WO2006114806A1 - Production/shipment system and method - Google Patents

Production/shipment system and method Download PDF

Info

Publication number
WO2006114806A1
WO2006114806A1 PCT/JP2005/006354 JP2005006354W WO2006114806A1 WO 2006114806 A1 WO2006114806 A1 WO 2006114806A1 JP 2005006354 W JP2005006354 W JP 2005006354W WO 2006114806 A1 WO2006114806 A1 WO 2006114806A1
Authority
WO
WIPO (PCT)
Prior art keywords
manufacturing
information
parts
standard
shipping
Prior art date
Application number
PCT/JP2005/006354
Other languages
French (fr)
Japanese (ja)
Inventor
Tamio Ishibashi
Original Assignee
Daiwa House Industry Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co., Ltd. filed Critical Daiwa House Industry Co., Ltd.
Priority to PCT/JP2005/006354 priority Critical patent/WO2006114806A1/en
Priority to CNA2005800493614A priority patent/CN101151627A/en
Publication of WO2006114806A1 publication Critical patent/WO2006114806A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the terminal 20 is configured to be able to send and receive various data to and from the procurement server device 10 via the communication line I.
  • the manufacturing contractor can send login information (ID and password), various search information, and various input information from the terminal 20 to the manufacturing management server 10. Based on this, various data are transmitted from the manufacturing management server 10 to the terminal 20.
  • the manufacturing management server 10 determines whether or not to create a material procurement plan, a manufacturing plan, and a shipping plan as a specific parts manufacturing plan based on the parts order list received at the current time. (Step S3).
  • a specific parts manufacturing plan can be created for each ordered building.
  • a specific part manufacturing plan may be created so that parts used in multiple buildings that have been submitted to the factory within a certain period of time are aggregated and manufactured together. Also, it is determined how many days the parts should be manufactured by calculating back the shipping date, and the necessary time is approaching! Even if a specific parts manufacturing plan is created so that parts are assembled and manufactured sequentially Good.
  • This determination may be performed by applying a predetermined algorithm included in the program stored in the storage unit 11 based on various data received by the manufacturing management server 10.
  • a predetermined algorithm included in the program stored in the storage unit 11 based on various data received by the manufacturing management server 10.
  • the person in charge of production inputs an instruction to create a specific parts manufacturing plan, it may be performed according to the input.
  • the preprocess power is received in advance as necessary information processing data, and various instruction information for manufacturing based on the data is created and provided to a manufacturing contractor or the like. Therefore, it is possible to give a clear manufacturing instruction to a manufacturing contractor or the like based on a predetermined contract contract. In addition, manufacturing contractors can work without complicated information processing in the actual manufacturing stage. As a result, production and lead time can be minimized.
  • the person in charge of material procurement receives the material procurement instruction information transmitted from the manufacturing management server 10 in step S6 and displays it on the terminal (step S7a).
  • this terminal may be the same terminal as the terminal 20 of the manufacturing contractor, or may be a different terminal. Further, the information may be confirmed by displaying the information on the display unit 14 of the manufacturing management server 10 without transmitting the information from the manufacturing management server 10 to the outside.

Abstract

A production management server (10) is prestored with data on various management criteria concerning production of components. Information on various components and information on procurement of materials is also stored. The production management server (10) receives a component order list made in the preceding process, extracts and aggregates components manufactured in a factory, and makes a concrete schedule for manufacturing the components. Production instruction information is then transmitted to a terminal (20) of a manufacture contractor in the factory. An instruction to procure materials and an instruction of shipment are transmitted to the terminal (20) of each person in charge. The manufacture contractor, the person in charge of procuring materials, and the person in charge of shipment acquire information from the management server (10) as required.

