WO2010058933A2 - 터널굴착공법 - Google Patents

터널굴착공법 Download PDF

Info

Publication number
WO2010058933A2
WO2010058933A2 PCT/KR2009/006735 KR2009006735W WO2010058933A2 WO 2010058933 A2 WO2010058933 A2 WO 2010058933A2 KR 2009006735 W KR2009006735 W KR 2009006735W WO 2010058933 A2 WO2010058933 A2 WO 2010058933A2
Authority
WO
WIPO (PCT)
Prior art keywords
excavation
tunnel
arcuate
blasting
foundation
Prior art date
Application number
PCT/KR2009/006735
Other languages
English (en)
French (fr)
Other versions
WO2010058933A3 (ko
Inventor
김진형
Original Assignee
Kim Jin Hyung
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kim Jin Hyung filed Critical Kim Jin Hyung
Publication of WO2010058933A2 publication Critical patent/WO2010058933A2/ko
Publication of WO2010058933A3 publication Critical patent/WO2010058933A3/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1053Making by using boring or cutting machines for making a slit along the perimeter of the tunnel profile, the remaining core being removed subsequently, e.g. by blasting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Definitions

  • the present invention relates to a tunnel excavation method, and in detail, to form a small arcuate cross section between the base and the excavation target ground by drilling a continuous arched hole in the form of a closed curve along the planned excavation line, using the blasting and excavation equipment
  • tunnel excavation that can safely excavate the tunnel while ensuring the stability of the rock surface which forms the excavation surface without the various support materials required for excavating the tunnel using blasting It is about public law.
  • the selection of the tunneling method should be made by comprehensively examining the safety, economic feasibility, and ease of construction based on the geological state of the excavation target.
  • the most preferred tunnel method is the conventional method, the NATM (New Austrian Tunnel Method) method, TBM (Tunnel boring Machine) method is an example.
  • the NATM method is proven to be superior to the conventional method and has been applied to most tunnels in urban and mountainous areas. If the conventional process uses steel steel ribs and concrete lining (concrete reinforcement walls to protect the inner walls of the tunnel) as the primary support, the NATM method is based on shotcrete, rock as the primary support. The use of rock bolts can be used to strengthen the excavation surface so that construction can be carried out effectively even in areas with weak rock.
  • the NATM method has the advantage of allowing tunnel construction regardless of the effects of soil and ground because the ground itself around the tunnel acts as a prop so that it bears enormous loads even if the pillar is not erected.
  • there are disadvantages such as falling accidents caused by blasting, destruction of the surrounding natural environment, and severe noise generation.
  • a large amount of support material (lock bolt, shotcrete) is required, and a large number of equipments such as blasting equipment and support material are required to have a small cross section.
  • the disadvantage is that it is not suitable for tunnel excavation.
  • TBM Tunite boring machine
  • This TBM method uses a tunnel drilling machine called TBM (Tunnel boring Machine), which is capable of excavating shear planes with no blasting and no vibration. Therefore, there is an advantage of minimizing asset deformation and maintaining a safe and clean mine environment by non-blasting work.
  • TBM tunnel drilling machine
  • it is economically disadvantageous compared to the NATM method as a method requiring an expensive drilling machine and a professional technician who can operate the machine.
  • the technical problem to be solved by the present invention is a tunnel excavation method that can maximize the economic aspects and stability, protection of the surrounding natural environment during excavation, while significantly reducing the fall accident or the destruction of the surrounding natural environment and noise during tunnel excavation. To provide.
  • the present invention as a means for solving the above problems, (a) the first drilling step of forming a small arcuate cross section between the base and the excavation target ground by drilling a continuous arched hole in the form of a closed curve along the planned excavation line; (b) a second excavation step of additionally excavating the excavation target ground located inside the arc-shaped small section by using a blast or vibration-free excavation equipment to form a foundation tunnel; (c) forming a lining structure along the excavation surface by installing linings along the excavation surface of the foundation tunnel formed through the secondary excavation step; And (d) stabilizing the rock surface by injecting mortar into the space between the lining structure and the excavation surface of the foundation tunnel, and sequentially performing steps (a) and (d) for each section along the tunnel excavation direction. It provides a tunnel excavation method to excavate the planned tunnel step by step repeatedly.
  • the arcuate small cross section in the step (a) is formed by using an excavation machine having a drill drill in a continuous arcuate arrangement, wherein the width of the arcuate cross section formed through the excavating machine is 1 m. It is preferable to form within 2 m.
  • step (b) it is preferable to minimize the work time required to take out the buckles out of the gang by continuously carrying out the buckles during excavation using the blasting or vibration-free excavation equipment out of the gang using a trolley. .
  • the foundation tunnel excavation surface adjacent to the excavation target ground where excavation is performed through the operation (b) corresponds to the basic tunnel excavation surface shape and is constant in the excavation direction of the tunnel. It is preferable to install an arcuate steel having a length so that safety accidents such as collapse or fall of foundation tunnels located around the blasting part can be prevented by vibration caused by the blasting during the blasting excavation process through the step (b). .
  • the arched steel is moved in a stepping direction toward the tunnel excavation in which the excavation proceeds through the step (b), and the foundation is located behind the arched steel. It is preferable to include the step (c) for the tunnel excavation surface and to proceed thereafter.
  • the arcuate steel applied to the tunnel excavation method of the present invention it is preferable to adopt a steel material having an appropriate length in consideration of the distance transmitted by the blasting when the blasting excavation to the excavation target rock through the step (b). It is preferable to use an arcuate steel having a length of preferably 30m to 40m.
  • the tunnel excavation method by drilling a continuous arched hole in the form of a closed curve along the planned excavation line to form an arcuate cross section between the base and the excavation target ground, blasting or vibration-free excavating equipment, for example, wire saw Using a (wire saw) to further excavate the excavation target ground located inside the arcuate small end surface.
  • the present invention basically uses the blasting method by the conventional NATM method, but even through the blasting method to excavate the tunnel by forming a space such as an arc-shaped small section using the TBM method between the original blasting ground and the excavation target ground.
  • the blasting noise is significantly reduced and the blasting shock is hardly transmitted to the ground, so that the excavation surface, that is, the foundation tunnel excavation surface, remains very stable.
  • the present invention uses an excavation machine for forming an arc-shaped small section before blasting, as in the conventional TBM method, but the area excavated through such an excavation machine is not the tunnel shear surface, as in the conventional TBM method, and the boundary between the base and the excavation target ground Since it is limited to, such as the excavation equipment used in the conventional TBM method, expensive large excavation equipment is not required.
  • the present invention is a breakthrough method that can maximize the economical aspects and stability, protection of the surrounding natural environment during excavation.
  • FIG. 1 is a process block diagram according to the tunnel excavation method proposed in the present invention.
  • FIGS. 2 and 3 are a perspective view and a side view schematically showing a tunnel excavation process by the tunnel excavation method according to the present invention, respectively.
  • FIG 4 to 8 are views showing the tunnel excavation process performed by the tunnel excavation method according to the present invention in order.
  • Figure 1 is a process block diagram according to the tunnel excavation method proposed in the present invention
  • Figure 2 is a perspective view schematically showing a tunnel excavation process by the tunnel excavation method according to the present invention
  • 4 and 8 are views sequentially showing a tunnel excavation process performed by the tunnel excavation method according to the present invention.
  • the tunnel in the tunnel excavation method proposed in the present invention, can be excavated more safely while ensuring stability of the rock surface where vibrations and cracks form the excavated surface of the tunnel when excavating the tunnel using blasting.
  • a blasting or vibration-free drilling equipment for example, a drilling equipment such as a wire saw.
  • the arched shape continuously in the form of a closed curve along the planned excavation line (L1, L2)
  • the hole is drilled to form an arcuate small cross section 10 having a constant width and depth as shown in FIG.
  • the arcuate small cross-section 10 is formed using a drilling equipment (not shown) having a drill drill of a continuous arcuate arrangement, the width of the arcuate small cross-section 10 formed through the drilling equipment to form within 1m ⁇ 2m It is preferable.
  • the drilling direction of the arcuate hole is preferably perpendicular to the excavation target surface, but is not necessarily limited thereto, and the first excavation may be performed according to the terrain and field working conditions of the excavation target portion and the specifications of the drilling equipment. Changes can be made in various directions as long as the work is ideally realized.
  • the arcuate hole may be drilled at a time by using a dedicated drilling equipment of the above configuration, but in some cases by drilling one circular hole and by forming another circular hole adjacent to the hole to connect each hole It is to be understood that such embodiments are also included in the scope of the present invention, as they can be formed through the operation of forming one continuous arcuate hole.
  • the excavation target ground 30 located inside the arcuate small cross section 10 is additionally excavated through the second excavation step.
  • drilling equipment such as point board reel on the excavation target ground (30) located inside the arcuate small cross section (10) (100) After drilling a plurality of holes using a) to charge the explosives and to form the base tunnel 40 by blasting.
  • the blasting force of the explosives blasted from the excavation target ground 30 located inside the arcuate small cross-section 10 in the second excavation step is directed toward the outside of the tunnel, the excavation surface of the foundation tunnel 40 will be formed. Since the ground ground 20 and the excavation target ground 30 are separated and partitioned through the arch-shaped small cross-section 10 formed through the first excavation process, the excavation target ground 30 by using the explosive blasting method. Excavation) does not transmit the shock and vibration due to the blasting to the base 20.
  • the base plate 20 located outside the arcuate small cross section 10 specifically, the excavation surface forming the excavation surface of the base tunnel 40 by primary excavation does not cause cracks due to explosive blasting.
  • the tunnel excavation surface can be maintained in a stable state without a separate shotcrete treatment or reinforcement construction such as a lock bolt to reinforce the excavation surface as in the prior art.
  • the present embodiment has been described using the explosive blasting method as an example, but in addition to this, other methods such as a crushing method and an excavation method can be used, in addition to the excavation method through such blasting.
  • Excavations using known vibration-free drilling rigs, such as, for example, wire saws, are also possible, and thus may also be included in the scope of the present invention.
  • lining structures 60 are formed along the excavation surface of the foundation tunnel 40 to form a lining structure 60 along the excavation surface.
  • a series of processes as described above, that is, primary excavation, secondary excavation, Finishing by forming lining structure and mortar injection is repeatedly performed in sequence along the tunnel excavation direction step by step to excavate the tunnel step by step to complete the tunnel of planned length.
  • the foundation has a length extending rearward a certain distance from the blasting position (the excavation target ground; corresponding to the "30" position of Figure 2) through the blasting in the gang It is preferable to provide an arcuate steel material 50 corresponding to the shape of the foundation tunnel 40 excavation surface on the tunnel 40 excavation surface.
  • the installation of the arcuate steel 50 is to prevent the safety accidents such as the collapse or fall of the foundation tunnel 40 located behind the blasting portion by vibration by the blasting in the blasting excavation process through the secondary excavation step as described above
  • a steel having a suitable length preferably the length (L) It is good to use the arcuate steel 50 having a 30m ⁇ 40m.
  • the curtain type soundproof dustproof opening 52 When the curtain type soundproof dustproof opening 52 is installed in the arcuate steel 50 installed in the gang, the noise and dust generated during the blasting excavation process through the secondary excavation step are more effectively prevented from being transmitted or scattered out of the tunnel. Since the arcuate steel 50 may be provided with a curtain type soundproof dustproof outlet 52, the curtain type soundproofing in the longitudinal direction of the arcuate steel 50 as shown in order to implement more effective soundproofing and dustproofing over multiple stages. It is good to provide the dustproof opening 52 in multiple stages.
  • the arcuate steels 50 are provided to be movable along rails (not shown) in the foundation tunnel, and are moved stepwise in the tunnel excavation direction through the blasting, so that Safety accidents such as collapse or fall are prevented, and the basic tunnel excavation surface exposed to the rear of the arcuate steel 50 in the gang, that is, the excavation surface located at a safe distance from the blasting during the blasting process through the secondary excavation.
  • the lining structure 60 is formed as above and the mortar 70 is stabilized by injecting mortar 70 into the space between the lining structure 60 and the excavation surface of the foundation tunnel, thereby completing the tunnel step by step in the tunnel excavation direction. Let it out.
  • the tunnel excavation method by drilling a continuous arc-shaped hole in the form of a closed curve along the planned excavation line (L1, L2) between the base ground 20 and the excavation target ground (30) arcuate cross section (10) ) To further excavate the excavation target ground (30) located inside the arcuate small cross-section (10) using the blasting and excavating equipment in the state formed.
  • the present invention basically uses a blasting method according to the conventional NATM method, but through the formation of a space such as an arc-shaped small cross section 10 using the TBM method between the original blasting base 20 and the excavation target ground 30, Even if the tunnel is excavated using the blasting method, the blasting noise is remarkably reduced and the blasting shock is hardly transmitted to the ground, so that the excavation surface, that is, the foundation tunnel excavation surface, remains very stable.
  • the present invention uses an excavation machine for forming the arch-shaped small cross-section 10 before blasting, as in the conventional TBM method, the area excavated through such an excavation machine is not the tunnel shear surface, as in the conventional TBM method, the base plate 20 And because it is limited to the excavation target ground (30) boundary portion, expensive large excavation equipment, such as the excavation equipment used in the conventional TBM method is not required.
  • the present invention is a breakthrough method that can maximize the economical aspects and stability, protection of the surrounding natural environment during excavation.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

발파를 이용하여 터널을 굴착함에 있어 요구되는 다양한 지보재 없이도 굴착면을 형성하는 암반면의 안정성을 확보하면서 터널을 안전하게 굴착할 수 있는 터널굴착공법을 제공한다. 상기 터널굴착공법은 (a) 계획된 굴착선을 따라 폐곡선 형태로 연속된 아치형 구멍을 천공하여 원지반과 굴착대상지반 사이에 아치형 소단면을 형성시키는 1차 굴진단계; (b) 발파 또는 무진동 굴착장비를 이용하여 상기 아치형 소단면 안쪽에 위치하는 굴착대상 지반을 추가적으로 굴착하여 기초터널을 형성시키는 2차 굴진단계; (c) 상기 2차 굴진단계를 통해 형성된 기초터널의 굴착면을 따라 라이닝을 설치하여 굴착면을 따르는 라이닝 구조체를 형성시키는 단계; 및 (d) 상기 라이닝 구조체와 기초터널의 굴착면 사이의 공간으로 몰탈을 주입시켜 암반면을 안정화시키는 단계;를 포함하며, 터널굴착 방향을 따라 구간별로 상기 (a) 및 (d)단계를 순차적으로 반복수행하면서 계획된 터널을 단계적으로 굴착토록 하는 것을 요지로 한다.

Description

터널굴착공법
본 발명은 터널굴착공법에 관한 것으로, 상세하게는 계획된 굴착선을 따라 폐곡선 형태로 연속된 아치형 구멍을 천공하여 원지반과 굴착대상지반 사이에 아치형 소단면을 형성시키고, 발파 및 굴진장비를 이용하여 상기 아치형 소단면 안쪽에 위치하는 굴착대상지반을 추가적으로 굴착함으로써, 발파를 이용하여 터널을 굴착함에 있어 요구되는 다양한 지보재 없이도 굴착면을 형성하는 암반면의 안정성을 확보하면서 터널을 안전하게 굴착할 수 있는 터널굴착공법에 관한 것이다.
터널을 굴착함에 있어 터널공법의 선정은 굴착 대상부의 지질상태에 기초한 시공의 안전성, 경제성, 시공의 편이성 등을 종합적으로 검토하여 이루어져야 한다. 최근 가장 선호하는 터널공법으로는 재래식의 공법과 함께 NATM(New Austrian Tunnel Method) 공법, TBM(Tunnel boring Machine) 공법을 예로 들 수 있다.
NATM 공법은 재래식 공법에 비해서 월등한 경제성과 안정성이 입증되어 도심지 및 산악지역의 대부분 터널에 적용되고 있다. 재래식 공법이 철재 스틸 립(Steel Rib)과 콘크리트 라이닝(터널내벽을 보호하는 콘크리트 보강 벽체)을 주요한 지보재(支保材)로 사용한다면, NATM 공법은 지반 자체가 주요한 지보재로서 숏크리트(Shot crete), 락 볼트(Rock Bolt)를 사용하여 굴착 표면을 강화시켜 암질이 연약한 부위에서도 효과적으로 공사를 수행할 수 있다.
상기 NATM 공법은 지주를 세우지 않더라도 전술한 바와 같이 터널 주변의 지반 자체로 하여금 지주 역할을 하도록 하여 막대한 하중을 견디게 하므로, 토질과 지반의 영향에 관계 없이 터널시공을 할 수 있다는 장점을 가진다. 그러나 발파에 의한 낙반사고나 주변 자연환경의 파괴 및 심각한 소음발생 등의 단점이 있고, 다량의 지보재(락 볼트, 숏크리트)가 요구되며, 발파 장비, 지보재 등 다수의 장비가 요구되어 작은 단면을 가진 터널굴착에는 부적합 하다는 단점이 있다.
TBM(Tunnel boring Machine) 공법은 정상적인 화약장전에 의한 발파 작업이 불가능한 지역(해저터널, 지반이 약한 지역)에서 터널 시공 시 주로 이용하는 방법이다. 이 TBM공법은 TBM(Tunnel boring Machine)이라는 터널굴착 기계를 이용한 방식으로 무발파, 무진동으로 전단면 굴착이 가능하다. 따라서 자산 변형을 최소화할 뿐 아니라 비발파 작업으로 안전하고 청결한 갱내 작업환경을 유지시킬 수 있다는 장점이 있다. 그러나 고가의 굴착기계 및 이 기계를 운용할 수 있는 전문 기능공이 요구되는 공법으로 상기 NATM 공법에 비해 경제적인 면에서 불리하다는 단점이 있다.
본 발명이 해결하고자 하는 기술적 과제는, 터널 굴착 시 낙반사고나 주변 자연환경의 파괴 및 소음발생을 현저히 줄일 수 있으면서 경제적인 면과 안정성, 굴착 시 주변 자연환경 보호를 극대화시킬 수 있는 터널굴착공법을 제공하는 데에 있다.
상기한 과제를 해결하기 위한 수단으로서 본 발명은, (a) 계획된 굴착선을 따라 폐곡선 형태로 연속된 아치형 구멍을 천공하여 원지반과 굴착대상지반 사이에 아치형 소단면을 형성시키는 1차 굴진단계; (b) 발파 또는 무진동 굴착장비를 이용하여 상기 아치형 소단면 안쪽에 위치하는 굴착대상지반을 추가적으로 굴착하여 기초터널을 형성시키는 2차 굴진단계; (c) 상기 2차 굴진단계를 통해 형성된 기초터널의 굴착면을 따라 라이닝을 설치하여 굴착면을 따르는 라이닝 구조체를 형성시키는 단계; 및 (d) 상기 라이닝 구조체와 기초터널의 굴착면 사이의 공간으로 몰탈을 주입시켜 암반면을 안정화시키는 단계;를 포함하며, 터널굴착 방향을 따라 구간별로 상기 (a) 및 (d)단계를 순차적으로 반복수행하면서 계획된 터널을 단계적으로 굴착하는 터널굴착공법을 제공한다.
본 발명에 따른 굴착공법에서 상기 (a)단계에서의 아치형 소단면은, 연속된 아치형 배열의 천공드릴을 갖는 굴착기계를 이용하여 형성시키며, 이때 굴착기계를 통해 형성되는 아치형 소단면의 폭을 1m ~ 2m 이내로 형성하는 것이 바람직하다.
그리고 상기 (b)단계에서는, 발파 또는 무진동 굴착장비를 이용한 굴착도중 발생한 버럭은 트롤리를 이용해 갱 밖으로 지속적으로 반출시킴으로써 버럭을 갱 밖으로 반출시킴에 있어 소요되는 작업시간을 최소화할 수 있도록 하는 것이 바람직하다.
또한 상기 (b)단계와 (c)단계 사이에, 상기 (b)단계를 통해 굴착이 진행되는 굴착대상지반과 근접한 기초터널 굴착면에 이 기초터널 굴착면 형상에 대응하고 터널의 굴착방향으로 일정한 길이를 갖는 아치형 강재를 설치하여, 상기 (b)단계를 통한 발파 굴착과정에서의 발파에 의한 진동으로 발파부 주변에 위치한 기초터널의 붕락 또는 낙반 등의 안전사고가 예방될 수 있도록 하는 것이 바람직하다.
또한 상기 (a), (b)단계를 거쳐 기초터널이 형성되면, 상기 아치형 강재를 (b)단계를 통해 굴착이 진행되는 터널굴착방향으로 단계적으로 이동시켜 가면서, 상기 아치형 강재 후방에 위치하는 기초터널 굴착면에 대해 상기 (c)단계를 포함하여 그 이후 과정이 진행되도록 하는 것이 바람직하다.
본 발명의 터널굴착공법에 적용되는 상기 아치형 강재는 상기 (b)단계를 통한 굴착대상암반에 대한 발파 굴착 시 발파에 의한 진동이 전달되는 거리를 감안하여 적당한 길이를 갖는 강재를 채택함이 바람직할 것인 바, 바람직하게는 그 길이가 30m ~ 40m 인 아치형 강재를 사용하는 것이 좋다.
한편, 상기 아치형 강재에는 커텐식 방음방진구를 설치함으로써, 상기 (b)단계를 통한 굴착 과정 중 발생하는 소음을 차단하고 분진이 터널 밖으로 비산되지 않도록 함이 바람직하다.
상기한 본 발명에 따른 터널굴착공법에 의하면, 계획된 굴착선을 따라 폐곡선 형태로 연속된 아치형 구멍을 천공하여 원지반과 굴착대상지반 사이에 아치형 소단면을 형성시키고, 발파 또는 무진동 굴착장비 예컨대, 와이어 쏘(Wire saw)를 이용하여 상기 아치형 소단면 안쪽에 위치하는 굴착대상지반을 추가적으로 굴착한다.
즉, 본 발명은 기본적으로는 종래 NATM 공법에 의한 발파 방식을 이용하지만 발파 전 원지반과 굴착대상지반 사이에 TBM 공법을 이용한 아치형 소단면과 같은 공간 형성을 통해, 발파방식을 이용하여 터널을 굴착하더라도 발파소음이 현저히 줄고 원지반에 발파 충격이 거의 전달되지 않아 굴착면 즉, 기초터널 굴착면은 매우 안정된 상태를 유지하게 된다.
이에 따라, 발파과정에서 연약해진 굴착면 보강을 위해 종래 공법에서 요구되던 락 볼트, 숏크리트, 지보 등과 같은 지보재 없이도 낙반사고 없는 안정적인 터널을 구축할 수 있고, 상기 지보재 및 이 지보재를 설치하기 위한 공정 역시 생략됨에 따라, 장비생략 및 공기단축으로 인하여 공사비용을 획기적으로 줄일 수 있다는 장점이 발현된다.
또한 본 발명은, 종래 TBM 공법과 같이 발파 전 아치형 소단면 형성을 위한 굴착기계를 이용하지만, 이러한 굴착기계를 통해 굴착되는 면적이 종래 TBM 공법과 같이 터널 전단면이 아닌 원지반과 굴착대상지반 경계부위에 국한되므로, 종래 TBM공법에 사용되는 굴착장비와 같이 고가 대형 굴착장비가 요구되지 않는다. 결과적으로, 본 발명은 경제적인 면과 안정성, 굴착 시 주변 자연환경 보호를 극대화 할 수 있는 획기적인 공법이다.
도 1은 본 발명에서 제시하는 터널굴착공법에 따른 공정 블록도.
도 2, 도 3은 각각 본 발명에 따른 터널굴착공법에 의한 터널굴착과정을 개략적으로 나타낸 사시도 및 측면도.
도 4 내지 도 8은 본 발명에 따른 터널굴착공법에 의해 수행되는 터널굴착과정을 순서대로 나타낸 도면들.
<도면의 주요부분에 대한 부호 설명>
10...아치형 소단면 20...원지반
30...굴착대상지반 40...기초터널
50...아치형 강재 52...커텐식 방음방진구
60...라이닝 구조체 70...몰탈
L1, L2...굴착선
이하, 첨부도면을 참조하여 본 발명에 따른 터널굴착공법을 상세히 설명하기로 한다.
하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다. 그리고 후술되는 용어들은 본 발명 안에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.
먼저 첨부도면을 간단히 설명하면, 도 1은 본 발명에서 제시하는 터널굴착공법에 따른 공정 블록도이며, 도 2, 도 3은 각각 본 발명에 따른 터널굴착공법에 의한 터널굴착과정을 개략적으로 나타낸 사시도 및 측면도이고, 도 4 내지 도 8은 본 발명에 따른 터널굴착공법에 의해 수행되는 터널굴착과정을 순서대로 나타낸 도면들이다.
도시된 도면들을 참조하면, 본 발명에서 제시하는 터널굴착공법은 발파를 이용하여 터널을 굴착함에 있어 진동 및 균열이 터널의 굴착면을 형성하는 암반면의 안정성을 확보하면서 터널이 보다 안전하게 굴착될 수 있도록, 원지반(20)과 굴착대상지반(30) 사이에 아치형 소단면(10)을 형성시키는 1차 굴진단계와, 발파 또는 무진동 굴착장비, 예컨대 와이어 쏘(Wire saw)와 같은 굴착장비를 이용하여 상기 아치형 소단면(10) 안쪽에 위치하는 굴착대상지반(30)을 추가적으로 굴착하여 기초터널(40)을 형성시키는 2차 굴진단계를 포함한다.
상기 1차 굴진단계에서는 도 4에서와 같이 굴착될 터널 형상으로 굴착 대상면에 굴착선(L1, L2)을 계획 설정한 후, 상기 계획된 굴착선(L1, L2)을 따라 폐곡선 형태로 연속되게 아치형 구멍을 천공하여 도 5에서와 같이 일정한 폭과 깊이를 가지는 아치형 소단면(10)을 형성시킨다. 상기 아치형 소단면(10)은 연속된 아치형 배열의 천공드릴을 갖는 천공장비(미도시)를 이용하여 형성시키고, 천공장비를 통해 형성되는 아치형 소단면(10)의 폭은 1m ~ 2m 이내로 형성하는 것이 바람직하다.
아치형 구멍을 형성함에 있어 상기 아치형 구멍의 천공방향은, 굴착 대상면에 대해 수직인 것이 바람직 하지만 반드시 이에 국한되는 것은 아니며, 굴착 대상부의 지형 및 현장 작업조건, 그리고 천공장비의 제원 등에 따라 1차 굴진작업을 가장 이상적으로 실현할 수만 있다면 다양한 방향으로 변경이 가능하다.
또한, 상기 아치형 구멍은 상기한 구성의 전용 천공장비를 이용하여 한번에 천공할 수도 있지만, 경우에 따라서는 하나의 원형 구멍을 뚫고 그 구멍에 인접하여 다른 원형 구멍을 추가적으로 형성하여 각각의 구멍을 연결시킴으로써 하나의 연속된 아치형 구멍을 형성시키는 작업을 통해서도 형성가능하므로, 이러한 실시예 역시 본 발명의 범주에 포함된다고 보아야 할 것이다.
1차 굴진단계를 거쳐 굴착 대상면에 아치형 소단면(10)이 형성되면, 상기 2차 굴진단계를 통해 아치형 소단면(10) 안쪽에 위치하는 굴착대상지반(30)을 추가적으로 굴착하여 도 6과 같이 기초터널(40)을 완성한다. 본 발명에 적용된 2차 굴진단계에서는 종래 NATM 공법에서 적용되는 일반적인 폭약 발파법을 사용하며, 이를 위해서 아치형 소단면(10) 안쪽에 위치하는 굴착대상지반(30)에 점보드릴과 같은 천공장비(100)를 이용하여 다수의 장약공을 천공한 후 폭약을 장약하고 발파시킴으로써 기초터널(40)을 형성시킨다.
상기 2차 굴진단계에서 아치형 소단면(10) 안쪽에 위치한 굴착대상지반(30)에서 발파된 폭약의 발파력은 일부가 터널의 바깥쪽으로 향하게 되지만, 기초터널(40)의 굴착면을 형성하게 될 원지반(20)과 상기 굴착대상지반(30) 사이는 상기 1차 굴진과정을 통해 이미 형성된 아치형 소단면(10)을 통해 분리 구획되어 있는 관계로, 폭약 발파법을 이용하여 상기 굴착대상지반(30)을 굴착하더라도 상기 발파에 의한 충격 및 진동이 상기 원지반(20)으로 전달되지 않는다.
이에 따라, 상기 아치형 소단면(10) 바깥쪽에 위치한 원지반(20) 구체적으로는, 1차 굴진에 의한 기초터널(40)의 굴착면을 형성하는 굴착면에는 폭약 발파에 따른 균열이 발생하지 않게 되고, 결과적으로는 종래와 같이 굴착면 보강을 위한 별도의 숏크리트 처리나 락 볼트와 같은 지보재(支保材) 시공없이도 터널 굴착면은 안정된 상태를 유지할 수 있다.
2차 굴진을 위한 굴착 방법으로서 본 실시예에서는 위와 같이 폭약 발파법을 예로 들어 설명하고 있지만, 이 외에도 파쇄법, 삭굴법 등 다른 방법이 사용될 수 있음은 물론이며, 이와 같은 발파를 통한 굴착방식 외에도 공지된 무진동 굴착장비, 예컨대 와이어 쏘(Wire saw)와 같은 굴착장비를 이용한 굴착 또한 가능하므로 이또한 본 발명의 범주에 포함될 수 있다.
상기 2차 굴진단계에서의 발파 또는 무진동 굴착장비를 통한 굴착과정에서 발생한 버럭(암반 부스러기)을 처리함에 있어서는, 도면에는 도시하지 않았으나 갱 내에 트롤리를 설치하고 이 트롤리를 이용해 갱 밖으로 지속적으로 반출시킴으로써, 상기 버럭을 갱 밖으로 반출시킴에 있어 소요되는 작업시간을 최소화 시킬 수 있도록 함이 바람직하다.
상기한 1, 2차 굴진단계를 거쳐 기초터널(40)이 완성되면, 이 기초터널(40)의 굴착면을 따라 도 7과 같이 라이닝을 설치하여 굴착면을 따르는 라이닝 구조체(60)를 형성시키고, 상기 라이닝 구조체(60)와 기초터널(40)의 굴착면 사이의 공간으로 도 8과 같이 몰탈을 주입시켜 암반면을 안정화시키는 데, 위와 같은 일련의 과정 즉, 1차 굴진, 2차 굴진, 라이닝 구조체 형성, 몰탈 주입을 통한 마감작업을 터널굴착 방향을 따라 구간별로 순차적으로 반복수행함으로써 터널을 단계적으로 굴착하여 계획된 길이의 터널을 완성시킨다.
이때, 상기한 2차 굴진을 통해 형성된 기초터널의 굴착면에 위와 같이 라이닝 구조체(60)를 형성시키기에 앞서, 상기한 2차 굴진단계를 통한 발파과정에서 발파 위치에 근접한 원지반의 붕락 또는 낙반 등의 안전사고에 대비할 수 있도록, 갱 내에서 발파를 통한 2차 굴진이 진행되는 발파 위치(굴착대상지반; 도 2의 "30" 위치에 해당)에서부터 일정거리 후방으로 연장된 길이를 가지면서 상기 기초터널(40) 굴착면에 이 기초터널(40) 굴착면 형상에 대응하는 아치형 강재(50)를 설치하는 것이 좋다.
상기 아치형 강재(50)의 설치는 위와 같이 2차 굴진단계를 통한 발파 굴착과정에서의 발파에 의한 진동으로 발파부 후방에 위치한 기초터널(40)의 붕락 또는 낙반 등의 안전사고가 예방될 수 있도록 하기 위한 것으로, 상기 2차 굴진단계를 통한 굴착대상지반(30)에 대한 발파 굴착 과정 중 발파에 의한 진동이 전달되는 거리를 감안하여 적당한 길이를 갖는 강재를 채택하며, 바람직하게는 그 길이(L)가 30m ~ 40m 인 아치형 강재(50)를 사용하는 것이 좋다.
갱 내에 설치되는 상기 아치형 강재(50)에 커텐식 방음방진구(52)를 설치하면, 상기 2차 굴진단계를 통한 발파 굴착 과정 중 발생하는 소음 및 분진이 터널 밖으로 전달되거나 비산되는 것을 보다 효과적으로 방지할 수 있으므로, 상기 아치형 강재(50)에는 커텐식 방음방진구(52)를 설치하되, 다단에 걸친 보다 효과적인 방음 및 방진 구현을 위해서는 도면에서와 같이 아치형 강재(50) 길이방향으로 상기 커텐식 방음방진구(52)를 다단 설치하는 것이 좋다.
위와 같은 아치형 강재를 적용함에 있어 상기 아치형 강재(50)는, 기초터널 내에서 레일(미도시)을 따라 이동가능하도록 마련하여 발파를 통한 터널굴착방향으로 단계적으로 이동시켜 가면서 발파 주변의 기초터널의 붕락 또는 낙반 등의 안전사고가 예방될 수 있도록 하고, 갱 내에서 상기 아치형 강재(50) 후방으로 노출되는 기초터널 굴착면 즉, 2차 굴진을 통한 발파과정에서 발파로부터 안전한 거리에 위치해 있는 굴착면에는 위와 같이 라이닝 구조체(60)를 형성하고 이 라이닝 구조체(60)와 기초터널의 굴착면 사이의 공간으로 몰탈(70)을 주입시켜 암반면을 안정화 시킴으로써, 터널 굴착방향에 대해 단계적으로 터널을 완성시켜 나간다.
상기한 본 발명에 따른 터널굴착공법에 의하면, 계획된 굴착선(L1, L2)을 따라 폐곡선 형태로 연속된 아치형 구멍을 천공하여 원지반(20)과 굴착대상지반(30) 사이에 아치형 소단면(10)을 형성시킨 상태에서 발파 및 굴진장비를 이용하여 상기 아치형 소단면(10) 안쪽에 위치하는 굴착대상지반(30)을 추가적으로 굴착한다.
즉, 본 발명은 기본적으로는 종래 NATM 공법에 의한 발파 방식을 이용하지만 발파 전 원지반(20)과 굴착대상지반(30) 사이에 TBM 공법을 이용한 아치형 소단면(10)과 같은 공간 형성을 통해, 발파방식을 이용하여 터널을 굴착하더라도 발파소음이 현저히 줄고 원지반에 발파 충격이 거의 전달되지 않아 굴착면 즉, 기초터널 굴착면은 매우 안정된 상태를 유지하게 된다.
이에 따라, 발파과정에서 연약해진 굴착면 보강을 위해 종래 공법에서 요구되던 락 볼트, 숏크리트, 지보 등과 같은 지보재 없이도 낙반사고 없는 안정적인 터널을 구축할 수 있고, 상기 지보재 및 이 지보재를 설치하기 위한 공정 역시 생략됨에 따라, 장비생략 및 공기단축으로 인하여 공사비용을 획기적으로 줄일 수 있다는 장점이 발현된다.
또한 본 발명은, 종래 TBM 공법과 같이 발파 전 아치형 소단면(10) 형성을 위한 굴착기계를 이용하지만, 이러한 굴착기계를 통해 굴착되는 면적이 종래 TBM 공법과 같이 터널 전단면이 아닌 원지반(20)과 굴착대상지반(30) 경계부위에 국한되므로, 종래 TBM공법에 사용되는 굴착장비와 같이 고가 대형 굴착장비가 요구되지 않는다. 결과적으로, 본 발명은 경제적인 면과 안정성, 굴착 시 주변 자연환경 보호를 극대화 할 수 있는 획기적인 공법이다.
이상의 본 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다. 하지만 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 고안의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.

Claims (8)

  1. (a) 계획된 굴착선을 따라 폐곡선 형태로 연속된 아치형 구멍을 천공하여 원지반과 굴착대상지반 사이에 아치형 소단면을 형성시키는 1차 굴진단계;
    (b) 발파 또는 무진동 굴착장비를 이용하여 상기 아치형 소단면 안쪽에 위치하는 굴착대상지반을 추가적으로 굴착하여 기초터널을 형성시키는 2차 굴진단계;
    (c) 상기 2차 굴진단계를 통해 형성된 기초터널의 굴착면을 따라 라이닝을 설치하여 굴착면을 따르는 라이닝 구조체를 형성시키는 단계; 및
    (d) 상기 라이닝 구조체와 기초터널의 굴착면 사이의 공간으로 몰탈을 주입시켜 암반면을 안정화시키는 단계;를 포함하며,
    터널굴착 방향을 따라 구간별로 상기 (a) 및 (d)단계를 순차적으로 반복수행하면서 계획된 터널을 단계적으로 굴착하는 터널굴착공법.
  2. 제 1 항에 있어서,
    상기 (a)단계에서의 아치형 소단면은,
    연속된 아치형 배열의 천공드릴을 갖는 굴착기계를 이용하여 형성시키는 것을 특징으로 하는 터널굴착공법.
  3. 제 2 항에 있어서,
    상기 굴착기계를 통해 형성되는 아치형 소단면의 폭을 1m ~ 2m 이내로 형성하는 것을 특징으로 하는 터널굴착공법.
  4. 제 1 항에 있어서,
    상기 (b)단계에서는,
    발파 또는 무진동 굴착장비를 이용한 굴착도중 발생한 버럭을 트롤리를 이용해 갱 밖으로 지속적으로 반출시키는 것을 특징으로 하는 터널굴착공법.
  5. 제 1 항에 있어서,
    상기 (b)단계와 (c)단계 사이에,
    상기 (b)단계를 통해 굴착이 진행되는 굴착대상지반과 근접한 기초터널 굴착면에 이 기초터널 굴착면 형상에 대응하고 터널의 굴착방향으로 일정한 길이를 가진 아치형 강재를 설치하는 것을 특징으로 하는 터널굴착공법.
  6. 제 5 항에 있어서,
    상기 아치형 강재를 (b)단계를 통해 굴착이 진행되는 터널굴착방향으로 단계적으로 이동시켜 가면서, 상기 아치형 강재 후방에 위치하는 기초터널 굴착면에 대해 상기 (c)단계를 포함하여 그 이후 과정이 진행되도록 하는 것을 특징으로 하는 터널굴착공법.
  7. 제 5 항에 있어서,
    상기 아치형 강재는 그 길이(L)가 30m ~ 40m 인 아치형 강재를 사용하는 것을 특징으로 터널굴착공법.
  8. 제 5 항에 있어서,
    상기 아치형 강재에는,
    상기 (b)단계를 통한 발파 굴착 과정 중 발생된 소음을 차단하고 분진이 비산하는 것을 방지할 수 있도록 커텐식 방음방진구를 다단 설치하는 것을 특징으로 하는 터널굴착공법.
PCT/KR2009/006735 2008-11-18 2009-11-17 터널굴착공법 WO2010058933A2 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020080114455A KR101054380B1 (ko) 2008-11-18 2008-11-18 터널굴착공법
KR10-2008-0114455 2008-11-18

Publications (2)

Publication Number Publication Date
WO2010058933A2 true WO2010058933A2 (ko) 2010-05-27
WO2010058933A3 WO2010058933A3 (ko) 2010-08-12

Family

ID=42198638

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2009/006735 WO2010058933A2 (ko) 2008-11-18 2009-11-17 터널굴착공법

Country Status (2)

Country Link
KR (1) KR101054380B1 (ko)
WO (1) WO2010058933A2 (ko)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389609A (zh) * 2014-09-24 2015-03-04 中国水利水电第十四工程局有限公司 一种无爆破机械开挖法
CN110295913A (zh) * 2019-08-05 2019-10-01 中信国安建工集团有限公司 一种隧道爆破开挖系统及施工方法
CN110618249A (zh) * 2018-06-20 2019-12-27 核工业北京地质研究院 一种岩土工程开挖施工的试验方法
CN112431597A (zh) * 2020-12-22 2021-03-02 中铁五局集团成都工程有限责任公司 一种单斜构造顺层偏压软岩大变形隧道单工序施工方法
CN112923818A (zh) * 2021-03-05 2021-06-08 中交一公局集团有限公司 一种拱架限制下全电脑三臂凿岩台车精细化钻爆开挖方法
CN113107497A (zh) * 2021-04-14 2021-07-13 中铁工程服务有限公司 一种硬岩隧道掘进施工方法
CN114000885A (zh) * 2021-10-29 2022-02-01 四川省交通勘察设计研究院有限公司 一种围岩隧道掘进施工方法
CN114320319A (zh) * 2021-11-09 2022-04-12 珠海华昕开发建设有限公司 一种隧道极小断面向特大断面扩挖的施工方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120034545A (ko) * 2010-10-01 2012-04-12 한국과학기술원 터널 발파 천공을 최소화하는 발파패턴을 가지는 발파구조
KR101256584B1 (ko) * 2010-12-07 2013-04-19 (주)한국투아치 이중공법을 통한 터널의 굴착방법
KR101256587B1 (ko) * 2010-12-07 2013-04-19 (주)한국투아치 진동흡수공간부를 적용한 터널굴착방법
KR101634119B1 (ko) 2014-08-19 2016-06-28 한국철도기술연구원 발파진동 저감을 위해 터널 외주면 일부를 절삭하는 터널 굴착공법
KR20190087909A (ko) 2018-01-17 2019-07-25 한국철도기술연구원 터널굴착장비 및 이를 이용한 터널굴착방법

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR960004410B1 (ko) * 1991-06-26 1996-04-02 사또고교 가부시끼가이샤 터널 굴착 방법
KR100237345B1 (ko) * 1997-06-25 2000-01-15 유근무 터널라이닝용 조립패널 및 그 설치방법

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4430191B2 (ja) * 2000-02-22 2010-03-10 株式会社大林組 高圧ガスの岩盤内貯蔵設備
KR100476906B1 (ko) * 2002-08-29 2005-03-18 건양씨엔이 (주) 대수층 유동사 지반 강관압입 추진공법 및 그 장치

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR960004410B1 (ko) * 1991-06-26 1996-04-02 사또고교 가부시끼가이샤 터널 굴착 방법
KR100237345B1 (ko) * 1997-06-25 2000-01-15 유근무 터널라이닝용 조립패널 및 그 설치방법

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389609A (zh) * 2014-09-24 2015-03-04 中国水利水电第十四工程局有限公司 一种无爆破机械开挖法
CN110618249A (zh) * 2018-06-20 2019-12-27 核工业北京地质研究院 一种岩土工程开挖施工的试验方法
CN110618249B (zh) * 2018-06-20 2022-03-18 核工业北京地质研究院 一种岩土工程开挖施工的试验方法
CN110295913A (zh) * 2019-08-05 2019-10-01 中信国安建工集团有限公司 一种隧道爆破开挖系统及施工方法
CN110295913B (zh) * 2019-08-05 2024-05-07 中信国安建工集团有限公司 一种隧道爆破开挖系统及施工方法
CN112431597A (zh) * 2020-12-22 2021-03-02 中铁五局集团成都工程有限责任公司 一种单斜构造顺层偏压软岩大变形隧道单工序施工方法
CN112923818A (zh) * 2021-03-05 2021-06-08 中交一公局集团有限公司 一种拱架限制下全电脑三臂凿岩台车精细化钻爆开挖方法
CN113107497A (zh) * 2021-04-14 2021-07-13 中铁工程服务有限公司 一种硬岩隧道掘进施工方法
CN113107497B (zh) * 2021-04-14 2022-07-29 中铁工程服务有限公司 一种硬岩隧道掘进施工方法
CN114000885A (zh) * 2021-10-29 2022-02-01 四川省交通勘察设计研究院有限公司 一种围岩隧道掘进施工方法
CN114320319A (zh) * 2021-11-09 2022-04-12 珠海华昕开发建设有限公司 一种隧道极小断面向特大断面扩挖的施工方法
CN114320319B (zh) * 2021-11-09 2024-05-03 珠海华昕开发建设有限公司 一种隧道极小断面向特大断面扩挖的施工方法

Also Published As

Publication number Publication date
KR101054380B1 (ko) 2011-08-04
WO2010058933A3 (ko) 2010-08-12
KR20100055639A (ko) 2010-05-27

Similar Documents

Publication Publication Date Title
WO2010058933A2 (ko) 터널굴착공법
CN109209382B (zh) 无煤柱无掘巷z型工作面回采方法
ES2927425T3 (es) Método y sistema de construcción de un túnel subterráneo
CN107060795A (zh) 一种地下矿井tbm组装施工方法
WO2018101790A1 (ko) 암반 tbm 터널의 단층파쇄구간 보강방법
CN116113754A (zh) 一种隧道盾构
KR20160022177A (ko) 발파진동 저감을 위해 터널 외주면 일부를 절삭하는 터널 굴착공법
KR20190121551A (ko) 코어장비를 이용한 무진동 굴착 방법
KR101170011B1 (ko) 터널시공장치 및 이를 이용한 급속 터널시공방법
JPWO2020193960A5 (ko)
RU2490467C2 (ru) Способ проходки горизонтальной или наклонной подземной горной выработки и проходческий комбайн для осуществления способа
RU2096621C1 (ru) Способ сооружения тоннелей глубокого заложения в слабоустойчивых грунтах
RU2302529C1 (ru) Комплекс для проведения выработок в слабоустойчивых породах
RU2723422C1 (ru) Способ крепления лба забоя тоннеля
JP2001323773A (ja) 先進導坑を利用したトンネル掘削方法
RU2152473C1 (ru) Способ возведения автодорожного тоннеля внутригородской кольцевой транспортной магистрали мегаполиса
Klados Experiences with hard rock shielded TBMs in special conditions
JP7434046B2 (ja) 支保工ユニット、及び鋼製支保工建込方法
Zou et al. Mechanical Underground Excavation in Rock
RU2304219C1 (ru) Способ охраны подготовительной выработки
O’Donnell The Use of Destressing at INCO’s Creighton Mine
KR100661498B1 (ko) 터널발파와 콘크리트 구조물 병행시공을 위한 터널시공방법
SU989083A1 (ru) Способ проходки выработок большого сечени
JP3748152B2 (ja) トンネル掘下工法
KR20150071885A (ko) 이중 프로텍터를 이용한 철도터널 확폭 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09827698

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09827698

Country of ref document: EP

Kind code of ref document: A2