WO2007120035A1 PCT/NL2006/000198 NL2006000198W WO2007120035A1 WO 2007120035 A1 WO2007120035 A1 WO 2007120035A1 NL 2006000198 W NL2006000198 W NL 2006000198W WO 2007120035 A1 WO2007120035 A1 WO 2007120035A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipeline
reel
assembly
vessel
laying
Prior art date
Application number
PCT/NL2006/000198
Other languages
English (en)
Inventor
Robert Paul Hovinga
Cornelis Van Zandwijk
Douwe Renkema
Original Assignee
Heerema Marine Contractors Nederland B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heerema Marine Contractors Nederland B.V. filed Critical Heerema Marine Contractors Nederland B.V.
Priority to PCT/NL2006/000198 priority Critical patent/WO2007120035A1/fr
Publication of WO2007120035A1 publication Critical patent/WO2007120035A1/fr

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/16Laying or reclaiming pipes on or under water on the bottom
    • F16L1/18Laying or reclaiming pipes on or under water on the bottom the pipes being S- or J-shaped and under tension during laying
    • F16L1/19Laying or reclaiming pipes on or under water on the bottom the pipes being S- or J-shaped and under tension during laying the pipes being J-shaped
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • F16L1/202Accessories therefor, e.g. floats, weights fixed on or to vessels
    • F16L1/203Accessories therefor, e.g. floats, weights fixed on or to vessels the pipes being wound spirally prior to laying
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/03Pipe-laying vessels

