WO2004065697A1 - Carrier beam system for houses - Google Patents

Carrier beam system for houses Download PDF

Info

Publication number
WO2004065697A1
WO2004065697A1 PCT/CA2004/000089 CA2004000089W WO2004065697A1 WO 2004065697 A1 WO2004065697 A1 WO 2004065697A1 CA 2004000089 W CA2004000089 W CA 2004000089W WO 2004065697 A1 WO2004065697 A1 WO 2004065697A1
Authority
WO
WIPO (PCT)
Prior art keywords
house
foundation
carrier
inverted
carrier beams
Prior art date
Application number
PCT/CA2004/000089
Other languages
French (fr)
Inventor
Paul Kerr
Frank Mazzocco
Original Assignee
The Mattamy Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CA002417039A external-priority patent/CA2417039A1/en
Priority claimed from CA002416999A external-priority patent/CA2416999A1/en
Priority claimed from CA002421475A external-priority patent/CA2421475A1/en
Priority claimed from CA002428174A external-priority patent/CA2428174A1/en
Application filed by The Mattamy Corporation filed Critical The Mattamy Corporation
Publication of WO2004065697A1 publication Critical patent/WO2004065697A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/46Combinations of several jacks with means for interrelating lifting or lowering movements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P1/00Vehicles predominantly for transporting loads and modified to facilitate loading, consolidating the load, or unloading
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D53/00Tractor-trailer combinations; Road trains
    • B62D53/04Tractor-trailer combinations; Road trains comprising a vehicle carrying an essential part of the other vehicle's load by having supporting means for the front or rear part of the other vehicle
    • B62D53/06Semi-trailers
    • B62D53/067Multi-purpose, convertible or extendable load surface semi-trailers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34336Structures movable as a whole, e.g. mobile home structures
    • E04B1/34352Base structures or supporting means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/10Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/14Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/161Handling units comprising at least considerable parts of two sides of a room or like enclosed space
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/163Jacks specially adapted for working-up building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B2001/3577Extraordinary methods of construction, e.g. lift-slab, jack-block prefabricating a building and moving it as a whole to the erection site
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B2001/3588Extraordinary methods of construction, e.g. lift-slab, jack-block using special lifting or handling devices, e.g. gantries, overhead conveying rails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0404Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
    • E04C2003/0443Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
    • E04C2003/0452H- or I-shaped

