • the bottom face 21a of the perimeter beam is a generally flat rectangular face which is adapted to rest level on any number of selected level topped screw piles as will be described more fully later.
  • the bottom face 22a of the suspended floor portion is substantially higher than the bottom face 21a of the perimeter beam and suitably results in use in the formation of a void 30 between the suspended portion and the ground surface 20.
  • Each floor panel is supported on a plurality of spaced apart cylindrical screw piers 31, each screw pier being capped at its upper end by a pile cap 32 which has a sleeve portion 33 and a support plate portion 34.
  • the pile stems are cut off level with each other at about ground level or at a selected height above ground level and then the sleeve portion is slid onto the upper end portion of its respective pier stem and is secured thereto by bolts 36 and 37 which pass through the sleeve and the pile stem.
  • the underside of the support plate engages the upper end of the stem so that download is applied directly to the stem.
  • steel encased concrete/load bearing grout caps be fitted to the tops of the piers.
  • a substantially conical shaped steel former is secured to the top portion of the respective pier and then filled with concrete which is then levelled off at the top of the former.
  • a wholly steel or cast iron cap is used.
  • a waterproof barrier suitably formed of plastics material may be run along the outside edge of the perimeter beam to prevent ingress of rainwater under the floor, the barrier being secured to the perimeter beam adjacent its upper edge and to the ground at its lower edge.
  • a waterproof barrier suitably formed of plastics material may be run along the outside edge of the perimeter beam to prevent ingress of rainwater under the floor, the barrier being secured to the perimeter beam adjacent its upper edge and to the ground at its lower edge.
  • light weight concrete panels or reinforced fibre cement products may be used if desired.
  • the present invention allows the site to be prepared by straightforward levelling whereupon the screw piers 31 can be driven into the ground in the design positions marked out. Once the screw piers have been driven, they are cut off level and then the caps are fitted and secured.
  • the floor panels which have been previously made in a factory off site (as will be described later) are then transported to the site and lifted into place by a suitable crane or more suitably by a purpose fitted fork lift with the perimeter beams resting on the pier caps as shown in the drawings.
  • termite barrier protection is provided at the joints between panels.
  • the floor 110 illustrated in Fig. 3 is similar to the floor 10 illustrated in Fig. 1 and the panels incorporated in floor 110 are similar to the panels incorporated in floor 10. Accordingly the same reference numbers are used to refer to corresponding integers or components where possible except prefaced by a "1".
  • the floor panels 111 to 119b engage with each other in a different manner from the panels in floor 10.
  • the right hand edge portion 129 of left hand side panel 111 rests on the set down 123 of the adjacent panel 112 and all the intermediate panels rest on the adjacent panel in like manner while the right hand side panel has a perimeter beam and set down extending full around.
  • Such form allows for easier and more accurate positioning and interlocating of the adjacent floor panels.
  • the screw piles supporting floor 110 extend above the ground surface such that the perimeter beam or edge beam as the case may be is spaced above the ground by a predetermined distance selected according to the swell potential of the soil, and the weight of the floor panels such that wetting of the underlying soil cannot lift any floor panel even by engagement under the perimeter beam.
  • a retaining panel 141 extends from the upper face 123a of the set down to a line just below ground surface 120 as can be seen in Fig. 6 and is affixed to the outside edge face of the perimeter beam to form a retaining wall against which soil 142 can be back filled.
  • selected ones of the floor panels are provided with drainage pipes 143 already fitted thereto when they arrive on site so that a plumber can easily connect the house to the sewage system 144 and similarly fit toilets, basins, sinks and showers to drainage pipes on site.
  • a house slab 210 of similar form to those previously described can be erected by first levelling the site then installing the screw piles 231 as described, cutting the screw piles off at the same level, fitting the screw pile caps and then placing the respective floor panels on the corresponding screw piles by a fork lift 246 or similar vehicle to form a complete house floor or slab with sufficient void space under the slab to accommodate soil heave.
  • the floor panels previously described are preferably made in a factory or manufacturing facility of the type illustrated in Fig. 10a and shown in flowchart format in Fig. 10b.
  • a forming table 351 enters the production line and is cleaned and oiled at station A ready for the formwork to be placed thereon for the upside down forming of a slab of predetermined size to suit a selected house floor.
  • the forming table then moves to station B where it is marked out ready for the formwork and the formwork is then mounted on the table as illustrated in Fig. 11 with outer edge form 352, outer end form 353, outer side form 354 and outer edge form 355.
  • Forms 356 and 357 are fitted to form the setdown 23 as will be appreciated from Fig. 11.
  • the forming table then moves to station D where reinforcing bar 358 is fitted within the outer forms. After the reinforcing bar is fitted, the inner edge forms 359 and 360 are fitted.
  • the forming table is lifted to station J where the forms are removed and the floor panel and the forming table is turned over at tilting station K in order to place the floor panel in its in-use disposition and then the forming table is lifted from the floor panel.
  • the floor panel can be lifted from the forming table while horizontal and still in its upside down disposition and then placed on the tilting device which would then turn the floor panel over ready for loading onto a truck.
  • the slab leaves the tilting station, it is lifted to station L where plumbing fittings are installed as required.
  • the penetrations can be formed during casting via forming blocks 371 or they can be cut by a drilling machine after curing. It will be appreciated that the manufacturing facility is capable of manufacturing floor panels of relatively exacting dimensions with an excellent finish on the top side, that finish being formed by the forming table.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Electromagnetism (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

L'invention concerne un procédé de construction de bâtiment, consistant : à entraîner une pluralité de pieux à vis dans le sol sur lequel le bâtiment doit être construit, jusqu'à une profondeur de fondations prédéterminée, de façon à former un réseau prédéterminé ; à couler une pluralité de panneaux de plancher en béton à distance du sol sur lequel le bâtiment doit être construit, ces panneaux étant conçus pour être reliés entre eux par des bords prédéterminés pour former le plancher du bâtiment à construire et pour reposer respectivement sur des pieux à vis sélectionnés parmi la pluralité de pieux ; et à placer les panneaux de plancher en béton respectivement sur les pieux à vis sélectionnés, de sorte qu'ils soient adjacents au niveau des bords prédéterminés pour former le plancher du bâtiment et qu'au moins une partie importante de chaque panneau soit éloignée du sol d'une distance prédéterminée en fonction du potentiel de gonflement du sol.
PCT/AU2010/000454 2009-04-23 2010-04-22 Procedes de construction de bâtiments et composants associes WO2010121310A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU2009901770 2009-04-23
AU2009901770A AU2009901770A0 (en) 2009-04-23 Method of constructing floors

Publications (1)

Publication Number Publication Date
WO2010121310A1 true WO2010121310A1 (fr) 2010-10-28

Family

ID=43010595

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2010/000454 WO2010121310A1 (fr) 2009-04-23 2010-04-22 Procedes de construction de bâtiments et composants associes

Country Status (2)

Country Link
AU (1) AU2010201613A1 (fr)
WO (1) WO2010121310A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042313A (zh) * 2019-12-28 2020-04-21 深圳世拓建筑科技有限公司 装配式钢骨建筑物及其建造方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000075440A1 (fr) * 1999-06-08 2000-12-14 Laing Gordon G Système de construction modulaire
US20040163357A1 (en) * 2003-02-20 2004-08-26 Gregory Enterprises, Inc. Preconstruction anchoring system and method for buildings
US7028445B2 (en) * 2002-03-18 2006-04-18 Evolution International No.2 Pty Ltd. Method of constructing a concrete slab

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000075440A1 (fr) * 1999-06-08 2000-12-14 Laing Gordon G Système de construction modulaire
US7028445B2 (en) * 2002-03-18 2006-04-18 Evolution International No.2 Pty Ltd. Method of constructing a concrete slab
US20040163357A1 (en) * 2003-02-20 2004-08-26 Gregory Enterprises, Inc. Preconstruction anchoring system and method for buildings

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042313A (zh) * 2019-12-28 2020-04-21 深圳世拓建筑科技有限公司 装配式钢骨建筑物及其建造方法
CN111042313B (zh) * 2019-12-28 2021-05-07 深圳世拓建筑科技有限公司 装配式钢骨建筑物及其建造方法

Also Published As

Publication number Publication date
AU2010201613A1 (en) 2010-11-11

Similar Documents

Publication Publication Date Title
US4918891A (en) Precast concrete foundation elements and system and method of using same
US6434900B1 (en) Prefabricated concrete wall system
US9874036B2 (en) Prefabricated, deconstructable, multistory building construction
RU2353740C2 (ru) Модульная система для сооружения фундаментов опоры воздушной линии и/или опорной сваи
KR100744693B1 (ko) 콘크리트 스틸 하우스 및 이를 이용한 말뚝기초 푸팅시공방법
US5540524A (en) Concrete slab foundation and method of construction
WO2007019414A2 (fr) Dalles suspendues structuralement, ajustables en hauteur pour une fondation structurale
CN102383443A (zh) 基坑支护桩与地下室外墙之间的连接结构及施工方法
US10053833B2 (en) Pre-cast decorative retaining wall system
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
CN106545030B (zh) 一种小型地埋式蓄水池及其制作方法
US10267011B2 (en) Pre-cast decorative retaining wall system
WO2008011443A2 (fr) Systèmes de plancher à fixation sur treillis et procédés et appareil associés
KR101761779B1 (ko) 기초 매입형 강재 집수정을 시공하는 방법
KR100726111B1 (ko) Pc 슬래브를 이용한 욕실바닥 제작 공법
CN205677070U (zh) 一种建筑框架结构
AU2008201825A1 (en) Method of constructing building slabs and pavements and storing water
WO2010121310A1 (fr) Procedes de construction de bâtiments et composants associes
US20100115691A1 (en) Basin, elements and method for manufacturing such a basin
RU2379424C1 (ru) Способ возведения фундаментной плиты рамной конструкции
WO2009053185A2 (fr) Pavage autoporteur destiné à être utilisé dans un environnement extérieur
CN102777032A (zh) 预制卫生间的安装方法
RU2671019C1 (ru) Способ возведения стенчатого фундамента с использованием ребристых плит перекрытий (покрытий)
CN111319118A (zh) 一种高原河谷桥梁施工中箱梁的预制施工方法
KR101056395B1 (ko) 조립식 저류조 구조물 및 상기 저류조 구조물의 시공방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10766503

Country of ref document: EP

Kind code of ref document: A1

DPE2 Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 29/02/2012)

122 Ep: pct application non-entry in european phase

Ref document number: 10766503

Country of ref document: EP

Kind code of ref document: A1