Definitions

  • This invention relates to a pipeline laying vessel and a method for laying a pipeline in a marine environment, in particular for laying a pipeline on a bottom of a seabed.
  • the invention further relates to a reel for use in the pipeline laying vessel and the method.
  • the invention also relates to the laying of a pipeline which extends from a seabed to a target location at or near the water level, which pipeline is also known as a riser.
  • J-lay An example of a J-lay vessel is disclosed in US 5 464 307.
  • An example of an S-lay vessel is disclosed in US 3 685 305.
  • An example of a G-lay vessel is disclosed in GB 2 287 517.
  • a different method of laying a pipeline is known as reeling, or reel-lay. In the reeling method, a relatively long section of pipeline is wound onto a reel positioned on board the pipeline-laying vessel prior to a pipeline laying operation. At the time of laying, the pipeline is unreeled from the reel and launched from the vessel.
  • An example of a reeling vessel is disclosed in GB 2 025 566 A.
  • the choice whether to perform J-lay, S-lay, G-lay or reeling in a given situation depends on a number of factors such as: water depth, diameter of the pipeline, wall thickness of the pipeline, a target position and a target orientation of the pipeline, a maximal allowed plastic deformation of the pipeline and other factors.
  • the J-lay method is often preferred as being more suitable for large water depths.
  • the J-lay method is also generally employed for a situation in which the quality of the pipeline is very important, such as for a riser, and for a situation in which a substantial plastic deformation of the pipeline is not acceptable.
  • J-lay is generally performed for pipes having thick walls, which render the pipe very rigid and difficult to wind onto a reel .
  • a pipeline is laid by reeling when a substantial length of pipeline is to be laid on the seabed. In the reeling method a certain amount of plastic deformation is accepted.
  • the vessel of US 6 371 694 comprises a launching ramp which is used both in the J-lay method and in the reeling method.
  • the pipeline may be unreeled from either of the reels.
  • a reeling operation may be continued by switching to the other reel.
  • a problem associated with the vessel of US 6 371 694 occurs when both the reels are empty. Then, the empty reels must each be reloaded with a new pipeline section before the reeling operation can be continued. This reloading is to be performed at the quayside by- winding a pipeline section onto the reels. For this reloading operation, the vessel must leave a location where the pipeline is laid and sail back to shore. The journey to shore, the winding of the pipeline onto the reels and the return journey to the laying location require a considerable amount of time (also called downtime) , which slows down the pipeline laying operation.
  • a further problem associated with the vessel of US 6 371 694 is that the launching ramp needs to be movable with respect to the vessel. For the reeling operation, it is necessary that the launching ramp be substantially aligned with the reel, which is in use. The pipeline from both reels is unreeled via the same launching ramp.
  • the launching ramp itself must be moved relative to the hull in order to substantially align it with one of the two reels. Pivoting the launching ramp about a vertical axis relative to the hull effects this movement.
  • the launching ramp however is a large, heavy and complex structure. Mounting the launching ramp pivotably about a vertical axis relative to the hull is very cumbersome. It is preferable to configure the pipeline laying vessel such that the launching ramp does not need to be pivoted relative to the vessel about a vertical axis .
  • the invention in a first aspect, relates to a pipeline-laying vessel comprising: - a connecting assembly configured for laying a pipeline by connecting consecutive pipe sections to a free end of the pipeline; - a reeling assembly configured for laying a pipeline by unreeling a pipe section from a reel; wherein the connecting assembly and the reeling assembly share at least a part of a support assembly for supporting the pipeline and/or pipe section, wherein the pipeline laying vessel further comprises an active reel position in which a reel is to be positioned during the unreeling of the pipe section from the reel, and wherein the pipeline laying vessel is configured to allow a reel to be moved to the active reel position and to be removed from the active reel position.
  • an empty reel may be removed from the active reel position and be replaced by a full reel so that the required downtime between the unreeling of two reels is substantially reduced.
  • the exchanging of the reels may be performed at sea, obviating the need for the vessel to return to shore for reloading of the reels .
  • the support assembly need not rotate about a vertical axis relative to the hull assembly in order to be aligned with a reel in the active reel position.
  • the connecting assembly and the reeling assembly are capable of laying what is known in the field of the art as a rigid pipeline, e.g. a steel pipeline having a substantial rigidity. Other metals or materials may also be used.
  • the connecting assembly generally comprises a support assembly for supporting a pipe section in an abutting position with the free end of the pipeline.
  • the support assembly has the form of a launching ramp or tower assembly.
  • the free end of the pipeline is supported on the vessel by a hang-off table.
  • the connecting assembly further typically comprises a welding station for welding pipe sections to the pipeline.
  • the reeling assembly generally comprises a pulling device for pulling the pipeline section from the reel, an aligner for giving the pipe an universal bending radius and for aligning the pipeline section with the firing line, a straightener for straightening the pipeline, and a support assembly for supporting the pipeline as it is advanced along the firing line on board.
  • the support assembly may be pivotable relative to the hull assembly about a substantially horizontal axis.
  • the pipeline-laying vessel may be configured such that the pipeline is advanced along a same trajectory on board the pipeline- laying vessel in the connecting method and in the reeling method.
  • This trajectory is also known as ⁇ firing line' or ⁇ lay path' in the field of the art.
  • the connecting assembly comprises a J-lay assembly configured for connecting pipe sections to the pipeline in a J-lay method.
  • the combination of the J-lay method with the reeling method is found to be very advantageous, because the J-lay method is very advantageous for risers, whereas the reeling method is very suitable for pipelines which are to rest on the seabed. Both types of pipeline may thus be laid with a single vessel.
  • the invention relates to a pipeline laying vessel comprising a reel coupling configured to allow a reel in the active reel position to be coupled to and uncoupled from the pipeline laying vessel. With the reel coupling, a rapid exchanging of an empty reel with a full reel may be performed in the active reel position.
  • the connecting assembly and the reeling assembly share a pipeline advancing device configured for unreeling a pipeline from a reel in the reeling method, wherein said pipeline advancing device is also configured for lowering the pipeline in the J-lay method.