Description

製造出荷システム及び製造出荷方法  Manufacturing / shipping system and manufacturing / shipping method
技術分野  Technical field
[0001] 本発明は、建物をシステム化し、このシステムを構成する部品や部材の生産及び調 達を集約的に行い、これにより各建物物件の設計力 竣工に至る一連の工程の効率 化を図ると共に、建物の品質を向上させ、かつ、建設コストの低減を図ることを可能と するもので、特に、建物の部品の発注を受け付けて、施工計画に合わせて効率的に 部品を製造し出荷するための製造出荷システム及び製造出荷方法に関する。  [0001] The present invention systematizes a building, and intensively produces and procure parts and components constituting the system, thereby improving the efficiency of a series of processes leading to the completion of the design capability of each building property. At the same time, it is possible to improve the quality of the building and reduce the construction cost. In particular, it accepts orders for building parts and efficiently manufactures and ships the parts according to the construction plan. The present invention relates to a manufacturing / shipping system and a manufacturing / shipping method.
背景技術  Background art
[0002] 従来、住宅を含む建築物は、固有の敷地や利用者に対応するため、一軒一軒その 形状や仕様が異なるものとされており、一品生産により建設されていた。一品生産で は、個々の建物を建設する際に、その都度、一から設計作業を行う必要があった。ま た、その都度、必要な建築資材を選定し市場力も調達する作業を行う必要があった。 従って、その都度、設計作業と、建築資材の選定作業及び調達作業に手間を要する という問題点があった。  [0002] Conventionally, a building including a house is different from each other in shape and specification in order to correspond to a specific site or user, and has been constructed by one-piece production. In single-product production, it was necessary to start design from scratch each time an individual building was constructed. In addition, each time, it was necessary to select the necessary building materials and procure market power. Therefore, each time, there is a problem in that it takes time for design work, construction material selection work and procurement work.
[0003] また、設計作業や建築資材の選定作業及び調達作業は専門知識と経験を要し、 作業担当者の能力が作業内容の良否に反映される。従って、建物を建設する度に 一からこのような作業を行うと、担当者の能力によって建物の品質や価格が左右され ることになる。つまり、能力の低い担当者力このような作業を行った場合には、適切な 設計や部材の選定を行うことができない。また、適切な価格、品質、納期で建築資材 を提供してくれる購買先を選定することができない。従って、完成した建物が、納期 や品質の点で顧客の要求を満足するものになって 、なかったり、費用が予算内にお さまらな 、と 、う問題点があった。  [0003] Design work, building material selection work, and procurement work require specialized knowledge and experience, and the ability of the person in charge of the work is reflected in the quality of the work. Therefore, if such work is performed from the beginning every time a building is constructed, the quality and price of the building will be affected by the ability of the person in charge. In other words, it is not possible to perform appropriate design and selection of members when such a work is performed by a person with low ability. In addition, it is not possible to select a supplier who can provide building materials at an appropriate price, quality and delivery date. Therefore, there was a problem that the completed building did not meet customer requirements in terms of delivery time and quality, and the cost was within the budget.
[0004] このような問題点を改善する方法として、 V、わゆる工業ィ匕住宅のように、建物をシス テム化して供給するのが有効な手段である。  [0004] As a method for solving such problems, it is an effective means to supply buildings in a system form like V, a so-called industrial house.
システム化された建物は、予め規格化された部品を用いて構成される。また、規格 ィ匕された部品を個別の設計条件や設計内容に対してどのように適用するかという設 計ルールが予め整備されている。従って、設計作業及び必要な建築資材の選定作 業にかかる手間が低減されると共に、担当者の能力に左右されずに一定の品質の建 物を提供することが可能となる。 A systemized building is constructed using parts that have been standardized in advance. Also, how to apply standardized parts to individual design conditions and design details. A total rule is prepared beforehand. Accordingly, it is possible to reduce the time and effort required for the design work and the selection of necessary building materials, and it is possible to provide a building with a certain quality regardless of the ability of the person in charge.
[0005] また、規格化された部品は、工場で一括して生産され、各現場へ供給される。従つ て、必要な部品の供給を適切な品質、納期、価格で受けることができる。また、現場 工事での作業量を最小限に抑えることができ、現場工期の短縮化が実現される。ま た、現場組立の作業を合理化することが可能である。従って、作業に要する時間及 び人員を計算し易ぐ現場工事での無駄を省くことが可能である。  [0005] In addition, standardized parts are collectively produced at a factory and supplied to each site. Therefore, the necessary parts can be supplied with appropriate quality, delivery time and price. In addition, the amount of work in on-site construction can be minimized, and the on-site construction period can be shortened. It is also possible to streamline on-site assembly work. Therefore, it is possible to eliminate the waste in the field work where it is easy to calculate the time and personnel required for the work.
[0006] このように有利な特徴を備えた工業ィ匕住宅の建設を更に効率的に行うために、設 計力 竣工に至る一連の工程において、各工程に必要な情報を適時に作成して供 給する情報管理手段及び情報加工手段が求められている。特に、施主のより高度な 要望に対応するために建物の仕様を多様化すると、部品の構成が複雑化すると共に 、部品の品種や組み合わせのパターンが格段に増大する。従って、部品の発注管理 及び生産管理が困難になるという問題が生じる。また、建物の施工スケジュールに合 わせて効率的に生産し現場に出荷する作業が困難になるという問題が生じる。  [0006] In order to more efficiently construct industrial houses with such advantageous features, in a series of processes leading to the completion of design power, information necessary for each process is created in a timely manner. Information management means and information processing means to be supplied are required. In particular, if the building specifications are diversified in order to meet the higher demands of the owner, the structure of the parts becomes complicated, and the types of parts and the patterns of combinations increase dramatically. Therefore, there arises a problem that the order management and production management of parts become difficult. In addition, there is a problem that it is difficult to efficiently produce and ship to the site according to the building construction schedule.
[0007] 本発明は、上記のような問題に鑑み、システム化された建物の仕様を多様ィ匕し、か つ、従来よりも更に効率的に供給するために必要な具体的手段を提供するものであ つて、特に、必要な部品を建物の施工スケジュールに合わせて効率的に生産し現場 に出荷することを可能とする手段を提供することを目的とする。  [0007] In view of the above problems, the present invention provides a specific means necessary for diversifying the specifications of a systemized building and supplying it more efficiently than before. In particular, it aims to provide a means that enables the necessary parts to be efficiently produced according to the construction schedule of the building and shipped to the site.
発明の開示  Disclosure of the invention
[0008] 本発明は、建物に使用される部品'部材の製造に関する管理基準が格納される製 造管理情報格納手段と、受注した建物の施工に必要な部品'部材の品目、数量、着 ェ日を含む具体的発注情報を取得する発注情報取得手段と、前記管理基準および 前記具体的発注情報に基づ!、て、資材調達スケジュールを含む資材調達指示情報 ,製造品目及び製造スケジュールを含む製造指示情報,出荷スケジュールを含む出 荷指示情報,を作成する情報加工手段と、前記資材調達指示情報、前記製造指示 情報、前記出荷指示情報、のいずれかに基づき前記管理基準に含まれる情報を抽 出する情報検索手段と、を備え、前記管理基準には、製造する部品の各々に該部品 が使用される建物の施主名を表示した識別手段を付与して識別可能に管理すること を定めた識別表示基準,製造する部品の各々を該部品に表示された施主名に基づ いて集積し保管することを定めた製品保管基準,が含まれること、を特徴とする。 [0008] The present invention relates to manufacturing management information storage means for storing management standards related to the manufacture of parts 'members used in buildings, and items, quantities, and items of parts' parts required for construction of ordered buildings. Order information acquisition means for acquiring specific order information including the date, manufacturing based on the management criteria and the specific order information, material procurement instruction information including material procurement schedule, manufacturing item and manufacturing schedule Information processing means for creating instruction information, shipping instruction information including a shipping schedule, and information included in the management criteria are extracted based on any of the material procurement instruction information, the manufacturing instruction information, and the shipping instruction information. Information retrieval means for outputting, and in the management standard, each component to be manufactured includes the component Each of the parts to be manufactured is integrated based on the owner name displayed on the part, the identification indication standard that specifies that the identification name indicating the owner name of the building where It is characterized by the inclusion of product storage standards that stipulate storage.
[0009] このように、本発明によれば、建物に使用される部品 ·部材の製造に関する管理基 準を予め準備しておくことができる。また、製造すべき部品'部材の品目、数量、着工 日を含む具体的発注情報を取得することができる。そして、管理基準と、具体的発注 情報とを利用することにより、資材調達、製造加工、出荷等の各種スケジュールを、 施工時に部品が確実に現場に届くように決定することができる。また、資材調達指示 情報、製造指示情報、出荷指示情報を作成して各担当者に受け渡し、各担当者は 必要に応じて管理基準などのデータを利用することができる。  [0009] As described above, according to the present invention, it is possible to prepare in advance a management standard related to the manufacture of parts / members used in a building. In addition, it is possible to acquire specific order information including the item, quantity, and start date of the part to be manufactured. By using management standards and specific ordering information, it is possible to determine various schedules for material procurement, manufacturing processing, shipping, etc., so that parts can be delivered to the site reliably during construction. In addition, material procurement instruction information, manufacturing instruction information, and shipping instruction information are created and transferred to each person in charge, and each person in charge can use data such as management standards as necessary.
また、識別表示基準、製品保管基準に従って部品を管理することにより、各々の部 品がどの施主の現場に出荷されるのかが容易に判別可能とされる。また、製造した部 品を施主別にまとめて集積することができるので、出荷の際に必要な部品が漏れるこ とが少ない。また、出荷スケジュール別に集積されることになり、集積スペースの無駄 をなくすことができる。従って、製造した部品の集積'保管を効率的に行うことができる  In addition, by managing the parts according to the identification display standards and the product storage standards, it is possible to easily determine which owner's site each part is shipped to. In addition, since manufactured parts can be collected and integrated by owner, there is little leakage of necessary parts at the time of shipment. In addition, since it is accumulated according to the shipping schedule, waste of the accumulation space can be eliminated. Therefore, it is possible to efficiently collect and store manufactured parts.
[0010] また、本発明において、前記管理基準には、各々の工場または製造請負業者にお ける工程管理能力を反映させた個別工程管理基準が含まれ、前記具体的発注情報 には、製造を担当する工場または製造請負業者を指定する指定情報が含まれ、前 記情報加工手段は、前記指定情報に基づき、指定された工場または製造請負業者 の工程管理能力を反映させて前記製造スケジュール及び前記資材調達スケジユー ルを作成するように構成することもできる。 [0010] Further, in the present invention, the management standard includes an individual process management standard that reflects a process management capability of each factory or a manufacturing contractor, and the specific order information includes manufacturing. Designation information for designating a factory or manufacturing contractor in charge is included, and the information processing means reflects the process schedule and the manufacturing contractor reflecting the process management capability of the designated factory or manufacturing contractor based on the designation information. It can also be configured to create a material procurement schedule.
