WO2006100753A1 - コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム - Google Patents
コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム Download PDFInfo
- Publication number
- WO2006100753A1 WO2006100753A1 PCT/JP2005/005130 JP2005005130W WO2006100753A1 WO 2006100753 A1 WO2006100753 A1 WO 2006100753A1 JP 2005005130 W JP2005005130 W JP 2005005130W WO 2006100753 A1 WO2006100753 A1 WO 2006100753A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- cost
- stage
- information management
- cost information
- input
- Prior art date
Links
- 238000007726 management method Methods 0.000 title claims abstract description 34
- 238000011161 development Methods 0.000 claims abstract description 10
- 238000012545 processing Methods 0.000 claims description 16
- 238000004519 manufacturing process Methods 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 11
- 238000013461 design Methods 0.000 abstract description 32
- 238000004364 calculation method Methods 0.000 abstract description 4
- 230000006870 function Effects 0.000 description 34
- 238000010586 diagram Methods 0.000 description 6
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000010365 information processing Effects 0.000 description 1
- 238000012905 input function Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/31—From computer integrated manufacturing till monitoring
- G05B2219/31408—Cost calculation of use of certain machine types
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/35—Nc in input of data, input till input file format
- G05B2219/35212—Estimating a cost associated with each operation, amount of time, target cost
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Definitions
- Cost information management system Cost information management method, and cost information management program Technical Field
- the present invention estimates a device cost composed of a plurality of parts such as communication devices and information processing devices, and covers, for example, from the design upstream of the development planning stage to the design downstream of the detailed design stage.
- the present invention relates to a cost information management system, a cost information management method, and a cost information management program.
- Patent Document 1 Japanese Patent Application Laid-Open No. 2002-182732
- the above-described method has a problem that the cost estimate varies depending on the level of expert experience, skill, and skill.
- cost estimates could not be made without possessing past manufacturing process data and CAD data of similar products.
- detailed drawings and CAD data are not available, so it is impossible to estimate costs with specialists or systems, and the overall equipment cost is unknown, and the profit / loss forecast for the business remains unknown. There was also a possibility that the project had to start.
- the present invention has been made to solve the above-described problems, and can be highly accurate and cost estimated without requiring expert skills.
- the object is to provide a cost information management system and method, and a cost information management program, which can estimate the cost from the current design to the design downstream of the detailed design stage. Means for solving the problem
- the present invention provides a cost information management system for managing cost information for manufacturing a device in the first stage and the second stage of manufacturing. Based on the input unit that inputs the function parameters and the target value of the device target cost in the first step and the second step, and the main function parameters in the first step input to the input unit, the device cost in the first step The function is compared with the target cost of the equipment to determine whether or not to move to the second stage, and if it is determined to move to the second stage, the function not set in the first stage It further comprises a control unit that further sets parameters and calculates the device cost in the second stage and compares the calculated value with the device target cost.
- control unit ends the device development process on condition that the device cost in the second stage is within the device target cost.
- the present invention is characterized in that an output unit is provided for outputting the device cost in the first stage and the second stage calculated by the control unit.
- the present invention further includes a storage unit having a cost table in which costs corresponding to the function parameters of each circuit constituting the device are stored in advance, and the control unit stores the cost table stored in the storage unit.
- the cost of each circuit according to the function parameter input to the input unit is obtained with reference to the above, and the device costs in the first stage and the second stage are calculated, respectively.
- the present invention is a cost information management method for managing cost information for manufacturing a device in the first stage and the second stage of manufacturing, wherein the first stage and the second of each circuit constituting the device.
- An input step for inputting function parameters and device target cost set values at the stage, and the device cost at the first stage is calculated based on the main function parameters at the first stage input by the input step. Compare the calculated value with the device target cost to determine whether or not to proceed to the second stage. If it is determined to proceed to the second stage, the function parameters that have not been set in the first stage are further set.
- a cost estimation step of setting and calculating the device cost in the second stage and comparing the calculated value with the device target cost.
- the cost estimation step is characterized in that the processing is terminated on condition that the device cost in the second stage is within the device target cost. Furthermore, an output step for outputting the device cost in the first stage and the second stage calculated by the cost estimation step is provided.
- a storage unit having a cost table in which costs corresponding to the function parameters of each circuit constituting the device are stored in advance is prepared, and the cost estimation step refers to the cost table stored in the storage unit.
- the cost of each circuit corresponding to the function parameter input to the input unit is obtained, and the device cost in the first stage and the second stage is calculated.
- the present invention is a cost information management program that causes a computer to manage cost information for manufacturing a device, and includes function parameters at the first stage and the second stage of each circuit constituting the apparatus.
- An input step for inputting the set value of the device target cost, and a device cost in the first step is calculated based on the main function parameters in the first step input in the input step, and the calculated value and the device target are calculated.
- the computer calculates a device cost at each stage, and causes the computer to execute a cost estimation step for comparing the calculated value with the device target cost.
- FIG. 1 is a block diagram showing a configuration of a cost information management system according to the present invention.
- FIG. 2 is a diagram for explaining an example of a circuit configuration constituting the apparatus.
- FIG. 3 is a diagram for explaining an example of function parameters set for each type of circuit constituting the apparatus.
- FIG. 4 is a diagram for explaining the contents of a cost table 3A stored in the storage device 3 of FIG.
- FIG. 5 is a flowchart showing the contents of a cost information management program 2A stored in the main memory 2 of FIG. 1 and executed by the central processing unit 1.
- FIG. 1 is a block diagram showing a configuration of a cost information management system according to the present invention.
- the cost information management system shown in Fig. 1 sets the functional parameters of each circuit that constitutes the device.
- a central processing unit 1 that is configured by a computer for setting and estimating a device cost and serves as a control means (control unit), and a planning stage (first step of the present invention) based on functional parameters of each circuit constituting the device Depending on the function parameters of the main memory 2 storing the cost information management program 2A for estimating the device cost in the design stage (corresponding to the second stage of the present invention) and each circuit constituting the device.
- a storage device 3 that stores a cost table 3A that stores previously stored costs, an input device 4 that inputs setting values of function parameters and device target costs at the planning and design stages of each circuit constituting the device, And an output device 5 for outputting the device cost at the planning stage and the design stage calculated by the central processing device 1.
- FIG. 2 is a diagram for explaining an example of a circuit configuration that constitutes the apparatus.
- the device 10 generally includes an input circuit 11, a processing circuit 12, an output circuit 13, a memory circuit 14, and a power supply circuit 15.
- functional parameters are set for each circuit type as shown in FIG. 3 for each circuit constituting such a device. That is, as the function parameters, for the input circuit 11, the processing circuit 12 and the output circuit 13, the circuit scale, the internal operation speed, the number of signal pins, the external size, etc. are set, and for the memory circuit 14, Set the memory system (SRAM, DRAM), memory capacity, operation clock speed, external size, etc. For the power supply circuit 15, input system (AC, DC), output voltage / current, presence / absence of protection circuit and external size Etc. are set.
- a cost table 3 A in which the correspondence relationship between the function parameters of the circuits constituting the apparatus shown in FIG. 4 and the cost is stored in advance in the storage device 3.
- the cost table 3A for example, as a cost table common to the input circuit 11, the processing circuit 12, and the output circuit 13, costs corresponding to the circuit scale, the internal operation speed, the number of signal pins, the outer size, and the like are stored in advance. Yes.
- Each of the memory circuit 14 and the power supply circuit 15 has a cost table.
- Figure 5 shows the cost information stored in the main memory 2 and executed by the central processing unit 1.
- 3 is a flowchart showing the contents of a management program 2A.
- step Sl when developing a device, at the planning stage, the main functional parameters and device target costs of each circuit constituting the device are set and inputted from the input device 4 (step Sl).
- circuit scale: 70k gate and external size: 22mm 2 are input as function parameters of input circuit 11, and specific values of circuit scale and external size are specified as function parameters of processing circuit 12 and output circuit 13.
- function parameter of the memory circuit 14 specific numerical values of the memory method and the external size are input, and as input function parameters of the power supply circuit 15, specific numerical values of the input method and the external size are input.
- the central processing unit 1 refers to the cost table shown in FIG. 4 to obtain the cost corresponding to the function parameter of each circuit, and calculates the device cost (step) S2).
- the cost corresponding to the function parameter of the input circuit 11 the circuit scale: 70k gate and the outer size: 22mm 2 were input as the function parameters. It is 500 yen-700 yen that is highlighted in a frame.
- costs corresponding to the function parameters of the processing circuit 12, the output circuit 13, the memory circuit 14, and the power supply circuit 15 are obtained, and the total device cost as a total is as follows.
- the calculated device cost is output by display or the like by the output device 5.
- Cost of input circuit 11 500 yen to 700 yen
- Processing circuit 12 costs: 600 yen one 800 yen,
- Output circuit 13 cost: 600 yen one 800 yen,
- Memory circuit 14 costs: 500 yen one 700 yen,
- Cost of power supply circuit 15 400 yen 1 600 yen,
- the central processing unit 1 determines whether or not the calculated value of the device cost calculated in the planning stage is equal to or less than the device target cost (step S3). In this case, if 3000 yen is set as the equipment target cost, for example, there is a lower limit of equipment cost that is lower than the equipment target cost, so development can proceed and the process moves to the design stage. On the other hand, if the calculated value of the equipment cost is larger than the equipment target cost, the development is abandoned. [0021] At the design stage, unset function parameters of each circuit are further set (step S4), and the device cost is calculated (step S5). The calculated device cost is output by the output device 5 by display or the like.
- the calculated value of the device cost is compared with the device target cost (step S6).
- the internal operation speed and the number of signal pins are further set as function parameters to achieve cost accuracy.
- step S4 If the calculated value of the device cost thus obtained is equal to or less than the device target cost, the device development is terminated. On the other hand, if the calculated value of the device cost is not less than or equal to the device target cost, the process proceeds to step S4, and the function parameters can be changed to execute step S4 and the subsequent steps.
- the device cost may be obtained by dividing the design stage of steps S 4 to S 6 into a basic design stage and a detailed design stage. In that case, first, in step S4, unset function parameters in the basic design stage are set, and when the determination in step S6 is completed, the process returns to step S4 to further set function parameters in the detailed design stage. Then, step S4 and subsequent steps may be repeatedly executed.
- the cost table 3 A shown in FIG. 4 is stored in the storage device 3, and the force cost table 3 A is used in which the central processing unit 1 calculates the cost using the cost table. The cost can be obtained using the next cost calculation formula.
- Cost of input circuit 11 circuit scale X kl + internal operating speed X k2
- the cost calculation using this calculation formula can be similarly performed for the processing circuit 12, the output circuit 13, the memory circuit 14, and the power supply circuit 15.
- the cost information management system according to the present invention can be implemented in the same manner as the cost information management method and the cost information management program. That is, each step method and program procedure in the flowchart shown in FIG.
- the cost information management method is implemented by storing a program that causes a computer to execute the steps shown in FIG. 5 in a recording medium that can be read by a computer. It can be executed by a computer.
- the recording medium readable by the computer is a portable storage medium such as a CD-ROM, a flexible disk, a DVD disk, a magneto-optical disk, an IC card, a database holding a computer program, or It includes other computers and their databases, as well as transmission media on the line.
- the device cost at the planning stage is calculated based on the function parameters at the planning stage of each circuit constituting the device, and the calculated value and the device are calculated. Compared with the target cost, it was decided whether or not to move to the design stage, and after the decision, the device cost at the design stage was calculated, so high accuracy and cost were required without requiring expert skills. Estimate is possible. In addition, the cost can be estimated from the upstream design stage of the equipment development planning stage to the downstream design stage of the detailed design stage, and the project can be started with an eye on business profit and loss.
- the first stage and the second stage have been described as the planning stage and the design stage, respectively, but it is not necessary to be limited to these formal stages.
- the device cost in the first stage is calculated based on the function parameter in the first stage (for example, the planning stage) of each circuit constituting the device, and the calculated value and the device target code are calculated. Since it was judged whether or not to move to the second stage (for example, the design stage) by comparing with the strike, and the equipment cost in the second stage was calculated after the judgment, it does not require expert skills. This makes it possible to estimate costs with high accuracy. In addition, it is possible to estimate costs covering the first stage of the equipment (development planning stage) from the upper design stage to the second stage (detailed design stage) of the design, so that the project can be started with an eye on business profits and losses. It becomes possible.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Development Economics (AREA)
- Strategic Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Economics (AREA)
- Game Theory and Decision Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
Description
Claims
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2005/005130 WO2006100753A1 (ja) | 2005-03-22 | 2005-03-22 | コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム |
JP2007509107A JP4800299B2 (ja) | 2005-03-22 | 2005-03-22 | コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム |
US11/859,081 US20080040292A1 (en) | 2005-03-22 | 2007-09-21 | Cost information management system, cost information management method, and cost information management program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2005/005130 WO2006100753A1 (ja) | 2005-03-22 | 2005-03-22 | コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/859,081 Continuation US20080040292A1 (en) | 2005-03-22 | 2007-09-21 | Cost information management system, cost information management method, and cost information management program |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2006100753A1 true WO2006100753A1 (ja) | 2006-09-28 |
Family
ID=37023450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2005/005130 WO2006100753A1 (ja) | 2005-03-22 | 2005-03-22 | コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム |
Country Status (3)
Country | Link |
---|---|
US (1) | US20080040292A1 (ja) |
JP (1) | JP4800299B2 (ja) |
WO (1) | WO2006100753A1 (ja) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4992408B2 (ja) * | 2006-12-19 | 2012-08-08 | 富士通株式会社 | ジョブ割当プログラム、方法及び装置 |
US8275643B2 (en) * | 2008-02-04 | 2012-09-25 | International Business Machines Corporation | Defining service ownership for a service oriented architecture |
US20090198537A1 (en) * | 2008-02-04 | 2009-08-06 | International Business Machines Corporation | Defining An SOA Strategy For A Service Oriented Architecture |
US20100071028A1 (en) * | 2008-09-18 | 2010-03-18 | International Business Machines Corporation | Governing Service Identification In A Service Oriented Architecture ('SOA') Governance Model |
US20100138252A1 (en) * | 2008-12-02 | 2010-06-03 | International Business Machines Corporation | Governing Realizing Services In A Service Oriented Architecture |
US20100138250A1 (en) * | 2008-12-02 | 2010-06-03 | International Business Machines Corporation | Governing Architecture Of A Service Oriented Architecture |
US20100138251A1 (en) * | 2008-12-02 | 2010-06-03 | International Business Machines Corporation | Governing The Design Of Services In A Service Oriented Architecture |
US10152692B2 (en) * | 2008-12-03 | 2018-12-11 | International Business Machines Corporation | Governing exposing services in a service model |
US8726227B2 (en) | 2010-09-15 | 2014-05-13 | International Business Machines Corporation | Modeling a governance process of establishing a subscription to a deployed service in a governed SOA |
US8607192B2 (en) | 2010-09-15 | 2013-12-10 | International Business Machines Corporation | Automating a governance process of creating a new version of a service in a governed SOA |
US8769483B2 (en) | 2010-09-15 | 2014-07-01 | International Business Machines Corporation | Automating a governance process of optimizing a portfolio of services in a governed SOA |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002108433A (ja) * | 2000-10-02 | 2002-04-10 | Ricoh Co Ltd | 注文生産品生産供給方法及び注文生産品生産供給システム |
JP2002312637A (ja) * | 2002-01-28 | 2002-10-25 | Hitachi Ltd | 受注生産方法 |
JP2003091661A (ja) * | 2001-09-17 | 2003-03-28 | Hitachi Ltd | 生産管理システム |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11120163A (ja) * | 1997-10-17 | 1999-04-30 | Toyota Motor Corp | 作業者の動作シミュレーション装置および生産ライン検討装置 |
WO1999062009A1 (en) * | 1998-05-29 | 1999-12-02 | Cadence Design Systems, Inc. | Method and apparatus for selecting ip blocks |
JP2003076767A (ja) * | 2001-08-31 | 2003-03-14 | Matsushita Electric Works Ltd | リース業務支援方法、リース業務支援システム、リース業務支援サーバ、リース業務支援プログラム |
US6944841B1 (en) * | 2002-01-22 | 2005-09-13 | Cadence Design Systems, Inc. | Method and apparatus for proportionate costing of vias |
JP2004110570A (ja) * | 2002-09-19 | 2004-04-08 | Mitsubishi Heavy Ind Ltd | コスト見積システム |
JP2004171484A (ja) * | 2002-11-22 | 2004-06-17 | Hitachi Ltd | 生産ライン情報自動作成装置 |
US7458055B2 (en) * | 2003-02-19 | 2008-11-25 | Diversified Systems, Inc. | Apparatus, system, method, and program for facilitating the design of electronic assemblies |
US7685075B2 (en) * | 2005-01-10 | 2010-03-23 | Taiwan Semiconductor Manufacturing Co., Ltd. | Costing system and method |
-
2005
- 2005-03-22 WO PCT/JP2005/005130 patent/WO2006100753A1/ja not_active Application Discontinuation
- 2005-03-22 JP JP2007509107A patent/JP4800299B2/ja not_active Expired - Fee Related
-
2007
- 2007-09-21 US US11/859,081 patent/US20080040292A1/en not_active Abandoned
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002108433A (ja) * | 2000-10-02 | 2002-04-10 | Ricoh Co Ltd | 注文生産品生産供給方法及び注文生産品生産供給システム |
JP2003091661A (ja) * | 2001-09-17 | 2003-03-28 | Hitachi Ltd | 生産管理システム |
JP2002312637A (ja) * | 2002-01-28 | 2002-10-25 | Hitachi Ltd | 受注生産方法 |
Also Published As
Publication number | Publication date |
---|---|
JP4800299B2 (ja) | 2011-10-26 |
US20080040292A1 (en) | 2008-02-14 |
JPWO2006100753A1 (ja) | 2008-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2006100753A1 (ja) | コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム | |
US7487477B2 (en) | Parametric-based semiconductor design | |
EP3371764A1 (en) | Systems and methods for pricing optimization with competitive influence effects | |
US20020161466A1 (en) | Computer method for providing optimization of manufacturing processes, with dynamic constraints | |
US11170327B2 (en) | Dynamic production planning system and dynamic production planning device | |
CN102983999B (zh) | 一种监控平台系统及设备群的参数配置方法、系统 | |
CN107992410A (zh) | 软件质量监测方法、装置、计算机设备和存储介质 | |
CN108920336A (zh) | 一种基于时间序列的服务异常提醒方法及装置 | |
CN112256886A (zh) | 图谱中的概率计算方法、装置、计算机设备及存储介质 | |
JP2019028871A (ja) | プロジェクト管理支援装置、プロジェクト管理支援方法およびプログラム | |
US20090013292A1 (en) | Context dependent timing analysis and prediction | |
JP2020144640A (ja) | 協調型学習システム及び監視システム | |
Byrd et al. | An active-set algorithm for nonlinear programming using parametric linear programming | |
TW202316215A (zh) | 用於工業機器的預測性維護 | |
van Vliet et al. | Development and application of a mixed product/process-based DFM methodology | |
CN115671744A (zh) | 游戏道具价格的确定方法、装置、电子设备和存储介质 | |
CN115600992A (zh) | 一种基于预测算法的项目管理方法 | |
Liao et al. | Optimizing site qualification across the supply network at western digital | |
US8667491B2 (en) | Method and apparatus for executing a transition workflow between swim lanes of a workflow | |
US10055532B2 (en) | Collapsing terms in statistical static timing analysis | |
CN102902838A (zh) | 基于趋势的过程控制目标设定方法和系统 | |
Ortloff et al. | MEMS product engineering | |
CN112149880A (zh) | 用户规模预测方法、装置、电子设备及存储介质 | |
Johnston et al. | Disentangling causal relationships of a manufacturing process using genetic algorithms and six-sigma techniques | |
TW201401189A (zh) | 在製品產出時程的推估方法與其電腦程式產品 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2007509107 Country of ref document: JP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 11859081 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
NENP | Non-entry into the national phase |
Ref country code: RU |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: RU |
|
WWP | Wipo information: published in national office |
Ref document number: 11859081 Country of ref document: US |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 05727080 Country of ref document: EP Kind code of ref document: A1 |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 5727080 Country of ref document: EP |