WO2010089916A1 - 運転状態シミュレーション装置及びヒートポンプ式給湯システムの設計方法 - Google Patents

運転状態シミュレーション装置及びヒートポンプ式給湯システムの設計方法 Download PDF

Info

Publication number
WO2010089916A1
WO2010089916A1 PCT/JP2009/066061 JP2009066061W WO2010089916A1 WO 2010089916 A1 WO2010089916 A1 WO 2010089916A1 JP 2009066061 W JP2009066061 W JP 2009066061W WO 2010089916 A1 WO2010089916 A1 WO 2010089916A1
Authority
WO
WIPO (PCT)
Prior art keywords
simulation
calculation
water supply
hot water
heat pump
Prior art date
Application number
PCT/JP2009/066061
Other languages
English (en)
French (fr)
Inventor
博 榎本
良夫 市田
耕司 松澤
高橋 佳宏
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to EP09839690.6A priority Critical patent/EP2395292B1/en
Priority to JP2010549342A priority patent/JP5143238B2/ja
Publication of WO2010089916A1 publication Critical patent/WO2010089916A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1066Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water
    • F24D19/1072Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water the system uses a heat pump
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/32Circuit design at the digital level
    • G06F30/33Design verification, e.g. functional simulation or model checking
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/14Pipes

Definitions

  • This invention heats the amount of heat obtained by the refrigeration cycle of the heat pump by heat exchange with water using a heat exchanger, and supplies the heated hot water to a hot water supply facility or a hot water radiant heating facility.
  • the present invention relates to a design support device for a heat pump hot water supply system.
  • Patent Document 1 a design support apparatus disclosed in Japanese Patent Application Laid-Open No. 2003-120982 (Patent Document 1) generates an air conditioning load pattern from the relationship between air temperature and humidity meteorological data of air temperature and humidity, and a connection configuration of an air conditioning facility created by a designer. Then, the heat supply pattern that satisfies the air conditioning load is simulated from the equipment characteristics of each facility, and the fuel and power consumption used for the heat supply and the annual running cost are calculated from the fuel and power charge prices. If the calculation result does not reach the design target by this design support apparatus, the simulation operation is repeated while changing the configuration of the air conditioner.
  • Patent Document 2 a design element of an air conditioner that can be quantified is treated as a design parameter, and the parameter is automatically changed using an optimization algorithm.
  • the parameters that can achieve the design goal are obtained by repeating the simulation.
  • the design support device for the air conditioning system of Patent Document 1 or Patent Document 2 is premised on heat supply that satisfies the air conditioning load, and design parameters that lack heat supply have low evaluation values and are excluded from design candidates.
  • a backup electric heater or boiler may be installed as an auxiliary heat source to compensate for the shortage of heat, but when the electric heater is activated as an auxiliary heat source when the amount of heat is insufficient, for example, the power is about 2 to 3 times that of the heat pump.
  • the auxiliary heat source is not operated as much as possible if the amount of heat is short and the temperature drop is small (within the allowable range).
  • the conventional design support apparatus does not use the allowable value of the insufficient heat amount as the evaluation condition, the condition that the auxiliary heat source covers all the insufficient heat amount is selected. Therefore, there is a problem that the CO 2 emission-intensive design.
  • An object of the present invention is to provide a design support device for a heat pump hot water supply system that presents design specifications of a heat pump hot water supply system in which the shortage of heat is within an allowable value and the amount of CO 2 emission is small.
  • the driving state simulation device of the present invention is In an operation state simulation device that simulates the operation state of a heat pump type hot water supply system that supplies hot water using a heat pump, A condition input unit for inputting simulation conditions for simulating the heat pump hot water supply system; A simulation result information including an operation state of the heat pump hot water supply system and an insufficient amount of heat in the operation state is generated by executing a preset operation program based on the simulation condition input to the condition input unit. A simulation execution unit; And an output unit that outputs the simulation result information generated by the simulation execution unit.
  • FIG. 1 is a diagram illustrating an example of a heat pump hot water supply system according to Embodiment 1.
  • FIG. 1 is a block diagram of a design support apparatus 100 according to a first embodiment. The figure which shows the characteristic data showing COP with respect to the external temperature of the heat pump of Embodiment 1, and a tapping temperature. The figure which shows the input data and output data of the design assistance apparatus 100 of Embodiment 1.
  • FIG. 5 is a flowchart showing the operation of the calculation unit 7 according to the first embodiment.
  • FIG. 6 is a diagram for explaining hunting in the control according to the second embodiment. The figure which shows the performance correction program of Embodiment 3, and a defrost operation control program.
  • FIG. 10 is a diagram illustrating a control program conversion unit according to the fifth embodiment.
  • FIG. 10 is a diagram illustrating a hardware configuration of a design support apparatus 100 according to a sixth embodiment.
  • FIG. 20 is a calculation flowchart of the design support apparatus 100 according to the sixth embodiment.
  • FIG. FIG. 20 is a diagram illustrating an example of an appearance of a design support apparatus 100 according to a seventh embodiment.
  • FIG. 18 is a diagram illustrating an example of a hardware configuration of the design support apparatus 100 according to the seventh embodiment.
  • Embodiment 1 demonstrates the design assistance apparatus 100 (operating state simulation apparatus) which simulates a heat pump type hot-water supply system.
  • FIG. 1 shows an example of a heat pump hot water supply system.
  • the system controller 90 is stored in a housing in which the hot water supply tank 25 is installed.
  • a heat pump 20 as a heat source device takes in heat from the outside by a refrigeration cycle, and adds water through a water heat exchanger 28 housed inside the outdoor unit of the heat pump or a water heat exchanger 28 connected to the outside of the outdoor unit. Warm water flows through the pipe 21.
  • the auxiliary heat source 22 is further heated using, for example, an electric heater.
  • the hot water is supplied to the hot water supply tank 25 or the radiator or fan coil unit 26 of the heating equipment and the floor heating 27 depending on the operating state of the electric valve 23 and the circulation pump 24. Note that heat supply to the hot water supply facility and the heating facility is not performed at the same time, and the operation is switched to either by the motor operated valve 23. If the hot water supply tank 25 is a direct heating type, the hot water flowing through the pipe 21 is used as it is, and if the hot water supply tank 25 is an indirect heating type, the hot water heated in the hot water supply tank 25 via a heat exchange facility is used.
  • FIG. 2 is a block diagram of the design support apparatus 100 for the heat pump hot water supply system.
  • the design support apparatus 100 includes an equipment database 1, a weather database 2, a building database 3, a calculation program database 4, a calculation condition input unit 5 (condition input unit), a calculation data creation unit 6, a calculation unit 7, and a calculation result evaluation unit 8 ( A determination unit), a calculation data correction unit 9, and a calculation result display unit 10 (output unit) for displaying the calculation results of the calculation unit 7.
  • the facility database 1 includes heat source facility data 11, heating facility data 12, hot water supply facility data 13, and transport facility data 14.
  • the calculation program database 4 includes a heat source facility calculation program 41, a heating facility calculation program 42, a hot water supply facility calculation program 43, a transfer facility calculation program 44, and a control device calculation program 45.
  • the heat source facility calculation program 41, the heating facility calculation program 42, the hot water supply facility calculation program 43, the transfer facility calculation program 44, and the control device calculation program 45 are the heat source facility, heating facility, hot water supply facility, transfer facility, It is a program for simulating a control device (system controller).
  • the calculation unit 7 executes these programs and generates a calculation result (simulation result information) including the operation state of the heat pump hot water supply system. Based on the simulation result information, the input calculation condition 51 (design specification) can be evaluated.
  • the facility database 1, the weather database 2, and the building database 3 are stored in the data storage unit 120.
  • the data storage unit 120 is, for example, a magnetic disk device described later in the seventh embodiment.
  • the arithmetic program database 4 and the arithmetic unit 7 constitute a simulation execution unit 110 that executes a simulation. Hereinafter, each part will be described.
  • the heat source facility data 11 in the facility database 1 represents structural data or characteristic data for each model of the heat pump 20 and the boiler or electric heater that is the auxiliary heat source 22.
  • the structural data represents data related to a physical shape such as a fin pitch of a heat exchanger.
  • the characteristic data represents data related to the performance of the heat pump 20 such as COP (Coefficient of Performance) with respect to the outside air temperature, and data related to characteristics of the heat pump components such as a heat exchanger heat transfer coefficient.
  • FIG. 3 is an example of the characteristic data, and represents the relationship between the outside air temperature and the tapping temperature and the COP.
  • the characteristic data may be data on a catalog or data obtained from a collection result of operation data of already delivered products.
  • the heating facility data 12 represents structure or characteristic data for each model or capacity of the radiator, floor heating, and fan coil unit.
  • the heating facility data 12 includes the type of construction such as a panel type and a concrete burying type, physical shape data such as piping pitch, and characteristic data such as floor surface heat transfer coefficient for each construction method.
  • the hot water supply equipment data 13 includes at least the shape and size of the tank or the wall surface heat transfer coefficient of the tank.
  • the shape of the tank is a coil-in-tank type in which piping for flowing hot water is inserted into the inside of the tank.
  • Another tank can be installed, and a pre-registered structure such as a tank-in-tank system in which warm water is allowed to flow between the two tanks and heated from the wall surface of the inner tank can be selected.
  • data on tank dimensions and materials are provided.
  • the transport equipment data 14 is data related to transport path equipment such as pumps, valves, and piping.
  • transport equipment data 14 represents flow rate, pressure, and power characteristic data.
  • the meteorological database 2 includes outside air temperature data of major cities, and includes temperature data for one year or several years at intervals of at most one hour. When data is used, data for a long period of one year or more may be used, or data may be selected and used only for the representative day for each season.
  • the building database 3 includes data on the types of room structures such as wall materials and floor materials, and data on the heat transfer rate at which heat is released from the structures to the outside of the room. Since the heat insulation performance differs between the new construction and the existing construction, the construction year and the corresponding heat transmission rate data may be provided.
  • the calculation program database 4 includes a heat source facility calculation program 41, a heating facility calculation program 42, a hot water supply facility calculation program 43, a transfer facility calculation program 44, and a control device calculation program 45.
  • the heat source facility calculation program 41 can calculate the amount of heat supplied, energy efficiency, COP, and the like of heat sources such as a heat pump, a boiler, and an electric heater (auxiliary heat source).
  • the heating facility calculation program 42 can calculate the amount of heat supplied from a heating facility such as a radiator, a fan coil unit, and floor heating, the amount of heat flowing out of the room, and the room temperature that changes depending on the difference between the amount of supplied heat and the amount of heat discharged. .
  • the hot water supply facility calculation program 43 calculates the amount of heat supplied to the hot water tank, the amount of heat that enters and exits the hot water supply and water supply, the amount of heat that flows out of the tank wall surface, and the water temperature inside the tank that changes depending on the difference between the amounts of heat. , Can be calculated.
  • the transfer facility calculation program 44 calculates the amount of heat that the transfer facility such as a pump, a valve, and a pipe transfers to the subsequent facility.
  • the control device calculation program 45 determines the operating state of the heat source equipment, the pump, and the valve.
  • FIG. 4 is a diagram illustrating inputs and outputs of the design support apparatus 100.
  • the calculation condition input unit 5 inputs a calculation condition 51 as an input.
  • FIG. 4 shows a case where a plurality of calculation conditions 51a, 51b, 51c and the like having different conditions are input.
  • calculation data 61a, 61b, 61c which will be described later, corresponding to each calculation condition is generated.
