WO2006100753A1 - コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム - Google Patents

コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム Download PDF

Info

Publication number
WO2006100753A1
WO2006100753A1 PCT/JP2005/005130 JP2005005130W WO2006100753A1 WO 2006100753 A1 WO2006100753 A1 WO 2006100753A1 JP 2005005130 W JP2005005130 W JP 2005005130W WO 2006100753 A1 WO2006100753 A1 WO 2006100753A1
Authority
WO
WIPO (PCT)
Prior art keywords
cost
stage
information management
cost information
input
Prior art date
Application number
PCT/JP2005/005130
Other languages
English (en)
French (fr)
Inventor
Yasuo Nakayashiki
Original Assignee
Fujitsu Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Limited filed Critical Fujitsu Limited
Priority to PCT/JP2005/005130 priority Critical patent/WO2006100753A1/ja
Priority to JP2007509107A priority patent/JP4800299B2/ja
Publication of WO2006100753A1 publication Critical patent/WO2006100753A1/ja
Priority to US11/859,081 priority patent/US20080040292A1/en

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31408Cost calculation of use of certain machine types
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/35Nc in input of data, input till input file format
    • G05B2219/35212Estimating a cost associated with each operation, amount of time, target cost
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • Cost information management system Cost information management method, and cost information management program Technical Field
  • the present invention estimates a device cost composed of a plurality of parts such as communication devices and information processing devices, and covers, for example, from the design upstream of the development planning stage to the design downstream of the detailed design stage.
  • the present invention relates to a cost information management system, a cost information management method, and a cost information management program.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 2002-182732
  • the above-described method has a problem that the cost estimate varies depending on the level of expert experience, skill, and skill.
  • cost estimates could not be made without possessing past manufacturing process data and CAD data of similar products.
  • detailed drawings and CAD data are not available, so it is impossible to estimate costs with specialists or systems, and the overall equipment cost is unknown, and the profit / loss forecast for the business remains unknown. There was also a possibility that the project had to start.
  • the present invention has been made to solve the above-described problems, and can be highly accurate and cost estimated without requiring expert skills.
  • the object is to provide a cost information management system and method, and a cost information management program, which can estimate the cost from the current design to the design downstream of the detailed design stage. Means for solving the problem
  • the present invention provides a cost information management system for managing cost information for manufacturing a device in the first stage and the second stage of manufacturing. Based on the input unit that inputs the function parameters and the target value of the device target cost in the first step and the second step, and the main function parameters in the first step input to the input unit, the device cost in the first step The function is compared with the target cost of the equipment to determine whether or not to move to the second stage, and if it is determined to move to the second stage, the function not set in the first stage It further comprises a control unit that further sets parameters and calculates the device cost in the second stage and compares the calculated value with the device target cost.
  • control unit ends the device development process on condition that the device cost in the second stage is within the device target cost.
  • the present invention is characterized in that an output unit is provided for outputting the device cost in the first stage and the second stage calculated by the control unit.
  • the present invention further includes a storage unit having a cost table in which costs corresponding to the function parameters of each circuit constituting the device are stored in advance, and the control unit stores the cost table stored in the storage unit.
  • the cost of each circuit according to the function parameter input to the input unit is obtained with reference to the above, and the device costs in the first stage and the second stage are calculated, respectively.
  • the present invention is a cost information management method for managing cost information for manufacturing a device in the first stage and the second stage of manufacturing, wherein the first stage and the second of each circuit constituting the device.
  • An input step for inputting function parameters and device target cost set values at the stage, and the device cost at the first stage is calculated based on the main function parameters at the first stage input by the input step. Compare the calculated value with the device target cost to determine whether or not to proceed to the second stage. If it is determined to proceed to the second stage, the function parameters that have not been set in the first stage are further set.
  • a cost estimation step of setting and calculating the device cost in the second stage and comparing the calculated value with the device target cost.
  • the cost estimation step is characterized in that the processing is terminated on condition that the device cost in the second stage is within the device target cost. Furthermore, an output step for outputting the device cost in the first stage and the second stage calculated by the cost estimation step is provided.
  • a storage unit having a cost table in which costs corresponding to the function parameters of each circuit constituting the device are stored in advance is prepared, and the cost estimation step refers to the cost table stored in the storage unit.
  • the cost of each circuit corresponding to the function parameter input to the input unit is obtained, and the device cost in the first stage and the second stage is calculated.
  • the present invention is a cost information management program that causes a computer to manage cost information for manufacturing a device, and includes function parameters at the first stage and the second stage of each circuit constituting the apparatus.
  • An input step for inputting the set value of the device target cost, and a device cost in the first step is calculated based on the main function parameters in the first step input in the input step, and the calculated value and the device target are calculated.
  • the computer calculates a device cost at each stage, and causes the computer to execute a cost estimation step for comparing the calculated value with the device target cost.
  • FIG. 1 is a block diagram showing a configuration of a cost information management system according to the present invention.
  • FIG. 2 is a diagram for explaining an example of a circuit configuration constituting the apparatus.
  • FIG. 3 is a diagram for explaining an example of function parameters set for each type of circuit constituting the apparatus.
  • FIG. 4 is a diagram for explaining the contents of a cost table 3A stored in the storage device 3 of FIG.
  • FIG. 5 is a flowchart showing the contents of a cost information management program 2A stored in the main memory 2 of FIG. 1 and executed by the central processing unit 1.
  • FIG. 1 is a block diagram showing a configuration of a cost information management system according to the present invention.
  • the cost information management system shown in Fig. 1 sets the functional parameters of each circuit that constitutes the device.
  • a central processing unit 1 that is configured by a computer for setting and estimating a device cost and serves as a control means (control unit), and a planning stage (first step of the present invention) based on functional parameters of each circuit constituting the device Depending on the function parameters of the main memory 2 storing the cost information management program 2A for estimating the device cost in the design stage (corresponding to the second stage of the present invention) and each circuit constituting the device.
  • a storage device 3 that stores a cost table 3A that stores previously stored costs, an input device 4 that inputs setting values of function parameters and device target costs at the planning and design stages of each circuit constituting the device, And an output device 5 for outputting the device cost at the planning stage and the design stage calculated by the central processing device 1.
  • FIG. 2 is a diagram for explaining an example of a circuit configuration that constitutes the apparatus.
  • the device 10 generally includes an input circuit 11, a processing circuit 12, an output circuit 13, a memory circuit 14, and a power supply circuit 15.
  • functional parameters are set for each circuit type as shown in FIG. 3 for each circuit constituting such a device. That is, as the function parameters, for the input circuit 11, the processing circuit 12 and the output circuit 13, the circuit scale, the internal operation speed, the number of signal pins, the external size, etc. are set, and for the memory circuit 14, Set the memory system (SRAM, DRAM), memory capacity, operation clock speed, external size, etc. For the power supply circuit 15, input system (AC, DC), output voltage / current, presence / absence of protection circuit and external size Etc. are set.
  • a cost table 3 A in which the correspondence relationship between the function parameters of the circuits constituting the apparatus shown in FIG. 4 and the cost is stored in advance in the storage device 3.
  • the cost table 3A for example, as a cost table common to the input circuit 11, the processing circuit 12, and the output circuit 13, costs corresponding to the circuit scale, the internal operation speed, the number of signal pins, the outer size, and the like are stored in advance. Yes.
  • Each of the memory circuit 14 and the power supply circuit 15 has a cost table.
  • Figure 5 shows the cost information stored in the main memory 2 and executed by the central processing unit 1.
  • 3 is a flowchart showing the contents of a management program 2A.
  • step Sl when developing a device, at the planning stage, the main functional parameters and device target costs of each circuit constituting the device are set and inputted from the input device 4 (step Sl).
  • circuit scale: 70k gate and external size: 22mm 2 are input as function parameters of input circuit 11, and specific values of circuit scale and external size are specified as function parameters of processing circuit 12 and output circuit 13.
  • function parameter of the memory circuit 14 specific numerical values of the memory method and the external size are input, and as input function parameters of the power supply circuit 15, specific numerical values of the input method and the external size are input.
  • the central processing unit 1 refers to the cost table shown in FIG. 4 to obtain the cost corresponding to the function parameter of each circuit, and calculates the device cost (step) S2).
  • the cost corresponding to the function parameter of the input circuit 11 the circuit scale: 70k gate and the outer size: 22mm 2 were input as the function parameters. It is 500 yen-700 yen that is highlighted in a frame.
  • costs corresponding to the function parameters of the processing circuit 12, the output circuit 13, the memory circuit 14, and the power supply circuit 15 are obtained, and the total device cost as a total is as follows.
  • the calculated device cost is output by display or the like by the output device 5.
  • Cost of input circuit 11 500 yen to 700 yen
  • Processing circuit 12 costs: 600 yen one 800 yen,
  • Output circuit 13 cost: 600 yen one 800 yen,
  • Memory circuit 14 costs: 500 yen one 700 yen,
  • Cost of power supply circuit 15 400 yen 1 600 yen,
  • the central processing unit 1 determines whether or not the calculated value of the device cost calculated in the planning stage is equal to or less than the device target cost (step S3). In this case, if 3000 yen is set as the equipment target cost, for example, there is a lower limit of equipment cost that is lower than the equipment target cost, so development can proceed and the process moves to the design stage. On the other hand, if the calculated value of the equipment cost is larger than the equipment target cost, the development is abandoned. [0021] At the design stage, unset function parameters of each circuit are further set (step S4), and the device cost is calculated (step S5). The calculated device cost is output by the output device 5 by display or the like.
  • the calculated value of the device cost is compared with the device target cost (step S6).
  • the internal operation speed and the number of signal pins are further set as function parameters to achieve cost accuracy.
  • step S4 If the calculated value of the device cost thus obtained is equal to or less than the device target cost, the device development is terminated. On the other hand, if the calculated value of the device cost is not less than or equal to the device target cost, the process proceeds to step S4, and the function parameters can be changed to execute step S4 and the subsequent steps.
  • the device cost may be obtained by dividing the design stage of steps S 4 to S 6 into a basic design stage and a detailed design stage. In that case, first, in step S4, unset function parameters in the basic design stage are set, and when the determination in step S6 is completed, the process returns to step S4 to further set function parameters in the detailed design stage. Then, step S4 and subsequent steps may be repeatedly executed.
  • the cost table 3 A shown in FIG. 4 is stored in the storage device 3, and the force cost table 3 A is used in which the central processing unit 1 calculates the cost using the cost table. The cost can be obtained using the next cost calculation formula.
  • Cost of input circuit 11 circuit scale X kl + internal operating speed X k2
  • the cost calculation using this calculation formula can be similarly performed for the processing circuit 12, the output circuit 13, the memory circuit 14, and the power supply circuit 15.
  • the cost information management system according to the present invention can be implemented in the same manner as the cost information management method and the cost information management program. That is, each step method and program procedure in the flowchart shown in FIG.
  • the cost information management method is implemented by storing a program that causes a computer to execute the steps shown in FIG. 5 in a recording medium that can be read by a computer. It can be executed by a computer.
  • the recording medium readable by the computer is a portable storage medium such as a CD-ROM, a flexible disk, a DVD disk, a magneto-optical disk, an IC card, a database holding a computer program, or It includes other computers and their databases, as well as transmission media on the line.
  • the device cost at the planning stage is calculated based on the function parameters at the planning stage of each circuit constituting the device, and the calculated value and the device are calculated. Compared with the target cost, it was decided whether or not to move to the design stage, and after the decision, the device cost at the design stage was calculated, so high accuracy and cost were required without requiring expert skills. Estimate is possible. In addition, the cost can be estimated from the upstream design stage of the equipment development planning stage to the downstream design stage of the detailed design stage, and the project can be started with an eye on business profit and loss.
  • the first stage and the second stage have been described as the planning stage and the design stage, respectively, but it is not necessary to be limited to these formal stages.
  • the device cost in the first stage is calculated based on the function parameter in the first stage (for example, the planning stage) of each circuit constituting the device, and the calculated value and the device target code are calculated. Since it was judged whether or not to move to the second stage (for example, the design stage) by comparing with the strike, and the equipment cost in the second stage was calculated after the judgment, it does not require expert skills. This makes it possible to estimate costs with high accuracy. In addition, it is possible to estimate costs covering the first stage of the equipment (development planning stage) from the upper design stage to the second stage (detailed design stage) of the design, so that the project can be started with an eye on business profits and losses. It becomes possible.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

 専門家のスキルを必要とせずに精度の高いコスト見積もりが可能なコスト情報管理システム等を提供するため、装置を構成する各回路の企画段階及び設計段階での機能パラメータと装置目標コストの設定値を入力する入力手段と、前記入力手段に入力された企画段階での主要な機能パラメータに基づいて企画段階での装置コストを演算し、当該演算値と装置目標コストとを比較して設計段階に移行するか否かを判定し、設計段階に移行すると判定された場合に、企画段階での未設定の機能パラメータをさらに設定して設計段階での装置コストを演算し、当該演算値と装置目標コストとを比較して設計段階での装置コストが装置目標コスト内ならば装置開発を終了する制御手段と、前記制御手段により演算される企画段階及び設計段階での装置コストを出力する出力手段とを備えた。

Description

明 細 書
コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログ ラム 技術分野
[0001] 本発明は、通信機器や情報処理機器等の複数の部品からなる装置コストを見積も るもので、装置の例えば開発企画段階の設計上流から詳細設計段階の設計下流ま でをカバーするようにしたコスト情報管理システム、コスト情報管理方法およびコスト 情報管理プログラムに関するものである。
背景技術
[0002] 従来、装置コストを算出する際、部品コストの見積りでは、専門家が図面をみて経験
'カンやスキルを元に値付けをしたりしていた。また、システム系での見積もりでは、過 去の類似部品の製造プロセスデータまたは CAD形状データと製造原価をベースに 当該部品のコストを適応修正して見積もるものがあった(例えば、特許文献 1参照)。
[0003] 特許文献 1 :特開 2002— 182732号公報
発明の開示
発明が解決しょうとする課題
[0004] し力、しながら、上述した方法では、専門家の経験.カンやスキルのレベルによってコ スト見積値がぶれる課題があった。また、過去の類似品の製造プロセスデータや CA Dデータを所有していないとコスト見積もりができない課題があった。さらに、装置開 発企画段階では、詳細な図面や CADデータがないため、専門家あるいはシステム でのコスト見積もりができず、装置全体のコストが不明であり、ビジネスの損益予想が 分からなレ、まま、プロジェクトをスタートせざるを得なくなる可能性もあった。
[0005] 本発明は上述した問題点を解決するためになされたもので、専門家のスキルを必 要とせずに精度の高レ、コスト見積もりが可能であり、装置の開発企画段階の設計上 流から詳細設計段階の設計下流までをカバーしてコスト見積もりを行うことができるコ スト情報管理システム及び方法、並びにコスト情報管理プログラムを提供することを目 的とする。 課題を解決するための手段
[0006] 上述した課題を解決するため、本発明は、装置製作のコスト情報の管理を製作の 第 1段階及び第 2段階で行うコスト情報管理システムであって、装置を構成する各回 路の第 1段階及び第 2段階での機能パラメータと装置目標コストの設定値を入力する 入力部と、前記入力部に入力された第 1段階での主要な機能パラメータに基づいて 第 1段階での装置コストを演算し、当該演算値と装置目標コストとを比較して第 2段階 に移行するか否力を判定し、第 2段階に移行すると判定された場合に、第 1段階での 未設定の機能パラメータをさらに設定して第 2段階での装置コストを演算し、当該演 算値と装置目標コストとを比較する制御部とを備えてなるものである。
[0007] また、本発明において、前記制御部は、第 2段階での装置コストが装置目標コスト 内となることを条件として装置開発処理を終了することを特徴とする。
また、前記制御部により演算される第 1段階及び第 2段階での装置コストを出力する 出力部を備えたことを特徴とする。
[0008] また、本発明において、装置を構成する各回路の機能パラメータに応じたコストを 予め記憶したコストテーブルを有する記憶部をさらに備え、前記制御部は、前記記憶 部に記憶されたコストテーブルを参照して前記入力部に入力された機能パラメータに 応じた各回路のコストを求め、第 1段階及び第 2段階での装置コストをそれぞれ演算 することを特徴とする。
[0009] また、本発明は、装置製作のコスト情報の管理を製作の第 1段階及び第 2段階で行 うコスト情報管理方法であって、装置を構成する各回路の第 1段階及び第 2段階での 機能パラメータと装置目標コストの設定値を入力する入力ステップと、前記入カステツ プにより入力された第 1段階での主要な機能パラメータに基づいて第 1段階での装置 コストを演算し、当該演算値と装置目標コストとを比較して第 2段階に移行するか否か を判定し、第 2段階に移行すると判定された場合に、第 1段階での未設定の機能パラ メータをさらに設定して第 2段階での装置コストを演算し、当該演算値と装置目標コス トとを比較するコスト見積ステップとを備えてなる。
[0010] このコスト情報管理方法において、前記コスト見積ステップにおいて、第 2段階での 装置コストが装置目標コスト内となることを条件として処理を終了することを特徴とする さらに、前記コスト見積ステップにより演算される第 1段階及び第 2段階での装置コ ストを出力する出力ステップを備えたことを特徴とする。
また、装置を構成する各回路の機能パラメータに応じたコストを予め記憶したコスト テーブルを有する記憶部を予め備えておき、前記コスト見積ステップでは、前記記憶 部に記憶されたコストテーブルを参照して前記入力部に入力された機能パラメータに 応じた各回路のコストを求め、第 1段階及び第 2段階での装置コストをそれぞれ演算 することを特徴とする。
[0011] また、本発明は、装置製作のコスト情報の管理をコンピュータに実行させるコスト情 報管理プログラムであって、装置を構成する各回路の第 1段階及び第 2段階での機 能パラメータと装置目標コストの設定値を入力する入力ステップと、前記入力ステップ により入力された第 1段階での主要な機能パラメータに基づいて第 1段階での装置コ ストを演算し、当該演算値と装置目標コストとを比較して第 2段階に移行するか否かを 判定し、第 2段階に移行すると判定された場合に、第 1段階での未設定の機能パラメ ータをさらに設定して第 2段階での装置コストを演算し、当該演算値と装置目標コスト とを比較するコスト見積ステップとをコンピュータに実行させる。
図面の簡単な説明
[0012] [図 1]本発明に係るコスト情報管理システムの構成を示すブロック図である。
[図 2]装置を構成する回路構成例を説明する図である。
[図 3]装置を構成する回路の種別毎に設定する機能パラメータの例を説明する図で ある。
[図 4]図 1の記憶装置 3内に格納されたコストテーブル 3Aの内容を説明する図である
[図 5]図 1のメインメモリ 2内に格納されて中央処理装置 1によって実行されるコスト情 報管理プログラム 2Aの内容を示すフローチャートである。
発明を実施するための最良の形態
[0013] 図 1は、本発明に係るコスト情報管理システムの構成を示すブロック図である。
図 1に示すコスト情報管理システムは、装置を構成する各回路の機能パラメータを 設定して装置コストを見積もるためのコンピュータで構成され、制御手段 (制御部)と なる中央処理装置 1と、装置を構成する各回路の機能パラメータに基づいて企画段 階 (本発明の第 1段階に相当する)及び設計段階 (本発明の第 2段階に相当する)に おける装置コストを見積もるコスト情報管理プログラム 2Aを格納してなるメインメモリ 2 と、装置を構成する各回路の機能パラメータに応じたコストを予め記憶したコストテー ブル 3Aを格納してなる記憶装置 3と、装置を構成する各回路の企画段階及び設計 段階での機能パラメータと装置目標コストの設定値を入力する入力装置 4と、前記中 央処理装置 1により演算される企画段階及び設計段階での装置コストを出力する出 力装置 5とを備えている。
[0014] 図 2は、装置を構成する回路構成例を説明する図である。
図 2に示すように、一般的に、装置 10は、入力回路 11と、処理回路 12と、出力回路 13と、メモリ回路 14と、電源回路 15とを備えているのが通常である。
[0015] 本発明においては、このような装置を構成する各回路に対して、図 3に示す如ぐ回 路種別毎に機能パラメータを設定している。すなわち、機能パラメータとして、入力回 路 11と処理回路 12及び出力回路 13に対しては、回路規模、内部動作速度、信号ピ ン数及び外形サイズ等を設定し、メモリ回路 14に対しては、メモリ方式(SRAM, DR AM)、メモリ容量、動作クロック速度及び外形サイズ等を設定し、電源回路 15に対し ては、入力方式 (AC, DC)、出力電圧/電流、保護回路有無及び外形サイズ等を 設定している。
[0016] そして、本発明においては、図 4に示す如ぐ装置を構成する回路の機能パラメ一 タとコストとの対応関係を予め記憶したコストテーブル 3Aを記憶装置 3内に格納して いる。このコストテーブル 3Aとしては、例えば、入力回路 11と処理回路 12及び出力 回路 13に共通なコストテーブルとして、回路規模、内部動作速度、信号ピン数及び 外形サイズ等に対応したコストが予め記憶されている。メモリ回路 14及び電源回路 1 5に対してもそれぞれコストテーブルを有する。
[0017] 次に、上記構成に係るコスト情報管理システムの動作について、図 5に示すフロー チャートを参照して説明する。
図 5は、メインメモリ 2内に格納されて中央処理装置 1によって実行されるコスト情報 管理プログラム 2Aの内容を示すフローチャートである。
まず、装置開発に際し、企画段階で、入力装置 4から装置を構成する各回路の主 要な機能パラメータ及び装置目標コストが設定入力される (ステップ Sl)。例えば、入 力回路 11の機能パラメータとして、回路規模: 70kゲート、外形サイズ: 22mm2が入 力され、処理回路 12及び出力回路 13の機能パラメータとして、回路規模及び外形 サイズの具体的な数値が入力され、メモリ回路 14の機能パラメータとして、メモリ方式 及び外形サイズの具体的な数値が入力され、電源回路 15の機能パラメータとして、 入力方式及び外形サイズの具体的な数値が入力される。
[0018] 中央処理装置 1は、上述した機能パラメータの設定入力に基づいて、図 4に示すコ ストテーブルを参照して各回路の機能パラメータに対応するコストを求め、装置コスト を演算する (ステップ S2)。例えば、入力回路 11の機能パラメータに対応したコストと しては、機能パラメータとして、回路規模: 70kゲート、外形サイズ: 22mm2が入力さ れたので、これに対応するコストは、図 4に太線枠でハイライト表示する 500円一 700 円となる。同様にして、処理回路 12、出力回路 13、メモリ回路 14及び電源回路 15の 機能パラメータに対応したコストが求められ、それら合計でなる全体の装置コストは、 次のようになる。なお、演算された装置コストは、出力装置 5により表示等によって出 力される。
[0019] 入力回路 11のコスト :500円一 700円、
処理回路 12のコスト :600円一 800円、
出力回路 13のコスト :600円一 800円、
メモリ回路 14のコスト: 500円一 700円、
電源回路 15のコスト :400円一 600円、
装置コスト(合計値) :2600円一 3600円。
[0020] 次に、中央処理装置 1は、企画段階で演算された装置コストの演算値が装置目標 コスト以下であるか否力、を判定する(ステップ S3)。この場合、装置目標コストとして例 えば 3000円が設定されていれば、装置目標コストより価格の低い装置コストの下限 値が存在するので、開発を進行することができ、設計段階に移行する。他方、装置コ ストの演算値が装置目標コストより大きければ開発を断念する。 [0021] 設計段階では、各回路の未設定の機能パラメータをさらに設定して (ステップ S4)、 装置コストを演算する (ステップ S5)。演算された装置コストは、出力装置 5により表示 等によって出力される。このようにすることで、装置コストのばらつきを縮小させてコス ト精度を向上させる。そして、装置コストの演算値と装置目標コストとの比較判定を行 う(ステップ S6)。例えば、入力回路 11の例では、機能パラメータとして内部動作速度 及び信号ピン数をさらに設定し、コスト精度を図る。
[0022] このようにして求められた装置コストの演算値が装置目標コスト以下であれば、装置 開発を終了する。他方、装置コストの演算値が装置目標コスト以下でなければ、ステ ップ S4に移行し、機能パラメータを変更してステップ S4以下を実行することができる
[0023] なお、図 5に示すフローチャートにおいて、ステップ S4— S6の設計段階を、基本設 計段階と詳細設計段階とに分けて、装置コストを求めるようにしても良い。その場合、 ステップ S4において、まず、基本設計段階の未設定の機能パラメータを設定し、ステ ップ S6の判定が終了したら、ステップ S4にリターンして詳細設計段階での機能パラメ ータをさらに設定し、ステップ S4以下を繰り返し実行するようにすればよい。
[0024] また、本発明では、図 4に示すコストテーブル 3Aを記憶装置 3に格納し、中央処理 装置 1により、コストテーブルを用いてコストを演算するようにした力 コストテーブル 3 Aを用いることなぐ次のコスト演算式を用いてコストを求めることができる。
入力回路 11のコスト =回路規模 X kl +内部動作速度 X k2
+信号ピン数 X k3 +外形サイズ X k4
(kl一 k4 :基準単価)
この計算式を用いるコスト演算は、処理回路 12、出力回路 13、メモリ回路 14及び 電源回路 15についても同様に実施できる。
[0025] また、本発明に係るコスト情報管理システムは、コスト情報管理方法及びコスト情報 管理プログラムに同様にして実施できる。すなわち、図 5に示すフローチャートの各ス テツプ方法及びプログラムの各手順とすれば良い。
[0026] この場合、図 5に示す各ステップをコンピュータに実行させるプログラムをコンビユー タにより読取り可能な記録媒体に記憶させることによって、コスト情報管理方法をコン ピュータに実行させることが可能となる。なお、本発明において、上記コンピュータに より読取り可能な記録媒体は、 CD— ROMやフレキシブルディスク、 DVDディスク、 光磁気ディスク、 ICカード等の可搬型記憶媒体や、コンピュータプログラムを保持す るデータベース、或いは、他のコンピュータ並びにそのデータベースや、更に回線上 の伝送媒体をも含むものである。
[0027] 以上のように、上述した実施の形態によれば、装置を構成する各回路の企画段階 での機能パラメータに基づいて企画段階での装置コストを演算して、当該演算値と装 置目標コストとを比較して設計段階に移行するか否かを判定し、判定後、設計段階 での装置コストを演算するようにしたので、専門家のスキルを要することなく精度の高 レ、コスト見積もりが可能となる。しかも、装置の開発企画段階の設計上流から詳細設 計段階の設計下流までをカバーしてコスト見積もりを行うことができ、ビジネス損益を 見据えたプロジエトのスタートが可能となる。なお、実施の形態では、第 1段階及び第 2段階をそれぞれ企画段階及び設計段階として説明したが、これら形式的な段階に 限られる必要はない。
産業上の利用可能性
[0028] 本発明によれば、装置を構成する各回路の第 1段階 (例えば企画段階)での機能 パラメータに基づいて第 1段階での装置コストを演算して、当該演算値と装置目標コ ストとを比較して第 2段階 (例えば設計段階)に移行するか否力 ^判定し、判定後、第 2段階での装置コストを演算するようにしたので、専門家のスキルを要しないで、精度 の高いコスト見積もりが可能となる。しかも、装置の第 1段階(開発企画段階)の設計 上流から第 2段階 (詳細設計段階)の設計下流までをカバーしてコスト見積もりを行う ことができるので、ビジネス損益を見据えたプロジエトのスタートが可能となる。

Claims

請求の範囲
[1] 装置製作のコスト情報の管理を製作の第 1段階及び第 2段階で行うコスト情報管理 システムであって、
装置を構成する各回路の第 1段階及び第 2段階での機能パラメータと装置目標コス トの設定値を入力する入力部と、
前記入力部に入力された第 1段階での主要な機能パラメータに基づいて第 1段階 での装置コストを演算し、当該演算値と装置目標コストとを比較して第 2段階に移行 するか否かを判定し、第 2段階に移行すると判定された場合に、第 1段階での未設定 の機能パラメータをさらに設定して第 2段階での装置コストを演算し、当該演算値と装 置目標コストとを比較する制御部と
を備えてなるコスト情報管理システム。
[2] 請求項 1に記載のコスト情報管理システムにおいて、
前記制御部は、第 2段階での装置コストが装置目標コスト内となることを条件として 装置開発処理を終了することを特徴とするコスト情報管理システム。
[3] 請求項 1又は請求項 2に記載のコスト情報管理システムにおいて、
前記制御部により演算される第 1段階及び第 2段階での装置コストを出力する出力 部を備えたことを特徴とするコスト情報管理システム。
[4] 請求項 1乃至請求項 3のいずれかに記載のコスト情報管理システムにおいて、 装置を構成する各回路の機能パラメータに応じたコストを予め記憶したコストテープ ルを有する記憶部をさらに備え、
前記制御部は、前記記憶部に記憶されたコストテーブルを参照して前記入力部に 入力された機能パラメータに応じた各回路のコストを求め、第 1段階及び第 2段階で の装置コストをそれぞれ演算する
ことを特徴とするコスト情報管理システム。
[5] 装置製作のコスト情報の管理を製作の第 1段階及び第 2段階で行うコスト情報管理 方法であって、
装置を構成する各回路の第 1段階及び第 2段階での機能パラメータと装置目標コス トの設定値を入力する入力ステップと、 前記入力ステップにより入力された第 1段階での主要な機能パラメータに基づいて 第 1段階での装置コストを演算し、当該演算値と装置目標コストとを比較して第 2段階 に移行するか否力を判定し、第 2段階に移行すると判定された場合に、第 1段階での 未設定の機能パラメータをさらに設定して第 2段階での装置コストを演算し、当該演 算値と装置目標コストとを比較するコスト見積ステップと
を備えてなるコスト情報管理方法。
[6] 請求項 5に記載のコスト情報管理方法において、
前記コスト見積ステップにおいて、第 2段階での装置コストが装置目標コスト内とな ることを条件として処理を終了することを特徴とするコスト情報管理方法。
[7] 請求項 5又は請求項 6に記載のコスト情報管理方法において、
前記コスト見積ステップにより演算される第 1段階及び第 2段階での装置コストを出 力する出力ステップを備えたことを特徴とするコスト情報管理方法。
[8] 請求項 5乃至請求項 7のいずれかに記載のコスト情報管理方法において、
装置を構成する各回路の機能パラメータに応じたコストを予め記憶したコストテープ ルを有する記憶部を予め備えておき、
前記コスト見積ステップでは、前記記憶部に記憶されたコストテーブルを参照して 前記入力部に入力された機能パラメータに応じた各回路のコストを求め、第 1段階及 び第 2段階での装置コストをそれぞれ演算する
ことを特徴とするコスト情報管理方法。
[9] 装置製作のコスト情報の管理をコンピュータに実行させるコスト情報管理プログラム であって、
装置を構成する各回路の第 1段階及び第 2段階での機能パラメータと装置目標コス トの設定値を入力する入力ステップと、
前記入力ステップにより入力された第 1段階での主要な機能パラメータに基づいて 第 1段階での装置コストを演算し、当該演算値と装置目標コストとを比較して第 2段階 に移行するか否力、を判定し、第 2段階に移行すると判定された場合に、第 1段階での 未設定の機能パラメータをさらに設定して第 2段階での装置コストを演算し、当該演 算値と装置目標コストとを比較するコスト見積ステップと をコンピュータに実行させるコスト情報管理プログラム。
[10] 請求項 9に記載のコスト情報管理プログラムにおいて、
前記コスト見積ステップにおいて、第 2段階での装置コストが装置目標コスト内とな ることを条件として処理を終了することを特徴とするコスト情報管理プログラム。
[11] 請求項 9又は請求項 10に記載のコスト情報管理プログラムにおいて、
前記コスト見積ステップにより演算される第 1段階及び第 2段階での装置コストを出 力する出力ステップを備えたことを特徴とするコスト情報管理プログラム。
[12] 請求項 9乃至請求項 11のいずれかに記載のコスト情報管理プログラムにおいて、 装置を構成する各回路の機能パラメータに応じたコストを予め記憶したコストテープ ルを有する記憶部を予め備えておき、
前記コスト見積ステップでは、前記記憶部に記憶されたコストテーブルを参照して 前記入力部に入力された機能パラメータに応じた各回路のコストを求め、第 1段階及 び第 2段階での装置コストをそれぞれ演算する
ことを特徴とするコスト情報管理プログラム。
PCT/JP2005/005130 2005-03-22 2005-03-22 コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム WO2006100753A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/JP2005/005130 WO2006100753A1 (ja) 2005-03-22 2005-03-22 コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム
JP2007509107A JP4800299B2 (ja) 2005-03-22 2005-03-22 コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム
US11/859,081 US20080040292A1 (en) 2005-03-22 2007-09-21 Cost information management system, cost information management method, and cost information management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2005/005130 WO2006100753A1 (ja) 2005-03-22 2005-03-22 コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/859,081 Continuation US20080040292A1 (en) 2005-03-22 2007-09-21 Cost information management system, cost information management method, and cost information management program

Publications (1)

Publication Number Publication Date
WO2006100753A1 true WO2006100753A1 (ja) 2006-09-28

Family

ID=37023450

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2005/005130 WO2006100753A1 (ja) 2005-03-22 2005-03-22 コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム

Country Status (3)

Country Link
US (1) US20080040292A1 (ja)
JP (1) JP4800299B2 (ja)
WO (1) WO2006100753A1 (ja)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4992408B2 (ja) * 2006-12-19 2012-08-08 富士通株式会社 ジョブ割当プログラム、方法及び装置
US8275643B2 (en) * 2008-02-04 2012-09-25 International Business Machines Corporation Defining service ownership for a service oriented architecture
US20090198537A1 (en) * 2008-02-04 2009-08-06 International Business Machines Corporation Defining An SOA Strategy For A Service Oriented Architecture
US20100071028A1 (en) * 2008-09-18 2010-03-18 International Business Machines Corporation Governing Service Identification In A Service Oriented Architecture ('SOA') Governance Model
US20100138252A1 (en) * 2008-12-02 2010-06-03 International Business Machines Corporation Governing Realizing Services In A Service Oriented Architecture
US20100138250A1 (en) * 2008-12-02 2010-06-03 International Business Machines Corporation Governing Architecture Of A Service Oriented Architecture
US20100138251A1 (en) * 2008-12-02 2010-06-03 International Business Machines Corporation Governing The Design Of Services In A Service Oriented Architecture
US10152692B2 (en) * 2008-12-03 2018-12-11 International Business Machines Corporation Governing exposing services in a service model
US8726227B2 (en) 2010-09-15 2014-05-13 International Business Machines Corporation Modeling a governance process of establishing a subscription to a deployed service in a governed SOA
US8607192B2 (en) 2010-09-15 2013-12-10 International Business Machines Corporation Automating a governance process of creating a new version of a service in a governed SOA
US8769483B2 (en) 2010-09-15 2014-07-01 International Business Machines Corporation Automating a governance process of optimizing a portfolio of services in a governed SOA

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002108433A (ja) * 2000-10-02 2002-04-10 Ricoh Co Ltd 注文生産品生産供給方法及び注文生産品生産供給システム
JP2002312637A (ja) * 2002-01-28 2002-10-25 Hitachi Ltd 受注生産方法
JP2003091661A (ja) * 2001-09-17 2003-03-28 Hitachi Ltd 生産管理システム

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11120163A (ja) * 1997-10-17 1999-04-30 Toyota Motor Corp 作業者の動作シミュレーション装置および生産ライン検討装置
WO1999062009A1 (en) * 1998-05-29 1999-12-02 Cadence Design Systems, Inc. Method and apparatus for selecting ip blocks
JP2003076767A (ja) * 2001-08-31 2003-03-14 Matsushita Electric Works Ltd リース業務支援方法、リース業務支援システム、リース業務支援サーバ、リース業務支援プログラム
US6944841B1 (en) * 2002-01-22 2005-09-13 Cadence Design Systems, Inc. Method and apparatus for proportionate costing of vias
JP2004110570A (ja) * 2002-09-19 2004-04-08 Mitsubishi Heavy Ind Ltd コスト見積システム
JP2004171484A (ja) * 2002-11-22 2004-06-17 Hitachi Ltd 生産ライン情報自動作成装置
US7458055B2 (en) * 2003-02-19 2008-11-25 Diversified Systems, Inc. Apparatus, system, method, and program for facilitating the design of electronic assemblies
US7685075B2 (en) * 2005-01-10 2010-03-23 Taiwan Semiconductor Manufacturing Co., Ltd. Costing system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002108433A (ja) * 2000-10-02 2002-04-10 Ricoh Co Ltd 注文生産品生産供給方法及び注文生産品生産供給システム
JP2003091661A (ja) * 2001-09-17 2003-03-28 Hitachi Ltd 生産管理システム
JP2002312637A (ja) * 2002-01-28 2002-10-25 Hitachi Ltd 受注生産方法

Also Published As

Publication number Publication date
JP4800299B2 (ja) 2011-10-26
US20080040292A1 (en) 2008-02-14
JPWO2006100753A1 (ja) 2008-08-28

Similar Documents

Publication Publication Date Title
WO2006100753A1 (ja) コスト情報管理システム、コスト情報管理方法およびコスト情報管理プログラム
US7487477B2 (en) Parametric-based semiconductor design
EP3371764A1 (en) Systems and methods for pricing optimization with competitive influence effects
US20020161466A1 (en) Computer method for providing optimization of manufacturing processes, with dynamic constraints
US11170327B2 (en) Dynamic production planning system and dynamic production planning device
CN102983999B (zh) 一种监控平台系统及设备群的参数配置方法、系统
CN107992410A (zh) 软件质量监测方法、装置、计算机设备和存储介质
CN108920336A (zh) 一种基于时间序列的服务异常提醒方法及装置
CN112256886A (zh) 图谱中的概率计算方法、装置、计算机设备及存储介质
JP2019028871A (ja) プロジェクト管理支援装置、プロジェクト管理支援方法およびプログラム
US20090013292A1 (en) Context dependent timing analysis and prediction
JP2020144640A (ja) 協調型学習システム及び監視システム
Byrd et al. An active-set algorithm for nonlinear programming using parametric linear programming
TW202316215A (zh) 用於工業機器的預測性維護
van Vliet et al. Development and application of a mixed product/process-based DFM methodology
CN115671744A (zh) 游戏道具价格的确定方法、装置、电子设备和存储介质
CN115600992A (zh) 一种基于预测算法的项目管理方法
Liao et al. Optimizing site qualification across the supply network at western digital
US8667491B2 (en) Method and apparatus for executing a transition workflow between swim lanes of a workflow
US10055532B2 (en) Collapsing terms in statistical static timing analysis
CN102902838A (zh) 基于趋势的过程控制目标设定方法和系统
Ortloff et al. MEMS product engineering
CN112149880A (zh) 用户规模预测方法、装置、电子设备及存储介质
Johnston et al. Disentangling causal relationships of a manufacturing process using genetic algorithms and six-sigma techniques
TW201401189A (zh) 在製品產出時程的推估方法與其電腦程式產品

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2007509107

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 11859081

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: RU

WWW Wipo information: withdrawn in national office

Country of ref document: RU

WWP Wipo information: published in national office

Ref document number: 11859081

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 05727080

Country of ref document: EP

Kind code of ref document: A1

WWW Wipo information: withdrawn in national office

Ref document number: 5727080

Country of ref document: EP