このように構成すると、製造設備、資材の調達事情、製造請負業者等が異なる複数 の工場において、各々の工程管理能力に応じて資材調達、製造、出荷等の各種ス ケジュールを決定することができる。従って、工場や製造請負業者による能力のばら つきを補正することができ、施工時に部品を確実に現場に届けることができる。  With this configuration, it is possible to determine various schedules for material procurement, manufacturing, shipping, etc. according to each process management capability at multiple factories with different manufacturing facilities, material procurement circumstances, manufacturing contractors, etc. . Therefore, it is possible to compensate for variations in capacity due to factories and manufacturing contractors, and to reliably deliver parts to the site during construction.
[0011] より具体的には、前記管理基準には、材料受入検査基準、材料保管基準、製造技 術基準、設備点検基準、製品検査基準、工程検査基準、の少なくともいずれかが含 まれる。このように、部品 ·部材の製造に関する管理基準を予め詳細に定めておき、 管理基準に従って製造することにより、部品の品質を確保することができる。また、予 定スケジュールに対する遅れを防止することができる。 [0011] More specifically, the management standard includes at least one of a material acceptance inspection standard, a material storage standard, a manufacturing technology standard, a facility inspection standard, a product inspection standard, and a process inspection standard. Be turned. Thus, the quality of parts can be ensured by prescribing in detail management standards for manufacturing parts / members in advance and manufacturing according to the management standards. In addition, delays to the schedule can be prevented.
[0012] そして、本発明は、建物に使用する部品 ·部材の製造に関する管理基準を予め作 成し、製造管理情報格納手段に格納する工程と、受注した建物の施工に必要な部 品 ·部材の品目、数量、着工日を含む具体的発注情報を取得する工程と、前記管理 基準および前記具体的発注情報に基づき、資材調達スケジュールを含む資材発注 情報,製造品目及び加工スケジュールを含む製造指示情報,出荷スケジュールを含 む出荷指示情報,を自動で作成する工程と、前記資材調達指示情報、前記製造指 示情報、前記出荷指示情報、のいずれかに基づき前記管理基準に含まれる情報を 抽出する工程と、前記管理基準に含まれる識別表示基準に基づき、製造する部品の 各々に該部品が使用される建物の施主名を表示した識別手段を付与する工程と、前 記管理基準に含まれる識別表示基準に基づき、製造する部品の各々を該部品に表 示された施主名に基づいて集積し保管する工程と、を行うことを特徴とする。  [0012] The present invention relates to a process for creating a management standard relating to the manufacture of parts / members used in a building in advance and storing them in the manufacturing management information storage means, and the parts / members required for the construction of the ordered building. Specific ordering information including items, quantities, and start date of materials, and production order information including material ordering information including material procurement schedule, manufacturing items and processing schedule based on the management criteria and the specific ordering information Information included in the management standard is extracted based on any one of a process for automatically generating shipping instruction information including a shipping schedule, and the material procurement instruction information, the manufacturing instruction information, and the shipping instruction information. And a step of providing an identification means for displaying the name of the owner of the building where the part is used based on the identification display standard included in the management standard, And collecting and storing each of the parts to be manufactured based on the name of the owner displayed on the parts based on the identification display standard included in the management standard.
[0013] このように、製造する部品の各々に該部品が使用される建物の施主名を表示した 識別手段を付与する工程と、前記管理基準に含まれる識別表示基準に基づき、製 造する部品の各々を該部品に表示された施主名に基づいて集積し保管する工程と、 を行うことにより、各々の部品がどの施主の現場に出荷されるのかが容易に判別可能 とされる。また、施主別にまとめて集積されていれば、出荷の際に必要な部品が漏れ ることがない。また、出荷スケジュール別に集積されることになり、集積スペースの無 駄をなくすことができる。従って、製造した部品の集積'保管を効率的に行うことがで きる。  [0013] In this manner, the part to be manufactured based on the identification display standard included in the management standard, and the step of providing the identification means displaying the name of the owner of the building where the part is used for each of the parts to be manufactured By collecting and storing each of the parts based on the owner name displayed on the parts, it is possible to easily determine to which site of the owner each part is shipped. Also, if they are integrated together by owner, the parts required for shipping will not leak. In addition, since it is accumulated according to the shipping schedule, waste of the accumulation space can be eliminated. Accordingly, it is possible to efficiently collect and store the manufactured parts.
図面の簡単な説明  Brief Description of Drawings
[0014] [図 1]本実施形態の製造出荷システムの全体構成を示す説明図である。 FIG. 1 is an explanatory diagram showing an overall configuration of a manufacturing / shipping system according to the present embodiment.
[図 2]本実施形態の製造出荷システムの全体構成を示す説明図である。  FIG. 2 is an explanatory diagram showing the overall configuration of the manufacturing / shipping system of the present embodiment.
[図 3]本実施形態の製造出荷システムにおける製造管理サーバの構成を示すブロッ ク図である。  FIG. 3 is a block diagram showing a configuration of a manufacturing management server in the manufacturing / shipping system of the present embodiment.
[図 4]本実施形態の製造出荷システムにおける端末の構成を示すブロック図である。 [図 5]製造出荷処理の流れを示すフローチャートである。 FIG. 4 is a block diagram showing a configuration of a terminal in the manufacturing / shipping system of the present embodiment. FIG. 5 is a flowchart showing the flow of manufacturing and shipping processing.
発明を実施するための最良の形態  BEST MODE FOR CARRYING OUT THE INVENTION
[0015] 本発明の実施の形態について、図面を参照して説明する。また、以下に説明する 配置、形状等は、本発明を限定するものではなぐ本発明の趣旨に沿って各種改変 することがでさることは勿!^である。 Embodiments of the present invention will be described with reference to the drawings. In addition, the arrangement, shape, and the like described below can be variously modified in accordance with the spirit of the present invention, which does not limit the present invention! ^.
図 1乃至図 5は本発明の一実施形態を示す図で、図 1、図 2は製造出荷システムの 全体構成を示す説明図、図 3は製造管理サーバの構成を示すブロック図、図 4は端 末の構成を示すブロック図、図 5は製造出荷処理の流れを示すフローチャートである  FIGS. 1 to 5 are diagrams showing an embodiment of the present invention. FIGS. 1 and 2 are explanatory diagrams showing the overall configuration of a manufacturing and shipping system, FIG. 3 is a block diagram showing the configuration of a manufacturing management server, and FIG. FIG. 5 is a flowchart showing the flow of manufacturing and shipping processing.
[0016] (工業化住宅の提供手段) [0016] (Means for providing industrialized housing)
建物を構成する部品を規格化し、予め工場で加工し、これにより現場での組み立て を最小限にした、いわゆる工業ィ匕住宅のような建物は、以下の(1)〜(5)のような情 報や手段を準備することにより提供可能となる。まず、開発段階において、(1)予め 規格化された建物構成部品の仕様、形状、構成材料、調達情報を含む部品情報と、 (2)これらの部品をどのように組み合わせると所定の形状あるいは所定の仕様の建物 が実現されるかという設計ルールと、を準備する。  Buildings such as so-called industrial homes that have standardized the parts that make up the building, processed in advance at the factory, and minimized assembly at the site, are as shown in (1) to (5) below. It can be provided by preparing information and means. First, in the development stage, (1) pre-standardized building component specifications, shape, component materials, and part information including procurement information, and (2) how these parts are combined to a predetermined shape or predetermined The design rules for whether or not a building with the specified specifications will be realized are prepared.
[0017] 部品情報及び設計ルールは、顧客の要望を建物の形状や仕様に反映させる作業 を行う提案設計者に対し、適宜使用可能な状態で提供される。例えば、設計ルール ブックや、プラン集、事例集として提供することができる。また、部品情報を登録した データベースとして提供することができる。また、設定された部品を図面上に配置可 能なアイテムとして登録し、設計ルールに従わな 、配置を禁止する機能を備える CA Dソフトウェアとして提供することができる。また、図面上に配置されたアイテムの品目 、位置、数量、等の情報を図面情報に含めて保持する CADソフトウェアとして提供す ることがでさる。  [0017] The parts information and the design rules are provided in a state where they can be used as appropriate to the proposed designer who performs the work of reflecting the customer's request on the shape and specifications of the building. For example, it can be provided as a design rule book, plan book, and case book. Also, it can be provided as a database in which component information is registered. Also, the set parts can be registered as items that can be placed on the drawing, and can be provided as CAD software with a function that prohibits placement without following the design rules. In addition, it can be provided as CAD software that holds information such as item, position, quantity, etc. of items placed on drawings in the drawing information.
[0018] また、規格化された部品や建築材料を適時に建設現場に供給するための具体的 手段を準備する。すなわち、(3)予め規格化された建物構成部品を製造可能な工場 設備及び製造請負業者と、(4)顧客が要望する設計内容に基づき、この設計内容を 実現するために必要な部品'部材の配置、品目、数量等を算出し、算出した情報を 工場に受け渡す調達準備システムと、 (5)調達準備システムカゝら提供された情報に 基づき、資材購買先や製造請負業者等に受け渡す指示情報を作成し、これに基づ き予め設定された基準に従って必要な部品 ·部材の製造を行い、施工計画に合わせ て適時に現場に出荷する製造出荷システムと、を備える。 [0018] In addition, specific means for supplying standardized parts and building materials to the construction site in a timely manner are prepared. In other words, (3) factory equipment and manufacturing contractors capable of producing pre-standardized building components, and (4) parts necessary to realize this design content based on the design content requested by the customer. Calculate the location, item, quantity, etc. of the Procurement preparation system to be delivered to the factory and (5) Procurement preparation system Based on the information provided, the instruction information to be delivered to the material supplier, manufacturing contractor, etc. is created and set in advance based on this. A manufacturing and shipping system that manufactures the necessary parts and components in accordance with the established standards and ships to the site in a timely manner according to the construction plan.
[0019] (製造出荷システムの概要) [0019] (Outline of manufacturing and shipping system)
本実施形態の製造出荷システム Sは、上記(1)〜(5)のうち、(5)の製造出荷シス テムに相当するものである。すなわち、本例の製造出荷システム Sは、建物の部品- 部材の製造を行うために、前工程力も受け渡された準備情報を取得して、その情報 の内容と、前もって準備された種々の管理基準やデータとに基づいて、資材調達作 業、製造作業、出荷作業を行うための具体的な資材調達計画、製造計画、出荷計画 を作成し、これらの計画を実行させるための指示情報を、実作業の担当者に受け渡 すものである。  The manufacturing / shipping system S of the present embodiment corresponds to the manufacturing / shipping system (5) among the above (1) to (5). In other words, the manufacturing / shipping system S of this example obtains the preparation information to which the pre-process capability has been handed over in order to manufacture the building parts-members, and the contents of the information and the various management prepared in advance. Based on the standards and data, create specific material procurement plans, manufacturing plans, and shipping plans for material procurement work, manufacturing work, and shipping work, and provide instruction information for executing these plans. This is handed over to the person in charge of actual work.
[0020] 前工程で作成された準備情報には、例えば、個々の受注物件につ!、ての確定した 設計内容に基づいて、受注した建物を施工するために必要な部品'部材の品目、数 量を拾い出して集計した拾い出しデータに更に調達費用などの情報を付加し、発注 先別にリストイ匕した調達準備情報としての部品発注リストが含まれる。部品発注リスト には、品目、数量だけでなぐ調達費用を積算した積算リストが含まれていてもよい。 部品発注リストには、受注物件を特定するための受注番号あるいは施主名等の情報 が含まれる。また、着工日などの施工スケジュールや、着工日等に基づき算出された 部品の調達スケジュールが含まれていてもよい。例えば、部品を工場から出荷すべき 出荷日などの情報が含まれて 、てもよ 、。  [0020] The preparation information created in the previous process includes, for example, individual order items !, parts necessary for constructing the ordered building based on the final design details, Information such as procurement costs is added to the picked-up data that has been picked up and collected, and a parts order list is included as procurement preparation information that is listed by ordering party. The parts order list may include an integration list that integrates procurement costs based on items and quantities. The parts order list includes information such as an order number or a client name for identifying an ordered property. In addition, a construction schedule such as the start date and a parts procurement schedule calculated based on the start date may be included. For example, it includes information such as the date of shipment when a part should be shipped from the factory.
部品発注リストは、例えば、受注を確定させた事業所や営業所からの指示により作 成される。そして、必要な部品の工場への発注手続である工場投入を行う際に、工場 に受け渡される。つまり、部品発注リストは、工場投入の際に、部品の品目及び数量 を拾い出すための調達準備システム力ゝら本発明の製造出荷システム Sに送信される  The parts order list is created, for example, by an instruction from a business office or sales office that has confirmed the order. Then, when the necessary parts are ordered to the factory, it is delivered to the factory. In other words, the parts order list is sent to the manufacturing and shipping system S of the present invention in addition to the procurement preparation system for picking up the items and quantities of parts at the time of factory entry.
[0021] また、前もって準備された種々の管理基準やデータには、例えば、後述する資材調 達計画を作成するための準備情報としての資材購買先名、価格、仕様、発注条件、 等の各種購買条件を定めた資材調達情報や、製造される部品'部材についての各 種情報、すなわち、部品'部材の仕様を定めた部品図や部品規格、あるいは各種性 能などの試験データ、等の部品情報が含まれる。また、部品の資材調達工程、製造 工程、出荷工程において適用される材料受入検査基準、材料保管基準、製造技術 基準、設備点検基準、製品検査基準、工程検査基準、工程管理基準、識別表示基 準などの管理基準が含まれる。 [0021] In addition, various management standards and data prepared in advance include, for example, material supplier names, prices, specifications, ordering conditions as preparation information for creating a material procurement plan to be described later, Materials procurement information that defines various purchasing conditions such as various types of information about manufactured parts 'members', that is, test data such as part drawings and parts standards that define the specifications of parts 'members', various performances, Etc. are included. In addition, material acceptance inspection standards, material storage standards, manufacturing technology standards, equipment inspection standards, product inspection standards, process inspection standards, process management standards, and identification display standards applied in the parts procurement process, manufacturing process, and shipping process. Management standards such as are included.
[0022] (製造出荷システムの構成)  [0022] (Configuration of manufacturing / shipping system)
まず、製造出荷システム Sの全体構成について説明する。  First, the overall configuration of the manufacturing / shipping system S will be described.
図 1に示すように、製造出荷システム Sは、製造管理サーバ 10と、端末 20とを備え て構成されている。製造管理サーバ 10と端末 20は、インターネット又は専用回線網 、あるいは LAN等の通信回線 Iを介して互いに接続可能に構成されている。また、製 造管理サーバ 10は、外部の調達準備サーバから、通信回線 Iを介してデータを受信 可能に構成されている。  As shown in FIG. 1, the manufacturing / shipping system S includes a manufacturing management server 10 and a terminal 20. The production management server 10 and the terminal 20 are configured to be connected to each other via a communication line I such as the Internet, a dedicated line network, or a LAN. The production management server 10 is configured to be able to receive data from the external procurement preparation server via the communication line I.
[0023] 製造管理サーバ 10は、例えば部品を製造する各工場に付設される管理部門として の生産管理部のオフィスに設置され、部品の製造管理を担当する生産管理担当者 によって使用される。端末 20は、例えば工場内に設けられた製造請負業者のオフィ スに設置され、部品製造業務の実作業を行う製造請負業者によって利用される。端 末 20は、複数の製造請負業者がそれぞれ部品を製造する場合には、各々専用端末 を設置してもよいし、共同の端末として工場内に 1台だけ設置してもよい。また、図 2 に示すように、端末 20は、工場内あるいは生産管理部のオフィスに設置され、資材 調達担当者あるいは出荷担当者によって利用されるように構成しても良い。本例では 、資材調達担当者及び出荷担当者は管理部門に属し、それぞれ専用の端末 20を使 用するものとするが、製造請負業者が資材調達作業及び出荷作業を受託して行って もよい。この場合には、製造請負業者が使用する端末のみ設置されていればよい。  The manufacturing management server 10 is installed in an office of a production management department as a management department attached to each factory that manufactures parts, and is used by a production management person in charge of manufacturing management of parts. The terminal 20 is installed in, for example, a manufacturing contractor's office installed in a factory, and is used by a manufacturing contractor who performs actual work of parts manufacturing work. When a plurality of manufacturing contractors manufacture parts, each terminal 20 may have a dedicated terminal installed, or a single terminal may be installed in the factory as a joint terminal. In addition, as shown in FIG. 2, the terminal 20 may be installed in the factory or in the office of the production management department and used by a person in charge of procurement of materials or a person in charge of shipping. In this example, the person in charge of procurement of materials and the person in charge of shipment belong to the management department and each uses a dedicated terminal 20. However, the manufacturing contractor may be entrusted with materials procurement and shipment. . In this case, only the terminals used by the manufacturing contractor need be installed.
[0024] 次に、製造管理サーバ 10の構成について説明する。  Next, the configuration of the manufacturing management server 10 will be described.
図 3に示すように、製造管理サーバ 10は、各種データ及びプログラムが記憶された 記憶部 11と、通信回線 Iとの入出力インターフェースであるモデム等力もなる通信部 1 2と、記憶部 11に格納されたプログラムを読み出してこのプログラムに基づき各種の 処理を行うための CPUを備えた制御部 13と、 CRT, LCDパネル等力もなる表示部 1 4と、を有して!/、る。 As shown in FIG. 3, the manufacturing management server 10 includes a storage unit 11 that stores various data and programs, a communication unit 12 that also has a modem power as an input / output interface with the communication line I, and a storage unit 11. The stored program is read out, and various programs are based on this program. It has a control unit 13 equipped with a CPU for processing, and a display unit 14 that has CRT and LCD panel power! /
製造管理サーバ 10は、例えば、パーソナルコンピュータ、ワークステーション、汎用 コンピュータなどにより構成することができる。また、製造管理サーバ 10は、単独のコ ンピュータであってもよぐまた、複数のコンピュータ等力もなる情報処理装置として構 成されていてもよい。また、通信回線 Iは、例えば電話回線網等の公衆回線や、専用 通信回線とすることができる。  The manufacturing management server 10 can be configured by, for example, a personal computer, a workstation, a general-purpose computer, or the like. Further, the manufacturing management server 10 may be a single computer or may be configured as an information processing apparatus that has a plurality of computers and the like. The communication line I can be a public line such as a telephone line network or a dedicated communication line.
[0025] 記憶部 11には、各種プログラム及びデータが格納されて 、る。  The storage unit 11 stores various programs and data.
例えば、工場投入の手続きに伴い、調達準備システムとしてのいわゆる仕切りシス テムから、調達準備情報としての部品発注リストのデータを受信するプログラム、受信 したデータに基づき、工場で製造する部品と外部力 購入するだけの部品とを判別 するプログラム、工場で製造する部品について、製造請負業者、資材購買先、等を 判定するプログラム、部品発注リストに含まれる着工日や出荷日などのスケジュール 情報に基づいて、各部品の購入時期や、各部品を製造するための資材の調達時期 、製造時期、出荷時期を算出するプログラム、上記各判定内容に基づき各々の担当 者が行うべき資材調達計画、製造計画、出荷計画を作成するプログラム、作成した計 画に基づき資材調達指示情報、製造指示情報、出荷指示情報を作成して各々の担 当者の端末 20に送信するプログラム、端末 20から送信された部品製造の進拔経過 情報を受信し、受信した情報と、作成した計画とに基づいて、各工程の進拔状況を 管理するプログラム、等の一部または全部が格納されて 、る。  For example, a program that receives parts order list data as procurement preparation information from a so-called partition system as a procurement preparation system, and parts manufactured at the factory and external force purchase based on the received data Based on a program that discriminates the parts that can be done, a program that judges manufacturing contractors, material suppliers, etc. for parts manufactured at the factory, and schedule information such as the start date and shipping date included in the parts order list, The purchase time of each part, the procurement time of materials for manufacturing each part, the program for calculating the production time, the shipping time, the material procurement plan, the manufacturing plan, and the shipment that each person in charge should perform based on the above judgment contents Create a program to create a plan, material procurement instruction information, manufacturing instruction information, and shipping instruction information based on the created plan. The program to be transmitted to the terminal 20 of each person in charge and the progress information of the parts manufacturing progress transmitted from the terminal 20 are received, and the progress status of each process is determined based on the received information and the created plan. Some or all of the programs to be managed are stored.
[0026] また、記憶部 11には、上述した各種管理基準のデータが格納される。管理基準は 、工場によって設備や製造請負業者が異なっていれば、各工場別に、その能力ゃ特 性の違!ヽが反映された個別管理基準として作成されて ヽてもよ ヽ。このようにすると、 各工場における製造能力の差異を補正して、施工計画に合わせて確実に部品を出 荷することができる。  [0026] Further, the storage unit 11 stores data of various management criteria described above. If the facilities and manufacturing contractors differ from factory to factory, the management standards may be created as individual management standards that reflect the differences in the characteristics of each factory. In this way, it is possible to correct the difference in manufacturing capacity at each factory and ensure that the parts are shipped in accordance with the construction plan.
[0027] また、記憶部 11には、上述した資材調達情報や、部品情報を登録したデータべ一 スが格納されている。このデータベースには、予め選定された資材購買先名、価格、 仕様、発注条件、等の各種購買条件や、部品'部材の仕様を定めた部品図や部品 規格、あるいは各種性能などの試験データ、等の部品情報が登録されている。これら の情報は、追加、変更があれば随時更新され、最新の情報が利用可能となるように 管理されている。 [0027] The storage unit 11 stores a database in which the above-described material procurement information and part information are registered. This database contains various purchase conditions such as pre-selected material supplier names, prices, specifications, ordering conditions, and parts drawings and parts that define the specifications of parts. Parts information such as test data such as standards or various performances is registered. This information is updated as needed and updated so that the latest information can be used.
部品情報を登録したデータベースには、例えば、部品を一意に特定可能な部品記 号、部品を構成する子部品や構成部材を特定する子部品記号、部品を含む親部品 がある場合には親部品を特定する親部品記号、部品の材質、形状、寸法、加工デー タ、構造計算に基づく強度データ、重量、部品 ·部材の割付に基づく接合データ、等 を登録することができる。また、部品がメーカー力も供給品であって工場での加工を 必要としない場合には、価格、納期、サプライャ名、代理店名、等を登録することがで きる。  In the database in which the part information is registered, for example, there is a part symbol that can uniquely identify the part, a child part symbol that identifies the child part or component that constitutes the part, and a parent part that contains the part. It is possible to register the parent part symbol that identifies the part, part material, shape, dimensions, machining data, strength data based on structural calculation, weight, joint data based on part / member assignment, and so on. If the parts are supplied by manufacturers and do not require processing at the factory, the price, delivery date, supplier name, agency name, etc. can be registered.
[0028] 次に、端末 20の構成について説明する。  Next, the configuration of terminal 20 will be described.
端末 20は、図 1に示すように、通信回線 Iを介して調達サーバ装置 10との間で各種 データを送受信可能に構成されている。製造請負業者は、端末 20から製造管理サ ーバ 10に、ログイン情報 (ID及びパスワード)や各種検索情報、各種入力情報を送 信することができる。これに基づき、製造管理サーバ 10から端末 20に各種データが 送信される。  As shown in FIG. 1, the terminal 20 is configured to be able to send and receive various data to and from the procurement server device 10 via the communication line I. The manufacturing contractor can send login information (ID and password), various search information, and various input information from the terminal 20 to the manufacturing management server 10. Based on this, various data are transmitted from the manufacturing management server 10 to the terminal 20.
[0029] 図 4に示すように、端末 20は、調達準備担当者がデータを入力するための入力部 2 1と、 CRT, LCDパネル等力 なる表示部 22と、通信回線 Iとの入出力インターフエ ースであるモデム等力 なる通信部 23と、各種データやプログラムが記憶された記憶 部 24と、これらを制御する CPUを備えた制御部 25を備えている。この端末 20は、例 えばパーソナルコンピュータから構成されている。また、ノ ーソナルコンピュータに代 えて、ワークステーション、汎用コンピュータなどにより構成することができる。入力部 21は、マウス、キーボード等力も構成されている。また、端末 20は、例えばレーザー プリンタなど、書類を印刷するためのプリンタ装置に接続されていてもよい。また、記 憶部 24には、製造管理サーバ 10との間でデータの送受信処理を行うためのプログ ラムが格納されている。  [0029] As shown in FIG. 4, the terminal 20 has inputs and outputs to and from the input unit 21 for a procurement preparation person to input data, a display unit 22 having the same power as a CRT or LCD panel, and the communication line I. It includes a communication unit 23 that is an interface, such as a modem, a storage unit 24 that stores various data and programs, and a control unit 25 that includes a CPU that controls them. The terminal 20 is composed of a personal computer, for example. In addition, a workstation, general-purpose computer, or the like can be used instead of the personal computer. The input unit 21 is also configured with a mouse, a keyboard and the like. Further, the terminal 20 may be connected to a printer device for printing documents such as a laser printer. The storage unit 24 stores a program for performing data transmission / reception processing with the manufacturing management server 10.
[0030] (製造出荷システム Sによる製造出荷処理の流れ)  [0030] (Flow of manufacturing / shipping process by manufacturing / shipping system S)
次に、図 5に示すフローチャートを参照しながら、本実施形態の製造出荷システム S で行われる製造出荷処理の流れについて説明する。この製造出荷処理は、例えば、 製造管理サーバ 10の記憶部 11に格納された各種プログラムに基づ!/、て行われる。 本例の製造出荷システム Sによる部品 ·部材の製造及び出荷の流れは、以下の (A ;)〜(D)の手順に基づき行われる。ここでは、部品として、耐カ壁パネルを構成する 子部品の一つである耐カフレームを例にとって説明する。 Next, referring to the flowchart shown in FIG. The flow of the manufacturing / shipping process performed in the above will be described. This manufacturing / shipping process is performed based on various programs stored in the storage unit 11 of the manufacturing management server 10, for example. The flow of manufacturing and shipping parts / members by the manufacturing / shipping system S of this example is performed based on the following procedures (A;) to (D). Here, an explanation will be given by taking as an example a resistance frame which is one of the child parts constituting the resistance wall panel.
[0031] (A)具体的部品製造計画の作成  [0031] (A) Creation of specific parts manufacturing plan
まず、製造管理サーバ 10は、外部の調達準備サーバ等力 送信された部品発注リ ストを受信する (ステップ Sl)。そして、製造管理サーバ 10は、受信した部品発注リス トに基づき、工場で製造すべき内製部品と外部力も購入するだけの部品とを判別し、 製造すべき部品の情報を抽出する (ステップ S2)。なお、部品発注リストが工場で製 造する内製部品のみを含むとされていた場合には、このステップは省略される。  First, the manufacturing management server 10 receives the parts order list transmitted from the external procurement preparation server, etc. (step Sl). Based on the received parts order list, the manufacturing management server 10 discriminates between in-house manufactured parts to be manufactured in the factory and parts to be purchased only by external force, and extracts information on the parts to be manufactured (step S2 ). If the parts order list includes only in-house manufactured parts manufactured at the factory, this step is omitted.
[0032] 次に、製造管理サーバ 10は、現時点で受信している部品発注リストに基づき、具体 的部品製造計画としての資材調達計画、製造計画、出荷計画を現時点で作成する か否かの判定を行う (ステップ S3)。具体的部品製造計画は、受注建物一棟ごとにそ れぞれ作成することができる。また、一定期間内に工場投入の手続きが行われた複 数の建物に使用される部品を集計し、これらを取りまとめて製造するように具体的部 品製造計画を作成してもよい。また、出荷日力 逆算して何日までに部品を製造す ればよ 、か判定し、必要な時期が近!、部品を順次取りまとめて製造するように具体的 部品製造計画を作成してもよい。この判定は、製造管理サーバ 10が受信した各種デ ータに基づき、記憶部 11に格納されたプログラムに含まれる所定のアルゴリズムを適 用して行ってもよい。また、生産管理担当者が具体的部品製造計画の作成指示を入 力した場合には、その入力に応じて行ってもよい。  [0032] Next, the manufacturing management server 10 determines whether or not to create a material procurement plan, a manufacturing plan, and a shipping plan as a specific parts manufacturing plan based on the parts order list received at the current time. (Step S3). A specific parts manufacturing plan can be created for each ordered building. In addition, a specific part manufacturing plan may be created so that parts used in multiple buildings that have been submitted to the factory within a certain period of time are aggregated and manufactured together. Also, it is determined how many days the parts should be manufactured by calculating back the shipping date, and the necessary time is approaching! Even if a specific parts manufacturing plan is created so that parts are assembled and manufactured sequentially Good. This determination may be performed by applying a predetermined algorithm included in the program stored in the storage unit 11 based on various data received by the manufacturing management server 10. In addition, when the person in charge of production inputs an instruction to create a specific parts manufacturing plan, it may be performed according to the input.
[0033] 具体的部品製造計画を作成する場合には (ステップ S3: Yes)、製造管理サーバ 1 0は、続いて、対象とする部品発注リストに含まれるデータのうち、工場で生産すべき 内製部品のデータを集計し、出荷日、品目、数量のリストを作成する (ステップ S4)。 対象とする部品発注リストの選定は、上述のように製造管理サーバ 10が受信した各 種データに基づき所定のアルゴリズムを適用して行ってもよいし、生産管理担当者が 、手動で対象とすべき部品発注リストを選定する入力を行ってもよい。 [0034] 次に、製造管理サーバ 10は、対象とする部品発注リストを集計したデータに基づき 、基本的には、出荷日に間に合うように、かつ、作業が一時期に集中せず、製造期間 中均等に各作業を行うことができるように、具体的部品製造計画を作成する (ステップ S5)。これにより、後述する資材調達計画、製造計画、出荷計画が概略作成される。 例えば、出荷日に基づき、搬入日計画を作成し、これに基づき、週間日程計画を作 成する。週間日程計画は、例えば一週間単位で日々の生産量を平均化するように作 成される。そして、この週間日程計画に基づき、製造日程計画を作成する。そして、 製造日程計画に基づき、資材調達計画を作成する。 [0033] When a specific parts manufacturing plan is created (step S3: Yes), the manufacturing management server 10 continues to determine which of the data included in the target parts ordering list should be produced at the factory. The data of manufactured parts is aggregated and a list of shipping date, item, and quantity is created (step S4). The selection of the target parts order list may be performed by applying a predetermined algorithm based on various data received by the manufacturing management server 10 as described above, or the person in charge of production management manually selects the target order list. An input for selecting a power parts order list may be performed. [0034] Next, the manufacturing management server 10 is basically based on data obtained by compiling the target parts order list, so that it is in time for the shipping date and the work is not concentrated at one time, and during the manufacturing period. A specific parts production plan is created so that each operation can be performed equally (step S5). Thereby, a material procurement plan, a manufacturing plan, and a shipping plan, which will be described later, are roughly created. For example, a delivery date plan is created based on the shipping date, and a weekly schedule is created based on this plan. A weekly schedule is created, for example, to average daily production on a weekly basis. Then, a production schedule is created based on this weekly schedule. Then, based on the production schedule, create a material procurement plan.
[0035] (調達準備データ作成処理の流れ)  [0035] (Procurement preparation data creation process flow)
ステップ S5における具体的部品製造計画の作成は、上述したように、前工程で作 成された準備情報と、前もって準備された種々の管理基準やデータ等、製造管理サ ーバ 10において取得可能な各種情報を適宜利用して行うことができる。  The preparation of a specific part manufacturing plan in step S5 can be acquired by the manufacturing management server 10 such as the preparation information prepared in the previous process and various management standards and data prepared in advance as described above. Various information can be used as appropriate.
このように、前工程力 予め必要な情報加工がなされたデータを受け取り、それに 基づいて製造を行うための各種指示情報が作成されて製造請負業者等に提供され る。従って、製造請負業者等に対し、予め定められた請負契約に基づいた内容で、 明確な製造指示を与えることができる。また、製造請負業者は、製造の実作業段階で は、複雑な情報加工なしに作業を行うことができる。これにより、生産やリードタイムを 極小化することができる。  In this way, the preprocess power is received in advance as necessary information processing data, and various instruction information for manufacturing based on the data is created and provided to a manufacturing contractor or the like. Therefore, it is possible to give a clear manufacturing instruction to a manufacturing contractor or the like based on a predetermined contract contract. In addition, manufacturing contractors can work without complicated information processing in the actual manufacturing stage. As a result, production and lead time can be minimized.