  • the calculation condition 51a is (1) Residence 511a, (2) Housing configuration 512a, (3) Facility configuration 513a of the hot water supply / heating system, (4) Specifications 514a of each facility, (5) Hot water supply usage pattern 515a, (6) Set value 516a of the system controller 90, (7) Evaluation period 517a, (8) Insufficient heat capacity 518a Each data of is included.
  • the items of calculation conditions 51b and 51c are the same as the calculation condition 51a.
  • the equipment configuration 513 of the hot water supply / heating system is created on the flow sheet 52 of the equipment flow construction screen illustrated in FIG.
  • a facility icon 53 registered in advance is pointed using the pointing device 54.
  • the equipment of the selected icon 53 is pasted.
  • the icon pasted on the flow sheet 52 is called a node.
  • a straight line or a broken line represented as piping is connected.
  • a line connecting two nodes is called a link.
  • the upstream side of the calculation is called a parent node, and the downstream side is called a child node.
  • Equipment specifications 514 can be input to the nodes and links via the parameter setting screen.
  • data regarding the configuration of the residence such as the size of the room where the heating facility is installed, the material of the wall, the size of the window, and the like are also input.
  • the hot water usage pattern 515 can be selected by directly entering the usage amount or by having a typical usage amount pattern in the database for the family structure, morning shower, cooking, evening bath, etc. You may make it the form to do.
  • System controller setting value 516 As the set value 516 of the system controller, a value used as a target value in the control device calculation program 45 described later, such as a tapping temperature, room temperature, tank water temperature, or the like is input.
  • the evaluation period 517 is set to at least one year, but may be a longer period.
  • the allowable value 518 of the insufficient heat quantity is given as a value in units of temperature difference from the target value ⁇ time, and is used for the determination of whether to leave the calculation result or to be rejected by the calculation result evaluation unit 8 described later.
  • the calculation data creation unit 6 extracts the temperature data of the city that matches the residence data 511 from the calculation condition 51 input from the calculation condition input unit 5 from the weather database 2, and the dwelling configuration data 512 of the room with the heating facility
  • the heat transfer rate data of the structural material that matches the above is extracted from the building database 3, and the equipment model, structure, and characteristic data corresponding to the node and link specification data created on the flow sheet 52 are extracted from the equipment database 1.
  • the calculation data 61 is created together with the other calculation conditions 51. When a plurality of calculation conditions are input as in the calculation conditions 51a, 51b, 51c, the calculation data creation unit 6 creates calculation data 61a, 61b, 61c corresponding to each calculation condition.
  • the calculation unit 7 uses the calculation data 61 and each calculation program in the calculation program database 4, (A) Operating state of heat source equipment, (B) CO 2 emissions from heat source equipment, (C) the environmental conditions of the load-side equipment, such as the water temperature of the hot water supply equipment, the room temperature of the heating equipment, (D) integrated value of insufficient heat in load side equipment such as hot water supply and heating equipment, Is calculated.
  • A Operating state of heat source equipment
  • B CO 2 emissions from heat source equipment
  • C the environmental conditions of the load-side equipment, such as the water temperature of the hot water supply equipment, the room temperature of the heating equipment
  • D integrated value of insufficient heat in load side equipment such as hot water supply and heating equipment
  • FIG. 6 is a flowchart showing processing of the calculation unit 7. This will be described with reference to this flowchart.
  • the calculation unit 7 starts calculation, (1)
  • the equipment calculation order creation step 71 the calculation unit 7 obtains the calculation order of each equipment from the node and link connection data.
  • the equipment flow has a loop structure.
  • the depth-first search method for searching tree-structured data is used to assign the order of operations in the order of search, and the search is not completed. If there is a node, the node can be regarded as a terminal node, so that the search can proceed in the same manner as a tree structure even in a loop configuration.
  • the calculation unit 7 extracts the data of the corresponding facility from the calculation data 61 and sets the initial value in the calculation program of each facility in the calculation program database 4.
  • the calculation unit 7 executes the control device calculation program 45.
  • the calculation unit 7 executes the control device calculation program 45 to obtain data (system controller setting value 516) as control target values for the control target node, such as the temperature of the hot pump, the temperature of the hot water tank, and the room temperature of the floor heating.
  • the heat pump, auxiliary heat source, pump, valve ON / OFF, and operation capability are obtained.
  • the pump and valve control results are used in step 74 for calculating the hot water flow rate of each facility. In this step 74, the flow rate of hot water flowing through each facility is determined by fluid pipeline network calculation.
  • step 75 of executing the facility operation program the operation unit 7 executes the facility operation programs 41 to 44 in accordance with the facility operation sequence obtained in step 71. For example, if the heat pump nodes (corresponding to the heat source equipment operation program 41), the or refrigeration cycle operation using the characteristic data of FIG. 3, and outputs the calculation result for supplying heat, CO 2 emissions, energy, such as COP . If it is a load-side hot water supply facility node and a heating facility node (corresponding to the heating facility calculation program 42 or the hot water supply facility calculation program 43), for example, the following calculation is executed.
  • the amount of heat supplied from the hot water is obtained using the following equation (1) of heat transfer, and the change in the tank water temperature or room temperature due to the amount of supplied heat is obtained from the following equation (2).
  • the heat transfer coefficient of the following equation (1) may be obtained from the Nusselt number without taking a fixed value.
  • the amount of heat flowing out from the room or tank to the outside air can be obtained by using the equation (1) where the heat transfer coefficient is the heat transfer rate from the room or tank to the outside air, and the temperature difference is the temperature difference between the outside air and room temperature or tank water temperature. It is done. If the amount of heat flowing out is calculated and calculated in the same way using equation (2), the temperature drop due to heat dissipation can be calculated. In addition, in (1) and (2), the temperature distribution in the room, the hot water tank, the heating facility, and the heat transfer part of the hot water tank was not taken into account. A simple temperature distribution may be calculated.
  • the transfer facility calculation program 44 performs a calculation to transfer heat between the heat source facility and the hot water supply and heating facilities. If there is a heat loss from the pipe, it is calculated as heat transfer from the pipe surface to the outside air.
  • the calculating part 7 performs the above calculation about all the installations. If the calculation of all facilities is completed (YES in step 76), the state is advanced to the next time section, and the calculation in the next time section is performed from the execution step 73 of the controller calculation program 45. If the calculation is repeated by advancing the time section and the calculation for the evaluation period is completed (YES in step 77), in step 78, the calculation unit 7 totals the CO 2 emission amount in the entire evaluation period of the heat source equipment. In addition, the amount of insufficient heat in the load side equipment is totaled.
  • step 79 the calculation unit 7 displays the calculation result display unit 10 on the (1) Calculation condition 51, (2) CO 2 emissions from heat source equipment, (3) Insufficient heat of load side equipment, (4) Operating status of each facility, Are appropriately displayed in a graph, numerical value, or table.
  • the calculation result evaluating unit 8 determines whether to continue the calculation or to stop depending on the number of calculations (step 80). For determining whether to abort the calculation (NO in step 80), a method of processing an insufficient heat amount and CO 2 emission amount to create an evaluation value, and aborting the calculation if the evaluation value is lower than a threshold (an example of a predetermined method) ) May be used.
  • the calculation result evaluation unit 8 uses a multi-objective optimization method such as a genetic algorithm or MOPSO (Multi Objective Particle Swarm Optimization), and the Pareto optimal solution includes the deficient heat amount and the CO 2 emission amount according to the current calculation condition. If not included, the calculation result is rejected. If included, the calculation condition and the calculation result are output to the calculation result display unit 10 using a table, a graph, and a numerical value.
  • the calculation result evaluation unit 8 displays the calculation result and the calculation condition 51 on the calculation result display unit 10 only when the insufficient heat quantity of the calculation result is within the allowable value when the calculation for the predetermined period is completed. It may be displayed.
  • the calculation result evaluation unit 8 determines that the calculated insufficient heat amount is the amount of insufficient heat included in the corresponding calculation condition. Only the calculation result within the allowable range may be displayed on the calculation result display unit 10.
  • calculation data correction unit 9 calculates the data to be corrected and its correction amount among the calculation conditions using the multi-purpose optimization method (an example of a predetermined method) listed above, or the equipment database.
  • the calculation data 61 is generated again by extracting another data from 1 (an example of a predetermined method) (step 81).
  • the simulation execution unit 110 uses the calculation data corrected by the calculation data correction unit 9 to generate a calculation result (simulation result information) again.
  • Embodiment 2 The second embodiment will be described with reference to FIG.
  • the second embodiment relates to control hunting countermeasures.
  • an evaluation value of the calculation result evaluation unit 8 an integrated value of the excess heat amount and the insufficient heat amount may be added.
  • the operation result (operation state) exceeds the set value (system controller set value 516) as shown in FIG. Hunting may be repeated.
  • evaluation with the total CO 2 emission value at each time section does not necessarily result in a low evaluation, but it is not an appropriate state in terms of control.
  • the integrated value of the excess heat amount and the insufficient heat amount is used, and the calculation condition 51 (for example, among the calculation conditions 51a to 51c) with a smaller (integrated value) is used.
  • the integrated value of the excess heat amount and the insufficient heat amount may be specified.
  • the excess heat quantity and the deficient heat quantity may be expressed as an excess / deficiency heat quantity vector using the excess heat quantity and the deficient heat quantity as orthogonal elements, respectively, in addition to adding the respective integrated values.
  • the simulation execution unit 110 generates a calculation result (simulation result information) including an insufficient heat amount and an excessive heat amount of the heat pump hot water supply system.
  • the calculation result evaluation unit 8 determineation unit) discards or maintains the calculation result based on the insufficient heat amount included in the calculation result and the integrated value (or excess / deficient heat amount vector) of the insufficient heat amount and the excess heat amount. Determine whether.
  • Embodiment 3 The third embodiment will be described with reference to FIG. Embodiment 3 demonstrates the case where the simulation of a defrost operation is reflected in the calculation of insufficient heat quantity.
  • frost adheres to the heat exchanger of the outdoor unit at a low temperature, which causes a decrease in heat transfer coefficient.
  • the frost grows, the performance of the heat exchanger is remarkably lowered. Therefore, a defrosting operation for melting and removing the frost is performed.
  • the defrosting operation there is a method of switching the heat pump circuit so that a high-temperature refrigerant flows through the outdoor heat exchanger, and the high-temperature refrigerant melts and removes frost.
  • the amount of heat obtained in the refrigeration cycle of the heat pump is used for melting frost, so heat cannot be supplied to hot water supply and heating equipment.
  • the heat source facility calculation program 41 includes a capability correction program 411 for reducing the amount of heat supplied in a predetermined temperature range where frost easily occurs.
  • the control device calculation program 45 includes a defrosting operation control program 451 that monitors the outside air temperature or the COP of the outdoor unit, and predicts a decrease in the performance of the heat pump due to frost formation and determines the defrosting operation start and stop timing. .
  • the configuration shown in FIG. 8 makes it possible to accurately grasp the degree of performance degradation in a cold region and to design a control that prevents heat shortage as much as possible.
  • the controller calculation program 45 includes a defrosting operation control program 451 for instructing start and stop of a defrosting operation for melting and removing frost attached to the heat exchanger of the outdoor unit of the heat pump.
  • the simulation execution unit 110 assumes that the input energy of the heat pump has been used for the defrosting operation, and calculates the insufficient heat amount of the hot water supply facility and the heating facility. With this configuration, it is possible to grasp the degree of influence that the COP reduction of the heat pump due to the defrosting operation and the insufficient heat amount during the defrosting operation have on the hot water supply and the heating equipment.
  • the heat pump hot water supply system includes an outdoor unit having a heat exchanger as a heat pump.
  • the control device calculation program 45 executed by the simulation execution unit 110 includes a defrosting operation control program 451 for simulating a defrosting operation for removing frost attached to the heat exchanger.
  • the simulation execution unit 110 When the defrosting operation is simulated, the simulation execution unit 110 generates a calculation result (simulation result information) including the insufficient heat quantity reflected in the defrosting operation.
  • Embodiment 4 FIG. The fourth embodiment will be described with reference to FIG. In the fourth embodiment, a case where an upper limit value of the CO 2 emission amount is further added to the calculation condition 51 will be described.
  • the capacity of the equipment may decrease from the capacity at the time of introduction, such as heat exchanger fouling and reduced thermal insulation of the residence, as years pass.
  • the amount of heat may be insufficient, or more CO 2 may be emitted than the result of avoiding the insufficient amount of heat.
  • a CO 2 emission upper limit value is added to the calculation condition 51, and this is added to the evaluation value of the calculation result evaluation unit 8. Even if the performance deteriorates within the assumed service life, the CO 2 emission amount does not exceed the upper limit value. This is used as a determination condition for leaving the current calculation condition as an optimal solution.
  • the calculation condition 51 includes the use years of the equipment (evaluation period 517) and the CO 2 emission amount upper limit value 519.
  • the calculation data correction unit 9 corrects the characteristic data of the heat pump, the heating facility, the hot water supply facility, and the building in the calculation data 61 to a capacity that is lower than the number of years of use, for example, every calculation period for one year (an example of a divided period).
  • the calculation result execution unit 110 executes the calculation using the calculation data 61 that is the corrected characteristic data.
  • Operation result evaluation unit 8 a simulation of the operation per year by the execution unit 110 a result, CO 2 emissions, if it exceeds the upper limit value 519 of the CO 2 emissions, the lives of the equipment update time, the simulation results Display (output) on the display unit 10 (output unit).
  • the calculation condition 51 (simulation condition) input to the calculation condition input unit 5 includes an allowable value 518 of an insufficient heat amount allowed for the heat pump hot water supply system and an emission of carbon dioxide allowable for the heat pump hot water supply system. And an upper limit value 519 of the amount (FIG. 9).
  • the calculation data correction unit 9 corrects the calculation data 61 by reflecting the aging deterioration every time a predetermined divided period obtained by dividing the use years (evaluation period) into a plurality of passes.
  • the simulation execution unit 110 executes the calculation data in which the aging deterioration is reflected by the calculation data correction unit 9 in each of the calculation programs 41 to 45, so that the carbon dioxide of the heat pump hot water supply system from the start of the evaluation period to the current period is obtained.
  • the total amount of emissions is calculated.
  • the calculation result evaluation unit 8 determines whether or not the total carbon dioxide emission calculated by the simulation execution unit 110 exceeds the carbon dioxide emission upper limit 519.
  • the calculation result display unit 10 determines that the calculation result evaluation unit 8 exceeds the upper limit value of carbon dioxide emission
  • the calculation result display unit 10 determines that the calculation result display unit 10 exceeds the upper limit value of carbon dioxide emission from the start of the evaluation period.
  • the total period up to is output.
  • Embodiment 5 FIG.
  • the design support apparatus 100 can convert the program of the system controller 90 into a program that can be executed by the calculation unit 7, and the control apparatus calculation program 45 can be converted into a program format that can be executed by the system controller 90.
  • the case where the control program conversion part 46 (program conversion part) to convert is provided is demonstrated.
  • the control device calculation program 45 may be a control program 47 (FIG. 10) that is actually incorporated into the system controller 90 of the heat pump hot water supply system. However, it is necessary to match the programming language and input / output data format. Therefore, the control program conversion unit 46 converts the control program 47 incorporated in the system controller 90 into a program equivalent to the control device calculation program 45, and the calculation unit 7 uses the converted program as the control device calculation program 45. . Further, when the control device calculation program 45 is newly added, the control program conversion unit 46 converts the newly added control device calculation program 45 into the control program 47.
  • the heat pump hot water supply system to be simulated includes a system controller that controls the system.
  • the arithmetic program executed by the simulation execution unit 110 includes a control device arithmetic program 45 that simulates the system controller 90.
  • the design support apparatus 100 includes a control program conversion unit 46 that can convert the control program 47 incorporated in the system controller 90 into the control apparatus arithmetic program 45 and can convert the control apparatus arithmetic program 45 into the control program 47. ing.
  • Embodiment 6 FIG.
  • the design support apparatus 100 converts the calculation result by the simulation execution unit 110 into either a voltage or current signal and outputs the signal to the system controller 90, and the voltage and current output from the system controller 90.
  • a case will be described in which a signal input / output device 97 for converting any of the control signals into calculation data is provided.
  • the 11 includes a “voltage or current signal input / output device 97” (hereinafter referred to as a signal input / output device 97).
  • a signal input / output device 97 By connecting the signal input / output device 97 (signal conversion unit) and the system controller 90, the design support device 100 can perform actual machine verification of the system controller 90.
  • the signal input / output device 97 converts operation data to be referred to by the system controller 90 into a voltage or current signal and inputs the voltage or current signal to the system controller 90.
  • the voltage or current signal (control signal) output from the system controller 90 is: It is converted into operation data 61 via a signal input / output device 97 (signal conversion unit).
  • a single design support apparatus 100 is equipped with a plurality of CPUs (Central Processing Units), or a plurality of apparatuses are connected via a network as a parallel computer. It may be configured. In this way, the design support apparatus performs computation in real time using one or more CPUs.
  • CPUs Central Processing Units
  • step 70 in FIG. 6 is replaced with the operation flow (S91 to S97) in FIG.
  • step 92 all the expressions of all the facilities are read. Since the variable names of the data passed between the parent node and the child node do not match, a relational expression that links both variables is added in step 93.
  • step 94 a matrix equation is established in step 94 using all the expressions of all nodes, and the matrix is parallelized in step 95.
  • step 95 There are various methods for solving matrix equations in parallel, such as LU decomposition. Individual elements obtained by parallelizing the matrix equation are assigned to a plurality of CPUs in step 96, and each CPU performs an operation in parallel. The calculation results are collected in step 97 and substituted into the original variable of each node. The subsequent steps are the same as in the first embodiment.
  • the design support apparatus 100 can simulate the behavior of each facility in real time, and necessary data can be exchanged via the voltage or current input / output device 97. Can be used.
  • the heat pump hot water supply system includes a system controller that controls the system and inputs and outputs signals.
  • the design support apparatus 100 includes a signal input / output device (signal conversion unit) that converts data into a signal when data is input and converts the signal into data when a signal is input.
  • the simulation execution unit 110 uses the at least one CPU to execute calculation in real time, converts the calculation data of the execution result into a signal in real time by the signal input / output device 97, and outputs the signal to the system controller 90.
  • the signal output from the system controller 90 is input from the signal input / output device 97, and the input signal is converted into operation data using the signal input / output device 97.
  • the at least one CPU is controlled based on the converted operation data. To perform operations.
  • Embodiment 7 FIG. The seventh embodiment will explain an example of the hardware configuration of the design support apparatus 100 of the first to sixth embodiments.
  • FIG. 13 is a diagram showing an example of the appearance of the design support apparatus 100 realized by a computer.
  • the design support apparatus 100 includes a system unit 830, a display device 813 having a CRT (Cathode / Ray / Tube) or LCD (liquid crystal) display screen, a keyboard 814 (Key / Board: K / B), and a mouse 815.
  • FDD 817 Flexible Disk Drive
  • CDD Compact Disk Drive
  • printer device 819 printer device 819, and the like, which are connected by cables and signal lines.
  • FIG. 14 is a diagram illustrating an example of hardware resources of the design support apparatus 100 realized by a computer.
  • the design support apparatus 100 includes a CPU 810 that executes a program.
  • the CPU 810 includes a ROM (Read Only Memory) 811, a RAM (Random Access Memory) 812, a display device 813, a keyboard 814, a mouse 815, a communication board 816, an FDD 817, a CDD 818, a printer device 819, and a magnetic disk device 820 via a bus 825. And control these hardware devices.
  • a storage device such as an optical disk device or a flash memory may be used.
  • the RAM 812 is an example of a volatile memory.
  • Storage media such as the ROM 811, the FDD 817, the CDD 818, and the magnetic disk device 820 are examples of nonvolatile memories. These are examples of a storage device or a storage unit, a storage unit, and a buffer.
  • the communication board 816, the keyboard 814, the FDD 817, and the like are examples of an input unit and an input device.
  • the communication board 816, the display device 813, the printer device 819, and the like are examples of an output unit and an output device.
  • the communication board 816 is connected to a network (such as a Local Area Network).
  • the communication board 816 may be connected not only to the LAN but also to a WAN (wide area network) such as the Internet or ISDN.
  • the magnetic disk device 820 stores an operating system 821 (OS), a window system 822, a program group 823, and a file group 824.
  • the programs in the program group 823 are executed by the CPU 810, the operating system 821, and the window system 822.
  • the program group 823 stores a program for executing the function described as “unit” in the description of the embodiment described above.
  • a series of programs described as the arithmetic program database 4 is stored. The program is read and executed by the CPU 810.
  • Information, data, signal values, variable values, and parameters stored in a storage medium such as a disk or memory are read out to the main memory or cache memory by the CPU 810 via a read / write circuit, and extracted, searched, referenced, compared, and calculated. Used for CPU operations such as calculation, processing, output, printing, and display.
  • Information, data, signal values, variable values, and parameters are temporarily stored in the main memory, cache memory, and buffer memory during CPU operations for extraction, search, reference, comparison, calculation, calculation, processing, output, printing, and display. Is remembered.
  • data and signal values are stored in the RAM 812 memory, the FDD 817 flexible disk, the CDD 818 compact disk, the magnetic disk device 820 magnetic disk, other optical disks, mini disks, DVD ( (Digital / Versatile / Disk) or the like.
  • Data and signals are transmitted on-line via the bus 825, signal lines, cables, and other transmission media.
  • to part may be “means”, “to circuit”, and “to device”, and “to step”, “to” It may be “procedure” or “procedure”. That is, what has been described as “ ⁇ unit” may be realized by firmware stored in the ROM 811. Alternatively, it may be implemented only by software, only hardware such as elements, devices, substrates, wirings, etc., or a combination of software and hardware, and further a combination of firmware.
  • Firmware and software are stored as programs in a recording medium such as a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, and a DVD.
  • the program is read by the CPU 810 and executed by the CPU 810. In other words, the program causes the computer to function as the “ ⁇ unit” described above. Alternatively, it causes a computer to execute the procedures and methods of “to part” described above.
  • the design support apparatus 100 has been described. However, the operation of the design support apparatus 100 may be grasped as a design support method (design method of a heat pump hot water supply system) performed by the design support apparatus 100. Is possible. It can also be understood as a design support program that causes a computer to execute the design support method. It can also be understood as a computer-readable recording medium on which the design support program is recorded.
  • a design support method design method of a heat pump hot water supply system

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Evolutionary Computation (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

 ヒートポンプ式給湯システムの設計支援装置において、不足熱量が許容値内であり、かつCO排出量の少ないヒートポンプ式給湯システムの設計諸元を提示する設計支援装置を提供する。演算条件入力部5は演算条件51a等を入力する。演算データ作成部6は演算条件51aに関連するデータを設備データベース1~建物データベース3から取得し、取得したデータと演算条件51aとから演算データ61aを生成する。演算部7は演算データ61aと演算プログラムデータベース4の各演算プログラムとを用いてヒートポンプ式給湯システムの運転状態をシミュレーションする。演算部7は演算出力として、負荷側設備の不足熱量の積算値、負荷側設備の環境状態、熱源設備のCO排出量、熱源設備の運転状態等を出力する。演算条件51b、51cも同様に処理され、不足熱量が許容値内、かつ、CO排出量の少ない演算条件を特定できる。

Description

運転状態シミュレーション装置及びヒートポンプ式給湯システムの設計方法
 この発明は、ヒートポンプの冷凍サイクルによって得た熱量を、熱交換器を用いて水と熱交換することによって水を加温し、加温された温水を給湯設備や温水輻射暖房設備に供給する、ヒートポンプ式給湯システムの設計支援装置に関するものである。
 従来から、空調設備が有する多様な空調機器の設計を支援する設計支援装置が存在する。例えば特開2003-120982号公報(特許文献1)の設計支援装置は、気温と湿度の気象データと空調負荷との関係から空調負荷パターンを生成し、設計者が作成した空調設備の接続構成と、個々の設備の機器特性とから空調負荷を満たす熱供給パターンをシミュレーションし、熱供給に用いた燃料及び電力使用量と、燃料及び電力料金価格から年間のランニングコストとを計算する。この設計支援装置により、計算結果が設計目標に達しなければ、空調機器の構成を変更しながらシミュレーション操作を繰り返す。これにより、コストが最も安くなる機器の構成を得ることができる。
 また、特開2003-207189号公報(特許文献2)の設計支援装置では、空調機器の設計要素のうち数値化できるものを設計パラメータとして扱い、最適化アルゴリズムを用いて自動的にパラメータを変化させながらシミュレーションを繰り返すことにより、設計目標の達成可能なパラメータを得ている。
特開2003-120982号公報(図1) 特開2003-207189号公報(図1)
 特許文献1または特許文献2の空調システムの設計支援装置は、空調負荷を満たす熱供給が前提であり、熱供給が不足する設計パラメータは評価値が低く設計候補から除外される。
 しかし、給湯タンクへの加温と暖房とを適宜切替えて熱供給を行うヒートポンプ式給湯システムにおいては、給湯タンク加温時の暖房設備への熱供給停止など、一時的に熱量不足が発生する事態は完全には回避できない。熱量不足を補うための補助熱源として、バックアップ用の電気ヒータまたはボイラを設置する場合があるが、熱量不足時に例えば補助熱源として電気ヒータが起動した場合、ヒートポンプに比べて2~3倍程度の電力を消費することから、システム全体でのCO排出量が増加する。そのため熱量不足が短時間で温度低下も少ない程度のもの(許容値の範囲内)であれば、補助熱源はできる限り運転しないことが望ましい。
 しかしながら、従来の設計支援装置は不足熱量の許容値を評価条件に用いていないので、補助熱源が不足熱量を全て賄うという条件が選ばれることになる。このため、CO排出量の多い設計となるという課題があった。
 この発明は、不足熱量が許容値内であり、かつCO排出量の少ない、ヒートポンプ式給湯システムの設計諸元を提示するヒートポンプ式給湯システムの設計支援装置の提供を目的とする。
 この発明の運転状態シミュレーション装置は、
 ヒートポンプを用いて給湯を行うヒートポンプ式給湯システムの運転状態をシミュレーションする運転状態シミュレーション装置において、
 前記ヒートポンプ式給湯システムをシミュレーションするシミュレーション条件が入力される条件入力部と、
 予め設定された演算プログラムを前記条件入力部に入力された前記シミュレーション条件に基づいて実行することにより、前記ヒートポンプ式給湯システムの運転状態と前記運転状態における不足熱量とを含むシミュレーション結果情報を生成するシミュレーション実行部と、
 前記シミュレーション実行部によって生成された前記シミュレーション結果情報を出力する出力部と
を備えたことを特徴とする。
 この発明により、不足熱量が許容値内であり且つCO排出量の少ないヒートポンプ式給湯システムの設計諸元を提示する設計支援装置を提供できる。
実施の形態1のヒートポンプ式給湯システムの一例を示す図。 実施の形態1の設計支援装置100のブロック図。 実施の形態1のヒートポンプの外気温度、出湯温度に対するCOPを表す特性データを示す図。 実施の形態1の設計支援装置100の入力データと出力データとを示す図。 実施の形態1の設備フローの作成画面を示す図。 実施の形態1の演算部7の動作を示すフローチャート。 実施の形態2の制御におけるハンチングを説明する図。 実施の形態3の性能補正プログラム、除霜運転制御プログラムを示す図。 実施の形態4のCO排出量の上限値を含む演算条件を示す図。 実施の形態5の制御プログラム変換部を示す図。 実施の形態6の設計支援装置100のハードウェア構成を示す図。 実施の形態6の設計支援装置100の演算のフローチャート。 実施の形態7の設計支援装置100の外観の一例を示す図。 実施の形態7の設計支援装置100のハードウェア構成の一例を示す図。
 実施の形態1.
 実施の形態1は、ヒートポンプ式給湯システムをシミュレーションする設計支援装置100(運転状態シミュレーション装置)を説明する。
 図1は、ヒートポンプ式給湯システムの一例を示す。図1では、システムコントローラ90が、給湯タンク25が設置された筐体内に収納されている例を示した。熱源機であるヒートポンプ20が冷凍サイクルによって外界から熱を取り込み、ヒートポンプの室外機内部に収めた水熱交換器28、あるいは室外機の外部に接続された水熱交換器28を介して水を加温し、温水が配管21内を流れる。ヒートポンプ20が故障したり一時的に能力が低下した場合には、補助熱源22として例えば電気ヒータを用いて更に加温する。温水は、電動弁23及び循環ポンプ24の運転状態によって給湯タンク25または暖房設備のラジエータまたはファンコイルユニット26と床暖房27に供給される。なお、給湯設備と暖房設備への熱供給は同時に行われず、電動弁23によって運転をどちらかに切り替える構成になっている。給湯タンク25は、直接加熱型であれば、配管21を流れる温水がそのまま利用され、間接加熱型であれば、給湯タンク25内で更に熱交換設備を介して加温された温水を利用する。
 図2は、ヒートポンプ式給湯システムの設計支援装置100のブロック図である。設計支援装置100は、設備データベース1、気象データベース2、建物データベース3、演算プログラムデータベース4、演算条件入力部5(条件入力部)、演算データ作成部6、演算部7、演算結果評価部8(判定部)、演算データ修正部9、演算部7の演算結果を表示する演算結果表示部10(出力部)を備えている。
 設備データベース1は、熱源設備データ11、暖房設備データ12、給湯設備データ13、搬送設備データ14を含む。演算プログラムデータベース4は、熱源設備演算プログラム41、暖房設備演算プログラム42、給湯設備演算プログラム43、搬送設備演算プログラム44、制御装置演算プログラム45を含む。また、熱源設備演算プログラム41、暖房設備演算プログラム42、給湯設備演算プログラム43、搬送設備演算プログラム44、制御装置演算プログラム45は、ヒートポンプ式給湯システムの熱源設備、暖房設備、給湯設備、搬送設備、制御装置(システムコントローラ)をシミュレーションするプログラムである。演算部7がこれらのプログラムを実行し、ヒートポンプ式給湯システムの運転状態を含む演算結果(シミュレーション結果情報)を生成する。このシミュレーション結果情報により、入力した演算条件51(設計諸元)を評価することができる。
 設備データベース1、気象データベース2、建物データベース3は、データ格納部120に格納されている。データ格納部120とは、例えば実施の形態7で後述する磁気ディスク装置である。また、演算プログラムデータベース4と演算部7とは、シミュレーションを実行するシミュレーション実行部110を構成する。以下、各部について説明する。
(熱源設備データ11)
 設備データベース1の熱源設備データ11は、ヒートポンプ20及び、補助熱源22であるボイラまたは電気ヒータの、機種毎の構造データあるいは特性データを表す。構造データは、例えば熱交換器のフィンピッチなど物理形状に関するものを表す。特性データは、外気温度に対するCOP(Coefficient of Performance)などヒートポンプ20の能力に関するものや、熱交換器熱伝達率などヒートポンプ構成要素の特性に関するものを表す。図3は特性データの一例であり、外気温度及び出湯温度とCOPの関係を表している。この特性データは、カタログ上のデータを用いてもよいし、既納入製品の運転データの収集結果から求めたデータであってもよい。
(暖房設備データ12)
 暖房設備データ12は、ラジエータ、床暖房及びファンコイルユニットの機種または容量毎の、構造あるいは特性データを表す。例えば床暖房であれば、パネル型やコンクリート埋設型など施工の種類や、配管ピッチなどの物理形状データ及び、工法毎の床面熱伝達率などの特性データを含む。
(給湯設備データ13)
 給湯設備データ13は、少なくともタンクの形状、サイズあるいはタンクの壁面熱伝達率を含み、タンクの形状は、タンクの内部に温水を流す配管がコイル状に挿入されたコイルinタンク式、タンクの中にもう一つのタンクを設置し、二つのタンクの間に温水を流して、内側タンクの壁面から加温するタンクinタンク方式など、あらかじめ登録された構造から選ぶことができる。その他、タンクの寸法、材質に関するデータを備える。
(搬送設備データ14)
 搬送設備データ14は、ポンプ、バルブ、配管など搬送経路の設備に関するデータであり、例えばポンプであれば流量、圧力、動力の特性データを表す。
(気象データベース2)
 気象データベース2は、主要都市の外気温度データからなり、長くとも1時間間隔で、1年分あるいは数年にわたる気温データを備える。なお、データを利用する場合には、1年分あるいはそれ以上の長期に渡るデータを利用しても、季節毎に代表日のみデータを選んで利用してもよい。
(建物データベース3)
 建物データベース3は、壁材、床材などの部屋の構造物種類と、構造物から室外に熱が放出される、熱通過率に関するデータを含むものである。新築と既築では断熱性能が異なるので、建築年次とそれに対応する熱通過率データを持たせてもよい。
(演算プログラムデータベース4)
 演算プログラムデータベース4は、熱源設備演算プログラム41、暖房設備演算プログラム42、給湯設備演算プログラム43、搬送設備演算プログラム44、制御装置演算プログラム45を含む。
(1)熱源設備演算プログラム41は、熱源である、ヒートポンプ、ボイラ、電気ヒータ(補助熱源)等の、供給熱量、エネルギー効率、COP等を演算可能である。
(2)暖房設備演算プログラム42は、ラジエータ、ファンコイルユニット、床暖房等の暖房設備の供給熱量と、部屋から流出する熱量と、供給熱量と流出熱量の差分により変化する室温を演算可能である。
(3)給湯設備演算プログラム43は、給湯タンクに供給される熱量と、給湯利用及び給水によって出入りする熱量と、タンク壁面より流出する熱量と、それらの熱量の差分によって変化するタンク内部の水温と、を演算可能である。
(4)搬送設備演算プログラム44は、ポンプ、バルブ、配管などの搬送設備が後段の設備に搬送する熱量を演算する。
(5)制御装置演算プログラム45は、熱源設備、ポンプ、バルブの運転状態を決める。
(演算条件入力部5)
 図4は、設計支援装置100の入力と出力とを示す図である。演算条件入力部5は、入力として、演算条件51を入力する。図4は、条件の異なる複数の演算条件51a,51b,51c等を入力する場合を示している。複数の演算条件51a,51b,51c等を入力する場合は、それぞれの演算条件に対応する後述の演算データ61a,61b,61cが生成される。
 例えば、演算条件51aは、
(1)居住地511a、
(2)住居構成512a、
(3)給湯暖房システムの設備構成513a、
(4)各設備の仕様514a、
(5)給湯使用パターン515a、
(6)システムコントローラ90の設定値516a、
(7)評価期間517a、
(8)不足熱量の許容値518a
の各データを含む。演算条件51b,51cの項目も演算条件51aと同じである。
(給湯暖房システムの設備構成513)
 給湯暖房システムの設備構成513は、図5に例示する設備フロー構築画面のフローシート52上に作成する。まず、あらかじめ登録された設備のアイコン53をポインティングデバイス54を用いてポイントする。次に、フローシート52の任意の位置上でポイントすると、選択したアイコン53の設備が貼り付けられる。フローシート52に貼り付けられたアイコンをノードと呼ぶ。次に、二つのノードをポイントすると、配管として表す直線または折線が接続される。二つのノードをつなぐ線を、リンクと呼ぶ。また、接続された二つのノードのうち、計算の上流側を親ノード、下流側を子ノードと呼ぶ。
(設備の仕様514)
 ノード及びリンクには、パラメータ設定画面を介して設備の仕様514を入力することができる。暖房設備のノードにおいては、暖房設備を設置する部屋の広さ、壁の材質、窓の大きさなど、住居の構成に関するデータも入力する。
(給湯使用パターン515)
 給湯使用パターン515は、使用量を直接入力するか、家族構成や、朝のシャワー、料理、夜のお風呂などの項目で典型的な使用量のパターンをデータベースに持たせておき、パターンを選択する形式にしてもよい。
(システムコントローラの設定値516)
 システムコントローラの設定値516は、出湯温度、室温、タンク水温など、後述する制御装置演算プログラム45で目標値として使われる値を入力する。
(評価期間517)
 評価期間517は、少なくとも1年を設定するが、より長い期間であってもよい。
(不足熱量の許容値518)
 不足熱量の許容値518は、目標値との温度差×時間を単位とする値で与え、後述する演算結果評価部8で、演算結果を残すか棄却するかの判定に用いる。
(演算データ作成部6)
 演算データ作成部6は、演算条件入力部5から入力した演算条件51のうち、居住地データ511に一致する都市の気温データを気象データベース2から抽出し、暖房設備のある部屋の住居構成データ512に一致する構造材の、熱通過率データを建物データベース3から抽出し、フローシート52上に作成したノード、リンクの仕様データに対応する設備の機種、構造、特性データを設備データベース1から抽出し、その他の演算条件51と併せて、演算データ61を作成する。演算条件が演算条件51a,51b,51cのように複数入力された場合には、演算データ作成部6は、各演算条件ごとに対応する演算データ61a,61b,61c等を作成する。
(演算部7)
 演算部7は、図4に示すように、演算データ61と、演算プログラムデータベース4の各演算プログラムを用いて、
(a)熱源設備の運転状態、
(b)熱源設備のCO排出量、
(c)給湯設備の水温、暖房設備の室温など、負荷側設備の環境状態、
(d)給湯、暖房設備等の負荷側設備における不足熱量の積算値、
を演算する。なお、複数の演算条件51a,51b,51c等が入力された場合には、演算部7は、演算条件ごとに演算情報を生成する。
 図6は、演算部7の処理を示すフローチャートである。このフローチャートを参照して説明する。演算部7が演算を開始すると、
(1)まず設備の演算順序作成ステップ71で、演算部7はノード、リンクの接続データから、各設備の演算順序を求める。図1に示すように設備フローはループ状の構成となっているが、木構造のデータを探索する深さ優先探索法を用いて探索の順に演算の順番を割り振っていき、探索未完了の親ノードがあればそのノードを末端ノードとみなすことにより、ループ状の構成であっても木構造と同様に探索を進めることができる。
(2)次に、設備の初期値設定ステップ72では、演算部7は、演算プログラムデータベース4の各設備の演算プログラムに、演算データ61から該当設備のデータを抽出して初期値を設定する。
(3)制御装置演算プログラム45の実行ステップ73では、演算部7は制御装置演算プログラム45を実行する。演算部7は制御装置演算プログラム45を実行することにより、ヒートポンプの出湯温度、給湯タンクの水温、床暖房の室温など、制御対象ノードの制御目標値とするデータ(システムコントローラの設定値516)を参照し、演算プログラムに従って、ヒートポンプ、補助熱源、ポンプ、バルブのON/OFF、及び運転能力を求める。
(4)求められた制御結果のうち、ポンプ、バルブの制御結果は、各設備の温水流量を計算するステップ74にて用いられる。このステップ74では、流体管路網計算により各設備を流れる温水流量を求める。
(各設備の演算プログラムの実行)
 設備の演算プログラムを実行するステップ75では、演算部7は、ステップ71で求めた設備の演算順序に従って各設備の演算プログラム41~44を実行する。例えばヒートポンプのノード(熱源設備演算プログラム41に対応)であれば、図3の特性データを用いてあるいは冷凍サイクル演算を行い、供給熱量、CO排出量、COPなどのエネルギーに関する演算結果を出力する。負荷側の給湯設備ノード及び暖房設備ノード(暖房設備演算プログラム42、あるいは給湯設備演算プログラム43に対応)であれば、例えば次のような演算が実行される。熱伝達の下記(1)式を用いて温水からの供給熱量を求め、下記式(2)から供給熱量によるタンク水温もしくは室温の変化を求める。下記(1)式の熱伝達率は、固定値とせずにヌセルト数から求めてもよい。
 Qw=KA(Tw-T)         ・・・(1)
 T’=T+Qw/(CρV/Δt)   ・・・(2)
 ここで、
 Qw:温水からの供給熱量(kW)、
 K:温水と部屋またはタンク内への熱伝達率(kW/m)、
 A:伝熱面積(m)、
 Tw:温水温度(℃)、
 T:室温またはタンク水温(℃)、
 Cp:水または空気の比熱(kJ/kg・℃)、
 ρ:水または空気の密度(kg/m)、
 V:部屋またはタンク容積(m)、
 Δt:計算刻み(s)、
 T’:温度変化後の室温またはタンク水温(℃)、
である。
 一方、部屋またはタンクから外気へ流出する熱量は、(1)式において熱伝達率を部屋またはタンク内から外気への熱伝達率、温度差を外気と室温またはタンク水温の温度差とすれば求められる。流出する熱量を求め、(2)式で同様に計算すれば、放熱による温度低下が求められる。なお、(1)、(2)式では部屋、給湯タンク内、あるいは暖房設備内、給湯タンクの伝熱部分での温度分布を考慮しなかったが、熱伝導と流体の連成解析により、詳細な温度分布を計算しても良い。
(不足熱量の算出)
 不足熱量は、室温またはタンク水温が、制御装置演算プログラム45の目標値(システムコントローラの設定値516)より下回った場合に、温度差×継続時間にて求める。目標値より上回る場合は過剰熱量であり計算しない。
 搬送設備演算プログラム44は、熱源設備と給湯、暖房設備との間で熱を受け渡す演算を行っており、配管からの熱損失がある場合は、配管表面から外気への熱伝達として演算する。
 演算部7は、以上の演算を全ての設備について行う。全設備の演算が完了すれば(ステップ76でYES)、次の時間断面に状態を進め、制御装置演算プログラム45の実行ステップ73から次の時間断面での演算を行う。時間断面を進めて演算を繰り返し、評価期間分の演算が完了した場合には(ステップ77でYES)、ステップ78において、演算部7は、熱源設備の評価期間全体でのCO排出量を集計し、また負荷側設備の不足熱量を集計する。
 ステップ79において、演算部7は、演算結果表示部10に、
(1)演算条件51、
(2)熱源設備のCO排出量、
(3)負荷側設備の不足熱量、
(4)各設備の運転状態、
などをグラフまたは数値または表にて適宜表示させる。
(演算結果評価部8)
 所定期間の計算が終了した場合には、演算結果評価部8は、演算回数によって演算を継続するか打ち切るかの判定を行う(ステップ80)。演算打ち切りの判定には(ステップ80でNO)、不足熱量及びCO排出量を加工して評価値を作成して、評価値が閾値より低ければ演算を打ち切るなどの方式(所定の手法の一例)を用いてもよい。また、この演算結果評価部8は、遺伝アルゴリズムやMOPSO(Multi Objective Particle Swarm Optimization)などの多目的最適化手法を用いて、現在の演算条件による不足熱量及びCO排出量がパレート最適解に含まれるか否かを判定し、含まれなければ演算結果を棄却、含まれれば演算条件と演算結果を表、グラフ、数値を用いて演算結果表示部10に出力する。
 あるいは、演算結果評価部8は、所定期間の計算が終了した場合には、演算結果の不足熱量が許容値内の場合にのみ、演算結果と、その演算条件51とを演算結果表示部10に表示させてもよい。また演算条件入力部5に演算条件51a,51b等の複数の演算条件が入力された場合には、演算結果評価部8は、算出された不足熱量が、対応する演算条件に含まれる不足熱量の許容値の範囲内である演算結果のみを演算結果表示部10に表示させてもよい。
(演算データ修正部9)
 演算データ修正部9は、演算を継続する場合に、上に挙げた多目的最適化手法(所定の手法の一例)を用いて演算条件のうち修正するデータとその修正量を演算する、あるいは設備データベース1より別のデータを抽出すること(所定の手法の一例)により、再度演算データ61を作成する(ステップ81)。シミュレーション実行部110は、演算データ修正部9によって修正された演算データを使用して再び演算結果(シミュレーション結果情報)を生成する。
 このような構成にすることで、不足熱量を許容範囲内に維持し、かつCO排出量の少ないヒートポンプ式給湯システムの設計諸元を得ることができるので、設計者の作業効率を向上できる。
 実施の形態2.
 図7を参照して実施の形態2を説明する。実施の形態2は制御のハンチング対策に関する。演算結果評価部8の評価値として、過剰熱量と不足熱量の積算値を加えてもよい。熱源設備の容量または能力の制御幅が過大な場合、制御目標値に対し、図7のように運転結果(運転状態)が設定値(システムコントローラの設定値516)を上回り、またその直後に下回るハンチングを繰り返すことがある。このようなハンチングの結果、各時間断面でのCO排出量集計値で評価すると、必ずしも評価の低い結果になるとは限らないが、制御上は適切な状態とはいえない。従って、このようなハンチングの少ない制御設計値を見つけるために、過剰熱量と不足熱量との積算値を用いて、これ(積算値)がより小さい演算条件51(例えば、演算条件51a~51cのうち過剰熱量と不足熱量との積算値が最少のもの)を特定するようにしてもよい。熱量過不足の表現方法として、過剰熱量と不足熱量は、それぞれの積算値を足し合わせる以外に、過剰熱量と不足熱量をそれぞれ直交要素とした、過不足熱量ベクトルとして表しても良い。
 動作としては、シミュレーション実行部110は、ヒートポンプ式給湯システムの不足熱量と過剰熱量とを含む演算結果(シミュレーション結果情報)を生成する。演算結果評価部8(判定部)は、演算結果に含まれる不足熱量と、不足熱量と過剰熱量との積算値(あるいは過不足熱量ベクトル)とに基づいて、前記演算結果を廃棄するか維持するかを判定する。
 この構成により、制御のハンチング動作の少ない、ヒートポンプ式給湯システムの設計諸元を得ることができるので、過剰な設備容量あるいは粗い制御幅による設計を防ぐことができる。また、CO排出量が少なく、且つ制御のハンチングも少ないヒートポンプ式給湯システムの設計諸元を得ることができる。
 実施の形態3.
 図8を参照して実施の形態3を説明する。実施の形態3は、除霜運転のシミュレーションを不足熱量の演算に反映する場合を説明する。ヒートポンプ式給湯システムを寒冷地に適用する場合、低温時には室外機の熱交換器に霜が付着し、熱伝達率低下の原因となる。霜が成長すると熱交換器の性能が著しく低下するため、この霜を融解し除去する除霜運転を行う。除霜運転の一例は、室外熱交換器に高温の冷媒が流れるようにヒートポンプの回路を切り替えて運転する方式があり、その高温の冷媒によって霜を融解し除去する。除霜運転時はヒートポンプの冷凍サイクルで得た熱量を、霜の融解に用いているので、給湯、暖房設備に熱を供給することはできない。
 この現象を模擬するために、図8に示すように、熱源設備演算プログラム41は、霜の付きやすい所定の温度範囲において、供給熱量を減少させる、能力補正プログラム411を含む。また、制御装置演算プログラム45は、外気温度または室外機のCOPを監視し、着霜によるヒートポンプの性能低下を予測して除霜運転起動、停止時期を判定する、除霜運転制御プログラム451を含む。
 図8の構成にすることにより、寒冷地における性能低下具合を的確に把握し、可能な限り熱量不足を防止する制御の設計が可能となる。
 図8のように、制御装置演算プログラム45は、ヒートポンプの室外機の熱交換器に付着した霜を融解除去する除霜運転開始及び停止を指令する除霜運転制御プログラム451を備えている。シミュレーション実行部110は、除霜運転開始と判定した場合には、ヒートポンプの投入エネルギーは除霜運転に使われたと仮定し、給湯設備と、暖房設備との不足熱量を演算する。この構成により、除霜運転によるヒートポンプのCOP低下、及び除霜運転時の不足熱量が給湯、暖房設備に与える影響度合いを把握することができる。
 以上のように、ヒートポンプ式給湯システムは、ヒートポンプとして熱交換器を有する室外機を備える。シミュレーション実行部110によって実行される制御装置演算プログラム45は、熱交換器に付着した霜を除去する除霜運転をシミュレーションする除霜運転制御プログラム451を含む。シミュレーション実行部110は、除霜運転がシミュレーションされた場合には、除霜運転の反映された不足熱量を含む演算結果(シミュレーション結果情報)を生成する。
 実施の形態4.
 図9を参照して実施の形態4を説明する。実施の形態4は、演算条件51にさらにCO排出量の上限値を追加する場合を説明する。
 設備の能力は、年数が経過すると、熱交換器の汚損、住居の断熱性低下など、導入時の能力から低下する可能性がある。その結果、熱量不足となるか、あるいは熱量不足を回避した結果より多くのCOを排出する可能性がある。演算条件51にCO排出量上限値を追加し、これを演算結果評価部8の評価値に追加し、想定した使用年数内は性能が低下してもCO排出量が上限値を超えないことを最適解として現在の演算条件を残すための判定条件とする。
 演算条件51は、図9に示すように、設備の利用年数(評価期間517)と、CO排出量上限値519とを含む。演算データ修正部9は、演算データ61におけるヒートポンプ、暖房設備、給湯設備、建物の特性データを、利用年数に対して例えば演算期間1年分毎(分割期間の例)に低い能力に修正する。演算結果実行部110は、修正後の特性データとされた演算データ61を用いて演算を実行する。演算結果評価部8は、シミュレーション実行部110による1年ごとの演算の結果、CO排出量が、CO排出量の上限値519を超えた場合に、その年数を設備更新時期として、シミュレーション結果表示部10(出力部)に表示(出力)させる。