  • the pipeline advancing device may comprise a moving clamp, one or more pairs of endless tracks or belts, or another device suitable for advancing the pipeline and/or pipe section.
  • the pipeline laying vessel comprises at least one inactive reel position for at least temporarily storing a reel, wherein the pipeline laying vessel is configured to allow a reel to be moved to and removed from the inactive reel position.
  • the pipeline-laying vessel comprises a moving device for moving a reel to and from the active reel position, in particular for moving the reel between the active reel position and the inactive reel position.
  • a full reel can be positioned in the active reel position by the moving device by moving it from the inactive reel position to the active reel position.
  • a crane is a simple and effective way of moving a reel to and from the active reel position.
  • the pipeline-laying vessel comprises a guiding device, in particular a track, for guiding a reel to and from the active reel position. This allows the exchanging of the reels with a minimal effort.
  • the reels comprise sliding means or wheels via which the reels can move along the guiding device.
  • the pipeline-laying vessel comprises a moving device for transferring a reel between the pipeline-laying vessel and an auxiliary vessel.
  • an empty reel can be transferred from the pipeline-laying vessel to the auxiliary vessel and be replaced by a full reel.
  • the transfer may be performed by the same moving device as the moving device used for moving the reel to and/or from the active position to the inactive position.
  • a separate moving device may be provided.
  • the reeling assembly is configured for laying a pipeline when the connecting assembly is not in use.
  • a known method exists wherein a reeled pipeline is provided merely as a piggyback pipeline on a pipeline laid with the connecting method .
  • the reeling method can not be performed independently from the connecting method.
  • the reeling assembly is capable of laying a pipeline independent from a pipeline laid with the connecting assembly.
  • the reeling assembly is only capable of reeling pipeline with a diameter which is substantially smaller than the diameter of the pipeline that can be laid with the connecting assembly.
  • the reeling assembly and the connecting assembly can lay pipeline having the same diameter.
  • the moving device is positioned between the active reel position and the inactive reel position.
  • the pipeline laying vessel comprises:
  • - winding means for winding the formed pipeline section onto a reel, in particular onto a reel which is positioned in the inactive reel position.
  • an empty reel may be reloaded with new pipeline on board the vessel. After reloading, the full reel may again be used for unreeling.
  • a second reel may be used in the reeling method in order to perform the reeling method continuously.
  • the pipeline laying vessel comprises a plurality of inactive reel positions. This allows a substantial flexibility of the reeling operation. For instance, a substantial number of empty or full reels may be stored on board. Also, in combination with a pipeline construction location a reel may be reloaded during a movement of another reel to or from an inactive position.
  • the invention further relates to a reel configured for use in a pipeline-laying vessel according to the invention.
  • the reel may comprise a pipeline wound on the reel.
  • the reel may be adapted for being coupled to and from the pipeline-laying vessel in order to allow a swift exchange of the reel when it is empty by a full reel.
  • the reel may also comprise sliding means or rolling means for moving the reel on board the pipeline-laying vessel.
  • the reel may be equipped with a lift coupling for coupling the reel to the crane, in order to lift the reel to and from the active reel position.
  • the invention further relates to a method of laying a pipeline, the method comprising: (a) providing a pipeline laying vessel comprising:
  • a connecting assembly configured for laying a pipeline by connecting consecutive pipe sections to a free end of a pipeline which is supported by the vessel;
  • a reeling assembly configured for laying a pipeline by unreeling a pipe section from a reel; wherein the connecting assembly and the reeling assembly share at least a part of a support assembly for supporting the pipeline and/or pipe section, wherein the pipeline laying vessel further comprises an active reel position in which a reel is to be positioned during the unreeling of the pipe section from the reel, and wherein the pipeline laying vessel is configured to allow a reel to be moved to the active reel position and to be removed from the active reel position; (b) positioning a first reel in the active reel position;
  • the present invention relates to a method of loading a reel with pipeline, the method comprising:
  • Fig.l shows a schematic side view of a pipeline laying vessel according to the invention performing the reeling method
  • Fig. 2 shows a schematic side view of a pipeline laying vessel according to the invention performing the J-lay method
  • FIG. 3 shows a schematic top view of the pipeline laying vessel according to the invention.
  • a pipeline laying vessel 10 according to the invention is shown.
  • the vessel 10 comprises a hull 12, a deck 14, a connecting assembly 16 in the form of a J-lay assembly, and a reeling assembly 18.
  • the water-line is indicated with reference number 20.
  • the J-lay assembly 16 and the reeling assembly 18 share a tower assembly 26.
  • the tower assembly 26 extends upwards from the deck 14, and is pivotably connected to the hull 12 about a horizontal axis 28 and adjustable struts 30.
  • the tower assembly 26 is not pivotable about a vertical axis relative to the hull 12.
  • a firing line 24 (or lay path) is defined along which a pipeline 22 is advanced during the laying thereof. A part of the firing line 24 extends through the tower assembly 26.
  • the J-lay assembly 16 comprises a welding station 32 for welding a lower end 33 of a pipe section 35 to a free end 34 of a pipeline 22 suspended from the vessel 10.
  • a pipeline support device in the form of a hang-off clamp 36 supports the free end 34.
  • the hang-off clamp 36 may operate on the pipeline 22 via friction forces. Other means of supporting the pipeline 22 are also possible .
  • the tower assembly 26 further comprises a pipe section support means 38 configured for supporting a pipe section 35 (shown in Fig. 2) which is to be welded to the free end 34 of the pipeline 22.
  • the pipe section support means 38 can have the form of a friction clamp which is movable along the firing line 24 in the direction of arrow 40.
  • pipe section support means 38 are also possible, such as endless belts (not shown) which operate on the pipeline 22 via friction.
  • support means 63 which are substantially fixed, for instance rollers, may be provided along the tower assembly 26 for laterally supporting the pipe section 22 at the firing line 24, which support means 63 may also be used in the reeling method.
  • the J-lay assembly 16 further comprises a pipe storage (not shown) for storing pipe sections 35.
  • the pipe sections 35 may be pre- assembled from a number of shorter pipes, e.g. from four or six pipes, which pre-assembling may be performed on board.
  • the movable clamp 38 on the tower assembly 26 is configured for roughly positioning a pipe section 35 along the firing line 24 in an end-to-end relationship with the pipeline 22 and for handing the pipe section 35 over to the line-up means 61. After the pipe section 35 has been. connected to the pipeline 22, the movable clamp 38 is used for lowering the upper end of the pipe section 35 plus the pipeline 22 to the hang-off clamp 36.
  • the line-up means 61 is a controllable tool for precisely aligning the pipe section 35 with the pipeline 22 prior to welding, by laterally and axially moving the pipe section 35 relative to the pipeline 22 and/or by rotating the pipe section 35 relative to the pipeline 22.
  • the reeling assembly 18 comprises an active reel position 42 configured for supporting a reel 44.
  • the reel 44 is rotatable about a rotation axis 49.
  • a drive 48 for rotating a reel 44 about the horizontal rotation axis 49 is provided, which drive 48 may be integrated with reel support means 50 for supporting the reel 44.
  • the active reel position 42 is substantially aligned with the firing line 24, when viewed from above.
  • a reel coupling 52 is provided which allows a reel 44 to be coupled to and uncoupled from the vessel 10.
  • the reeling assembly 18 further comprises an aligner 54 mounted for rotation at an upper end 56 of the tower assembly 26.
  • the reeling assembly 18 further comprises a straightener 60 and a pulling device 38 which are known in the field of the art.
  • support means 63 along the tower assembly may be provided for laterally supporting the pipeline 22 at the firing line 24, which support means 63 may also be part of the J-lay assembly 16.
  • the active reel position 42 is provided on a reel support module 62 positioned on the vessel 10 and coupled to the vessel via module coupling means 80.
  • the reel support module 62 may be uncoupled and integrally removed from the vessel 10.
  • a number of components of the reeling assembly 18, i.e. the aligner 54, the straightener 60 and the pulling device 38 are mounted on the tower assembly 26.
  • the J-lay assembly 16 and the reeling assembly 18 share a number of components, i.e. the tower assembly 26 and the support means 63 for supporting the pipeline on the tower assembly 26.
  • the reeling method and the J-lay method also share a part of the firing line 24 or lay path 24.
  • the J-lay mode which is well known in the field of the art, pipe sections 35 are taken one by one from the pipe section storage and positioned end-to-end with the pipeline 22. The pipe section is then aligned with the pipeline 22, and welded to the pipeline 22.
  • the pipeline 22 is lowered by lowering the moving friction clamp 38 relative to the tower assembly 26 until the upper end 34 of the pipeline 22 is in a position in- which it can be supported by the hang-off clamp 36.
  • the vessel 10 moves forward in the direction of arrow 64.
  • the pipeline 22 is laid.
  • the pipeline 22 is unwound from the reel 44, advanced in the direction of arrow 66 over the aligner 54 and down into the tower assembly 26 along the firing line 24.
  • the pipeline 22 is straightened by the straightener 60, because the pipeline 22 has previously been plastically deformed due to being wound onto the reel 44.
  • the pipeline 22 is lowered by repetitiously lowering the moving friction clamp 38 relative to the tower assembly 26 until the upper end 34 of the pipeline 22 is in a position in which it can be supported by the hang-off clamp 36.
  • the vessel 10 moves forward in the direction of arrow 64.
  • the moving friction clamp 38 is at the hang-off clamp 36, the hang-off clamp 36 is engaged to the pipeline 22 and the moving friction clamp 38 retrieved to its uppermost position. In this position, the moving friction clamp 38 is engaged to the pipeline 22 and the hang-off clamp released.
  • reel 44 When the reel 44 is empty, it will be replaced by a full reel 44.
  • the reel 44 is uncoupled from the reel coupling 52, and removed from the active reel position 42.
  • the empty reel 44 may be removed from the vessel 10, or moved to an inactive reel position on board the vessel 10, as will be discussed with reference to Figure 3.
  • the vessel 10 is shown wherein a top section 68 of the tower assembly 24 is removed and replaced by a different top section 68.
  • the vessel 10 is capable of laying pipeline in J-lay mode, wherein the pipe sections 35 which are to be connected to the free end of the pipeline are pre- assembled from six shorter pipes.
  • the pipe sections 35 may have a length of 73 meter. Other lengths are also possible.
  • the vessel 10 is shown wherein a top section 68 of the tower assembly 24 is configured for reeling. In this configuration, the vessel 10 is capable of laying pipeline in J- lay mode, wherein the pipe sections 35 which are to be connected to the free end of the pipeline are pre-assembled from four shorter pipes.
  • the pipe sections 35 may have a length of 49 meter. Other lengths are also possible.
  • the pipeline laying vessel 10 is shown, comprising an active reel position 42 and two inactive reel positions 43.
  • inactive reel position 43 it is also possible to provide a single inactive reel position 43, or more than two inactive/storage reel positions 43. In an alternative embodiment, no inactive reel positions 43 are provided.
  • the tower assembly 26 is positioned at a side 46 of the vessel 10.
  • a crane 70 having a working range 72 is provided on the vessel 10 for moving a reel 44 from the active reel position 42 to the inactive reel position 43 and back.
  • the working range 72 overlaps the active and inactive reel positions 42, 43.
  • other means of moving the reels 42 may be provided, such as a track (not shown) extending between the active reel position 42 and the inactive reel positions 43, on which track a reel 44 can roll or slide.
  • the vessel 10 further comprises a pipe section construction ramp 74, comprising two assembly lines 76.
  • Each assembly line 76 comprises a number of working stations 78, which depending on the type of pipeline to be welded, are configured for welding, weld inspection or coating.
  • the assembly lines are used for manufacturing a pipeline from respective pipe sections.
  • a tensioning device 84 is provided at each assembly line 76 configured for giving back- tension when winding an assembled pipeline section 22 onto a reel 44.
  • Drive means 48 are provided for rotating each reel 44 in the inactive position 43 about a rotation axis 85 as the pipeline 22 is wound onto the reel 44.
  • one inactive reel position 43 may be kept empty so that a reel 44 in the active reel position 42 can be moved by the crane 70 to that empty inactive reel position 43.
  • the inactive reel positions 43 thus may have the function of storage of a full reel 44, storage of an empty reel 44 or for reloading an empty reel with a new pipeline 22.
  • An inactive reel position 43 may be selected and a reel 44 may be moved from the active reel position 42 to a selected inactive reel position 43. Different methods of providing a full reel 44 on board the vessel 10 are possible.
  • One way is to assemble a pipeline section 22 on board an auxiliary vessel, and to wind the pipeline section onto the reel 44 on board the auxiliary vessel. Then, the full reel 44 can be transferred to the pipeline laying vessel 10 from the auxiliary vessel. Another way is to assemble a pipeline section on shore, and to wind the pipeline section onto a reel 44 on shore. When the vessel 10 is positioned at the quayside, the full reel 44 can be transferred to the vessel. Alternatively, the full reel may be transferred from the shore to the vessel 10 by an auxiliary vessel. Other possibilities also exist.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

L'invention concerne un navire de pose de conduite (10) comprenant : un assemblage de connexion (16) conçu pour poser une conduite (22) en connectant des sections de conduite consécutives (35) à une extrémité libre (34) de la conduite (22) ; un assemblage de déroulement (18) conçu pour poser une conduite (22) en déroulant une section de conduite (22) d'un dévidoir (44) ; l'assemblage de connexion (16) et l'assemblage de déroulement (18) ayant au moins en commun une partie d'un assemblage de support (26, 38, 63) permettant de supporter la conduite (22) et/ou une section de conduite (35), le navire de pose de conduite (10) comprenant de plus une position de dévidoir actif (42) dans laquelle un dévidoir (44) est positionné pendant le déroulement de la section de conduite (22) à partir du dévidoir, et le navire de pose de conduite étant conçu pour permettre de déplacer un dévidoir en position de dévidoir actif (42) et de le retirer de la position de dévidoir actif (42). L'invention concerne de plus une méthode de pose de conduite et un dévidoir à utiliser dans le navire selon l'invention.
PCT/NL2006/000198 2006-04-14 2006-04-14 Navire de pose de conduite et méthode de pose d'une conduite en environnement marin WO2007120035A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/NL2006/000198 WO2007120035A1 (fr) 2006-04-14 2006-04-14 Navire de pose de conduite et méthode de pose d'une conduite en environnement marin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/NL2006/000198 WO2007120035A1 (fr) 2006-04-14 2006-04-14 Navire de pose de conduite et méthode de pose d'une conduite en environnement marin

Publications (1)

Publication Number Publication Date
WO2007120035A1 true WO2007120035A1 (fr) 2007-10-25

Family

ID=37459328

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NL2006/000198 WO2007120035A1 (fr) 2006-04-14 2006-04-14 Navire de pose de conduite et méthode de pose d'une conduite en environnement marin

Country Status (1)

Country Link
WO (1) WO2007120035A1 (fr)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008156352A1 (fr) * 2007-06-18 2008-12-24 Itrec B.V. Navire de pose de canalisation
WO2009153354A3 (fr) * 2008-06-20 2010-02-25 Saipem Spa Navire de pose de conduites et procédé de pose de pipeline
WO2010107319A1 (fr) * 2009-03-16 2010-09-23 Cecon Asa Ensemble de pose de canalisation
WO2012101233A3 (fr) * 2011-01-28 2012-11-15 Saipem S.P.A. Navire de pose de tuyaux et procédé de pose de pipeline
NL2008456C2 (en) * 2012-03-09 2013-09-10 Heerema Marine Contractors Nl Improved reeling system.
US9874295B2 (en) 2011-01-28 2018-01-23 Saipem S.P.A. Clamp assembly for pipe-laying vessel and method of laying a pipeline
CN118309843A (zh) * 2024-02-21 2024-07-09 青岛安装建设股份有限公司 一种海底管道铺设用牵引沉管装置及方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3685305A (en) * 1970-08-17 1972-08-22 Santa Fe Int Corp Column stabilized stinger
GB2025566A (en) * 1978-05-05 1980-01-23 Santa Fe Int Corp Pipe laying ship
EP0661488A1 (fr) * 1993-12-29 1995-07-05 McDERMOTT INTERNATIONAL, INC. Dispositif pour la pose verticale de tuyaux
GB2287518A (en) * 1994-03-16 1995-09-20 Stena Offshore Ltd Pipe laying vessel
EP1063163A2 (fr) * 1999-06-24 2000-12-27 Global Industries, Limited Barge pour la pose de canalisation avec une bobine horizontale
WO2001018349A1 (fr) * 1999-09-08 2001-03-15 Petróleo Brasileiro S.A. - Petrobras Procede d'installation d'une colonne montante a catenaire sous la mer
US6371694B1 (en) * 1999-04-30 2002-04-16 Coflexip Vessel for laying rigid pipes at great depth
US20030044235A1 (en) * 2001-07-03 2003-03-06 Lyle Stockstill Reel type pipeline laying ship and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3685305A (en) * 1970-08-17 1972-08-22 Santa Fe Int Corp Column stabilized stinger
GB2025566A (en) * 1978-05-05 1980-01-23 Santa Fe Int Corp Pipe laying ship
EP0661488A1 (fr) * 1993-12-29 1995-07-05 McDERMOTT INTERNATIONAL, INC. Dispositif pour la pose verticale de tuyaux
GB2287518A (en) * 1994-03-16 1995-09-20 Stena Offshore Ltd Pipe laying vessel
US6371694B1 (en) * 1999-04-30 2002-04-16 Coflexip Vessel for laying rigid pipes at great depth
EP1063163A2 (fr) * 1999-06-24 2000-12-27 Global Industries, Limited Barge pour la pose de canalisation avec une bobine horizontale
WO2001018349A1 (fr) * 1999-09-08 2001-03-15 Petróleo Brasileiro S.A. - Petrobras Procede d'installation d'une colonne montante a catenaire sous la mer
US20030044235A1 (en) * 2001-07-03 2003-03-06 Lyle Stockstill Reel type pipeline laying ship and method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8360686B2 (en) 2007-06-18 2013-01-29 Itrec B.V. Pipelaying vessel
WO2008156352A1 (fr) * 2007-06-18 2008-12-24 Itrec B.V. Navire de pose de canalisation
US8622655B2 (en) 2008-06-20 2014-01-07 Saipem S.P.A. Pipe-laying vessel and method of laying a pipeline
WO2009153354A3 (fr) * 2008-06-20 2010-02-25 Saipem Spa Navire de pose de conduites et procédé de pose de pipeline
US9964233B2 (en) 2008-06-20 2018-05-08 Saipem S.P.A. Pipe-laying vessel and method of laying a pipeline
EP2631519A1 (fr) * 2008-06-20 2013-08-28 Saipem S.p.A. Navire de pose de conduites et procédé de pose d'un pipeline
EP2631520A1 (fr) * 2008-06-20 2013-08-28 Saipem S.p.A. Navire de pose de conduites et procédé de pose d'un pipeline
WO2010107319A1 (fr) * 2009-03-16 2010-09-23 Cecon Asa Ensemble de pose de canalisation
US9874295B2 (en) 2011-01-28 2018-01-23 Saipem S.P.A. Clamp assembly for pipe-laying vessel and method of laying a pipeline
CN103403428A (zh) * 2011-01-28 2013-11-20 塞彭公司 管敷设船以及敷设管线的方法
RU2606540C2 (ru) * 2011-01-28 2017-01-10 САЙПЕМ С.п.А. Трубоукладочное судно (варианты) и способ укладки трубопровода (варианты)
WO2012101233A3 (fr) * 2011-01-28 2012-11-15 Saipem S.P.A. Navire de pose de tuyaux et procédé de pose de pipeline
RU2701981C2 (ru) * 2011-01-28 2019-10-02 САЙПЕМ С.п.А. Трубоукладочное судно (варианты) и способ укладки трубопровода
US10591088B2 (en) 2011-01-28 2020-03-17 Saipem S.P.A. Pipe-laying vessel and method of laying a pipeline
WO2013133716A1 (fr) 2012-03-09 2013-09-12 Heerema Marine Contractors Nederland Se Système d'enroulement perfectionné
NL2008456C2 (en) * 2012-03-09 2013-09-10 Heerema Marine Contractors Nl Improved reeling system.
CN118309843A (zh) * 2024-02-21 2024-07-09 青岛安装建设股份有限公司 一种海底管道铺设用牵引沉管装置及方法

Similar Documents

Publication Publication Date Title
US6554538B2 (en) Reel type pipeline laying ship and method
US10125895B2 (en) Marine pipeline installation vessel and method
US6702519B2 (en) Reel type pipeline laying ship and method
US6733208B2 (en) Reel type pipeline laying ship and method
US7955028B2 (en) Marine pipelaying system and method for installing an offshore pipeline that includes one or more accessories
AU764207B2 (en) Deep water pipelaying ship
US8905676B2 (en) Marine pipeline installation system and methods
WO2007120035A1 (fr) Navire de pose de conduite et méthode de pose d'une conduite en environnement marin
US20110274498A1 (en) Pipelay vessel
AU2008233376A1 (en) Pipeline laying vessel and method of laying a pipeline
AU2012204941B2 (en) Device for laying a duct in an expanse of water, and related structure and method
US6149347A (en) Methods of laying seabed pipelines
NO336019B1 (no) Installasjon til fremstilling av kveilede, stive, rørformede ledninger
GB2439295A (en) Method and vessel for laying reeled articles at sea
GB2469519A (en) A pipeline J-lay apparatus having two erector arms for loading pipe sections
DK2457008T3 (en) INSTALLATION AND PROCEDURE FOR UNDER SEASON PIPING OF A PIPE COIL
WO2015040374A1 (fr) Procédés de pose de canalisations améliorés
KR101347356B1 (ko) 파이프부설선 및 이를 이용한 해저 파이프라인 부설장치와 부설방법
CN114423982A (zh) 海洋卷筒式管道铺设船
Christiani Ultra deepwater reel and flexible pipelay vessel for pre-salt field developments
GB2595824A (en) System and method for laying a pipe with a large radius of curvature and low weight on the seabed
AU2002354783A1 (en) Reel type pipeline laying ship and method
NO335832B1 (no) Anordning og fremgangsmåte for legging av et langstrakt element fra et fartøy

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 06733005

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 06733005

Country of ref document: EP

Kind code of ref document: A1