JP2000210845A - Production control device and method - Google Patents

Production control device and method

Info

Publication number
JP2000210845A
JP2000210845A JP983599A JP983599A JP2000210845A JP 2000210845 A JP2000210845 A JP 2000210845A JP 983599 A JP983599 A JP 983599A JP 983599 A JP983599 A JP 983599A JP 2000210845 A JP2000210845 A JP 2000210845A
Authority
JP
Japan
Prior art keywords
product
cost
production management
delivery date
days
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP983599A
Other languages
Japanese (ja)
Inventor
Isaburo Kataoka
猪三郎 片岡
Takeshi Hamazaki
猛 浜崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP983599A priority Critical patent/JP2000210845A/en
Publication of JP2000210845A publication Critical patent/JP2000210845A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To provide a production control device and its method, capable of quickly coping with personal changes and the change of production equipment and the like, and of being used in a multipurpose manner for a production line different in the kind of a product to be manufactured. SOLUTION: A cost computing part 15 and the like are provided, capable of computing the cost of a part while referring to the capacity of equipment to manufacture a product, the ability of operators working for manufacturing the product, and the price of parts making up the product upon receiving the order slip 13 of the product, and an alternation part 19 is also provided, capable of accepting the alternation of the housed contents of ability data base 11 and member data base 12.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、製品の計画から
納入に至る一連の業務を管理する生産管理装置及び生産
管理方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production management apparatus and a production management method for managing a series of operations from product planning to delivery.

【0002】[0002]

【従来の技術】図26は従来の生産管理装置を示す構成
図であり、図において、1は製品のコストを計算するた
めのコスト計算プログラムを記憶するとともに、製品の
納期を計算するための納期計算プログラムを記憶する記
憶部、2は製造する製品の種類や個数等が記述された発
注伝票、3は発注伝票2を入力して製品の種類や個数を
解析し、製品の種類や個数を示す製品情報を出力する伝
票受付部、4はコスト計算プログラムを実行して製品の
コストを計算するとともに、納期計算プログラムを実行
して製品の納期を計算するコスト・納期計算部、5はコ
スト・納期計算部4により計算された製品のコストと納
期をCRT6に表示する表示制御部、6はCRTであ
る。
2. Description of the Related Art FIG. 26 is a block diagram showing a conventional production management apparatus. In FIG. 26, reference numeral 1 denotes a delivery date for storing a cost calculation program for calculating the cost of a product and for calculating a delivery date of the product. A storage unit for storing a calculation program, 2 is an ordering slip in which the type and number of products to be manufactured are described, and 3 is an ordering slip 2 which inputs the ordering slip 2 and analyzes the type and number of products to indicate the type and number of products. A slip receiving unit that outputs product information, a cost / delivery date calculation unit that executes a cost calculation program and calculates a product delivery date by executing a cost calculation program, and a cost / delivery date calculation unit that executes a delivery date calculation program. A display control unit for displaying the cost and delivery date of the product calculated by the calculation unit 4 on the CRT 6, and the display control unit 6 is a CRT.

【0003】次に動作について説明する。例えば、製造
会社の計画部の部員が発注伝票2を伝票受付部3に入力
すると、伝票受付部3は、発注伝票2に記述されている
製品の種類や個数を解析し、製品の種類(例えば、船舶
の操作盤)や個数(例えば、10台)を示す製品情報を
出力する。
Next, the operation will be described. For example, when a member of the planning department of the manufacturing company inputs the order slip 2 to the slip receiving section 3, the slip receiving section 3 analyzes the type and number of products described in the order slip 2, and analyzes the type of the product (for example, And product information indicating the operation panel of the ship) and the number (for example, 10).

【0004】そして、コスト・納期計算部4は、伝票受
付部3から製品の種類や個数を示す製品情報を受ける
と、記憶部1に記憶されているコスト計算プログラムと
納期計算プログラムを実行する。
[0004] Upon receiving the product information indicating the type and number of products from the slip receiving unit 3, the cost / delivery calculation unit 4 executes the cost calculation program and the delivery date calculation program stored in the storage unit 1.

【0005】即ち、コスト計算プログラムを実行するこ
とにより、その製品の設計に要する費用(人件費)と、
その製品の製造や検査に要する費用(人件費と設備使用
費)と、その製品を構成する部材の価格とを計算して、
その製品のコストを計算する。また、納期計算プログラ
ムを実行することにより、その製品の設計に要する日数
と、その製品の製造や検査に要する日数と、その製品を
構成する部材の調達日数とを計算して、その製品の納期
を計算する。
[0005] That is, by executing the cost calculation program, the cost required for designing the product (personnel cost) and
Calculate the costs required for the manufacture and inspection of the product (personnel costs and equipment usage costs) and the price of the components that make up the product,
Calculate the cost of the product. Also, by executing the delivery date calculation program, the number of days required for the design of the product, the number of days required for the manufacture and inspection of the product, and the number of days for procurement of components constituting the product are calculated, and the delivery date of the product is calculated. Is calculated.

【0006】そして、表示制御部5は、コスト・納期計
算部4が製品のコストと製品の納期を計算すると、その
製品のコストと納期をCRT6に表示する。これによ
り、製造会社の計画部の部員等は、製品のコストと納期
を確認することができる。
When the cost / delivery calculation unit 4 calculates the cost of the product and the delivery date of the product, the display control unit 5 displays the cost and delivery date of the product on the CRT 6. As a result, members of the planning department of the manufacturing company can check the cost and delivery date of the product.

【0007】[0007]

【発明が解決しようとする課題】従来の生産管理装置は
以上のように構成されているので、発注伝票を伝票受付
部3に入力すれば、製品のコストと納期を確認すること
ができるが、人事異動や生産設備の変動等が発生する
と、改修に手間を要するコスト計算プログラムや納期計
算プログラムを修正しなければ、製品のコストと納期を
正確に計算することができなくなる課題があった。ま
た、製造する製品の種類が異なる生産ラインには、同一
のコスト計算プログラム及び納期計算プログラムを使用
することができないため、生産管理装置に汎用性を持た
せることができない課題があった。さらに、製品の設計
開始後に、人事異動や生産設備の変動等が発生して、製
品のコストと納期が計画段階と異なる事態が発生して
も、その旨を計画者等に通知し、さらに必要に応じて当
初の計画を変更することができない課題もあった。
Since the conventional production management apparatus is configured as described above, the cost and delivery date of the product can be confirmed by inputting the order slip into the slip receiving section 3. When personnel changes or fluctuations in production equipment occur, there is a problem that the cost and delivery date of a product cannot be accurately calculated unless a cost calculation program or a delivery time calculation program that requires labor for repair is modified. In addition, since the same cost calculation program and delivery date calculation program cannot be used for production lines with different types of products to be manufactured, there is a problem that the production management device cannot have versatility. Furthermore, even if personnel changes or changes in production equipment occur after the product design starts, and the cost and delivery date of the product differ from the planning stage, the fact is notified to the planner, etc. There was also a problem that the initial plan could not be changed according to the situation.

【0008】また、計画の立案にあたり参照するマスタ
データは、システム管理者等が手動でメンテナンスしな
ければ最新の情報にならず、そのため、これを元に作成
した生産計画は最近の諸事情の変化(部材、リソース能
力などの値の変化)を反映しておらず、正確さを欠くと
いう課題もあった。さらに、各プロセスにおけるリソー
スの割付などの計画立案にあたっては、該プロセスに関
する詳しい知識を持つ者でなくては正確に立案ができな
い課題もあった。また、既製品と殆ど仕様的に変わらな
い製品に関する計画立案についても、新しい製品として
最初から設計やコスト見積もりなどを行わなければなら
ない課題もあった。
Further, the master data referred to in making a plan does not become the latest information unless it is manually maintained by a system administrator or the like. Therefore, a production plan created based on the master data is subject to recent changes in various circumstances. (Changes in values of components, resource capabilities, etc.), and there was a problem that accuracy was lacking. In addition, there is a problem that it is not possible to accurately make a plan, such as resource allocation in each process, unless a person who has detailed knowledge of the process is required. In addition, there is also a problem that it is necessary to design and estimate costs from the beginning as a new product in planning a product that is almost the same in specifications as an existing product.

【0009】この発明は上記のような課題を解決するた
めになされたもので、人事異動や生産設備の変動等に対
して速やかに対処することができるとともに、製造する
製品の種類が異なる生産ラインに対して汎用的に使用す
ることができる生産管理装置及び生産管理方法を得るこ
とを目的とする。また、製品のコストと納期が計画段階
と異なる事態が発生すると、その旨を計画者等に通知す
ることができる生産管理装置を得ることを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is possible to quickly cope with personnel changes and fluctuations in production equipment, etc., and to provide a production line in which the types of products to be manufactured are different. An object of the present invention is to obtain a production management device and a production management method that can be used for general purposes. Another object of the present invention is to provide a production management apparatus capable of notifying a planner or the like when a situation occurs in which the cost and delivery date of a product are different from the planning stage.

【0010】[0010]

【課題を解決するための手段】この発明に係る生産管理
装置は、製品の発注伝票を受けると、その製品を製造す
る設備の能力,その製品の製造に係わる人間の能力及び
その製品を構成する部材の価格を参照して、その製品の
コストを計算するコスト計算手段を設けるとともに、能
力データ格納手段及び部材データ格納手段の格納内容の
変更を受け付ける変更手段を設けたものである。
SUMMARY OF THE INVENTION A production management apparatus according to the present invention, when receiving a product order slip, configures the capabilities of facilities for manufacturing the product, the capabilities of humans involved in manufacturing the product, and the product. A cost calculation means for calculating the cost of the product with reference to the price of the member is provided, and a change means for receiving a change in the storage contents of the capability data storage means and the member data storage means is provided.

【0011】この発明に係る生産管理装置は、製品の発
注伝票を受けると、その製品を製造する設備の能力,そ
の製品の製造に係わる人間の能力及びその製品を構成す
る部材の調達日数を参照して、その製品の納期を計算す
る納期計算手段を設けるとともに、能力データ格納手段
及び部材データ格納手段の格納内容の変更を受け付ける
変更手段を設けたものである。
[0011] When a production management device according to the present invention receives an order slip for a product, it refers to the capability of the facility for manufacturing the product, the capability of humans involved in the manufacture of the product, and the number of days of procurement of members constituting the product. A delivery date calculation means for calculating the delivery date of the product is provided, and a change means for receiving a change in the storage contents of the capability data storage means and the member data storage means is provided.

【0012】この発明に係る生産管理装置は、製品の発
注伝票を受けると、その製品を製造する設備の能力,そ
の製品の製造に係わる人間の能力及びその製品を構成す
る部材の価格を参照して、その製品のコストを計算する
コスト計算手段と、製品の発注伝票を受けると、その製
品を製造する設備の能力,その製品の製造に係わる人間
の能力及びその製品を構成する部材の調達日数を参照し
て、その製品の納期を計算する納期計算手段とを設ける
とともに、能力データ格納手段及び部材データ格納手段
の格納内容の変更を受け付ける変更手段を設けたもので
ある。
[0012] When the production management device according to the present invention receives an order slip for a product, it refers to the capabilities of the equipment for manufacturing the product, the capabilities of humans involved in the manufacture of the product, and the prices of the members constituting the product. Cost calculation means for calculating the cost of the product, and, upon receiving the order slip for the product, the capacity of the equipment for manufacturing the product, the capabilities of the human beings involved in the manufacture of the product, and the number of days of procurement of the members constituting the product , A delivery date calculation means for calculating a delivery date of the product is provided, and a change means for receiving a change in the storage contents of the capability data storage means and the member data storage means is provided.

【0013】この発明に係る生産管理装置は、同一の部
材に分類される部品が複数個存在する場合、最も価格が
安い部品の価格を参照して、製品のコストを計算するよ
うにしたものである。
In the production management apparatus according to the present invention, when there are a plurality of parts classified as the same member, the cost of the product is calculated by referring to the price of the cheapest part. is there.

【0014】この発明に係る生産管理装置は、同一の部
材に分類される部品が複数個存在する場合、最も調達日
数が短い部品の調達日数を参照して、製品の納期を計算
するようにしたものである。
In the production management apparatus according to the present invention, when there are a plurality of parts classified as the same member, the delivery date of the product is calculated by referring to the number of days of procurement of the part having the shortest number of days of procurement. Things.

【0015】この発明に係る生産管理装置は、納期計算
手段により選択された各部材のコストの合計が指定コス
トを越える場合、他の部品の価格を参照して、製品のコ
ストを指定された範囲内に収まるように再計算するもの
である。
In the production management apparatus according to the present invention, when the total cost of each member selected by the delivery date calculation means exceeds the specified cost, the cost of the product is specified by referring to the prices of other parts. It is recalculated to fit within.

【0016】この発明に係る生産管理装置は、コスト計
算手段により選択された各部材の調達納期が指定納期を
超える場合、他の部品の調達日数を参照して、製品の調
達日数を指定された範囲内に収まるように再計算するも
のである。
In the production management apparatus according to the present invention, when the procurement delivery date of each member selected by the cost calculation means exceeds the designated delivery date, the number of procurement days of the product is designated by referring to the procurement days of other parts. It is recalculated to be within the range.

【0017】この発明に係る生産管理装置は、製品の設
計から製品の製造を経て、製品の納入が完了するまでの
間に、変更手段により能力データ格納手段又は部材デー
タ格納手段の格納内容が変更された場合、製品のコスト
を再計算するようにしたものである。
In the production management device according to the present invention, the storage contents of the capability data storage means or the member data storage means are changed by the change means during the period from the design of the product to the manufacture of the product until the delivery of the product is completed. If so, the cost of the product is recalculated.

【0018】この発明に係る生産管理装置は、製品の設
計から製品の製造を経て、製品の納入が完了するまでの
間に、変更手段により能力データ格納手段又は部材デー
タ格納手段の格納内容が変更された場合、製品の納期を
再計算するようにしたものである。
In the production management device according to the present invention, the storage contents of the capability data storage means or the member data storage means are changed by the change means during the period from the design of the product to the manufacture of the product until the delivery of the product is completed. In such a case, the delivery date of the product is recalculated.

【0019】この発明に係る生産管理装置は、設計部門
の人間の能力を格納する際、既製品を設計する場合の能
力と、新規製品を設計する場合の能力に分けて格納し、
既製品の設計能力計算にあたっては、該既製品における
設計実績データを必要に応じて参照し、利用するもので
ある。
In the production management apparatus according to the present invention, when storing the human ability of the design department, it is stored separately for the ability to design an existing product and the ability to design a new product.
In calculating the design capability of the ready-made product, the actual design data of the ready-made product is referred to and used as needed.

【0020】この発明に係る生産管理装置は、注文品を
設計する場合の能力を参照する際、注文に係る製品が既
製品又は過去に設計された新規製品と類似する製品であ
る場合には、新規製品を設計する場合のコストより割安
にし、コスト計算の際に既製品のコストデータを必要に
応じて参照し、利用するものである。
[0020] The production management apparatus according to the present invention, when referring to the ability in designing an ordered product, when an ordered product is an existing product or a product similar to a new product designed in the past, The cost is lower than the cost of designing a new product, and the cost data of the existing product is referred to and used as needed when calculating the cost.

【0021】この発明に係る生産管理装置は、新製品を
設計する場合の能力を参照する際、注文に係る製品が既
製品又は過去に設計された注文品と類似する製品である
場合には、必要に応じて既製品の完了実績データを参照
して、納期計算の際に利用するものである。
[0021] The production management device according to the present invention, when referring to the ability when designing a new product, when the product pertaining to the order is an existing product or a product similar to an order product designed in the past, It is used when calculating the delivery date by referring to the completed result data of the ready-made product as necessary.

【0022】この発明に係る生産管理装置は、部材の調
達先が指定された場合、その調達先において指定された
部材の価格である購入価格を参照して、製品のコストを
計算するものである。
A production management apparatus according to the present invention calculates a product cost by referring to a purchase price, which is the price of a member specified by the supplier, when the supplier of the member is specified. .

【0023】この発明に係る生産管理装置は、部材の調
達先が指定された場合、その調達先から生産拠点までの
部材の調達日数であるリードタイムを参照して、製品の
納期を計算するものである。
[0023] A production management apparatus according to the present invention calculates a delivery date of a product by referring to a lead time, which is the number of days of material procurement from a supplier to a production base, when a material supplier is designated. It is.

【0024】この発明に係る生産管理装置は、コスト計
算手段により計算された製品のコストが指定コストを上
回る場合、指定コストを上回る旨を示すメッセージを提
示するようにしたものである。
In the production management apparatus according to the present invention, when the cost of the product calculated by the cost calculation means exceeds the designated cost, a message indicating that the designated cost is exceeded is presented.

【0025】この発明に係る生産管理装置は、納期計算
手段により計算された製品の納期が指定納期を越える場
合、指定納期に間に合わない旨を示すメッセージを提示
するようにしたものである。
In the production management apparatus according to the present invention, when the delivery date of the product calculated by the delivery date calculation means exceeds the designated delivery date, a message indicating that the specified delivery date cannot be met is presented.

【0026】この発明に係る生産管理装置は、コスト計
算手段により計算された製品のコストが再計算された場
合、再計算後の製品のコストを提示するとともに、計画
段階と状況が異なる旨を示すメッセージを提示するよう
にしたものである。
In the production management apparatus according to the present invention, when the cost of the product calculated by the cost calculation means is recalculated, the cost of the product after the recalculation is presented, and the fact that the situation is different from the planning stage is indicated. The message is presented.

【0027】この発明に係る生産管理装置は、納期計算
手段により計算された製品の納期が再計算された場合、
再計算後の製品の納期を提示するとともに、計画段階と
状況が異なる旨を示すメッセージを提示するようにした
ものである。
According to the production management apparatus of the present invention, when the delivery date of a product calculated by the delivery date calculation means is recalculated,
The delivery date of the product after recalculation is presented, and a message indicating that the situation is different from the planning stage is presented.

【0028】この発明に係る生産管理装置は、工程管理
者によって入力された設備の稼働実績と人間の就労実績
を考慮して、設備の能力と人間の能力を更新し、その旨
を関係者に通知するものである。
The production management apparatus according to the present invention updates the capability of the equipment and the capability of the human in consideration of the operation results of the equipment and the employment performance of the human input by the process manager, and informs the concerned parties of the update. Notify.

【0029】この発明に係る生産管理装置は、部材の供
給元から部材の新規登録を含む部材の価格又は調達日数
の変更要求を受けると、部材の価格又は調達日数を更新
し、その旨を計画立案中の担当者などに通知するもので
ある。
When the production management apparatus according to the present invention receives a request for changing the price or the number of days of procurement of a member including a new registration of a member from a supplier of the member, the production management device updates the price or number of days of procurement of the member and plans to that effect. This is to notify the person in charge of planning.

【0030】この発明に係る生産管理装置は、計画担当
者の通知において、その変更のあった部材は、担当者が
計画中の製品に対して適用可能である場合に限って、該
通知が行われるものである。
[0030] The production management apparatus according to the present invention, when notified by the person in charge of the plan, sends the changed member only when the member is applicable to the product being planned by the person in charge. It is something to be done.

【0031】この発明に係る生産管理装置は、部材の供
給元からインターネット経由で変更要求を受け付けるよ
うにしたものである。
The production management device according to the present invention is adapted to receive a change request from a member supplier via the Internet.

【0032】この発明に係る生産管理装置は、製品名、
数量、納期といった生産計画の基本要素であるデータを
計画立案者に入力させ、これをもとに計画指示書を作成
する作成手段を設けたものである。
The production management device according to the present invention includes a product name,
There is provided a creating means for allowing a planner to input data which are basic elements of a production plan such as quantity and delivery date, and for creating a plan instruction based on the data.

【0033】この発明に係る生産管理装置は、シミュレ
ーション機能を有し、計画に係る製品の製造コスト及び
所要日数がどれ位になるかを計算する機能を備えるもの
である。
The production management apparatus according to the present invention has a simulation function, and has a function of calculating the production cost and the required number of days of a product according to a plan.

【0034】この発明に係る生産管理装置は、製造コス
トの計算において、コスト計算手段を起動し、ここから
得られる最適な部品構成を計算して、これをシミュレー
ション結果として利用するものである。
The production management apparatus according to the present invention activates cost calculation means in calculating a manufacturing cost, calculates an optimum component configuration obtained therefrom, and uses it as a simulation result.

【0035】この発明に係る生産管理装置は、所要日数
の計算において、納期計算手段を起動し、ここから得ら
れる最適な部品構成を計算して、これをシミュレーショ
ン結果として利用するものである。
In the production management apparatus according to the present invention, in calculating the required number of days, the delivery date calculation means is activated, the optimum component configuration obtained from the means is calculated, and this is used as a simulation result.

【0036】この発明に係る生産管理装置は、製造コス
トの計算において、シミュレーション結果は、その製品
と同一種類に属する各製品の製造コストの平均値であっ
てもよいようにしたものである。
In the production management apparatus according to the present invention, in the calculation of the manufacturing cost, the simulation result may be an average value of the manufacturing costs of each product belonging to the same type as the product.

【0037】この発明に係る生産管理装置は、所要日数
の計算において、シミュレーション結果は、その製品と
同一種類に属する各製品の所要日数の平均値であっても
よいようにしたものである。
In the production management apparatus according to the present invention, in the calculation of the required days, the simulation result may be an average value of the required days of each product belonging to the same type as the product.

【0038】この発明に係る生産管理装置は、作成手段
により作成された計画指示書を製品の製造に係わる関係
部門に配信し、この内容で良いか否かを関係者に問い合
わせを行うワークフロー機能を有する配信手段を設けた
ものである。
The production management apparatus according to the present invention has a workflow function for distributing the planning instructions created by the creating means to the departments involved in the manufacture of products and inquiring concerned parties whether or not the contents are satisfactory. Having a distribution means.

【0039】この発明に係る生産管理装置は、製品の製
造に係わる関係部門から計画指示書の承認又は非承認を
示すデータを計画指示書の配信元に返送し、非承認であ
る場合は、非承認である理由及び代替案を返送し、一方
承認である場合は、この内容を正式の計画指示書として
確定させるものである。
The production management apparatus according to the present invention returns data indicating the approval or non-approval of the plan instruction from the department involved in the manufacture of the product to the distribution source of the plan instruction. The reason for the approval and the alternatives will be returned, while if it is approved, the content will be finalized as a formal planning instruction.

【0040】この発明に係る生産管理装置は、製品の製
造に係わる関係部門の進捗状況を入力し、この入力結果
を計画指示書に反映するものである。
The production management apparatus according to the present invention inputs the progress of the related departments involved in the manufacture of products and reflects the input result in the plan instruction.

【0041】この発明に係る生産管理装置は、進捗状況
入力手段が関係部門の進捗状況を入力すると、工程遅れ
の有無を判断するようにしたものである。
In the production management apparatus according to the present invention, when the progress input means inputs the progress of the related department, it is determined whether there is a process delay.

【0042】この発明に係る生産管理装置は、工程遅れ
を検知すると指定納期に間に合うか否かを判断し、指定
納期に間に合わない場合には、指定納期に間に合わない
旨を示すメッセージを工程管理者に通知するようにした
ものである。
The production management device according to the present invention determines whether or not the specified delivery date is due when the process delay is detected. If the specified delivery date is not met, a message indicating that the specified delivery date is not met is sent to the process manager. Is to be notified.

【0043】この発明に係る生産管理装置は、指定納期
に間に合わない旨を示すメッセージを通知する際、指定
納期に間に合わない原因及び遅れが見込まれる日数を通
知するようにしたものである。
In the production management apparatus according to the present invention, when a message indicating that the designated delivery date is not delivered is notified, the cause of the failure to meet the designated delivery date and the number of days expected to be delayed are notified.

【0044】この発明に係る生産管理装置は、進捗管理
手段により工程遅れの通知を受け取った工程管理者が工
程遅れに対処する代替案を入力すると、その代替案を製
品の製造に係わる関係部門に配信し、この代替案で良い
か否かをワークフローして問い合わせを行うものであ
る。
In the production management apparatus according to the present invention, when a process manager who has received a notification of a process delay by the progress management means inputs an alternative to deal with the process delay, the alternative is sent to a department involved in the manufacture of the product. It distributes and inquires whether this alternative is good or not in a workflow.

【0045】この発明に係る生産管理装置は、関係部門
から代替案の承認を受けると、計画指示書を変更するよ
うにしたものである。
The production management apparatus according to the present invention is configured to change a plan instruction when an alternative is approved by a related department.

【0046】この発明に係る生産管理装置は、客先から
インターネット経由で製品の発注を受け付けて、発注伝
票を作成するようにしたものである。
The production management apparatus according to the present invention receives an order for a product from a customer via the Internet and creates an order slip.

【0047】この発明に係る生産管理装置は、客先から
の発注内容を営業部門へメール等で転送し、その結果営
業部門がこれを承認した場合、そのデータに基づいて受
注の有無を客先に回答するものである。
The production management apparatus according to the present invention transfers the contents of an order from a customer to a sales department by e-mail or the like. As a result, when the sales department approves the order, the customer determines whether or not there is an order based on the data. The answer is.

【0048】この発明に係る生産管理装置は、客先から
発注オーダの変更要求を受けると、その変更内容を営業
部門などの関係部門に配信するものである。
The production management apparatus according to the present invention, when receiving a request for changing the order from a customer, distributes the change to a related department such as a sales department.

【0049】この発明に係る生産管理装置は、関係部門
から変更内容の承認又は非承認を示すデータを受ける
と、そのデータに基づいて変更受諾の有無を客先に回答
するようにしたものである。
[0049] The production management apparatus according to the present invention, when receiving data indicating approval or non-approval of a change content from a related department, replies to the customer whether or not the change has been accepted based on the data. .

【0050】この発明に係る生産管理装置は、関係部門
から変更内容の承認を受けると、計画指示書を変更する
ようにしたものである。
In the production management apparatus according to the present invention, the plan instruction is changed when approval of the change is received from the related department.

【0051】この発明に係る生産管理装置は、能力デー
タ格納手段により格納された人間の能力を人事評価用の
データベースに送信するようにしたものである。
In the production management apparatus according to the present invention, the human ability stored in the ability data storage means is transmitted to a personnel evaluation database.

【0052】この発明に係る生産管理方法は、製品の発
注伝票を受けると、データベースに格納されている製品
を製造する設備の能力,その製品の製造に係わる人間の
能力及びその製品を構成する部材の価格を参照して、そ
の製品のコストを計算する一方、データベースの格納内
容の変更を受け付けるようにしたものである。
In the production management method according to the present invention, when a product order slip is received, the capacity of facilities for manufacturing products stored in the database, the capabilities of humans involved in manufacturing the products, and the members constituting the products. With reference to the price, the cost of the product is calculated, and at the same time, a change in the stored contents of the database is accepted.

【0053】この発明に係る生産管理方法は、製品の発
注伝票を受けると、データベースに格納されている製品
を製造する設備の能力,その製品の製造に係わる人間の
能力及びその製品を構成する部材の調達日数を参照し
て、その製品の納期を計算する一方、データベースの格
納内容の変更を受け付けるようにしたものである。
According to the production management method of the present invention, when a product order slip is received, the capacity of the equipment for manufacturing the product stored in the database, the ability of humans involved in the manufacture of the product, and the members constituting the product. With reference to the number of procurement days, a delivery date of the product is calculated, and a change in the content stored in the database is received.

【0054】この発明に係る生産管理方法は、製品の発
注伝票を受けると、データベースに格納されている製品
を製造する設備の能力,その製品の製造に係わる人間の
能力,その製品を構成する部材の価格及びその製品を構
成する部材の調達日数を参照して、その製品のコストと
調達日数を計算する一方、データベースの格納内容の変
更を受け付けるようにしたものである。
In the production management method according to the present invention, when a product order slip is received, the capacity of the equipment for manufacturing the product stored in the database, the capacity of the human being involved in the manufacture of the product, and the members constituting the product The cost and the number of days of procurement of the product are calculated with reference to the price of the product and the number of days of procurement of the components constituting the product, and changes in the contents stored in the database are accepted.

【0055】この発明に係る生産管理方法は、以前に計
画立案者などが入力したある工程に関する設備や人員等
の情報が実績データとしてマスタDBへ格納され、以降
に同様の計画を立てる際にこれらのデータを業務ひな形
として再利用可能にするものである。
In the production management method according to the present invention, information such as equipment and personnel related to a certain process previously input by a planner or the like is stored in the master DB as actual data, and these data are used when a similar plan is made thereafter. This data can be reused as a business model.

【0056】[0056]

【発明の実施の形態】以下、この発明の実施の一形態を
説明する。 実施の形態1.図1はこの発明の実施の形態1による生
産管理装置を示す構成図であり、図において、11は製
品を製造する設備の能力を格納するとともに、製品の製
造に係わる人間の能力を格納する能力データベース(能
力データ格納手段)、12は製品を構成する部材の価格
と調達日数を格納する部材データベース(部材データ格
納手段)、13は製造する製品の種類,個数,指定納期
等が記述された発注伝票、14は発注伝票13を入力し
て製品の種類,個数,指定納期等を解析し、製品の種類
等を示す製品情報を出力する伝票受付部である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below. Embodiment 1 FIG. FIG. 1 is a configuration diagram showing a production management apparatus according to a first embodiment of the present invention. In the figure, reference numeral 11 denotes an ability to store the capabilities of facilities for manufacturing products and the ability to store human abilities related to manufacturing of products. A database (capacity data storage means), 12 is a member database (member data storage means) for storing prices and procurement days of parts constituting the product, and 13 is an order describing the kind, number, designated delivery date, etc. of the product to be manufactured. A slip 14 is a slip receiving unit that inputs the order slip 13 to analyze the type, number, and designated delivery date of the product, and outputs product information indicating the type of the product.

【0057】15は製品を製造する設備の能力,その製
品の製造に係わる人間の能力及びその製品を構成する部
材の価格を参照して、その製品のコストを計算するコス
ト計算部(コスト計算手段)、16は製品を製造する設
備の能力,その製品の製造に係わる人間の能力及びその
製品を構成する部材の調達日数を参照して、その製品の
納期を計算する納期計算部(納期計算手段)、17はコ
スト計算部15により計算された製品のコストと納期計
算部16により計算された製品の納期をCRT18に表
示する表示制御部(提示手段)、18はCRT(提示手
段)、19は部材の供給元から部材の価格又は調達日数
の変更要求を受けた場合、または、製品の納入が完了し
て更新指令を受けた場合、能力データベース11及び部
材データベース12の格納内容を変更する変更部(変更
手段)である。
Reference numeral 15 denotes a cost calculation unit (cost calculation means) for calculating the cost of the product by referring to the capacity of the equipment for manufacturing the product, the human ability involved in the manufacture of the product, and the price of the members constituting the product. ), 16 is a delivery date calculation unit (delivery date calculation means) for calculating the delivery date of the product by referring to the capacity of the equipment for manufacturing the product, the human ability involved in the manufacturing of the product, and the number of days of procurement of the members constituting the product. ) And 17 are display control units (presentation means) for displaying on the CRT 18 the product cost calculated by the cost calculation unit 15 and the product delivery date calculated by the delivery time calculation unit 16, 18 is a CRT (presentation means), and 19 is When a request for changing the price or the number of days for procurement of a member is received from a member supplier, or when the delivery of a product is completed and an update command is received, the capability database 11 and the member database 1 A changing unit for changing the stored content (changing means).

【0058】また、図2は生産管理装置を含む生産管理
システムの全体図、図3はコスト計算部及び納期計算部
の動作を示すフローチャート、図4は生産管理装置の全
体フローを示す概念図、図5は基本的な業務の流れを説
明する説明図である。
FIG. 2 is an overall view of a production management system including a production management apparatus, FIG. 3 is a flowchart showing operations of a cost calculation section and a delivery date calculation section, and FIG. 4 is a conceptual diagram showing an overall flow of the production management apparatus. FIG. 5 is an explanatory diagram for explaining a basic business flow.

【0059】次に動作について説明する。例えば、製造
会社の計画部の部員が発注伝票13を伝票受付部14に
入力すると、伝票受付部14は、発注伝票13に記述さ
れている製品の種類,個数,指定納期等を解析し、製品
の種類(例えば、船舶の操作盤),個数(例えば、10
台),指定納期(例えば、12月24日)等を示す製品
情報を出力する(ステップST1)。
Next, the operation will be described. For example, when a member of the planning department of the manufacturing company inputs the order slip 13 into the slip receiving section 14, the slip receiving section 14 analyzes the type, number, designated delivery date and the like of the product described in the order slip 13 and outputs the product. (For example, the operation panel of a ship) and the number (for example, 10
And product information indicating a designated delivery date (for example, December 24) and the like (step ST1).

【0060】そして、コスト計算部15は、伝票受付部
14から製品情報を受けると、能力データベース11の
格納内容と、部材データベース12の格納内容を参照し
て、その製品のコストを計算する(ステップST2)。
即ち、能力データベース11には、下記に示すように、
製造する設備の能力(例えば、製品の製造時間)と、製
品の製造に係わる人間の能力(例えば、製品の設計時
間、製品の検査時間)が記憶され、部材データベース1
2には、製品を構成する部材の価格が記憶されているの
で、これらを下記の演算式に代入して、その製品のコス
トを計算する。
When receiving the product information from the slip receiving unit 14, the cost calculation unit 15 calculates the cost of the product by referring to the storage contents of the capability database 11 and the storage contents of the member database 12 (step). ST2).
That is, in the ability database 11, as shown below,
The capacity of the equipment to be manufactured (for example, the manufacturing time of the product) and the human abilities related to the manufacturing of the product (for example, the design time of the product, the inspection time of the product) are stored, and the member database 1 is stored.
2 stores the prices of the components that make up the product, and substitutes them into the following equation to calculate the cost of the product.

【0061】(1)製造する設備の能力(1) Capacity of manufacturing equipment

【表1】 (2)製品の製造に係わる人間の能力[Table 1] (2) Human abilities related to product manufacturing

【表2】 [Table 2]

【0062】(3)製品を構成する部材の価格 ・製品→船舶の操作盤 部材A 10万円 部材B 8万円 ・ ・ ・ 部材F 30万円 ・製品→発電所の配電盤 部材G 5万円 部材H 7万円 ・ ・ ・ 部材K 12万円(3) Price of components that make up the product ・ Product → Operation panel of ship Member A 100,000 yen Member B 80,000 yen ・ ・ ・ Member F 300,000 yen ・ Product → Distribution board of power plant Member G 50,000 yen Material H 70,000 yen ・ ・ ・ Material K 120,000 yen

【表3】 [Table 3]

【0063】(4)製品1台当たりのコスト コスト=設計時間×a+製造時間×b+検査時間×c+
全部材の価格の総額 a,b,cは任意の定数
(4) Cost per product Cost = design time × a + manufacturing time × b + inspection time × c +
Total price of all parts a, b, c are arbitrary constants

【0064】例えば、船舶の操作盤を製造する場合、部
材A〜部材Fの価格の総額を上記の演算式に代入するこ
とになるが、下記に示すように、部材Aに分類される部
品が1個ではなく、部材Aに分類される部品が複数個存
在し、各部品の価格が記憶されている場合には、最も価
格が安い部品の価格(部品A2の価格)を参照して計算
する。 ・部材Aに分類される部品 部品A1 11万円 部品A2 9万円 部品A3 10万円
For example, when manufacturing the operation panel of a ship, the total price of the members A to F is substituted into the above-mentioned arithmetic expression. If there is not one but a plurality of parts classified as the member A and the price of each part is stored, the calculation is performed with reference to the price of the cheapest part (the price of the part A2). .・ Parts classified as member A Part A1 110,000 yen Part A2 90,000 yen Part A3 100,000 yen

【0065】そして、コスト計算部15は、製品のコス
トを計算すると、その計算結果を納期計算部16に出力
するが、その製品のコストが指定コストを上回る場合に
は、表示制御部17に対して、指定コストを上回る旨の
通知を出力し、その旨をCRT18に表示させる(ステ
ップST3,ST4)。
When the cost of the product is calculated, the cost calculation unit 15 outputs the calculation result to the delivery date calculation unit 16. When the cost of the product exceeds the designated cost, the cost calculation unit 15 sends the result to the display control unit 17. Then, a notice to the effect that the designated cost is exceeded is output, and the fact is displayed on the CRT 18 (steps ST3 and ST4).

【0066】そして、納期計算部16は、コスト計算部
15が製品のコストを計算すると、能力データベース1
1の格納内容と、部材データベース12の格納内容を参
照して、その製品の納期を計算する(ステップST
5)。即ち、能力データベース11には、製造する設備
の能力(例えば、製品の製造時間)と、製品の製造に係
わる人間の能力(例えば、製品の設計時間、製品の検査
時間)が記憶され、部材データベース12には、製品を
構成する部材の調達日数が記憶されているので、これら
を下記の演算式に代入して、その製品の納期を計算す
る。
When the cost calculation unit 15 calculates the cost of the product, the delivery date calculation unit 16 calculates
1 and the stored content of the member database 12 to calculate the delivery date of the product (step ST).
5). That is, the capability database 11 stores the capability of the equipment to be manufactured (for example, the manufacturing time of the product) and the human abilities related to the manufacturing of the product (for example, the design time of the product and the inspection time of the product). 12 stores the number of days of procurement of the members constituting the product, and substitutes them into the following formula to calculate the delivery date of the product.

【0067】(5)製品を構成する部材の調達日数 ・製品→船舶の操作盤 部材A 5日 部材B 3日 ・ ・ ・ 部材F 4日 ・製品→発電所の配電盤 部材G 1日 部材H 3日 ・ ・ ・ 部材K 7日(5) Procurement days for components that make up the product ・ Product → Operation panel of ship Member A 5 days Member B 3 days ・ ・ Member F 4 days ・ Product → Power distribution board of power plant Member G 1 day Member H 3 Day ・ ・ ・ Material K 7th

【0068】(6)製品1台当たりの所要日数 コスト=設計時間+製造時間+検査時間+全部材のうち
調達日数が一番 遅い部材の調達日数
(6) Required days per product Cost = design time + manufacturing time + inspection time + procurement days of the member with the slowest procurement days of all members

【0069】例えば、船舶の操作盤を製造する場合にお
いて、部材A〜部材Fのうち部材Aの調達日数が一番遅
い場合には、部材Aの調達日数を上記の演算式に代入す
ることになるが、上述したように、部材Aに分類される
部品が1個ではなく、部材Aに分類される部品が複数個
存在し、各部品の調達日数が記憶されている場合があ
る。
For example, when manufacturing the operation panel of a ship, if the number of days of procurement of the member A is the latest among the members A to F, the number of days of procurement of the member A is substituted into the above equation. However, as described above, there is a case where there is not one component classified as the member A but a plurality of components classified as the member A, and the number of days of procurement of each component is stored.

【0070】・部材Aに分類される部品 部品A1 5.3日 部品A2 5.1日 部品A3 4.8日 この場合、コスト計算部15により最も価格が安い部品
として選択された部品(部品A2)の調達日数を上記の
演算式に代入して、製品の納期を計算する。
Parts classified as member A Part A1 5.3 days Part A2 5.1 days Part A3 4.8 days In this case, the part (part A2) selected by the cost calculator 15 as the cheapest part ) Is substituted into the above formula to calculate the delivery date of the product.

【0071】そして、納期計算部16は、製品の納期を
計算すると、その製品の納期とコストを表示制御部17
に出力してCRT18に表示させるが(ステップST
8)、その製品の納期が客先の指定納期を越える場合に
は、表示制御部17に対して、指定納期に間に合わない
旨の通知を出力し、その旨をCRT18に表示させる
(ステップST6,ST7)。ただし、上述した部材A
のように、同一の部材に分類される部品が1個ではな
く、複数個の部品の情報(価格、調達日数)が記憶され
ている場合には、コスト計算部15に対して、コストの
再計算を指令したのち、再度、製品の納期を計算する。
After calculating the delivery date of the product, the delivery date calculation unit 16 displays the delivery date and cost of the product on the display control unit 17.
To be displayed on the CRT 18 (step ST
8) If the delivery date of the product exceeds the designated delivery date of the customer, a notification that the designated delivery date is not delivered is output to the display control unit 17, and the fact is displayed on the CRT 18 (step ST6). ST7). However, the member A described above
In the case where information (price, number of days of procurement) of a plurality of parts is stored instead of one part classified as the same member as in After instructing the calculation, the delivery date of the product is calculated again.

【0072】例えば、部品A2を使用したとき、製品の
納期が間に合わないという結果がでた場合には、部品A
2の次に安価な部品A3の価格を参照して、製品のコス
トを計算したのち、部品A3の調達日数を参照して、製
品の納期を計算する。そして、製品の納期が客先の指定
納期を越える場合には、更に、コストの再計算指令をコ
スト計算部15に出力するが、製品の納期が客先の指定
納期に間に合う場合には、その計算結果を表示制御部1
7に出力する。一方、製品の納期が客先の指定納期に間
に合う部品がもはや存在しない場合には、指定納期に間
に合わない旨の通知を出力し、その旨をCRT18に表
示させる(コスト計算部15及び納期計算部16の計算
結果も表示させる)。
For example, when using the part A2, if the result that the delivery date of the product is not in time comes out,
After calculating the cost of the product by referring to the price of the second cheapest part A3, the delivery date of the product is calculated by referring to the number of days of procurement of the part A3. If the delivery date of the product exceeds the delivery date specified by the customer, a cost recalculation command is further output to the cost calculation unit 15. If the delivery date of the product meets the delivery date specified by the customer, the cost is re-calculated. Display control unit 1 for calculation results
7 is output. On the other hand, when there is no longer a part whose delivery date of the product is within the designated delivery date of the customer, a notification indicating that the product cannot be delivered in time for the designated delivery date is output, and the fact is displayed on the CRT 18 (the cost calculation unit 15 and the delivery date calculation unit). 16 is also displayed).

【0073】これにより、製品のコスト、製品の納期、
指定コストを確保できない旨のメッセージ、指定納期に
間に合わない旨のメッセージ等の情報がCRT18に表
示されるので、製造会社の計画部の部員等は、これらの
情報に基づいて発注された製品の製造許否を判断するこ
とになる。なお、これらの情報が記述された計画指示書
(図6を参照)、即ち、指示書オブジェクトが作成手段
により作成され、その指示書オブジェクトは関係部門間
で共有される(図7を参照)。ただし、図7には製品構
成コストマスタ等の記述があるが、これらの意味は図8
に記述している。例えば、指示書オブジェクトが設計部
門,資材部門,製造部門,検査部門等で共有され(設計
や部材の調達等の全てを指示書オブジェクトに基づいて
実行する)、製品の設計から納入までの工程が一元的に
管理される(詳細は実施の形態6,7を参照)。
As a result, the cost of the product, the delivery date of the product,
Since information such as a message indicating that the designated cost cannot be secured and a message indicating that the designated delivery date cannot be delivered is displayed on the CRT 18, a member of the planning department of the manufacturing company can manufacture the ordered product based on the information. The decision will be made. A plan instruction (see FIG. 6) in which these pieces of information are described, that is, an instruction object is created by the creating unit, and the instruction object is shared between the related departments (see FIG. 7). Note that FIG. 7 includes a description of a product configuration cost master, etc.
Is described in. For example, the instruction object is shared by the design department, the material department, the manufacturing department, the inspection department, etc. (all of the design and parts procurement are performed based on the instruction object), and the process from product design to delivery is performed. It is managed centrally (see Embodiments 6 and 7 for details).

【0074】そして、発注された製品の製造が許可され
た場合、指示書オブジェクトに基づいて製品の設計等が
行われるが、例えば、製品の製造が完了して、その製品
が客先に納入されると、能力データベース11の格納内
容を最新の状態に維持するため、設備の稼働実績と人間
の就労実績を考慮して、設備の能力と人間の能力を更新
する。即ち、変更部19は、製品の納入が完了して更新
指令を受けた場合、または、図9(a)に示すように、
最近の進捗実績履歴とプロセス能力マスタを参照し、能
力変動が認められる等の場合(担当者、組織、設備等の
各種リソースの処理能力に定常的な変化が確認される場
合)、設備の稼働実績と人間の就労実績を考慮して、能
力データベース11の格納内容を更新する。
When the manufacture of the ordered product is permitted, the product is designed based on the instruction object. For example, the manufacture of the product is completed and the product is delivered to the customer. Then, in order to maintain the contents stored in the capability database 11 in the latest state, the capability of the facility and the capability of the human are updated in consideration of the operation results of the facility and the human employment results. That is, the change unit 19 receives the update instruction after the delivery of the product is completed, or as shown in FIG.
Refers to the recent progress history and process capability master, and if there is a change in capacity (when a steady change in the processing capacity of various resources such as persons in charge, organization, facilities, etc. is confirmed), operation of the facility The storage contents of the ability database 11 are updated in consideration of the results and the employment results of humans.

【0075】具体的には、製品の製造が許可された後、
担当者の最新の能力を入力して変更する。また、工程管
理者等が入力する進捗状況や各種リソースの働きは、進
捗ログとして記録されるが、これらを変更部19が監視
し、当該リソースのプロセス能力マスタの値に比して解
離している状態が一定期間以上継続すると、即ち、担当
者が定常的なオーバーワークにより、一定期間のパフォ
ーマンスを向上させると、例えば、工程管理者等が進捗
状況を入力する際、能力変動を検知してプロセス能力マ
スタの当該リソース部分のデータを更新する。なお、工
程の担当先が社内ではなく外注である場合、社内の工程
管理者が進捗状況を日々入力することができないので、
依頼日と完了日を社内の人間が入力する。この結果から
パフォーマンスの平均値が計算され、その平均値が外注
のプロセス能力マスタのデータとして取り扱われる。そ
の際の値は、外注会社の全体としてのプロセス能力とな
る。
Specifically, after the manufacture of the product has been approved,
Enter and change the person's latest capabilities. The progress status and the functions of various resources input by the process manager or the like are recorded as a progress log. These are monitored by the change unit 19 and dissociated compared to the value of the process capability master of the resource. If the status continues for more than a certain period of time, that is, if the person in charge improves the performance for a certain period of time through regular overwork, for example, when a process manager etc. Update the data of the resource part of the process capability master. If the person in charge of the process is outsourced instead of in-house, the in-house process manager cannot input the progress status every day.
The request date and completion date are entered by a person in the company. An average value of the performance is calculated from the result, and the average value is treated as data of the process capability master outsourced. The value at that time is the overall process capability of the outsourcing company.

【0076】また、変更部19は、図9(b)に示すよ
うに、例えば、人事異動や生産設備の変動等に伴って、
設備の能力と人間の能力の変更要求が発生すると、その
要求にしたがって能力データベース11の格納内容を変
更する。例えば、ある工程で使用している設備が故障し
て、代替機種を購入した場合や、不慮の事故等が発生し
て依頼先を変更する場合などに生じる。何れも計画実行
過程で発生する可能性がある事象であり、これらの処置
を講ずるに際しては、工程管理者による関係者の伺いが
必要である。配信手段及び返送手段の動作により、伺い
の結果承認が得られると、計画指示書と関連するリソー
ス等のマスタ情報が更新される。
Further, as shown in FIG. 9B, the change unit 19 is provided, for example, in response to a personnel change or a change in production equipment.
When a request for changing the capability of the equipment and the capability of the human is generated, the storage content of the capability database 11 is changed according to the request. For example, it occurs when equipment used in a certain process breaks down and a substitute model is purchased, or when an unexpected accident or the like occurs and the request destination is changed. All of these are events that may occur in the process of executing the plan, and in order to take these measures, it is necessary for the process manager to ask the relevant persons. When approval is obtained as a result of the inquiry by the operation of the distribution means and the return means, master information such as resources related to the plan instruction is updated.

【0077】なお、製品を納入する前に変更要求を受け
た場合でも、能力データベース11の格納内容を変更す
るが、この場合、製品の計画段階と状況が異なり、先に
計算されたコストや納期が無意味なものになるので、変
更後の能力(現状の能力)を参照して、再度、製品のコ
ストと納期を計算し、その計算結果をCRT18に表示
する。また、その際、人事異動等に伴って計画段階と状
況が変化した旨を示すメッセージ等もCRT18に表示
する。
Even if a change request is received before the product is delivered, the contents stored in the capacity database 11 are changed. In this case, the situation differs from the planning stage of the product, and the cost and delivery date calculated earlier are different. Is meaningless, the cost and delivery date of the product are calculated again with reference to the changed capacity (current capacity), and the calculation result is displayed on the CRT 18. At this time, a message or the like indicating that the planning stage and the situation have changed due to a personnel change or the like is also displayed on the CRT 18.

【0078】さらに、変更部19は、図9(c)に示す
ように、部材の供給元からインターネット経由で、部材
の価格又は調達日数の変更要求を受けると(例えば、部
材の改良等に伴って、部材の価格や調達日数が変動する
場合)、その要求にしたがって部材データベース12の
格納内容(部材の価格又は調達日数)を変更する(図1
0を参照)。
Further, as shown in FIG. 9 (c), when the change unit 19 receives a request for changing the price or the number of days of procurement of the component from the supplier of the component via the Internet (for example, with the improvement of the component, etc.) In the case where the price of the member or the number of days of procurement changes, the contents stored in the member database 12 (the price of the member or the number of days of procurement) are changed according to the request (FIG. 1).
0).

【0079】例えば、部材の供給元である業者から部材
データが自動的にダウンロードされると、部材マスタや
製品マスタの該当部分が更新される。その際、更新され
た最新日付が記憶され、この日付が更新されると、新た
に構成部材を検討し直すか否かを問うため、部材監視手
段がその旨を関係者に通知する。
For example, when member data is automatically downloaded from a supplier that supplies members, the corresponding parts of the member master and the product master are updated. At this time, the updated latest date is stored, and when this date is updated, the member monitoring means notifies the relevant person of the fact to ask whether or not to reconsider a new component.

【0080】ここで、部材監視手段は、図11に示すよ
うに、計画指示書で指定されている対象製品を作成する
ための部品について、その部品に関するマスタDB(部
品マスタ、製品マスタ)を一定のタイミングで参照して
ゆき、仮に、計画指示書で使用されている部品情報より
も新しい部品情報がマスタDBに存在すると、その旨を
関係者に通知する。関係者への通知は、計画指示書に指
定されている関係者に対してメール等で行われる。
Here, as shown in FIG. 11, the member monitoring means keeps a master DB (part master, product master) related to the part for creating the target product specified in the plan instruction. If the part information newer than the part information used in the plan instruction exists in the master DB, the related person is notified. The notification to the related persons is made by e-mail or the like to the related persons specified in the plan instruction.

【0081】新規部品でも、その部品を使用することで
製品の全体機能に影響がでるようでは困るので、部品情
報を判断する際は、その部品の用途、対象製品、部品仕
様等を参照して、これらが現在の部品と同一であるもの
だけを拾うようにする。仮に、置き換え可能な新規製品
を検索した場合、この部品を使用するか否かを関係者に
メール等で配信して問い合わせるが、その際に新規部品
を使用することでもたらされるメリットの情報を提供す
る。メリットの判断は、例えば、部品データの各項目を
参照し、これを既存部品データと比較計算などを実行す
ることで行う(例えば、価格がいくら安くなる、調達時
間が少なくなる、多くの関連製品に適用できる等のメリ
ットを提示する)。
Even with a new part, it is difficult to use the part to affect the overall function of the product. Therefore, when judging the part information, refer to the use of the part, the target product, the part specification, and the like. , Ensure that only those which are identical to the current part are picked up. If you search for a new product that can be replaced, you will be informed by email or other information to the relevant person whether or not to use this part. At that time, information on the merits brought by using the new part will be provided. I do. The merit is determined by, for example, referring to each item of the component data and performing a comparison calculation with the existing component data (for example, how much the price is reduced, the procurement time is reduced, and many related products are reduced). And other advantages).

【0082】また、変更部19は、図9(d)に示すよ
うに、設計や基本仕様の変更があると、それに該当する
マスタデータや計画指示書を変更するが、これについて
は後述する(実施の形態9を参照)。
As shown in FIG. 9D, when there is a change in the design or the basic specifications, the change unit 19 changes the corresponding master data or plan instruction, which will be described later (see FIG. 9D). See Embodiment 9).

【0083】以上で明らかなように、この実施の形態1
によれば、製品の発注伝票13を受けると、その製品を
製造する設備の能力,その製品の製造に係わる人間の能
力及びその製品を構成する部材の価格を参照して、その
製品のコストを計算するコスト計算部15と、製品の発
注伝票13を受けると、その製品を製造する設備の能
力,その製品の製造に係わる人間の能力及びその製品を
構成する部材の調達日数を参照して、その製品の納期を
計算する納期計算部16とを設けるとともに、能力デー
タベース11及び部材データベース12の格納内容の変
更を受け付ける変更部19を設けるように構成したの
で、人事異動や生産設備の変動等が生じた場合、能力デ
ータベース11や部材データベース12の格納内容を変
更するだけで対処することができるようになり、その結
果、人事異動や生産設備の変動等に対して速やかに対処
することができる効果を奏する。また、製造する製品の
種類が異なる生産ラインに対しても、能力データベース
11や部材データベース12の格納内容を変更するだけ
で適用することができるため、装置の汎用性を高めるこ
とができる効果を奏する。
As is apparent from the above, the first embodiment
According to the above, upon receiving the order slip 13 for a product, the cost of the product is determined by referring to the capacity of the facility for manufacturing the product, the capabilities of humans involved in the manufacture of the product, and the prices of the members constituting the product. Upon receiving the cost calculation unit 15 for calculating the product and the order slip 13 for the product, referring to the capacity of the facility for manufacturing the product, the capacity of human beings involved in the manufacture of the product, and the number of days of procurement of the members constituting the product, A delivery date calculation unit 16 for calculating the delivery date of the product is provided, and a change unit 19 for receiving a change in the storage contents of the capability database 11 and the member database 12 is provided. If this occurs, it is possible to deal with it simply by changing the storage contents of the capability database 11 and the member database 12, and as a result, personnel changes and production An effect that can be addressed quickly relative to the fluctuation. In addition, the present invention can be applied to production lines with different types of products to be manufactured by simply changing the storage contents of the capability database 11 and the member database 12, so that the versatility of the apparatus can be improved. .

【0084】実施の形態2.上記実施の形態1では、コ
スト計算部15が製品のコストを計算したのち、納期計
算部16が製品の納期を計算するものについて示した
が、納期計算部16が製品の納期を計算したのち、コス
ト計算部15が製品のコストを計算するようにしてもよ
い。ただし、この場合には、コスト計算部15が製品の
コストを計算して、そのコストが指定コストを上回ると
き、納期の再計算指令を納期計算部16に出力するよう
にする。これにより、上記実施の形態1と同様の効果を
奏する。
Embodiment 2 In the first embodiment, the cost calculation unit 15 calculates the cost of the product, and then the delivery date calculation unit 16 calculates the delivery date of the product. However, after the delivery date calculation unit 16 calculates the delivery date of the product, The cost calculator 15 may calculate the cost of the product. However, in this case, the cost calculator 15 calculates the cost of the product, and when the cost exceeds the designated cost, outputs a recalculation command of the delivery date to the delivery date calculator 16. Thereby, the same effect as in the first embodiment can be obtained.

【0085】実施の形態3.上記実施の形態1では、設
計部門の人間の能力を能力データベース11に格納する
際、既製品を設計する場合の能力と、新製品を設計する
場合の能力を特に区別することなく格納するものについ
て示したが、下記に示すように、既製品を設計する場合
の能力と、新製品を設計する場合の能力に分けて格納す
るようにしてもよい。
Embodiment 3 In the first embodiment, when storing the human ability of the design department in the ability database 11, the ability to design an existing product and the ability to design a new product are stored without distinction. Although shown, the capacity for designing an existing product and the capacity for designing a new product may be stored separately as shown below.

【0086】(7)製品の製造に係わる人間の能力(設
計部門の人間の能力) ・既製品を設計する場合の能力 設計時間 100時間 ・注文品を設計する場合の能力 設計時間 200時間
(7) Human abilities related to the manufacture of products (human abilities of the design department) ・ Ability to design ready-made products 100 hours ・ Ability to design custom products 200 hours

【0087】これにより、既製品の設計に要する時間
と、新製品の設計に要する時間が異なる実情が考慮され
て、製品のコストと納期が計算されるため、コスト及び
納期の計算精度が向上する効果が得られる。
Thus, the cost and delivery date of a product are calculated in consideration of the fact that the time required for designing an existing product and the time required for designing a new product are different, so that the calculation accuracy of cost and delivery date is improved. The effect is obtained.

【0088】実施の形態4.上記実施の形態3では、既
製品を設計する場合の能力と、新製品を設計する場合の
能力に分けて格納するものについて示したが、さらに、
既製品又は過去に設計された注文品に類似する類似品を
設計する場合の能力を格納するようにしてもよい。
Embodiment 4 In the above-described third embodiment, the case where the capacity for designing an existing product and the capacity for designing a new product are separately stored has been described.
The ability to design an off-the-shelf product or a similar product similar to an order product designed in the past may be stored.

【0089】(8)製品の製造に係わる人間の能力(設
計部門の人間の能力) ・既製品を設計する場合の能力 設計時間 100時間 ・注文品を設計する場合の能力 設計時間 200時間 ・類似品を設計する場合の能力 設計時間 150時間
(8) Human abilities related to the manufacture of products (human abilities in the design department) ・ Ability to design ready-made products 100 hours ・ Ability to design custom products 200 hours ・ Similar Ability to design products Design time 150 hours

【0090】上記に示すように、一般的に、既製品の設
計に要する時間が最も短く、次に、類似品の設計に要す
る時間が短く、注文品の設計に要する時間が最も長いと
いう実情が考慮されて、製品のコストと納期が計算され
るため、コスト及び納期の計算精度が更に向上する効果
が得られる。なお、言うまでもないが、類似品を設計す
る場合のコストは、注文品を設計する場合のコストより
割安になり、また、類似品を設計する場合の納期は、注
文品を設計する場合の納期より一般に短くなる場合が多
い。
As described above, in general, the time required for designing a ready-made product is the shortest, the time required for designing a similar product is short, and the time required for designing an ordered product is the longest. Since the cost and delivery date of the product are calculated in consideration of the above, the effect of further improving the calculation accuracy of the cost and delivery date is obtained. Needless to say, the cost of designing a similar product is lower than the cost of designing an ordered product, and the delivery time of designing a similar product is shorter than the delivery time of designing an ordered product. Generally, it is often shorter.

【0091】ここで、発注された製品が既製品等に類似
しているか否かの判断であるが、概念的には、発注され
た製品の図面と、既製品等の図面を比較し、例えば、両
者の基本仕様や使用部材、あるいは、形状などで近似性
が見出されれば、類似していると判断する(図13を参
照)。
Here, it is determined whether or not the ordered product is similar to a ready-made product or the like. Conceptually, the drawing of the ordered product is compared with the drawing of the ready-made product. If similarity is found in the basic specifications, the members used, or the shapes of the two, it is determined that they are similar (see FIG. 13).

【0092】具体的には、コスト計算部15又は納期計
算部16がコスト又は納期を計算する際、発注された製
品の基本仕様や製品分類を入力して、類似判断を実行す
るロードモジュールを呼び出すことにより、製品情報マ
スタ、部品情報マスタ、過去の設計指示書(完了実績)
等に記録されている製品データを検索対象にして類似判
断を実行する。ただし、検索対象の製品データは、製品
情報マスタ等に記録されている全ての製品データではな
く、発注された製品と同一の製品分類に属する製品の製
品データである。
More specifically, when the cost calculation unit 15 or the delivery date calculation unit 16 calculates the cost or the delivery date, the basic specifications and the product classification of the ordered product are input, and the load module for executing the similarity determination is called. By this, product information master, parts information master, past design instructions (completed results)
The similarity determination is executed with the product data recorded in the file or the like as a search target. However, the product data to be searched is not the product data recorded in the product information master or the like, but the product data of products belonging to the same product category as the ordered product.

【0093】類似性の判断は、図13に示すフローチャ
ートにしたがって実行するが、類似性を判断する基準に
は、製品の基本仕様、仕様部品、製造業者名などの検索
パラメータがあり、これらの検索パラメータを満たして
いるとき類似関係にあると判断する。ただし、例えば、
製造業者名だけが一致し、基本仕様等が異なっているよ
うな場合、類似しているとは言えないので、このような
場合に類似関係が認められるのは不適切である。そこ
で、これらの検索パラメータには重み付け値が付与され
(優先順位が高い検索パラメータには大きな重み付け値
が付与される)、条件を満たす検索パラメータの重み付
け値の合計が閾値を越えるとき、類似関係にあると判断
する。
The similarity is determined according to the flowchart shown in FIG. 13. The criteria for determining the similarity include search parameters such as the basic specifications of the product, specification parts, and the manufacturer name. When the parameters are satisfied, it is determined that there is a similarity. However, for example,
If only the manufacturer names match and the basic specifications and the like are different, it cannot be said that they are similar, so it is inappropriate to recognize similarity in such a case. Therefore, a weight value is assigned to these search parameters (a large weight value is assigned to a search parameter having a higher priority), and when the sum of the weight values of the search parameters satisfying the condition exceeds a threshold value, a similarity relationship is established. Judge that there is.

【0094】なお、類似関係が認められた類似製品の基
本データ(例えば、製品情報)は、CRT18に表示さ
れるが(表示形式はユーザの指定が可能である。したが
って、類似関係が認められた類似製品の全ての基本デー
タを表示してもよいし、優先順位の高い検索条件を満た
している類似製品の基本データのみを表示してもよ
い)、その類似製品の過去の計画指示書等もCRT18
に表示される。これにより、どの程度の費用と工期を要
するかを類推することができる。また、個々の類似製品
のデータを提供するだけではなく、検索された製品間の
平均値を計算して、それをユーザ等に提供してもよい
(例えば、使用部材の入手先、平均価格、平均納期)。
The basic data (for example, product information) of a similar product having a similar relationship is displayed on the CRT 18 (the display format can be specified by the user. Therefore, the similar relationship has been recognized). All basic data of similar products may be displayed, or only basic data of similar products satisfying the search criteria with high priority may be displayed), and past planning instructions of the similar products are also displayed. CRT18
Will be displayed. Thereby, it is possible to analogize how much cost and construction period are required. Further, in addition to providing data of individual similar products, an average value between searched products may be calculated and provided to a user or the like (for example, a source of used materials, an average price, Average delivery time).

【0095】因みに、類似判断モジュールは、計画指示
書の作成を補助するため、製品のコスト又は納期を計算
する際、コスト計算部15又は納期計算部16により呼
び出されるが、製品分類や基本仕様等といった製品を定
義付ける上での基本的な要因値が入力されれば、類似判
断モジュールを単独で起動することも可能である。
Incidentally, the similarity determination module is called by the cost calculation unit 15 or the delivery date calculation unit 16 when calculating the cost or the delivery date of the product to assist in the preparation of the planning instruction. When a basic factor value for defining a product is input, the similarity determination module can be started alone.

【0096】実施の形態5.上記実施の形態1等では、
部材の調達先については特に言及していないが、通常
は、製造会社の資材部が、コスト計算部15や納期計算
部16によりコストと納期が計算されたのち、その計算
の基準とされた部品の調達先を選定するが(部品の調達
先を示す調達先データを参照して、調達先を選定す
る)、例えば、客先や計画部等から部材の調達先が指定
された場合には、その調達先データを参照して、調達先
が提供する部材を決定し、それから、部材データベース
12に記憶されたその部材の価格及び調達日数を参照し
て、その製品のコストと納期を計算するようにしてもよ
い。これにより、部材の調達先が決められている場合で
も、製品のコストと納期を計算することができる効果を
奏する。
Embodiment 5 In the first embodiment and the like,
Although the supplier of the parts is not particularly mentioned, usually, the material department of the manufacturing company calculates the cost and the delivery date by the cost calculation unit 15 and the delivery date calculation unit 16, and then sets the component used as the basis for the calculation. (The supplier is selected by referring to the supplier data indicating the parts supplier.) For example, if the parts supplier is designated by the customer or the planning department, By referring to the supplier data, a component provided by the supplier is determined, and then the cost and delivery date of the product are calculated by referring to the price and the number of days of the component stored in the component database 12. It may be. As a result, there is an effect that the cost and the delivery date of the product can be calculated even when the supplier of the member is determined.

【0097】実施の形態6.上記実施の形態1等では、
計画指示書が設計部門,資材部門,製造部門,検査部門
等で共有され、製品の設計から納入までの工程が一元的
に管理されるものについて示したが、この実施の形態6
では、計画指示書の作成について説明する。なお、図1
4は計画指示書の作成手順を示すフローチャートであ
る。
Embodiment 6 FIG. In the first embodiment and the like,
Although the design instruction, the materials department, the manufacturing department, the inspection department, and the like are shared by the planning instructions and the processes from product design to delivery are centrally managed, this embodiment is described.
Now, creation of the planning instruction will be described. FIG.
4 is a flowchart showing a procedure for creating a planning instruction.

【0098】計画指示書は、例えば、製造会社の計画部
等により作成され、製品の製造に係わる関係部門間のワ
ークフローによって了解が得られると完成するが(図4
を参照)、本システムにおける製造管理の中心的役割を
担うものであり、製品の製造に係わる全データ(計画立
案者が入力した品名、納期等のデータの他に、各マスタ
DBへのポインタ情報)を有するオブジェクトである。
また、オブジェクトは上記のデータの他に、各処理を実
行する処理モジュールへのポインタ(参照先に関する情
報)や、本システムにおける各処理手段のポインタを所
持する。
The planning instruction is created by, for example, the planning department of the manufacturing company, and is completed when the approval is obtained by the workflow between the related departments related to the production of the product (FIG. 4).
), And plays a central role in manufacturing management in this system, and includes all data related to manufacturing of a product (in addition to data such as a product name and a delivery date input by a planner, pointer information to each master DB). ).
Further, the object has, in addition to the above data, a pointer to a processing module that executes each processing (information about a reference destination) and a pointer of each processing unit in the present system.

【0099】計画指示書の作成に際しては、客先オーダ
情報と、関係部門により入力された詳細情報(例えば、
基本仕様、使用部材)と、各種マスタ情報(製品を製造
する設備の能力及び製品の製造に係わる人間の能力、基
準コストとを参照するが、もし、対象製品に関する過去
の完了実績データが存在する場合、この実績データ(全
工程が完了した指示書オブジェクト)を参照しながら作
成することも可能である。一方、対象製品に関する過去
データが存在しない場合、単に、品名・納期等の基本情
報を入力するだけで計画指示書とすることも可能である
し、類似製品に関するデータ等を参考情報としながら計
画指示書を作成することも可能である。
When creating the planning instruction, the customer order information and the detailed information (for example,
Reference is made to basic specifications, used materials, and various master information (capacity of facilities for manufacturing products, human abilities related to manufacturing of products, and reference costs). In this case, it is also possible to create the data while referring to the actual data (instruction object in which all processes are completed), whereas if there is no past data on the target product, simply input basic information such as the product name and delivery date. It is also possible to create a planning instruction simply by doing so. It is also possible to create a planning instruction using data on similar products or the like as reference information.

【0100】製品の製造に係わる関係部門は、担当する
業務内容を考慮して、下記に示すようなデータ(計画指
示書作成用のデータ)を入力する(図15及び図16を
参照)。 1.計画担当 全体計画に関する内容を指定する。例えば、設計、資材
調達、製造などの主要プロセスの依頼先、費用、製品の
納期(目標期限)等を指定する。
The departments involved in the manufacture of the product input the following data (data for creating a planning instruction) in consideration of the contents of the work in charge (see FIGS. 15 and 16). 1. Planner Specify the contents related to the overall plan. For example, the request destination of the main process such as design, material procurement, and manufacturing, the cost, the delivery date of the product (target deadline), and the like are specified.

【0101】2.設計担当 新規製品や改良製品の場合、基本仕様や使用部品に関す
る詳細な情報を入力する。既製品の場合、一般的には設
計の必要がないので、特別な情報を入力しないが、若干
の設計を伴う場合等には、設計に必要な情報を入力す
る。なお、改良品(類似製品)を設計する場合、新規製
品と同様に一から図面等を作成するのは時間的にも無駄
が多いので、改良品の元になる製品の図面を利用して図
面等を作成する。なお、この際、元になる製品や類似す
る製品の検索を支援する前記類似判断モジュールが実行
される。
2. For a new or improved product, enter detailed information on basic specifications and parts used. In the case of an off-the-shelf product, there is generally no need to design, so no special information is input. However, when a slight design is required, the information necessary for the design is input. When designing an improved product (similar product), it is time-consuming to create a drawing or the like from scratch like a new product. Create etc. At this time, the similarity determination module that supports the search for the original product or a similar product is executed.

【0102】3.製造担当 製品を製造する工程、使用する設備、各工程の担当者、
各工程における設備の稼働時間等を入力する。ただし、
設備や担当者の割付は下記のように行う。 ・割付指定を行うプロセスを指定する。 ・プロセスに係わるリソース(設備や担当者)の一覧を
表示する。 ・各リソースの業務適性や現在の空き時間状況等を表示
する。 ・各リソースの業務適性や負荷状況等を考慮の上、割付
を決定する。 なお、上記でリソース一覧については、プロセス能力マ
スタ等のマスタDBから情報を参照して、この結果が表
示される。また、空き時間状況については、プロセス能
力マスタの値と、そのリソースの実勤時間(工程管理者
によって日々入力される)とが計算された上で製造担当
者に照会される。
3. Manufacturing staff The process of manufacturing products, the equipment used, the person in charge of each process,
Enter the operating time of the equipment in each process. However,
Assignment of equipment and staff is as follows.・ Specify the process to assign.・ Display a list of resources (equipment and staff) involved in the process.・ Displays the suitability of each resource and the current free time status. -Assignment is determined in consideration of the work suitability and load status of each resource. As for the resource list, the result is displayed by referring to information from a master DB such as a process capability master. As for the free time status, the value of the process capability master and the actual working time of the resource (input daily by the process manager) are calculated, and the calculated time is referred to the manufacturing staff.

【0103】4.経理担当 計画や資材等の関係各部門の承認を得た計画指示書は、
最終的に経理部門へワークフローが送られる。経理部門
は予算額を考慮の上、この計画指示書の承認可否を決定
する。承認した場合、支払先/支払方法を指定する。
4. Planning instructions that have been approved by the relevant departments, such as accounting staff and materials,
Finally, the workflow is sent to the accounting department. The accounting department determines whether or not to approve the plan instruction in consideration of the budget amount. If approved, specify payee / payment method.

【0104】5.資材担当 部材調達先などを指定する(計画や設計の担当は、一般
的に、使用部材の調達に関する情報を知らない為)。順
序としては、設計や製造の担当者による使用部材に関す
る詳細情報の入力が完了した後に行う(資材部は、製品
情報だけでは、どの部材を調達すればよいか分からない
為)。また、決定した部材調達先から見積書を入手し、
この情報を入力する。
5. Designate the material supplier, etc. (Because the person in charge of planning and design generally does not know the information on the procurement of used materials) The order is performed after the input of the detailed information on the used members by the person in charge of design and manufacture is completed (because the material department does not know which members to procure based on the product information alone). Also, get a quote from the determined material supplier,
Enter this information.

【0105】ここで、計画指示書の作成を具体的に説明
する。計画指示書は、関係部門間のワークフローによっ
て了解が得られると完成するが(詳細は後述する)、そ
の前段階として、製品マスタや過去の計画指示書のデー
タを参照しながら、製品のコストや納期等をシミュレー
ションすることができる。そのシミュレーション結果は
ユーザに表示されるので、ユーザは、その計画に満足が
ゆかない場合には、再度、パラメータを入力して、シミ
ュレーションの再実行を要求することができる。ここ
で、入力するパラメータとしては、対象製品群(大分
類、品名)、基本仕様、希望予算、納期等の項目があ
る。
Here, the creation of the plan instruction will be specifically described. The planning instruction is completed when the consent is obtained through the workflow between the related departments (details will be described later), but as a pre-stage, referring to the data of the product master and past planning instructions, Delivery time and the like can be simulated. Since the simulation result is displayed to the user, if the user is not satisfied with the plan, the user can input the parameters again and request a re-execution of the simulation. Here, the input parameters include items such as a target product group (major category, product name), basic specifications, desired budget, and delivery date.

【0106】パラメータの入力が完了すると、その入力
内容は過去のデータと比較され、それらの解離が大きい
場合には、入力内容に不備があるとして警告等を発信
し、パラメータの再入力を促す処理を実行する。一方、
入力内容に不備がなければ、ユーザが再入力しない限
り、その入力内容に基づいて計画指示書が作成される。
ただし、この段階では、計画に無理がある場合があるこ
とを考慮し、関係者の承認を得るため、関係者に対して
計画指示書をワークフローさせる(詳細は実施の形態7
を参照)。
When the input of the parameters is completed, the input contents are compared with the past data. If the dissociation is large, a warning or the like is issued assuming that the input contents are inadequate, and processing for prompting the re-input of the parameters is performed. Execute on the other hand,
If there is no deficiency in the input contents, a plan instruction is created based on the input contents unless the user re-enters them.
However, at this stage, in consideration of the fact that the plan may be unreasonable, in order to obtain the approval of the stakeholders, the stakeholders are caused to work on the plan instruction form (for details, see Embodiment 7
See).

【0107】前述シミュレーションであるが、既製品で
ある場合、製品マスタや過去の完了実績(既製品である
場合、その製品の製造に関する過去の計画指示書がセン
トラルサーバに保管されている)等のデータが提供さ
れ、一方、新規製品である場合は、同一製品分類(例え
ば、テレビ、洗濯機)に属する製品の中で基本仕様など
の点で、その製品に比較的に近いデータが検索され、そ
れらの製品間での平均値(平均的なコスト、工期、最も
よく使用される部材など)を計算し、ユーザに参考資料
として提供することも可能である。ユーザは、そのよう
な参考資料を元に計画におけるパラメータ(製品名、個
数、納期等の一般的なパラメータの他に、基本仕様、仕
様部品、製造依頼先等の詳細データも入力することが可
能)を入力し、これを計画指示書(案)とすることもで
きる。
In the simulation described above, if the product is a ready-made product, the product master and past completion results (if the product is a ready-made product, the past planning instructions relating to the manufacture of the product are stored in the central server). Data is provided, while if it is a new product, data that is relatively close to the product in terms of basic specifications, etc., in terms of basic specifications, etc. among products belonging to the same product category (for example, TV, washing machine) It is also possible to calculate the average value (average cost, construction period, most frequently used members, etc.) between those products and provide the information to the user as reference material. Based on such reference materials, the user can input detailed data such as basic specifications, specification parts, manufacturing requestees in addition to general parameters in the plan (product name, quantity, delivery date, etc.) ), Which can be used as a planning instruction (draft).

【0108】因みに、製品を製造するに際し、各製品毎
に業務フローが異なる。ただし、基本的な流れは、どの
製品もほぼ同一であり(全体計画→設計→製造等のフェ
ーズ)、その基本的な部分の流れにおける個々の業務ア
イテムが異なるのが一般的である。この実施の形態6で
は、その基本的な流れに相当する部分を業務テンプレー
トとして定義し、その中の詳細業務をユーザが自由に定
義して、それを実際の業務の場面で利用できるような仕
組みを提供する。
Incidentally, when manufacturing products, the business flow differs for each product. However, the basic flow is almost the same for all products (the phase of overall planning → design → manufacturing, etc.), and individual business items in the basic flow are generally different. In the sixth embodiment, a part corresponding to the basic flow is defined as a business template, and a detailed business in the business template is freely defined by a user and can be used in an actual business scene. I will provide a.

【0109】具体的には、ある大工程名(例えば、設
計、製造)を指定すると、それに対応する一般的な下流
工程名が表示される(例えば、製造であれば、部材投
入、加工、組立等)。表示された各下流工程名を選択
し、これらに関する設備や担当者をユーザが入力する。
入力が完了したら、その内容が各マスタ(リソースマス
タ、プロセス能力マスタ、業務マスタ等)に登録され、
以降、計画立案の際には、この情報の利用が可能にな
る。即ち、各製品の製造にどういったプロセスがあり、
どのようなリソース割付が適切かということを過去デー
タを基に知ることができるため、計画立案に不慣れな者
でも生産計画を立てられるという効果がある。なお、業
務内容の定義は、計画立案の段階で計画担当者が入力し
て定義することが一般的であるが、客先オーダのあるな
しに関係なく、業務内容の定義のみを単独で実行するこ
ともできる。
Specifically, when a certain large process name (for example, design, manufacture) is designated, a general downstream process name corresponding to the name is displayed (for example, in the case of manufacture, material input, processing, assembly) etc). Each of the displayed downstream process names is selected, and the user inputs the equipment and the person in charge of these.
When the input is completed, the content is registered in each master (resource master, process capability master, business master, etc.),
Thereafter, this information can be used in planning. In other words, what kind of process is involved in the manufacture of each product,
Since it is possible to know what resource allocation is appropriate based on past data, there is an effect that even a person unfamiliar with planning can make a production plan. In addition, it is general that the definition of the business content is input and defined by the person in charge of planning at the stage of planning, but only the definition of the business content is independently executed regardless of whether or not there is a customer order. You can also.

【0110】実施の形態7.上記実施の形態6では、計
画指示書の作成方法を示したが、例えば、製造会社の計
画部等が、その計画指示書を製品の製造に係わる関係部
門に配信し、その関係部門から計画指示書の内容に関す
る承認を受けるようにしてもよい(図17を参照)。図
18は計画指示書のワークフローを示すフローチャート
である。
Embodiment 7 FIG. In the sixth embodiment, a method of creating a planning instruction has been described. For example, a planning department of a manufacturing company distributes the planning instruction to relevant departments involved in product manufacturing, and the relevant department issues a planning instruction. Approval regarding the contents of the document may be received (see FIG. 17). FIG. 18 is a flowchart showing the workflow of the plan instruction.

【0111】製造会社の計画部等は、上述したように、
シミュレーションを実行することができるので、製品の
コストや納期等を概ね認識することができるが、例え
ば、製造設備の混雑状況等は常に一定ではなく、シミュ
レーションされた製品のコストや納期を守れるとは限ら
ないので、作成された計画指示書を製品の製造に係わる
関係部門に配信する(計画指示書を配信する関係部門
は、計画担当者等が指定することができる)。
The planning department of the manufacturing company, as described above,
Since simulation can be executed, the cost and delivery time of the product can be generally recognized.However, for example, the congestion status of the manufacturing equipment is not always constant, and the cost and delivery time of the simulated product can be kept. Since there is no limitation, the created planning instruction is distributed to the relevant departments related to the manufacture of the product (the relevant department that distributes the planning instruction can be designated by a person in charge of planning or the like).