Definitions

  • the present invention relates to a carrier beam system, and more particularly to carrier beams for use in the support and movement of houses.
  • perimeter frames have been manufactured and placed beneath the house, to support the house from the perimeter, for lifting.
  • a perimeter frame requires the house designer to provide support for the house at those locations which are remote from the perimeter walls.
  • long joists have been used to span the distance between the perimeter walls, and thereby support those floor locations which are remote from the perimeter.
  • long floor joists are expensive and often less than optimal when designing a house, and the use of the perimeter frames of the prior art requires the builder to design floor plans based upon the maximum length of joists available, thereby limiting the flexibility of floor plans available to the house designer.
  • the object of the present invention is to provide a device which permits increased flexibility in house floor plans and to provide support for the house in those regions of the house which are remote from the perimeter wall.
  • the invention relates to a device for distributing the support provided to a house comprising a means for supporting the house, a beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house.
  • a device for distributing the support provided to a house comprising a means for supporting the house; and at least one beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with the at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house, wherein the at least one beam is aligned substantially pe ⁇ endicular to the at least two joists of the house.
  • a device for distributing the support provided to a house comprising a means for supporting the house; at least one beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with the at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house, the at least one beam being aligned substantially perpendicular to the at least two joists of the house, wherein inverted "L” shaped brackets are affixed to each opposed end of the at least one beam, the inverted “L” shaped brackets thus extending a lifting length of the at least one beam wherein, when the house is lowered for placement on a house foundation, a lower surface of each of the inverted "L” shaped brackets affixed on the opposed ends of the at least one beam will contact and engage an upper surface of the house foundation, whereby the inverted "L” shaped brackets will rest on the
  • a system for supporting a house on skate beams for placement on a house foundation comprising providing at least two carrier beams for spanning at least two joists of the house, the said at least two carrier beams having a first contact surface adapted to be in contact with the at least two joists of the house and the said at least two carrier beams having a second contact surface in engagement with and supported by the skate beam; notching at least two carrier beam notches in the house foundation to receive the at least 2 carrier beams; and lowering the house onto the house the house foundation, whereby the at least two carrier beams are received in the at least two carrier beam receiving notches when the house is lowered onto the house foundation.
  • a system for supporting a house on skate beams for placement on a house foundation comprising providing at least two carrier beams for spanning at least two joists of the house, the said at least two carrier beams having a first contact surface adapted to be in contact with the at least two joists of the house and the said at least two carrier beams having a second contact surface in engagement with and supported by the skate beam, and wherein each of the at least two carrier beams are comprised of two or more components which are secured together temporarily; notching at least two carrier beam notches in the house foundation to receive the at least 2 carrier beams; affixing inverted "L" shaped brackets to each opposed end of each of the at least two carrier beams, the inverted "L” shaped brackets affixed to the at least two carrier beams each receiving and supporting a rim joist of each opposed side of the house which is placed on the at least two carrier beams; lowering the house onto the house foundation, whereby the
  • the advantage of the present invention is that it provides a device which provides a more uniform support for the load of the house, permits shorter joists to be used in the manufacturing of houses, and provides for a simplified and reusable means of supporting houses when they are being moved and installed.
  • Figure 1 is a drawing of one embodiment of the carrier beams of the present invention supporting a house
  • Figure 2 is a drawing of one embodiment of the single piece carrier beam when the house is being installed onto a foundation;
  • Figure 3 is a drawing of one embodiment of a single piece carrier beam when the house is being transported;
  • Figure 4 is a view of one embodiment of a multi-part carrier beam in accordance with one aspect of the present invention.
  • Figure 5 is an exploded view of the components of an embodiment of a multi-part carrier beam
  • Figure 6 is a cross section view of an embodiment of the two-part carrier beam installed in a house positioned above the foundation;
  • Figure 7 is a cross section view of an embodiment of the two-part carrier beam installed in a house resting on the foundation;
  • Figure 8 A is a drawing of the multi-part bevelled carrier beam and Figure 8B is an exploded view of an embodiment of the connection between carrier beam segments;
  • Figure 9 is a three-quarter view of the bevelled end of the multi-part carrier beam
  • Figure 10 is an end view of the bevelled end of the multi-part carrier beam in the lowered position.
  • Figure 11 is a side view of the bevelled end of the multi-part carrier beam in the lowered position.
  • carrier beams 10 of the present invention an embodiment of the carrier beams 10 of the present invention is illustrated, the carrier beams 10 being positioned underneath the house 20 to efficiently distribute and support the load of the house 20.
  • the house when the house is ready for transportation, with the carrier beams positioned beneath the house, the house may then be loaded onto a suitable house transporter 5 for subsequent transportation to the house foundation or elsewhere, depending the production and scheduling needs of the factoiy.
  • skate beams 30 may be used to support the house 20 and carrier beams 10, and to provide a surface upon which the house 20 and carrier beams 10 may be moved into location above the foundation 40. It is preferred to have the carrier beams 10 aligned substantially pe ⁇ endicular to the skate beams 30, and it is preferred, when designing a house 20, to have the joists of the house 20 aligned substantially pe ⁇ endicularly to the carrier beams 10, to the extent this is possible, for improved weight distribution of the house 20.
  • the carrier beams 10 are temporarily attached to the underside of the house 20.
  • the carrier beams 10 are positioned in spaced relation to one another, the spacing between the carrier beams being determined by the loading and structural characteristics of the house 20, and the required support of the house 20 at any particular location.
  • the carrier beams 10 are likewise horizontally aligned, substantially parallel to one another, it being understood that the precise location of each carrier beam 10 will depend upon the unique characteristics of each house.
  • the carrier beams 10 have a substantially horizontal top surface, the top surface engaging the underside of the house and joists, and a substantially horizontal lower surface upon which the carrier beams 10 may rest when loaded with a house 20, and providing a surface from which the carrier beams 10 and house 20 may be lifted or lowered.
  • the carrier beams 10 When single piece carrier beams 10 as shown in Figure 1 are utilized, the carrier beams 10 generally span across the bottom of the house and extend beyond the external wall of the house 20.
  • the foundation 40 of the house may require alteration to accommodate the passage of the carrier beam 10 below the top of the foundation wall when the house is being lowered onto the foundation, as the foundation wall would otherwise interfere with the carrier beam's movement as the house is being lowered onto the foundation.
  • the foundation wall may need to be cut, or notched, or formed to a sufficient size 130 to allow the carrier beam to be lowered sufficiently as to allow the house to be placed on the top of the foundation, and to allow for the removal of the carrier beam once the house is securely positioned on the foundation 40.
  • multi-part carrier beams 60 may be constructed of two or more components which may be separated for easy disassembly after the house is positioned and lowered onto the foundation.
  • this embodiment of the multi-part carrier beam includes parts 62, 64 and 66.
  • the combined length of the two part carrier beam is long enough that it extends to within a short distance of the inside surface of both of the foundation walls 80 and 82 at which the carrier beam will be positioned.
  • the combined length of the three part carrier beam is long enough that it extends to within a short distance of both of the inside surfaces of the foundation walls at which the beam will be positioned.
  • face plates 55 are securely welded to those ends of the carrier beam sections which are to be joined to other carrier beam sections. Holes are drilled in the face plates 55 to receive bolts 59, as shown in Figure 5, the holes being positioned to ensure that when the two face plates of two carrier beam sections are in alignment with and abutting one another, the holes in the face plates are aligned to receive the bolts 59, which may then be inserted in the holes, and nuts threaded thereon
  • inverted "L" shaped ears 70 are securely affixed, and preferably welded to those ends of the multi-part carrier beams on which no face plate has been welded so that when a multi-part carrier beam is assembled, it has ears 70 extending outwardly on both ends thereof.
  • the ears 70 are made of steel, having a thickness generally of between 3/4" and 1 Vi ", the horizontal surface measuring approximately 12 inches by 12 inches.
  • Figure 8A illustrates the preferred embodiment of a multi-part carrier beam 60 with beveled ends 90 and 92.
  • Figures 8 A and 8B also illustrates an alternative embodiment of the face plates 55 (in the embodiment shown in Figures 8 A and 8B, the face plates are plate steel, having a thickness of greater than 3/8", with 16 holes bored therethrough, it being understood that a worker skilled in the art would be aware of alternative configurations for connecting multi-part carrier beams) which securely and temporarily engage one carrier beam to another.
  • the face plates extend across the ends of two carrier beams, and, when the holes in the face plates align with holes in the carrier beams, the face plates are bolted 59 to the carrier beams, thereby securely engaging the two carrier beams to each other.
  • Figure 9 illustrates the bevel 90 at the end of the multi-part carrier beam and support flange 150 extending from the lower flange 160 to the upper flange 170, said support flange 150 being proximate to the bevel 90.
  • the carrier beams are of the single piece type as shown in Figure 1, or the multi- piece types of Figures 4, 5, 6, 7, 8, 9 or 11 in one embodiment, the house 20 and carrier beams 50 are unloaded from the transporter 5 in close proximity to the foundation 40 and thereafter supported by skate beams 30 while the house and carrier beams are being positioned above the foundation 40.
  • jacks 100 installed within the basement of the house 20 may be used to raise the carrier beams and house 20 allowing the skate beams 30 to be removed, whereupon the house and carrier beams can be lowered.
  • Figure 6 shows a two-part carrier beam 50 supporting a portion of a house 20 in a position directly above the foundation 40 and suitably aligned so as to allow the house to be lowered onto the foundation 40.
  • Figure 6 shows a two part carrier beam 50 the ears 70 loaded with exterior walls 80 and 82 of a house 20.
  • the house 20 may additionally be reinforced and supported by a chamiel 110 fixedly engaged to the ears 70, the channel abutting the exterior surface of the rim joist of the house for additional support.
  • hydraulic or other suitable jacks 100 are positioned on the basement floor and suitably arranged to engage with and to support in order to lift or lower the two part carrier beam 50 and the house 20.
  • Figure 7 shows, in one embodiment, the house 20 in the lowered position, having been suitably lowered from the raised position illustrated in Figure 6, by means of hydraulic or other suitable jacks 100, until the house rests securely on the sill plate 120 (the sill plates having been suitably notched to accommodate and receive the ears 70).
  • Figure 10 illustrates the preferred embodiment of a multi-part carrier beam with said beam in the lowered position, a cut in the sill plate 120 being marginally greater than the width of the upper flange 170 of the carrier beam 60 and a cut in the foundation 40 being marginally greater than the width of the vertical webbing 180 of said carrier beam 60.
  • the lower flange 160 of the multi-part carrier beam 60 does not interfere with the foundation 40 when the carrier beam 60 is in the lowered position.
  • the house 20 has been installed upon the foundation 80, the rim joist 75 and floor joist 190 and resting upon the sill plate 120, the rim joist 75 and floor joist 190 supporting the floor material 200, and the exterior walls 210 (supported by the floor material 200) being ready for the application of exterior finishing, such as brick (which will rest on the brick ledge 220), siding or other suitable material, it being understood that the builder may alternatively apply the exterior finish in the factory, except where to do so would make the house prohibitively heavy or difficult to transport or manipulate.
  • exterior finishing such as brick (which will rest on the brick ledge 220), siding or other suitable material
  • the components of the multi-part carrier beam may then be disassembled one from the other at the face plates and removed in components from the basement, by the window 130, as shown in Figure 2, or in any other suitable manner.
  • the single piece carrier beam it may be removed through the sufficiently sized cut or notch 120, as shown in figure 2, in the foundation wall. The removed carrier beams may then be reused as needed.
  • the number of carrier beams used for a particular house will depend on several factors, including, the loading bearing limits of the carrier beams, the loading and structural characteristics of the house, the size and shape of the house, and whether the underside of the house presents a flat or a multilayered surface.
  • the invention provides a device and system for distributing the support provided to a home, and more particularly to carrier beams for use in the support and movement of houses, the device permitting increased flexibility in house floor plans and to provide support for the house in those regions of the house which are remote from the perimeter wall.
  • the present invention also provides a more uniform support for the load of the house, permits shorter joists to be used in the manufacturing of the house, and provides for a simplified and reusable means of supporting houses when they are being moved and installed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Transportation (AREA)
  • Combustion & Propulsion (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Floor Finish (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A carrier beam for distributing the load of a house wherein said beam spans at least two joists of the house, said beam having a first contact surface adapted to be in contact with at least two joists of the house and said beam having a second contact surface in engagement with the means for supporting the house.

Description

CARRIER BEAM SYSTEM FOR HOUSES
FIELD OF THE INVENTION
The present invention relates to a carrier beam system, and more particularly to carrier beams for use in the support and movement of houses.
DESCRIPTION OF THE PRIOR ART
The manufacturing of completed or partially completed houses within a factory (referred to herein as a "house" or "houses"), for subsequent transport to the installation location of the house, for example in a subdivision, is well-known. During this process it is necessary to support, lift and move the house, for example from the manufacturing factory to the house foundation or footing or like support system for the house.
Previously, perimeter frames have been manufactured and placed beneath the house, to support the house from the perimeter, for lifting. Reference is made to Canadian Patent Number 2,139,622 (Biffis) describing a base member having a rectangular metal frame affixed to the underside of the house, which is attached tlirough a series of straps and cables and another frame and then to an overhead crane capable of lifting and positioning the house.
The use of a perimeter frame requires the house designer to provide support for the house at those locations which are remote from the perimeter walls. To solve this problem, for example, long joists have been used to span the distance between the perimeter walls, and thereby support those floor locations which are remote from the perimeter. However, long floor joists are expensive and often less than optimal when designing a house, and the use of the perimeter frames of the prior art requires the builder to design floor plans based upon the maximum length of joists available, thereby limiting the flexibility of floor plans available to the house designer.
SUMMARY OF THE INVENTION
The object of the present invention is to provide a device which permits increased flexibility in house floor plans and to provide support for the house in those regions of the house which are remote from the perimeter wall.
Accordingly, the invention relates to a device for distributing the support provided to a house comprising a means for supporting the house, a beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house.
According to another aspect of the present invention, there is provided a device for distributing the support provided to a house comprising a means for supporting the house; and at least one beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with the at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house, wherein the at least one beam is aligned substantially peφendicular to the at least two joists of the house.
According to a further aspect of the present invention, there is provided a device for distributing the support provided to a house comprising a means for supporting the house; at least one beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with the at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house, the at least one beam being aligned substantially perpendicular to the at least two joists of the house, wherein inverted "L" shaped brackets are affixed to each opposed end of the at least one beam, the inverted "L" shaped brackets thus extending a lifting length of the at least one beam wherein, when the house is lowered for placement on a house foundation, a lower surface of each of the inverted "L" shaped brackets affixed on the opposed ends of the at least one beam will contact and engage an upper surface of the house foundation, whereby the inverted "L" shaped brackets will rest on the upper surface of the house foundation, and wherein an upper surface of each of the inverted "L" shaped brackets of the at least one beam receives and supports a rim joist of each opposed side of the house which is placed on the at least one beam.
According to another aspect of the present invention, there is provided a system for supporting a house on skate beams for placement on a house foundation comprising providing at least two carrier beams for spanning at least two joists of the house, the said at least two carrier beams having a first contact surface adapted to be in contact with the at least two joists of the house and the said at least two carrier beams having a second contact surface in engagement with and supported by the skate beam; notching at least two carrier beam notches in the house foundation to receive the at least 2 carrier beams; and lowering the house onto the house the house foundation, whereby the at least two carrier beams are received in the at least two carrier beam receiving notches when the house is lowered onto the house foundation.
According to a still further aspect of the present invention, there is provided a system for supporting a house on skate beams for placement on a house foundation comprising providing at least two carrier beams for spanning at least two joists of the house, the said at least two carrier beams having a first contact surface adapted to be in contact with the at least two joists of the house and the said at least two carrier beams having a second contact surface in engagement with and supported by the skate beam, and wherein each of the at least two carrier beams are comprised of two or more components which are secured together temporarily; notching at least two carrier beam notches in the house foundation to receive the at least 2 carrier beams; affixing inverted "L" shaped brackets to each opposed end of each of the at least two carrier beams, the inverted "L" shaped brackets affixed to the at least two carrier beams each receiving and supporting a rim joist of each opposed side of the house which is placed on the at least two carrier beams; lowering the house onto the house foundation, whereby the at least two carrier beams are received in the at least two carrier beam receiving notches when the house is lowered onto the foundation, and wherein a lower surface of each of the inverted "L" shaped brackets affixed on the opposed ends of the at least two carrier beams will contact and engage an upper surface of the house foundation, whereby the inverted "L" shaped brackets will rest on the upper surface of the house foundation; and disassembling the two or more components which comprise each of the at least two carrier beams when the house has been placed on the house foundation, whereby the at least two carrier beams can be removed from contact with the at least two joists of the house.
The advantage of the present invention is that it provides a device which provides a more uniform support for the load of the house, permits shorter joists to be used in the manufacturing of houses, and provides for a simplified and reusable means of supporting houses when they are being moved and installed.
BRIEF DESCRIPTION OF THE DRAWINGS
A preferred embodiment of the present invention is described below with reference to the accompanying drawings, in which:
Figure 1 is a drawing of one embodiment of the carrier beams of the present invention supporting a house;
Figure 2 is a drawing of one embodiment of the single piece carrier beam when the house is being installed onto a foundation;
Figure 3 is a drawing of one embodiment of a single piece carrier beam when the house is being transported;
Figure 4 is a view of one embodiment of a multi-part carrier beam in accordance with one aspect of the present invention;
Figure 5 is an exploded view of the components of an embodiment of a multi-part carrier beam;
Figure 6 is a cross section view of an embodiment of the two-part carrier beam installed in a house positioned above the foundation;
Figure 7 is a cross section view of an embodiment of the two-part carrier beam installed in a house resting on the foundation;
Figure 8 A is a drawing of the multi-part bevelled carrier beam and Figure 8B is an exploded view of an embodiment of the connection between carrier beam segments;
Figure 9 is a three-quarter view of the bevelled end of the multi-part carrier beam;
Figure 10 is an end view of the bevelled end of the multi-part carrier beam in the lowered position; and
Figure 11 is a side view of the bevelled end of the multi-part carrier beam in the lowered position.
DESCRIPTION OF THE PREFERRED EMBODIMENT
Referring to Figure 1, an embodiment of the carrier beams 10 of the present invention is illustrated, the carrier beams 10 being positioned underneath the house 20 to efficiently distribute and support the load of the house 20.
As shown in Figure 3, when the house is ready for transportation, with the carrier beams positioned beneath the house, the house may then be loaded onto a suitable house transporter 5 for subsequent transportation to the house foundation or elsewhere, depending the production and scheduling needs of the factoiy.
Referring to Figure 2, when a house 20 is being installed onto a foundation 40, skate beams 30 may be used to support the house 20 and carrier beams 10, and to provide a surface upon which the house 20 and carrier beams 10 may be moved into location above the foundation 40. It is preferred to have the carrier beams 10 aligned substantially peφendicular to the skate beams 30, and it is preferred, when designing a house 20, to have the joists of the house 20 aligned substantially peφendicularly to the carrier beams 10, to the extent this is possible, for improved weight distribution of the house 20.
In an alternative embodiment, the carrier beams 10 are temporarily attached to the underside of the house 20. The carrier beams 10 are positioned in spaced relation to one another, the spacing between the carrier beams being determined by the loading and structural characteristics of the house 20, and the required support of the house 20 at any particular location.
In the case where the floor of the house 20 is entirely on a single horizontal plane, as shown in Figure 1, the carrier beams 10 are likewise horizontally aligned, substantially parallel to one another, it being understood that the precise location of each carrier beam 10 will depend upon the unique characteristics of each house.
In the embodiment shown in Figure 1, the carrier beams 10 have a substantially horizontal top surface, the top surface engaging the underside of the house and joists, and a substantially horizontal lower surface upon which the carrier beams 10 may rest when loaded with a house 20, and providing a surface from which the carrier beams 10 and house 20 may be lifted or lowered.
When single piece carrier beams 10 as shown in Figure 1 are utilized, the carrier beams 10 generally span across the bottom of the house and extend beyond the external wall of the house 20.
When utilizing single piece carrier beams 10 as shown in Figure 1 to move and support a house, the foundation 40 of the house may require alteration to accommodate the passage of the carrier beam 10 below the top of the foundation wall when the house is being lowered onto the foundation, as the foundation wall would otherwise interfere with the carrier beam's movement as the house is being lowered onto the foundation. For example, as shown in Figure 2, the foundation wall may need to be cut, or notched, or formed to a sufficient size 130 to allow the carrier beam to be lowered sufficiently as to allow the house to be placed on the top of the foundation, and to allow for the removal of the carrier beam once the house is securely positioned on the foundation 40.
In one embodiment, as an alternative to the solid single piece carrier beams illustrated in Figure 1, multi-part carrier beams 60, as shown in Figures 4, 5 and 8 may be constructed of two or more components which may be separated for easy disassembly after the house is positioned and lowered onto the foundation. As shown in Figure 5, this embodiment of the multi-part carrier beam includes parts 62, 64 and 66. As illustrated in Figure 6, in the case of one embodiment of the two part carrier beams 50, the combined length of the two part carrier beam is long enough that it extends to within a short distance of the inside surface of both of the foundation walls 80 and 82 at which the carrier beam will be positioned. Similarly, in the case of another embodiment where three part carrier beams are used, the combined length of the three part carrier beam is long enough that it extends to within a short distance of both of the inside surfaces of the foundation walls at which the beam will be positioned.
The multi-part carrier beams are joined securely and temporarily in a manner known to a worker skilled in the art. In one embodiment, face plates 55, as shown in Figure 5, are securely welded to those ends of the carrier beam sections which are to be joined to other carrier beam sections. Holes are drilled in the face plates 55 to receive bolts 59, as shown in Figure 5, the holes being positioned to ensure that when the two face plates of two carrier beam sections are in alignment with and abutting one another, the holes in the face plates are aligned to receive the bolts 59, which may then be inserted in the holes, and nuts threaded thereon
In one embodiment, inverted "L" shaped ears 70, as shown in Figures 4, 5, and 6 are securely affixed, and preferably welded to those ends of the multi-part carrier beams on which no face plate has been welded so that when a multi-part carrier beam is assembled, it has ears 70 extending outwardly on both ends thereof. In this embodiment, the ears 70 are made of steel, having a thickness generally of between 3/4" and 1 Vi ", the horizontal surface measuring approximately 12 inches by 12 inches. These ears 70 effectively extend the lifting length of the carrier beams, permitting the carrier beams, by means of the ears, to receive a significant portion of the load of the house through the rim joist 75 which rests upon the ear, as shown in Figure 6.
Figure 8A illustrates the preferred embodiment of a multi-part carrier beam 60 with beveled ends 90 and 92. Figures 8 A and 8B also illustrates an alternative embodiment of the face plates 55 (in the embodiment shown in Figures 8 A and 8B, the face plates are plate steel, having a thickness of greater than 3/8", with 16 holes bored therethrough, it being understood that a worker skilled in the art would be aware of alternative configurations for connecting multi-part carrier beams) which securely and temporarily engage one carrier beam to another. The face plates extend across the ends of two carrier beams, and, when the holes in the face plates align with holes in the carrier beams, the face plates are bolted 59 to the carrier beams, thereby securely engaging the two carrier beams to each other. Multiple face plates may be utilized as shown in Figures 8 A and 8B for additional strength. Figure 9 illustrates the bevel 90 at the end of the multi-part carrier beam and support flange 150 extending from the lower flange 160 to the upper flange 170, said support flange 150 being proximate to the bevel 90.
Whether the carrier beams are of the single piece type as shown in Figure 1, or the multi- piece types of Figures 4, 5, 6, 7, 8, 9 or 11 in one embodiment, the house 20 and carrier beams 50 are unloaded from the transporter 5 in close proximity to the foundation 40 and thereafter supported by skate beams 30 while the house and carrier beams are being positioned above the foundation 40. In one embodiment, when the house is properly positioned above the foundation, as shown in Figure 6, jacks 100 installed within the basement of the house 20 may be used to raise the carrier beams and house 20 allowing the skate beams 30 to be removed, whereupon the house and carrier beams can be lowered.
Figure 6 shows a two-part carrier beam 50 supporting a portion of a house 20 in a position directly above the foundation 40 and suitably aligned so as to allow the house to be lowered onto the foundation 40. Figure 6 shows a two part carrier beam 50 the ears 70 loaded with exterior walls 80 and 82 of a house 20. The house 20 may additionally be reinforced and supported by a chamiel 110 fixedly engaged to the ears 70, the channel abutting the exterior surface of the rim joist of the house for additional support. As shown in Figure 6, hydraulic or other suitable jacks 100 are positioned on the basement floor and suitably arranged to engage with and to support in order to lift or lower the two part carrier beam 50 and the house 20.
Figure 7 shows, in one embodiment, the house 20 in the lowered position, having been suitably lowered from the raised position illustrated in Figure 6, by means of hydraulic or other suitable jacks 100, until the house rests securely on the sill plate 120 (the sill plates having been suitably notched to accommodate and receive the ears 70).
Figure 10 illustrates the preferred embodiment of a multi-part carrier beam with said beam in the lowered position, a cut in the sill plate 120 being marginally greater than the width of the upper flange 170 of the carrier beam 60 and a cut in the foundation 40 being marginally greater than the width of the vertical webbing 180 of said carrier beam 60.
As illustrated in Figure 10 and Figure 11, the lower flange 160 of the multi-part carrier beam 60 does not interfere with the foundation 40 when the carrier beam 60 is in the lowered position. As illustrated in Figure 11 , the house 20 has been installed upon the foundation 80, the rim joist 75 and floor joist 190 and resting upon the sill plate 120, the rim joist 75 and floor joist 190 supporting the floor material 200, and the exterior walls 210 (supported by the floor material 200) being ready for the application of exterior finishing, such as brick (which will rest on the brick ledge 220), siding or other suitable material, it being understood that the builder may alternatively apply the exterior finish in the factory, except where to do so would make the house prohibitively heavy or difficult to transport or manipulate.
In the case of the multi-part carrier beams, once the house is securely positioned on the foundation, the components of the multi-part carrier beam may then be disassembled one from the other at the face plates and removed in components from the basement, by the window 130, as shown in Figure 2, or in any other suitable manner. In the case of the single piece carrier beam, it may be removed through the sufficiently sized cut or notch 120, as shown in figure 2, in the foundation wall. The removed carrier beams may then be reused as needed.
It is understood that the number of carrier beams used for a particular house will depend on several factors, including, the loading bearing limits of the carrier beams, the loading and structural characteristics of the house, the size and shape of the house, and whether the underside of the house presents a flat or a multilayered surface.
The present invention has been described herein with regard to preferred embodiments. However, it will be obvious to persons skilled in the art that a number of variations and modifications can be made without departing from the scope of the invention as described herein.
INDUSTRIAL APPLICABILITY The invention provides a device and system for distributing the support provided to a home, and more particularly to carrier beams for use in the support and movement of houses, the device permitting increased flexibility in house floor plans and to provide support for the house in those regions of the house which are remote from the perimeter wall. The present invention also provides a more uniform support for the load of the house, permits shorter joists to be used in the manufacturing of the house, and provides for a simplified and reusable means of supporting houses when they are being moved and installed.

Claims

THE EMBODIMENTS OF THE INVENTION IN WHICH AN EXCLUSIVE PROPERTY OR PRIVILEGE IS CLAIMED ARE DEFINED AS FOLLOWS:
1. A device for distributing the support provided a to house comprising:
a. a means for supporting the house;
b. a beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house.
2. A device for distributing the support provided to a house comprising:
a means for supporting the house; and
at least one beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with the at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house, characterized in that the at least one beam is aligned substantially peφendicular to the at least two joists of the house.
3. The device of claim 1, characterized in that the beam is aligned substantially peφendicular to the at least two joists of the house.
4. The device of any one of claims 1 to 3, characterized in that the device is temporarily attached to an underside of the at least two joists of the house.
5. The device of any one of claims 1 to 4, characterized in that the at least one beam extends beyond an external wall of the house.
6. The device of any one of claims 1 to 5, characterized in that the at least one beam is comprised of two or more components.
7. The device of claim 6, characterized in that the two or more components comprising the at least one beam are temporarily secured together.
8. The device of claim 6 or 7, characterized in that face plates are attached to opposed ends of the at least one beam, the face plates having apertures defined therein.
9. The device of claim 8, characterized in that the two or more components comprising the at least one beam can be connected together by aligning the apertures in the face plates and inserting securing means therethrough.
10. The device of claim 9, characterized in that the securing means used to connect the two or more components together are bolts.
11. The device of any one of claims 8 to 10, characterized in that the face plates are welded to the opposed ends of the at least one beam.
12. The device of any one of claims 9 to 11, characterized in that a length of the at least one beam extends to a distance within an inside surface of each of the opposed ends of a house foundation where the at least one beam will be positioned when the house is lowered onto the house foundation.
13. The device of any one of claims 6 to 12, characterized in that the two or more components comprising the at least one beam are detachable, whereby disassembly of the at least one beam is possible after the house is lowered and placed onto a house foundation.
14. The device of any one of claims 1 to 6, characterized in that inverted "L" shaped brackets are affixed to each opposed end of the at least one beam, the inverted "L" shaped brackets thus extending a lifting length of the at least one beam.
15. The device of claim 14, characterized in that the inverted "L" shaped brackets are welded to each of the opposed ends of the at least one beam.
16. The device of claim 14, characterized in that the inverted "L" shaped brackets are bolted to each of the opposed ends of the at least one beam.
17. The device of any one of claims 14 to 16, characterized in that the inverted "L" shaped brackets are made of steel, and have a thickness of from 3/4" to 1 Vι
18. The device of any one of claims 14 to 17, characterized in that an upper horizontal surface of the inverted "L" shaped brackets measures from 12 inches long by 12 inches wide.
19. The device of any one of claims 14 to 18, characterized in that, when the house is lowered for placement on a house foundation, a lower surface of each of the inverted "L" shaped brackets affixed on the opposed ends of the at least one beam will contact and engage an upper surface of the house foundation, whereby the inverted "L" shaped brackets will rest on the upper surface of the house foundation.
20. The device of claim 19, characterized in that, prior to the house being lowered for placement on the house foundation, the upper surface of the house foundation is notched, whereby, when the house is lowered for placement on the house foundation, the notch in the upper surface is greater than a width of an upper portion of the carrier beam.
21. The device of any one of claims 14 to 20, characterized in that an upper surface of each of the inverted "L" shaped brackets of the at least one beam receives and supports a rim joist of each opposed side of the house which is placed on the at least one beam.
22. The device of claim 21, characterized in that a channel is temporarily engaged to the upper surface of each of the inverted "L" shaped brackets, whereby the channel affixed on the upper surfaces of each of the inverted "L"shaped brackets will abut an exterior surface of the rim joists of each opposed side of the house which is placed on the at least one beam.
23. A device for distributing the support provided to a house comprising:
a means for supporting the house;
at least one beam for spanning at least two joists of the house, the said beam having a first contact surface adapted to be in contact with the at least two joists of the house and the said beam having a second contact surface in engagement with the means for supporting the house, the at least one beam being aligned substantially peφendicular to the at least two joists of the house, characterized in that inverted "L" shaped brackets are affixed to each opposed end of the at least one beam, the inverted "L" shaped brackets thus extending a lifting length of the at least one beam characterized in that, when the house is lowered for placement on a house foundation, a lower surface of each of the inverted "L" shaped brackets affixed on the opposed ends of the at least one beam will contact and engage an upper surface of the house foundation, whereby the inverted "L" shaped brackets will rest on the upper surface of the house foundation, and characterized in that an upper surface of each of the inverted "L" shaped brackets of the at least one beam receives and supports a rim joist of each opposed side of the house which is placed on the at least one beam.
24. A system for supporting a house on skate beams for placement on a house foundation comprising:
providing at least two carrier beams for spanning at least two joists of the house, the said at least two carrier beams having a first contact surface adapted to be in contact with the at least two joists of the house and the said at least two carrier beams having a second contact surface in engagement with and supported by the skate beam;
notching at least two carrier beam notches in the house foundation to receive the at least 2 carrier beams; and
lowering the house onto the house the house foundation, whereby the at least two carrier beams are received in the at least two carrier beam receiving notches when the house is lowered onto the house foundation.
25. The system of claim 24, characterized in that the at least two carrier beams are positioned in spaced relation to each other so as to support the house placed thereon, the at least two carrier beams being placed in a substantially parallel relationship.
26. The system of claim 24 or 25, characterized in that the at least two carrier beams each have a substantially horizontal upper surface for engaging an underside of the at least two joists of the house, and a substantially horizontal lower surface upon which the at least two carrier beams may be supported or engaged by the skate beam.
27. A system for supporting a house on skate beams for placement on a house foundation comprising: providing at least two carrier beams for spanning at least two joists of the house, the said at least two carrier beams having a first contact surface adapted to be in contact with the at least two joists of the house and the said at least two carrier beams having a second contact surface in engagement with and supported by the skate beam;
notching at least two carrier beam notches in the house foundation to receive the at least 2 carrier beams;
affixing inverted "L" shaped brackets to each opposed end of each of the at least two carrier beams, the inverted "L" shaped brackets of each of the at least two carrier beams each receiving and supporting a rim joist of each opposed side of the house which is placed on the at least two carrier beams; and
lowering the house onto the house foundation, whereby the at least two carrier beams are received in the at least two carrier beam receiving notches when the house is lowered onto the foundation, and characterized in that a lower surface of each of the inverted "L" shaped brackets affixed on the opposed ends of the at least two carrier beams will contact and engage an upper surface of the house foundation, whereby the inverted "L" shaped brackets will rest on the upper surface of the house foundation.
28. A system for supporting a house on skate beams for placement on a house foundation comprising:
providing at least two carrier beams for spanning at least two joists of the house, the said at least two carrier beams having a first contact surface adapted to be in contact with the at least two joists of the house and the said at least two carrier beams having a second contact surface in engagement with and supported by the skate beam, and characterized in that each of the at least two carrier beams are comprised of two or more components which are secured together temporarily; notching at least two carrier beam notches in the house foundation to receive the at least 2 carrier beams;
affixing inverted "L" shaped brackets to each opposed end of each of the at least two carrier beams, the inverted "L" shaped brackets affixed to the at least two carrier beams each receiving and supporting a rim joist of each opposed side of the house which is placed on the at least two carrier beams;
lowering the house onto the house foundation, whereby the at least two carrier beams are received in the at least two carrier beam receiving notches when the house is lowered onto the foundation, and characterized in that a lower surface of each of the inverted "L" shaped brackets affixed on the opposed ends of the at least two carrier beams will contact and engage an upper surface of the house foundation, whereby the inverted "L" shaped brackets will rest on the upper surface of the house foundation; and
disassembling the two or more components which comprise each of the at least two carrier beams when the house has been placed on the house foundation, whereby the at least two carrier beams can be removed from contact with the at least two joists of the house.
29. The system of any one of claims 24 to 28, characterized in that at least 4 carrier beam notches are notched in the house foundation to receive the at least 2 carrier beams when the house is lowered onto the house foundation.
PCT/CA2004/000089 2003-01-23 2004-01-22 Carrier beam system for houses WO2004065697A1 (en)

Applications Claiming Priority (10)

Application Number Priority Date Filing Date Title
CA2,416,999 2003-01-23
CA002417039A CA2417039A1 (en) 2003-01-23 2003-01-23 Carrier beams for manufactured houses
CA002416999A CA2416999A1 (en) 2003-01-23 2003-01-23 Transporter for manufactured house
CA2,417,039 2003-01-23
CA002421475A CA2421475A1 (en) 2003-01-23 2003-03-11 Manufactured house lifting and lowering device
CA2,421,475 2003-03-11
CA002428174A CA2428174A1 (en) 2003-01-23 2003-05-07 Transport and alignment device and process for manufactured houses
CA2,428,174 2003-05-07
CA2,436,767 2003-08-08
CA002436767A CA2436767A1 (en) 2003-01-23 2003-08-08 Carrier beam system for manufactured houses

Publications (1)

Publication Number Publication Date
WO2004065697A1 true WO2004065697A1 (en) 2004-08-05

Family

ID=32719528

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CA2004/000089 WO2004065697A1 (en) 2003-01-23 2004-01-22 Carrier beam system for houses

Country Status (2)

Country Link
CA (1) CA2436767A1 (en)
WO (1) WO2004065697A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372272A (en) * 2018-11-30 2019-02-22 上海宝冶集团有限公司 The control method of load transverse distribution when more file modular cart translation members
EE01571U1 (en) * 2019-04-09 2022-07-15 Telise OÜ A lifting system for a building with a concrete foundation reinforced by ribs

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7452173B2 (en) 2006-05-09 2008-11-18 Custom Quality Homes, L.L.C. Building transport device
GB2531243A (en) * 2014-09-24 2016-04-20 Timothy Paul Holt Base for a building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2068817A1 (en) * 1969-12-17 1971-09-03 Bau Montagekombinat
WO1996000332A2 (en) * 1994-06-23 1996-01-04 Bernard Douet Beam interconnecting arrangement for buildings
DE29721204U1 (en) * 1997-11-29 1998-05-07 Rudolstädter Stahlbau GmbH, 07407 Rudolstadt Heat-insulating component for section steel
US6094873A (en) * 1997-11-24 2000-08-01 Hoffman; Keith M. Foundation for manufactured homes

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2068817A1 (en) * 1969-12-17 1971-09-03 Bau Montagekombinat
WO1996000332A2 (en) * 1994-06-23 1996-01-04 Bernard Douet Beam interconnecting arrangement for buildings
US6094873A (en) * 1997-11-24 2000-08-01 Hoffman; Keith M. Foundation for manufactured homes
DE29721204U1 (en) * 1997-11-29 1998-05-07 Rudolstädter Stahlbau GmbH, 07407 Rudolstadt Heat-insulating component for section steel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372272A (en) * 2018-11-30 2019-02-22 上海宝冶集团有限公司 The control method of load transverse distribution when more file modular cart translation members
CN109372272B (en) * 2018-11-30 2021-10-01 上海宝冶集团有限公司 Control method for transverse load distribution during translation of component by multi-column module vehicle
EE01571U1 (en) * 2019-04-09 2022-07-15 Telise OÜ A lifting system for a building with a concrete foundation reinforced by ribs

Also Published As

Publication number Publication date
CA2436767A1 (en) 2004-07-23

Similar Documents

Publication Publication Date Title
US10745906B1 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
JP2019526004A (en) Precast concrete formwork, floor system, and construction method
KR20110032203A (en) Slab panel and system for constructing the panel and method for assembling and disassembling the panel
US8978343B1 (en) Method and system for transporting a cast panel
US10641247B2 (en) Pre-assembly slab system for concrete wind turbine towers and method for assembling a pre-assembly slab system for concrete wind turbine towers
WO2004065697A1 (en) Carrier beam system for houses
US20040160086A1 (en) Carrier beams for houses
KR100599059B1 (en) table form estabishment apparatus for building and estabishment method thereof
KR101726068B1 (en) Precast panel structure and construction method thereof
FI109414B (en) Initialize roller rotation for printing machine and method for mounting roller rotary printing machine on such substrate
EP4093926B1 (en) Load transferring connecting element
JPS6317791A (en) Lifting conveying method of panel
JP2931761B2 (en) Fixing device for outer wall material and laminating method for middle and high-rise buildings using the fixing device
WO2004065726A1 (en) Device and method for the removal of skate beams during the installation of a building
US20220220693A1 (en) Modular access cover
CN220201147U (en) Hanging bracket is transported to assembled component
CA2455061A1 (en) Device and method for the removal of skate beams during the installation of a building
CN213953099U (en) Temporary support structure of steel structure
KR200337465Y1 (en) Table form estabishment apparatus for building
CN112796451B (en) Combined construction method of special-shaped steel beam structure and PC (polycarbonate) composite slab
CN214453418U (en) Adjustable floor transportation frame
CN114319092B (en) Connecting device, bridge and installation method of connecting device
US4272465A (en) Method for multi-storied concrete construction and apparatus therefor
KR102242175B1 (en) Mold for prefabricated double wall precast concrete
JPH0642184A (en) Construction of skeleton using half precast floor board

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase