WO2010092562A1 - Erection method by simple tower instrument devices of building upper bridge construction - Google Patents

Erection method by simple tower instrument devices of building upper bridge construction Download PDF

Info

Publication number
WO2010092562A1
WO2010092562A1 PCT/ID2010/000003 ID2010000003W WO2010092562A1 WO 2010092562 A1 WO2010092562 A1 WO 2010092562A1 ID 2010000003 W ID2010000003 W ID 2010000003W WO 2010092562 A1 WO2010092562 A1 WO 2010092562A1
Authority
WO
WIPO (PCT)
Prior art keywords
tower
premier
pillar
construction
arc
Prior art date
Application number
PCT/ID2010/000003
Other languages
French (fr)
Inventor
Ben Ibrahim S. Bahat
Original Assignee
Bahat Ben Ibrahim S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bahat Ben Ibrahim S filed Critical Bahat Ben Ibrahim S
Priority to US13/147,442 priority Critical patent/US20110283467A1/en
Priority to JP2011600060U priority patent/JP3177157U/en
Publication of WO2010092562A1 publication Critical patent/WO2010092562A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • E01D1/005Bowstring bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Definitions

  • Present invention refers to a erection method by simple tower instrument devices on building upper bridge construction, especially relates to simple tower instrument devices (cable stayed) in form of tower construction as supporting structure and the cable functions as hanging upper bridge structure, also bearing function as additional tie cable to said tower during pulling activity using twin ram jack unit or multi-strand M-PV in order to construct upper part of bridge so that no need hammer and winch any longer.
  • simple tower instrument devices as help device during construction process on wide river, result minimize disturbance to river traffic such as pontoon, ship, raft, etc, which will be able to go through freely during the construction, plus rninimize accident level.
  • This erection method using simple tower instrument devices may utilize existence bridge pillars, also adjustable tower dimension and cable with designed construction specification and results cost and duration saving.
  • said erection process is sensitive to water stream and river bed situation. It is hard to do because the pontoon will be inhibited by the stones. Other obstacles are longer duration, high cost, and sensitive to transportation vehicle crush, like pontoon, ship, raft, etc.
  • present invention refers to erection method using simple tower instrument (cable stayed) to build upper bridge construction in form of tower construction as supporting structure and the cable functions to hang upper bridge structure, also bearings which function as additional tie-up cable to said tower during pulling activity using twin ram jack unit or multi-strand M-PV in order to construct upper part of bridge but no need hammer and winch any longer.
  • simple tower instrument devices as help device during construction process on wide river, result minimize disturbance to river traffic such as pontoon, ship, raft, etc, which will be able to go through freely during the construction, additionally minimize accident level.
  • This erection method uses simple tower instrument devices which utilize existence bridge pillars; while tower dimension, cable are adjustable with designed construction specification as cost and duration saving.
  • a simple tower instrument during construction upper bridge portion consists of:
  • a number arc construction onto pontoon using crane which all arc components made segmental, from segment 1 until segment 13, which loaded onto pontoon, arranged by a mean so that pontoon stay stabile during installing arc construction.
  • a number bracings together with arc construction accordingly following arc construction installation A number twin rams jack unit or multi-strand M-PV to stabilize premier supporter installation of upper bridge.
  • Main objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge, mainly on wide range to reduce cost and using existent pillars.
  • Further objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge to minimize disturbance to river traffic and accident risk during the construction.
  • Further objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge which knock-down easily to reduce cost and duration.
  • Further objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge by uniting on site as necessary.
  • Further objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge which visible to wide range and stoned river bed without disrupt river bed topography as well as reducing environment pollution.
  • Figure IA is front perspective, shows fore-face of conventional scaffolding to build upper bridge structure, according to prior art.
  • Figure IB is above perspective, shows upper-face of conventional scaffolding to build upper bridge structure, according to prior art.
  • Figure 1C is "A" perspective, shows joint of shoes or foundation between piled steel pipe under river bed and above pipes, according to prior art.
  • Figure ID is "A” perspective, shows joint of unplugged shoes or foundation between piled steel pipe under river bed and above pipes, according to prior art.
  • Figure 2 is front perspective, shows fore-face of simple tower instrument, according to present invention.
  • Figure 3 is perspective view, shows erection method of simple tower instrument during installing premier pillar on tower main pillar, according to present invention.
  • Figure 4 is front perspective, shows erection method of simple tower instrument during installing premier pillar on tower main pillar through bearings, according to present invention.
  • Figure 5 is front perspective, shows side of simple tower instrument which has unite to bridge pillar, according to present invention.
  • Figure 6 is front perspective, shows detail of tower installation on bridge pillar, according to present invention.
  • Figure 7 is above perspective, shows upper part of tower installation on bridge pillar, according to present invention.
  • Figure 8 is perspective view, shows joint of wind fastener to bridge pillar, according to present invention.
  • Figure 9 is side perspective, shows detailed joint of wind fastener to main bridge pillar, according to present invention.
  • Figure 10 is above perspective, shows detailed bearings installation to main tower pillar, according to present invention.
  • Figure 11 is side perspective, shows anchor installation on back pillar of bridge tower pillar, according to present invention.
  • Figure 12 is side perspective, shows detailed anchor installation on rear pillar of bridge tower pillar, according to present invention.
  • Figure 13 is perspective view, shows shape of bearings on simple tower instrument, according to present invention.
  • Figure 14 is perspective view, shows flat frame erection installation of upper bridge construction, according to present invention.
  • Figure 15 is upper perspective, shows erection method on arc starting point construction, according to present invention.
  • Figure 16 is perspective view, shows erection installation of arc starting point construction, according to present invention.
  • Figure 17 is upper perspective, shows erection method on arc end point construction, according to present invention.
  • Figure 18 is perspective view, shows erection installation of arc end point construction, according to present invention.
  • Figure IA shows fore-face of conventional scaffolding to build upper bridge structure, according to prior art.
  • Figure IB is above perspective, shows upper-face of conventional scaffolding to build upper bridge structure, according to prior art.
  • Figure 1C is front perspective, shows joint of shoes or foundation between piled steel pipe under river bed and above pipes, according to prior art.
  • Figure ID is front perspective, shows joint of unplugged shoes or foundation between piled steel pipe under river bed and above pipes, according to prior art.
  • Figure 2 is front perspective, shows fore-face of simple tower instrument, according to present invention.
  • Figure 3 is perspective view, shows erection method of simple tower instrument during installing premier pillar on tower main pillar, according to present invention.
  • Figure 4 is front perspective, shows erection method of simple tower instrument during installing premier pillar on tower main pillar through bearings, according to present invention.
  • An erection method by simple tower instrument during upper bridge construction installation consists of: Installing 8 bolt/anchor (7b) 0 1 l / 2 " - 400 and lower joint plate 24 mm bold,
  • a simple tower instrument devices on upper bridge construction consist of:
  • a number bracing (5) install at the same time with arc (1) construction accordingly following arc (1) construction installation.
  • Position of temporary tower (7) construction for arc center range (1) erection is calculated pillars (6a,6b) capability by estimating steel pile strength (9a,9b) on said pillars (6a,6b). Value of steel pile strength (9a,9b) on said pillars (6a,6b) are different for every site, depend on designed flat frame (3) load and soil strength of site. Further refers to Figure 5 until Figure 7, which Figure 5 is front perspective, shows side of simple tower instrument which has unite to bridge pillar, according to present invention. While Figure 6 is front perspective, shows detail of tower installation on bridge pillar, according to present invention. Also, Figure 7 is upper perspective, shows upper part of tower installation on bridge pillar, according to present invention.
  • Simple tower (7) structure design as temporary tower is bar structure as premier tower by using three steel pipes 0 30 cm, steel plate 6.5 mm bold, and pipe bracing (10) 0 15 cm, properties of yield stressing point 250 MPa, and made segmental which every segment 6 meter tall in 9 number.
  • Premier tower pillar (7a) 0 30 cm, lay on pillar (6a) which had installed tower hook (7a) previously by deploy bolt/anchor (7b), which attached to pillar head's (6a) properties are anchor/bolt (7b) 8 0 1 14 - 400 diameter, and lower joint plate (7a) 24 mm, also locking plate (7c) of 5, 24 mm bold and 42 cm tall as junction of tower pipes (7) and base plate (7a).
  • FIG. 8 is perspective view, shows joint of wind fastener to bridge pillar, according to present invention
  • Figure 9 is side perspective, shows detailed joint of wind fastener to main bridge pillar, according to present invention.
  • wind fastener (10) which functions as tower pillar stiffener uses circle steel pipes 0 15 cm and jointed by bolt (10a) 4 0 %" and previously made junction joint (1 Ob) from steel plate 16 mm bold.
  • Figure 10 shows detailed bearings installation to main tower pillar, according to present invention.
  • Figure 11 is side perspective, shows anchor installation on rear pillar of bridge tower pillar, according to present invention.
  • Figure 12 is side perspective, shows detailed anchor installation on rear pillar of bridge tower pillar, according to present invention.
  • Figure 13 is perspective view, shows shape of bearings on simple tower instrument, according to present invention. Bearings (12) are used to tie cables (8a,8b) to premier tower (7) pillar to provide tension during erection by twin ram jack unit or multi-strand M-PV (now shown in Figure).
  • each of bearings (12) attached and calculated tension magnitude of cables (8a, 8b).
  • Cables (8a,8b) use single strand 3 0 0,6", 270 ksi, which laying cable 70° to tower and backstays (8b) 50° to tower.
  • Hanging cable (8a) functions to reduce deflection on arc structure (1) during the erection meanwhile backstay (8b) functions to stabilize tower against lateral force due to the erection.
  • Cables (8a,8b) are given tension using multi-strand M-PV (not shown in Figure) with pretension force 650 kN.
  • FIG 16 is perspective view, shows erection installation of arc starting point construction, according to present invention.
  • Figure 17 is above perspective, shows erection method on arc end point construction, according to present invention.
  • Figure 18 is perspective view, shows erection installation of arc end point construction, according to present invention.
  • Tower (7) installations of pillars (6a) proceed segmental into 9 segments together with both pillars (6a).
  • Each segment of tower (7) construction built on preparation phase and each tower (7) deployed by crane (13) which posed on pontoon (14) at starting point pillar (6a) (shown in Figure 15), begin with tower (7) segment then bolted on pillar lay up (7a). After tower segment (7) deployed on site, continue joining bolt of segmented tower (7)2 and then continue until wholly tower segment (7)9 also proceed to left and right pillar (6a). After that, bracing (10) placed by crane (13) which posed on pontoon (14) and placed on designed position per tower segment (7).
  • pontoon number (c) do arc construction installation on right side of end point for arc construction segment 1 until segment 13.
  • the arc (1) construction has erected from starting point wise.
  • arc (1) construction erection which proceed from end point, and use same method of arc (1) construction installation on starting point.
  • Pontoon (14) position number (c) move to right side of pontoon (14) number (d). after stable, proceed arc (1) construction installation on left starting point for arc (1) construction segment 1 until segment 13, and at the same time, proceed bracing (5) fastener segmental, thus move to pontoon number (e).
  • pontoon (14) number (e) proceed arc (1) construction installation on right side of end point for arc (a) construction segment 1 until segment 13.
  • bracing (5) tied segmental refers to arc (1) construction installation rightward.
  • Prior arc (1) construction installation per segment rear cable anchor (11) installed on desired position, e.g. on pillar (6b).
  • Rear cable (8b) installation to provide simple structure stabilization during erecting of arc (1) construction.
  • process of arc (1) construction erection has accomplished for end point side.
  • supporting cables (8a,8b) are plugged, the left side and right side, at the same time.
  • unplugging tower may be preceding by crane (13) which posed on pontoon (14) segment by segment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

An erection method by simple tower instrument during upper bridge construction installation, consists of installing 8 bolt ∅ 1 1/2" — 400 and lower joint plate 24 mm bold, ∅ 50 cm on head of bridge construction pillar as hook designed tower, installing 5 locking plates from lower plate with 24 mm bold, 42 cm height as joint of premier steel pile ∅ 30 cm, 6.5 mm bold, through 8 bolts and lower joint plate on every head of bridge construction pillar, installing and locking wind fastener ∅ 15 cm through joint plate 16 mm bold and 4 bolts ∅ 3/4" to unite premier tower 3 ∅ 30 cm, 6.5 mm bold, locating axis bearings 6 cm on outer side of premier tower as supporting part to tie and tension cable to tower, locating front stays with to 70 degree to tower to put premier supporter on premier tower through bearings, locating back stays with 50 degree to tower to stabilize tower on rear tower pillar through bolt on bridge pillar, locating arc construction onto pontoon using crane, which all arc components made segmental, from segment 1 until segment 13, which loaded onto pontoon, arranged by a way so that pontoon stay stabile during installing arc construction, installing bracing at the same time with arc construction accordingly following arc construction installation, stressing cable using twin ram jack unit or multi-strand M-PV to stabilize premier supporter installation of upper bridge, featured that to unite premier tower piles, we use segmental by unite on site as necessary, and knock down easily after installing premier supporter stabilization of upper bridge portion, meanwhile tower hook, tower, bearings, cable installation, and tension, as additional device by using existent pillars so that reduce duration and cost wholly.

Description

ERECTION METHOD BY SIMPLE TOWER INSTRUMENT DEVICES OF BUILDING UPPER BRIDGE
CONSTRUCTION
Description
Technical Field of Invention
Present invention refers to a erection method by simple tower instrument devices on building upper bridge construction, especially relates to simple tower instrument devices (cable stayed) in form of tower construction as supporting structure and the cable functions as hanging upper bridge structure, also bearing function as additional tie cable to said tower during pulling activity using twin ram jack unit or multi-strand M-PV in order to construct upper part of bridge so that no need hammer and winch any longer. Further of present invention, refers to simple tower instrument devices as help device during construction process on wide river, result minimize disturbance to river traffic such as pontoon, ship, raft, etc, which will be able to go through freely during the construction, plus rninimize accident level. This erection method using simple tower instrument devices may utilize existence bridge pillars, also adjustable tower dimension and cable with designed construction specification and results cost and duration saving.
Background of Invention
As technology development, especially bridge construction for wide range, the experts compete to improve quality of bridge construction and speed to proceed it self.
Many methods and devices are available to build bridge construction for wide bentangan have some obstacles or weaknesses which effect some destruction. Usually, previous building bridge construction especially for wide range uses conventional method, which use scaffolding as well as crane, pontoon, tugboat, and gauge in every step, the provide cable tension to bridge construction pillars. This method needs more manpower and long duration to construct the continues bridge.
Also, said erection process is sensitive to water stream and river bed situation. It is hard to do because the pontoon will be inhibited by the stones. Other obstacles are longer duration, high cost, and sensitive to transportation vehicle crush, like pontoon, ship, raft, etc.
Another obstacle is that piles prohibit wooden material as temporary pile due to water condition. It causes using steel pile and high cost thereof. Indeed, high cost for temporary job. Other, numerous pillar will inhibit river traffic so that disturb traffic safety and performance.
Further, during beginning of process which cranes pile scaffolding one by one, pontoon, tugboat, and gauges to construct arc construction and flat frame, so that needs hammer and winch and additional time and fund, also complicated devices.
Another obstacle related to technical factor due to accurate tool to erect premier pillar. Whether there is one mistake, the strength of building will be reduced.
In other words, the strength of upper bridge construction is influenced very much by posed premier pillar. To solve these problems, proposed an erection method by using simple tower instrument (cable stayed) which consists of tower construction as supporting structure and cable to hang upper bridge construction, also bearings as additional help device to tie up to tower and provide tension by twin ram jack and multi-strand M-PV. This simple tower structure functions to support constructing upper bridge portion on wide river so that no disturbance to river traffic. Present erection method may use existence pillars, as well as adjustable tower and cable dimension to reduce the cost and duration.
Brief Description of Invention As previous description, present invention refers to erection method using simple tower instrument (cable stayed) to build upper bridge construction in form of tower construction as supporting structure and the cable functions to hang upper bridge structure, also bearings which function as additional tie-up cable to said tower during pulling activity using twin ram jack unit or multi-strand M-PV in order to construct upper part of bridge but no need hammer and winch any longer. Further present invention, refers to simple tower instrument devices as help device during construction process on wide river, result minimize disturbance to river traffic such as pontoon, ship, raft, etc, which will be able to go through freely during the construction, additionally minimize accident level. This erection method uses simple tower instrument devices which utilize existence bridge pillars; while tower dimension, cable are adjustable with designed construction specification as cost and duration saving.
Present erection method using simple tower instrument, which consists of: Installing 8 bolt 0 1 1A" - 400 and lower joint plate 24 mm bold, 0 50 cm on head of bridge construction pillar as designed tower hook.
Installing 5 locking plates from lower plate with 24 mm bold, 42 cm height to joint premier steel pile 0 30 cm, 6.5 mm bold, through 8 bolts and lower joint plate on every head of bridge construction pillar.
Installing and locking wind fastener 0 15 cm through joint plate 16 mm bold and 4 bolts 0 3A" to unite premier tower 3 0 30 cm, 6.5 mm bold.
Locating axis bearings 6 cm on outer side of premier tower as supporting part to tie and cable tension to tower. Locating front stays with to 70 degree to tower to put premier supporting on premier tower through bearings.
Locating back stays with 50 degree to tower to stabilize tower on rear tower pillar through bolt on bridge pillar.
Locating arc construction onto pontoon using crane, which all arc components made segmental, from segment 1 until segment 13, which loaded onto pontoon, arranged by a mean so that pontoon stay stabile during installing arc construction.
Installing bracing together with arc construction according to arc construction installation.
Providing cable tension using twin ram jack unit or multi-strand M-PV in order to stabilize premier supporter installation of upper bridge.
Featured that to unite premier tower piles, we use segmental by unite on site as necessary, and unplugged easily after installing premier supporter of upper bridge portion, meanwhile tower hook, tower, bearings, cable installation, and tension, as additional device by using existent pillars so that reduce duration and cost generally. A simple tower instrument during construction upper bridge portion, consists of:
A number of bar frames as premier pillar by using three steel pipes 0 30 cm, 6.5 mm bold which constructed segmental;
A number bolts 0 1 1A" - 400 and lower joint plate 24 mm bold, 0 50 cm on head of bridge construction pillar as designed hook tower.
A number locking plates from lower plate with 24 mm bold, 42 cm height as joint of premier steel pile 0 30 cm, 6.5 mm bold, through 8 bolts and lower joint plate on every head of bridge construction pillar. A number wind fasteners 0 15 cm through joint plate 16 mm bold and 4 bolts 03A" to unite premier tower of 3 0 30 cm, 6.5 mm bold.
A number axis bearings 6 cm on outer side of premier tower as supporting part to tie up and tense cable to tower. A number front stays with to 70 degree to tower to put premier supporter on premier tower through bearings.
A number back stays with 50 degree to tower to stabilize tower on rear tower pillar through bolt on bridge pillar.
A number arc construction onto pontoon using crane, which all arc components made segmental, from segment 1 until segment 13, which loaded onto pontoon, arranged by a mean so that pontoon stay stabile during installing arc construction.
A number bracings together with arc construction accordingly following arc construction installation. A number twin rams jack unit or multi-strand M-PV to stabilize premier supporter installation of upper bridge.
Featured that whole components unite by using existent pillars as simple tower instrument, act as temporary supporting unit during installing premier pillar of upper bridge portion. Main objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge, mainly on wide range to reduce cost and using existent pillars.
Further objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge to minimize disturbance to river traffic and accident risk during the construction.
Further objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge which knock-down easily to reduce cost and duration.
Further objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge by uniting on site as necessary.
Further objective of present invention is to provide an erection method using simple tower devices on constructing upper part of bridge which visible to wide range and stoned river bed without disrupt river bed topography as well as reducing environment pollution.
Brief Description of Drawings For making it easier to understand present invention, following story will describe and refer to attached drawings, they are:
Figure IA is front perspective, shows fore-face of conventional scaffolding to build upper bridge structure, according to prior art.
Figure IB is above perspective, shows upper-face of conventional scaffolding to build upper bridge structure, according to prior art.
Figure 1C is "A" perspective, shows joint of shoes or foundation between piled steel pipe under river bed and above pipes, according to prior art.
Figure ID is "A" perspective, shows joint of unplugged shoes or foundation between piled steel pipe under river bed and above pipes, according to prior art. Figure 2 is front perspective, shows fore-face of simple tower instrument, according to present invention.
Figure 3 is perspective view, shows erection method of simple tower instrument during installing premier pillar on tower main pillar, according to present invention. Figure 4 is front perspective, shows erection method of simple tower instrument during installing premier pillar on tower main pillar through bearings, according to present invention.
Figure 5 is front perspective, shows side of simple tower instrument which has unite to bridge pillar, according to present invention. Figure 6 is front perspective, shows detail of tower installation on bridge pillar, according to present invention.
Figure 7 is above perspective, shows upper part of tower installation on bridge pillar, according to present invention.
Figure 8 is perspective view, shows joint of wind fastener to bridge pillar, according to present invention.
Figure 9 is side perspective, shows detailed joint of wind fastener to main bridge pillar, according to present invention.
Figure 10 is above perspective, shows detailed bearings installation to main tower pillar, according to present invention. Figure 11 is side perspective, shows anchor installation on back pillar of bridge tower pillar, according to present invention.
Figure 12 is side perspective, shows detailed anchor installation on rear pillar of bridge tower pillar, according to present invention. Figure 13 is perspective view, shows shape of bearings on simple tower instrument, according to present invention.
Figure 14 is perspective view, shows flat frame erection installation of upper bridge construction, according to present invention.
Figure 15 is upper perspective, shows erection method on arc starting point construction, according to present invention.
Figure 16 is perspective view, shows erection installation of arc starting point construction, according to present invention.
Figure 17 is upper perspective, shows erection method on arc end point construction, according to present invention. Figure 18 is perspective view, shows erection installation of arc end point construction, according to present invention.
Detailed Description of Invention
Further description will be provided in details, refers to attached drawings. Refers to Figure IA until ID, which Figure IA is front perspective, shows fore-face of conventional scaffolding to build upper bridge structure, according to prior art. Meanwhile Figure IB is above perspective, shows upper-face of conventional scaffolding to build upper bridge structure, according to prior art. Figure 1C is front perspective, shows joint of shoes or foundation between piled steel pipe under river bed and above pipes, according to prior art. Figure ID is front perspective, shows joint of unplugged shoes or foundation between piled steel pipe under river bed and above pipes, according to prior art.
To precede center range construction (1) of upper bridge and arced with 150 meters or more length by conventional scaffolding method, usually utilize some cranes (13) and pontoon (14) for steel scaffolding pillar installation (4) temporarily. Wherein scaffolding use steel pipes (4) 40 cm and 60 cm diameter which piled into river bed so disturb river traffic because of reduced river space by scaffolding pillars (4). During steel pipes installation (4), a crane (13) located on pontoon (14) with same direction with river stream to reduce traffic disturbance. Steel pipe (3) which piled into river bed thus made inner joint (3a) with pipes (4) above it with certainty space from pile end (3) which functions as shoes or foundation (shown in Figure 1C), and meant to unplugged easily after erection work finish, but piled scaffolding pillar will not unplugged so disturb river traffic (shown in Figure ID). Meanwhile, flat frame center range (2) installation which functions as vehicle floor will be proceed after pile (3,4) and beam (1,5) installed completely. During flat frame (2) erection installation proceed one direction due to flat frame material (2) located far apart of pillars (6a,6b) so that need link set as weighing. In order to support flat frame material (2), use crane (13) which located on pontoon (14) (not shown in this figure). These installations proceed step by step so need more labor and duration.
Further refers to Figure 2 until Figure 4, which Figure 2 is front perspective, shows fore-face of simple tower instrument, according to present invention. Figure 3 is perspective view, shows erection method of simple tower instrument during installing premier pillar on tower main pillar, according to present invention. Figure 4 is front perspective, shows erection method of simple tower instrument during installing premier pillar on tower main pillar through bearings, according to present invention. During simple tower instrument installation, it needs some calculation of:
1. pillar (6a) stability;
2. pillar (6b) as anchor stability; 3. tower construction design;
4. cable (8a,8b) of tower and anchor design;
5. upper bridge construction (2) stability which installed on the erection.
An erection method by simple tower instrument during upper bridge construction installation consists of: Installing 8 bolt/anchor (7b) 0 1 l/2" - 400 and lower joint plate 24 mm bold,
0 50 cm on head of bridge construction pillar as hook designed tower (7).
Installing 5 locking plates from lower plate with 24 mm bold, 42 cm height as joint of premier steel pile (7) 0 30 cm, 6.5 mm bold, through 8 bolts/anchor (7b) and lower joint plate (7a) on every head (6a) of bridge construction pillar as hook designed tower (7).
Installing and locking 3 main tower pillars (7) 0 30 cm, 6.5 mm bold through locking plate tower pipe joint (7c) and base plate (7a) with 8 bolts/anchor (7b) on every head (6a) of bridge construction pillar. Installing and locking wind fastener (10) 0 15 cm through joint plate 16 mm bold and 4 bolts 0 3Λ" to unite premier tower 3 0 30 cm, 6.5 mm bold.
Locating axis bearings (12) 6 cm on outer side of premier tower as supporting part to tie and stress cable to tower. Locating front stays (8a) with to 70 degree to tower (7) to put main center arc supporter (1) on premier tower (7) through bearings (12).
Locating back stays (8b) with 50 degree to tower (7) to stabilize tower on rear tower pillar (6a) through bolt/anchor (11) on bridge pillar (6b).
Locating arc construction (1) onto pontoon (14) using crane (13), which all arc (1) components made segmental, from segment 1 until segment 13, which loaded onto pontoon (14), arranged by a way so that pontoon (14) stay stabile during installing arc (1) construction.
Installing bracing (5) together with arc (1) construction according to following arc (1) construction installation. Providing cable tension using twin ram jack unit or multi-strand M-PV in order to stabilize premier supporter (1) installation of upper bridge.
Featured that to unite premier tower (7) piles, use segmental by unite on site as necessary, and knock down easily after installing premier supporter stabilization of upper bridge portion, meanwhile hook tower (7), bearings (12), cable (8a,8b) installation, and stressing, as additional device by using existent pillars (6a,6b)so that reduce duration and cost wholly.
A simple tower instrument devices on upper bridge construction, consist of:
A number of bar frame as premier pillar (7) by using three steel pipes 0 30 cm, 6.5 mm bold which constructed segmental. A number bolts/anchor (7b) 0 1 W - 400 and lower joint plate (7a) 24 mm bold, 0 50 cm on head of bridge construction pillar as hook designed tower (7).
A number locking plates (7c) from lower plate with 24 mm bold, 42 cm height as joint of premier steel pile 0 30 cm, 6.5 mm bold, as cable hook (8a,8b) to give stress stability center range (1) upper part of bridge. A number wind fastener (10) 0 15 cm through joint plate (10b) 16 mm bold and 4 bolts (10a) 0 3Λ" to unite premier tower (7) 3 0 30 cm, 6.5 mm bold.
A number axis bearings (12) 6 cm on outer side of premier tower (J) as supporting part to tie and stress cable (8a,8b) to tower (7). A number front stays (8a) with to 70 degree to tower (7) to put premier supporter on premier tower (7) through bearings.
A number back stays (8b) with 50 degree to tower (7) to stabilize tower (7) on rear tower pillar (7) through bolt (11) on bridge pillar (6b). A number segmental arc (1) construction, from segment 1 until segment 13, which loaded onto pontoon, arranged by a way so that stable and balances during the installation.
A number bracing (5) install at the same time with arc (1) construction accordingly following arc (1) construction installation. A number twin rams jack unit or multi-strand M-PV to stress cable (8a,8b) and stabilize premier supporter (1) installation of upper bridge.
Featured that whole components unite by using existent pillars (6a,6b) to be one as simple tower instrument, as temporary supporting unit during installing premier arc (1) of upper bridge portion. Whereas such erection method of center range (1) in form of arc with 150 meters or more diameter, using tower (7) and cables (8a,8b), so it needs precise calculation about structure strength especially tower hook (8a,8b) stability and tower (7) pillar strength to bear some load (1) during construction. Simple tower instrument (7,8a,8b) on upper bridge construction (2) process, mainly on wide range bar to achieve more the erection cost efficiently by utilize existent pillars (6a,6b). Position of temporary tower (7) construction for arc center range (1) erection is calculated pillars (6a,6b) capability by estimating steel pile strength (9a,9b) on said pillars (6a,6b). Value of steel pile strength (9a,9b) on said pillars (6a,6b) are different for every site, depend on designed flat frame (3) load and soil strength of site. Further refers to Figure 5 until Figure 7, which Figure 5 is front perspective, shows side of simple tower instrument which has unite to bridge pillar, according to present invention. While Figure 6 is front perspective, shows detail of tower installation on bridge pillar, according to present invention. Also, Figure 7 is upper perspective, shows upper part of tower installation on bridge pillar, according to present invention. Simple tower (7) structure design as temporary tower is bar structure as premier tower by using three steel pipes 0 30 cm, steel plate 6.5 mm bold, and pipe bracing (10) 0 15 cm, properties of yield stressing point 250 MPa, and made segmental which every segment 6 meter tall in 9 number. Premier tower pillar (7a) 0 30 cm, lay on pillar (6a) which had installed tower hook (7a) previously by deploy bolt/anchor (7b), which attached to pillar head's (6a) properties are anchor/bolt (7b) 8 0 1 14 - 400 diameter, and lower joint plate (7a) 24 mm, also locking plate (7c) of 5, 24 mm bold and 42 cm tall as junction of tower pipes (7) and base plate (7a). Refers to Figure 8 and Figure 9, which Figure 8 is perspective view, shows joint of wind fastener to bridge pillar, according to present invention; and Figure 9 is side perspective, shows detailed joint of wind fastener to main bridge pillar, according to present invention. It shows that wind fastener (10) which functions as tower pillar stiffener uses circle steel pipes 0 15 cm and jointed by bolt (10a) 4 0 %" and previously made junction joint (1 Ob) from steel plate 16 mm bold.
Further refers to Figure 10 until Figure 13, which Figure 10 is above perspective, shows detailed bearings installation to main tower pillar, according to present invention. While Figure 11 is side perspective, shows anchor installation on rear pillar of bridge tower pillar, according to present invention. Meanwhile, Figure 12 is side perspective, shows detailed anchor installation on rear pillar of bridge tower pillar, according to present invention. Thus Figure 13 is perspective view, shows shape of bearings on simple tower instrument, according to present invention. Bearings (12) are used to tie cables (8a,8b) to premier tower (7) pillar to provide tension during erection by twin ram jack unit or multi-strand M-PV (now shown in Figure). To lay designed bearings (12) using power of 20 until 50 tons with axis 6 cm, posed on outsider main pipe (7), each of bearings (12) attached and calculated tension magnitude of cables (8a, 8b). Cables (8a,8b) use single strand 3 0 0,6", 270 ksi, which laying cable 70° to tower and backstays (8b) 50° to tower. Hanging cable (8a) functions to reduce deflection on arc structure (1) during the erection meanwhile backstay (8b) functions to stabilize tower against lateral force due to the erection. Cables (8a,8b) are given tension using multi-strand M-PV (not shown in Figure) with pretension force 650 kN. Backstays (8b) posed on pillar which located rear of tower pillar (6a) and connected with anchor (11), so weight of arch construction (1) beared by pillar (6b) on back of tower pillar (6a). bolt/anchor (11) of cable (8b) function to bear pillar (6b) by steel pipe 3 0 6", which provided a locking bolt (1 Ia) on the site (1 Ib) of pillar (6b), then provide tension by twin ram jack unit or multi-strand M-PV (not shown in Figure). Further refers to Figure 14 until Figure 18, which Figure 14 is perspective view, shows flat frame erection installation of upper bridge construction, according to present invention, which Figure 15 is upper perspective, shows erection method on arc starting point construction, according to present invention. While Figure 16 is perspective view, shows erection installation of arc starting point construction, according to present invention. Meanwhile Figure 17 is above perspective, shows erection method on arc end point construction, according to present invention. Thus Figure 18 is perspective view, shows erection installation of arc end point construction, according to present invention. Arc (1) construction process divided into 13 segment, left and right, which is started by pontoon (14) preparation works, crane (13), tug boat, jack unit, gauges, etc; material preparation, manpower, tower construction (7), bearings (12) installation of tower (7). Tower (7) installations of pillars (6a) proceed segmental into 9 segments together with both pillars (6a). Each segment of tower (7) construction built on preparation phase and each tower (7) deployed by crane (13) which posed on pontoon (14) at starting point pillar (6a) (shown in Figure 15), begin with tower (7) segment then bolted on pillar lay up (7a). After tower segment (7) deployed on site, continue joining bolt of segmented tower (7)2 and then continue until wholly tower segment (7)9 also proceed to left and right pillar (6a). After that, bracing (10) placed by crane (13) which posed on pontoon (14) and placed on designed position per tower segment (7).
As shown in Figure 14, erecting arch (1) construction begin on starting point, through load arch (1) construction onto pontoon (14) and helped by crane (13), which all arch (1) component material made segmental, from segment 1 until segment 13 which loaded onto pontoon (14) and arranged neatly and by a way arch (1) construction so that installation run stable. Shown in Figure 15 that arc (1) construction process from starting point to make it easier, which pontoon (14) posed on (a) while load arc (1) construction which is stacked on left side of bank, and all components load on pontoon (14) then after finish, the pontoon (14) move to (b) to install arc (1) construction on left side of end point for arc (1) construction segment 1 until segment 13, thus pontoon (14) move to (c). Meanwhile pontoon number (c) do arc construction installation on right side of end point for arc construction segment 1 until segment 13. As shown in Figure 16, the arc (1) construction has erected from starting point wise. As shown in Figure 17, arc (1) construction erection which proceed from end point, and use same method of arc (1) construction installation on starting point. Pontoon (14) position number (c) move to right side of pontoon (14) number (d). after stable, proceed arc (1) construction installation on left starting point for arc (1) construction segment 1 until segment 13, and at the same time, proceed bracing (5) fastener segmental, thus move to pontoon number (e). Where pontoon (14) number (e) proceed arc (1) construction installation on right side of end point for arc (a) construction segment 1 until segment 13. At the same time, bracing (5) tied segmental refers to arc (1) construction installation rightward. Prior arc (1) construction installation per segment, rear cable anchor (11) installed on desired position, e.g. on pillar (6b). Rear cable (8b) installation to provide simple structure stabilization during erecting of arc (1) construction. Also shown in Figure 18 that process of arc (1) construction erection has accomplished for end point side. After every arc construction installed, supporting cables (8a,8b) are plugged, the left side and right side, at the same time. After that, unplugging tower may be preceding by crane (13) which posed on pontoon (14) segment by segment.
All description and statement which refers to figures are illustration purpose, not to limit of invention. Other practices of this invention are possible as long as within spirit of present invention, and included into patent protection which claimed as followings.

Claims

Claims
1. An erection method by simple tower instrument during upper bridge construction installation, consists of:
Installing 8 bolt/anchor (7b) 0 1 1A" - 400 and lower joint plate 24 mm bold, 0 50 cm on head of bridge construction pillar as hook designed tower.
Installing 5 locking plates from lower plate with 24 mm bold, 42 cm height as joint of premier steel pile (7) 0 30 cm, 6.5 mm bold, through 8 bolts/anchor (7b) and lower joint plate (7a) on every head (6a) of bridge construction pillar. Installing and locking 3 main tower pillars (7) 0 30 cm, 6.5 mm bold through locking plate tower pipe joint (7c) and base plate (7a) with 8 bolts/anchor (7b) on every head (6a) of bridge construction pillar.
Installing and locking wind fastener (10) 0 15 cm through joint plate 16 mm bold and 4 bolts 0 %" to unite premier tower 3 0 30 cm, 6.5 mm bold.
Locating axis bearings (12) 6 cm on outer side of premier tower as supporting part to tie and stress cable to tower.
Locating front stays (8a) with to 70 degree to tower (7) to put main center arc supporter (1) on premier tower (7) through bearings (12).
Locating back stays (8b) with 50 degree to tower (7) to stabilize tower on rear tower pillar (6a) through bolt/anchor (11) on bridge pillar (6b). Locating arc construction (1) onto pontoon (14) using crane (13), which all arc (1) components made segmental, from segment 1 until segment 13, which loaded onto pontoon (14), arranged by a way so that pontoon (14) stay stabile during installing arc (1) construction.
Installing bracing (5) together with arc (1) construction according to following arc (1 ) construction installation.
Providing cable tension using twin ram jack unit or multi-strand M-PV in order to stabilize premier supporter (1) installation of upper bridge.
Featured that to unite premier tower (7) piles, use segmental by unite on site as necessary, and knock down easily after installing premier supporter stabilization of upper bridge portion, meanwhile hook tower (7), bearings (12), cables (8a,8b) installation, and tension, as additional device by using existent pillars (6a,6b) so that reduce duration and cost generally.
2. An erection method by simple tower instrument during upper bridge construction installation as Claim 1, whereas premier tower (1) pillar installation at the same time to both pillar (6a) and segmental which each has 6 meter height and 9 segments.
3. An erection method by simple tower instrument during upper bridge construction installation as Claim 1, whereas arc (1) component install from starting point and end point of bridge.
4. An erection method by simple tower instrument during upper bridge construction installation as Claim 1, whereas tower (7) unplugging segmental by cranes (13) which located on pontoon (14), after all arc (10) construction finish.
5. A simple tower instrument devices on upper bridge construction, consist of:
A number of bar frame as premier pillar (T) by using three steel pipes 0 30 cm, 6.5 mm bold which constructed segmental;
A number bolts/anchor (7b) 0 1 1Z2" - 400 and lower joint plate (7a) 24 mm bold, 0 50 cm on head of bridge construction pillar as hook designed tower
(7).
A number locking plates (7c) from lower plate with 24 mm bold, 42 cm height as joint of premier steel pile 0 30 cm, 6.5 mm bold, as cable hook (8a,8b) to give tension stability for center range (1) upper part of bridge. A number wind fastener (10) 0 15 cm through joint plate (10b) 16 mm bold and 4 bolts (10a) 0 3Λ" to unite premier tower (7) 3 0 30 cm, 6.5 mm bold.
A number axis bearings (12) 6 cm on outer side of premier tower (7) as supporting part to tie and tension cables (8a,8b) to tower (7).
A number front stays (8a) with to 70 degree to tower (T) to put premier supporter on premier tower (7) through bearings.
A number back stays (8b) with 50 degree to tower (7) to stabilize tower (7) on rear tower pillar (7) through bolt (11) on bridge pillar (6b).
A number segmental arc (1) construction, from segment 1 until segment 13, which loaded onto pontoon, arranged by a way so that stable and balances during the installation.
A number bracing (5) install at the same time with arc (1) construction accordingly following arc (1) construction installation. A number twin rams jack unit or multi-strand M-PV to tension cable (8a,8b) and stabilize premier supporter (1) installation of upper bridge.
Featured that whole components unite by using existent pillars (6a,6b) to be one as simple tower instrument, as temporary supporting unit during installing premier arc ( 1 ) of upper bridge portion.
6. Simple tower instrument devices for bridge construction as claimed in Claim 5, which main tower pillar (7) made 9 segments with 6 meters height, by uniting on site as necessary, and unplugged easily after stabilize main arc pillar (1).
7. Simple tower instrument devices for bridge construction as claimed in Claim 5, which arc (1) components made segmental, from segment 1 until segment 13 which each has strand, stressed cable, and various designed load.
8. Simple tower instrument devices for bridge construction as claimed in Claim 5, which bearings (12) used to tie cable (8a,8b) to main tower pillar (7) to give tension during the erection by twin ram jack or multi-strand P-PV.
PCT/ID2010/000003 2009-02-09 2010-02-03 Erection method by simple tower instrument devices of building upper bridge construction WO2010092562A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US13/147,442 US20110283467A1 (en) 2009-02-09 2010-02-03 simple tower instrument construction and its method
JP2011600060U JP3177157U (en) 2009-02-09 2010-02-03 A simple tower instrument in a high-rise bridge.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ID20090068 2009-02-09
IDP00200900068 2009-02-09

Publications (1)

Publication Number Publication Date
WO2010092562A1 true WO2010092562A1 (en) 2010-08-19

Family

ID=42167341

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/ID2010/000003 WO2010092562A1 (en) 2009-02-09 2010-02-03 Erection method by simple tower instrument devices of building upper bridge construction

Country Status (3)

Country Link
US (1) US20110283467A1 (en)
JP (1) JP3177157U (en)
WO (1) WO2010092562A1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704405A (en) * 2012-06-21 2012-10-03 中铁大桥局集团有限公司 Method utilizing buckle cable and anchor cable for balancing extra horizontal force
CN102953342A (en) * 2012-12-13 2013-03-06 中铁四局集团第二工程有限公司 Assembling and lifting method of half-span skeleton of tied arch bridge
RU2541010C1 (en) * 2013-09-18 2015-02-10 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Method to install arch
CN104372743A (en) * 2014-10-31 2015-02-25 中铁四局集团第二工程有限公司 Rapid construction method for trestle
CN105421232A (en) * 2015-12-30 2016-03-23 中国建筑第七工程局有限公司 Round steel tower structure of bridge
CN106498851A (en) * 2015-09-08 2017-03-15 上海浦江缆索股份有限公司 The main cable unit cable strand preformation method of cross section change
CN107190647A (en) * 2017-07-13 2017-09-22 中交二航局第四工程有限公司 A kind of alignment control apparatus and method suitable for the special-shaped tower of steel construction
CN107370088A (en) * 2017-08-24 2017-11-21 国网山东省电力公司淄博供电公司 Transmission line of electricity preformed armor rods construction platform
CN107761542A (en) * 2017-11-14 2018-03-06 江苏科技大学 One kind arch oblique pull combined system bridge and its construction method
CN110144831A (en) * 2019-06-04 2019-08-20 中铁三局集团第二工程有限公司 A kind of rotating method for the swivel structure of continuous beam and for controlling swivel
CN114104990A (en) * 2021-11-08 2022-03-01 云南路桥股份有限公司 Cable crane steel pipe assembling type cable buckle integrated tower construction process

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100571102B1 (en) * 2003-02-14 2006-04-13 한만엽 Device of Innovative Prestressed Scaffolding System for Improving Workability
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
CN104612058B (en) * 2014-12-26 2016-05-25 中铁大桥勘测设计院集团有限公司 A kind of construction method of buckstay flexible arch bridge
CN106436574B (en) * 2015-12-24 2018-12-21 中铁二局集团有限公司 A kind of button hanging method of bridge
CN108239937B (en) * 2017-09-14 2021-12-28 贵州桥梁建设集团有限责任公司 Self-balancing control method for arch bridge tower
CN112726961B (en) * 2020-12-29 2022-03-22 福建省晓沃建设工程有限公司 Prestressed steel strand laying device and method
CN218373365U (en) * 2022-09-16 2023-01-24 中铁七局集团郑州工程有限公司 Folding tie rod arch continuous beam curve beam bottom bracket device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB181713A (en) * 1921-06-14 1923-09-14 Gabriel Marcel Gouyaud Method of constructing reinforced concrete arches, without using moulding, arched falseworks or scaffoldings
CN101117795A (en) * 2007-08-29 2008-02-06 中铁大桥局股份有限公司 Mounting method for steel case basket arch single-frame segment

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2938029A1 (en) * 1979-09-20 1981-04-02 Polensky & Zöllner, 6000 Frankfurt METHOD FOR PRODUCING A CABLE ROPE OR TOW BELT BRIDGE
CA2192063A1 (en) * 1995-04-05 1996-10-10 Nobumichi Yamamura Method of suspending bridge girder suspension bridge
US6138309A (en) * 1997-12-10 2000-10-31 Board Of Regents Of University Of Nebraska Tension members for erecting structures
US6301736B1 (en) * 2000-04-20 2001-10-16 Ernst G. Knolle Elevated suspended guideway
US6728987B1 (en) * 2002-04-23 2004-05-04 Ch2M Hill, Inc. Method of adjusting the vertical profile of a cable supported bridge
US20050097686A1 (en) * 2003-11-12 2005-05-12 Royer George R. Bridge structure
US7415746B2 (en) * 2005-12-01 2008-08-26 Sc Solutions Method for constructing a self anchored suspension bridge
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB181713A (en) * 1921-06-14 1923-09-14 Gabriel Marcel Gouyaud Method of constructing reinforced concrete arches, without using moulding, arched falseworks or scaffoldings
CN101117795A (en) * 2007-08-29 2008-02-06 中铁大桥局股份有限公司 Mounting method for steel case basket arch single-frame segment

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704405B (en) * 2012-06-21 2014-11-05 中铁大桥局集团有限公司 Method utilizing buckle cable and anchor cable for balancing extra horizontal force
CN102704405A (en) * 2012-06-21 2012-10-03 中铁大桥局集团有限公司 Method utilizing buckle cable and anchor cable for balancing extra horizontal force
CN102953342A (en) * 2012-12-13 2013-03-06 中铁四局集团第二工程有限公司 Assembling and lifting method of half-span skeleton of tied arch bridge
CN102953342B (en) * 2012-12-13 2014-09-17 中铁四局集团第二工程有限公司 Assembling and lifting method of half-span skeleton of tied arch bridge
RU2541010C1 (en) * 2013-09-18 2015-02-10 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Method to install arch
CN104372743B (en) * 2014-10-31 2016-05-18 中铁四局集团第二工程有限公司 Trestle rapid constructing method
CN104372743A (en) * 2014-10-31 2015-02-25 中铁四局集团第二工程有限公司 Rapid construction method for trestle
CN106498851A (en) * 2015-09-08 2017-03-15 上海浦江缆索股份有限公司 The main cable unit cable strand preformation method of cross section change
CN106498851B (en) * 2015-09-08 2020-05-01 上海浦江缆索股份有限公司 Method for preforming main cable unit strand with variable cross section
CN105421232A (en) * 2015-12-30 2016-03-23 中国建筑第七工程局有限公司 Round steel tower structure of bridge
CN107190647A (en) * 2017-07-13 2017-09-22 中交二航局第四工程有限公司 A kind of alignment control apparatus and method suitable for the special-shaped tower of steel construction
CN107370088A (en) * 2017-08-24 2017-11-21 国网山东省电力公司淄博供电公司 Transmission line of electricity preformed armor rods construction platform
CN107761542A (en) * 2017-11-14 2018-03-06 江苏科技大学 One kind arch oblique pull combined system bridge and its construction method
CN107761542B (en) * 2017-11-14 2019-09-27 江苏科技大学 A kind of arch oblique pull combined system bridge and its construction method
CN110144831A (en) * 2019-06-04 2019-08-20 中铁三局集团第二工程有限公司 A kind of rotating method for the swivel structure of continuous beam and for controlling swivel
CN114104990A (en) * 2021-11-08 2022-03-01 云南路桥股份有限公司 Cable crane steel pipe assembling type cable buckle integrated tower construction process
CN114104990B (en) * 2021-11-08 2023-06-20 云南路桥股份有限公司 Construction process of cable crane steel pipe assembly type cable buckle integrated tower

Also Published As

Publication number Publication date
US20110283467A1 (en) 2011-11-24
JP3177157U (en) 2012-07-26

Similar Documents

Publication Publication Date Title
US20110283467A1 (en) simple tower instrument construction and its method
CN204098463U (en) Builder's jack
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN108755377B (en) Construction method of deepwater non-covering layer steel trestle
CN104695336B (en) The double-deck first up and then down stand construction method of Cast-in-situ Beam
CN108571425B (en) Pile foundation cap foundation of offshore wind turbine generator set and construction method thereof
CN108442232A (en) Assembled steel suspension bridge structure and its construction method
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN107227814B (en) A kind of large cantilever concrete structure section construction method
CN110886187B (en) Cable crane system installation system and construction method thereof
BR102016023743B1 (en) STRUCTURAL CONCRETE TOWER AND ASSEMBLY METHOD
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN104652813A (en) Tower crane construction technology used for super high-rise building steel structure
CN106758839A (en) A kind of strutting system and its installation method of the cast-in-place segmental construction of pier top
CN111197318B (en) Foundation for a tower of a wind turbine
EP3147407A1 (en) Scissors-type retractable structure
CN110130656B (en) Turnover type composite anchoring unloading platform and construction method
CN203947769U (en) Cooling tower bottom ring beam concrete cast-in-situ steel truss form bracing system
JP3215059B2 (en) Construction method of tower-like structure roof
CN215482366U (en) Double-line continuous beam bracket structure
CN114575259B (en) Template adjusting device
KR101313886B1 (en) Apparatus for constructing V-shaped tower to reduce cross-section of top of bridge using jack-up and method thereof
JP2002364004A (en) Installation method for underwater foundation
CN211312214U (en) Cable crane system installation system
JP2007217108A (en) Method of supporting tower crane

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10703987

Country of ref document: EP

Kind code of ref document: A1

DPE2 Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101)
WWE Wipo information: entry into national phase

Ref document number: 13147442

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2011600060

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10703987

Country of ref document: EP

Kind code of ref document: A1