【0112】そして、製品の製造に係わる関係部門は、
計画指示書の配信を受けると、その計画指示書の内容を
確認して、計画指示書の承認又は非承認を決定し、承認
又は非承認を示すデータを計画指示書の配信元に返送す
る。ただし、関係部門は、非承認を示すデータを返送す
る場合、承認しない理由と代替案(例えば、部材Aの代
わりに、部材Bを使用すれば、希望納期に間に合う等の
代替案)を合わせて返送する。
The relevant departments involved in the manufacture of the product
Upon receiving the distribution of the plan instruction, the contents of the plan instruction are confirmed, approval or non-approval of the plan instruction is determined, and data indicating approval or non-approval is returned to the distribution source of the plan instruction. However, when returning the data indicating the non-approval, the related department should combine the reason for rejection with the alternative (for example, if the member B is used instead of the member A, the alternative such as to meet the desired delivery date). I will send it back.

【0113】そして、製造会社の計画部等は、関係部門
の全てから承認を示すデータを受けると、例えば、営業
部門を通じて、客先に製品の製造を承る旨を通知し、そ
の製品の製造を関係部門に指示する。一方、製造会社の
計画部等は、関係部門の一部から非承認を示すデータと
代替案等を受けると、全関係部門から計画指示書の承認
を受けるため、その代替案等を考慮して計画指示書を修
正し、再度、計画指示書を製品の製造に係わる関係部門
に配信する。
When the planning department or the like of the manufacturing company receives the data indicating the approval from all the related departments, the planning department or the like notifies the customer that the production of the product is to be accepted, for example, through the sales department. Instruct related departments. On the other hand, if the planning department of the manufacturing company receives data indicating non-approval and alternatives from a part of the related departments, it receives approval of the planning instructions from all the related departments. Modify the planning instructions and distribute the planning instructions again to the relevant departments involved in product manufacturing.

【0114】これにより、全関係部門から計画指示書の
承認が得られたとき、客先に対する受注の回答と、製品
の製造を指示できるため、製品の製造開始後に、コスト
や納期が客先の希望に沿わないことが判明する等の不具
合を解消することができるとともに、生産効率を向上す
ることができる効果を奏する。
With this, when the approval of the plan instruction is obtained from all the related departments, it is possible to reply to the order received for the customer and to instruct the production of the product. It is possible to solve the problems such as the fact that it is found that the request is not met, and to improve the production efficiency.

【0115】実施の形態8.上記実施の形態7では、計
画指示書の承認が得られたとき製品の製造を指示するも
のについて示したが、製品の製造指令を受けた後、製品
の製造に係わる関係部門の進捗状況を入力する進捗状況
入力手段を設け、工程遅れの有無を判断するようにして
もよい。なお、図19は工程管理者の役割を説明する説
明図、図20は進捗状況の判断を示すフローチャート、
図21は警告の発信を示すフローチャート、図22は代
替案の承認・非承認の処理を示すフローチャートであ
る。
Embodiment 8 FIG. In the seventh embodiment, the case where the production instruction is instructed when the approval of the plan instruction is obtained has been described. However, after receiving the production instruction of the product, the progress of the related departments involved in the production of the product is input. May be provided to determine whether there is a process delay. FIG. 19 is an explanatory diagram for explaining the role of the process manager, FIG. 20 is a flowchart showing the determination of the progress,
FIG. 21 is a flowchart showing the issuance of a warning, and FIG. 22 is a flowchart showing the process of approving / rejecting the alternative.

【0116】即ち、製品の製造指令を受けた後、担当者
の病欠や転勤等に伴う担当変更、設備の故障等が発生す
ると、工程遅れ等が発生するので、各工程の管理担当者
が日々、関係部門の進捗状況を入力する。
In other words, after receiving a product manufacturing order, if a person in charge changes due to sickness or relocation, equipment failure, etc., a process delay occurs. , Enter the progress of the relevant department.

【0117】入力項目としては、製造ラインの場合、本
日の生産数量、作業者の労働時間等の定量的なデータで
あり、設計や企画などの業務であれば、労働時間等の定
量的なデータの他に、例えば、ある目標の達成度合(あ
る設計者が、プロセスの中で要求される全体の仕事分量
のうち、どの程度仕事を達成したかを示す度合)を数値
化したものがある。なお、インタフェースとしては、プ
ロセス名を指定すると、その工程の進度がグラフ表示さ
れ、更に、そのグラフを選択すると、そのプロセスに携
わる担当者が一覧表示されるものがある。したがって、
そのようなインタフェースを用いれば、個々の担当者の
進捗状況を入力することができる。
The input items are quantitative data such as today's production quantity and the working hours of workers in the case of a production line, and quantitative data such as working hours in the case of design and planning. In addition to the above, for example, there is a numerical value of a degree of achievement of a certain goal (a degree indicating a degree of work achieved by a designer in a total work amount required in a process). As an interface, when a process name is designated, the progress of the process is displayed in a graph, and when the graph is selected, a person in charge of the process is displayed in a list. Therefore,
If such an interface is used, the progress status of each person in charge can be input.

【0118】そして、関係部門の進捗状況が入力される
と、図示せぬ進捗管理手段が、例えば、進捗状況を数値
化して目標の達成度を計算し、工程遅れがあるか否かを
検知する(工程遅れの検知処理の実行は、入力処理の完
了直後でもよいし、入力処理後一定の時間が経過した後
でもよい)。
When the progress of the related department is input, a progress management means (not shown) calculates the degree of achievement of the target by quantifying the progress, for example, and detects whether there is a process delay. (The process delay detection process may be performed immediately after the input process is completed or after a certain time has elapsed after the input process.)

【0119】具体的には、入力された関係部門の進捗状
況と、プロセス能力マスタの基準情報に基づいて判断す
るが、例えば、プロセス全体の仕事量を数値化したもの
と、これまでの進度を数値化したものを比較し、残りの
分量を現在の担当者の能力値(プロセス能力マスタの
値)の総和で除算した値をもとにして判断する。また、
担当者だけでなく、稼働設備の能力も同様に数値化さ
れ、上述の除算の対象に組み入れることができる。ここ
で、例えば、故障設備等の情報が入力されれば、プロセ
ス能力マスタのその設備に関する値が異常値になる仕組
みになっており、それによって計算の際に、そのことが
反映されるようになっている。
More specifically, the judgment is made based on the input progress status of the concerned department and the reference information of the process capability master. For example, the work amount of the whole process is quantified, and the progress up to now is determined. The quantified values are compared, and the remaining quantity is determined based on the value obtained by dividing the remaining quantity by the sum of the current capacity values of the person in charge (process capability master value). Also,
Not only the person in charge but also the capacity of the operating equipment is similarly quantified and can be included in the above-mentioned division. Here, for example, if information on a faulty facility or the like is input, a value related to the facility in the process capability master becomes an abnormal value, so that this is reflected in the calculation. Has become.

【0120】進捗管理手段は、工程遅れを検知すると、
その旨を示すメッセージと、遅れが見込まれる日数、プ
ロセス名、遅れの原因となっている要素、代替手段の可
能性等を工程管理者(例えば、計画部の部員)に通知す
る一方、指定納期に間に合うか否かを判断し、指定納期
に間に合わない場合には、指定納期に間に合わない旨を
示すメッセージを工程管理者に通知する。また、その
際、指定納期に間に合わない原因等を合わせて通知す
る。
When the progress management means detects a process delay,
The process manager (for example, a member of the planning department) is notified of the message indicating the fact and the number of days expected to be delayed, the name of the process, the element causing the delay, the possibility of alternative means, and the like. Is determined, and if it is not possible to meet the designated delivery date, a message indicating that the designated delivery date cannot be met is notified to the process manager. At this time, the user is notified together with the cause of the missed delivery date.

【0121】工程管理者は、進捗管理手段から工程遅れ
を検知した旨を示すメッセージや遅れが見込まれる日数
等を受けると、そのメッセージや遅れが見込まれる日数
等を関係部門に通知するが、さらに、指定納期に間に合
わない旨を示すメッセージを受けると、その製品の製造
の続行及び代替案(例えば、納期延長、担当者追加、設
備変更)を検討する。
When the process manager receives a message indicating that a process delay has been detected or the number of days expected to be delayed from the progress management means, the process manager notifies the relevant department of the message and the number of days expected to be delayed. When a message indicating that the designated delivery date is not received is received, continuation of the manufacture of the product and alternatives (for example, extension of delivery date, addition of personnel, and equipment change) are considered.

【0122】そして、図示せぬ計画調整手段は、工程管
理者が製品の製造の続行を決定すると、その旨を関係部
門に通知し、工程管理者が代替案を入力すると、全関係
部門から代替案の承認を受けるため、その代替案を製品
の製造に係わる関係部門に配信する。即ち、その代替案
の承認を求めるワークフロー文書を関係部門(例えば、
後工程の管理者、計画担当者、製造管理部、営業担当)
に配信する。
When the process manager decides to continue the production of the product, the schedule coordinator (not shown) notifies the relevant departments of the fact. Distribute the alternatives to relevant departments involved in the manufacture of the product for approval. That is, the workflow document requesting approval of the alternative is sent to the relevant department (for example,
Post-process managers, planners, manufacturing control departments, sales representatives)
Deliver to.

【0123】そして、計画調整手段は、全関係部門から
代替案の承認を受けると、その代替案を考慮して計画指
示書を変更する。したがって、以後、変更された計画指
示書にしたがって製品の製造が行われることになる。一
方、全関係部門から代替案の承認が受けられない場合に
は、その代替案を一部修正して、再度、製造に係わる関
係部門に配信する。これにより、例えば、不慮の事故等
が発生して、指定納期に間に合わない事態が生じたと
き、指定納期に間に合うように対処することができる効
果を奏する。また、当初の計画の修正を余儀なくされた
場合でも、計画を最初から作り直す手間を省く効果もあ
る。
When the plan adjustment means receives approval of the alternative from all the related departments, the plan adjusting means changes the plan instruction in consideration of the alternative. Therefore, thereafter, the manufacture of the product is performed according to the changed planning instruction. On the other hand, if the approval of the alternative is not received from all the related departments, the alternative is partially corrected and distributed again to the relevant departments related to manufacturing. Thus, for example, when an unexpected accident or the like occurs and a situation occurs in which the designated delivery date cannot be met, there is an effect that it is possible to take measures to meet the designated delivery date. In addition, even if the original plan has to be modified, there is an effect of eliminating the need to recreate the plan from the beginning.

【0124】実施の形態9.上記実施の形態1等では、
製造会社の計画部の部員が発注伝票13を伝票受付部1
4に入力するものについて示したが、伝票受付部14が
受付手段を構成し、伝票受付部14が客先からインター
ネット経由で製品の発注を受け付けて、発注伝票13を
作成するようにしてもよい。
Embodiment 9 FIG. In the first embodiment and the like,
A member of the planning department of the manufacturing company sends the order slip 13 to the slip receiving section 1
4, the slip receiving unit 14 constitutes a receiving means, and the slip receiving unit 14 may receive an order for a product from a customer via the Internet and create the order slip 13. .

【0125】例えば、WWWブラウザを用いて、客先が
製造会社のホームページをアクセスすると、図23に示
すように、客先の端末に製品発注用の入力画面を表示す
る。なお、伝票受付部14には、社外からHTTP等、
ネットワークセキュリティに対して透過的なプロトコル
によるWWWアクセスを受け付けるプロセスを搭載して
いる。また、客先に本システムのクライアントモジュー
ル等をインストールする必要はなく、WWWブラウザに
よって当該システムのセントラルサーバのURLを入力
することにより、誰でもアクセスすることができる。例
えば、会社のPR用のホームページ上にリンクを作成
し、このリンクをマウスでクリックすれば、図23に示
すようなオーダ受付画面が客先に表示されるようにする
方法がある。
For example, when a customer accesses a homepage of a manufacturer using a WWW browser, an input screen for ordering a product is displayed on the terminal of the customer as shown in FIG. It should be noted that the slip receiving unit 14 receives HTTP or the like from outside the company.
A process for receiving WWW access by a protocol transparent to network security is installed. Also, there is no need to install the client module or the like of the present system at the customer, and anyone can access by inputting the URL of the central server of the system using a WWW browser. For example, there is a method in which a link is created on a company's PR homepage, and when this link is clicked with a mouse, an order reception screen as shown in FIG. 23 is displayed at the customer.

【0126】これにより、客先が製品名、数量、納期、
希望予算、オーダに際して重視する項目(例えば、品
質、アフタケア、価格、完了納期)等を入力すると、伝
票受付部14が入力内容の妥当性を判断し、不具合があ
れば、再入力を促すメッセージを表示する。一方、入力
内容に不具合がなければ、その入力内容に基づいて発注
伝票13を作成し、その発注伝票13を営業担当者に配
信する。客先オーダを受けて直ぐにコストや納期を計算
することはしない。オーダ受付→計画指示書(仮)を作
成→作成においてシミュレーション機能を使用する際に
コスト計算部が動作する。
As a result, the customer can determine the product name, quantity, delivery date,
When a desired budget, an important item in ordering (for example, quality, aftercare, price, completed delivery date) and the like are input, the slip receiving unit 14 determines the validity of the input content, and if there is a problem, a message prompting re-input. indicate. On the other hand, if there is no defect in the input contents, an order slip 13 is created based on the input contents, and the order slip 13 is distributed to the sales representative. We do not calculate costs or delivery dates immediately after receiving customer orders. The cost calculation unit operates when the simulation function is used in order reception → creation of the planning instruction (temporary) → creation.

【0127】そして、伝票受付部14は、上記のように
して、関係部門から計画指示書の承認又は非承認を示す
データを受けると、図24に示すように、そのデータに
基づいて受注の有無を客先に回答する。即ち、伝票受付
部14は、計画指示書の承認を示すデータを受けると、
製品の製造を承る旨を示すメッセージを客先に返信し、
計画指示書の非承認を示すデータを受けると、製品の製
造を承ることができない旨を示すメッセージを客先に返
信する。また、経理や製造管理部等の関係部門にも当該
メッセージを送信する。
When the slip receiving unit 14 receives data indicating approval or non-approval of the plan instruction from the relevant department as described above, the slip receiving unit 14 determines whether or not there is an order based on the data as shown in FIG. To the customer. That is, when the slip receiving unit 14 receives the data indicating the approval of the plan instruction,
Responds to the customer with a message indicating that the product will be manufactured,
Upon receiving the data indicating the non-approval of the planning instruction, a message indicating that production of the product cannot be received is returned to the customer. Further, the message is also transmitted to related departments such as the accounting and manufacturing management departments.

【0128】また、伝票受付部14は、製品の製造開始
後に、客先から製品の変更要求を受けると、その変更内
容を製品の製造に係わる関係部門に配信する。そして、
関係部門から変更内容の承認又は非承認を示すデータを
受けると、そのデータに基づいて変更受諾の有無を客先
に回答する。
When receiving a request for changing the product from the customer after the start of the production of the product, the slip receiving unit 14 distributes the content of the change to the departments involved in the production of the product. And
When data indicating approval or non-approval of the change is received from the related department, a response is made to the customer as to whether or not the change has been accepted based on the data.

【0129】即ち、伝票受付部14は、変更内容の承認
を示すデータを受けると、変更を承る旨を示すメッセー
ジを客先に返信するとともに、計画指示書を変更する。
一方、変更内容の非承認を示すデータを受けると、変更
を承ることができない旨を示すメッセージを客先に返信
する。これにより、製品の製造を開始した後でも、ある
程度、客先の変更希望を受け入れることができる効果を
奏する。
That is, when receiving the data indicating the approval of the change, the slip receiving unit 14 returns a message indicating that the change is accepted to the customer and changes the plan instruction.
On the other hand, upon receiving the data indicating the rejection of the change, a message indicating that the change cannot be accepted is returned to the customer. As a result, even after the production of the product is started, there is an effect that the change request of the customer can be accepted to some extent.

【0130】実施の形態10.上記実施の形態1等で
は、製品の製造に係わる人間の能力を参照して、製品の
コスト等を計算するものについて示したが、能力データ
ベース11により格納された人間の能力を人事評価用の
データベースに送信するようにしてもよい(図25を参
照)。これにより、人事担当者は、人事査定に用いるこ
とができる客観的な情報をリアルタイムに入手すること
ができる効果を奏する。
Embodiment 10 FIG. In the above-described first embodiment and the like, an example has been described in which the cost of a product is calculated with reference to the human ability related to the manufacture of a product. However, the human ability stored in the ability database 11 is used as a database for personnel evaluation. (See FIG. 25). This has the effect that the personnel manager can obtain objective information that can be used for personnel assessment in real time.

【0131】なお、人間の能力の送信タイミングである
が、一般的には、製造された製品が納入されて、人間の
能力が更新されたとき送信する。ただし、送信タイミン
グはこれに限るものではなく、一定時間が経過する毎に
送信してもよいし、人間の能力が規定値以上変動したと
き送信するようにしてもよい。
The transmission timing of the human ability is generally transmitted when the manufactured product is delivered and the human ability is updated. However, the transmission timing is not limited to this, and transmission may be performed every time a predetermined time elapses, or may be transmitted when the ability of a person fluctuates by a specified value or more.

【0132】因みに、人事評価用のデータベースには、
各プロセスにおける担当者のデータが記録されている。
即ち、給与情報の他に、仕事関連のファクタ(例えば、
速さ、丁寧さ、努力の度合)に対して、どのような特性
を有しているかという情報が数値化されて記録されてい
る。
Incidentally, the database for personnel evaluation includes:
The data of the person in charge in each process is recorded.
That is, in addition to salary information, work-related factors (for example,
Information on what characteristics it has with respect to speed, politeness, and degree of effort is quantified and recorded.

【0133】計画指示書作成の際に参照されるデータ
は、プロセス能力マスタや基準コストマスタに記録され
ている人間又は組織に関するデータであり、人事評価用
のデータベースが計画指示書作成の際に参照されること
は通常ないが、工程実施後の進捗において、人間又は組
織に関するデータが大きく変わった場合、例えば、定常
的なオーバーワークにより勤務時間や一定時間の業務速
度に変化が生じた場合、その旨が人事評価用のデータベ
ースに反映され、その情報が人事担当者に通知される。
The data referred to when creating the planning instruction is data relating to a person or an organization recorded in the process capability master or the reference cost master, and the database for personnel evaluation is referred to when creating the planning instruction. Although it is not usually performed, if data related to humans or organizations changes significantly in the progress after the process is implemented, for example, if the working time or the work speed for a certain time changes due to routine overwork, The effect is reflected in the personnel evaluation database, and the information is notified to the personnel manager.

【0134】ここで、業務速度の変化をシステムが認識
する手段は次の通りである。 (1)工程管理者が日々の進捗状況を入力する(その人
の働き具合)。 (2)入力内容は計画指示書と進捗実績ログファイルに
書き込まれる。 (3)計画指示書と進捗実績ログファイルを定期的に監
視するプロセスが、個々のリソース(担当者、設備)に
関する稼働実績と、当該リソースのマスタDB(リソー
スマスタ、プロセス能力マスタ)にある情報とを比較す
る。 (4)上記の比較で、マスタDBと稼働実績の間に差異
が見出される場合、その結果を上記マスタに反映させる
とともに、その旨を人事担当者等にメール等で通知す
る。
Here, the means by which the system recognizes a change in the business speed is as follows. (1) The process manager inputs the daily progress status (how the person works). (2) The input contents are written in the plan instruction and the progress log file. (3) The process of periodically monitoring the plan instruction sheet and the progress log file is based on the operation results of each resource (person in charge, equipment) and the information in the master DB (resource master, process capability master) of the resource Compare with (4) If a difference is found between the master DB and the operation results in the above comparison, the result is reflected in the master, and a notification to that effect is sent to a personnel manager or the like by e-mail or the like.

【0135】[0135]

【発明の効果】以上のように、この発明によれば、製品
の発注伝票を受けると、その製品を製造する設備の能
力,その製品の製造に係わる人間の能力及びその製品を
構成する部材の価格を参照して、その製品のコストを計
算するコスト計算手段を設けるとともに、能力データ格
納手段及び部材データ格納手段の格納内容の変更を受け
付ける変更手段を設けるように構成したので、人事異動
や生産設備の変動等に対して速やかに対処することがで
きるとともに、製造する製品の種類が異なる生産ライン
に対して汎用的に使用することができる効果がある。
As described above, according to the present invention, when an order slip for a product is received, the capabilities of the equipment for manufacturing the product, the capabilities of humans involved in the manufacture of the product, and the members of the product are described. A cost calculation means for calculating the cost of the product with reference to the price is provided, and a change means for receiving a change in the storage contents of the capability data storage means and the member data storage means is provided. There is an effect that it is possible to promptly deal with fluctuations in equipment and the like, and to be able to use the product line for production lines of different types in general.

【0136】この発明によれば、製品の発注伝票を受け
ると、その製品を製造する設備の能力,その製品の製造
に係わる人間の能力及びその製品を構成する部材の調達
日数を参照して、その製品の納期を計算する納期計算手
段を設けるとともに、能力データ格納手段及び部材デー
タ格納手段の格納内容の変更を受け付ける変更手段を設
けるように構成したので、人事異動や生産設備の変動等
に対して速やかに対処することができるとともに、製造
する製品の種類が異なる生産ラインに対して汎用的に使
用することができる効果がある。
According to the present invention, when a product order slip is received, referring to the capabilities of the equipment for manufacturing the product, the capabilities of humans involved in the manufacturing of the product, and the number of days of procurement of the members constituting the product, A delivery date calculation means for calculating the delivery date of the product is provided, and a change means for receiving a change in the storage contents of the capability data storage means and the member data storage means is provided. In addition to this, there is an effect that it can be used promptly, and can be used for general purpose for production lines of different types of products to be manufactured.

【0137】この発明によれば、製品の発注伝票を受け
ると、その製品を製造する設備の能力,その製品の製造
に係わる人間の能力及びその製品を構成する部材の価格
を参照して、その製品のコストを計算するコスト計算手
段と、製品の発注伝票を受けると、その製品を製造する
設備の能力,その製品の製造に係わる人間の能力及びそ
の製品を構成する部材の調達日数を参照して、その製品
の納期を計算する納期計算手段とを設けるとともに、能
力データ格納手段及び部材データ格納手段の格納内容の
変更を受け付ける変更手段を設けるように構成したの
で、人事異動や生産設備の変動等に対して速やかに対処
することができるとともに、製造する製品の種類が異な
る生産ラインに対して汎用的に使用することができる効
果がある。
According to the present invention, when an order slip for a product is received, by referring to the capacity of the facility for manufacturing the product, the ability of humans involved in the manufacture of the product, and the price of the members constituting the product, Upon receiving a product ordering slip, the cost calculation means for calculating the cost of the product, and referring to the capacity of the equipment that manufactures the product, the capabilities of humans involved in the manufacture of the product, and the procurement days of the components that make up the product Means for calculating the delivery date of the product, and a change means for receiving a change in the storage contents of the capability data storage means and the member data storage means. Etc. can be promptly dealt with, and there is an effect that it can be generally used for production lines with different types of products to be manufactured.

【0138】この発明によれば、同一の部材に分類され
る部品が複数個存在する場合、最も価格が安い部品の価
格を参照して、製品のコストを計算するように構成した
ので、最小限のコストを提示することができる効果があ
る。
According to the present invention, when there are a plurality of parts classified as the same member, the cost of the product is calculated by referring to the price of the cheapest part. There is an effect that the cost can be presented.

【0139】この発明によれば、同一の部材に分類され
る部品が複数個存在する場合、最も調達日数が短い部品
の調達日数を参照して、製品の納期を計算するように構
成したので、最短の納期を提示することができる効果が
ある。
According to the present invention, when there are a plurality of parts classified as the same member, the delivery date of the product is calculated by referring to the number of days of procurement of the part having the shortest number of days of procurement. There is an effect that the shortest delivery date can be presented.

【0140】この発明によれば、納期計算手段により選
択された各部材のコストの合計が指定コストを越える場
合、他の部品の価格を参照して、製品のコストを指定さ
れた範囲内に収まるように再計算する構成にしたので、
指定納期に間に合う製品のコストを提示することができ
る効果がある。
According to the present invention, when the total cost of each member selected by the delivery date calculation means exceeds the specified cost, the cost of the product falls within the specified range by referring to the prices of other parts. So that it is recalculated as follows
This has the effect of presenting the cost of the product in time for the specified delivery date.

【0141】この発明によれば、コスト計算手段により
選択された各部材の調達納期が指定納期を超える場合、
他の部品の調達日数を参照して、製品の調達日数を指定
された範囲内に収まるように再計算する構成にしたの
で、指定コストを下回る製品の納期を提示することがで
きる効果がある。
According to the present invention, if the procurement delivery date of each member selected by the cost calculation means exceeds the designated delivery date,
Since the configuration is such that the procurement days of the product are recalculated so as to be within the specified range by referring to the procurement days of other parts, it is possible to present the delivery date of the product that is less than the specified cost.

【0142】この発明によれば、製品の設計から製品の
製造を経て、製品の納入が完了するまでの間に、変更手
段により能力データ格納手段又は部材データ格納手段の
格納内容が変更された場合、製品のコストを再計算する
ように構成したので、製品の計画段階と異なる状況が発
生した場合には、現状に合致した製品のコストを改めて
提示することができる効果がある。
According to the present invention, when the storage contents of the capability data storage means or the member data storage means are changed by the change means during the period from the design of the product to the manufacture of the product to the completion of the delivery of the product. Since the cost of the product is recalculated, if a situation different from the product planning stage occurs, the cost of the product that matches the current situation can be presented again.

【0143】この発明によれば、製品の設計から製品の
製造を経て、製品の納入が完了するまでの間に、変更手
段により能力データ格納手段又は部材データ格納手段の
格納内容が変更された場合、製品の納期を再計算するよ
うに構成したので、製品の計画段階と異なる状況が発生
した場合には、現状に合致した製品の納期を改めて提示
することができる効果がある。
According to the present invention, when the storage contents of the capability data storage unit or the member data storage unit are changed by the change unit during the period from the design of the product to the manufacture of the product to the completion of the delivery of the product. Since the delivery date of the product is recalculated, if a situation different from the product planning stage occurs, the delivery date of the product that matches the current situation can be presented again.

【0144】この発明によれば、設計部門の人間の能力
を格納する際、既製品を設計する場合の能力と、新規製
品を設計する場合の能力に分けて格納し、既製品の設計
能力計算にあたっては、既製品における設計実績データ
を必要に応じて参照し、利用する構成にしたので、既製
品の設計に要する時間と、注文品の設計に要する時間が
異なる実情が考慮されて、製品のコストと納期が計算さ
れる結果、コスト及び納期の計算精度が向上する効果が
ある。
According to the present invention, when the human capacity of the design department is stored, the capacity for designing an existing product and the capacity for designing a new product are stored separately, and the design capacity of the existing product is calculated. In this case, the actual product design data is referred to and used as necessary, so that the time required for designing the ready-made product and the time required for designing the ordered product are different. As a result of calculating the cost and the delivery date, there is an effect that the calculation accuracy of the cost and the delivery date is improved.

【0145】この発明によれば、注文品を設計する場合
の能力を参照する際、注文に係る製品が既製品又は過去
に設計された新規製品と類似する製品である場合には、
新規製品を設計する場合のコストより割安にし、コスト
計算の際に既製品のコストデータを必要に応じて参照
し、利用する構成にしたので、一般的に、既製品の設計
に要する時間が最も短く、次に、類似品の設計に要する
時間が短く、注文品の設計に要する時間が最も長いとい
う実情が考慮されて、製品のコストが計算される結果、
コストの計算精度が更に向上する効果がある。
According to the present invention, when referring to the capability in designing an ordered product, if the product to be ordered is a product that is similar to an existing product or a new product designed in the past,
In general, the cost of designing a new product is lower than the cost of designing a new product, and the cost data of the existing product is referred to and used when calculating the cost. The cost of the product is calculated, taking into account the fact that it takes less time to design similar products, and secondly, it takes the longest to design an order.
This has the effect of further improving the cost calculation accuracy.

【0146】この発明によれば、新製品を設計する場合
の能力を参照する際、注文に係る製品が既製品又は過去
に設計された注文品と類似する製品である場合には、必
要に応じて既製品の完了実績データを参照して、納期計
算の際に利用する構成にしたので、一般的に、既製品の
設計に要する時間が最も短く、次に、類似品の設計に要
する時間が短く、注文品の設計に要する時間が最も長い
という実情が考慮されて、製品の納期が計算される結
果、納期の計算精度が更に向上する効果がある。
According to the present invention, when referring to the ability to design a new product, if the product to be ordered is an existing product or a product similar to an ordered product designed in the past, the In general, the time required for designing a ready-made product is the shortest, and the time required for designing a similar product is the shortest. The delivery time of the product is calculated in consideration of the fact that it is short and the time required for designing the ordered product is the longest, and as a result, the calculation accuracy of the delivery time is further improved.

【0147】この発明によれば、部材の調達先が指定さ
れた場合、その調達先において指定された部材の価格で
ある購入価格を参照して、製品のコストを計算するよう
に構成したので、部材の調達先が決められている場合で
も、製品のコストを計算することができる効果がある。
According to the present invention, when the supplier of a member is designated, the cost of the product is calculated by referring to the purchase price which is the price of the member designated at the supplier. There is an effect that the cost of the product can be calculated even when the supplier of the member is determined.

【0148】この発明によれば、部材の調達先が指定さ
れた場合、その調達先から生産拠点までの部材の調達日
数であるリードタイムを参照して、製品の納期を計算す
るように構成したので、部材の調達先が決められている
場合でも、製品の納期を計算することができる効果があ
る。
According to the present invention, when a supplier of a member is designated, the delivery date of a product is calculated by referring to a lead time, which is the number of days of material procurement from the supplier to the production base. Therefore, there is an effect that the delivery date of the product can be calculated even when the supplier of the member is determined.

【0149】この発明によれば、コスト計算手段により
計算された製品のコストが指定コストを上回る場合、指
定コストを上回る旨を示すメッセージを提示するように
構成したので、製造会社の計画部の部員等は、製品の製
造を許可すべきか否かを判断することができる効果があ
る。
According to the present invention, when the cost of the product calculated by the cost calculation means exceeds the specified cost, a message indicating that the specified cost is exceeded is presented. And the like have the effect that it can be determined whether or not the production of the product should be permitted.

【0150】この発明によれば、納期計算手段により計
算された製品の納期が指定納期を越える場合、指定納期
に間に合わない旨を示すメッセージを提示するように構
成したので、製造会社の計画部の部員等は、製品の製造
を許可すべきか否かを判断することができる効果があ
る。
According to the present invention, when the delivery date of the product calculated by the delivery date calculation means exceeds the designated delivery date, a message indicating that the delivery date cannot be met is presented. There is an effect that a member or the like can determine whether or not to permit production of a product.

【0151】この発明によれば、コスト計算手段により
計算された製品のコストが再計算された場合、再計算後
の製品のコストを提示するとともに、計画段階と状況が
異なる旨を示すメッセージを提示するように構成したの
で、製品の製造を続行すべきか否かを判断することがで
きる効果がある。
According to the present invention, when the cost of the product calculated by the cost calculating means is recalculated, the cost of the product after the recalculation is presented and a message indicating that the situation is different from the planning stage is presented. Therefore, it is possible to determine whether or not to continue manufacturing the product.

【0152】この発明によれば、納期計算手段により計
算された製品の納期が再計算された場合、再計算後の製
品の納期を提示するとともに、計画段階と状況が異なる
旨を示すメッセージを提示するように構成したので、製
品の製造を続行すべきか否かを判断することができる効
果がある。
According to the present invention, when the delivery date of the product calculated by the delivery date calculation means is recalculated, the delivery date of the product after the recalculation is presented, and a message indicating that the situation is different from the planning stage is presented. Therefore, it is possible to determine whether or not to continue manufacturing the product.

【0153】この発明によれば、工程管理者によって入
力された設備の稼働実績と人間の就労実績を考慮して、
設備の能力と人間の能力を更新し、その旨を関係者に通
知するように構成したので、能力データ格納手段の格納
内容を最新の状態に維持することができる結果、製品の
コスト及び納期の計算精度を高めることができる効果が
ある。
According to the present invention, taking into account the operation results of the equipment and the results of human labor input by the process manager,
The system is configured to update the capabilities of the equipment and the capabilities of human beings and notify the concerned parties of the update, so that the contents stored in the capability data storage means can be kept up to date, and as a result, the cost of the product and the delivery date There is an effect that calculation accuracy can be improved.

【0154】この発明によれば、部材の供給元から部材
の新規登録を含む部材の価格又は調達日数の変更要求を
受けると、部材の価格又は調達日数を更新し、その旨を
計画立案中の担当者などに通知するように構成したの
で、部材の供給元の事情を反映することができる効果が
ある。
According to the present invention, when a request for changing the price or the number of days of procurement of a member including a new registration of a member is received from the supplier of the member, the price of the member or the number of days of procurement is updated, and this is being planned. Since the configuration is such that the person in charge is notified, there is an effect that the situation of the member supplier can be reflected.

【0155】この発明によれば、計画担当者の通知にお
いて、その変更のあった部材は、担当者が計画中の製品
に対して適用可能である場合に限って、該通知が行われ
る構成にしたので、計画中の製品に対して適用可能であ
ることを認識することができる効果がある。
According to the present invention, in the configuration in which the changed member is notified only when applicable to the product being planned by the person in charge, the notification is made by the person in charge of planning. Therefore, it is possible to recognize that the present invention is applicable to the product under planning.

【0156】この発明によれば、部材の供給元からイン
ターネット経由で変更要求を受け付けるように構成した
ので、部材の供給元が遠隔地に位置する場合でも、速や
かに部材の価格等を変更することができる効果がある。
According to the present invention, since a change request is received from the supplier of the member via the Internet, even if the supplier of the member is located in a remote place, the price of the member can be changed quickly. There is an effect that can be.

【0157】この発明によれば、製品名、数量、納期と
いった生産計画の基本要素であるデータを計画立案者に
入力させ、これをもとに計画指示書を作成するように構
成したので、計画指示書が関係部門間で共有される結
果、製品の設計から納入までの工程が一元的に管理さ
れ、生産管理の効率が向上する効果がある。
According to the present invention, the data, which is a basic element of the production plan, such as the product name, quantity, and delivery date, is input by the planner, and the plan instruction is created based on the data. As a result of sharing the instructions between the related departments, the process from product design to delivery is centrally managed, which has the effect of improving the efficiency of production management.

【0158】この発明によれば、シミュレーション機能
を有し、計画に係る製品の製造コスト及び所要日数がど
れ位になるかを計算する機能を備えるように構成したの
で、製造コストや所要日数を把握することができる効果
がある。
According to the present invention, since the apparatus is provided with a simulation function and a function of calculating the production cost and the required number of days of the product according to the plan, the production cost and the required number of days are grasped. There is an effect that can be.

【0159】この発明によれば、製造コストの計算にお
いて、コスト計算手段を起動し、ここから得られる最適
な部品構成を計算して、これをシミュレーション結果と
して利用するように構成したので、最適な部品構成を把
握することができる効果がある。
According to the present invention, in the calculation of the manufacturing cost, the cost calculation means is started, the optimum component configuration obtained from this is calculated, and this is used as a simulation result. There is an effect that the component configuration can be grasped.

【0160】この発明によれば、所要日数の計算におい
て、納期計算手段を起動し、ここから得られる最適な部
品構成を計算して、これをシミュレーション結果として
利用するように構成したので、最適な部品構成を把握す
ることができる効果がある。
According to the present invention, in the calculation of the required number of days, the delivery date calculation means is started, the optimum component configuration obtained from the calculation is calculated, and this is used as a simulation result. There is an effect that the component configuration can be grasped.

【0161】この発明によれば、製造コストの計算にお
いて、シミュレーション結果は、その製品と同一種類に
属する各製品の製造コストの平均値であってもよいよう
に構成したので、簡単に最適な部品構成を求めることが
できる効果がある。
According to the present invention, in the calculation of the manufacturing cost, the simulation result may be the average value of the manufacturing costs of the products belonging to the same type as the product, so that the optimum parts can be easily obtained. There is an effect that the configuration can be obtained.

【0162】この発明によれば、所要日数の計算におい
て、シミュレーション結果は、その製品と同一種類に属
する各製品の所要日数の平均値であってもよいように構
成したので、簡単に最適な部品構成を求めることができ
る効果がある。
According to the present invention, in the calculation of the required number of days, the simulation result may be an average value of the required number of days of each product belonging to the same type as the product. There is an effect that the configuration can be obtained.

【0163】この発明によれば、作成手段により作成さ
れた計画指示書を製品の製造に係わる関係部門に配信
し、この内容で良いか否かを関係者に問い合わせを行う
ワークフロー機能を有する配信手段を設ける構成にした
ので、関係部門から計画指示書の承認を得ることができ
る効果がある。
According to the present invention, the distribution means having a workflow function of distributing the planning instruction created by the creation means to the related departments involved in the manufacture of the product and inquiring the concerned parties whether or not the contents are satisfactory. Is provided, there is an effect that approval of the plan instruction can be obtained from the related department.

【0164】この発明によれば、製品の製造に係わる関
係部門から計画指示書の承認又は非承認を示すデータを
計画指示書の配信元に返送し、非承認である場合は、非
承認である理由及び代替案を返送し、一方承認である場
合は、この内容を正式の計画指示書として確定させる返
送手段を設ける構成にしたので、製品の製造開始後に、
コストや納期が客先の希望に沿わないことが判明する等
の不具合を解消することができる効果がある。
According to the present invention, the data indicating approval or non-approval of the plan instruction is returned from the relevant department related to the manufacture of the product to the distribution source of the plan instruction. In the case of approval, on the other hand, in the case of approval, a return means shall be provided to confirm this content as a formal planning instruction.
This has the effect of eliminating problems such as finding that the cost and delivery date do not meet the customer's wishes.

【0165】この発明によれば、製品の製造に係わる関
係部門の進捗状況を入力し、その入力結果を計画指示書
に反映するように構成したので、工程管理者が関係部門
の進捗状況を把握することができる効果がある。
According to the present invention, the progress status of the relevant department related to the manufacture of the product is input and the input result is reflected in the plan instruction, so that the process manager can grasp the progress status of the relevant department. There is an effect that can be.

【0166】この発明によれば、進捗状況入力手段によ
って関係部門の進捗状況が入力されると、工程遅れの有
無を判断するように構成したので、工程遅れの発生を検
知することができる効果がある。
According to the present invention, when the progress status of the related department is input by the progress status input means, the presence or absence of the process delay is determined, so that the occurrence of the process delay can be detected. is there.

【0167】この発明によれば、進捗状況入力後、その
工程の作業が指定納期に間に合うか否かを判断し、指定
納期に間に合わない場合には、指定納期に間に合わない
旨を示すメッセージを工程管理者に通知するように構成
したので、例えば、不慮の事故等が発生して、指定納期
に間に合わない事態が生じたとき、指定納期に間に合う
ように対処することができる効果がある。
According to the present invention, after inputting the progress status, it is determined whether or not the work in the process is in time for the designated delivery date, and if not, a message indicating that the work is not in time for the designated delivery date is sent to the process. Since the system is configured to notify the administrator, for example, when an unexpected accident or the like occurs and a situation occurs in which the designated delivery date cannot be met, it is possible to take measures to meet the designated delivery date.

【0168】この発明によれば、指定納期に間に合わな
い旨を示すメッセージを通知する際、指定納期に間に合
わない原因及び遅れが見込まれる日数を通知するように
構成したので、最善の代替案等を得ることができる効果
がある。
According to the present invention, when a message indicating that the designated delivery date is not delivered is notified, the cause of the failure to meet the designated delivery date and the number of days expected to be delayed are notified. There is an effect that can be obtained.

【0169】この発明によれば、進捗管理手段により工
程遅れの通知を受け取った工程管理者が工程遅れに対処
する代替案を入力すると、その代替案を製品の製造に係
わる関係部門に配信し、この代替案で良いか否かをワー
クフローして問い合わせを行うように構成したので、関
係部門から代替案の承認を得ることができる効果があ
る。
According to the present invention, when the process manager who has received the notification of the process delay by the progress management means inputs an alternative to deal with the process delay, the alternative is distributed to the department involved in the manufacture of the product. Since the configuration is such that an inquiry is made in a workflow as to whether or not this alternative is OK, there is an effect that the approval of the alternative can be obtained from the related department.

【0170】この発明によれば、関係部門から代替案の
承認を受けると、計画指示書を変更するように構成した
ので、以後、変更された計画指示書にしたがって製品の
製造を行うことができる効果がある。
According to the present invention, when the alternative section is approved by the relevant department, the plan instruction is changed, so that the product can be manufactured according to the changed plan instruction. effective.

【0171】この発明によれば、客先からインターネッ
ト経由で製品の発注を受け付けて、発注伝票を作成する
ように構成したので、客先の所在地を問わず、簡単に製
品を発注することができる効果がある。
According to the present invention, a product order is received from a customer via the Internet and an order slip is created, so that the product can be easily ordered regardless of the customer's location. effective.

【0172】この発明によれば、客先からの発注内容を
営業部門へメール等で転送し、その結果営業部門がこれ
を承認した場合、そのデータに基づいて受注の有無を客
先に回答するように構成したので、客先は希望する製品
が要求通り受注されるか否かを認識することができる効
果がある。
According to the present invention, the contents of the order from the customer are transferred to the sales department by e-mail or the like, and as a result, when the sales department approves the order, the customer is notified of the presence or absence of the order based on the data. With such a configuration, there is an effect that the customer can recognize whether or not the desired product is ordered as requested.

【0173】この発明によれば、客先から発注オーダの
変更要求を受けると、その変更内容を営業部門などの関
係部門に配信するように構成したので、関係部門から変
更内容の承認を得ることができる効果がある。
According to the present invention, when a request for changing the order is received from the customer, the change is distributed to the related departments such as the sales department. There is an effect that can be.

【0174】この発明によれば、関係部門から変更内容
の承認又は非承認を示すデータを受けると、そのデータ
に基づいて変更受諾の有無を客先に回答するように構成
したので、客先は要求通り変更されるか否かを認識する
ことができる効果がある。
According to the present invention, when data indicating approval or non-approval of the change is received from the relevant department, the customer is informed of whether or not the change has been accepted based on the data. There is an effect that it is possible to recognize whether or not the change is made as requested.

【0175】この発明によれば、関係部門から変更内容
の承認を受けると、計画指示書を変更するように構成し
たので、以後、変更された計画指示書にしたがって製品
の製造を行うことができる効果がある。
According to the present invention, the configuration is such that the plan instruction is changed when the change is approved by the related department, so that the product can be manufactured according to the changed plan instruction. effective.

【0176】この発明によれば、能力データ格納手段に
より格納された人間の能力を人事評価用のデータベース
に送信するように構成したので、人事担当者は、人事査
定に用いることができる客観的な情報をリアルタイムに
入手することができる効果がある。
According to the present invention, since the capability of the human being stored by the capability data storage means is transmitted to the database for personnel evaluation, the personnel personnel can be objectively used for personnel evaluation. There is an effect that information can be obtained in real time.

【0177】この発明によれば、製品の発注伝票を受け
ると、データベースに格納されている製品を製造する設
備の能力,その製品の製造に係わる人間の能力及びその
製品を構成する部材の価格を参照して、その製品のコス
トを計算する一方、データベースの格納内容の変更を受
け付けるように構成したので、人事異動や生産設備の変
動等に対して速やかに対処することができるとともに、
製造する製品の種類が異なる生産ラインに対して汎用的
に使用することができる効果がある。
According to the present invention, when a product order slip is received, the capacity of facilities for manufacturing products stored in the database, the capabilities of humans involved in manufacturing the products, and the prices of members constituting the products are reduced. By referring to and calculating the cost of the product, it is configured to accept changes in the contents stored in the database, so that personnel changes and changes in production equipment can be dealt with promptly,
This has the effect that it can be used universally for production lines with different types of products to be manufactured.

【0178】この発明によれば、製品の発注伝票を受け
ると、データベースに格納されている製品を製造する設
備の能力,その製品の製造に係わる人間の能力及びその
製品を構成する部材の調達日数を参照して、その製品の
納期を計算する一方、データベースの格納内容の変更を
受け付けるように構成したので、人事異動や生産設備の
変動等に対して速やかに対処することができるととも
に、製造する製品の種類が異なる生産ラインに対して汎
用的に使用することができる効果がある。
According to the present invention, upon receiving an order slip for a product, the capacity of the equipment for manufacturing the product stored in the database, the capacity of the human being involved in the manufacture of the product, and the number of days of procurement of the members constituting the product , While calculating the delivery date of the product, while accepting changes in the contents stored in the database, it is possible to quickly respond to personnel changes and fluctuations in production equipment, etc., and manufacture There is an effect that it can be generally used for production lines with different types of products.

【0179】この発明によれば、製品の発注伝票を受け
ると、データベースに格納されている製品を製造する設
備の能力,その製品の製造に係わる人間の能力,その製
品を構成する部材の価格及びその製品を構成する部材の
調達日数を参照して、その製品のコストと予想工期を計
算する一方、データベースの格納内容の変更を受け付け
るように構成したので、人事異動や生産設備の変動等に
対して速やかに対処することができるとともに、製造す
る製品の種類が異なる生産ラインに対して汎用的に使用
することができる効果がある。
According to the present invention, when a product order slip is received, the capacity of the facility for manufacturing the product stored in the database, the capacity of human beings involved in the manufacture of the product, the price of members constituting the product, and the like. By referring to the procurement days of the components that make up the product and calculating the cost and expected construction time of the product, the system is configured to accept changes in the contents stored in the database. In addition to this, there is an effect that it can be used promptly, and can be used for general purpose for production lines of different types of products to be manufactured.

【0180】この発明によれば、以前に計画立案者など
が入力したある工程に関する設備や人員等の情報が実績
データとしてマスタDBへ格納され、以降に同様の計画
を立てる際にこれらのデータを業務ひな形として再利用
可能にする構成にしたので、計画の立案精度が向上する
効果がある。
According to the present invention, information such as equipment and personnel related to a certain process previously input by the planner or the like is stored in the master DB as actual data, and these data are used when making a similar plan thereafter. Since it is configured to be reusable as a business model, there is an effect that the accuracy of planning is improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1による生産管理装置
を示す構成図である。
FIG. 1 is a configuration diagram illustrating a production management device according to a first embodiment of the present invention.

【図2】 生産管理装置を含む生産管理システムの全体
図である。
FIG. 2 is an overall view of a production management system including a production management device.

【図3】 コスト計算部及び納期計算部の動作を示すフ
ローチャートである。
FIG. 3 is a flowchart illustrating operations of a cost calculation unit and a delivery date calculation unit.

【図4】 生産管理装置の全体フローを示す概念図であ
る。
FIG. 4 is a conceptual diagram showing an overall flow of the production management device.

【図5】 基本的な業務の流れを説明する説明図であ
る。
FIG. 5 is an explanatory diagram illustrating a basic business flow.

【図6】 計画指示書の内容を示す説明図である。FIG. 6 is an explanatory diagram showing the contents of a plan instruction.

【図7】 指示書オブジェクトの作成例を示す概念図で
ある。
FIG. 7 is a conceptual diagram illustrating an example of creating an instruction book object.

【図8】 製品構成コストマスタ等の意味を記述する説
明図である。
FIG. 8 is an explanatory diagram describing the meaning of a product configuration cost master and the like.

【図9】 変更部の更新処理を示すフローチャートであ
る。
FIG. 9 is a flowchart illustrating an update process of a change unit.

【図10】 部材の価格等の変更例を示す概念図であ
る。
FIG. 10 is a conceptual diagram showing an example of changing a member price and the like.

【図11】 部材監視手段の監視処理を示すフローチャ
ートである。
FIG. 11 is a flowchart illustrating a monitoring process of a member monitoring unit.

【図12】 製品の類似性のチェック例を示す概念図で
ある。
FIG. 12 is a conceptual diagram showing an example of checking the similarity of products.

【図13】 類似性の判断処理を示すフローチャートで
ある。
FIG. 13 is a flowchart illustrating similarity determination processing.

【図14】 計画指示書の作成手順を示すフローチャー
トである。
FIG. 14 is a flowchart showing a procedure for creating a plan instruction.

【図15】 計画指示書の作成フローを示す概念図であ
る。
FIG. 15 is a conceptual diagram showing a flow of creating a plan instruction.

【図16】 業務フロー等を示す概念図である。FIG. 16 is a conceptual diagram showing a business flow and the like.

【図17】 計画指示書のワークフローを示す概念図で
ある。
FIG. 17 is a conceptual diagram showing a workflow of a plan instruction.

【図18】 計画指示書の承認・非承認の処理を示すフ
ローチャートである。
FIG. 18 is a flowchart showing a process of approving / rejecting a plan instruction.

【図19】 工程管理者の役割を説明する説明図であ
る。
FIG. 19 is an explanatory diagram illustrating the role of a process manager.

【図20】 進捗状況の判断を示すフローチャートであ
る。
FIG. 20 is a flowchart showing a determination of a progress situation.

【図21】 警告の発信を示すフローチャートである。FIG. 21 is a flowchart showing issuing of a warning.

【図22】 代替案の承認・非承認の処理を示すフロー
チャートである。
FIG. 22 is a flowchart showing a process of approving / rejecting an alternative.

【図23】 客先の端末に表示される製品発注用の入力
画面等を示す説明図である。
FIG. 23 is an explanatory diagram showing an input screen for ordering a product and the like displayed on the terminal of the customer;

【図24】 受注の有無を客先に回答する処理を示すフ
ローチャートである。
FIG. 24 is a flowchart showing a process for replying to the customer whether or not an order has been received.

【図25】 人間の能力の送信例を示す概念図である。FIG. 25 is a conceptual diagram showing a transmission example of human capabilities.

【図26】 従来の生産管理装置を示す構成図である。FIG. 26 is a configuration diagram showing a conventional production management device.

【符号の説明】[Explanation of symbols]

11 能力データベース(能力データ格納手段)、12
部材データベース(部材データ格納手段)、15 コ
スト計算部(コスト計算手段)、16 納期計算部(納
期計算手段)、17 表示制御部(提示手段)、18
CRT(提示手段)、19 変更部(変更手段)。
11 ability database (capability data storage means), 12
Member database (member data storage means), 15 cost calculation section (cost calculation means), 16 delivery date calculation section (delivery date calculation means), 17 display control section (presentation means), 18
CRT (presenting means), 19 changing unit (changing means).

フロントページの続き Fターム(参考) 3C042 RJ00 5B049 BB07 CC05 CC11 CC21 CC35 EE01 EE05 EE41 FF03 FF04 GG04 GG07 9A001 JJ44 Continued on the front page F term (reference) 3C042 RJ00 5B049 BB07 CC05 CC11 CC21 CC35 EE01 EE05 EE41 FF03 FF04 GG04 GG07 9A001 JJ44

Claims (46)

【特許請求の範囲】[Claims] 【請求項1】 製品を製造する設備の能力を格納すると
ともに、製品の製造に係わる人間の能力を格納する能力
データ格納手段と、製品を構成する部材の価格を格納す
る部材データ格納手段と、製品の発注伝票を受けると、
その製品を製造する設備の能力,その製品の製造に係わ
る人間の能力及びその製品を構成する部材の価格を参照
して、その製品のコストを計算するコスト計算手段と、
上記コスト計算手段により計算された製品のコストを提
示する提示手段と、上記能力データ格納手段及び部材デ
ータ格納手段の格納内容の変更を受け付ける変更手段と
を備えた生産管理装置。
1. A capability data storage unit that stores the capability of a facility that manufactures a product and also stores the capabilities of humans involved in manufacturing the product, a member data storage unit that stores prices of members that make up the product, When you receive a product order slip,
Cost calculation means for calculating the cost of the product by referring to the capacity of the facility for manufacturing the product, the human ability involved in manufacturing the product, and the price of the members constituting the product;
A production management device comprising: a presentation unit for presenting a product cost calculated by the cost calculation unit; and a change unit for receiving a change in the storage contents of the capability data storage unit and the member data storage unit.
【請求項2】 製品を製造する設備の能力を格納すると
ともに、製品の製造に係わる人間の能力を格納する能力
データ格納手段と、製品を構成する部材の調達日数を格
納する部材データ格納手段と、製品の発注伝票を受ける
と、その製品を製造する設備の能力,その製品の製造に
係わる人間の能力及びその製品を構成する部材の調達日
数を参照して、その製品の納期を計算する納期計算手段
と、上記納期計算手段により計算された製品の納期を提
示する提示手段と、上記能力データ格納手段及び部材デ
ータ格納手段の格納内容の変更を受け付ける変更手段と
を備えた生産管理装置。
2. A capability data storage unit for storing the capability of a facility for manufacturing a product and storing the capability of a human being involved in the manufacture of the product, and a member data storage unit for storing the number of days of procurement of members constituting the product. Upon receipt of an order slip for a product, the delivery date for calculating the delivery date of the product by referring to the capabilities of the equipment for manufacturing the product, the capabilities of humans involved in the manufacture of the product, and the number of days of procurement of the components that make up the product A production management apparatus comprising: a calculating unit; a presenting unit for presenting a delivery date of a product calculated by the delivery date calculating unit; and a changing unit for receiving a change in the storage contents of the capability data storage unit and the member data storage unit.
【請求項3】 製品を製造する設備の能力を格納すると
ともに、製品の製造に係わる人間の能力を格納する能力
データ格納手段と、製品を構成する部材の価格と調達日
数を格納する部材データ格納手段と、製品の発注伝票を
受けると、その製品を製造する設備の能力,その製品の
製造に係わる人間の能力及びその製品を構成する部材の
価格を参照して、その製品のコストを計算するコスト計
算手段と、製品の発注伝票を受けると、その製品を製造
する設備の能力,その製品の製造に係わる人間の能力及
びその製品を構成する部材の調達日数を参照して、その
製品の納期を計算する納期計算手段と、上記コスト計算
手段により計算された製品のコストと上記納期計算手段
により計算された製品の納期を提示する提示手段と、上
記能力データ格納手段及び部材データ格納手段の格納内
容の変更を受け付ける変更手段とを備えた生産管理装
置。
3. A capability data storage means for storing the capability of a facility for manufacturing a product and storing the capability of a person involved in the manufacture of the product, and a member data storage for storing the price and the number of days of procurement of the members constituting the product. Upon receipt of the order form for the product, the cost of the product is calculated by referring to the capacity of the equipment for manufacturing the product, the capabilities of humans involved in the manufacture of the product, and the prices of the components that make up the product. Upon receipt of the cost calculation means and the order slip for the product, the delivery date of the product is referred to by referring to the capabilities of the equipment for manufacturing the product, the capabilities of humans involved in the manufacture of the product, and the number of days of procurement of the components constituting the product. Delivery time calculating means for calculating the cost of the product calculated by the cost calculating means and the delivery time of the product calculated by the delivery time calculating means; A production management device comprising: a change unit that receives a change in the storage content of the column and member data storage unit.
【請求項4】 コスト計算手段は、同一の部材に分類さ
れる部品が複数個存在する場合、最も価格が安い部品の
価格を参照して、製品のコストを計算することを特徴と
する請求項1または請求項3記載の生産管理装置。
4. The cost calculating means, when there are a plurality of parts classified as the same member, calculates the cost of the product by referring to the price of the cheapest part. The production management device according to claim 1 or 3.
【請求項5】 納期計算手段は、同一の部材に分類され
る部品が複数個存在する場合、最も調達日数が短い部品
の調達日数を参照して、製品の納期を計算することを特
徴とする請求項2または請求項3記載の生産管理装置。
5. The delivery date calculation means, when there are a plurality of parts classified as the same member, calculates the delivery date of the product by referring to the number of days of purchase of the component having the shortest number of days of purchase. The production management device according to claim 2 or 3.
【請求項6】 コスト計算手段は、納期計算手段により
選択された各部材のコストの合計が指定コストを越える
場合、他の部品の価格を参照して、製品のコストを指定
された範囲内に収まるように再計算することを特徴とす
る請求項4記載の生産管理装置。
6. The cost calculating means, when the sum of the costs of each member selected by the delivery date calculating means exceeds a designated cost, refers to the price of another part and sets the cost of the product within the designated range. 5. The production management apparatus according to claim 4, wherein the recalculation is performed so as to fit.
【請求項7】 納期計算手段は、コスト計算手段により
選択された各部材の調達納期が指定納期を超える場合、
他の部品の調達日数を参照して、製品の調達日数を指定
された範囲内に収まるように再計算することを特徴とす
る請求項5記載の生産管理装置。
7. The delivery date calculation means, when the procurement delivery date of each member selected by the cost calculation means exceeds the designated delivery date,
6. The production management apparatus according to claim 5, wherein the procurement days of the product are recalculated with reference to the procurement days of other parts so as to fall within a specified range.
【請求項8】 コスト計算手段は、製品の設計から製品
の製造を経て、製品の納入が完了するまでの間に、変更
手段により能力データ格納手段又は部材データ格納手段
の格納内容が変更された場合、製品のコストを再計算す
ることを特徴とする請求項1または請求項3記載の生産
管理装置。
8. The cost calculation means, wherein the storage contents of the capability data storage means or the member data storage means are changed by the change means from the design of the product to the manufacture of the product to the completion of the delivery of the product. 4. The production management device according to claim 1, wherein the cost of the product is recalculated in the case.
【請求項9】 納期計算手段は、製品の設計から製品の
製造を経て、製品の納入が完了するまでの間に、変更手
段により能力データ格納手段又は部材データ格納手段の
格納内容が変更された場合、製品の納期を再計算するこ
とを特徴とする請求項2または請求項3記載の生産管理
装置。
9. The delivery date calculation means, wherein the storage content of the capability data storage means or the member data storage means is changed by the change means during the period from the design of the product to the manufacture of the product to the completion of the delivery of the product. 4. The production management device according to claim 2, wherein the delivery date of the product is recalculated in the case.
【請求項10】 能力データ格納手段は、設計部門の人
間の能力を格納する際、既製品を設計する場合の能力
と、新規製品を設計する場合の能力に分けて格納し、既
製品の設計能力計算にあたっては、該既製品における設
計実績データを必要に応じて参照し、利用することを特
徴とする請求項1から請求項9のうちのいずれか1項記
載の生産管理装置。
10. The ability data storage means, when storing the ability of a human in the design department, stores the ability when designing an existing product and the ability when designing a new product separately. The production management apparatus according to any one of claims 1 to 9, wherein at the time of calculating the capacity, design performance data of the ready-made product is referenced and used as needed.
【請求項11】 コスト計算手段は、注文品を設計する
場合の能力を参照する際、注文に係る製品が既製品又は
過去に設計された新規製品と類似する製品である場合に
は、新規製品を設計する場合のコストより割安にし、コ
スト計算の際に該既製品のコストデータを必要に応じて
参照し、利用することを特徴とする請求項10記載の生
産管理装置。
11. The cost calculation means, when referring to the ability in designing an ordered product, if the product to be ordered is an existing product or a product similar to a new product designed in the past, a new product 11. The production management apparatus according to claim 10, wherein the cost is designed to be lower than the cost when designing, and the cost data of the off-the-shelf product is referred to and used as needed when calculating the cost.
【請求項12】 納期計算手段は、新製品を設計する場
合の能力を参照する際、注文に係る製品が既製品又は過
去に設計された注文品と類似する製品である場合には、
必要に応じて該既製品の完了実績データを参照して、納
期計算の際に利用することを特徴とする請求項10記載
の生産管理装置。
12. The delivery date calculation means, when referring to the ability when designing a new product, when the product pertaining to the order is an existing product or a product similar to an order product designed in the past,
11. The production management apparatus according to claim 10, wherein the production management apparatus refers to the completed result data of the ready-made product as needed and calculates the delivery date.
【請求項13】 コスト計算手段は、部材の調達先が指
定された場合、その調達先において指定された部材の価
格である購入価格を参照して、製品のコストを計算する
ことを特徴とする請求項1または請求項3記載の生産管
理装置。
13. A cost calculating means, when a supplier of a member is designated, calculates a product cost by referring to a purchase price which is a price of the member designated at the supplier. The production management device according to claim 1 or 3.
【請求項14】 納期計算手段は、部材の調達先が指定
された場合、その調達先から生産拠点までの部材の調達
日数であるリードタイムを参照して、製品の納期を計算
することを特徴とする請求項2または請求項3記載の生
産管理装置。
14. A delivery date calculation means, when a supplier of a member is designated, calculates a delivery date of a product by referring to a lead time, which is the number of days of procurement of the member from the supplier to the production base. The production management device according to claim 2 or 3, wherein:
【請求項15】 提示手段は、コスト計算手段により計
算された製品のコストが指定コストを上回る場合、指定
コストを上回る旨を示すメッセージを提示することを特
徴とする請求項1または請求項3記載の生産管理装置。
15. The method according to claim 1, wherein the presenting means presents a message indicating that the cost of the product calculated by the cost calculating means exceeds the designated cost if the cost exceeds the designated cost. Production management equipment.
【請求項16】 提示手段は、納期計算手段により計算
された製品の納期が指定納期を越える場合、指定納期に
間に合わない旨を示すメッセージを提示することを特徴
とする請求項2または請求項3記載の生産管理装置。
16. The method according to claim 2, wherein the presenting means presents a message indicating that the product cannot be delivered in time when the delivery time of the product calculated by the delivery time calculating means exceeds the designated delivery time. The production management device as described.
【請求項17】 提示手段は、コスト計算手段により計
算された製品のコストが再計算された場合、再計算後の
製品のコストを提示するとともに、計画段階と状況が異
なる旨を示すメッセージを提示することを特徴とする請
求項8記載の生産管理装置。
17. When the cost of the product calculated by the cost calculating means is recalculated, the presenting means presents the cost of the product after the recalculation and presents a message indicating that the situation is different from the planning stage. The production management device according to claim 8, wherein
【請求項18】 提示手段は、納期計算手段により計算
された製品の納期が再計算された場合、再計算後の製品
の納期を提示するとともに、計画段階と状況が異なる旨
を示すメッセージを提示することを特徴とする請求項9
記載の生産管理装置。
18. The presenting means, when the delivery date of the product calculated by the delivery date calculating means is recalculated, presents the delivery date of the product after the recalculation and presents a message indicating that the situation is different from the planning stage. 10. The method according to claim 9, wherein
The production management device as described.
【請求項19】 変更手段は、工程管理者によって入力
された設備の稼働実績と人間の就労実績を考慮して、設
備の能力と人間の能力を更新し、その旨を関係者に通知
することを特徴とする請求項1から請求項18のうちの
いずれか1項記載の生産管理装置。
19. The changing means updates the capacity of the equipment and the capacity of the human in consideration of the operation result of the equipment and the work performance of the human input by the process manager, and notifies the relevant person of the update. The production management device according to any one of claims 1 to 18, wherein:
【請求項20】 変更手段は、部材の供給元から部材の
新規登録を含む部材の価格又は調達日数の変更要求を受
けると、部材の価格又は調達日数を更新し、その旨を計
画立案中の担当者などに通知することを特徴とする請求
項1から請求項19のうちのいずれか1項記載の生産管
理装置。
20. The changing means, upon receiving a request for changing the price or the number of days of procurement of the member including the new registration of the member from the supplier of the member, updates the price or number of days of procurement of the member, The production management apparatus according to any one of claims 1 to 19, wherein a person in charge is notified.
【請求項21】 計画担当者の通知において、その変更
のあった部材は、該担当者が計画中の製品に対して適用
可能である場合に限って、該通知が行われることを特徴
とする請求項20記載の生産管理装置。
21. A notice of a planner, wherein the changed member is notified only when the member is applicable to the product under planning. The production management device according to claim 20.
【請求項22】 変更手段は、部材の供給元からインタ
ーネット経由で変更要求を受け付けることを特徴とする
請求項20記載の生産管理装置。
22. The production management apparatus according to claim 20, wherein the change unit receives a change request from a member supplier via the Internet.
【請求項23】 製品名、数量、納期といった生産計画
の基本要素であるデータを計画立案者に入力させ、これ
をもとに計画指示書を作成する作成手段を設けたことを
特徴とする請求項1から請求項22のうちのいずれか1
項記載の生産管理装置。
23. A method according to claim 1, further comprising the step of allowing a planner to input data as basic elements of a production plan, such as a product name, a quantity, and a delivery date, and preparing a planning instruction based on the data. 23. Any one of items 1 to 22
The production management device according to the item.
【請求項24】 作成手段は、シミュレーション機能を
有し、計画に係る製品の製造コスト及び所要日数がどれ
位になるかを計算する機能を備えていることを特徴とす
る請求項23記載の生産管理装置。
24. The production method according to claim 23, wherein the creation means has a simulation function, and has a function of calculating the production cost and the required number of days of the product according to the plan. Management device.
【請求項25】 製造コストの計算において、コスト計
算手段を起動し、ここから得られる最適な部品構成を計
算して、これをシミュレーション結果として利用するこ
とを特徴とする請求項24記載の生産管理装置。
25. The production management system according to claim 24, wherein in the calculation of the manufacturing cost, a cost calculation means is started, an optimum component configuration obtained from the cost calculation means is calculated, and this is used as a simulation result. apparatus.
【請求項26】 所要日数の計算において、納期計算手
段を起動し、ここから得られる最適な部品構成を計算し
て、これをシミュレーション結果として利用することを
特徴とする請求項24記載の生産管理装置。
26. The production management system according to claim 24, wherein in the calculation of the required number of days, a delivery date calculation means is started, an optimum part configuration obtained from the means is calculated, and this is used as a simulation result. apparatus.
【請求項27】 製造コストの計算において、シミュレ
ーション結果は、その製品と同一種類に属する各製品の
製造コストの平均値であってもよいことを特徴とする請
求項25記載の生産管理装置。
27. The production management apparatus according to claim 25, wherein in the calculation of the manufacturing cost, the simulation result may be an average value of manufacturing costs of each product belonging to the same type as the product.
【請求項28】 所要日数の計算において、シミュレー
ション結果は、その製品と同一種類に属する各製品の所
要日数の平均値であってもよいことを特徴とする請求項
26記載の生産管理装置。
28. The production management apparatus according to claim 26, wherein in the calculation of the required days, the simulation result may be an average value of the required days of each product belonging to the same type as the product.
【請求項29】 作成手段により作成された計画指示書
を製品の製造に係わる関係部門に配信し、この内容で良
いか否かを関係者に問い合わせを行うワークフロー機能
を有する配信手段を設けたことを特徴とする請求項23
記載の生産管理装置。
29. Distributing means having a workflow function for distributing the planning instructions created by the creating means to the related departments involved in the manufacture of the product and inquiring concerned parties as to whether or not the contents are satisfactory. 24. The method of claim 23, wherein
The production management device as described.
【請求項30】 製品の製造に係わる関係部門から計画
指示書の承認又は非承認を示すデータを計画指示書の配
信元に返送し、非承認である場合は、非承認である理由
及び代替案を返送し、一方承認である場合は、この内容
を正式の計画指示書として確定させる返送手段を設けた
ことを特徴とする請求項29記載の生産管理装置。
30. Data related to approval or non-approval of the planning instruction is returned from the relevant department involved in the manufacture of the product to the distribution source of the planning instruction. If not approved, the reason for the non-approval and an alternative 30. The production management apparatus according to claim 29, further comprising a return unit for returning the information and, when the approval is granted, for confirming the contents as a formal plan instruction.
【請求項31】 製品の製造に係わる関係部門の進捗状
況を入力し、この入力結果を計画指示書に反映する進捗
状況入力手段を設けたことを特徴とする請求項1から請
求項30のうちのいずれか1項記載の生産管理装置。
31. A system according to claim 1, further comprising a progress input means for inputting a progress status of a related department relating to manufacturing of the product and reflecting the input result in a plan instruction. The production management device according to any one of claims 1 to 7.
【請求項32】 進捗状況入力手段が関係部門の進捗状
況を入力すると、工程遅れの有無を判断する進捗管理手
段を設けたことを特徴とする請求項31記載の生産管理
装置。
32. The production management apparatus according to claim 31, further comprising a progress management means for judging whether or not there is a process delay when the progress input means inputs the progress of the related department.
【請求項33】 進捗管理手段は、工程遅れを検知する
と指定納期に間に合うか否かを判断し、指定納期に間に
合わない場合には、指定納期に間に合わない旨を示すメ
ッセージを工程管理者に通知することを特徴とする請求
項32記載の生産管理装置。
33. The progress management means judges whether or not a designated delivery date is reached when a process delay is detected, and notifies the process manager of a message indicating that the designated delivery date is not met when the designated delivery date is not met. 33. The production management device according to claim 32, wherein:
【請求項34】 進捗管理手段は、指定納期に間に合わ
ない旨を示すメッセージを通知する際、指定納期に間に
合わない原因及び遅れが見込まれる日数を通知すること
を特徴とする請求項33記載の生産管理装置。
34. The production method according to claim 33, wherein the progress management means, when notifying the message indicating that the designated delivery date cannot be delivered, notifies the cause of the missed delivery date and the number of days expected to be delayed. Management device.
【請求項35】 進捗管理手段により工程遅れの通知を
受け取った工程管理者が工程遅れに対処する代替案を入
力すると、その代替案を製品の製造に係わる関係部門に
配信し、この代替案で良いか否かをワークフローして問
い合わせを行う計画調整手段を設けたことを特徴とする
請求項34記載の生産管理装置。
35. When the process manager receives the notification of the process delay by the progress management means, and inputs an alternative to deal with the process delay, the alternative is distributed to the relevant department related to the manufacture of the product, and this alternative is used. 35. The production management apparatus according to claim 34, further comprising a plan adjustment unit for making an inquiry as to whether or not the workflow is good.
【請求項36】 計画調整手段は、関係部門から代替案
の承認を受けると、計画指示書を変更することを特徴と
する請求項35記載の生産管理装置。
36. The production management apparatus according to claim 35, wherein the plan adjustment means changes the plan instruction when receiving the approval of the alternative from the related department.
【請求項37】 客先からインターネット経由で製品の
発注を受け付けて、発注伝票を作成する受付手段を設け
たことを特徴とする請求項1から請求項36のうちのい
ずれか1項記載の生産管理装置。
37. The production method according to claim 1, further comprising a receiving means for receiving an order for a product from a customer via the Internet and creating an order slip. Management device.
【請求項38】 受付手段は、客先からの発注内容を営
業部門へメール等で転送し、その結果営業部門がこれを
承認した場合、そのデータに基づいて受注の有無を客先
に回答することを特徴とする請求項37記載の生産管理
装置。
38. Receiving means transfers the contents of an order from a customer to a sales department by e-mail or the like. As a result, when the sales department approves the order, the reception means responds to the customer based on the data whether there is an order. 38. The production management device according to claim 37, wherein:
【請求項39】 受付手段は、客先から発注オーダの変
更要求を受けると、その変更内容を営業部門などの関係
部門に配信することを特徴とする請求項37または請求
項38記載の生産管理装置。
39. The production management system according to claim 37, wherein the receiving means, upon receiving a request for changing the order from the customer, distributes the change to a related department such as a sales department. apparatus.
【請求項40】 受付手段は、関係部門から変更内容の
承認又は非承認を示すデータを受けると、そのデータに
基づいて変更受諾の有無を客先に回答することを特徴と
する請求項39記載の生産管理装置。
40. The apparatus according to claim 39, wherein the accepting means, upon receiving data indicating approval or disapproval of the change content from the related department, replies to the customer whether or not the change has been accepted based on the data. Production management equipment.
【請求項41】 受付手段は、関係部門から変更内容の
承認を受けると、計画指示書を変更することを特徴とす
る請求項39記載の生産管理装置。
41. The production management apparatus according to claim 39, wherein the receiving means changes the plan instruction upon receiving approval of the change from the related department.
【請求項42】 能力データ格納手段により格納された
人間の能力を人事評価用のデータベースに送信する送信
手段を設けたことを特徴とする請求項1から請求項41
のうちのいずれか1項記載の生産管理装置。
42. The apparatus according to claim 1, further comprising transmission means for transmitting the human ability stored in the ability data storage means to a database for personnel evaluation.
The production management device according to claim 1.
【請求項43】 製品の発注伝票を受けると、データベ
ースに格納されている製品を製造する設備の能力,その
製品の製造に係わる人間の能力及びその製品を構成する
部材の価格を参照して、その製品のコストを計算し、そ
の製品のコストを提示する一方、上記データベースの格
納内容の変更を受け付ける生産管理方法。
43. Upon receipt of a product order slip, referring to the capacity of the facility for manufacturing the product stored in the database, the ability of humans involved in the manufacture of the product, and the price of the members constituting the product, A production management method that calculates the cost of the product, presents the cost of the product, and accepts a change in the storage content of the database.
【請求項44】 製品の発注伝票を受けると、データベ
ースに格納されている製品を製造する設備の能力,その
製品の製造に係わる人間の能力及びその製品を構成する
部材の調達日数を参照して、その製品の納期を計算し、
その製品の納期を提示する一方、上記データベースの格
納内容の変更を受け付ける生産管理方法。
44. Receiving a product order slip, referring to the capacity of the facility for manufacturing the product stored in the database, the capacity of human beings involved in the manufacture of the product, and the number of days of procurement of the members constituting the product. , Calculate the delivery date of the product,
A production management method for presenting a delivery date of the product and receiving a change in the stored contents of the database.
【請求項45】 製品の発注伝票を受けると、データベ
ースに格納されている製品を製造する設備の能力,その
製品の製造に係わる人間の能力,その製品を構成する部
材の価格及びその製品を構成する部材の調達日数を参照
して、その製品のコストと調達日数を計算し、その製品
のコストと調達日数を提示する一方、上記データベース
の格納内容の変更を受け付ける生産管理方法。
45. Receiving an order slip for a product, the capacity of the facility for manufacturing the product stored in the database, the capacity of human beings involved in the manufacture of the product, the price of members constituting the product, and the configuration of the product A production management method for calculating the cost and the number of days of procurement of a product by referring to the number of days of procurement of a member to be provided, presenting the cost and the number of days of procurement of the product, and receiving a change in the stored contents of the database.
【請求項46】 以前に計画立案者などが入力したある
工程に関する設備や人員等の情報が実績データとしてマ
スタDBへ格納され、以降に同様の計画を立てる際にこ
れらのデータを業務ひな形として再利用可能にすること
を特徴とする生産管理方法。
46. Information such as equipment and personnel related to a certain process previously input by a planner or the like is stored in a master DB as actual data, and these data are used as a business model when making a similar plan thereafter. A production management method characterized by being reusable.
JP983599A 1999-01-18 1999-01-18 Production control device and method Pending JP2000210845A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP983599A JP2000210845A (en) 1999-01-18 1999-01-18 Production control device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP983599A JP2000210845A (en) 1999-01-18 1999-01-18 Production control device and method

Publications (1)

Publication Number Publication Date
JP2000210845A true JP2000210845A (en) 2000-08-02

Family

ID=11731194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP983599A Pending JP2000210845A (en) 1999-01-18 1999-01-18 Production control device and method

Country Status (1)

Country Link
JP (1) JP2000210845A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002230356A (en) * 2001-02-06 2002-08-16 Key Tranding Co Ltd Information providing method
JP2006318254A (en) * 2005-05-13 2006-11-24 Rishi Ro Automatic inventory management system
JP2010225058A (en) * 2009-03-25 2010-10-07 Mitsubishi Electric Corp Production management system
KR101061528B1 (en) 2004-02-20 2011-09-01 대우조선해양 주식회사 Cost management method when all kinds of vessel different are constructed in a dock
KR20140141256A (en) * 2013-05-31 2014-12-10 현대중공업 주식회사 Method of building ship
JP2018081401A (en) * 2016-11-15 2018-05-24 株式会社カブク Price quotation system, price quotation method and program
JP2021174227A (en) * 2020-04-24 2021-11-01 武州工業株式会社 Production information management method, production information management system, and production method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002230356A (en) * 2001-02-06 2002-08-16 Key Tranding Co Ltd Information providing method
KR101061528B1 (en) 2004-02-20 2011-09-01 대우조선해양 주식회사 Cost management method when all kinds of vessel different are constructed in a dock
JP2006318254A (en) * 2005-05-13 2006-11-24 Rishi Ro Automatic inventory management system
JP2010225058A (en) * 2009-03-25 2010-10-07 Mitsubishi Electric Corp Production management system
KR20140141256A (en) * 2013-05-31 2014-12-10 현대중공업 주식회사 Method of building ship
KR102024337B1 (en) 2013-05-31 2019-09-23 한국조선해양 주식회사 Method of building ship
JP2018081401A (en) * 2016-11-15 2018-05-24 株式会社カブク Price quotation system, price quotation method and program
JP2021174227A (en) * 2020-04-24 2021-11-01 武州工業株式会社 Production information management method, production information management system, and production method
JP7233106B2 (en) 2020-04-24 2023-03-06 武州工業株式会社 Production information management method, production information management system, and production method

Similar Documents

Publication Publication Date Title
US20060212323A1 (en) Production management system
US20040122689A1 (en) Method and apparatus for tracking a part
JP5738779B2 (en) Supply capability estimation system, method, and program
US20020147622A1 (en) System and method for enabling a configurable electronic business exchange platform
Karim et al. An on-time delivery improvement model for manufacturing organisations
US7099726B2 (en) Production planning system
JP3948429B2 (en) Price revision method and price revision support system
US7039481B2 (en) Production planning system
WO2001026010A1 (en) Method and estimator for production scheduling
KR102345145B1 (en) Production and logistics ERP automation system by linking and using customer information
Franz Project management with SAP project system
AU2019100163A4 (en) Automated building construction project management system
JPH06214996A (en) Production management method
JP2004021364A (en) Management intention decision support system
JP2020119491A (en) Delivery date prediction device, delivery date prediction method and program
Huang Information architecture for effective Workload Control: an insight from a successful implementation
JP2000210845A (en) Production control device and method
JP7392725B2 (en) Negotiation systems, negotiation methods and negotiation programs
JP2023046204A (en) Production management device, production management method, and production management program
JP2006318046A (en) Information management system and information management method
JP2018169684A (en) Business support device
Chiu et al. Collective impact of scrap, random breakdown, overtime and discontinuous issuing on batch production planning in a supply-chain environment
JP6695298B2 (en) Order control device
JP4239767B2 (en) Design change support system, design change method, design change support program, and recording medium recording the same
Perdomo-Rivera A framework for a decision support model for supply chain management in the construction industry

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060113

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20071113

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20071113

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20071113

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20080804

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090512

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090605

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090707