[0036] 例えば、耐カフレームを製造する場合には、資材として軽量形鋼、鋼板、溶接ナツ ト、溶接ボルト、溶接ワイヤ、等が使用される。資材調達計画を作成するための準備 情報として、前工程において、予め資材購買先の鋼材メーカー、金属加工メーカー、 等が選定され、価格、仕様、発注条件、等の各種購買条件が定められている。資材 購買先は、購買先選定担当者により、購買条件に定めた所定の品質や供給体制等 が確保されることを確認した上で選定されている。従って、この準備情報を利用する ことにより、計画通りに資材を調達するための資材調達計画を作成することが可能と される。なお、資材購買先は、複数の中から選択可能に設定されていてもよぐ地域 別に設定されていても良い。  [0036] For example, when manufacturing a frame-resistant frame, light-weight shaped steel, steel plate, weld nut, weld bolt, weld wire, etc. are used as materials. As preparatory information for preparing a material procurement plan, the steel supplier, metal processing manufacturer, etc. of the material supplier are selected in advance in the previous process, and various purchasing conditions such as price, specifications, ordering conditions, etc. are defined. . Materials Suppliers are selected by the person in charge of supplier selection after confirming that the prescribed quality and supply system specified in the purchase conditions are secured. Therefore, by using this preparation information, it is possible to create a material procurement plan for procuring materials as planned. The material supplier may be set to be selectable from a plurality of regions or may be set for each region.
[0037] また、例えば、調達準備情報としての部品発注リストには、必要な耐カフレームの品 目(部品記号)及び数量のリストが含まれる。また、必要な耐カフレームを製造するの に必要な資材の品目及び数量を資材購買先別にリストイ匕した資材発注リストを含ん でいてもよい。また、これらのリストには、調達費用と、着工日などのスケジュール情報 が含まれていてもよい。 [0037] Further, for example, the parts order list as the procurement preparation information includes a necessary frame-resistant product. Includes a list of eyes (part symbols) and quantities. It may also include a material order list that lists the items and quantities of materials required to produce the required frame-proof by material supplier. These lists may also include procurement information and schedule information such as the start date.
上記のように、資材調達計画として、発注リストを集計して得た数量及び品目と、着 ェ日などのスケジュール情報と、資材調達計画を作成するための準備情報として予 め設定された調達や製造の所要期間とに基づき、いつ、どの資材を、どこに発注し、 いつ受け入れるかという資材調達スケジュールを適切に作成することができる。これ により、必要なとき(工場力 現場への出荷日)力 何日前に材料を入れて何日前に 作るという情報を確保することにより、部品を必要な時に必要なだけ作ることができ、 在庫を抱える必要がない。従って、保管費用が削減される。  As mentioned above, as the material procurement plan, the quantity and items obtained by aggregating the order list, schedule information such as the arrival date, and the procurement information set in advance as preparation information for creating the material procurement plan. Based on the production period, it is possible to appropriately create a material procurement schedule for when, what materials, where to place orders, and when to accept them. This ensures that when necessary (factory capability, date of shipment to the site), how many days in advance, and how many days in advance the material is made, parts can be made as much as necessary when needed, and inventory can be increased. There is no need to hold it. Therefore, storage costs are reduced.
[0038] 続 ヽて、作成された具体的部品製造計画に基づき、資材調達担当者に資材調達 指示情報を、製造請負業者に製造指示情報を、出荷担当者に出荷指示情報を、生 産管理担当者側からそれぞれ受け渡す (ステップ S6)。具体的には、例えば、製造 管理サーバ 10から端末 20へ各指示情報を送信する。この指示情報に基づき、以下 (B)〜 (D)に示すような各作業が行われる。  [0038] Next, based on the specific parts manufacturing plan that was created, material procurement instruction information to material procurement personnel, manufacturing instruction information to manufacturing contractors, shipping instruction information to shipping personnel, production management Deliver each from the person in charge (step S6). Specifically, for example, each instruction information is transmitted from the manufacturing management server 10 to the terminal 20. Based on this instruction information, the following operations (B) to (D) are performed.
[0039] (B)資材調達  [0039] (B) Material procurement
次に、製造管理サーバ 10で作成された資材調達計画に基づいて行われる資材調 達作業について説明する。  Next, the material procurement work performed based on the material procurement plan created by the manufacturing management server 10 will be described.
資材調達担当者は、ステップ S6において製造管理サーバ 10から送信された資材 調達指示情報を受信し、端末に表示する (ステップ S7a)。なお、この端末は、上述し たように、製造請負業者の端末 20と同一の端末であってもよいし、別の端末であって もよい。また、製造管理サーバ 10から外部に情報を送信せず、製造管理サーバ 10 の表示部 14に表示させて情報を確認してもよい。  The person in charge of material procurement receives the material procurement instruction information transmitted from the manufacturing management server 10 in step S6 and displays it on the terminal (step S7a). As described above, this terminal may be the same terminal as the terminal 20 of the manufacturing contractor, or may be a different terminal. Further, the information may be confirmed by displaying the information on the display unit 14 of the manufacturing management server 10 without transmitting the information from the manufacturing management server 10 to the outside.
[0040] 確認した情報に基づき、資材調達担当者は、資材供給者に資材発注を行う。そし て、納品予定日に向けて受け入れ準備を行う。すなわち、資材調達指示情報に基づ いて資材発注処理が行われたことに基づき、端末 20から製造管理サーバ 10に検索 情報を送信し、資材の受け入れ及び保管に必要な情報を取得する (ステップ S8a)。 ここで必要な情報とは、予め定められた材料受入検査基準に従って受け入れ検査を 行うために必要な情報と、受け入れた資材を予め定められた材料保管基準に従って 保管するために必要な情報である。そして、発注した資材が納品されると、取得した 情報に基づいて受け入れ検査を行い、合格した資材を保管する。なお、端末 20に予 め各種情報を格納しておき、必要な情報を端末 20内で検索 ·取得してもよ 、。 [0040] Based on the confirmed information, the person in charge of material procurement places an order for the material with the material supplier. Then, prepare for acceptance for the scheduled delivery date. That is, based on the material ordering process performed based on the material procurement instruction information, the search information is transmitted from the terminal 20 to the manufacturing management server 10 to acquire information necessary for receiving and storing the material (step S8a ). The information required here is information necessary for performing an acceptance inspection in accordance with a predetermined material acceptance inspection standard and information necessary for storing the received material in accordance with a predetermined material storage standard. When the ordered materials are delivered, an acceptance inspection is performed based on the acquired information, and the accepted materials are stored. It is also possible to store various information in advance in the terminal 20 and search and obtain necessary information in the terminal 20.
[0041] 納品された資材の受け入れ検査は、例えば、材料受入検査基準に定められた以下 のような方法によって行われる。まず、資材の入庫ごとに、検査の教育を受けた納品 検査担当者が、納品物の数量、寸法、メーカー名、を納品書により確認する。そして 、ロット Noをメーカーラベルまたは荷札により確認する。確認方法は例えば目視によ る。そして、合格と判定された納品物は、識別表示基準に基づいて所定の表示が付 される。これにより、識別可能とされる。そして、所定の置場に、予め定められた材料 保管基準に従って保管される。  [0041] The acceptance inspection of the delivered material is performed, for example, by the following method defined in the material acceptance inspection standard. First, for each warehousing of materials, a delivery inspection person who has received an education of inspection confirms the quantity, dimensions, and manufacturer name of the delivery items on the delivery note. Then, the lot number is confirmed by the manufacturer label or the tag. The confirmation method is visually. A delivery that is determined to pass is given a predetermined display based on the identification display criteria. As a result, identification is possible. Then, it is stored in a predetermined place according to a predetermined material storage standard.
[0042] (C)製造  [0042] (C) Manufacturing
次に、製造管理サーバ 10で作成された製造計画に基づき、予め定められた製造 技術基準及び工程管理基準に従って部品の製造を行う製造作業について説明する 製造計画として、上記準備情報に含まれる必要な耐カフレームの品目(部品記号) 及び数量のリストと、着工日などのスケジュール情報と、その他利用可能な情報に基 づき、どの部品を、工場内のどの製造請負業者に、どのようなスケジュールで製造さ せるかが決定され、製造請負業者に与える製造指示情報が作成される。  Next, based on the manufacturing plan created by the manufacturing management server 10, a manufacturing plan for explaining the manufacturing operation for manufacturing parts in accordance with the predetermined manufacturing technology standard and process control standard is included in the above preparation information. Based on a list of items (part symbols) and quantities of frame-resistant frames, schedule information such as start date, and other available information, which parts to which manufacturing contractor in the factory, what schedule It is determined whether or not to manufacture, and manufacturing instruction information to be given to the manufacturing contractor is created.
[0043] 製造指示情報には、例えば、部品図、組み立て図、工程図、積算リスト等が含まれ る。また、邸別生産用製造指示書、週間発注工程表、ロット生産用製造指示書、等が 含まれる。この中で、邸別生産用製造指示書は、施主ごとに部品をとりまとめて管理 するためのものである。また、週間発注工程表は、週間日程計画に基づき、材料搬 入と製造とを毎日一定量行うように設定したものである。これにより、現場への出荷は 日により多少があっても、毎日の製造作業は一定量ずつ行われるように調整される。  [0043] The manufacturing instruction information includes, for example, a part drawing, an assembly drawing, a process drawing, an integration list, and the like. Also included are production instructions for production by residence, weekly ordering schedules, production instructions for lot production, and so on. Among these, the manufacturing instruction for production by residence is for collecting and managing parts for each owner. The weekly ordering schedule is based on a weekly schedule and is set so that a certain amount of material is delivered and manufactured every day. As a result, even if there are some shipments to the site, the daily production work is adjusted so that a certain amount is performed.
[0044] 製造請負業者は、ステップ S6において製造管理サーバ 10から送信された製造指 示情報を受信し、端末に表示する (ステップ S7b)。次に、確認した情報に基づき、製 造請負業者は、製造作業を行う。また、設備点検基準に基づき、製造設備や治具の 点検や整備を行う。そして、完成した製品に対して予め定められた製品検査基準に 従って抜き取り検査を行い、合格品カゝ否かを判定する。 [0044] The manufacturing contractor receives the manufacturing instruction information transmitted from the manufacturing management server 10 in step S6 and displays it on the terminal (step S7b). Next, based on the confirmed information, The contractor performs manufacturing operations. In addition, inspection and maintenance of manufacturing equipment and jigs will be conducted based on equipment inspection standards. Then, the completed product is subjected to a sampling inspection according to a predetermined product inspection standard to determine whether or not the product is acceptable.
すなわち、製造指示情報に基づいて製造準備を行う工程において、端末 20から製 造管理サーバ 10に検索情報を送信し、製造作業、設備点検、製品検査等に必要な 情報を取得する (ステップ S8b)。ここで必要な情報とは、上記各作業について予め 定められた管理基準に従って作業を行うために必要な情報である。  That is, in the process of manufacturing preparation based on the manufacturing instruction information, the search information is transmitted from the terminal 20 to the manufacturing management server 10, and information necessary for manufacturing work, equipment inspection, product inspection, etc. is acquired (step S8b). . Here, the necessary information is information necessary for performing the work in accordance with the management standard defined in advance for each of the above work.
[0045] 製造請負業者は、例えば、耐カフレームの製造作業では、まず、上記材料保管基 準に従って保管された軽量形鋼、鋼板、溶接ナット、溶接ボルト、溶接ワイヤ、等の資 材を必要分出庫し、資材の加工に伴って、順次製造ラインの所定場所に設置する。 出庫の際には、保管担当者に連絡する。また、置場の場所、置場に設置されたかん ばん、資材に付されたラベル等により、使用する資材を間違いなく識別することがで きる。 [0045] For example, manufacturing contractors need materials such as lightweight sections, steel plates, welding nuts, welding bolts, welding wires, etc. stored in accordance with the above-mentioned material storage standards in the manufacturing work of the frame-resistant frame. Distribute and install it at a predetermined location on the production line as materials are processed. When leaving the store, contact the person in charge of storage. In addition, the material used can be definitely identified by the location of the storage site, the kanban installed at the storage site, and the label attached to the material.
[0046] そして、まず、鋼材に孔開け、切断等の加工を行う。上記と同様に、予め定められた 製造技術基準に従い、製造ロットの初回、あるいは始業時の最初の製造において、 孔位置、孔径、孔かえり、切断寸法、切断かえり等を確認する。確認方法は、目視、ノ ギスあるいはコンベックスを用いた測定による。そして規格値との相違が許容範囲を 超える場合には、手直し基準に従って、加工した資材を加工しなおす。  [0046] First, the steel material is processed such as drilling and cutting. In the same manner as described above, the hole position, hole diameter, hole burr, cut dimension, cut burr, etc. are confirmed in the first production lot or the first production at the start of the production according to the predetermined production technology standards. The confirmation method is by visual observation, measurement using calipers or convexes. If the difference from the standard value exceeds the allowable range, rework the processed material according to the rework standard.
次に、溶接ナット及び溶接ボルトを鋼材に溶接する加工を行う。このとき、予め定め られた製造技術基準に従い、製造ロットの初回、あるいは始業時の最初の製造にお いて、溶接したナット、ボルトの脱落の有無、溶接電流、通電時間等を確認する。確 認方法は、目視あるいは溶接モニターによる。  Next, the process which welds a welding nut and a welding bolt to steel materials is performed. At this time, in accordance with the predetermined manufacturing technology standards, the welded nuts and bolts are checked for dropout, welding current, energization time, etc. at the first manufacturing lot or at the first manufacturing at the start of operation. Confirmation method is by visual inspection or welding monitor.
[0047] 次に、予め定められた識別表示基準に従い、邸別生産用製造指示書、週間発注 工程表、ロット生産用製造指示書に従って加工した各資材や部品に対して、識別表 示を行う。例えば、邸別生産用製造指示書に基づき加工した各資材や部品には、施 主名を表示する。表示方法は、例えばラベル等の貼付、スタンプ、マーキングなどに より行うことができる。また、必要に応じて、ロット No、品目(部品記号)、製造日、作業 者名等を表示する。 [0048] 続 、て、鋼材同士を組立溶接する加工を行う。このとき、予め定められた製造技術 基準に従い、製造ロットの初回、あるいは始業時の最初の製造において、フレーム高 さ、フレーム幅、対角寸法差、変型、曲がり、ねじれ、溶接長、溶接電流、溶接電圧、 炭酸ガス流量等を確認する。確認方法は、目視、電流計、電圧計、流量計等による。 そして確認した値が許容範囲外の場合には、手直し基準に従って修正する。また、 溶接箇所のグラインダー仕上げ、スパッタ除去を行う。 [0047] Next, according to a predetermined identification display standard, identification display is performed for each material and part processed according to the manufacturing instruction for each house, the weekly ordering process chart, and the manufacturing instruction for lot production. . For example, the name of the owner is displayed on each material and part processed based on the manufacturing instruction for each house. The display method can be performed, for example, by attaching a label or the like, stamping, marking, or the like. If necessary, the lot number, item (part code), date of manufacture, worker name, etc. are displayed. [0048] Subsequently, a process of assembling and welding the steel materials is performed. At this time, in accordance with the predetermined manufacturing technology standards, in the first production of the production lot or the first production at the start of operation, the frame height, the frame width, the diagonal dimension difference, the deformation, the bending, the twist, the welding length, the welding current, Check the welding voltage, carbon dioxide flow rate, etc. The confirmation method is visual inspection, ammeter, voltmeter, flow meter, etc. If the confirmed value is out of the allowable range, it is corrected according to the rework standard. Also, grinder finish and spatter removal at the weld location.
[0049] 以上の加工によりフレーム形状が出来上がると、続いて、部品図との照らし合わせ で検査を行う。上記確認項目のうち、フレーム高さ、フレーム幅、対角寸法差、孔位 置、溶接長、曲がり、ねじれ、変型等を確認する。そして、合格であれば、検査完了 表示及び工程検査員名の表示を行う。続いて、製品検査を行い、同様に、検査完了 表示及び検査員名の表示を行う。そして、フレームに電着塗装を行ったのち、検査 及び識別表示を行う。  [0049] When the frame shape is completed by the above processing, the inspection is then performed by checking against the component drawing. Among the items to be checked, check the frame height, frame width, diagonal size difference, hole position, weld length, bend, twist, deformation, etc. If it passes, the inspection completion display and the process inspector name are displayed. Subsequently, the product is inspected. Similarly, the inspection completion display and the inspector name are displayed. After the electrodeposition coating is applied to the frame, inspection and identification are performed.
[0050] (D)出荷  [0050] (D) Shipment
次に、製造管理サーバ 10で作成された出荷計画に基づいて行われる出荷作業に ついて説明する。  Next, the shipping work performed based on the shipping plan created by the manufacturing management server 10 will be described.
出荷担当者は、ステップ S6において製造管理サーバ 10から送信された出荷指示 情報を受信し、端末に表示する (ステップ S7c)。そして、確認した情報に基づき、出 荷日に向けて出荷の準備を行う。出荷担当者は、端末 20から製造管理サーバ 10に 検索情報を送信し、出荷の準備に必要な情報を取得し (ステップ S8c)、利用すること ができる。  The person in charge of shipping receives the shipping instruction information transmitted from the manufacturing management server 10 in step S6, and displays it on the terminal (step S7c). Then, based on the confirmed information, prepare for shipment toward the shipping date. The person in charge of shipping can transmit the search information from the terminal 20 to the production management server 10 to acquire information necessary for preparation for shipping (step S8c) and use it.
[0051] 具体的には、完成した部品のうち、上記各検査に合格した合格品については、製 品保管基準に従い、部品に表示された施主名ごとに集積し保管されている。このよう に、出荷される部品は 1棟分ずつまとめて保管され、トラックに積み易いように荷造り される。これにより、各々の部品がどの施主の現場に出荷されるのかが容易に判別可 能とされる。また、施主別にまとめて集積されていれば、出荷の際に必要な部品が漏 れることがない。また、出荷スケジュール別に集積されることになり、集積スペースの 無駄をなくすことができる。従って、製造した部品の集積'保管を効率的に行うことが できる。 [0052] そして、出荷担当者は、配車計画を立て、出荷許可証の発行を受ける手続きを行う 。続いて、配車が整うと、出荷スケジュールに従って積み込み作業を行い、出荷検収 を行って現場へ向けて発送する。輸送業務は委託業者が行い、現場で荷卸作業を 行う。出荷担当者は、出荷検収が完了すると現場への引渡しが終了(出荷完了)した として、売上として計上する手続きを行う。以上のようにして、製造から出荷までの各 作業が完了する。 [0051] Specifically, among completed parts, those that have passed the above inspections are collected and stored for each owner name displayed on the parts in accordance with the product storage standards. In this way, the parts to be shipped are stored together for each building and packed so that they can be easily loaded onto a truck. As a result, it is possible to easily determine to which client site each part is shipped. In addition, if they are integrated together by owner, the parts required for shipping will not be leaked. In addition, since it is accumulated according to the shipping schedule, waste of the accumulation space can be eliminated. Therefore, it is possible to efficiently collect and store the manufactured parts. [0052] Then, the person in charge of shipping makes a vehicle allocation plan and performs a procedure for receiving a shipping permit. Subsequently, when the vehicle is ready, the loading operation is performed according to the shipping schedule, the shipment is inspected and sent to the site. Transport operations are performed by contractors and unloading work is performed on site. The person in charge of shipping performs the procedure of recording as sales on the assumption that delivery to the site is completed (shipping is completed) when shipping inspection is completed. As described above, each operation from manufacturing to shipping is completed.
[0053] 以上のように、本発明によれば、以下のような効果を奏する。  [0053] As described above, according to the present invention, the following effects can be obtained.
本発明の製造出荷システム及び製造出荷方法によれば、予め準備した管理基準と 具体的発注情報とを利用することにより、資材調達、製造加工、出荷等の各種スケジ ユールを、施工時に部品が確実に現場に届くように決定することができる。また、資材 調達指示情報、製造指示情報、出荷指示情報を作成して各担当者に受け渡し、各 担当者は必要に応じて管理基準などのデータを利用することができる。これにより、 効率よく部品の製造を行うことが可能となる。また、施工時に部品を確実に現場に届 けることができる。また逆に、工場に不要な部品が滞留することがなぐ管理コストを削 減することができる。  According to the manufacturing / shipping system and the manufacturing / shipping method of the present invention, by using the management standards prepared in advance and the specific ordering information, various schedules such as material procurement, manufacturing processing, shipping, etc., can be ensured. You can decide to reach the site. In addition, material procurement instruction information, manufacturing instruction information, and shipping instruction information are created and passed to each person in charge, and each person in charge can use data such as management standards as necessary. This makes it possible to manufacture parts efficiently. In addition, parts can be reliably delivered to the site during construction. Conversely, management costs can be reduced because unnecessary parts do not stay in the factory.
[0054] また、識別表示基準、製品保管基準に従って部品を管理することにより、各々の部 品がどの施主の現場に出荷されるのかが容易に判別可能とされる。また、施主別に まとめて集積されていれば、出荷の際に必要な部品が漏れることがない。また、出荷 スケジュール別に集積されることになり、集積スペースの無駄をなくすことができる。 従って、製造した部品の集積'保管を効率的に行うことができる。  [0054] Further, by managing the parts in accordance with the identification display standard and the product storage standard, it is possible to easily determine which owner's site each part is shipped to. Also, if they are integrated together by owner, the parts required for shipping will not leak. In addition, since it is accumulated according to the shipping schedule, waste of the accumulation space can be eliminated. Therefore, it is possible to efficiently collect and store the manufactured parts.
各々の工場または製造請負業者における工程管理能力を反映させた個別工程管 理基準を予め準備することにより、各々の工程管理能力に応じて資材調達、製造、 出荷等の各種スケジュールを決定することができる。従って、工場による能力のばら つきを補正することができ、施工時に部品を確実に現場に届けることができる。  By preparing in advance individual process control standards that reflect the process control capability of each factory or manufacturing contractor, various schedules such as material procurement, manufacturing, and shipping can be determined according to each process control capability. it can. Therefore, it is possible to compensate for variations in capacity due to factories, and to reliably deliver parts to the site during construction.

Claims

請求の範囲 The scope of the claims
[1] 建物に使用される部品'部材の製造に関する管理基準が格納される製造管理情報 格納手段と、  [1] Manufacturing management information storage means for storing management standards related to the manufacture of parts used in buildings
受注した建物の施工に必要な部品'部材の品目、数量、着工日を含む具体的発注 情報を取得する発注情報取得手段と、  Order information acquisition means for acquiring the specific order information including the item, quantity, and start date of the parts necessary for the construction of the building for which the order was received,
前記管理基準および前記具体的発注情報に基づ!/、て、資材調達スケジュールを 含む資材発注情報,製造品目及び製造スケジュールを含む製造指示情報,出荷ス ケジュールを含む出荷指示情報,を作成する情報加工手段と、  Based on the management criteria and the specific ordering information, information to create material ordering information including a material procurement schedule, manufacturing instruction information including manufacturing items and manufacturing schedule, and shipping instruction information including a shipping schedule Processing means;
前記資材発注情報、前記製造指示情報、前記出荷指示情報、のいずれかに基づ き前記管理基準に含まれる情報を抽出する情報検索手段と、を備え、  Information retrieval means for extracting information included in the management standard based on any of the material ordering information, the manufacturing instruction information, and the shipping instruction information;
前記管理基準には、製造する部品の各々に該部品が使用される建物の施主名を 表示した識別手段を付与して識別可能に管理することを定めた識別表示基準,製造 する部品の各々を該部品に表示された施主名に基づいて集積し保管することを定め た製品保管基準,が含まれることを特徴とする製造出荷システム。  The management standard includes an identification display standard that stipulates that each part to be manufactured is provided with an identification means that displays the name of the owner of the building in which the part is used, and that each part to be manufactured is managed. A manufacturing / shipping system characterized by including a product storage standard that stipulates accumulation and storage based on a client name displayed on the part.
[2] 前記管理基準には、各々の工場または製造ラインにおける工程管理能力を反映さ せた個別工程管理基準が含まれ、  [2] The above management standards include individual process control standards that reflect the process control capability in each factory or production line.
前記具体的発注情報には、製造を担当する工場または製造請負業者を指定する 指定情報が含まれ、  The specific ordering information includes designation information for designating a factory or manufacturing contractor in charge of production,
前記情報加工手段は、前記指定情報に基づき、指定された工場または製造ライン の工程管理能力を反映させて前記製造スケジュール及び前記資材調達スケジユー ルを作成することを特徴とする請求項 1に記載の製造出荷システム。  The said information processing means creates the said manufacturing schedule and the said material procurement schedule reflecting the process control capability of the designated factory or a manufacturing line based on the said designation | designated information. Manufacturing shipping system.
[3] 前記管理基準には、材料受入検査基準、材料保管基準、製造技術基準、設備点 検基準、製品検査基準、工程検査基準、の少なくともいずれかが含まれることを特徴 とする請求項 1または請求項 2に記載の製造出荷システム。  [3] The management standard includes at least one of a material acceptance inspection standard, a material storage standard, a manufacturing technology standard, a facility inspection standard, a product inspection standard, and a process inspection standard. Or the manufacturing and shipping system according to claim 2.
[4] 建物に使用する部品'部材の製造に関する管理基準を予め作成し、製造管理情報 格納手段に格納する工程と、  [4] The process of creating a management standard related to the manufacture of the parts used for the building and storing it in the manufacturing management information storage means;
受注した建物の施工に必要な部品'部材の品目、数量、着工日を含む具体的発注 情報を取得する工程と、 前記管理基準および前記具体的発注情報に基づき、資材調達スケジュールを含 む資材調達指示情報,製造品目及び加工スケジュールを含む製造指示情報,出荷 スケジュールを含む出荷指示情報,を自動で作成する工程と、 The process of obtaining specific ordering information including the item, quantity and start date of the parts necessary for the construction of the building Automatically generating material procurement instruction information including a material procurement schedule, manufacturing instruction information including a manufacturing item and a processing schedule, and shipping instruction information including a shipping schedule based on the management standard and the specific ordering information;
前記資材調達指示情報、前記製造指示情報、前記出荷指示情報、のいずれかに 基づき前記管理基準に含まれる情報を抽出する工程と、  Extracting information included in the management standard based on any of the material procurement instruction information, the manufacturing instruction information, and the shipping instruction information;
前記管理基準に含まれる識別表示基準に基づき、製造する部品の各々に該部品 が使用される建物の施主名を表示した識別手段を付与する工程と、  Providing an identification means that displays the name of the owner of the building where the part is used, based on the identification display standard included in the management standard; and
前記管理基準に含まれる識別表示基準に基づき、製造する部品の各々を該部品 に表示された施主名に基づいて集積し保管する工程と、を行うことを特徴とする製造 出荷方法。  And a step of accumulating and storing each of the parts to be manufactured based on a client name displayed on the parts based on an identification display standard included in the management standard.
PCT/JP2005/006354 2005-03-31 2005-03-31 Production/shipment system and method WO2006114806A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2005/006354 WO2006114806A1 (en) 2005-03-31 2005-03-31 Production/shipment system and method
CNA2005800493614A CN101151627A (en) 2005-03-31 2005-03-31 Production/shipment system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2005/006354 WO2006114806A1 (en) 2005-03-31 2005-03-31 Production/shipment system and method

Publications (1)

Publication Number Publication Date
WO2006114806A1 true WO2006114806A1 (en) 2006-11-02

Family

ID=37214446

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2005/006354 WO2006114806A1 (en) 2005-03-31 2005-03-31 Production/shipment system and method

Country Status (2)

Country Link
CN (1) CN101151627A (en)
WO (1) WO2006114806A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7342296B1 (en) 2023-03-27 2023-09-11 株式会社メタルワン Metal base material management system, metal base material management method, and metal base material management program

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5540877B2 (en) * 2010-05-14 2014-07-02 富士ゼロックス株式会社 Information processing apparatus and information processing program

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003345969A (en) * 2002-05-27 2003-12-05 Hitachi Ltd Supporting system and method for business operation
JP2004265427A (en) * 2004-03-29 2004-09-24 Matsushita Electric Ind Co Ltd Method and system for monitoring and managing implementation factory

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003345969A (en) * 2002-05-27 2003-12-05 Hitachi Ltd Supporting system and method for business operation
JP2004265427A (en) * 2004-03-29 2004-09-24 Matsushita Electric Ind Co Ltd Method and system for monitoring and managing implementation factory

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7342296B1 (en) 2023-03-27 2023-09-11 株式会社メタルワン Metal base material management system, metal base material management method, and metal base material management program

Also Published As

Publication number Publication date
CN101151627A (en) 2008-03-26

Similar Documents

Publication Publication Date Title
US20060212323A1 (en) Production management system
US20140172479A1 (en) Integrated Customer Profiling, Service Provider Matching and Smart Order, Creation System and Method
US20150234377A1 (en) Construction management system
US20030208434A1 (en) On-line system and method for analyzing vendor proposals in response to a request-for-proposal
US20030105775A1 (en) Plant management system
WO2001077781A2 (en) Method and system to obtain automatic quotations from manufacturing details
US20130290052A1 (en) Methods and systems for managing renovation of a property
KR20210082919A (en) Production and logistics ERP automation system by linking and using customer information
US20230081485A1 (en) Information processing device, information processing method and non-transitory computer-readable medium
US20030074329A1 (en) Computer-implemented method and system for supporting price negotiations
Liu et al. Resource-loaded piping spool fabrication scheduling: Material-supply-driven optimization
JP2010267219A (en) Work information management system
WO2006114806A1 (en) Production/shipment system and method
JP2007041799A (en) Project management support system
CN116757464A (en) Production plan management method, system, equipment and readable storage medium
KR100561067B1 (en) Automatic ordering and manufacturing system and method thereof
US20030126025A1 (en) Method, system, and storage medium for facilitating procurement of direct and indirect items
JPH09319795A (en) Work control system in product processing work
JP2000210845A (en) Production control device and method
Perdomo-Rivera A framework for a decision support model for supply chain management in the construction industry
KR102025281B1 (en) Metal Product Oder Method Through Promote Oder Enlargement
JP2001160101A (en) Processing method, system and terminal device for inventory management
JP3902161B2 (en) International consolidated logistics system
KR20130096092A (en) Method for the administration of physical distribution using bar code on enterprise resource planning system
Navon et al. Automated materials management and control model

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200580049361.4

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Country of ref document: DE

NENP Non-entry into the national phase

Ref country code: RU

WWW Wipo information: withdrawn in national office

Country of ref document: RU

122 Ep: pct application non-entry in european phase

Ref document number: 05727247

Country of ref document: EP

Kind code of ref document: A1

WWW Wipo information: withdrawn in national office

Ref document number: 5727247

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: JP