WO2010026677A1 - 作業機械における油圧制御システム - Google Patents

作業機械における油圧制御システム Download PDF

Info

Publication number
WO2010026677A1
WO2010026677A1 PCT/JP2009/002407 JP2009002407W WO2010026677A1 WO 2010026677 A1 WO2010026677 A1 WO 2010026677A1 JP 2009002407 W JP2009002407 W JP 2009002407W WO 2010026677 A1 WO2010026677 A1 WO 2010026677A1
Authority
WO
WIPO (PCT)
Prior art keywords
oil
accumulator
pressure
hydraulic
valve
Prior art date
Application number
PCT/JP2009/002407
Other languages
English (en)
French (fr)
Inventor
和田篤志
白仁啓介
Original Assignee
キャタピラージャパン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by キャタピラージャパン株式会社 filed Critical キャタピラージャパン株式会社
Publication of WO2010026677A1 publication Critical patent/WO2010026677A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2217Hydraulic or pneumatic drives with energy recovery arrangements, e.g. using accumulators, flywheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2282Systems using center bypass type changeover valves
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2296Systems with a variable displacement pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B1/00Installations or systems with accumulators; Supply reservoir or sump assemblies
    • F15B1/02Installations or systems with accumulators
    • F15B1/024Installations or systems with accumulators used as a supplementary power source, e.g. to store energy in idle periods to balance pump load
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B21/00Common features of fluid actuator systems; Fluid-pressure actuator systems or details thereof, not covered by any other group of this subclass
    • F15B21/14Energy-recuperation means

Definitions

  • the present invention belongs to the technical field of a hydraulic control system in a working machine capable of recovering and reusing potential energy of the working unit in a working machine provided with a vertically movable working unit.
  • a working machine such as a hydraulic shovel or a crane is provided with a vertically movable working unit, and the working unit is configured to move up and down based on the expansion and contraction operation of a hydraulic cylinder supplied with pressure oil from a hydraulic pump
  • oil discharged from the head-side oil chamber of the hydraulic cylinder to the oil tank during descent of the working unit is conventionally discharged to supply oil to the hydraulic cylinder in order to prevent it from falling sharply due to its own weight.
  • Metering out control is configured by a throttle provided on a control valve that performs control.
  • Patent Document 1 discloses a technology in which pressure is accumulated in an accumulator and pressure oil accumulated in the accumulator is supplied to a head-side oil chamber of an assist cylinder when the working unit ascends (see, for example, Patent Document 1).
  • the discharge oil from the assist cylinder is accumulated in the accumulator at the time of descent of the working part in the Patent Document 1
  • the discharged oil from the hydraulic cylinder conventionally provided for raising and lowering the working part is The oil is discharged to the oil tank via the control valve, and only a part of the potential energy of the working machine is recovered.
  • a part of the pressure oil supplied from the hydraulic pump to the hydraulic cylinder via the control valve is supplied to the assist cylinder when the accumulator is not sufficiently accumulated in the accumulator and for accumulator accumulator pressure As a result, the rising speed of the working unit is slowed and the working efficiency is reduced.
  • Patent Document 2 a dedicated pump for increasing the pressure accumulated in the accumulator to a high pressure, and a power transmission device (gear device etc.) for transmitting the engine power to the pump become necessary, resulting in an increase in cost.
  • energy loss such as torque reduction in power transmission equipment and idling torque due to inertia mass of the pump itself, so that further energy saving is required, and the present invention is intended to solve the problem. There is a problem.
  • the invention according to claim 1 comprises a vertically movable work unit, and a pair of vertically movable work units.
  • a hydraulic control system of a working machine comprising: first and second hydraulic cylinders; a plurality of hydraulic actuators including the first and second hydraulic cylinders; and a hydraulic pump for supplying pressure oil to the plurality of hydraulic actuators.
  • the hydraulic control system is provided with an openable and closable unload oil passage for flowing pressure oil in the head side oil chamber of the first hydraulic cylinder to the oil tank, and a control device for controlling the open and close of the unload oil passage.
  • a hydraulic control system in a working machine comprising: an accumulator for accumulating pressure; and a joining oil passage for joining the accumulated pressure oil of the accumulator to a delivery line of the hydraulic pump.
  • the hydraulic control system is controlled by the control device to open and close the head side communication oil path connecting the head side oil chambers of the first and second hydraulic cylinders and the head side communication oil path.
  • the head side communication oil passage open / close valve opens the head communication passage while the unloading oil passage is closed, while the unloading oil passage is open.
  • the invention according to claim 3 is characterized in that a joining valve for controlling the joining amount from the accumulator to the discharge line of the hydraulic pump is disposed in the joining oil passage, the hydraulic control system in the working machine according to claim 1 or 2 It is.
  • the invention according to claim 4 is characterized in that the hydraulic control system has pump flow rate reduction means for reducing the discharge flow rate of the hydraulic pump according to the joining amount from the accumulator to the discharge line of the hydraulic pump.
  • Hydraulic control system in the working machine of The invention of claim 5 is characterized in that the hydraulic control system is provided with a second flow control valve for controlling the discharge flow rate of the head-side oil chamber of the second hydraulic cylinder when the working unit is lowered. It is a hydraulic control system in the working machine according to any one of the above.
  • the unloading oil passage is opened and the pressure oil in the head side oil chamber of the first hydraulic cylinder flows to the oil tank so that the weight of the working part is the second
  • the pressure is maintained at the pressure of the head side oil chamber of the hydraulic cylinder, and the oil discharged from the head side oil chamber of the second hydraulic cylinder is accumulated in the accumulator.
  • the head side of the second hydraulic cylinder Since the pressure in the oil chamber, that is, the holding pressure for holding the weight of the working unit is doubled with respect to the holding pressure when holding the weight of the working unit with both the first and second hydraulic cylinders, A high pressure hydraulic oil that can cope with high load work is accumulated.
  • the pressure-accumulating oil of the accumulator can be used as the pressure-supplying oil to the first and second hydraulic cylinders at the time of rising of the working part by joining the pressure-accumulating oil of the high pressure accumulator to the discharge line of the hydraulic pump.
  • it can be used for various operations including high load operations as pressure oil to be supplied to a plurality of hydraulic actuators provided in a working machine.
  • the potential energy of the working unit collected in the accumulator can be used with as little loss as possible, and can greatly contribute to cost reduction.
  • the head-side oil chambers of the second hydraulic cylinder are in communication with each other, and the first and second hydraulic cylinders can support the working unit in a well-balanced manner, while the unloading oil passage is open, that is, the second hydraulic cylinder.
  • the third aspect of the present invention by controlling the joining amount from the accumulator to the discharge line of the hydraulic pump by means of the joining valve, it is possible to efficiently use the accumulated oil in the accumulator without waste.
  • the discharge flow volume of a hydraulic pump can be reduced appropriately, and fuel consumption improvement can be achieved efficiently.
  • the fifth aspect of the present invention it is possible to control the lowering speed of the working unit by the second flow control valve.
  • the pressure oil in the head-side oil chamber of the second hydraulic cylinder flows out to the accumulator or the accumulated oil in the accumulator is the second hydraulic cylinder at the time of rising and elevating stop of the working unit. It is possible to reliably avoid such problems as being supplied to the head side oil chamber.
  • FIG. 2 is a hydraulic circuit diagram of a hydraulic control system. It is a block diagram which shows the input-output of a control apparatus.
  • reference numeral 1 denotes a hydraulic shovel, which is an example of a working machine
  • the hydraulic shovel 1 is a crawler type lower traveling body 2 and an upper revolving structure 3 rotatably supported above the lower traveling body 2.
  • the boom 5 includes a working unit 4 and the like attached to the front of the upper swing body 3, and the working unit 4 further includes a boom 5 whose base end portion is supported by the upper swing body 3 so as to be vertically pivotable.
  • the arm 6 is supported at the front end of the boom 5 so as to be pivotable back and forth, and the bucket 7 and the like attached to the front end of the arm 6.
  • 8 and 9 are a pair of left and right first and second boom cylinders (corresponding to the first and second hydraulic cylinders of the present invention) for swinging the boom 5 up and down.
  • the two boom cylinders 8, 9 hold the weight of the working unit 4 by the pressure of the head side oil chambers 8a, 9a, and supply pressure oil to the head side oil chambers 8a, 9a and from rod side oil chambers 8b, 9b. Discharge the oil by moving the boom 5 upward, and supply the pressure oil to the rod side oil chambers 8b, 9b and the oil discharge from the head side oil chambers 8a, 9a reduce the boom 5 so as to lower it. It is configured.
  • the entire working unit 4 ascends and descends as the boom 5 ascends and descends, and the potential energy of the working unit 4 increases as the boom 5 ascends, but the potential energy is recovered by a hydraulic control system described later.
  • the first boom cylinder 8 is one of the boom cylinders 8 and 9, and the second boom cylinder 9 is the other boom cylinder 9, and in FIG. Although one boom cylinder 8 is used and the right side is used as the second boom cylinder 9, it may be of course reversed.
  • FIG. 2 8 and 9 indicate the first and second boom cylinders, and 10 indicates the engine E mounted on the hydraulic shovel 1.
  • the main pump 10 is not only the first and second boom cylinders 8 and 9 but also a plurality of other hydraulic actuators (not shown in FIG. 2 but traveling motors, swing motors, arms) provided in the hydraulic shovel 1 It is a pump which becomes an oil pressure supply source of a cylinder, a bucket cylinder, etc.).
  • reference numeral 13 denotes a regulator for controlling the discharge flow rate of the main pump 10.
  • the regulator 13 receives the control signal pressure from the main pump output control electromagnetic proportional pressure reducing valve 14 and controls the engine speed and the work load. While operating to obtain a corresponding pump output, constant horsepower control is performed by receiving the discharge pressure of the main pump 10. Furthermore, although the regulator 13 also performs flow control based on the negative control signal pressure Pn or the flow control signal pressure Pc, the flow control will be described later.
  • 15 is a discharge line of the main pump 10, and the discharge line 15 merges with a joining oil passage 16 described later and reaches a pressure oil supply oil passage 17, and the pressure oil supply oil passage 17
  • a boom cylinder control valve 18 is connected to control the supply and discharge of the first and second boom cylinders 8 and 9.
  • a hydraulic actuator control valve (traveling motor (hydraulic motor control valve) performing oil supply and discharge control not only to the boom cylinder control valve 18 but also to a plurality of other hydraulic actuators provided in the hydraulic shovel 1 in the pressure oil supply oil passage 17
  • Control valves, a control valve for the swing motor, a control valve for the arm cylinder, a control valve for the bucket cylinder, etc. are also connected, but are omitted in FIG.
  • the boom cylinder control valve 18 is constituted by a spool valve provided with rising side and lowering side pilot ports 18a and 18b, and the first, second, and third pilot valves 18a and 18b are not used. It is located at the neutral position N where the oil supply and discharge to the second boom cylinders 8 and 9 is not performed, but when the pilot pressure is input to the rising side pilot port 18a, the pressure oil in the pressure oil supply oil passage 17 is First, the head side oil chambers 8a and 9a of the second boom cylinders 8 and 9 are switched to the rising side position X in which the oil discharged from the rod side oil chambers 8b and 9b is supplied to the oil tank 12 The pressure oil in the pressure oil supply oil passage 17 is set to the rod side oil of the first and second boom cylinders 8 and 9 by the pilot pressure being input to the lowering side pilot port 18b. 8b, and is configured to Setsu ⁇ Ru so the descending side position Y to be supplied to 9b.
  • the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 and the control valve 18 for the boom cylinder are the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9, respectively.
  • 9a are connected with each other via a head side communication oil passage 21 which communicates with each other, and a head side main oil passage 22 which connects the head side communication oil passage 21 and the boom cylinder control valve 18 with each other.
  • the rod side oil chambers 8b and 9b of the first and second boom cylinders 8 and 9 and the boom cylinder control valve 18 communicate with rod side communication oil passages 23 communicating the rod side oil chambers 8b and 9b with each other, and It is connected via a rod-side main oil passage 24 connecting the rod-side communication oil passage 23 and the boom cylinder control valve 18.
  • oil is supplied and discharged between the first and second boom cylinders 8 and 9 and the boom cylinder control valve 18 through these oil passages.
  • 25 and 26 are rising side and falling side electromagnetic proportional pressure reducing valves, and these electromagnetic proportional pressure reducing valves 25 and 26 are the boom cylinder control valve 18 based on a control signal from the control device 27 described later.
  • the pilot pressure is operated to output the pilot pressure to the rising side pilot port 18a and the lowering side pilot port 18b, respectively.
  • the pilot pressures output from the rising side and the lowering side electromagnetic proportional pressure reducing valves 25 and 26 are controlled to increase or decrease according to the operation amount of the boom control lever (not shown), and the pilot pressure is increased or decreased.
  • the opening area of the boom cylinder control valve 18 is controlled to be increased or decreased by increasing or decreasing the moving stroke of the spool correspondingly to the first and second boom cylinders from the boom cylinder control valve 18. It is comprised so that increase / decrease control of the supply flow volume to 8 and 9 may be made
  • the boom cylinder control valve 18 is formed with a center bypass valve passage 18 c for flowing the pressure oil of the pressure oil supply oil passage 17 to the oil tank 12 via the negative control valve 28.
  • the passage flow rate of the center bypass valve passage 18c is largest when the boom cylinder control valve 18 is at the neutral position N, and becomes smaller as the movement stroke of the spool becomes larger, that is, the operation amount of the boom control lever increases.
  • the flow rate of the center bypass valve 18 c is controlled to decrease. Then, the passing flow rate of the center bypass valve passage 18c is output to one input port 29a of a shuttle valve 29 described later as a negative control signal pressure Pn.
  • Reference numeral 30 denotes a main pump flow control electromagnetic proportional pressure reducing valve that outputs a flow control signal pressure Pc based on a control signal from the control device 27, and is output from the main pump flow control electromagnetic proportional pressure reducing valve 30.
  • the flow control signal pressure Pc is input to the other input port 29 b of the shuttle valve 29.
  • the shuttle valve 29 selects the high pressure side out of the negative control signal pressure Pn and the flow control signal pressure Pc input from the input ports 29a and 29b, and outputs the same to the regulator 13 of the main pump 10. Then, the regulator 13 controls the flow rate of the main pump 10 so as to decrease the pump flow rate as the input signal pressure is higher. That is, of the negative control signal pressure Pn and the flow control signal pressure Pc, the signal pressure for reducing the discharge flow rate of the main pump 10 is selected by the shuttle valve 29 and is input to the regulator 13.
  • the pump flow rate is increased or decreased according to the increase or decrease of the operation amount of the boom control lever, while when the flow control signal pressure Pc is input, the flow rate control Although flow control based on the signal pressure Pc is performed, this flow control signal pressure Pc will be described later.
  • the first and second head side oil passages 19, 20 are oil passages connected to the head side oil chambers 8a, 9a of the first and second boom cylinders 8, 9 as described above,
  • the first and second head side oil passages 19 and 20 allow oil supply to the head side oil chambers 8a and 9a but prevent oil discharge from the head side oil chambers 8a and 9a.
  • the check valves 31, 32 and first and second flow control valves 33, 34 for controlling the flow rate of discharge from the head side oil chambers 8a, 9a are arranged in parallel.
  • the oil supply to the head side oil chambers 8a, 9a of the first and second boom cylinders 8, 9 is performed via the first and second check valves 31, 32, while the head side oil chamber 8a is , 9a are discharged via the first and second flow control valves 33, 34.
  • the first and second flow control valves 33, 34 are spool valves provided with pilot ports 33a, 34a, and in a state where pilot pressure is not input to the pilot ports 33a, 34a, the first and second heads It is located at the closed position N for closing the side oil passages 19 and 20. However, when the pilot pressure is input to the pilot ports 33a and 34a, the open position X for opening the first and second head side oil passages 19 and 20 It is comprised so that it may switch.
  • Reference numerals 35 and 36 denote first and second electromagnetic proportional pressure reducing valves, and the electromagnetic proportional pressure reducing valves 35 and 36 are controlled by the first and second flow rate control valves based on control signals from the controller 27. It operates to output pilot pressure to the pilot ports 33a, 34a of 33, 34. Then, the opening areas of the first and second flow control valves 33 and 34 are controlled to increase or decrease in response to the increase or decrease of the pilot pressure output from the first and second electromagnetic proportional pressure reducing valves 35 and 36. ing.
  • 37 and 38 are first and second relief valves connected to the first and second head side oil passages 19 and 20, respectively.
  • the first and second relief valves 37 and 38 The head-side relief pressure of the second boom cylinders 8 and 9 is set.
  • the head side communication oil passage 21 is connected between the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 via the first and second head side oil passages 19 and 20, respectively.
  • the head side communication oil path 21 is provided with a head side communication oil path opening / closing valve 39 for opening and closing the head side communication oil path 21 based on a control signal from the control device 27. ing.
  • the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 are located at the open position X where the head side communication oil path opening / closing valve 39 opens the head side communication oil path 21.
  • the communication is made via the first and second head side oil passages 19 and 20, but the head side communication oil passage on-off valve 39 is located at the closed position N closing the head side communication oil passage 21. Is configured to be in a blocked state.
  • the on-off valve such as the head-side communication oil passage on-off valve 39 is not disposed in the rod-side communication fluid passage 23, and the rod-side oil chambers 8b and 9b of the first and second boom cylinders 8 and 9 Is always in communication.
  • 40 is a first head side discharge oil path extending from the first head side oil path 19 to the oil tank 12, and an unload valve 41 is disposed in the first head side discharge oil path 40. .
  • the unload valve 41 is configured using a poppet valve 42 and an electromagnetic switching valve 43 for unload valve that switches from the OFF position N to the ON position X based on a control signal output from the control device 27. .
  • the unload valve 41 prevents the flow of oil from the first head side oil passage 19 to the oil tank 12 when the unload valve electromagnetic switching valve 43 is at the OFF position N, that is, One head side discharge oil passage 40 is held in a closed state, but the electromagnetic switching valve 43 for unload valve is switched to the ON position X, whereby oil from the first head side oil passage 19 to the oil tank 12 is The flow is permitted, that is, the first head side drain oil passage 40 is opened.
  • the pressure oil in the head-side oil chamber 8a of the first boom cylinder 8 is set to the first position by setting the unload valve electromagnetic switching valve 43 to the ON position X and opening the unload valve 41. It can be made to flow to the oil tank 12 via the first flow control valve 33 and the first head side drain oil passage 40.
  • the pressure oil of the head side oil chamber 8a of the first boom cylinder 8 is set to the first flow control valve 33 and the first head side discharge oil passage 40.
  • the pressure oil in the head-side oil chamber 8a of the first boom cylinder 8 can be substantially reduced by flowing the oil to the oil tank 12 via the first flow control valve 33 in this case. It can flow to the oil tank 12 in a loaded state.
  • the first head side oil passage 19, the first flow control valve 33, the first head side discharge oil passage 40, and the unloading valve 41 are the openable and closable unload oil passages of the present invention. In the state where the unloading oil passage of the present invention is open, the opening area of the first flow control valve 33 is the largest, and the unloading valve 41 is in the open state. In this case, the unloading oil passage is closed.
  • 44 is a recovery oil passage connected to the second head side oil passage 20, and the head side oil of the second boom cylinder 9 passing through the second head side oil passage 20 is connected to the recovery oil passage 44.
  • Exhaust oil from the chamber 9a is supplied, and the recovery oil passage 44 is connected to the accumulator oil passage 45 via a cylinder side check valve 46 and an accumulator side check valve 49 described later.
  • the accumulator oil passage 45 is an oil passage connected to the accumulator 59 in order to supply and discharge pressure oil to the accumulator 59.
  • the cylinder side check valve 46 is configured by using a poppet valve 47 and a cylinder side check valve electromagnetic switching valve 48 that switches from the OFF position N to the ON position X based on a control signal output from the control device 27. ing.
  • the cylinder side check valve electromagnetic switching valve 48 When the cylinder side check valve electromagnetic switching valve 48 is positioned at the OFF position N, the cylinder side check valve 46 is closed so as to block the flow of oil from the recovery oil passage 44 to the accumulator oil passage 45.
  • the cylinder side check valve electromagnetic switching valve 48 is switched to the ON position X, an open state allowing bidirectional flow between the recovery oil passage 44 and the accumulator oil passage 45 is established.
  • the accumulator side check valve 49 uses the poppet valve 50 and the accumulator side check valve electromagnetic switching valve 51 that switches from the OFF position N to the ON position X based on the control signal output from the control device 27. It is configured.
  • the accumulator side check valve 49 is in a closed state that prevents the flow of oil from the accumulator oil passage 45 to the recovery oil passage 44 when the accumulator side check valve electromagnetic switching valve 51 is in the OFF position N.
  • an open state allowing bidirectional flow between the recovery oil passage 44 and the accumulator oil passage 45 is established.
  • the accumulator side check valve 49 allows the flow of oil from the recovery oil passage 44 to the accumulator oil passage 45 even when the accumulator side check valve electromagnetic switching valve 51 is in the OFF position N. However, when the accumulator side check valve electromagnetic switching valve 51 is at the ON position X, the pressure in the accumulator oil passage 45 is not introduced into the spring chamber 50a of the poppet valve 50, so recovery is performed with almost no pressure loss. Oil can flow from the oil passage 44 to the accumulator oil passage 45.
  • the accumulator 59 can be pressure-accumulated via the recovery oil passage 44 and the accumulator oil passage 45.
  • the cylinder side check valve 46 and the accumulator side check valve 49 constitute the valve means of the present invention.
  • the accumulator 59 is a bladder type that is optimal for storing hydraulic energy.
  • the accumulator 59 is not limited to this, and may be, for example, a piston type.
  • 16 is a combined oil passage formed from the accumulator oil passage 45 to the discharge line 15 of the main pump 10, and a combined valve 52 is disposed in the combined oil passage 16.
  • the merging valve 52 is a flow control valve in which the spool moves based on the operation of the merging valve electro-hydraulic conversion valve 53 to which the control signal from the control device 27 is input, and the merging valve electro-hydraulic conversion valve 53 In the non-operating state, it is located at the closed position N for closing the merging oil passage 16, but the spool moves by the operation of the merging valve electrical oil conversion valve 53 to open the merging oil passage 16. It is comprised so that it may switch. Furthermore, the merging valve 52 incorporates a check valve 54 that allows the flow of oil from the accumulator oil passage 45 to the discharge line 15 but blocks the flow in the reverse direction. Thus, by switching the joining valve 52 to the open position X, the pressure oil accumulated in the accumulator 59 is joined to the discharge line 15 of the main pump 10 via the accumulator oil passage 45 and the joining oil passage 16. It can be made to
  • the opening area of the merging valve 52 is controlled to increase or decrease according to the signal value of the control signal input from the control device 27 to the merging valve electric oil conversion valve 53, and the opening area of the merging valve 52
  • the control of increasing and decreasing the flow rate of the flow joining the discharge line 15 of the main pump 10 from the accumulator 59 via the merging oil passage 16 is performed by the increase and decrease control of
  • 55 is a discharge oil passage for the accumulator which is branched from the accumulator oil passage 45 and reaches the oil tank 12, and a tank check valve 56 is disposed in the discharge oil passage 55 for the accumulator.
  • the tank check valve 56 is configured using a poppet valve 57 and a tank check valve electromagnetic switching valve 58 that switches from the OFF position N to the ON position X based on a control signal output from the control device 27. .
  • the tank check valve 56 blocks the flow of oil from the accumulator oil passage 45 to the oil tank 12 when the tank check valve electromagnetic switching valve 58 is at the OFF position N, that is, the accumulator discharge oil
  • the tank check valve electromagnetic switching valve 58 is switched to the ON position X to allow the flow of oil from the accumulator oil passage 45 to the oil tank 12, that is, the accumulator The discharge oil passage 55 is opened. Then, by positioning the tank check valve electromagnetic switching valve 58 at the ON position X and opening the tank check valve 56, the accumulated oil of the accumulator 59 is oil via the accumulator discharge oil passage 55. It can be discharged into the tank 12.
  • control device 27 is constituted by using a microcomputer or the like, and as shown in the block diagram of FIG. 3, a boom operation detection means 60 for detecting the operation direction and operation amount of the boom control lever; A pump pressure sensor 61 that detects the discharge pressure of the main pump 10, a first head side pressure sensor 62 that detects the pressure of the head side oil chamber 8a of the first boom cylinder 8, and a head side oil chamber 9a of the second boom cylinder 9.
  • the control device 27 operates the boom based on the operation signal of the boom control lever input from the boom operation detection means 60.
  • the weight of the working unit 4 is set to the first and second It is determined that double-held control to hold the pressure on the head side oil chambers 8a and 9a of the boom cylinders 8 and 9 is performed, and when the boom control lever is operated downward, that is, when the working unit 4 is lowered. It is determined that cantilever control is performed in which the weight of the working unit 4 is held by the pressure of the head-side oil chamber 9 a of the second boom cylinder 9.
  • the control device 27 outputs a control signal so that the unload valve electromagnetic switching valve 43 is positioned at the OFF position N, and the unload valve 41 is closed. Set the condition (close the unloading oil passage). Thus, the oil in the head-side oil chamber 8 a of the first boom cylinder 8 is prevented from flowing to the oil tank 12 via the first head-side discharge oil passage 40. Further, the control device 27 outputs a control signal so as to be positioned at the open position X with respect to the head side communication oil passage open / close valve 39.
  • both the first and second boom cylinders 8, 9 will be responsible for holding the weight of the working unit 4, so that the head side of both the first and second boom cylinders 8, 9
  • Both-end control for holding the weight of the working unit 4 is executed by the pressure of the oil chambers 8a and 9a.
  • the control device 27 when it is determined that the cantilever control is to be performed, the control device 27 outputs a control signal so as to be positioned at the closed position N with respect to the head side communication oil passage open / close valve 39. As a result, the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 are shut off. Furthermore, the control device 27 outputs a control signal of the maximum pilot pressure output to the first electromagnetic proportional pressure reducing valve 35 to maximize the opening area of the first flow control valve 33, and the electromagnetic switching valve 43 for unloading valve. Is output to the ON position X to open the unloading valve 41 (open the unloading oil passage).
  • the oil of the head side oil chamber 8a of the first boom cylinder 8 flows to the oil tank 12 via the first head side oil passage 19 and the first head side discharge oil passage 40.
  • the pressure in the head-side oil chamber 8a of the boom cylinder 8 decreases to substantially the tank pressure.
  • weight retention of the working unit 4 by the first boom cylinder 8 is not performed, and only the second boom cylinder 9 is responsible for weight retention of the working unit 4, and thus, the first and second boom cylinders
  • the cantilever control for holding the weight of the working unit 4 is executed by the pressure of the head-side oil chamber 9 a of one of the second boom cylinders 9 among 8 and 9.
  • the pressure of the head-side oil chamber 9a of the second boom cylinder 9 is controlled by the above-mentioned cantilever control so that the head-side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 at the time of the double control. Pressurize about twice the pressure of.
  • control of the control device 27 based on the operation of the boom control lever will be described.
  • the control device 27 controls the rising side electromagnetic proportional pressure reducing valve 25 and the falling side electromagnetic proportional
  • the control signal of the pilot pressure output is not output to the pressure reducing valve 26, the first electromagnetic proportional pressure reducing valve 35, and the second electromagnetic proportional pressure reducing valve 36, whereby the boom cylinder control valve 18 is positioned at the neutral position N.
  • the first and second flow control valves 33 and 34 are located at the closed position N.
  • control signal of the flow control signal pressure Pc output is not output to the main pump flow control electromagnetic proportional pressure reducing valve 30, and the negative control signal pressure Pn is input to the regulator 13 of the main pump 10.
  • the cylinder side check valve electromagnetic switching valve 48, the accumulator side check valve electromagnetic switching valve 51, and the tank check valve electromagnetic switching valve 58 are all controlled to be at the OFF position N, whereby the cylinder side check valve 46, the accumulator side check valve 49, and the tank check valve 56 are all kept closed.
  • no operation signal is output to the merging valve electro-hydraulic conversion valve 53, whereby the merging valve 52 is located at the closed position N.
  • the head side communication oil passage open / close valve 39 is located at the open position X, and the unload valve 41 is controlled to be in a closed state.
  • the boom control lever is operated to the boom lowering side, that is, when the working unit 4 is lowered, as described above, the cantilever control is executed, so the head side communication oil passage open / close valve 39 is closed.
  • the opening area of the first flow control valve 33 is maximized, and the unloading valve 41 is controlled to open.
  • the oil discharged from the head side oil chamber 8a of the first boom cylinder 8 flows to the oil tank 12 via the first head side oil discharge passage 40, and the weight of the working unit 4 is the second boom cylinder It will be in the state hold
  • the control device 27 corresponds to the operation amount of the boom control lever at the lowering side pilot port 18b of the boom cylinder control valve 18 with respect to the lowering side electromagnetic proportional pressure reducing valve 26.
  • the control signal is output to output the pilot pressure.
  • the boom cylinder control valve 18 is switched to the lowering side position Y, so that the pressure oil in the pressure oil supply oil passage 17 becomes the boom cylinder control valve 18 at the lowering position Y and the rod side main oil passage. 24 are supplied to the rod side oil chambers 8b and 9b of the first and second boom cylinders 8 and 9 via the rod side communication oil passage 23.
  • the boom control lever is operated to the boom lowering side, only the discharge oil of the main pump 10 is supplied to the pressure oil supply oil passage 17.
  • the control device 27 when operated to the boom lowering side, the control device 27 does not output a control signal of the flow control signal pressure Pc output to the main pump flow control electromagnetic proportional pressure reducing valve 30.
  • the pressure input to the other port 29 a of the shuttle valve 29 becomes the tank pressure, and the shuttle valve 29 selects the negative control signal pressure Pn and inputs it to the regulator 13 of the main pump 10.
  • the main pump 10 is controlled to increase or decrease the discharge flow rate in accordance with the increase or decrease of the operation amount of the boom control lever.
  • the control device 27 controls the pilot pressure corresponding to the operation amount of the boom control lever to the pilot port 34 a of the second flow control valve 34 with respect to the second electromagnetic proportional pressure reducing valve 36. Output the control signal.
  • the second flow control valve 34 is switched to the open position X where the second head side oil passage 20 is opened.
  • the pressure oil discharged from the head side oil chamber 9a of the second boom cylinder 9 is supplied to the recovery oil passage 44 via the second flow control valve 34 at the open position X, but the flow rate is , And the opening area of the second flow control valve 34.
  • the cantilever control is executed when the working unit 4 is lowered, and the weight of the working unit 4 is held by the head-side oil chamber 9a of the second boom cylinder 9, so that the second boom
  • the pressure of the oil discharged from the head-side oil chamber 9 a of the cylinder 9 is approximately twice as high as that in the case of dual control, and the high-pressure oil is supplied to the recovery oil passage 44.
  • the control device 27 when operated to the boom lowering side, the control device 27 outputs a control signal to switch to the ON position X to the cylinder side check valve electromagnetic switching valve 48 and the accumulator side check valve electromagnetic switching valve 51 Do.
  • the cylinder side check valve 46 and the accumulator side check valve 49 both open, and the flow of oil from the recovery oil passage 44 to the accumulator oil passage 45 is permitted.
  • the oil discharged from the head side oil chamber 9a of the second boom cylinder 9 and supplied to the recovery oil passage 44 flows into the accumulator oil passage 45 and is accumulated in the accumulator 59 via the accumulator oil passage 45. It has become so.
  • the head of the second boom cylinder 9 is switched by the second flow control valve 34 switching to the open position X and the cylinder side check valve 46 and the accumulator side check valve 49 both opening.
  • Exhaust oil from the side oil chamber 9a flows into the recovery oil passage 44 and is accumulated in the accumulator 59 from the recovery oil passage 44 via the accumulator oil passage 45.
  • the control device 27 inputs the pressure Ph2 of the head side oil chamber 9a of the second boom cylinder 9 input from the second head side pressure sensor 63 and the accumulator pressure sensor 64 Compared with the pressure Pa of the stored accumulator 59, and the pressure Ph2 of the head side oil chamber 9a of the second boom cylinder 9 is accumulated. If the pressure is smaller than the pressure Pa of the compressor 59 (Ph2 ⁇ Pa), the accumulator side check valve electromagnetic switching valve 51 is positioned at the OFF position N, and the accumulator side check valve 49 is controlled to be closed. Thus, the backflow of oil from the accumulator 59 to the head side oil chamber 9a can be prevented.
  • cantilever control is performed to hold the weight of the working unit 4 by the pressure of the head side oil chamber 9a of the second boom cylinder 9, and the head side oil of the second boom cylinder 9
  • the oil discharged from the chamber 9a is accumulated in the accumulator 59.
  • the pressure on the head side oil chamber 9a of the second boom cylinder 9 is about twice as high as that in the case of dual control.
  • the accumulator 59 is charged with high-pressure oil which can cope with high-load operations such as digging and lifting and turning.
  • the control device 27 does not output an operation signal to the merging valve electro-hydraulic conversion valve 53, whereby the merging valve 52 is positioned at the closed position N closing the merging oil passage 16. To be controlled.
  • the discharge oil of the main pump 10 is supplied to the pressure oil supply oil passage 17 without the pressure oil being supplied from the accumulator oil passage 45 to the pressure oil supply oil passage 17 via the merging oil passage 16. It has become so.
  • the control device 27 controls the tank check valve electromagnetic switching valve 58 to be positioned at the OFF position N.
  • the tank check valve 56 is held in a closed state in which the accumulator discharge oil passage 55 is closed.
  • the control device 27 when operated to the boom rising side, corresponds to the operation amount of the boom control lever at the upper and lower pilot ports 18 a of the boom cylinder control valve 18 with respect to the rising electromagnetic proportional pressure reducing valve 25.
  • the control signal is output to output the pilot pressure.
  • the boom cylinder control valve 18 is switched to the rising side position X, and the pressure oil in the pressure oil supply oil passage 17 is firstly transmitted via the boom cylinder control valve 18 at the rising side position X.
  • the oil is supplied to the head side oil chambers 8 a and 9 a of the second boom cylinder 8 and the discharge oil from the rod side oil chambers 8 b and 9 b is discharged to the oil tank 12.
  • the pressure-accumulated oil of the accumulator 59 is supplied to the pressure oil supply oil passage 17 when operated to the boom upward side.
  • the control device 27 does not output the control signal of the pilot pressure output to the first and second electromagnetic proportional pressure reducing valves 35, 36, whereby the first and second flow control valves 33, 34 It is controlled to be located at the closed position N. Further, as described above, the head side communication oil passage open / close valve 39 is located at the open position X, and the unload valve 41 is in the closed state. The pressure oil supplied to the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 via the boom cylinder control valve 18 at the rising side position X is the first head side.
  • Head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 are connected via the valves 31 and 32, respectively.
  • control device 27 controls the cylinder side check valve electromagnetic switching valve 48 and the accumulator side check valve electromagnetic switching valve 51 to be positioned at the OFF position N.
  • the cylinder side check valve 46 and the accumulator side check valve 49 are held in the closed state, and thus the state between the collection oil passage 44 and the accumulator oil passage 45 is shut off.
  • the control device 27 when operated to the boom rising side, the control device 27 outputs an operation signal to the merging valve electro-hydraulic conversion valve 53 so as to switch the merging valve 52 to the open position X.
  • the merging valve 52 opens the merging oil passage 16 from the accumulator oil passage 45 to the discharge line 15 of the main pump 10, but the opening area thereof is the operation amount of the boom control lever and the pressure Pa of the accumulator 59 and the main It is controlled according to the differential pressure with the discharge pressure Pp of the pump 10.
  • the pressure oil accumulated in the accumulator 59 joins the discharge line 15 of the main pump 10 via the accumulator oil passage 45 and the joining oil passage 16 and, as described above, the pressure oil supply oil passage
  • the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 are supplied via the boom cylinder control valve 18 at the rising position X17.
  • the control device 27 when operated to the boom rising side, the control device 27 outputs a control signal to the main pump flow control electromagnetic proportional pressure reducing valve 30 so as to output the flow control signal pressure Pc.
  • the control device 27 sets the discharge flow rate of the main pump 10 to a flow rate obtained by subtracting the merging amount from the accumulator 59 from the pump flow rate required according to the operation amount of the boom operation lever and the pump output. To control the value of the flow control signal pressure Pc.
  • the flow control signal pressure Pc output from the main pump flow control electromagnetic proportional pressure reducing valve 30 is input to the other input port 29 b of the shuttle valve 29.
  • the negative control signal pressure Pn is input to one input port 29a of the shuttle valve 29, but in the state where the supply pressure oil from the accumulator 59 joins the discharge line 15, the flow control signal pressure Pc is Is a signal pressure that makes the pump flow smaller than the negative control signal pressure Pn, that is, the flow control signal pressure Pc is higher than the negative control signal pressure Pn, so the flow control signal pressure Pc is selected by the shuttle valve 29 And is input to the regulator 13 of the main pump 10.
  • the discharge flow rate of the main pump 10 is controlled to be a flow rate reduced by the merging amount from the accumulator 59, and thus the pump flow rate reducing means of the present invention is configured. There is.
  • the pressure-accumulated oil of the accumulator 59 joins with the discharge oil of the main pump 10 via the joining oil passage 16 and the joined pressure oil is the boom cylinder control valve at the rising position X It is supplied to the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 via the line 18. Further, at this time, the discharge flow rate of the main pump 10 is controlled to be a flow rate reduced by the amount of merging from the accumulator 59.
  • the potential energy collected by the accumulator 59 when the working unit 4 is lowered can be reused when the working unit 4 is raised, and the discharge flow rate of the main pump 10 can be reduced accordingly. .
  • the control device 27 controls the tank check valve electromagnetic switching valve 58 to be positioned at the OFF position N.
  • the tank check valve 56 is held in a closed state in which the accumulator discharge oil passage 55 is closed.
  • the working unit 4 of the hydraulic shovel 1 ascends and descends as the boom 5 constituting the working unit 4 moves up and down.
  • the hydraulic control system of the hydraulic shovel 1 includes the first boom cylinder of one of the pair of first and second boom cylinders 8 and 9 although the expansion control of the second boom cylinders 8 and 9 is performed.
  • An openable / closable unloading oil passage (first head side oil passage 19, first flow control valve 33, first head side discharge oil passage 40, and an oil passage 12 for flowing pressure oil of the head side oil chamber 8a into the oil tank 12 A load valve 41) and a control device 27 for controlling the opening and closing of the unloading oil passage are provided, and the unloading oil passage is closed when the working unit 4 is lifted and stopped moving up and down.
  • the unloading oil passage is opened and the pressure oil of the head side oil chamber 8a of the first boom cylinder 8 flows to the oil tank 12, whereby the weight of the working unit 4 is the second boom
  • the oil is held by the pressure of the head side oil chamber 9a of the cylinder 9, and the oil discharged from the head side oil chamber 9a of the second boom cylinder 9 is accumulated in the accumulator 59.
  • the second boom The pressure of the head side oil chamber 9a of the cylinder 9, that is, the holding pressure for holding the weight of the working unit 4 is the holding pressure when the weight of the working unit 4 is held by both the first and second boom cylinders 8,9.
  • the accumulator 59 is charged with high pressure oil which can cope with high load operation. Then, the pressure-accumulated oil of the high pressure accumulator 59 is joined to the discharge line 15 of the main pump 10 to supply the pressure-accumulated oil of the accumulator 59 to the first and second boom cylinders 8 and 9 when the working unit 4 is elevated.
  • high load work is included as pressure oil to be supplied to a plurality of hydraulic actuators (traveling motor, swing motor, arm cylinder, bucket cylinder, etc.) provided in the hydraulic shovel 1 It can be used for various tasks.
  • the unloading oil passage is opened, that is, the weight of the working unit 4 is held by the pressure of the head side oil chamber 9a of the second boom cylinder 9 when the working unit 4 performs pressure accumulation to the accumulator 59.
  • the unloading oil passage is closed, that is, the pressure of the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 Since the weight is maintained, the loss of flowing the pressure oil from the head side oil chamber 8a of the first boom cylinder 8 to the oil tank 12 is avoided except when accumulating pressure in the accumulator 59.
  • a head side communication oil passage 21 communicating the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 with each other, and the head side communication oil passage 21
  • a head side communication oil passage open / close valve 39 controlled by the control device 27 for opening and closing is provided, and the head side communication oil passage on / off valve 39 is in a state where the unloading oil passage is closed. While the oil passage 21 is opened, the head side communicating oil passage 21 is controlled to be closed when the unloading oil passage is open.
  • the head side oil chambers 8a and 9a of both the first and second boom cylinders 8 and 9 hold the weight of the working unit 4, While both head side oil chambers 8a and 9a are in communication with each other, the working portion 4 can be supported in a well-balanced manner by the pair of first and second boom cylinders 8 and 9, while the unloading oil passage is open.
  • the head side oil chamber 9 a of the second boom cylinder 9 and the head side oil chamber 8 a of the first boom cylinder 8 Can be cut off.
  • a merging valve 52 for controlling the merging amount from the accumulator 59 to the discharge line 15 of the main pump 10 is disposed in the merging oil passage 16.
  • the pressure storage oil of the accumulator 59 can be used efficiently without waste by controlling
  • the discharge flow rate of the main pump 10 is controlled by the flow control signal pressure Pc output from the main pump flow control electromagnetic proportional pressure reducing valve 30 to the regulator 13 of the main pump 10. It is controlled to be reduced according to the joining amount to the discharge line 15, so that the discharge flow rate of the main pump 10 can be appropriately reduced, and fuel consumption can be efficiently reduced.
  • the hydraulic control system of the hydraulic shovel 1 is provided with a second flow control valve 34 for controlling the flow rate of discharge from the head-side oil chamber 9a of the second boom cylinder 9 when the working unit 4 descends.
  • the downward flow rate of the working unit 4 can be controlled by the second flow control valve 34.
  • the head side oil chamber 9a of the second boom cylinder 9 is connected to the accumulator 59 via the second head side oil passage 20, the recovery oil passage 44 and the accumulator oil passage 45, the recovery oil passage 44 and the accumulator between the oil passage 45 and the cylinder side check valve 46 that blocks the flow of oil from the head side oil chamber 9a of the second boom cylinder 9 to the accumulator 59 when the working unit 4 is moving up and down,
  • An accumulator side check valve 49 is provided to block the flow of oil from the accumulator 59 to the head side oil chamber 9 a of the second boom cylinder 9.
  • the pressure oil in the head-side oil chamber 9a of the second boom cylinder 9 is collected in the recovery oil passage 44 and at the time of raising and lowering of the working unit 4 by the cylinder side check valve 46 and the accumulator side check valve 49. It may flow to the accumulator 59 through the accumulator oil passage 45, or the accumulated oil in the accumulator 59 may be supplied to the head side oil chamber 9a of the second boom cylinder 9 through the recovery oil passage 44 and the accumulator oil passage 45. It can be prevented reliably.
  • the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 communicate with each other through the head side communication oil passage 21 when the working unit 4 ascends and stops moving up and down.
  • the present invention is, of course, not limited to the above embodiment, and, for example, the head side oil chamber 8a of the first and second boom cylinders 8, 9 even when the working unit 4 is lowered.
  • the cantilever control can be executed according to the pressure Ph1 and Ph2 of 9a and the pressure Pa of the accumulator 59.
  • the control device 27 sets the pressure difference between the average value ((Ph1 + Ph2) / 2) of the pressures Ph1 and Ph2 of the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 and the pressure Pa of the accumulator 59.
  • the set value C1 is a value set in advance as a differential pressure necessary to cause the pressure oil to flow from the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 to the accumulator 59. If the set value C1 is too small, the lowering speed of the working unit 4 may be slowed, so the heads of the first and second boom cylinders 8 and 9 can be maintained in a state where the lowering speed of the working unit 4 can be secured.
  • the differential pressure necessary for flowing the pressure oil from the side oil chambers 8a and 9a to the accumulator 59 is set as the set value C1. That is, when the differential pressure between the pressure Ph1 of the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 and the average value of the pressure Ph2 and the pressure Pa of the accumulator 59 is the set value C1 or more, both Even in the holding control, since the discharge oil of the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 can be accumulated in the accumulator 59, the cantilever control is not executed.
  • the value of the set value C1 is set to be slightly different between when shifting from the double control to the cantilever control and when changing from the cantilever control to the dual control.
  • the differential pressure between the head-side relief pressure Pr2 of the second boom cylinder 9 set by the second relief valve 38 and the pressure Ph2 of the head-side oil chamber 9a of the second boom cylinder 9 is set in advance.
  • the set value C2 is a value of differential pressure which is set in advance in order to prevent the inadvertent operation of the second relief valve 38. That is, when the differential pressure between the head-side relief pressure Pr2 of the second boom cylinder 9 and the pressure Ph2 of the head-side oil chamber 9a of the second boom cylinder 9 is less than the set value C2, the second relief valve 38 is not prepared.
  • the valve 38 operates to eliminate the loss that the oil discharged from the head side oil chamber 9 a of the second boom cylinder 9 flows to the oil tank 12. That is, even when the working unit 4 is lowered, the pressures Ph1 and Ph2 of the head side oil chambers 8a and 9a of the first and second boom cylinders 8 and 9 are higher than the pressure Pa of the accumulator 59, or If there is a possibility that the pressure Ph2 of the head side oil chamber 9a of the second boom cylinder 9 becomes too high and the second relief valve 38 operates, the both-end control is executed.
  • the head side communication oil passage open / close valve 39 is located at the open position X, and the unload valve 41 is controlled to be in the closed state, so the head side oil chamber of the first boom cylinder 8
  • the oil discharged from 8a is also collected together with the oil discharged from the head side oil chamber 9a of the second boom cylinder 9 via the collected oil passage 44, the cylinder side check valve 46, the accumulator side check valve 49, and the accumulator oil passage 45. , It is adapted to be accumulated in the accumulator 59.
  • the discharge flow rate from the head side oil chamber 8 a of the first boom cylinder 8 in this case can be controlled by the first flow control valve 33.
  • the present invention can be applied not only to hydraulic excavators but also to hydraulic control systems of various working machines provided with a pair of hydraulic cylinders that raise and lower the working unit.
  • one main pump is shown as a hydraulic pump for supplying pressure oil to a plurality of hydraulic actuators, but it goes without saying that two or more main pumps may be provided.
  • the openable and closable unload oil passage is formed using the first head side oil passage 19, the first flow control valve 33, the first head side discharge oil passage 40, and the unload valve 41.
  • it comprises, without being limited to this, it may be an openable / closable oil passage which can flow the pressure oil in the head side oil chamber of the first hydraulic cylinder to the oil tank in an unloaded state.
  • the present invention relates to the technical field of a hydraulic control system in a working machine capable of recovering and reusing potential energy of the working unit in a working machine provided with a vertically movable working unit, and configured as in the present invention
  • the accumulator is charged with high-pressure hydraulic oil that can cope with high-load work.
  • the accumulated pressure oil of the accumulator can be used as supplied pressure oil to the first and second hydraulic cylinders at the time of rising of the working unit, and high as supplied pressure oil to a plurality of hydraulic actuators provided in the work machine. It can be used for various tasks, including loading tasks.
  • the potential energy of the working unit collected in the accumulator can be used with as little loss as possible, and there is the industrial applicability that it can greatly contribute to cost reduction.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

【課題】昇降動する作業部の有する位置エネルギーを回収してアキュムレータに蓄圧するにあたり、高負荷作業にも対応できる高圧の圧油を蓄圧できるようにすると共に、該アキュムレータの蓄圧油を、各種油圧アクチュエータに用いることができるようにする。 【解決手段】作業部4を昇降せしめる一対の第一、第二ブームシリンダ8、9のうち、第一ブームシリンダ8のヘッド側油室8aの圧油を油タンク12に流す開閉自在なアンロード弁41を設け、作業部4の下降時にアンロード弁41を開くことで、第二ブームシリンダ9のヘッド側油室9aの圧力で作業部4の重量を保持する構成にすると共に、作業部4の下降時に第二ブームシリンダ9のヘッド側油室9aからの排出油を蓄圧するアキュムレータ59と、該アキュムレータ59の蓄圧油をメインポンプ10の吐出ライン15に合流させる合流油路16とを設けた。

Description

作業機械における油圧制御システム
 本発明は、昇降自在な作業部を備えた作業機械において、作業部の有する位置エネルギーを回収、再利用することができる作業機械における油圧制御システムの技術分野に属するものである。
 一般に、油圧ショベルやクレーン等の作業機械は、昇降自在な作業部を備えると共に、該作業部の昇降は、油圧ポンプから圧油供給される油圧シリンダの伸縮作動に基づいて行うように構成されているが、このものにおいて、従来、作業部の下降時に油圧シリンダのヘッド側油室から油タンクに排出される油は、作業部の自重による急激な落下を防止するため、油圧シリンダの油供給排出制御を行うコントロールバルブに設けられた絞りによってメータアウト制御されるように構成されている。つまり、地面より上方に位置している作業部は位置エネルギーを有しているが、該位置エネルギーは、前記コントロールバルブの絞りを通過するときに熱エネルギーに変換され、さらに該熱エネルギーはオイルクーラーによって大気中に放出されることになって、無駄なエネルギー損失となる。
 そこで、作業部の有する位置エネルギーを回収、再利用するために、従来設けられている油圧シリンダに加えてアシストシリンダを設け、作業部の下降時に、アシストシリンダのヘッド側油室から排出される油をアキュムレータに蓄圧すると共に、作業部の上昇時に、アキュムレータに蓄圧された圧油をアシストシリンダのヘッド側油室に供給するようにした技術が開示されている(例えば、特許文献1参照。)。
 しかるに、前記特許文献1のものは、作業部の下降時に、アシストシリンダからの排出油はアキュムレータに蓄圧されるものの、作業部を昇降するために従来から設けられている油圧シリンダからの排出油は、コントロールバルブを経由して油タンクに排出されるようになっており、作業機の有する位置エネルギーのうちの一部しか回収されていないことになる。しかも、作業部の上昇時にアキュムレータに充分に蓄圧されていない場合には、油圧ポンプからコントロールバルブを介して油圧シリンダに供給される圧油の一部が、アシストシリンダに供給されると共にアキュムレータ蓄圧用に用いられるように構成されているため、作業部の上昇速度が遅くなって、作業効率が低下するという問題がある。
 これに対し、アシストシリンダを設けることなく、作業部の下降時に油圧シリンダから排出された油をアキュムレータに蓄圧すると共に、作業部の上昇時に該アキュムレータに蓄圧された圧油を油圧シリンダに供給するように構成すれば、作業機の有する位置エネルギーを確実に回収できることになるが、この場合、アキュムレータの蓄圧油の圧力は、油圧シリンダが作業部の重量を保持する保持圧よりは高圧にならないため、高負荷作業時に用いる圧油の圧力としては不足する場合がある。そこでアキュムレータの蓄圧油を、エンジン動力で駆動する専用のポンプで高圧にして、油圧シリンダに供給する技術が提唱されている(例えば、特許文献2参照。)。
特許第2582310号公報 特開2008-14468号公報
 しかるに、特許文献2のものでは、アキュムレータの蓄圧油を高圧にするための専用のポンプや、該ポンプにエンジン動力を伝達するための動力伝達機器(ギア装置等)が必要になって、コストアップの要因となるうえ、動力伝達機器におけるトルク低下や、ポンプ自体の慣性質量などによる空転トルク等のエネルギー損失の問題があって、更なる省エネルギー化が求められ、ここに本発明が解決しようとする課題がある。
 本発明は、上記の如き実情に鑑みこれらの課題を解決することを目的として創作されたものであって、請求項1の発明は、昇降自在な作業部と、該作業部を昇降せしめる一対の第一、第二油圧シリンダと、該第一、第二油圧シリンダを含む複数の油圧アクチュエータと、これら複数の油圧アクチュエータに圧油供給する油圧ポンプとを備えてなる作業機械の油圧制御システムにおいて、該油圧制御システムに、前記第一油圧シリンダのヘッド側油室の圧油を油タンクに流す開閉自在なアンロード油路と、該アンロード油路の開閉制御を行なう制御装置とを設け、作業部の上昇時および昇降停止時には前記アンロード油路を閉じて第一および第二油圧シリンダのヘッド側油室の圧力で作業部の重量を保持する一方、作業部の下降時にアンロード油路を開いて第二油圧シリンダのヘッド側油室の圧力で作業部の重量を保持する構成にすると共に、作業部の下降時に前記第二油圧シリンダのヘッド側油室から排出される圧油を蓄圧するアキュムレータと、該アキュムレータの蓄圧油を前記油圧ポンプの吐出ラインに合流させる合流油路とを設けたことを特徴とする作業機械における油圧制御システムである。
 請求項2の発明は、油圧制御システムに、第一、第二油圧シリンダのヘッド側油室同士を連通するヘッド側連通油路と、該ヘッド側連通油路を開閉するべく制御装置により制御されるヘッド側連通油路開閉弁とを設けると共に、該ヘッド側連通油路開閉弁は、アンロード油路が閉じている状態ではヘッド側連通油路を開く一方、アンロード油路が開いている状態ではヘッド側連通油路を閉じるように制御されることを特徴とする請求項1に記載の作業機械における油圧制御システムである。
 請求項3の発明は、合流油路に、アキュムレータから油圧ポンプの吐出ラインへの合流量を制御する合流バルブを配したことを特徴とする請求項1または2に記載の作業機械における油圧制御システムである。
 請求項4の発明は、油圧制御システムは、アキュムレータから油圧ポンプの吐出ラインへの合流量に応じて油圧ポンプの吐出流量を低減せしめるポンプ流量低減手段を有することを特徴とする請求項3に記載の作業機械における油圧制御システムである。
 請求項5の発明は、油圧制御システムに、作業部の下降時に第二油圧シリンダのヘッド側油室の排出流量を制御する第二流量制御弁を設けたことを特徴とする請求項1乃至4の何れか一項に記載の作業機械における油圧制御システムである。
 請求項6の発明は、第二油圧シリンダのヘッド側油室からアキュムレータに至る油路に、作業部の上昇時および昇降停止時において、第二油圧シリンダのヘッド側油室からアキュムレータへの油の流れ、およびアキュムレータから第二油圧シリンダのヘッド側油室への油の流れを阻止する弁手段を設けたことを特徴とする請求項1乃至5の何れか一項に記載の作業機械における油圧制御システムである。
 請求項1の発明とすることにより、作業部の下降時に、アンロード油路を開いて第一油圧シリンダのヘッド側油室の圧油を油タンクに流すことで、作業部の重量は第二油圧シリンダのヘッド側油室の圧力で保持されると共に、該第二油圧シリンダのヘッド側油室からの排出油がアキュムレータに蓄圧されることになるが、この場合、第二油圧シリンダのヘッド側油室の圧力、つまり作業部の重量を保持する保持圧は、第一および第二の両方の油圧シリンダで作業部の重量を保持する場合の保持圧に対して倍増するから、アキュムレータには、高負荷作業にも対応できる高圧の圧油が蓄圧されることになる。そして該高圧のアキュムレータの蓄圧油を油圧ポンプの吐出ラインに合流させることで、アキュムレータの蓄圧油を、作業部の上昇時における第一、第二油圧シリンダへの供給圧油として用いることができるのは勿論のこと、作業機械に備えられた複数の油圧アクチュエータへの供給圧油として、高負荷作業を含めた様々な作業に用いることができる。しかも、エンジン動力で駆動するポンプを用いてアキュムレータの蓄圧油を増圧する場合のように、エンジンからポンプへの動力伝達経路におけるトルク低下やポンプ自体の慣性質量などによる空転トルクの損失等がなく、アキュムレータに回収した作業部の位置エネルギーを可及的に損失の少ない状態で利用できると共に、コスト削減にも大きく貢献できる。
 請求項2の発明とすることにより、アンロード油路が閉じている状態、つまり、第一および第二油圧シリンダのヘッド側油室で作業部の重量を保持している状態では、第一および第二油圧シリンダのヘッド側油室同士が連通状態になって、第一および第二油圧シリンダでバランス良く作業部を支持できる一方、アンロード油路が開いている状態、つまり、第二油圧シリンダのヘッド側油室で作業部の重量を保持している状態では、該第二油圧シリンダのヘッド側油室と第一油圧シリンダのヘッド側油室とを遮断することができる。
 請求項3の発明とすることにより、合流バルブによりアキュムレータから油圧ポンプの吐出ラインへの合流量を制御することで、アキュムレータの蓄圧油を無駄無く効率的に用いることができる。
 請求項4の発明とすることにより、油圧ポンプの吐出流量を適切に低減せしめることができて、効率よく低燃費化を達成できる。
 請求項5の発明とすることにより、第二流量制御弁によって、作業部の下降速度を制御することができる。
 請求項6の発明とすることにより、作業部の上昇時および昇降停止時において、第二油圧シリンダのヘッド側油室の圧油がアキュムレータに流出したり、或いはアキュムレータの蓄圧油が第二油圧シリンダのヘッド側油室に供給されてしまうような不具合を、確実に回避することができる。
油圧ショベルの斜視図である。 油圧制御システムの油圧回路図である。 制御装置の入出力を示すブロック図である。
 次に、本発明の実施の形態について、図面に基づいて説明する。図1において、1は作業機械の一例である油圧ショベルであって、該油圧ショベル1は、クローラ式の下部走行体2、該下部走行体2の上方に旋回自在に支持される上部旋回体3、該上部旋回体3のフロントに装着される作業部4等の各部から構成され、さらに該作業部4は、基端部が上部旋回体3に上下揺動自在に支持されるブーム5、該ブーム5の先端部に前後揺動自在に支持されるアーム6、該アーム6の先端部に取付けられるバケット7等から構成されている。
 さらに、8、9は前記ブーム5を上下揺動せしめるための左右一対の第一、第二ブームシリンダ(本発明の第一、第二油圧シリンダに相当する)であって、これら第一、第二ブームシリンダ8、9は、ヘッド側油室8a、9aの圧力によって作業部4の重量を保持すると共に、該ヘッド側油室8a、9aへの圧油供給およびロッド側油室8b、9bからの油排出により伸長してブーム5を上昇せしめ、また、ロッド側油室8b、9bへの圧油供給およびヘッド側油室8a、9aからの油排出により縮小してブーム5を下降せしめるように構成されている。そして、該ブーム5の昇降に伴って作業部4全体が昇降すると共に、ブーム5の上昇に伴い作業部4の有する位置エネルギーが増加するが、該位置エネルギーは、後述する油圧制御システムによって回収されて再利用されるようになっている。尚、前記第一ブームシリンダ8は、一対のブームシリンダ8、9のうちの何れか一方のブームシリンダ8、第二ブームシリンダ9は他方のブームシリンダ9であって、図1では、左側を第一ブームシリンダ8とし、右側を第二ブームシリンダ9としているが、左右逆であっても勿論良い。
 次いで、前記油圧制御システムについて、図2の油圧回路図に基づいて説明するが、該図2において、8、9は前記第一、第二ブームシリンダ、10は油圧ショベル1に搭載のエンジンEにより駆動される可変容量型のメインポンプ(本発明の油圧ポンプに相当する)、11はパイロット油圧源となるパイロットポンプ、12は油タンクである。尚、前記メインポンプ10は、第一、第二ブームシリンダ8、9だけでなく、油圧ショベル1に設けられる他の複数の油圧アクチュエータ(図2には図示しないが、走行モータ、旋回モータ、アームシリンダ、バケットシリンダ等)の油圧供給源になるポンプである。
 さらに、13は前記メインポンプ10の吐出流量制御を行うレギュレータであって、該レギュレータ13は、メインポンプ出力制御用電磁比例減圧弁14からの制御信号圧を受けて、エンジン回転数と作業負荷に対応したポンプ出力にするべく作動すると共に、メインポンプ10の吐出圧を受けて定馬力制御を行う。さらにレギュレータ13は、ネガティブコントロール信号圧Pn或いは流量制御信号圧Pcに基づいた流量制御も行うが、該流量制御については後述する。
 一方、15は前記メインポンプ10の吐出ラインであって、該吐出ライン15は、後述する合流油路16と合流して圧油供給油路17に至るが、該圧油供給油路17には、前記第一、第二ブームシリンダ8、9に対する給排制御を行うブームシリンダ用コントロールバルブ18が接続されている。また、圧油供給油路17には、前記ブームシリンダ用コントロールバルブ18だけでなく、油圧ショベル1に設けられる他の複数の油圧アクチュエータに対する油給排制御をそれぞれ行なう油圧アクチュエータ用コントロールバルブ(走行モータ用コントロールバルブ、旋回モータ用コントロールバルブ、アームシリンダ用コントロールバルブ、バケットシリンダ用コントロールバルブ等)も接続されるが、図2においては省略する。
 前記ブームシリンダ用コントロールバルブ18は、上昇側、下降側パイロットポート18a、18bを備えたスプール弁で構成されており、両パイロットポート18a、18bにパイロット圧が入力されていない状態では、第一、第二ブームシリンダ8、9に対する油給排を行なわない中立位置Nに位置しているが、上昇側パイロットポート18aにパイロット圧が入力されることにより、圧油供給油路17の圧油を第一、第二ブームシリンダ8、9のヘッド側油室8a、9aに供給する一方、ロッド側油室8b、9bから排出された油を油タンク12に流す上昇側位置Xに切換わり、また、下降側パイロットポート18bにパイロット圧が入力されることにより、圧油供給油路17の圧油を第一、第二ブームシリンダ8、9のロッド側油室8b、9bに供給する下降側位置Yに切換るように構成されている。
 ここで、前記第一、第二ブームシリンダ8、9のヘッド側油室8a、9aとブームシリンダ用コントロールバルブ18とは、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aにそれぞれ接続される第一、第二ヘッド側油路19、20、これら第一、第二ヘッド側油路19、20を介して第一、第二ブームシリンダ8、9のヘッド側油室8a、9a同士を連通するヘッド側連通油路21、該ヘッド側連通油路21とブームシリンダ用コントロールバルブ18とを接続するヘッド側メイン油路22を介して連結されている。また、第一、第二ブームシリンダ8、9のロッド側油室8b、9bとブームシリンダ用コントロールバルブ18とは、ロッド側油室8b、9b同士を連通するロッド側連通油路23、および該ロッド側連通油路23とブームシリンダ用コントロールバルブ18とを接続するロッド側メイン油路24を介して連結されている。而して、これらの油路を介して、第一、第二ブームシリンダ8、9とブームシリンダ用コントロールバルブ18とのあいだの油の給排が行なわれるようになっている。
 一方、25、26は上昇側、下降側電磁比例減圧弁であって、これら各電磁比例減圧弁25、26は、後述する制御装置27からの制御信号に基づいて、前記ブームシリンダ用コントロールバルブ18の上昇側パイロットポート18a、下降側パイロットポート18bにそれぞれパイロット圧を出力するべく作動する。これら上昇側、下降側電磁比例減圧弁25、26から出力されるパイロット圧は、ブーム用操作レバー(図示せず)の操作量に応じて増減するように制御されると共に、該パイロット圧の増減に対応してスプールの移動ストロークが増減することでブームシリンダ用コントロールバルブ18の開口面積が増減制御されるようになっており、これによって、ブームシリンダ用コントロールバルブ18から第一、第二ブームシリンダ8、9への供給流量の増減制御がなされるように構成されている。
 さらに、前記ブームシリンダ用コントロールバルブ18には、圧油供給油路17の圧油をネガティブコントロールバルブ28を経由して油タンク12に流すセンタバイパス弁路18cが形成されている。該センタバイパス弁路18cの通過流量は、ブームシリンダ用コントロールバルブ18が中立位置Nのときに最も大きく、スプールの移動ストロークが大きくなるほど小さくなる、つまり、ブーム用操作レバーの操作量が増加するほどセンタバイパス弁路18cの通過流量が減少するように制御される。そして、該センタバイパス弁路18cの通過流量は、ネガティブコントロール信号圧Pnとして後述するシャトル弁29の一方の入力ポート29aに出力される。
 また、30は制御装置27からの制御信号に基づいて流量制御信号圧Pcを出力するメインポンプ流量制御用電磁比例減圧弁であって、該メインポンプ流量制御用電磁比例減圧弁30から出力された流量制御信号圧Pcは、前記シャトル弁29の他方の入力ポート29bに入力される。
 前記シャトル弁29は、入力ポート29a、29bから入力されるネガティブコントロール信号圧Pnと流量制御信号圧Pcとのうち高圧側を選択して、前記メインポンプ10のレギュレータ13に出力する。そして、該レギュレータ13は、入力された信号圧が高いほどポンプ流量を減少せしめるように、メインポンプ10の流量を制御する。つまり、ネガティブコントロール信号圧Pnと流量制御信号圧Pcとのうち、メインポンプ10の吐出流量を少なくする方の信号圧がシャトル弁29により選択されてレギュレータ13に入力され、そして、該レギュレータ13は、ネガティブコントロール信号圧Pnが入力された場合には、ブーム用操作レバーの操作量の増減に対応してポンプ流量を増減せしめる一方、流量制御信号圧Pcが入力された場合には、該流量制御信号圧Pcに基づく流量制御を行なうが、この流量制御信号圧Pcについては後述する。
 一方、前記第一、第二ヘッド側油路19、20は、前述したように、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aに接続される油路であるが、該第一、第二ヘッド側油路19、20には、ヘッド側油室8a、9aへの油供給は許容するがヘッド側油室8a、9aからの油排出は阻止する第一、第二チェック弁31、32と、ヘッド側油室8a、9aからの排出流量を制御する第一、第二流量制御弁33、34とが並列状に配されている。而して、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aへの油供給は第一、第二チェック弁31、32を経由して行なわれる一方、ヘッド側油室8a、9aからの油排出は、第一、第二流量制御弁33、34を経由して行なわれるようになっている。
 前記第一、第二流量制御弁33、34は、パイロットポート33a、34aを備えたスプール弁であって、パイロットポート33a、34aにパイロット圧が入力されていない状態では、第一、第二ヘッド側油路19、20を閉じる閉位置Nに位置しているが、パイロットポート33a、34aにパイロット圧が入力されることにより、第一、第二ヘッド側油路19、20を開く開位置Xに切換わるように構成されている。
 また、35、36は第一、第二電磁比例減圧弁であって、これら各電磁比例減圧弁35、36は、制御装置27からの制御信号に基づいて、前記第一、第二流量制御弁33、34のパイロットポート33a、34aにパイロット圧を出力するべく作動する。そして、これら第一、第二電磁比例減圧弁35、36から出力されるパイロット圧の増減に対応して、第一、第二流量制御弁33、34の開口面積が増減制御されるようになっている。
 さらに、37、38は前記第一、第二ヘッド側油路19、20にそれぞれ接続される第一、第二リリーフ弁であって、該第一、第二リリーフ弁37、38によって、第一、第二ブームシリンダ8、9のヘッド側リリーフ圧が設定されるように構成されている。
 一方、前記ヘッド側連通油路21は、前述したように、第一、第二ヘッド側油路19、20を介して第一、第二ブームシリンダ8、9のヘッド側油室8a、9a同士を連通する油路であるが、該ヘッド側連通油路21には、制御装置27からの制御信号に基づいてヘッド側連通油路21を開閉するヘッド側連通油路開閉弁39が配設されている。而して、第一、第二ブームシリンダ8、9のヘッド側油室8a、9a同士は、ヘッド側連通油路開閉弁39がヘッド側連通油路21を開く開位置Xに位置している状態では、第一、第二ヘッド側油路19、20を介して連通する状態になっているが、ヘッド側連通油路開閉弁39がヘッド側連通油路21を閉じる閉位置Nに位置することにより、遮断された状態になるように構成されている。尚、ロッド側連通油路23には前記ヘッド側連通油路開閉弁39のような開閉弁は配されておらず、第一、第二ブームシリンダ8、9のロッド側油室8b、9b同士は常時連通状態になっている。
 さらに、40は前記第一ヘッド側油路19から油タンク12に至る第一ヘッド側排出油路であって、該第一ヘッド側排出油路40には、アンロード弁41が配されている。
 前記アンロード弁41は、ポペット弁42と、制御装置27から出力される制御信号に基づいてOFF位置NからON位置Xに切換わるアンロード弁用電磁切換弁43とを用いて構成されている。そして、該アンロード弁41は、アンロード弁用電磁切換弁43がOFF位置Nに位置しているときには、第一ヘッド側油路19から油タンク12への油の流れを阻止する、つまり第一ヘッド側排出油路40を閉じる閉状態に保持されるが、アンロード弁用電磁切換弁43がON位置Xに切換わることにより、第一ヘッド側油路19から油タンク12への油の流れを許容する、つまり、第一ヘッド側排出油路40を開く開状態になる。而して、上記アンロード弁用電磁切換弁43をON位置Xに位置せしめてアンロード弁41を開状態にすることにより、第一ブームシリンダ8のヘッド側油室8aの圧油を、第一流量制御弁33および第一ヘッド側排出油路40を経由して油タンク12に流すことができるようになっている。
 ここで、前述したように、アンロード弁41が開状態のときには、第一ブームシリンダ8のヘッド側油室8aの圧油を、第一流量制御弁33および第一ヘッド側排出油路40を経由して油タンク12に流すことができるが、この場合、第一流量制御弁33の開口面積を最大にすることによって、第一ブームシリンダ8のヘッド側油室8aの圧油を、略アンロード状態で油タンク12に流すことができるようになっている。尚、本実施の形態において、前記第一ヘッド側油路19、第一流量制御弁33、第一ヘッド側排出油路40、およびアンロード弁41は、本発明の開閉自在なアンロード油路を構成するが、本発明のアンロード油路が開いている状態とは、第一流量制御弁33の開口面積が最大で、且つ、アンロード弁41が開状態のときであって、それ以外の場合には、アンロード油路が閉じている状態とする。
 さらに、44は前記第二ヘッド側油路20に接続される回収油路であって、該回収油路44には、第二ヘッド側油路20を経由する第二ブームシリンダ9のヘッド側油室9aからの排出油が供給されるが、該回収油路44は、アキュムレータ油路45に対して、後述するシリンダ側チェック弁46およびアキュムレータ側チェック弁49を介して接続されている。ここで、上記アキュムレータ油路45は、アキュムレータ59に圧油を給排するべくアキュムレータ59に接続される油路である。
 前記シリンダ側チェック弁46は、ポペット弁47と、制御装置27から出力される制御信号に基づいてOFF位置NからON位置Xに切換わるシリンダ側チェック弁用電磁切換弁48とを用いて構成されている。そして、該シリンダ側チェック弁46は、シリンダ側チェック弁用電磁切換弁48がOFF位置Nに位置している状態では、回収油路44からアキュムレータ油路45への油の流れを阻止する閉状態に保持されるが、シリンダ側チェック弁用電磁切換弁48がON位置Xに切換わることにより、回収油路44とアキュムレータ油路45との間の双方向の流れを許容する開状態になる。
 また、前記アキュムレータ側チェック弁49は、ポペット弁50と、制御装置27から出力される制御信号に基づいてOFF位置NからON位置Xに切換わるアキュムレータ側チェック弁用電磁切換弁51とを用いて構成されている。そして、該アキュムレータ側チェック弁49は、アキュムレータ側チェック弁用電磁切換弁51がOFF位置Nに位置している状態では、アキュムレータ油路45から回収油路44への油の流れを阻止する閉状態に保持されるが、アキュムレータ側チェック弁用電磁切換弁51がON位置Xに切換わることにより、回収油路44とアキュムレータ油路45との間の双方向の流れを許容する開状態になる。尚、アキュムレータ側チェック弁49は、アキュムレータ側チェック弁用電磁切換弁51がOFF位置Nに位置している状態であっても、回収油路44からアキュムレータ油路45への油の流れを許容するが、アキュムレータ側チェック弁用電磁切換弁51がON位置Xに位置している状態では、アキュムレータ油路45の圧力がポペット弁50のバネ室50aに導入されないため、殆ど圧力損失のない状態で回収油路44からアキュムレータ油路45に油を流すことができるようになっている。
 而して、前記シリンダ側チェック弁46およびアキュムレータ側チェック弁49が共に閉状態に保持されている状態では、回収油路44からアキュムレータ油路45への油の流れ、およびアキュムレータ油路45から回収油路44への油の流れは共に阻止される一方、シリンダ側チェック弁46およびアキュムレータ側チェック弁49が共に開状態になることにより、第二ブームシリンダ9のヘッド側油室9aから排出油を、回収油路44およびアキュムレータ油路45を経由してアキュムレータ59に蓄圧することができるようになっている。尚、上記シリンダ側チェック弁46およびアキュムレータ側チェック弁49は、本発明の弁手段を構成する。また、本実施の形態において、アキュムレータ59は、油圧エネルギー蓄積用として最適なブラダ型のものが用いられているが、これに限定されることなく、例えばピストン型のものであっても良い。
 一方、16は前記アキュムレータ油路45からメインポンプ10の吐出ライン15に至るように形成される合流油路であって、該合流油路16には、合流バルブ52が配されている。
 前記合流バルブ52は、制御装置27からの制御信号が入力される合流バルブ用電油変換弁53の作動に基づいてスプールが移動する流量制御弁であって、合流バルブ用電油変換弁53が非作動の状態では、合流油路16を閉じる閉位置Nに位置しているが、合流バルブ用電油変換弁53が作動することによりスプールが移動して、合流油路16を開く開位置Xに切換わるように構成されている。さらに、該合流バルブ52には、アキュムレータ油路45から吐出ライン15への油の流れは許容するが、逆方向の流れは阻止するチェック弁54が内蔵されている。而して、合流バルブ52が開位置Xに切換わることによって、アキュムレータ59に蓄圧された圧油を、アキュムレータ油路45および合流油路16を経由して、メインポンプ10の吐出ライン15に合流させることができるようになっている。
 前記合流バルブ52の開口面積は、制御装置27から合流バルブ用電油変換弁53に入力される制御信号の信号値によって増減制御されるようになっており、そして、該合流バルブ52の開口面積の増減制御によって、アキュムレータ59から合流油路16を経由してメインポンプ10の吐出ライン15に合流する流量の増減制御がなされるように構成されている。
 さらに、55は前記アキュムレータ油路45から分岐形成されて油タンク12に至るアキュムレータ用排出油路であって、該アキュムレータ用排出油路55にはタンクチェック弁56が配されている。
 前記タンクチェック弁56は、ポペット弁57と、制御装置27から出力される制御信号に基づいてOFF位置NからON位置Xに切換わるタンクチェック弁用電磁切換弁58とを用いて構成されている。そして、該タンクチェック弁56は、タンクチェック弁用電磁切換弁58がOFF位置Nに位置しているときには、アキュムレータ油路45から油タンク12への油の流れを阻止する、つまりアキュムレータ用排出油路55を閉じる閉状態に保持されるが、タンクチェック弁用電磁切換弁58がON位置Xに切換わることにより、アキュムレータ油路45から油タンク12への油の流れを許容する、つまり、アキュムレータ用排出油路55を開く開状態になる。而して、上記タンクチェック弁用電磁切換弁58をON位置Xに位置せしめてタンクチェック弁56を開状態にすることにより、アキュムレータ59の蓄圧油をアキュムレータ用排出油路55を経由して油タンク12に排出することができるようになっている。
 一方、前記制御装置27は、マイクロコンピュータ等を用いて構成されるものであって、図3のブロック図に示すごとく、ブーム用操作レバーの操作方向および操作量を検出するブーム操作検出手段60、メインポンプ10の吐出圧を検出するポンプ用圧力センサ61、第一ブームシリンダ8のヘッド側油室8aの圧力を検出する第一ヘッド側圧力センサ62、第二ブームシリンダ9のヘッド側油室9aの圧力を検出する第二ヘッド側圧力センサ63、アキュムレータ59の圧力を検出するアキュムレータ圧力センサ64等からの信号を入力し、これら入力信号に基づいて、前述の上昇側電磁比例減圧弁25、下降側電磁比例減圧弁26、メインポンプ流量制御用電磁比例減圧弁30、第一電磁比例減圧弁35、第二電磁比例減圧弁36、ヘッド側連通油路開閉弁39、アンロード弁用電磁切換弁43、シリンダ側チェック弁用電磁切換弁48、アキュムレータ側チェック弁用電磁切換弁51、合流バルブ用電油変換弁53、タンクチェック弁用電磁切換弁58等に制御信号を出力する。
 前記制御装置27の行なう制御のうち、まず、両持ち制御、片持ち制御について説明すると、制御装置27は、ブーム操作検出手段60から入力されるブーム用操作レバーの操作信号に基づき、ブーム用操作レバーが下降側、上昇側の何れにも操作されていない場合、或いは上昇側に操作された場合、つまり、作業部4の昇降停止時および上昇時には、作業部4の重量を第一および第二ブームシリンダ8、9のヘッド側油室8a、9aの圧力で保持する両持ち制御を行なうと判断し、また、ブーム用操作レバーが下降側に操作された場合、つまり、作業部4の下降時には、作業部4の重量を第二ブームシリンダ9のヘッド側油室9aの圧力で保持する片持ち制御を行なうと判断する。
 そして、両持ち制御を行なうと判断された場合、制御装置27は、アンロード弁用電磁切換弁43に対してOFF位置Nに位置するように制御信号を出力して、アンロード弁41を閉状態にする(アンロード油路を閉じる)。これにより、第一ブームシリンダ8のヘッド側油室8aの油が、第一ヘッド側排出油路40を経由して油タンク12に流れることが阻止される。さらに制御装置27は、ヘッド側連通油路開閉弁39に対して開位置Xに位置するように制御信号を出力する。これにより、第一、第二ブームシリンダ8、9のヘッド側油室8a、9a同士は、第一、第二ヘッド側油路19、20を介して連通状態になる。この状態では、第一および第二の両方のブームシリンダ8、9が作業部4の重量保持を担うことになり、而して、第一および第二の両方のブームシリンダ8、9のヘッド側油室8a、9aの圧力で作業部4の重量を保持する両持ち制御が実行される。
 一方、片持ち制御を行なうと判断された場合、制御装置27は、ヘッド側連通油路開閉弁39に対して閉位置Nに位置するように制御信号を出力する。これにより、第一、第二ブームシリンダ8、9のヘッド側油室8a、9a同士は遮断された状態になる。さらに制御装置27は、第一電磁比例減圧弁35に対して最大パイロット圧出力の制御信号を出力して第一流量制御弁33の開口面積を最大にすると共に、アンロード弁用電磁切換弁43に対してON位置Xに位置するように制御信号を出力してアンロード弁41を開状態にする(アンロード油路を開く)。これにより、第一ブームシリンダ8のヘッド側油室8aの油は、第一ヘッド側油路19および第一ヘッド側排出油路40を経由して油タンク12に流れることになって、第一ブームシリンダ8のヘッド側油室8aの圧力は略タンク圧まで低下する。この状態では、第一ブームシリンダ8による作業部4の重量保持はなされず、第二ブームシリンダ9のみが作業部4の重量保持を担うことになり、而して、第一、第二ブームシリンダ8、9のうち片方の第二ブームシリンダ9のヘッド側油室9aの圧力で作業部4の重量を保持する片持ち制御が実行される。そして、該片持ち制御にすることにより、第二ブームシリンダ9のヘッド側油室9aの圧力は、前記両持ち制御時における第一、第二ブームシリンダ8、9のヘッド側油室8a、9aの圧力に対して約二倍に昇圧する。
 次いで、ブーム用操作レバーの操作に基づく制御装置27の制御について説明する。
 まず、ブーム用操作レバーがブーム下降側、上昇側の何れにも操作されていない場合、つまり、作業部4の昇降停止時には、制御装置27は、上昇側電磁比例減圧弁25、下降側電磁比例減圧弁26、第一電磁比例減圧弁35、第二電磁比例減圧弁36に対してパイロット圧出力の制御信号を出力せず、これによりブームシリンダ用コントロールバルブ18は中立位置Nに位置し、第一、第二流量制御弁33、34は閉位置Nに位置している。また、メインポンプ流量制御用電磁比例減圧弁30に対して流量制御信号圧Pc出力の制御信号は出力されず、メインポンプ10のレギュレータ13にはネガティブコントロール信号圧Pnが入力される。さらに、シリンダ側チェック弁用電磁切換弁48、アキュムレータ側チェック弁用電磁切換弁51、タンクチェック弁用電磁切換弁58は何れもOFF位置Nに位置するように制御され、これによりシリンダ側チェック弁46、アキュムレータ側チェック弁49、タンクチェック弁56は何れも閉状態に保持される。さらに、合流バルブ用電油変換弁53に作動信号は出力されず、これにより合流バルブ52は閉位置Nに位置している。さらに、作業部4の昇降停止時には、前述したように、両持ち制御が実行されるようになっているため、ヘッド側連通油路開閉弁39は開位置Xに位置し、また、アンロード弁41は閉状態になるように制御される。
 一方、ブーム用操作レバーがブーム下降側に操作された場合、つまり、作業部4の下降時には、前述したように、片持ち制御が実行されるため、ヘッド側連通油路開閉弁39は閉位置Nに位置し、また、第一流量制御弁33の開口面積は最大になり、さらに、アンロード弁41は開状態になるように制御される。これにより、第一ブームシリンダ8のヘッド側油室8aからの排出油は、第一ヘッド側排出油路40を経由して油タンク12に流れると共に、作業部4の重量は、第二ブームシリンダ9のヘッド側油室9aの圧力で保持される状態になる。
 さらに、ブーム下降側に操作された場合、制御装置27は、下降側電磁比例減圧弁26に対し、ブームシリンダ用コントロールバルブ18の下降側パイロットポート18bに、ブーム用操作レバーの操作量に対応したパイロット圧を出力するように制御信号を出力する。これによりブームシリンダ用コントロールバルブ18が下降側位置Yに切換わり、而して、圧油供給油路17の圧油が、上記下降側位置Yのブームシリンダ用コントロールバルブ18、ロッド側メイン油路24、ロッド側連通油路23を経由して、第一、第二ブームシリンダ8、9のロッド側油室8b、9bに供給される。尚、後述するように、ブーム用操作レバーがブーム下降側に操作された場合、圧油供給油路17にはメインポンプ10の吐出油のみが供給されるようになっている。
 さらに、ブーム下降側に操作された場合、制御装置27は、メインポンプ流量制御用電磁比例減圧弁30に対して、流量制御信号圧Pc出力の制御信号を出力しない。これにより、シャトル弁29の他方のポート29aに入力される圧力はタンク圧となり、而して、シャトル弁29はネガティブコントロール信号圧Pnを選択して、メインポンプ10のレギュレータ13に入力する。これによりメインポンプ10は、ブーム用操作レバーの操作量の増減に対応して吐出流量が増減するように制御される。
 さらに、ブーム下降側に操作された場合、制御装置27は、第二電磁比例減圧弁36に対し、第二流量制御弁34のパイロットポート34aに、ブーム用操作レバーの操作量に対応したパイロット圧を出力するように制御信号を出力する。これにより、第二流量制御弁34は、第二ヘッド側油路20を開く開位置Xに切換わる。而して、第二ブームシリンダ9のヘッド側油室9aから排出された圧油が、開位置Xの第二流量制御弁34を経由して回収油路44に供給されるが、その流量は、第二流量制御弁34の開口面積により制御される。尚、前述したように、作業部4の下降時には片持ち制御が実行されていて、作業部4の重量を第二ブームシリンダ9のヘッド側油室9aで保持しているため、該第二ブームシリンダ9のヘッド側油室9aからの排出油の圧力は両持ち制御の場合と比して約二倍の高圧になり、該高圧の油が回収油路44に供給される。
 さらに、ブーム下降側に操作された場合、制御装置27は、シリンダ側チェック弁用電磁切換弁48およびアキュムレータ側チェック弁用電磁切換弁51に対し、ON位置Xに切換わるように制御信号を出力する。これにより、シリンダ側チェック弁46およびアキュムレータ側チェック弁49は共に開状態になって、回収油路44からアキュムレータ油路45への油の流れが許容される。而して、第二ブームシリンダ9のヘッド側油室9aから排出されて回収油路44に供給された油がアキュムレータ油路45に流れ、該アキュムレータ油路45を経由してアキュムレータ59に蓄圧されるようになっている。
 ここで、前述したように、第二流量制御弁34が開位置Xに切換わると共に、シリンダ側チェック弁46およびアキュムレータ側チェック弁49が共に開状態になることにより、第二ブームシリンダ9のヘッド側油室9aからの排出油が回収油路44に流れ、そして該回収油路44からアキュムレータ油路45を経由してアキュムレータ59に蓄圧されることになるが、この場合に、アキュムレータ59からヘッド側油室9aへの逆流を防止するため、制御装置27は、第二ヘッド側圧力センサ63から入力される第二ブームシリンダ9のヘッド側油室9aの圧力Ph2と、アキュムレータ圧力センサ64から入力されるアキュムレータ59の圧力Paとを比較し、そして、第二ブームシリンダ9のヘッド側油室9aの圧力Ph2がアキュムレータ59の圧力Paよりも小さい場合(Ph2<Pa)には、アキュムレータ側チェック弁用電磁切換弁51をOFF位置Nに位置せしめてアキュムレータ側チェック弁49が閉状態になるように制御するようになっており、これによって、アキュムレータ59からヘッド側油室9aへ油が逆流してしまうことを防止できるようになっている。
 つまり、作業部4の下降時には、作業部4の重量を第二ブームシリンダ9のヘッド側油室9aの圧力で保持する片持ち制御が実行されると共に、該第二ブームシリンダ9のヘッド側油室9aからの排出油がアキュムレータ59に蓄圧されることになるが、この場合、第二ブームシリンダ9のヘッド側油室9aの圧力は、両持ち制御の場合と比して約二倍の高圧になっており、而して、アキュムレータ59には、例えば掘削作業や持上げ旋回等の高負荷作業にも対応できる高圧の圧油が蓄圧されることになる。
 さらに、ブーム下降側に操作された場合、制御装置27は、合流バルブ用電油変換弁53に作動信号を出力せず、これにより合流バルブ52は、合流油路16を閉じる閉位置Nに位置するように制御される。而して、アキュムレータ油路45から合流油路16を経由して圧油供給油路17に圧油供給されることなく、圧油供給油路17にはメインポンプ10の吐出油のみが供給されるようになっている。
 さらに、ブーム下降側に操作された場合、制御装置27は、タンクチェック弁用電磁切換弁58に対し、OFF位置Nに位置するように制御する。これにより、タンクチェック弁56は、アキュムレータ用排出油路55を閉じる閉状態に保持されるようになっている。
 次に、ブーム用操作レバーがブーム上昇側に操作された場合、つまり作業部4の上昇時における制御について説明すると、作業部4の上昇時には、前述したように、両持ち制御が実行されるようになっているため、ヘッド側連通油路開閉弁39は開位置Xに位置し、また、アンロード弁41は閉状態になるように制御される。
 さらに、ブーム上昇側に操作された場合、制御装置27は、上昇側電磁比例減圧弁25に対し、ブームシリンダ用コントロールバルブ18の上降側パイロットポート18aに、ブーム用操作レバーの操作量に対応したパイロット圧を出力するように制御信号を出力する。これによりブームシリンダ用コントロールバルブ18が上昇側位置Xに切換わり、而して、該上昇側位置Xのブームシリンダ用コントロールバルブ18を経由して、圧油供給油路17の圧油が第一、第二ブームシリンダ8のヘッド側油室8a、9aに供給されると共に、ロッド側油室8b、9bからの排出油が油タンク12に排出される。尚、後述するように、ブーム上昇側に操作された場合、圧油供給油路17には、メインポンプ10の吐出油だけでなく、アキュムレータ59の蓄圧油も供給されるようになっている。
 さらにこのとき、制御装置27は、第一、第二電磁比例減圧弁35、36に対してパイロット圧出力の制御信号を出力せず、これにより、第一、第二流量制御弁33、34は閉位置Nに位置するように制御される。また、前述したように、ヘッド側連通油路開閉弁39は開位置Xに位置し、また、アンロード弁41は閉状態になっている。而して、前記上昇側位置Xのブームシリンダ用コントロールバルブ18を経由して第一、第二ブームシリンダ8、9のヘッド側油室8a、9aに供給される圧油は、第一ヘッド側排出油路40を経由して油タンク12に流れることなく、ヘッド側メイン油路22、ヘッド側連通油路21、および第一、第二ヘッド側油路19、20の第一、第二チェック弁31、32を経由して、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aに至るようになっている。
 さらに、ブーム上昇側に操作された場合、制御装置27は、シリンダ側チェック弁用電磁切換弁48およびアキュムレータ側チェック弁用電磁切換弁51を、OFF位置Nに位置するように制御する。これにより、シリンダ側チェック弁46およびアキュムレータ側チェック弁49は閉状態に保持され、而して、回収油路44とアキュムレータ油路45との間は遮断された状態になる。
 さらに、ブーム上昇側に操作された場合、制御装置27は、合流バルブ用電油変換弁53に対して、合流バルブ52を開位置Xに切換えるよう作動信号を出力する。これにより合流バルブ52は、アキュムレータ油路45からメインポンプ10の吐出ライン15に至る合流油路16を開くが、その開口面積は、ブーム用操作レバーの操作量、およびアキュムレータ59の圧力Paとメインポンプ10の吐出圧Ppとの差圧に応じて制御される。而して、アキュムレータ59に蓄圧された圧油が、アキュムレータ油路45、合流油路16を経由してメインポンプ10の吐出ライン15に合流し、そして、前述したように、圧油供給油路17、上昇側位置Xのブームシリンダ用コントロールバルブ18を経由して、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aに供給されるようになっている。
 さらに、ブーム上昇側に操作された場合、制御装置27は、メインポンプ流量制御用電磁比例減圧弁30に対して、流量制御信号圧Pcを出力するように制御信号を出力する。この場合、制御装置27は、メインポンプ10の吐出流量を、ブーム用操作レバーの操作量やポンプ出力に応じて要求されるポンプ流量から、前記アキュムレータ59からの合流量分を減じた流量にするべく、流量制御信号圧Pcの値を制御する。
 前記メインポンプ流量制御用電磁比例減圧弁30から出力された流量制御信号圧Pcは、シャトル弁29の他方の入力ポート29bに入力される。一方、シャトル弁29の一方の入力ポート29aにはネガティブコントロール信号圧Pnが入力されるが、アキュムレータ59からの供給圧油が吐出ライン15に合流している状態では、流量制御信号圧Pcの方がネガティブコントロール信号圧Pnよりもポンプ流量を少なくする信号圧、つまり、流量制御信号圧Pcの方がネガティブコントロール信号圧Pnよりも高圧になるから、該流量制御信号圧Pcがシャトル弁29により選択されて、メインポンプ10のレギュレータ13に入力される。而して、メインポンプ10の吐出流量は、アキュムレータ59からの合流量分だけ低減した流量となるように制御されることになり、このようにして、本発明のポンプ流量低減手段が構成されている。
 つまり、作業部4の上昇時には、アキュムレータ59の蓄圧油が、合流油路16を経由してメインポンプ10の吐出油に合流し、該合流した圧油が上昇側位置Xのブームシリンダ用コントロールバルブ18を経由して第一、第二ブームシリンダ8、9のヘッド側油室8a、9aに供給される。さらにこのとき、メインポンプ10の吐出流量は、アキュムレータ59からの合流量分低減した流量となるように制御される。而して、作業部4の下降時にアキュムレータ59に回収された位置エネルギーを、作業部4の上昇時に再利用できると共に、その分メインポンプ10の吐出流量を低減することができるようになっている。
 さらに、ブーム上昇側に操作された場合、制御装置27は、タンクチェック弁用電磁切換弁58に対し、OFF位置Nに位置するように制御する。これにより、タンクチェック弁56は、アキュムレータ用排出油路55を閉じる閉状態に保持されるようになっている。
 叙述の如く構成された本形態において、油圧ショベル1の作業部4は、該作業部4を構成するブーム5の昇降に伴って昇降すると共に、該ブーム5の昇降は、一対の第一、第二ブームシリンダ8、9の伸縮作動に基づいて行なわれることになるが、油圧ショベル1の油圧制御システムには、前記一対の第一、第二ブームシリンダ8、9のうち一方の第一ブームシリンダ8のヘッド側油室8aの圧油を油タンク12に流す開閉自在なアンロード油路(第一ヘッド側油路19、第一流量制御弁33、第一ヘッド側排出油路40、およびアンロード弁41によって構成される)と、該アンロード油路の開閉制御を行なう制御装置27とが設けられており、そして、作業部4の上昇時および昇降停止時には上記アンロード油路を閉じて、第一および第二のブームシリンダ8、9のヘッド側油室8a、9aの圧力で作業部4の重量を保持する一方、作業部4の下降時にアンロード油路を開く(第一流量制御弁33の開口面積を最大にし、且つ、アンロード弁41を開状態にする)ことで、第二ブームシリンダ9のヘッド側油室9aの圧力で作業部4の重量を保持することになると共に、作業部4の下降時に第二ブームシリンダ9のヘッド側油室9aから排出された油は、アキュムレータ59に蓄圧され、さらに該アキュムレータ59の蓄圧油は、第一、第二ブームシリンダ8、9および油圧ショベル1に設けられる複数の油圧アクチュエータの油圧供給源になるメインポンプ10の吐出ライン15に、合流油路16を介して合流されることになる。
 而して、作業部4の下降時に、アンロード油路を開いて第一ブームシリンダ8のヘッド側油室8aの圧油を油タンク12に流すことで、作業部4の重量は第二ブームシリンダ9のヘッド側油室9aの圧力で保持されると共に、該第二ブームシリンダ9のヘッド側油室9aからの排出油がアキュムレータ59に蓄圧されることになるが、この場合、第二ブームシリンダ9のヘッド側油室9aの圧力、つまり作業部4の重量を保持する保持圧は、第一および第二の両方のブームシリンダ8、9で作業部4の重量を保持する場合の保持圧に対して倍増するから、アキュムレータ59には、高負荷作業にも対応できる高圧の圧油が蓄圧されることになる。そして該高圧のアキュムレータ59の蓄圧油をメインポンプ10の吐出ライン15に合流させることで、アキュムレータ59の蓄圧油を、作業部4の上昇時における第一、第二ブームシリンダ8、9への供給圧油として用いることができるのは勿論のこと、油圧ショベル1に設けられる複数の油圧アクチュエータ(走行モータ、旋回モータ、アームシリンダ、バケットシリンダ等)への供給圧油として、高負荷作業を含めた様々な作業に用いることができる。しかも、エンジン動力で駆動するポンプを用いてアキュムレータの蓄圧油を増圧する場合のように、エンジンからポンプへの動力伝達経路におけるトルク低下やポンプ自体の慣性質量などによる空転トルクの損失等がなく、アキュムレータ59に回収した作業部4の位置エネルギーを可及的に損失の少ない状態で利用できると共に、コスト削減にも大きく貢献できる。
 またこのものにおいて、アンロード油路を開く、つまり作業部4の重量を第二ブームシリンダ9のヘッド側油室9aの圧力で保持するのは、アキュムレータ59への蓄圧を行なう作業部4の下降時であって、作業部4の上昇時および昇降停止時には、アンロード油路を閉じる、つまり、第一および第二ブームシリンダ8、9のヘッド側油室8a、9aの圧力で作業部4の重量を保持する構成になっているから、アキュムレータ59への蓄圧を行なう場合以外のときに、第一ブームシリンダ8のヘッド側油室8aの圧油を油タンク12に流してしまう損失をなくすことができると共に、作業部4を上昇させる場合に力不足になったりバランスが損なわれたりする惧れもない。
 さらに、油圧ショベル1の油圧制御システムには、第一、第二ブームシリンダ8、9のヘッド側油室8a、9a同士を連通するヘッド側連通油路21と、該ヘッド側連通油路21を開閉するべく制御装置27により制御されるヘッド側連通油路開閉弁39とが設けられていると共に、該ヘッド側連通油路開閉弁39は、アンロード油路が閉じている状態ではヘッド側連通油路21を開く一方、アンロード油路が開いている状態ではヘッド側連通油路21を閉じるように制御されることになる。而して、アンロード油路が閉じている、つまり、第一および第二の両方のブームシリンダ8、9のヘッド側油室8a、9aで作業部4の重量を保持している状態では、両ヘッド側油室8a、9a同士が連通状態になって、一対の第一および第二ブームシリンダ8、9でバランス良く作業部4を支持できる一方、アンロード油路が開いている、つまり、第二ブームシリンダ9のヘッド側油室9aで作業部4の重量を保持している状態では、該第二ブームシリンダ9のヘッド側油室9aと第一ブームシリンダ8のヘッド側油室8aとを遮断できることになる。
 さらにこのものにおいて、前記合流油路16には、アキュムレータ59からメインポンプ10の吐出ライン15への合流量を制御する合流バルブ52が配されており、而して、該合流バルブ45によって合流量を制御することで、アキュムレータ59の蓄圧油を無駄無く効率的に用いることができる。
 そのうえ、メインポンプ10の吐出流量は、前述したように、メインポンプ流量制御用電磁比例減圧弁30からメインポンプ10のレギュレータ13に出力される流量制御信号圧Pcによって、アキュムレータ59からメインポンプ10の吐出ライン15への合流量に応じて低減するように制御されることになり、而して、メインポンプ10の吐出流量を適切に低減せしめることができて、効率よく低燃費化を達成できる。
 また、油圧ショベル1の油圧制御システムには、作業部4の下降時に第二ブームシリンダ9のヘッド側油室9aからの排出流量を制御する第二流量制御弁34が設けられており、該第二流量制御弁34によって、作業部4の下降速度を制御することができる。
 さらに、第二ブームシリンダ9のヘッド側油室9aは、第二ヘッド側油路20、回収油路44およびアキュムレータ油路45を介してアキュムレータ59に連結されるが、上記回収油路44とアキュムレータ油路45との間には、作業部4の上昇時および昇降停止時において、第二ブームシリンダ9のヘッド側油室9aからアキュムレータ59への油の流れを阻止するシリンダ側チェック弁46と、アキュムレータ59から第二ブームシリンダ9のヘッド側油室9aへの油の流れを阻止するアキュムレータ側チェック弁49とが設けられている。而して、これらシリンダ側チェック弁46およびアキュムレータ側チェック弁49によって、作業部4の上昇時および昇降停止時において、第二ブームシリンダ9のヘッド側油室9aの圧油が回収油路44およびアキュムレータ油路45を介してアキュムレータ59に流れたり、或いはアキュムレータ59の蓄圧油が回収油路44およびアキュムレータ油路45を介して第二ブームシリンダ9のヘッド側油室9aに供給されてしまうことを、確実に防止できる。尚、作業部4の上昇時および昇降停止時において、第一、第二ブームシリンダ8、9のヘッド側油室8a、9a同士は、ヘッド側連通油路21を介して連通状態になっているが、前記シリンダ側チェック弁46およびアキュムレータ側チェック弁49によって、第一ブームシリンダ8のヘッド側油室8aからアキュムレータ59への油の流れ、およびアキュムレータ59から第一ブームシリンダ8のヘッド側油室8aへの油の流れも、阻止されることになる。
 尚、本発明は、上記実施の形態に限定されないことは勿論であって、例えば、作業部4の下降時であっても、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aの圧力Ph1、Ph2やアキュムレータ59の圧力Paに応じて、片持ち制御だけでなく両持ち制御も実行されるように構成することもでき、この様に構成した場合について、以下に説明する。
 つまり、制御装置27は、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aの圧力Ph1、Ph2の平均値((Ph1+Ph2)/2)とアキュムレータ59の圧力Paとの差圧が、予め設定される設定値C1以上であるか否か({(Ph1+Ph2)/2}-Pa≧C1?)を判断し、そして、設定値C1以上の場合には、作業部4の下降時であっても、両持ち制御を実行する。ここで、上記設定値C1は、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aからアキュムレータ59に圧油を流すために必要な差圧として予め設定される値であるが、該設定値C1が小さすぎると、作業部4の下降速度が遅くなってしまう場合があるため、作業部4の下降速度を確保できる状態で、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aからアキュムレータ59に圧油を流すために必要な差圧が、設定値C1として設定される。つまり、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aの圧力Ph1、圧力Ph2の平均値とアキュムレータ59の圧力Paとの差圧が設定値C1以上の場合には、両持ち制御であっても、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aの排出油をアキュムレータ59に蓄圧することができるため、片持ち制御は実行されないようになっており、これによって、片持ち制御時にアンロード油路が開くことで第一ブームシリンダ8のヘッド側油室8aの圧油を油タンク12に流してしまう損失を、低減させることができるようになっている。尚、ハンチング防止のため、上記設定値C1の値は、両持ち制御から片持ち制御に移行する場合と、片持ち制御から両持ち制御に移行する場合とでは若干異なるように設定されている。
 さらに、制御装置27は、第二リリーフ弁38によって設定される第二ブームシリンダ9のヘッド側リリーフ圧Pr2と第二ブームシリンダ9のヘッド側油室9aの圧力Ph2との差圧が、予め設定される設定値C2以下であるか否か(Pr2-Ph2≦C2?)を判断し、そして、設定値C2以下の場合には、作業部4の下降時であっても、両持ち制御を実行する。ここで、上記設定値C2は、第二リリーフ弁38の不用意な作動を防止するために予め設定される差圧の値である。つまり、第二ブームシリンダ9のヘッド側リリーフ圧Pr2と第二ブームシリンダ9のヘッド側油室9aの圧力Ph2との差圧が設定値C2以下の場合には、第二リリーフ弁38が不用意に作動して第二ブームシリンダ9のヘッド側油室9aの油が油タンク12に流れてしまう惧れが大きくなるため、片持ち制御は実行されないようになっており、これにより、第二リリーフ弁38が作動して第二ブームシリンダ9のヘッド側油室9aからの排出油が油タンク12に流れてしまう損失をなくすことができるようになっている。
 つまり、作業部4の下降時であっても、第一、第二ブームシリンダ8、9のヘッド側油室8a、9aの圧力Ph1、Ph2がアキュムレータ59の圧力Paに対して高圧の場合や、第二ブームシリンダ9のヘッド側油室9aの圧力Ph2が高くなりすぎて第二リリーフ弁38が作動してしまう惧れがある場合には、両持ち制御が実行されるようになっているが、この場合には、ヘッド側連通油路開閉弁39は開位置Xに位置し、また、アンロード弁41は閉状態になるように制御されるため、第一ブームシリンダ8のヘッド側油室8aからの排出油も、第二ブームシリンダ9のヘッド側油室9aからの排出油と共に、回収油路44、シリンダ側チェック弁46、アキュムレータ側チェック弁49、およびアキュムレータ油路45を経由して、アキュムレータ59に蓄圧されるようになっている。この場合の第一ブームシリンダ8のヘッド側油室8aからの排出流量は、第一流量制御弁33によって制御することができる。
 また、本発明は、油圧ショベルだけでなく、作業部を昇降せしめる一対の油圧シリンダが設けられた各種作業機械の油圧制御システムに実施することができる。
 さらに、図2の油圧回路図では、複数の油圧アクチュエータに圧油供給する油圧ポンプとして一つのメインポンプを示したが、二つ以上のメインポンプが設けられていても良いことは勿論である。
 さらにまた、本実施の形態では、開閉自在なアンロード油路を、第一ヘッド側油路19、第一流量制御弁33、第一ヘッド側排出油路40、およびアンロード弁41を用いて構成しているが、これに限定されることなく、第一油圧シリンダのヘッド側油室の圧油をアンロード状態で油タンクに流すことができる開閉自在な油路であれば良い。
 本発明は、昇降自在な作業部を備えた作業機械において、作業部の有する位置エネルギーを回収、再利用することができる作業機械における油圧制御システムの技術分野に関するものであり、本発明のごとく構成することにより、アキュムレータには、高負荷作業にも対応できる高圧の圧油が蓄圧されることになる。そして、アキュムレータの蓄圧油を、作業部の上昇時における第一、第二油圧シリンダへの供給圧油として用いることができ、作業機械に備えられた複数の油圧アクチュエータへの供給圧油として、高負荷作業を含めた様々な作業に用いることができる。しかも、アキュムレータに回収した作業部の位置エネルギーを可及的に損失の少ない状態で利用できると共に、コスト削減にも大きく貢献できるという産業上の利用可能性がある。
 4   作業部
 8   第一ブームシリンダ
 8a  第一ブームシリンダヘッド側油室
 9   第二ブームシリンダ
 9a  第二ブームシリンダヘッド側油室
 10  メインポンプ
 12  油タンク
 13  レギュレータ
 15  吐出ライン
 16  合流油路
 21  ヘッド側連通油路
 27  制御装置
 29  シャトル弁
 30  メインポンプ流量制御用電磁比例減圧弁
 34  第二流量制御弁
 39  ヘッド側連通油路開閉弁
 41  アンロード弁
 46  シリンダ側チェック弁
 49  アキュムレータ側チェック弁
 52  合流バルブ
 59  アキュムレータ

Claims (6)

  1.  昇降自在な作業部と、該作業部を昇降せしめる一対の第一、第二油圧シリンダと、該第一、第二油圧シリンダを含む複数の油圧アクチュエータと、これら複数の油圧アクチュエータに圧油供給する油圧ポンプとを備えてなる作業機械の油圧制御システムにおいて、該油圧制御システムに、前記第一油圧シリンダのヘッド側油室の圧油を油タンクに流す開閉自在なアンロード油路と、該アンロード油路の開閉制御を行なう制御装置とを設け、作業部の上昇時および昇降停止時には前記アンロード油路を閉じて第一および第二油圧シリンダのヘッド側油室の圧力で作業部の重量を保持する一方、作業部の下降時にアンロード油路を開いて第二油圧シリンダのヘッド側油室の圧力で作業部の重量を保持する構成にすると共に、作業部の下降時に前記第二油圧シリンダのヘッド側油室から排出される圧油を蓄圧するアキュムレータと、該アキュムレータの蓄圧油を前記油圧ポンプの吐出ラインに合流させる合流油路とを設けたことを特徴とする作業機械における油圧制御システム。
  2.  油圧制御システムに、第一、第二油圧シリンダのヘッド側油室同士を連通するヘッド側連通油路と、該ヘッド側連通油路を開閉するべく制御装置により制御されるヘッド側連通油路開閉弁とを設けると共に、該ヘッド側連通油路開閉弁は、アンロード油路が閉じている状態ではヘッド側連通油路を開く一方、アンロード油路が開いている状態ではヘッド側連通油路を閉じるように制御されることを特徴とする請求項1に記載の作業機械における油圧制御システム。
  3.  合流油路に、アキュムレータから油圧ポンプの吐出ラインへの合流量を制御する合流バルブを配したことを特徴とする請求項1または2に記載の作業機械における油圧制御システム。
  4.  油圧制御システムは、アキュムレータから油圧ポンプの吐出ラインへの合流量に応じて油圧ポンプの吐出流量を低減せしめるポンプ流量低減手段を有することを特徴とする請求項3に記載の作業機械における油圧制御システム。
  5.  油圧制御システムに、作業部の下降時に第二油圧シリンダのヘッド側油室の排出流量を制御する第二流量制御弁を設けたことを特徴とする請求項1乃至4の何れか一項に記載の作業機械における油圧制御システム。
  6.  第二油圧シリンダのヘッド側油室からアキュムレータに至る油路に、作業部の上昇時および昇降停止時において、第二油圧シリンダのヘッド側油室からアキュムレータへの油の流れ、およびアキュムレータから第二油圧シリンダのヘッド側油室への油の流れを阻止する弁手段を設けたことを特徴とする請求項1乃至5の何れか一項に記載の作業機械における油圧制御システム。
PCT/JP2009/002407 2008-09-04 2009-06-01 作業機械における油圧制御システム WO2010026677A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008-226651 2008-09-04
JP2008226651A JP2010060055A (ja) 2008-09-04 2008-09-04 作業機械における油圧制御システム

Publications (1)

Publication Number Publication Date
WO2010026677A1 true WO2010026677A1 (ja) 2010-03-11

Family

ID=41796863

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/002407 WO2010026677A1 (ja) 2008-09-04 2009-06-01 作業機械における油圧制御システム

Country Status (2)

Country Link
JP (1) JP2010060055A (ja)
WO (1) WO2010026677A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9051944B2 (en) 2012-06-15 2015-06-09 Caterpillar Inc. Hydraulic system and control logic for collection and recovery of energy in a double actuator arrangement
CN108915007A (zh) * 2018-07-09 2018-11-30 马鞍山市润启新材料科技有限公司 一种挖掘机动臂斗杆节能系统

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5246759B2 (ja) * 2008-09-04 2013-07-24 キャタピラー エス エー アール エル 作業機械における油圧制御システム

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS639359U (ja) * 1986-07-08 1988-01-21
JP2004003652A (ja) * 2002-05-17 2004-01-08 Caterpillar Inc 油圧再生システム
JP2004084097A (ja) * 2002-08-26 2004-03-18 Toppan Printing Co Ltd セルロース繊維構造物
JP2008089024A (ja) * 2006-09-29 2008-04-17 Kobelco Contstruction Machinery Ltd 油圧アクチュエータの制御装置及びこれを備えた作業機械
JP2008121893A (ja) * 2006-11-14 2008-05-29 Husco Internatl Inc 油圧システムのためのエネルギー回収及び再利用技術
JP2008133914A (ja) * 2006-11-29 2008-06-12 Shin Caterpillar Mitsubishi Ltd 作業機械における油圧制御システム
JP2008185098A (ja) * 2007-01-29 2008-08-14 Shin Caterpillar Mitsubishi Ltd 作業機械における制御システム

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS639359U (ja) * 1986-07-08 1988-01-21
JP2004003652A (ja) * 2002-05-17 2004-01-08 Caterpillar Inc 油圧再生システム
JP2004084097A (ja) * 2002-08-26 2004-03-18 Toppan Printing Co Ltd セルロース繊維構造物
JP2008089024A (ja) * 2006-09-29 2008-04-17 Kobelco Contstruction Machinery Ltd 油圧アクチュエータの制御装置及びこれを備えた作業機械
JP2008121893A (ja) * 2006-11-14 2008-05-29 Husco Internatl Inc 油圧システムのためのエネルギー回収及び再利用技術
JP2008133914A (ja) * 2006-11-29 2008-06-12 Shin Caterpillar Mitsubishi Ltd 作業機械における油圧制御システム
JP2008185098A (ja) * 2007-01-29 2008-08-14 Shin Caterpillar Mitsubishi Ltd 作業機械における制御システム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9051944B2 (en) 2012-06-15 2015-06-09 Caterpillar Inc. Hydraulic system and control logic for collection and recovery of energy in a double actuator arrangement
CN108915007A (zh) * 2018-07-09 2018-11-30 马鞍山市润启新材料科技有限公司 一种挖掘机动臂斗杆节能系统

Also Published As

Publication number Publication date
JP2010060055A (ja) 2010-03-18

Similar Documents

Publication Publication Date Title
JP5354650B2 (ja) 作業機械における油圧制御システム
KR101879881B1 (ko) 에너지 회생용 제어회로 및 작업기계
WO2010026678A1 (ja) 作業機械における油圧制御システム
US7775040B2 (en) Bidirectional hydraulic transformer
CN107949707B (zh) 作业机械的液压驱动装置
KR102258694B1 (ko) 건설 기계
US9932993B2 (en) System and method for hydraulic energy recovery
WO2008007484A1 (fr) Système de commande hydraulique pour machine de chantier
US9290911B2 (en) Energy recovery system for hydraulic machine
US20130081382A1 (en) Regeneration configuration for closed-loop hydraulic systems
JP2006064071A (ja) 流体圧駆動回路
US20140174069A1 (en) Hydraulic control system having swing motor energy recovery
JP5246759B2 (ja) 作業機械における油圧制御システム
JP2009150462A (ja) 作業機械における油圧制御システム
JP2004346485A (ja) 油圧駆動装置
WO2010026677A1 (ja) 作業機械における油圧制御システム
CN107893787B (zh) 用于工程机械的液压系统
JP4753307B2 (ja) 作業機械における油圧制御システム
JP2009270660A (ja) 作業機械における油圧制御システム
JP2008185182A (ja) 作業機械における油圧制御システム
JP2008185098A (ja) 作業機械における制御システム
JP4756600B2 (ja) 作業機械における油圧制御システム
JP2008185099A (ja) 作業機械における制御システム
JP4831679B2 (ja) 作業機械における油圧制御システム
JP2008014440A (ja) 作業機械における油圧制御システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09811207

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09811207

Country of ref document: EP

Kind code of ref document: A1