WO2005106051A1 - Method for the recovery of gold in connection with the production of copper - Google Patents

Method for the recovery of gold in connection with the production of copper Download PDF

Info

Publication number
WO2005106051A1
WO2005106051A1 PCT/FI2005/000193 FI2005000193W WO2005106051A1 WO 2005106051 A1 WO2005106051 A1 WO 2005106051A1 FI 2005000193 W FI2005000193 W FI 2005000193W WO 2005106051 A1 WO2005106051 A1 WO 2005106051A1
Authority
WO
WIPO (PCT)
Prior art keywords
copper
leaching
chloride
gold
solution
Prior art date
Application number
PCT/FI2005/000193
Other languages
English (en)
French (fr)
Inventor
Matti Hämäläinen
Olli Hyvärinen
Original Assignee
Outokumpu Technology Oyj
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Outokumpu Technology Oyj filed Critical Outokumpu Technology Oyj
Publication of WO2005106051A1 publication Critical patent/WO2005106051A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B11/00Obtaining noble metals
    • C22B11/06Chloridising
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B11/00Obtaining noble metals
    • C22B11/04Obtaining noble metals by wet processes
    • C22B11/042Recovery of noble metals from waste materials
    • C22B11/044Recovery of noble metals from waste materials from pyrometallurgical residues, e.g. from ashes, dross, flue dust, mud, skim, slag, sludge
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B15/00Obtaining copper
    • C22B15/0063Hydrometallurgy
    • C22B15/0065Leaching or slurrying
    • C22B15/0067Leaching or slurrying with acids or salts thereof
    • C22B15/0069Leaching or slurrying with acids or salts thereof containing halogen
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B15/00Obtaining copper
    • C22B15/0063Hydrometallurgy
    • C22B15/0084Treating solutions
    • C22B15/0089Treating solutions by chemical methods
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Definitions

  • the invention relates to a method for recovering gold from an intermediate product or residue containing sulphur and iron generated in the leaching of a copper raw material in connection with the hydrometallurgical production of copper.
  • the recovery of both copper and gold takes place in a chloride environment.
  • the gold contained in the intermediate product or residue is leached with divalent copper and chlorine in a solution of copper (II) chloride - sodium chloride, in conditions where the oxidation-reduction potential is in the range of 650-750 mV and the pH in the range 1-1.6.
  • the acid generated during the chlorine feed is neutralised with the copper (II) oxychloride generated in the process. Neutralisation prevents the costs that arise from the dissolution of iron.
  • US patent 6,007,600 describes a method for the hydrometallurgical production of copper from a copper-bearing raw material such as copper sulphide concentrate.
  • the raw material is leached as a countercurrent leaching with a solution of sodium chloride - copper chloride in several stages to form monovalent copper (I) chloride solution. Since there are always both divalent cupric chloride and impurities formed from other metals remaining in solution, reduction of the divalent copper and solution purification is performed on the solution.
  • the pure cuprous chloride solution is precipitated by means of sodium hydroxide into copper oxidule and the oxidule is reduced further to elemental copper.
  • the sodium chloride solution formed during copper oxidule precipitation is further treated in chlorine-alkali electrolysis, from which the chlorine gas and/or chloride solution obtained is used for raw material leaching, the sodium hydroxide formed in electrolysis is used for oxidule precipitation, and the hydrogen produced for the reduction of elemental copper.
  • the recovery of gold from the leaching residue is not described separately in the method.
  • US patent 4,551 ,213 describes a method in which gold can be leached from sulphur-containing material, in particular the residue from hydrometallurgical processes.
  • the preferred starting material for the method is the residue from the CLEAR process.
  • the CLEAR process is a hydrometallurgical copper recovery process, which occurs in a chloride environment and at elevated pressure.
  • the gold-containing residue is elutriated into water and the chloride concentration of the resulting suspension is adjusted so that it is 12 - 38 weight percent.
  • the oxidation-reduction potential is adjusted to the range of 650 - 750 mV and the pH to below 0.
  • Copper (II) chloride or iron (III) chloride are added to the suspension to oxidize the gold contained in the raw material, so that it dissolves.
  • EP patent 646185 relates to the recovery of copper from sulphidic concentrates with chloride leaching in atmospheric conditions.
  • the gold from the leach residue is dissolved into electrolyte, which includes two or more halides, such as sodium chloride and sodium bromide.
  • electrolyte which includes two or more halides, such as sodium chloride and sodium bromide.
  • the purpose is to store oxidising energy in the bromine complex on the copper electrolysis anode, and thereby leach the gold from the residue.
  • WO patent application 03/091463 describes a method for leaching gold from leaching residue or intermediate product containing iron and sulphur, generated in the atmospheric chloride leaching of copper sulphide concentrate.
  • the publication states that gold may be leached from an iron- and sulphur-containing material into an aqueous solution of copper (II) chloride and sodium chloride with copper and oxygen in conditions where the oxidation-reduction potential is below 650 mV and the pH value of the solution in the range 1 - 3. In these conditions iron does not dissolve and the sulphur remains undissolved to a large extent. Thus the costs that arise when iron and sulphur are removed from the solution are avoided.
  • the recovery of gold from the solution is made by one of the methods of the prior art such as electrolysis or active carbon. The method in question is in itself quite good, but in practice however it is somewhat slow.
  • WO patent application 03/035916 describes a method where the divalent copper chloride (CuCI 2 ) produced in the leaching of copper-bearing raw material is removed from the solution by precipitating the copper with the aid of a suitable reagent as basic copper (II) chloride, that is as copper (II) oxychloride. Copper (II) oxychloride is leached with hydrochloric acid and the copper (II) chloride solution that is generated is circulated to copper sulphide concentrate leaching. PURPOSE OF THE INVENTION
  • the leaching of gold from the remaining residue is carried out with the aid of an alkali chloride - copper (II) chloride aqueous solution and chlorine in atmospheric conditions.
  • the oxidation-reduction potential of the leaching stage is raised to the range of 650-750 mV by means of chlorine.
  • a high oxidation-reduction potential enables the elemental sulphur in the residue to dissolve and as a consequence, acid is formed in the stage.
  • at least the basic copper (II) chloride generated in connection with the precipitation of divalent copper is used to neutralize the acid.
  • the simultaneous neutralisation of the acid keeps the pH at a value of 1.0 - 1.6, whereby the dissolution of iron is prevented.
  • the dissolved gold is recovered by some method known as such in the prior art.
  • a gold-bearing intermediate product or residue is leached into a sodium chloride solution containing copper (II) chloride forming a suspension and the Dxidation-reduction potential required for gold leaching is obtained Darticularly by means of divalent copper and chlorine gas. If the feed to gold leaching still contains undissolved copper sulphide, oxygen-containing gas can be fed to the start of the leaching stage in order to dissolve the copper. Chlorine gas is obtained advantageously from chlorine-alkali electrolysis connected with the hydrometallurgical recovery of copper concentrate. The oxidation-reduction potential is measured with Pt- and Ag/AgCI electrodes and the potential is kept at a value of 650-750 mV.
  • the amount of divalent copper, Cu 2+ , in the solution is preferably 20 - 80 g/l and the amount of sodium chloride in the region of 200 - 330 g/l.
  • Gold dissolves as a chlorine compound in accordance with the following reaction: Au + 3 Cu 2+ + 6 CI - ⁇ » AuCI 4 " + 3 Cu + + 2 CP (1 )
  • Leaching occurs in atmospheric conditions at a temperature, which is between room temperature and the boiling point of the suspension, preferably, however, between 80 °C and the boiling point of the suspension.
  • Reaction (2) shows that a lot of acid is generated (8 mol H+/ mol S°).
  • the acid generated in the solution must however be neutralised, since at pH values under 1 the iron in the solids begins to dissolve.
  • the dissolution of iron causes process costs, as dissolved iron is circulated and is precipitated during Cu 2+ precipitation and consumes reagents.
  • the preferred pH region to keep iron in the residue is between 1.0 and 1.6.
  • the hydrochloric acid that is generated is neutralised at least by the basic copper (II) chloride generated during divalent copper precipitation, which has the mineral name of atacamite and the chemical formula Cu 2 (OH) 3 CI.
  • the basic copper (II) chloride dissolves and the copper (II) chloride generated can be used for raw material leaching. If copper (II) oxychloride is not routed to this stage, acid is however required for leaching it, and said acid must be produced some other way.
  • the neutralization of hydrochloric acid and copper (II) oxychloride leaching occur according to the following reaction: 3 Cu(OH) 2 CuCI 2 + 6 HCI ⁇ » 4 CuCI 2 + 6 H 2 0 (3)
  • the sulphuric acid generated can be neutralised for example with lime:
  • Naturally some other alkali can be used instead of lime such as sodium or potassium hydroxide.
  • the recovery of gold from the solution takes place by some method known as such in the prior art, for instance active carbon, electrolysis or chemical precipitation.
  • a copper sulphidic raw material such as copper sulphide concentrate 2 is fed to the first leaching stage 1 , and solution 3 from a later process stage, which is an aqueous solution of copper (II) chloride - sodium chloride, is also circulated to this stage.
  • the thicker arrows denote solids and the thinner arrows the flow of solution.
  • the stage always includes at least one or more reactors and thickening.
  • the copper of the copper concentrate dissolves mainly into the process solution and the resulting solution 4 includes copper chloride, in which about 70 g/l of copper is mainly monovalent.
  • the divalent copper of the solution is precipitated in precipitation stage 5 by means of some suitable alkali or alkali earth such as e.g.
  • the solution in which all the copper is now monovalent, is routed to solution purification 6 and after this to the cuprous oxide precipitation stage 7.
  • the sodium chloride solution from cuprous oxide precipitation is routed to chlorine-alkali electrolysis 8, where the chlorine and hydrogen gas formed and sodium hydroxide are used as reagents in the process.
  • Hydrogen can be used for instance in the cuprous oxide reduction stage 9, and if required, also with chlorine in the preparation of hydrochloric acid according to the following reaction:
  • the leaching of solids 10 from the first leaching stage is continued in the second leaching stage 11 with solution 12, which is taken from a later process stage. Air is fed into the reactors at this stage in order to enhance leaching. Thickening is done at the end of this stage.
  • the solution 3 from the second stage is routed to the first leaching stage 1 to leach the concentrate.
  • the leaching of the solids 13 from the second leaching stage is continued in the third stage 14 in order to leach the rest of the copper and the gold.
  • the residue is leached with copper (II) chloride - sodium chloride solution 15, in which the Cu 2+ -content is 20 - 80 g/l and the sodium chloride content 200 - 330 g/l. If the residue entering this leaching stage still contains undissolved copper sulphide, oxygen, preferably in the form of air, can also be routed to the first reactor at the beginning of the stage.
  • Copper sulphide should be leached out of the residue before the gold dissolves.
  • chlorine gas 16 is also fed into the reactor, obtained from the chlorine-alkali electrolysis 8 connected to the process. Because of the high potential, sulphur starts to dissolve and as a result acid is formed in the stage. So that the pH of the stage does not fall below 1.0, some basic copper (II) chloride 17 is fed into it, which is formed during the precipitation of divalent copper. If necessary some other alkali could also be added here.
  • the gold-chloro complex solution 18 obtained from the leaching stage is routed either as it is or filtered to gold recovery, which in this case occurs in a carbon column 19 by means of active carbon.
  • the gold product 20 is obtained from the column.
  • the solution exiting column 19 is a gold-free solution 21 , which is circulated to the second stage of leaching 11 and sodium chloride solution is routed there as required to achieve a suitable copper (II) chloride content for leaching.
  • the residue of the gold recovery stage after normal after-treatment such as filtration and washing (not shown in detail in the diagram), becomes the final leach residue 22, which contains nearly all the sulphur and iron of the concentrate.
  • the residue filtrate and rinse water are returned for example to the concentrate leaching process.
  • the flow chart in Fig. 1 presents a gold leaching method in connection with the leaching of copper-bearing raw material, but the method of the invention is not exactly limited to the copper-bearing raw material leaching process shown in the chart.
  • the crux of our method is that the leaching of gold- bearing material is performed with divalent copper and chlorine in conditions where the redox potential of the solution is raised to a value of 650-750 mV, and the acid formed during the dissolution of sulphur is neutralised so that the pH is minimum 1 , preferably at least 1.0 - 1.6.
  • Example 1 is in accordance with the state of the art and example 2 describes the method according to the invention.
  • Example 1 is in accordance with the state of the art and example 2 describes the method according to the invention.
  • Gold was leached from the leaching residue of a chalcopyrite concentrate in the laboratory in a one-litre reactor equipped with a mixer.
  • the residue was obtained by leaching ordinary chalcopyrite copper concentrate according to US patent 6,007,600 in a laboratory-scale three-stage countercurrent leaching.
  • the residue contained 3.7 % Cu, 28.9 % Fe, 32.4 % S and 5.8 ppm Au.
  • a synthetic solution was used for leaching that contained approx. 40 g Cu 2+ as chloride and approx. 300 g NaCI / L.
  • the test temperature was 40 °C and the redox-potential was kept at a level of 690-700 mV (AgCI/Ag vs. Pt) by means of chlorine gas.
  • the test lasted 12 hours and the gold leaching yield amounted to approx. 83 %.
  • the pH of the solution and the solution analyses changed as follows:
  • a laboratory-scale continuous three-stage countercurrent leaching was performed according to US patent 6,007,600, which included a Cu 2+ removal stage.
  • divalent copper was precipitated out of the product solution as an basic copper (II) chloride, and in addition Fe was also precipitated out completely and S0 4 2" almost completely.
  • the size of the leaching reactors was 5 L.
  • the third leaching stage in which gold leaching took place consisted of two reactors, R4 and R5. Their operating temperature was 90 °C, their redox potential (AgCI/Ag vs. Pt) was adjusted with chlorine gas and the pH value was adjusted with the residue from Cu 2+ precipitation.
  • a synthetic solution was used as solvent, which contained 40 g Cu 2+ chloride and 280 g NaCI/L.
  • the solution delay time of the stage was in the region 10 h.
  • the feedstock was the residue from the preceding reactor R3.
  • the solids analyses from that particular week were as follows:

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Manufacture And Refinement Of Metals (AREA)
PCT/FI2005/000193 2004-04-30 2005-04-25 Method for the recovery of gold in connection with the production of copper WO2005106051A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI20040622 2004-04-30
FI20040622A FI117708B (sv) 2004-04-30 2004-04-30 Förfarande för utvinning av guld i samband med framställning av koppar

Publications (1)

Publication Number Publication Date
WO2005106051A1 true WO2005106051A1 (en) 2005-11-10

Family

ID=35185130

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI2005/000193 WO2005106051A1 (en) 2004-04-30 2005-04-25 Method for the recovery of gold in connection with the production of copper

Country Status (4)

Country Link
AR (1) AR049634A1 (sv)
FI (1) FI117708B (sv)
PE (1) PE20060225A1 (sv)
WO (1) WO2005106051A1 (sv)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009068735A1 (en) * 2007-11-27 2009-06-04 Outotec Oyj Method for processing pyritic concentrate containing gold, copper and arsenic
US20220213575A1 (en) * 2020-08-18 2022-07-07 Enviro Metals, LLC Metal refinement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4097271A (en) * 1975-12-11 1978-06-27 Cominco Ltd. Hydrometallurgical process for recovering copper and other metal values from metal sulphides
US4551213A (en) * 1984-05-07 1985-11-05 Duval Corporation Recovery of gold
US4874429A (en) * 1986-10-31 1989-10-17 Austria Metall Aktiengesellschaft Hydrometallurgical process for the recovery of silver from copper electrolysis anode sludge
WO1994000606A1 (en) * 1992-06-26 1994-01-06 Intec Pty. Ltd. Production of metals from minerals
WO2003091463A1 (en) * 2002-04-23 2003-11-06 Outokumpu, Oyj Method for the recovery of gold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4097271A (en) * 1975-12-11 1978-06-27 Cominco Ltd. Hydrometallurgical process for recovering copper and other metal values from metal sulphides
US4551213A (en) * 1984-05-07 1985-11-05 Duval Corporation Recovery of gold
US4874429A (en) * 1986-10-31 1989-10-17 Austria Metall Aktiengesellschaft Hydrometallurgical process for the recovery of silver from copper electrolysis anode sludge
WO1994000606A1 (en) * 1992-06-26 1994-01-06 Intec Pty. Ltd. Production of metals from minerals
WO2003091463A1 (en) * 2002-04-23 2003-11-06 Outokumpu, Oyj Method for the recovery of gold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009068735A1 (en) * 2007-11-27 2009-06-04 Outotec Oyj Method for processing pyritic concentrate containing gold, copper and arsenic
US20220213575A1 (en) * 2020-08-18 2022-07-07 Enviro Metals, LLC Metal refinement
US11578386B2 (en) * 2020-08-18 2023-02-14 Enviro Metals, LLC Metal refinement

Also Published As

Publication number Publication date
AR049634A1 (es) 2006-08-23
FI117708B (sv) 2007-01-31
PE20060225A1 (es) 2006-04-25
FI20040622A (sv) 2005-10-31

Similar Documents

Publication Publication Date Title
EP1984531B1 (en) Method for recovering gold by halide leaching
PT1834001E (pt) Processo para o tratamento hidrometalúrgico de concentrados de sulfureto contendo vários metais valiosos
FI125575B (sv) Återvinning av fasta ämnen i oxiderande tryckextraktion av metaller genom användning av halidjoner
PL201418B1 (pl) Sposób odzyskiwania metalicznego cynku z minerału cynkowego
US20070245856A1 (en) Method for Recovering Gold
EA020759B1 (ru) Способ переработки никельсодержащего сырья
ZA200501592B (en) Method for the recovery of metals using chloride leaching and extraction
JP4207959B2 (ja) 高純度塩化銀の分離精製方法とそれを用いた高純度銀の製造方法
MXPA04010238A (es) Metodo para la recuperacion de oro.
WO2005106051A1 (en) Method for the recovery of gold in connection with the production of copper
EP1577408A1 (en) Method for separating platinum group element
AU695956B1 (en) Process for extracting and recovering silver
JP2007231397A (ja) 塩化銀の精製方法
JP2004190133A (ja) セレンテルル白金族含有物の処理方法
JP5573763B2 (ja) 高純度銀製造廃液の処理方法
EP1438439A1 (en) A method for purifying the solution in the hydrometallurgical processing of copper
JP2019189891A (ja) セレンとテルルを含有する混合物からセレン及びテルルを分離する方法
JPH10158752A (ja) 銀の抽出回収方法

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KM KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SM SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Country of ref document: DE

122 Ep: pct application non-entry in european phase