 このような構成にすることにより、想定した使用年数以内に設備更新の必要性を生じることなく運転可能な設備の諸元を得ることができる。すなわち、この構成により、設備の経年劣化によるCO排出量の増加量を見積もることができ、想定した使用年数内の性能維持が可能な設備の設計諸元を得ることができる。
 以上のように、演算条件入力部5に入力される演算条件51(シミュレーション条件)は、ヒートポンプ式給湯システムに許容される不足熱量の許容値518とヒートポンプ式給湯システムに許容される二酸化炭素の排出量の上限値519とを含む(図9)。演算データ修正部9は、利用年数(評価期間)を複数に分割した所定の分割期間が経過するごとに演算データ61に経年劣化を反映して修正する。シミュレーション実行部110は、演算データ修正部9によって経年劣化が反映された演算データを各演算プログラム41~45に実行さることにより、評価期間の開始から現在の期間までのヒートポンプ式給湯システムの二酸化炭素の総排出量を算出する。演算結果評価部8(判定部)は、シミュレーション実行部110により算出される二酸化炭素の総排出量が二酸化炭素の排出量上限値519を超えるかどうかを判定する。演算結果表示部10は、演算結果評価部8によって二酸化炭素の排出量上限値を超えると判定された場合には、評価期間の開始から二酸化炭素の排出量上限値を超えると判定された分割期間までの合計の期間を出力する。
 実施の形態5.
 図10を参照して実施の形態5を説明する。実施の形態5では、設計支援装置100が、システムコントローラ90のプログラムを演算部7の実行可能なプログラムに変換可能であり、また、制御装置演算プログラム45をシステムコントローラ90の実行可能なプログラム形式に変換する制御プログラム変換部46(プログラム変換部)を備えた場合を説明する。
 制御装置演算プログラム45は、実際にヒートポンプ式給湯システムのシステムコントローラ90に組み込まれる制御プログラム47(図10)でもよい。ただし、プログラム言語や入出力データのフォーマットを合わせる必要がある。このため、制御プログラム変換部46が、システムコントローラ90に組み込まれる制御プログラム47を制御装置演算プログラム45相当のプログラムに変換し、演算部7は、変換されたプログラムを制御装置演算プログラム45として使用する。また、新規に制御装置演算プログラム45が追加された場合、制御プログラム変換部46が、新規に追加された制御装置演算プログラム45を制御プログラム47に変換する。
 このような構成にすることにより、新規に開発したシステムコントローラ90のプログラムが、CO排出量の少ない運転が可能か否か、速やかに検証できるとともに、また設計支援装置100上で制御装置演算プログラム45として開発した場合には、機能を検証したのち、速やかにシステムコントローラ90の実機に搭載可能なプログラムを得ることができる。
 以上のように、シミュレーションの対象となるヒートポンプ式給湯システムは、システムを制御するシステムコントローラを備える。そして、シミュレーション実行部110によって実行される演算プログラムは、システムコントローラ90をシミュレーションする制御装置演算プログラム45を含む。そして、設計支援装置100は、システムコントローラ90に組み込まれる制御プログラム47を制御装置演算プログラム45に変換可能であると共に、制御装置演算プログラム45を制御プログラム47に変換可能な制御プログラム変換部46を備えている。
 実施の形態6.
 図11、図12を参照して実施の形態6を説明する。実施の形態6では、設計支援装置100が、シミュレーション実行部110による演算結果を電圧と電流とのいずれかの信号に変換してシステムコントローラ90に出力し、システムコントローラ90から出力された電圧と電流とのいずれかの制御信号を演算データに変換する信号入出力装置97を備えた場合を説明する。
 図11に示すヒートポンプ式給湯システムの設計支援装置100は、「電圧または電流信号入出力装置97」(以下、信号入出力装置97という)を備えている。信号入出力装置97(信号変換部)とシステムコントローラ90とが接続することにより、設計支援装置100は、システムコントローラ90の実機検証を行うことができる。信号入出力装置97は、システムコントローラ90が参照するべき演算データを電圧または電流信号に変換してシステムコントローラ90に入力し、またシステムコントローラ90の出力である電圧または電流信号(制御信号)は、信号入出力装置97(信号変換部)を介して演算データ61に変換される。
 このような構成で用いる場合、システムコントローラ90の実機と接続することから、演算は実時間で行う必要がある。そのためには、設計支援装置100にはより速い演算能力が必要なので、1台の設計支援装置100が複数のCPU(Central Processing Unit)を搭載するか、複数の装置をネットワークでつないで並列計算機として構成してもよい。このように設計支援装置は、1つまたは複数のCPUを用いて実時間で演算を実行する。
 演算を並列化するためには、図6のステップ70を、図12の演算フロー(S91~S97)に置き換える。まずステップ92で全ての設備の全ての式を読み込み、親ノードと子ノード間で受け渡されるデータは変数名が一致していないので、ステップ93で双方の変数を結びつける関係式を追加する。
 そして全てのノードの全ての式を用いてステップ94で行列方程式を立て、ステップ95で行列を並列化する。行列方程式を並列化して解く手法は、LU分解など種々の方式が存在する。行列方程式を並列化した個々の要素は、ステップ96で複数のCPUに割り当てられ、各CPUが並列的に演算を行う。演算結果はステップ97でまとめ、元の各ノードの変数に代入する。これ以降は実施の形態1と同様である。
 このような構成にすることにより、設計支援装置100は実時間で各設備の振る舞いを模擬でき、必要なデータは、電圧または電流入出力装置97を介してやりとりできるので、システムコントローラ90の実機検証に用いることができる。
 以上のように、ヒートポンプ式給湯システムは、システムを制御すると共に信号を入出力するシステムコントローラを備える。また、設計支援装置100は、データを入力すると信号に変換すると共に、信号を入力するとデータに変換する信号入出力装置(信号変換部)を備えている。シミュレーション実行部110は、少なくとも一つのCPUを用いることにより実時間で演算を実行しながら実行結果の演算データを信号入出力装置97によって実時間で信号に変換してシステムコントローラ90に出力すると共に、システムコントローラ90の出力した信号を信号入出力装置97から入力し、入力された信号を信号入出力装置97を用いて演算データに変換し、変換された演算データに基づいて前記少なくとも一つのCPUを用いて演算を実行する。
 実施の形態7.
 実施の形態7は実施の形態1~6の設計支援装置100のハードウェア構成の一例を説明する。
 図13は、コンピュータで実現される設計支援装置100の外観の一例を示す図である。図13において、設計支援装置100は、システムユニット830、CRT(Cathode・Ray・Tube)やLCD(液晶)の表示画面を有する表示装置813、キーボード814(Key・Board:K/B)、マウス815、FDD817(Flexible・Disk・ Drive)、コンパクトディスク装置818(CDD:Compact Disk Drive)、プリンタ装置819などのハードウェア資源を備え、これらはケーブルや信号線で接続されている。
 図14は、コンピュータで実現される設計支援装置100のハードウェア資源の一例を示す図である。図14において、設計支援装置100は、プログラムを実行するCPU810を備えている。CPU810は、バス825を介してROM(Read Only Memory)811、RAM(Random Access Memory)812、表示装置813、キーボード814、マウス815、通信ボード816、FDD817、CDD818、プリンタ装置819、磁気ディスク装置820と接続され、これらのハードウェアデバイスを制御する。磁気ディスク装置820の代わりに、光ディスク装置、フラッシュメモリなどの記憶装置でもよい。
 RAM812は、揮発性メモリの一例である。ROM811、FDD817、CDD818、磁気ディスク装置820等の記憶媒体は、不揮発性メモリの一例である。これらは、記憶装置あるいは記憶部、格納部、バッファの一例である。通信ボード816、キーボード814、FDD817などは、入力部、入力装置の一例である。また、通信ボード816、表示装置813、プリンタ装置819などは、出力部、出力装置の一例である。
 通信ボード816は、ネットワーク(Local Area Network等)に接続されている。通信ボード816は、LANに限らず、インターネット、ISDN等のWAN(ワイドエリアネットワーク)などに接続されていても構わない。
 磁気ディスク装置820には、オペレーティングシステム821(OS)、ウィンドウシステム822、プログラム群823、ファイル群824が記憶されている。プログラム群823のプログラムは、CPU810、オペレーティングシステム821、ウィンドウシステム822により実行される。
 上記プログラム群823には、以上に述べた実施の形態の説明において「~部」として説明した機能を実行するプログラムが記憶されている。また、演算プログラムデータベース4として説明した一連のプログラムが記憶されている。プログラムは、CPU810により読み出され実行される。
 ファイル群824には、以上に述べた実施の形態の説明において、「設備データベース1」、「気象データベース2」、「建物データベース3」、あるいは「演算条件51」、「演算データ61」、シミュレーション結果情報などとして説明した情報や、「~の判定結果」、「~の演算結果」、「~の抽出結果」、「~の生成結果」、「~の処理結果」として説明した情報や、データや信号値や変数値やパラメータなどが、「~ファイル」や「~データベース」の各項目として記憶されている。「~ファイル」や「~データベース」は、ディスクやメモリなどの記録媒体に記憶される。ディスクやメモリなどの記憶媒体に記憶された情報やデータや信号値や変数値やパラメータは、読み書き回路を介してCPU810によりメインメモリやキャッシュメモリに読み出され、抽出・検索・参照・比較・演算・計算・処理・出力・印刷・表示などのCPUの動作に用いられる。抽出・検索・参照・比較・演算・計算・処理・出力・印刷・表示のCPUの動作の間、情報やデータや信号値や変数値やパラメータは、メインメモリやキャッシュメモリやバッファメモリに一時的に記憶される。
 また、以上に述べた実施の形態の説明においては、データや信号値は、RAM812のメモリ、FDD817のフレキシブルディスク、CDD818のコンパクトディスク、磁気ディスク装置820の磁気ディスク、その他光ディスク、ミニディスク、DVD(Digital・Versatile・Disk)等の記録媒体に記録される。また、データや信号は、バス825や信号線やケーブルその他の伝送媒体によりオンライン伝送される。
 また、以上に述べた実施の形態の説明において、「~部」として説明したものは、「手段」、「~回路」、「~機器」であってもよく、また、「~ステップ」、「~手順」、「~処理」であってもよい。すなわち、「~部」として説明したものは、ROM811に記憶されたファームウェアで実現されていても構わない。或いは、ソフトウェアのみ、或いは、素子・デバイス・基板・配線などのハードウェアのみ、或いは、ソフトウェアとハードウェアとの組み合わせ、さらには、ファームウェアとの組み合わせで実施されても構わない。ファームウェアとソフトウェアは、プログラムとして、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ミニディスク、DVD等の記録媒体に記憶される。プログラムはCPU810により読み出され、CPU810により実行される。すなわち、プログラムは、以上に述べた「~部」としてコンピュータを機能させるものである。あるいは、以上に述べた「~部」の手順や方法をコンピュータに実行させるものである。
 以上の実施の形態1~6では、設計支援装置100を説明したが、設計支援装置100の動作を、設計支援装置100が行う設計支援方法(ヒートポンプ式給湯システムの設計方法)として把握することも可能である。また、設計支援方法をコンピュータに実行させる設計支援プログラムとして把握することも可能である。また、設計支援プログラムを記録したコンピュータ読み取り可能な記録媒体として把握することも可能である。
 1 設備データベース、2 気象データベース、3 建物データベース、4 演算プログラムデータベース、5 演算条件入力部、6 演算データ作成部、7 演算部、8 演算結果評価部、9 演算データ修正部、10 演算結果表示部、11 熱源設備データ、12 暖房設備データ、13 給湯設備データ、14 搬送設備データ、20 ヒートポンプ、21 配管、22 補助熱源、23 電動弁、24 ポンプ、25 タンク、26 ラジエータまたはファンコイルユニット、27 床暖房、28 水熱交換器、41 熱源設備演算プログラム、42 暖房設備演算プログラム、43 給湯設備演算プログラム、44 搬送設備演算プログラム、45 制御装置演算プログラム、46 制御プログラム変換部、47 制御プログラム、51 演算条件、52 フローシート、53 アイコン、54 ポインティングデバイス、61 演算データ、70 各設備の演算プログラム実行ステップ、90 システムコントローラ、92 CPU、93 メモリ、94 HDD、95 ディスプレイ、96 マウス・キーボード、97 電圧又は電流信号入出力装置、98 電圧または電流信号、99 バス、100 設計支援装置。

Claims (18)

  1.  ヒートポンプを用いて給湯を行うヒートポンプ式給湯システムの運転状態をシミュレーションする運転状態シミュレーション装置において、
     前記ヒートポンプ式給湯システムをシミュレーションするシミュレーション条件が入力される条件入力部と、
     予め設定された演算プログラムを前記条件入力部に入力された前記シミュレーション条件に基づいて実行することにより、前記ヒートポンプ式給湯システムの運転状態と前記運転状態における不足熱量とを含むシミュレーション結果情報を生成するシミュレーション実行部と、
     前記シミュレーション実行部によって生成された前記シミュレーション結果情報を出力する出力部と
    を備えたことを特徴とする運転状態シミュレーション装置。
  2.  前記シミュレーション実行部は、
     前記ヒートポンプ式給湯システムによって排出される二酸化炭素の排出量を含む前記シミュレーション結果情報を生成することを特徴とする請求項1記載の運転状態シミュレーション装置。
  3.  前記条件入力部は、
     複数の前記シミュレーション条件が入力され、
     前記シミュレーション実行部は、
     前記複数のシミュレーション条件ごとに前記シミュレーション結果情報を生成することを特徴とする請求項2記載の運転状態シミュレーション装置。
  4.  前記条件入力部に入力される前記複数のシミュレーション条件は、
     前記ヒートポンプ式給湯システムに対して許容される不足熱量の許容値を含み、
     前記出力部は、
     前記演算プログラムの実行によって算出された前記不足熱量が、算出された前記不足熱量を含む前記シミュレーション結果情報に対応する前記シミュレーション条件に含まれる前記不足熱量の許容値の範囲内である前記シミュレーション結果情報のみを出力することを特徴とする請求項3記載の運転状態シミュレーション装置。
  5.  前記条件入力部に入力される前記シミュレーション条件は、
     前記ヒートポンプ式給湯システムのシミュレーション期間を示す評価期間を含み、
     前記運転状態シミュレーション装置は、さらに、
     前記条件入力部に入力される前記シミュレーション条件に対応するデータを格納するデータ格納部と、
     前記条件入力部に入力された前記シミュレーション条件に合致するデータを前記データ格納部から取得し、取得されたデータと前記シミュレーション条件とから前記演算プログラムによって実行される演算の演算データを作成する演算データ作成部と、
     前記評価期間における前記演算プログラムによる前記演算データを用いた演算が終了した場合には、所定の手法に基づいて、前記演算を継続するか終了するかを判定する判定部と、
     前記判定部によって前記演算を継続すると判定された場合には、前記演算データ作成部によって作成された前記演算データを所定の手法を用いて修正する演算データ修正部と
    を備え、
     前記シミュレーション実行部は、
     前記演算データ修正部によって修正された前記演算データを前記演算プログラムに実行させることを特徴とする請求項2記載の運転状態シミュレーション装置。
  6.  前記シミュレーション実行部は、
     さらに、前記運転状態における前記ヒートポンプ式給湯システムの過剰熱量を含むシミュレーション結果情報を生成し、
     前記判定部は、
     前記シミュレーション結果情報に含まれる前記不足熱量と前記過剰熱量とに基づいて、前記シミュレーション結果情報を廃棄するかどうかを判定することを特徴とする請求項5記載の運転状態シミュレーション装置。
  7.  前記ヒートポンプ式給湯システムは、
     ヒートポンプとして熱交換器を有する室外機を備え、
     前記シミュレーション実行部によって実行される前記演算プログラムは、
     前記熱交換器に付着した霜を除去する除霜運転をシミュレーションする除霜運転制御プログラムを含み、
     前記シミュレーション実行部は、
     前記除霜運転がシミュレーションされた場合には、前記除霜運転の反映された前記不足熱量を含む前記シミュレーション結果情報を生成することを特徴とする請求項2記載の運転状態シミュレーション装置。
  8.  前記条件入力部に入力される前記シミュレーション条件は、
     前記ヒートポンプ式給湯システムに許容される不足熱量の許容値と前記ヒートポンプ式給湯システムに許容される二酸化炭素の排出量上限値とを含み、
     前記演算データ修正部は、
     前記評価期間を複数に分割した所定の分割期間が経過するごとに前記演算データに経年劣化を反映して修正し、
     前記シミュレーション実行部は、
     前記演算データ修正部によって経年劣化が反映された前記演算データを前記演算プログラムに実行させることにより、前記評価期間の開始から現在の分割期間までの前記ヒートポンプ式給湯システムの二酸化炭素の総排出量を算出し、
     前記判定部は、
     前記シミュレーション実行部により算出される前記二酸化炭素の総排出量が前記シミュレーション条件に含まれる二酸化炭素の排出量上限値を超えるかどうかを判定し、
     前記出力部は、
     前記判定部によって前記二酸化炭素の排出量上限値を超えると判定された場合には、前記評価期間の開始から前記二酸化炭素の排出量上限値を超えると判定された前記分割期間までの合計の期間を出力することを特徴とする請求項5記載の運転状態シミュレーション装置。
  9.  前記ヒートポンプ式給湯システムは、
     システムを制御するシステムコントローラを備え、
     前記シミュレーション実行部によって実行される前記演算プログラムは、
     前記システムコントローラをシミュレーションする制御装置演算プログラムを含み、
     前記運転状態シミュレーション装置は、さらに、
     前記システムコントローラに組み込まれる制御プログラムを前記制御装置演算プログラムに変換可能であると共に、前記制御装置演算プログラムを前記制御プログラムに変換可能なプログラム変換部を備えたことを特徴とする請求項2記載の運転状態シミュレーション装置。
  10.  前記ヒートポンプ式給湯システムは、
     システムを制御すると共に信号を入出力するシステムコントローラを備え、
     前記運転状態シミュレーション装置は、さらに、
     データを入力すると信号に変換すると共に、信号を入力するとデータに変換する信号変換部を備え、
     前記シミュレーション実行部は、
     少なくとも一つのCPU(Central Processing Unit)を用いることにより実時間で演算を実行しながら実行結果の演算データを前記信号変換部によって前記実時間で信号に変換して前記システムコントローラに出力すると共に、前記システムコントローラの出力した信号を前記信号変換部から入力し、入力された信号を前記信号変換部を用いて演算データに変換し、変換された演算データに基づいて前記少なくとも一つのCPUを用いて演算を実行することを特徴とする請求項2記載の運転状態シミュレーション装置。
  11.  ヒートポンプを用いて給湯を行うヒートポンプ式給湯システムの設計方法において、
     前記ヒートポンプ式給湯システムをシミュレーションするシミュレーション条件を入力する入力ステップと、
     予め設定された演算プログラムを前記シミュレーション条件に基づいて実行することにより、前記ヒートポンプ式給湯システムの運転状態と前記運転状態における不足熱量とを含むシミュレーション結果情報を生成する実行ステップと、
     前記シミュレーション結果情報を出力する出力ステップと
    を備えたことを特徴とするヒートポンプ式給湯システムの設計方法。
  12.  前記シミュレーション結果情報は、
     前記ヒートポンプ式給湯システムによって排出される二酸化炭素の排出量を含むことを特徴とする請求項11記載のヒートポンプ式給湯システムの設計方法。
  13.  前記実行ステップは、
     複数のシミュレーション条件のそれぞれに対して、前記複数のシミュレーション条件ごとに前記シミュレーション結果情報を生成することを特徴とする請求項12記載のヒートポンプ式給湯システムの設計方法。
  14.  前記複数のシミュレーション条件は、
     前記ヒートポンプ式給湯システムに対して許容される不足熱量の許容値を含み、
     前記出力ステップは、
     前記不足熱量の許容値の範囲内であるシミュレーション結果情報のみを出力することを特徴とする請求項13記載のヒートポンプ式給湯システムの設計方法。
  15.  前記シミュレーション条件は、
     前記ヒートポンプ式給湯システムのシミュレーション期間を示す評価期間を含み、
     ヒートポンプ式給湯システムの設計方法は、さらに、
     前記シミュレーション条件に対応するデータを格納する格納ステップと、
     格納されたデータのうち前記シミュレーション条件に合致するデータと前記シミュレーション条件とから前記演算プログラムによって実行される演算データを作成する作成ステップと、
     前記評価期間における前記演算データを用いた前記実行ステップが終了した場合には、所定の手法に基づいて、前記実行ステップを継続するか終了するかを判定する判定ステップと、
     前記実行ステップを継続すると判定された場合には、作成された前記演算データを所定の手法を用いて修正する修正ステップと
    を備え、
     前記実行ステップは、
     修正された前記演算データを前記演算プログラムに使用させることにより前記シミュレーション結果情報を生成することを特徴とする請求項12記載のヒートポンプ式給湯システムの設計方法。
  16.  前記実行ステップは、
     さらに、前記運転状態における前記ヒートポンプ式給湯システムの過剰熱量を含むシミュレーション結果情報を生成し、
     前記判定ステップは、
     前記シミュレーション結果情報に含まれる前記不足熱量と前記過剰熱量とに基づいて、前記シミュレーション結果情報を廃棄するかどうかを判定することを特徴とする請求項15記載のヒートポンプ式給湯システムの設計方法。
  17.  前記ヒートポンプ式給湯システムは、
     ヒートポンプとして熱交換器を有する室外機を備え、
     前記実行ステップは、
     前記熱交換器に付着した霜を除去する除霜運転をシミュレーションするステップを含むと共に、
     前記除霜運転がシミュレーションされた場合には、前記除霜運転の反映された前記不足熱量を含む前記シミュレーション結果情報を生成することを特徴とする請求項12記載のヒートポンプ式給湯システムの設計方法。
  18.  前記シミュレーション条件は、
     前記ヒートポンプ式給湯システムに許容される不足熱量の許容値と前記ヒートポンプ式給湯システムに許容される二酸化炭素の排出量上限値とを含み、
     前記修正ステップは、
     前記評価期間を複数に分割した所定の分割期間が経過するごとに前記演算データに経年劣化を反映して修正し、
     前記実行ステップは、
     経年劣化が反映された前記演算データを用いることにより前記評価期間の開始から現在の分割期間までの前記ヒートポンプ式給湯システムの二酸化炭素の総排出量を算出し、
     前記判定ステップは、
     前記実行ステップによって算出される前記二酸化炭素の総排出量が前記シミュレーション条件に含まれる二酸化炭素の排出量上限値を超えるかどうかを判定し、
     前記出力ステップは、
     前記判定ステップによって二酸化炭素の排出量上限値を超えると判定された場合には、前記評価期間の開始から前記二酸化炭素の排出量上限値を超えると判定された前記分割期間までの合計の期間を出力することを特徴とする請求項15記載のヒートポンプ式給湯システムの設計方法。
PCT/JP2009/066061 2009-02-03 2009-09-15 運転状態シミュレーション装置及びヒートポンプ式給湯システムの設計方法 WO2010089916A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP09839690.6A EP2395292B1 (en) 2009-02-03 2009-09-15 Operating state simulation device and method for designing heat pump hot-water supply system
JP2010549342A JP5143238B2 (ja) 2009-02-03 2009-09-15 運転状態シミュレーション装置及びヒートポンプ式給湯システムの設計方法及びヒートポンプ式給湯システム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-022735 2009-02-03
JP2009022735 2009-02-03

Publications (1)

Publication Number Publication Date
WO2010089916A1 true WO2010089916A1 (ja) 2010-08-12

Family

ID=42541831

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/066061 WO2010089916A1 (ja) 2009-02-03 2009-09-15 運転状態シミュレーション装置及びヒートポンプ式給湯システムの設計方法

Country Status (3)

Country Link
EP (1) EP2395292B1 (ja)
JP (1) JP5143238B2 (ja)
WO (1) WO2010089916A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016174735A1 (ja) * 2015-04-28 2016-11-03 三菱電機株式会社 熱搬送装置監視装置および方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3009611A1 (fr) * 2013-08-08 2015-02-13 Ace Sas Installation de chauffage d'un circuit d'eau sanitaire
WO2016157480A1 (ja) * 2015-04-01 2016-10-06 三菱電機株式会社 空調システム制御装置
CN106440017B (zh) * 2016-09-09 2019-04-30 黑龙江建筑职业技术学院 供热工程运行调控虚拟仿真实训平台

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003120982A (ja) 2001-10-16 2003-04-23 Hitachi Ltd 空調設備運用システム及び空調設備設計支援システム
JP2003161514A (ja) * 2001-11-27 2003-06-06 Noritz Corp 給湯器システム設計支援装置の動作方法および給湯器システムの生産方法
JP2003207189A (ja) 2002-01-18 2003-07-25 Foundation For The Promotion Of Industrial Science 室内温熱環境設計システム及びその方法
JP2004310456A (ja) * 2003-04-07 2004-11-04 Toho Gas Co Ltd 設備設計支援システムおよび設備設計支援装置
JP2007011919A (ja) * 2005-07-04 2007-01-18 Mitsubishi Electric Building Techno Service Co Ltd 機器の運用評価情報提供装置
JP2007032880A (ja) * 2005-07-22 2007-02-08 Chofu Seisakusho Co Ltd 貯湯式電気給湯器の運転計画作成装置及び運転計画作成方法
JP2007040613A (ja) * 2005-08-03 2007-02-15 National Institute Of Advanced Industrial & Technology エネルギ需給バランス調整システム、エネルギ需給バランス調整方法、制御装置及びコンピュータプログラム

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003120982A (ja) 2001-10-16 2003-04-23 Hitachi Ltd 空調設備運用システム及び空調設備設計支援システム
JP2003161514A (ja) * 2001-11-27 2003-06-06 Noritz Corp 給湯器システム設計支援装置の動作方法および給湯器システムの生産方法
JP2003207189A (ja) 2002-01-18 2003-07-25 Foundation For The Promotion Of Industrial Science 室内温熱環境設計システム及びその方法
JP2004310456A (ja) * 2003-04-07 2004-11-04 Toho Gas Co Ltd 設備設計支援システムおよび設備設計支援装置
JP2007011919A (ja) * 2005-07-04 2007-01-18 Mitsubishi Electric Building Techno Service Co Ltd 機器の運用評価情報提供装置
JP2007032880A (ja) * 2005-07-22 2007-02-08 Chofu Seisakusho Co Ltd 貯湯式電気給湯器の運転計画作成装置及び運転計画作成方法
JP2007040613A (ja) * 2005-08-03 2007-02-15 National Institute Of Advanced Industrial & Technology エネルギ需給バランス調整システム、エネルギ需給バランス調整方法、制御装置及びコンピュータプログラム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2395292A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016174735A1 (ja) * 2015-04-28 2016-11-03 三菱電機株式会社 熱搬送装置監視装置および方法
JPWO2016174735A1 (ja) * 2015-04-28 2017-11-30 三菱電機株式会社 熱搬送装置監視装置および方法

Also Published As

Publication number Publication date
JP5143238B2 (ja) 2013-02-13
EP2395292A1 (en) 2011-12-14
EP2395292B1 (en) 2019-05-08
JPWO2010089916A1 (ja) 2012-08-09
EP2395292A4 (en) 2013-09-18

Similar Documents

Publication Publication Date Title
Qiu et al. Model-free control method based on reinforcement learning for building cooling water systems: Validation by measured data-based simulation
US9429921B2 (en) Method and system for energy control management
US11243503B2 (en) Building management system with online configurable system identification
US8396572B2 (en) System and method for energy plant optimization using mixed integer-linear programming
US11042924B2 (en) Building controller for optimizing equipment upgrades with design of experiments
Lu et al. Operational optimization of district heating system based on an integrated model in TRNSYS
Urieli et al. A learning agent for heat-pump thermostat control
Li et al. Experimental validation of the simulation module of the water-cooled variable refrigerant flow system under cooling operation
US20230040886A1 (en) Building equipment energy management control system and control therefor
Shen et al. Development and validation of quasi-steady-state heat pump water heater model having stratified water tank and wrapped-tank condenser
Zhuang et al. A risk-based robust optimal chiller sequencing control strategy for energy-efficient operation considering measurement uncertainties
JP5248897B2 (ja) 運転計画決定システム
JP5143238B2 (ja) 運転状態シミュレーション装置及びヒートポンプ式給湯システムの設計方法及びヒートポンプ式給湯システム
Pachano et al. Seasonal adaptation of VRF HVAC model calibration process to a Mediterranean climate
Liang et al. Stochastic economic dispatch of regional integrated energy system considering the pipeline dynamics using improved approximate dynamic programming
Moghaddas-Zadeh et al. ANN-based procedure to obtain the optimal design and operation of the compression chiller network–Energy, economic and environmental analysis
Wang et al. Performance prediction and evaluation on the first balanced energy networks (BEN) part I: BEN and building internal factors
Song et al. A development of easy-to-use tool for fault detection and diagnosis in building air-conditioning systems
Wang et al. Modeling Variable Refrigerant Flow (VRF) systems in building applications: A comprehensive review
Jansen et al. Mixed-integer non-linear model predictive control of district heating networks
Wang et al. A global optimization method for data center air conditioning water systems based on predictive optimization control
Kassai Development and experimental validation of a TRNSYS model for energy design of air-to-water heat pump system
Wang et al. Methodology for optimizing the operation of heating/cooling plants with multi-heat-source equipments
Ritosa et al. A probabilistic approach to include the overall efficiency of gas-fired heating systems in urban building energy modelling
Nomura et al. Design–operation gap caused by parameter variance in HVAC system control sequences: A simulation-based study on energy efficiency and temperature controllability

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09839690

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2010549342

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 2009839690

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE