WO2007108486A1 - 履帯リンク及び履帯リンクの製造方法 - Google Patents

履帯リンク及び履帯リンクの製造方法 Download PDF

Info

Publication number
WO2007108486A1
WO2007108486A1 PCT/JP2007/055736 JP2007055736W WO2007108486A1 WO 2007108486 A1 WO2007108486 A1 WO 2007108486A1 JP 2007055736 W JP2007055736 W JP 2007055736W WO 2007108486 A1 WO2007108486 A1 WO 2007108486A1
Authority
WO
WIPO (PCT)
Prior art keywords
cooling
crawler belt
tread
belt link
surface portion
Prior art date
Application number
PCT/JP2007/055736
Other languages
English (en)
French (fr)
Inventor
Kazuhide Okawa
Hiroshi Sunada
Haruka Konno
Original Assignee
Komatsu Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd. filed Critical Komatsu Ltd.
Publication of WO2007108486A1 publication Critical patent/WO2007108486A1/ja

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D55/00Endless track vehicles
    • B62D55/08Endless track units; Parts thereof
    • B62D55/18Tracks
    • B62D55/20Tracks of articulated type, e.g. chains
    • B62D55/205Connections between track links
    • B62D55/21Links connected by transverse pivot pins
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K23/00Making other articles
    • B21K23/02Making other articles members of endless tracks, e.g. track guides, shoes
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/06Surface hardening
    • C21D1/09Surface hardening by direct application of electrical or wave energy; by particle radiation
    • C21D1/10Surface hardening by direct application of electrical or wave energy; by particle radiation by electric induction
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Definitions

  • the present invention relates to a crawler belt link and a method of manufacturing the crawler belt link, and in particular, the present invention relates to a crawler belt link and a production of the crawler belt link that can obtain a desired hardness distribution for each portion of the crawler belt link with a small amount of process. Regarding the method.
  • FIG. 11 is a configuration diagram showing a traveling device provided with the crawler belt link 3.
  • a pair of left and right traveling devices 10 as shown in FIG. 11 are arranged at the bottom of the tracked vehicle body.
  • the traveling device 10 has a crawler belt 1.
  • the crawler belt 1 is formed by connecting the crawler belts 2 with bolts or welded joints to each crawler belt link 3 in a ring shape with connecting pins 4.
  • the traveling device 10 includes a track frame 5 disposed along the vehicle front-rear direction, and an idler 6 and a sprocket 7 that are rotatably attached to the front and rear end directions of the track frame 5.
  • the lower part of the track frame 5 has a pair of lower and lower wheels 8 and 8 that are supported in a vertically swingable and rotatable manner.
  • a roller device 9a and a lower roller device 9b having one lower roller 8 supported so as to be vertically swingable and rotatable are provided.
  • the lower roller 8 of each of the lower roller devices 9a and 9b is configured to abut against the tread portion of the crawler belt link 3 and roll.
  • FIG. 12 is a partially exploded perspective view of the crawler belt 1 shown in FIG.
  • the crawler belt 1 includes a crawler plate 2, a crawler belt link 3, a bush 11, a connecting pin 4, and a dust seal 12.
  • the bush 11 is strongly pressed into the crawler belt link 3, and the connecting pin 4 is loosely fitted into the bush.
  • the connecting pin 4 is strongly press-fitted and connected to the crawler belt link 3 located outside the crawler belt link 3, and the crawler belt 1 is bent between the bush 11 and the connecting pin 4.
  • FIG. 13 (a) is a side view of the crawler belt link 3
  • FIG. 13 (b) is a plan view of the crawler belt link 3 as viewed from the crawler plate mounting surface portion 14.
  • the crawler belt link 3 is formed with a tread surface portion 13 that is in rolling contact with the lower wheel 8 while supporting the vehicle weight. This tread 13 Is also the tread of Idler 6.
  • a footwear mounting surface portion 14 for attaching the footwear 2 is formed on the opposite side of the tread surface portion 13, a bush hole 16 into which the bush 11 is inserted is formed at one end of the crawler belt link 3, and a pin hole 15 into which the connecting pin 4 is inserted and a dust seal 12 are inserted into the other end of the crawler belt link 3.
  • the crawler belt link 3 is formed with a bolt hole 17 through which a mounting bolt for the crawler plate 2 is inserted, and a nut seat surface (not shown) on which a nut for mounting the crawler plate 2 (not shown) is seated.
  • a space indicated by reference numeral 18 is a window portion for accommodating a mounting nut.
  • the crawler belt link 3 has different desired hardness and strength depending on each part! Since the tread 13 is in continuous contact with the lower roller 8, it must be wear resistant. Therefore, it is important to have high hardness and high strength. Further, since the shoe mounting surface portion 14 is in surface contact with the shoe and bolts, it needs to have a hardness that does not cause sag. In addition, the corner portion of the window portion 18 on the side of the footwear mounting surface 14 tends to generate high stress during operation, and also requires high hardness from the viewpoint of improving fatigue strength. However, it is necessary to ensure the surface roughness with a mechanical cage so that the bolts do not loosen when bolting the shoe, and machinability is required. It is important that the surface hardness is lower than that of the tread portion 13.
  • a crawler belt link is formed by forging at about 1200 ° C. Then, it is reheated to about 750 ° C or higher, and the force is rapidly cooled, that is, quenched. Next, in order to ensure toughness and machinability, the entire crawler belt link is tempered (high temperature tempering process) at about 500 ° C. Next, after the end face processing is performed, the tread portion is subjected to induction hardening and tempering treatment to improve the hardness and strength of the tread portion. After that, roughing and finishing are performed on the pin hole and bushing hole of the crawler belt link, and finally the nut bearing surface is processed.
  • tempering instead of tempering at about 500 ° C (high-temperature tempering), tempering (low-temperature tempering) was performed at a temperature of 200 ⁇ 50 ° C, and the high hardness obtained by quenching There is also a method of effectively using high intensity (for example, Patent Document 1).
  • Patent Document 1 JP-A-9-78136
  • the above-described conventional method for manufacturing a crawler belt link requires five times of heating, including forging, overall reheat quenching, overall tempering, tread surface induction quenching, and tread surface low temperature tempering, and the number of processes is excessive. It takes a lot of time and effort.
  • the present invention has been made in consideration of the above-described circumstances, and an object of the present invention is to provide a crawler belt link that can appropriately obtain a desired hardness distribution for each portion of the crawler belt link with a small number of steps. It is to provide a method of manufacturing a crawler belt link.
  • a method for manufacturing a crawler belt link according to the present invention includes hot-forging a crawler belt link having a tread surface portion, a crawler plate mounting surface portion at a position facing the tread surface portion, and a window portion on a side surface.
  • the first cooling rate is a cooling rate at which the tread surface is quenched.
  • the first cooling rate is 60 ° CZ seconds or more
  • the second cooling rate is 9 to 13 ° CZ seconds
  • the third cooling rate is Is preferably 6 to 10 ° CZ seconds.
  • the tread portion may be tempered by reheating from the residual heat of a portion other than the tread portion in the crawler belt link.
  • the cooling ability to the tread portion may be weakened even if the cooling of the tread portion is stopped.
  • the internal temperature of the entire crawler belt link reaches within the range of 150 ° C to 250 ° C, all cooling to the crawler belt link may be stopped.
  • the crawler belt link is disposed in a cooling tank, and an inner surface of the cooling tank is arranged. Further, it may be a step of cooling by injecting a coolant from at least one cooling nozzle arranged in each of the lower part and the upper part. At this time, it is preferable that the spray is water, air, or a mixture of water and air.
  • a crawler belt link according to the present invention is a crawler belt link that is formed by hot forging and has a window on a side surface that has been subjected to cooling treatment after the hot forging,
  • a crotch plate mounting surface portion that is in a position opposite to the tread surface portion and has a lower hardness than the tread surface portion;
  • the corner portion of the window portion on the side of the footwear mounting surface has a hardness lower than that of the tread surface portion, and the remaining portions other than the tread surface portion, the footwear mounting surface portion and the corner portion are the footwear mounting surface described above. It has lower hardness than the face and corners and has hardness
  • the crawler plate mounting surface portion and the corner portion preferably have a Picker hardness of Hv280 to 340. Further, it is preferable that the tread portion has a martensite structure, and other than the tread portion has a mixed structure having at least one of ferrite, pearlite, and bainite.
  • FIG. 1 is a schematic configuration diagram showing a side surface of a cooling device that implements a method for manufacturing a crawler belt link.
  • FIG. 2 is a schematic configuration diagram showing a plane of the cooling device shown in FIG.
  • FIG. 3 is a side view showing the hardness distribution in each part of the crawler belt link according to the embodiment of the present invention.
  • FIG. 4 is a graph showing temperature changes during the production of the crawler belt link.
  • FIG. 5 is a process diagram of a method for manufacturing a crawler belt link according to the present invention.
  • FIG. 6 is a view showing a cooling method when manufacturing the crawler belt link according to the first embodiment.
  • FIG. 7 shows the results of measuring the hardness of the crawler belt link manufactured using the cooling method shown in FIG. Figure.
  • FIG. 8 is a diagram showing the hardness distribution of the tread portion shown in FIG.
  • FIG. 9 is a view showing a cooling method when manufacturing the crawler belt link according to the second embodiment.
  • FIG. 10 is a diagram showing the results of measuring the hardness of a crawler belt link manufactured using the cooling method shown in FIG.
  • FIG. 11 is a configuration diagram showing a traveling device provided with a crawler belt link.
  • FIG. 12 is a partially exploded perspective view of the crawler belt 1 shown in FIG.
  • FIG. 13 (a) is a side view of the crawler belt link, and (b) is a plan view of the crawler belt link as viewed from the crawler plate mounting surface portion.
  • Cooling nozzle 23a, 23b , 23c, 23 d, 23e, 23 "Water tank
  • FIG. 3 is a side view showing the hardness distribution in each part of the crawler belt link according to the embodiment of the present invention. Since the tread surface portion 13 that is in rolling contact with the lower rolling wheel 8 while supporting the weight of the vehicle body is required to have load resistance and wear resistance, it is important to have high hardness and high strength. And it is preferable that the surface hardness in this part is Vickers hardness Hv440-595. Further, at the time of the cooling process after forging, the tread surface portion 13 corresponds to the strong cooling region 19. [0022] In addition, the footwear mounting surface portion 14 and the corner portion of the window portion 18 on the side of the footwear mounting surface portion 14 are subjected to a thrust load from the shoe, so that a relatively high stress is applied.
  • the hardness and strength are lower than the tread portion 13 in order to ensure machinability.
  • the surface hardness in this part is Vickers hardness Hv280-340.
  • the remaining portion of the crawler belt link 3 excluding the strong cooling region 19 and the intermediate cooling regions 20a and 20b corresponds to the weak cooling region 21 during the cooling process after forging.
  • the pin hole 15 and bushing hole 16 have a high strength or high strength, there is a high risk of delayed fracture due to residual stress generated when the connecting pin and bush are press-fitted. Further, when the pin hole 15 and the bush hole 16 after the cooling treatment are finished, it becomes a factor of reducing the working efficiency. Therefore, it is necessary to keep the surface hardness and strength low. And it is preferable that the surface hardness in this part is Vickers hardness Hv250-300.
  • the cooling rate in the strong cooling region 19 is, for example, 60 ° CZ seconds or more
  • the cooling rate in the medium cooling regions 20a, 20b is, for example, 9-13 ° CZ seconds
  • the cooling rate in the weak cooling region 21 Is preferably, for example, 6 to 10 ° CZ seconds.
  • FIG. 1 is a schematic configuration diagram illustrating a side surface of a cooling device that performs a method of manufacturing a crawler belt link according to an embodiment of the present invention.
  • FIG. 2 is a schematic configuration diagram showing a plane of the cooling device shown in FIG.
  • This cooling device is provided with a cooling tank 30 for cooling the crawler belt link 3 formed by forging.
  • a cooling plate 29 is provided in the cooling tank 30 to separate the strong cooling region 19 of the crawler belt link 3 from other portions. As a result, the cooling process in the strong cooling region 19 and the cooling process in other parts are suppressed from affecting each other's cooling process.
  • the coolant for cooling the crawler belt link 3 for example, water, air, or a spray obtained by mixing water and air is used.
  • Water has a fast cooling rate and air has a slow cooling rate.
  • the waste liquid does not adversely affect the environment, and the waste liquid treatment cost is high.
  • each cooling nozzle 22a is provided with a water control valve 23a.
  • the water control valve 23a controls the flow rate of water supplied from the pump 25 via the water pipe 27, or the injection time.
  • each of the cooling nozzles 22a is provided with a water control valve 23a, but it is also possible to provide only one water control valve 23a for controlling the water sprayed from all the cooling nozzles 22a.
  • a plurality of cooling nozzles 22b for injecting a coolant to the middle cooling region 20a of the crawler belt link 3 are arranged in the upper part of the cooling tank 30.
  • Each cooling nozzle 22b is provided with a water control valve 23b and an air control valve 24a.
  • the water control valve 23b controls the flow rate of water supplied from the pump 25 via the water pipe 27, or the injection time.
  • the air control valve 24a controls the flow rate of air supplied from the air compressor 26 through the air pipe 28, or the injection time.
  • the water control valve 23b and the air control valve 24a control the mixing ratio of water and air sprayed from the cooling nozzle 22b.
  • a water control valve 23b and an air control valve 24a are provided for each cooling nozzle 22b, respectively. However, water and air sprayed from all the cooling nozzles 22b are supplied.
  • One water control valve 23b and one wheel control valve 24a may be provided.
  • a plurality of cooling nozzles 22c and 22d for injecting a coolant to the weak cooling region 21 of the crawler belt link 3 are arranged on the left and right side surfaces of the cooling tank 30 as shown in FIG.
  • the cooling nozzles 22c and 22d are provided with water control valves 23c and 23d and air control valves 24b and 24c, respectively.
  • the water control valves 23c and 23d control the flow rate of water supplied from the pump 25 through the water pipe 27, or the injection time.
  • the air control valves 24b and 24c control the flow rate or injection time of the air supplied from the air compressor 26 via the air pipe 28.
  • the water control nozzles 23c and 23d and the air control valves 24b and 24c control the mixing ratio of water and air injected from the cooling nozzles 22c and 22d.
  • the water control valves 23c and 23d and the air control valves 24b and 24c are provided for the cooling nozzles 22c and 22d, respectively.
  • One water control valve 23c, 23d and one air control valve 24b, 24c for controlling the water and air to be injected may be provided.
  • cooling nozzles 22e to 22p are disposed on the front and rear surfaces of the side surface of the cooling tank 30, as shown in FIG.
  • the cooling nozzles 22e to 22p are arranged in three rows vertically (in FIG.
  • cooling nozzles 22g, 22h, 22m, and 22 ⁇ inject coolant into the intermediate cooling region 20b.
  • the cooling nozzles 22e to 22p are provided with water control valves 23e to 23p and air control valves 24d to 24o, respectively.
  • the water control valves 23e to 23p control the flow rate of water supplied from the pump 25 via the water pipe 27, or the injection time.
  • ⁇ 24 ⁇ controls the flow rate of air supplied from the air compressor 26 via the air pipe 28, or the injection time.
  • the water control valve 23e-23p and the air control valve 24d-24o control the mixing ratio of water and air injected from the cooling nozzles 22e-22p. For example, the water flow rate is increased in the middle cooling region 20b, and the air flow rate is increased in the weak cooling region 21.
  • water control valves 23e to 23p and air control valves 24d to 24o are provided for each of the cooling nozzles 22e to 22p, respectively. Even if one water control valve and one air control valve are provided to control water and air injected from all the cooling nozzles that inject the coolant into the middle cooling region 20b among the cooling nozzles 22g, 22h, 22m, and 22 ⁇ . Good. Alternatively, one water control valve and one air control valve may be provided to control the cooling nozzle that injects the coolant into the intermediate cooling regions 20a and 20b. The same configuration may be applied to the other chilled Ronozu Nore 22e, 22f, 22i to 221, 22 ⁇ , and 22 ⁇ .
  • the cooling nozzles 22e to 22p are not limited to the number of three rows, and may be variously changed in accordance with, for example, the size of the crawler belt link 3 or the hardness distribution.
  • the injection of the coolant into the intermediate cooling region 20b is not limited to the upper two rows of the cooling nozzles 22g, 22h, 22m, and 22 ⁇ .
  • the coolant can be variously changed according to the range of the intermediate cooling region 20b. Also good.
  • FIG. 4 is a graph showing a temperature transition when manufacturing the crawler belt link 3 according to the present invention.
  • FIG. 5 is a diagram showing a process of a method for manufacturing a crawler belt link according to the present invention.
  • the crawler belt link 3 is formed by hot forging. Hot forging is performed at a temperature of 1200 ° C, for example.
  • the crawler belt link 3 is cooled.
  • the cooling tank 30 shown in FIG. water, air, and spray mixed with water and air are sprayed from the cooling nozzle to cool the crawler belt link 3.
  • the strong cooling region 19 is quenched with water and quenched. Thereby, the tread portion 13 is hardened by the martensite transformation.
  • the cooling rate is faster than in other regions because water is used as the coolant.
  • the internal temperature of the tread portion 13 is t (for example, 150
  • the cooling process in the strong cooling region 19 is stopped. Or you may weaken a cooling rate. Then, the entire crawler belt link 3 is still hot except for the tread portion 13. Therefore, the remaining heat of the other part of the tread part 13 is recovered. Then, the tread portion 13 is tempered. As a result, the tread portion 13 can increase the fatigue strength by removing the residual stress and recovering the toughness.
  • the tread portion 13 is tempering, the cooling treatment in the intermediate cooling regions 20a, 20b and the weak cooling region 21 is performed, and the temperature inside the tread portion rises to t (400 ° C) or more. Not to
  • the internal temperature of the entire crawler belt link 3 is t (for example, 150
  • the cooling process is stopped in all areas.
  • the crawler plate mounting surface portion 14, the pin hole 15, the bush hole 16, and the nut seat surface are processed. Since the quenching and tempering treatment is not performed on portions other than the tread portion 13, a martensite structure is not formed, and the strength and hardness are not increased more than necessary. Therefore, the processing efficiency at the time of finishing can be improved. Except for the tread portion 13, it is a mixed structure of ferrite, pearlite, and bainite. Therefore, by changing the cooling rate, the ratio of ferrite, pearlite, and bainite can be changed, and a desired hardness distribution can be formed according to the part.
  • the hardness and strength distribution required for the crawler belt link 3 can be obtained by only one heating at the time of forging. Therefore. It is possible to obtain the desired hardness distribution appropriately for each part with a small number of processes. It takes time and effort.
  • the tread portion 13 is subjected to quenching and tempering treatment, high hardness and high strength can be obtained.
  • the tempering process of the tread part 13 is performed at a low temperature of 400 ° C or less because the residual heat of the crawler belt link 3 is reheated and tempered, so the crawler belt with a large heat capacity such as a large link or a straddled structure is used. It can also be applied to a small crawler track link that goes only with the link.
  • all parts of the crawler belt link 3 are continuously cooled to a low temperature, hardness unevenness does not occur.
  • the quenching and tempering treatment is not performed on portions other than the tread portion 13.
  • the coolant sprayed from each cooling nozzle can be independently controlled. Therefore, it is possible to perform fine hardness control within one crawler belt link 3, and by strengthening necessary portions, it is possible to reduce the weight and cost by eliminating the waste of the crawler belt link 3.
  • the cooling nozzle 22a may be configured to inject water and air in the same manner as other cooling nozzles. If necessary, the cooling rate of the intermediate cooling region 20a of the footplate mounting surface 14 and the intermediate cooling region 20b near the window 18 may be changed.
  • the force showing water and air as an example of the coolant of the crawler belt link 3 is not limited to this, and in order to facilitate temperature control, oil, a solibble, an organic heat transfer fluid, a polymer heat transfer fluid, or these Even a mixture of.
  • the squeeze plate 29 for separating the strong cooling region 19 from other parts is provided, but the present invention is not limited to this, and a configuration without the squeeze plate 29 may be provided.
  • the hobbing portion 13 and the crawler plate mounting surface part 14 are kept hot while maintaining the residual forging heat. You may give a tosiebing process. In this case, since the force is applied with relatively low hardness and strength, the processing efficiency can be improved.
  • tread portion 13 may be subjected to a hot shaving cache treatment before the cooling treatment, and the crawler plate mounting surface portion 14 may be subjected to a milling force after the cooling treatment.
  • the shoeboard mounting surface portion 14 has lower hardness and strength than the tread surface portion 13, so that the processing efficiency is not significantly reduced even if the processing is performed after the cooling treatment.
  • FIG. 6 is a diagram showing a cooling method when manufacturing the crawler belt link according to the first embodiment of the present invention.
  • FIG. 6 (A) is a diagram showing the relationship between the injection pressure and the timing at which the mist mixed with air and water is injected from the upper cooling nozzle 22b shown in FIG.
  • Fig. 6 is a diagram showing the relationship between the timing of jetting air from the lateral cooling nozzles 22c to 22p shown in Fig. 1 and Fig. 2 and the injection pressure. It is a figure which shows the relationship between the timing and the injection pressure which inject the water spray which mixed a small amount of air and water from the nozzle 22a.
  • FIG. 7 is a diagram showing the results of measuring the hardness of the crawler belt link manufactured using the cooling method shown in FIG.
  • FIG. 8 is a diagram showing the hardness distribution of the tread portion shown in FIG.
  • the crawler belt link is formed by hot forging at a temperature of 1200 ° C.
  • the track link weighs 1 45 kg, the chemical components C:.. 0. 32 ⁇ 0 39 weight 0 / o, Si: 0. 15 ⁇ 0 35 weight 0/0, Mn:.. L 2 0 ⁇ 1 50% by weight, Cr: 0.35% by weight or less, steel material with the balance Fe and inevitable impurities.
  • the crawler belt link is cooled by the cooling method shown in FIGS. 6 (A) to 6 (C).
  • the cooling method shown in FIGS. 6 (A) to 6 (C) Set the crawler belt link with the tread surface facing downward in the cooling tank 30 shown in FIG.
  • a mist mixed with water and air is sprayed from the cooling nozzle, air is sprayed, and a water spray mixed with a small amount of air and water is sprayed to cool the crawler belt link.
  • the mist sprayed from the upper cooling nozzle 22b and the air sprayed from the lateral cooling nozzles 22c to 22p are alternately jetted without simultaneously jetting.
  • the injection pressure is gradually lowered. That is, the horizontal cooling nozzles 22c to 22p are injected with the injection pressure PI 1 from time 0 to time Tl 1 and the upper cooling nozzle 22b is injected from time Tl 1 to time 12 with the injection pressure P1 to cool the side cooling.
  • Nozzles 22c to 22p are smaller than PI 1 from time T12 to time T13!
  • Fig. 6 (C) water spray mixed with water and a small amount of air is continuously sprayed from the lower cooling nozzle 22a. Then, the injection pressure is lowered stepwise. That is, the lower cooling nozzle 22a is injected from time 0 to time T21 at an injection pressure P31, from time T21 to time T22 is injected at an injection pressure P32 smaller than P31, and from time T22 to time T23 is smaller than P32 Injected with a shooting pressure of P33.
  • the time axes correspond to each other in FIGS. 6A to 6C, the time T21 is between the times Tl 1 and T12, the time T22 is between the times T13 and T14, and the time T23 is the time Between T15 and T16.
  • the tread portion is quenched and quenched by cooling with water spray shown in FIG. 6 (C), and the tread portion is hardened by martensitic transformation. .
  • the water spray is applied to the coolant sprayed from the lower cooling nozzle 22a, the tread portion is cooled faster than the other regions.
  • FIG. 7 shows the measurement results.
  • the crawler belt link tread was cut at the position indicated by the dotted line in FIG. 7, and the hardness of the cut surface along the 1 to 3 arrows was measured.
  • Fig. 8 shows the relationship between the distance from the tread and the hardness of the part along the arrows 1 to 3 that are the measurement results.
  • a hardened layer is formed on the tread portion at a depth of 10 to 15 mm from the tread surface, It was confirmed that the hardness of the hardened layer was Vickers hardness Hv440-595.
  • FIG. 9 is a diagram showing a cooling method when manufacturing the crawler belt link according to the second embodiment of the present invention.
  • FIG. 9 (A) is a diagram showing the relationship between the timing of jetting air from the upper cooling nozzle 22b shown in FIG. 1 and the injection pressure
  • FIG. 9 (B) is the lower diagram shown in FIG.
  • FIG. 6 is a diagram showing the relationship between the injection pressure and the timing at which a water spray mixed with a small amount of air and water is injected from the cooling nozzle 22a on the side.
  • FIG. 10 is a diagram showing the results of measuring the hardness of the crawler belt link manufactured using the cooling method shown in FIG.
  • a crawler belt link is formed by hot forging at a temperature of 1200 ° C.
  • the track link weighs 0 58kg, the chemical components C:.. 0. 37 ⁇ 0 44 weight 0 / o, Si: 0. 15 ⁇ 0 35 weight 0/0, Mn:.. L 3 5 ⁇ 1 65% by weight, Cr: 0.30% by weight or less, steel material with the balance Fe and inevitable impurities.
  • the crawler belt link is cooled by the cooling method shown in FIGS. 9 (A) and 9 (B).
  • air is sprayed from the cooling nozzle and water spray mixed with water and air is sprayed to cool the crawler belt link.
  • air is continuously injected from the upper cooling nozzle 22b.
  • the injection pressure is lowered step by step. That is, the upper cooling nozzle 22b is injected from time 0 to time T31 at an injection pressure P41, from time T31 to time T32, is injected at an injection pressure P42 smaller than P41, and from time T32 to time T33 at an injection pressure P43 smaller than P42.
  • Spray Do not spray water and air from the cooling nozzle on the side.
  • a water spray in which water and a small amount of air are mixed is continuously ejected from the lower cooling nozzle 22a.
  • the injection pressure is lowered stepwise. That is, the lower cooling node Swell 22a is injected from time 0 to time T41 at an injection pressure P51, from time T41 to time T42 at an injection pressure P52 smaller than P51, and from time T42 to time T32 at an injection pressure P53 smaller than P52.
  • the time axes correspond to each other in FIGS. 9A and 9B, the time T41 is between time 0 and T31, and the time T42 is between time T31 and T32.
  • the tread portion is quenched and quenched by cooling with water spray shown in FIG. 9B, and the tread portion is hardened by martensitic transformation. .
  • the water spray is applied to the coolant sprayed from the lower cooling nozzle 22a, the tread portion is cooled faster than the other regions.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Thermal Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Heat Treatment Of Articles (AREA)
  • Forging (AREA)

Abstract

 少ない工程で履帯リンクの各部分に対して所望の硬度分布を得る。本発明の履帯リンクの製造方法は、踏面部13、該踏面部13に相対する位置に履板取付面部14、及び側面に窓部18を有する履帯リンク3を熱間鍛造により成形する工程と、前記踏面部13を第1の冷却速度で冷却し、且つ前記履板取付面部14、及び前記窓部18の前記履板取付面部側のコーナー部を、前記第1の冷却速度よりも遅い第2の冷却速度で冷却し、且つ前記履帯リンク3における前記踏面部、前記履板取付面部、及び前記コーナー部を除いた残りの部分を、前記第2の冷却速度よりも遅い第3の冷却速度で冷却する工程とを具備し、前記第1の冷却速度は前記踏面部13が焼入れ処理される冷却速度である。

Description

明 細 書
履帯リンク及び履帯リンクの製造方法
技術分野
[0001] 本発明は、履帯リンク及び履帯リンクの製造方法に関し、特に本発明は、少ないェ 程で履帯リンクの各部分に対して所望の硬度分布を得ることができる履帯リンク及び 履帯リンクの製造方法に関する。
背景技術
[0002] 図 11は、履帯リンク 3を備えた走行装置を示す構成図である。装軌式車体下部に は図 11に示すような左右一対の走行装置 10が配設されて ヽる。走行装置 10は履帯 1を有する。履帯 1は、履板 2がボルトで締着された又は溶接で接合された各履帯リン ク 3を連結ピン 4により環状に連結して構成されて 、る。
[0003] 走行装置 10は、車両前後方向に沿って配設されたトラックフレーム 5と、トラックフレ ーム 5の前後両端方向に回転自在に取り付けられたアイドラ 6及びスプロケット 7とを 備えている。また、アイドラ 6及びスプロケット 7の間で、トラックフレーム 5の下部には、 上下揺動自在に且つ回転自在に支持された前後 1対の下転輪 8,下転輪 8を有する 3組の下転輪装置 9aと、上下揺動自在に且つ回転自在に支持された 1つの下転輪 8 を有する下転輪装置 9bとがそれぞれ設けられている。下転輪装置 9a, 9bそれぞれ の下転輪 8は、履帯リンク 3の踏面部に当接して転動するようになっている。
[0004] 図 12は、図 11に示す履帯 1を一部分解した斜視図である。履帯 1は、履板 2、履帯 リンク 3、ブッシュ 11、連結ピン 4及びダストシール 12により構成されている。各要素の 連結方法は、図 11に示すように履帯リンク 3にブッシュ 11が強く圧入され、そのブッ シュの中に連結ピン 4がゆるく滑合されて 、る。その連結ピン 4は履帯リンク 3の外側 に位置する履帯リンク 3に強く圧入され連結し、履帯 1の屈曲はブッシュ 11と連結ピン 4との間で行われる。
[0005] 図 13 (a)は、履帯リンク 3の側面図であり、図 13 (b)は履板取付面部 14からみた履 帯リンク 3の平面図である。履帯リンク 3には、図 13 (a)に示すように、上面に車体重 量を支えつつ下転輪 8と転がり接触する踏面部 13が形成されている。この踏面部 13 はアイドラ 6の踏面でもある。また、踏面部 13の反対側には履板 2を取り付ける履板 取付面部 14が形成されている。また、履帯リンク 3の一端部にはブッシュ 11が嵌挿さ れるブッシュ孔 16が形成され、履帯リンク 3の他端部には連結ピン 4が嵌挿されるピン 孔 15及びダストシール 12を嵌着するシールカウンタボア(図示せず)がそれぞれ同 心で形成されている。また、履帯リンク 3には、履板 2の取付用ボルトを挿通するボル ト孔 17、履板 2の取付用ナット(図示せず)を座らせるナット座面(図示せず)などが形 成されている。尚、参照符号 18で示される空間は、取付用ナットを収めるための窓部 である。
[0006] 履帯リンク 3は、各部分に応じてそれぞれ所望の硬さや強度が異なって!/、る。踏面 部 13は、下転輪 8と連続的に接触するため、耐磨耗性が必要である。よって、高硬度 及び高強度であることが重要である。また、履板取付面部 14はシユーとボルト締結に より面接触するためへたりが生じないような硬度が必要である。また、窓部 18の履板 取付面部 14側のコーナー部は稼動中に高応力が発生しやすく疲労強度向上面から やはり高硬度が必要である。しかし、これらの部位はシユーをボルト締結する際、ボル トゆるみが生じないように機械カ卩ェにて面あらさを確保する必要があり、被削性が必 要である。踏面部 13よりも表面硬さは低 、ことが重要である。
[0007] 履帯リンクの所望の硬度分布を得る従来の方法として、約 1200°Cで鍛造処理を行 い履帯リンクを成形する。そして、約 750°C以上に再加熱し、そこ力も急冷、すなわち 焼入れ処理を行う。次いで、靭性及び被削性を確保するために履帯リンク全体を約 5 00°Cで焼戻し処理 (高温焼戻し処理)を行う。次いで、端面加工を行った後に、踏面 部に高周波焼入れ焼戻し処理を行い、踏面部の硬さ及び強度を向上させる。その後 、履帯リンクのピン孔及びブッシュ孔に、荒加工及び仕上げ加工を施し、最後にナツ ト座面加工を行う。
[0008] また、約 500°Cで焼戻し処理(高温焼戻し処理)を行う代わりに、 200± 50°Cの温 度で焼戻し処理 (低温焼戻し処理)を行 、、焼入れ処理で得られた高硬度及び高強 度を有効に利用する方法もある(例えば、特許文献 1)。
特許文献 1 :特開平 9— 78136号公報
発明の開示 発明が解決しょうとする課題
[0009] 上記従来の履帯リンクの製造方法は、製造時に鍛造、全体再加熱焼入れ、全体焼 戻し、踏面部高周波焼入れ、及び踏面部低温焼戻しの 5回の加熱が必要で工程数 が多ぐ余分な時間と手間がかかっている。
[0010] 本発明は上記のような事情を考慮してなされたもので、その目的は、少ない工程で 履帯リンクの各部分に対して、適切に所望の硬度分布を得ることができる履帯リンク 及び履帯リンクの製造方法を提供することにある。
課題を解決するための手段
[0011] 上記課題を解決するため、本発明に係る履帯リンクの製造方法は、踏面部、該踏 面部に相対する位置に履板取付面部、及び側面に窓部を有する履帯リンクを熱間 鍛造により成形する工程と、
前記踏面部を第 1の冷却速度で冷却し、且つ前記履板取付面部、及び前記窓部 の前記履板取付面部側のコーナー部を、前記第 1の冷却速度よりも遅い第 2の冷却 速度で冷却し、且つ前記履帯リンクにおける前記踏面部、前記履板取付面部、及び 前記コーナー部を除いた残りの部分を、前記第 2の冷却速度よりも遅い第 3の冷却速 度で冷却する工程と、
を具備し、
前記第 1の冷却速度は前記踏面部が焼入れ処理される冷却速度である。
[0012] この履帯リンクの製造方法において、前記第 1の冷却速度は、 60°CZ秒以上であり 、前記第 2の冷却速度は、 9〜13°CZ秒であり、前記第 3の冷却速度は、 6〜10°CZ 秒であることが好ましい。
[0013] そして、前記踏面部が焼入れされた後、前記履帯リンクにおける前記踏面部以外 の部分の残熱からの復熱により、前記踏面部は焼戻しされてもよい。この時、前記踏 面部の内部温度が 150°Cから 250°Cの範囲内に達したときに前記踏面部の冷却を 停止してもよぐ前記踏面部への冷却能を弱めてもよい。また、前記履帯リンク全体の 内部温度が 150°Cから 250°Cの範囲内に達したときに前記履帯リンクへの全ての冷 却を停止してもよい。
[0014] また、前記冷却する工程は、前記履帯リンクを冷却槽に配置し、該冷却槽の内側面 、下部及び上部それぞれに少なくとも 1つ配置された冷却ノズルカゝら冷却剤を噴射さ せて冷却する工程であってもよい。この時、水、エアー、又は水とエアーを混合させ た噴霧であることが好まし 、。
[0015] 本発明にかかる履帯リンクは、熱間鍛造により成形され、前記熱間鍛造後に冷却処 理が行われた側面に窓部を有する履帯リンクであって、
Hv440〜595のビッカース硬さを有する踏面部と、
前記踏面部に相対する位置にあり、前記踏面部より低い硬度を有する履板取付面 部と、
を具備し、
前記窓部の前記履板取付面部側のコーナー部は前記踏面部より低い硬度を有し 、前記踏面部、前記履板取付面部及び前記コーナー部を除いた残りの部分は、前 記履板取付面部及び前記コーナー部より低!、硬度を有して 、る
[0016] この履帯リンクにおいて、前記履板取付面部及び前記コーナー部の硬さはピッカー ス硬さ Hv280〜340であることが好ましい。また、前記踏面部は、マルテンサイト組織 を有し、前記踏面部以外はフェライト、パーライト、及びべ一ナイトの少なくとも 1つを 有する混合組織であることが好ま 、。
発明の効果
[0017] 以上説明したように、本発明によれば、少ない工程で履帯リンクの各部分に対して 、適切に所望の硬度分布を得ることができる履帯リンク及び履帯リンクの製造方法を 提供することができる。
図面の簡単な説明
[0018] [図 1]履帯リンクの製造方法を実施する冷却装置の側面を示す概略構成図。
[図 2]図 1に示す冷却装置の平面を示す概略構成図。
[図 3]本発明の実施形態に係る履帯リンクの各部分での硬度分布を示す側面図。
[図 4]履帯リンクの製造時の温度変化を示すグラフ。
[図 5]本発明に係る履帯リンクの製造方法の工程図。
[図 6]実施例 1による履帯リンクを製造する際の冷却方法を示す図。
[図 7]図 6に示す冷却方法を用いて製造した履帯リンクの硬度を測定した結果を示す 図。
[図 8]図 7に示す踏面部の硬度分布を示す図。
[図 9]実施例 2による履帯リンクを製造する際の冷却方法を示す図。
[図 10]図 9に示す冷却方法を用いて製造した履帯リンクの硬度を測定した結果を示 す図。
[図 11]履帯リンクを備えた走行装置を示す構成図。
[図 12]図 11に示す履帯 1を一部分解した斜視図。
[図 13] (a)は、履帯リンクの側面図、 (b)は、履帯リンクを履板取付面部からみた平面 図。
符号の説明
[0019] 1…履帯、 2…履板、 3…履帯リンク、 4…連結ピン、 5···トラックフレーム、 6…アイドラ 、 7···スプロケット、 8…下転輪、 9a, 9b…転輪装置、 10…走行装置、 11···ブッシュ、 12…ダストシール、 13···踏面部、 14··履板取付面部、 15…ピン孔、 16···ブッシュ 孔、 17···ボルト孔、 18···窓部、 19··強冷却領域、 20a, 20b…中冷却領域、 21··· 弱冷却領域、 22a, 22b, 22c, 22d, 22e, 22f…冷却ノズル、 23a, 23b, 23c, 23 d, 23e, 23 "水帘||御ノ ノレブ、 24a, 24b, 24c, 24d, 24e,,-エアー ffiU御ノ ノレブ、 2 5···ポンプ、 26···エアーコンプレッサー、 27···水配管、 28···エアー配管、 29···しき り板、 30···冷却槽
発明を実施するための最良の形態
[0020] 以下、図面を参照して本発明に係る実施形態について説明する。本実施形態は、 履帯リンクを熱間鍛造により成形した後に冷却する際、履帯リンクの各部分で冷却速 度を制御することによって、前記各部分に対して、所望の硬度分布を得るものである
[0021] 図 3は、本発明の実施形態に係る履帯リンクの各部分での硬度分布を示す側面図 である。車体重量を支えつつ下転輪 8と転がり接触する踏面部 13は、耐荷重性及び 耐磨耗性が必要であるため、高硬度と高強度であることが重要である。そして、この 部位での表面硬さはビッカース硬さ Hv440〜595であることが好ましい。また、鍛造 後の冷却処理時では、踏面部 13は強冷却領域 19に該当する。 [0022] また、履板取付面部 14及び、窓部 18の履板取付面部 14側のコーナー部は、シュ 一からの突き上げ荷重を受けるため相対的に高い応力がかかる。また、被削性を確 保するため踏面部 13よりも硬度及び強度が低いことが重要である。そして、この部位 での表面硬さはビッカース硬さ Hv280〜340であることが好ましい。また、鍛造後の 冷却処理時では、履板取付面部 14及び前記コーナー部は中冷却領域 20a, 20bに 該当する。
[0023] また、履帯リンク 3から強冷却領域 19及び中冷却領域 20a, 20bを除いた残りの部 位は、鍛造後の冷却処理時で、弱冷却領域 21に該当する。特にピン孔 15及びブッ シュ孔 16付近力 高硬度又は高強度であると、連結ピン及びブッシュ圧入時に生じ る残留応力によって遅れ破壊が発生する危険が高い。また、冷却処理後のピン孔 15 及びブッシュ孔 16の仕上げカ卩ェ時において、加工能率の低下の要因となる。そのた め、表面の硬度及び強度を低く抑える必要がある。そして、この部位での表面硬さは ビッカース硬さ Hv250〜300であることが好ましい。
[0024] 鍛造後の冷却処理において、強冷却領域 19の冷却速度は例えば 60°CZ秒以上 、中冷却領域 20a, 20bの冷却速度は例えば 9〜13°CZ秒、弱冷却領域 21の冷却 速度は例えば 6〜10°CZ秒であることが好ましい。
[0025] 図 1は、本発明の実施形態に係る、履帯リンクの製造方法を実施する冷却装置の 側面を示す概略構成図である。また、図 2は、図 1に示す冷却装置の平面を示す概 略構成図である。この冷却装置には、鍛造により成形された履帯リンク 3を冷却する 冷却槽 30が設けられている。そして、冷却槽 30内には、履帯リンク 3の強冷却領域 1 9と他の部分とを分けるしきり板 29が設けられている。これにより、強冷却領域 19の冷 却処理と、他の部分の冷却処理とで、お互いの冷却処理に影響を与えることを抑制 する。
[0026] この冷却装置では、履帯リンク 3を冷却する冷却剤には、例えば水、エアー又は水 とエアーを混合した噴霧が用いられる。水は冷却速度が速ぐエアーは冷却速度が 遅い。また、水とエアーしか使用していないので、廃液は環境に悪影響を及ぼさず、 廃液処理コストがかからな 、。
[0027] 冷却槽 30の下部には履帯リンク 3の強冷却領域 19に冷却剤を噴射するための冷 却ノズル 22aが複数配置されている。そして、各冷却ノズル 22aには、水制御バルブ 23aがそれぞれ設けられている。水制御バルブ 23aは、ポンプ 25から水配管 27を介 して供給される水の流量、又は噴射時間を制御している。ここで、冷却ノズル 22aごと に水制御バルブ 23aをそれぞれ設けて!/、るが、全ての冷却ノズル 22aから噴射される 水を制御する水制御バルブ 23aを 1つだけ設けてもよい。
[0028] また、冷却槽 30の上部には履帯リンク 3の中冷却領域 20aに冷却剤を噴射するた めの冷却ノズル 22bが複数配置されている。そして、各冷却ノズル 22b〖こは、水制御 バルブ 23b及びエアー制御バルブ 24aがそれぞれ設けられて!/、る。水制御バルブ 2 3bは、ポンプ 25から水配管 27を介して供給される水の流量、又は噴射時間を制御 している。エアー制御バルブ 24aは、エアーコンプレッサー 26からエアー配管 28を 介して供給されるエアーの流量、又は噴射時間を制御している。また、水制御バルブ 23b及びエアー制御バルブ 24aによって、冷却ノズル 22bから噴射される水とエアー の混合比を制御している。ここで図 1及び図 2に示す冷却装置では、冷却ノズル 22b ごとに水制御バルブ 23b及びエアー制御バルブ 24aをそれぞれ設けて!/、るが、全て の冷却ノズル 22bから噴射される水及びエアーを制御する水制御バルブ 23b及びェ ァー制御バルブ 24aを 1つずつ設けてもよい。
[0029] また、冷却槽 30の左右側面部には、図 1に示すように履帯リンク 3の弱冷却領域 21 に冷却剤を噴射するための冷却ノズル 22c及び 22dが複数配置されて 、る。そして、 各冷却ノズル 22c及び 22dには、水制御バルブ 23c, 23d及びエアー制御バルブ 24 b, 24cがそれぞれ設けられている。水制御バルブ 23c, 23dは、ポンプ 25から水配 管 27を介して供給される水の流量、又は噴射時間を制御している。エアー制御バル ブ 24b, 24cは、エアーコンプレッサー 26からエアー配管 28を介して供給されるエア 一の流量、又は噴射時間を制御している。また、水制御ノ レブ 23c, 23d及びエアー 制御バルブ 24b, 24cによって、冷却ノズル 22c及び 22dから噴射される水とエアー の混合比を制御している。ここで図 1及び図 2に示す冷却装置では、冷却ノズル 22c 及び 22dごとに水制御バルブ 23c, 23d及びエアー制御バルブ 24b, 24cをそれぞ れ設けているが、全ての冷却ノズル 22c, 22dから噴射される水及びエアーを制御す る水制御バルブ 23c, 23d及びエアー制御バルブ 24b, 24cを 1つずつ設けてもよい [0030] また、冷却槽 30の側面部における正面及び背面には、図 2に示すように冷却ノズ ル 22e〜22pが配置されている。また、冷却ノズル 22e〜22pは、それぞれ縦に 3列 ずつ配置されている(図 2では、上部の一列のみ示し、他の 2列は図示せず)。そして 、冷却ノズル 22g, 22h, 22m,及び 22ηにおいて、上部 2列の冷却ノズルは、中冷 却領域 20bに冷却剤を噴射している。これら以外の冷却ノズル 22e, 22f, 22i〜221 , 22ο,及び 22ρは、弱冷却領域 21に冷却剤を噴射している。そして、各冷却ノズル 22e〜22pには、水制御バルブ 23e〜23p及びエアー制御バルブ 24d〜24oがそれ ぞれ設けられている。水制御バルブ 23e〜23pは、ポンプ 25から水配管 27を介して 供給される水の流量、又は噴射時間を制御している。エアー制御バルブ 24c!〜 24ο は、エアーコンプレッサー 26からエアー配管 28を介して供給されるエアーの流量、 又は噴射時間を制御している。また、水制御バルブ 23e〜23p及びエアー制御バル ブ 24d〜24oによって、冷却ノズル 22e〜22pから噴射される水とエアーの混合比を 制御している。例えば、中冷却領域 20bでは水の流量を多くし、弱冷却領域 21では エアーの流量を多くしている。
[0031] ここで図 1及び図 2に示す冷却装置では、冷却ノズル 22e〜22pごとに水制御バル ブ 23e〜23p及びエアー制御バルブ 24d〜24oをそれぞれ設けて!/、る。冷却ノズル 22g, 22h, 22m,及び 22ηのうち中冷却領域 20bに冷却剤を噴射する全ての冷却 ノズルから噴射される水及びエアーを制御する水制御バルブ及びエアー制御バルブ を 1つずつ設けてもよい。または、中冷却領域 20a, 20bに冷却剤を噴射する冷却ノ ズルを制御する水制御バルブ及びエアー制御バルブを 1つずつも設けてもょ 、。ま た、他の冷去ロノズノレ 22e, 22f, 22i〜221, 22ο,及び 22ρにっても同様の構成にし てもよい。
[0032] また、冷却ノズル 22e〜22pは 3列の数に限定するものではなぐ例えば履帯リンク 3の大きさ又は、硬度分布に合わせて種々に変更してもよい。また、中冷却領域 20b に冷却剤を噴射するのは、冷却ノズル 22g, 22h, 22m,及び 22ηの上部 2列に限定 するものではなぐ例えば中冷却領域 20bの範囲に合わせて種々に変更してもよい。
[0033] 図 4は、本発明に係る履帯リンク 3を製造する時の温度推移を示すグラフであり、図 5は、本発明に係る履帯リンクの製造方法の工程を示す図である。まず、熱間鍛造で 履帯リンク 3を成形する。熱間鍛造は、例えば 1200°Cの温度で行われる。
[0034] 次いで、履帯リンク 3に冷却処理を施す。図 1に示す冷却槽 30内に履帯リンク 3の 踏面部 13を下向きにしてセットする。次いで、冷却ノズルから、水、エアー、及び水と エアーを混合した噴霧を噴射し、履帯リンク 3を冷却する。このとき、強冷却領域 19は 、水によって急冷され焼入れ処理が行われる。これにより、踏面部 13はマルテンサイ ト変態により硬化される。また、強冷却領域 19では、冷却剤に水を用いているため冷 却速度が他の領域よりも速く冷却される。
[0035] 次いで、踏面部 13の内部温度が t (例えば、 150
2 〜250°C)まで下がると、強冷却 領域 19の冷却処理を止める。又は、冷却速度を弱めてもよい。すると、履帯リンク 3全 体は、踏面部 13以外ではまだ高温である。よって、踏面部 13は他の部位の残熱が 復熱される。そして、踏面部 13には、焼戻し処理が行われる。これにより、踏面部 13 は、残留応力の除去と靭性を回復させて疲労強度を高めることができる。また、踏面 部 13が焼戻し処理を行っているとき、中冷却領域 20a, 20b,及び弱冷却領域 21で の冷却処理は行われ、踏面部の内部の温度が t (400°C)以上に上昇しないように制
3
御している。
[0036] 次いで、履帯リンク 3全体の内部温度が t (例えば、 150
2 〜250°C)までに達すると、 全ての領域での冷却処理を停止する。次いで、冷却処理終了後に、履板取付面部 1 4、ピン孔 15、ブッシュ孔 16、及びナット座面に加工を施す。踏面部 13以外は、焼入 れ焼戻し処理が行われないので、マルテンサイト組織が形成されず、必要以上に高 強度、及び高硬度になることがない。よって、仕上げ加工時の加工能率を向上させる ことができる。そして、踏面部 13以外は、フェライト、パーライト、及びべ一ナイトの混 合組織である。よって、冷却速度を変化させることにより、フェライト、パーライト、及び ベーナイトの比率を変化させて、部位に応じて所望の硬度分布を形成させることがで きる。
[0037] 以上、本実施形態における履帯リンクの製造方法によれば、鍛造時の一度の加熱 のみで履帯リンク 3に要求されている硬度及び強度分布を得ることができる。よって。 少ない工程で各部分に対して、適切に所望の硬度分布を得ることができ、余分な時 間及び手間がかからな 、。
[0038] また、踏面部 13は焼入れ焼戻し処理が行われるため、高硬度、高強度を得ることが できる。そして、踏面部 13の焼戻し処理を履帯リンク 3の残熱を復熱させ焼戻し処理 を行っている力 400°C以下の低温で行っているため、大型リンクやストラッド構造の ような熱容量の大きい履帯リンクだけでなぐ小型の履帯リンクにも実施することがで きる。また、履帯リンク 3の全ての部位で低温まで連続冷却を施しているため、硬度ム ラが生じない。
[0039] また、踏面部 13以外は、焼入れ焼戻し処理が行われない。これにより、ピン孔 15及 びブッシュ孔 16付近のように、表面の硬度及び強度を低く抑える必要がある部位が 高硬度、及び高強度になることがない。よって、連結ピン及びブッシュ圧入時に生じ る残留応力によって生じる遅れ破壊を抑制することができ、仕上げカ卩ェ時の加工能 率を向上させることちできる。
[0040] また、各冷却ノズルから噴射される冷却剤をそれぞれ独立して制御することができ る。よって、 1つの履帯リンク 3内で細かい硬度制御を行うことができ、必要な部分を強 化することにより履帯リンク 3の駄肉を排除して軽量化とコストダウンが可能である。
[0041] 尚、本発明は上述した実施形態に限定されるものではなぐ本発明の主旨を逸脱し ない範囲内で種々変更して実施することが可能である。例えば、冷却ノズル 22aから は、水のみを噴射する構成になっている力 他の冷却ノズル同様に水とエアーを噴 射するように構成してもよい。また、必要に応じて履板取付面部 14の中冷却領域 20 aと窓部 18付近の中冷却領域 20bの冷却速度を変化させてもょ 、。
[0042] また、履帯リンク 3の冷却剤の一例として水及びエアーを示した力 これに限らず、 温度制御を容易にするため、油、ソリブル、有機熱伝達流体、ポリマー熱伝達流体、 又はそれらの混合物であってもよ 、。
また、上記実施形態では、強冷却領域 19とその他の部位とを分けるしきり板 29を 設けているが、これに限定されるものでなぐしきり板 29を設けない構成にすることも 可能である。
[0043] また、履帯リンクの製造工程において、熱間鍛造処理の後、履帯リンクに冷却処理 を施す前に、鍛造の残熱を保ちつつ、踏面部 13及び履板取付面部 14に対してホッ トシエ一ビング加工処理を施してもよい。この場合、比較的硬度及び強度が低い状態 で力卩ェを施すため、加工能率を向上させることができる。
また、踏面部 13のみ冷却処理前にホットシェービングカ卩ェ処理を施し、履板取付 面部 14は冷却処理後にフライス力卩ェを施してもよい。履板取付面部 14は、踏面部 1 3よりも硬度及び強度が低いため、冷却処理後に加工を施しても加工能率が著しく低 下することがな 、からである。
実施例 1
[0044] (実施例 1)
図 6は、本発明の実施例 1による履帯リンクを製造する際の冷却方法を示す図であ る。詳細には、図 6 (A)は、図 1に示す上側の冷却ノズル 22bからエアーと水を混合し た霧を噴射するタイミングと噴射圧との関係を示す図であり、図 6 (B)は、図 1及び図 2に示す横側の冷却ノズル 22c〜22pからエアーを噴射するタイミングと噴射圧との 関係を示す図であり、図 6 (C)は、図 1に示す下側の冷却ノズル 22aから少量エアー と水を混合した水スプレーを噴射するタイミングと噴射圧との関係を示す図である。 図 7は、図 6に示す冷却方法を用いて製造した履帯リンクの硬度を測定した結果を 示す図である。図 8は、図 7に示す踏面部の硬度分布を示す図である。
[0045] まず、 1200°Cの温度の熱間鍛造で履帯リンクを成形する。この履帯リンクは、重さ 1 . 45kg、化学成分を C : 0. 32〜0. 39重量0 /o、Si: 0. 15〜0. 35重量0 /0、Mn: l. 2 0〜1. 50重量%、Cr: 0. 35重量%以下、残部 Feと不可避的不純物からなる鋼材で ある。
[0046] 次いで、図 1及び図 2に示す冷却装置を用い、図 6 (A)〜(C)に示すような冷却方 法で履帯リンクに冷却処理を施す。図 1に示す冷却槽 30内に履帯リンクの踏面部を 下向きにしてセットする。次いで、冷却ノズルから、水とエアーを混合した霧を噴射し 、エアーを噴射し、且つ少量エアーと水を混合した水スプレーを噴射し、履帯リンクを 冷却する。
[0047] 以下に詳細な冷却方法を説明する。
図 6 (A)及び (B)に示すように、上側の冷却ノズル 22bから噴射する霧と横側の冷 却ノズル 22c〜22pから噴射するエアーを同時に噴射することなぐ互い違いに噴射 する。そして、噴射圧は徐々に低くする。即ち、横側の冷却ノズル 22c〜22pを時間 0 力も時間 Tl 1まで噴射圧 PI 1で噴射し、上側の冷却ノズル 22bを時間 Tl 1から時間 12まで噴射圧 P1で噴射し、横側の冷却ノズル 22c〜22pを時間 T12から時間 T13 まで PI 1より小さ!/、噴射圧 P12で噴射し、上側の冷却ノズル 22bを時間 T13から時 間 14まで P1より小さい噴射圧 P2で噴射し、横側の冷却ノズル 22c〜22pを時間 T1 4から時間 T15まで P12より小さい噴射圧 P13で噴射し、上側の冷却ノズル 22bを時 間 T15から時間 16まで P2より小さい噴射圧 P3で噴射する。このように上側の冷却ノ ズル 22bと横側の冷却ノズル 22c〜22pを交互に噴射することにより、履帯リンクを冷 却する時の温度バラツキを低く抑えることができる。尚、ここでは、上側の冷却ノズル 2 2b及び横側の冷却ノズル 22c〜22pそれぞれから 3回の噴射を行って!/、るが、 4回 又は 5回の噴射を行っても良い。
図 6 (C)に示すように、下側の冷却ノズル 22aから水と少量エアーを混合した水スプ レーを連続的に噴射する。そして、噴射圧は段階的に低くする。即ち、下側の冷却ノ ズル 22aを時間 0から時間 T21まで噴射圧 P31で噴射し、時間 T21から時間 T22ま で P31より小さい噴射圧 P32で噴射し、時間 T22から時間 T23まで P32より小さい噴 射圧 P33で噴射する。尚、時間軸は図 6 (A)〜(C)で互いに対応しており、時間 T21 は時間 Tl 1と T12の間にあり、時間 T22は時間 T13と T14の間にあり、時間 T23は 時間 T15と T16の間にある。
[0048] 上述したように履帯リンクを冷却することにより、図 6 (C)に示す水スプレーによる冷 却によって踏面部が急冷され焼入れ処理が行われ、踏面部はマルテンサイト変態に より硬化される。また、下側の冷却ノズル 22aから噴射される冷却剤に水スプレーを用 Vヽて 、るため、踏面部は他の領域よりも速く冷却される。
[0049] 次に、図 7の点線に示す位置で上記冷却処理を行った履帯リンクを切断し、その切 断面の硬度を測定した。その測定結果を図 7に示している。また、履帯リンクの踏面 部については、図 7の点線に示す位置で切断し、その切断面における 1〜3の矢印 に沿う部分の硬度を測定した。その測定結果である 1〜3の矢印に沿う部分における 踏面からの距離と硬度との関係を図 8に示している。
[0050] 図 8に示すように、踏面部には踏面から 10〜15mmの深さに硬化層が形成され、 その硬化層の硬さはビッカース硬さ Hv440〜595であることが確認された。
[0051] また、図 7に示すように、履板取付面部及び、窓部の履板取付面部側のコーナー 部の表面硬さはビッカース硬さ Hv270〜343であることが確認された。また、ピン孔 及びブッシュ孔の表面硬さはビッカース硬さ Hv255〜305であることが確認された。
[0052] (実施例 2)
図 9は、本発明の実施例 2による履帯リンクを製造する際の冷却方法を示す図であ る。詳細には、図 9 (A)は、図 1に示す上側の冷却ノズル 22bからエアーを噴射する タイミングと噴射圧との関係を示す図であり、図 9 (B)は、図 1に示す下側の冷却ノズ ル 22aから少量エアーと水を混合した水スプレーを噴射するタイミングと噴射圧との 関係を示す図である。
図 10は、図 9に示す冷却方法を用いて製造した履帯リンクの硬度を測定した結果 を示す図である。
[0053] まず、 1200°Cの温度の熱間鍛造で履帯リンクを成形する。この履帯リンクは、重さ 0 . 58kg、化学成分を C : 0. 37〜0. 44重量0 /o、Si: 0. 15〜0. 35重量0 /0、Mn: l. 3 5〜1. 65重量%、Cr: 0. 30重量%以下、残部 Feと不可避的不純物からなる鋼材で ある。
[0054] 次いで、図 1及び図 2に示す冷却装置を用い、図 9 (A) , (B)に示すような冷却方法 で履帯リンクに冷却処理を施す。図 1に示す冷却槽 30内に履帯リンクの踏面部を下 向きにしてセットする。次いで、冷却ノズルから、エアーを噴射し、且つ水とエアーを 混合した水スプレーを噴射し、履帯リンクを冷却する。
[0055] 以下に詳細な冷却方法を説明する。
図 9 (A)に示すように、上側の冷却ノズル 22bからエアーを連続的に噴射する。そし て、噴射圧は段階的に低くする。即ち、上側の冷却ノズル 22bを時間 0から時間 T31 まで噴射圧 P41で噴射し、時間 T31から時間 T32まで P41より小さい噴射圧 P42で 噴射し、時間 T32から時間 T33まで P42より小さい噴射圧 P43で噴射する。尚、横側 の冷却ノズルからは水及びエアーを噴射しな 、。
図 9 (B)に示すように、下側の冷却ノズル 22aから水と少量エアーを混合した水スプ レーを連続的に噴射する。そして、噴射圧は段階的に低くする。即ち、下側の冷却ノ ズル 22aを時間 0から時間 T41まで噴射圧 P51で噴射し、時間 T41から時間 T42ま で P51より小さい噴射圧 P52で噴射し、時間 T42から時間 T32まで P52より小さい噴 射圧 P53で噴射する。尚、時間軸は図 9 (A) , (B)で互いに対応しており、時間 T41 は時間 0と T31の間にあり、時間 T42は時間 T31と T32の間にある。
[0056] 上述したように履帯リンクを冷却することにより、図 9 (B)に示す水スプレーによる冷 却によって踏面部が急冷され焼入れ処理が行われ、踏面部はマルテンサイト変態に より硬化される。また、下側の冷却ノズル 22aから噴射される冷却剤に水スプレーを用 Vヽて 、るため、踏面部は他の領域よりも速く冷却される。
[0057] 次に、図 10の点線に示す位置で上記冷却処理を行った履帯リンクを切断し、その 切断面の硬度を測定した。その測定結果を図 10に示している。
[0058] 図 10に示すように、履板取付面部、窓部の履板取付面部側のコーナー部、ピン孔 及びブッシュ孔の表面硬さはビッカース硬さ Hv263〜318であることが確認された。

Claims

請求の範囲
[1] 踏面部、該踏面部に相対する位置に履板取付面部、及び側面に窓部を有する履 帯リンクを熱間鍛造により成形する工程と、
前記踏面部を第 1の冷却速度で冷却し、且つ前記履板取付面部、及び前記窓部 の前記履板取付面部側のコーナー部を、前記第 1の冷却速度よりも遅い第 2の冷却 速度で冷却し、且つ前記履帯リンクにおける前記踏面部、前記履板取付面部、及び 前記コーナー部を除いた残りの部分を、前記第 2の冷却速度よりも遅い第 3の冷却速 度で冷却する工程と、
を具備し、
前記第 1の冷却速度は前記踏面部が焼入れ処理される冷却速度であることを特徴 とする履帯リンクの製造方法。
[2] 前記第 1の冷却速度は、 60°CZ秒以上であり、前記第 2の冷却速度は、 9〜13°C
Z秒であり、前記第 3の冷却速度は、 6〜10°CZ秒であることを特徴とする請求項 1 に記載の履帯リンクの製造方法。
[3] 前記踏面部が焼入れされた後、前記履帯リンクにおける前記踏面部以外の部分の 残熱からの復熱により、前記踏面部は焼戻しされることを特徴とする請求項 1又は 2に 記載の履帯リンクの製造方法。
[4] 前記踏面部の内部温度が 150°Cから 250°Cの範囲内に達したときに前記踏面部 の冷却を停止することを特徴とする請求項 1から 3のいずれかに記載の履帯リンクの 製造方法。
[5] 前記踏面部の内部温度が 150°Cから 250°Cの範囲内に達したときに前記踏面部 への冷却能を弱めることを特徴とする請求項 1から 3のいずれかに記載の履帯リンク の製造方法。
[6] 前記履帯リンク全体の内部温度が 150°Cから 250°Cの範囲内に達したときに前記 履帯リンクへの全ての冷却を停止することを特徴とする請求項 1から 5のいずれかに 記載の履帯リンクの製造方法。
[7] 前記冷却する工程は、前記履帯リンクを冷却槽に配置し、該冷却槽の内側面、下 部及び上部それぞれに少なくとも 1つ配置された冷却ノズルカゝら冷却剤を噴射させて 冷却する工程であることを特徴とする請求項 1から 6のいずれかに記載の履帯リンク の製造方法。
[8] 前記冷却剤は、水、エアー、又は水とエアーを混合させた噴霧であることを特徴と する請求項 7に記載の履帯リンクの製造方法。
[9] 熱間鍛造により成形され、前記熱間鍛造後に冷却処理が行われた側面に窓部を 有する履帯リンクであって、
Hv440〜595のビッカース硬さを有する踏面部と、
前記踏面部に相対する位置にあり、前記踏面部より低い硬度を有する履板取付面 部と、
を具備し、
前記窓部の前記履板取付面部側のコーナー部は前記踏面部より低い硬度を有し 、前記踏面部、前記履板取付面部及び前記コーナー部を除いた残りの部分は、前 記履板取付面部及び前記コーナー部より低 、硬度を有して 、ることを特徴とする履 帯リンク。
[10] 前記履板取付面部及び前記コーナー部の硬さはビッカース硬さ Hv280〜340で あることを特徴とする請求項 9に記載の履帯リンク。
[11] 前記踏面部は、マルテンサイト組織を有し、前記踏面部以外はフェライト、パーライ ト、及びべ一ナイトの少なくとも 1つを有する混合組織であることを特徴とする請求 9又 は 10に記載の履帯リンク。
PCT/JP2007/055736 2006-03-22 2007-03-20 履帯リンク及び履帯リンクの製造方法 WO2007108486A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006-078747 2006-03-22
JP2006078747 2006-03-22

Publications (1)

Publication Number Publication Date
WO2007108486A1 true WO2007108486A1 (ja) 2007-09-27

Family

ID=38522514

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2007/055736 WO2007108486A1 (ja) 2006-03-22 2007-03-20 履帯リンク及び履帯リンクの製造方法

Country Status (1)

Country Link
WO (1) WO2007108486A1 (ja)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016527129A (ja) * 2013-07-02 2016-09-08 キャタピラー インコーポレイテッドCaterpillar Incorporated 接地軌道の軌道リンクにおける可変硬化深さ
US9440693B2 (en) 2014-03-20 2016-09-13 Caterpillar Inc. Air-hardenable bainitic steel part
WO2017010376A1 (ja) * 2015-07-16 2017-01-19 トピー工業株式会社 無限軌道帯用リンク、及び無限軌道帯
WO2020046692A1 (en) * 2018-08-27 2020-03-05 Caterpillar Inc. Scallop-resistant track link and method of making same
WO2022098541A1 (en) * 2020-11-05 2022-05-12 Caterpillar Inc. Track pad with uniform hardened region
US11396336B2 (en) 2019-01-11 2022-07-26 Caterpillar Inc. Anti-toenailing track shoe

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH059488B2 (ja) * 1983-09-29 1993-02-05 Komatsu Mfg Co Ltd
JPH1088228A (ja) * 1996-08-28 1998-04-07 Caterpillar Inc 履帯チェーンリンクの選択硬化熱処理方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH059488B2 (ja) * 1983-09-29 1993-02-05 Komatsu Mfg Co Ltd
JPH1088228A (ja) * 1996-08-28 1998-04-07 Caterpillar Inc 履帯チェーンリンクの選択硬化熱処理方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016527129A (ja) * 2013-07-02 2016-09-08 キャタピラー インコーポレイテッドCaterpillar Incorporated 接地軌道の軌道リンクにおける可変硬化深さ
US9440693B2 (en) 2014-03-20 2016-09-13 Caterpillar Inc. Air-hardenable bainitic steel part
WO2017010376A1 (ja) * 2015-07-16 2017-01-19 トピー工業株式会社 無限軌道帯用リンク、及び無限軌道帯
WO2020046692A1 (en) * 2018-08-27 2020-03-05 Caterpillar Inc. Scallop-resistant track link and method of making same
CN112654555A (zh) * 2018-08-27 2021-04-13 卡特彼勒公司 抗扇形凹口履带链节及其制造方法
US11186331B2 (en) 2018-08-27 2021-11-30 Caterpillar Inc. Scallop-resistant track link and method of making same
US20220009569A1 (en) * 2018-08-27 2022-01-13 Caterpillar Inc. Scallop-resistant track link and method of making same
CN112654555B (zh) * 2018-08-27 2023-07-04 卡特彼勒公司 抗扇形凹口履带链节及其制造方法
US11396336B2 (en) 2019-01-11 2022-07-26 Caterpillar Inc. Anti-toenailing track shoe
WO2022098541A1 (en) * 2020-11-05 2022-05-12 Caterpillar Inc. Track pad with uniform hardened region
US11807318B2 (en) 2020-11-05 2023-11-07 Caterpillar Inc. Track pad with uniform hardened region

Similar Documents

Publication Publication Date Title
US5759309A (en) Thermal process for selectively hardening track chain links
US7040080B2 (en) Track link production method and track link produced by the same
WO2007108486A1 (ja) 履帯リンク及び履帯リンクの製造方法
EP1911536A1 (en) Hot forging equipment
KR0153482B1 (ko) 무한궤도용 링크의 제조방법
EP3119916B1 (en) Air-hardenable bainitic steel part
US20140152086A1 (en) Undercarriage track link
CN105143474A (zh) 具有增强的材料特性的空气可硬化贝氏体钢
EP3279016A1 (en) Hollow stabilizer
WO2007043307A1 (ja) 建設機械下部走行体のローラーシェルの製造方法
JP2004060003A (ja) 無限軌道帯用リンクの製造方法
US6270595B1 (en) Bushing for crawler belt and method of manufacture
CN110760787A (zh) 一种汽车悬架下摆臂的复合热处理强化方法
JP4807982B2 (ja) リンク及びその製造方法
JPH0978134A (ja) 無限軌道帯用リンクの製造方法
JPH04129621A (ja) 歯車部材の製造方法
EP3844055B1 (en) Scallop-resistant track link and method of making same
Kobasko et al. Design of Steel-Intensive Quench Processes
JPH03166320A (ja) トラックブッシュおよびその製造方法
JPH0978135A (ja) 無限軌道帯用リンクの製造方法
KR101009771B1 (ko) 트랙링크의 제조방법
JPH0978136A (ja) 無限軌道帯用リンクの製造方法
US20010050121A1 (en) Bushing for crawler belt and method of manufacture
US20220195550A1 (en) Air-hardened machine components
JPH07109517A (ja) 無限軌道帯用リンクの製造方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07739179

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07739179

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP